Loading...
0010-275 (SFD) Title 24f Carole Christensen, Certified Energy Analyst TITLE -24 ENERGY CALCULATIONS ENERGY CALCULATIONS FOR! Southwest Concepts 82-723 Dr. Carreon Blvd. Indio, CA 92201 PROJECT_ : J. Paul Residence 4578 sq.ft. Custom Home La Quinta, CA 92253 June 7, 2001 Standard Design Proposed Design Compliance Margin 51.66 50.13 +1.53 CTZ 15,- 34.8% fenestration Credit taken for Radiant Barrier Dual fenestration, Low E(2) Default, Lt. Blinds Walls R-19; Roof R-38, Duct R.4.2; AFUE 80%; SEER 13.0 Two 5.0 gal gas water heaters EF. 60, Recirc/TimeTemp One 75 gal gas water heater, Recirc/TimeTemp CONTENTS CF -1R MF -1R C -2R C -3R HVAC Sizing. Micropas v5.10 BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE 47-596Lake :Guryon Drive, Aguanga, CA 92536 1-800-735-8152 Member CABEC - California Association of Building Energy Consultants CERTIFICATE OF COMPLIANCE.: RESIDENTIAL Page 1 CF -1R Project Title.......... J.Paul Residence Date..06/07/01 14:26:29 AddPro5 68 Ch H'11 ******* ject rens........ 5 - 5 errys. i La Quinta, CA. *v5.1.0* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 4.7-_596 Lake Canyon Drive Plan Check Date Aguanga, CA 92536 800-735-8152 Field Check/ Date Climate Zone. ..... 15 .Compliance Method...... MICROPAS'5 x5.10 for 1998 Standards by Enercomp, Inc. MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh GENERAL INFORMATION Conditioned Floor Area..... 4578 sf Building Type....... .. Single Family Detached Construction Type ... New Building Front Orientation., Front Facing 90 deg (E) Number of Dwelling Units.... 1. Number of Stories.. ...... 1 Floor Construction Type.... Slab On Grade Glazing Percentage......... 34.8 % of floor area Average Glazing U -value..... 0.6.5 Btu/hr-sf-F Average Glazing SHGC....... 0.41 Average Ceiling Height..... 11.6 ft BUILDING SHELL INSULATION Component Frame Cavity Sheathing Total Assembly Type Type R -value R -value R -value U -value Location/Comments Wall Wood R-17.8 R=0 R=17.8 0.065 Wall Wood R-17.8 R-0 R-17.8 0.06.4 To mech, To garage RoofRadiant. Wood R-1'1 R-27 R-38 0.025 flat SlabEdge None R-0 R-0 F2=0.760 To outside SlabEdge None R-0 R-0 F2=0.510 to garage Door None R-0 R-0 R-0 0.330 to garage Wall Wood R-0 R=0 R-0 0.3.86 FENESTRATION Over - Area U- Interior Exterior hang/ Orientation (sf) Value SHGC Shading Shading Fins Door Front (E) 48.0 0.650 0.400 Standard B1dShad'e None Window Front (E) 16.0 0.650 0.400 Standard Standard None Window Front (E) 20.0 0.650 0.4.00 Standard B1dShade None Window Front ('E) 24.0 0.650 0.4,00 Standard Standard Yes Window Front (E) 24.0 0.650 0.400 Blind Standard Yes Door Front (E) 40.0 0.650 0.400 Blind Standard Yes Window .Front (E) 20.0 0.650 0.400 Blind Standard Yes Window Front (E) 20.0 0.650 0..4.00 Blind Standard Yes Door .Front (E) 40.0 0.650 0.400 Blind Standard Yes Window Front (E) 12.0 0.6,50 0.400 Blind Standard None Window Left (S) 9.0 0.570 0.700 Standard B1dShade None Window Left (S) 15.0 0.650 0.400 Blind B1dShade None. 'Window Left (S) 40.0 0.6.50 0.4.00 Blind Standard None CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R Project Title..........,.. J.Paul Residence Date..06/07/01 14:26:2.9 MICROPAS5 x5.10 File-JPAUL Wth-CTZ115S92. Program -FORM CF -1R User#=MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh FENESTRATION Type S1abOnGrade S1abOnGrade S1abOnGrade SlabOnGrade InteriorHorz. InteriorHorz. Exposed Area Thickness (sf) (in) Location/Comments Over- hang/ Fins None None None None None None Yes Yes None Yes Yes Yes Yes Yes Yes Yes None Yes Yes Yes Yes. Yes None None. None None Yes 1123 3.5 Area U- 311 Interior Exterior Orientation 1298 (sf) Value SHGC Shading Shading Door Left (S) 40.0 0.650 0.400 Standard Standard Window Left (S) 40.0 0.65:0 0.400 Standard Standard • Window Left (S) 40.0 0.650 0.400 Standard B1dShade Window Left (S) 8.0 0.570 0.700 Blind Standard Window Left (S) 25.0 .0.650 0.400 Standard B1dShade Door Left (S) 40.0 0.650 0.400 Standard B1dShade Window Left (S) 70.0 0.650 0.400 Blind Standard Window Left (S) 36.0 0.650 0.400 Blind Standard Window Back (W) 40.0 0.650 0.4.00 Blind Standard Window Back (W.) 60.0 0.650 0.400 Blind Standard Door Back (W) 90.0 0.650 0.400 Blind Standard Door Back (W) 160.0 0.650 0.400 Blind Standard Window Back (W) 40.0 0.650 0.400 Blind Standard Window Back (W) 36.0 0.65:0 0.400 Blind Standard Door Back (W) 160.0 0.6,50 0.400 Blind Standard Window Back (W) 13.3 0.570 0.700 Standard Standard Window Right (N) 12.0 0.6.5.0 0.400 Blind B1dShade Window Right (N) 36.0 0.650 0.400 Blind Standard Window Right (N) 48.0 0.650 0.400 Blind Standard Door Right (N) 120.0 0.650 0.400 Blind Standard Window Right (N) 16.0 0.650 0.400 Blind Standard Door Right (N,) 80.0 0.650 0.400 .Blind. Standard Window Right_ (N) 13„3 0.570 0.700 Standard Standard Window Right (N) 15.0 0.6.50 0.400 Blind. Standard Skylight Hor.z 16.0 0.750 0.400 None None Skylight Horz 9.0 0.750 0.400 None None SLAB SURFACES Area Slab Type (sf) Standard Slab 1127 THERMAL MASS Type S1abOnGrade S1abOnGrade S1abOnGrade SlabOnGrade InteriorHorz. InteriorHorz. Exposed Area Thickness (sf) (in) Location/Comments Over- hang/ Fins None None None None None None Yes Yes None Yes Yes Yes Yes Yes Yes Yes None Yes Yes Yes Yes. Yes None None. None None Yes 1123 3.5 marble/tile Yes 311 3.5 marble/tile No 1298 3.5 framing/carpet/cabinets No 719 3..5 framing/carpet/cabinets Yes 194 1.0 cabinet/vanity tops Yes 28 1.0 cabinet/vanity tops CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R Project Title.......... J.Paul. Residence Date..06/07/01 14:26:29 MICROPASS v5.10 File-JPAUL Wth-CTZ15'S92 Program, -FORM CF -1R User#-MP1017 User -Carole Christensen Run-vbloe8.0.13R19.38.4 3wh HVAC SYSTEMS WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation System Efficiency Input. Fraction R -value 2ZDHW Large 0.792 n/a 0.02.2 R-n/a Pilot Light 0 SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on;:the plans, *** *** installed to manufacturer and CEC specifications, and *** ***verified during plan check and field inspection. *** This building incorporates a Radiant Barrier. This building incorporates non-standard Fenestration Shading. This building incorporates a High. Mass Design. This building incorporates non-standard Water Heating System REMARKS 1 Zone = Ent/Din/Kit/Fam/Liv/Hall - zoned as Living 2 Zone = Master Suite - zoned as Sleeping 3 Zone = Guest Bedrooms hall and laundry - zoned as Living Minimum Duct Duct Tested Duct ACCA Thermostat Equipment Type Efficiency Location R -value Leakage Manual D Type Furnace 0.800 AFUE Attic R-4.2 No No Setback ACSplit 13.00 SEER Attic R-4.`2 No No Setback Furnace 0.800 AFUE Attic R-4.2. No No Setback ACSplit 13.00 SEER Attic R-4.2 No No Setback Furnace 0.800 AFUE Attic R-4.2 No No Setback ACSplit 13.00 SEER Attic, R-4.2 No No Setback WATER HEATING SYSTEMS Number Tank External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gal) R=value 1ZDHW Storage Gas Recirc/TimeTemp 1 0.60 50 R- n/a 2ZDHW Large Gas Recirc/TimeTemp 1 n/a 75 R-0 3ZDHW Storage Gas Recirc/TimeTemp 1 0.60 50 R- n/a WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation System Efficiency Input. Fraction R -value 2ZDHW Large 0.792 n/a 0.02.2 R-n/a Pilot Light 0 SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on;:the plans, *** *** installed to manufacturer and CEC specifications, and *** ***verified during plan check and field inspection. *** This building incorporates a Radiant Barrier. This building incorporates non-standard Fenestration Shading. This building incorporates a High. Mass Design. This building incorporates non-standard Water Heating System REMARKS 1 Zone = Ent/Din/Kit/Fam/Liv/Hall - zoned as Living 2 Zone = Master Suite - zoned as Sleeping 3 Zone = Guest Bedrooms hall and laundry - zoned as Living CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF -1R Project Title.......... J.Paul Residence Date..06/07/01 14:26:29 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh REMARKS This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of.Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features Modeling Assumptions section. Name.... Company. Address. Phone... License. Signed.. Name.... Title... Agency.. Phone... DESIGNER or OWNER DOCUMENTATION AUTHOR Stephen R. Nieto Name.... Carole Christensen SouthWest Concepts Company. Carole Christensen 82-723 Dr. Carreon Blvd. Address. 47-596 Lake Canyon Drive t o, CA 92201 Aguanga, CA 92536 ) 352- 555 Phone... 800-735-81.52 ,6 -4-01 Signed,. . CZu14_&44@, ate ate ENFORCEMENT AGENCY d / Signed.. ate Certitled Energy Anetyet Carole Chdstermm CEPE r r R 98-W239 r-W r C-ADEC Ccaomio Assodadan of Dukhry Energy Comitants MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page I of 2) MF -1R Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when completed.or enter N/A if not applicable. DESCRIPTION DESIGNER 'ENFORCEMENT Building Envelope Measures: • §150(a): Minimum R-19 ceiling insulation. A 150(6): Loose fill insulation manufacturer's labeled R -Value. • §150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U-Faetor.inmetal frame walls / (does not applylo exterior mass walls). V • §150(d): Minimum R-1'3 raised floor insulation in framed floors. p�q� §150(1): Slab edge insulation -water absorption rale no greater than 0.3%, water vapor transmission tate ✓ no greaterthan 2:0 nn/inch. §1.18: Insulation specified or'installed meets insulation quality standards. Indicate type and form. §,116-17: Fenestration Products, Exterior Doors, and Infiltration/Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field -fabricated) have label with certified U, -Factor, . certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windowsweatherstripped; all joints and penetrations caulked and sealed. 150(g): Vapor'barriers mandatory in Climate Zones 14 and 16 only. 019L, 0150(1`): Special'infiltration barrier installed to comply with § 151 meets Commission quality standards. V01101 0150(6): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces haver a. Closeable metal or glass door b. Outside air intake with damper and control c.'Flue damper, andcontrol / 2. No continuous burning gas pilot lights allowed. Space Conditioning, Water Heating and Plumbing System Measures: 01,10-0113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. p 150(h)i Heating and/or cooling loads calculated in accordance withASHRAE, SMACNA or ACOA. 0150(i): Setback thermostat on all applicable heating and/or cooling systems. ✓ 01500): Pipe and tank insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally .wrapped mi& insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks forsolar system, unfired storage tanks, or other indirect.horwater tanks have R-12 extemal�insulationor R-1`6 combined intemallexternal insulation. 4. All buried or exposed piping insulated in recirculating sections of.hot water systems. 5. Cooling, system piping below 55• F'insulated. 6. Piping insulated between heating source and indirect hokwater tank. January 4,:2001 MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 2 42) MF -1R Note: Lowrise residential buildings subject to,the Standards must contain these measures regardless of the compliance approach used: Items marked with an asterisk,(*) maybe superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when. completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT Space Conditioning, WaterNeating and Plumbing System Measures: (continued) ' §150(m): Ducts and Fans 1. All ducts and plenums installed,. sealed and;insulated to meet the requirement of the 1998 CMCSaWons 601, 603, 604, and'Standard 6-3; ducts insulated toa minimunn.histalled lewl.of R4.2 or.enclosed entirely in conditioned space. Openings shall -be sealed with mastic, tape, aerosol,sealant, or other duct -closure system, that meas the applieablevaquirements of UL 181, UL 191 A, or UL 181 B. If mastic or tape is used to seal openings greater than 1/4,, inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air..Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Exhaust, fan systems have back draft. or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, - / manual) operated dampers.v §,114: Pool and Heating Systeins and Equipment. I. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. 2 -System is installed with: a. At least 36" of pipe between filter and,heater future solar heating. b. Cover for outdoor pools or outdoor spas. 3.. Pool system has directional inlets and a circulation pump time.switch. § 115: Gas fired central fumaces;,pool heaters, spa heaters,or household cooking appliances have continuously. burninilot light. (Exception: Non -electrical cooking appliances with pilot -150 BoAr Lighting Measures: §150(k) L:, Luminaires for general lighting in kitchens shall have lamps with an efficacy of 40 lumens/watt or greater -for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panelat an entrance to the kitchen. § 150(k)2.: Rooms with, a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumaWwatt or greater, switched at the entrance to the room or one of the alteratives to this requirement allowed in § 150(k)2.; and recessed coilinit fixtures are IC insulation cover approved. January 4, 2061 COMPUTER METHOD SUMMARY Page 1 C -2R Project Title.......... J.Paul. Residence Date..06/07/01 14:26:29 Project Address........ .55-685 Cherry Hills La Quinta, CA *v5.10* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 47-596 Lake Canyon Drive Plan Check Date Aguanga, CA 92536 800-735-8152 Field Check/ Date' Climate Zone. ..... 15 Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc. MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S9'2 Program -FORM C --2R User#-MP1017 User -Carole. Christensen Run-vbloe80.13R19.38.4 3wh Energy Use ('kBtu/sf -yr) MICROPAS5 ENERGY USE.SUMMARY Standard Proposed Design Design Compliance Margin Space Heating. .... .. 4.3.1 5.76 -1.4.5 Space Cooling.......... 41.1.3 35.77 5.36 Water Heating........... 6..22 8.60 -2.38 Total .51.66 50.13 .1.53 *** Building complies with Computer Performance *** GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front Orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -value.... Average Glazing SHGC....... Average Ceiling Height..... Floor 45.78 sf Single Family New Front Facing 1 1 ReducedYear Detached 90 deg (E) .Slab On Grade 3 53112 cf 4578 sf 34.8' of floor area 0.65 Btu/hr-sf.-F' 0.4.1 11.6'ft BUILDING ZONE INFORMATION # of Volume Dwell Cond- Thermostat (cf) Units itioned Type 30326 0.52 Yes Setback 12486 0.25 Yes Setback Vent Area Zone Type (sf) 1ZONE Leakage Residence 2421 2ZONE. Residence 1127 45.78 sf Single Family New Front Facing 1 1 ReducedYear Detached 90 deg (E) .Slab On Grade 3 53112 cf 4578 sf 34.8' of floor area 0.65 Btu/hr-sf.-F' 0.4.1 11.6'ft BUILDING ZONE INFORMATION # of Volume Dwell Cond- Thermostat (cf) Units itioned Type 30326 0.52 Yes Setback 12486 0.25 Yes Setback Vent Vent Air Height Area Leakage (f t) (sf). Credit 2.0 Standard No 2.0 Standard No DATABASE Page 1 DBASE MICROPAS5 v5.10 Database-JPAUL Program -DATABASE Database-JPAUL FILE AZI- 50.13 5.76 35:77 COM. NAME MUTH STANDARD PROPOSED.MARGIN 5.24 PLY RUN TITLE 1> JPAUL 90 51.66 50.13 1..53 Yes vbloe80.13R19.38.4 3wh 2> JPAULGST 0 111.90 111.03 0.87 Yes FILE AZI- PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED NAME MUTH TOTAL HEATING COOLING FAN DHW l> 2> 1> 2> 1> 2> 1> 2> JPAUL 90 50.13 5.76 35:77 0.00 8.60 JPAULGST 0 111.03 5.24 70.99 0.00 34.80 FILE AZI- STANDARD STANDARD STANDARD STANDARD STANDARD NAME MUTH TOTAL HEATING COOLING FAN DHW JPAUL 90 51.66 4.31 41.13 0.00 6.22 JPAULGST 0 1.11.90 4.18 6.8.04 0.00 39..68 FILE AZI- MARGIN MARGIN MARGIN MARGIN MARGIN NAME MUTH TOTAL HEATING COOLING FAN DHW JPAUL 90 1.53 -1.45 5.36 0.00 -2.38 JPAULGST 0 0.87 -1.06 -2.95 0.00 4.88 FILE AZI- HEATING COOLING COOLING HEATING COOLING NAME MUTH LOAD LOAD SENSIBLE DUCTEFF DUCTEFF JPAUL 90 107557 138784 115,653 0.74.3 0.637 JPAULGST 0 12'928 23724 19770 0.743 0.596 FILE AZI- WEATHER NAME MUTH DATE TIME FILE JPAUL 90 06/07/01 14:26 CTZ15S.92 JPAULGST 0 10/11/00 07:03 CTZ15S92 GOND AREA 4578 470 RUN TITLE vbloe80.13R19.38.4 3wh COMPUTER METHOD SUMMARY Page 2 C -2R Project Title.......... J.Paul Residence Date..06/07/01 14:26:29 MICROPAS5 x5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-vblo.e80.13R19.38.4 3wh BUILDING ZONE INFORMATION Floor # of Vent Vent .Air Area Volume Dwell Cond- Thermostat Height Area Leakage Zone Type (sf) (cf) Units itioned Type (ft) (sf) Credit Residence 1030 10300 0.2.3 Yes Setback 2.0 Standard No OPAQUE SURFACES Area U- Insul Act Solar Form 3 Location/ Surface (sf) value R-vai Azm Tilt Gains Reference Comments 1ZONE 1 Wall 206 0.065 17.8 90 50 Yes W.19.2X6.16 2 Wall 4 0.065 1.7.8 90 90 No W.19.2X6.16 3 Wall 144 0.065 17.8 90 90 Yes W.19.2X6.16 7 Wall 13'0 0.065 17.8 180 90 Yes W.19.2X6.16 8 Wall 20 0.065 17.8 180 90 No W.19.2X6.16 9 Wall 254 0.0.65 17.8 180 9.0 Yes W.19.2X6.16 1.0 Wall 225 0.065 17.8 180 90 No W.19.2X6.16 1.1 Wall 84 0.064 17.8 90 90 No GWALL.R19 To mech 13 Wall 148 0.065 17.8 270 90 Yes W.19.2X6.16 15 Wall 154 0.065 17.8 0 90 Yes W.19.2X6..16 16 Wall 28 0.065 17.8 0 90 Yes W.19.2X6.16 21 Roof Radiant 2396 0.025 38 n/a 0 Yes R.38.2X4.24F flat 2ZONE 4 Wall 48 0.065 1.7.8 90 90 Yes W.19.2X6.16 14 Wall 83 0:065 17.8 270 90 Yes W.19.2X6.16 17 Wall 375 0.065 1.7.8 0 90 Yes W.19.2X6.16 19 Wall 70 0.064 1.7.8 90 90 Yes GWALL.R1:9 To mech 22 Roof Radiant 1121 0.025 38 n/a 0 Yes R.38.2X4..24F flat 3ZONE 5 Wall 10 0.065 1.7.8' 180 90 Yes W.19..2X6.16 6 Wall 161 0.065 17.,8. 180 90 No W.1.9.2X6.16 12 Wall 45 0.065 17.8 270 90 Yes W.19.2X6.16 1.8 Wall 202 0.065 17.8 0 90 Yes W.19.2X6.16 20 Wall 340 0.064 17.8L90 90 Yes GWALL.R19 To garage 23 RoofRadiant 1030 0.025 38 n/a 0 Yes R.38.2X4.24F flat 30 Door 24 0.330 0 90 90 No None to garage PERIMETER LOSSES Length F2 Insul Solar Surface (ft) Factor R-val Gains Location/Comments 1ZONE 24 SlabEdge 201 0.760 R-0 No To outside 27 S1abEdge 6 0.510 R-0 No to garage 2ZONE 25 S1abEdge 6.6 0.760 R-0 No To outside 28 S1abEdge 6 0.510 R-0 No to garage 3`ZONE 26 S1abEdge 363 0.760 R-0 No To outside 29 S1abEdge 35 0.510 R-0 No to garage COMPUTER METHOD SUMMARY Page 3 C -2R Project Title........... J.;Paul Residence Date..0.6/07/01 14:26:29 MICROPAS5 x5.10. File-JPAUL Wth-CTZ15.S9,2 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-vbloe80.13R1.9.38.4 3wh Orientation 1ZONE 1 Door 2 Window 3 Window 4 Window 5 Window .6 Door 7 Window 8 Window 9 Door 10 Window 14 Door 15 Window 16 Window 17 Window 18 Window 19 Door 2.0 Window 21 Window 23 Window 24 Door 25 Door 26 Window 27 Window 30 Window 31 Window 38 Skylight 39 Skylight 2ZONE 28 Door 29 Window 32 Window 33 Door 34 Window 3ZONE 11 Window 12 Window 13 Window 22 Window .35 Door 36 'Window 37 Window FENESTRATION SURFACES' Area U- Act Exterior Shade Interior Shade (sf) Value SHGC Azm Tilt Type/SHGC Type./SHGC Front. (E) 48.0 0.650 0..400 90 90 B1dShade./0.2 Front (E) 16.0 0.650 0.400 50 90 Standard/0.76 Front (E) 20.0 0.6`50 0.400 90 90 B1dShade/0.2 Front (E) 24.0 0.650 0..400 90 90 Standard/0.76 Front (E) 24.0 0.650 0.400 90 90 Standard/0.76 Front (E) 40.0 0.650 0.400 90 90 Standard/0.76 Front, (E) 20.0 0.6.50 0.400 90 90 Standard/0.76 Front (E) 20.0 0.650 0..400 .90 90 Standard/0.76 Front (E) 40.0 0.650 0.40.0 90 90 Standard/0.76 Front (E) 12.0 0.650 0.400 90 90 Standard/0.76 Left (S) 40.0 0.650 0.400 180 90 Standard/0.76 Left (S) 40.0 0.650 0.400 180 90 Standard/0.76 Left (S) 40:0 0.6.50 0.400 18'0 90 B1dShade/0.2 Left (S) 8.0 0.570 0.700 180 90 Standard/0.76 Left (S) 25.0 0.650 0.400 180 90 BldShade/0..2 Left (S) 40.0 0.650 0.400 180 90 B1dShade/0.2 Left (S) 70.0 0.650 0.400 18.0 90 Standard/0.76 Left (S) 36.0 0.650 0.400 180 90 Standard/0.76 Back (W) 60.0 0.650 0.400 270 90 Standard/0.76 Back (W) 90.0 0.6.50 0.400 270 90 Standard/0.76 Back (W) 1,60.0 0.650 0.400 270 90 Standard/0..76 Back (W) 40.0 0.6'50 0.400 270 90 Standard/0.76 Back (W) 36.0 0.650 0.400 270 90 Standard/0.76 Right (N) 12.0 0.650 0.400 0 90 BldShade/0.2 Right (N), 36.0 0.650 0.40.0 0 90 Standard/0.76 Horz 16.0 0.1750 0.400 90 0 None/1 Horz 9.0 0.750 0.400 90 0 None/1 Back (W) .160.0 0.6.50 0.400 270 90 Standard/0.76 Back (W) 13.3 0.570 0.700 270 .90 Standard/0.76 Right (N) 48.0 0.650 0.400 0 90 Standard/0.76 Right (N) 120.0 0.650 0.400 0 90 Standard/0.76 Right (N) 16.0 0.6:50 0.400 0 90 Standard/0.76 Left (S) 9.0 0.570 0.70:0 180 9'0 B1dShade/0.2 Left (S) 15.0 0.650 0.400 180 90 B1dShade/0.2 Left (,S) 40.0 0.650 0.,400 180 90 Standard/0.76 Back (W) 40.0 0.650 0.400 270 90 Standard/0.76 Right (N) 80.0 0.650 0.400 0 90 Standard/0.76 Right (N) 13.3 0.570 0.700 0 90 Standard/0.76 Right (N) 15.0 0.650 01.400 0 90 Standard/0.76 Standard/0.68 Standard/0.68 Standard/0.68 Standard/0.68 Blind/0.47 Blind/0.47 Blind/0.47 Blind/0.47 Blind/0.47 Blind/0.47 Standard/0.68 Standard/0.68 Standard/0.68 Blind/0.47 Standard/0.68 Standard./0.68 Blind/0.47 Blind/0.47 Blind/0.47 Blind/0.47 Blind/0.47 Bl-ind/0.47 Blind/0.47 Blind/o.,47 Blind/0.47 None/1 None/1 Blind/0.47 Standard/0.68 Blind/0.47 Blind/0.47 Blind/0.47 Standard/0.68 Blind/0.47 Blind/0.47 Blind/0.47 Blind/0.47' Standard/0.68 Blind/0.47 COMPUTER,METHOD SUMMARY Page 4 C -2R Project Title........:. J.Paul. Residence Date..06/07/01 14:26:2.9 MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-vbloe80.13R1.9.3,8.4 3wh Surface 1ZONE 4 Window 5 Window 6 Door 7 Window 8 Window 9 Door 20 Window 21 Window 23 Window 24 Door 25 Door 26 Window 2,7 Window 31 Window 2ZONE 28 Door 29 Window 32 Window 33 Door 34 Window 3ZONE 35 Door Surface OVERHANGS AND SIDE FINS Window- Overhang Left Fin Right Fin - Area Left Rght (sf) Wdth Hgth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght 24.0 8.0 3.0 3.0 0..0 8.0 9.0 8.0 7.0 0.0 9.0 24.0 0.0 24.0 8.0 3.0 3.0 0.0 0.0 16.0 0.0 7.0 0.0. 0.0 0.0 0.0 40.0 8.0 5.0 3.0 0.0 3.0 12.0 3.0 7.0 0.0 12.0 24.0 0.0 20.0 8.0, 2.5 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 20.0 8.0 2.5 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 40.0 8.0 5.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 70.0 10.0 7.0 3.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0 36.0 6.0 6.0 2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 60.0 .10.0 .6.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 90.0 10.0 9.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 160.0 10.0 16.0 4.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 9.0 0.0 40.0 2.5 16.0 1.0 0.0 0.0 0.0 0.0 .5.0 0.0 0.0 8.0 0.0 36.0 6.0 6.0 '2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 36.0 6.0 6.0 2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 1.60.0 .10.0 16.0 5.0 0.0 0.0 0..0 0.0 5.0 0.0 0.0 7.0 0.0 13.3 .3.4 4.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 48.0 8.0 6.0 2.0 0.0 0.0, 0.0 0.0 2.0 0.0 0.0 2..0 0.0 120.0 10.0 12.0 3.0 0.0 0..0 0.0 0.0 8.0 0.0 0.0 16.0 0.0 16.0 4.0 2.0 1.5 0.0 0.0 0.0 0.0 1.5. 