06-2632 (RC) Title 24.,
TITLE 24 REPORT
Title 24 Report for:
Benny Bagel's Tenant Impro a NG
F LA QUINTA
50-620 Eisenhower, Bldg. G, ui I 8& SAFETY DEPT.
La Quinta, Ca 92253 AP P Ro4CTION
ED
FOR CONST
Project Designer:
Candice Noto Designs
74-830 Velie Way, Suite E
Palm Desert, Ca 92260
(760) 880-3016
Report Prepared By:
Tim 'Scott
Scott Design & Title 24
77085 Michigan Dr..
Palm Desert, CA 92211
(760) 200-4780
Job Number: ( 1
� UG 1 5 X606
n A
Date.-
7/9/2006
ate:
7/9/2006
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the CaliforniaEnergy Commission for use with both the Residential, and, Nonresidential 2005:.Building.Energy Efficiency Standards.
This program developed by EnergySoft; LLC - www.energysoft.com.
EnergyPro 4.1 by EneWSoft Job',Number. User Number. 6712 1
TABLE OF CONTENTS
Cover Page
1
Table of Contents
2
Nonresidential Performance Title 24 Forms
3
Form LTG -7-C Room Cavity Ratio Worksheet
14
Form LTG -MM Lighting Mandatory:Measures
15
Form MECH-MM Mechanical Mandatory Measures
16
HVAC System Heating and Cooling Loads Summary
18
Room Load Summary
19
Room Heating Peak Loads
20
Room Cooling Peak Loads
21
Room Cooling Coil Loads
22
EnergyPro 4.1 by EnergySoft Job Number. User Number. 6712 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
IPROJECT NAME DATE
Benny Bagel's Tenant Improvement 7/9/2006
PROJECT ADDRESSe.:a:r�a:;_;;
50-620 Eisenhower, Bldg. G, Suite 105 La Quinta
PRINCIPAL DESIGNER - ENVELOPE TELEPHONE : ,BuUding I?erm�t
Candice Noto Designs (760) 880-3016
DOCUMENTATION AUTHOR TELEPHONE Checked'by/Date
Scott Design & Title 24 (760) 200-4780 en�r�emeM n�e��:uae
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certlficate.applles only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation Is acAurateand fompletb.
DOCUMENTATION AUTHOR
DATE OF PLANS
DATE
Tim Scott
BUILDING CONDITIONED FLOOR AREA
940 Sq.Ft
The Principal Designer hereby certifys that the proposed building -design represented in this set of construction documen s is
CLIMATE ZONE
15
BUILDING TYPE
through 118, and 140, 142, 143 or49-of Title 24, Part 6.
NONRESIDENTIAL HIGH RISE RESIDENTIAL
❑ ❑ F 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of°the Business and Professions Code to
HOTELIMOTEL GUEST ROOM
PHASE OF CONSTRUCTION
®
NEW CONSTRUCTION ADDITION
contractor performing this work.
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certlficate.applles only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation Is acAurateand fompletb.
DOCUMENTATION AUTHOR
SIG
DATE
Tim Scott
The Principal Designer hereby certifys that the proposed building -design represented in this set of construction documen s is
consistent with the other compliance forms and worksheets; with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or49-of Title 24, Part 6.
ENV. LTG. MECH.
❑ ❑ F 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of°the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, or I am a licensed architect.
F F F-1 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this,document as the person responsible for its preparation; and that l am a licensed
contractor performing this work.
❑ ❑ E�/3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Envelope Compliance Not In The Scope Of
Required Forms
Th—is SubMittal
PRINCIPAL ENVELOPE DESIGNER- NAME
SIGNATURE
LIC. NO.
DATE
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
'LT 1., LTG -2
Required Forms
PRINCIPAL.LIGHTING.DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
Candice Noto Designs
0
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ECH-1 MECH-2 MECH-3 MECH-5
Required rms
PRINCIPAL MECHANICAL DESIGNER -NAME
SI N
LIC. NO.
DAT
`7 -f 06
Scott Design and. Title 24
Run Initiation Timer 07/09/0614:44:37 Run Code: 11.52481477
EnergyPm 4.1 by EnergySoft User Number 6712 Job Number. Page:3 of 22
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1
1 PROJECT NAME DATE
Benny Bagel's Tenant Improvement I
7/9/2006
ENERGY COMPONENT
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Standard
Design.
