0010-275 (SFD) Title 24f
Carole Christensen, Certified Energy Analyst
TITLE -24 ENERGY CALCULATIONS
ENERGY CALCULATIONS FOR!
Southwest Concepts
82-723 Dr. Carreon Blvd.
Indio, CA 92201
PROJECT_ : J. Paul Residence
4578 sq.ft. Custom Home
La Quinta, CA 92253
June 7, 2001
Standard Design Proposed Design Compliance Margin
51.66 50.13 +1.53
CTZ 15,- 34.8% fenestration
Credit taken for Radiant Barrier
Dual fenestration, Low E(2) Default, Lt. Blinds
Walls R-19; Roof R-38,
Duct R.4.2; AFUE 80%; SEER 13.0
Two 5.0 gal gas water heaters EF. 60, Recirc/TimeTemp
One 75 gal gas water heater, Recirc/TimeTemp
CONTENTS
CF -1R
MF -1R
C -2R
C -3R
HVAC Sizing.
Micropas v5.10 BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
DATE
47-596Lake :Guryon Drive, Aguanga, CA 92536
1-800-735-8152
Member CABEC - California Association of Building Energy Consultants
CERTIFICATE OF COMPLIANCE.: RESIDENTIAL Page 1 CF -1R
Project Title.......... J.Paul Residence Date..06/07/01 14:26:29
AddPro5 68 Ch H'11 *******
ject rens........ 5 - 5 errys.
i
La Quinta, CA. *v5.1.0*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen
4.7-_596 Lake Canyon Drive Plan Check Date
Aguanga, CA 92536
800-735-8152 Field Check/ Date
Climate Zone. ..... 15
.Compliance Method...... MICROPAS'5 x5.10 for 1998 Standards by Enercomp, Inc.
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
GENERAL INFORMATION
Conditioned Floor Area..... 4578 sf
Building Type....... .. Single Family Detached
Construction Type ... New
Building Front Orientation., Front Facing 90 deg (E)
Number of Dwelling Units.... 1.
Number of Stories.. ...... 1
Floor Construction Type.... Slab On Grade
Glazing Percentage......... 34.8 % of floor area
Average Glazing U -value..... 0.6.5 Btu/hr-sf-F
Average Glazing SHGC....... 0.41
Average Ceiling Height..... 11.6 ft
BUILDING SHELL INSULATION
Component
Frame
Cavity
Sheathing Total Assembly
Type
Type
R -value
R -value R -value U -value
Location/Comments
Wall
Wood
R-17.8
R=0
R=17.8 0.065
Wall
Wood
R-17.8
R-0
R-17.8 0.06.4
To mech, To garage
RoofRadiant. Wood
R-1'1
R-27
R-38 0.025
flat
SlabEdge
None
R-0
R-0
F2=0.760
To outside
SlabEdge
None
R-0
R-0
F2=0.510
to garage
Door
None
R-0
R-0
R-0 0.330
to garage
Wall
Wood
R-0
R=0
R-0 0.3.86
FENESTRATION
Over -
Area
U-
Interior
Exterior
hang/
Orientation
(sf)
Value
SHGC Shading
Shading
Fins
Door
Front (E)
48.0
0.650
0.400 Standard
B1dShad'e
None
Window
Front (E)
16.0
0.650
0.400 Standard
Standard
None
Window
Front (E)
20.0
0.650
0.4.00 Standard
B1dShade
None
Window
Front ('E)
24.0
0.650
0.4,00 Standard
Standard
Yes
Window
Front (E)
24.0
0.650
0.400 Blind
Standard
Yes
Door
Front (E)
40.0
0.650
0.400 Blind
Standard
Yes
Window
.Front (E)
20.0
0.650
0.400 Blind
Standard
Yes
Window
Front (E)
20.0
0.650
0..4.00 Blind
Standard
Yes
Door
.Front (E)
40.0
0.650
0.400 Blind
Standard
Yes
Window
Front (E)
12.0
0.6,50
0.400 Blind
Standard
None
Window
Left (S)
9.0
0.570
0.700 Standard
B1dShade
None
Window
Left (S)
15.0
0.650
0.400 Blind
B1dShade
None.
'Window
Left (S)
40.0
0.6.50
0.4.00 Blind
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R
Project Title..........,.. J.Paul Residence Date..06/07/01 14:26:2.9
MICROPAS5 x5.10 File-JPAUL Wth-CTZ115S92. Program -FORM CF -1R
User#=MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
FENESTRATION
Type
S1abOnGrade
S1abOnGrade
S1abOnGrade
SlabOnGrade
InteriorHorz.
InteriorHorz.
Exposed
Area Thickness
(sf) (in) Location/Comments
Over-
hang/
Fins
None
None
None
None
None
None
Yes
Yes
None
Yes
Yes
Yes
Yes
Yes
Yes
Yes
None
Yes
Yes
Yes
Yes.
Yes
None
None.
None
None
Yes
1123
3.5
Area
U-
311
Interior
Exterior
Orientation
1298
(sf)
Value
SHGC
Shading
Shading
Door
Left
(S)
40.0
0.650
0.400
Standard
Standard
Window
Left
(S)
40.0
0.65:0
0.400
Standard
Standard
• Window
Left
(S)
40.0
0.650
0.400
Standard
B1dShade
Window
Left
(S)
8.0
0.570
0.700
Blind
Standard
Window
Left
(S)
25.0
.0.650
0.400
Standard
B1dShade
Door
Left
(S)
40.0
0.650
0.400
Standard
B1dShade
Window
Left
(S)
70.0
0.650
0.400
Blind
Standard
Window
Left
(S)
36.0
0.650
0.400
Blind
Standard
Window
Back
(W)
40.0
0.650
0.4.00
Blind
Standard
Window
Back
(W.)
60.0
0.650
0.400
Blind
Standard
Door
Back
(W)
90.0
0.650
0.400
Blind
Standard
Door
Back
(W)
160.0
0.650
0.400
Blind
Standard
Window
Back
(W)
40.0
0.650
0.400
Blind
Standard
Window
Back
(W)
36.0
0.65:0
0.400
Blind
Standard
Door
Back
(W)
160.0
0.6,50
0.400
Blind
Standard
Window
Back
(W)
13.3
0.570
0.700
Standard
Standard
Window
Right
(N)
12.0
0.6.5.0
0.400
Blind
B1dShade
Window
Right
(N)
36.0
0.650
0.400
Blind
Standard
Window
Right
(N)
48.0
0.650
0.400
Blind
Standard
Door
Right
(N)
120.0
0.650
0.400
Blind
Standard
Window
Right
(N)
16.0
0.650
0.400
Blind
Standard
Door
Right
(N,)
80.0
0.650
0.400
.Blind.
Standard
Window
Right_
(N)
13„3
0.570
0.700
Standard
Standard
Window
Right
(N)
15.0
0.6.50
0.400
Blind.
Standard
Skylight
Hor.z
16.0
0.750
0.400
None
None
Skylight
Horz
9.0
0.750
0.400
None
None
SLAB
SURFACES
Area
Slab
Type
(sf)
Standard
Slab 1127
THERMAL
MASS
Type
S1abOnGrade
S1abOnGrade
S1abOnGrade
SlabOnGrade
InteriorHorz.
InteriorHorz.
Exposed
Area Thickness
(sf) (in) Location/Comments
Over-
hang/
Fins
None
None
None
None
None
None
Yes
Yes
None
Yes
Yes
Yes
Yes
Yes
Yes
Yes
None
Yes
Yes
Yes
Yes.
Yes
None
None.
None
None
Yes
1123
3.5
marble/tile
Yes
311
3.5
marble/tile
No
1298
3.5
framing/carpet/cabinets
No
719
3..5
framing/carpet/cabinets
Yes
194
1.0
cabinet/vanity tops
Yes
28
1.0
cabinet/vanity tops
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R
Project Title.......... J.Paul. Residence Date..06/07/01 14:26:29
MICROPASS v5.10 File-JPAUL Wth-CTZ15'S92 Program, -FORM CF -1R
User#-MP1017 User -Carole Christensen Run-vbloe8.0.13R19.38.4 3wh
HVAC SYSTEMS
WATER HEATING SYSTEMS DETAIL
Standby Internal Tank
Recovery Rated Loss Insulation
System Efficiency Input. Fraction R -value
2ZDHW
Large 0.792 n/a 0.02.2 R-n/a
Pilot
Light
0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
*** Items in this section should be documented on;:the plans, ***
*** installed to manufacturer and CEC specifications, and ***
***verified during plan check and field inspection. ***
This building incorporates a Radiant Barrier.
This building incorporates non-standard Fenestration Shading.
This building incorporates a High. Mass Design.
This building incorporates non-standard Water Heating System
REMARKS
1 Zone = Ent/Din/Kit/Fam/Liv/Hall - zoned as Living
2 Zone = Master Suite - zoned as Sleeping
3 Zone = Guest Bedrooms hall and laundry - zoned as Living
Minimum Duct
Duct Tested Duct
ACCA
Thermostat
Equipment Type
Efficiency Location
R -value Leakage
Manual
D Type
Furnace
0.800 AFUE Attic
R-4.2
No
No
Setback
ACSplit
13.00 SEER Attic
R-4.`2
No
No
Setback
Furnace
0.800 AFUE Attic
R-4.2.
No
No
Setback
ACSplit
13.00 SEER Attic
R-4.2
No
No
Setback
Furnace
0.800 AFUE Attic
R-4.2
No
No
Setback
ACSplit
13.00 SEER Attic,
R-4.2
No
No
Setback
WATER HEATING
SYSTEMS
Number
Tank
External
in
Energy
Size
Insulation
Tank Type
Heater Type Distribution Type System
Factor
(gal)
R=value
1ZDHW
Storage
Gas Recirc/TimeTemp
1
0.60
50
R- n/a
2ZDHW
Large
Gas Recirc/TimeTemp
1
n/a
75
R-0
3ZDHW
Storage
Gas Recirc/TimeTemp
1
0.60
50
R- n/a
WATER HEATING SYSTEMS DETAIL
Standby Internal Tank
Recovery Rated Loss Insulation
System Efficiency Input. Fraction R -value
2ZDHW
Large 0.792 n/a 0.02.2 R-n/a
Pilot
Light
0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
*** Items in this section should be documented on;:the plans, ***
*** installed to manufacturer and CEC specifications, and ***
***verified during plan check and field inspection. ***
This building incorporates a Radiant Barrier.
This building incorporates non-standard Fenestration Shading.
This building incorporates a High. Mass Design.
This building incorporates non-standard Water Heating System
REMARKS
1 Zone = Ent/Din/Kit/Fam/Liv/Hall - zoned as Living
2 Zone = Master Suite - zoned as Sleeping
3 Zone = Guest Bedrooms hall and laundry - zoned as Living
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF -1R
Project Title.......... J.Paul Residence Date..06/07/01 14:26:29
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
REMARKS
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of.Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
Name....
Company.
Address.
Phone...
License.
Signed..
Name....
Title...
Agency..
Phone...
DESIGNER or OWNER DOCUMENTATION AUTHOR
Stephen R. Nieto Name.... Carole Christensen
SouthWest Concepts Company. Carole Christensen
82-723 Dr. Carreon Blvd. Address. 47-596 Lake Canyon Drive
t
o, CA 92201 Aguanga, CA 92536
) 352- 555 Phone... 800-735-81.52
,6
-4-01 Signed,. .
CZu14_&44@, ate ate
ENFORCEMENT AGENCY d /
Signed..
ate
Certitled Energy Anetyet
Carole Chdstermm CEPE
r r R 98-W239
r-W
r
C-ADEC
Ccaomio Assodadan of Dukhry Energy Comitants
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page I of 2) MF -1R
Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used.
Items marked with an asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when completed.or enter N/A if not applicable.
DESCRIPTION
DESIGNER 'ENFORCEMENT
Building Envelope Measures:
• §150(a): Minimum R-19 ceiling insulation.
A 150(6): Loose fill insulation manufacturer's labeled R -Value.
• §150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U-Faetor.inmetal frame walls
/
(does not applylo exterior mass walls).
V
• §150(d): Minimum R-1'3 raised floor insulation in framed floors.
p�q�
§150(1): Slab edge insulation -water absorption rale no greater than 0.3%, water vapor transmission tate
✓
no greaterthan 2:0 nn/inch.
§1.18: Insulation specified or'installed meets insulation quality standards. Indicate type and form.
§,116-17: Fenestration Products, Exterior Doors, and Infiltration/Exfiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field -fabricated) have label with certified U, -Factor, . certified Solar Heat
Gain Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windowsweatherstripped; all joints and penetrations caulked and sealed.
150(g): Vapor'barriers mandatory in Climate Zones 14 and 16 only.
019L,
0150(1`): Special'infiltration barrier installed to comply with § 151 meets Commission quality standards.
V01101
0150(6): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1. Masonry and factory -built fireplaces haver
a. Closeable metal or glass door
b. Outside air intake with damper and control
c.'Flue damper, andcontrol
/
2. No continuous burning gas pilot lights allowed.
Space Conditioning, Water Heating and Plumbing System Measures:
01,10-0113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
p 150(h)i Heating and/or cooling loads calculated in accordance withASHRAE, SMACNA or ACOA.
0150(i): Setback thermostat on all applicable heating and/or cooling systems.
✓
01500): Pipe and tank insulation
1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally .wrapped mi&
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater)
3. Back-up tanks forsolar system, unfired storage tanks, or other indirect.horwater tanks have R-12
extemal�insulationor R-1`6 combined intemallexternal insulation.
4. All buried or exposed piping insulated in recirculating sections of.hot water systems.
5. Cooling, system piping below 55• F'insulated.
6. Piping insulated between heating source and indirect hokwater tank.
January 4,:2001
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 2 42) MF -1R
Note: Lowrise residential buildings subject to,the Standards must contain these measures regardless of the compliance approach used:
Items marked with an asterisk,(*) maybe superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when. completed or enter N/A if not applicable.
DESCRIPTION
DESIGNER
ENFORCEMENT
Space Conditioning, WaterNeating and Plumbing System Measures: (continued)
' §150(m): Ducts and Fans
1. All ducts and plenums installed,. sealed and;insulated to meet the requirement of the 1998 CMCSaWons
601, 603, 604, and'Standard 6-3; ducts insulated toa minimunn.histalled lewl.of R4.2 or.enclosed entirely
in conditioned space. Openings shall -be sealed with mastic, tape, aerosol,sealant, or other duct -closure
system, that meas the applieablevaquirements of UL 181, UL 191 A, or UL 181 B. If mastic or tape is used
to seal openings greater than 1/4,, inch, the combination of mastic and either mesh or tape shall be used.
Building cavities shall not be used for conveying conditioned air..Joints and seams of duct systems and
their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used
in combination with mastic and drawbands.
2. Exhaust, fan systems have back draft. or automatic dampers.
3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible,
- /
manual) operated dampers.v
§,114: Pool and Heating Systeins and Equipment.
I. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no
electric resistance heating and no pilot light.
