Loading...
BCOM2016-0014 Title 24BUILDING ENERGY ANALYSIS REPORT PROJECT: Advanced Women's Health Care Tenant Improvement _7e2@9 -Corporate Center Dr., Ste 106 _ 'La Quinta, CA 92248 r Project Designer: Robert H. Ricciardi, Architect 75-400 Gerald Ford Road, Suite 115 Palm Desert, CA 92211 (760) 610-5036 Report Prepared by: �• Tim Scott ' Scott Design and Title 24, Inc, 77085 Michigan Drive Palm Desert, CA 92211 (760) 200-4780 CITY OF LAC 1ll�I�- BUILDING & SAFE `� 4 } PP�,q�� PT OR CON TRUCTION E)ATE Job Number:'- , P8 0 7 20116 Date: CITY'0, FLA, QVINTA 3/28/2016 MMUNI ' -710EVPL0,PM1NT The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is • authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. t This program developed by EnergySoft, LLC — www.energysoft.com. EnergyPro 6.7 by EnergySoft User Number: 6712 ID: TABLE OF CONTENTS .Cover Page 1 Table of Contents 2 Form ELC-01-E Electrical Power Distribution 3 Form LTI-01-E Indoor Lighting 10 Form LTI-02-E Lighting Controls 16 Form LTI-03-E Indoor Lighting Power Allowance 19 Form MCH -03-E Mechanical Ventilation and. Reheat 23 HVAC System Heating and Cooling Loads Summary 25 Zone Load Summary 26 Room Load Summary 27 CRY C� 6UILDI�vG & 9 U`N-„A P�P�ETY DEPT CC TUC OC D,?T� N BY EnergyPro 6.7 by EnergySoft Job Number: ID: User Number: 6 STATE OF CALIFORNIA Electrir,-al Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE 'Electrical Power Distribution Project Name: Advanced Women's Health Care Tenant Improvement Date y , CALIFORNIA ENERGY COMMISSION NRCC-ELC-01-E (Page 1 of 7) 3/28/2016 A. General Information Project Address: 79200 Corporate Center Dr., Ste 106 Climate Zone: 15 Conditioned Floor Area 1,596 Unconditioned Floor Area 0 Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel ❑ Schools ❑ Relocatable Public Schools m Conditioned Spaces ❑ Unconditioned Spaces Phase of Construction: ❑ New Construction ❑ Addition m Alteration 00 • CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance ! ®F B UILp1NG 1 QU1N'7'. �SA PPF3 Ely DEPT FOS C;ONSTR VCD D,4tTE ON May 2015 old STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power Distribution Project Name. Advanced Women's Health Care Tenant Improvement IQ ENERGY COMMISSION Date Prepared: 3/28/2016 NRCC-ELC-01-E (Page 2 of 7) B. Electrical Service Metering ❑ Each newly installed electrical service (in both existing and newly constructed buildings) is required to be metered, as set out in Table 130.5-A, which is reproduced below. ❑ Fill out a separate line for each electrical service that is connected to the building. Electrical Field Electrical Service Schedule Service Rating Metering Capabilities (check all that are present) Inspector A B C D E F G a N x rDN ;0~ 2 S 7 MN y 3 7r M < '(D v S y T a ' 3= M N 3 N a C d Dr M s o M o d :: = Designation/location in building/description kVA ami 900 Amp SILlb Panel ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Table 130.5-A - MINIMUM REQUIREMENTS FOR METERING OF ELECTRICAL LOAD More than 50kVA More than 250 kVA Services rated and less than or and less than or more than Meter Rating (kVA) 50 kVA or less equal to 250 kVA equal to 1000kVA 3000kVA Instantaneous (at the time) kW demand Required Required Required Required Historical peak demand (kW) Not required Not required Required Required Resettable kWh Required Required Required Required kWh per rate period Not required Not required Not required Required Btj'LDING a011 SQU/NT,i �P� 0 DEPT '10ONSTR DVC�� • ATE N CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 94 4 STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power Distribution Project Name: Advanced Women's Health Care Tenant Improvement CALIFORNIA ENERGY COMMISSION Q Date Prepared: 3/28/2016 NRCC-ELC-01-E (Page 3 of 7) C. Disaggregation of Electrical Circuits ❑ Each newly installed switchboard, panel, and motor control center (in both existing and newly constructed buildings) is required to be disaggregated according to the requirements of Table 130.5-B, shown on the next page. ❑ Individual branch circuits, taps or disconnects that require overcurrent protection devices rated 60A or greater. ❑ As an alternative, current transformers can be added for individual branch circuits and loads throughout the building, and a permanent measurement system can be installed. In this case, disaggregated wiring would not be required as long as the metering system allows the equivalent