0.0 0.0 1.5 0.0 80.0 8.0 10.0 3.0 0.0 1.0 3.0 1.0 3.0 0.0 3.0 3.0 0.0 INTER -ZONE SURFACES 1ZONE/2ZONE Area (sf) U -value Insul Form 3 R-val Reference Location/Comments 1 Wall 539 0.386 R-0 W.0.2X4.16 3 Door 40 0.330 R-0 None 2ZONE/3ZONE: 2 Wall 200 0.3.86 R-0 W.0.2X4.16 SLAB SURFACES Area Slab Type (sf) 2'ZONE Standard Slab 1127 COMPUTER METHOD SUMMARY Page 5 C -2R Project Ti.tle........... J.Paul Residence Date..06/07/01 ,14:26:29 MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ1.5S'92 Program -FORM C -2R User4-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh Mass Type 1'ZONE .1 SlabOnGrade 3 SlabOnGrade 5 InteriorHorz 3ZONE 2 SlabOnGrade 4 SlabOnGrade 6 InteriorHorz System Type 1ZONE Furnace ACSplit 2ZONE Furnace ACSplit 3ZONE Furnace ACSplit Tank Type 1ZDHW 1 Storage 2ZDHW 2 Large 3ZDHW 3 Storage System THERMAL MASS Area Thick Heat Conduct- Surface (sf) (in) Cap ivity UIMC R -value 1123 3.5 28.0 1298 .3..5 28.0 1.94 1.0 24.0 311 3.5 28.0 719 3.5 28.0 28 1.0 24.0 0.98 4.60 R-0.0 0.98 1.80 R=2.0 0.67 1.70 R-0.0 0.98 4.60 R-0.0 0.98 1.80 R-2.0 0.67 1.70 R-0.0 HVAC SYSTEMS R-4.2 Location/Comments marble./tile framing/carpet/cabinet cabinet/vanity tops marble/tile framing/carpet/cabinet cabinet/vanity tops Minimum Duct 'Duct Tested Duct ACOA Duct Efficiency Location R -value Leakage Manual D Eff 0.800 AFUE Attic R-4.2 13.00 SEER Attic R-4.2 0.800 AFUE Attic R-4..2 13.00 SEER Attic R-4.2 0.800 AFUE Attic R-4.2 13.00 SEER Attic R-4.2 Recirc/TimeTemp 1 WATER HEATING SYSTEMS No No 0.743 No No 0.637 No No 0.743 No No 0.637 No No 0.743 No No 0.637 2ZDHW 2 Large 0.792 n/a 0.022 R-n/a 0 Number_ Tank External in Energy Size Insulation Heater Type Distribution Type System Factor (gal) R -value Gas Recirc/TimeTemp 1 0.60 50 R- n/a Gas Recirc/TimeTemp 1 n/a: 75 R-0 Gas Recirc/TimeTemp 1 0.60 50 R- n/a WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation Pilot Efficiency Input Fraction R -value Light 2ZDHW 2 Large 0.792 n/a 0.022 R-n/a 0 COMPUTER METHOD SUMMARY Page 6 C -2R Project Title.......... J.Paul Residence Date..06/07/01 14:26:29 MI_CROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C' -2R User#-MP1.017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section .should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a Radiant Barrier. This building incorporates non-standard Fenestration Shading. This building incorporates a High Mass Design. This building incorporates non-standard Water Heating System REMARKS 1 Zone = Ent/Din/Kit/'Fam/Liv/Hall - zoned as Living 2 Zone Master Suite - zoned as Sleeping 3 Zone = Guest Bedrooms hall and laundry - zoned as Living CONSTRUCTION ASSEMBLY Page 1 3R Project Title.......... J.Paul Residence Date..06/07/01 14:26:29 MICRO.PAS5 v5.10 File-JPAUL Wth-CTZ15S92, Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe'80.13R19.38.4 .3.wh Parallel Path Method Reference Name . W..19.2X6.16 Description Wall R -1.92x6 16oc Type Wall R -Value 17.8 Hr-sf-F/Btu Framing Material ..... FIR.2X6 Type ..... Wood Description .. 2x6 fir Spacing .... 16 inches on center Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Name Description O. FILM..EX Exterior air film: winter value 1. STUCCO.0.88 0.875 in stucco 2. BLDG.PAPER Building paper (felt) 3c. BATT.R19 R-19 batt insul (cavity = 5.5 in'), 3f. FIR.2X6 2x6 fir 4. GYP.0.50 0.50 in gypsum or plaster board I. FILM..IN.WLL Inside air film: heat sideways FRAMING ADJUSTMENT CALCULATION Cavity Total. Unadjusted R -Values Framing U -Value: (1 / 19.3.4 x 0.85) + (1 / 6.98 x 0.15) = Total R -Value: 1 / 0.065 = Cavity Frame R -Value R -Value 0.17 0.17 0.17 0.17 0.06 0.0:6 17.80 -- -- 5.45 0.4.5 0.45 0.6.8 0.68 19.34 6.58 Total 0.065 Btu/hr-sf-F 15.28 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 2 3R Project Title.......... J.Paul Residence Date..06/07/01 14:2.6:29 MICROPAS5 v5.10 File-JPAUL Wth-CTZ115S9.2 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh. Parallel Path Method Reference Name . GWALL.R19 Description . Wall R-19 2x6 '16oc Type ....... Wall R -Value ........ 17.8 Hr-sf-F/Btu Framing Material ..... FIR.2X6 Type .. .....Wood Description .. 2x6 fir Spacing ...... 16 inches on center .Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Name Description 0. FILM.EX Exterior air film: winter value 1. GYP.0.50 0.50 in gypsum or plaster board 3c. BATT.R19 R-19 batt insul (cavity = 5.5 in) 3f. FIR. 2X6 2x6 fir 7.19 4. GYP.0.50 0.50 in qrypsum or plaster board I. FILM.IN.WLL Inside air film-: heat sideways FRAMING ADJUSTMENT CALCULATION Cavity Total Unadjusted R -Values Cavity R -Value Frame R -Value 0.17 0.17 0.45 0.45 17.80 -- -- 5.45 0.45 0.45 0.68 0.68 19.55 7.19 .Framing Total U -Value: (1 / 19.55 x 0.85) + (1 / 7.19 x 0.15) = 0.064 Btu/hr-sf-F Total R -Value: 1 / 0.064. = 15.55 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 3 3R Project Title.......... J..Paul Residence Date..06/07/01 14:26:29 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S.9.2 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe80.13R1.9.38.:4 3wh Parallel Path Method Reference Name . R.38.2X4.24F Description .... Roof R-38 2x4 24oc Type Roof R -Value 38 Hr-sf-F/Btu Framing Material ..... Type ..... Description .. Spacing ...... Framing Frac.. Sketch.of Construction Assembly LIST OF CONSTRUCTION COMPONENTS FIR. 2X4 Wood 2x4 fir 24 inches on center 0.07 Cavity U -Value: (1 / 41.04 x 0..93) + (1 / Total R -Value: Framing Cavity Material. Name Description 0. FILM.EX .Exterior air film.: winter value 1. BUILTUP.0.38 0.375 in built-up roofing 2.. BLDG.PAPER Building paper (felt) 3. PLY.0.50 0.50 in plywood 4. AIR,.RF.3.50 3.5 in & greater air space: heat flow up 5. BATT.R27.0 R-27 batt insulation 6c. BATT.RII.0 R -ll batt insul (cavity > 3.5 in) 6f. FIR.2X4 2x4 fir 7. GYP.0.50 0.50 in gypsum or plaster board I. F,ILM..IN.RF Inside air film: heat flow straight up; Total Unadjusted R -Values FRAMING ADJUSTMENT CALCULATION Cavity U -Value: (1 / 41.04 x 0..93) + (1 / Total R -Value: Framing Cavity Frame. R -Value R -Value 0.17 0.17 0.33 0.33 0.06 0.0'6 0.62 0.62 0.80 0.80 27.00 27.00 11.00 -- -- 3.46 0.45 0.45 0.61 0.61 41.04 33.51 Total 33.51.x 0.07) = 0.025 Btu/hr-sf-F 1 / 0.0.25 = 40,.40 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 4 3R Project Title.......... J.Paul Residence Date..06/07/01 14:2:6:29 MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh Parallel Path Method Reference Name . W.0.2X4.16 Description . Wall R-0 2x4 16oc Type ........... Wall R -Value ........ 0 Hr-sf-F/Btu Framing Material ..... FIR.2X4 Type ..... Wood Description .. 2x4 fir Spacing ...... 16 inches on center Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. STUCCO.O.88 0.875 in stucco 0.17 0.17 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3c. AIR.WLL.3.50 3.5 in & greater air space: heat sidewys 0.85 -- 3f. FIR.2X4 2x4 fir -- 3.46 4. GYP.0.50 0.50 in gypsum or plaster board 0,.4,5 0:45 I. FILM.IN.'WLL Inside air film.: heat sideways 0.68 0.68 Total. Unadjusted R -Values 2.38 5.00 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 2.38 x 0.85) + (1 / 5.00 x 0.15) = 0.386 Btu/hr-sf-F Total R -Value: 1 / 0.386 = 2;..59 hr-sf-F/Btu HVAC SIZING Page 1 HVAC Project Title.. ....... J.Pau1 Residence Date..06/07/01 14:26:29 Project Address......... 5.5-6'85 Cherry Hills ******* 30458 8425 Glazing Conduction................ La Quinta, CA *v5.10* Glazing Solar .:.................. n/a Documentation Author... Carole Christensen ******* Building Permit Internal. Gain.... ................ Carole Christensen 2550 Ducts ............................ 9778 1051.4 47-596 Lake Canyon Drive Plan Check,/ Date Aguanga, CA 92.536 800-735-8152 Field Check/ Date Climate Zone. ........ 15 Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc. MICROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User-Carole.Christensen Run-vbloe80.13R19.38.4 3wh GENERAL INFORMATION Floor Area ................. 4578 sf Volume..:**—:* --'—*53112 cf Front Orientation.......... Front Facing 90 deg (E) Sizing Location............. PALM DESERT Latitude... ... ........ 33'.7 degrees Winter Outside Design...... 32 F Winter Inside Design....... 70 F Summer Outside.Design...... 112 F Summer Inside Design....... 18 F Summer Range. .. ...... 34 F Interior Shading Used.... . No Exterior Shading Used...... No Overhang Shading Used...... No Latent Load Fraction........ 0.20 HEATING AND COOLING LOAD SUMMARY Sensible Load .................... 107557 115654 Latent Load ...................... n/a 23131 Minimum Total Load. 107557 138784 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. Heating Cooling Description (Btuh) (Btuh) Opaque Conduction and Solar...... 30458 8425 Glazing Conduction................ 39275 35141 Glazing Solar .:.................. n/a 40464 Infiltration ...................... 28046 18560 Internal. Gain.... ................ n/a 2550 Ducts ............................ 9778 1051.4 Sensible Load .................... 107557 115654 Latent Load ...................... n/a 23131 Minimum Total Load. 107557 138784 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. M HVAC SIZING Page 2 HVAC Project Title.......... J.Paul Residence Date..06/07/01 14:26:29 MICROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -HVAC SIZING User#-'MP1017 User -Carole Christensen Run-vbloe80.13R19.38.4 3wh HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 11ZONE" Floor Area... .................... 242.1 sf Volume ........................... 30326 cf Description Opaque Conduction and Solar...... Glazing Conduction............... GlazingSolar .................... Infiltration ..................... Internal Gain.. ................... Duct's ............................. Sensible Load .................... Latent Load ....................... ................. ZONE '2ZONE' Heating Cooling (Btuh) (Btuh) 1164.6 4214 25314 2264.9 n/a 29446 16014 10597 n/a 132'6 5297 68.23 58271 75056 n/a 150:11 Minimum Zone Load 58271 90068 Floor Area............ 1127 sf Volume ................4.......... 12486 cf Description Opaque Conduction and Solar...... Glazing Conduction ............... Glazing Solar .................... Infiltration ..................... InternalGain .................... Ducts............................ Sensible Load .................... Latent Load ...................... Minimum Zone Load Heating Cooling (Btuh) (Btuh) 4511 1.895 8785 7860 n/a 7699 6593 4363 n/a 638 1989 2245 21878 n/a 24700 4940 21878 2.964.0 HVAC SIZING' Page 3 HVAC Project Title........... J.Paul Residence Date..06/07/01.14:26:29 MICROPAS5 v5.10 File-JPAUL Wth-CT.Z15S92 Program -HVAC SIZING User#-MP1017 User -Carole. Christensen Run-vbloe80.13R19.38.4 3wh ZONE 13ZONE' Floor Area ....................... 1030 sf Volume...... 10300 cf Description " Opaque Conduction and Solar...... Glazing Conduction. ............... Glazing Solar .................... Infiltration ..................... Internal Gain.. ................... Ducts............................ Sensible Load............ ...... LatentLoad................... ... Minimum Zone Load M Heating Cooling (Btuh) (Btuh) 14301 2`316 5176 4.631 n/a 3319 5439 3.599 n/a 587 2492 1445 27408 15897 n/a 3179 2740.8 19076 I Carole Christensen, CertifedEnerUAnalyst TITLE -24 ENERGY CALCULATIONS November 27, 2000 ENERGY CALCULATIONS FOR: Southwest Concepts 82-723 Dr. Carreon. Blvd. Indio, CA 92201 PROJECT: J. Paul Residence 457$ s :ft. Custom Home 5'5-6Cherry Hills La Quinta, CA 92253 Standard Design Proposed Design. Compliance Margin 51.66 49.82 +1.84 CTZ 15 - 34.8% fenestration Credit taken for Radiant Barrier Dual fenestration, Low E(2) Default, Lt. Blinds Walls,R-21; Roof R-38, Duct R.4.2; AFUE 80%•, SEER 1.3.0 Two 50 gal gas water heaters EF. 60; Recirc/TimeTemp One 75 gal gas water heater, Recirc/TimeTemp. CONTENTS CF -1R MF -1R C -2R C -3R ;HVAC Sizing GN��r N -t CITY OF LA IDUINTA BUILDING ETY DEPT. APPROVED FOR CONSTRUCTION DATE IV-14UM BY 47 -596 -Lake Canyon Drive, Aguanga, CA W36 1-800-735-8152 Member'CABEC - California Association of Building Energy Consultants CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 ****-*** Pr-oject Address......,.. 55-685 Cherry Hills La Quinta, CA *v5.10* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 47-596 Lake Canyon Drive Plan Check Date Aguanga, CA 92.536 800--735-8152 Field Check/ Date Climate Zone. ...... 15 Compliance Method...... MICROPAS5 v5.1.0 for 1998 Standards by Enercomp, Inc. MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program" -FORM CF -1R User4-.MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh GENERAL INFORMATION Conditioned.Floor Area..... 4578 sf Building Type .............. Single Family Detached Construction Type ......... New Building Front Orientation. Front Facing 90 deg (E) Number of Dwelling Units... 1 Number of Stories... ...... 1 Floor Construction Type.... Slab On Grade Glazing Percentage......... 34.8 % of floor area Average Glazing U -value.... 0.65 Btu/hr-sf-F Average Glazing SHGC....... 0.41 Average Ceiling Height..... 