BCOM2016-0021 Title 24II BUILDING ENERGY ANALYSIS REPORT
'.Mh� I
PROJECT: .
Lazer Oasis Tenant Improvement
46-805 Dune Palms Rd
La Quinta, CA 92253
Project Designer:
Niche Builders, Inc.
840 East West Drive
Murphys , CA 95247
(209) 609-3752
CITY OF LA OUINTA
BUILDING & SAFETY
Report Prepared by:
r1%
FOR CONSTRUCTION
Tim Scott
Scott Design and Title 24, In
9
, DATE (0 t to BY� .
78818 Velie Way; Suite 8
(e ZA'
Palm Desert, CA 92260
(760) 777-0102
Job Number:
Date:
6/23/2016
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program, developed by EnergySoft, LLC—www.energysoft.com.
EnergyPro6.7 by EnemvSoft User Number: 6712 ID:
r E
•
r�
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 1 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xmi
A. PROJECT GENERAL INFORMATION
1.
Project Location (city)
La Quinta
7.
# of dwelling units
0
2.
CA Zip Code
92253
8.
Standards Version
Cornpliance2015
3.
Climate Zone
15
9.
Compliance Software (version)
EnergyPro 6.7
4.
Total Conditioned Floor Area
11,700 ft2
1U.
Buming urientation (deg)
(E) 98 deg
5.
Total Unconditioned Floor Area
4,364 ft2
11.
Permitted Scope of Work
ExistingAlteration
6.
# of Stories (Habitable Above Grade)
2
12
Building Type(s)
Nonresidential
B. COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS
§ 140.1
BUILDING COMPLIES
1. Energy Component
2. Standard Design (TDV)
3. Proposed Design (TDV)
4. Compliance Margin (TDV)
S. Percent Better than Standard
Space Heating
4.0
1.9
2.1
52.5%
Space Cooling
351.7
314.9
36.8
10.5%
Indoor Fans
107.0
139.5
-32.5
-30.4%
Heat Rejection
--
--
-
Pumps & Misc.
0.2
--
0.2
Domestic Hot Water
17.0
32.3
-15.3
-90.0%
Indoor Lighting
148.1
104.1
44.0
29.7%
COMPLIANCE TOTAL
- 628.0
592.7
35.3
5.6%
Receptacle
130.1
130.1
0.0
0.0%
Process
--
--
--
--
Process Ltg
-
-
--
TOTAL
758.1
722.8
35.3
4.7%
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
0 0 9
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 2 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
C. PRIORITY PLAN CHECK/ INSPECTION ITEMS (in order of highest to lowest TDV energy savings)
1st
Indoor Lighting: Check lighting
Compliance Margin By Energy Component (from Table B column 4)
Indoor Lighting
Space Cooling
Space Heating
Pumps & Misc.
Heat Rejection
Domestic Hot Water
Indoor Fans y
' Penalty Eriergy Credit
2nd
Space Cooling: Check envelope and mechanical
3rd
Space Heating: Check envelope and mechanical
4th
Pumps & Misc.: Check mechanical
5th
Heat Rejection: Check envelope and mechanical
6th
Domestic Hot Water: Check mechanical
7th
Indoor Fans: Check envelope and mechanical
D. EXCEPTIONAL CONDITIONS
E. HERS VERIFICATION
This Section Does Not Apply
F. ADDITIONAL REMARKS
None Provided
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
�i
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 3 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY
Identify which building components use the performance or prescriptive path for compliance. "NA"= not in project
For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans.
Building Component
Compliance Path
Compliance Forms (required for submittal)
Location of Mandatory Notes on
Plans
Envelope
®
Performance
NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E)
❑
Prescriptive
NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E
❑
NA
Mechanical
®
Performance
NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E)
❑
Prescriptive
NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E
❑
NA
Domestic Hot Water
®
Performance
NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E)
❑
Prescriptive
NRCC-PLB-01-E
❑ ,
NA
Lighting (Indoor Conditioned)
®
Performance
NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E)
❑
Prescriptive
NRCC-LTI-01 / 02 / 03 / 04 / 05-E
❑
NA
Covered Process:
Commercial Kitchens.
❑
Performance
S2 (section of the NRCC-PRF-01-E)
®
Prescriptive
NRCC PRC Ol/ 03 E
❑
NA
Covered Process:
Computer Rooms
❑
Performance
S3 (section of the NRCC-PRF-01-E)
❑
Prescriptive
NRCC PRC-01/ 04-E
®
NA
Covered Process:
Laboratory Exhaust
❑
Performance
54 (section of the NRCC-PRF-01-E)
❑
Prescriptive
NRCC PRC O1/ 09 E
®
NA
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 4 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xm1
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY
The following building components ore only eligible for prescriptive compliance. Indicate which ore
The following building components may have mandatory requirements per Part 6. Indicate
relevant to the project.
which are relevant to the project.
Yes NA
Prescriptive Requirement
Compliance Forms
Yes NA
Mandatory Requirement
Compliance Forms
Lighting (Indoor
Commissioning: §120.8
E] ®
NRCC-LTI-01 / 02 / 03 / 04 / 05-E
❑ ®
Simple Systems
NRCC-CXR-01 / 02 / 03 / 05-E
Unconditioned) §140.6
❑ ®
Complex Systems
NRCC-CXR-01 / 02 / 04 / 05-E
❑ ®
Lighting (Outdoor) §140.7
NRCC-LTO-01 / 02 / 03-E
® ❑
Electrical: §130.5
NRCC-ELC-01-E
❑ ®
Lighting (Sign) §140.8
NRCC-LTS-01-E
❑ ®
Solar Ready: §110.10
NRCC-SRA-01 / 02-E
Covered Process: §120.6
NRCC-PRC-01-E
❑ ®
Parking Garage
NRCC-PRC-02-E
❑ ®
Solar Thermal Water
NRCC-STH-Ol-E
❑ ®
Commercial Refrigeration
NRCC-PRC-05-E
Heating: §140.5
❑ ®
Warehouse Refrigeration
NRCC-PRC-06/07/08-E
❑ ®
Compressed Air
NRCC-PRC-10-E
❑ ®
Process Boilers
NRCC-PRC-11-E
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance' Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 5 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCl/NRCA/NRCV) — —
Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance
(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).
See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component
Compliance Forms (required for submittal)
Pass
Fail
Envelope
® NRCI-ENV-01-E - For all buildings
❑
`❑
,
❑ NRCA-ENV-02-F- NFRC label verification for fenestration
❑
❑
Mechanical
® NRCI-MCH-01-E - For all buildings with Mechanical Systems
❑
❑
® NRCA-MCH-02-A- Outdoor Air
❑
❑
® NRCA-MCH-03-A—Constant Volume Single Zone HVAC
❑
❑
❑ NRCA-MCH-04-H- Air Distribution Duct Leakage
❑
❑
❑ NRCA-MCH-05-A- Air Economizer Controls
❑
❑
❑ NRCA-MCH-06-A- Demand Control Ventilation
❑
❑
❑ NRCA-MCH-07-A—Supply Fan Variable Flow Controls
❑
❑
® NRCA-MCH-08-A- Valve Leakage Test
❑
❑
® NRCA-MCH-09-A—Supply Water Temp Reset Controls
❑
❑
❑ NRCA-MCH-10-A- Hydronic System Variable Flow Controls
❑
❑
❑ N RCA-MCH-11-A —Auto Demand Shed Controls
❑
❑
❑ NRCA-MCH-12-A- Packaged Direct Expansion Units
❑
❑
❑ NRCA-MCH-13-A- Air Handling Units and Zone Terminal Units
❑
❑
❑ NRCA-MCH-14-A- Distributed Energy Storage
❑
❑
❑ NRCA-MCH-15-A— Thermal Energy Storage
❑
❑
❑ NRCA-MCH-16-A- Supply Air Temp Reset Controls
❑
❑
❑ NRCA-MCH-17-A — Condensate Water Temp Reset Controls
❑
❑
❑ NRCA-MCH-18-A- Energy Management Controls Systems
❑
❑
❑ NRCV-MCH-04-H- Duct Leakage Test
❑
❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
0 0 0
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 6 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCl/NRCA/NRCV) —
Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance
(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).