disaggregated measurements. ❑ Fill out a separate line for each switchboard, motor control center, panelboard and subpanel. Switchboard, motor control center, panelboard or Electrical Service that supplies that subpanel switchboard or panel Electrical Service Rating Field Inspector 0 A B C D Designation/location in building/description Designation/location in kVA building/description ❑ ❑ 200 n -R h-papel 200 Amp -S, late 106 7205 ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ V t !'n 1 -� -10 ❑ I N R, C r r d ❑ ❑ PT; ❑ ❑ P"� r t El ..' ' UCTION OR I DATE ,BY Current transformers have been attached to individual branch circuits and loads throughout fh-LrbuNdirag,_ � a eYmafle+�� measurement system is installed that allows an equivalent degree of disaggregated measurement as required by the Standar s.. ❑ ❑ CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 04 STATE OF CALIFORNIA Electrical Power Distribution s CEC-NRCC-ELC-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E Electrical Power Distribution (Page 4 of 7) Project Name: Advanced Women's Health Care Tenant Improvement °ace °`ePa.ea: 3/28/2016 D. Disaggregation of Electrical Circuits (continued) Table 130.5-B - MINIMUM REQUIREMENTS FOR SEPARATION OF ELECTRICAL LOAD Table 130.5 — B sets the upper limit on how many load(s) of each type can be supplied by each feeder. A feeder may not supply loads of more than one type unless the service is rated at 50 kVA or less. For instance, on the fifth row of the table, one feeder on a service >50 kVA could be used to supply all the plug loads on a floor of a building, provided that there are no areas in which more than 25kVA of plug load is supplied to a space less - than 5000sf Services rated more than Services rated more than Services rated 50kVA and less than or 250 kVA and less than or Services rated more Load Type 50 kVA or less equal to 250 kVA equal to 1000kVA than 1000kVA Lighting including exit and All lighting egress lighting and exterior Not required All lighting in aggregate All lighting disaggregated disaggregated by floor, lighting g g by floor, type or area type or area HVAC systems and components including chillers, fans, heaters, All HVAC in aggregate All HVAC in aggregate furnaces, package units, cooling Not required All HVAC in aggregate and each HVAC load and each HVAC load towers, and circulation pumps rated at least 50 kVA rated at least 50kVA associated with HVAC Domestic and service water system pumps and related Not required All loads in aggregate All loads in aggregate All loads in aggregate systems and components All plug load separated by All plug loads separated All plug load in aggregate floor, type or area by floor, type or area. Plug load including appliances Groups of plug loads Groups of plug loads All groups of plug loads rated less than 25 kVA Not required exceeding 25 kVA exceeding 25 kVA exceeding 25 kVA connected load in an area less than 5000 sf connected load in an area connected load in an less than 5000 sf area less than 5000 sf Elevators, escalators, moving walks, and transit systems Not required All loads in aggregate All loads in aggregate All loads in aggregate Other individual non -HVAC loads or appliances rated 25kVA Not required All Each Each or greater Industrial and commercial load centers 25 kVA or greater including theatrical lighting Not required All Each Each installations and commercial kitchens Renewable power source (net or total) Each group Each group Each group Each group Loads associated with moi 9`f-� s renewable Not required All loads in aggregate I All lows i aggregat al Irtoadsrr� a gregate power source n 1-111 lik Charging stations for electric All loads in All loads in N 0 `AII lo, d % -TpI vehicles aggregate aggregate' ,in, aagg"r�gat@,F gtd� n gl gate LlC � t -op C°N� Ruc�©N • �c,TE By CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION IQ *4 E. Voltage Drop ❑ Attach voltage drop worksheet to this form, ❑ Field inspector has discretion to approve the worksheets; the tables shown below in this section are advisory only ❑ Feeder conductors and branch circuits that are dedicated to emergency services are exempt from these requirements. ❑ An advisory table of typical power factors is shown below Field Inspector � d N N T L1 Feeders. Feeder conductors shall be sized for a maximum voltage drop of 2 percent at design load. ❑ ❑ Branch Circuits. Branch circuit conductors shall