2 -System is installed with:
a. At least 36" of pipe between filter and,heater future solar heating.
b. Cover for outdoor pools or outdoor spas.
3.. Pool system has directional inlets and a circulation pump time.switch.
§ 115: Gas fired central fumaces;,pool heaters, spa heaters,or household cooking appliances have
continuously. burninilot light. (Exception: Non -electrical cooking appliances with pilot -150 BoAr
Lighting Measures:
§150(k) L:, Luminaires for general lighting in kitchens shall have lamps with an efficacy of 40 lumens/watt
or greater -for general lighting in kitchens. This general lighting shall be controlled by a switch on a
readily accessible lighting control panelat an entrance to the kitchen.
§ 150(k)2.: Rooms with, a shower or bathtub must have either at least one luminaire with lamps with an
efficacy of 40 lumaWwatt or greater, switched at the entrance to the room or one of the alteratives to this
requirement allowed in § 150(k)2.; and recessed coilinit fixtures are IC insulation cover approved.
January 4, 2061
COMPUTER METHOD SUMMARY Page 1 C -2R
Project Title.......... J.Paul. Residence Date..06/07/01 14:26:29
Project Address........ .55-685 Cherry Hills
La Quinta, CA *v5.10*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen
47-596 Lake Canyon Drive Plan Check Date
Aguanga, CA 92536
800-735-8152 Field Check/ Date'
Climate Zone. ..... 15
Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc.
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S9'2 Program -FORM C --2R
User#-MP1017 User -Carole. Christensen Run-vbloe80.13R19.38.4 3wh
Energy Use
('kBtu/sf -yr)
MICROPAS5 ENERGY USE.SUMMARY
Standard Proposed
Design Design
Compliance
Margin
Space
Heating. .... ..
4.3.1
5.76
-1.4.5
Space
Cooling..........
41.1.3
35.77
5.36
Water
Heating...........
6..22
8.60
-2.38
Total
.51.66
50.13
.1.53
*** Building complies with Computer Performance ***
GENERAL INFORMATION
Conditioned Floor Area.....
Building Type ..............
Construction Type .........
Building Front Orientation.
Number of Dwelling Units...
Number of Building Stories.
Weather Data Type..........
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -value....
Average Glazing SHGC.......
Average Ceiling Height.....
Floor
45.78 sf
Single Family
New
Front Facing
1
1
ReducedYear
Detached
90 deg (E)
.Slab On Grade
3
53112 cf
4578 sf
34.8' of floor area
0.65 Btu/hr-sf.-F'
0.4.1
11.6'ft
BUILDING ZONE INFORMATION
# of
Volume Dwell Cond- Thermostat
(cf) Units itioned Type
30326 0.52 Yes Setback
12486 0.25 Yes Setback
Vent
Area
Zone Type
(sf)
1ZONE
Leakage
Residence
2421
2ZONE.
Residence
1127
45.78 sf
Single Family
New
Front Facing
1
1
ReducedYear
Detached
90 deg (E)
.Slab On Grade
3
53112 cf
4578 sf
34.8' of floor area
0.65 Btu/hr-sf.-F'
0.4.1
11.6'ft
BUILDING ZONE INFORMATION
# of
Volume Dwell Cond- Thermostat
(cf) Units itioned Type
30326 0.52 Yes Setback
12486 0.25 Yes Setback
Vent
Vent
Air
Height
Area
Leakage
(f t)
(sf).
Credit
2.0 Standard No
2.0 Standard No
DATABASE
Page 1 DBASE
MICROPAS5 v5.10 Database-JPAUL Program -DATABASE
Database-JPAUL
FILE
AZI-
50.13
5.76
35:77
COM.
NAME
MUTH
STANDARD
PROPOSED.MARGIN
5.24
PLY RUN TITLE
1> JPAUL
90
51.66
50.13
1..53
Yes vbloe80.13R19.38.4 3wh
2> JPAULGST
0
111.90
111.03
0.87
Yes
FILE
AZI-
PROPOSED
PROPOSED
PROPOSED PROPOSED PROPOSED
NAME
MUTH
TOTAL
HEATING
COOLING
FAN DHW
l>
2>
1>
2>
1>
2>
1>
2>
JPAUL
90
50.13
5.76
35:77
0.00
8.60
JPAULGST
0
111.03
5.24
70.99
0.00
34.80
FILE
AZI-
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
NAME
MUTH
TOTAL
HEATING
COOLING
FAN
DHW
JPAUL
90
51.66
4.31
41.13
0.00
6.22
JPAULGST
0
1.11.90
4.18
6.8.04
0.00
39..68
FILE
AZI-
MARGIN
MARGIN
MARGIN
MARGIN
MARGIN
NAME
MUTH
TOTAL
HEATING
COOLING
FAN
DHW
JPAUL
90
1.53
-1.45
5.36
0.00
-2.38
JPAULGST
0
0.87
-1.06
-2.95
0.00
4.88
FILE
AZI-
HEATING
COOLING COOLING
HEATING COOLING
NAME
MUTH
LOAD
LOAD
SENSIBLE
DUCTEFF DUCTEFF
JPAUL
90
107557
138784 115,653
0.74.3 0.637
JPAULGST
0
12'928
23724
19770
0.743 0.596
FILE
AZI-
WEATHER
NAME
MUTH
DATE
TIME FILE
JPAUL
90
06/07/01
14:26 CTZ15S.92
JPAULGST
0
10/11/00
07:03 CTZ15S92
GOND
AREA
4578
470
RUN TITLE
vbloe80.13R19.38.4 3wh
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title.......... J.Paul Residence Date..06/07/01 14:26:29
MICROPAS5 x5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run-vblo.e80.13R19.38.4 3wh
BUILDING ZONE INFORMATION
Floor
# of
Vent
Vent .Air
Area
Volume
Dwell
Cond-
Thermostat Height
Area Leakage
Zone Type
(sf)
(cf)
Units
itioned
Type (ft)
(sf) Credit
Residence
1030
10300
0.2.3
Yes
Setback 2.0 Standard No
OPAQUE SURFACES
Area
U-
Insul
Act
Solar
Form 3
Location/
Surface
(sf)
value
R-vai
Azm Tilt
Gains
Reference
Comments
1ZONE
1
Wall
206
0.065
17.8
90
50
Yes
W.19.2X6.16
2
Wall
4
0.065
1.7.8
90
90
No
W.19.2X6.16
3
Wall
144
0.065
17.8
90
90
Yes
W.19.2X6.16
7
Wall
13'0
0.065
17.8
180
90
Yes
W.19.2X6.16
8
Wall
20
0.065
17.8
180
90
No
W.19.2X6.16
9
Wall
254
0.0.65
17.8
180
9.0
Yes
W.19.2X6.16
1.0
Wall
225
0.065
17.8
180
90
No
W.19.2X6.16
1.1
Wall
84
0.064
17.8
90
90
No
GWALL.R19
To mech
13
Wall
148
0.065
17.8
270
90
Yes
W.19.2X6.16
15
Wall
154
0.065
17.8
0
90
Yes
W.19.2X6..16
16
Wall
28
0.065
17.8
0
90
Yes
W.19.2X6.16
21
Roof Radiant
2396
0.025
38
n/a
0
Yes
R.38.2X4.24F
flat
2ZONE
4
Wall
48
0.065
1.7.8
90
90
Yes
W.19.2X6.16
14
Wall
83
0:065
17.8
270
90
Yes
W.19.2X6.16
17
Wall
375
0.065
1.7.8
0
90
Yes
W.19.2X6.16
19
Wall
70
0.064
1.7.8
90
90
Yes
GWALL.R1:9
To mech
22
Roof Radiant
1121
0.025
38
n/a
0
Yes
R.38.2X4..24F
flat
3ZONE
5
Wall
10
0.065
1.7.8'
180
90
Yes
W.19..2X6.16
6
Wall
161
0.065
17.,8.
180
90
No
W.1.9.2X6.16
12
Wall
45
0.065
17.8
270
90
Yes
W.19.2X6.16
1.8
Wall
202
0.065
17.8
0
90
Yes
W.19.2X6.16
20
Wall
340
0.064
17.8L90
90
Yes
GWALL.R19
To garage
23
RoofRadiant
1030
0.025
38
n/a
0
Yes
R.38.2X4.24F
flat
30
Door
24
0.330
0
90
90
No
None
to garage
PERIMETER
LOSSES
Length
F2
Insul
Solar
Surface
(ft)
Factor
R-val
Gains
Location/Comments
1ZONE
24 SlabEdge
201
0.760
R-0
No
To outside
27 S1abEdge
6
0.510
R-0
No
to garage
2ZONE
25 S1abEdge
6.6
0.760
R-0
No
To outside
28 S1abEdge
6
0.510
R-0
No
to garage
3`ZONE
26 S1abEdge
363
0.760
R-0
No
To outside
29 S1abEdge
35
0.510
R-0
No
to garage
COMPUTER METHOD SUMMARY Page 3 C -2R
Project Title........... J.;Paul Residence Date..0.6/07/01 14:26:29
MICROPAS5 x5.10. File-JPAUL Wth-CTZ15.S9,2 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R1.9.38.4 3wh
Orientation
1ZONE
1 Door
2 Window
3 Window
4 Window
5 Window
.6 Door
7 Window
8 Window
9 Door
10 Window
14 Door
15 Window
16 Window
17 Window
18 Window
19 Door
2.0 Window
21 Window
23 Window
24 Door
25 Door
26 Window
27 Window
30 Window
31 Window
38 Skylight
39 Skylight
2ZONE
28 Door
29 Window
32 Window
33 Door
34 Window
3ZONE
11 Window
12 Window
13 Window
22 Window
.35 Door
36 'Window
37 Window
FENESTRATION SURFACES'
Area U- Act Exterior Shade Interior Shade
(sf) Value SHGC Azm Tilt Type/SHGC Type./SHGC
Front.
(E)
48.0
0.650
0..400
90
90
B1dShade./0.2
Front
(E)
16.0
0.650
0.400
50
90
Standard/0.76
Front
(E)
20.0
0.6`50
0.400
90
90
B1dShade/0.2
Front
(E)
24.0
0.650
0..400
90
90
Standard/0.76
Front
(E)
24.0
0.650
0.400
90
90
Standard/0.76
Front
(E)
40.0
0.650
0.400
90
90
Standard/0.76
Front,
(E)
20.0
0.6.50
0.400
90
90
Standard/0.76
Front
(E)
20.0
0.650
0..400
.90
90
Standard/0.76
Front
(E)
40.0
0.650
0.40.0
90
90
Standard/0.76
Front
(E)
12.0
0.650
0.400
90
90
Standard/0.76
Left
(S)
40.0
0.650
0.400
180
90
Standard/0.76
Left
(S)
40.0
0.650
0.400
180
90
Standard/0.76
Left
(S)
40:0
0.6.50
0.400
18'0
90
B1dShade/0.2
Left
(S)
8.0
0.570
0.700
180
90
Standard/0.76
Left
(S)
25.0
0.650
0.400
180
90
BldShade/0..2
Left
(S)
40.0
0.650
0.400
180
90
B1dShade/0.2
Left
(S)
70.0
0.650
0.400
18.0
90
Standard/0.76
Left
(S)
36.0
0.650
0.400
180
90
Standard/0.76
Back
(W)
60.0
0.650
0.400
270
90
Standard/0.76
Back
(W)
90.0
0.6.50
0.400
270
90
Standard/0.76
Back
(W)
1,60.0
0.650
0.400
270
90
Standard/0..76
Back
(W)
40.0
0.6'50
0.400
270
90
Standard/0.76
Back
(W)
36.0
0.650
0.400
270
90
Standard/0.76
Right
(N)
12.0
0.650
0.400
0
90
BldShade/0.2
Right
(N),
36.0
0.650
0.40.0
0
90
Standard/0.76
Horz
16.0
0.1750
0.400
90
0
None/1
Horz
9.0
0.750
0.400
90
0
None/1
Back
(W)
.160.0
0.6.50
0.400
270
90
Standard/0.76
Back
(W)
13.3
0.570
0.700
270
.90
Standard/0.76
Right
(N)
48.0
0.650
0.400
0
90
Standard/0.76
Right
(N)
120.0
0.650
0.400
0
90
Standard/0.76
Right
(N)
16.0
0.6:50
0.400
0
90
Standard/0.76
Left
(S)
9.0
0.570
0.70:0
180
9'0
B1dShade/0.2
Left
(S)
15.0
0.650
0.400
180
90
B1dShade/0.2
Left
(,S)
40.0
0.650
0.,400
180
90
Standard/0.76
Back
(W)
40.0
0.650
0.400
270
90
Standard/0.76
Right
(N)
80.0
0.650
0.400
0
90
Standard/0.76
Right
(N)
13.3
0.570
0.700
0
90
Standard/0.76
Right
(N)
15.0
0.650
01.400
0
90
Standard/0.76
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Blind/0.47
Blind/0.47
Blind/0.47
Blind/0.47
Blind/0.47
Blind/0.47
Standard/0.68
Standard/0.68
Standard/0.68
Blind/0.47
Standard/0.68
Standard./0.68
Blind/0.47
Blind/0.47
Blind/0.47
Blind/0.47
Blind/0.47
Bl-ind/0.47
Blind/0.47
Blind/o.,47
Blind/0.47
None/1
None/1
Blind/0.47
Standard/0.68
Blind/0.47
Blind/0.47
Blind/0.47
Standard/0.68
Blind/0.47
Blind/0.47
Blind/0.47
Blind/0.47'
Standard/0.68
Blind/0.47
COMPUTER,METHOD SUMMARY Page 4 C -2R
Project Title........:. J.Paul. Residence Date..06/07/01 14:26:2.9
MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R1.9.3,8.4 3wh
Surface
1ZONE
4 Window
5 Window
6 Door
7 Window
8 Window
9 Door
20 Window
21 Window
23 Window
24 Door
25 Door
26 Window
2,7 Window
31 Window
2ZONE
28 Door
29 Window
32 Window
33 Door
34 Window
3ZONE
35 Door
Surface
OVERHANGS AND SIDE FINS
Window- Overhang Left Fin Right Fin -
Area Left Rght
(sf) Wdth Hgth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght
24.0
8.0
3.0
3.0
0..0
8.0
9.0
8.0
7.0
0.0
9.0
24.0
0.0
24.0
8.0
3.0
3.0
0.0
0.0
16.0
0.0
7.0
0.0.
