Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
05-2121 (CSCS) Title 24
V W. TITLE 24 REPORT Title 24 Report for: L�_� _ est Buy - E 79M---lighway_111-_1 La Quinta, CA Project Designer: 0 Report Prepared By: Steve Balderrama Stueven Engineering Consultants 326 Kalmia Street Escondido, CA 92025 (760) 735-8577 . Job Number: CITY OF 'LA QUINTA f3U1LDING & SAFETY DEFT. APPROVED FOR CONSTRUCTION z.6b / L�5 DAT AD M D BY ETeCalif' C� Date: 5/18/2005 The Enem has b s sed to perform the calculations summarized in this compliance report. T11is program has approval and is authorizefission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number: User Number: 3429 Cofy W. TITLE 24 REPORT Title 24 Report for: L�_� _ est Buy - E 79M---lighway_111-_1 La Quinta, CA Project Designer: 0 Report Prepared By: Steve Balderrama Stueven Engineering Consultants 326 Kalmia Street Escondido, CA 92025 (760) 735-8577 . Job Number: CITY OF 'LA QUINTA f3U1LDING & SAFETY DEFT. APPROVED FOR CONSTRUCTION z.6b / L�5 DAT AD M D BY ETeCalif' C� Date: 5/18/2005 The Enem has b s sed to perform the calculations summarized in this compliance report. T11is program has approval and is authorizefission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number: User Number: 3429 Cofy TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 12 Form MECH-MM Mechanical Mandatory Measures 13 EnergyPro 3.1 By EnergySoft Job Number: User Number: 3429 t 1PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of.3 PERF -1 PROJECT NAME Best Buy PROJECT ADDRESS . 79- Highway 111 La Quinta RINCIPAL DESIGNER - ENVELOPE ENTATION AUTHOR- Stuev6n* E nsoltants' ---FDATE 5/24/2005 --- TELEPHONE Building Permit -4 TELEPHONE Checked by/Date — (760) 735-8577 1 Enforcement Agencv Use GENERAL INFORMATION'. DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CL.IMATEZONE .:,;. 33,865 sga=c 1.5 NONRESIDENTIAL I HIGH RISE RESIDENTIAL 46ILDING TYPE-HOTEUMOTEL dl.lEk ROOM CONSTRUCTION M` .ADDITION .-D ALTERATION' F ---j EXISTING +ADDITION ISTATEMENT OF COMPLIANCE:.' !-7 7 Thls'CertificaWof Compliance lists the building fealbres,and,I56rfomriancespecifications teed6d.to.'coirnply with Title 24,Pa'rts:fand J 1. 6; of the .State B. uildihg�.P- bd ;,This certificate I t --I p ate aliol`10s 0 performance comp. iance approach, only p-0-,uidihg'us'inj%tqe e orm h, DOCUMENTATION ALIT ISIGNATIJ k AUTHOR DAT Mb' Z teve . -8 a I'd e r'r 61 The. Priocipal Dbsigne'rs' hereby certify.Ahat the proposed. building design �repr6s6nted in'the,699$'!r'yction'd6cume' d" a n lts.,bh. modelle for this permit application• are, consistent With all othe'r-forms and w6rkskieets-soeciticatio'iis,,'6t.�d'otherc6iculatio6,q submitted with this -The proposed building as.' e f S�permit`application:d signe meets -t e.en'e efficI6 byreqdirementso. the, State Oildlng:Code ,Title 24,: Part 6. .ENV. LTG 1. 1, hereby a irm, that I am,eli6ibld',Un� under provisions Division affirm, `6 orO of the Business, and Professions Code* to' s' -'d t a's the pets and:th at,l;a' th'- , , en` . - responsible _r licensed a"a' 1 engineer, sign is ocume person its preparation; M s mechanical engineer; . ineer, e . ectrica , engineer architect:: h' I I M66`i4 archite Ej -2-1.affirim'that I am eligible underI . . the provis ion's dDivision 3 -of the 'b6sih66s.-.ari&Professions-Code Sec'ti on El 5537 2 or OV.3` to-si grijkis dbcum-p 1, nt,-.�as tL its�' n;, can I dj that I am�a license he'person.responsib e�fol preparatio h d ngdocuments .'fbrw.