BRES2015-0377 Title 24Title 24 Energy Report
Darby Lane. Plan 1 M -Lot 9
La Quinta
2013 Building Energy Efficiency Standards
HEG Project No.: 13174U
GHA Companies
Len Nobel Co.
Heritage Energy Group, LLC
January 12, 2016
Tel: (949) 789-7221 / Fax: (949) 789-7222
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1 M - Lot 9
Calculation Description: Title 24 Analysis
Calculation Date/Time: 22:18, Mon, Jan 11, 2016
Input File Name: 13174UP1MLot9.xml
CF1 R -PRF -01
Page 1 of 8
GENERAL INFORMATION
01
Project Name Plan 1M - Lot 9
02
Calculation Description Title 24 Analysis
03 This building incorporates one'or,more Special Features showdbelew _
✓'
03
Project Location Darby Lane
J i-
ISS► V v v
04
A City La Quinta
05
Standards Version Compliance 2014
06
Zip code
07
Compliance Manager Version BEMCmpMgr 2013-3 (651)
08
Climate Zone CZ15
09
Software Version EnergyPro 6.3
10
Building Type Single Family
11
Front Orientation (deg/Cardinal) 335
12
Project Scope Newly Constructed
13
Number of Dwelling Units 1
14
Total Cond. Floor Area (FT2) 2415
15
Number of Zones 1
16
Slab Area (FT2) 2415
17
Number of Stories 1
18
Addition Cond. Floor Area N/A
19
Natural Gas Available Yes
20
Addition Slab Area (FT2) N/A
21 j
Glazing Percentage (%) 16.7%
COMPLIANCE RESULTS
01 Building Complies with Computer Performance '
02 This building incorporates features that require field testing and/or verification by a+certified HERS iater'under' the supervision of a CEC-approved HERS provider.
f j�
03 This building incorporates one'or,more Special Features showdbelew _
✓'
J i-
ISS► V v v
L-0 ti: J A
ENERGY USE SUMMARY
04 05
06
07
08
Energy Use Standard
(kTDV/ft) Design
Proposed
Design
Compliance
Margin
Percent
Improvement
Space Heating 1.22
2.53
-1.31
-107.4%
Space Cooling 99.41
98.66
0.75
0.8%
IAQ Ventilation 1.14
1.14
0.00
0.0%
Water Heating 11.08
10.06
1.02
9.2%
Photovoltaic Offset ----
0.00
0.00
---
Compliance Energy Total 112.85
112.39
0.46
0.4%
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016
Calculation Description: Title 24 Analysis Input File Name: 13174UP1MLot9.xml
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
Window overhangs and/or fins
CF1 R -PRF -01
Page 2 of 8
HERS FEATURE SUMMARY
The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is
provided in the building components tables below.
Building -level Verifications:
• IAQ mechanical ventilation
.Cooling System Verifications:
• Verified EER
• Verified SEER
• Refrigerant Charge
• Fan Efficacy Watts/CFM
HVAC Distribution System Verifications:
• Duct Seating
Domestic Hot Water System Verifications:
• --None --
ENERGY DESIGN RATINGn , f= r,Z �--�
This is the sum of the annual TDV energy consumption for.energy use components iricluded in -the, performance compliance approa& fog the'Standard Design Building (Energy Budget) and the annual
TDV energy consumption for lighting and components not regulated by Title 24, Pa�t'6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an
on-site renewable energy system. �\ 1 `� �.t U `� i_' U U Li 4. 11 U U U \ O
NRefererice Energy Use Ito Energy Design Rating Margin Percent Improvement
Total Energy (kTDV/f2)' 157.48 157.02 0.46 0.3%
• includes calculated Appliances and Miscellaneous Energy Use (AMEU)
BUILDING - FEATURES INFORMATION
01
02
03
04
05
06
07
Project Name
Conditioned Floor Area (sft)
Number of Dwelling
Units
Number of Bedrooms
Number of Zones
Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