0.0
0.0
0.0
40.0
8.0
5.0
3.0
0.0
3.0
12.0
3.0
7.0
0.0
12.0
24.0
0.0
20.0
8.0,
2.5
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
20.0
8.0
2.5
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
40.0
8.0
5.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
70.0
10.0
7.0
3.0
0.0
3.0
0.0
0.0
0.0
0.0
0.0
16.0
0.0
36.0
6.0
6.0
2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
60.0
.10.0
.6.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
90.0
10.0
9.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
160.0
10.0
16.0
4.0
0.0
0.0
0.0
0.0
5.0
0.0
0.0
9.0
0.0
40.0
2.5
16.0
1.0
0.0
0.0
0.0
0.0
.5.0
0.0
0.0
8.0
0.0
36.0
6.0
6.0
'2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
36.0
6.0
6.0
2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
1.60.0
.10.0
16.0
5.0
0.0
0.0
0..0
0.0
5.0
0.0
0.0
7.0
0.0
13.3
.3.4
4.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
48.0
8.0
6.0
2.0
0.0
0.0,
0.0
0.0
2.0
0.0
0.0
2..0
0.0
120.0
10.0
12.0
3.0
0.0
0..0
0.0
0.0
8.0
0.0
0.0
16.0
0.0
16.0
4.0
2.0
1.5
0.0
0.0
0.0
0.0
1.5.
0.0
0.0
1.5
0.0
80.0
8.0
10.0
3.0
0.0
1.0
3.0
1.0
3.0
0.0
3.0
3.0
0.0
INTER -ZONE
SURFACES
1ZONE/2ZONE
Area
(sf) U -value
Insul Form 3
R-val Reference Location/Comments
1 Wall 539 0.386 R-0 W.0.2X4.16
3 Door 40 0.330 R-0 None
2ZONE/3ZONE:
2 Wall 200 0.3.86 R-0 W.0.2X4.16
SLAB SURFACES
Area
Slab Type (sf)
2'ZONE
Standard Slab 1127
COMPUTER METHOD SUMMARY Page 5 C -2R
Project Ti.tle........... J.Paul Residence Date..06/07/01 ,14:26:29
MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ1.5S'92 Program -FORM C -2R
User4-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
Mass Type
1'ZONE
.1 SlabOnGrade
3 SlabOnGrade
5 InteriorHorz
3ZONE
2 SlabOnGrade
4 SlabOnGrade
6 InteriorHorz
System Type
1ZONE
Furnace
ACSplit
2ZONE
Furnace
ACSplit
3ZONE
Furnace
ACSplit
Tank Type
1ZDHW
1 Storage
2ZDHW
2 Large
3ZDHW
3 Storage
System
THERMAL MASS
Area Thick Heat Conduct- Surface
(sf) (in) Cap ivity UIMC R -value
1123
3.5
28.0
1298
.3..5
28.0
1.94
1.0
24.0
311
3.5
28.0
719
3.5
28.0
28
1.0
24.0
0.98
4.60
R-0.0
0.98
1.80
R=2.0
0.67
1.70
R-0.0
0.98
4.60
R-0.0
0.98
1.80
R-2.0
0.67
1.70
R-0.0
HVAC SYSTEMS
R-4.2
Location/Comments
marble./tile
framing/carpet/cabinet
cabinet/vanity tops
marble/tile
framing/carpet/cabinet
cabinet/vanity tops
Minimum Duct 'Duct Tested Duct ACOA Duct
Efficiency Location R -value Leakage Manual D Eff
0.800
AFUE
Attic
R-4.2
13.00
SEER
Attic
R-4.2
0.800
AFUE
Attic
R-4..2
13.00
SEER
Attic
R-4.2
0.800
AFUE
Attic
R-4.2
13.00
SEER
Attic
R-4.2
Recirc/TimeTemp
1
WATER HEATING
SYSTEMS
No
No
0.743
No
No
0.637
No
No
0.743
No
No
0.637
No
No
0.743
No
No
0.637
2ZDHW
2 Large 0.792 n/a 0.022 R-n/a 0
Number_
Tank
External
in
Energy
Size
Insulation
Heater Type
Distribution Type System
Factor
(gal)
R -value
Gas
Recirc/TimeTemp
1
0.60
50
R- n/a
Gas
Recirc/TimeTemp
1
n/a:
75
R-0
Gas
Recirc/TimeTemp
1
0.60
50
R- n/a
WATER HEATING SYSTEMS DETAIL
Standby
Internal
Tank
Recovery
Rated
Loss
Insulation
Pilot
Efficiency Input
Fraction
R -value
Light
2ZDHW
2 Large 0.792 n/a 0.022 R-n/a 0
COMPUTER METHOD SUMMARY Page 6 C -2R
Project Title.......... J.Paul Residence Date..06/07/01 14:26:29
MI_CROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C' -2R
User#-MP1.017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
SPECIAL FEATURES AND MODELING ASSUMPTIONS
*** Items in this section .should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a Radiant Barrier.
This building incorporates non-standard Fenestration Shading.
This building incorporates a High Mass Design.
This building incorporates non-standard Water Heating System
REMARKS
1 Zone = Ent/Din/Kit/'Fam/Liv/Hall - zoned as Living
2 Zone Master Suite - zoned as Sleeping
3 Zone = Guest Bedrooms hall and laundry - zoned as Living
CONSTRUCTION ASSEMBLY Page 1 3R
Project Title.......... J.Paul Residence Date..06/07/01 14:26:29
MICRO.PAS5 v5.10 File-JPAUL Wth-CTZ15S92, Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe'80.13R19.38.4 .3.wh
Parallel Path Method
Reference Name . W..19.2X6.16
Description Wall R -1.92x6 16oc
Type Wall
R -Value 17.8 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type ..... Wood
Description .. 2x6 fir
Spacing .... 16 inches on center
Framing Frac.. 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Name Description
O.
FILM..EX
Exterior air film: winter value
1.
STUCCO.0.88
0.875 in stucco
2.
BLDG.PAPER
Building paper (felt)
3c.
BATT.R19
R-19 batt insul (cavity = 5.5 in'),
3f.
FIR.2X6
2x6 fir
4.
GYP.0.50
0.50 in gypsum or plaster board
I.
FILM..IN.WLL
Inside air film: heat sideways
FRAMING ADJUSTMENT CALCULATION
Cavity
Total. Unadjusted R -Values
Framing
U -Value: (1 / 19.3.4 x 0.85) + (1 / 6.98 x 0.15) =
Total R -Value:
1 / 0.065 =
Cavity
Frame
R -Value
R -Value
0.17
0.17
0.17
0.17
0.06
0.0:6
17.80
--
--
5.45
0.4.5
0.45
0.6.8
0.68
19.34
6.58
Total
0.065 Btu/hr-sf-F
15.28 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 2 3R
Project Title.......... J.Paul Residence Date..06/07/01 14:2.6:29
MICROPAS5 v5.10 File-JPAUL Wth-CTZ115S9.2 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh.
Parallel Path Method
Reference Name . GWALL.R19
Description . Wall R-19 2x6 '16oc
Type ....... Wall
R -Value ........ 17.8 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type .. .....Wood
Description .. 2x6 fir
Spacing ...... 16 inches on center
.Framing Frac.. 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Name Description
0.
FILM.EX
Exterior air film: winter
value
1.
GYP.0.50
0.50 in gypsum or plaster
board
3c.
BATT.R19
R-19 batt insul (cavity =
5.5 in)
3f.
FIR. 2X6
2x6 fir
7.19
4.
GYP.0.50
0.50 in qrypsum or plaster
board
I.
FILM.IN.WLL
Inside air film-: heat sideways
FRAMING ADJUSTMENT CALCULATION
Cavity
Total Unadjusted R -Values
Cavity
R -Value
Frame
R -Value
0.17
0.17
0.45
0.45
17.80
--
--
5.45
0.45
0.45
0.68
0.68
19.55
7.19
.Framing Total
U -Value: (1 / 19.55 x 0.85) + (1 / 7.19 x 0.15) = 0.064 Btu/hr-sf-F
Total R -Value: 1 / 0.064. = 15.55 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 3 3R
Project Title.......... J..Paul Residence Date..06/07/01 14:26:29
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S.9.2 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R1.9.38.:4 3wh
Parallel Path Method
Reference Name . R.38.2X4.24F
Description .... Roof R-38 2x4 24oc
Type Roof
R -Value 38 Hr-sf-F/Btu
Framing
Material .....
Type .....
Description ..
Spacing ......
Framing Frac..
Sketch.of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
FIR. 2X4
Wood
2x4 fir
24 inches on center
0.07
Cavity
U -Value: (1 / 41.04 x 0..93) + (1 /
Total R -Value:
Framing
Cavity
Material.
Name
Description
0.
FILM.EX
.Exterior air film.: winter value
1.
BUILTUP.0.38
0.375 in built-up roofing
2..
BLDG.PAPER
Building paper (felt)
3.
PLY.0.50
0.50 in plywood
4.
AIR,.RF.3.50
3.5 in & greater air space: heat flow up
5.
BATT.R27.0
R-27 batt insulation
6c.
BATT.RII.0
R -ll batt insul (cavity > 3.5 in)
6f.
FIR.2X4
2x4 fir
7.
GYP.0.50
0.50 in gypsum or plaster board
I.
F,ILM..IN.RF
Inside air film: heat flow straight up;
Total Unadjusted R -Values
FRAMING ADJUSTMENT
CALCULATION
Cavity
U -Value: (1 / 41.04 x 0..93) + (1 /
Total R -Value:
Framing
Cavity
Frame.
R -Value
R -Value
0.17
0.17
0.33
0.33
0.06
0.0'6
0.62
0.62
0.80
0.80
27.00
27.00
11.00
--
--
3.46
0.45
0.45
0.61
0.61
41.04
33.51
Total
33.51.x 0.07) = 0.025 Btu/hr-sf-F
1 / 0.0.25 = 40,.40 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 4 3R
Project Title.......... J.Paul Residence Date..06/07/01 14:2:6:29
MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ15S92 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
Parallel Path Method
Reference Name . W.0.2X4.16
Description . Wall R-0 2x4 16oc
Type ........... Wall
R -Value ........ 0 Hr-sf-F/Btu
Framing
Material ..... FIR.2X4
Type ..... Wood
Description .. 2x4 fir
Spacing ...... 16 inches on center
Framing Frac.. 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Cavity Frame
Name
Description
R -Value R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
STUCCO.O.88
0.875 in stucco
0.17
0.17
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3c.
AIR.WLL.3.50
3.5 in & greater air space: heat
sidewys 0.85
--
3f.
FIR.2X4
2x4 fir
--
3.46
4.
GYP.0.50
0.50 in gypsum or plaster board
0,.4,5
0:45
I.
FILM.IN.'WLL
Inside air film.: heat sideways
0.68
0.68
Total. Unadjusted
R -Values 2.38
5.00
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing
Total
U -Value: (1 / 2.38 x 0.85) + (1 / 5.00 x 0.15)
= 0.386 Btu/hr-sf-F
Total R -Value:
1 / 0.386
= 2;..59 hr-sf-F/Btu
HVAC SIZING
Page 1
HVAC
Project Title.. .......
J.Pau1 Residence
Date..06/07/01
14:26:29
Project Address.........
5.5-6'85 Cherry Hills
*******
30458
8425
Glazing Conduction................
La Quinta, CA
*v5.10*
Glazing Solar .:..................
n/a
Documentation Author...
Carole Christensen
*******
Building Permit
Internal. Gain.... ................
Carole Christensen
2550
Ducts ............................
9778
1051.4
47-596 Lake Canyon Drive
Plan Check,/
Date
Aguanga, CA 92.536
800-735-8152
Field Check/
Date
Climate Zone. ........
15
Compliance Method......
MICROPAS5 v5.10 for 1998
Standards by Enercomp,
Inc.
MICROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -HVAC SIZING
User#-MP1017 User-Carole.Christensen Run-vbloe80.13R19.38.4 3wh
GENERAL INFORMATION
Floor Area ................. 4578 sf
Volume..:**—:* --'—*53112 cf
Front Orientation.......... Front Facing 90 deg (E)
Sizing Location............. PALM DESERT
Latitude... ... ........ 33'.7 degrees
Winter Outside Design...... 32 F
Winter Inside Design....... 70 F
Summer Outside.Design...... 112 F
Summer Inside Design....... 18 F
Summer Range. .. ...... 34 F
Interior Shading Used.... . No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction........ 0.20
HEATING AND COOLING LOAD SUMMARY
Sensible Load .................... 107557 115654
Latent Load ...................... n/a 23131
Minimum Total Load. 107557 138784
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
Heating
Cooling
Description
(Btuh)
(Btuh)
Opaque Conduction and Solar......
30458
8425
Glazing Conduction................
39275
35141
Glazing Solar .:..................
n/a
40464
Infiltration ......................
28046
18560
Internal. Gain.... ................
n/a
2550
Ducts ............................
9778
1051.4
Sensible Load .................... 107557 115654
Latent Load ...................... n/a 23131
Minimum Total Load. 107557 138784
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
M
HVAC SIZING Page 2 HVAC
Project Title.......... J.Paul Residence Date..06/07/01 14:26:29
MICROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -HVAC SIZING
User#-'MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh
HEATING AND COOLING LOAD SUMMARY BY ZONE
ZONE 11ZONE"
Floor Area... .................... 242.1 sf
Volume ........................... 30326 cf
Description
Opaque Conduction and Solar......
Glazing Conduction...............
GlazingSolar ....................
Infiltration .....................
Internal Gain.. ...................
Duct's .............................
Sensible Load ....................
Latent Load .......................
.................
ZONE '2ZONE'
Heating Cooling
(Btuh) (Btuh)
1164.6
4214
25314
2264.9
n/a
29446
16014
10597
n/a
132'6
5297
68.23
58271 75056
n/a 150:11
Minimum Zone Load 58271 90068
Floor Area............ 1127 sf
Volume ................4.......... 12486 cf
Description
Opaque Conduction and Solar......
Glazing Conduction ...............
Glazing Solar ....................
Infiltration .....................
InternalGain ....................
Ducts............................
Sensible Load ....................
Latent Load ......................
Minimum Zone Load
Heating Cooling
(Btuh)
(Btuh)
4511
1.895
8785
7860
n/a
7699
6593
4363
n/a
638
1989
2245
21878
n/a
24700
4940
21878
2.964.0
HVAC SIZING' Page 3 HVAC
Project Title........... J.Paul Residence Date..06/07/01.14:26:29
MICROPAS5 v5.10 File-JPAUL Wth-CT.Z15S92 Program -HVAC SIZING
User#-MP1017 User -Carole. Christensen Run-vbloe80.13R19.38.4 3wh
ZONE 13ZONE'
Floor Area ....................... 1030 sf
Volume...... 10300 cf
Description
" Opaque Conduction and Solar......
Glazing Conduction. ...............
Glazing Solar ....................
Infiltration .....................
Internal Gain.. ...................
Ducts............................
Sensible Load............ ......
LatentLoad................... ...
Minimum Zone Load
M
Heating
Cooling
(Btuh)
(Btuh)
14301
2`316
5176
4.631
n/a
3319
5439
3.599
n/a
587
2492
1445
27408
15897
n/a
3179
2740.8
19076
I
Carole Christensen, CertifedEnerUAnalyst
TITLE -24 ENERGY CALCULATIONS November 27, 2000
ENERGY CALCULATIONS FOR:
Southwest Concepts
82-723 Dr. Carreon. Blvd.