See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component
Compliance Forms (required forsubmittal)
Pass
Fail
Plumbing
® NRCI-PLB-01-E - For all buildings with Plumbing Systems
❑
❑
❑ NRCI-PLB-02-E - required on central systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-PLB-03-E - Single dwelling unit systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-PLB-21-E - HERS verified central systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-PLB-22-E - HERS verified single dwelling unit systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCV-PLB-21-H- HERS verified central systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCV-PLB-22-H - HERS verified single dwelling unit systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-STH-01-E - Any solar water heating
❑
❑
Indoor Lighting
® NRCI-LTI-01-E - For all buildings
❑
❑
❑ NRCI-LTI-02-E -Lighting control system, or for an Energy Management Control System (EMCS)
❑
❑
❑ NRCI-LTI-03-E - Line -voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to
energize only line -voltage track lighting
❑
❑
❑ NRCI-LTI-04-E - Two interlocked systems serving an auditorium, a convention center, a conference room, or a theater
❑
❑
❑ NRCI-LTI-05-E -Lighting Control Credit Power Adjustment Factor (PAF)
❑
❑
❑ NRCI-LTI-06-E - Additional wattage installed in a video conferencing studio
❑
❑
❑ NRCA-LTI-02-A - Occupancy sensors and automatic time switch controls.
❑
❑
❑ NRCA-LTI-03-A - Automatic daylighting controls
❑
❑
❑ NRCA-LTI-04-A - Demand responsive lighting controls
❑
❑
Outdoor Lighting
❑ NRCI-LTO-01-E — Outdoor Lighting
❑
❑
❑ NRCI-LTO-02-E- EMCS Lighting Control System
❑
❑
❑ NRCA-LTO-02-A - Outdoor Lighting Control
❑
❑
Sign Lighting
❑ NRCI-LTS-01-E —Sign Lighting
❑
❑
Electrical
® NRCI-ELC-01-E - Electrical Power Distribution
❑
❑
Photovoltaic
❑ NRCI-SPV-01-E Photovoltaic Systems
❑
❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
0 0 9
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 7 of 21'
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCl/NRCA/NRCV) —
Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance
(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).
See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component
Compliance Forms (required for submittal)
Pass
Fail
Covered Process
❑ NRCI-PRC-01-E Refrigerated Warehouse
❑
❑
❑ NRCA-PRC-01-F- Compressed Air Systems
❑
❑
❑ NRCA-PRC-02-F- Kitchen Exhaust
❑
❑
❑ NRCA-PRC-03-F- Garage Exhaust
❑
❑
❑ NRCA-PRC-04-F- Refrigerated Warehouse- Evaporator Fan Motor Controls
❑
❑
❑ NRCA-PRC-05-F- Refrigerated Warehouse- Evaporative Condenser Controls
❑
❑
❑ NRCA-PRC-06-F- Refrigerated Warehouse- Air Cooled Condenser Controls
❑
❑
❑ NRCA-PRC-07F- Refrigerated Warehouse- Variable Speed Compressor
❑
❑
❑ NRCA-PRC-08-F- Electrical Resistance Underslab Heating System
❑
❑
I. ENVELOPE GENERAL INFORMATION (See NRCC-PRF-ENV-DETAILS for more information)
1.
Total Conditioned Floor Area
11,700 ft2
5.
Number of Floors Above Grade
2
Confirmed
2.
Total Unconditioned Floor Area
4,364 ft2
6.
Number of Floors Below Grade
0
V
N
T
OJ
_
3.
Addition Conditioned Floor Area
0 ft2
4.
Addition Unconditioned Floor Area
0 ft2
7. Opaque Surfaces & Orientation
8. Total Gross Surface Area
9. Total Fenestration Area
10. Window to Wall Ratio
North Wall
508 ft2
0 ft2
00.0%
❑
❑
East Wall
5,420 ft2
771 ft2
14.2%
❑
❑
South Wall
956 ft2
90 ft2
09.4%
❑
❑
West Wall
2,330 ft2
90 ft2
03.9%
❑
❑
Total
9,214 ft2
951 ft2
10.3%
❑
❑
Roof
11,700 ft2
0 ft2
00.0%
❑
I ❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 8 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xm1
J. FENESTRATION ASSEMBLY SUMMARY
§ 110.6
Confirmed
1.
2.
3.
4.
S.
6.
7.
8.
9.
Fenestration Assembly Name /
Overall
Overall
Overall
�
T
01
Fenestration Type
Certification Method'
Assembly Method
Area ft1
v
Tag or I.O.
U-factor
SHGC
VT
N
Double Metal Tinted
Vertica I Fenestration
DefaultPerformance
Manufactured
951
0.76
0.60
1 0.55
E
❑
❑
1 Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.E-B. Site -built fenestration less than 1,000 ft� or more than or equal to 1,000 ftZ see Reference Nonresidential
Appendix NA6.
I Status: N - New, A - Altered, E - Existing
Taking compliance credit for fenestration shading devices? (if "Yes", see NRCC-PRF-ENV-DETAILS for more information)
K. OPAQUE SURFACE ASSEMBLY SUMMARY
§ 120.7/ § 140.3
Confirmed
1.
2.
3.
4.
S.
6.
7.
8.
Surface Name
Surface Type
1
Area (ft)
Framing
Type
Cavity
R-Value
Continuous
R-Value
U-Factor / F-Factor
/ C-Factor
E
N
°'
R-30 Roof Attic18
Roof
13029
Wood
30
NA
U-Factor: 0.038
E
❑
❑
Existing Wa1120
ExteriorWall
13146
NA
0
NA
U-Factor: 0.366
E
❑
❑
Existing Partition32
ExteriorWall
1040
Wood
11
NA
U-Factor: 0.110
E
❑
❑
Slab On Grade39
UndergroundFloor
22887
NA
0
NA
F-Factor: 0.730
E
❑
❑
R-30 Roof(R.30.2x12.16)92
Roof
3035
Wood
30
NA
U-Factor: 0.042
E
❑
❑
R-19 Floor Crawlspace100
ExteriorFloor
1077
Wood
19
NA
U-Factor: 0.047
j A
❑
R-19 Floor Crawlspace1001
InteriorFloor
1077
Wood
19
NA
U-Factor: 0.046 1
E
❑
❑
I Status: N - New, A - Altered, E - Existing
L. ROOFING PRODUCT SUMMARY I
§ 140.3
Confirmed
1.
2.
3.
4.
S.
6.
7.
