Loading...
06-2632 (RC) Title 24., TITLE 24 REPORT Title 24 Report for: Benny Bagel's Tenant Impro a NG F LA QUINTA 50-620 Eisenhower, Bldg. G, ui I 8& SAFETY DEPT. La Quinta, Ca 92253 AP P Ro4CTION ED FOR CONST Project Designer: Candice Noto Designs 74-830 Velie Way, Suite E Palm Desert, Ca 92260 (760) 880-3016 Report Prepared By: Tim 'Scott Scott Design & Title 24 77085 Michigan Dr.. Palm Desert, CA 92211 (760) 200-4780 Job Number: ( 1 � UG 1 5 X606 n A Date.- 7/9/2006 ate: 7/9/2006 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the CaliforniaEnergy Commission for use with both the Residential, and, Nonresidential 2005:.Building.Energy Efficiency Standards. This program developed by EnergySoft; LLC - www.energysoft.com. EnergyPro 4.1 by EneWSoft Job',Number. User Number. 6712 1 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form LTG -7-C Room Cavity Ratio Worksheet 14 Form LTG -MM Lighting Mandatory:Measures 15 Form MECH-MM Mechanical Mandatory Measures 16 HVAC System Heating and Cooling Loads Summary 18 Room Load Summary 19 Room Heating Peak Loads 20 Room Cooling Peak Loads 21 Room Cooling Coil Loads 22 EnergyPro 4.1 by EnergySoft Job Number. User Number. 6712 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 IPROJECT NAME DATE Benny Bagel's Tenant Improvement 7/9/2006 PROJECT ADDRESSe.:a:r�a:;_;; 50-620 Eisenhower, Bldg. G, Suite 105 La Quinta PRINCIPAL DESIGNER - ENVELOPE TELEPHONE : ,BuUding I?erm�t Candice Noto Designs (760) 880-3016 DOCUMENTATION AUTHOR TELEPHONE Checked'by/Date Scott Design & Title 24 (760) 200-4780 en�r�emeM n�e��:uae GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certlficate.applles only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation Is acAurateand fompletb. DOCUMENTATION AUTHOR DATE OF PLANS DATE Tim Scott BUILDING CONDITIONED FLOOR AREA 940 Sq.Ft The Principal Designer hereby certifys that the proposed building -design represented in this set of construction documen s is CLIMATE ZONE 15 BUILDING TYPE through 118, and 140, 142, 143 or49-of Title 24, Part 6. NONRESIDENTIAL HIGH RISE RESIDENTIAL ❑ ❑ F 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of°the Business and Professions Code to HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION contractor performing this work. EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certlficate.applles only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation Is acAurateand fompletb. DOCUMENTATION AUTHOR SIG DATE Tim Scott The Principal Designer hereby certifys that the proposed building -design represented in this set of construction documen s is consistent with the other compliance forms and worksheets; with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or49-of Title 24, Part 6. ENV. LTG. MECH. ❑ ❑ F 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of°the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. F F F-1 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this,document as the person responsible for its preparation; and that l am a licensed contractor performing this work. ❑ ❑ E�/3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Envelope Compliance Not In The Scope Of Required Forms Th—is SubMittal PRINCIPAL ENVELOPE DESIGNER- NAME SIGNATURE LIC. NO. DATE LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures 'LT 1., LTG -2 Required Forms PRINCIPAL.LIGHTING.DESIGNER - NAME SIGNATURE LIC. NO. DATE Candice Noto Designs 0 MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ECH-1 MECH-2 MECH-3 MECH-5 Required rms PRINCIPAL MECHANICAL DESIGNER -NAME SI N LIC. NO. DAT `7 -f 06 Scott Design and. Title 24 Run Initiation Timer 07/09/0614:44:37 Run Code: 11.52481477 EnergyPm 4.1 by EnergySoft User Number 6712 Job Number. Page:3 of 22 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 1 PROJECT NAME DATE Benny Bagel's Tenant Improvement I 7/9/2006 ENERGY COMPONENT Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Standard Design. TOTALS: 794.25 Percent better,than Standard: Proposed Compliance 789.51 4.74 0.6% ( 0.6% excluding process) Building Orientation Number of Stories