Indio, CA 92201
PROJECT: J. Paul Residence
457$ s :ft. Custom Home
5'5-6Cherry Hills
La Quinta, CA 92253
Standard Design Proposed Design. Compliance Margin
51.66 49.82 +1.84
CTZ 15 - 34.8% fenestration
Credit taken for Radiant Barrier
Dual fenestration, Low E(2) Default, Lt. Blinds
Walls,R-21; Roof R-38,
Duct R.4.2; AFUE 80%•, SEER 1.3.0
Two 50 gal gas water heaters EF. 60; Recirc/TimeTemp
One 75 gal gas water heater, Recirc/TimeTemp.
CONTENTS
CF -1R
MF -1R
C -2R
C -3R
;HVAC Sizing GN��r N -t
CITY OF LA IDUINTA
BUILDING ETY DEPT.
APPROVED
FOR CONSTRUCTION
DATE IV-14UM BY
47 -596 -Lake Canyon Drive, Aguanga, CA W36
1-800-735-8152
Member'CABEC - California Association of Building Energy Consultants
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
****-***
Pr-oject Address......,.. 55-685 Cherry Hills
La Quinta, CA *v5.10*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen
47-596 Lake Canyon Drive Plan Check Date
Aguanga, CA 92.536
800--735-8152 Field Check/ Date
Climate Zone. ...... 15
Compliance Method...... MICROPAS5 v5.1.0 for 1998 Standards by Enercomp, Inc.
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program" -FORM CF -1R
User4-.MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh
GENERAL INFORMATION
Conditioned.Floor Area..... 4578 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Front Facing 90 deg (E)
Number of Dwelling Units... 1
Number of Stories... ...... 1
Floor Construction Type.... Slab On Grade
Glazing Percentage......... 34.8 % of floor area
Average Glazing U -value.... 0.65 Btu/hr-sf-F
Average Glazing SHGC....... 0.41
Average Ceiling Height..... 11.6 ft
BUILDING SHELL INSULATION
Component
Frame
Cavity
Sheathing Total Assembly
Type
Type
R -value
R -value R -value U -value
Location/Comments
Wall
Wood
R-21
R-0
R-21 0.05,9
'Wall
Wood
R-17.8
R'-0
R-17.8 4.064"
To mech, To garage
Roof Radiant Wood
R-11
R-27
R-38 0.025
flat
SlabEdge
None
R-0
R-0
F2=0.76,0
To outside
SlabEdge
None
R-0
R-0
F2=0.510
to garage
Door
None
R-0
R'-0
R-0 0.330
to garage
Wall
Wood
R-0
R-0
R-0 0.386
FENESTRATION
Over -
Area
U-
Interior
Exterior
hang/
Orientation
(sf)
Value
SHGC Shading
Shading
Fins
Door
Front (E)
48.0
0.650
0.400 Standard
B1dShade
None
Window
Front (E)
1.6.0
0.650
0.400 Standard
Standard
None
Window
Front (E)
20.0
0.650
0.400 Standard
B1dShade
None
Window
Front (E)
24.0
0.650.
0.400 Standard
Standard
Yes
Window
Front. (E)
24.0
0.650
0.4.00 Blind
Standard
Yes
Door
Front (E)
40.0
0.650
0.400 Blind
Standard
Yes
Window
Front (E)
20.0
0.650
0.400 Blind
Standard
Yes
Window
Front. (E)
20.0
0.650
0.400 Blind
Standard
Yes
Door
Front (E)
40.0
0.650
0.400 Blind
Standard
Yes
Window
Front (E)
12.0
0.650
0.400 Blind
Standard
None
Window
Left (S)
9.0
0.570
0.700 Standard
BldShade
None
Window
Left (S)
15.0
0.650
0.400 Blind
B1dShade
None
Window
Left (S)
40.0
0.650
0.400 Blind
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ1.5S9.2 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run-vblo,e80:13R21.38.4 3wh
FENESTRATION
Over -
Area
U-
Interior
Exterior hang/
Orientation
(sf)
Value
SHGC
Shading
Shading Fins
Door
Left
(S)
40.0
0.650
0.400
Standard
Standard
None
Window
Left
(,S)
40.0
0.650
0.400
Standard
Standard
None
Window
Left
(S)
40.0
0.650
0.400
Standard
BldShade
None
Window
Left
(S)
8.0
0.570
0.700
Blind
Standard
None
Window_
Left
(S)
25.0
0.650
.0.400
Standard
BldShade
None
Door
Left
(S)
40.0
0.650
0.400
Standard
BldShade
None
Window
Left
(S)
70.0
0.650'
0.400
Blind
Standard
Yes
Window
Left
(S)
36.0
0.650
0.400
Blind
Standard
Yes
Window
Back
(W)
40.0
0.650
0.400
Blind
Standard
None
Window
Back
(W)
60.0
0.650
0.400
Blind
Standard
Yes
Door
Back
(W)
90.0
0.650
0.400
Blind
Standard
Yes
Door
Back
(W)
160.0
0.650
0.400
Blind
Standard
Yes
Window
Back
(W)
40.0
0.650
0.400
Blind
Standard
Yes
Window
Back
(W)
36.0
0.650
0.400
Blind
Standard
Yes
Door
Back
(W)
160.0
0.650
0.400
Blind
Standard
Yes
Window
Back
(W)
13.3
0.570
0.700
Standard
Standard
Yes
Window
Right
(N)
12.0
0.650
0.4.00
Blind
BldShade
None
Window
Right
(N)
36.0
0.650
0.400
Blind
Standard
Yes
Window
Right
(N)
48.0
0.650
0.400
Blind
Standard
Yes
Door
Right
(N)
120,.0
0.650
0.400
Blind
Standard
Yes
Window
Right
(N)
16.0
0.650
0.400
Blind
Standard
Yes
Door
Right
(N)
80.0
0.650
0.400
Blind
Standard
Yes
Window
Right
(N)
13.3
0.570
0.700
Standard
Standard
None
Window
Right
(N)
1.5.0
0.650
0.400
Blind
Standard
None
Skylight
Horz
16.0
0.750
0.400
None.
None
None
Skylight
Horz
9.0
0.750
0.4.00
None
None
None
SLAB SURFACES
Area
Slab
Type
(sf)
Standard
Slab 1127
THERMAL
MASS
Area 'Thickness
Type
Exposed
(sf)
(in)
Location/Comments
S1abOnGrade
Yes
1.123
3.5
marble/tile
SlabOnGrade
Yes
311
3.5
marble/tale
S1abOnGrade
No
129.8
3.5
framing/carpet/cabinets
S1abOnGrade
No
719
3.5
framing/carpet/cabinets
InteriorHorz
Yes
194
1.0
cabinet/vanity tops
InteriorHorz
Yes
28
1.0
cabinet/vanity tops
CERTIFICATE OF
COMPLIANCE: RESIDENTIAL
Page 3
CF -1R
Project Title.......... J.Paul Residence
Date..11/27/00.
16:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User --Carole Christensen, Run-vbloe8.6.13R21.38.4 3wh
HVAC SYSTEMS
•
Minimum Duct Duct Tested,Duct
ACCA
Thermostat
Equipment Type
Efficiency Location R -value Leakage
Manual
D Type
Furnace
0.800 AFUE Attic R-4.2 No
No
Setback
ACSplit
13.00 SEER Attic R-4.2 No
No
Setback
Furnace
0.8,00 AFUE Attic R-4.2 No
No
Setback
ACSplit
13.00 SEER Attic R-4.2 No
No
Setback
Furnace
0.800 AFUE Attic R-4.2 No
No
Setback
ACSplit
13.00 SEER Attic. R-4.2 No
No
Setback
WATER HEATING SYSTEMS
Number
Tank.
External
in Energy
Size
Insulation
Tank Type
Heater Type Distribution Type System Factor
(gal)
R -value
1ZDHW
Storage
Gas Recirc/TimeTemp 1 0.60
50
R- n/a.
2ZDHW
Large
Gas Recirc/TimeTemp 1 n/a
75
R-0
3 ZDHW
Storage
Gas Recirc/TimeTemp 1 0.60
50
R- n/a
WATER HEATING SYSTEMS DETAIL
Standby Internal
Tank
Recovery Rated Loss Insulation
Pilot
System
Efficiency Input Fraction R, -value
Light
2ZDHW
Large
0.792 n/a 0.022 R-n/a
0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
*** Items
in this section should be documented on,the
plans,
***
** installed
to manufacturer and CEC.specifications,
and
***
** verified
during plan check and field inspection.
***
This building
incorporates a Radiant.Barrier.
This building
.incorporates non-standard Fenestration Shading.
This building
incorporates a High Mass Design.
This building
incorporates non-standard Water Heating System
REMARKS
1 Zone ='Ent/Din/Kit./Fam/Liv/Hall
- zoned as Living
2 Zone = Master
Suite - zoned.as Sleeping
3 Zone = Guest
Bedrooms hall and laundry - zoned as Living
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF -1R
Project Title.......... J.Paul Residence `Date:.11/27/00 16:0.3:39
MICROPAS5 v5.10 File-,JPAUL Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh
REMARKS
,COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California- Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
Name.... Stephen R. Nieto
Company. SouthWest Concepts
Address. 82-723 Dr. Carreon Blvd.
Indio, CA 92201
Phone... (76W 352-5555
License.
Signed.. S
ate
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
ate
DOCUMENTATION AUTHOR
Name.... Carole Christensen
Company. Carole Christensen
Address. 47-596 Lake Canyon Drive
Aguanga, CA 9.2.536
Phone... 800-735-8152
Signed..
ate.
ertified Energy Analyst
Carole Christensen, CEPE
r r R 98-99-239
rr
CADEC
California Association of Building Energy Consultww
COMPUTER METHOD SUMMARY Page 1. C -2R
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
Project Addre s........ 55-6"85 Cherry Hills *******
La Quinta, CA *v5.10*
Documentation Author... Carole Christensen
Carole Christensen
47-59Z Lake Canyon Drive
Aguanga, CA 92536
800-735-8152
Climate Zone 15
Building Permit
Plan C:ec Date
Field Check/ Date
Compliance Method...... MICROPAS5 v5.10 for 1998.Standards by Enercomp, Inc.
MICROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP10'17 User -Carole Christensen Run-vbloe8&.13R21.38.4 3wh
Zone Type
1ZONE
MICROPAS5 ENERGY USE SUMMARY
Energy Use
(kBtu/sf -yr)
Space Heating.........
Space Cooling..........
Water Heating..........
Standard
Proposed
Compliance
Design
Design
Margin
4.31
5.70
-1.39
41.13
35.52
5.61
6.22
8.60
-2.38
Total 51.66 49.82 1.84.
*** Building complies with Computer Performance ***
GENERAL INFORMATION
Conditioned Floor Area.....
Building Type ..............
Construction Type .........
Building Front Orientation.
Number of Dwelling Units...
Number of Building Stories.
Weather Data Type..........
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -value....
Average Glazing SHGC.......
Average Ceiling Height....:.
4578 sf
Single Family Detached
New
Front Facing 90 deg (E)
1
1
ReducedYear
Slab On Grade
3
53112 cf
4578 sf
34.8 's of floor area
0.6.5 Btu/hr-sf-F
0.4.1
11.6 ft
BUILDING ZONE INFORMATION
Floor # of Vent Vent Air
Area Volume Dwell Cond- 'Thermostat Height Area Leakage
(sf) (cf) Units itioned Type (ft) (sf) Credit
Residence 2421 30326 0.52 Yes Setback 2.0 Standard No
2.ZONE
Residence 1.127 1.248.6 0.25 Yes Setback 2.0 Standard No
3ZONE
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title.......... J.Paul Residence 'Date..11/27/00 16:03:39
MICROPAS5 v5..10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh,
BUILDING ZONE INFORMATION
Floor
# of
Vent
Vent Air
Area
Volume
Dwell
Cond=
Thermostat Height
Area Leakage
Zone Type
(sf)
(cf)
Units
itioned
Type (ft)
(sf) Credit
Residence
1030
10.300
0.23
Yes
Setback 2.0 Standard No
OPAQUE SURFACES
Area
U-
Insul
Act
Solar
Form 3
Location/
Surface
(sf)
value
R-val
A,zm Tilt
Gains
Reference
Comments
1ZONE
.1
Wall
206
0.0.59
21
90
90
Yes
W.2.1.2X6.16
2
Wall
4
0.0.59
21
90
90
No
W. 2'1.2X6.16
3
Wall
144
0.0:59
21
90
90
Yes
W.21.2X6'.16
7
Wall
130
-0.0,59
21
1.80
90
Yes
W.21.2X6.16
8
Wall
20
0.059
21
180
90
No
W.21.2X6.16
9
Wall
254
0.0,59
21
180
90
Yes
W.21.2X6.16
10
Wall
2:25
0.0,59
21
180
9:0
No
W.21.2X6.16
11
Wall
84
.0.064
17.8
90
90
No
GWALL.R1.9
To meth
13
Wall
148
0.059
2.1
270
90
Yes
W.21.2X6.16
15
Wall
154
0.059
21
0
90
Yes
W.21.2X6.16
16
Wall
28
0.05.9
21
0
9'0
Yes
W.21.2X6.16
21
RoofRadiant
239'6
0.02<5
38
n/a
0
Yes
R.38.2X4.24F
flat
2ZONE
4
Wall
48
0.05.9
21
90
90
Yes
W.21.2X6.16
14
Wall
83
0.0-59
21
2`70
90
Yes
W.21.2X6.16
17
Wall
375
0.0.59
21
0
90
Yes
W.21.2X6.16
19
Wall
70
0.064
17.8
90
90
Yes
GWALL.R19
To meth
22
RoofRadiant
1127
0.025
38
n/a_
0
Yes
R.38.2X4.24F
flat
3ZONE
5
Wall
10
0.059
21
180
90
Yes
W.21.2X6.16
6
Wall
1,61
0.059
21
180
90
No
W.21.,2X6.16
12
Wall
45
0.059
21
270
90
Yes
W.21.2X6.16
18
Wall
202
0.059
21
0
90
Yes
W.21.2X6.16
20
Wall
340
0.064
11.8
90
90
Yes
GWALL.,R19
To garage
23
RoofRadiant
10.30
0.025
38
n/a
0
Yes
R.38.2X4.24F
flat
30
Door
24
0.330
0
90
90
No
None
to garage
PERIMETER LOSSES
Length
F2
Insul
Solar
Surface
(ft)
Factor
R-val
Gains
Location/Comments
1ZONE
24 .SlabEdge
201
0.76.0
R-0
No
To outside
27 S1abEdge
6
0.510
R-0
No
to garage
2ZONE
25 S1abEdge
66
0.760
R-0
No
To outside
28 S1abEdge
6
0.510
R-0
No
to garage
3 ZONE
26 SlabEd'ge,
363
0.760
R-0
No
To outside
29 S.labEdge
35
0.510
R-0
No
to garage
COMPUTER METHOD SUMMARY Page '3 C -2R
Project Title.......... J.Paul. Residence Date..11/27/00 16:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.3'8.4 3wh
Orientation
1ZONE
1 Door
2 Window
3 Window
4 Window
5 Window
6 Door
7 Window
8 Window
9 Door
10 Window
14 Door
15 Window
16 Window
17 Window
18 Window
19 Door
20 Window
21 Window
23 Window
24 Door
25 Door
26 Window
27 Window
30 Window
31 Window
38 Skylight
3.9 Skylight
2ZONE
28 Door
29 Window
32 Window
33 Door
34 Window
3ZONE
,11 Window
12 Window
13 Window
22 Window
35 Door
36 Window
.37 Window
FENESTRATION SURFACES
Area U- Act Exterior Shade Interior Shade
(sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC
Front
(E)
48.0'0.650
0.400
90
90
BldShade/0.2
Standard/0.68
Front
(E)
16.0'0.650
0.4:00
90
90
Standard/0.76
Standard/0.68
Front
(E)
20.0 0.650
0.4:00
90
90
B1dShade/0.2
Standard/0.68
Front
(E)
24.0'0.650
0.400
90
90
Standard/0.76
Standard/0.68
Front
(E)
24.60.650
0.400
90
90
Standard/0.76
Blind/0.47
Front
(E)
40.0''0.650
0.400
90
90
Standard/0.76
Blind/0.47
Front
(E)
20.0"0.650
0.400
90
90
Standard/0.7'6
Blind/0.47
Front
(E)
20.e 0.650
0.400
90
90
Standard/0.76
Blind/0.47
Front
(E)
40.0' 0..650
0.4.00
90
90
Standard/0.76
Blind/0.47
Front
(E')
12.0'0.650
0.400
90
190
Standard/0.76
Blind/•0.47
Left
(S)
40.0'0.650
0.4.00
180
90
Standard/0.76
Standard/0.68
Left-
(S)
40.9'0.650
0.400
1.80
90
Standard/0.76
Standard/0.68
Left
(S)
40.0'0.650
0..400
180
90
BldShade/0.2
Standard/0.68
Left
(S)
8.0^0.570
0.700
180
90
Standard/0.76
Blind/0.47
Left
(S)
25.00.650
0.4.00
180
90
B1dShade/0.2
Standard/0.68
Left
(S)
40.0'0.650
0.400
180
90
B1dShade/0.2
Standard/0.68
Left
(S)
70.9,,0.650
0.400
180
90
Standard/0.76
Blind/0.47
Left
(S)
36 '0.650
0.400
18,0
90
Standard/0.'76
Blind/0.47
Back
(W)
60.0'0.650
0.400
270
90
Standard/0.76
Blind/0.47
Back
(W)
90.0'0.650
0.400
270
90
Standard/0.76
Blind/0.47
Back
(W)
1.60.0%'0..650
.0.400
270
910
Standard/0.76
Blind/0.47
Back
(W)
40.0'0.650
0.400
270
90
Standard/0.76
Blind/0.4.7
Back
(W)
36.0,"0.650
0.400
270
90
Standard/'0.76
Blind/0.47
Right,
(N)
12.@0.650
0.400
0
90
B1dShade/0.2
Blind/0.47
Right
(N)
36.f O .6.50
0.400
0
90
Standard/0.76
Blind/'0.47
Horz
16.0 0.750
0.400
90
0
None/1
None/1
Horz
9.0 0.750
0.400
90
0
None/1
None/1
Back
(W)
16'0"0 0.650
0.400
270
90
Standard/0.76
Blind/0.47
Back.
