BRES2016-0157 Revision 1 Plan CheckB.G. STRUCTURAL ENGINEERING
BRIAN GOTTLIEB - CIVIL ENGINEER - Lic. No. C33047
75-175 Merle Drive, Suite 200 "
Palm Desert, CA 92211
(760) 568-3553 (760) 568-5681 Fax
Firestone Residence Remodel
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCT ON
Stracts Inc.
DATE BY �p 550 S. Oleander
Palm Springs, CA 92264
Job Number: 908.13
June 27, 2016
Plan Check # 1
i
.J
�M1kr'
s
ECE"ED
JUN 2 8 2016
CITY OF LA QUINTA
COMMUNITY DEVtLOPMENT
QROFESS/O�\"
* Exp.6-30-18
q�OF CA%VFO��
VALID ONLY IF SIGNED .
IN RED se I
B.G. STRUCTURAL ENGINEERING
BRIAN GOTTLIEB - CIVIL ENGINEER - Lic. No. C33047
75-175 Merle Drive, Suite 200
Palm Desert, CA 92211
(760) 568-3553 (760) 568-5681 Fax
June 27, 2016
Mr. Anton Marinkovich
Stracts Inc.
550 S. Oleander
Palm Springs, CA 92264
RE: Plan Check for SRF - Firestone Residence Remodel
53-510 Del Gato Drive (Lot 100, Tract 28867)
La Quinta, CA 92253
Structural (General) Comments:
1. See attached l 1x17 copies of existing foundation and framing plans for the
existing residence. See also attached framing details. We do not have foundation
details. Per attached existing plans and details, (3)-6x6 wood columns (not used
for shear/lateral) within wood framed column masses along with (4)-4x 10 beams
are being omitted to eliminate the arches and create a larger opening as depicted
in the remodel per structural sheet S-2. See detail 1/S-3 for added 2x blocking
and mechanical ties to the existing roof sheathing/decking and new 6 3/a"x 16.5"
glu lam beam. As noted on structural sheet S-2, No lateral analysis is required.
Also, there are no changes to the structural calculations.
Structural (Observation) Comments:
1. Not applicable, see comment #1 in structural (general) comment(s).
Additional Comments:
1. See comment #1 in structural (general)_ comment(s).
2. See comment #1 in structural (general) comment(s).
Please call me at (760) 568-3553 if you have any questions or would like to discuss
this matter.
Sincerely,
1 /
, 1
�p i
bn Gottlieb, P.E.
cc: file
* EV.6-30-18
CIVII- �Q-
q�OF CAlIFO��
VALID ONLY IF SIGNED
IN RED
K
iUo,�c.-4k-1
fa
j `POST .
ea
F 1 I
Ps
E- '
Mae'
I em I I
� Posr
Fd I I
�FQ
i� CA
,
L__ J
6m 1a1+6 ®EA FACE �-
t*osT
I I
-I I
�. F19
I 6m
1 I P09T 1a7"®EA FACE -I I
I I
1 I
I I
aSLOPE
I I
1ffm. I I
' I I
fa
F I I
I 1'
�
I
� i � P0,4f QJ13®FA FACE i 1
POST
_
L_J F I I
--- J
' i
a1P6®EA FACE
GA ;
A.MW
o
S IONIV I
ARCHITECTURE
o
v
I
1;�
o
11
o
v
--- -- --------- -----
------ ----
------- v ----
------
.
I m ya I J +a I I I. SEE STRUCTURAL NOTES ON SHEET Si.
POST
1 PDsr 1 ( u sa 1 I
sa Tm I , z I 1 64 I I a VEFVYALLDSSMON6. hue STEPS. S10PM
I 1 I 1 i um w
OEPI SMNSruCFMOR�YMMPan
TOCONSTRUCTIOK
a DONIRDL meas BYDDNTRADrpL pe6es. MAa, W
I
��_ �. . C4
P-z ,Omt yAtmaa. I l I 1 � .
I I I I
60N.
wA1 I P03f -- --- I
----------- ——-- I 1 L
I 1 ❑ —, r— t, i L_
POST
F}—
n
r — aJ
a•coNc. atAe ovERawe.e. III I u I .