Number of Systems Number of Zones 270 deg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 940 scA sgft. soft. 1 0 1 940 11' Natural Gas 24.0% Left Elevation (N) Orientation Gross Area. Glazing Area Glazing Ratio. Front Elevation W 200 sgft. 48 sgft. 24.0% Left Elevation (N) 470 sgtt. 144 sgtt. 30.6% Rear Elevation E 200 'sgft. 0 sgft. 0.0% Right Elevation (S) Total Roof 470 1,340 940 sgft. sgfL sgft.. 0 192 0 sgR sgft: $qn 0.0% Standard Proposed Lighting Power Density 1.700 w1sgfc 1.640 wisge. Prescriptive Env. Heat Loss 255 Btu/h 322 Btum .Prescriptive Env. Heat Gain 24;223 Btu/h-F 31,238 Btu/h-F Remarks: EnergyPro 4.1 by EnergySoft User Number., 6712 Job Number. Page:4 of 22 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME DATE Bennv Bawl's Tenant Improvement I 7/9/2006 1 The local enforcement agencyshould pay special attention to the hems specified In thli checklist These Items require special written Justification and documentation, and special verification to be used with the. pe►formance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of'the s I justiflcaUon.and documentation submitted. l`�� IThe HVAC.Svstem "York E4FH060S06"'is designated as 3 Phase, or is Exemptedfrom the NAECAM3 SEER reauirement. I / 1 The exceptional features listed in this performance approach application: have specifically been reviewed. Adequate written justification and documentation for their use have been provided bythe applicant Authorized Signature or Stam Run Initiation Time: 0710910614-44:37 Run Code: 1152481477 EnergyPro 4.1 by EnergySoft User Number 6712 Job Number: Page:5 of 22 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C PROJECT NAME DATE Bennv Bagel's Tenant Improvement I 7/9/2006 1 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG-5-C)WATTS F-1TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 1,542 1ALTERNATE COMPLIANCE 0 PERFORMANCE, METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C). ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION CONTROL IDENTIFICATION CONTROL TYPE Time Switch. Dimm Check if SPACE CONTROLLED Daylighfing NO,TE„T0- FIELD NOTES TO FIELD - For Buildin De artment Use Only R$t- - � e 't .I�`�r �� 4. i4 J. i Run Initiation Timm 07109106 14:44:37 Run C1152481477 EnergyPro 4.1 by EnergySoft User Number 6712 Job Number. Page:6 of 22 INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 1,542 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 1,542 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG-5-C)WATTS F-1TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 1,542 1ALTERNATE COMPLIANCE 0 PERFORMANCE, METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C). ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION CONTROL IDENTIFICATION CONTROL TYPE Time Switch. Dimm Check if SPACE CONTROLLED Daylighfing NO,TE„T0- FIELD NOTES TO FIELD - For Buildin De artment Use Only R$t- - � e 't .I�`�r �� 4. i4 J. i Run Initiation Timm 07109106 14:44:37 Run C1152481477 EnergyPro 4.1 by EnergySoft User Number 6712 Job Number. Page:6 of 22 CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-C PROJECT NAME BennyBagel's Tenant Improvement DATE 7/9/2006 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget, for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance; LTG-1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and. Title 24 Part 6. T s_crlption Test Performed BY: ❑ LTG-2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing ❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro4AI by EnergySoft User' Number:; 6712 Job Number. Pagel of 22 1 CERTIFICATE OF COMPLIANCE MECH-1-C NAME enantlm This form is to be used by the designerandattached tothe plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the. equipment•description and the. number of systems to'be tested in iparentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate,the,person responsible for performing the tests (i.e. the Installing contractor, design professional or an agent selected by the owner). Since this form will. be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices servingthe building or space: shall be certified as meetingthe Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall besubmittedto the building department that certifies plans, specifications, installation certificates. and ooeratina and maintenance information meet the reauirements of Section 10-1 03(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Consinaon and Retrain ❑ MECH-3=A: Packaged HVAC Systems,Acceptance Document Equipment. requiring acceptance testing. Test required on all New systems both New Construction and Reboht ❑.MECH-4-A: Air -Side Economizer Acceptance, Document Equipment requiring acceptance testing Test required on all New systems both New.Construction and Retrofit. Units, with economisers Mat are installed at the factory and cenYftd with the commission do not require equipment testing but do, require consbucbm inspection. ❑ MECH-5-A: Air Distribution. Acceptance Document Equipmentrequiring acceptance testing This test required BMe unit serves 5,000112 of space or Mss and 2576 or more of the ducts are In noncondiboned or samfcondponed.space like an attic. New systems that mew the above requirements. Retrofit systems that mee6Me above requirements and either extend ducts, replace duds of replace Me packaged unit ❑ MECH-6-A: Demand ControlVentilation Acceptance Document Equipment requiring acceptance testing. All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls Apples to chilled and, hot watersystems. -Automatic Isolation Controls Applles to new boilers end chillers and Me primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant ligw chlied and hot watersystems Mat have a design cepedty greater Man cr equal to 5OA000 Bluft -Water-loop Heat Pump Controls Applies to all new waledoop heat pump systems where Me combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to sit new disinbution pumps on new variable flow chilled, hydropic heat pump or condenser walersydems where Bra pumps motors are greater than 5 hp. Equipment reuirin acce tancetestin EnergyPro 41 by EnetgySoft User Number: 6712 Job Number. Page:8 of 22 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C NAME Benny Bagel's Tenant Improvement INSTALLED LIGHTING POWER FOR CONDITIONED SPACES 7/9/2006 Luminaire Lam s/Ballasts Installed Watts C D E F G H I J Name Type Description ,gym $v rWZ 3.�3 �'p� A 3. m.v* �<' PwZ 3iv3 61" -YeaTNO r 3c�m m 'w vm n c 3'03 ew _ vwii 4 ft Fluorescent TS Energy Savings lac --32T8 2 30 1.0 54.0 X 1 54 V4) 4 ft Fluorescent T8 Energy Savings lec 3 1. 104.OX— 12 1,248 'L5w per ft Track. Light (with Current 1 15 15.0 X 16 240 PAGE TOTAL 1 542 BUILDING TOTAL (sum oT all pages) 1, 542 PORTABLE LIGHTING (From LTG -3-C) CONTROL CREDIT (From LTG -4-C) �O ADJUSTED ACTUAL WATTS 1 542. EnergyPro 4.1 by EnergySoft User Numbers 6712 Job Number. Page:9 of 22 1 AIR SYSTEM REQUIREMENTS Part.1 of 2 MECH-2-C (PROJECT NAME DATE Benny Bagel's Tenant Improvement 7/9/2006 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct.lnsulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x1.212 Proposed Sensible. Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealingfor Prescriptive Compliance AIR SYSTEMS Central or Single Zone HVAC -1 1 Reference on Pians or Specification 1 112(a) P n/a 112(a) 1 .0 SEER / 10.7 EER or 112 Y 35,601 btuh 112(c), 115(a) n/a 121(b) Yes n/a 121 b 282 cfm 121 c No 48,523 btuh 121(c) No 121(c), 122(e) Procirammable Switch Constant Volume 122(e) Heating & Cooling Required '122 Auto '122 n/a 123 Yes 124 R-4.2 144 a & b n/a 144 a & b 35,601 btuh 144 a & b n/a 144 (&& b 48,523 btuh 144 c Constant Volume 144 c 144 c Yes 144 d No 144 a No Economizer 144 Constant Tem 144 (t} Constant Temp 144 k No 1: For each central and single zone air systems (or group of similar units) fill'in the reference to sheet number and/or specification section and paragraph number where the required features are. documented. If a.mqulrement is not-applicable,.put "N/A'in the column. 