Plan 1 M- Lot 9
2415
1
4
1
0
1
ZONE INFORMATION
01
02
03
04
05
06
07
Zone Name
Zone Type
HVAC System Name
Zone Floor Area
(ft2)
Avg. Ceiling
Height
Water Heating System 1
Water Heating System 2
Plan 1M
Conditioned
Res HVAC1
2415
10
DHW Sys 1
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016
Calculation Description: Title 24 Analysis Input File Name: 13174LIP1MLot9.xml
CF1 R -PRF -01
Page 3 of 8
OPAQUE SURFACES
` IIJI IC n c
n Q--> t'1
% /`1
r-% IC
n
01
02
03
04
05
06
07
08
Name
Zone
Construction
Azimuth
Orientation
Gross Area (ft2)
Window Area (ft)
Tilt(deg)
Back Wall
Plan 1 M
R-13 Wall
155
Back
305
78
90
Back Wall 2x6
Plan 1 M
R-19 Wall
155
Back
195
96
90
Right Wall
Plan 1 M
R-13 Wall
245
Right
520
91
90
Right Wall 2
Plan 1 M
R-19 Wall
245
Right
100
0
90
Front Wall
Plan 1 M
R-13 Wall
335
Front
290
40
90
Left Wall
Plan 1M
R-13 Wall
65
Left
688
99
90
Front Wall -Garage
Plan 1M
Garage R-13 Wall
335
Front
212
0
90
Right Wall Garage
Plan 1M
Garage R-13 Wall
245
Right
69
0
90
Roof
Plan 1M
R-38 Roof RB
Window
Left Wall (Left -65)
2415
----
1
ATTIC
01 02 03 04 05 06 07
Name Construction a Roof Riser (r= r - !RoofJReflectance ( Roof Emittance Radiant Barrier Cool Roof
Attic Attic Roof Cons 0.1 � 0.85' Yes No
C\ 1% %11_I11J1 11 1,- 1l__JI i{ 11 rl 11 11 1! x1_ 0%
WINDOWS
` IIJI IC n c
n Q--> t'1
% /`1
r-% IC
n
01
02
- 03 - -
04-
-05 -
- 06 -
- 07
08
09
10
Name
Type
Surface (Orientation -Azimuth)
Width(ft)
Height
(ft)
Multiplier
Area
(ft)
U -factor
SHGC
Exterior Shading
Window
Window
Back Wall (Back -155)
----
----
1
18.0
0.34
0.24
Insect Screen (default)
Window 2
Window
Back Wall (Back -155)
12.0
5.0
1 1
60.0
0.30
0.26
Insect Screen (default)
Door
Window
Back Wall 2x6 (Back -155)
12.0
8.0
1
96.0
0.42
0.23
Insect Screen (default)
Window 3
Window
Right Wall (Right -245)
----
---
1
67.0
0.34
0.24
Insect Screen (default)
French Door
Window
Right Wall (Right -245)
3.0
8.0
1
24.0
0.30
0.19
Insect Screen (default)
Window 4
Window
Front Wall (Front -335)
4.0
5.0
2
40.0
0.34
0.24
Insect Screen (default)
French Doors
Window
Left Wall (Left -65)
----
----
1
40.0
0.30
0.19
Insect Screen (default)
Window 5
Window
Left Wall (Left -65)
---
----
1
35.0
0.34
0.24
Insect Screen (default)
French Door 2
Window
Left Wall (Left -65)
3.0
8.0
1
24.0
0.30
0.19
Insect Screen (default)
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016
Calculation Description: Title 24 Analysis
Input File Name: 13174UP1MLot9.xml
CFI R -PRF -01
Page 4 of 8
OVERHANGS AND FINS
01
02
03
04
05
06
Construction Name
Surface Type
Construction Type
Framing
Total Cavity R -value
Assembly Layers
01
02
03
04
05
06
07
08
09
10
11
12 13
14
Roof—T�russ @ 24 inr.
Overhang
Tile Gap: present
Attic Roof Cons
Attic Roofs
Left Fin
If— O.C.���!
1� noneq �
Roofing: 10 PSF (Roofrile)
Right Fin
Window
Depth
Dist Up
Left
Extent
Right
Extent
Flap Ht.
Depth
Top Up
DistL
Bot Up
Depth
Top Up
Dist R
Bot Up
Window 2
1.5
1.25
2
2
0 10
0
0
0
0
0
0
0
Door
10
0.1
10
10
1
0
0
0
0
0
0
0
0
French Door
10
0.1
10
10
1
0
0
0
0
0
0
0
0
Window 4
5
0.1
6
6
0
0
0
0
0
0
0
0
0
French Door 2
10
0.1
10
10
1
0
0
0
0
0
0
0
0
OPAQUE SURFACE CONSTRUCTIONS
01
02
03
04
05
06
Construction Name
Surface Type
Construction Type
Framing
Total Cavity R -value
Assembly Layers
• Cavity/ Frame: no insul. / 2x4 Top Chrd
— `
2x4 Top Chord of
Roof Deck: Wood Siding/sheathing/decking
Roof—T�russ @ 24 inr.
f�
Tile Gap: present
Attic Roof Cons
Attic Roofs
Wood Framed Ceiling
If— O.C.���!