TOTALS: 794.25
Percent better,than Standard:
Proposed Compliance
789.51 4.74
0.6% ( 0.6% excluding process)
Building Orientation
Number of Stories
Number of Systems
Number of Zones
270 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
940
scA
sgft.
soft.
1
0
1
940
11'
Natural Gas
24.0%
Left Elevation (N)
Orientation
Gross Area.
Glazing Area
Glazing
Ratio.
Front Elevation W
200
sgft.
48
sgft.
24.0%
Left Elevation (N)
470
sgtt.
144
sgtt.
30.6%
Rear Elevation E
200
'sgft.
0
sgft.
0.0%
Right Elevation (S)
Total
Roof
470
1,340
940
sgft.
sgfL
sgft..
0
192
0
sgR
sgft:
$qn
0.0%
Standard Proposed
Lighting Power Density 1.700 w1sgfc 1.640 wisge.
Prescriptive Env. Heat Loss 255 Btu/h 322 Btum
.Prescriptive Env. Heat Gain 24;223 Btu/h-F 31,238 Btu/h-F
Remarks:
EnergyPro 4.1 by EnergySoft User Number., 6712 Job Number. Page:4 of 22
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
DATE
Bennv Bawl's Tenant Improvement I 7/9/2006 1
The local enforcement agencyshould pay special attention to the hems specified In thli checklist These Items require special written Justification
and documentation, and special verification to be used with the. pe►formance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of'the s I justiflcaUon.and documentation
submitted. l`��
IThe HVAC.Svstem "York E4FH060S06"'is designated as 3 Phase, or is Exemptedfrom the NAECAM3 SEER reauirement. I / 1
The exceptional features listed in this performance approach application: have specifically been reviewed. Adequate written justification and
documentation for their use have been provided bythe applicant
Authorized Signature or Stam
Run Initiation Time: 0710910614-44:37 Run Code: 1152481477
EnergyPro 4.1 by EnergySoft User Number 6712 Job Number: Page:5 of 22
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C
PROJECT NAME
DATE
Bennv Bagel's Tenant Improvement I 7/9/2006 1
INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG-5-C)WATTS
F-1TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 1,542
1ALTERNATE COMPLIANCE
0 PERFORMANCE, METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C).
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
CONTROL
IDENTIFICATION
CONTROL TYPE
Time Switch. Dimm
Check if
SPACE CONTROLLED Daylighfing
NO,TE„T0-
FIELD
NOTES TO FIELD - For Buildin De artment Use Only
R$t- - � e 't
.I�`�r ��
4. i4
J. i
Run Initiation Timm 07109106 14:44:37 Run C1152481477
EnergyPro 4.1 by EnergySoft User Number 6712 Job Number. Page:6 of 22
INSTALLED
WATTS
INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C)
1,542
PORTABLE LIGHTING (From LTG -3-C)
0
LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C)
0
CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER
1,542
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG-5-C)WATTS
F-1TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 1,542
1ALTERNATE COMPLIANCE
0 PERFORMANCE, METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C).
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
CONTROL
IDENTIFICATION
CONTROL TYPE
Time Switch. Dimm
Check if
SPACE CONTROLLED Daylighfing
NO,TE„T0-
FIELD
NOTES TO FIELD - For Buildin De artment Use Only
R$t- - � e 't
.I�`�r ��
4. i4
J. i
Run Initiation Timm 07109106 14:44:37 Run C1152481477
EnergyPro 4.1 by EnergySoft User Number 6712 Job Number. Page:6 of 22
CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-C
PROJECT NAME
BennyBagel's Tenant Improvement
DATE
7/9/2006
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance
tests for lighting systems. The designer is required to check the boxes by all acceptance tests that
apply and list all equipment that require an acceptance test. If all equipment of a certain type requires
a test, list the equipment description and the number of systems to be tested in parentheses. The NJ
number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the
test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design
professional or an agent selected by the owner). Since this form will be part of the plans, completion
of this section will allow the responsible party to budget, for the scope of work appropriately.