2: Not required for hydronic°heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see. PERF -1 for performance method dud sealing requirements. EnergyPro 4.1 by EnergySoft User Number.:0712 Job Number: Paoe:10 of 22 1 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C PROJECT NAME DATE Benny Bagel's Tenant Improvement 7/9/2006 2 WATER SIDE SYSTEMS: ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specification Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity TowerFan Controls TowerFlow Controls Variable Flow System Design Chiller and Boller isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic. loop (or groups of similar equipment) fill in,the referenceto sheet number and/or specification section and paragraph number where.the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids.such as glycol or brine. Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW'Heater Number of Systems 1 MANDATORY MEASURES Reference on'Plans or Specification' Water Heater Certification Water Heater Efficiency Service Water Heating Installation Pool and Spa Efficiency and Control Pool and Spa Installation Pool Heater - No Pilot Light Spa Heater - No Pilot Light 113 (a) 113 b 113 (c) 114 a 114 b 115 (c) 115 d A.O. SMITH FPS -50-224 79% n/a n/a • n/a n/a 1: For each waterheater,, pool heat and domestic water loop (or groups of similar equipment) fill in the,reference to sheet number and/or specification section and paragraph.number where the required features are documented. We requiremenfIs not applicable, put "N/A" ins.the column. Run Initiation Time: 07/09/0614:44:37 Run Code: 1162481477 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number. Page: 11 of 22 MECHANICAL VENTILATION MECH-3-C NAME PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL E I (Section 121 (b)2) A EA.BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L I M N ZONE/SYSTEM a'= Tia yZ d p 371", °0 oD 3 3 x> 3 -0 0,3 �O�r °� 'v m n 3i� O.1 me Ken 3 Ma m A $''p ..3 G) D m'p 02 �tr.� w: �o aR ° Am X '"'Ca �m a '� ao RX ao ;K0 ° C 3 w3 o° op m tie —I Restaurant 94C 0.251 235 235 282 HVAC -1 Total 235 282 C rate per Section 121 T E Based on seat or the reater of the=iberof occupants and 50% of the CBC occu load for earess vurposea fors aces without fixed seats . H' R rw Required Ventilation Air REQ'D V.A. is the lamer of the ventilation rates calculated on eAREA or OCCUPANCY BASIS column D or G). I Must be creater than or equal to H or use Transfer Air column N tomake up the ditiance. J Design,fan supply cfm Fan CFM x 30%;, or - K Condition area x 04 dmilt. e .• or L Maximum of Columns H, J, K. or 300 cfm M This must be less than or equal to Column L and' greater that or equal to the sum of Columns H + N. N Transfer air must be provided where, the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Air (column M), column H - M. EnergyPro 4.1 by EnergySoft User Number. 6712 Job Number: Page: 12 of 22 IMECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-Cl PROJECT NAME Bennv Baael's Tenant Improvement I DATE 7/9/2006 .;HIL ER AND TOWER SUMMARY Energy Factor or RE Efficiency Tons PUMPS System Type Distribution Type Equipment Name Equipment pe Vol. „(Gals.) Tot. Q GPM BHP Motor Eff. Drive Eft. Pump Control 43,000 50 New 0.60 Na n/a SEER/ 10.7 EER Existing No Economizer MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water mp Hot Water Piping Len ft Control # HP Type In Plenum Outside Buried 'CENTRA6 SYSTEM'.RATINGS Energy Factor or RE Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input Vol. „(Gals.) Condition Status Ext R -Val. A.0. SMITH FPS -50-224 Small Gas All Pipes Ins 1 43,000 50 New 0.60 Na n/a SEER/ 10.7 EER Existing No Economizer MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water mp Hot Water Piping Len ft Control # HP Type In Plenum Outside Buried Insulation 'CENTRA6 SYSTEM'.RATINGS HEATING COOLING Svstsm Name SMIRM Tog City Output Aux. kW Eff. Out ut E c encStatus Condition Economizer Type York E4FH060S06 Packaged DX 1 57,000 0. 8.20 HSPF 58,00012:0 SEER/ 10.7 EER Existing No Economizer CENTRA6 SYSTEM FAN SUMMA F'FAN RETURN FAN Name Fan Motor Location -SUPP12 CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. Wm York E060SO6 Constant Volume Draw -Through 2,000 1.00 82.5% 97.0% none Run Inatsation Time* 07109/06 14@"@37 Run Codee 1162481477 EnergyPro 4.1 by EnergySoft User Number. 