Product Type
Product >_25 lb ft1
Aged Solar
Reflectance
Thermal
Emittance
SRI
Cool Roof
Credit
CRRC Product ID Number
a
d
R-30 Roof Attic18
No
0.08
0.75
NA
No
NA
❑
❑
R-30 Roof (R.30.2x12.16)92
No
0.08
0.75
NA
No
NA
❑
I ❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 9 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xm1
M. HVAC SYSTEM SUMMARY (see NRCC-PRF-MCH-DETAILS for more information)
§ 110.1 / § 110.2
Dry System Equipment' (Fan & Economizer info included below in Table N)
Confirmed
1.
2.
3.
4.
S.
6.
7.
8.
9.
10.
11.
System Type
Total Heating
Supp Heat
Supp Heat
Total Cooling
Efficiency
Acceptance
Testing
„
a
Equip Name
Equip Type
3
(Simple or
Qty
Output
Source (Y/N)
Output
Output
Required? (Y/N)
N
Complex')
(kBtu/h)
(k8tuh)
(kBtu/h)
s
Cooling
Heating
HVAC 1-53
SZHP
(Packaged3Phase)
Simple
5
120
No
0
120
EER-11.0
COP-3.3
No
E
❑
❑
HVAC-1066
SZHP (Split3Phase)
Simple
1
36
No
0
36
SEER-13.0
HSPF-7.7
Yes
N
❑
❑
HVAC81
SZHP
(Packaged3Phase)
Simple
4
69
Yes
17
69
EER-11.0
COP-3.3
Yes
N
❑
❑
Wet System Equipment 1
Pumps
Confirmed
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Rated Capacity
Tank
VSD
w
oVi
oTi
E.
Equip Name
q P
Equip Type
4 P YP
Qty
Vol al
(gal)
(kBtu/h)
Efficiency
�
StandbyLoss
Ext. R
Qty
GPM
HP
(y/N)
Value
P
Rheem HE119-1602
Storage
4
119
160
Thrml. Eff: 0.869
0.0085
NA
NA
NA
NA
No
N
❑
❑ "
AO SMITH EUF-06*80
Storage
2
6
5
EF: 0.950
NA
NA
NA
NA
NA
No
N
❑
❑
1 Dry System Equipment includes furnaces, air handling units, heat pumps, etc.
2 Wet System Equipment includes boilers, chillers, cooling towers, water heaters, etc.
3 Simple. Systems must complete NRCC-CXR-03-E commissioning design review form
Complex Systems must complete NRCC-CKR-04-E commissioning design review farm
5 A summary of which acceptance tests are applicable is provided in NRCC-PRF-MCH-DETAILS
6 Status: N - New, A - Altered, E - Existing
Discrepancy between modeled and designed equipment sizing? (if "Yes", see Table F. "Additional Remarks" for an explanation) No
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 10 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
N. ECONOMIZER & FAN SYSTEMS SUMMARY'
§ 140.4
Confirmed'
1.
2.
3.
4.
5.
Outside
Supply Fan
Return Fan
Air
v
-n
Economizer Type
N
T.
TSP
TSP
Equip Name
(if present)
CFM
CFM
HP
BHP
(inch
Control
CFM
HP
BHP
(inch
Control
WC)
WC)
HVAC 1-53
406
4000
2.000
2.000
1.90
ConstantVolume
NA
NA
NA
NA
NA
NoEconomizer
❑
❑
HVAC-1066
416
1200
0.330
0.330
0.87
ConstantVolume
NA
NA
NA
NA
NA
NoEconomizer
❑
❑
HVAC81
190
2300
j 1.000
j 1.000
j 1.66
j ConstantVolume j
NA
j NA
j NA
j NA
j NA
NoEconomizer
❑
❑
' Mechanical ventilation calculations and exhaust fans are included in the NRCC-PRF-MCH-DETAILS section
O. EQUIPMENT CONTROLS
1.§ 120.2
Confirmed
1.
2.
3.
V
d
T
y
Equip Name
Equip Type
Controls
No DCV Controls
HVAC 1-53
SZHP
No Economizer
❑
❑
No Supply Air Temp. Control
No DCV Controls
HVAC-1066
SZHP
No Economizer
❑
❑
No Supply Air Temp. Control
No DCV Controls
HVAC81
SZHP
No Economizer
❑
❑
No Supply Air Temp. Control
DHW1- SHW
Service Hot Water, Primary Only
Fixed Temperature Control, No DDC
❑
❑
DHW79 - SHW
Service Hot Water, Primary Only
Fixed Temperature Control, No DDC
❑
❑
P. SYSTEM DISTRIBUTION SUMMARY § 120.4/ § 140.4(i)
This Section Does Not Apply
Does the Project Include Zonal Systems? (if "Yes", see NRCC-PRF-MCH-DETAILS for system information)
No
Does the Project Include a Solar Hot Water System? (if "Yes", see NRCC-PRF-MCH-DETAILS for system information)
No
Multifamily or Hotel/ Motel Occupancy? (if "Yes", see NRCC-PRF-MCH-DETAILS for DHW system information)
No
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 11 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xmi
Q. INDOOR CONDITIONED LIGHTING GENERAL INFO (see NRCC-PRF-LTI-DETAILS for more info);
§ 140.6
Confirmed
1.
2.
3.
4.
S.
1
Occupancy Type
Conditioned Floor Area 2
Installed Lighting Power
Lighting Control Credits
Additional (Custom) Allowance
M
N
-n
°'
(ft2)
(Watts)
(Watts)
Area Category Footnotes
Tailored Method (Watts)
❑
❑
(Watts)
Retail Merchandise Sales,
11,700
10,530
0
0
0
❑
❑
Wholesale Showroom
Building Totals:
11,700
10,530
0
1 See Table 140.E-C
2 See NRCC-LTI-01-E for unconditioned spaces
3Lighting information for existing spaces modeled is not included in the table
R. INDOOR CONDITIONED LIGHTING SCHEDULE (Adapted from NRCC-LTI-01-E)l
§ 130.0
Luminaire Schedule (includes all permanent installed lighting in
conditioned space, and portable lighting over 0.3 w/ftz in
offices)
Installed Watts (Conditioned)
Confirmed
Name or Item Tag3-lam
Complete Luminaire Description (i.e.,
P fluorescent troffer, F32T8,
one dimmable electronic ballast)
Watts per luminaire
P
How Wattage is Determined
Total Number
Luminaires
Installed Watts
Pass
Fail
CEC Default
from NA8
According to
§330.0(c)
1X4
1X4LED
90
Yes
No
11
990
❑
❑
2X2 L
2X2 LED
26
Yes
No
4
104
❑
❑
2X2 FI
2X2 Flor.
39
Yes
No
5
195
❑
❑
2X4
2X4 LED
54
Yes
No
29
1,566
❑
❑
CLF
CLF (2) 26W
52
Yes
No
3
156
❑
❑
4 Can
4" Can
14
Yes
No
60
840
❑
❑
6 Can
6" Can
20
Yes
No
88
1,760
❑
❑
HG Lt
Hang. Lt (8) 15W
120
Yes
No
5
600
❑
❑
Ex 2X4
Ex 2X4 FI
104
Yes
No
37
3,848
❑
❑
D
(2) 4 ft Fluorescent T8
54
Yes
No
8
432
❑
❑
Ex 2X2
Ex 2X2 FI
39
Yes
No
1
39
❑
❑
'if lighting power densities were used in the compliance model Building Departments will need to check prescriptive forms for Luminaire Schedule details.