be sized for a maximum voltage drop of 3 percent at design load. ❑ ❑ Compliance Manual, Chapter 8, Table 8 2: Typical Power Factors for Voltage Drop Calculations Default Power Factor Default Power Factor Load Type at 120 volts at 277 volts Clarifying Notes Fluorescent lighting 0.95 0.95 Compact 0.9 (hardwired) 0.9 (hardwired) fluorescent lighting NPF magnetic ballasts use GU -24 values 0.5 (GU -24) 0.3 (GU -24) LED lighting 0.7 0.5 May be higher if specifications call for high power factor drivers Incandescent lighting 1.0 1.0 HID lighting 0.9 0.9 May be lower if NPF ballasts are specified HVAC packages 0.85 0.9 Other motors <5 HP 0.8 0.8 Other motors >5 HP 0.85 0.85 Kitchen equipment 0.9 N/A Receptacles 0.6 N/A For dedicated receptacles, may be rated according to the load Electric heating includinghot water 1.0 1.0 EULDIN / - QUINA & SAFETY DEPT Other 0.85 0.85 1 F0jj coN' R(v�D • BATE v, Y ---�—'"—ABY CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 0 STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power Distribution Project Name: Advanced Women's Health Care Tenant Improvement Date CALIFORNIA ENERGY COMMISSION NRCC-ELC-01-E 3/28/2016 (Page 6 of 7) F. Circuit Controls for 120 -Volt Receptacles ❑ Controlled 120 volt receptacles shall be provided, as required by Section 130.5(d) of the Standards. ❑ In open office areas, controlled circuit receptacles are not required if, at time of final permit, workstations are installed, and each workstation is equipped with an occupant sensing control that is permanently mounted in each workstation, and which controls a hardwired, nonresidential - rated power strip. Plug-in strips and other plug-in devices that incorporate an occupant sensor shall not be used for this exception. ❑ Receptacles that are only for the following purposes are exempt: -Receptacles specifically for refrigerators and water dispensers in kitchenettes. -Receptacles located a minimum of six feet above the floor that are specifically for clocks. -Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in copy rooms. Field Inspector � IL N N T - 1 1. At least one controlled receptacle is installed within 6 feet of each uncontrolled receptacle, or split -wired duplex receptacles are installed, that have one controlled and one uncontrolled receptacle. This applies in all of the following spaces: • Private offices, open office areas • Receptions and lobbies' ❑ ❑ • Conference rooms • Kitchenettes in office spaces • Copy room 2. Electric circuits serving controlled receptacles are equipped with automatic shut -OFF controls following the requirements prescribed in Section 130.1(c)1 through 5 (in many cases this will mean that the receptacles are connected ❑ ❑ to the same automatic shut -OFF system as the general lighting of the space). 3. Controlled receptacles shall have a permanent marking to differentiate them from uncontrolled receptacles. ❑ ❑ 4. For open office areas, controlled circuits shall be provided and marked to support installation and configuration of office furniture with receptacles that comply with Section 130.5(d) 1, 2, and 3. ❑ ❑ 5. For hotel and motel guest rooms at least one-half of the 120 -volt receptacles in each guest room are controlled receptacles that comply with Section 130.5(d)1, 2, and 3 (see numbers 1,2 and 3 above). Electric circuits serving controlled receptacles have captive card key controls, occupancy sensing controls, or automatic controls such that, no ❑ ❑ longer than 30 minutes after the guest room has been vacated, power is switched off. 6. Plug-in strips and other plug-in devices that incorporate an occupant sensor are not used to comply with any of these requirements. ❑ ❑ C l OF.,, rI.DING & SAF,Uf N,A FOR j.�0�n' D'EPT CNSTRUCTIC� • oAr� N • �—BY CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 0 STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power Distribution Project Name:Advaneed Women's Health Care Tenant Improvement CALIFORNIA ENERGY COMMISSION IQ Date Prepared: 3/28/2016 NRCC-ELC-01-E (Page 7 of 7) DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Documentation Author Signature: company. Scott Design and Title 24, Inc, Signature Date: 3/28/2016 Address: 77085 Michigan Drive CEA/ HERS Certification Identification (if applicable): City/State/zip: Palm Desert, CA 92211 phone: (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides- Rthp bit ing owner at occupancy. Responsible