11.6 ft BUILDING SHELL INSULATION Component Frame Cavity Sheathing Total Assembly Type Type R -value R -value R -value U -value Location/Comments Wall Wood R-21 R-0 R-21 0.05,9 'Wall Wood R-17.8 R'-0 R-17.8 4.064" To mech, To garage Roof Radiant Wood R-11 R-27 R-38 0.025 flat SlabEdge None R-0 R-0 F2=0.76,0 To outside SlabEdge None R-0 R-0 F2=0.510 to garage Door None R-0 R'-0 R-0 0.330 to garage Wall Wood R-0 R-0 R-0 0.386 FENESTRATION Over - Area U- Interior Exterior hang/ Orientation (sf) Value SHGC Shading Shading Fins Door Front (E) 48.0 0.650 0.400 Standard B1dShade None Window Front (E) 1.6.0 0.650 0.400 Standard Standard None Window Front (E) 20.0 0.650 0.400 Standard B1dShade None Window Front (E) 24.0 0.650. 0.400 Standard Standard Yes Window Front. (E) 24.0 0.650 0.4.00 Blind Standard Yes Door Front (E) 40.0 0.650 0.400 Blind Standard Yes Window Front (E) 20.0 0.650 0.400 Blind Standard Yes Window Front. (E) 20.0 0.650 0.400 Blind Standard Yes Door Front (E) 40.0 0.650 0.400 Blind Standard Yes Window Front (E) 12.0 0.650 0.400 Blind Standard None Window Left (S) 9.0 0.570 0.700 Standard BldShade None Window Left (S) 15.0 0.650 0.400 Blind B1dShade None Window Left (S) 40.0 0.650 0.400 Blind Standard None CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 MICROPAS5 v5.1.0 File-JPAUL Wth-CTZ1.5S9.2 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-vblo,e80:13R21.38.4 3wh FENESTRATION Over - Area U- Interior Exterior hang/ Orientation (sf) Value SHGC Shading Shading Fins Door Left (S) 40.0 0.650 0.400 Standard Standard None Window Left (,S) 40.0 0.650 0.400 Standard Standard None Window Left (S) 40.0 0.650 0.400 Standard BldShade None Window Left (S) 8.0 0.570 0.700 Blind Standard None Window_ Left (S) 25.0 0.650 .0.400 Standard BldShade None Door Left (S) 40.0 0.650 0.400 Standard BldShade None Window Left (S) 70.0 0.650' 0.400 Blind Standard Yes Window Left (S) 36.0 0.650 0.400 Blind Standard Yes Window Back (W) 40.0 0.650 0.400 Blind Standard None Window Back (W) 60.0 0.650 0.400 Blind Standard Yes Door Back (W) 90.0 0.650 0.400 Blind Standard Yes Door Back (W) 160.0 0.650 0.400 Blind Standard Yes Window Back (W) 40.0 0.650 0.400 Blind Standard Yes Window Back (W) 36.0 0.650 0.400 Blind Standard Yes Door Back (W) 160.0 0.650 0.400 Blind Standard Yes Window Back (W) 13.3 0.570 0.700 Standard Standard Yes Window Right (N) 12.0 0.650 0.4.00 Blind BldShade None Window Right (N) 36.0 0.650 0.400 Blind Standard Yes Window Right (N) 48.0 0.650 0.400 Blind Standard Yes Door Right (N) 120,.0 0.650 0.400 Blind Standard Yes Window Right (N) 16.0 0.650 0.400 Blind Standard Yes Door Right (N) 80.0 0.650 0.400 Blind Standard Yes Window Right (N) 13.3 0.570 0.700 Standard Standard None Window Right (N) 1.5.0 0.650 0.400 Blind Standard None Skylight Horz 16.0 0.750 0.400 None. None None Skylight Horz 9.0 0.750 0.4.00 None None None SLAB SURFACES Area Slab Type (sf) Standard Slab 1127 THERMAL MASS Area 'Thickness Type Exposed (sf) (in) Location/Comments S1abOnGrade Yes 1.123 3.5 marble/tile SlabOnGrade Yes 311 3.5 marble/tale S1abOnGrade No 129.8 3.5 framing/carpet/cabinets S1abOnGrade No 719 3.5 framing/carpet/cabinets InteriorHorz Yes 194 1.0 cabinet/vanity tops InteriorHorz Yes 28 1.0 cabinet/vanity tops CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R Project Title.......... J.Paul Residence Date..11/27/00. 16:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User --Carole Christensen, Run-vbloe8.6.13R21.38.4 3wh HVAC SYSTEMS • Minimum Duct Duct Tested,Duct ACCA Thermostat Equipment Type Efficiency Location R -value Leakage Manual D Type Furnace 0.800 AFUE Attic R-4.2 No No Setback ACSplit 13.00 SEER Attic R-4.2 No No Setback Furnace 0.8,00 AFUE Attic R-4.2 No No Setback ACSplit 13.00 SEER Attic R-4.2 No No Setback Furnace 0.800 AFUE Attic R-4.2 No No Setback ACSplit 13.00 SEER Attic. R-4.2 No No Setback WATER HEATING SYSTEMS Number Tank. External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gal) R -value 1ZDHW Storage Gas Recirc/TimeTemp 1 0.60 50 R- n/a. 2ZDHW Large Gas Recirc/TimeTemp 1 n/a 75 R-0 3 ZDHW Storage Gas Recirc/TimeTemp 1 0.60 50 R- n/a WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation Pilot System Efficiency Input Fraction R, -value Light 2ZDHW Large 0.792 n/a 0.022 R-n/a 0 SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on,the plans, *** ** installed to manufacturer and CEC.specifications, and *** ** verified during plan check and field inspection. *** This building incorporates a Radiant.Barrier. This building .incorporates non-standard Fenestration Shading. This building incorporates a High Mass Design. This building incorporates non-standard Water Heating System REMARKS 1 Zone ='Ent/Din/Kit./Fam/Liv/Hall - zoned as Living 2 Zone = Master Suite - zoned.as Sleeping 3 Zone = Guest Bedrooms hall and laundry - zoned as Living CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF -1R Project Title.......... J.Paul Residence `Date:.11/27/00 16:0.3:39 MICROPAS5 v5.10 File-,JPAUL Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh REMARKS ,COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California- Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features Modeling Assumptions section. DESIGNER or OWNER Name.... Stephen R. Nieto Company. SouthWest Concepts Address. 82-723 Dr. Carreon Blvd. Indio, CA 92201 Phone... (76W 352-5555 License. Signed.. S ate ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. ate DOCUMENTATION AUTHOR Name.... Carole Christensen Company. Carole Christensen Address. 47-596 Lake Canyon Drive Aguanga, CA 9.2.536 Phone... 800-735-8152 Signed.. ate. ertified Energy Analyst Carole Christensen, CEPE r r R 98-99-239 rr CADEC California Association of Building Energy Consultww COMPUTER METHOD SUMMARY Page 1. C -2R Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 Project Addre s........ 55-6"85 Cherry Hills ******* La Quinta, CA *v5.10* Documentation Author... Carole Christensen Carole Christensen 47-59Z Lake Canyon Drive Aguanga, CA 92536 800-735-8152 Climate Zone 15 Building Permit Plan C:ec Date Field Check/ Date Compliance Method...... MICROPAS5 v5.10 for 1998.Standards by Enercomp, Inc. MICROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP10'17 User -Carole Christensen Run-vbloe8&.13R21.38.4 3wh Zone Type 1ZONE MICROPAS5 ENERGY USE SUMMARY Energy Use (kBtu/sf -yr) Space Heating......... Space Cooling.......... Water Heating.......... Standard Proposed Compliance Design Design Margin 4.31 5.70 -1.39 41.13 35.52 5.61 6.22 8.60 -2.38 Total 51.66 49.82 1.84. *** Building complies with Computer Performance *** GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front Orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -value.... Average Glazing SHGC....... Average Ceiling Height....:. 4578 sf Single Family Detached New Front Facing 90 deg (E) 1 1 ReducedYear Slab On Grade 3 53112 cf 4578 sf 34.8 's of floor area 0.6.5 Btu/hr-sf-F 0.4.1 11.6 ft BUILDING ZONE INFORMATION Floor # of Vent Vent Air Area Volume Dwell Cond- 'Thermostat Height Area Leakage (sf) (cf) Units itioned Type (ft) (sf) Credit Residence 2421 30326 0.52 Yes Setback 2.0 Standard No 2.ZONE Residence 1.127 1.248.6 0.25 Yes Setback 2.0 Standard No 3ZONE COMPUTER METHOD SUMMARY Page 2 C -2R Project Title.......... J.Paul Residence 'Date..11/27/00 16:03:39 MICROPAS5 v5..10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh, BUILDING ZONE INFORMATION Floor # of Vent Vent Air Area Volume Dwell Cond= Thermostat Height Area Leakage Zone Type (sf) (cf) Units itioned Type (ft) (sf) Credit Residence 1030 10.300 0.23 Yes Setback 2.0 Standard No OPAQUE SURFACES Area U- Insul Act Solar Form 3 Location/ Surface (sf) value R-val A,zm Tilt Gains Reference Comments 1ZONE .1 Wall 206 0.0.59 21 90 90 Yes W.2.1.2X6.16 2 Wall 4 0.0.59 21 90 90 No W. 2'1.2X6.16 3 Wall 144 0.0:59 21 90 90 Yes W.21.2X6'.16 7 Wall 130 -0.0,59 21 1.80 90 Yes W.21.2X6.16 8 Wall 20 0.059 21 180 90 No W.21.2X6.16 9 Wall 254 0.0,59 21 180 90 Yes W.21.2X6.16 10 Wall 2:25 0.0,59 21 180 9:0 No W.21.2X6.16 11 Wall 84 .0.064 17.8 90 90 No GWALL.R1.9 To meth 13 Wall 148 0.059 2.1 270 90 Yes W.21.2X6.16 15 Wall 154 0.059 21 0 90 Yes W.21.2X6.16 16 Wall 28 0.05.9 21 0 9'0 Yes W.21.2X6.16 21 RoofRadiant 239'6 0.02<5 38 n/a 0 Yes R.38.2X4.24F flat 2ZONE 4 Wall 48 0.05.9 21 90 90 Yes W.21.2X6.16 14 Wall 83 0.0-59 21 2`70 90 Yes W.21.2X6.16 17 Wall 375 0.0.59 21 0 90 Yes W.21.2X6.16 19 Wall 70 0.064 17.8 90 90 Yes GWALL.R19 To meth 22 RoofRadiant 1127 0.025 38 n/a_ 0 Yes R.38.2X4.24F flat 3ZONE 5 Wall 10 0.059 21 180 90 Yes W.21.2X6.16 6 Wall 1,61 0.059 21 180 90 No W.21.,2X6.16 12 Wall 45 0.059 21 270 90 Yes W.21.2X6.16 18 Wall 202 0.059 21 0 90 Yes W.21.2X6.16 20 Wall 340 0.064 11.8 90 90 Yes GWALL.,R19 To garage 23 RoofRadiant 10.30 0.025 38 n/a 0 Yes R.38.2X4.24F flat 30 Door 24 0.330 0 90 90 No None to garage PERIMETER LOSSES Length F2 Insul Solar Surface (ft) Factor R-val Gains Location/Comments 1ZONE 24 .SlabEdge 201 0.76.0 R-0 No To outside 27 S1abEdge 6 0.510 R-0 No to garage 2ZONE 25 S1abEdge 66 0.760 R-0 No To outside 28 S1abEdge 6 0.510 R-0 No to garage 3 ZONE 26 SlabEd'ge, 363 0.760 R-0 No To outside 29 S.labEdge 35 0.510 R-0 No to garage COMPUTER METHOD SUMMARY Page '3 C -2R Project Title.......... J.Paul. Residence Date..11/27/00 16:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.3'8.4 3wh Orientation 1ZONE 1 Door 2 Window 3 Window 4 Window 5 Window 6 Door 7 Window 8 Window 9 Door 10 Window 14 Door 15 Window 16 Window 17 Window 18 Window 19 Door 20 Window 21 Window 23 Window 24 Door 25 Door 26 Window 27 Window 30 Window 31 Window 38 Skylight 3.9 Skylight 2ZONE 28 Door 29 Window 32 Window 33 Door 34 Window 3ZONE ,11 Window 12 Window 13 Window 22 Window 35 Door 36 Window .37 Window FENESTRATION SURFACES Area U- Act Exterior Shade Interior Shade (sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC Front (E) 48.0'0.650 0.400 90 90 BldShade/0.2 Standard/0.68 Front (E) 16.0'0.650 0.4:00 90 90 Standard/0.76 Standard/0.68 Front (E) 20.0 0.650 0.4:00 90 90 B1dShade/0.2 Standard/0.68 Front (E) 24.0'0.650 0.400 90 90 Standard/0.76 Standard/0.68 Front (E) 24.60.650 0.400 90 90 Standard/0.76 Blind/0.47 Front (E) 40.0''0.650 0.400 90 90 Standard/0.76 Blind/0.47 Front (E) 20.0"0.650 0.400 90 90 Standard/0.7'6 Blind/0.47 Front (E) 20.e 0.650 0.400 90 90 Standard/0.76 Blind/0.47 Front (E) 40.0' 0..650 0.4.00 90 90 Standard/0.76 Blind/0.47 Front (E') 12.0'0.650 0.400 90 190 Standard/0.76 Blind/•0.47 Left (S) 40.0'0.650 0.4.00 180 90 Standard/0.76 Standard/0.68 Left- (S) 40.9'0.650 0.400 1.80 90 Standard/0.76 Standard/0.68 Left (S) 40.0'0.650 0..400 180 90 BldShade/0.2 Standard/0.68 Left (S) 8.0^0.570 0.700 180 90 Standard/0.76 Blind/0.47 Left (S) 25.00.650 0.4.00 180 90 B1dShade/0.2 Standard/0.68 Left (S) 40.0'0.650 0.400 180 90 B1dShade/0.2 Standard/0.68 Left (S) 70.9,,0.650 0.400 180 90 Standard/0.76 Blind/0.47 Left (S) 36 '0.650 0.400 18,0 90 Standard/0.'76 Blind/0.47 Back (W) 60.0'0.650 0.400 270 90 Standard/0.76 Blind/0.47 Back (W) 90.0'0.650 0.400 270 90 Standard/0.76 Blind/0.47 Back (W) 1.60.0%'0..650 .0.400 270 910 Standard/0.76 Blind/0.47 Back (W) 40.0'0.650 0.400 270 90 Standard/0.76 Blind/0.4.7 Back (W) 36.0,"0.650 0.400 270 90 Standard/'0.76 Blind/0.47 Right, (N) 12.@0.650 0.400 0 90 B1dShade/0.2 Blind/0.47 Right (N) 36.f O .6.50 0.400 0 90 Standard/0.76 Blind/'0.47 Horz 16.0 0.750 0.400 90 0 None/1 None/1 Horz 9.0 0.750 0.400 90 0 None/1 None/1 Back (W) 16'0"0 0.650 0.400 270 90 Standard/0.76 Blind/0.47 Back. (W) 13 .3' 0 . 570 0.700 270 9`0 Standard/0.76 Standard/'O.,68 Right (N) 4.8.0-0.650 0.400 0 90 Standard/0.76 Blind/0.47 Right (N) 120.9/0.650 0.400 0 90 Standard/.0.76 Blind/0.47 Right (N) 16.0 0.650 0..400 0 90 Standard/0.76 Blind/0.47 Left (S) 9.VO .570 0.700 180 90 B1dShade/0.2 Standard/0.68 Left (S) 15.0''0.650 0.400 180 90 B1dShade/0.2 Blind/0.47 Left (.S) 40.-0 0.650 0.400 180 90 Standard/0.76 Blind/0.47 Back (W) 40.-e 0.650 0.400 270 90 Standard/0.76 Blind/0.47 Right (N) 8,0,.