_ �� I
F Fs POST I L
SPREAD FOOTING SCHEDULE
REINFORCING
FOOTING FOOTING OF S 1a'QEM FROM
MARK SUEI50.) PN.1 SOTTOM)
EA WAY
F•1
2'-0'
1?
264
Fa
7•e:'
IV
324
v
7.0'
+r
366
' F-4-
SW
+r
166
FL6
.. ra
rr
466
Fd
c4r
tr
565
' F•T
, W-W
+r
666
F-0
6'8'
tr
Ste
: F•1D
ea
a
Tse
Z
PLACE CONTROL I r—
metre EYERV2006P. �--. I � _ __— --� arcol2rRAeroR I I _----J L..._J 0 I
I
n>�
POST 10 'PANDir
1 I
I I
I
Fd
N-=--'=-
FJ I I
I
L_ Olzs
---------
----�
I---
I
66 TNT
I I
I
YAtmlr
I
L�
POST
t I
{PI
LJ
;ANDIr
MAIN HOUSE FOUNDATION PLAN
SCA4-E : 1/4" =l'-0"
0.
0 W .
VERIFY ALL DIMENSIONS WITH ARCHITECTURAL.
<:
❑ DRAWINGS PRIOR TO: CONSTRUCTION.
= "1
Revisions
S.E. CONSULTANTS, INC. IS NOT RESPONSIBLE FOR
DIMENSIONS, -ONLY PROVIDED AS A COURTESY.
.O09-02-04.
Project Na
04.126
Ina
SE. CONSULTANTS: .
I , woo Fast Thomve Raa4 5m'ta la
. ScaDe6d.. AZ essst
will
r
r
- - - - - - -� L---------------
I ---- ----I----
-------
I i
BBQ I
I
1
I I
F-4
I
----L
I
1,
SIMP.
--L
I
1
1
1
"HPAHD22"
I
O
I _-�
FA
I
L-----..� 6x6
�OST----r
I
t
I
1
--�JEll
1 F-2
1
14
F-4 I
I
I
I
TYP'. ----L
-1,
S-8
I
C.J. I
I
i .
I
I L_
1 F-2
.t,tt�t
&L1�S I
I
SIMP.
13
i POST
I
F-4
I
5
"HPAHD22
S-8
I F-2--
I
-L
I
-1,
S-8
1 ----
I.
1
----------
---
C.J.
I
1
I I t
L-- --�
(2)#5 @ EA. FACE
I
6x6
I
I
SIMP.
3 "HPAHD22"
I
POST
F-2
F-4 I
I
S-8 TYP
I
1---
I
F.
• I
I
O
1 i
i
C.J. I
i
I
I
I
I
(2)#5 @ E. FACE -
1 6x6
S-8
I '
POST
§L PE I .
I•
1/8" /FT. F-4
SIMP.-
(3)2x6
"HPAHD22"
I
19 L
_J -P,OST
I
4 r-_ -
- --
I r-----
S-8
I
i
C.J. 1
I
1
L--J
I I
64
POST
I
I
(2)0. @ EA..FACE � TI
1
� J
I
F-4 J--
f
I
t
I
4" CONC..SLAB OVER 4"'A'.B.C.
SLOPE :I•
1/8 /F1'. I
I
F-2
I
F-4 I
I
I
I
PLACE CONTROL
F-4
1
-_1
_�__�
JOINTS EVERY 200 S.F.
----
C.J. I
I
BY CONTRACTOR
I
I
I
I
1
IFc
1
1
I
(3)2X8
I
I
1
I
L
I
1
POST,
(2)#5 @ EA. FACE T
6x6 I
I
(3)2x6
I
POST I
I
I
I. POST
19
L - J
F-4
I (2)#5 @ EA. FACE 1
C.J. I I
I I I
F-4
O
I I I I I
1 -,6
. D
LF-0
M
loll
MOR9
R=MLZ.
al
1
Ni
NJ
�I
1
91
T®ROMM,
------------------------------------ - --------- -----------------
71 ---------- ---------- ---------------- 17--4 ------
o
a 9 1 s a B 9 0'
0 9
m z
T
. 05?
