04-7071 (OFC) Geotechnical InvestigationSladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
August 24, 2006 Project No. 544-4626
06-08-834
Orr Builders
39-301 Badger
Palm Desert, California 92211
Attn: Mr. Scott Werry
Project: 79-180, 79-200 & 79-220 Corporate Centre Way
J Paul Corporate Centre
La Quinta, California
Reference: Geotechnical Investigation prepared by Sladden Engineering dated October 6, 2004,
Project No. 544-9170, Report No. 99-10-167.
This memo has been prepared to provide formal confirmation of our recent discussion regarding
structural values. The structural values included .within the above referenced report remain
applicable for carport foundation design. The structural values are summarized below.
Footings should extend at least 12 inches beneath lowest adjacent grade for single story structures.
Isolated square or rectangular footings at least 2 -feet square may be designed using an allowable
bearing value of 2000 pounds per square foot. Continuous footings at least 12 inches wide may be
designed using an allowable bearing value of 1800 pounds per square foot. Allowable increases of
200 psf for each additional 1 -foot of width and 200 psf for each additional 6 -inches of depth may be
utilized for larger footings. The maximum allowable bearing pressure should be 3000 psf. The
allowable bearing pressures are for dead and frequently applied live loads and may be increased by
1/3 to resist wind, seismic or other transient loading.
Resistance to lateral loads may be provided by a combination of friction acting at the base of the
slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of
friction of 0.45 between soil and concrete may be used for dead load forces only. A passive earth
pressure of 275 pounds per square foot, per foot of depth, may be used along the sides of footings,
which are poured against properly compacted native or'approved import soils.
We appreciate the opportunity to provide. service to you on this project, if you have any questions
regarding this letter or the referenced report please contact the undersigned.
Respectfully submitted,
SLADDEN ENGINEERING "
Brett L. Anderso
Principal Engineer I
Copies: 4/Orr Builders
%. AN
No. J9/30106
Exp
ON cfvtl�
�TFOF CAO
CITY OF
BUILDING & SAFETY DEPT
APPROVED Pr.
FOR CO1veTo1
4, -rgw
M e_'Ic� 4owl
07/1 /2006 16:25 7603605591 ORR BUILDERS PAGE 02/46
• f� � .� •,nA „ �, r ems+ fir`
MAY } 0 2i
(V.Sladden Engineering
6782 Stanton Ave„ Suite A, Buena Pdrk, CA (714) 523-0952 Fax (714
39-725 Garand Ln-, Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3595
October_06,_2004
EProjejetlNo. 544-4626
04-10-712
Santamaria Design Associates
75-153 Merle Drive, Suite B
Palm Desert, California 92211
Attn: Mr. 'Pony Ariza
Project: 79-440 Corporate 'Way
Parcels 3., 4, and 5 = La Quinta Corporate Centre
La Quinta, California' _ �J
Subje� Geotechnical Update
Reference: Geotechnical Investigation prepared by Sladden Engineering dated October 6, 2004,
Project No. 544.9170, Report No. 99-10-167.
As requested, we have reviewed the referenced Geotechnical Investigation report as it relates to the
design and construction of the proposed new office complex. In addition, we' have visited the project
site to observe the present conditions. The subject lots are located within the La Quints Corporate
Center in the City of La Quinta, .California.
The referenced Geotechnical Investigation report includes recommendations for site grading and the
design and construction of development commercial structure foundations. Based upon our review of
the referenced report and our recent site, observations, it is our opinion that the recommendations
included in the referenced Geotechnical Investigation remain applicable.
Footings should extend at least 12 inches beneath lowest adjacent grade for single story structures.
Isolated square or rectangular footings at least 2 -feet square may be designed using an allowable
bearing value of 2000 pounds per square foot. Continuous footings at least 12 inches wide may be
designed using an allowable bearing value of�180.O0 ands per square foot. ,Allowable increases of
200 psf for each additional 1 -foot of width an 2d 00 psf for each additional -6 -inches -of depth may be
utilized for larger footings. The maximum allowable bearing pressure should be 3000 pef The
allowable bearing pressures are for dead and frequently applied live loads and may be increased by
1/8 to resist wind, seismic or other transient loading.
The recommendations made in the preceding paragraph are based on the assumption that all
footings will be supported by properly compacted soils. Prior to the placement of the reinforcing steel
and concrete, we recommend that the footing excavation be inspected in order to verify that they
-extend into the firm compacted soils and are free of loose and disturbed materials.
InI
JUL 11 2006 D
�j
. 07.11/2006 16:25 7603605591 ORR BUILDERS PAGE 03/46
October 06, 2004 -2- 'Project No. 544.4626
04-10-712
Settlements may result from the anticipated foundation loads. These estimated ultimate settlements
are calculated to be a maximum of 1 inch when using the recommended bearing values. As a
practical matter, differential settlements between footings can be assumed as one-half of the total
settlement. These elastic settlements are expected to occur during construction.
Resistance to lateral loads may be provided by a combination of friction acting at the base of the
slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of
friction of 0,95 between soil and concrete may be used- for dead load forces only. A passive earth
pressure of 250 pounds per. square foot, per foot of depth, may be used along the sides of footings,
which are poured against properly compacted native or approved import soils. Passive earth
pressure should be ignored within the upper 1 foot except where confined (such as beneath a floor
slab)- '
'Retaining walls may be required to accomplish the proposed construction. Cantilever retaining ovally
may be designed using "active" pressures. Active pressures may be estimated using an equivalent
fluid weight of 35 pcf for native backfill. soils with level free -draining backfill conditions. For walls
that are restrained, "at zest" pressures should be utilized in design_ At rest pressures may be
estimated using an equivalent fluid weight of 55 pcf. Walls should be provided with adequate
drainage.
The remedial grading recommendations included in the referenced report remain applicable. The
remedial grading should include recomp'action of the foundation bearing soils within the proposed
building areas.
The building pad areas should be cleared of any surface vegetation and root systems prior to grading.
Building areas should be overexcavated to a depth of at least 3 feet .below existing grade or 3 feet
below the bottom of the footings, whichever is deeper. The exposed surface should be compacted to a
minimum of 90 percent relative compaction. The previously removed soils and any fill material may
then be placed 'in oisture content and -compacted to at least 90 percent
relative compaction. Compaction should be verified by testing.
It should be noted that the site is located within a seismically active area of Southern California and
it is likely that the proposed structures will experience strong ground shaming as a result of an
earthquake event along one of the faults in the region during the expected life of the development.
As a minimum, structures should -be designed based upon Seismic Zone 4 design criteria included in
the Uniform Building Code (MC)..The potential for liquefaction or other geologic/seismic hazards
occurring at the site is considered to be negligible...
We appreciate the opportunity to provide service to you on this project, if you have any questions
regarding this letter or the referenced report please contact the undersigned.
Respectfully submitted,
SLAIOD�N ,ENGIIVL�'JERIN'G _�,-��ss'- ,��
w� ne
O,
Brett L. And rson r
Principal Engineer'
SERJ h
Copies: .4/Santamaria Design Associates
Sladden Engineering
07.111/2006 16:25
October 06, 2004
7603605591
-J-
ORR BUILDERS
1997 U1411FOR,M BUILDING CODE INFORMATION
PAGE 04/46
Project No. 544-4
04 -10 -
The International Conference of Building Officials 1997 Uniform Building Code contains substar
revisions and additions to the earthquake engineering section in Chapter 16. Concepts contain
th'e code that will be relevant to construction of the proposed structures are summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based u
proximity to significant faults capable of generating large earthquakes. Major fault zones considi
to be most likely to create strong ground shaking at the site are listed below.
U
Approximate Distance Fault Type
Fault Zone From Site 1997 UBC
San Andreas 8.5 km A
San Jacinto 32 km A
Based on our field .observations and understanding of local geologic conditions, the soil profile pe
judged applicable to this site is SD, generally described as stiff or dense soil: The site is loc ted
within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant
to seismic mitigation for now construction upon adoption of the 1997 code.