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 12 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration r
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
S1. COVERED PROCESS SUMMARY — ENCLOSED PARKING GARAGES § 140.9
This Section Does Not Apply
S2. COVERED PROCESS SUMMARY —COMMERCIAL KITCHENS § 140.9
This Section Does Not Apply
S3. COVERED PROCESS SUMMARY —COMPUTER ROOMS § 140.9
This Section Does Not Apply
S4. COVERED PROCESS SUMMARY— LABORATORY EXHAUSTS § 140.9
This Section Does Noi Apply
T. UNMET LOAD HOURS
Cooling Unmet Load Hour Limit for
Heating Unmet Load Hour Limit for
Thermal Zone Name
Thermal Zone
proposed Cooling Unmet Load Hours
Thermal Zone
proposed Heating Unmet Load Hours
5-Party Room Zone
150
1953.5
150
0.25
U. ENERGY USE SUMMARY
Electric
(kWh/yr)
Natural Gas
(therms/yr)
Total Annual Baseline
313881
1382.32
Total Annual Proposed
310650
970.231
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance
Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
•
•
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 13 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
§ 10-103
1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Tim Scott
Signature:
Company: Scott Design and Title 24, Inc,
Address: 78818 Velie Way, Suite 8
Signature Date:
City/State/Zip: Palm Desert CA 92260
CEA Identification (If applicable):
Phone: (760) 777-0102
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am
licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
2
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its
preparation; and that I am a licensed contractor performing this work.
3
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to
Business and Professions Code Sections 5537, 5538 and 6737.1.
Responsible Envelope Designer Name: Joe Donati
Signature:
Company: Niche Builders, Inc.
Address: 840 East West Drive
Date Signed:
City/State/Zip: Murphys CA 95247
Declaration Statement Type:
Phone: (209) 609-3752
Title: License #:
Responsible Lighting Designer Name: Joe Donati
Signature:
Company: Niche Builders, Inc.
Address: 840 East West Drive
Date Signed:
City/State/Zip: Murphys CA 95247
Declaration Statement Type:
Phone: (209) 609-3752
Title:
License #:
Responsible Mechanical Designer Name: Dexter Barr
Signature:
4 ei=
Company: Polar Barr Air Conditioning, Inc.
Address: 41-921 Beacon Hill, Suite C
Date Signed:
City/State/Zip: Palm Desert Ca 92211
Declaration Statement Type:
Phone: (760) 346-5529
Title:
License #:
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
s 0 •
Project Name:,
Lazer Oasis
NRCC-PRF-01-E
Page 14 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration .
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
NRCC-PRF-ENV-DETAILS -SECTION START
A. OPAQUE SURFACE ASSEMBLY DETAILS
Confirmed
1.
2.
3.
4.
v
N
'^
T
�
_
Surface Name
Surface Type
Description of Assembly Layers
Notes
Asphalt shingles - 1/4 in.
Vapor permeable felt - 1/8 in.
R-30 Roof Attic18
Roof
• Plywood - 1/2 in.
❑
❑
Air - Cavity - Wall Roof Ceiling - 4 in. or more
Wood framed roof, 24in. OC, 3.5in., R-30
Gypsum Board - 1/2 in.
Existing Wa1120
ExteriorWall
Concrete - Solid Grout - 105 Ib/ft3 - 8 in.
❑
❑
Air - Cavity - Wall Roof Ceiling - 4 in. or more
Stucco - 7/8 in.
Existing Partition32
ExteriorWall
Vapor permeable felt - 1/8 in.
❑
El
Wood framed wall, 16in. OC, 3.5in., R-11
Gypsum Board - 1/2 in.
Slab Type = UnheatedSlabOnGrade
Slab On Grade39
Underground Floor
Insulation Orientation = None
❑
❑
Insulation R-Value = RO
Asphalt shingles - 1/4 in.
Vapor permeable felt - 1/8 in.
R-30 Roof (R.30.2x12.16)92
Roof
Plywood - 1/2 in.
El
❑
Air - Cavity - Wall Roof Ceiling - 4 in. or more
Wood framed roof, 16in. OC, 3.5in., R-30
Gypsum Board - 1/2 in.
Air - Floor - 3 1/2 in.
R-19 Floor Crawlspace100
ExteriorFloor
Wood framed floor, 16in. OC, 5.5in., R-19
❑
❑
Plywood - 1/2 in.
Carpet - 3/4 in.
Air - Floor - 3 1/2 in.
R-19 Floor Crawlspace1001
InteriorFloor
Wood framed floor, 16in. OC, 5.5in., R-19
❑
❑
Plywood - 1/2 in.
Carpet - 3/4 in.
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 15 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name: -
Laser Oasis -Niche -Polar Barr-16.xml
B. OVERHANG DETAILS (Adapted from NRCC-ENV-02-E)
This Section Does Not Apply
C. OPAQUE DOOR SUMMARY
Confirmed
1.
2.
3.
4.
S.
Opaque Door Assembly Name / Tag
or I.D.
Door Type
Certification Method
Operation
Overall U-factor
Pass
Fail
Insulated Metal Door22
Meta lUninsulatedSingleLayerpoor
DefaultPerformance
Swinging
0.079
❑
❑
1 Stotus: N- New, A -Altered, E- Existing
NRCC-PRF-MCH-DETAILS -SECTION START -
A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E)
Confirmed
1. DESIGN AIR FLOWS
2. VENTILATION (§ 120.1)
tsn
v
o
9
A
D
Z
Gl
Z
D Z
Z
X
v
<
O
Z
O
3
Z
rn
C)
z
C
<
m
v+
vZ+
v
a�
OC
��
O�
n
Z
1
Z
r1<
to
Z
m
p
T
O C
Z
Z
T Z
C
m
v
d
w
CONDITIONED
00
3
N
3
n
D
<
ZONE NAME
0
3 z
D
n m
D m
A
v
3 v
m m
70
z
Z
N
Z
r. j
n<
_n
� 3
-n
�>
Or
m
3
D
N A
O
A
G
-n
-- D
z
0
D
T
3
Z<
_
Z
D
<
v Z
GZ1
C)
Z
O
m
O
t^
r
O
n
LAr
3
D
D
D
:.
D
m
O
Z
n
T
T
3
1-lower Lever
HVAC 1-53
4,000
NA
NA
NA
NA
N
HVAC 1-53
8,111
0.25
270
7.5
2,028
2,028
NA
N
❑
❑
5-Party Room
HVAC-1066
1,200
NA
NA
NA
NA
N
HVAC-1066
554
0.75
55
7.5
416
416
NA
N
❑
❑
Zone
6-Upper Level
HVAC81
2,300
NA
NA
NA
NA
N
HVAC81
3,035
0.25
101
7.5
759
759
NA
N
❑
❑
TOTAL
16,064
1
426
1
3,203
3,203
NA
❑
❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
0
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 16 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY
§ 140.4
1.
2.
3.
4.
S.
6.
7.
8.
Confirmed
Rated Capacity
Airflow (cfm)
Fan
(kBtuh)
System ID
System Type
Qty
Economizer
Zone Name
a
Heating
Cooling
Design
Min.
Min.