Building Departments:
Before an occupancy permit is granted for newly constructed building or space, or a new lighting
system system serving a building or space is operated for normal use, all control devices serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
In addition a Certificate of Acceptance; LTG-1-A, Forms shall be submitted to the building department
that:
A. Certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of§ 10-103(b) and. Title 24 Part 6.
T s_crlption
Test Performed BY:
❑ LTG-2-A: Lighting Control Acceptance Document
- Occupancy Sensor Acceptance
- Manual Daylight Controls Acceptance
- Automatic Time Switch Control Acceptance
Equipment requiring acceptance testing
❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document
Equipment requiring acceptance testing
EnergyPro4AI by EnergySoft User' Number:; 6712 Job Number. Pagel of 22 1
CERTIFICATE OF COMPLIANCE MECH-1-C
NAME
enantlm
This form is to be used by the designerandattached tothe plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the.
equipment•description and the. number of systems to'be tested in iparentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate,the,person responsible for performing the tests (i.e. the Installing contractor, design professional or an agent
selected by the owner). Since this form will. be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices servingthe building or space: shall be certified as meetingthe Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall besubmittedto the building department that certifies plans, specifications, installation
certificates. and ooeratina and maintenance information meet the reauirements of Section 10-1 03(b) and Title 24 Part 6.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Consinaon and Retrain
❑ MECH-3=A: Packaged HVAC Systems,Acceptance Document
Equipment. requiring acceptance testing.
Test required on all New systems both New Construction and Reboht
❑.MECH-4-A: Air -Side Economizer Acceptance, Document
Equipment requiring acceptance testing
Test required on all New systems both New.Construction and Retrofit. Units, with economisers Mat are installed at the factory and cenYftd with the
commission do not require equipment testing but do, require consbucbm inspection.
❑ MECH-5-A: Air Distribution. Acceptance Document
Equipmentrequiring acceptance testing
This test required BMe unit serves 5,000112 of space or Mss and 2576 or more of the ducts are In noncondiboned or samfcondponed.space like an
attic. New systems that mew the above requirements. Retrofit systems that mee6Me above requirements and either extend ducts, replace duds of
replace Me packaged unit
❑ MECH-6-A: Demand ControlVentilation Acceptance Document
Equipment requiring acceptance testing.
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A:-Hydronic System Control Acceptance Document
-Variable Flow Controls Apples to chilled and, hot watersystems.
-Automatic Isolation Controls Applles to new boilers end chillers and Me primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant ligw chlied and hot watersystems Mat have a design cepedty greater Man cr equal to 5OA000 Bluft
-Water-loop Heat Pump Controls
Applies to all new waledoop heat pump systems where Me combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to sit new disinbution pumps on new variable flow chilled, hydropic heat pump
or condenser walersydems where Bra pumps motors are greater than 5 hp.
Equipment reuirin acce tancetestin
EnergyPro 41 by EnetgySoft User Number: 6712 Job Number. Page:8 of 22
INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C
NAME
Benny Bagel's Tenant Improvement
INSTALLED LIGHTING POWER FOR CONDITIONED SPACES
7/9/2006
Luminaire
Lam s/Ballasts
Installed Watts
C
D
E
F
G
H
I
J
Name
Type Description
,gym
$v
rWZ
3.�3
�'p�
A 3.
m.v*
�<'
PwZ
3iv3
61"
-YeaTNO
r
3c�m
m 'w
vm
n
c
3'03
ew
_
vwii
4 ft Fluorescent TS Energy Savings
lac
--32T8
2
30
1.0
54.0
X
1
54
V4) 4 ft Fluorescent T8 Energy Savings
lec
3
1.
104.OX—
12
1,248
'L5w per ft Track. Light (with Current
1
15
15.0
X
16
240
PAGE TOTAL 1 542
BUILDING TOTAL (sum oT all pages) 1, 542
PORTABLE LIGHTING (From LTG -3-C)
CONTROL CREDIT (From LTG -4-C) �O
ADJUSTED ACTUAL WATTS 1 542.
EnergyPro 4.1 by EnergySoft User Numbers 6712 Job Number. Page:9 of 22 1
AIR SYSTEM REQUIREMENTS Part.1 of 2 MECH-2-C
(PROJECT NAME DATE
Benny Bagel's Tenant Improvement 7/9/2006
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct.lnsulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x1.212
Proposed Sensible. Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealingfor Prescriptive Compliance
AIR SYSTEMS Central or Single Zone
HVAC -1
1
Reference on Pians or Specification 1
112(a) P
n/a
112(a) 1 .0 SEER / 10.7 EER
or
112 Y
35,601 btuh
112(c), 115(a) n/a
121(b) Yes
n/a
121 b 282 cfm
121 c No
48,523 btuh
121(c) No
121(c), 122(e) Procirammable Switch
Constant Volume
122(e) Heating & Cooling Required
'122 Auto
'122 n/a
123
Yes
124 R-4.2
144 a & b
n/a
144 a & b
35,601 btuh
144 a & b
n/a
144 (&& b
48,523 btuh
144 c
Constant Volume
144 c
144 c
Yes
144 d
No
144 a
No Economizer
144
Constant Tem
144 (t}
Constant Temp
144 k
No
1: For each central and single zone air systems (or group of similar units) fill'in the reference to sheet number and/or specification section and paragraph number where the
required features are. documented. If a.mqulrement is not-applicable,.put "N/A'in the column.