@' 0.65'0 0.400 0 90 Standard/0.76 Blind/0.47 Right (N) 13.3^0.570 0.700 0 90 Standard/0.76 Standard/0.68 Right (N) 15.00.650 0.400 0 90 Standard/0.76 Blind/0.47 COMPUTER METHOD SUMMARY Page 4 C -2R Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 MI.CROPASS v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP10,17 User -Carole Christensen. Run-vbloe80.13R21.38.4 3wh Surface 1ZONE 4 Window 5 Window 6 Door 7 Window 8 Window 9 Door 20 Window 21 Window 23 Window 24 Door 25 Door 26 Window 27 Window 31 Window 2ZONE 28 Door 29 Window 32 Window 33 Door 34 Window 3ZONE 35 Door Surface. OVERHANGS AND SIDE FINS Window- Overhang Left.Fin Right Fin - Area Left Rght (sf) Wdth Hgth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght 24.0 8.0 24.0 8.0 40.0 8.0 20.0 8.0 `20.0 8.0 40.0 8.0 70.0 10.0 36.0 6.0 60.0 10.0 90.0 10.0 160.0 10.0 40.0 2.5 ,36 .0 6.0 36.0 6.0 160.0 10.0 13.3 3.4 :48.0 8.0 120.0 10.0 16.0 4.0 1ZONE/2ZONE 1 Wall 3 Door 2ZONE/3ZONE 2 Wall Area (sf) 3.0 3.0 0..0 8.0 9.0 8.0 7.0 0.0 9.0 24.0 0.0 3.0 3.0 0.0 0.0 16.0 0.0 7..0 0.0 0.0 0.0 0.0 5.0 3.0 0.0 3.0 12.0 3.0 7.0 0.0 12.0 24.0 0.0 2.5 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 2.5 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 5.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 7.0 3.0 0.0 3.0 0.0 0.0 0.0 0.0 0..0 16.0 0.0 6.0 2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 6.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 9.0 3.0 0.0 n/a n/a n/a n./a n/a n/a n/a n/a 16.0 4.0 0.0 0.0 0..0 0.0 5.0 0.0 0.0 9.0 0.0 16.0 1.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 8.0 0.0 6.0 2..0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 6.0 2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 16.0 5.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 7.0 0.0 4.0 3.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a 6.0 2.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 2.0 0.0 12.0 3.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 16.0 0.0 2.0 1.5 0.0 0.0 0.0 0.0 1.5 0.0 0.0 1.5 0.0 10.0 3.0 0.0 1.0 3.0 1.0 3.0 0.0 3.0 3.0 0.0 INTER -ZONE SURFACES Insul Form 3 U -value R-wal Reference Location/Comments 53.9 .0.386 R-0 40 0.330 R-0 200 0.386 R-0 W.0.2X4.16 None W.0.2X4.16 SLAB SURFACES Area Slab Type (sf) 2ZONE Standard Slab 1127 COMPUTER METHOD SUMMARY Page 5 C -2R Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#.--MP1017 User -Carole Christensen Run-vbloe801.13R21.38.4 3wh Mass Type 1ZONE 1 S1abOnGrade 3 S1abOndtade 5 InteriorHorz 3ZONE 2 S1abOnGrade. 4 S1abOnGrade 6 InteriorHorz Minimum Duct THERMAL MASS ACCA Duct Area Thick Heat Conduct- .Manual Surface 1ZONE (sf) (in) Cap ivity UIMC R -value Location/Comments 1123 3.5 28.0 0.98 4.60 R-0.0 marble/tile 129.8 3.5 28.0 0.98 1.&0 R-2:0 framing/carpet/cabinet 194 1.0 24.0 0.67 1.70 R-0.0 cabinet/vanity tops 311 3.5 28.0 0.98 4.60 R-0.0 marble/tile 719 3.5 28.0 0.9,8 1.80 R-2.0 framing/carpet/cabinet 28 1.0 24.0 0.67 1.70 R-0.0 cabinet/vanity tops R-4.2 No No HVAC SYSTEMS WATER HEATING Minimum Duct Duct Tested Duct ACCA Duct System Type Efficiency Location R -value Leakage .Manual D Eff 1ZONE Furnace 0.800 AFUE Attic R-4.2 No No 0.74.3 ACSplit 13.00 SEER Attic R-4.2 No No 0.637 2ZONE Furnace 0.800 AFUE Attic R-4.2 No No 0.743 ACSplit 13.00 SEER Attic R-4.2 No No 0.637 3ZONE Furnace 0.800 AFUE Attic R-4.2 No No 0.743 ACSplit 13.00 SEER Attic R-4.2 No No 0.637 WATER HEATING SYSTEMS Number Tank External in Energy Size. Insulation Tank Type Heater Type Distribution Type System Factor (gal) R=value 1ZDHW 1 Storage Gas Recirc/TimeTemp 1 0.60 50 R- n/a 2ZDHW 2 Large Gas Recirc/TimeTemp 1 n/a 75 R-0 3ZDHW 3 Storage Gas Recirc/TimeT,emp 1 0.60 50 R- n/a WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation Pilot System Efficiency, Input Fraction R -value Light 2ZDHW 2 Large 0.792 n/a 0.022 R-n/a 0 COMPUTER METHOD SUMMARY Page 6 C -2R Project Title........... J,Paul Residence Date..11,/27/00 .16:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh SPECIAL,FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a Radiant Barrier. This building incorporates non-standard Fenestration Shading:. This building incorporates a.High Mass Design. This building incorporates non-standard Water Heating System REMARKS 1 Zone = Ent/Din/Kit/Fam/Liv/Hall - zoned as Living 2 Zone = Master Suite. - zoned as Sleeping 3 Zone = Guest Bedrooms hall and laundry - zoned as.Living CONSTRUCTION ASSEMBLY Page 1 3R Project Title.......... J.Paul Residence Date..11/27/00 1.6:03:39 MICROPAS5 v5.10: File-JPAUL Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe80.13R2:1.3°8.4 3wh Parallel Path Method Reference Name . W.21.2X6.1.6 Description .... Wall R-2'1 2x6 16oc Type Wall R -Value 21 Hr-sf-F/Btu Framing Material FIR.2X6 Type ......... Wood. Description .. 2x6 fir Spacing ...... 16 inches on center Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R=Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. STUCCO.0.88 0.875 in stucco 0.17 0..17 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3c: BATT.R21 R-21 batt insul (cavity = 5.5 in) 21.00 -- 3f. FIR.2X6 2x6 fir -- 5.45 4. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total'Unadj'usted R -Values 22.54 6.98 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 22.54 x 0.85) + (1 / 6.98 x 0.15) = 0.059 Btu/hr-sf-F Total R -Value: 1 / 0.059 = 16.89 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 2 3R Project Tit.le.......... J.Paul Residence Date..11/'27/00 16:03:39 MICROPAS5 v5..10 File-JPAUL Wth-CTZ15,S92 Program -FORM 3R User#-MP1.017 User -Carole Christensen Run-vbloe80.13R2.1.38.4 3wh Parallel Path Method Reference Name . GWALL.R19 Description .... Wall R-19 2x6 16oc Type Wall R -Value 17.8 Hr-sf-F/Btu Framing Material ..... FIR.2X6 Type ..... Wood Description .. 2x6 fair Spacing 16 inches on center Framing°Frac.. 0.15 Sketch.of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. GY.P.0.50 0.50 in gypsum or plaster board 0.45 0.45 3C. BATT.R19 R-19 batt insul (cavity = 5.5 in) 17.80 -- 3f. FIR.2X6 2x6 fir -- 5.45 4. GYP.0.50 0.50 in gypsum or plaster board 0,.45 0.4.5 I. FILM.IN.WLL Inside air.film: heat sideways 0.68 0.68 Total Unadjusted R -Values 19.55 7.19 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 19.55 x 0.85) + (1 / 7.19 x 0.15) = 0,.064 Btu/hr-sf-F Total R -Value: 1 / 0.064 = 15.55 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 3 3R Project Title........... J..Paul Residence Date..11/27/00 1.6:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe80,13R21.38.,4 3wh Parallel Path Method Reference Name R.38.2X4.24F Description .... Roof R-38 2x4 24oc Type ........... Roof R -Value 38 Hr-sf-F/Btu Framing Material ..... FIR.2X4 Type Wood Description .. 2x4 fir Spacing .... 24 inches on center Framing Frac.. 0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value O. FILM.EX Exterior air film: winter value 0.17 0.17 1. BUILTUP.0.38 0.375 in built-up roofing 0.33 0.3.3 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. PLY.0.50 0..50 in plywood 0.62 0.62 4. AIR.RF.3.5.0 3.5 in & greater air space: heatflow up 0.80 0.80 5. BATT.R27.0 R-27 batt insulation 27.00 27.0,0 6c. BATT.RII.0 R-11 batt insul (cavity >.3.5 in) 11.00 -- 6f. FIR:2X4 2x4 fir -- 3.46 7. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.RF Inside air film;: heat flow straight up 0.61 0.61 Total'Unadjusted R -Values 41.04 33.51 FRAMING ADJUSTMENT CALCULAT.I'ON Cavity Framing Total U -Value: (1 / 41.04 x 0.93) + (1 / '33.5.1 x 0.07) = 0.025 Btu/hr-sf-F Total R -Value: 1 / 0.025 = 40.40 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 4, 3R .Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 MICRO.PAS5 v5.10 File-JPAUL Wth-CTZ15S9'2 Program -FORM 3R User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh Parallel Path Method Reference Name . W.0.2X4.16 Description .... Wall R-0 2x4 16.oc Type ........... Wall R -Value ........ 0 Hr-sf-F./Btu Framing Material .. FIR.2X4 Type .. Wood Description .. 2x4 fir Spacing ...... 16 inches on center Framing Frac... 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS FRAMING ADJUSTMENT CALCULATION Cavity U -Value: (,1 / 2.38 .x 0.85), + (1 / Framing 5.00 x 0.15) = Total 0.386 Btu/hr-s.f-F Total R -Value: 1 / 0.386 = 2.59 hr-sf-F/Btu Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. STUCCO.0.88 0.875 in stucco 0.17' 0.17 2. BLDG.,PAPER Building paper (felt) 0.06 0.06 3c, AIR.WLL.3.50 3.5 in & greater air space: heat sidewys 0.85 -- 3f. FIR.2X4: 2x4 fir -- 3.46. 4,. GYP.0.50 0.50 in gypsum or plaster board 0.4.5 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total Unadjusted R -Values 2.38 5.00 FRAMING ADJUSTMENT CALCULATION Cavity U -Value: (,1 / 2.38 .x 0.85), + (1 / Framing 5.00 x 0.15) = Total 0.386 Btu/hr-s.f-F Total R -Value: 1 / 0.386 = 2.59 hr-sf-F/Btu HVAC SIZING Page 1 HVAC Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 ******* Project Address........ 55-685 Cherry Hills La Quinta, CA *v5.10* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 47-596 Lake Canyon Drive Plan Check.. Date .Aguanga, CA 92536 800-735-8152 Field Check/ Date Climate Zone. ........ 15 Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc. MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S,92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.3°8.4 3wh GENERAL INFORMATION Floor Area ................. Volume.. ........ Front Orientation.......... Sizing Location............ Latitude .................... Winter Outside Design...... Winter Inside Design....... Summer Outside Design....... Summer Inside Design....... Summer Range ............... Interior Shading Used...... Exterior Shading Used..:.... Overhang Shading Used...... Latent Load Fraction....... Description 4.578 sf 531.12, cf Front Facing PALM DESERT 33.7 degrees 32 F 70 F 112 F 78 F 34 F No No No 0.20 HEATING AND COOLING LOAD SUMMARY 9 0 deg (E) Heating Cooling (Btuh) (Btuh) Opaque Conduction and Solar....... 2992:8 7992 Glazing Conduction ............... 39.275 35,141 Glazing Solar .............. n/a 40464 Infiltrat.ion..................... 2804.6 18560 Internal Gain .................... n/a 25.50 Duct.s............................. 9725 10471 Sensible Load .................... 106973 115177 Latent. Load ...................... n/a 23035 Minimum Total Load 106973 138,212 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. HVAC'SIZING Page 2 HVAC Project Title......:.:. J.Paul Residence Date..1.1/27/00 16:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen. Run-vbloe80.13R21.38.4 3wh HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE '1ZONE' Floor Area.... .................. 24.2:1 sf Volume ............ ........ .... Volume ........................... 303.26 cf Heating Description Heating Cooling Description (Btuh) (.Btuh) Opaque Conduction and Solar...... 11334 3960 Glazing Conduction ............... 25314 226.49 Glazing Solar .................... n/a 2944.6 Infiltration ..................... 1.6014 10597 Internal Gain ..................... n/a 13'2.6 Ducts ............................ 5266 6798 Sensible Load .................... 57928 74777 Latent Load ....................... n/a 14955 Minimum Zone Load ZONE '.2ZONE' 57928 Floor Area................. ..... 1127 sf Volume ............ ........ .... 1248.6 cf Heating Description (Btuh) Opaque Conduction and Solar...... 4391 Glazing Conduction ................ 8785 Glazing Solar .................... n/a Infiltration. .... ............ 6593 Internal Gain .................... n/a Ducts ............................ 1977 Sensible Load...... 21746 Latent Load ...................... n/a Minimum Zone Load 21746 89733 Cooling (Btuh) 1792 7860 7699 4363 638 2235 2458'7 4917 2'9504 1 HVAC SIZING Page 3 HVAC Project Title.......... J.Paul Residence Date..11/27/00 16:03:39 MICROPAS5 v5.10 File-JPAUL Wth-CTZ15S9'2 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run-vbloe80.13R21.38.4 3wh ZONE 13ZONEI Floor Area ................... .. 1030' sf Volume. 1030,0 ,cf. Description Heating Cooling (Btuh) (Btuh) Opaque Conduction and Solar...... 14202 2239 Glazing Conduction ............... 5176 4631 Glazing Solar .................... n/a 3319 Infiltration......... 5439 3599 Internal Gain .................... n/a 5.87 Ducts.............. ................ 2482 1438 Sensible Load ................. 