Loading...
BRES2015-0377 Title 24Title 24 Energy Report Darby Lane. Plan 1 M -Lot 9 La Quinta 2013 Building Energy Efficiency Standards HEG Project No.: 13174U GHA Companies Len Nobel Co. Heritage Energy Group, LLC January 12, 2016 Tel: (949) 789-7221 / Fax: (949) 789-7222 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1 M - Lot 9 Calculation Description: Title 24 Analysis Calculation Date/Time: 22:18, Mon, Jan 11, 2016 Input File Name: 13174UP1MLot9.xml CF1 R -PRF -01 Page 1 of 8 GENERAL INFORMATION 01 Project Name Plan 1M - Lot 9 02 Calculation Description Title 24 Analysis 03 This building incorporates one'or,more Special Features showdbelew _ ✓' 03 Project Location Darby Lane J i- ISS► V v v 04 A City La Quinta 05 Standards Version Compliance 2014 06 Zip code 07 Compliance Manager Version BEMCmpMgr 2013-3 (651) 08 Climate Zone CZ15 09 Software Version EnergyPro 6.3 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 335 12 Project Scope Newly Constructed 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (FT2) 2415 15 Number of Zones 1 16 Slab Area (FT2) 2415 17 Number of Stories 1 18 Addition Cond. Floor Area N/A 19 Natural Gas Available Yes 20 Addition Slab Area (FT2) N/A 21 j Glazing Percentage (%) 16.7% COMPLIANCE RESULTS 01 Building Complies with Computer Performance ' 02 This building incorporates features that require field testing and/or verification by a+certified HERS iater'under' the supervision of a CEC-approved HERS provider. f j� 03 This building incorporates one'or,more Special Features showdbelew _ ✓' J i- ISS► V v v L-0 ti: J A ENERGY USE SUMMARY 04 05 06 07 08 Energy Use Standard (kTDV/ft) Design Proposed Design Compliance Margin Percent Improvement Space Heating 1.22 2.53 -1.31 -107.4% Space Cooling 99.41 98.66 0.75 0.8% IAQ Ventilation 1.14 1.14 0.00 0.0% Water Heating 11.08 10.06 1.02 9.2% Photovoltaic Offset ---- 0.00 0.00 --- Compliance Energy Total 112.85 112.39 0.46 0.4% Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016 Calculation Description: Title 24 Analysis Input File Name: 13174UP1MLot9.xml REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. Window overhangs and/or fins CF1 R -PRF -01 Page 2 of 8 HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • IAQ mechanical ventilation .Cooling System Verifications: • Verified EER • Verified SEER • Refrigerant Charge • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Seating Domestic Hot Water System Verifications: • --None -- ENERGY DESIGN RATINGn , f= r,Z �--� This is the sum of the annual TDV energy consumption for.energy use components iricluded in -the, performance compliance approa& fog the'Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24, Pa�t'6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an on-site renewable energy system. �\ 1 `� �.t U `� i_' U U Li 4. 11 U U U \ O NRefererice Energy Use Ito Energy Design Rating Margin Percent Improvement Total Energy (kTDV/f2)' 157.48 157.02 0.46 0.3% • includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (sft) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Plan 1 M- Lot 9 2415 1 4 1 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 Plan 1M Conditioned Res HVAC1 2415 10 DHW Sys 1 Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016 Calculation Description: Title 24 Analysis Input File Name: 13174LIP1MLot9.xml CF1 R -PRF -01 Page 3 of 8 OPAQUE SURFACES ` IIJI IC n c n Q--> t'1 % /`1 r-% IC n 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window Area (ft) Tilt(deg) Back Wall Plan 1 M R-13 Wall 155 Back 305 78 90 Back Wall 2x6 Plan 1 M R-19 Wall 155 Back 195 96 90 Right Wall Plan 1 M R-13 Wall 245 Right 520 91 90 Right Wall 2 Plan 1 M R-19 Wall 245 Right 100 0 90 Front Wall Plan 1 M R-13 Wall 335 Front 290 40 90 Left Wall Plan 1M R-13 Wall 65 Left 688 99 90 Front Wall -Garage Plan 1M Garage R-13 Wall 335 Front 212 0 90 Right Wall Garage Plan 1M Garage R-13 Wall 245 Right 69 0 90 Roof Plan 1M R-38 Roof RB Window Left Wall (Left -65) 2415 ---- 1 ATTIC 01 02 03 04 05 06 07 Name Construction a Roof Riser (r= r - !RoofJReflectance ( Roof Emittance Radiant Barrier Cool Roof Attic Attic Roof Cons 0.1 � 0.85' Yes No C\ 1% %11_I11J1 11 1,- 1l__JI i{ 11 rl 11 11 1! x1_ 0% WINDOWS ` IIJI IC n c n Q--> t'1 % /`1 r-% IC n 01 02 - 03 - - 04- -05 - - 06 - - 07 08 