-6rk that I have to,perf6rml.,L:�'_ contractor preparing ha d P.'r fession Codejo sigh.this'd666hnent -0�, (affirm-thai Lam eligible under Division 3 ofthe Business an b because it pertains.tobstructL;'reoriypeofw'ork-describ6'das'et'xi'��of,:USU,66t'to,.BUsiness.andPfofessibns, p tion of the.13Usiness4nd'Profeisi' o' I a6.rint' 6 i, C6d6,8ecti6ps �5.37,-,6538� and ISM ons:C, de. p e n., full in, the "Nonresidential Manual'.) ENVELOPE' COMPLIANCE ock.f6r. I' -,Indicate:*f64itibn- n pans, ofNote- BI Mandatory Measures. i. Reouirdd, Forms ENV PRINCIPAL E!4YELOPE DESIGNERj- NAME L1 NO; DA-Tf- 6TUR e Aw? W • LIGHTING COMPLIANCE ..Irfdicatb location on'plans -of Note Block for Manda6ry Measure Com ianco - Not In The Scope Of T(ighting C P This�Sabrdt I - ::Requiredforrns. [PRINCIPAL LIGHTING DESIGNER - NAME !SIGNATURE' LIC. NO. DATE MECHANICAL -COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Forms MECH-1, MECH-2,.-MECH-3 PRINCIPAL MECHANICAL ECHANICAL DESIGNER - NAME SIG AVURE ILIC. NO. DATE Karges & Associates V V Run'linitiation Time: 05/18/05 13:51:50 Run Code: 1116449510 l[EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:3 of 14 PHASE OF CONSTRUCTION ISTATEMENT OF COMPLIANCE:.' !-7 7 Thls'CertificaWof Compliance lists the building fealbres,and,I56rfomriancespecifications teed6d.to.'coirnply with Title 24,Pa'rts:fand J 1. 6; of the .State B. uildihg�.P- bd ;,This certificate I t --I p ate aliol`10s 0 performance comp. iance approach, only p-0-,uidihg'us'inj%tqe e orm h, DOCUMENTATION ALIT ISIGNATIJ k AUTHOR DAT Mb' Z teve . -8 a I'd e r'r 61 The. Priocipal Dbsigne'rs' hereby certify.Ahat the proposed. building design �repr6s6nted in'the,699$'!r'yction'd6cume' d" a n lts.,bh. modelle for this permit application• are, consistent With all othe'r-forms and w6rkskieets-soeciticatio'iis,,'6t.�d'otherc6iculatio6,q submitted with this -The proposed building as.' e f S�permit`application:d signe meets -t e.en'e efficI6 byreqdirementso. the, State Oildlng:Code ,Title 24,: Part 6. .ENV. LTG 1. 1, hereby a irm, that I am,eli6ibld',Un� under provisions Division affirm, `6 orO of the Business, and Professions Code* to' s' -'d t a's the pets and:th at,l;a' th'- , , en` . - responsible _r licensed a"a' 1 engineer, sign is ocume person its preparation; M s mechanical engineer; . ineer, e . ectrica , engineer architect:: h' I I M66`i4 archite Ej -2-1.affirim'that I am eligible underI . . the provis ion's dDivision 3 -of the 'b6sih66s.-.ari&Professions-Code Sec'ti on El 5537 2 or OV.3` to-si grijkis dbcum-p 1, nt,-.�as tL its�' n;, can I dj that I am�a license he'person.responsib e�fol preparatio h d ngdocuments .'fbrw.-6rk that I have to,perf6rml.,L:�'_ contractor preparing ha d P.'r fession Codejo sigh.this'd666hnent -0�, (affirm-thai Lam eligible under Division 3 ofthe Business an b because it pertains.tobstructL;'reoriypeofw'ork-describ6'das'et'xi'��of,:USU,66t'to,.BUsiness.andPfofessibns, p tion of the.13Usiness4nd'Profeisi' o' I a6.rint' 6 i, C6d6,8ecti6ps �5.37,-,6538� and ISM ons:C, de. p e n., full in, the "Nonresidential Manual'.) ENVELOPE' COMPLIANCE ock.f6r. I' -,Indicate:*f64itibn- n pans, ofNote- BI Mandatory Measures. i. Reouirdd, Forms ENV PRINCIPAL E!4YELOPE DESIGNERj- NAME L1 NO; DA-Tf- 6TUR e Aw? W • LIGHTING COMPLIANCE ..Irfdicatb location on'plans -of Note Block for Manda6ry Measure Com ianco - Not In The Scope Of T(ighting C P This�Sabrdt I - ::Requiredforrns. [PRINCIPAL LIGHTING DESIGNER - NAME !SIGNATURE' LIC. NO. DATE MECHANICAL -COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Forms MECH-1, MECH-2,.