Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
0303-156 (OFC) Title 24
I TITLE 24 REPORT Title 24 Report for: Bank of America -Point Happy Pavilion Center 78-400 Highway #111 La Quinta, CA Project Designer: Gensler 4675 MacArthur Court Suite 350 Newport Beach, CA 92660 (949) 863 9434 Report Prepared By: Glumac International GLUMAC INTERNATIONAL 16845 Von Karman, Suite 250 Irvine, CA 92606-4960 (949) 833-8190 Job Number: 43004 Date: 5/5/03 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE 5 o eY U The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number. 43004 User Number: 3124A BVI TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form ENV -1 Certificate of Compliance 3 Form ENV -2 Overall Envelope Method 6 Form ENV -MM Envelope Mandatory Measures 15 Form MECH-1 Certificate of Compliance 16 Form MECH-2 Mechanical Equipment Summary 20 Form MECH-3 Mechanical Ventilation 22 Form MECH-4 Mechanical Sizing and Fan Power 23 Form MECH-MM Mechanical Mandatory Measures 29 EnergyPro 3.1 By EnergySoft Job Number: 43004 User Number: 3124A CERTIFICATE OF COMPLIANCE Part 1 of 2 ENV -1 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 PROJECT ADDRESS 78-400 Highway #111 La QUlntaBuilding Permit# PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Gensler (949) 863 9434 DOCUMENTATION AUTHOR GLUMAC INTERNATIONAL TELEPHONEChecked 949 833-8190 by/Date Enforcement A enc Use GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 3,997 Sq.Ft. 15 BUILDING TYPE ❑X NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ADDITION [:] ALTERATION EXISTING + ADDITION METHOD OF ENVELOPE COMPONENT ® OVERALL ENVELOPE ❑ PERFORMANCE COMPLIANCE STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building envelope requirements. The documentation preparer hereby certifies that the document is accurate and complete. DOCUMENTATION AUTHOR SIGNATUREDAT Glumac International A. sv3 The Principal Envelope Designer hereby certifies that the proposed building design repres ted in this set of construction documents is consistent with the other compliance forms and worksheets, with the specificMions, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the envelope requirements contained in Sections 110, 116 through 118, and 140, 142, 143 or 149 of Title 24, Part 6. Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the state of California as a civil engineer or mechanical engineer, or I am a licensed architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE wDATE LIC. # Gensler .Q Gags ENVELOPE MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures Q�0 INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. ENV -1: Required on plans for all submittals. Part 2 may be incorporated in schedules on plans. ENV -2: Used for all submittals; choose appropriate version depending on method of envelope compliance. ENV -3: Optional. Use if default U -values are not used. Choose appropriate version for assembly U -value to be calculated. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page:3�30 ENVELOPE COMPLIANCE SUMMARY Part 2 of 2 ENV-] PROJECT NAME Bank of America -Point Happy Area U -Fac. Act. Azm. Pavilion Center DATE 5/5/03 OPAQUE SURFACES Location I Comments 1 Window 334 0.290 25 0.23 SOLAR CONT LOW -E C-2 & AC -3 Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 1 Roof Wood 1145 3 Window 0.035 0 0 1 X I I R-30 Roof R.30.2x12.16 AC -7 2 lWall Wood 162 1 0.065 115 901 X R-19 Wall W.19.2x6.16 AC -7 3 Wall Wood 162 0.065 205 90 X R-19 Wall W.19.2x6.16 AC -7 4 Wall lWood 164 0.065 295 1 90 x JR-19Wall W.19.2x6.16 AC -6 5 Wall lWood 360 0.065 205 90 & JR-19Wall W.19.2x6.16 AC -6 6 Roof lWood 1200 0.035 0 0 X R-30 Roof R.30.2x12.16 AC -6 7 Roof Wood 1 140 0.035 1 0 0 R-30 Roof R.30.2x12.16 AC -6 8 Wall lWood 135 1 0.065 1 205 90 X R-19 Wall W.19.2x6.16 AC -6 9 lRoof Wood 210 0.035 1 0 0 R-30 Roof R.30.2x12.16 AC -6 10 Roof Wood 50 0.035 0 1 0 X R-30 Roof R.30.2x12.16 AC -6 Wall Wood 81 0.065 205 90 R-19Wall W.19.2x6.16 AC -6 Roof Wood 50 0.035 0 0 X R-30Roof R.30.2x12.16 AC -6 Roof Wood 50 0.035 0 0 R-30 Roof R.30.2x12.16 AC -6 Wall 113 Wood 81 0.065 205 90 X R-19Wall W.19.2x6.16 AC -6 Roof Wood 150 0.035 0 0 R-30 Roof R.30.2x12.16 AC -6 Wall lWood 162 0.065 295 90 X R-19 Wall W.19.2x6.16 AC -6 17 IRoof lWood 1 30 0.035 0 0 X R-30 Roof R.30.2x12.16 AC -6 18 lWall lWood 1 96 0.065 295 90 X11 I R-19 Wall W.19.24.16 AC -6 19 lRoof Wood 1 40 0.035 0 0 1XII I R-30 Roof R.30.2x12.16 AC -6 20 IRoof lWood 1100 0.035 0 0 X R-30 Roof(R.30.2x12.16) AC -6 FENESTRATION SURFACES Site Assembled Glazing U GneCK Dox IT tluuaing Is— 1uu,uuu sgtt of GFA and >= 10,000 sqft vertical glazing then NFRC Certification is required. Follow NFRC 100 -SB Procedures and suhmit NFRC I nhal Carlifirnfa Pnrm # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location I Comments 1 Window 334 0.290 25 0.23 SOLAR CONT LOW -E C-2 & AC -3 2 Window 18 0.290 295 0.23 SOLAR CONT LOW -E C-1 3 Window 18 0.290 295 0.23 SOLAR CONT LOW -E C-1 4 Window 18 0.290 295 0.23 SOLAR CONT LOW -E C-1 EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Len. H t. LExt.RExt. Dist. Len. H Right Fin t. Dist. Len. H t. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page:4 of 30 I (, ENVELOPE COMPLIANCE SUMMARY Part 2 of 2 ENV -1 PROJECT NAME Bank of America -Point Happy Pavilion Center DATE 5/5/03 OPAQUE SURFACES Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 21 Wall Wood 1 96 0.065 295 90X R-19 Wall W.19.2x6.16 AC -6 22 Wall lWood 1192 0.065 205 90 R-19 Wall W.19.2x6.16 AC -6 23 Roof Wood 90 0.035 0 0 X I I R-30 Roof R.30.2x12.16 AC -6 24 Roof lWood 230 0.035 0 0 X R-30 Roof R.30.2x12.16 AC -5 25 Wall lWood 270 0.065 115 90 X R-19 Wall W.19.2x6.16 AC -5 26 Roof lWood 160 0.035 0 0 X R-30 Roof R.30.2x12.16 AC -5 27 Wall lWood 176 0.065 115 90 X R-19 Wall W.19.2x6.16 AC -5 28 Roof lWood 1200 0.035 1 0 0 X R-30 Roof R.30.2x12.16 AC -4 29 Wall lWood 108 0.065 115 90 R-19 Wall .19.2x6.16 AC -4 30 lWall lWood 311 0.065 25 90 X11 JR-19Wall W.19.2x6.16 AC -4 31 lRoof lWood 1,732 0.035 0 0 JXJ I R-30 Roof R.30.2x12.16 AC -2 & AC -3 32 Wall lWood 260 0.065 25 90 X I I R-19 Wall (W.19.2x6.16) AC -2 & AC -3 33 Roof lWood 140 0.035 0 0 x I I R-30 Roof R.30.2x12.16 AC -1 34 Wall lWood 117 0.065 295 90 X I I R-19 Wall W.19.2x6.16 AC -1 35 Wall lWood 176 0.065 25 90 & JR-19Wall .19.2x6.16 AC -1 36 Roof lWood 140 0.035 0 0 X I R-30 Roof R.30.2x12.16 AC -1 37 Wall lWood 1 117 0.065 1 295 90 X R-19 Wall W.19.2x6.16 AC -1 38 JRoof lWood 140 0.035 1 0 0 R-30 Roof R.30.2x12.16 ACA 39 lWall lWood 117 0.065 1 295 90 R-19 Wall W.19.2x6.16 AC -1 40 lWall lWood 176 0.065 1 25 90 X R-19 Wall (W.19.2x6.16) AC -1 FENESTRATION SURFACES :oro e.�e. WaA r_i���— F Check box if Building is — 100,000 sgft of CFA and — 10,000 sgftvertical glazing then NFRC Certification is reauirec Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type AreaU-Fac. Act. Azm. SHGC Glazing Type Location / Comments EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. Ha -t. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page:5 of 30 I OVERALL ENVELOPE METHOD Part 1 of 6 ENV -2 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 1 5/5/03 WINDOW AREA TEST A. DISPLAY PERIMETER B. GROSS EXTERIOR WALL AREA C. GROSS EXTERIOR WALL AREA D. ENTER LARGER OF A or B E. ENTER PROPOSED WINDOW AREA 01 ftX6= 3,9071 sf X 0.40 = 3,907 sf X 0.10 = sf DISPLAY AREA 1, 56 sf 40% AREA 39 sf MINIMUM STND. AREA 1,561 sf MAXIMUM STND. AREA 38 sf PROPOSED AREA F. WINDOW WALL RATIO = Proposed Window Area Divided by Gross Exterior Wall Area = 1 9,93% IF E IS GREATER THAN D OR LESS THAN C, PROCEED TO THE NEXT CALCULATION FOR THE WINDOW AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 6. 1. IF E GREATER THAN D: MAXIMUM PROPOSED WINDOW STANDARD AREA WINDOW AREA ADJUSTMENT FACTOR 2. IF LESS THAN C: GO TO PART 6 TO CALCULATE ADJUSTED AREAS. MINIMUM PROPOSED WINDOW STANDARD AREA AREA ADJUSTMENT FACTOR 3911 388 = 1.007 GO TO PART 6 TO CALCULATE ADJUSTED AREAS. SKYLIGHT AREA TEST ATRIUM HEIGHT 10 FT IF -55 FT IF>55FT 0.10 X = 0.05 X 3,9971 =1 2001- STANDARD 00STANDARD % GROSS STANDARD ROOF AREA SKYLIGHT AREA PROPOSED SKYLIGHT AREA IF THE PROPOSED SKYLIGHT AREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIGHT AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 6. 1. IF PROPOSED SKYLIGHT AREA >= STANDARD SKYLIGHT AREA: SKYLIGHT STANDARD SKYLIGHT AREA PROPOSED SKYLIGHT AREA ADJUSTMENT FACTOR GO TO PART 6 TO CALCULATE ADJUSTED AREAS. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page:6 of 30 OVERALL ENVELOPE METHOD Part 2 of 6 ENV -2 PROJECT NAME ASSEMBLY NAME (e.g. Wall -1, Floor -1) Roof E WALL S WALL West Wall South wall Roof Roof S WALL Roof Roof S WALL Roof Roof S WALL Roof W WALL Roof West Wall Roof Roof West Wall South Wall Roof Roof E WALL Roof E WALL Roof E WALL N WALL DATE J ICJ LD] I E I IFI IGI IH PROPOSED AREA' (Adjusted) U -FACTOR UA (F X G) TABLE 0.057 8.3 HEAT U- VALUES UA AREA CAPACITY FACTOR (B X D) --y--N 3601 145 2.73 0.035 0 ❑ 5.0 .162 3.23 0.065 X❑ ❑ 10.6 162 3.23 0.065 0.057 ❑ 10.6 1641 3.23 0.065 0.057 ❑ 10.7 360 3.23 0.065 X❑ ❑ 23.6 200 2.73 0.035 X ❑ 6.9 140 2.73 0.035 X❑ ❑ 4.9 0.057 2.3 100 0.057 5.7 96 135 3.23 0.065 X ❑ 8.8 210 2.731 0.035 ®❑ 13.1 7.3 50 2.73 0.035 ®❑ 9.1 1.7 81 3.23 0.065 X❑ ❑ 5.3 50 2.73 0.035 0 ❑ 1.7 50 2.73 0.035 0 ❑ 1.7 81 3.23 0.065 FXI ❑ 5.3 150 2.731 0.035 X❑ ❑ 5.2 162 3.23 0.065 X❑ ❑ 10.6 30 2.73 0.035 X❑ ❑ 96 3.23 0.065 ❑ ]63 40 2.73 0.035 100 2.73 0.035 X❑ ❑ 3.5 96 3.23 0.065 ❑ 6.3 192 3.23 0.065 X❑ ❑ 12.6 90 2.73 0.035 X❑ ❑ 3.1 230 2.73 0.035 X❑ ❑ 8.0 270 3.23 0.065 X❑ ❑ 17.7 160 2.73 0.035 0 ❑ 5.6 176 3.23 0.065 X❑ ❑ 11.5 200 2.73 0.035 X ❑ 6.9 108 3.23 0.065 a ❑ 7.1 311 3.231 0.065 X❑ ❑ 20.4 *If Window and/or Skylight Area Adjustment is Required, Column E shall be 231 use Adjusted Areas from Part 6 of 6. no greater than Column H 482 EnergyPro 3.1 By EnergySoft User Number. 