2: Not required for hydronic°heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see. PERF -1 for performance method dud sealing requirements.
EnergyPro 4.1 by EnergySoft User Number.:0712 Job Number: Paoe:10 of 22 1
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C
PROJECT NAME DATE
Benny Bagel's Tenant Improvement 7/9/2006
2 WATER SIDE SYSTEMS:
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section Reference on Plans or Specification
Equipment Efficiency 112(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Calculated Capacity
Proposed Capacity
TowerFan Controls
TowerFlow Controls
Variable Flow System Design
Chiller and Boller isolation
CHW and HHW Reset Controls
WLHP Isolation Valves
VSD on CHW, CW & WLHP Pumps > 5
HP
DP Sensor Location
1: For each chiller, cooling tower, boiler, and hydronic. loop (or groups of similar equipment) fill in,the referenceto sheet number and/or specification section and paragraph
number where.the required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Water side systems include wet side system using other liquids.such as glycol or brine.
Service Hot Water, Pool Heating
ITEM OR SYSTEM TAG(S) DHW'Heater
Number of Systems 1
MANDATORY MEASURES Reference on'Plans or Specification'
Water Heater Certification
Water Heater Efficiency
Service Water Heating Installation
Pool and Spa Efficiency and Control
Pool and Spa Installation
Pool Heater - No Pilot Light
Spa Heater - No Pilot Light
113 (a)
113 b
113 (c)
114 a
114 b
115 (c)
115 d
A.O. SMITH FPS -50-224
79%
n/a
n/a
• n/a
n/a
1: For each waterheater,, pool heat and domestic water loop (or groups of similar equipment) fill in the,reference to sheet number and/or specification section and
paragraph.number where the required features are documented. We requiremenfIs not applicable, put "N/A" ins.the column.
Run Initiation Time: 07/09/0614:44:37 Run Code: 1162481477
EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number. Page: 11 of 22
MECHANICAL VENTILATION MECH-3-C
NAME
PRESCRIPTIVE REHEAT
LIMITATION Section 144(d))
MECHANICAL E I (Section 121 (b)2)
A EA.BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
I M
N
ZONE/SYSTEM
a'=
Tia
yZ
d p
371",
°0
oD 3
3
x>
3
-0
0,3
�O�r
°�
'v
m n
3i�
O.1
me
Ken
3
Ma m
A
$''p
..3 G) D
m'p
02
�tr.�
w:
�o aR
°
Am X
'"'Ca
�m
a
'� ao
RX
ao
;K0
° C 3
w3
o°
op
m tie
—I
Restaurant
94C
0.251
235
235
282
HVAC -1
Total
235
282
C rate per Section 121 T
E Based on seat or the reater of the=iberof occupants and 50% of the CBC occu load for earess vurposea fors aces without fixed seats .
H' R rw Required Ventilation Air REQ'D V.A. is the lamer of the ventilation rates calculated on eAREA or OCCUPANCY BASIS column D or G).
I Must be creater than or equal to H or use Transfer Air column N tomake up the ditiance.
J Design,fan supply cfm Fan CFM x 30%;, or -
K Condition area x 04 dmilt. e .• or
L Maximum of Columns H, J, K. or 300 cfm
M This must be less than or equal to Column L and' greater that or equal to the sum of Columns H + N.
N Transfer air must be provided where, the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.1 by EnergySoft User Number. 6712 Job Number: Page: 12 of 22
IMECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-Cl
PROJECT NAME
Bennv Baael's Tenant Improvement I
DATE 7/9/2006
.;HIL ER AND TOWER SUMMARY
Energy
Factor
or RE
Efficiency
Tons
PUMPS
System Type
Distribution Type
Equipment Name
Equipment pe
Vol.
„(Gals.)
Tot.
Q
GPM
BHP
Motor
Eff.
Drive
Eft.