Near -Source Near -Source Seismic Seismic
Seismic Acceleration Velocity Coefficient Coefficient
Source Factor, No Factor, N� C. C�
San Andreas 1.1 1.3 0.44 Nn 0.64 N,,
San Jacinto 1.0 1.0 0.44 IN 0.64 Ny
Siadd'en
E 2, 2006
,f OPECIAL INSPECTION PROGRAM
ADDRESS OR LEGAL DESCRIPTION: O o(slep
PLAN CHECK NUMBER: OWNER'S NAME: �oT�,t _
I, as the owner, or agent of the owner (contractors may not employ the special inspector), certify
that 1, or the archltecUengineer of record, will be responsible for employing the special
Inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction
project located at the site listed above. UBC Section 105.3.5.
Signed
1, as the englneer/architect of record, certify that 1 have prepared the following special inspection
program as required by UBC Section 106.3.5 for the construction project located at the site listed
above.
a w.
Signed
1. List of work ulring special inspection:
❑ Soils Compliance Prior to Foundation Inspection Field Welding
❑ Structural Concrete Over 2500 PSI High Strength Bolting
❑ Prestressed Concrete ExpansionlEpoxy Anchors
❑ Structural Masonry ❑ Sprayed -On Fireproofing
❑ Designer Specified ❑ Other
2. Names) of individual(s) or firm(s) responsible for the special inspections listed above:
A.
8.
C.
3. Duties of the special Inspectors for the work listed above:
A.
e.
C.
80e01al Inspectors shall cheek in with the City and present their credentials
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CO � TRUC�TJON
DATE/ -
BY % l�—
t- SI Z6,
ft 6 t
67/11'/2006 16:25 7603605591 ORR BUILDERS PAGE 05/46
}, 0%; — f
_ ECE"ED
MAY 2 0 2005
Slbdden. Engineering OR6
PgRS
6752 Stanton Ave.. Suite E, Buena Park, CA 90621 (562.) 864-4121 (714) $23-0952 Fax (71 �2�
39-725 Garand Ln., Suite G. Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
October L3, 1099 Project No. 544-917
99-10-16
Troll Woodpark Development
2323 N. Tustin Avenue, Suite F
Santa Ana, California 92705
ention: Mr. Scott Gayner
Project: La Quinta Corporate enter
La Quinta, California
Subject: Geotechnica nvestigation
Presented herewith is the report of our Geotechnical Investigation conducted at the site of the proposed a
Quinta Corporate Center project to be located in'tite City of La Quinta, California. The investigation was
performed in order to provide recommendations for site preparation and to assist in foundation design for
the proposed .mixed-use commercial project that includes two sites located along the north side of
Highway 111. The two properties iticlude an approximately 30 acre parcel located along the east side of
Adams Street and an approximately 12 acre site along the west side of Dune Palms Road. Both prope 'es
are located along the south edge of the Whitewater River channel.
This report presents the results of our Feld investigation and laboratory testing along with conclusions
and recommendations for foundation design and site preparation. This report completes our origin. al
scope of services as described in our proposal dated September 22', 1999.. ,
We appreciate the opportunity to provide service to you on this project.
regarding this report, please contact the undersigned
Respectfully submitted,
SLANDEN ENGME( RING
Brett L. Anderson
Principal Engineer
SER/pc
Copies: 6/Troll Woodpark Development
If you have any questions
07/11/2006 16'25 7G0360559I
_ O�R BUILDERS
~ ___ PAGE 06/46
_
^ -
/ � |
l |
. . .
GC-OTECHN]C�L[NV28TlGAT�N
LADD/N7A ' CORPORATE CENTER
I LA QUINTA, CALIFORNIA
October 13, 1999
TABLBOFCONTENTS
INTRODUCTION ............................. ........ ............... ._-....--..................
................... l
SCOPE C)PWORK .................................................................. ............... —....................
...—' >
PROJECTDESCRIPTION ................................... .............................................. ...................... \
SUBSURFACE- CONDITIONS ........................ .................... .... .......................... .................. 2
CONCLUSIONS ANDRECOMMENDATION'S —'--.--.--......... .�.................. ---2
FoundationDesign ............................................................. ......... ..—............. ................. 3
Settlements............................................................. ,......................... ...................... .......... 3
�
Lateral Design ....... '—...........................................................
....—�—....—....---..., 3
RetainingWalls .......................................................................... ................... .............. ... 4
Expansive Soils ................ .~......... .................................. ................... ........................
`^.. 4
Concrete 0a6s-mn'Gradu.................................................................................. —............. .-4
Soluble Sulfates ...................... ...... ,....r—^...'—^...---_..—^^—'--^^.---~^.. 4
Tentative Puveoneut-[)wxicyo......................... I-----.—.'---.------.-----. 4
Shrinkageand Subsidence ............................................................................................ —.-5
GeneralSite Grading ................................................................. ---........ ............... .......... 5
l.Clearing and Grubbhno,........ ... ............................... ... ........ .... ......................... ........ 5
2' Preparation of Building Areas ...................................... ............................................... 5
3, PreparationofSurfac000lReowiveConupuctedFD]--.--------------- 5
4, Placement ofCompacted --......—....---,.------~'^.---^^.. 5
5. Prepairation wfSlab and Pavement Areas ........................................................ 6
� 6.Testing and on—..... --....-1—...--..---...--....—''....--. 6
{}ENEBJ\L................. ............................................................................ ..—.....--............ 6
APPENDIX A- Site Plan and BoringField Exploration
APPENDIX B- Laboratory Ten o(T
Laboratory Test Result�
APPENDIX C- }Vy7UBC Scismic D�sjgnCdteriu
I
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 07/46
October 13, 1999
IN'TRODUCTI[ON
Project No. 544-91 I 0
99-10-)67
This report presents the results of our Geotechnical Investigation performed ill order to provide
recornmendatioils for the desi,n and construction of the foundations for the buildings within the propo ec
mixed use commercial development. The two properties are located along the north side of Highway 11 i
just east of Adams Street and along just west of Dune Palms Road in the City of La Quinta, California
Both properties are located along the south edge of the Whitewater Rivdr channel. The associated site
improvements will include paved roadways and parking lots, underground utilities, and landscape areas
SCOPE OF WORK
The purpose of our investigation was to determine certain engineering characteristics of the near surfAce
soils on the site in order to develop recommendations for foundation design and site preparation. Our
investigation included field exploration, laboratory testing, engineering analysis and the preparation of
this report. Evaluation of environmental. issues or hazardous materials was not within the scope of
services provided... Our investigation was performed in accordance with contemporary geotechnical
engineering principles and practice. We make no other warranty, either express of -implied.
PROTECT DESCRIPTION
The proposed project includes two properties located on the north side of Highway i 1 I just ea
Adams Street and just west of Dune'Palms Road in the City of La Quinta, California. The site loc
along Dune Palms occupies approximately. 12 acres and the site that borders Adams Street oeet
approximately 30 acres. The preliminary site plan indicates that the project will include numerous pa
for mixed use commercial development. it is our assumption that the proposed commercial buildings
be of relatively lightweight wood -frame, steel -frame, reinforced masonry, or concrete tilt -up construe
The associated site improvements will include paved roadways and parking areas, landscape areas
various underground utilities.
The majority of the project sites are presently vacant and the ground surface is covered with scatt(
desert brush, weeds, and minor debris. The Whitewater Channel alignment forms the north edge of
sites and Highway l i 1 forms the south edge of.the sites. There 'is an approximately 14 acre
separating the two parcels that is not presently a part of the proposed development. There is a si
commercial building near the southeast corner of the site. The majority of the project sites remain
basically native desert condition. The sites are relatively level except for the sand dunes that occupy
southern portions of the sites, Some grading related to the construction of the Whitewater River.Chat
is evident within the northern pot -tions of the sites. The grading appears to be limited to the construe
of the channel embankment and leveling of.the adjacent portions of the properties. There are exis
overhead power lines and underground utilities.
of
es
D.
ite
all
nel
Based upon our previous experience with similar lightweight commercial structures, we expect Ithat
isolated column loads will be less than 100 kips and wall loading will be less than 6.0 taps per linear foot.
Grading is expected to include: ctits'and fills to corTsti-uct level building pads and to accommodate site
drainage. This does nor include removal and reeompaction.of the foundation bearing soils within the
building areas. If the anticipated foundation loading or site grading varies substantially from that
assumed, the recommendations included in this report should be reevaluated.