-MECH-3 PRINCIPAL MECHANICAL ECHANICAL DESIGNER - NAME SIG AVURE ILIC. NO. DATE Karges & Associates V V Run'linitiation Time: 05/18/05 13:51:50 Run Code: 1116449510 l[EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:3 of 14 V V Run'linitiation Time: 05/18/05 13:51:50 Run Code: 1116449510 l[EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:3 of 14 PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERF -1 DATE Best Bu 5/18/2005 ANNUAL SOURCE ENERGY USE SUMMARY kBtu/s ft- r Standard ENERGY COMPONENT Design Space Heating 0.70 Space Cooling 50.43 Indoor Fans 24.92 Heat Rejection 0.00 Pumps & Misc. 0.00 Domestic Hot Water 0.00 Lighting 55.00 Receptacle 16.93 Process 0.00 TOTALS: 147.98 Percent better than Standard: Proposed Design Compliance Margin ❑!sG.7dara g� ., -N 0.78 -0.09 s Space H"WV 41.18 9.25 Sp8Cecwft 25.45 -0.53 'nd-Fenn 0.00 0.00 H° Rel `�" 0.00 0.00 wmp, s Mix 0.00 0.00 0' 55.00 0.00 "g'tft 16.93 0 10Y 20 -T30 40 50 kBtulsgR-yr 0.00 139.35 8.63 5.8% ( 5.8% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones North 0 deg Conditioned Floor Area 33,865 sqft. Unconditioned Floor Area 0 sqft. Conditioned Footprint Area 33,865 sqft. 1 10 6 Orientation Front Elevation (North Left Elevation (East) Rear Elevation (South) Right Elevation (west Total Roof Gross Area sqft. sqft. sqft. sqn. sqft. sqft. Glazing Area Glazing sqft. sqft. sqft. sqft. sqft. sqft. Ratio 3,720 0 0.0% 1,600 0 0.0% 5,780 480 8.3% 1,100 o o. ° 12,200 480 3.9% 33,86 5 E= 0.0% Standard Proposed Lighting Power Density 1.868 w/sgft. 0.000 w/sqn. Prescriptive Env. Heat Loss 3,410 Btu/h 3,308 Btu/h Prescriptive Env. Heat Gain 428,124 Btu/h-F 354,795 Btu/h-F LEEDTM Energy & Atmosphere Credit Savings vs. Title 241 6.59% Energy Performance Credit2 1 Points 1. excludes process and receptacle 2. see LEED table 8-c or 8-d Remarks: Run Initiation Time: 05/18/05 13:51:50 Run Code: 1116449510 EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: PageA of 14 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Best Buy I DATE 5/18/2005 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)1 Port. LPD (W/sf)1 Ctrl. Tailored Credits LPD (W/sf)2 (W/Sq 3 Proc. Loads (W/Sq RTU- 16 Sales Floor Retail/Wholesale Sales 28,612 0.000 0.000 RTU- 7 Receiving Industrial Work, High Bay 2,589 0.000 0.000 RTU- 8 Stereo Install Industrial Work, High Bay 1,108 0.000 0.000 RTU- 9 Sales Devel/Hubb Office 575 0.000 0.000 Restroom Corridor/Restroom/Support 617 0.000 0.000 RTU- 10 Admin/Comm Room Office 364 0.000 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the speciaal 'ustification and documentation submitted. nl ice., I r�sia The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:5 of 14 1 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME Best Buy Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 480 0.720 180 DATE 5/18/2005 OPAQUE SURFACES Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 1 Roof IMetal 28,612 0.044 0 0 X Roof - Ri id Insulation Sales Floor 2 Wall Wood 3 120 0.131 _ 0 90 X R-7 Wall W.7.2x4.16 Sales Floor 3 Wall Wood 2,400 0.131 180 90 X R-7 Wall W.7.2x4.16 Sales Floor 4 Wall Wood 60 0.131 270 90 x R-7 Wall W.7.2x4.16 Sales Floor 5 Roof Metal 2,589 0.044 0 0 X Roof - Rigid Insulation Receiving 6 Wall Wood 600 0.131 0 90 X R-7 Wall W.7.2x4.16 Receiving 7 Wall lWood 2,060 0.131 180 90 X R-7 Wall W.7.2x4.16 Receiving 8 Wall lWood 280 0.131 270 90 X R-7 Wall (W.7.2x4.16) Receiving 9 Door INone 240 0.581 270 90 & Hollow Metal Door Receiving 10 Roof Metal 1,108 0.044 0 0 X Roof- Rigid Insulation Stereo Install 11 Wall Wood 480 0.131 90 90 & R-7 Wall W.7.2x4.16 Stereo Install 12 Door None 240 0.581 90 90 X Hollow Metal Door Stereo Install 13 Roof Metal 575 0.044 0 0 & Roof - Rigid Insulation Sales Devel/Hubb 14 Wall Wood 500 0.131 90 90 X R-7 Wall W.7.2x4.16) Sales Devel/Hubb 15 Roof Metal 617 0.044 0 0 x Roof - Rigid Insulation Restroom 16 Wall Wood 380 0.131 90 90 X R-7 Wall W.7.2x4.16 Restroom 17 lWall Wood 560 1 0.131 180 90 X R-7 Wall W.7.2x4.16 Restroom 18 Roof Metal 364 1 0.044 0 0 of - Rigid Insulation Admin/Comm Room 19 Wall Wood 280 0.131 180 90 R-7 Wall W.7.2x4.16 Admin/Comm Room 20 lWall Wood 520 