Loading...
0003-052 (SFD) Title 24FROM Christensen/T-24/CABEC I FAX NO. : 909 763 0522 Mar. 27 2000 01:20PM P2 Carole Christensen, Certified Energy Analyst Title -24 Energy Calculations March 27, 2000 ENERGY CALCULATIONS FOR: Lucas Coronel Coronel Construction P.O. Box 389 ' La Quinta, CA 92253-0389 PROJECT: The Bireeze 4 Table of Contents , CF -IR MF -IR C -2R 3R HVAC 47-S961ekc Canyon Dfi vc, Aguanga, CA 92536 1-800-735-8152 CABFC Certified Encrgy Analyst - Calilornin A ctociation of*Building Energy Consullams LaQninta, CA 92253 Standard Proposed Compliance North 63.98 61.81 +2.17 East 63.98 63.19 +0.79 South 63.98 59.66 +4.32 East 63.98 62.97 +1-01 CTZ 15 1492 sq.ft.,12.8% fenestration Dual Aluminum fenestration, Default Walls R-13+1"Falcon, Roof R-38, Duct R-4.2 AFUE 78%, SEER 10.0 One 40 gal gas water heater, EF.58 Table of Contents , CF -IR MF -IR C -2R 3R HVAC 47-S961ekc Canyon Dfi vc, Aguanga, CA 92536 1-800-735-8152 CABFC Certified Encrgy Analyst - Calilornin A ctociation of*Building Energy Consullams FROM : ChriStenSen/T-24/CABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:20PM P3 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title.......... The Breeze Date..03/27/00 13=07:50 Project Address........ ******* La Quanta, CA *v5.00* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 47-596 Lake Canyon Drive Plan Check Date Aguanga, CA 92536 800-735-8152 Field check/ Date Climate Zone........... 15 Compliance Method...... MICROPASS v5.00 for 1999 Standards by Enercomp, Inc. MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 GENERAL INFORMATION Conditioned Floor Area..... 1.492 sf Building Type .............. Single Family Detached Construction Type ......... New Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Stories.......... 1 Floor Construction Type.... Slab On Grade Glazing Percentage......... 12.8 % of floor area Average Glazing U -value.... 0.77 Btu/hr-sf-F Average Glazing SHGC....... 0.69 BUILDING SHELL INSULATION Component Frame Cavity Sheathing Total Assembly Type Type R -value R -value R -value U -value Location/Comments Wall Wood R-13 R-4.61 R-17.61 0.060 front, corner, back. right wall wood R-13 R-0 R-13 0.086 to garage Roof Wood R-11 R-27 R-38 0.025 Attic Door n/a R-0 R-n/a R-0 0.330 solid wood SlabEdge n/a R-0 R-n/a F2=0.900 to outside SlabEdge n/a R-0 R-n/a F2=0.720 to outside SlabEdge n/a R-0 R-n/a F2=0.550 to garage SlabEdge n/a R-0 R-n/a F2=0.500 to garage FENESTRATION Over - Area U- Interior Exterior hang/ Orientation (sf) Value SHGC Shading Shading Fins Window Front (N) 16.0 0.720 0.670 Standard Standard None Window Front (NE) 5.3 0.630 0.720 Standard Standard None Window Right (NW) 5.3 0.630 0.720 Standard Standard None Window Left (E) 24.0 0.720 0.670 Standard Standard Yes Window Left (E) 12.0 0.720.0.670 Standard Standard Yes Window Left (E) 4.0 0.720 0.670 Standard Standard Yes Window Left (E) 4.0 0.720 0.670 Standard Standard Yes Door Back (S) 40.0 0.850 0.700 Standard Standard None Door Back (S) 40.0 0.850 0.700 Standard Standard None Window Back (S) 16.0 0.720 0.670 Standard Standard None Window Right (w) 4.0 0.720 0.670 Standard Standard Yes Window Right (W) 4.0 0.720 0.670 Standard Standard Yes FROM : Christensen/T-24/CABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:20PM P4 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 Orientation Window Right (W) Equipment Type Furnace ACSplit FENESTRATION Area U- Interior (sf) Value SHGC Shading 16.0 0.720 0.670 Standard SLAB SURFACES Area Slab Type (sf) Standard Slab 1492 HVAC SYSTEMS Over - Exterior hang/ Shading Fins standard Yes Minimum Duct Duct Tested Duct ACCA Thermostat Efficiency Location R -value Leakage Manual D Type 0.800 AFUE Attic R-4.2 No No Setback 10.00 SEER Attic R-4.2 No