(W)
13 .3' 0 . 570
0.700
270
9`0
Standard/0.76
Standard/'O.,68
Right
(N)
4.8.0-0.650
0.400
0
90
Standard/0.76
Blind/0.47
Right
(N)
120.9/0.650
0.400
0
90
Standard/.0.76
Blind/0.47
Right
(N)
16.0 0.650
0..400
0
90
Standard/0.76
Blind/0.47
Left
(S)
9.VO .570
0.700
180
90
B1dShade/0.2
Standard/0.68
Left
(S)
15.0''0.650
0.400
180
90
B1dShade/0.2
Blind/0.47
Left
(.S)
40.-0 0.650
0.400
180
90
Standard/0.76
Blind/0.47
Back
(W)
40.-e 0.650
0.400
270
90
Standard/0.76
Blind/0.47
Right
(N)
8,0,.@' 0.65'0
0.400
0
90
Standard/0.76
Blind/0.47
Right
(N)
13.3^0.570
0.700
0
90
Standard/0.76
Standard/0.68
Right
(N)
15.00.650
0.400
0
90
Standard/0.76
Blind/0.47
COMPUTER METHOD SUMMARY Page 4 C -2R
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
MI.CROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP10,17 User -Carole Christensen. Run-vbloe80.13R21.38.4 3wh
Surface
1ZONE
4 Window
5 Window
6 Door
7 Window
8 Window
9 Door
20 Window
21 Window
23 Window
24 Door
25 Door
26 Window
27 Window
31 Window
2ZONE
28 Door
29 Window
32 Window
33 Door
34 Window
3ZONE
35 Door
Surface.
OVERHANGS AND SIDE FINS
Window- Overhang Left.Fin Right Fin -
Area Left Rght
(sf) Wdth Hgth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght
24.0 8.0
24.0 8.0
40.0 8.0
20.0 8.0
`20.0 8.0
40.0 8.0
70.0 10.0
36.0 6.0
60.0 10.0
90.0 10.0
160.0 10.0
40.0 2.5
,36 .0 6.0
36.0 6.0
160.0 10.0
13.3 3.4
:48.0 8.0
120.0 10.0
16.0 4.0
1ZONE/2ZONE
1 Wall
3 Door
2ZONE/3ZONE
2 Wall
Area
(sf)
3.0
3.0
0..0
8.0
9.0
8.0
7.0
0.0
9.0
24.0
0.0
3.0
3.0
0.0
0.0
16.0
0.0
7..0
0.0
0.0
0.0
0.0
5.0
3.0
0.0
3.0
12.0
3.0
7.0
0.0
12.0
24.0
0.0
2.5
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
2.5
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
7.0
3.0
0.0
3.0
0.0
0.0
0.0
0.0
0..0
16.0
0.0
6.0
2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
6.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
9.0
3.0
0.0
n/a
n/a
n/a
n./a
n/a
n/a
n/a
n/a
16.0
4.0
0.0
0.0
0..0
0.0
5.0
0.0
0.0
9.0
0.0
16.0
1.0
0.0
0.0
0.0
0.0
5.0
0.0
0.0
8.0
0.0
6.0
2..0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
6.0
2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
16.0
5.0
0.0
0.0
0.0
0.0
5.0
0.0
0.0
7.0
0.0
4.0
3.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
6.0
2.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
2.0
0.0
12.0
3.0
0.0
0.0
0.0
0.0
8.0
0.0
0.0
16.0
0.0
2.0
1.5
0.0
0.0
0.0
0.0
1.5
0.0
0.0
1.5
0.0
10.0
3.0
0.0
1.0
3.0
1.0
3.0
0.0
3.0
3.0
0.0
INTER -ZONE SURFACES
Insul
Form
3
U -value
R-wal
Reference
Location/Comments
53.9
.0.386
R-0
40
0.330
R-0
200
0.386
R-0
W.0.2X4.16
None
W.0.2X4.16
SLAB SURFACES
Area
Slab Type (sf)
2ZONE
Standard Slab 1127
COMPUTER METHOD SUMMARY Page 5 C -2R
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#.--MP1017 User -Carole Christensen Run-vbloe801.13R21.38.4 3wh
Mass Type
1ZONE
1 S1abOnGrade
3 S1abOndtade
5 InteriorHorz
3ZONE
2 S1abOnGrade.
4 S1abOnGrade
6 InteriorHorz
Minimum Duct
THERMAL MASS
ACCA
Duct
Area
Thick
Heat
Conduct-
.Manual
Surface
1ZONE
(sf)
(in)
Cap
ivity
UIMC
R -value
Location/Comments
1123
3.5
28.0
0.98
4.60
R-0.0
marble/tile
129.8
3.5
28.0
0.98
1.&0
R-2:0
framing/carpet/cabinet
194
1.0
24.0
0.67
1.70
R-0.0
cabinet/vanity tops
311
3.5
28.0
0.98
4.60
R-0.0
marble/tile
719
3.5
28.0
0.9,8
1.80
R-2.0
framing/carpet/cabinet
28
1.0
24.0
0.67
1.70
R-0.0
cabinet/vanity tops
R-4.2
No
No
HVAC SYSTEMS
WATER HEATING
Minimum Duct
Duct Tested Duct
ACCA
Duct
System Type
Efficiency Location
R -value
Leakage
.Manual
D Eff
1ZONE
Furnace
0.800 AFUE Attic
R-4.2
No
No
0.74.3
ACSplit
13.00 SEER Attic
R-4.2
No
No
0.637
2ZONE
Furnace
0.800 AFUE Attic
R-4.2
No
No
0.743
ACSplit
13.00 SEER Attic
R-4.2
No
No
0.637
3ZONE
Furnace
0.800 AFUE Attic
R-4.2
No
No
0.743
ACSplit
13.00 SEER Attic
R-4.2
No
No
0.637
WATER HEATING
SYSTEMS
Number
Tank
External
in
Energy
Size.
Insulation
Tank Type
Heater Type Distribution Type System
Factor
(gal)
R=value
1ZDHW
1 Storage
Gas Recirc/TimeTemp
1
0.60
50
R- n/a
2ZDHW
2 Large
Gas Recirc/TimeTemp
1
n/a
75
R-0
3ZDHW
3 Storage
Gas Recirc/TimeT,emp
1
0.60
50
R- n/a
WATER HEATING SYSTEMS
DETAIL
Standby
Internal
Tank
Recovery Rated
Loss
Insulation
Pilot
System
Efficiency, Input
Fraction
R -value
Light
2ZDHW
2 Large
0.792 n/a
0.022
R-n/a
0
COMPUTER METHOD SUMMARY Page 6 C -2R
Project Title........... J,Paul Residence Date..11,/27/00 .16:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh
SPECIAL,FEATURES AND MODELING ASSUMPTIONS
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a Radiant Barrier.
This building incorporates non-standard Fenestration Shading:.
This building incorporates a.High Mass Design.
This building incorporates non-standard Water Heating System
REMARKS
1 Zone = Ent/Din/Kit/Fam/Liv/Hall - zoned as Living
2 Zone = Master Suite. - zoned as Sleeping
3 Zone = Guest Bedrooms hall and laundry - zoned as.Living
CONSTRUCTION ASSEMBLY Page 1 3R
Project Title.......... J.Paul Residence Date..11/27/00 1.6:03:39
MICROPAS5 v5.10: File-JPAUL Wth-CTZ15S92 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R2:1.3°8.4 3wh
Parallel Path Method
Reference Name . W.21.2X6.1.6
Description .... Wall R-2'1 2x6 16oc
Type Wall
R -Value 21 Hr-sf-F/Btu
Framing
Material FIR.2X6
Type ......... Wood.
Description .. 2x6 fir
Spacing ...... 16 inches on center
Framing Frac.. 0.15
Sketch of Construction Assembly
LIST
OF CONSTRUCTION COMPONENTS
Material
Cavity
Frame
Name
Description
R -Value
R=Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
STUCCO.0.88
0.875 in stucco
0.17
0..17
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3c:
BATT.R21
R-21 batt insul (cavity = 5.5 in)
21.00
--
3f.
FIR.2X6
2x6 fir
--
5.45
4.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.WLL
Inside air film: heat sideways
0.68
0.68
Total'Unadj'usted R -Values 22.54
6.98
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing
Total
U -Value: (1 / 22.54 x 0.85) + (1 / 6.98 x 0.15) =
0.059 Btu/hr-sf-F
Total R -Value: 1 / 0.059 = 16.89 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 2 3R
Project Tit.le.......... J.Paul Residence Date..11/'27/00 16:03:39
MICROPAS5 v5..10 File-JPAUL Wth-CTZ15,S92 Program -FORM 3R
User#-MP1.017 User -Carole Christensen Run-vbloe80.13R2.1.38.4 3wh
Parallel Path Method
Reference Name . GWALL.R19
Description .... Wall R-19 2x6 16oc
Type Wall
R -Value 17.8 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type ..... Wood
Description .. 2x6 fair
Spacing 16 inches on center
Framing°Frac.. 0.15
Sketch.of Construction Assembly
LIST
OF CONSTRUCTION COMPONENTS
Material
Cavity
Frame
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
GY.P.0.50
0.50 in gypsum or plaster board
0.45
0.45
3C.
BATT.R19
R-19 batt insul (cavity = 5.5 in)
17.80
--
3f.
FIR.2X6
2x6 fir
--
5.45
4.
GYP.0.50
0.50 in gypsum or plaster board
0,.45
0.4.5
I.
FILM.IN.WLL
Inside air.film: heat sideways
0.68
0.68
Total Unadjusted R -Values
19.55
7.19
FRAMING
ADJUSTMENT CALCULATION
Cavity Framing Total
U -Value: (1 /
19.55 x 0.85) + (1 / 7.19 x 0.15) = 0,.064
Btu/hr-sf-F
Total
R -Value:
1 / 0.064 = 15.55
hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 3 3R
Project Title........... J..Paul Residence Date..11/27/00 1.6:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe80,13R21.38.,4 3wh
Parallel Path Method
Reference Name R.38.2X4.24F
Description .... Roof R-38 2x4 24oc
Type ........... Roof
R -Value 38 Hr-sf-F/Btu
Framing
Material ..... FIR.2X4
Type Wood
Description .. 2x4 fir
Spacing .... 24 inches on center
Framing Frac.. 0.07
Sketch of Construction Assembly
LIST
OF CONSTRUCTION COMPONENTS
Material
Cavity
Frame
Name
Description
R -Value R
-Value
O.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
BUILTUP.0.38
0.375 in built-up roofing
0.33
0.3.3
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3.
PLY.0.50
0..50 in plywood
0.62
0.62
4.
AIR.RF.3.5.0
3.5 in & greater air space: heatflow up
0.80
0.80
5.
BATT.R27.0
R-27 batt insulation
27.00
27.0,0
6c.
BATT.RII.0
R-11 batt insul (cavity >.3.5 in)
11.00
--
6f.
FIR:2X4
2x4 fir
--
3.46
7.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.RF
Inside air film;: heat flow straight up
0.61
0.61
Total'Unadjusted R -Values
41.04
33.51
FRAMING
ADJUSTMENT
CALCULAT.I'ON
Cavity Framing Total
U -Value:
(1 / 41.04 x 0.93) + (1 / '33.5.1 x 0.07) = 0.025
Btu/hr-sf-F
Total
R -Value:
1 / 0.025 = 40.40
hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 4, 3R
.Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
MICRO.PAS5 v5.10 File-JPAUL Wth-CTZ15S9'2 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh
Parallel Path Method
Reference Name . W.0.2X4.16
Description .... Wall R-0 2x4 16.oc
Type ........... Wall
R -Value ........ 0 Hr-sf-F./Btu
Framing
Material .. FIR.2X4
Type .. Wood
Description .. 2x4 fir
Spacing ...... 16 inches on center
Framing Frac... 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
FRAMING ADJUSTMENT CALCULATION
Cavity
U -Value: (,1 / 2.38 .x 0.85), + (1 /
Framing
5.00 x 0.15) =
Total
0.386 Btu/hr-s.f-F
Total R -Value: 1 / 0.386 = 2.59 hr-sf-F/Btu
Material
Cavity
Frame
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
STUCCO.0.88
0.875 in stucco
0.17'
0.17
2.
