Loading...
13-0732 (RC) Title 24i i OrFirc /copy BUILDING ENERGY ANALYSIS EPORT PROJECT: JJ's Spa Highway 111 La Quinta, CA Project Designer: [?ECEIVED AUG 0 6 2013 coMM OF 1A QUIT T l' OEVELOPMFNT Report Prepared by: Joan D. Hacker Insu-form, Inc. 77810 Las Montanas Road, Suite 201 Palm Desert, Ca 92211 760-345-1352 Job Number: SIT OF LA C�UINTA Date: bULDING & SAFETY DEPT. 7/16/2013 ; �� PPR QED . FUR CONS TR CTION i 2��� The EnergyPro computer program has been used to perform the calculations summarizedin this?oIIVn-ptf9.pohis [a[tLna�an )roval and is authorized by the California Energy Commission for use with both the Residential and Nonrede 2008 Build E ic'e c standards. This program developed by EnergySoft, LLC — www.energysoft.com. Ener Pro.5.1 by Ener Soft User Number: 2655 RunCode: 2013-07-16T12:51:59 ID:. ' TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form LTG -1-C Certificate of Compliance 3 Form LTG -2-C Lighting Controls Credit Worksheet 7 Form LTG -3-C Indoor Lighting Power Allowance 8 Form LTG -MM Lighting Mandatory Measures 9 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVE® FOR CONSTRUCTION • DATE BY EnergyPro 5.1 by EnergySoft Job Number: ID: User Number: 2655 CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG-1 C Project Name JJ's Spa 1 Date 7/16/2013 Project Address Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 1,750 Unconditioned Floor Area 0 GENERAL INFORMATION Building Type: m Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ School ❑ Relocatable, Public m Conditioned Spaces ❑ Unconditioned Spaces School t Phase of Construction: ❑ New Construction ❑ Addition m Alteration Method of Compliance: ❑ Complete Building m Area Category ❑ Tailored Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Signatur Name Joan D. Hacker Company Insu-form, Inc. Date 7/16/1013 Address 77810 Las Montanas Road, Suite 201 CEA # CEPE # City/State/Zip Palm Desert, Ca 92211 Phone 760-345-1352 The Principal Lighting Designer's Declaration Statement • 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Signature Company Phone Address License # City/State/Zip Date Lighting Mandatory Measures Indicate location on building plans of Mandatory Measures Note Block: LIGHTING COMPLIANCE FORMS & WORKSHEETS check box if worksheets is included For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published by the California Energy Commission. -- ------� © LTG-1C Pages 1 through 4 Certificate of Compliance. All Pages required on plans fog allasuim�tals.LA QUINTA © LTG-2C Lighting Controls Credit Worksheet -A-,DI G & SAFETY ❑ LTG 3C Indoor Lighting Power Allowance —'P ReVED Q LTG-4C Pages 1 through 4 Tailored Method Worksheet -r s-tenn � ❑ LTG-5C Pages 1 and 2 Line Voltage Track Lighting Worksheet i ' ' ^.T1= BY- EnergyPro 5.1 by Ener Soft User Number: 2655 RunCode: 2013-07-16T12:51:59 ID: Page 3 ofll CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1 C Project Name JJ's Spa Date 1 7/16/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A and LTG -3A Retain a copy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: ® CONDITIONED SPACE ❑ UNCONDITIONED SPACE ® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the ® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F I G H None or Item Ta Complete Luminaire Description' i.e, 3 lam fluorescent troffer, F32T8, one dimmable electronic ballasts ^N a E � 3 J How wattage Was determined a� o N X C1 O O N CECiv ro Default 0 � £ �, From o > > N NA8 ¢ ~ z J c Field Ins ector` a iro A 100w Recessedlncandescent 100.0 0 ❑ 2 200 ❑ ❑ B 100 Wall Mounted 100.0 ® ❑ 1 100 ❑ ❑ C (1) 22w Fluorescent Circline T5 Elec 28.0 ® ❑ 2 56 ❑ ❑ D 100w Wall Mount Incandescent 100.0 ❑ ❑ 17 1,700 ❑ ❑ E Chandeliers 200.0 ® ❑ 5 1,000 ❑ ❑ F 100w Surface Mount Incandescent 100.0 ® 1 ❑ 21 200 ❑ 1 ❑- ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0— 6DEP E5 ❑ I -T❑ ❑ BUILEDI IG I. SAFETY a ❑ nORCROVFD ❑ ❑ 1 S -RUC ION ❑ ❑ ❑ ❑ ❑ ❑ E] 1:1❑ ❑ —InstalledMatts.R. - Building total number of pages: installed Watts Building Total Sum of all pages) Enter into LTG -1C Page 4 of 4 3,256 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Ener Pro 5.1 by Ener Soft User Number: 2655 RunCode: 2013-07-16712:51:59 ID: Page 4 of 9 CERTIFICATE OF COMPLIANCE Part 3 of 4) LTG -1 C Project Name JJ'S Spa Date 7/16/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ftZ, automatic