(P
012,
m
n
0000000000
G1
L—L
01
FIRESTONE RESIDENCE.` i;��}�_,��, �� RRXX
at 7RADITION
LOT 100 LA. QUINTA, CALIFORNIA...: 013.0
W"
fllolZot io
' WAU-WHEREO=JRS
'
WEB SnFRffN
® ENDS
2R PLATE M tsd ®tr GG
BX3
ROOFSHEATHSEE CSH
.PLYWOOD GS.H
29SOUD BLKG
-SEE
BETWEEN JOIST
BOUNDCHY NNLINO BOISIDARY NAILING
2K5 PL JOIST -
SEE PLAN
2t STUDS ®18' 0.G
'
SIMPSON It2-S ® EA Jolsr
'
.
2. BLOCKING
Jo15T-SEEPLAN
JOIST BEARING AT WALL
2 TJI TO WALL
314"
1 tn" = r-0•
BOUNDARY HAILING
PLYWOOD 2 R BLOCKING.
... .
oOF DIAPIUNGIL
.
JACK NIP TRUSS
GILDER TRUSStrr
sNEnTNwa
2R4our-
4R—
R BLOCKING. *R-F
R BLOCIM. '
W ISd TJL WO tsd TN.
®s" O.C. r D.C.
.
BOUNDARY NM1NGBOUNDARY HAILING. .
TRUSS TAILS EXTEND TRUSS TAILS
AT�ROOF PPOROUT.AT ROOF POPCUT. DIAPHRAGM BOUNDARY NWLINO SIMPSON'AMP
2RBLOCW)LG tr GO.ROOF SHEATHIN
ROOFtN OUTTUGGERS za SLOCI
TRUSSEE
PLAN.
• Q ! BOUNDARY Be' O.C.I! �'� NAILING.2R FASCUDOUBLE TOP PLATE
BUR` SHEANWALL SHEATHAS REQUIREDKO.F
HEADER-AS
OCCURS. SEE PUN. JOUST -SEE
.. N "A3S 27J BRACE
DE
B E7(T CE W O.C. START
ui. .
xr TRUSS DEv
ROOF TRUSS TO EXT. WALL 4 ROOF TRUSS TO BEAM 3r4"-+�rBLE ENDy4,•VOD BEAN -BEE PLAN
BOUNOARYNAILING
21 SOLID BLOCKING
• -/
3 O 2 SIMPSON 112N•
tG EA J015T
3 LEDGER (SEE PLAN) CUT INTO TRUSS-
STUDADO NOT OVER CUTL M SEE PLAN
PLYWOOD AT 24�R4C. 1 NJ1B0 a SIWWWA3S ® EA. STUD
MA ROOF. SIMPSON OF® x FRONTVIEW
HEEL 2R CONT. TOP PLATE
WHERE OCCURS ROOF SHEAT!@LO
SEE PLAN � 2RSTUD®te•oc. _ _ _-----
SLMO.
SIDE VIEW
ROOF
APPROVED 6W O.SS SIMPSON ECC COLUMN CAP
TRU55 HANGER • W/ THRU BOLTS PER MFRL
KEY notes: 3
1) tep dwd bT—
NAIL
LTTOGETRSSES 2)UtPad tYP pa DPL J01ST-' WOOD POST SEE FAIN .
BEE PLAN
tsd ATtr O.G Jj 2.4 nb. bruf ffft Q 24* ae .
AT TOP AND 5)2RSadpe b..dc L .
BOTTOM CHORD.'. S)'.0 HaeaWns _y be aftM PLAN .
b wiled amu bdowecmG f—adid. B '
6 GABLE END @ ADJ. ROOF 7 JACK TO GIRDER g. OVER FRAMING g JOIST &TRUSS TO WALL�4"_+� 10 BEAM TO POST CONIC . _
3W _ +�•�. 314" _ Nr 314' = I -(r 3/4" - +'-0"
DOUBLE TRUSS. SEE PLAN TRUSS- SEE PLAN .
TOP PLATE CE ROOF SHEATHING- SEE PLAN'
KING SLUR •'a T 4' 0.
'tea AT l'O.C. i i SD BO MRYNAWNG .