0.131 270 90 1 X R-7 Wall (W.7.2x4.16) Admin/Comm Room FENESTRATION SURFACES Site Assembled Glazing Check box if Building is — 100,000 sgft of CFA and — 10,000 sgft vertical glazing then NFRC Certification is required. Fnllnw NFRC inn -SR PrnrP.r1ijrP.S and siihmit NFRC 1 ahel Cartifirate Fnrm # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 480 0.720 180 0.73 Double Metal Clear Default Sales Floor EXTERIOR SHADING ## Exterior Shade Type Window SHGC Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 Run Initiation Time: 05/18/05 13:51:50 Run Code: 1116449510 EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:6 of 14 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE Best Buy 5/18/2005 SYSTEM FEATURES SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION I R -VALUE COOLING DUCT LOCATION R -VALUE VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE MECHANICAL SYSTEMS RTU- 16 RTU- 7 11 RTU- 8 Programmable Switch Heating & Cooling Required n/a n/a n/a Constant Volume No No Constant Tem Constant Temp n/a Air Balance Auto Fixed Tem (Integrated) 7153 cfm Gas Furnace 80% AFUE Packaged DX 11.5 EER TRANE YCD181C4L Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Required n/a n/a n/a Constant Volume No No Constant Tem Constant Temp n/a Air Balance Auto Fixed Tem (Integrated) 388 cfm Gas Furnace 81%AFUE Packaged DX 11.3 EER TRANE YHC120A4L Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Require n/a n/a n/a Constant Volume No No Constant Tem Constant Temp n/a Air Balance Auto No Economizer 166 cfm Gas Furnace 80% AFUE Packaged DX 11.3 EER TRANE YHC072A4M Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above. NOTE TO FIELD TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch Sensor B: Both V: VFD M: Manual Timer O: Other C: Curve VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM B: Air Balance A: Auto A: Air Enter Outdoor Air C: Outside Air Cert. G: Gravity W: Water CFM. M: Out. Air Measure N: Not Required Note: This shall be no D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MECH-3. 144e3 Run Initiation Time: 05/18/05 13:51:50 Run Code: 1116449510 EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:7 of 14 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE Best Buy 5/18/2005 SYSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS RTU- 9 1 RTU- 10 Programmable Switch Programmable Switch Heating & Cooling Required Heating & Cooling Required n/a n/a n/a n/a n/a n/a Constant Volume Constant Volume No No No No Constant Temp Constant Tem Constant Temp Constant Temp n/a n/a Air Balance Air Balance Auto Auto No Economizer No Economizer 179 cfm 91 cfm Gas Furnace Gas Furnace 81% AFUE 81% AFUE Packaged DX Packaged DX 11.9 SEER / 10.8 EER 10.0 SEER/ 9.1 EER TRANE YHC048A41VI TRANE YCC030F1 L Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 No No CODE TABLES: Enter code from table below into columns above. NOTE TO FIELD EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:8 of 14 1 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME Best Buy DATE 5/18/2005 CHILLER AND TOWER SUMMARY BHP Efficiency Tons PUMPS BHP Motor Eff. Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control TRANE YHC120A4L Constant Volume Blow -Through 4,000 2.00 84.0% 97.0% none TRANE YHC072A4M Constant Volume Blow -Through 1,950 0.60 77.0%1100.0% none TRANE YHC048A4M Constant Volume Blow -Through 1,600 1.00 82.5% 100.0% none -F -T Blow -Through 800 0.25 77.0% 100.0% none DHW BOILER SUMMARY Energy Factor or Recovery Efficiency Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Q Rated Input (Gals.) Vol. Ext. R -Val. CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qty. Output Aux. kW Eff. Out ut Sensible Efficiency Economizer Type TRANE YCD181C4L Packaged DX 6 