daylighting controls for daylit areas > 2,500 ftZ, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ftZ, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST Field Ins ector Number Special Type/ Description of Units Location in Building Features Pass Fail ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. I I ai I r J MEDING & 6AFI=. I APPROVED j FOR CONSTRUCTION Field Inspector's Notes or Discrepancies: DATE BY Ener Pro 5.1 by Ener Soft User Number: 2655 RunCode: 2 013-0 7-1 6 712:51:59 ID: Page 5 of 9 CERTIFICATE OF COMPLIANCE Pall 4 of 4 LTG-1 C Project Name Date JJ's Spa 1 7/16/2013 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 3,256 Installed Lighting 0 from Conditioned LTG-1C, Page 2 from Unconditioned LTG-1 C, Page 2 Lighting Control Credit _ 306 Lighting Control Credit _ 0 Conditioned Spaces from LTG-2C Unconditioned Spaces from LTG-2C Adjusted Installed = ' 2,950 Adjusted Installed = 0 Lighting Power Lighting Power Complies if Installed 5 Allowed Complies if Installed 5 Allowed Allowed Lighting Power Allowed Lighting Power Conditioned Spaces from LTG-3C or PERF-1 2'975 Unconditioned Spaces from LTG-3C)0 Required Acceptance Tests Designer: • . This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG-2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG-2A and LTG-3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A and LTG-3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. LTG-2A and Luminaires Controlled LTG-3A Controls and Sensors and Number of Automatic Luminaires Daylighting Controls Equipment Re uirin Testing Description controlled Location Acceptance Dimming - Manual 100w Wall Mount Incandescent 17 Spa m Dimming - Manual Chandeliers 5 Spa m Dimming - Manual (1) 22w Fluorescent Circline T5 Elec 2 i-----'--5pa Dimming - Manual 100w Recessed Incandescent 2 i I Spa Dimming - Manual 100 Wall Mounted 1 i H U I LQall N G& SATE rY-EEFU.-- I APPROV D ❑ FOR CONSTRUCTION ❑ a'ATF BY ❑ ❑ Ener Pro 5.1 by EnergySoh User Number: 2655 RunCode: 2013-07-16712:51:59 ID: Page 6 of 9 LIGHTING CONTROLS CREDIT WORKSHEET Part 1 of 2) LTG-2C Project Name JJ's Spa Date 1 7/16/2013 POWER ADJUSTMENT FACTORS PAF FOR NON-DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: m ' CONDITIONED SPACES ❑ UNCONDITIONED SPACES A B C D E F G Watts of Power Room # Zone ID Plan Room Area Control Adjustments Areas Lighting Control Description' Reference(ft') Lighting Factor Control Credit Watts E x F Spa Dimming - Manual D 1,750 1,700 0.10 170 Spa Dimming - Manual E 1,750 1,000 0.10 100 Spa Dimming - Manual C 11750 56 0.10 6 Spa Dimming - Manual A 1,750 200 0.10 20 Spa Dimming - Manual 8 1,750 100 0.10 10 (-ITY OF LA QUINTA SAF DEPT. E13 R11a COVE r0,1 PAGE TOTAL 306 Note: Conditioned and Unconditioned Building total of non-daylight control credit watts for all pages of LTG-2C Pae 1 of 2 Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2 0 Space shall be separately totaled BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) 306 Enter in LTG-1 C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C Ener Pro 5.1 by Ener Soft User Number: 2655 RunCode: 2013-07-16T12:51:59 ID: Pae 7 of 9 INDOOR LIGHTING POWER ALLOWANCE LTG-3C Project Name JJ's Spa Date 7/16/2013 ALLOWED LIGHTING POWER Chose One Method A Separate LTG-3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this page are only for: m CONDITIONED SPACES ❑ UNCONDITIONED SPACES COMPLETE BUILDING METHOD WATTS BUILDING CATEGORY From §146 Table 146-E PER(ft') X COMPLETE BLDG. AREA = ALLOWED WATTS TOTALS AREA WATTS AREA CATEGORY METHOD WATTS BUILDING CATEGORY From §146 Table 146-F PER(ft') X ALLOWED Area ft2 = WATTS 1,750 2,975 Beauty Salon 1.70 ITLA QL i-J v N C 1,750 2,9 15 AREA— B WATTS iE), • For, TOTALS TAILORED METHOD Total Allowed Watts using the Tailored Method taken from LTG-4C Pae 1 of 4 Row 3 0 The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG-4C set of forms. A separate set of LTG- 4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces EnenqyPro5l by Ener Soft User Number: 2655 RunCode: 2013-07-16T12:51:59 ID: Page 8 of 9 LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date JJ's Spa 7/16/2013 Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. ►A QUINTA & SAFETY DEPT. D �RUCTIONI EDATE BY Ener Pro 5.1 by Ener Soft User Number: 2655 RunCode: 2013-07-16712:51:59 ID: Pa e 9 of 9