09 10 Name Type Surface (Orientation -Azimuth) Width(ft) Height (ft) Multiplier Area (ft) U -factor SHGC Exterior Shading Window Window Back Wall (Back -155) ---- ---- 1 18.0 0.34 0.24 Insect Screen (default) Window 2 Window Back Wall (Back -155) 12.0 5.0 1 1 60.0 0.30 0.26 Insect Screen (default) Door Window Back Wall 2x6 (Back -155) 12.0 8.0 1 96.0 0.42 0.23 Insect Screen (default) Window 3 Window Right Wall (Right -245) ---- --- 1 67.0 0.34 0.24 Insect Screen (default) French Door Window Right Wall (Right -245) 3.0 8.0 1 24.0 0.30 0.19 Insect Screen (default) Window 4 Window Front Wall (Front -335) 4.0 5.0 2 40.0 0.34 0.24 Insect Screen (default) French Doors Window Left Wall (Left -65) ---- ---- 1 40.0 0.30 0.19 Insect Screen (default) Window 5 Window Left Wall (Left -65) --- ---- 1 35.0 0.34 0.24 Insect Screen (default) French Door 2 Window Left Wall (Left -65) 3.0 8.0 1 24.0 0.30 0.19 Insect Screen (default) Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016 Calculation Description: Title 24 Analysis Input File Name: 13174UP1MLot9.xml CFI R -PRF -01 Page 4 of 8 OVERHANGS AND FINS 01 02 03 04 05 06 Construction Name Surface Type Construction Type Framing Total Cavity R -value Assembly Layers 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Roof—T�russ @ 24 inr. Overhang Tile Gap: present Attic Roof Cons Attic Roofs Left Fin If— O.C.���! 1� noneq � Roofing: 10 PSF (Roofrile) Right Fin Window Depth Dist Up Left Extent Right Extent Flap Ht. Depth Top Up DistL Bot Up Depth Top Up Dist R Bot Up Window 2 1.5 1.25 2 2 0 10 0 0 0 0 0 0 0 Door 10 0.1 10 10 1 0 0 0 0 0 0 0 0 French Door 10 0.1 10 10 1 0 0 0 0 0 0 0 0 Window 4 5 0.1 6 6 0 0 0 0 0 0 0 0 0 French Door 2 10 0.1 10 10 1 0 0 0 0 0 0 0 0 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 Construction Name Surface Type Construction Type Framing Total Cavity R -value Assembly Layers • Cavity/ Frame: no insul. / 2x4 Top Chrd — ` 2x4 Top Chord of Roof Deck: Wood Siding/sheathing/decking Roof—T�russ @ 24 inr. f� Tile Gap: present Attic Roof Cons Attic Roofs Wood Framed Ceiling If— O.C.���! 1� noneq � Roofing: 10 PSF (Roofrile) CC)I) I k1 i.J �� [ f ( �i { � [ ��- � �} lJ J � i I 0 f' (,J jJ 1 •�Cavie Finish: Gypsum Board Cavity /Frame: R-9.1 / 2x4 R-38 Roof RB Ceilings (below attic) Wood Framed Ceiling 2x4 @,24 in. O.C_ .-% % R 38—N 11= Over Floor Joists: R-28.9 insul. - — — - - y Inside Finish: Gypsum Board • Cavity/Frame: R -13/2x4 R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 Exterior Finish: Wood Siding/sheathing/decking • Inside Finish: Gypsum Board • Cavity / Frame: R-19 / 2x6 R-19 Wall Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 19 Exterior Finish: Wood Siding/sheathing/decking • Inside Finish: Gypsum Board • Cavity / Frame: R-13 / 2x4 Garage R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. R 13 Exterior Finish: Wood Siding/sheathing/decking SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft2) Perimeter (ft) Edge Insul. R -value& Depth Carpeted Fraction Heated Covered Slab Plan 1 M 2415 242 None 0.8 No Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016 ' Calculation Description: Title 24 Analysis Input File Name: 13174LIP1MLot9.xml CFI R -PRF -01 BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage ACH @ 50 Pa Not Required Not Required Not Required --- Page 5 of 8 WATER HEATING SYSTEMS 01 02 03 04 - 05 06 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%) DHW Sys 1 DHW Standard DHW Heater 1 1 .0% WATER HEATERS 01 021 03 04 05 06 07 08 Name Heater Element Type Tank Type Tank Volume (gal) Energy Factor or Efficiency Input Rating Tank Exterior Insulation R -value Standby Loss (Fraction) DHW Heater 1 Natural Gas Small Storage 50 0.62 40000-Btu/hr 0 0 �-. n ---% .---, .-----, .