No Setback WATER HEATING SYSTEMS Number Tank External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gal) R -value Storage Gas Standard 1 0.58 40 R- n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This is a multiple orientation building with no orientation restrictions. This printout is for the front facing North. REMARKS Philips fenestration or better FROM : Christensen/T-24/CABEC FAX NO. : 909 763 0522 Mar. 27 2000 01:21PM P5 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of comVliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features Modeling Assumptions section. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Lucas Coronel Name.... Carole Christensen Company. Coronel Construction Company. Carole Christensen Address. P.O. Box 389 Address. 47-596 Lake Canyon Drive La Quinta, CA 92253 Aguanga, CA 92536 Phone... Phone... 800-735-8152 License. 4981 Signed.. signed. ate ! ate ENFORCEMENT AGENCY Certified Energy Analyst, Name.... Title... Carole Christensen, CEPE Agency.. r r R 98-99-239 r r Phone...C A a E C Signed.. Cotfomlb ,Awcforion of Duilding Energy Consultanrs' date FRDM : ChriStensen/T-24i1ZABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:21PM P6 MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page i of 2) WAR Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (") may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all paries as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only, Instructions: Check or initial applicable boxes when -completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT Building Envelope Measures: • § 150(x): Minimum R. 19 ceiling insulation, 1 § 15o(b): Loose fill insulation manufacturer's labeled R•Valuc. V Gam/ • § 150(c): Minimum R• 13 wall insulation in wood framed walls or equivalent U•value in metal frame walls (does riot apply to exterior mass walls). • § 150(4): Minimum R•13 raised floor insulation in framed floors. �. 150(') : Slab edge insulation - water absorption rote no greater than 0,3%, water vapor transmission rate no / greater than 2.0 arrrVinch, § 1 l8: Insulation specified or installed mocts insulation quality standards. Indicate type and form. §116-17: Fenestration Products, Exterior Doors, and Inftltration/L•x6ltration Controls I Doors and windows bcnvacn conditioned and unconditioned spaces designed to limit air leakage.. 2. fenestration products (except field•fabricated)have label with cenified U•valuc, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. t 3. Exterior doors iitd windows weatherstripped; all joints and penetrations caulked and scaled. 150(g): Vapor barriers mandatory in Climate Zones to and 16 only. § 1$00fl; Special infiltration barrier installed to comply with § 151 meets Commission quality standards. §I50(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. t. Masonry and factory.buili fircptaccs have: 1 a. Closeable metal or glass door t b. Outside air intake with damper and control c. Flue damper and control I ! 2. No continuous burning gas pilot lights allowed, Space Conditioning, Water Heating and Plumbing System Measures: § 1 10.41 13; HVAC equipment, water heaters, showcrheads and faucets ccrlificd by the Commission. ! §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE. SMACNA or ACCA. §150(1): Setback thermostat on all applicable heating and/or cooling systems. I� § 1506): Pipe and tank insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with l ` insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feel of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3 Backup tanks for solar system, unfired storage ranks, or other indirect hot water tanks have R-12 external s insulation or R. 16 combined internat/external insulation. i 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55° F