&" LAG BOLTWnB" EMBED. ROOF FOR TOP PLATE SPLICE }-
'2AeLICG
1zeTMGOR EXTEMDTRUSSTAIL
ROOF SHEATHING I •�$ FOR OVERHANG
.If I i 3AY O.SS.
STUD—,,,
6EEPWWTRUSS DOUBLE PLATES 's LI,.��B®2:Tlm LATE SI .WA 0EA
NOTCHSEAM p)-ISdENDNARS -------=----- 21STUos@18.D.C. JoiSfTOeTuo
INTO EA. HEADER - --- --- --- 2R LEDGER PER BOUNDARY HAILING
SEE ARCHL BEAM MEMBER- ; Y PLAN CUT INTO
NFADm - fIJ �4 Y STUD (DO
a00F SHEATHING GEE PLAN
. - A SIMPSON . ; OVER CUT)
LVAir .
A Woad
POST-SEEPLPN STUDS
' q .py'Oao � YYF9 BTIFFNEIt
00 . ®ENDS•TYP' JOIST -
AL SEE PLAN
. •oi SIMPSON'LTHMA• ro SIMPSON HANGER
-SEE PLAN
BOUNDARY HAII.G
SECTIO
CHORD TO SPLICE 14 ALT. TRUSS TO TRUSS CONN 15 TRUSS BRG. AT WALL .
JOIST TO BEAM
12 HEADER BEARING
13
3/4"=1,-0,
3W 1'4D"
314 =1-0"
a
TRUSS-SEEPLAN /
R BLOCIONQ
PLYWOOD Yn 1Bd TN.
SHEATH. arD.C.OFROOF.TRUSS
BOUNDARY NAILING
PLrYY00D MODE SHEATH ,
ROOF DIAPHRAGM
JOST-SEE PLAN
PLYWOOD SHEATHING a NAILINGROOF
. EXTEND TOP CHORD
AS OCCURS
2. BLOCKING
' TAILS
BOUNDARY NAILING
SEE PLAN A G.SN.SEE
91FATHINOTRUSS
GSN.
ISd@rO.G
.
BOIDIDARY NAlL1N0
318' O.S.B.
3(S"O.S.B.
DOUBLE 2A TOP PLATE BOINOARYNANNG
N
1•NOTCH MUL2RBOWBlX0.W/1Ba
'/QSA1?OSBROOF
TOENAI S a r D.C.
TRUSS - (USE to'1 A•
SHEATL@70
PLATE
BEEPLAN ®GWDERTRUSS)
DBL 2<CONT. TOP PLATE' .
21 BLOCKIHG•d
BOUNDARY NAILING
2R BLOCI@l0
ROOF SHTG
- SEE G.S.H.6EE
ROOF TRUSS-
.
SIMPSON HL5 ® EA
JOIST
zrsTUDs@18 O.G
SDmSON •HO.SA•
0EA. STUD
2esnros®18.O.C.
PlAR
wr O.S.B.
SIMPSON T/2.a-
.2RPUTE
2Re sTuos®18'O.C.
SIMPSON112aA•
NOTCHED STUO DLO NaT[11�
2R LEDGER PFAPUww
OOF SS
® EA STUD
. OVERCUn
BEE FLNL
'
ea uls ®era D.C. '
s LLPs°" aTe ®4r
SIMP• ��• �
TRUSS (USED
SS(RTRUSS)
FASCIA. SEE ARCH
S.E CONSULTANTS Inc.
'
SEEJUST.
SEE PLAN
a
DWOS .
WEB
BEAM -SEE PLAN
.
�� East e. 104
BEAM -
SEE PLAN
2RBLOCKING SIA�SON HANGER-
SoutteddteAZ 85251i(e
BEE�AN
KANGER
SIMPSON >:
)946-2010
SEE�IN
Fox (M)84G-1909
JOIST BRG. STUD WALL
20 @ 3f4`=1'D
N..-Be�dl>smmnte-�eDL3ft:r
TRUSS BRG. AT WALL
TRUSS BRG. AT WALL
1g TRUSSES TO WALL
TRUSS/JOISTS
@BEAM
17
1g
3ia"-1'D"
ARCHITECTURE
WRY L STOWE ARCHITECT
109 WEST PALM LANE
PHOE?4K AZ .. 63007
FAX
Mod
' fa9 4e34D
E
v
cetezD�
� a
CIVIL• TQ•
Ttb �O C
R��d to Oro w�Y,d b
�btiiFWd �od�/�lE.
ap a.and a mnn.ruV..
d R"m0 m� nol ®.ON d N
W Q
U Z tY
Z ° _
W
U
Z
un OuJ z
~rvl Or
W<
Z F-
O
Cz
O
W O•
O
LLM
J
Revisions
A
Date:
09-02-04
Project Na
04125
\�O\V
S 9
. 'I
2. 7
9 ®1W O.C.
