Loading...
11-1363 (RC) Title 24y 'BUILDING ENERGY ANALYSIS REPORT PROJECT: McDonald's 78962 Highway 111 La Quinta, CA 92253 Project Designer: Underwood and Associates 12832 Valley View St., #207 Garden Grove, CA 98245 714-892-3900 Report Prepared by: PP PJP Engineering, Inc 13231 Acoro Place Cerritois, CA 90703 562-404-2695 Job Number: CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CO NSTR-UCCT�ION DATE DECEIVED PP4400-434 DEC 2 7 2011 Date: 12/26/2011 BY: The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the Califomia Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. EneigyPro 5.1 by Energ Soft User Number 4806 RunCode: 2011-12-26T13:47:02 I0: PP4400-434 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 15 Form MECH-MM Mechanical Mandatory Measures 16 EnergyPro 5.1 by EnergySoft Job Number. ID: PP4400-434 User Number. 4806 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 C Project Name Date McDonald's 11212612011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 78962 Highway 111 La Quinta CA Climate Zone 15 4,754 81 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ® Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name PP Signature Company PJP Engineering, Inc Date 1226/2011 Address 13231 Acoro Place Phone 562-404-2695 City/State/Zip Cerritois, CA 90703 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑. ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name . TL [Signature Company Underwood and Associates Date Address 12832 Valley View St. #207 License # City/State/Zip Garden Grove, CA 98245 Phone 714-892-3900 Principal Mechanical Designer Name TL Signature Company Underwood & Associates Date Address License # City/State/Zip Garden Grove, CA Phone Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State2ip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box If worksheets are Included) m ENV -1C Certificate of Compliance. Required on plans. m MECH-1 C Certificate of Compliance. Required on plans. ❑ LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. Energ Pro 5.1 by EnergySoft User Number., 4806 Run Code: 2011-12-26T13:47:02 ID: PP4400-434 Page 3 of 16 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 C Project NameDate McDonald's 12/26/2011 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sgft-vr) Energy Component Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS itandard Proposed Compliance DESInn DPcinn Marnin 1.34 1.24 0.10 511.67 502.86 8.80 136.87 142.57 -5.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.02 100.02 0.00 76.77 76.77 0.00 136.61 136.61 0.00 0.00 0.00 0.00 963.27 960.07 3.20 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg Percent better than Standard 0.3% 0.4 % excluding process) BUILDING COMPLIES I GENERAL INFORMATION Building Orientation (►M 270 deg Conditioned Floor Area 4,754 sqft. _ q Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 5 Conditioned Footprint Area 4,754 sqft. Number of Zones 3 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total I Roof Oriantntinn rirnQC Aran (tM 854 (N) 1,246 (E) 854 (S) 1,246 4,200 4,754 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard 1.430 W/sgft. 292,283 sqft. sqft. sqft. sqft. sqft. sqft. Glazina Area 305 59 147 483 994 0 Proposed 1.430 W/sqft. 694, 628 I 'I KIMI sqft. sqft. sqft. sqft. sqft. sqft. 35.7% 4.7% 17.2% 38.8% 23.7 0.0% Prescriptive Values for Comparison only. See LTG -1 C for allowed LPD. PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C Project Name McDonald's Date 11212612011 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf' Ctrl. CreditsArea W/sf 2 Allowed LPD Proc. Tailored Loads W/sf 3 W/sf ° W/sf McDonald's Kitchen McDonald's Kitchen, Food Preparation 2,729 "1.600 3.000 McDonald's Dining McDonald's Comp Bldg Restaurant 1,944 `1.200 1.000 McDonald's Comp Bldg Restaurant 81 •1.200 Notes: 1. See LTG -1 C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1-C b others b others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified In this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed In this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number. • 4806 RunCode: 2011-12-26T13:47:02 ID: PP4400-434 Page 5 of 16 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name McDonald's Date 11212612011 Project Address 78962 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Ai;j 4,754 Addition Floor Area 81 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ftz (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1270 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType d.2 Q 3 Cy UJLL O2 u i tib C W> G 5 W{L o d— > o c d r CU, C d C 16 v d LL 1 Slab 2,729 (N) 0.730 Nonel 4.4.7-A1 Existing ❑ ❑ 2 Wall 1,168 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 3 Roof 2,729 (N) 