insulated. t 6. Piping ins6lated between heating source and indirect hot water tank. Y. ... . . - FROM : Christensen/T-24/CABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:22PM 'P7 MANDATORY MEASURES CHECKLIST: RESIDENTIAL(Page 2 of 2) MF -1R Note: Lowrisc residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. hems marked with an asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all panics as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT Space Couditioning, Water Heating and Plumbing System Measures: (continued) § 150tm) Ducts and fans 1. All ducts and plenums constructed, installed, insulated, fastened, and scaled to comply with the ICBO 1997 UMC sections 60 t and 603; ducts insulated to a minimum installed R-4,2 or ducts enclosed entirely within conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant or other duct closure system that rnects the applicable requircmetns of ULI81, ULISIA, or UL ISIS and other applicable specified tests for longevity given in § 150(m).. '. Exhaust fan systems have back drag or automatic dampers. / 1. Gravity ventilating systems serving conditioned space have either automatic or readily accessibic, manually operated dampers. 114. Pool and Spa Heating Systems and Equipment. I System is certified with 78% thermal efficiency, on-ofiswitch, weatherproof opera ling instructions, no electric resistance heating and no pilot light. 2 System is installed with: a. A( least 16" of pipe between filter and heater for futurt solar heating. b. Cover for outdoor pools or outdoor spas. l Pool system has directional inlets and a circulation pump time switch. § 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously buming pilot li ht. (Exception: Non -electrical cooking appliances with pilot < 150 BtwAr Lightin Measures; 150(k)I.: Luminaires for general lighting in kitchens shall have lamps with an efficacy of40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control ncl at an entrance to the kitchen. § 150(k)2.: Rooms with a shower or bathtub must either have at least one luminaire with lamps with an efficacy of 40 lumens/wan or greater switched at the entrance to the room or one of the altcmatives to this requirernoni allowed it, ' t 50 k 2. and recessed ceiling fixtures are IC insulation cover approved. 4 FROM : Christensen/T-24/CRBEC FAX NO. : 909 763 0522 Mar. 27 2000 01:22PM P8 COMPUTER METHOD SUMMARY Page 1 C -2R Project Title.......... The Breeze Date..03/27/00 13:07:50 Pro'ect Add ******* � ress........ La Quanta, CA *v5.00* Documentation Author... Carole Christensen ******* Building Permit -79 Carole Christensen 47-596 Lake Canyon Drive Plan Check Date Aguanga, CA 92536 800-735-8152 Field Check/ Date Climate Zone.. ........ 15 Compliance Method...... MICROPAS5 v5.0b for 1999 Standards by Enercomp, Inc. MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM C --2R User#-MP1017 User -Carole Christensen Run-Drp80.lORl3+PW38.4 40 GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... 1492 sf Single Family Detached New Cardinal - N,E,S,W 1 1 ReducedYear Slab On Grade 1 MICROPAS5 ENERGY USE SUMMARY Energy Use Standard Proposed Compliance (kBtu/sf-yr) Design Design Margin Space Heating.......... 3.48 2.25 1.23 Space Cooling.......... 44.68 45.35 -0.67 Water Heating.......... 15.82 14.21 1.61 North Total 63.98 61.81 2.17 Space Heating.......... 3.48 2.94 0.54 Space Cooling.......... 44.68 46.04 -1.36 Water Heating.......... 15.82 14.21 1.61 East Total 63.98 63.19 0.79 Space Heating.......... 3.48 3.76 -0.28 Space Cooling.......... 44.68 41.69 2.99 Water Heating.......... 15.82 14.21 1.61 South Total 63.98 59.66 4.32 Space Heating.......... 3.48 3.10 0.38 Space Cooling.......... 44.68 45.66 -0.98 Water Heating.......... 