Designer Name: Robert Ricciardi Responsible Designer Signature: Company: Robert H. Ricciardi, Architect Date Signed: V■ Address: 75-400 Gerald Ford Road, Suite 115 License: C Phone: (760) 610-5036 City/State/zip: Palm Desert, CA 92211 BUILDGI QI JIN-rA & s a YDE Pr For'C�NS7-RV C�� arF N • 8Y I CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 ST CALIFORNIA to IN*R LIGHTING b CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 1 of 6} Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 A. General Information For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission. YES NO FORM TITLE ✓ NRCC-LTI-01-E Certificate of Compliance. All Pages required on plans for all submittals. Climate Zone: Conditioned Floor Area: 1,596 ✓ NRCC-LTI-03-E Indoor Lighting Power Allowance ✓ NRCC-LTI-04-E Tailored Method Worksheets 15 Unconditioned Floor Area : 0 Building Type: ❑ _ Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel ❑ Schools ❑ Relocatable Public Schools L✓] Conditioned Spaces ❑ Unconditioned Spaces Phase of Construction: ❑ New Construction ❑ Addition Alteration Method of Compliance: ❑ Complete Building LI Area Category ❑ Tailored Project Address: 79200 Corporate Center Dr., Ste 106 B. Lighting Compliance Documents (select yes for each document included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission. YES NO FORM TITLE ✓ NRCC-LTI-01-E Certificate of Compliance. All Pages required on plans for all submittals. ✓ NRCC-LTI-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals. ✓ NRCC-LTI-03-E Indoor Lighting Power Allowance ✓ NRCC-LTI-04-E Tailored Method Worksheets ✓ NRCC-LTI-05-E Line Voltage Track Lighting Worksheets o � c �Qo _r7 x Co yr �®mom CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 ST CALIFORNIA • INOR LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 2 of 6) Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 C. Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces Form/Title Watts Watts ❑ Field Inspector Installed Lighting Installed Lighting CI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), 935 1 0 1. NRCC-LTI-01-E, page 4 + !=NRCI-LTI-03-E �' �� � NRCC-LTI-01-E, page 4 + � 2' PORTABLE ONLY FOR OFFICES + 'NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a NRCC-LTI-01-E, page 3 C conference room, a multipurpose room, or a theater to be recognized for compliance. Minus Lighting Control Credits �J 0 Minus Lighting Control Credits MT 0 3 NRCC-LTI-02-E, page 2 t NRCC-LTI-02-E, page 2 Adjusted Installed Lighting Power 935 Adjusted Installed Lighting Power 0 4 (row 1 plus row 2 minus row 3) _ (row 1 minus row 3) _ 5. Complies ONLY if Installed _< Allowed Complies ONLY if Installed <_ Allowed 6. Allowed Lighting Power 1,197 Allowed Lighting Power 0. Conditioned NRCC-LTI-03-E, page 1 Unconditioned NRCC-LTI-03-E, page 1 D. Declaration of Required Installation Certificates Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) r;YES- - —NO Form/Title �mNRCI-LTI-01-E - Must be submitted for all buildings ❑ Field Inspector 0 �Q _N� CI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), [3 Field Inspector ' ` to be recognized for compliance. t O !=NRCI-LTI-03-E �' �� � - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary ' ❑Field Inspector � �overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance. 'NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a ❑Field Inspector C conference room, a multipurpose room, or a theater to be recognized for compliance. �J NRCI-LTI-05-E -Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. ❑Field Inspector MT b, y I NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for ❑ Field Inspector t compliance. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STA CALIFORNIA IN R LIGHTING • • a CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 3 of 6} Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 E. Declaration of Required Certificates of Acceptance . Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title ; NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. ❑ Field Inspector NRCA-LTI-03-A - Must be submitted for automatic daylight controls. ❑ Field Inspector NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. ❑ Field Inspector A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: ❑ CONDITIONED SPACE ❑ UNCONDITIONED SPACE F. Indoor Lighting Schedule and Field Inspection Energy Checklist ❑ The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. ❑ When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. ❑ When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines ❑ Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed. m CD z gym° CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STA CALIFORNIA IN R LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE' NRCC-LTI-01-E Indoor Lighting (Page 4 of 6} Project Name: Advanced Women's Health Care Tenant'Improvement Date Prepared: 3/28/2016 G. Installed Portable Luminaires in Offices — Exception to Section 140.6(a) ❑ This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. ❑ This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office ❑ Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector 1 2 3 4 5 6' 7 8 9 10 Installed If F:5 0.3, portable Watts enter 0 v luminaire CU w w per zero; Identify Office area in - •c ' watts in v ° square G05 x G07 which these portable Pass Fail Complete Luminaire Description Z J . this office 6 w foot if G06 > luminaires are installed (i.e., LED, under cabinet, furniture mounted Watts per (G02 x ° (G04 / 0.3, direct/indirect) Luminaire G03) G05) (G06-0.3) ❑ ❑ ❑ ❑ �j ❑ ❑ ❑ ❑ M, rry rN C a' Enter sum total of all pages into NRCC-LTI- �ota�nstalled portable luminaire watts that are greater than 0.3 watts per square foot per office: 01-E; Page 1 6-090 co Q �'77 zo � 0b CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STA CALIFORNIA IN R LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSIVN CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 5 of 6y Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE ❑ UNCONDITIONED SPACE H. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector A B C D E F G H How wattage was determined v v � O1 h • `o M Complete Luminaire Description n O j to a c v (UN �, Y 0 c c x .Y v E E (Le, 3 lamp fluorescent troffer, Y c ;� v z v o E g m c E E — X ;4 o Primary Function area in which z y F32T8, one dimmable electronic ballast) J a z , = these luminaires are installed Pass Fail 2X2 LED 2X2 LED Panel 25.0 ❑5 125 Office > 250 s ft ❑ ❑ 45.0 ❑ -18' 810 Office > 250 s�ft ❑ ❑ ❑ ❑ ❑ ❑ �`__ ❑ ❑ ❑ ❑ D ❑ ❑ ❑ ❑ I m Q7 ❑ ❑ ❑ ❑ G r ❑ ❑ ❑ ❑ O 6 U INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into f 935 NRCC-LTI-01-E; Page 2 C m Mz CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STA ALIFORNIA IN R LIGHTING CEC-NRCC-LTI-01-E (Revised 08/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 6 of 6) - Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Documentation Author Signature: J Company: Scott Design and Title 24, Inc, Signature Date: 3/28/2016 Address: 77085 Michigan Drive CEA Certification Identification (if applicable): City/State/Zip: Palm Desert, CA 92211 Phone: (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the rb.uilder provides to the building owner at occupancy. Responsible Designer Names Robed -Ricciardi Responsible Designer Signature: 11 Co panyi: LR' Qrt/H. Ricciardi, Architect C )b414 Date Signed: 1 Ad r ss. � � X75- 0 Gerald Ford Road, Suite 115 License: Ci j tate/zip: o %r ;f besert, CA 92211 Phone: Phone_ (760) 610-5036 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STA CALIFORNIA INIWR LIGHTING — LIGHTING CONTROLS is CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION v' CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3� PrgectName: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project. Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.) YES NO Control Requirements Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9. •/ Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b). One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b). A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an ✓ Installation Certificate shall be installed in accordance with Section 130.4(b). All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's ✓ instructions in accordance with Section 130.1. ✓ All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a). General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, ✓ and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, omental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4. i m The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the ✓ lighting in accordance with Section 130.1(b). _T7r�ultilAJI control requirements it lllbd indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c). co U?ghZ 5mgin all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans. �1 i - n power'in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in laiRr nce with Section 130.1(e). or an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for ✓ I use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in dance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF n oIs, and demand responsive controls. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STA CALIFORNIA INOWR LIGHTING — LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3} ProjectName: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: ❑✓ CONDITIONED SPACES ❑ UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST PAF Credit Calculation 2 n rD D _T a - 1 o r 3 r) n o z M CD -0 `— N fD Standards Complying With ° " (D a, Lighting Control Schedule (✓ all that apply, or enter 'E' if Exempted) aq CL ° -n = ° a rD o A B C D E F G H I J K L M N O Type/ Description of Lighting Control (i.e.: occupancy sensor, # to, °' to, WI °' ato,Location in Building b automatic time switch, of 0 0 0 0 0 0 0 0 �_ dimmer, automatic daylight, Units t:t 2 O : etc...) Offices -�� occupancy sensors 8 ❑ ❑ dffces Q7 automatic time clock 1 ❑ ❑ ices Q r = daylighting sensors 5 ❑ ❑ � ` `� ❑ ❑ O ❑ ❑ �, 1 ❑ ❑ W .Z -'n K .1 101 ❑ C n Control Credit PAGE TOTAL (Sum of Column M): 0 `! IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M): 0 z O Enter Control Credit total �j into NRCC-LTI-01-E; Page 1. 1. §130.1(a) = rea controls, §130.0(b) = Multi Level, §130.1(c) =Auto Shut -Off, §130.1(d) =Mandatory Daylight; §130.1(e) =Demand Responsive, §140.6(d) = Additional lighting controls installed to earn a PAF, • §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PRFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out signed, and submitted. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STA CALIFORNIA INOWR LIGHTING — LIGHTING CONTROLS -EC-NRCC-LTI-02-E (Revised 05115) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E' Indoor Lighting - Lighting Controls (Page 3 of 3} Project Name: Advanced Women's Health Care .Tenant Improvement Date Prepared: 3/28/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Documentation Author Signature: ,, Company: Scott Design and Title 24, Inc, Signature Date: 3/28/2016 Address: 77085 Michigan Drive CEA Certification Identification (if applicable): City/State/Zip: Palm Desert, CA 92211 Phone: (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency fur approval wlth this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Robert Ricciardi Responsible Designer Signature: Company: Robert H. Ricciardi, Architect Date Signed: o License: o Addr'ss:75-400'Gerald Ford Road, Suite 115 City State%tip: (P -De' esert, CA 92211 Phone: (760) 610-5036 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STACALIFORNIA IND OR LIGHTING POWER ALLOWANCE 101 b 4 . �� 'EC -NRCC-LTI-03-E (Revised 05115) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 1 of 4) Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: m CONDITIONED spaces ❑ UNCONDITIONED spaces A. SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES ❑ If using Complete Building Method for compliance, use only the total in column (a) as total allowed building watts. ❑ If using Area Category Method, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total allowed building watts 1 (a) (b) 1. Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E (below on this page) 3 Total Watts. Enter Total Watts into section A, row 2 (Above on this page) 2. Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI-03-E (below on this page) 1,197 3. Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E 0 TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01, Page 2, Row 1 1,197 ❑ Check here if building contains both conditioned and unconditioned areas. B. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE Total from section C-2 1 2 0 3 Total Watts. Enter Total Watts into section A, row 2 (Above on this page) 4 WATTS COMPLETE ALLOWED M n TYPE OF BUILDING (From §140.6 Table 140.6-B) PER (ftZ) X BLDG. AREA _ WATTS O% r'- --. 