1� noneq �
Roofing: 10 PSF (Roofrile)
CC)I) I k1
i.J ��
[ f ( �i { �
[ ��- � �} lJ
J � i I 0 f'
(,J jJ 1
•�Cavie Finish: Gypsum Board
Cavity /Frame: R-9.1 / 2x4
R-38 Roof RB
Ceilings (below attic)
Wood Framed Ceiling
2x4 @,24 in. O.C_ .-%
% R 38—N 11=
Over Floor Joists: R-28.9 insul.
- — —
- -
y
Inside Finish: Gypsum Board
• Cavity/Frame: R -13/2x4
R-13 Wall
Exterior Walls
Wood Framed Wall
2x4 @ 16 in. O.C.
R 13
Exterior Finish: Wood Siding/sheathing/decking
• Inside Finish: Gypsum Board
• Cavity / Frame: R-19 / 2x6
R-19 Wall
Exterior Walls
Wood Framed Wall
2x6 @ 16 in. O.C.
R 19
Exterior Finish: Wood Siding/sheathing/decking
• Inside Finish: Gypsum Board
• Cavity / Frame: R-13 / 2x4
Garage R-13 Wall
Exterior Walls
Wood Framed Wall
2x4 @ 16 in. O.C.
R 13
Exterior Finish: Wood Siding/sheathing/decking
SLAB FLOORS
01 02 03 04 05 06 07
Name Zone Area (ft2) Perimeter (ft) Edge Insul. R -value& Depth Carpeted Fraction Heated
Covered Slab Plan 1 M 2415 242 None 0.8 No
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016
' Calculation Description: Title 24 Analysis Input File Name: 13174LIP1MLot9.xml
CFI R -PRF -01
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04
Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage ACH @ 50 Pa
Not Required Not Required Not Required ---
Page 5 of 8
WATER HEATING SYSTEMS
01 02 03 04 - 05 06
Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%)
DHW Sys 1 DHW Standard DHW Heater 1 1 .0%
WATER HEATERS
01
021
03
04
05
06
07
08
Name
Heater Element Type
Tank Type
Tank Volume
(gal)
Energy Factor or
Efficiency
Input Rating
Tank Exterior
Insulation
R -value
Standby Loss
(Fraction)
DHW Heater 1
Natural Gas
Small Storage
50
0.62
40000-Btu/hr
0
0
�-. n ---% .---, .-----, .-� .,
WATER HEATING - HERS VERIFICATION
01
<02 t1 �` r
L � ) \\03,, �l� �j "
` �f X041 r7
;�,05 ri
06
07
Name
, t
Pipe Insulation j '�
ParallefPiping
f �"r
(Compact Distribution
E
EPUse
Recirculation
Control
Central DHW
Distribution
DHW Sys 1 - 1/1
N/A
N/A
N/A
N/A
N/A
N/A
HVAC SYSTEMS
01
02
03
04
05
06
07
Heating System
Cooling System
Distribution
Floor Area
Name
System Type.
Name Ducted
Name Ducted
System
Fan System
Served
Res HVAC1
Other Heat/Cool
Heating Component 1
Yes
Cooling Component 1
Yes
Air Distribution
2415
System 1
HVAC - HEATING SYSTEMS
01 02 03
Name Type Efficiency
Heating Component 1 CntrlFurnace - Fuel -fired central furnace 80 AFUE
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016
Calculation Description: Title 24 Analysis Input File Name: 13174UPIMLot9.xml
CFI R -PRF -01
Page 6 of 8
HVAC - COOLING SYSTEMS
01
02
03' 04
05
06
07
Name
Verified Airflow
Efficiency
Verified EER
Multi -speed
Verified Refrigerant
Charge
Name
System Type
EER SEER
Zonally Controlled
Compressor
HERS Verification
Cooling Component 1
SplitAirCond - Split air conditioning
12.5
15
No
No
Cooling Component
1-hers-dist
system
1 -hers -cool
HVAC COOLING - HERS VERIFICATION
01
02
03
04
05
06
Name
Verified Airflow
Airflow Target
Verified EER
Verified SEER
Verified Refrigerant
Charge
Cooling Component 1 -hers -cool
Required
350
Required
Required
Required
HVAC - DISTRIBUTION SYSTEMS
01
02
03
04
05
06
07
08
Name
Type
-
Duct Leakage
Insulation R -value
r
Supply Duct
_ Location _
Return Duct
Bypass Duct
HERS Verification
Air Distribution System 1
Ducts located in attic
7� S I I ��
Sealed and tested
t1 �/-i1 II
Required
6
1 1 f
� f"1
�AttIC i i
1 I I t^
�-^
+( Attic
tj
None
Air Distribution
System 1 -hers -dist
y
C PN .� a �� L U U U �f 1! u U U �s v
a s r r-% r V-% r_* d -1%,a t L/ it v-► 9—