3124A Job Number: 43004 STANDARD AREA' (Adjusted) U -FACTOR UA (F X G) 145 0.057 8.3 162 0.084 13.6 162 0.084 13.6 164 0.084 13.8 3601 0.084 30.2 200 0.057 11.4 140 0.057 8.0 135 0.084 11.3 2101 0.057 12.0 50 0.057 2.8 81 0.084 6.8 50 0.057 2.8 50 0.057 2.8 81 0.084 6.8 150 0.057 8.6 1621 0.084 13.6 30 0.057 1.7 96 0.084 8.1 40 0.057 2.3 100 0.057 5.7 96 0.084 8.1 192 0.084 16.1 901 0.057 5.1 230 0.057 13.1 270 0.084 22.7 160 0.057 9.1 176 0.084 14.8 200 0.057 11.4 108 0.081 9.1 311 0.084 26.1 This Page Total 320 Building Total 715 of 30 y OVERALL ENVELOPE METHOD Part 2 of 6 ENV -2 PROJECT NAME DATE Bank of America -Point Haimy Pavilion Center 5/5/03 OVERALL HEAT LOSS n n n n n n n n ASSEMBLY NAME (e.g. Wall -1, Floor -1) Roof N WALL N Roof W WALL W N WALL Roof W WALL W Roof W WALL W N WALL PROPOSED AREA HEAT CAPACITY U- FACTOR TABLE VALUES UA (B X D) Y N 1,732 2.73 0.035 X❑ ❑ 60.1 260 3.23 0.065 0.0 ❑ 17.0 334 8.9 0.290 ❑ ❑X 96.9 140 2.73 0.035 a ❑ 4.9 117 3.23 0.065 X❑ ❑ 7.7 18 9.8 0.290 ❑ 0 5.2 176 3.23 0.065 [91❑ 11.5 140 2.73 0.035 ® El4.9 117 3.23 0.065 ® ❑ 7.7 18 0.290 ❑ ® 5.2 140 2.73 0.035 0 ❑ 4.9 117 3.23 0.065 X ❑ 7.7 18 0.290 ❑ ❑X 5.2 176 3.231 0.065 X❑ ❑ 11.5 ❑ ❑ ❑❑ El 1:1 STANDARD AREA` (Adjusted) U -FACTOR UA (F X G) 1,732 0.05 98.7 258 0.0 21.6 336 0.49 164.8 140 0.05 8.0 117 0.0 9.8 181 0.49C 8.9 176 0.084 14.8 140 0.057 8.0 117 0.084 9.8 18 0.490 8.9 140 0.057 8.0 117 0.084 9.8 18 0.49C 8.9 176 0.084 14.8 `If Window and/or Skylight Area Adjustment is Required Column E shall be 250 This Page Total 395 use Adjusted Areas from Part 6 of 6. no greater than Column H 482 Building Total 715 EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number. 43004 Page:8 of 30 OVERALL ENVELOPE METHOD Part 3 of 6 ENV -2 PROJECT NAME Bank of America -Point Ha Pavilion Center DATE 5/5/03 VERALL HEAT GAIN FROM CONDUCTION A] aao a a© a o 0 PROPOSED STANDARD TABLE HEAT HEAT ASSEMBLY NAME HEAT U- VALUES GAIN AREA- U- GAIN (e.g. Wall -1, Floor -1) AREA TF CAPACITY FACTOR y N BXCxE (Adjusted) FACTOR TF Q GxHxl Roof 145 55 2.73 0.035 [XI 1 [:1 277 145 0.057 55 455 WALL 162 55 3.23 0.065 FN] ❑ 583 162 0.084 55 748 WALL 162 55 3.23 0.065 0 ❑ 583 162 0.084 55 748 Nest Wall 164 55 3.23 0.065 X. ❑ 590 164 0.084 55 758 South wall 360 55 3.23 0.065 X I ❑ 1,296 360 0.084 55 1,663 Roof 200 55 2.73 0.035 X❑ ❑ 382 200 0.057 55 627 Roof 140 55 2.73 0.035 X❑ ❑ 267 140 0.057 55 439 WALL 135 55 3.23 0.065 ®❑ 486 135 0.084 55 624 Roof 2101 55 2.73 0.035 ®❑ 401 210 0.057 55 658 Roof 50 55 2.73 0.035 ®❑ 95 50 0.057 55 157 WALL 81 55 3.23 0.065 X❑ ❑ 292 81 0.0841 55 374 Roof 50 55 2.73 0.035 0 ❑ 95 50 0.057 55 157 Roof 50 55 2.73 0.035 ❑ 95 50 0.057 55 157 WALL 81 55 3.23 0.065 X❑ ❑ 292 81 0.084 55 374 Roof 150 55 2.73 0.035 X❑ ❑ 286 150 0.057 55 470 WALL 162 55 3.23 0.065 X❑ ❑ 583 162 0.084 55 748 Roof 30 55 2.73 0.035 0 ❑ 571 30 0.057 551 94 Nest Wall 961 55 3.23 0.065 X❑ ❑ 346 96 0.084 55 444 Roof 40 55 1 2.731 0.035 0 ❑ 76 40 0.057 55 1 125 Roof 100 55 2.73 0.035 FX] ❑ 191 100 0.057 55 314 Nest Wall 96 55 3.23 0.065 ❑ 346 96 0.084 55 444 South Wall 192 55 3.23 0.065 0 ❑ 691 192 0.084 55 887 Roof 90 55 2.73 0.035 X❑ ❑ 172 90 0.057 55 282 Roof 2301 55 2.73 0.035 [91 ❑ 439 230 0.0571 55 721 WALL 270 55 3.23 0.065 ❑ 972 270 0.084 55 1,247 Roof 160 55 2.73 0.035 X❑ ❑ 306 160 0.057 55 502 WALL 176 55 3.23 0.065 ❑ 634 176 0.084 55 1 813 Roof 200 55 2.73 0.035 ® ❑ 382 200 0.057 55 627 WALL 108155 3.23 0.065 X❑ ❑ 389 108 0.084 55 499 WALL 311 55 3.23 0.065 X❑ ❑ 1,1201 3111 0.0841 55 1,437 12,725 17,593 Subtotal Subtotal • If Window and/or Skylight Area Adjustment is Required use Adjusted Areas from Part 6 of 6. EnergyPro 3.1 By EnergySoft User Number. 