15.82 14.21 1.61 West Total 63.98 62.97 1.01 *** Building complies with Computer Performance *** GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... 1492 sf Single Family Detached New Cardinal - N,E,S,W 1 1 ReducedYear Slab On Grade 1 FROM : Christensen/T-24/CABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:23PM P9 COMPUTER METHOD SUMMARY Page 2 C -2R Project Title.,,....... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-Drp80.l0R13+PW38.4 40 I Zone Type I HOUSE Residence Surface Conditioned Volume......... 13040 cf Slab -On -Grade Area......... 1492 sf Glazing Percentage......... 12.8 � of floor area Average Glazing U -value.... 0.77 Btu/hr-sf-F Average Glazing SHGC....... 0.69 Average Ceiling Height..... 8.7 ft BUILDING ZONE INFORMATION Floor # of Area Volume Dwell Cond- Thermostat (sf) (cf) Units itioned Type 1492 13040 1.00 Yes Setback OPAQUE SURFACES Area U- Insul Act Solar (s£) value R-val Azm Tilt Gains Vent Vent Aix' Height Area Leakage (ft) (sf) CrE°dit 2.0 Standard No Form 3 Location/ Reference Comments HOUSE 12 SlabEdge 9 0.900 R-0 No 1 Wall 93 0.060 17.61 0 90 Yes W13.2X4.16FA front 2 Wall 45 0.060 17.61 0 90 No W13.2X4.16FA R-0 3 Wall 412 0.060 17.61 90 90 Yes W13.2X4.16FA 0.500 4 Wall 12 0.060 17.61 45 90 Yes W13.2X4.16FA corner 5 Wall 12 0.060 17.61 315 90 Yes W13.2X4.16FA corner 6 Wall 282 0.060 17.61 180 90 Yes W13.2X4.16FA back 7 Wall 276 0.060 17.61 270 90 Yes W13.2X4.16FA right 8 Wall 292 0.086 13 0 90 No GARWALLRI3 to garage 9 Roof 1492 0.025 38 n/a 0 Yes R,38.2X4.24F Attic 10 Door 20 0.330 0 0 90 No None solid wood 11 Door 17 0.330 0 0 90 No None solid wood Left (E) 24.0 0.720 PERIMETER LOSSES 90 Standard/0.76 Standard/0.68 5 Length F2 Insul 12.0 Solar 0.670 90. 90 Surface Standard/0.68 (ft) Factor R-val Gains Location/Comments HOUSE 12 SlabEdge 9 0.900 R-0 No to outside 13 SlabEdge 146 0.720 R-0 No to outside 14 SlabEdge 6 0.550 R-0 No to garage 15 SlabEdge 31 0.500 R-0 No to garage FENESTRATION SURFACES Area U- Act Exterior Shade Interior Shade Orientation (sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC HOUSE 1 Window Front (N) 16.0 0.720 0.670 0 90 Standard/0.76 Standard/0.68 2 Window Front (NE) 5.3 0.630 0.720 45 90 Standard/0.76 Standard/0.68 3 Window. Right (NW) 5.3 0.630 0.720 315 90 Standard/0.76 Standard/0.68 4 Window Left (E) 24.0 0.720 0.670 90 90 Standard/0.76 Standard/0.68 5 Window Left (E) 12.0 0,720 0.670 90. 90 Standard/0.76 Standard/0.68 FROM : Christensen/T-24/CABEC FAX NO. : 909 763 0522 Mar. 27 2000 01:23PM P10 COMPUTER METHOD SUMMARY Page 3 C -2R Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 FENESTRATION SURFACES System Type HOUSE Furnace ACSplit SLAB SURFACES Area Slab Type (sf) HOUSE Standard Slab 1492 HVAC SYSTEMS Minimum Duct Duct Tested Duct ACCA Duct Efficiency Location R -value Leakage Manual D Eff 0.800 AFUE Attic R-4.2 No 10.00 SEER Attic R-4.2 No WATER HEATING SYSTEMS Number in Tank Type Heater Type Distribution Type System 1 Storage Gas Standard I Energy Factor 0.58 No 0.743 No 0.596 Tank External Size Insulation (gal) R -value 40 R- n/a Area U- Act Exterior Shade Interior Shade Orientation (sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC 6 Window Lett (E) 4.0 0.720 0.670 90 90 Standard/0.76 Standard/0.68 7 Window Left (E) 4.0 0.720 0.670 90 90 Standard/0.76 Standard/0.68 8 Door Back (S) 40.0 0.850 0.700 180 90 Standard/0.76 Standard/0.68 9 Door Back (S) 40.0 0.850 0.700 180 90 Standard/0.76 Standard/0.68 10 Window Back (S) i6.0 0.720 0.670 180 90 Standard/0.76 Standard/0.68 11 Window Right (W) 4.0 0.720 0.670 270 90 Standard/0.76 Standard/0.68 12 Window Right (W) 4.0 0.720 0.670 270 90 Standard/0.76 Standard/0.68 13 Window Right (W) 16.0 0.720 0.670 270 90 Standard/0.76 Standard/0.68 OVERHANGS AND SIDE FINS Window- Overhang Left Fin Right Fin - Area Left Rght Surface (sf) Wdth Hgth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght HOUSE 4 window 24.0 4.0 4.