BHP
Cycles
ECM
N
—
Ratio
Motor
lower Lever5-TRM
Uncontrolled
S
NA
NA
NA
1-lower Lever
4000
NA
NA
NA
NA
❑
❑
❑
Party Room
Uncontrolled
1
NA
NA
NA
5-Party Room Zone
1200
NA
NA
NA
NA
❑
❑
❑
Zone68-TRM
Upper Leve183-TRM
Uncontrolled
4
NA
I NA
NA
6-Upper Level
2300
NA
NA
NA
NA
r ❑
❑
❑
C. EXHAUST FAN SUMMARY
This Section Does Not Apply
D. DHW EQUIPMENT SUMMARY — (Adapted from NRCC-PLB-01)
§ 110.3
Confirmed
1.
2.
3.
4.
S.
6.
7.
8.
9.
10.
11.
12.
�
DHW Name
Fuel
Type
Qty
Distribution
Rated Input
Efficiency
Pilot Energy
External Tank
Vol
Standby Loss
Vol. of Suppl.
N
T
°'
Type
ketuh
(Btu/h)
Insulation
Storage Tank
Rheem
NaturalGas
Storage
4
Nonrecirculating
160
Thrml. Ef .:
0
NA
119
0.0085
NA
❑
❑
HE119-1602
0.869
AO SMITH
Electricity
Storage
2
Non recirculating
5
EF:0.950
0
NA
6
0.027
NA
El
ELJF-06*80
E. MULTI -FAMILY CENTRAL DHW SYSTEM DETAILS
This Section Does Not Apply
F. SOLAR HOT WATER HEATING SUMMARY (Adapted from NRCC-STH-01)
This Section Does Not Apply
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
r�
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 17 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
G. MECHANICAL HVAC ACCEPTANCE TESTS & FORMS (Adapted from 2013-NRCC-MCH-01-E)
§ RA4
Declaration of Required Acceptance Certificates (NRCA) — Acceptance Certificates that may be submitted. (Retain copies and verify forms are completed and signed to post in field for Field
Inspector to verify).
Test Description
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
n
x
Confirmed
6
N
6
6
6
6
6
o
O
4
r
i+
F+
W
r
A
r+
Ln
f+
al
►.
V
L.
00
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
C
D
m
o
c
LA
v
a
o
p�
N
m n
Equipment
-
O
M
_
p
N
D
Requiring
#of
a
ON
..
O
-<
rD
z
p d
p
3 3
O
N O
o v
ro
x
.*rD
�
o
m
r)
v
�,
Testing or
units
°
fD
c
v
n
<
v
z
o Cr
a
o. Q
x
'
rD o
D <
ri N
fD
3
rM
Verification
D
?
<
o
„
D
o
v
o f
p,
K
O
N
<
2
'O
:E
CD
2
ry
M
N
DHW1-
1
--
X
X
El
ElSHW
DHW79 -
1
X
❑
❑
SHW
HVAC 1-53
5
❑
❑
HVAC-1066
1
X
X
--
-
❑
❑
HVAC81
4
X
_ X
❑
❑
H. EVAPORATIVE COOLER SUMMARY
This Section Does Not Apply
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
9
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 18 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
NRCC-PRF-LTI-DETAILS -SECTION START -
A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E)
§ 140.6
Lighting Control Credits Schedule (includes all lighting controls installed in conditioned space for
Control Credit Calculation
Confirmed
compliance credit per §140.6(a)2 and Table 140.6-A)
V If Acceptance
Test Required
q
Location in
Occupancy Type (must meet
Type/Description of Lighting
Watts of
Power
Control Credit
Building
requirements of Table 140.6-A)
Control (i.e., partial on occupancy
# of Units
Controlled
Adjustment
Watts
sensor, manual dimming, etc.)
Lighting
Factor
Pass
Fail
S-1-lower Lever
Retail Merchandise Sales,
- none specified -
1
990
0.00
0
❑
❑
Wholesale Showroom
S 1 lower Lever
Retail Merchandise Sales,
-none specified -
1
104
0.00
0
❑
❑
Wholesale Showroom
S-1-lower Lever
Retail Merchandise Sales,
none specified -
1
195
0.00
0
❑
❑
Wholesale Showroom
S-1-lower Lever
Retail Merchandise Sales,
none specified -
1
648
•0.00
0
❑
❑
Wholesale Showroom
S-1-lower Lever
Retail Merchandise Sales,
- none specified -
1
156
0.00
0
❑
n
Wholesale Showroom
S-1-lower Lever
Retail Merchandise Sales,
none specified -
1
644
0.00
0
❑
❑
Wholesale Showroom
S 1 lower Lever
Retail Merchandise Sales,
none specified -
1
1240
0.00
0
❑
El
Wholesale Showroom
S 1 lower Lever
Retail Merchandise Sales,
none specified
1
360
0.00
0
El
❑
Wholesale Showroom
S 1 lower Lever
Retail Merchandise Sales,
none specified
1
1144
0.00
0
El
❑
Wholesale Showroom
S-5-Party Room
Retail Merchandise Sales,
none specified
1
432
0.00
0
❑
❑
Zone
Wholesale Showroom
S-6-Upper Level
Retail Merchandise Sales,
none specified -
1
432
0.00
0
❑
❑
Wholesale Showroom
S-6-Upper Level
Retail Merchandise Sales,
none specified -
1
486
0.00
0
ElWholesale
❑
Showroom
S 6 Upper Level
Retail Merchandise Sales,
none specified -
1
196
0.00
0
El
El
Wholesale Showroom
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 19 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xm1
A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E)
§ 140.6
Lighting Control Credits Schedule (includes all lighting controls installed in conditioned space for
Control Credit Calculation
Confirmed
compliance credit per §140.6(a)2 and Table 140.6-A)
'
V If Acceptance
Test wired
q
Location in
Occupancy Type (must meet
Type/Description of Lighting
Watts of
Power
Control Credit
Building
requirements of Table 140.6-A)
Control (i.e., partial on occupancy
# of Units
Controlled
Adjustment
Watts
sensor, manual dimming, etc.)
Lighting
Factor
Pass
Fail
S-6-Upper
pper Level
Retail Merchandise Sales,
none specified
1
520
0.00
0
❑
El
Wholesale Showroom
S 6 Upper Level
Retail Merchandise Sales,
none specified -
1
240
0.00
0
E-]
E]
Wholesale Showroom
S-6-Upper Level
Retail Merchandise Sales,
none specified -
1
2704
0.00
0
❑
❑
Wholesale Showroom
S 6 Upper Level
Retail Merchandise Sales,
none specified
1
39
0.00
0
El
❑
Wholesale Showroom
B. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS (Adapted from NRCC-LTI-02-E) § 130.1
This Section Does Not Apply
$130.1(a) = Manual area controls; §130.0(b)-= Multi Level; §130.1(c) = Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive
C. TAILORED METHOD LIGHTING POWER ALLOWANCE SUMMARY AND CHECKLIST (Adapted from NRCC-LTI-04-E)
§ 140.6
General lighting power (see Table D)
0
General lighting power from special function areas (see Table E)
NA
Additional "use it or lose it" (See Table G)
0
Total watts
0
D. GENERAL LIGHTING POWER (Adapted from NRCC-LTI-04-E) § 140.6-D
This Section Does Not Apply
E. GENERAL LIGHTING FROM SPECIAL FUNCTION AREAS (Adapted from NRCC-LTI-04-E)
§ 140.6(c) 3H
Room Number
Primary Function Area
Illuminance Value
(LUX)
Room Cavity Ratio
(Table G)
Allowed LPD
Floor Area (ft1)
Allowed Watts
Confirmed
pass
Fail
NA
NA
NA
NA
NA
NA
NA
❑
1 ❑
Note: Tailored Method for Special Function Areas is not currently implemented
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
0 0 0
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 20 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xm1
F. ROOM CAVITY RATIO (Adapted from NRCC-LTI-04-E)
Rectangular Spaces
Room Number
Task/Activity Description
Room Length (ft)
Room Width (ft)
Room Cavity Height (ft)
RCR
Confirmed
Pass
Fail
NA
NA
NA
NA
NA
NA
❑
❑
Non -Rectangular Spaces
This Section Does Not Apply
Note: All applicable spaces are listed under the Non -Rectangular Spaces table
G. ADDITIONAL "USE IT OR LOSE IT" (Adapted from NRCC-LTI-04-E)
1.