Pump
Control
43,000
50
New
0.60
Na
n/a
SEER/ 10.7 EER
Existing
No Economizer
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water mp
Hot Water Piping Len
ft
Control
#
HP
Type
In Plenum
Outside
Buried
'CENTRA6 SYSTEM'.RATINGS
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name
System Type
Distribution Type
Qty
Rated
Input
Vol.
„(Gals.)
Condition
Status
Ext
R -Val.
A.0. SMITH FPS -50-224
Small Gas
All Pipes Ins
1
43,000
50
New
0.60
Na
n/a
SEER/ 10.7 EER
Existing
No Economizer
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water mp
Hot Water Piping Len
ft
Control
#
HP
Type
In Plenum
Outside
Buried
Insulation
'CENTRA6 SYSTEM'.RATINGS
HEATING
COOLING
Svstsm Name
SMIRM Tog
City
Output
Aux.
kW
Eff.
Out ut
E c encStatus
Condition
Economizer Type
York E4FH060S06
Packaged DX
1
57,000
0.
8.20 HSPF
58,00012:0
SEER/ 10.7 EER
Existing
No Economizer
CENTRA6 SYSTEM FAN SUMMA
F'FAN
RETURN
FAN
Name
Fan
Motor Location
-SUPP12
CFM
BHP
Motor
Eff.
Drive
Eff.
CFM
BHP
Motor
Eff.
Drive
Eff.
Wm
York E060SO6
Constant Volume
Draw -Through
2,000
1.00
82.5%
97.0%
none
Run Inatsation Time* 07109/06 14@"@37 Run Codee 1162481477
EnergyPro 4.1 by EnergySoft User Number. 6712 Job Number: Page: 13 of 22
ROOM CAVITY RATIO WORKSHEET (RCR>=3.5)
PROJECT NAME Benny Bagel's Tenant Improvement
)OCUMENTATION AUTHOR DATE
LTG -7-C
A
B
C
D
E
F
Room
Name
Task/Activity
Description
Room
Length (L)
ft
Room
Width (W)
ft
Room Cavity
Height (H)
(ft)
Room. Cay. Ratio
5xHx(L+W)
/(LxW)
A
B
C
D
E
F
Room
Name
Task/Activity
Description
Room
Area (A)
(SO
Room
Perimeter (P)
(ft)
Room Cavity
Height (H)
(ft)
Room Cay. Ratio
2.5 x H x P
/A
EnergyPM 4.1 by,EnergySoft User Number. 6712 Job Number. Page: 14 of 22 1
LIGHTING MANDATORY MEASURES LTG -MM
PROJECT NAME
el's Tenant Improvement 1 7/9/2006
DESCRIPTION
Designer
Enforcement
❑X §131(d)1 For every floor, all Interior lighting system&shall be equipped with a separate automatic
control to shut off the lighting. This automatic control shall meet the requirements of
Section 119 and may be an occupancy sensor, automatic time switch, or other device
capable of automatically shutting off the lighting.
§131(d)20verride for Building Lighting Shut-off. The automatic building shut-off system Is
provided with a manual, accessible -override switch In sight of the lights. The area
of override Is not to.exceed 5,000 square feet.
X❑ §119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed bythe
manufacturer.
X1 §111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for
the. project are certified and listed in the Directory. All installed fixtures shall be
certifled.
FX §132 Tandem Wiring for One and Three Lamp Fluorescent Fbdures: All one and three
lamp fluorescent fixtures are tandem wired with two lamp ballasts where required
by Standards Section 132;;or all one and three lamp fluorescent fixtures are
specified with electronic high -frequency ballasts and are exempt.from tandem
wiring requirements.
§131(a) Individual Room/Area Controls: Each room and area in this building is equipped
with a separate switch or occupancy sensor device for each area with floor -to -
calling walls.
§131(b) Uniform Reduction for individual Rooms: All rooms and areas greater than 100
square feet andmore than 0.8 watts per square foot of lighting load shall be
controlled with bi-level switching for uniform reduction of lighting within the room.
X❑ §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall
have 50% of the lamps in each dayllt.area controlled by°a separate switch; or the
effective use of daylight cannot be accomplished because the windows are
contlnuouslyshaded by a building on the adjacent lot. Diagram of shading during
different times of the year is Included on plans.
§131(e) Display Lighting. Display lighting shall be separately switched on circuits that
are 20 amps or less..