6712 Job Number: Page: 13 of 22 ROOM CAVITY RATIO WORKSHEET (RCR>=3.5) PROJECT NAME Benny Bagel's Tenant Improvement )OCUMENTATION AUTHOR DATE LTG -7-C A B C D E F Room Name Task/Activity Description Room Length (L) ft Room Width (W) ft Room Cavity Height (H) (ft) Room. Cay. Ratio 5xHx(L+W) /(LxW) A B C D E F Room Name Task/Activity Description Room Area (A) (SO Room Perimeter (P) (ft) Room Cavity Height (H) (ft) Room Cay. Ratio 2.5 x H x P /A EnergyPM 4.1 by,EnergySoft User Number. 6712 Job Number. Page: 14 of 22 1 LIGHTING MANDATORY MEASURES LTG -MM PROJECT NAME el's Tenant Improvement 1 7/9/2006 DESCRIPTION Designer Enforcement ❑X §131(d)1 For every floor, all Interior lighting system&shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. §131(d)20verride for Building Lighting Shut-off. The automatic building shut-off system Is provided with a manual, accessible -override switch In sight of the lights. The area of override Is not to.exceed 5,000 square feet. X❑ §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed bythe manufacturer. X1 §111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the. project are certified and listed in the Directory. All installed fixtures shall be certifled. FX §132 Tandem Wiring for One and Three Lamp Fluorescent Fbdures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132;;or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt.from tandem wiring requirements. §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - calling walls. §131(b) Uniform Reduction for individual Rooms: All rooms and areas greater than 100 square feet andmore than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. X❑ §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each dayllt.area controlled by°a separate switch; or the effective use of daylight cannot be accomplished because the windows are contlnuouslyshaded by a building on the adjacent lot. Diagram of shading during different times of the year is Included on plans. §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.. EnergyPm 4.1 by EnergySoft. User Number. e712 Job Number. Page: 15 of 22 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE Bennv Bagel's Tenant Imarovement 7/9/2006 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies §.111 Any appliance for which there is a California standard established in the Appliance: Efficlency Regulations will comply with the.applicable standard. §115(a) Fan type central furnaces shall not have a pilot light § 123 Piping, except thatconveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. a§ 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be Installed with one of the following: § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an -automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to .4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power Is Interrupted;- or § 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1 C.A 4 -hour timer that can be manually operated to control the operating period of the system. 0 § 122(9)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the -system as required to maintain a setback heating and/or a setup cooling thermostat setpoint § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with Isolation zones. Each zone: shall not exceed 25;000 square feet; shall be provided with, isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. FX]§ 122(a&b) Each space conditioning system shall be controlled by an. individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustableup to 65 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a•deadband of at least &degrees_F within which the: supply of heating and cooling is shut off or reduced to a minimum.. § 122(c) Thermostats hall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls.to prevent electric resistance supplementary heater operation when the heating load can bemet by the heat pump alone. EnergyPm By EnergySoft User Number. User Job Number Page: 16 of 22 MECHANICAL MANDATORY MEASURES Part2 of 2 MECH-MM NAME Tenant lm DATE 7/9/2006 Description Designer Enforcement Ventilation a§ 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122M Gravity or automatic dampers Interlocked and closed on fan shutdown shall be provided on the outside. air Intakes and dlscharges.of all space conditioning and exhaust systems. 