2. CONT. PLATE
MFR TO PROWUE
WEB STIFFNERAT
JOIST fiN0.5 a BTHo.
LOCATIONS-TYP. .
2x SOLID sum
BETWEENJOISTS
5R' O.S.B.2x BUCG TOP
& BOTTOM
515.O.S.S. SIM
EA
BEA
BOUNDARY - SEE
NNUNG '
JOIST TO BEAM
O13T-SEEPLAN MUPSON•CO•COL
CAP WL f/1 w• O
•Ht6A• THRU BOLTS
MST
WOODCOUJIVIN
AN SEE PLAN
EXTEND TOP CHORD
OF ROOF TRUSS
2. BLOCKING
AS OCCURS
ROOF SHEATHING
-BEE O.SJJ:
Da
SIMPSON
'F/7.5A'
TRUSS- (USE 7125A'
SEE PLAN 0GIRDEJt TRu93) .
DBL 2x CONT. TOP RATE
2. STUDS 0160.C.
:r O.SJ3
SIMPSON ICAA• .
®EA STUD
2x CONi. RATE \d
. 1SS NAILS ®60.C.
JOIST-SEEPUIN .
3W _
O
BOUNDARY
NAILINa IAPNRAG—M
SHEAR WALL DIASEE
PUW AND SCHEF.
l TRUSS TO SHEARWALL
NUFACTURED
RUSSES
I FOR
LOAD.
L3rlr
3/4- =
TOP BARS. EXTEND 113
oPG. WIDTH (J'-0" MIN.) TOP OF SOUR
BOUNDARY NARBLG ROOF S.SN. BEYONDJAMB GROUT FULL DEPTH
JOIST -
IF M. ABEAM • SEE PLAN
Zs BLOCgNO SEE PLAN
OPEN END BLOCKS
®GROUT.IDOII:D
' 6BEYOND JAMB
.
'
'
I LINTEL p(
V BLOCK (S fA kS
BOT. BARS. EXTEND 6 O
SIJP.1125A•®EA JOIST
BEYOND EACH JAMB -DO
'
' SI.IPSOH'A26®EA. JOIST
NOTSPUCE
2x CONT. RATE Iw
STIRRUPS SEE
REINF' Suter
• 5WO A.D. 0 3r O.C.
= • .
i, si
IS M CONT. BOND BEAM
NOTE ® OPENINGS GREATER THAN
C•
.
®OPENINGS LESS THAN 170 174r PROVIDE M15 M EACH
'
PROWOE(2p61N JAMB LEIlS 2ADJACENT CELLS®JAMBS
MASK WALL-
�•.:-
SEE PLAN
(n HLs
-
_-
iJI I5
JOIST TO.MASN. WALL
4 MASON. LINTEL SCHEDULE��
' 5 GLB TO MASH.
3
PLYWOOD SHEATHING Bd NAILS ®6O.C.
. -SEE PLANS&G.S.N.
.
GYP. WALLBOARD OR
.
2x BLKGG Wd (4)
FLYWOOD 6HEARWALL
SEE SCHEDULE
.
1Sd PER BLK NABED TO
TOP PLATE ONLY. FIT SIPLAN
NAB. PLYWOOD TO FULL !HEIGHT
TIGM BTWTJ. FLAT 2x1'e
WALL CHORD MEMBER
!LEADER BEAM SEE SHEARWALL SCHED.
STUD EACH SIDE OF OPETJMMD
FOR FULL LENGHTK TO R) 2X
-SEE PINT.