5loddan
07/,11/2006 16:25 7603605591 ORR BUILDERS PAGE 08/46
October 13, 1999 -2- Project No. 5 44-9 117 0
99-10-167
SUBSURFACECONDITIONS
The site is underlain primarily by fine-grained windblown sands; silty -sands and sandy silts. Artificial fill
soils comprised of a mixture of the native sands and silts were encountered throughout the northern
portion of the, parcels alone the Whitevvater River channel, /artificial tills were generally limited to file
northern portions of the sites but fill depths in excess of 10 sect were encountered within our borapgs
along the Whitewater River channel, In general, the site soils appeared somewhat loose throughout Me
upper 3 to 4 feet but sampler penetration resistance (as indicted by bloweounts) indicates that the native
site soils are generally firmer with depth. The artificial fills appeared very loose in the area of our,
borings.
The site soils were found to be very inconsistent in density with undisturbed samples indicating dry
density varying,from 79 to 113 pcf. The site soils were found to be generally dry throughout the depth of
our borings. Moisture contents varying from 0.5 to 15.0 percent were: determined for the samplles
obtained within our borings. i
Laboratory classification, testing indicates that the near surface soils consist primarily of fine grafi Ined .
windblown sands, silty sands and sandy silts. Expansion testing indicates that the surface soils are non -
expansive and fall within the "very low" expansion category in accordance with .the Uniform Building
Code classification system. Consolidation testing indicates that the artificial fills and native soils .
underlying the sites may be susceptible to potentially damaging settlements due to hydroconsolida on
and compression. The artificial fills appear to be very loose and susceptible to large hydroconsolida 'on
settlements:
Groundwater was not encountered in our -borings and groundwater is expected to be in excess of 80 feet
below the existing ground surface. Groundwater should not be a factor in foundation design) or
construction,
CONCLUSIONS AND RECOMMENDATIONS
Based upon our field and laboratory investigation, it is our opinion that the ,proposed commercial
development is feasible from a soil mechanic's standpoint provided that the recommendations included in
this report are considered in building foundation design and site preparation. Due to the presence of
uncertified artificial fill soils and the generally loose condition of the near surface native soils, remedial
grading includingoverexcavation and recompaction is recommended for the proposed building areas. We
recommend that remedial gradin-, within the proposed building areas include overexcavation and
recompaction of artificial fill soils and the foundation bearing soils. Specific recommendations for site
preparation are presented in the site grading section of this report. The extent of artificial fill removaland
overexcavation should be eonsidereq..-in building location determination.
Groundwater was not encountered vA, hill our borings and groundwater is expected to be in'excess of 00
feet below the existing ground surfa>~.p, Due to the depth to groundwater, specific liquefaction anal ses
were not performed. Based upon the depth to groundwater, the potential for liquefaction and the related
surtieial affects of liquefaction impacting the site are considered negligible.
The site is located within an activii seismic area of Southern California within approximately 8.5
kilometers of the San Andreas fault, Strong ground motion resulting from earthquake activity along the
nearby San Andreas or San Jacinto fault systems is likely to impact the site during the anticipated lifetime
of the structures. Structures should -be designed by professionals familiar with the geologic and seismic
settirig of the site. As a minimum, structure design should conform to Uniform Building Code (CJIBC}
requirements for Seismic Zone 4. Pertinent seismic dasign criteria as outlined in the 1997 UBC, is
summarized in appendix C.
Slodden Englneering
07/11/2006 16:25
October 139 1999
7603605591
-3-
ORR BUILDERS
PAGE 09/46
nrojeci No. 5 44-91 10
99-10-167
Caving did occur within each of our exploratory borings and the surface soils will be susceptible
caving within deeper excavations. All excavations should be constructed in accordancc with the norm
CalOSHA excavation criteria. On the basis of our observations of the materials encountered,
anticipate that the subsoils will conform to those described by Ca1OSHA as Type C. Soil conditio
should be verified in the field by a "Competent person" employed.by the Contractor,
The surface soils encountered during our investigation were found to be non -expansive. b,aboratc
testing indicated an Expansion Index of 0, which corresponds with the "very low" category in aecordar
with UBC Standard 18-2. If imported soils are to -be used during grading, they should have an Expansi
Index of less than 20.
The following recommendations present more detailed design criteria, which have been developed on tJte
basis of our field and laboratory investigation.
)foundation Design: The results of our investigation indicate that either conventional shallow
continuous footings or isolated pad footings, which are supported upon properly recontpae�Ied
soils, may be expected to provide satisfactory support for the proposed structures. Recompactilon
should be performed as described in the Site Grading Section of this report.
1~ootings should extend at least 12 inches beneath. lowest .adjacent grade for single st'ry
structures. Isolated square or rectangular footings at least 2 -feet square may be designed usingyan
allowable bearing value of 2000 pounds per square foot. Continuous footings at least 12 incl) es
wide may be designed using an allowable bearing value of 1800 pounds per square foot_
Allowable increases of 200 psf for each additional 1 -foot of width aIR 200 psf for each additional
6 -inches of depth may be utilized for larger footings. The maximum allowable bearing pressure
[sl►o`uldAbe 30_00^psf.—Ther allowable bearing pressures are.for dead an.d frequently applied live
loads a.nd-may he increased by 1/3 to resist wind, seismic or other transient loading.
Because of the hydroconsolidation potential of the soils underlying the site, care should be taen
to see that bearing soils are not allowed to become saturated from the.pondino of rain wate or
irrigation. Drainage from the building areas should be rapid'and complete.
The recommendations made in the preceding paragraphs are based on the assumption that all
footings will be supported upon properly compacted engineered fill soils. All grading steal be
performed tinder the testing and inspection of the Soils Engineer or his representative: Prior to
the placement of concrete, we recommend that the footing excavations be inspected in order to
verify that they extend into compacted soil and are free of loose and disturbed materials.
Settlements: Settlements may result from the anticipated foundation loads. These estimdted
ultimate settlements are calculated to be a maximum of ' 1 -inch when using the reeomme ided
bearing values, As a practical matter. differential settlements between footings can be assume as
one-half of the total settlement.
Lateral Design. Resistance to lateral loads can be provided by 1'combination of friction acting
at the base of the slabs or foundations and passive earth pressure along the sides of the
foundations_ A coefficient of friction. of 0.45 between soil send concrete may be used with dead
load forces only. �A passive earth pressure of 275 pounds per square foot, per foot of depth, may
be used forthcsidzs offoofinns, �wliich are poure against properly compacted native soils.
Slodden
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 10/46
October 13, 1999 4- Project No, 544-91'70
99-10-167
Passive earth pressure should be ignored within the upper 1 -foot except Where confined (such as
beneath a floor slab). When used in combination, either the passive resistance or the coeffici nl
of friction should be reduced by one-third. I
Retaining Walls: Retaining walls may be required to accomplish the proposed construction.
Cantilever retaining walls may be designed using "active" pressures.' Active pressures n,ay Ibe
estimated using an equivalent fluid weight of 35 pef for native backfill soils with level free -
draining backfill conditions.
For walls that -are restrained, "at rest' pressures Should be utilized in design. At test pressures
maybe estimated using an equivalent fluid weight of 55 pcf for native backfill soils with level
free -draining backfill conditions. l
Expansive Soils: Due to the prominence of non -expansive soils on the site, special expansive
soil design criteria should not be necessary for the design of foundations and concrete slabs -on -
grade. Final design criteria should be established by the Structural Engineer.
Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain
by recompacted soils as described in the Site Grading Section of this report. Where slabs are to
receive moisture sensitive; floor coverings or where dampness of the floor slab is not desired, 1we
recommend the use of an appropriate vapor barrier. Vapor barriers should be protected by at_least
two inches of sand in order to reduce the possibility of damage and to aid in obtaining unifgrm
concrete curing.
Reinforcement of slabs -on -grade in order to resist expansive soil pressures may not be requ
however, reinforcement will have a beneficial effect. in containing cracking due to cone
shrinkage. Temperature and shrinkage related cracking should be anticipated in all cone
slabs -on -grade. Slab reinforcement and the spacing of control joints should be determined by
Structural Engineer_
Soluble Sulfates: The soluble sulfate concentrations of the surface soils were detennined td be
approximately 555 parts per million (ppm), Soluble sulfate concentration will likely change as a
result of the recommended site Grading. Soluble sulfate content should be determined after
grading and appropriate concrete mix designs should be selected in accordance with U13C Table
19-A-3. —
Tentative Pavement Design- All paving should be underlain by a minimum compacted till
thickness of 12 inches (excluding aggregate base). This may be pErfotmed as described in the
Site Grading Section of this report. Although R -Value testing was not conducted during our
investigation, based upon the surface soil conditionsencountered an R -Value in excess of 5�3 is
expected. On this basis, a niminium pavement section of 3.0 inches of asphaif on 4.0 inches of
base material should be applicable for the design of the majority of the onsite pavement but the
design of primary drive lanes and roadways should be established based upon anticipated triffic
conditions. The appropriate pavement sections for off site improvemcnts will be dependent Moon
traffic. indices determined by the City of La Quinta, California.