2.
3.
4.
Allowed Watts
Confirmed
Wall Display
Combined Floor Display and Task
Lighting
Combined Ornamental and Special
Effects Lighting
Very Valuable Merchandise
a
N
d
=
0
0
0
0
0
❑
❑
S. Wall Display
This Section Does Not Apply
6. Floor Display and Task Lighting
This Section Does Not Apply
7. Combined Ornamental and Special Effects Lighting
This Section Does Not Apply
8. Very Valuable Merchandise
This Section Does Not Apply
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
Project Name:
Lazer Oasis
NRCC-PRF-01-E
Page 21 of 21
Project Address:
46-805 Dune Palms Rd La Quinta 92253
Calculation Date/Time:-
20:07, Thu, Jun 23, 2016
Compliance Scope:
ExistingAlteration
Input File Name:
Laser Oasis -Niche -Polar Barr-16.xml
H. INDOOR & OUTDOOR LIGHTING ACCEPTANCE TESTS & FORMS (Adapted from NRCC-LTI-01-E and NRCC-LTO-01-E)
I § 130.4
Declaration of Required Acceptance Certificates (NRCA) —Acceptance Certificates that must be verified in the field. (Retain copies and verify forms are completed and signed to post in field for
Field Inspector to verify).
Test Description
Indoor
Outdoor
Confirmed
NRCA-LTI-02-A
NRCA-LTI-03-A
NRCA-LTI-04-A
NRCA-LTO-02-A
Equipment Requiring
Testing or Verification
# of units
Occ Sensors / Auto Time
Switch
Auto Daylight
Demand Responsive
Outdoor Controls
Mfu
T
Occupant Sensors
0
❑
❑
❑
❑
❑
❑
Automatic Time Switch
0
❑
❑
❑
❑
❑
j ❑
Automatic Daylighting
0
❑
❑
❑
❑
❑
❑
Demand Responsive
0
❑
❑
❑
❑
❑
❑
Outdoor Controls
0
❑
❑
❑
❑
❑
❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-06212016-760 Report Generated at: 2016-06-23 20:08:13
•
•
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM'
Project Name
Date
Lazer Oasis Tenant Improvement
612312016
DESCRIPTION
Building Envelope Measures:
§110.8(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§110.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§110 8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value
of no less than R-13 between framing members.
§110.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.Z of
§110.6(a): window area, 0.3 cfm/ft.z of door area for residential doors, 0.3 cfm/ft.Z of door area for nonresidential single doors
(swingingand sliding), and 1.0 cfm/ft.Z for nonresidential double doors (swinging).
§110.6(a): Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor.
§110.6(a) : Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors). ,
l
v
EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2016-06-23T20:09:04 ID: Page 24 of 37
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE
NRCC-ELC-01-E
Electrical Power Distribution
(Page 1 of 7)
Project Name:
Lazer Oasis Tenant Improvement
Date Prepared:
6/23/2016
A. General Information
Project Address:
46-805 Dune Palms Rd
Climate Zone:
15
Conditioned Floor Area
11,700
Unconditioned Floor Area
4,364
Building Type:
0 Nonresidential ❑ High -Rise Residential
❑ Hotel/Motel
❑ Schools
❑ Relocatable Public Schools m Conditioned Spaces
0 Unconditioned Spaces
Phase of Construction:
❑ New Construction ❑ Addition
m Alteration
C
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
May 2015
r STATE OF CALIFORNIA
Electrical Power Distributiori h ;�
CEC-NRCC-ELC-01-E Revised 05/15
( ) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E .
Electrical Power Distribution r (Page 2 of 7)
Project Name: Lazer Oasis Tenant -Improvement oa�e P.ePa,ed. 6/23/2016 -
B. Electrical Service Metering
,
❑ Each newly installed electrical service (in both existing and newly constructed buildings) is required to be metered, as set out in Table 130.5-A,
which is reproduced below.
,
❑ Fill out a separate line for each electrical service that is connected to the building.
Electrical
Field `
Electrical Service Schedule
Service Rating
Metering Capabilities (check all that
are present)
Inspector
A
B
C
D
E
F
G
N
~
a x _
fD N
p
'
•
CL S 7
N (D N
3
a)
N
7CCc D
<
v S
�. N
N
2
C
r•
Designation/location in building/description
kVA
a
�
c -
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
`
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑.
❑
❑
-❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ r,
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑'
❑
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Table 130.5-A- MINIMUM REQUIREMENTS FOR METERING OF ELECTRICAL LOAD
More than 50kVA
More than 250 kVA
Services rated
and less than or
and less than or .
more than
Meter Rating (kVA)
50 kVA or less
equal to 250 kVA
equal to 1000kVA
1000kVA
s
Instantaneous (at the
r -- '•
Required
xr ;' -
;°r� Required'
} •Required •.
iRequired
time) kW demand
y.
Historical peak demand
(kW)
Not required
Not required
Required
Required
Resettable kWh
Required '.
Required
Required7,
Required
kWh per rate period
Not required
Not required
Not required
Required
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
May 2015
4
4
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CERTIFICATE OF COMPLIANCE
`Electrical Power Distribution
" Project Name:
Lazer Oasis Tenant Improvement
CALIFORNIA ENERGY COMMISSION ,
Date Prepared:6/23/2016
NRCC-ELC-01-E
(Page 3 of 7)
C. Disaggregation of Electrical Circuits
❑ Each newly installed switchboard, panel, and motor control center (in both existing and newly constructed buildings) is required to be
disaggregated according to the requirements of Table 130.5-B, shown on the next page.
❑ Individual branch circuits, taps or disconnects that require overcurrent protection devices rated 60A or greater.
❑ As an alternative, current transformers can be added for individual branch circuits and loads throughout the building, and a permanent
measurement system can be installed. In this case, disaggregated wiring would not be required as long as the metering system allows the
equivalent disaggregated measurements.
❑ Fill out a separate line for each switchboard, motor control center, panelboard and subpanel.
Switchboard, motor control center, panelboard or
subpanel
Electrical Service that supplies that
switchboard or panel
Electrical Service Rating
Field
Inspector
m
W.
A
B
C
D
Designation/location in building/description
Designation/location in
building/description
kVA
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
OR
Current transformers have been attached to individual branch circuits and loads throughout the building, and a permanent
measurement system is installed that allows an equivalent degree of disaggregated measurement as required by the Standards..