BLDG.,PAPER
Building paper (felt)
0.06
0.06
3c,
AIR.WLL.3.50
3.5 in & greater air space: heat sidewys
0.85
--
3f.
FIR.2X4:
2x4 fir
--
3.46.
4,.
GYP.0.50
0.50 in gypsum or plaster board
0.4.5
0.45
I.
FILM.IN.WLL
Inside air film: heat sideways
0.68
0.68
Total Unadjusted R -Values
2.38
5.00
FRAMING ADJUSTMENT CALCULATION
Cavity
U -Value: (,1 / 2.38 .x 0.85), + (1 /
Framing
5.00 x 0.15) =
Total
0.386 Btu/hr-s.f-F
Total R -Value: 1 / 0.386 = 2.59 hr-sf-F/Btu
HVAC SIZING Page 1 HVAC
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
*******
Project Address........ 55-685 Cherry Hills
La Quinta, CA *v5.10*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen
47-596 Lake Canyon Drive Plan Check.. Date
.Aguanga, CA 92536
800-735-8152 Field Check/ Date
Climate Zone. ........ 15
Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc.
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S,92 Program -HVAC SIZING
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.3°8.4 3wh
GENERAL INFORMATION
Floor Area .................
Volume.. ........
Front Orientation..........
Sizing Location............
Latitude ....................
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design.......
Summer Inside Design.......
Summer Range ...............
Interior Shading Used......
Exterior Shading Used..:....
Overhang Shading Used......
Latent Load Fraction.......
Description
4.578 sf
531.12, cf
Front Facing
PALM DESERT
33.7 degrees
32 F
70 F
112 F
78 F
34 F
No
No
No
0.20
HEATING AND COOLING LOAD SUMMARY
9 0 deg (E)
Heating Cooling
(Btuh) (Btuh)
Opaque Conduction and Solar....... 2992:8 7992
Glazing Conduction ............... 39.275 35,141
Glazing Solar .............. n/a 40464
Infiltrat.ion..................... 2804.6 18560
Internal Gain .................... n/a 25.50
Duct.s............................. 9725 10471
Sensible Load .................... 106973 115177
Latent. Load ...................... n/a 23035
Minimum Total Load 106973 138,212
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC'SIZING Page 2 HVAC
Project Title......:.:. J.Paul Residence Date..1.1/27/00 16:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -HVAC SIZING
User#-MP1017 User -Carole Christensen. Run-vbloe80.13R21.38.4 3wh
HEATING AND COOLING LOAD SUMMARY BY ZONE
ZONE '1ZONE'
Floor Area.... ..................
24.2:1 sf
Volume ............ ........ ....
Volume ...........................
303.26 cf
Heating
Description
Heating
Cooling
Description
(Btuh)
(.Btuh)
Opaque Conduction and Solar......
11334
3960
Glazing Conduction ...............
25314
226.49
Glazing Solar ....................
n/a
2944.6
Infiltration .....................
1.6014
10597
Internal Gain .....................
n/a
13'2.6
Ducts ............................
5266
6798
Sensible Load ....................
57928
74777
Latent Load .......................
n/a
14955
Minimum Zone Load
ZONE '.2ZONE'
57928
Floor Area................. .....
1127 sf
Volume ............ ........ ....
1248.6 cf
Heating
Description
(Btuh)
Opaque Conduction and Solar......
4391
Glazing Conduction ................
8785
Glazing Solar ....................
n/a
Infiltration. .... ............
6593
Internal Gain ....................
n/a
Ducts ............................
1977
Sensible Load...... 21746
Latent Load ...................... n/a
Minimum Zone Load 21746
89733
Cooling
(Btuh)
1792
7860
7699
4363
638
2235
2458'7
4917
2'9504
1
HVAC SIZING Page 3 HVAC
Project Title.......... J.Paul Residence Date..11/27/00 16:03:39
MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S9'2 Program -HVAC SIZING
User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh
ZONE 13ZONEI
Floor Area ................... .. 1030' sf
Volume. 1030,0 ,cf.
Description
Heating Cooling
(Btuh) (Btuh)
Opaque Conduction and Solar...... 14202 2239
Glazing Conduction ............... 5176 4631
Glazing Solar .................... n/a 3319
Infiltration......... 5439 3599
Internal Gain .................... n/a 5.87
Ducts.............. ................ 2482 1438
Sensible Load ................. 27299 1.5813
Latent Load ...................... n/a
Minimum Zone Load 2729°9
3163
18975
I
Cap
Catole Christensen, Certified Energy Analyst
TITLE -24 ENERGY CALCULATIONS October 11, 2000
ENERGY CALCULATIONS FOR:
Southwest Concepts
82-723 Dr. Carreon Blvd.
Indio, CA 92201
PROJECT: J. Paul Guest House
470 sq.ft. Custom Home
55-685 Cherry Hills
La Quinta, CA 92253
Standard Design Proposed Design Compliance Margin
111.90 111.03 +0.87
CTZ 15 - 32.3% fenestration
Dual fenestration, Default,. Std. Drape
Walls R-19; Roof R-38,
Duct R.4.2; AFUE 80%; SEER 12.0
One 50 gal gas water heaters EF.58
CONTENTS
CF -1R
MF -1R
C -2R
C -3R
HVAC Sizing
CF -6R
IC -1
515 Co.�5
cel -2'-C la-�
CITY OF LA UINTA
RHILDING & SAFEV DEPT.
AP'P'ROVED
FOR CONSTRUCTION
DATE 1jill eo BY
47-596 Lake Canyon Drive; Aguanga; CA 92536
1-800-735-8152.
Member'CABEC - California. Association of Building Energy Consultants
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R
Project Title.......... J.Paul Guest House Date..10/11/00 07;0.3:51
U �11 *******
Project Address........ .55.-685 C erry Hi s
La Quinta, CA *x5.10*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen
47-596 Lake Canyon Drive Plan Check Date
Aguanga, CA 92536
800-735-8152 Field Check/ Date
Climate Zone. ..... 15
Compliance Method....... MICROPAS5 v5.10 for 1998 Standards by Enercomp,, Inc.
MICROPAS'5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run -
GENERAL INFORMATION
Conditioned Floor Area.....
Building Type ..............
Construction Type .
Building Front Orientation.
Number of Dwelling Units...
Number of Stories.. .....
Floor Construction,Type....
Glazing Percentage.........
Average Glazing U -value....
Average Glazing SHGC.......
Average Ceiling Height.....
Component Frame
Type Type
Wall
Wall
Roof
S1abEdge
SlabEdge
. Orientation
Wood
Wood
Wood
None
None
470 sf
Single Family Detached
New
Front Facing 0 deg (N)
1
1
Slab On Grade
3:2.3 k of floor area
0.72 Btu/hr-sf-F
0.73
10 ft
BUILDING SHELL INSULATION
Cavity Sheathing Total Assembly
R -value R -value R -value U -value Location/Comments
R-17.8 R-0 R-17.8 0.065
R-1.7.8 R-0 R-17.8 0.064 To mech
R-11 R-27 R-38 0.025 flat
R-0 R-0 F2=0.760 To outside
R-0 R-0 F2=0..5.10 to garage
FENESTRATION
Area U- Interior Exterior
(sf) Value SHGC Shading Shading
Over-
hang/
Fins
Window
Front
(N)
30.0
0.720
0.730
Blind
B1dShade
None
Window
Front
(N)
6.7
0.570
0.7.00
Standard
Standard
None
Window
Left
(E)
30..0
0.720
0.730
Blind
Standard
Yes
Window
Right
(W)
75.0
0.720
0.730
Blind
Standard
Yes
Window
Right
(W)
1.0.0
0.870
0.700
Blind
B1dShade
None
X30.1 :M461114:910)DK
Area
Slab Type (sf)
Standard Slab 470
CERTIFICATE OF
COMPLIANCE: RESIDENTIAL
Page 2
CF -'1R
Project Title.......... J.Paul Guest House
Date..10/1.1/00
07:03:51
MI'CROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run -
HVAC SYSTEMS
Minimum Duct Duct Tested Duct ACCA Thermostat
Equipment Type, Efficiency Location R -value Leakage Manual D Type
Furnace 0..800 AFUE Attic R-4.2 No No Setback
ACSplit 12.00 SEER Attic R-4.2 No No Setback
WATER HEATING SYSTEMS
Number Tank External
in Energy Size Insulation
Tank Type :Heater Type Distribution Type System Factor (gal) R -value
Storage Gas Standard 1 0.58 50 R- n/a
SPECIAL FEATURES AND MODELING ASSUMPTIONS
**'* Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates non-standard Fenestration Shading..
REMARKS
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R
Project Title.......... J.Paul Guest House Date..10/11/00 07:03:51
MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM CF -1R
User#-MP1017 User -Carole Christensen Run -
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions, section.
DESIGNER or OWNER.
DOCUMENTATION AUTHOR
Name....
Stephen R.
Nieto
Name.....
Carole Christensen
Company.
SouthWest
Concepts
Company.
Carole Christensen
Address.
82-723 Dr.
Carreon Blvd.
Address.
47-5.96 Lake Canyon Drive
Indio, CA
92.201
Aguanga, CA 92536
Phone...
(760) 352-5555
Phone...
800-735--8152
License.
Signed..
Signed..
at
ate
ENFORCEMENT
AGENCY
Name....
Title...
Agency..
Phone...
Signed..
ate
Certified Energy Analyst
Carole Christensen, CEPE
rrr-P r r -
R 9&99-M
CABEC
CaIMbwdo Association of DuNding Energy Comimm
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 1 on) MY -IR
Note: i„owrise residential buildings subject to the Standards must contain, these measures regardless of the compliance approach used,
ms marked with an asterisk (•) .may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance: When this checklist is•incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable.
DESCRIPTION
DESIGNER
ENFORCEMENT
'Building Envelope Measures:
• §130(a): Minimum R-19 ceiling insulation..
§150(b): Loose fill insulation manufacturer's labeled IkValue.
N14-
• § 150,(c): Minimum R-13 wall insulation in wood framed walls:or equivalent U -value fit, metal frame walls
(does not apply to exterior mass walls),
• §150(d): Minimum R-13 raisedfloor insulation in framed floors.
N
§ 150(1),:, Slab edge. insulation - water absorption rate no.greater than 0.3%, water vapor transmission rate
no greater than 2:0 pennn/inch..
§118: Insulation specified or installed meets insulation quality -standards. Indicate type and,form.
§,116-1.7 Fenestration, Products, Exterior Doors, and lnfiltration/Exfiltration Controls
I . Doors and windows between conditioned and unconditioned, spaces:designed to limit air leakage.
2. Fenestration products (except.field-fabricated)have label with certified 0 -value, certified Solar Heat
Gain Coefficient (SHGC), and infiltration certification.
.3. Exterior doors acid windows weatherstripped; all joints and penetrations caulked and sealed.
§ISG,` Vapor barriers mandatory in Climate Zones 14 and 16 only.
N
§ 150(f): Special infiltration barrier installed to comply with § 151 meets:Commission quality standards.
§150(e)! Installation of Fireplaces, Decorative Gas Appliances and Gas1ogs.
I,.Masonry and factory -built fireplaces.have:
a. Closeable metal. or glass door
b. Outside air intake with damperand control
c. Flue damper and control
2. No continuous burning gas pilot lights allowed.
Space Conditioning, Water Heating and Plumbing System Measures:
110-§113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
§ I50(h): Heating andior cooling loads calculated in accordance with ASHRAE, SMACNA or ACOA.
§150(i): Setback thermostat on all applicable heating and/or cooling systems.
§1500): Pipe and tank insulation
1. Storage gas water heaters rated with an Energy Factor less than'0.58 must beexternally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest.to water heatertank, non -recirculating systems, insulated (R4 or greater)
3_13ack-up tanks for solar system, unflred,storage tanks, orother indirect hot water tanks have R-12
external insulation or R-16 combined intemal/extemal insulation.
4..A1l buried or exposed piping insulated in recirculating sections of hot water systems.
5.(- ag system piping.below 55• F insulated.
6. Piping insulated between heating source and indirect hot water tank.
July 1,1999
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 2 of 2) MF -1R
Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of thecompliance approach.used.
Items marked with an asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated.into the permit documents, the features noted shall be consideredby all parties as
minimum component performance specifications for the mandatory measures whether they art shown elsewhere in the documents
or on. this checklist only.
Instructions: Check or initial applicable boxes when completed or enter N/A if not; applicable.
DESCRIPTION
DESIGNER
ENFORCEMENT
Space Conditioning, Water Heating and Plumbing System Measures: (continued)
• § 150(m): Ducts and Fans
1. All ducts and plenums constructed, installed, insulated, fastened, and -scaled to comply with the ICBO
1997 UMC sections 601 and 603; ducts insulated to a minimum, installed R4.2 or ducts enclosed
entirely within conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant or other
ductclosure system that meets the applicable requiremetns of UL181, ULIBIA, or ULIBIB and other
applicable specified tests for longevity given in §150(m)..
2. Exhaust fan systems have back draft or automatic dampers.
3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible,
/
/
manually operated dampers.
VVV
§ 114: Pool and Spa Heating Systems and"Equipment.
1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating
instructions, no electric resistance heating -and no pilot light.
2. System is installed with:
•. At least 36" of pipe between filter. and heater for future solar heating.
`- b. Cover for outdoor pools or outdoor spas. .
3. Pool system has directional inlets and a circulation pump time switch.
§ 115: Gas fired central furnaces, pool heaiers,:spa heaters or household cooking appliances have no
continuously buming.pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Bw/hr)
(/
Lighting Measures:
§ 150(k)l.: Luminaires for general lighting In kitchens shall have lamps with an efficacy of 40
lumens/watrorgreater for general lighting in kitchens. This general lighting shall be controlled by a
switch on a readily accessible. lighting control panel at an entrance to the kitchen.
v
§ 150(k)2.: Rooms with a shower or bathtub must either have at least one luminaire with lamps with an
efficacy of 40 lumens/watt or greater.switched at the entrance to the room ozone of the alternatives to
this requiremental lowed in § I30(k)2.; and recessed ceiling.fixtures:are IC (insulation cover) approved.