EnergyPm 4.1 by EnergySoft. User Number. e712 Job Number. Page: 15 of 22
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME DATE
Bennv Bagel's Tenant Imarovement 7/9/2006
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
§.111 Any appliance for which there is a California standard established in the
Appliance: Efficlency Regulations will comply with the.applicable standard.
§115(a) Fan type central furnaces shall not have a pilot light
§ 123 Piping, except thatconveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
a§ 124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 603 and 604 of the Uniform Mechanical Code.
Controls
§ 122(e) Each space conditioning system shall be Installed with one of the following:
§ 122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an -automatic time switch
with an accessible manual override that allows operation of the system during
off -hours for up to .4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power Is Interrupted;- or
§ 122(e)1 B An occupancy sensor to control the operating period of the system; or
§ 122(e)1 C.A 4 -hour timer that can be manually operated to control the operating period of
the system.
0 § 122(9)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the -system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint
§ 122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
Isolation zones. Each zone: shall not exceed 25;000 square feet; shall be
provided with, isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
FX]§ 122(a&b) Each space conditioning system shall be controlled by an. individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustableup to 65 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a•deadband of at
least °rees_F within which the: supply of heating and cooling is shut off or
reduced to a minimum..
§ 122(c) Thermostats hall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
§ 112(b) Heat pumps shall be installed with controls.to prevent electric resistance
supplementary heater operation when the heating load can bemet by the heat
pump alone.
EnergyPm By EnergySoft User Number. User Job Number Page: 16 of 22
MECHANICAL MANDATORY MEASURES Part2 of 2 MECH-MM
NAME
Tenant lm
DATE
7/9/2006
Description
Designer
Enforcement
Ventilation
a§ 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at
the ventilation rates as specified on these plans.
§ 122M Gravity or automatic dampers Interlocked and closed on fan shutdown shall be
provided on the outside. air Intakes and dlscharges.of all space conditioning and
exhaust systems.
0 § 122(f) All gravity vendiating.systems shall be provided with automatic or readily accessible
manually operated dampers In all openings to the outside, except for combustion air
openings.
X❑ § 121(f)1 Air Balancing: The system shall be balanced in accordancewith the National
Environmental Balancing Bureau.(NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§ 121M2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified, by the
Installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2), the installing licenced C-20 mechanical contractor, or (3) the
person with overall responsibility for the design of the ventilation system; or
§ 121(f)3 Outside.Air Measurement:. The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
0 § 121 (f)4 Another method approved by thwCommissiom
Service Water Heating Systems
❑ 6113(b)2 If a circulating, hot water system Is Installed, It shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
X] § 113(b)38 Lavatories in restrooms of public facilities shall be equipped with controls°to limit the
outlet temperatureto 110 degrees F:
0 § 113(b)3C Lavatories in restroome of public facilities shall be equipped with one of the
following:
Outlet devices that limit the flow of hot.water to a maximum of 0.5 gallons per
minute.
Foot actuated control valves, and outlet devices that limit the flow,of hot water to a
maximum of 0.75 gallons per minute.
Proximity sensor actuated, control valves, and outlet devices that limit the flow of hot
water to a maximum of 0.75 gallons per minute.
Self-closing valves, and outlet devices that limit the flow of hot water to a maximum
of 2.5 gallons perrminute, and 0.25 gallons/cycle (circulating system).
SeH�closing valves, and outlet devices that limit the flow of hot water to a maximum
of 2.5 gallons per minute, and 0.50 gallonsicycle (non -circulating system).
SeH-closing valves, and outlet devices that limit the flow of hot water to a maximum
of 2.5 gallons per minute; and 0:75 gallonslcycle (foot switches and proximity sensor
controls).