Aggregate base should conform to the requirements for Class 2-A0
gregate base in Section 26I of
CalTrans Standard Specifications, .lanuary 1992. Asphaltic concrete should conform to Section
39 of the CalTrans Standard Specifications. The recommended scctiotls should be provided with
a uniformly compacted subgrade and precise control of thickness and elevations dt no
placement.
Slodden Englneering
07/11/2006 16:25 7603605591. ORR BUILDERS PAGE 11/46
October 13, 1999 -5- Project No. 544-91
99-10-1
Pavement and slab designs arc tentative and should be confirmed at the completion of s
grading when the subgrade soils are in-place. This will include sampling and testing of the acts
subgrade soils and an analysis based upon the specific traffic information
Shrinkagc and Subsidence: Volumetric •shrinkage of the material, which is excavated
replaced as controlled -compacted fill should be anticipated. We estimate that this shrink,,
could vary from 15 to 25 percent.. Subsidence of the surfaces which are scarified and con-,pac
should be between 0.1 and 0.3 tenths of a foot. This Wili vary depending upon the type
equipment used, the moisture content of the soil at the time of grading and the actual degree
compaction attained.
These values for shrinkage and subsidence are exclusive of losses, which will occur due to
stripping of the organic material from the site, the removal of deleterious materials and
removal of debris, and other subsurface obstructions.
General Site (trading: All grading should be perforated in accordance with the grading
ordinance of the City of La Quinta, California. The .following recommendations have been
developed on the basis of our field and laboratory testing:
1. Clearing and Grubbing: Proper clearing of any existing vegetation and debris
be very important. All surfaces to receive compacted fill should be cleared of rbj
vegetation, debris, and other unsuitable materials which should be removed from the s
Soils that are disturbed due to. the removal of the surface vegetation, previa
improvements or artificial fill material should be replaced as controlled compacted
under the direction of the Soils Engineer.
2. Preparation of Building Areas: Within the building areas, removal and
recompaetion of all artificial fill soils and the primary foundation bearing soils is
recommended. As a minimum, removals within the building areas should extend t a
depth of at I -east 3 feet below existing grade or 3 feet below the bottom of the footin s,
whichever is deeper. Additional removals in excess of 10 feet in depth may be required
to accomplish adequate artificial fill removal within the buildings adjacent to the
Whitewater River channel. The exposed surface should be scarified, moisture
conditioned and compacted so that a minimum of 90% relative compaction is attained.
Once deleterious materials are; removed, the native soils and artificial fill materials may
be placed as controlled compacted fill. Overexcavation, should, be observed by a
representative of Sladden Engineerino and compaction should be verified by testing.
Overexcavation should extend at least 5 feet laterally beyond the footings.
3. Preparation of Surfaces to Receive Compacted Fill: . Other areas to rete e
compacted fill should be brought to near optimum moisture content and compacted t a
minimum of 90% relative compaction.
4. Placement of Compacted Till: Fill inaterials consisting of on-site soils or approved
imported granular soils, should be spread in thin lifts, and compacted at near optilljIL111
moisture content to a minimum of 90% relative compaction. Imported material shall
have an Expansion Index not exceeding 20. The contractor shall notify the S ifs
Engineer at least 4F hours in advance of importing soils in order to provide sufficient
C.time for the evaluation 0l'. -proposed import materials.
Sladde3n
07/11/2006 16:25
October 13, 1999
7603605591
-6-
ORR BUILDERS
PAGE 12/46
r—
Project No. 514-91
99-10-1
The contractor shall be responsible for delivering material to the site, which complies
with the project specifications. Approval by the Soils Engineer will be based upl n
material delivered to the site and not the preliminaryevaluation of import sources.
Our observations of the material' encountered during our investigation indicate that
compaction will be most readily obtained by means of heavy rubber -wheeled equipment
and/or vibratory compactors. At the time of our investigation, the subsoils were found Ito
be quite dry. A more uniform moisture content should be attained during recompaction
and fill. placement.
S. Preparation of Slab and Pavement Areas: All surfaces to receive asphalt concr6te
pavement or concrete slatis-on-grade, should be underlain by a minimum compacted pll
thickness of 12 inches. This may be accomplished by a combination of scarification and
recompaction of the surface soils and placement of the fill material as controlled
compacted fill. Compaction of the slab and pavement areas should be to a minimum Af
90 percent re tat ive,compaction.
6. 'Testing and Inspection: During grading tests and observations should be performed
by the Soils Engineer or his representative in order to verify that the grading is bei � q
performed in accordance with the project specifications. Field density testing shall �e
performed in accordance with acceptable ASTM test methods. The minimum accepta0e .
degree of compaction should be 90 percent of the maximum dry density as obtained by
the ASTM D1557-91 test method. Where testing indicates insufficient density,
additional compactive effort shall be applied until retesting indicates satisfactory
compaction.
GENERAL
The findings and recommendations presented in this report are based upon an interpolation of the soil
Conditions between the exploratory boring locations and extrapolation of these conditions throughout tie
proposed building area. Should .conditions encountered during grading appear different than those
indicated in this report, this office should be notified.
This report is considered to be applicable for use by Troll Woodpark Development, and its consultants f
the specific site and project described here -in. The use of this report by other parties or for other projec
is not authorized. The recommendations of this report are contingent upon monitoring of the gradin
operations by a representative of Sladden Engineering. All recommendations are considered to, 1
tentative pending our review of the grading operations and additional testing, if indicated. If others a
employed to perform any soil testing, this office should be notified prior to such testing in order
coordinate any required site visits by our representative and to assure indemnification of Sladd�
Engineering.
Our investigation was conducted prior Co the completion of plans for the project. We recommend that a
pre job conference be held on the site prior to the initiation of site grading. The purpose of this meeting
will be to assure a complete understanding of the recommendations presented in this report as they apply
to the actual grading performed.
Slodden Englrieering
07/11/2006 16:25 7603605591 ORR BUILDERS
I
i
APPENDIX.A
Site Plan
Borings sobs
Siodden
PAGE 13/46
07/11/2006 16:25
7603605591
ORR BUILDERS
APPENDLX A
FIELD EXPLORATION
PAGE 14146
h
For our field investigation, 15 exploratory borings were excavated on September 28, 1999, using a trufk
mounted hollow stein auger rig (Mobile B53) in the approxi nate, locations indicated on the site plan
included in this appendix. Continuous logs of the materials encountered were made on the site by a
representative of Sladden Engineering, Boring logs are included in this appendix.
Representative undisturbed samples were obtained within our borings by driving a thin-walled steel
penetration sampler (California split spoon sampler) or a Stand ird Penetration Test (SPT) sampler witli a
140 pound hammer dropping approximately 30 inches (ASTM 1586). The number of blows required to
drive the samplers 18 inches was recorded (generally in 6 inch increments) Bl.oweounts are indicated on
the boring logs.
The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters f
2.5 inches. The standard penetration samplers are 2.0 inches n diameter with an inner diameter of 1.5.
inches.. Undisturbed samples were removed from the sampler and placed in moisture sealed containers in
order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation
spoils and samples were then transported to our laboratory for further observations and testing. Sampls
were Then transported to our laboratory for further observations' rid testing,
Slodden Engirisering
07/11/2006 16:25 7603605591
J
ORR BUILDERS
AMS .STREET V)
PAGE 15/46
�E7 DUNE P M ROAD
F ��._ Boring Location -Map lI�
FLa Quints Corporate Center
Approximate Boring Locations La Quinta, California
Sladclen Ex)Lg neerrig
DATIZ - 10.1&99 JOB NO.: 544-9170
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 16/46
ILa Quinta Corporate Center ! ]La Quinta, California
Date: 9-28-99 Boring No.1 Job No.; 544L9170
DESCRIPTION
�'
✓,
A
o
-4
a
REMARKS
P4
0
-
Sandy Silt: Light brown
ML
-
23/32/50
89
2.2
74
6
13/15/20
Silty Sand: Grey brown,
SM
Sample fell. out
-
fine grained
---
---
•--
x0
13/26/37
Clayey Silt: Brown
84
3.6
15
12/14/22
Silty Sand: Grey brown,
SM
,-,
1.0
-•-
fine grained
20 _
15/20/24
r
1.0
25
18/18/29
89
0.5
84
30
17/30/34
Clayey Silt: Brown
ML
93
2.0
-•-
3 i
14/17/20
Silty Sand: Grey brown,
SM
93
1.0
88
-
r
fine grained
.