3124A Job Number: 43004 Page:9 of 30 OVERALL ENVELOPE METHOD Part 3 of 6 ENV -2 ECT NAME Bank of America -Point Ha Pavilion Center LVERALL DATE 5/5/03 HEAT GAIN FROM CONDUCTION rA aao a a a a a a PROPOSED STANDARD TABLE HEAT HEAT ASSEMBLY NAME HEAT U- VALUES GAIN AREA" U. GAIN (e.g. Wall -1, Floor -1) AREA TF CAPACITY FACTOR Q Y N BxCxE (Adjusted) FACTOR TF GxHxl Roof 1,732 55 1 2.73 0.035 X ❑ 3,308 1,732 0.057 55 5,430 WALL 260 55 3.23 0.065 X❑ ❑ 936 258 0.084 55 1,190 N 334 55 0.290 ❑ X❑ 5,327 336 0.49055 9,064 Roof 140 55 2.73 0.035 NI ❑ 267 140 0.057 55 439 WALL 117 55 1 3.23 0.065 0 ❑ 4211 117 0.084 55 540 W 18 55 0.290 ❑ X❑ 287 18 0.490 55 488 WALL 176 55 3.23 0.065 X❑ ❑ 634 176 0.084 55 813 Roof 140 55 2.73 0.035 ® ❑ 267 140 0.057 55 439 WALL 117 55 3.23 0.065 ® ❑ 4211 117 0.084 55 540 W 18 55 0.290 ❑ ® 287 18 0.4901 55 488 Roof 140 55 2.73 0.035 ❑ 267 140 0.057 55 439 WALL 117 55 3.23 0.065 X❑ ❑ 421 117 0.084 55 540 W 18 55 0.290 ❑ a 287 18 0.490 55 488 WALL 176 55 3.23 0.065 X] ❑ 634 176 0.084 55 813 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ El El 1:1 El ❑❑ 1:1 El El El El El El El 13,766 21,712 Subtotal Subtotal If Window and/or Skylight Area Adjustment is Required, use Adjusted Areas from Part 6 of 6. EnergyPro 3.1 By EnergySoft User Number. 3124A Job Number. 43004 Page: 10 of 30 OVERALL ENVELOPE METHOD Part 4 of 6 ENV -2 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 OVERALL HEAT GAIN FROM RADIATION OPAQUE SURFACES 0 0© o o a n n n n n 10,995 SUBTOTAL 18,047 SUBTOTAL EnergyPro 3.1 By EnergyPro User Number: 3124A Job Number: 43004 Page: 11 of 30 PROPOSED STANDARD ASSEMBLY NAME e.g. Roof -1) AREA SF WEIGHTING FACTOR U- FACTOR Absorp HEAT GAIN (BxCxDxExF) AREA* (ADJUSTED) U -Factor Absorp HEAT GAIN (CxDxHxlxJ) Roof 145 123 0.92 0.035 0.70 399 145 0.057 0.70 655 Roof 200 123 0.92 0.035 0.70 5501 200 0.057 0.70 903 Roof 140 123 0.92 0.035 0.70 385 140 0.057 0.70 632 Roof 210 123 0.92 0.035 0.70 578 210 0.057 0.70 948 Roof 50 123 0.92 0.035 0.70 138 50 0.057 0.70 226 Roof 5 123 0.92 0.035 0.70 138 50 0.057 0.70 226 Roof 50 1231 0.92 0.035 0.70 138 50 0.057 0.70 226 Roof 150 123 0.92 0.035 0.70 413 150 0.057 0.70 677 Roof 30 123 0.92 0.035 0.70 83 30 0.057 0.70 135 Roof 40 123 0.92 0.035 0.70 110 40 0.057 0.70 181 Roof 100 1231 0.92 0.035 0.70 275 100 0.057 0.70 452 Roof 90 123 0.92 0.035 0.70 248 90 0.057 0.70 406 Roof 230 123 0.92 0.035 0.70 633 230 0.057 0.70 1.038 Roof 160 123 0.92 0.035 0.70 440 160 0.057 0.70 722 Roof 20d 1231 0.92 0.035 0.70 550 200 0.057 0.70 903 Roof 1.73 123 0.92 0.035 0.70 4.764 1,732 0.057 0.70 7,820 Roof 140 123 0.92 0.035 0.70 385 140 0.057 0.70 632 Roof 140 123 0.92 0.035 0.70 385 140 0.057 0.70 632 Roof 14d 123 0.92 0.035 0.70 385 140 0.057 0.70 632 10,995 SUBTOTAL 18,047 SUBTOTAL EnergyPro 3.1 By EnergyPro User Number: 3124A Job Number: 43004 Page: 11 of 30 OVERALL ENVELOPE METHOD Part 5 of 6 ENV -2 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 1 5/5/03 IOVERALL HEAT GAIN FROM RADIATION FENESTRATION SURFACES FA] o ©aooaoo a aoo PROPOSED STANDARD WINDOW/SKYLIGHT NAME e.g. Wind -1, Sky -1) ORIENT. WEIGHTING FACTOR AREA SF SHG OVERHANG HEATGAINAREA` (BxCxDxExH) (ADJUSTED) RSHG (or SHGC" SF HEATGAIN (BxJxKxL) H V HN OHF N N 0.61 334 123 0.23 'If Window and/or Skylight Area Adjustment is Required, use Column I must be less than column M 5,764 336 0.61 123 15,393 W W 1.05 16 123 0.23 535 18 0.46 123 1,077 W W 1.05 1 123 0.23 Job Number. 43004 Page: 12 of 30 535 18 0.46 123 1 1.077 W W 1.05 18 123 0.231 535 18 0.46 123 1,077 " Only SHGC is Part 3 Subtotal 26,491 Part 3 Subtotal 39,305 used for Skylights Part 4 Subtotal 10,995 Part 4 Subtotal 18,047 'If Window and/or Skylight Area Adjustment is Required, use Column I must be less than column M Part 5 Subtotal 7,368 Part 5 Subtotal 18,623 Adjusted Areas from Part 6 of 6. 44,853 Total Heat Gain 75,975 EnergyPro 3.1 By EnergySoft User Number. 3124A Job Number. 43004 Page: 12 of 30 t. OVERALL ENVELOPE METHOD Part 6 of 6 ENV -2 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 CHECK IF NOT APPLICABLE (See Part 1 of 6.) ❑A WALL NAME (e.g. Wall -1, Wall -2) E WALL S WALL West Wall South wan S WALL S WALL S WALL W WALL West Wall West Wall South Wall E WALL E WALL E WALL N WALL N WALL W WALL ORIENTATION N I E S IW ❑ ❑X ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ X❑ ❑ ❑ X❑ ❑ ❑ ❑ X❑ ❑ ❑❑oa ❑ ❑ 0 ❑ ❑❑❑X ❑❑❑a ❑ ❑ ❑ X❑ ❑ ❑ 0 ❑ ❑ ❑X ❑ ❑ ❑ ❑X ❑ ❑ ❑ ❑X ❑ ❑ X❑ ❑ ❑ ❑ X❑ ❑ ❑ ❑ ❑ ❑ ❑ IN ❑ ❑ ❑ ❑ G ❑D ADJUSVT..ADJUSTED FACTOR (From Part 1) WINDOW AREA (D X E) ADJUSTED AREA B - (F + C) GROSS AREA DOOR AREA WINDOW AREA 162 0 0 1.007 0 162 162 0 0 1.007 0 162 164 0 0 1.007 0 164 360 0 0 1.007 0 360 135 0 0 1.007 0 135 81 0 0 1.007 0 8 81 0 0 1.007 0 81 162 01 0 1.007 0 162 96 0 0 1.007 0 96 96 0 0 1.007 0 96 192 0 0 1.007 0 192 270 0 0 1.007 0 270 176 0 0 1.007 0 176 108 0 0 1.007 0 108 311 0 0 1.007 0 31 594 0 334 1.007 336 258 135 0 18 1.007 18 117 TOTALS 3,2851 01 35 N/Al 3541 2,93 EnergyPro 3.1 By EnergySoft User Number 3124A Job Number: 43004 Page: 13 of 30 OVERALL ENVELOPE METHOD Part 6 of 6 ENV -2 PROJECT NAME Bank of America -Point Happv Pavilion Center