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a 5 Window 12.0 4.0 3.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a 6 Window 4.0 4.0 1.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a 7 Window 4.0 2.0 2.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a 11 Window 4.0 4.0 1.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a 12 Window 4.0 2.0 2.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a 13 Window 16.0 4.0 4.0 2.0 0.5 n/a n/a n/a n/a n/a n/a n/a n/a System Type HOUSE Furnace ACSplit SLAB SURFACES Area Slab Type (sf) HOUSE Standard Slab 1492 HVAC SYSTEMS Minimum Duct Duct Tested Duct ACCA Duct Efficiency Location R -value Leakage Manual D Eff 0.800 AFUE Attic R-4.2 No 10.00 SEER Attic R-4.2 No WATER HEATING SYSTEMS Number in Tank Type Heater Type Distribution Type System 1 Storage Gas Standard I Energy Factor 0.58 No 0.743 No 0.596 Tank External Size Insulation (gal) R -value 40 R- n/a FROM : Christensen/T-24/CABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:23PM P11 COMPUTER METHOD SUMMARY Page 4 C -2R Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPASS v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on the plans, **'* *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This is a multiple orientation building with no orientation restrictions. This printout is for the front facing,North. REMARKS Philips fenestration or better FROM : Christensen/T-24/CABEC FAX NO. 909 763 0522 Mar. 27 2800 01:24PM P12 CONSTRUCTION ASSEMBLY Page 1 3R Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPASS v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 Parallel Path Method Reference Name . W13.2X4.16FA Descziption .... Wal1R-13 2x4 16oclinFalc Type ........... Wall R -Value ........ 17.61 Hr-sf-F/Btu Framing Material ..... FIR.2X4 Type wood Description .. 2x4 fir Spacing ...... 16 inches on center Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. STUCCO.0.88 0.875 in stucco 0.17 0.17 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. R 4.61 RIGID R-4.61 Insulated Sheathing 4.61 4.61 4c. SATT.R13 R-13 batt insul (cavity = 3.5 in) 13.00 -- 4f. FIR.2X4 2x4 fir -- 3.46 S. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total Unadjusted R --Values 19.15 9.61 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 19.15 x 0.85) + (1 / 9.61 x 0.15) = 0.060 Btu/hr-sf-F Total R -Value: 1 / 0.060 = 16,.66 hr-sf-F/Btu FROM : Christensen/T-24/CABEC FAX NO. : 909 763 0522 Mar. 27 2000 01:24PM P13 CONSTRUCTION ASSEMBLY Page 2 3R Fxoject Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 Parallel Path Method Reference Name . GARWALLRI3 Description .... Wall R-11 2x4 16oc Type ........... Wall R -Value ........ 1.3 Hr-sf-F/Btu Framing Material ..... FIR.2X4 Type ......... Wood Description .. 2x4 fir Spacing ...... 1.6 inches on center Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3c. BATT.R13 R-13 batt insul (cavity = 3.5 in) 13.00 -- 3f. FIR.2X4 2x4 fir -- 3.46 4. GYP.0.50 0.50 in gypsum or pilaster board 0.45 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total Unadjusted R --Values 14.81 5.27 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 14.81 x 0.85) + (1 / 5.27 x 0.15) = 0.086 Btu/hr-sf-F Total R -Value: 1 / 0.086 = 11.65 hr-sf-F/Btu FROM : Christensen/T-24/CABEC FAX NO. : 909 763 0522 Mar. 27 2000 01:25PM P14 CONSTRUCTION ASSEMBLY Page 3 3R Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 Parallel Path Method Reference Name . R.38.2X4.24F Description .... Roof R-38 2x4 2400 Type ........... Roof R -Value 38 Hr-sf-F/Btu Framing Material ..... FIR.2X4 Type Wood Description'.. 