_
40
27/32/42
i
106
1.5
-
45
17120/27 i
Silty Sand: Brown,
SM
I07
4.2 '
fine to medium grained.
�0
18/30/45
Clayey Silt: Brown
PVIL
95
O:S
---
Total Depth = 51.5,
® Recovered Sample
Note: The stratification
linea
No Bedrock
�r
represent the approximate
No Groundwater
I
boundaries between
the Boil
typee;
.
the transitions may
be gradual.
07/11/2006 16:25 7603605591 ORR.BUILDERS PAGE 17/46
La Quin to Corporate Center / La Quinta, California
Date: 9-28-99 goring No. 2 Job No.: 5449170
,[
o
DESCRIP'T'I®N
q
REMARKS
121
Q '
rr>1
U
0
Sandy Silt; Light brown
ML
b/3/5
91
1.0
76
J
4/4/7
Silty Sand: Grey brown,
SM
---
2.0
__
Sample disturbed.
-
fine arained
10
Sample fell out
10/10/17
�� ��
��
��-
---
1G
.
'
15/18/30
Sandy Silt: Light brown
ML
92
1.0
77
20
Silty Sand: Brown,
SM
_
12/18/2
fine to medium grained
I13
0.5
?
-
Recovered Sample
Total bepth = 26.6' y
No Bedrock
='6
rVI
JL i Standard Penetration
No Gabundwater
Sample.
30
35
40
a5
r
i
50
'
r
Note: The stratification linea
represent the appreaamatc;
boundaries between the soil types;
i
the transitionsay be gradual.
m
SM
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 18/46
La. Q uinta Corpoxai:e Centel r / La Quinta, C-Aifornia
Aute: 9-28-99 Boring No. 3 Job No.: 544.9170
^o
a
DESCRIPTION
Q
0
RE M
7
z
��
i
Q
Pq.
to
0
_
12/12'/12
Silty Sand: Grey brown,
tine grained
SM
101
1:5
95
6
3/2/3
88
1.5
88
10
-
20
2 6
•
so
3/4/4
10/10/16
141.19/19
13/13/19
10/16/25
Sandy Silt; Light brown
I
ML
86
---
1,5
1.5
72
•••
1
Clayey Silt; Brown
l ..
L
ML
...T
...
3.6
3.1
---
--26
-
Silty Sand: Grey brown,
fine grained
SM
---
O.a
.•.
Total Depth = 31.5'
-
® Recovered Sample
No Bedrock
35
40
_
I
I
Men Standard Penetration
Sample
No Groundwater
t
45
-
I
i
Note: The stratification lines
55
represent the approximate
boundaries between the evil types;
the transitions may be gradual,
07/11/2006 16:25 7603605591 ORR BUILDERS
19/46
La Quanta Corporate Center I La Quinta, California
Date:. 9-28-99 Boring No. 4 Job Na.: 544-9I70`��
DESCRIPTION 0; q REMARKS
0
-
Sandy Silt: Light brown
hn-
_
Fill upper 5'
5
4/4/8
87
1.5
73
10
Silty Sand: Grcy brown,
SM
97
3:6
92
.
12/20/27
fine grained
15
9111113
Spy Silt: Light brown
ML
...
6.4
--
20
15/15/19
Clayey Silt: Brown
i
MX,
---
7.5
---
25
12/17/26
r
---
15.0
...
30
10/10/22
Silty Sand: Grey brown,
fine grained
SM
••-
2 5
-
Total Depth = 31.5'
Rceovereol Sample
No Bedrock
-
No Groundwater
35
®Standard Penetration
-
Sample
40
43
•
r
•
50
I
Note: The stratification lues
S represent the ate
55
boundaries between ho soil t
ey;
r
the transitions may bc- gradual.
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 20/46
I
La Q Minta Corporate Center 1 La Qu.inta, CaR ornia
Date: 9-28-99 ]Boring No. 5 Job No.- 544191701
o
DESCRIPTION
�
�
o
y 11
� �
REMARKS
q
U
o
0
_
Sandy Silt: Light brown
ML
1-
76
2.0
63
:10
Silty Sand; Grcy brown,
Sly
99
1.0
93
12/16/26
lino grained
1j
20/36/36
Silty Sand: Brown,
"JIM
79
7.0
-
fine to medium grained
20
27/34/42
82
9.3
1.0
Sandy Silt: Light brown
ML
96
1.0
S0.
25
23/27/34
80
28/60
Sand: Brown, fine grained
S1P
97
0.5
---
35
15/I8/23
Silry•Sand; Grey brown,
SISI
98
1.0
92
-
fine grained
40
15/28/42
Silty Sand; Brown,
SM
109
1.0
---
-
fent to medium -rained
aJ
-
88/'12/50
"
110
1.0
i
60
14/28/50
"
107
12.4
...
-
—
l Depth;:e 51.5'
tXteadrot1c
-
Racovered Sample
Note; The stratiiication lines
Standard Penetration
reprebent the approximate
boundaries between the soil types; i
No Groundwaterss
Sample
the transitions may be gradual.
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 21/46
La Quinta Corporate Center / La Quinta, California
Date: '9-26-99 Borixx- No. 6 Job No.: 54-9170
o
]DESCRIPTION
REMARKS
04-N
c
4z
S
a
1Z
'cn
0
Silty Sand: Grey brown,
SNi
•
fine grained
15/32/50
92
0.5
87
10
14/22/25II
If
95
1.0
90
Xs
20/35/40
It
87
0.5
82
20
_
15/23/26
Sandy Sill: Light brown
NAL
--
4.7
_-_
25
-
12/17/25
Clayey Sill: Brown
1bYL
---
5.8
--•
so30135/40
Silty Sand: Grey brown,
SNA
.
fine grained
n
0.5
.-
Recovered Sample
Total Depth - 31.5'
No Bedrock
-
35
� Standard Penetration
No Groundwater
Sample
40
45
50
Note; The stratification line
repr0S0Zkt the appr0XiX3�&te
boundaries between the soil t�es;
I
the tr=itioxw may be gradu
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 22/46
La Qu inta Corporate Center t La Quintap California
Date: 9-28.99 BoringNo..7 Job No., 544-9170
DESCRIPTION
Ea
q
o
REMARKS
0
o
Sand: Brown, Sine gained
Sp
f
s
9/15/28
II
I
•-•
0.9
,
io
I.I
.I
...
1.0
..16/24/30
Interbedded silt layers
15
0.9
I
-
Total Depth = 21.5'
•
® Disturbed Samplr
No Bedrock
No Groundwater
20
I
-
25.
y
so
_
I
I
I
�
i
R�
-
i
I
4o
4
i
50
\
-
Note: The stratifioat,4.on lino
-
represent the approximate
boundaries between the soil t"Q)S:
i
the transitions may be gradual.
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 23/46
_
Date:
0
-
ro
9-29-99
o
11/121X?
13/17/22
La, Quinta Corporate
DESCRIPTION
Sandy Sift: Light brown
i
III
Center
Poring
�
ra
MEL
'�
/ La
No. 8
y
A
J¢
87
Quinta,
a)
�
a
9.9
California
d 0
� �
e C 7
73
Job No.: 544-P170�
1
REMARKS
I
Silty Sand: Grey brown,
SM
89
1.0
84
"
fine grained
16
14/17/20
86
1.0
81
-
Total Depth = 21.5'
-
Recovered Sample
No Bedrock .