0.049 R-19 4.2.1-A4 Existing ❑ ❑ 4 Wall 300 (E) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 5 Roof 1,944 (N) 1 0.049 R-19 4.2.1-A4 Existing ❑ ❑ 6 Slab 1,944 (N) 0.730 None 4.4.7-A 1 Existing ❑ ❑ 7 Wall 348 (Vt9 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 8 Wall 743 (S) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 9 Wall 407 (E) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 10 Wall 160 (149 1 0.110 R-11 4.3.1-A2 Removed ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type L' a `3 C w :' O Z 0 RLL > 0 LL c > Cn U '� 2¢ _ 'o N u) c > O o o C) N A a LL 1 Window 36 (N) 1.190 NFRC 0.830 NFRC ❑ Existing ❑ ❑ 2 Window 170 (tM 1.190 NFRC 0.830 NFRC ❑ Existing ❑ ❑ 3 Window 461 (S) 1.190 NFRC 0.830 NFRC ❑ Existing ❑ ❑ 4 Window 147 (E) 1.190 NFRC 0.830 NFRC ❑ Existing ❑ ❑ 5 Window 176 (IM 1.190 NFRC 0.830 NFRC ❑ Removed ❑ ❑ 6 Window 23 (N) 1.000 NFRC 0.700 NFRC ❑ New ❑ ❑ 7 Window 22 (S) 1.000 NFRC 0.700 NFRC ❑ New ❑ ❑ 8 Window 135 (W) 1.000 NFRC 0.700 NFRC ❑ New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number., 4806 RunCode: 2011-12-26713:47:02 ID: PP4400-434 Pa e 6 of 16 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name McDonald's Date 12/26/2011 Project Address 78962 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 4,754 Addition Floor Area 81 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space z 8000 ftz (If checked include the ENV -4C with submittal) Phase of Construction: 1 New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 270 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION AssemblyT a 30 C N O z V n 2+ 7 v W C ww > 2 C U. 8 5.2 1Tag/ID > O C i C -3 a r y O N N a U. 11 Roof 81 (N) 0.049 R-19 1 4.2.1-A4 Existing ❑ ❑ 12 Slab 81 (N) 0.730 None 4.4.7-A1 Existing ❑ ❑ 13 Wall 19 (N) 0.110 R-11 4.3.1-A2 New ❑ ❑ 14 Wall 20 (S) 0.110 R-11 4.3.1-A2 New ❑ ❑ 15 Wall '201 0.110 R-111 4.3.1-A2 New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type 2w a 3 OZ V RLLUT �> c= > .N V �¢ o NN o� C > O c o VN A a LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 13 ❑ 131. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5. 1 by EnergySoft User Number 4806 RunCode: 2011-12-26T13:47:02 ID: PP4400-434 Page 7 of 16 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name McDonald's Date 12/26/2011 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fall' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or 13SRIthat have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. 13 13 13SRI ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ [3 roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are 13 exempted. ted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/ 13 13 13exem ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from Cool Roof criteria below. C] 13 13the ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are ted from the low -sloped roofingcriteria. 1313 13exem 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Roof Slope Product Weight Number' s 2:12 > 2:12 < 51b/fe 2 51b/ft 2 Product Type2 Aged Solar Reflectance Thermal Emmitance SPI 15 Pass Fail6 ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ _ ❑ ❑ ❑ ❑ c3 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.or-q/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p,,d"al — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.energy.ca.gov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessarv. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnergyPro 5.1 by EnergySoft User Number. 4806 Run Code: 2011-12-26713:47:02 ID: PP4400-434 Page 8 of 16 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name McDonald's Date 11212612011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test low a window 180 m 13 13 13 13 13 13 13 13 13 13 13 13 ❑ ❑ 13 13 13 13 13 13 13 EnergyPro 5. 1 by EnergySoft User Number: 4806 RunCode: 2011-12-26713:47:02 ID: PP4400-434 Page 9 of 16 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name McDonald's Date 12/26/2011 Project Address 78962 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 4,754 Addition Floor Area 81 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: M New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Enerqy Front Orientation: N, E, S, W or in Degrees: 270 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Ins ection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1 RTU-1 HP-1 McDonald's Kitchen 13 ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 2 ❑ ❑ Max Allowed Heating Capacity' 90,000 Btulhr ❑ ❑ Minimum Heating Efficiency' 78% AFUE ❑ ❑ Max Allowed Cooling Capacity' 60,000 Btu/hr ❑ ❑ Cooling Efficiency' 10.0 SEER / 10.0 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented 4.2 ❑ ❑ When duct testing is required, submit & MECH-4-HERS No 13 13MECH-4A Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 McDonald's Dining [3 13i.e. Eq ui ment Type 3: Packaged DX ❑ ❑ Number of Systems 3 ❑ ❑ Max Allowed Heating Capacity' 90,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 78% AFUE ❑ ❑ Max Allowed Cooling Capacity' 60,000 Btu/hr ❑ ❑ Cooling Efficiency' 10.0 SEER / 10.0 EER ❑ ❑ Duct Location/ R-value Attic, Ceiling Ins, vented/ 4.2 ❑ ❑ When duct testing is required, submit & MECH-4-HERS NO ❑ 13MECH-4A Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro6lbyEnergySoft User Number. 