203,000 0.0 80%AFUE 180,000 126,00 11.5 EER Fixed Temp (Integrate( TRANE YHC120A4L Packaged DX 1 121,500 0.0181 % AFU E 116,000 89,90 11.3 EER Fixed Temp (Integrate TRANE YHC072A4M Packaged DX 1 0 0.0 80%AFUE 70,000 49,00011.3 EER No Economizer TRANE YHC048A4M Packaged DX 1 64,000 0.0 81 % AFUE 42,400 39,40011.9 SEER / 10.8 EER No Economizer TRANE YCC030F1L Packaged DX 1 60,000 0.0 81%AFUE 29,200 20,40 10.0 SEER / 9.1 EER No Economizer SI IPPI V FAN I F-D;:Ti IRN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. TRANE YCD181C4L Constant Volume Blow -Through 6,000 3.00 86.5% 97.0% none TRANE YHC120A4L Constant Volume Blow -Through 4,000 2.00 84.0% 97.0% none TRANE YHC072A4M Constant Volume Blow -Through 1,950 0.60 77.0%1100.0% none TRANE YHC048A4M Constant Volume Blow -Through 1,600 1.00 82.5% 100.0% none TRANE YCC030F1L Constant Volume Blow -Through 800 0.25 77.0% 100.0% none EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Paoe:9 of 14 1 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME DATE Best Buv 5/18/2005 VAV TERMINAL BOX TERMINAL FAN BASEBOARD Min. CFM Reheat Coil Motor Drive System Type Qtv. Ratio Type DeltaT CFM BHP Eff. Eff. Type Output EXHAUST FAN SUMMARY EXHAUSTFAN EXHAUSTFAN Room Name Qt CFM BHP Motor Eff. Drive Eff. Room Name Q . CFM BHP Motor Eff. Drive Eff. EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Pape:10 of 14 1 MECHANICAL VENTILATION MECH-3 PROJECT NAME DATE Best Buv I 5/18/2005 MECHANICAL VENTILATION o © a o a o© o o a o ZONE/SYSTEM Sales Floor RTU- 16 Receiving RTU- 7 Stereo Install RTU- 8 Sales Devel/Hubb Restroom RTU- 9 Admin/Comm Room RTU- 10 AREA BASIS COND. AREA (SF) CFM PER SF MIN. CFM (B x C) 28,612 0.25 7,153 7,153 7,153 2,589 0.15 388 388 1,108 0.15 166 166 166 575 0.15 86 617 0.15 93 861 86 364 0.15 55 179 179 55 91 55 91 OCCUPANCY BASIS NO. CFM MIN. OF PER CFM PEOPLE PERSON (ExF) Totall REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOOR AIR CFM VAV MIN. RATIO TRANS FER AIR 7,153 7,153 7,153 7,153 388 388 388 388 166 166 166 166 861 86 93 93 179 179 55 91 55 91 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Paae: 11 of 14 1 ENVELOPE MANDATORY MEASURES ENV -MM ECT NAME Best Bi DATE 5/18/2005 DESCRIPTION Desi ner Enforcement ❑X § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. X❑ §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page: 12 of 14 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE Best Buy 5/18/2005 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies ❑ §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. ❑ § 115(a) Fan type central furnaces shall not have a pilot light. § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: ❑ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ § 122(e)1 B An occupancy sensor to control the operating period of the system; or ❑ § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. ❑ § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ❑ § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. ❑ § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. F] § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page: 13 of 14 VIECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE Best Buy 5/18/2005 Description Designer Enforcement Ventilation § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. F§ 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or ❑ §121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or ❑ § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or ❑ § 121(f)4 Another method approved by the Commission. Service Water Heating Systems ❑ § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. ❑ § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: , Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page: 14 of 14 r A 0