`
No Groundwater
20
26
80
_
35
I
I
40
�J
I
80
I
1
Note: The stratification linos
represent the approximate
5,5
boundaries between the soil
types;
the transitions may be gradual.,
07/11/2006
16:25
7603605591
ORR
BUILDERS
PAGE 24/46
La Quinta Corporate' Ce�oter / La Qluinta, California
--_----
Date: 9-29-99 ^---
--�
Borin- No.
9
Job No-: 5449170
-
-
y
I
DESCRIPTION
q
00
REMARKS
Pa
-
0
Silty Sand: Grey brown,
SM
fine grained ;
I
Interbedded silt layers upper 7'
5
8/10/14
92
5.3
$ 7
10
19/37/43
SM
104
0.5
Silty Sand: Brawn'
^
fine to medium grained
l.B20f30/44I
Silty Sand: Grey brown,
SM
102
0.5
I
--
Trace coarse grained sand
-
i
fine grained
20
j
17/28/34
t
i
94.
0.5
89
Total Depth = 26.5'
1
Recovered Sample
i
No Bedrock'
No Groundwater
2s
-
so
-
J
i
i
40
45
-
50
I
I
i
1
I
Note: The stratification lines
represent the approximate
55
I
en
types:
I I
I
ydual.
he transitionsma be mil.
07/11/2006 16:25 7603605591
ORR BUILDERS
La Quintaa-Corporate Center / La Qulinta, -California
PAGE 25/46
►ate:
9-29-99
Boring
No. 10
Job No.: 544-9170
r
Or
a
DESCRIPTION'
�
A
�
� �
REMARKS
09
0
Sandy Silt: Light brown
Iii
J S/12/26
- I '
10 12116/19 Sand: Brown, fine graiucd
Silty Sand: Brown,
r5 15/26/42 Fine to medium grained
® Recovered Sample
20
_ I
25
80
35
40
45
50
55
11 11 94 1 1.5 1 76
SP 11 97 1 0.7 1 ---
SM
0.b --- Sample disturbed
Total Depth = 21.6'
No Bedrock
No Groundwater
Note: The stratification linea
represent the approximate
boundaries between the soil types;
the transitions may be o adual.
07/11/2006 16:25 7603605591
ORR BUILDERS
La Quinta Corporate Center /Yea Quinta, California
PAGE 26/46
:ate_
9-29-99
9/16/21
Silty Sand: Grey brown.
to' ring
No. 11
Job No.: 544-9170
fine grained
15
13/24%42
"
20
18/31/50
"
-
Recovered Sample
25
a�
30
DE S CRIPTI ON
q
S
REMARKS
,,�
40
AW
74
45
o
50
�D
;� U
0
Sand• Brown fine grained
SP
10
9/16/21
Silty Sand: Grey brown.
fine grained
15
13/24%42
"
20
18/31/50
"
-
Recovered Sample
25
30
33
40
45
50
f I 99 I 1.0 I -
Siva 11 93 1 7.0 1 88
'. 11 99 1 1.0 1 93
100 •2.0 94
TQW Depth != 26
No Bedrock
No Groundwater
Note: The stratification liners
represent the approximate
boundadies between the soil types;
the traneitio= may be gradual.
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 27146
La Quinta Corporate
Center
/ La
Quinta,
California
ate:
9-29-99
Boring
No. 12
Job No.: 544-9170
DESCRIPTION.
,
REMARKS
-.z
r�
U
f�
v�
��IR.1
R,
I"
Silty Sand: Grey brown,
SM
fine grainci
9/10/13
"
"
89
0.5
84
10
11/14/23
97
0"5
92
15
21/25/30
96
.0.5
91
-
Sandy Silt: Light brown
ML
20
12/16/32
89
1.0
74
Total Depth = 26.5'
® Recovered Sample
No Bedrock
No Groundwater
25
30
Sv
40
45
Note; The stratification linos
55
represent the approximate
boundaries between the soil t, es;
the.trawitions may be gradual.
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 28/46
La Quanta Corporate Center / La Quinta, California
ate: 9-29-99 Boring No. 18 Job No.: 544.9170
4-5
m'
DESCRIPTIONA
a'+
h
m
o
� .e
REMARKS
o
~s
.44 o
z
Pa
I
o
e
Silty Sand: Grey brown,
fine grained
7/9/12
"
92
1.0
87
8/9/12
97
1.0
92
7117!20
h b
Sany t; gt rown
Silt; d Li
ML
88
0.5
- 73
Total Depth = 26.5'
® Recovered Sample
No Bedrock
I
I
I No Groundwater
I
Note: The strsti$cation Linea
represent the approximate
boundaries between the soil types;
I
the transitioiw. may be gradual,
07/11/2006 16:25 7603605591
ORR BUILDERS
PAGE 29/46
fine grainctl
10 ,
I
15 5/7/9 _. 1.0 - -
_ _ I
zo 4/519 ... 1.5
25 6/7/10 .. ... 1.0
Total Depth = 26.5'
S#indard Penetration No Bedrock
Sample No Groundwater .
30
i
35
40
_ I
da I
G0
I
Note: The 6; razification lines
UrUret'nt t1ke approximate,
between the soil types;
the transitions may be gradual.
Quilnta Corporate Center / La Qub ita, California _T
(
-ate: 9-29-99
Boring No. 14
Job No.: 544-9170
o
DESCRIPTION � q
�
z 0 REMARKS
0
Silty Send: Grey brown,. SM
fine grainctl
10 ,
I
15 5/7/9 _. 1.0 - -
_ _ I
zo 4/519 ... 1.5
25 6/7/10 .. ... 1.0
Total Depth = 26.5'
S#indard Penetration No Bedrock
Sample No Groundwater .
30
i
35
40
_ I
da I
G0
I
Note: The 6; razification lines
UrUret'nt t1ke approximate,
between the soil types;
the transitions may be gradual.
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 30/46
07/11/2006 16:25 7603605591
ORR BUILDERS
APPENDIX B
Laboratory Testing
Laboratory Test Results
PAGE 31/46
07/11/2006 16:25 7603605591 ORR BUILDERS
AJPPEN7DEK B
LABORATORY TESTING
PAGE 32/46
Representative. bulls and relatively undisturbed .soil samples were obtained in the field and returned to our
laboratory for additional observations and testing. Laboratory testing was generally performed in. two
phases. The first phase consisted of testing in order to determine the compaction- of the existing natural
soil and the genera..] engineering classifications of the soils underlying 'the site. This testing was
performed in order to estimate the engineering. characteristics of the soil at�d toe serve as a basis for
selecting samples for the second phase of testing. The second phase consisted of soil meehanies testing.
This testing including consolidation, shear strength and expansion testing was performed in order'to
provide a means of developing specific design recommendations based on the mechanical properties of
the soil.
CLASSIFICATION AND COMPACTION TF STING
Unit Weight and Moisture Content Determinations.- )rash undisturbed sample was weighed and
measured in order to determine its unit weight. A small portion of -each sample was then subjected to
testing in order to determine its moisture content. This was used in order to determine the dry density of
the soil in its natural condition. The results of this testing are shown on the Boring Logs.
Maximum Density-Optunum Moisture Determinations: Representative soil types were selected for
maximurn density determinations. This testing was performed in accordance with the ASTM Standard
D1557-91, Test Method A. The results of this testing are presented gaphically in this appendix. The
maximum densities are compared to the field densities of. *the soil in order to determine the, existing
relative compaction to the soil. This is shown on the Boring Logs, and is useful in estimating the strength
and compressibility of the soil.
Classification Testing: Soil samples were selected for classification testing. This testing consists of
mechanical grain size analyses and Aiterberg Limits determinations. These provide information for
developing classifications for the soil in accordance with the Unified Classification System. This
classification system categorizes the soil into groups having similar engineering characteristics. The
results of this testing are very useful in detecting variations in the soils and in selecting samples for
further testing.
SOIL MECHANIC'S TESTING
Direct Shear Testing: Two bulk samples were selected for Direct Shear Testing. This testing treasures
the shear strength of the soil under various normal pressures and is used in developer; parameters for-
foundation
orfoundation design and lateral design. Testing was performed using recompacted test specimens, which
were saturated prior to testing. Testing was performed using a strain controlled test apparatus with
normal pressures ranging from 800 to 2300 pounds per square foot.