EnergyPro By EnergySoft User Number. User Job Number. Page: 17 of 22
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Benny Bagel's Tenant Improvement 7/9/2006
SYSTEM NAME FLOOR AREA
HVAC -1 940
[ENGINEERING CHECKS SYSTEM LOAD
Number of Systems
1
Heating System
Output per System
57,000
Total Output (Btuh)
57,000
Output(Btuhlsgft)
60.6
Cooling System
Output,per System
58,000
Total Output (Stub)
58,000
Total Output (Tons)
4.8
Total Output (Stuh/sgft)
61.7
Total Output (sgft/Ton)
194.5
Air System
CFM per System
2,000
Airnow (cfm)
2,000
Airflow (cfm/sgft)
2.13
Airflow (cbnrron)
413.8
Outside Air (°/6)
14.1
Outside Air,(cfmisgft)
0.30
Note: values above given at ARI conditions
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel Latent
CFM
I Sensible
Total Room Loads 1 1,796
Return Vented Lighting
Return Air'Ducts
Return Fan
Ventilation 282
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
36,311
5,45
0
1,816
0
11,148
-72
0
1,816
51090
4723
York E4FHO60SO6 48,523 1,923 35,60
Total Adjusted System Output 48;523 1,923 35,60
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 m Jan 12 am
EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak
26.0 of 63.3 of 105.0 of 105.0 of
Supply Air Ducts
Outside Air
282 ch Heating Coil Supply Fan 104'5 °F
2600 ch ROOMS
69:5 of 70.0 of
Return Air Ducts I
DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Coolin Peak
112:0 /72.8 OF 80.:1 / 63.7 of 5&0153.7 of 55.0 [53.7 of
I 41 F1 Supply Air Ducts
Outside Air
282 ofm Cooling Coil Supply Fan 55.9 / 5CO of
2000 cfm 50.2% R.H. ROOMS
74.9162.0 of 74.0.161.7 of
4.1.
User Number.. 6712
Return Air Ducts
Job Number.
8 Of
ROOM LOAD SUMMARY
PROJECT NAME DATE
Benny Bagel's Tenant Improvement I
7/9/2006
SYSTEM NAME FLOOR AREA
HVAC -1 1 940
ROOM COOLING PEAK I COIL COOLING PEAK II COIL HTG_ PEAK
TOTAL 1 1,796 36,311 5,450 595 22,150
EnergyPro By EnergySoft User Number. User Job Number: Pageag of 22
ZONE NAME
I ROOM NAME
MUK.
CFM
SENSIBLE
LATENT
CFM
SENSIBLE
LATENT
CFM
SENSIBLE
Restaurant.
Restaurant
1
1,7961
3613111
5450
1,7961
36,3111
5,450
595
22,150
TOTAL 1 1,796 36,311 5,450 595 22,150
EnergyPro By EnergySoft User Number. User Job Number: Pageag of 22
ROOM HEATING PEAK LOADS
Project Me Date
Benny Ba al's Tenantimprovement rovement 7/9/2006
Room Information Desion Conditions
Room. Name Restaurant Time. of Peak Jan 12 am
Floor Area 940 Outdoor Dry Bulb Temperature 260E
Indoor Dry Bulb Temperature 70°F
Conduction Area U -Value AT of Btu/hr
940.0
326.0
48.0
48.0
48.0
200.0
470.0
152.0
48.0
pefimeter=134.0
Items shown with an, asterisk (*)) denote conduction through an interior surface to another room.
Infiltration: 1 1.001 x 1.064 x 940 x
che10.00
dule Air Sensible Area Calling Height
Fraction
0.0650
0.1020
0.8700
0.8700
0:8700
0.0740
0.0740
0.0740
02700
0.7300
x A H /60] X
2,688
1,463
1,837
1,837
1,837.
651
1,530
495
1,837
4,304
Page Total: I 18.482AT1
TOTAL HOURLY HEAT LOSS FOR ROOM 22,150
EnergyPro 4.1 by EnergySoft User Number. 671.2 Job Number. Page: 20 of 22
ROOM COOLING PEAK LOADS
IProject Title Date
Benny Bagel's Tenant Improvement 7/9/2006
ROOM INFORMATION DESIGN CONDITIONS
Room Name Restaurant Time of Peak Jul 3 pm
Floor Area 940 Outdoor Dry Bulb Temperature 112 `k
Indoor Dry Bulb Temperature 74`F Outdoor Wet Bulb Temperature 73 OF
Conduction
-19 Roof -Wood Frame
-13 Wall .0:2x4::16
ouble Mtl Tinte&Default
-19 Wall A.24.16
-19 Wall .0.24:16
=19 Wall .0:2x6.16
Area
1. Design Equivalent Tempersture.DiRerenow(DETD)
Items shown with an asterisk (•) denote conduction through en interior surface to another room.