27299 1.5813 Latent Load ...................... n/a Minimum Zone Load 2729°9 3163 18975 I Cap Catole Christensen, Certified Energy Analyst TITLE -24 ENERGY CALCULATIONS October 11, 2000 ENERGY CALCULATIONS FOR: Southwest Concepts 82-723 Dr. Carreon Blvd. Indio, CA 92201 PROJECT: J. Paul Guest House 470 sq.ft. Custom Home 55-685 Cherry Hills La Quinta, CA 92253 Standard Design Proposed Design Compliance Margin 111.90 111.03 +0.87 CTZ 15 - 32.3% fenestration Dual fenestration, Default,. Std. Drape Walls R-19; Roof R-38, Duct R.4.2; AFUE 80%; SEER 12.0 One 50 gal gas water heaters EF.58 CONTENTS CF -1R MF -1R C -2R C -3R HVAC Sizing CF -6R IC -1 515 Co.�5 cel -2'-C la-� CITY OF LA UINTA RHILDING & SAFEV DEPT. AP'P'ROVED FOR CONSTRUCTION DATE 1jill eo BY 47-596 Lake Canyon Drive; Aguanga; CA 92536 1-800-735-8152. Member'CABEC - California. Association of Building Energy Consultants CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title.......... J.Paul Guest House Date..10/11/00 07;0.3:51 U �11 ******* Project Address........ .55.-685 C erry Hi s La Quinta, CA *x5.10* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 47-596 Lake Canyon Drive Plan Check Date Aguanga, CA 92536 800-735-8152 Field Check/ Date Climate Zone. ..... 15 Compliance Method....... MICROPAS5 v5.10 for 1998 Standards by Enercomp,, Inc. MICROPAS'5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run - GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type . Building Front Orientation. Number of Dwelling Units... Number of Stories.. ..... Floor Construction,Type.... Glazing Percentage......... Average Glazing U -value.... Average Glazing SHGC....... Average Ceiling Height..... Component Frame Type Type Wall Wall Roof S1abEdge SlabEdge . Orientation Wood Wood Wood None None 470 sf Single Family Detached New Front Facing 0 deg (N) 1 1 Slab On Grade 3:2.3 k of floor area 0.72 Btu/hr-sf-F 0.73 10 ft BUILDING SHELL INSULATION Cavity Sheathing Total Assembly R -value R -value R -value U -value Location/Comments R-17.8 R-0 R-17.8 0.065 R-1.7.8 R-0 R-17.8 0.064 To mech R-11 R-27 R-38 0.025 flat R-0 R-0 F2=0.760 To outside R-0 R-0 F2=0..5.10 to garage FENESTRATION Area U- Interior Exterior (sf) Value SHGC Shading Shading Over- hang/ Fins Window Front (N) 30.0 0.720 0.730 Blind B1dShade None Window Front (N) 6.7 0.570 0.7.00 Standard Standard None Window Left (E) 30..0 0.720 0.730 Blind Standard Yes Window Right (W) 75.0 0.720 0.730 Blind Standard Yes Window Right (W) 1.0.0 0.870 0.700 Blind B1dShade None X30.1 :M461114:910)DK Area Slab Type (sf) Standard Slab 470 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -'1R Project Title.......... J.Paul Guest House Date..10/1.1/00 07:03:51 MI'CROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run - HVAC SYSTEMS Minimum Duct Duct Tested Duct ACCA Thermostat Equipment Type, Efficiency Location R -value Leakage Manual D Type Furnace 0..800 AFUE Attic R-4.2 No No Setback ACSplit 12.00 SEER Attic R-4.2 No No Setback WATER HEATING SYSTEMS Number Tank External in Energy Size Insulation Tank Type :Heater Type Distribution Type System Factor (gal) R -value Storage Gas Standard 1 0.58 50 R- n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS **'* Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates non-standard Fenestration Shading.. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R Project Title.......... J.Paul Guest House Date..10/11/00 07:03:51 MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen Run - COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features Modeling Assumptions, section. DESIGNER or OWNER. DOCUMENTATION AUTHOR Name.... Stephen R. Nieto Name..... Carole Christensen Company. SouthWest Concepts Company. Carole Christensen Address. 82-723 Dr. Carreon Blvd. Address. 47-5.96 Lake Canyon Drive Indio, CA 92.201 Aguanga, CA 92536 Phone... (760) 352-5555 Phone... 800-735--8152 License. Signed.. Signed.. at ate ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. ate Certified Energy Analyst Carole Christensen, CEPE rrr-P r r - R 9&99-M CABEC CaIMbwdo Association of DuNding Energy Comimm MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 1 on) MY -IR Note: i„owrise residential buildings subject to the Standards must contain, these measures regardless of the compliance approach used, ms marked with an asterisk (•) .may be superseded by more stringent compliance requirements listed on the Certificate of Compliance: When this checklist is•incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT 'Building Envelope Measures: • §130(a): Minimum R-19 ceiling insulation.. §150(b): Loose fill insulation manufacturer's labeled IkValue. N14- • § 150,(c): Minimum R-13 wall insulation in wood framed walls:or equivalent U -value fit, metal frame walls (does not apply to exterior mass walls), • §150(d): Minimum R-13 raisedfloor insulation in framed floors. N § 150(1),:, Slab edge. insulation - water absorption rate no.greater than 0.3%, water vapor transmission rate no greater than 2:0 pennn/inch.. §118: Insulation specified or installed meets insulation quality -standards. Indicate type and,form. §,116-1.7 Fenestration, Products, Exterior Doors, and lnfiltration/Exfiltration Controls I . Doors and windows between conditioned and unconditioned, spaces:designed to limit air leakage. 2. Fenestration products (except.field-fabricated)have label with certified 0 -value, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. .3. Exterior doors acid windows weatherstripped; all joints and penetrations caulked and sealed. §ISG,` Vapor barriers mandatory in Climate Zones 14 and 16 only. N § 150(f): Special infiltration barrier installed to comply with § 151 meets:Commission quality standards. §150(e)! Installation of Fireplaces, Decorative Gas Appliances and Gas1ogs. I,.Masonry and factory -built fireplaces.have: a. Closeable metal. or glass door b. Outside air intake with damperand control c. Flue damper and control 2. No continuous burning gas pilot lights allowed. Space Conditioning, Water Heating and Plumbing System Measures: 110-§113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. § I50(h): Heating andior cooling loads calculated in accordance with ASHRAE, SMACNA or ACOA. §150(i): Setback thermostat on all applicable heating and/or cooling systems. §1500): Pipe and tank insulation 1. Storage gas water heaters rated with an Energy Factor less than'0.58 must beexternally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest.to water heatertank, non -recirculating systems, insulated (R4 or greater) 3_13ack-up tanks for solar system, unflred,storage tanks, orother indirect hot water tanks have R-12 external insulation or R-16 combined intemal/extemal insulation. 4..A1l buried or exposed piping insulated in recirculating sections of hot water systems. 5.(- ag system piping.below 55• F insulated. 6. Piping insulated between heating source and indirect hot water tank. July 1,1999 MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 2 of 2) MF -1R Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of thecompliance approach.used. Items marked with an asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated.into the permit documents, the features noted shall be consideredby all parties as minimum component performance specifications for the mandatory measures whether they art shown elsewhere in the documents or on. this checklist only. Instructions: Check or initial applicable boxes when completed or enter N/A if not; applicable. DESCRIPTION DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) • § 150(m): Ducts and Fans 1. All ducts and plenums constructed, installed, insulated, fastened, and -scaled to comply with the ICBO 1997 UMC sections 601 and 603; ducts insulated to a minimum, installed R4.2 or ducts enclosed entirely within conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant or other ductclosure system that meets the applicable requiremetns of UL181, ULIBIA, or ULIBIB and other applicable specified tests for longevity given in §150(m).. 2. Exhaust fan systems have back draft or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, / / manually operated dampers. VVV § 114: Pool and Spa Heating Systems and"Equipment. 1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating -and no pilot light. 2. System is installed with: •. At least 36" of pipe between filter. and heater for future solar heating. `- b. Cover for outdoor pools or outdoor spas. . 3. Pool system has directional inlets and a circulation pump time switch. § 115: Gas fired central furnaces, pool heaiers,:spa heaters or household cooking appliances have no continuously buming.pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Bw/hr) (/ Lighting Measures: § 150(k)l.: Luminaires for general lighting In kitchens shall have lamps with an efficacy of 40 lumens/watrorgreater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible. lighting control panel at an entrance to the kitchen. v § 150(k)2.: Rooms with a shower or bathtub must either have at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater.switched at the entrance to the room ozone of the alternatives to this requiremental lowed in § I30(k)2.; and recessed ceiling.fixtures:are IC (insulation cover) approved. July 1, 1999 COMPUTER METHOD SUMMARY Page 1 C -2R Project Title........... J.Paul Guest House Date..10/11/00 07:03:51 Project A cess........ 55-685 C =cry Hi s La Quinta, CA *v5.10* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen 47-596 Lake Canyon Drive Plan Check Date Aguanga, CA 92536 800-735-8152 Fie C ec Date Climate Zone.. ..... 15 Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc. MICROPAS5 x5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User, -Carole Christensen Run- .MICROPAS5 ENERGY USE SUMMARY Energy Use Standard Proposed (kBtu/.sf-yr-) Design. Design Space Heating.......... 4.18 5.2.4 Space.Cooling....... ... 68.04 70.99 Water Heating.......... 39.68 34.80 Total 1.11.90 1.1.1.03 Compliance Margin -1.06 -2.95 4.8'8 0.87 *** Building complies with Computer Performance *'** GENERAL INFORMATION Conditioned Floor Area...... 470 sf Building Type .............. Single Family Detached Construction Type .. ... New Building Front Orientation. Front Facing O deg (N) Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... ReducedYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade. Area......... Glazing Percentage.......... Average Glazing U -value,.... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 1 4700 cf 470 sf 32.3 % of floor area 0.72 Btu/hr-sf-F 0.73 10 ft BUILDING ZONE INFORMATION Floor # of Area Volume Dwell Cond- Thermostat Zone Type (sf) (cf) Units itioned Type HOUSE Residence 470 4700 1..00 Yes Setback Vent Vent Air Height Area Leakage (ft) (sf) Credit 2.0 Standard No COMPUTER METHOD SUMMARY Page 2 C -2R Project Title........... J.Paul Guest House Date..10/11/00 07:03:5.1 MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM C -'2R User#-MP1017 User -Carole Christensen Run - OPAQUE SURFACES PERIMETER LOSSES Location/ Comments To meth flat Area U- Insul. Act Solar Form 3 Surface (sf) value R-val Azm Tilt Gains Reference HOUSE HOUSE Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght HOUSE 1 Wall 143 0.065 17.8 0 90 Yes W.19.2X6.16 2 Wall 45 0.065 17.8 0 90 No W.19.2X6.16 3 Wall 225 0.065 17.8 90 90 Yes W.19.2X6.16 4 Wall 160 0.065 17.8 180 90 Yes W.19.2X6.16 5 Wall 65 0.065 .17.8 270 90 Yes W.19.2X6.16 6 Wall 90 0.065 17.8 27`0 90 'Yes W.19.2X6.16 7 Wall 70 0.064 1.7.8 0 90 Yes GWALL.R19 8 Roof 470 0.025 38 n/a 0 Yes R.38.2X4.24F PERIMETER LOSSES Location/ Comments To meth flat OVERHANGS AND SIDE FINS Length F2 Insul Solar Right Fin - Area Surface (ft) Factor R-val Gains Location/Comments (sf.) HOUSE Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght HOUSE 9 S1abEdge 88 3 Window 0.7.60 R-0 1.5 0'.0 2.0 No To outside 2.0 1.5 0.0 4 Window 10 S1abEdge 7 1.0 0.0 n/a 0.510 R-0 n/a n/a n/a No, to garage FENESTRATION SURFACES Area U- Act Exterior Shade Interior Shade Orientation (sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC HOUSE 1 Window Front (N) 30.0 0..720 0.730 0 90 B1dShade/0.2 Blind/0.47 2 Window Front (N) 6.7 0.570 0:700 0 90 Standard/0.76 Standard/0.68 3 Window Left (E) 30.0 0.720 0.730 90 90 Standard/0.76 Blind/0.47 4 Window Right (W) 75.0 0.720 0.730.270 90 Standard/0.76 Blind/0.47 5 Window Right (W) 10.0 0.870 0.700 270 90 B1dShade/0.2 Blind/0.47 OVERHANGS AND SIDE FINS SLAB SURFACES Area Slab Type (sf) HOUSE Standard Slab 470 Window- Overhang Left Fin Right Fin - Area Left Rght Surface (sf.) Wdth Hgth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght HOUSE 3 Window 30.0 5.0 6.0 1.5 0'.0 2.0 2.0 2.0 1.5 0.0 2.0 1.5 0.0 4 Window 75.0 10.0 7.5 1.