Expansion Testing: These bulls samples were selected for Expansion testing. Expansion testing was
performed in accordance with the UBC Standard 18-22. This testing consists of remolding 4 -inch diameter
by 1 -inch thick test specimens to a moisture content and dry density corresponding to approximately 50
percent saturation. The samples are subjected to a surcharge of 144 pounds -per square foot and allowed
to reach equilibrium. At tliat point the specimens are inundated with distilled water. The linear
expansion is then. measured until complete.
Consolidation Testing: Eight relatively undisturbed samples were selected for consolidation testing,
for this testing one -inch thick test specimens are subjected to vertical loads varying from 575 psf to
11520 psf applied prooressivcly. Tho consolidation at each load increment was recorded prior to
placement of each subsequent load. The specimens were saturated at the 575 psf or 720 psf load
increment.
Sudden Enpineeting
axano aUf1ISION TufjNjJ cjo-X LjSX9(j JAIfIFliIIMW
MT
i
OUT 19-0@I
IHDIZA1 ZIN INIXVW x i OS
0 UO V QOHS 9:K `I6-L99T-Q WLLS`d'
N0Il0K W0D A0 QOHJ aN
(%) luequo0 aanasiow
E't 9'VI FT 9'IT Tl' S'OI OI 9'6
qoP
9TT
09T
TZT
9b/EE 39dd Sd3G-lins ddo T69909609L 5Z:9Z 9002/TT/L0
i
yi
f
3
i
s
z
'
�
I
f
!i
i
qoP
9TT
09T
TZT
9b/EE 39dd Sd3G-lins ddo T69909609L 5Z:9Z 9002/TT/L0
aAnD 9MUSION WfIWI Lao -.&IISXH(I IAIf1KI CVX
L'IF 901
ZNHIN O gualslow PUM11TO ,LH,)IaM .LIN WIX 'Jl�II B
0 HO V C[OHsaW`T6-L99T-a W I.SV
N(OIJIDV KOO 3o QOIUHN
(oj,) �ua�aop axn�.sxoyQ
£T S'ZL ZT Cal' ii �'OT OY
901
s
1
COT
i�OT, u
a
E
S •
901
LOT
0L,16-019 'oN q°P
9b/VE 3Jdd
Sd3G-lina X6o
T69909609L 9Z:9T 900Z/TT/L0
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 35/46
07/11/2006 16:25
7603605591
ORR BUILDERS
Congolidation DiaZram
PAGE 36/46
M
ta Cozporate Centex
ning 3 @ 10'
EN ]ENGINEERING
9 1 Job No.: 544-9170
Pressure in KIPS per Square Foot
0.000
0.720 2.800
11.520
0.0
-
—_ -
_ "—F T V-gwrexo
;02
__
.04—
_— - -
— - - - - - -
— - —
— _
— _ _
— +
03
__
.10
.12
=F
-
_==_=_-=
-18
_m 7.
m
- —
.22 -
— _ -
_ _ _ - _
— _
— L- -
.24—
.26
Congolidation DiaZram
PAGE 36/46
M
ta Cozporate Centex
ning 3 @ 10'
EN ]ENGINEERING
9 1 Job No.: 544-9170
l 07/11/2006 16:25
7603605591
ORR BUILDERS
Consolidation Diagram
PAGE 37/46
La Quinta Corporate Center,
Boring 4 @ 5'
mm)DEN ENGINEERINGY
Late; 10118199 lJob No.: 544-9170
Pressure in
XCPS per Square Foot
0.000 _575
2.300
9.200
0.0
.01_-=_-�___
4_
__ _
C �- —
_
04
co
o
.05—
_
_
06
—_ _
cd
o
.07—
.08
_ —�
- - -_
t - — -
_
-09
0.1
- - —_ -
_—
Consolidation Diagram
PAGE 37/46
La Quinta Corporate Center,
Boring 4 @ 5'
mm)DEN ENGINEERINGY
Late; 10118199 lJob No.: 544-9170
07/11/2006 16:25
7603605591
ORR BUILDERS
Consoh(lation Di&.°am
PAGE 38/46
I La Quinta Corporate' Center 1
Boring 4 @ 10'
I SLADDEN 1
10/18/99 lJob No.; 544.9170
Pressure in KIPS per Square Foot
0.000
.575 2.300
9.200
— _
5E
0.0
_—_
--
01 =
-�
-
—Eifer�bid
--- f -ate=--=
- — -
- --_ -
.02
03
_7.
.05
=
.07
.08-
__=
=7 =7_=_-=-=_ __E
==_=
-09
—
— -
7.
0.1 -
— -
- - x =_ _ _ _ —_ _
=-c =
.12—
.13—
r
Consoh(lation Di&.°am
PAGE 38/46
I La Quinta Corporate' Center 1
Boring 4 @ 10'
I SLADDEN 1
10/18/99 lJob No.; 544.9170
07/11/2006 16:25 - 7603605591 ORR BUILDERS PAGE 39/46
07/11/2006 16:25 7603605591 . ORR BUILDERS PAGE 40/46
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 41/46
Congolidation Diaerazn_
I La Quinta Corporate Center I
Boring 5 @ 20'
I SLAADEN ENGINEERENG I
ate: 10/18/99 1Job No.: 544-9170
Pressure in HIPS per Square Foot
0-000
0.720 2-880
11.520
0.0
.01 -
--
03
_
_
.04
.05-
a.
06
-
-
c
.07
_— -
_— _— _ _ —_ - -
—
.09
0.1 =
- -
—_
-
12—=—=---�-_
.13
.14
.15
Congolidation Diaerazn_
I La Quinta Corporate Center I
Boring 5 @ 20'
I SLAADEN ENGINEERENG I
ate: 10/18/99 1Job No.: 544-9170
07/11/2006 16:25
\I
7603605591
ORR BUILDERS
Consolidation l' meram
PAGE 42/46
La Quinta Corporate Centex
Boring 6 Q 5'
SLAADEN ENGINEERING
ate: 10/18/99 Job No.- 544-9170
Pressure in HIPS per Square Foot
0.000.
.575 2.300
9.200'
—EY%�Add�
_ _
�
- — _
=7-
03=::Im_=_-
—
4-
04
.05 -
— - -
- — - - — - -
— - - — -
06
-
-
— - -
0
07
- - — -
o
-
_
OS----___
.09 —
— _ - — _-
— _ _ - -_
— - -_ -
0.1 _
— - - -
* - - _ -
— r - — -
-_ -
-
`_ -
11
.12
-
r - _
Consolidation l' meram
PAGE 42/46
La Quinta Corporate Centex
Boring 6 Q 5'
SLAADEN ENGINEERING
ate: 10/18/99 Job No.- 544-9170
07/11/2006 16:25 7603605591 ORR BUILDERS PAGE 43/46
ANAHEIM TEST LABORATORY
3008 S. ORANGE AVENUE
SANTA ANA, CALIFORNIA, 92707
PHONE (714) 549-7267
'o; SLADDEN ENGINEERING:
6782 STANTON AVE. -SUITE E DATE: 10-1-99
BUENA PARK, CA. 90621.
i P.O. No. VERBAL
Shipper No.
ATTN : BRETT ANDERSON lab. No. B 5 3 4 6
Speclflcatlon:
Material: SOIL
PROJECT: # 544-9170
H-1 @ 0-5'
:ORM #2
ANALYTICAL REPORT
SOLUBLE SULFATES
per CA_ 417
173 ppm
07/11/2006 16:25
7603605591 ORR BUILDERS
,ANAHEIM TEST LABORATORY
3008 S. ORANGE AVENUE
SANTA ANA, CALIFORNIA 92707
PHONE (714) 549-7267
TO: SL' ADDEN BNGINEBRING':
6782 STANTON-AVE. SUITE E 10-5-99
BUENA PARK, CA-90621DAh:
P.O. No, VERBAL
ATTN : BRETT ANDERSON SnIpper No.
Lob, No. B 5 3 6 0
Speciticotion:
Material: SOIL
PROJECT:# 522-9170
LA QUINTA CORP. CENTER
H-13 @ 0-5'
.ANALYTICAL REPORT
SOLUBLE SULFATES
per CA. 417
555 ppm
FORM #2
PAGE 44/46
07/11/2006 16:25 7603605591
0
l
ORR BUILDERS
AFTENDIX C
1997.UBC Seismic Design Criteria
t
e .