DATE 5/5/03 WINDOW AREA ADJUSTMENT CALCULATIONS ❑ CHECK IF NOT APPLICABLE (See q❑ Part 1 of 6.) ORIENTATION �B © SKYLIGHT AREA E❑ F❑ WINDOW ADJUST. FACTOR (From Part 1) ADJUSTED WINDOW AREA (D X E) ADJUSTED WALL AREA B - (F + C) WALL NAME (e.g. Wall -1, Wall -2) GROSS AREA DOOR AREA WINDOW AREA N I E I S 1W N WALL X❑ ❑ ❑ ❑ ❑ ❑ ❑ X❑ ❑ ❑ ❑X❑ D ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ ❑❑❑❑ 176 0 0 1.007 0 176 W WALL 135 0 18 1.007 18 11 W WALL 135 01 18 1.007 18 11 N WALL 176 0 0 1.007 0 176 TOTALS 6221 01 36 N/Al 361 58 a CHECK IF NOT APPLICABLE (See Part 1 of 5.) a ROOF NAME I. Roof -1, Roc TOTALS © SKYLIGHT ADJUST. FACTOR (From Part 1) ADJUSTED SKYLIGHT AREA (C X D) ADJUSTED ROOF AREA (B - E) GROSS AREA SKYLIGHT AREA N/A EnergyPro 3.1 By EnergySoft User Number 3124A Job Number. 43004 Page: 14 of 30 ENVELOPE MANDATORY MEASURES ENV -MM PROJECT NAME_ DATE Bank of America -Point Happy Pavilion Center 5/5/03 DESCRIPTION Desi ner Enforcement ❑X §118(,) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. X § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. ❑ §117(a) All Exterior Joints and openings In the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. X❑ § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). X❑ § 116(a)1 Manufactured Doors and Windows Installed shall have air infiltration rates not exceeding those shown In Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. ❑§118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page: 15 of 30 CERTIFICATE OF COMPLIANCE Part 1 of 2 MECH-1 PROJECT NAME DATE OF PLANS DATE Bank of America -Point Happy Pavilion Center 5/5/03 PROJECT ADDRESS BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION ❑ ALTERATION EXISTING + ADDITION 78-400 Highway #111 La Quinta COMPLIANCE PROOF OF ENVELOPE COMPLIANCE PREVIOUS ENVELOPE PERMIT r ENVELOPE COMPLIANCE ATTACHED PRINCIPAL DESIGNER - MECHANICAL TELEPHONE Building Permit# Glumac International (949) 833 8190 SIGNATUR ( DOCUMENTATION AUTHOR GLUMAC INTERNATIONAL TELEPHONE (949) 833-8190 Checked by/Date So The Principal Mechanical Designer hereby certifies that the proposed building design represe ted in this set of construction 1 -.,Enforcement Agency Use GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 3,997Sq.Ft. 1 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION ❑ ALTERATION EXISTING + ADDITION METHOD OF MECHANICAL ® PRESCRIPTIVE PERFORMANCE COMPLIANCE PROOF OF ENVELOPE COMPLIANCE PREVIOUS ENVELOPE PERMIT r ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building mechanical requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATUR ( DATE Glumac International �. So The Principal Mechanical Designer hereby certifies that the proposed building design represe ted in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifics ns, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in Sections 110 through115, 120 through 124, 140 through 142, 144 and 145. Please check one: ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, or mechanical engineer or I am a licensed architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1. PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE DATE LIC. # Glu ac International 5-3-�3 MECHANICAL MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures 905-,0 INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. MECH-1: Required on plans for all submittals. Parts 2 may be incorporated in schedules on plans. MECH-2: Required for all submittals, but may be incorporated in schedules on plans. MECH-3: Required for all submittals unless required outdoor ventilation rates and airflows are shown on plans per Section 4.3.4. MECH-4: Required for Prescriptive submittals. MECH-5: Optional. Performance use only for mechanical distribution summary. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page: 16 of 30 t, CERTIFICATE OF COMPLIANCE Part 2 of 2 MECH-1 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center I 5/5/03 [SYSTEM FEATURES SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM MECH3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION I R -VALUE COOLING DUCT LOCATION R -VALUE VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE MECHANICAL SYSTEMS DHW Heater I I AC -7 I I AC -6 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Electric Res 100% n/a n/a Lochinvar SB -006 Yes Yes n/a n/a n/a n/a n/a Programmable Switch Heating & Cooling Required n/a n/a n/a Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 50 cfm Gas Furnace 80% AFUE Packaged DX 10.0 SEER / 8.7 EER LENNOX GCS16-024 Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Require n/a n/a n/a Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 200 cfm