0 § 122(f) All gravity vendiating.systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air openings. X❑ § 121(f)1 Air Balancing: The system shall be balanced in accordancewith the National Environmental Balancing Bureau.(NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121M2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified, by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2), the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or § 121(f)3 Outside.Air Measurement:. The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or 0 § 121 (f)4 Another method approved by thwCommissiom Service Water Heating Systems ❑ 6113(b)2 If a circulating, hot water system Is Installed, It shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. X] § 113(b)38 Lavatories in restrooms of public facilities shall be equipped with controls°to limit the outlet temperatureto 110 degrees F: 0 § 113(b)3C Lavatories in restroome of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot.water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow,of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated, control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons perrminute, and 0.25 gallons/cycle (circulating system). SeH�closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallonsicycle (non -circulating system). SeH-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute; and 0:75 gallonslcycle (foot switches and proximity sensor controls). EnergyPro By EnergySoft User Number. User Job Number. Page: 17 of 22 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Benny Bagel's Tenant Improvement 7/9/2006 SYSTEM NAME FLOOR AREA HVAC -1 940 [ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output(Btuhlsgft) 60.6 Cooling System Output,per System 58,000 Total Output (Stub) 58,000 Total Output (Tons) 4.8 Total Output (Stuh/sgft) 61.7 Total Output (sgft/Ton) 194.5 Air System CFM per System 2,000 Airnow (cfm) 2,000 Airflow (cfm/sgft) 2.13 Airflow (cbnrron) 413.8 Outside Air (°/6) 14.1 Outside Air,(cfmisgft) 0.30 Note: values above given at ARI conditions COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible Total Room Loads 1 1,796 Return Vented Lighting Return Air'Ducts Return Fan Ventilation 282 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 36,311 5,45 0 1,816 0 11,148 -72 0 1,816 51090 4723 York E4FHO60SO6 48,523 1,923 35,60 Total Adjusted System Output 48;523 1,923 35,60 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 m Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 of 63.3 of 105.0 of 105.0 of Supply Air Ducts Outside Air 282 ch Heating Coil Supply Fan 104'5 °F 2600 ch ROOMS 69:5 of 70.0 of Return Air Ducts I DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Coolin Peak 112:0 /72.8 OF 80.:1 / 63.7 of 5&0153.7 of 55.0 [53.7 of I 41 F1 Supply Air Ducts Outside Air 282 ofm Cooling Coil Supply Fan 55.9 / 5CO of 2000 cfm 50.2% R.H. ROOMS 74.9162.0 of 74.0.161.7 of 4.1. User Number.. 6712 Return Air Ducts Job Number. 8 Of ROOM LOAD SUMMARY PROJECT NAME DATE Benny Bagel's Tenant Improvement I 7/9/2006 SYSTEM NAME FLOOR AREA HVAC -1 1 940 ROOM COOLING PEAK I COIL COOLING PEAK II COIL HTG_ PEAK TOTAL 1 1,796 36,311 5,450 595 22,150 EnergyPro By EnergySoft User Number. User Job Number: Pageag of 22 ZONE NAME I ROOM NAME MUK. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Restaurant. Restaurant 1 1,7961 3613111 5450 1,7961 36,3111 5,450 595 22,150 TOTAL 1 1,796 36,311 5,450 595 22,150 EnergyPro By EnergySoft User Number. User Job Number: Pageag of 22 ROOM HEATING PEAK LOADS Project Me Date Benny Ba al's Tenantimprovement rovement 7/9/2006 Room Information Desion Conditions Room. Name Restaurant Time. of Peak Jan 12 am Floor Area 940 Outdoor Dry Bulb Temperature 260E Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr 940.0 326.0 48.0 48.0 48.0 200.0 470.0 152.0 48.0 pefimeter=134.0 Items shown with an, asterisk (*)) denote conduction through an interior surface to another room. Infiltration: 1 1.001 x 1.064 x 940 x che10.00 dule Air Sensible Area Calling Height Fraction 0.0650 0.1020 0.8700 0.8700 0:8700 0.0740 0.0740 0.0740 02700 0.7300 x A H /60] X 2,688 1,463 1,837 1,837 1,837. 651 1,530 495 1,837 4,304 Page Total: I 18.482AT1 TOTAL HOURLY HEAT LOSS FOR ROOM 22,150 EnergyPro 4.1 by EnergySoft User Number. 671.2 Job Number. Page: 20 of 22 ROOM COOLING PEAK LOADS IProject Title Date Benny Bagel's Tenant Improvement 7/9/2006 ROOM INFORMATION DESIGN CONDITIONS Room Name Restaurant Time of Peak Jul 3 pm Floor Area 940 Outdoor Dry Bulb Temperature 112 `k Indoor Dry Bulb Temperature 74`F Outdoor Wet Bulb Temperature 73 OF Conduction -19 Roof -Wood Frame -13 Wall .0:2x4::16 ouble Mtl Tinte&Default -19 Wall A.24.16 -19 Wall .0.24:16 =19 Wall .0:2x6.16 Area 1. Design Equivalent Tempersture.DiRerenow(DETD) Items shown with an asterisk (•) denote conduction through en interior surface to another room. Solar Gain U Value X X X X X X X X X DETD 1 = = = = = = = = = 65.4 53.6 26.2 40.2 40.3 76.7 (N) 48.0 41 Page Total Orientation Area .X X X X X x x x X x SGF X X X X X X X X X X SC WeightingFactor X x x X X X x X X X = = = = = = = = (N) 48.0 41 0.657 0.832 (N) 48.0 41 0.657 0.832 O 48.0 41 0.657 0.799 (W) 48.0 56 0.657 0.699 Page Total Btu/hr 3,995 1,781 4,381 595 1,402 863 13 016 Btu/hr 1,075 1,075 1,032 1,234 4 417 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1. X 940 X 1.640 Watts/sgft X 3.41 Btuh/Watt x 0.999 = 5,258 ccu ants 1.0 x 940 x 300 Btuh/occ. /5 sgfUocc. x 1.00 = 5,640 acetacle 1.0 x 940 X 1,500 Watts/sgft x 3.41 Btuh/Watt x 1.00 = 4,81.2 rocess 1.0 x 940 X 0.000 Watts/sgft x, 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 x 1.064 x 940 x 10:00 x 0.50 / 60] x 38 =3168 chedule Air Sensible Area Calling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36 311 Schad. Btu/hr Latent Gain Frac. Area Heat Gain c cu ants 1.00 x 940 X 3001 Btuh/occ: / 50 sgfUocc. = 5640 ace tacle i 00 x x 0,000 Watts/sgft'x Btuh/Watt = rooess 1:00 X 940 X 0.000 Watts/sgft ,x 3.413 Btuh/Watt = o Infiltration: x X x x�/ 6] x ®_ chedule AlrLatent Area Celiing Height ACH pyy ROOM COOLING COIL LOADS Title Date Benny Bagel's Tenant Improvement 1 7/9/2006 1 Room Name Restaurant Time of Peak Jul 3 pm Floor Area 940 Outdoor Dry Bulb Temperature 112 9F Indoor Dry Bulb Temperature 741� Outdoor Wet Bulb Temperature 73V Conduction =19. Roof -Wood. Frame -13 Wall .0.2x4.16 ouble Mtl Tinted Default -19 Wall .0.24.16 -19 Wall .0.24.16 -19 Wall :0.24.16 Area 1. Design. Equivalent Temperature Difference (DETD) Items shown with an asterisk(') denote conduction through an interior surface to another room. Solar Gain U -Value Orientation Area X X X X X X X X X X SGF X X X X X X x X X X SC (N) 48.0 41 0.657 (N) 48.0 41 0.657 (N) 48.0 41 0.657 (W) 48.0 56 0.657 DETD t 65.4 = 53.6 = 26.2 = 40.2 = 40.3 = 76.7 = Page Total Weighting Factor X 0.832 = X 0.832 X 0.799 X 0:699 = X X X X = X = X = Page Total Btu/hr 3,995 1,781 4,381 595 1,402 863 13 016 Btu/hr 1,075 1,075 1,032 1,234 4 417 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 940'X 1.640 Watts/sgft X 3.41 BtuhlWatt X 0.999 = 5,258 ccu ants 1.0 X 940 x 300 Btuh/occ. / sgft/occ. x 1.00 = 5,640 ecelade 1.0 x 940 X 1.500 Watts/sgft x 3.41 BtuhlWatt X 1.00 = 4,812 rocess 1.0 'X 940 X 0.000 Watts/sgft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration:1.00 x 1.064 x 940 x 10.00 x 0.50 1601 x 38 = 3168 Uedule Air Sensible Area Ceiling Height ACH 7 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 3 3311' Sched. Btu/hr Latent Gain. Frac. Area Heat Gain ccu ants 1.00 X 940 X 300 Btuhlocc. / 50 sgfUocc. = 5 640 ecetale 1_nn x x Watts/sgft x BtuhlWatt = rocess 1.00 x 940 X 0.000 WatWsgft x 3.413 Btuh1Watt = 0 Infiltration: x x x x�/ 6] x�_ chedule Alr Latent Area Ceiling Height ACH pyy