July 1, 1999
COMPUTER METHOD SUMMARY Page 1 C -2R
Project Title........... J.Paul Guest House Date..10/11/00 07:03:51
Project A cess........ 55-685 C =cry Hi s
La Quinta, CA *v5.10*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen
47-596 Lake Canyon Drive Plan Check Date
Aguanga, CA 92536
800-735-8152 Fie C ec Date
Climate Zone.. ..... 15
Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc.
MICROPAS5 x5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM C -2R
User#-MP1017 User, -Carole Christensen Run-
.MICROPAS5
ENERGY USE
SUMMARY
Energy Use
Standard
Proposed
(kBtu/.sf-yr-)
Design.
Design
Space Heating..........
4.18
5.2.4
Space.Cooling....... ...
68.04
70.99
Water Heating..........
39.68
34.80
Total
1.11.90
1.1.1.03
Compliance
Margin
-1.06
-2.95
4.8'8
0.87
*** Building complies with Computer Performance *'**
GENERAL INFORMATION
Conditioned Floor Area...... 470 sf
Building Type .............. Single Family Detached
Construction Type .. ... New
Building Front Orientation. Front Facing O deg (N)
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type.......... ReducedYear
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade. Area.........
Glazing Percentage..........
Average Glazing U -value,....
Average Glazing SHGC.......
Average Ceiling Height.....
Slab On Grade
1
4700 cf
470 sf
32.3 % of floor area
0.72 Btu/hr-sf-F
0.73
10 ft
BUILDING ZONE INFORMATION
Floor # of
Area Volume Dwell Cond- Thermostat
Zone Type (sf) (cf) Units itioned Type
HOUSE
Residence 470 4700 1..00 Yes Setback
Vent
Vent
Air
Height
Area
Leakage
(ft)
(sf)
Credit
2.0 Standard No
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title........... J.Paul Guest House Date..10/11/00 07:03:5.1
MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM C -'2R
User#-MP1017 User -Carole Christensen Run -
OPAQUE SURFACES
PERIMETER LOSSES
Location/
Comments
To meth
flat
Area
U-
Insul.
Act
Solar
Form 3
Surface
(sf)
value
R-val
Azm
Tilt Gains
Reference
HOUSE
HOUSE
Dpth Hght Ext
Ext
Ext Dpth Hght
Ext Dpth Hght
HOUSE
1
Wall
143
0.065
17.8
0
90 Yes
W.19.2X6.16
2
Wall
45
0.065
17.8
0
90 No
W.19.2X6.16
3
Wall
225
0.065
17.8
90
90 Yes
W.19.2X6.16
4
Wall
160
0.065
17.8
180
90 Yes
W.19.2X6.16
5
Wall
65
0.065
.17.8
270
90 Yes
W.19.2X6.16
6
Wall
90
0.065
17.8
27`0
90 'Yes
W.19.2X6.16
7
Wall
70
0.064
1.7.8
0
90 Yes
GWALL.R19
8
Roof
470
0.025
38
n/a
0 Yes
R.38.2X4.24F
PERIMETER LOSSES
Location/
Comments
To meth
flat
OVERHANGS AND SIDE FINS
Length
F2
Insul
Solar
Right Fin -
Area
Surface
(ft)
Factor
R-val
Gains
Location/Comments
(sf.)
HOUSE
Dpth Hght Ext
Ext
Ext Dpth Hght
Ext Dpth Hght
HOUSE
9 S1abEdge
88
3 Window
0.7.60
R-0
1.5 0'.0 2.0
No
To outside
2.0 1.5 0.0
4 Window
10 S1abEdge
7
1.0 0.0 n/a
0.510
R-0
n/a n/a n/a
No,
to garage
FENESTRATION
SURFACES
Area
U-
Act
Exterior Shade
Interior Shade
Orientation
(sf)
Value
SHGC
Azm
Tilt Type/SHGC
Type/SHGC
HOUSE
1
Window Front
(N)
30.0
0..720
0.730
0
90
B1dShade/0.2
Blind/0.47
2
Window Front
(N)
6.7
0.570
0:700
0
90
Standard/0.76
Standard/0.68
3
Window Left
(E)
30.0
0.720
0.730
90
90
Standard/0.76
Blind/0.47
4
Window Right
(W)
75.0
0.720
0.730.270
90
Standard/0.76
Blind/0.47
5
Window Right
(W)
10.0
0.870
0.700
270
90
B1dShade/0.2
Blind/0.47
OVERHANGS AND SIDE FINS
SLAB SURFACES
Area
Slab Type (sf)
HOUSE
Standard Slab 470
Window-
Overhang
Left Fin
Right Fin -
Area
Left
Rght
Surface
(sf.)
Wdth Hgth
Dpth Hght Ext
Ext
Ext Dpth Hght
Ext Dpth Hght
HOUSE
3 Window
30.0
5.0 6.0
1.5 0'.0 2.0
2.0
2.0 1.5 0.0
2.0 1.5 0.0
4 Window
75.0
10.0 7.5
1.0 0.0 n/a
n/a
n/a n/a n/a
n/a n/a n/a
SLAB SURFACES
Area
Slab Type (sf)
HOUSE
Standard Slab 470
COMPUTER METHOD SUMMARY Page 3 C -2R
Project Title ........... J.Paul Guest House Date.,.10/11/0.0 0'7:0:3:51
M.ICROPAS5 x5.10 File-JPAULGST' Wth-CTZ15'S'92 Program -FORM C -2R
User#-MP1017 User -Carole Christensen Run -
System Type
HOUSE
Furnace
ACSplit
Tank Type.
1 Storage
Minimum
Efficiency
HVAC SYSTEMS
Duct Duct Tested Duct ACCA
Location R -value Leakage Manual D
0.800 AFUE Attic -4.2 No
12.00 SEER Attic R-4.2. No
WATER HEATING SYSTEMS
Number
in
Heater Type Distribution Type System
Gas Standard
'i
Duct
Eff
No 0.743
No 0.596
Tank
External
Energy Size
Insulation
Factor (gal)
R -value
0.58 50
R- n/a,
SPECIAL FEATURES AND MODELING ASSUMPTIONS
** Items in this section should,be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check .and field inspection. ***
This building incorporates non-standard Fenestration Shading.
REMARKS
CONSTRUCTION ASSEMBLY Page 1 3R
Project Title.......... J.Paul Guest House Date..1.0/11/00 07:03:51
MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S'92 Program -FORM 3R
User#-MP1017 User -Carole Christensen Run -
Parallel Path Method
Reference Name . W.19..2X6.16'
Description Wall R-19 2x6 16oc
Type ........... Wall
R -Value 17.8 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type Wood
Description ... 2x6 fir
Spacing 16 inches on center
Framing Frac.. 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Total R -Value:
1 / 0.065 = 15.28 hr-sf-F/Btu
Material
Cavity
Frame
Name.
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter Value
0.17
0.17
1.
STUCCO.0.88
0.875 in stucco
0.17
0.17
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3c.
BATT.R19
R-19 batt insul (cavity = 5.5 in)
17.80
--
3f.
FIR.2X6
2x6 fir
--
5.45
4.
GYP.,0.50
0.50 in gypsum or ,plaster board
0.45
0.45
I.
FILM.IN.WLL
Inside air film: heat sideways
0.68
0.68
Total Unadjusted R -Values
19.34
6.98
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing Total
U -Value: (1 / 19.34 x 0.85) .+ (1 / 6.98 x.0.15) = 0.065
Btu/hr-sf-F
Total R -Value:
1 / 0.065 = 15.28 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 2 3R
Project Title.......... J.Paul Guest House Date..10/11/00 07:03:51
MICROPAS'5 x5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM 3R
User#-MP1.017 User -Carole Christensen Run -
Parallel Path Method
Reference Name GWALL.R19
Description .... Wall R-19 2x6 16oc
Type Wall
R -Value 17.8 Hr.-sf-F/Btu
Framing
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material.
Name Description
0. FILM. EX
1. GYP. 0. 5 0
3c. BATT.R19
3f. FIR.2X6
4. GYP. 0.50
I. FILM.IN.WLL
Material ..... FIR.2X6
Type .. Wood
Description 2x6 fir
Spacing ....... 16 inches on center
Framing Frac.. 0.15
Exterior air film: winter value
0..50 in gypsum or plaster board
R-1.9 batt insul (cavity = 5.5 in)
2x6 fir
0.50 in gypsum or plaster board
Inside air film: heat sideways
•FRAMING ADJUSTMENT CALCULATION
Cavity
Cavity Frame
R -Value R -Value•,
G.17
0.4.5
17.80
0.45
0.68
Total Unadjusted R -Values 19.55
Framing
Total
U -Value: (1 / 1.9.55 x 0.85) + (1 /
7.19
x 0.15) _
0.064
Btu/hr-sf-F
Total R -Value:
1 /
0.064 =
15;.55
hr-sf-F/Btu.
0.17
0.45-
5.45
0.45
0.68
7.19
CONSTRUCTION ASSEMBLY Page 3 3R
Project Title.......... J.P.aul Guest House Date..10/11/00 07:03:51
MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM 3R
User#-MP10.17 User -Carole Christensen Run -
Parallel Path Method
Reference Name . R.38.2X4.24F
Description .... Roof R-38 2x4 24oc
Type Roof
R, -Value ........ 38 Hr-sf-F/Btu
Framing
Material ......FIR.2X4
Type ......... Wood
Description ... 2x4 fir
Spacing ...... 24 inches on center
.Framing Frac.. 0.07
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Name. Description
O. FILM.EX Exterior air film: winter value
1. BUILTUP.0.38 0.375 in built-up roofing
2. BLDG.PAPER Building paper (,felt)
3. PLY.0.50 0.50 in plywood
4. AIR.RF.3.50 3.5 in & greater air space: heat flow up
5. BATT.R27.0 R-27 batt insulation
6c. BATT.RI.1.0 R-11 batt insul (cavity >3.5 in)
6f. FIR.2X4 2x4 fir
7. GYP.0.50 0.50 in gypsum or plaster board
I. FILM.IN.RF .Inside air film: heat flow straight up
'FRAMING ADJUSTMENT CALCULATION
Cavity
Cavity
Frame
R -Value
R -Value
0.17
0.17
0.33
0.33
0.06
0.06
0.62
0.62
0.80
0.80
27.00
27.00
11.00
--
--
3.46
0.45
0.45
0.61
0.61
Total Unadjusted R -Values 41.04 33.51
Framing
Total
U -Value: (1 /
41.04 x 0.93) + (1 / 33.51
x 0.07) =
0.025
Btu/hr-sf-F
Total R -Value:
1 /
0.025 =
40.40
hr-sf-F/Btu
HVAC SIZING Page 1 HVAC
Project Title.......... J.Paul Guest House Date..10,/11/00 07:03:51
Project Address........ 55-685 Cherry Hills *******
La Quinta, CA *v5.10*
Documentation Author... Carole Christensen ******* Building Permit
Carole Christensen,
47-596 Lake Canyon Drive Plan Check./ Date
Aguanga, CA 92536
800-735-8152 Field Check/ Date
Climate Zone. ..... 15
Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc.
MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -HVAC SIZING
User#-MP1017 User -Carole Christensen Run -
GENERAL INFORMATION
Floor Area .................. 470 s'f
volume.. ..... ............. 4700 cf
Front Orientation.......... Front Facing 0 deg (N)
Sizing Location............ PALM DESERT
Latitude... .... ........ 33.1 degrees
Winter Outside Design...... 32 F
Winter Inside Design........ 70 F
Summer Outside Design...... 112 F
Summer I-nside Design....... 78 F
Summer Range. .. .... . ...:34 F
Interior Shading Used ...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Sensible Load.... ....... ...... 12.928 19770
Latent Load ....................... n/a 3954
Minimum Total Load 12928 23724
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment., oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
Heating.
Cooling
Description
(Btuh)
(Btuh)
Opaque Conduction and Solar......
5.102
2292
Glazing Conduction ...............
4169
3730
Glazing Solar ....................
n/a
7758
Infiltration ......................
2482
1642
Internal Gain..... ....................
n/a
2550
Ducts ............................
1175
1797
Sensible Load.... ....... ...... 12.928 19770
Latent Load ....................... n/a 3954
Minimum Total Load 12928 23724
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment., oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
INSTALLATION CERTIFICATE (Page 1 of '7) CF -6R
Site Address Permit Number
.An installation certificate is required to be posted at the building site or made available -for all appropriate inspections. (The
information -provided on this foam is required;, however, use of this form to provide.the information is optional.) After
completion..of final inspection, a copy must be provided to the building department (upon request) and the building owner at
occupancy, per Section 1:0-103(b).
HVAC SYSTEMS:
Heating Equipment
'Equip. # of Efficiency Duct Duct or Heatipg Heating
Type (pkg. CEC.Certified Mfr Name Identical (AFUE, etc.)' Location Piping Load Capacity
heat pump) and Model Number systems I2CF-1R valuel (attic etc Y R -value (Btu/hr) (B ,/hri
Cooling Equipment
Equip. CEC Certified Compressor k of Efficiency Duct Cooling Cooling
Type (pkg. Unit Mfr: Name>and Identical (SEER„etc.)' Location Duct Load Capacity
heat nump) Model Number Systems 2CMR valuel (attic_ etc.). R -value (Btulhr) (Btu!_h_rl
1. > reads greater than or equal to:
I, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more
efficient than that specified in the certificate of compliance (Form CF4R) submitted for compliance with the Energy
Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements
for manufactured devices (from the Appliance Efciency Regulations or Part 6), where applicable..
Signature, Date Installing Subcontractor (Co. Name)
OR General Contractor (Co. Name) OR Owner
WATER HEATING SYSTEMS:
Distribution If Recir- # of Rated Tank E1fi- External
Heater CEC Certified M e, Type (Std, culation, Identical' Input (kW Volume ciency2 Standby' Insulation
Type Name&Model Number Point -of -Use) Control.Type Systems or Btu/lu) (gallons) (EF, RE) Loss (%) R -value'
2 For small gasistorage (rated input of less than or equal to 75,000 Btu/hr), electric resistance and heat -pump water heaters, IistEnergy Factor.
.For large gas storage water heaters (rated input -of greater than 75,000 Btu/hr), list Recovery Efficiency, Standby Loss sa d.Rated lnput:
For instantaneous gas water heaters, list Recovery Efficiency. and Rated Input:
3. R-12 external insulationis mandatory for storage water heaters. iith:an energy factor of less than 0.58.
Faucets & Shower Heads:
All faucets and showerheads installed are certified to the Commission, pursuant to Title 24, Part 6, Section 111.
I, the undersigned, verify that -equipment listed above my signature is: t) the actual equipment installed; 2) equivalent
to or more efficient than that specified in the certificate of compliance -(Form CF -IR) submitted for compliance with
the Energy.Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate
requirements for manufactured devices (from the Appliance Efficiency Regulations or Part;6), where<applicable.