PAGE 45/46
Siodden Engineering
07/11/2006 16:25 7603605591
ORR BUILDERS
1997 YJNIFORM BUILDING CODE SEISMIC DESIGN INFORMATION
Recently the International Conference of Building Officials. issued the 1997 Uniform
Building Code containing substantial revisions and'. additions to the earthquake
engineering section in Chapter 16. New concepts contained, in the updated code that will
likely be relevant to construction of the proposed structures are sunuxiarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based
upon proximity to significant faults capable of generating large earthquakes_ Major fault
zones considered to be most likely to create strong ground shaping at the site are listed
below.
PAGE .46/46
Based on our field observations. and understanding of local geologic conditions, the soil
profile type judged applicable to this site is So, generally described as stiff or dense soil.
The site is located within UBC'Seisinic Zone 4. The following table presents additional
coefficients and factors relevant to seismic mitigation for new construction upon adoption
of the 1997 code.
Approximate Distance
Fault.Type
Fault Zone
From Site
1997 UBC
San Andreas
8.5 km
A.
San Jacinto
32 kin
I A
Based on our field observations. and understanding of local geologic conditions, the soil
profile type judged applicable to this site is So, generally described as stiff or dense soil.
The site is located within UBC'Seisinic Zone 4. The following table presents additional
coefficients and factors relevant to seismic mitigation for new construction upon adoption
of the 1997 code.
L.
C
Sladden Engineering
Near -Source
Near -Source
Seismic
Seismic
Seismic
Accelerations
Velocity
Coefficient
Coefficient
Source-
Factor Na
Factor,-Nv
Ca
CV
San Andreas
1.1
1.3
0.44 Na
0.64 NV
San Jacinto
1.0
1.0
0.44 Na
0.64 Nv
L.
C
Sladden Engineering
F
Sladden Engineering
6762 Stanton Ave., Suite A, Buena Park, CA (714) 523-4952 Fax (714) 523-1369
39.725 Ga(and 4n., Sulte G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
October 06, 2004 Project No. 544-4626
04-10-712
Santamaria Design Associates
75-153 Merle Drive, Suite B
Palm Desert, California 92211
Attn: Mir, Tony Ariza
Projcct: 79-440 Corporate Way
Parcels 3, 4, and 5 — La Quinta Corporate Centre
La Quinta, California
Subject: Geotechnical Update
Reference: Geotechnical Investigation prepared by Sladden ingincering dated October 13, 1999,
Project No. 522-1043, Report No. 04,10-712.
As requested, we have reviewed the referenced Geotedmical Investigation report as it relates to the
design and construction of the proposed new office complex. In addition, we have visited the project
site to observe the present conditions. The eubject lots are located within the La Quinta Corporate
Center in the City of La Quinta. California.
The .referenced Geotechnical Investigation report includeo recommendations for site grading and the
design and construction of development commercial structure foundations. Based upon our review of
the referenced report and our recent site observations, it is our opinion that the recommendations
included in the referenced Geotechnical Investigation remain applicable.
Footings should extend at least 12 inches beneath lowest adjacent grade for single story structures.
faolnu-d square or rectangular footings at least 2•fect square may be designed using an allowable
bearing value of 2000 pounds per square foot. Contintlous footings nt. leant 12 inches+ wide may be
deeignod using an allowable bearing value of 1900 pounds per square foot. Allowable increases of
200 pnf for each additional 1. -foot of width and 200 pef for each additional 6 -inch" of depth may be
utilized for larger footings. The maximum alluwable bearing pre8oure should be 3000 p6f. The
allowable bearing pressures are for dead and frequently applied live loads and may be increased by
113 to resist wind, seismic or other transient loading.
The recommendations made in the preceding pnrngrnph are bitaed on the assumption that all
footince will be supported by properly compacted soils. Prior to the placement of the reinforcing steel
and concrete, we recommend that the footing excavations be inspected in order to verify that they
extend into the firm compacted soils and are free of looue and disturbed suatvrials.
i d Z51011d089 '0N/H.' 0l '1S%83:01 6002
. ` �� OJO /.14
DO (ANI)
IPr Qln W-1WJ "'"flu -1A id^"
y
October 06, 2004 .2- Project No. 544-4626
04.10.712
Settlements may result from the anticipated foundation loads. Then estimated ultimate settlements
are calculated to he u maximum of 1 inch when using the recommended hearing values. As a
practical matter, differential settlements between footings can be assumed as one-half of the total
settlement, These elastic settlements are expected to occur during construction.
Resistance to lateral loads may be provided by a combination of friction acting at the base of the
slabs or foundations and passive earth pressure along the aides of the foundations. A coefficient of
friction of 0.45 between soil and concrete may be used for dead. load forces only. A passive earth
pressure of 250 pounds per square foot, per foot of depth, may be used along the sides of footings.
which are poured against properly compacted native or approved import soils, PARFIve earth
pressure should be ignored within the upper 1 foot except where confined (such as beneath a floor
Retaining walls may be required to accomplish the proposed construction. Cantilever retaining walls
may be designed using "active" pressures. Active pressures may be estimated using an equivalent
fluid weight of 35 pef for native backfill soils with level free -draining backfill conditions. For walls
that are restrained, "at rest" pressures should be utilized in design. At rest pressured may be
estimated using an equivalent fluid weight of 55 pef. Walls should be provided with adequate
drainage.
The remedial grading recommendations included in the referenced repurt rewain applicable. The
remedial grading should include recompaction of the foundation bearing soils within the proposed
building areas.
The building pad areae should be cleared of any surface vegetation and root -Ayatems prior to grading.
Building arena should be overexcavated to :a depth of at least 3 feet below existing grade or 3 feet
below the bottom of the footings, whichever is deeper. The exposed surface should be compacted to a
minimum of 90 percent relative compaction. The previously removed soils and any fill material may
then be placed in thin lifts at near optimum moisture content and,aompacted to at least. 90 percent
relative. compaction. Compaction should be verged by testing.
It should be noted that the site is located within a seismically active area of Southern California and
it is likely that the proposed structures will experience strong ground shaking as a reset of an
earthquake event along one of the faults in the region during the expected life of the development.
As a minimum, structures should be designed Weed upon Scismic Zone 4 design criteria included in
the Uniform Building Code (UBC). The potential for liquefaction or other geologicteeiamic hazards
occurring »tthe.site is considered to be negligible.
We appreciate the opportunity to provide service to you on this project, if you have any questions
regarding this letter or the referenced report please contact the undersigned.
Respectfully submitted,
SLAiDIDEN EN[id�NJ ERIN �o"i:ss(�,
<, ir_ GMM
004 a �. ANOF�4�
Brett L. And tic. G "mos a
i5 W. q�yoa a
Principal Engineer it
SRR/lh
Copies-. 4/Santamaria
Sl/Adders Engineering
Z d ZSZ0IIZ089 'ON/H'..0 i 'IS/ 8Z' 01 0.001 L'10001Y. 183530 w1dd N300VIS W08A
October 06, 2004 -3- Project No. 644-4626
04-10-71.2
1997 UNIFORM BUILDING CODE INFORMATION
The International Conference of Building Officials 1997 Uniform Building Code contains substantial
revisions and additions to the earthquake engineering section in Chapter 16. Concepts contained in
the code that will be relevant to construction of the proposed structures are summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon
proximity to significant faults capable of generating large earthquakes. Major fault zones considered
to be most likely to create strong ground shaking at the site are listed below.
Fault Zone
Approxinwate Distance
From Site
Fault Type
g1997 UBC
San Andremi
8.5 km
A
San Jacinto
32 km
A
Based on our field observations and understanding of local geologic conditions, the soil profile type
judged :applicable to this site is So, generally described as stiff or dense soil. The site is located
within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant
to seismic mitigation for new construction upon adoption of the 1091 code.
Madden Engineering
8 d WZ Z 130(AHI) 183S30 Wldd N300d1S W083
Near -Source
NeaRSource Seismic
Seismic
Seismic
Acceleration
Velocity Coefficient
Coefficient,
Source
Factor N,
Factor X. rill
CV
San Andreas
1.1
1.3 0.44 Na
0,64 N.
San Jacinto
1 1..0
1 1.0 1 0.44 N.
1 0.64 N„
Madden Engineering
8 d WZ Z 130(AHI) 183S30 Wldd N300d1S W083