Gas Furnace 80% AFUE Packaged DX 10.0 SEER / 8.7 EER LENNOX GCS16-030 Yes Yes Ducts in Attic 4.2 r cts in Attic 4.2 No EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page: 17 of 30 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/ COOL? Y: Yes N: No HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B: Air Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural A: Auto G: Gravity A: Air W: Water N: Not Required EC: Economizer Control See Section 144 e 3 Enter Outdoor Air CFM. Note: This shall be no less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE Use Only NOTES - TO FIELD For Building Department EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page: 17 of 30 CERTIFICATE OF COMPLIANCE Part 2 of 2 MECH-1 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 ---] [SYSTEM FEATURES 71 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION I R -VALUE COOLING DUCT LOCATION R -VALUE VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE MECHANICAL SYSTEMS AC -5 AC -4 I AC -2 & AC -3 Programmable Switch Heating & Cooling Required n/a n/a n/a Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 160 cfm Gas Furnace 80% AFUE Packaged DX 10.0 SEER/ 8.7 EER LENNOX GCS16-024 Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Required n/a n/a n/a Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 60 cfm Gas Furnace 80% AFUE Packaged DX 10.0 SEER / 8.7 EER LENNOX GCS16-024 Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below Into columns above. CERTIFICATE OF COMPLIANCE Part 2 of 2 MECH-1 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM FEATURES SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION I R -VALUE COOLING DUCT LOCATION R -VALUE VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE Programmable Switch Heating & Cooling Required n/a n/a n/a Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 80 cfm Gas Furnace 80% AFUE Packaged DX 10.0 SEER / 8.7 EER LENNOX GCS16-024 Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above. MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME DATE Bank of America -Point Ha Pavilion Center 5/5/03 CHILLER AND TOWER SUMMARY Efficiency Tons PUMPS RETURN FAN Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control Motor Eff. Drive Eff. LENNOX GCS16-024 Constant Volume Draw -Through 800 0.20 77.0% 100.0% none LENNOX GCS16-030 Constant Volume Draw -Through 1,000 0.20 77.0% 100.0% none none TWO LENNOX GCS16- 036 Constant Volume Draw -Through 2,400 0.60 77.0%1100.0% 1QHWL BOILER SUMMARY TANK INSUL. Energy Factor or Recovery Efficiency Standby Loss or Pilot System Name System Type Distribution Type City Rated Input (Gals.) Vol. Ext. R -Val. Lochinvar SB -006 Storage Elec. Standard 1 20,478 17 0.93 n/a n/a CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qty. Output Aux. kW Eff. Out ut Sensible Efflciency Economizer Type LENNOX GCS16-024 Packaged DX 4 40,000 0.0 80%AFUE 21,400 17,20 10.0 SEER/ 8.7 EER No Economizer LENNOX GCS16-030 Packaged DX 1 60,000 0.0 80%AFUE 25,800 20,90 10.0 SEER /8.7 EER No Economizer TWO LENNOX GCS16- 036 Packaged DX 1 120,0001 0.0 80%AFUE 66,600 56,00 10.6 EER No Economizer CENTRAL SYSTEM FAN SUMMARY SUPPLYFAN RETURN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. LENNOX GCS16-024 Constant Volume Draw -Through 800 0.20 77.0% 100.0% none LENNOX GCS16-030 Constant Volume Draw -Through 1,000 0.20 77.0% 100.0% none none TWO LENNOX GCS16- 036 Constant Volume Draw -Through 2,400 0.60 77.0%1100.0% I EnergyPro 3.1 By EnergySoft User Number. 3124A Job Number: 43004 Page: 20 none of 30 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 1 PROJECT NAME I DATE CFM FAN SU EXHAUST FAN FAN Room Name Qty. CFM BHP Motor Eff. Drive Eff. TERMINAL FAN Motor Drive CFM BHP Eff. Eff. EXHAUS FAN Room Name Qty. CFM BHP Motor Eff. Drive Eff. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page:21 of 30 MECHANICAL VENTILATION MECH-3 (PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 MECHANICAL VENTILATION FA] ©© o 0 0© a a a o ZONE/SYSTEM AC -7 AC -7 AC -6 AC -6 AC -5 AC -5 AC -4 AC -4 AC -2 & AC -3 AC -2 & AC -3 AC -1 AC -1 AREA BASIS COND. AREA (SF) CFM PER SF MIN. CFM (B x C) 145 0.15 22 22 50 1,110 0.15 166 200 390 0.15 59 59 160 200 0.15 30 160 1,732 0.15 260 30 60 420 0.15 63 350 260 350 63 80 63 80 OCCUPANCY BASIS NO. CFM MIN. OF PER CFM PEOPLE PERSON (ExF) Totall Totall REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOOF AIR CFM VAV MIN. RATIO TRANS. FER AIR 22 50 22 50 166 200 166 200 59 160 59 160 30 60 30 60 260 350 260 350 63 80 63 80 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page: 22 of 30 1 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM NAMEFLOOR AC -7 AREA 