7 Total Area: O —0 I Total Watts. Enter Total Watts into section A, row 1 (Above on this page) IC< -1 ARE74- Al EGO�tYMETHOD TOTAL LIGHTING POWER ALLOWANCES (D plus E) Watts C115 C �5 Total from section C-2 1,197 Total from section C-3 0 Z f77 Total Watts. Enter Total Watts into section A, row 2 (Above on this page) 1,197 y CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STACALIFORNIA IND OR LIGHTING POWER ALLOWANCE 0 90 EC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 2 of 4) Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: m CONDITIONED spaces ❑ UNCONDITIONED spaces C -2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE ❑ Do not include portable lighting for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E. ❑ Separately list lighting for each primary function area as defined in §100.1 of the Standards. A B C D AREA CATEGORY (From §140.6 Table 140.6-C) WATTS ALLOWED Location in Building Primary Function Area per Table 140.6-C PER (ftz) X AREA (ft2) = WATTS Tenant Improvement -Office Office > 250 soft 0.75 1,596 1,197 -n ., C � r=- �. C) Z r) i7 zC�1R7 TOTALS 1, 596 Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance form) WATTS CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STA' CALIFORNIA IND OR LIGHTING POWER ALLOWANCE �EC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 3 of 4) Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: m CONDITIONED spaces ❑ UNCONDITIONED spaces C-3 AREA CATEGORY METHOD ADDITIONAL LIGHTING WATTAGE ALLOWANCE (from Table 140.6-C Footnotes) A B CZ D E F G ALLOWED Additional Wattage WATTS Primary Sq Ft or Watts Allowance Description(s) and Quantity of Special Total Design Smaller of Function linear ft 1 Allowed (B x C) Luminaire Types in each Primary Function Area Watts 3 D or F C � =� —f TOTALS —Enter into TOTAL AREA CATEGORY METHOD ADDITIONAL ALLOWANCES —Section C-1 0 1. Us li ar,�f6, e��io. ly for additional allowance for white board or chalk board. All other additional Area Category allowances shall use watts per square foot. 2 . A ditiona't5 are available only when allowed according to the footnotes on bottom of Table 146-C, which include: Specialized task work; Ornamental lighting; Precision- coea e tial and industrial work; Per linear foot of white board or chalk board; Accent, display and feature lighting; and Videoconferencing Studio lighting.. f cation and wattage shall be determined in accordance with §130.0(c) of the Standards. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STACALIFORNIA IND OR LIGHTING POWER ALLOWANCE • • s CEC-NRCC-LTI-03-E (Revised 05/15) - CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 4 of 4) Project Name: Advanced Women's Health Care Tenant Improvement Date Prepared: 3/28/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Documentation Author Signature: Company: Scott Design and Title 24, Inc, Signature Date: 3/28/2016 Address: 77085 Michigan Drive CEA Certification Identification (if applicable): City/state/Zip: Palm Desert, CA 92211 • Phone: (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Robert RICCIBrdI Responsible Designer Signature: Ja Company: Robert H. Ricciardi, Architect Date Signed: Address: License: 7�5_-400 Gerald Ford Road, Suite 115 Cjty/State/Zip:^ C �al`ml Desert, CA 92211 Phone: (760) 610-5036 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CAJ&ORNIA MECHAWAL VENTILATION AND REHEAT CEC-NRCC- -03-E (Revised 05/15) CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E Mechanical Ventilation & Reheat of2) (Page 1 Project Name: Advanced Women's Health Care Tenant Improvement Date PrePared: 3/28/2016 ACTUAL DESIGN INFO (FROM EQUIPMENT VAV Reheated Primary Air VAV Deadband SCHEDULES, ETC) AREA BASIS OCCUPANCY BASIS MINIMUM CFM Primary Air CFM A B C D E F G H I 1 K L M N O P Q R s T r, O < Z n m O to Z Ll a o T O in D x 0 D N Z Gl n Z > z n O Z 3 Z r 9 Z r Z C " v 3 Z r 3 X D p n O O p e D a n X 3 3 n O N Z O 0= Z_ \ 0o D n C) m O v, n Z 3Ds Z p Z C y �Go n Z G1 9 3pz \ Zm n T D T Z 30�^ _ D D ,^ A 3 v 3 m A v D 3 T A r 0 G3 3r00G z r? O D< 3oRzn0 O 3 C 9 r-1 2 p 0 n v T Q p n X,^ m D D " T y --Dp < > v m' 1< V = 0X v 3 v Z r GD'1 3 < O D 3 1< D O m D z �+ C z i v+ o x 3 N Z Z 0 vmi y m Z GZ'1 D D Tenan 1,596 0.15 239 16.0 15.0 239 239 Y Total 239 Yellow shaded cells require user input. Remaining cells are protected and automatic B. The largest- ta o t of-pFima.r-y air supplied by the terminal unit when it's operating in the cooling mode. C. The smallest amount of primary air supplied by the terminal unit in the deadband mode. D. The l rr est ar1lDunt of Lima y alr supplied by the terminal unit when it's operating in the heating mode. E. F. A terminal urkiD aS1be contro�ledl with DDC controls, or non -DDC controls. Each control category has different reheat limitations in code. Transfer Air Required Ventilation Airflow M) is than the Design Primary Deadband Airflow C). H. rtausf=be ISrovided where (Column greater (Column M�i n mum ve�itiI ttion�ate,p r §120.1. Table 120.1-A. J. ��ection Bas�d the 50% CBC load for for fixed M. on nurnber�of.f ed seats where applicable or greater of the expected number of occupants and of the occupant egress purposes spaces without seating. wired Venula ri /AirfM (Peq'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L) N. isscolumra.identjYfiftwh-ether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. 