0207-059 (BLDG)P.O. BOX 1504 TEL 760-777-7012
78-495 CALLE TAMPICO INSPECTION REQUESTS
LA QUINTA, CALIFORNIA 92253 760-777-7153
m m°
o m ?<oaCO' ^�w— �w - ow c �o••- �o moy'fow.�oo oy�o�•
mmmo a Q"v'° m -mm"mwm
q o m o w O m mm°m o w nO r c 7 Cl N IDCam
D ID
CD
ID
myC
m 03 <13
�a3o ) "w°m�aosu�m -n m m x °1w mgviao o
_ 3m v
3 oD :E CD o
m0 o 30ID �woC
:3wmo.yv�o ° m nwo 0m <o n w 3c O o 3Q�m �CD0 a)=O n� m O- m
mnmm C a m a=a 7 n
a m°a �gDn Q° �w �°boav
am°°w�w oo0am CDmymmoMo* I oCD m
-0 � oID mo2 1a,�w Nm a Z
i 33'n Er -0 33 °wm � m �CDo Q°
m�'��°� m m , 5cc(�>j m -=rc
o crCr ° m w ' '`° 0° m m°vO oCDN=oO m� •3 °teaowm aO ° ro mw1ioD-� awm oma
a = m3 wcma° ??(3'm3nz
SD ?vc
w vwwa nm y a boyow��m m a O ID 0y o
°n�0C�onW, 3 w0Z3ca-a�3—m
N � x�vwQ�m�°
Er w ~ �y n(D m 2 w o 7 � v C Ow'a 0
°v.m °a CD N3 C° w
n o.omDm cm°<m 3wmw=,o (Qoy CD (-
3°
_
❑ acOo[°fD7C�ca0amQ w° 7m �'o,c=m[ocan o' �oa�_�o -° -�o.�o _Qo"npoO7 c
w y O• 0mn K vN
wmom
amaA= fm ai
aa m3mra ��0?r 5<=o CD r=n
my �5 =r o3 mammommm gm° m y
Qcam T� �m Z °c COL vm w C
�'om co o `v:m0 y m m Q,w� 3 0) spx O
�o m , fx CD m wa ?p m m mm mo a m o m�§o SD
om�cm _w owm �iO 3oS� a3 ai�m a � �m 5.CD 2 _ tC.)w (O70 c cm CD m
0- oC pnm'°O w w mo °o y° te w oc ow
C ��m� m 0 5y ° -4PW ,� w (ED
� w(p O[C7 f3 _. G w a O 7ya y a m (p nr?°
tin
O
o O
m
-0
"�
z
- _
_ m
o
.z
m
o m
mm
- m
°
D
ti
G:
D ♦'
Y
c_
>
-
C
y
,s
o
i
z
0
it mr.
D
L
•> �: _
m
Q m
z
z
V,
D
m
^"
M7 L m
i]
�
m
n
INSPECTION RECORD
OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR
BUILDING APPROVALS MECHANICAL APPROVALS
Set Backs T
Underground Ducts
Forms & Footings
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck
Exhaust Fans
O.K.to Wrap
F.A.U.
Framing
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
Final
Final 1144NI14 Aa POOLS - SPAS
BLOCKWALL A PROV LS steel
Set Backs Electric Bond
Footings Main Drain
Bond Ream Approval to Cover
Equipment Location
Underground Electric
Underground Fiog. Test
Final Gas Piping
PLUMBING APPROVALS Gas Test
Electric Final
Waste Lines Heater Final
Water Piping Plumbing Final
Plumbing Top Out Equipment Enclosure
Shower Pans O.K, for Finish Plaster
Sewer Lateral Po^! Cover
Swver Connection En�apst� -" ry
Gas Piping —�'
Gas Test
Appliances T"
Final
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Ternp. Pow-vr Pole
Underground Conduit
Rough Wiring
_Low Voltage Wiring
Fixtures
Mair Sq dice
Sub Famds
Exter-or Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
REQUEST EST FOR PROPQSA
INSTALL POLYURETHANE FOAM ROOF SYSTEM
8 BUILDINGS (30 UNITS)
LOCAATIONS: it i" priority,
- 1,;2
S 1
Numbers-
55-485, 467, 449, 431
Street
Southern Hills
Phase
Units
Bldg Type
D `b
80-575, 587, 599, 611
Cherry Hills
17B
1113
4
SM
(fS-- �3
54-655, 639, 623, 607
Riviera
4
17M
4
55-682, 670, 658, 646
Riviera
31B
35A
4
5M
`
55-070, 060
Riviera
4
9M
-7 �®
55-27 1258; 246, 234
Shoal Creek
37A
14A
2
27M
�
1 14— L
54-732, 720, 708, 696
Shoal Creek
18A
4
9M
�►+
54-516, 504, 492, 480
Shoal Creek
20A
4
9M
4
1 OM
SCOPE OF WORK
Furnish all labor, materials, equipment and services
this document, necessary for completion of all roofing and related work as specified in
POLYURETHANE FOAM ROOFING WITH ACRYLIC AND LES
1) All loose gravel, dust and residue shall be removed using power vacuum equipment, power s
air blowing or other suitable means. weeper,
2) Grind all loose paint from Z-bar metal, solvent wipe and prime with metal primer before application of
foam roofing. Install new Z-bar metal (will be identified at job walk) as needed and solvent wipe and
prime with metal primer before application of foam roofing.
3) Remove two (2) courses of tile and cut 3" water blocks where slope meets flat roof areas.
4) All surfaces shalt be Pied with neoprime primer at the rate of not less than %z gallon per 100 square
feet prior to foam application
applied in ponding areas to help disperse the standing water. 5) Urethane foam shall be sprayed - applied to a minimum thickness of 1.5". Additional foam shall be
6) Coating shall be applied in a minimum of two (2) separate coats. Acrylic coating to be 55% solids.
a) The base coat shall be applied at a rate of 2.0 gallons per 100 square feet.
b) The topcoat shall be applied at the rate of 2.0 gallons per 100 square feet, with a combined
thickness of 32 total dry mils. Ceramic granules shall be embedded into the final coat while the
coating is wet.
PGA WEST Residential Aswia[ion, Inc.
2012 Foam RoAng RFP