-� ., WATER HEATING - HERS VERIFICATION 01 <02 t1 �` r L � ) \\03,, �l� �j " ` �f X041 r7 ;�,05 ri 06 07 Name , t Pipe Insulation j '� ParallefPiping f �"r (Compact Distribution E EPUse Recirculation Control Central DHW Distribution DHW Sys 1 - 1/1 N/A N/A N/A N/A N/A N/A HVAC SYSTEMS 01 02 03 04 05 06 07 Heating System Cooling System Distribution Floor Area Name System Type. Name Ducted Name Ducted System Fan System Served Res HVAC1 Other Heat/Cool Heating Component 1 Yes Cooling Component 1 Yes Air Distribution 2415 System 1 HVAC - HEATING SYSTEMS 01 02 03 Name Type Efficiency Heating Component 1 CntrlFurnace - Fuel -fired central furnace 80 AFUE Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016 Calculation Description: Title 24 Analysis Input File Name: 13174UPIMLot9.xml CFI R -PRF -01 Page 6 of 8 HVAC - COOLING SYSTEMS 01 02 03' 04 05 06 07 Name Verified Airflow Efficiency Verified EER Multi -speed Verified Refrigerant Charge Name System Type EER SEER Zonally Controlled Compressor HERS Verification Cooling Component 1 SplitAirCond - Split air conditioning 12.5 15 No No Cooling Component 1-hers-dist system 1 -hers -cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1 -hers -cool Required 350 Required Required Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 Name Type - Duct Leakage Insulation R -value r Supply Duct _ Location _ Return Duct Bypass Duct HERS Verification Air Distribution System 1 Ducts located in attic 7� S I I �� Sealed and tested t1 �/-i1 II Required 6 1 1 f � f"1 �AttIC i i 1 I I t^ �-^ +( Attic tj None Air Distribution System 1 -hers -dist y C PN .� a �� L U U U �f 1! u U U �s v a s r r-% r V-% r_* d -1%,a t L/ it v-► 9— HVAC DISTRIBUTION - HERS VERIFICATION `� ' ' �' ' r "t ' ' a N'" '� ' v ` ' HVAC 01 02 03 04 05 06 07 Duct Leakage Verified Duct Design Low -leakage Name Verification Duct Leakage Target (%) Verified Duct Location Return Supply Air Handler Air Distribution System Required 6.0 Not Required Not Required Not Required --- 1-hers-dist HVAC -FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM) HERS Verification HVAC Fan 1 Single Speed PSC Furnace Fan 0.58 HVAC Fan 1 -hers -fan HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name VerifiedFanWatt Draw Required Fan Efficiency (Watts/CFM) Registration Number: 216-No019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1 M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016 Calculation Description: Title 24 Analysis Input File Name: 13174UP1MLot9.xml HVAC Fan 1 -hers -fan Required 0.58 CF1 R -PRF -01 Page 7 of 8 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 06 Name IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification DwellingUnit 61.65 0.25 Default 0 Required Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaiCERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Plan 1M - Lot 9 Calculation DatefTime: 22:18, Mon, Jan 11, 2016 Calculation Description: Title 24 Analysis Input File Name: 13174UP1MLot9.xml CF1 R -PRF -01 Page 8 of 8 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Rudy Sains Company: Signature Date: Heritage Energy Group 2016-01-12 14:48:10 Address: CEA/HERS Certification Identification (If applicable): 470 Wald City/State/Zip: Phone: Irvine, CA 92618 949-584-1052 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: / c` 1 i { I 1 y ' Responsible Designer Signature*,,, ��`::J Alex Gonzales 'Company: \ �, � �-. Date Signed: tf "1 � r - _.+. GHA Companies ,- .i:. 2016-01a -12. 14:48:54.v Address: License: 30-875 Date Palm Drive N/A City/State/Zip: Phone: Cathedral City, CA 92234 760-969-1400 Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Plan 1M - Lot 9 Date 1/12/2016 System Name Res HVAC Floor Area 2,415 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,319 Return Vented Lighting Return Air Ducts Return Fan ' Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 89,000 26,650 2,718 817 29,608 Total Output Btuh 89,000 0 Output Btuh/s ft 36.9 1,819 1,708 Cooling System 0 0 Output per System 46,500 0 0 0 0 Total Output Btuh 46,500 0 2,718 0 Total Output Tons 3.9 1,819 1,708 Total Output Btuh/sgft 19.3 Total Output s ft/Ton 623.2 1 30,287 33,024 Air System CFM per System 1,680 HVAC EQUIPMENT SELECTION Airflow cfm 1,680 15/12/80% 31,844 7,711 89,000 Airflow cfmisgft 0.70 Airflow cfmfTon 433.5 Outside Air % 0.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 31,844 7,711 89,000 Aug 3 PM Jan 1 AM Outside Air cfmis ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF Outside Air 0 cfm 69 OF 69 OF 105 OF 105 OF Heating Coil Supply Fan 1,680 cfm 104 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78°F Outside Air Alr 0 cfm 76/62°F 76/62°F 55/54°F 55/54°F - Cooling Coil Supply Fan 1,680 cfrn 56 / 54 OF 47.9% ROOM 75/62°F EnergyPro 6.7 by EnergySoR User Number: 7244 RunCode: 2016-01-12714:58:06 /D: 13174U Page 1 of 1