Signature, Date
COPY TO:. Building.Department
HERS Provider (if applicable)
Building Owner at Occupancy
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
a
July 1, 1999
INSTALLATION CERTIFICATE (Page 2 of 7) CF -6R
Site Address Permit Number
FENESTRATION/GLAZING:
Total
Quantity Interior or
Product Product of Like Exterior Shading
U -Value' (5 SHGC' (5 q of Product Square Deviee'or Comments/Location%
Manufacturer/Brand-Name. CF -1R value)' CF- IRvaluel Penes (Optional) 'Feet Overhana SnecialFeatures
(GROUP'LIKE PRODUCTS)
1.
2. —
3. _
4. _
5.
6. _
7. _
9.
pp. —
—
12..
13.
14: —
15.
' Manufactured fenestration products use the values from the product label. Field fabricated fenestration products use the
default values from Section 116 of the Energy Efficiency Standards.
_ lnstalled U -value must be less than or equal to values from CF -1R. Installed SHGC must be less than or equal to values
from CF -1R, or a shading device (interior; exterior or overhang) is installed as specified on the CF -1R. Alternatively,
installed, weighted average U -values for the total fenestration area are fess than orequal to values from CF -1 R.
1, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product
installed; 2) is equivalent to or has a lower U -Value and lower SHGC than that specified in, the certificate of
compliance (Form CF -1R) submitted for compliance with'the Energy Efficiency Standards for residential buildings;.
and.'3.) the product meets or exceeds the appropriate. requirements for manufactured devices (from Part 6), where
applicable.
ltem #s. Signature, Date Installing Subcontractor (Co. Name) OR
(if applicable) General Contractor (Co. Name) OR Owner
OR Window Distributor
Item #s -
(if'applicable)
.Item ;#s
(if applicable)
Signature, Date Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner-
OR Window Distributor
Signature, Date Installing Subcontractor (Co: Name), OR
General Contractor (Co. Name) OR .Owner
OR Window Distributor
COPY TO: Building Department
HERS Provider (if applicable)
Building Owner at Occupancy
July 1" 1999
INSTALLATION CERTIFICATE (Page 3 of 7) CF -6R
Site Address Permit Number
DUCT DIAGNOSTICS
This building obtained compliance credit for: ❑ Duct sealing ❑ Duct Area Reduction
❑ ACCA Manual :D design and installation
CREDIT -FOR REDUCED DUCT
SURFACE AREA OR LOCATION
Duct Location* Exterior Measured
Surface Exterior
Area Surface
Area
❑ Attic
❑ Crawlspace
❑ Basement
❑ Other
ACCA Design
❑ Duct Design on Plans
❑ Installed duct diameters match plans
❑ TXV installed
❑ Access to TXV valve (if installed)
❑ No TXV, Fan air flow (CFM)
Duct Sealing
❑ Duct Leakage. Measured
❑Measured.leakage (CFM)
*Ignore ducts in , HVAC Fan air flow (CFM) (measured or calculated as.
conditioned. space. ❑CFM,= 0.7 x Aflorn for CZ 8 through 15
Only a check is ❑CFM 0.5 x Afla,,, for CZ I through 7 & 16
required for
location credit. or, if the equipment size .is known, the larger of 1 or 2.
1. ❑CFM = 400 x Cooling Capacity in Tons or
2. ❑CFM = 21.7 x Heating Capacity in Thousands of Btu per hour)
Leakage divided by HVAC Fan air flow (must be:5 0.06).
For AEROSOL TYPE SEALANTS ONLY The following diagnostic testing: was completed:
❑ Duct Fan Pressurization at rough -in measured leakage CFM) CHECK AFTER FINISHING WALL::
❑ Pressure pan test ❑ House pressurization test ❑ Visual Inspection of Duct Connections.
Provide Follow-up Test.Results or Inspection Results on a Separate Page
❑ This certifies thatthe duct surface area and duct locations were verified.
When compliance credit is claimed for duct surface area reductions and duct location improvements beyond those covered
by default assumptions, builder employees or subcontractors shall certify that they have verified that the duct surface, area
and locationsmatch those on the plans: and .shall indicate the! duct surfacearea in each duct location on the CF -6R.
❑ This is to certify that the above diagnostic test results and the work:I performed associated with the test(s) is in
conformance with the requirements for compliance credit. [The builder shall provide the HERS provider a copy of the CF -
6R signed by the builder employees or sub -contractors certifying that diagnostic testing and installation meet the
requirements for compliance credit.]
Tests.
Performed
COPY TO:
Signature, Date Installing Subcontractor (Co: Name) OR
General Contractor (Co. Name)
Building Department
HERS Provider (if applicable)
Building Owner at Occupancy
July 1, 1999
INSTALLATION CERTIFICATE (Page 4 of 7) CF -6R
Site Address Permit Number
BUILDING ENVELOPE LEAKAGE
DIAGNOS'T'ICS
This building obtained. compliance credit for: ❑ Envelope sealing using diagnostic testing (CF -1R)
Diagnostic Testing .Results
Needed for Compliance Measured
(from CF -1 R) Blowerdoor Test
Results
Building Envelope Leakage (CFM @ 50 Pa)
Leakage level equivalent to an SLA of 3.0 from CF -1 R
Minimum Building Leakage equivalent to an SLA of 1.5
from CF -1 R (CFM c@ 50 Pa)
❑ Yes ❑ No Is design leakage less than the SLA 3.0 equivalent (from CF -1R)?
❑ Yes ❑ No Is mechanical ventilation installed? (Required if design is .less than 3.0 SLA)
❑ Yes ❑ No Is..measured.leakage (without fans operating) less than, minimum in the above Table (1.5 SLA from
CF -1R)?
❑ Yes ❑ No Is mechanical supply ventilation installed to assure house pressure does not: go below minus 5 Pascal
relative to outside ambient with all exhaust fans operating?
Mechanical Ventilation — Fill in Table if mechanical ventilation is installed
Used for Compliance Measured
(from CF -1 R) Actual
Continuous 'Mechanical Ventilation (CFM)'
Continuous Mechanical Supply Ventilation (CFM)
Required to maintain -5 Pa if building
envelope leakage is less than minimum (see
above)
Total Power Consumption of Continuous
Mechanical Ventilation (Wafts) 2
❑ This certifies. that the building envelope leakage was verified..
When compliance credit is claimed for building leakage reduction below default assumptions, builder employees or
subcontractors. shall certify that:they have verified that the building leakage level matches that.used for compliance on the
CF -1 R and shalldocument the leakage levels required for compliance and the tested infiltration values on the CF -611.
❑ This is to certify that ;the above diagnostic test results and the work I performed associated with the test(s) is in
conformance with: the.requirements for compliance credit. [The builder shall provide the HERS provider a copy of the
CF -6R signed by the builder employees or sub -contractors certifying that diagnostic testing and installation meet•the
requirements for compliance credit.]
Test Performed Signature
COPY TO: Building. Department
HERS Provider (if applicable)
Date
Testing Subcontractor (Co. Name) OR
General Contractor (Co. Name)
' When mechanical ventilation. is required, CEM less than 0.047 CFM per square foot of conditioned floor area indicates
failure to achieve compliance.
s As determined from label on. fan or manufacturers literature.
July 1, 1999
INSTALLATION CERTIFICATE (Page 5 of 7) CF -6R
Site Address Permit Number
The following is an explanation ofmany of the input values required on this form:
HVAC SYSTEMS
Heating Equipment Type must be one of the following:
Furnace:
Gas (including Liquefied Petroleum Gases) or oil -fired central furnace &
space heater
Boiler:
Gas or oilfired boiler
PckgHeatPump:
Packaged central heat pump
SplitHeatPump:
Split central heat pump
RoomfleatPump:
Room heat pump
LgPkgHeatPumpc
Large packaged heat pump 2 65,000 Btu/hr output)
Electrici
Electricxesistance heating (fixed.HSPF = 3.413); radiant electric resistance
(fixed HSPF = 3.55).
CombinedHydro:
Reference•water heater under water heating systems below
CEC Certified Manufacturer Name & Model Number from applicable Commission approved appliance directory.
# of Identical Systems is forthose systems with the same efficiency, duct location, duct R -value and capacity.
Efficiency from applicable Commission certified appliance directory.
Duct (or Piping) Location is attic, crawl space, CVC crawl space, conditioned space, unconditioned space or none.
Duct:(or Piping) R -Value from Directory of Certified Insulation Materials and/or manufacturer's data.
Heating/Cooling Load refer to Commission approved load calculation procedure.
Heating/Cooling Capacity from the applicable. Commission certified appliance directory. Note: location elevations over
2,000 ft above sea level require a derating of output capacity (refer to manufacturer's literature).
Cooline Eduinment Tvoe must be one of the following:
SplitAirCond:
Split system air conditioner
PckgAirCond:
Packaged air conditioner
Split Heat Pump;
Split system heat pump
PckgHeatPump:
Packaged heat pump
RoomHeatPump:
Room heat pump
LgPkgHeatPump:
Large packaged;heat pump (2t 65,000.Btu/hr output). Substitute.EER for SEER
when SEER is not available
RoomAirCond:
Room air conditioner. Minimum SEER varies"
LgPkgAirCond:
Large packaged air conditioner (Z 65,000 Btuft output). Substitute EER for
SEER when SEER is not available
EvapDirect:
Direct evaporative cooling system. For compliance calculation ,purposes, fixed
values: SEER = 11.0; duct location = attic; duct insulation R -value = 4.2
EvapIndirect:
Indirect -evaporative cooling system. For compliance calculation purposes, fixed
values; SEER = 13.0; duct location = attic; duct insulation R -value = 4.2
*Refer to Energy Commission publication.Appliance Efficiency Regulations, P400-92-029
July 1, IM
INSTALLATION CERTIFICATE (Page 6 of 7) CF -6R
Site Address Permit Number
The following is an explanation of many of the input values required on this form:.
WATER HEATING SYSTEMS
Distribution Systems Refer to Residential Manual for more details:
Standard:
Standard —Supply pressure based system, no pumps
Pipe Insulation:
Pipe Insulation on all 3/4 -inch pipes
POU/HWR:
Point of Use/Hot Water Recovery System
Recirc/NoControl:
Recirculation loop with no controls
Recirc/Timer:
Recirculation loop with a timer
Recirc/Temp:
Recirculation loop with temperature. control
Recirc/Time+Temp:
Recirculation. loop with a timer and temperature control
Reeire/Demand:
Recirculation loop with demand control
Water Heater Tuve
Storage Gas, Oil. or Electric
Heat Pump
Instantaneous Gas
Instantaneous Electric
Large, Storage Gas.
Indirect Gas (Boiler)
FENESTRATION/GLAZING
Information Needed
Energy Factor
Recovery Efficiency
Standby Loss
Rated Input
Yes
No
No
No,
Yes
No
No
No
No
Yes
No
No
Yes
No
No
No
TIo
Yes
Yes
Yves
No
Yes (AFUE)
No
Yes
Fenestration:
Windows, sliding glass doors, French doors, skylights, garden windows, and
any door with more than one square foot of glass
Operator Type:
Slider, hinged,, fixed
U -Value:
Installed U=value must be less than or,equal to value from CF -1R
OR
Installed weighted average U -value for the total -fenestration area is less than
orequal to value from CF- l R
SHGC:
Installed SHGC must be less than or equal to value from CF -IR
OR
Installed weighted SHGC for the total fenestration area is less than or equal
to value from CF -1 R
OR
An interior shading device, overhang, or exterior shading device is installed
consistent with the CF -1R
Shading Device:
Include when the building complied using an interior shading device: blinds,
opaque roller shades, blinds (do not .list draperies), an exterior shading
device: woven sunscreen, louvered sunscreen, low sun:angle sunscreen, roll -
down awning, roll -down blinds or slats (do not list bug screen), or an
overhang include depth in feet
July 1, 1999
INSTALLATION CERTIFICATE (Page 7 of"7) CF -6R
Site Address Permit,Number
The following is an explanation of many of the input values required on,the, Diagnostic portion of this form (page 3 of 6):
TYPE,OF CREDIT
Refer to Residential Manual Chapters 4 and 5 for more details:
Reduced Duct Surface Area:
Calculated as the outside area of the duct. Areas must be measured and
verified by a HERS rater.
Improved Duct Location:
Supply ductlocated in other than attic, as verified by location of registers
(does not require HERS rater verification).
Catastrophic Leakage:
Pressure pan test readings must be less than 1.5 Pascal at a house pressure of
25 Pascal..
TXV:
Access cover required to facilitate verification.
Infiltration Reduction:
Infiltration is measured without mechanical ventilation operating.
Mechanical ventilation is required for very tight house construction when
credits for infiltration reduction using diagnostic testing are being used for
achieving compliance. These very tight houses are defined as those with
SLA of less than I.S. The compliance documentation (CF -1R) will contain
the measured CFM target value from a blower door test at 50 Pascal pressure
difference that represents this SLA: of 1.5. Mechanical ventilation is also
required if the builder chooses to design the building to use mechanical
ventilation and claims a credit for infiltration below an SLA of 10. The
compliance documentation (CF -1R) will contain the measured CFM target
value that represents this 3.0 SLA. .If -the builder claims credit in a design
for infiltration reduction that is at an, SLA of 3.0 or higher, and the actual
measured SLA is 1.5 or greater, then mechanical ventilation is not required.
If the SLA in this case were below 1.5, then mitigation (such as mechanical
ventilation) would be required.
July 1, 1999
INSULATION CERTIFICATE IC -1
Number and Street city
County
Description of Installation
I . .ROOF
Subdlv13lon
Material Brand Name
Thickness (inches) Thermal Resistance (R -Value)
CEILING
Ban or Blanket Type Brand Nacre
Thickness (inches) normal Resistance (R -Value)
Loose Fill Type Brand
Contractor's min installed weight/R' lb Minimum thickness inches
Manufacturers installed weight per square foot to achieve'Ihermal Resistance (R -Value)
3 EXTERIOR WALL
Frame. Type
A. Cavity Insulation
Nfatetial`-
Thickness (inches)
B Exterior Foam .Sheathing
Material
Thickness (inches)
4. RAISED FLOOR
Material
Thickness (inches)
S. SLAB FLOOR/PERIM TER
Material
"thickness (inches)
Peru-neter Insulation Depth (inches)
6. FOUNDATION WALL
Material
Thickness (inches)
Brand Name
Thermal Resistance (R -Value)
Brand Name
Thermal Resistance (R -Value)
Brand Name
Thermal Resistance (R -Value)
Brand Name
Thermal Resistance (R.Value)
Brand Name
Thermal Resistance (R -Value)
Lot Number
Declaration
I hereby certify that the above insulation was installed in the building at the above location In conformance with the current
6, CaliforniaCode of Regula
Energy Efciency Standards for residential buildings (Title 24, Part tions) as indicated on the.
Ccmificateof Compliance, where applicable.
Item as Signature, Date
Item as Signature, Date
item. As , Signature, Date
installing Subcontractor (Co. Name) OR
Ocncml Contractor (Co. Name) OR Owner
Installing Subcontractor (Co. Name) OR
Ocnemi Contractor (Co, Name) OR Owner
Installing Subcontractor (Co. Name) OR
Oeneral Contactor (Co, Name) OR Owner