❑
❑
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
rl
L
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CERTIFICATE OF COMPLIANCE
Electrical Power Distribution
Project Name: Lazer Oasis Tenant Improvement
CALIFORNIA ENERGY COMMISSION
Date Prepared: 6/23/2016
NRCC-ELC-01-E
(Page 4 of 7)
D. Disaggregation of Electrical Circuits (continued)
Table 130.5-B - MINIMUM REQUIREMENTS FOR SEPARATION OF ELECTRICAL LOAD
Table 130.5 — B sets the upper limit on how many load(s) of each type can be supplied by each feeder. A feeder may not supply loads of more'than
one type unless the service is rated at 50 kVA or less. For instance, on the fifth row of the table, one feeder on a service >50 kVA could be used to
supply all the plug loads on a floor of a building, provided that there are no areas in which more than 25kVA of plug load is supplied to a space less
than 5000sf
Services rated more than
Services rated more than
Services rated
50kVA and less than or
250 WA and less than or
Services rated more
Load Type
50 WA or less
equal to 250 WA
equal to 1000kVA
than 1000kVA
Lighting including exit and
All lighting
egress lighting and exterior
Not required
All lighting in aggregate
All lighting disaggregated
disaggregated by floor,
lighting
bfloor
y , type or area
type or area
HVAC systems and components
including chillers, fans, heaters,
All HVAC in aggregate
All HVAC in aggregate
furnaces, package units, cooling
Not required
All HVAC in aggregate
and each HVAC load
and each HVAC load
towers, and circulation pumps
rated at least 50 kVA
rated at least 50kVA
associated with HVAC
Domestic and service water
system pumps and related
Not required
All loads in aggregate
All loads in aggregate
All loads in aggregate
systems and components
'
All plug load separated by
All plug loads separated
All plug load in aggregate
floor, type or area
by floor, type or area.
Plug load including appliances
Groups of plug loads
Groups of plug loads
All groups of plug loads
rated less than 25 kVA
Not required
exceeding 25 kVA
exceeding 25 WA
exceeding 25 WA
connected load in an area
less than 5000 sf
connected load in an area
connected load in an
less than 5000 sf
area less than 5000 sf
Elevators, escalators, moving
walks, and transit systems
Not required
All loads in aggregate
All loads in aggregate
All loads in aggregate
Other individual non-HVAC
loads or appliances rated 25kVA
Not required
All
Each
Each
or greater
Industrial and commercial load
centers 25 kVA or greater
including theatrical lighting
Not required
All
Each
Each
installations and commercial
kitchens
Renewable power source (net
or total)
Each group
Each group
Each group
Each group
Loads associated with
renewable power source
Not required
All loads in aggregate
All loads in aggregate
All loads in aggregate
Charging stations for electric
All loads in
vehicles
aggregate
All loads in aggregate
All loads in aggregate
All loads in aggregate
L,
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
STATE OF CALIFORNIA
Is
'Electrical Power Distribution
E. Voltage Drop
❑ Attach voltage drop worksheet to this form,
❑ Field inspector has discretion to approve the worksheets; the tables shown b=_low in this secti6n are advisory only
❑ Feeder conductors and branch circuits that are dedicated to emergency services are exempt from these requirements.
❑ An advisory table of typical power factors is shown below
Field
'
Inspector
�
N
N
N
T
Ol
Feeders. Feeder conductors shall be sized for a maximum voltage drop of 2 percent at design load.
❑
11
Branch Circuits. Branch circuit conductors shall be sized for a maximum voltage drop of 3 percent at design load.
❑
❑
Compliance Manual, Chapter 8, Table 8 2: Typical Power Factors for Voltage Drop Calculations
Default Power Factor
Default Power Factor
Load Type
at 120 volts
at 277 volts
Clarifying Notes
Fluorescent lighting
0.95
0.95
Compact.
0.9 (hardwired)
0.9 (hardwired)
fluorescent lighting
�
NPF magnetic ballasts use GU-24 values
0.5 (GU-24)
0.3 (GU-24)
LED lighting
0.7
0.5
May be higher if specifications call for high
power factor drivers
Incandescent
lighting
1.0
1.0
HID lighting
0.9
0.9
May be lower if NPF ballasts are specified
HVAC packages
0.85
0.9
Other motors <5 HP
0.8
0.8
Other motors >5 HP
0.85
0.85
Kitchen equipment
0.9
N/A
Receptacles
0.6
N/A
For dedicated receptacles, may be rated
according to the load
Electric heating
1.0
1.0 -
including hot water
Other
0.85
0.85
is
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
STATE OF CALIFORNIA
Elebtrical Power Distribution
4 .,
CEC-NRCC-ELC-01-E (Revised 05/15)
CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE
NRCC-ELC-01-E
Electrical Power Distribution
(Page 6 of 7)
Project Name:
Lazer Oasis Tenant Improvement
Date Prepared:
6123/2016
F. Circuit Controls for 120-Volt Receptacles
❑ Controlled 120 volt receptacles shall be provided, as required by Section 130.5(d) of the Standards.
❑ In open office areas, controlled circuit receptacles are not required if, at time of final permit, workstations are installed, and each workstation is
equipped with an occupant sensing control that is permanently mounted in each workstation, and which controls a hardwired, nonresidential -
rated power strip. Plug-in strips and other plug-in devices that incorporate an occupant sensor shall not be used for this exception.
❑ Receptacles that are only for the following purposes are exempt:
-Receptacles specifically for refrigerators and water dispensers in kitchenettes.
-Receptacles located a minimum of six feet above the floor that are specifically for clocks.
-Receptacles for network copiers, fax machines, A/V and data equipment other, than personal computers in copy rooms.
Field
Inspector
�
11
N
IA
T
N
—
1. At least one controlled receptacle is installed within 6 feet of each uncontrolled receptacle, or split -wired duplex
receptacles are installed, that have one controlled and one uncontrolled receptacle. This applies in all of the following
spaces: -
• Private offices, open office areas
• Receptions and lobbies
❑
❑
• Conference rooms
• Kitchenettes in office spaces
• Copy room
2. Electric circuits serving controlled receptacles are equipped with automatic shut -OFF controls following the
requirements prescribed in Section 130.1(c)1 through 5 (in many cases this will mean that the receptacles are connected
❑
❑
to the same automatic shut -OFF system as the general lighting of the space).
3. Controlled receptacles shall have a permanent marking to differentiate them from uncontrolled receptacles.
❑
❑
4. For open office areas, controlled circuits shall be provided and marked to support installation and configuration of office
furniture with receptacles that comply with Section 130.5(d) 1, 2, and 3.
❑
❑
5. For hotel and motel guest rooms at least one-half of the 120-volt receptacles in each guest room are controlled
receptacles that comply with Section 130.5(d)1, 2, and 3 (see numbers 1,2 and 3 above). Electric circuits serving
controlled receptacles have captive card key controls, occupancy sensing controls, or automatic controls such that, no
❑
❑
longer than 30 minutes after the guest room has been vacated, power is switched off.
6. Plug-in strips and other plug-in devices that incorporate an occupant sensor are not used to comply with any of these
requirements.
❑Fi
•
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance I May 2015
STATE OF CALIFORNIA
'Electrical Power Distribution
•
Q_
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Tim Scott
Documentation Author Signature:
Company: Scott Design and Title 24, Inc,
Signature Date:6/23/2016
Address: 78818 Velie Way, Suite 8
CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Palm Desert, CA 92260
Phone. (760) 777-0102
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this
Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Joe Donati
Responsible Designer Signatu
Company: Niche Builders, Inc.