2x4 fir Spacing ...... 24 inches on center Framing Frac.. '0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. BUILTUP.0.38 0.375 in built-up roofing 0.33 0.33 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. PLY.0.50 O.SO in plywood 0.62 0.62 4, AIR.RF.3.50 3.5 in & greater air space: heat flow up 0.80 0.80 5. BATT.R27.0 R-27 batt insulation 27.00 27.00 6c. BATT.RII.0 R-11 batt insul (cavity > 3.5 in) 11.00 -- 6f. FIR.2X4 2x4 fir -- 3.46 7. GYP.0.63 0.625 in gypsum or plaster board 0.56 0.56 I. FILM.IN.RF Inside air film: heat flow straight up 0.61 0.61 Total Unadjusted R -Values 41.15 33.62 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -value: (1 / 41.15 x 0.93) + (1 / 33.62 x 0.07) = 0.025 Btu/hr-sf-F Total R -Value: 1 / 0.025 = 40.51 hr-sf-F/Btu FROM : Christensen/T-24/CABEC FAX N0. : 909 763 0522 Mar. 27 2000 01:25PM P15 HVAC SIZING Page 1 HVAC Project Title.......... The Breeze Date..03/27/00 13:07:50 Project Address........ ******* La Quinta, CA *v5.00* Documentation Author... Carole Christensen ******* Carole Christensen 47-596 Lake Canyon Drive Aguanga, CA 92536 800-735-8152 Climate Zone........... 15 Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc. MICROPAS5 v5.00 File-CORNSIC Wth-CTZ1SS92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 GENERAL INFORMATION Floor Area ................. Volume ..................... Front Orientation.......... Sizing Location............ Latitude ................... Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design ....... Summer Range ............... Interior Shading Used...... Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... 1492 sf 13040 Cf Front Facing PALM DESERT 33.7 degrees 32 F 70 F 112 F 78 F 34'F No No No 0.20 HEATING AND COOLING LOAD SUMMARY Heating Description (Btuh) 0 deg (N) Cooling (Btuh) Opaque Conduction and Solar...... 10415 Building Permit Plan check Date Field Check/ Date Climate Zone........... 15 Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc. MICROPAS5 v5.00 File-CORNSIC Wth-CTZ1SS92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 GENERAL INFORMATION Floor Area ................. Volume ..................... Front Orientation.......... Sizing Location............ Latitude ................... Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design ....... Summer Range ............... Interior Shading Used...... Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... 1492 sf 13040 Cf Front Facing PALM DESERT 33.7 degrees 32 F 70 F 112 F 78 F 34'F No No No 0.20 HEATING AND COOLING LOAD SUMMARY Heating Description (Btuh) 0 deg (N) Cooling (Btuh) Opaque Conduction and Solar...... 10415 5038 Glazing Conduction ............... 5575 4988 Glazing Solar .................... n/a 7143 Infiltration ..................... 6886 4557 Internal Gain .................... n/a 2550 Ducts ............................ 2288 2428 Sensible Load .................... 25163 26705 Latent Load ...................... n/a 5341 Minimum Total Load 25163 32045 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. it is the HVAC designers responsibility to consider all factors when selecting the HVAC equipment. FROM : Christensen/T-24/CABEC FRX NO. : 909 763 0522 Mar. 27 2000 01:25PM P16 HVAC SIZING Page 2 HVAC Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC. Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 GENERAL INFORMATION Floor Area ................. Volume ..................... Front Orientation.......... Sizing Location............ Latitude...........'........ Winter Outside Design....'.. Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Interior Shading Used...... Exterior Shading Used...... overhang Shading Used...... Latent Load Fraction....... Description 1492 A 13040 cf Front Facing 90 deg (E) PALM DESERT 33.7 degrees 32 F 70 F 112 F 78 F 34 p No No No 0.20 HEATING AND COOLING LOAD SUMMARY Heating (stuh) Cooling (Btuh) Opaque Conduction and Solar...... 