HVAC DISTRIBUTION - HERS VERIFICATION `� ' ' �' ' r "t ' ' a N'" '� ' v ` '
HVAC
01
02
03
04
05 06
07
Duct Leakage
Verified Duct Design
Low -leakage
Name
Verification
Duct Leakage Target (%)
Verified Duct Location
Return Supply
Air Handler
Air Distribution System
Required
6.0
Not Required
Not Required
Not Required
---
1-hers-dist
HVAC -FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM) HERS Verification
HVAC Fan 1 Single Speed PSC Furnace Fan 0.58 HVAC Fan 1 -hers -fan
HVAC FAN SYSTEMS - HERS VERIFICATION
01 02 03
Name VerifiedFanWatt Draw Required Fan Efficiency (Watts/CFM)
Registration Number: 216-No019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1 M - Lot 9 Calculation Date/Time: 22:18, Mon, Jan 11, 2016
Calculation Description: Title 24 Analysis Input File Name: 13174UP1MLot9.xml
HVAC Fan 1 -hers -fan Required 0.58
CF1 R -PRF -01
Page 7 of 8
IAQ (Indoor Air Quality) FANS
01
02
03
04
05
06
Name
IAQ CFM
IAQ Watts/CFM
IAQ Fan Type
IAQ Recovery
Effectiveness(%)
HERS Verification
DwellingUnit
61.65
0.25
Default
0
Required
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaiCERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Plan 1M - Lot 9 Calculation DatefTime: 22:18, Mon, Jan 11, 2016
Calculation Description: Title 24 Analysis
Input File Name: 13174UP1MLot9.xml
CF1 R -PRF -01
Page 8 of 8
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
Rudy Sains
Company:
Signature Date:
Heritage Energy Group
2016-01-12 14:48:10
Address:
CEA/HERS Certification Identification (If applicable):
470 Wald
City/State/Zip:
Phone:
Irvine, CA 92618
949-584-1052
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name: / c` 1 i { I 1 y '
Responsible Designer Signature*,,, ��`::J
Alex Gonzales
'Company: \ �, �
�-.
Date Signed: tf "1
� r - _.+.
GHA Companies
,- .i:.
2016-01a -12. 14:48:54.v
Address:
License:
30-875 Date Palm Drive
N/A
City/State/Zip:
Phone:
Cathedral City, CA 92234
760-969-1400
Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the
information.
Registration Number: 216-N0019227A-000000000-0000 Registration Date/Time: 2016-01-12 14:48:54 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-10172014-651 Report Generated at: 2016-01-1122:19:56
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Plan 1M - Lot 9
Date
1/12/2016
System Name
Res HVAC
Floor Area
2,415
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,319
Return Vented Lighting
Return Air Ducts
Return Fan
' Ventilation 0
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 89,000
26,650
2,718 817
29,608
Total Output Btuh 89,000
0
Output Btuh/s ft 36.9
1,819
1,708
Cooling System
0
0
Output per System 46,500
0
0 0
0
Total Output Btuh 46,500
0
2,718
0
Total Output Tons 3.9
1,819
1,708
Total Output Btuh/sgft 19.3
Total Output s ft/Ton 623.2
1 30,287
33,024
Air System
CFM per System
1,680
HVAC EQUIPMENT SELECTION
Airflow cfm
1,680
15/12/80%
31,844 7,711
89,000
Airflow cfmisgft
0.70
Airflow cfmfTon
433.5
Outside Air %
0.0%
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
31,844 7,711 89,000
Aug 3 PM Jan 1 AM
Outside Air cfmis ft 0.00
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF
Outside Air
0 cfm
69 OF
69 OF 105 OF 105 OF
Heating Coil Supply Fan
1,680 cfm
104 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling
Peak
112/78°F
Outside Air Alr
0 cfm
76/62°F
76/62°F 55/54°F 55/54°F
-
Cooling Coil Supply Fan
1,680 cfrn
56 / 54 OF
47.9% ROOM
75/62°F
EnergyPro 6.7 by EnergySoR
User Number: 7244 RunCode: 2016-01-12714:58:06
/D: 13174U Page 1 of 1