AT2STORYCONDITION
BLOCKING&AROUND OPENING
PERIMETER WITH DIAPHRAGM'
OPENING . PROVIDE SI.PSON TIES
EDGE NAILNO PER SHEAR-
ORSIRAPSATEACII
WALL ED(
MAINTAIN IlJ'gR STWN. FLAT
QBY SEE HOIDOWNS
DBL STUD 2ne FLOOR OF SH6AIt1YALL
.
BLKG a TOP RATE IF BUM FIISH PER SPECS
CRP MH- SCHEDULE FOR TYPE
IS WSTlL11E0 PRIOR TO
STAC40NO ROOF NROOFMG 2x1 FIAT BIKYi ®21.O.C.
2nd FLOOR
FRAMMQ
MATERIALS ' BETWEEN TRUSSES\d(2)
BOLINOA)C/ NAILING 18d RAILS iIDtU BOTTOM
CHORD OF TRUSS
Z,,TOS. SEESIfFAR-
'
HEADER IN SCNEDUIE FOR
DBL 2x COHTTOP PLATE h 8TUD3 ® 21. O.C.
D
SEAM!- MA)DMUM SPACING.
SEE PLAN.
m e N07m OTIfERVNS[1
OPENING, 6HEARWALL WALL CHORD MEMBER
LENGTH- SEE SHEARWAtLSCHED.
• SHE RWALL PER PLAN
SEE SHEARWALL SCL ON
SILL PL a SEE PLAN'
BOLTS PER 8IMP. HOLDOWN AT ENDS
FLOOR PLAN
SHEARWALL OF SHEARWALL-SEE
SCHEDULE SCHED. & DET. AT
DnERSECTION OF
BHEARWALLS.1JSE
LARGER HOLDONM.
SHEARWALL CONNECTION
8 3d4- = 1'-O"
��'
DIAPHRAGM
BOUNDARY NAILING.
ROOF DIAPHRAGM.
2'x FRAME AROUND
TRUSS SPACE.
PREMFRD..
ROOF TRUSS.
DIAPHRAGM
BOUNDARY
SHEATH. TO MATCH NAILING.
SHEARWALL
SHEATHING. SHEARWALL
SEE PLAN
& SCHEDULE.
TRUSS PERPENDICULAR TO WALL
SHEAR WALL TO. ROOF CONN.
3/4" =
Kg) SHEAR
DIAPHRAGM
BOUNDARY NAILING.
4PREROOF DIAPHRAGM
ROOF SHFATHING.
MANUFACTURED
ROOF TRUSS- SEE PLAN.
SHEATHING TO MATCH
SHEARWALL SHEATH.
DIAPHRAGM
BOUNDARY NAILING.
SHEARWALL- SEE
PLAN & SCHEDULE.
TRUSS PARALLEL TO WALL
SHEAR WALL TO ROOF CONN.
3/4' = 1'-0-
/ N
OTE: CONDITION SHOWN.
1 STORY CONDITION SIMILAR.
LEVATION7 OPENING IN
GIRDER TRUSS • SEE PLAN-\ ROOF SHEATHING
BOUNDARY NAILING, \ ROOF DIAPiRAGM�
ROOF TRUSSLAN
-SEE RAN J
DBL 2xTOP PLATE SIMP.
2. STUD WALL ® f6 O.C. EA TRUSS
SHEARWALL SHEATHING -SEE PLAN�•'�-
® 16 oc.
14 TRUSSES TO WALL
3/4- =1'-0-
9
ro
)L
3/4• =1'-0-
OPENING HEADER
SIMPSON T13T4B•
(2) 2 X SLOCI@W FOR
—28TUD SPACES
SHEAR WALL
SHEATHING I
SHEARWALL
SCHEDULE
■
ARCHITECTURE
GARY L STOWF, All
tE;=-
Zql
•
clva ��
mo. a.ans x. dmylser•
a nm�a ao+m cr..aM i
� mm�
W
UCie
Z °
W .Q
V
0Z;
V / O Z_
W-D
g
W <
ZCie
�-
O ` .
Cz
W o
N e—
I�B O
J
Date:
09-02-04
Project No:
04125
S.E. CONSULTANTS Inc.
5800 East rnome, Road. Suite 104
85251
_OScottsdale.!S
S
�
Fo946-2010
x (4)80)916--19D9 '
www.sacamItant.—