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a SLAB SURFACES Area Slab Type (sf) HOUSE Standard Slab 470 COMPUTER METHOD SUMMARY Page 3 C -2R Project Title ........... J.Paul Guest House Date.,.10/11/0.0 0'7:0:3:51 M.ICROPAS5 x5.10 File-JPAULGST' Wth-CTZ15'S'92 Program -FORM C -2R User#-MP1017 User -Carole Christensen Run - System Type HOUSE Furnace ACSplit Tank Type. 1 Storage Minimum Efficiency HVAC SYSTEMS Duct Duct Tested Duct ACCA Location R -value Leakage Manual D 0.800 AFUE Attic -4.2 No 12.00 SEER Attic R-4.2. No WATER HEATING SYSTEMS Number in Heater Type Distribution Type System Gas Standard 'i Duct Eff No 0.743 No 0.596 Tank External Energy Size Insulation Factor (gal) R -value 0.58 50 R- n/a, SPECIAL FEATURES AND MODELING ASSUMPTIONS ** Items in this section should,be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check .and field inspection. *** This building incorporates non-standard Fenestration Shading. REMARKS CONSTRUCTION ASSEMBLY Page 1 3R Project Title.......... J.Paul Guest House Date..1.0/11/00 07:03:51 MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S'92 Program -FORM 3R User#-MP1017 User -Carole Christensen Run - Parallel Path Method Reference Name . W.19..2X6.16' Description Wall R-19 2x6 16oc Type ........... Wall R -Value 17.8 Hr-sf-F/Btu Framing Material ..... FIR.2X6 Type Wood Description ... 2x6 fir Spacing 16 inches on center Framing Frac.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Total R -Value: 1 / 0.065 = 15.28 hr-sf-F/Btu Material Cavity Frame Name. Description R -Value R -Value 0. FILM.EX Exterior air film: winter Value 0.17 0.17 1. STUCCO.0.88 0.875 in stucco 0.17 0.17 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3c. BATT.R19 R-19 batt insul (cavity = 5.5 in) 17.80 -- 3f. FIR.2X6 2x6 fir -- 5.45 4. GYP.,0.50 0.50 in gypsum or ,plaster board 0.45 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total Unadjusted R -Values 19.34 6.98 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 19.34 x 0.85) .+ (1 / 6.98 x.0.15) = 0.065 Btu/hr-sf-F Total R -Value: 1 / 0.065 = 15.28 hr-sf-F/Btu CONSTRUCTION ASSEMBLY Page 2 3R Project Title.......... J.Paul Guest House Date..10/11/00 07:03:51 MICROPAS'5 x5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM 3R User#-MP1.017 User -Carole Christensen Run - Parallel Path Method Reference Name GWALL.R19 Description .... Wall R-19 2x6 16oc Type Wall R -Value 17.8 Hr.-sf-F/Btu Framing Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material. Name Description 0. FILM. EX 1. GYP. 0. 5 0 3c. BATT.R19 3f. FIR.2X6 4. GYP. 0.50 I. FILM.IN.WLL Material ..... FIR.2X6 Type .. Wood Description 2x6 fir Spacing ....... 16 inches on center Framing Frac.. 0.15 Exterior air film: winter value 0..50 in gypsum or plaster board R-1.9 batt insul (cavity = 5.5 in) 2x6 fir 0.50 in gypsum or plaster board Inside air film: heat sideways •FRAMING ADJUSTMENT CALCULATION Cavity Cavity Frame R -Value R -Value•, G.17 0.4.5 17.80 0.45 0.68 Total Unadjusted R -Values 19.55 Framing Total U -Value: (1 / 1.9.55 x 0.85) + (1 / 7.19 x 0.15) _ 0.064 Btu/hr-sf-F Total R -Value: 1 / 0.064 = 15;.55 hr-sf-F/Btu. 0.17 0.45- 5.45 0.45 0.68 7.19 CONSTRUCTION ASSEMBLY Page 3 3R Project Title.......... J.P.aul Guest House Date..10/11/00 07:03:51 MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -FORM 3R User#-MP10.17 User -Carole Christensen Run - Parallel Path Method Reference Name . R.38.2X4.24F Description .... Roof R-38 2x4 24oc Type Roof R, -Value ........ 38 Hr-sf-F/Btu Framing Material ......FIR.2X4 Type ......... Wood Description ... 2x4 fir Spacing ...... 24 inches on center .Framing Frac.. 0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Name. Description O. FILM.EX Exterior air film: winter value 1. BUILTUP.0.38 0.375 in built-up roofing 2. BLDG.PAPER Building paper (,felt) 3. PLY.0.50 0.50 in plywood 4. AIR.RF.3.50 3.5 in & greater air space: heat flow up 5. BATT.R27.0 R-27 batt insulation 6c. BATT.RI.1.0 R-11 batt insul (cavity >3.5 in) 6f. FIR.2X4 2x4 fir 7. GYP.0.50 0.50 in gypsum or plaster board I. FILM.IN.RF .Inside air film: heat flow straight up 'FRAMING ADJUSTMENT CALCULATION Cavity Cavity Frame R -Value R -Value 0.17 0.17 0.33 0.33 0.06 0.06 0.62 0.62 0.80 0.80 27.00 27.00 11.00 -- -- 3.46 0.45 0.45 0.61 0.61 Total Unadjusted R -Values 41.04 33.51 Framing Total U -Value: (1 / 41.04 x 0.93) + (1 / 33.51 x 0.07) = 0.025 Btu/hr-sf-F Total R -Value: 1 / 0.025 = 40.40 hr-sf-F/Btu HVAC SIZING Page 1 HVAC Project Title.......... J.Paul Guest House Date..10,/11/00 07:03:51 Project Address........ 55-685 Cherry Hills ******* La Quinta, CA *v5.10* Documentation Author... Carole Christensen ******* Building Permit Carole Christensen, 47-596 Lake Canyon Drive Plan Check./ Date Aguanga, CA 92536 800-735-8152 Field Check/ Date Climate Zone. ..... 15 Compliance Method...... MICROPAS5 v5.10 for 1998 Standards by Enercomp, Inc. MICROPAS5 v5.10 File-JPAULGST Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen Run - GENERAL INFORMATION Floor Area .................. 470 s'f volume.. ..... ............. 4700 cf Front Orientation.......... Front Facing 0 deg (N) Sizing Location............ PALM DESERT Latitude... .... ........ 33.1 degrees Winter Outside Design...... 32 F Winter Inside Design........ 70 F Summer Outside Design...... 112 F Summer I-nside Design....... 78 F Summer Range. .. .... . ...:34 F Interior Shading Used ...... No Exterior Shading Used...... No Overhang Shading Used...... No Latent Load Fraction....... 0.20 HEATING AND COOLING LOAD SUMMARY Sensible Load.... ....... ...... 12.928 19770 Latent Load ....................... n/a 3954 Minimum Total Load 12928 23724 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment., oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. Heating. Cooling Description (Btuh) (Btuh) Opaque Conduction and Solar...... 5.102 2292 Glazing Conduction ............... 4169 3730 Glazing Solar .................... n/a 7758 Infiltration ...................... 2482 1642 Internal Gain..... .................... n/a 2550 Ducts ............................ 1175 1797 Sensible Load.... ....... ...... 12.928 19770 Latent Load ....................... n/a 3954 Minimum Total Load 12928 23724 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment., oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. INSTALLATION CERTIFICATE (Page 1 of '7) CF -6R Site Address Permit Number .An installation certificate is required to be posted at the building site or made available -for all appropriate inspections. (The information -provided on this foam is required;, however, use of this form to provide.the information is optional.) After completion..of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 1:0-103(b). HVAC SYSTEMS: Heating Equipment 'Equip. # of Efficiency Duct Duct or Heatipg Heating Type (pkg. CEC.Certified Mfr Name Identical (AFUE, etc.)' Location Piping Load Capacity heat pump) and Model Number systems I2CF-1R valuel (attic etc Y R -value (Btu/hr) (B ,/hri Cooling Equipment Equip. CEC Certified Compressor k of Efficiency Duct Cooling Cooling Type (pkg. Unit Mfr: Name>and Identical (SEER„etc.)' Location Duct Load Capacity heat nump) Model Number Systems 2CMR valuel (attic_ etc.). R -value (Btulhr) (Btu!_h_rl 1. > reads greater than or equal to: I, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF4R) submitted for compliance with the Energy Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efciency Regulations or Part 6), where applicable.. Signature, Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner WATER HEATING SYSTEMS: Distribution If Recir- # of Rated Tank E1fi- External Heater CEC Certified M e, Type (Std, culation, Identical' Input (kW Volume ciency2 Standby' Insulation Type Name&Model Number Point -of -Use) Control.Type Systems or Btu/lu) (gallons) (EF, RE) Loss (%) R -value' 2 For small gasistorage (rated input of less than or equal to 75,000 Btu/hr), electric resistance and heat -pump water heaters, IistEnergy Factor. .For large gas storage water heaters (rated input -of greater than 75,000 Btu/hr), list Recovery Efficiency, Standby Loss sa d.Rated lnput: For instantaneous gas water heaters, list Recovery Efficiency. and Rated Input: 3. R-12 external insulationis mandatory for storage water heaters. iith:an energy factor of less than 0.58. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Commission, pursuant to Title 24, Part 6, Section 111. I, the undersigned, verify that -equipment listed above my signature is: t) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance -(Form CF -IR) submitted for compliance with the Energy.Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part;6), where<applicable. Signature, Date COPY TO:. Building.Department HERS Provider (if applicable) Building Owner at Occupancy Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner a July 1, 1999 INSTALLATION CERTIFICATE (Page 2 of 7) CF -6R Site Address Permit Number FENESTRATION/GLAZING: Total Quantity Interior or Product Product of Like Exterior Shading U -Value' (5 SHGC' (5 q of Product Square Deviee'or Comments/Location% Manufacturer/Brand-Name. CF -1R value)' CF- IRvaluel Penes (Optional) 'Feet Overhana SnecialFeatures (GROUP'LIKE PRODUCTS) 1. 2. — 3. _ 4. _ 5. 6. _ 7. _ 9. pp. — — 12.. 13. 14: — 15. ' Manufactured fenestration products use the values from the product label. Field fabricated fenestration products use the default values from Section 116 of the Energy Efficiency Standards. _ lnstalled U -value must be less than or equal to values from CF -1R. Installed SHGC must be less than or equal to values from CF -1R, or a shading device (interior; exterior or overhang) is installed as specified on the CF -1R. Alternatively, installed, weighted average U -values for the total fenestration area are fess than orequal to values from CF -1 R. 1, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product installed; 2) is equivalent to or has a lower U -Value and lower SHGC than that specified in, the certificate of compliance (Form CF -1R) submitted for compliance with'the Energy Efficiency Standards for residential buildings;. and.'3.) the product meets or exceeds the appropriate. requirements for manufactured devices (from Part 6), where applicable. ltem #s. Signature, Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Item #s - (if'applicable) .Item ;#s (if applicable) Signature, Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner- OR Window Distributor Signature, Date Installing Subcontractor (Co: Name), OR General Contractor (Co. Name) OR .Owner OR Window Distributor COPY TO: Building Department HERS Provider (if applicable) Building Owner at Occupancy July 1" 1999 INSTALLATION CERTIFICATE (Page 3 of 7) CF -6R Site Address Permit Number DUCT DIAGNOSTICS This building obtained compliance credit for: ❑ Duct sealing ❑ Duct Area Reduction ❑ ACCA Manual :D design and installation CREDIT -FOR REDUCED DUCT SURFACE AREA OR LOCATION Duct Location* Exterior Measured Surface Exterior Area Surface Area ❑ Attic ❑ Crawlspace ❑ Basement ❑ Other ACCA Design ❑ Duct Design on Plans ❑ Installed duct diameters match plans ❑ TXV installed ❑ Access to TXV valve (if installed) ❑ No TXV, Fan air flow (CFM) Duct Sealing ❑ Duct Leakage. Measured ❑Measured.leakage (CFM) *Ignore ducts in , HVAC Fan air flow (CFM) (measured or calculated as. conditioned. space. ❑CFM,= 0.7 x Aflorn for CZ 8 through 15 Only a check is ❑CFM 0.5 x Afla,,, for CZ I through 7 & 16 required for location credit. or, if the equipment size .is known, the larger of 1 or 2. 