Date Signed:
NJ IVA,
Address` 840 East West Drive
License:
City/state/zip: MUr h s , CA 95247
p y
Phone:
(209) 609-3752
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
azer Oasis Tenant Improvement
Date
6/23/2016
System Name
HVAC 1-5
Floor Area
8,111
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
5
COIL
CFM
Total Room Loads 14,868
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 2,028
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per System
120,000
232.621
81,110
6,876
93,155
Total Output Btuh
600.000
0
-Output Btuh/s ft
74.0
11,631
4,658
Cooling System
0
0
Output per System
120,000
80,824
20,041
2,028
94,478
Total Output Btuh
600,000
0
101,151
0
Total Output Tons
50.0
11,631
4,658
Total Output Btuhls ft
74.0
Total Output s ft/Ton
162.2
336,707
196,949
Air System
CFM per System
4,000
HVAC EQUIPMENT SELECTION
Airflow cfm
20,000
Existing HVAC
416,995
126,525
374,744
Airflow cfm/s ft
2.47
Airflow cfm/Ton
400.0
Outside Air %
10.1 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
416,995
126,525
374,744
Jan 1 AM
Outside Air cfm/s ft
0.25
Note: values above given at ARI conditions
Jul 3 PM
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak)
26 OF
Outside Air
2,028 cfm
70 OF
65 °F 83 OF 83 OF
IC��rJ
Heating Coil Supply Fan
20,000 cfm
-0-
83 °F
k ROOM F fl
70 OF
COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling
Peak
112/78OF
Outside Air
2,028 cfm
75 / 65 OF
78/66°F 59/58°F 59/58°F
IN Cooling Coil Supply Fan
20,000 cfm
59 158 OF
60.1 % ROOM fl
74 / 64 OF
EnergyPro 6.7 by EnergySoR
User Number: 6712 RunCode: 2016-06-23T20:09:04
ID:
Page 32 of 37
n�
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
LazerOasis Tenant Improvement
Date
6/23/2016
System Name
HVAC-10
Floor Area
554
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 5,464
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 416
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per System
36,000
98,860
16,620
2,061
83,352
Total Output Btuh
36,000
0
Output Btuh/s ft
65.0
4,943
4,168
Cooling System
0
0
Output per System
36,000
15,919
-3,741
416
18,572
Total Output Btuh
36,000
0
12,879
0
Total Output Tons
3•0
4,943
4,168
Total Output Btuh/s ft
65.0
Total Output s ft/Ton
184.7
124,664
110,258
Air System
CFM per System
1,200
HVAC EQUIPMENT SELECTION
Airflow, cfm
1,200
New 3 Ton Split
28,248
8,346
22,485
Airflow, cfm/s ft
2.17
Airflow, cfm/Ton
400.0
Outside Air %
34.6 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
28,248
8,346
22,485
Outside Air cfm/s ft
0.75
Note: values above given at ARI conditions
Jul 3 PM
Jan 1 AM
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
26 OF 53 OF 53 OF 110 OF
O _
Outside Air
416 cfm Supply Fan Heating Coil
1,200 cfm
68 OF II ((
�. Iti,._,.-) _. �I,..._.._U
f
108 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling
Peak
112/78OF 88/73OF 88/73OF 55/59OF
�w
Outside Air
416 cfm Supply Fan Cooling Coil
1,200 cfm
76/70OF
57 / 60 OF
81.4 % FROOM
74/70OF
EnergyPro 6.7 by EnergySoft
User Number: 6712 RunCode: 2016-06-23T20:09:04
ID: Page 33 of 37
,
4
C:
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Lazer Oasis Tenant Improvement
Date
6/23/2016
System Name
HVAC
Floor Area
3,035
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
4
COIL
CFM
Total Room Loads 8,655
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 759
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output per System
69,000
142,344
30,350
2,691
58,362
Total Output Btuh
276,000
0
Output Btuh/s ft
90•9
7,117
2,918
Cooling System
0
0
Output per System
69,000
30,097
9,417
759
35,288
Total Output Btuh
276,000
0
7,117
186,676 39.767
0
Total Output Tons
23.0
2,918
Total Output Btuh/s ft
90•9
Total Output s ft/Ton
132.0
99,486
Air System
CFM per System
2,300
HVAC EQUIPMENT SELECTION
Airflow cfm
9,200
HVAC 6-9
195,639
50,680
172,382
Airflow cfm/s ft
3.03
5.0 kW Supplemental Electric
68,260
Airflow cfm/Ton
400.0
Outside Air %
8•2 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
195,639
50,680
240,642
Outside Air cfm/s ft
0.25
Note: values above given at ARI conditions
Jul 3 PM
Jan 1 AM
HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating
Peak
26 OF
Outside Air
759 cfm
70 OF
66 OF 84 OF 91 OF 91 OF
Heating Coil Aux. Heat Coil Supply Fan
9,200 cfm
90 OF
ROOM [7Q]
70 OF
COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling
Peak
112 / 78 OF
Outside Air
Ar
759 cfm
75 / 64 OF
78 / 65 OF 58 / 57 OF 58 / 57 OF
UJ
Cooling Coil Supply Fan
9,200 cfm
59 / 57 OF
----
57.2% ; ROOM
74164 OF
EnergyPro 6.7 by EnergySoff
User Number., 6712 Run Code: 2016-06-23T20:09:04
/D: Page 34 of 37
ZONE LOAD SUMMARY
Project Name
Lazer Oasis Tenant Improvement
Date
6/23/2016
System Name
HVAC 1-5
Floor Area
8,111
ZONE LOAD SUMMARY
ZONAL SYSTEM
COOLING PEAK
HEATING PEAK
ZONE NAME
SYSTEM NAME
Mult.
CFM
Sensible
Latent
Heating
OA CFM
Peak Hr
CFM
Sensible
Latent
CFM
Sensible
lower Lever
1.0
2,028
Jul PM
14,868
314,624
119,188
6,876
188,106
TOTALS
0
0
01
3,119
Jul 3 PM
314, 624I
119,188
188,106
(BLOCK LOAD)
EnergyPro 6.7 by EnergySoR -User Number: 6712 Run Code: 2016-06-23T20:09:04 ID: Page 35 of 37
•
ZONE LOAD SUMMARY
Project Name
Lazer Oasis Tenant Improvement
Date
6/23/2016
System Name
HVAC-10
Floor Area
554
ZONE LOAD SUMMARY
ZONAL SYSTEM
COOLING PEAK
HEATING PEAK
ZONE NAME
SYSTEM NAME
Mult.
CFM
Sensible
Latent
Heating
OA CFM
Peak Hr
CFM
Sensible
Latent
CFM
Sensible
Party Room Zone
1.0
416
Jul PM
5,464
115,663
24,422
2,061
102,808
TOTALS
0
0
01
416
Jul 3PM
115,663
24,422
102,808
(BLOCK LOAD)
EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2016-06-23T20:09:04 ID: Page 36 of 37
ZONE LOAD SUMMARY
Project Name
Lazer Oasis Tenant Improvement
Date
6/23/2016
System Name
HVAC
Floor Area
3,035
ZONE LOAD SUMMARY
ZONAL SYSTEM
COOLING PEAK
HEATING PEAK
ZONE NAME
SYSTEM NAME
Mult.
CFM
Sensible
Latent
Heating
OA CFM
Peak Hr
CFM
Sensible
Latent
CFM
Sensible
Upper Level
1.0
759
Jul 3PM
8,655
173,028
44,598
2,691
93,891
TOTALS
0
0
0
759
Jul PM
173,028I
44,598
93,891
(BLOCK LOAD)
EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2016-06-23T20:09:04 ID: Page 37 of 37