Solar Gain
U Value
X
X
X
X
X
X
X
X
X
DETD 1
=
=
=
=
=
=
=
=
=
65.4
53.6
26.2
40.2
40.3
76.7
(N)
48.0
41
Page Total
Orientation
Area
.X
X
X
X
X
x
x
x
X
x
SGF
X
X
X
X
X
X
X
X
X
X
SC
WeightingFactor
X
x
x
X
X
X
x
X
X
X
=
=
=
=
=
=
=
=
(N)
48.0
41
0.657
0.832
(N)
48.0
41
0.657
0.832
O
48.0
41
0.657
0.799
(W)
48.0
56
0.657
0.699
Page Total
Btu/hr
3,995
1,781
4,381
595
1,402
863
13 016
Btu/hr
1,075
1,075
1,032
1,234
4 417
Sched. Weighting Btu/hr
Internal Gain Frac. Area Heat Gain Factor
i hts 1. X 940 X 1.640 Watts/sgft X 3.41 Btuh/Watt x 0.999 = 5,258
ccu ants 1.0 x 940 x 300 Btuh/occ. /5 sgfUocc. x 1.00 = 5,640
acetacle 1.0 x 940 X 1,500 Watts/sgft x 3.41 Btuh/Watt x 1.00 = 4,81.2
rocess 1.0 x 940 X 0.000 Watts/sgft x, 3.41 Btuh/Watt x 1.00 = 0
Infiltration: 1.00 x 1.064 x 940 x 10:00 x 0.50 / 60] x 38 =3168
chedule Air Sensible Area Calling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36 311
Schad. Btu/hr
Latent Gain Frac. Area Heat Gain
c cu ants 1.00 x 940 X 3001 Btuh/occ: / 50 sgfUocc. = 5640
ace tacle i 00 x x 0,000 Watts/sgft'x Btuh/Watt =
rooess 1:00 X 940 X 0.000 Watts/sgft ,x 3.413 Btuh/Watt = o
Infiltration: x X x x�/ 6] x ®_
chedule AlrLatent Area Celiing Height ACH pyy
ROOM COOLING COIL LOADS
Title
Date
Benny Bagel's Tenant Improvement 1 7/9/2006 1
Room Name Restaurant Time of Peak Jul 3 pm
Floor Area 940 Outdoor Dry Bulb Temperature 112 9F
Indoor Dry Bulb Temperature 741� Outdoor Wet Bulb Temperature 73V
Conduction
=19. Roof -Wood. Frame
-13 Wall .0.2x4.16
ouble Mtl Tinted Default
-19 Wall .0.24.16
-19 Wall .0.24.16
-19 Wall :0.24.16
Area
1. Design. Equivalent Temperature Difference (DETD)
Items shown with an asterisk(') denote conduction through an interior surface to another room.
Solar Gain
U -Value
Orientation
Area
X
X
X
X
X
X
X
X
X
X
SGF
X
X
X
X
X
X
x
X
X
X
SC
(N)
48.0
41
0.657
(N)
48.0
41
0.657
(N)
48.0
41
0.657
(W)
48.0
56
0.657
DETD t
65.4 =
53.6 =
26.2 =
40.2 =
40.3 =
76.7 =
Page Total
Weighting
Factor
X 0.832 =
X 0.832
X 0.799
X 0:699 =
X
X
X
X =
X =
X =
Page Total
Btu/hr
3,995
1,781
4,381
595
1,402
863
13 016
Btu/hr
1,075
1,075
1,032
1,234
4 417
Sched. Weighting Btu/hr
Internal Gain Frac. Area Heat Gain Factor
i hts 1.0 X 940'X 1.640 Watts/sgft X 3.41 BtuhlWatt X 0.999 = 5,258
ccu ants 1.0 X 940 x 300 Btuh/occ. / sgft/occ. x 1.00 = 5,640
ecelade 1.0 x 940 X 1.500 Watts/sgft x 3.41 BtuhlWatt X 1.00 = 4,812
rocess 1.0 'X 940 X 0.000 Watts/sgft X 3.41 Btuh/Watt X 1.00 = 0
Infiltration:1.00 x 1.064 x 940 x 10.00 x 0.50 1601 x
38 = 3168
Uedule Air Sensible Area Ceiling Height ACH 7
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 3 3311'
Sched. Btu/hr
Latent Gain. Frac. Area Heat Gain
ccu ants 1.00 X 940 X 300 Btuhlocc. / 50 sgfUocc. = 5 640
ecetale 1_nn x x Watts/sgft x BtuhlWatt =
rocess 1.00 x 940 X 0.000 WatWsgft x 3.413 Btuh1Watt = 0
Infiltration: x x x x�/ 6] x�_
chedule Alr Latent Area Ceiling Height ACH pyy