1. ❑CFM = 400 x Cooling Capacity in Tons or 2. ❑CFM = 21.7 x Heating Capacity in Thousands of Btu per hour) Leakage divided by HVAC Fan air flow (must be:5 0.06). For AEROSOL TYPE SEALANTS ONLY The following diagnostic testing: was completed: ❑ Duct Fan Pressurization at rough -in measured leakage CFM) CHECK AFTER FINISHING WALL:: ❑ Pressure pan test ❑ House pressurization test ❑ Visual Inspection of Duct Connections. Provide Follow-up Test.Results or Inspection Results on a Separate Page ❑ This certifies thatthe duct surface area and duct locations were verified. When compliance credit is claimed for duct surface area reductions and duct location improvements beyond those covered by default assumptions, builder employees or subcontractors shall certify that they have verified that the duct surface, area and locationsmatch those on the plans: and .shall indicate the! duct surfacearea in each duct location on the CF -6R. ❑ This is to certify that the above diagnostic test results and the work:I performed associated with the test(s) is in conformance with the requirements for compliance credit. [The builder shall provide the HERS provider a copy of the CF - 6R signed by the builder employees or sub -contractors certifying that diagnostic testing and installation meet the requirements for compliance credit.] Tests. Performed COPY TO: Signature, Date Installing Subcontractor (Co: Name) OR General Contractor (Co. Name) Building Department HERS Provider (if applicable) Building Owner at Occupancy July 1, 1999 INSTALLATION CERTIFICATE (Page 4 of 7) CF -6R Site Address Permit Number BUILDING ENVELOPE LEAKAGE DIAGNOS'T'ICS This building obtained. compliance credit for: ❑ Envelope sealing using diagnostic testing (CF -1R) Diagnostic Testing .Results Needed for Compliance Measured (from CF -1 R) Blowerdoor Test Results Building Envelope Leakage (CFM @ 50 Pa) Leakage level equivalent to an SLA of 3.0 from CF -1 R Minimum Building Leakage equivalent to an SLA of 1.5 from CF -1 R (CFM c@ 50 Pa) ❑ Yes ❑ No Is design leakage less than the SLA 3.0 equivalent (from CF -1R)? ❑ Yes ❑ No Is mechanical ventilation installed? (Required if design is .less than 3.0 SLA) ❑ Yes ❑ No Is..measured.leakage (without fans operating) less than, minimum in the above Table (1.5 SLA from CF -1R)? ❑ Yes ❑ No Is mechanical supply ventilation installed to assure house pressure does not: go below minus 5 Pascal relative to outside ambient with all exhaust fans operating? Mechanical Ventilation — Fill in Table if mechanical ventilation is installed Used for Compliance Measured (from CF -1 R) Actual Continuous 'Mechanical Ventilation (CFM)' Continuous Mechanical Supply Ventilation (CFM) Required to maintain -5 Pa if building envelope leakage is less than minimum (see above) Total Power Consumption of Continuous Mechanical Ventilation (Wafts) 2 ❑ This certifies. that the building envelope leakage was verified.. When compliance credit is claimed for building leakage reduction below default assumptions, builder employees or subcontractors. shall certify that:they have verified that the building leakage level matches that.used for compliance on the CF -1 R and shalldocument the leakage levels required for compliance and the tested infiltration values on the CF -611. ❑ This is to certify that ;the above diagnostic test results and the work I performed associated with the test(s) is in conformance with: the.requirements for compliance credit. [The builder shall provide the HERS provider a copy of the CF -6R signed by the builder employees or sub -contractors certifying that diagnostic testing and installation meet•the requirements for compliance credit.] Test Performed Signature COPY TO: Building. Department HERS Provider (if applicable) Date Testing Subcontractor (Co. Name) OR General Contractor (Co. Name) ' When mechanical ventilation. is required, CEM less than 0.047 CFM per square foot of conditioned floor area indicates failure to achieve compliance. s As determined from label on. fan or manufacturers literature. July 1, 1999 INSTALLATION CERTIFICATE (Page 5 of 7) CF -6R Site Address Permit Number The following is an explanation ofmany of the input values required on this form: HVAC SYSTEMS Heating Equipment Type must be one of the following: Furnace: Gas (including Liquefied Petroleum Gases) or oil -fired central furnace & space heater Boiler: Gas or oilfired boiler PckgHeatPump: Packaged central heat pump SplitHeatPump: Split central heat pump RoomfleatPump: Room heat pump LgPkgHeatPumpc Large packaged heat pump 2 65,000 Btu/hr output) Electrici Electricxesistance heating (fixed.HSPF = 3.413); radiant electric resistance (fixed HSPF = 3.55). CombinedHydro: Reference•water heater under water heating systems below CEC Certified Manufacturer Name & Model Number from applicable Commission approved appliance directory. # of Identical Systems is forthose systems with the same efficiency, duct location, duct R -value and capacity. Efficiency from applicable Commission certified appliance directory. Duct (or Piping) Location is attic, crawl space, CVC crawl space, conditioned space, unconditioned space or none. Duct:(or Piping) R -Value from Directory of Certified Insulation Materials and/or manufacturer's data. Heating/Cooling Load refer to Commission approved load calculation procedure. Heating/Cooling Capacity from the applicable. Commission certified appliance directory. Note: location elevations over 2,000 ft above sea level require a derating of output capacity (refer to manufacturer's literature). Cooline Eduinment Tvoe must be one of the following: SplitAirCond: Split system air conditioner PckgAirCond: Packaged air conditioner Split Heat Pump; Split system heat pump PckgHeatPump: Packaged heat pump RoomHeatPump: Room heat pump LgPkgHeatPump: Large packaged;heat pump (2t 65,000.Btu/hr output). Substitute.EER for SEER when SEER is not available RoomAirCond: Room air conditioner. Minimum SEER varies" LgPkgAirCond: Large packaged air conditioner (Z 65,000 Btuft output). Substitute EER for SEER when SEER is not available EvapDirect: Direct evaporative cooling system. For compliance calculation ,purposes, fixed values: SEER = 11.0; duct location = attic; duct insulation R -value = 4.2 EvapIndirect: Indirect -evaporative cooling system. For compliance calculation purposes, fixed values; SEER = 13.0; duct location = attic; duct insulation R -value = 4.2 *Refer to Energy Commission publication.Appliance Efficiency Regulations, P400-92-029 July 1, IM INSTALLATION CERTIFICATE (Page 6 of 7) CF -6R Site Address Permit Number The following is an explanation of many of the input values required on this form:. WATER HEATING SYSTEMS Distribution Systems Refer to Residential Manual for more details: Standard: Standard —Supply pressure based system, no pumps Pipe Insulation: Pipe Insulation on all 3/4 -inch pipes POU/HWR: Point of Use/Hot Water Recovery System Recirc/NoControl: Recirculation loop with no controls Recirc/Timer: Recirculation loop with a timer Recirc/Temp: Recirculation loop with temperature. control Recirc/Time+Temp: Recirculation. loop with a timer and temperature control Reeire/Demand: Recirculation loop with demand control Water Heater Tuve Storage Gas, Oil. or Electric Heat Pump Instantaneous Gas Instantaneous Electric Large, Storage Gas. Indirect Gas (Boiler) FENESTRATION/GLAZING Information Needed Energy Factor Recovery Efficiency Standby Loss Rated Input Yes No No No, Yes No No No No Yes No No Yes No No No TIo Yes Yes Yves No Yes (AFUE) No Yes Fenestration: Windows, sliding glass doors, French doors, skylights, garden windows, and any door with more than one square foot of glass Operator Type: Slider, hinged,, fixed U -Value: Installed U=value must be less than or,equal to value from CF -1R OR Installed weighted average U -value for the total -fenestration area is less than orequal to value from CF- l R SHGC: Installed SHGC must be less than or equal to value from CF -IR OR Installed weighted SHGC for the total fenestration area is less than or equal to value from CF -1 R OR An interior shading device, overhang, or exterior shading device is installed consistent with the CF -1R Shading Device: Include when the building complied using an interior shading device: blinds, opaque roller shades, blinds (do not .list draperies), an exterior shading device: woven sunscreen, louvered sunscreen, low sun:angle sunscreen, roll - down awning, roll -down blinds or slats (do not list bug screen), or an overhang include depth in feet July 1, 1999 INSTALLATION CERTIFICATE (Page 7 of"7) CF -6R Site Address Permit,Number The following is an explanation of many of the input values required on,the, Diagnostic portion of this form (page 3 of 6): TYPE,OF CREDIT Refer to Residential Manual Chapters 4 and 5 for more details: Reduced Duct Surface Area: Calculated as the outside area of the duct. Areas must be measured and verified by a HERS rater. Improved Duct Location: Supply ductlocated in other than attic, as verified by location of registers (does not require HERS rater verification). Catastrophic Leakage: Pressure pan test readings must be less than 1.5 Pascal at a house pressure of 25 Pascal.. TXV: Access cover required to facilitate verification. Infiltration Reduction: Infiltration is measured without mechanical ventilation operating. Mechanical ventilation is required for very tight house construction when credits for infiltration reduction using diagnostic testing are being used for achieving compliance. These very tight houses are defined as those with SLA of less than I.S. The compliance documentation (CF -1R) will contain the measured CFM target value from a blower door test at 50 Pascal pressure difference that represents this SLA: of 1.5. Mechanical ventilation is also required if the builder chooses to design the building to use mechanical ventilation and claims a credit for infiltration below an SLA of 10. The compliance documentation (CF -1R) will contain the measured CFM target value that represents this 3.0 SLA. .If -the builder claims credit in a design for infiltration reduction that is at an, SLA of 3.0 or higher, and the actual measured SLA is 1.5 or greater, then mechanical ventilation is not required. If the SLA in this case were below 1.5, then mitigation (such as mechanical ventilation) would be required. July 1, 1999 INSULATION CERTIFICATE IC -1 Number and Street city County Description of Installation I . .ROOF Subdlv13lon Material Brand Name Thickness (inches) Thermal Resistance (R -Value) CEILING Ban or Blanket Type Brand Nacre Thickness (inches) normal Resistance (R -Value) Loose Fill Type Brand Contractor's min installed weight/R' lb Minimum thickness inches Manufacturers installed weight per square foot to achieve'Ihermal Resistance (R -Value) 3 EXTERIOR WALL Frame. Type A. Cavity Insulation Nfatetial`- Thickness (inches) B Exterior Foam .Sheathing Material Thickness (inches) 4. RAISED FLOOR Material Thickness (inches) S. SLAB FLOOR/PERIM TER Material "thickness (inches) Peru-neter Insulation Depth (inches) 6. FOUNDATION WALL Material Thickness (inches) Brand Name Thermal Resistance (R -Value) Brand Name Thermal Resistance (R -Value) Brand Name Thermal Resistance (R -Value) Brand Name Thermal Resistance (R.Value) Brand Name Thermal Resistance (R -Value) Lot Number Declaration I hereby certify that the above insulation was installed in the building at the above location In conformance with the current 6, CaliforniaCode of Regula Energy Efciency Standards for residential buildings (Title 24, Part tions) as indicated on the. Ccmificateof Compliance, where applicable. Item as Signature, Date Item as Signature, Date item. As , Signature, Date installing Subcontractor (Co. Name) OR Ocncml Contractor (Co. Name) OR Owner Installing Subcontractor (Co. Name) OR Ocnemi Contractor (Co, Name) OR Owner Installing Subcontractor (Co. Name) OR Oeneral Contactor (Co, Name) OR Owner