10415 5038 Glazing Conduction ............... 5575 4988 Glazing Solar .................... n/a 8658 Infiltration ..................... 6886 4557 Internal Gain .................... n/a 2550 Ducti .... 1 ....................... 2288 2579 Sensible Load .................... 251.63 28370 Latent Load ...................... n/a 5674 Minimum Total Load 25163 34044 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability 'of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. FROM : Christensen/T-24/CABEC FAX NO. : 909 763 0522 Mar. 27 2000 01:26PM P17 HVAC SIZING Page 3 HVAC Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPASS v5.00 File-CORNBIC Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 GENERAL INFORMATION Floor Area ................. Volume ..................... Front Orientation.......... Sizing Location............ Latitude... .............. Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Interior Shading Used...... Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... 1492 sf 13040 cf Front Facing PALM DESERT 33.7 degrees 32 F 70 F 112 F 78 F 34 F No No No 0.20 HEATING AND COOLING LOAD SUMMARY Heating Description (Btuh) 180 deg (S) Cooling (Btuh) Opaque Conduction and Solar...... 10415 5038 Glazing Conduction ............... 5575 4988 Glazing Solar .................... n/a 6136 Infiltration ..................... 6886 4557 Internal Gain .................... n/a 2550 Ducts ............................ 2288 2327 Sensible Load .................... 25163 25597 Latent Load ...................... n/a 5119 Minimum Total Load 25163 30716 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. FROM : Christensen/T-24/CRBEC FRX NO. : 909 763 0522 Mar. 27 2000 01:26PM P18 xVAC SIZING Page 4 HVAC Project Title.......... The Breeze Date..03/27/00 13:07:50 MICROPAS5 v5.00 File-CORNBIC Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-Drp80.10R13+PW38.4 40 GENERAL INFORMATION Floor Area ................. Volume ..................... Front Orientation.......... Sizing Location............ Latitude..........:. ..... Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range., ............. Interior Shading Used...... Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... 1492 sf 13040 cf Front Facing PALM DESERT 33.7 degrees 32 F 70 F 112 F 78 F 34 F No No No 0.20 HEATING AND COOLING LOAD SUMMARY Heating Description (Btuh) 27o deg (W) Cooling (Stuh) Opaque Conduction and Solar...... 10415 5038 Glazing Conduction ............... 5575 4988 Glazing Solar .................... n/a 8386 Infiltration ..................... 6886 4557 Internal Gain .................... n/a 2550 Ducts ............................ 2288 2552 Sensible Load .................... 25163 28071 Latent Load ...................... n/a 5614 Minimum Total Load 25163 33685 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. Ff20M Christensen/T-24/CABEC FRX N0. 909 763 0522 0 6.1.03.`88 14A? F.A1 219F880018 `lark6L1A6SuD➢ort 1:1 PHtPgO¢U� Mar. 27 2000 01:26PM P19 zoo? M9" Szli.�? "glut 240 H$ lgorizwal Slider Clexr/AJr/C1car 172 Clear/Argon/Cleu .70 Clear/LowVaear .1.57 Clr/LowE/Arg/Clr' 53 240SH Single Hung Clear/Air/Clear .72 ClegLr/Argon/Clear ,70 ClenrlowE/Clear .57 Clr/LowE/Arg/Clr .53 Z40F Picture W[ndow Clear/Adr/Clestr .63 Clear/Argoa/Clw 60 CICArfUwE/Clear .45 Clr/LowE Arg/Clr .41 Philips Produce's uses Spectrally Selective Low.F CuaiiHgs- 7-99 IEEI.� .67 w/ Grids .61 .67 w/ Grids, .61 ,3S w/ Grids .35 .3n w/ Grids .35 ,6 w/ Grids ,61 ,6'/ W/ Grids, .61 .38 w/ Grids ,35 .38 'n/ Grids .3f, ?2 wl Gri.ds .66 72 W/ Grids .66 .40 W/ Grids.37 .40 w/ Grids .3'