111ilsignAigloyv 0. * 0.50 for DDC, Design Primary Cooling Airflow * 0.30 for Non -DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. Prir ary�Cdo1'rgg aximumLof CoL�rnniNka�d Column O. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable. 1+wkthet is not the Design Primary Reheat Airflow the level, It the in P to the in D. LR.design colurari4entifi- der or at zone complies or not. compares value column value column Pr�maf-y-- of �liirfpw * 0.20 for DDC. Not applicable for Non -DDC zones or zones where Design Primary Cooling Airflow is 300 cfm or less. aximurr fCcar nd Column R. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less. is column identife4her or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C. CA Building Energy Eff- fic a y -Standards 2013 Nonresidential Compliance May 2015 STATE OF C ORNIA MECHAL VENTILATION AND REHEAT •� CEC-NRCC- 03-E Revised 05/15 CALIFORNIA ENERGY COMMIS CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E Mechanical Ventilation & Reheat (Page 2 of 2) Project Name: Advanced Women's Health Care Tenant Improvement - Date Prepared: 3/28/2016 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Documentation Author Signature: Company: Scott Design and Title 24, Inc, Signature Date: 3/28/2016 Address: 77085 Michigan Drive CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert, CA 92211 Phone: (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. l understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Tim Scott Responsible Designer Signature: A Company: Scott Design and Title 24, Inc. Date Signed: 312, Address.---�_ 77085 Michigan Drive License: City/State%Zig:> —I Palm=Resert, CA 92211 Phone: (760) 200-4780 I -n c X ZC n �� O -G) G �z C: M Z CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 f L— HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Advanced Women's Health Care Tenant Improvement Date 3/28/2016 System Name Exist. HVAC Floor Area 1,596 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL CFM 1,083 239 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 58,000 19,864 6,673 369 5,605 Total Output Btuh 116,000 0 Output Btuh/s ft 72.7 993 280 Cooling System 0 0 Output perSystem 58,000 9,112 3,126 239 11,193 Total Output Btuh 116,000 0 9,798 0 Total Output Tons 9.7 993 280 Total Output Btuh/sgft 72.7 Total Output s ft/Ton 165.1 30,963 17,359 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 4,000 Exist. 5 Ton HVAC 84,444 18,952 72,450 Airflow cfm/s ft 2.51 Airflow cfmfTon 413.8 Outside Air % 6.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 84,444 18,952 Jul 3 PM 72,450 Outside Air cfm/s ft 0,15 Note: values above given at ARI conditions Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF Outside Air 239 cfm 70 OF 67 OF 84 OF Heating Coil Supply Fan 4,000 cfm 84 OF ► ����� o 84 F ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak 112/78°F Outside AirAr cfm OF 76 / 64 F 78/65°F 59/57°F 59/57°F ,�y LA %�' 1jj+j�239 7Fan Coolin Coil SQ�581OF g 4BUILDING & SA A ¢� 52.9=°0 o T FOR CONST k o Jl RUCTION 76 / F EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 201 6-03-28 70 9:10:17 /D: Page 25 of 27 • ZONE LOADSUMMARY ProjectDate ,Advanced .Improvement Name ,Exist HVAC FloorSystem Area 5•, ZONE LOAD SUMMARY SYSTEM COOLINGZONAL SYSTEM NAME Tenant Improvement -Office TOTALS (BLOCK LOAD) • ROOM LOAD SUMMARY Project Name Advanced Women's Health Care Tenant Improvement System Name Exist. HVAC ROOM LOAD SUMMARY Date 3/28/2016 Floor Area 1.596 ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible Tenant Improvement -office T/ 1 1,083 19,864 -522 1,0831 19,8641 6,673 3691 5,605 PAGE TOTAL TOTAL ' 1,083 19,864 6,673 369 5,605 1,083 19,864 6,673 369 5,605 Total includes ventilation load for zonal systems. I EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2016-03-28709:10:17 ID: Paae 27 of 27