4806 RunCode: 2011-12-26T13:47:02 ID: PP4400-434 Pae 10 of 16 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date McDonald's 12/26/2011 I EnergyPrO 5.1 by EnergySoft User Number., 4806 Run Code: 2011-12-26713:47:02 ID: PP4400-434 Page 11 of 16 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date McDonald's 12/26/2011 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 McDonald's Kitchen McDonald's Dining Number of Systems 2 3 Indicate Page Reference on Plans or Schedule and Indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112 a 78% AFUE 78% AFUE Cooling Equipment Efficiency 112(a) 10.0 SEER / 10.0 EER 10.0 SEER/ 10.0 EER HVAC Heat Pump Thermostat 112(b), 112(c) n/a n/a Furnace Controls/Thermostat 112(c), 115 a n/a n/a Natural Ventilation 121 b No No Mechanical Ventilation 121 b 409 cfm 1,013 cfm VAV Minimum Position Control 121 c No No Demand Control Ventilation 121 c No No Time Control 1 22 a Programmable Switch Programmable Switch Setback and Setup Control 122(e) Setback Required Setback Required Outdoor Damper Control 122(f) Auto Auto Isolation Zones 122 n/a n/a Pipe Insulation 123 N/A N/A Duct Location/ R -value 124 Attic, Ceiling Ins, vented 4.2 Attic, Ceiling Ins, vented 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a n/a Proposed Heating Capacity 144(a & b 180,000 Btu/hr 270,000 Btulhr Calculated Design Cooling Load 144(a & b n/a n/a Proposed Cooling Capacity 144(a & b 77,961 Btu/hr 128,879 Btu/hr Fan Control 144(c) Constant Volume Constant Volume DP Sensor Location 144(c) N/A N/A Supply Pressure Reset (DDC only) 144(c) No No Simultaneous Heat/Cool 144(d) No No Economizer 144(e) No Economizer No Economizer Heat Air Supply Reset 144(f) Constant Temp Constant Temp Cool Air Supply Reset 144 Constant Temp Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted I 144(k) No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 4806 Runcode: 2011-12-26T13:47:02 ID: PP4400-434 Pae 12 of 16 MECHANICAL VENTILATION AND REHEAT MECH-3C. Project Name McDonald's Date 12/26/2011 MECHANICAL VENTILATION §121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System(ft2 Condition Area CFM per ft2 Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air McDonald's 2, 729 0.15 409 27.3 15.0 409 409 409 McDonald's Kitchen Total 409 409 McDonald's 1,944 0.38 739 64.8 15.0 972 972 972 McDonald's 81 0.38 31 2.7 15.0 41 41 41 McDonald's Dining Total 1,013 1,013 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number. 4806 RunCode: 2011-12-26713:47:02 ID: PP4400-434 Pae 13 of 16 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name McDonald's Date 12/26/2011 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Ot . Efficiency Tons Pump Ot . GPM BHP Control DHW / BOILER SUMMARY System Name Type Distribution Ot . Rated Input Vol. (Gals). Energy Factor Standby Loss Tank Ext. or RE or Pilot R -Value Status MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water PIping Length ft Control Ot . HP Type In Plenum Outside Buried Add 1/2" Insulation ❑ CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Ot . Output Aux. kW Efficiency Output Efficiency Status Exist. AC unit Packaged DX 5 90,000 0.0 78% AFUE 60,000 10.0 SEER/ 10.0 EER Existing CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type [Exist. Economizer Type CFM BHP CFM BHP AC unit Constant Volume No Economizer 2,000 1.00 none EnergyPro 5.1 by EnerqySoft User Number. 4806 RunCode: 2011-12-26T13:47:02 ID: PP4400-434 Pae 14 of 16 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name McDonald's Date 12/26/2011 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. 17 a All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, §1 ()' weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). EnergyPro 5.1 by EnemySoft User Number: 4806 RunCode: 2011-12-26713:47:02 ID: PP4400-434 Pae 15 of 16 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date McDonald's 12/26/2011 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(g): square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled bv a time control device as described above. 122 c § ()' Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number: 4806 RunCode: 2011-12-26T13:47:02 ID: PP4400-434 Pae 16 of 16