5 NOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: - OUTDOOR DRY BULB TEMPERATURE - OUTDOOR WET BULB TEMPERATURE - INDOOR, DRY BULB TEMPERATURE 2. SIZING: - DESIGN OUTDOOR AIR - ROOM LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS - RETURN FAN - SUPPLY FAN - SUPPLY DUCTS SAFETY / WARM-UP FACTOR (APPENDIX C) (APPENDIX C) SEE ASHRAE CHAPTER 8, 1993 OR APPENDIX B 50 CFM (MECH 3; COLUMN 1) TOTALS MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY / WARM-UP FACTOR) 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN i0 FAN DESCRIPTION Fan a DESIGN BRAKE HP 0.200 © a EFFICIENCY MOTOR DRIVE 77.0% 100.0% NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for constant volume systems or 1.25 Watts/cfm for VAV systems. 0 NUMBER OF FANS 1 COOLING HEATING 112 OF 26 OF 78 OF 75 °F 70 OF 1,936 2,354 14,643 1,155 0 n/ 732 58 0 0 0 0 732 58 18,046 3,624 1.21 1.43 21,836 5,182 17,292 40,000 Btu / Hr Btu / Hr 0 PEAK WATTS BxEx746/(CXD 1 1941 CFM (Supply Fans) 800 TOTALS I 800 TOTAL FAN SYSTEM POWER DEMAND 0.242 WATTS / CFM Col. F / Col. G EnergyPro 3.1 By EnergySoft User Number 3124A Job Number. 43004 Page: 23 of 30 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM NAME AC -6 FLOOR AREA 1,110 NOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: - OUTDOOR DRY BULB TEMPERATURE - OUTDOOR WET BULB TEMPERATURE - INDOOR, DRY BULB TEMPERATURE 2. SIZING: - DESIGN OUTDOOR AIR - ROOM LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS - RETURN FAN - SUPPLY FAN - SUPPLY DUCTS SAFETY / WARM-UP FACTOR (APPENDIX C) (APPENDIX C) SEE ASHRAE CHAPTER 8, 1993 OR APPENDIX B 2OO CFM (MECH 3; COLUMN 1) TOTALS MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY/ WARM-UP FACTOR) 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN COOLING HEATING 112 OF 26 OF 78 OF 75 OF 70 OF 7,793 9,300 16,312 5,633 0 n/a 816 28 0 0 0 0 8161 28 25,7361 15,496 1.21 1.43 31,141 22,159 20,8411 1 60,000 Btu / Hr Btu / Hr FAN POWER CONSUMPTION EA] © © a o a a DESIGN EFFICIENCY NUMBER PEAK WATTS CFM FAN DESCRIPTION BRAKE HP MOTOR DRIVE OF FANS B x E x 746 / (C X D) (Supply Fans) Supply Fan 0.200 77.0% 100.0% 1 194 1,000 TOTALS 19 141 1,0 NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for TOTAL FAN SYSTEM constant volume systems or 1.25 Watts/cfm for VAV systems. POWER DEMAND 0.194 WATTS / CFM Col. F / Col. G EnergyPro 3.1 By EnergySoft User Number 3124A Job Number: 43004 Page:24 of 30 .1" 1 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM NAME AC -5 FLOOR 390 NOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: - OUTDOOR DRY BULB TEMPERATURE - OUTDOOR WET BULB TEMPERATURE - INDOOR, DRY BULB TEMPERATURE 2. SIZING: -DESIGN OUTDOOR AIR - ROOM LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS - RETURN FAN - SUPPLY FAN - SUPPLY DUCTS SAFETY / WARM-UP FACTOR (APPENDIX C) (APPENDIX C) SEE ASHRAE CHAPTER 8, 1993 OR APPENDIX B 160 CFM (MECH 3; COLUMN 1) TOTALS MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY / WARM-UP FACTOR) 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN A] FAN DESCRIPTION Supply Fan DESIGN BRAKE HP 0.200 FDj EFFICIENCY MOTOR I DRIVE 77.0%1 100.0% NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for constant volume systems or 1.25 Watts/cfm for VAV systems. ❑E NUMBER OF FANS 1 COOLING HEATING 112 OF 26 OF 78 OF 75 OF 70 OF 6,198 7,452 8,363 1,880 0 n/a 418 94 0 0 0 0 4181 9 15,399 9,520 1.21 1.43 18,632 13,613 17,203 40,000 Btu / Hr Btu / Hr FF] PEAK WATTS BxEx746/(CXD 194 FG] CFM (Supply Fans) 800 TOTALS 19411 800 TOTAL FAN SYSTEM POWER DEMAND 1 0.242 WATTS / CFM Col. F / Col. G I EnergyPro 3.1 By EnergySoft User Number 3124A Job Number: 43004 Page: 25 of 30 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM NAME AC -4 FLOOR 200 NOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: - OUTDOOR DRY BULB TEMPERATURE - OUTDOOR WET BULB TEMPERATURE - INDOOR, DRY BULB TEMPERATURE 2. SIZING: - DESIGN OUTDOOR AIR - ROOM LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS - RETURN FAN - SUPPLY FAN - SUPPLY DUCTS SAFETY/ WARM-UP FACTOR (APPENDIX C) (APPENDIX C) SEE ASHRAE CHAPTER 8, 1993 OR APPENDIX B 6O CFM (MECH 3; COLUMN 1) TOTALS MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY/ WARM-UP FACTOR) 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN _ COOLING HEATING 112 OF 26 OF 78 OF 75 OF 70 OF 2,319 2,804 11,670 1,512 0 n/ 583 76 0 0 0 0 5831 76 15,1561 4,467 1.21 1.43 18,338 6,388 17,020 40,000 Btu / Hr Btu / Hr FAN POWER CONSUMPTION FA] a a a a o DESIGN EFFICIENCY NUMBER PEAK WATTS CFM FAN DESCRIPTION BRAKE HP MOTOR DRIVE OF FANS B x E x 746 / (C X D) (Supply Fans) Supply Fan 0.200 77.0% 100.0% 1 194 800 TOTALS 94 1 800 NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for TOTAL FAN SYSTEM constant volume systems or 1.25 Watts/cfm for VAV systems. POWER DEMAND 0.242 WATTS / CFM Col. F / Col. G EnergyPro 3.1 By EnergySoft User Number 3124A Job Number: 43004 Page:26 of 30 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM NAME AC -2 & AC -3 FLOOR AREA 1,732 .INOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: - OUTDOOR DRY BULB TEMPERATURE - OUTDOOR WET BULB TEMPERATURE - INDOOR, DRY BULB TEMPERATURE 2. SIZING: -DESIGN OUTDOOR AIR - ROOM LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS - RETURN FAN - SUPPLY FAN - SUPPLY DUCTS SAFETY / WARM-UP FACTOR (APPENDIX C) (APPENDIX C) SEE ASHRAE CHAPTER 8, 1993 OR APPENDIX B 350 CFM (MECH 3; COLUMN 1) TOTALS MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY / WARM-UP FACTOR) 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN ❑A FAN DESCRIPTION Supply Fan FRI DESIGN BRAKE HP 0.600 a o EFFICIENCY MOTOR I DRIVE 77.0%1 100.0% NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for constant volume systems or 1.25 Watts/cfm for VAV systems. FE] NUMBER OF FANS 1 COOLING HEATING 112 OF 26 OF 78 OF 751 OF 70 OF 13,536 16,333 33,657 7,657 0 n/a 1,683 383 0 0 0 0 1,-6831 383 50,5601 24,756 1.21 1.43 61,178 35,401 57,577 1 120,000 . Btu / Hr Btu / Hr a PEAK WATTS BxEx746/(CXD R M FG] CFM (Supply Fans) 2,400 TOTALS 581 2,4001 TOTAL FAN SYSTEM POWER DEMAND 0.242 WATTS / CFM Col. F / Col. G EnergyPro 3.1 By EnergySoft User Number 3124A Job Number: 43004 Page: 27 of 30 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 SYSTEM NAME AC -1 FLOOR AREA 420 (NOTE: Provide one copy of this form for each mechanical system when using the Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: COOLING HEATING - OUTDOOR DRY BULB TEMPERATURE (APPENDIX C) 112 OF 26 OF - OUTDOOR WET BULB TEMPERATURE (APPENDIX C) 78 OF - INDOOR, DRY BULB TEMPERATURE SEE ASHRAE CHAPTER 8, 1993 75 °F 70 °F OR APPENDIX B 2. SIZING: - DESIGN OUTDOOR AIR 80CFM (MECH 3; COLUMN 1) 3,004 3,720 - ROOM LOADS 10,377 3,355 - RETURN VENTED LIGHTING 0 n/a - RETURN AIR DUCTS 519 168 - RETURN FAN 0 0 - SUPPLY FAN 0 0 - SUPPLY DUCTS 5191 1 168 TOTALS 14,420 7,411 SAFETY / WARM-UP FACTOR 1.21 1.43 MAXIMUM ADJUSTED LOAD (TOTALS FROM ABOVE x SAFETY / WARM-UP FACTOR) 17,449 10,597 3. SELECTION: 16,879 40,000 INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) Btu / Hr Btu / Hr IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN ❑A FAN DESCRIPTION Fan a DESIGN BRAKE HP 0.200 a a EFFICIENCY MOTOR DRIVE 77.0% 100.0% NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan System Power Demand may not exceed 0.8 Watts/cfm for constant volume systems or 1.25 Watts/cfm for VAV systems. FE] o a NUMBER OF FANS 1 CFM (Supply Fans) 800 TOTALS 194 800 TOTAL FAN SYSTEM POWER DEMAND 0.242 WATTS / CFM Col. F / Col. G EnergyPro 3.1 By EnergySoft User Number 3124A Job Number. 43004 Page•28 of 30 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE Bank of America -Point Happy Pavilion Center 5/5/03 DESCRIPTION Designer Enforcement Equipment and Systems. Efficiencies ❑X §111 Any appliance for which there is a California standard established In the Appliance Efficiency Regulations will comply with the applicable standard. r§ 115(a) Fan type central furnaces shall not have a pilot light. X] § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be Insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: ❑X § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be Installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power Is Interrupted; or ❑ § 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. X § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off Independently of other isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. X❑ § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. F§ 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number: 43004 Page:29 of 30 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM NAME DATE Bank of America -Point Happy Pavilion Center I 5/5/03 Description Designer Enforcement Ventilation F§ 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. X❑ § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. X❑ § 122(o All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air openings. X] § 121(1)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or X] § 121(1)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or ❑ § 121(1)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or 0 § 121(1)4 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. a § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. , Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 3124A Job Number. 43004 Page:30 of 30