07-2435 (RC) Title 24I - TITLE .24 REPORT I SEP 2 7 207 Title 24 Report for: T -Mobile 79485 Highway 111 La Quinta, CA 92253 Project Designer: Design Forum Engineering 7575 Paragon Road Dayton, OH 45459 937-439-4400 Report Prepared By: Dennis Lewis Design Forum 7575 Paragon Road Dayton, OH 45459 (937) 439-4400 Job Number: 783577 Date: 8/9/2007 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION l OQ,;?,OFESS/O co ti w No. 17464 z M WDecember 31, 2008 Q,�,pFESS/O� J. 11 LU No. 33835 m m SEP 3 0 2007 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval ai d is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.3 by EnergySoft Job Number:783577 User Number: 6341 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form LTG -1-C Certificate of Compliance 3 Form LTG -2-C Indoor Lighting Schedule 6 Form LTG -5-C Indoor Lighting Power Allowance 7 Form LTG -9-C Line Voltage Track Lighting Worksheet 8 Form LTG -MM Lighting Mandatory Measures 9 Form MECH-1-C Certificate of Compliance 11 Form MECH-2-C Air & Water System Requirements 13 Form MECH-3-C Mechanical Ventilation 14 Form MECH-4-C HVAC Misc. Prescriptive Requirements 16 Form MECH-MM Mechanical Mandatory Measures 17 EnergyPro 4.3 by EnergySoft Job Number: 783577 User Number: 6341 CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG -1-C PROJECT NAME DATE T -Mobile 8/9/2007 PROJECT ADDRESS Hwy 111 & Dune Palms La Quinta Building Permit # PRINCIPAL DESIGNER - LIGHTING TELEPHONE Tim Raberding 937-439-4400 DOCUMENTATION AUTHOR Design Forum TELEPHONE 937 439-4400 Checked by/Date Enforcement A enc Use GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 3,120 Sq. Ft. 1 15 BUILDING TYPE ® NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM ® CONDITIONED SPACES ❑ UNCONDITIONED SPACES ❑ INDOOR & OUTDOOR SIGNS PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION ❑ ADDITION ® ALTERATION METHOD OF LIGHTING ❑ COMPLETE BUILDING ® AREA CATEGORY ❑ TAILORED ❑ PERFORMANCE COMPLIANCE ❑ COMMON LIGHTING STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to buildi lighting requirements. The documentation preparer hereby certifies that the documento"accuratp, mplete. DOCUMENTATION AUTHOR SIGN DAT Dennis Lewis 9O The Principal Lighting Designer hereby certifies that the osed bui ' g design represented in this set of construction docum is consistent with the other compliance forms and worksheets, with a specifications, and with any other calculations submitte this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 130 - 132, 146, 148 & 149 of Title 24, Part 6. ® The plans & specifications meet the requirements of Part 6 (Sections 10-103a). ® The installation certificates meet the requirements of Part 6 (10-103a 3). ® The operation & maintenance information meet the requirements of Part 6 (10-103c). Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ® I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect ❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this docume as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and frofessions Code Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING DESIGNER - NAME Tim Raberdin SIGNATUREDATE, IC. #� LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measure LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ®LTG -1-C, Parts 1 of 4 and 2 of 4Certificate of Compliance. Part 1 of 4 and 2 of 4 are required for all submittals []LTG -1-C, Part 3 of 4: Certificate of Compliance. Part 3 of 4 submittal is required only if Control Credits are claimed ®LTG -1-C, Part 4 of 4: Certificate of Compliance. Part 4 of 4 submittal is required when lighting controls are installe (RILTG-2-C: Indoor Lighting Schedule ❑LTG -3-C: Portable Lighting Worksheet ❑LTG -4-C: Lighting Controls Credit Worksheet ® LTG -5-C: Indoor Lighting Power Allowance ❑LTG -6-C: Tailored Method Worksheet ❑LTG -7-C: Room Cavity Ratio Worksheet ❑LTG -8-C: Common Lighting Systems Method Worksheet ®LTG -9-C: Line Voltage Track Lighting Worksheet EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 783577 Page:3 of 17 )nts with 19, CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1 -C (PROJECT NAME DATE T -Mobile 1 8/9/2007 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) C 4,620 PORTABLE LIGHTING (From LTG -3-C) 0 Q LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 4.620 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑X AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 4,884 ALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROLLOC (Room #) I • Room 100 1 I Room 100 1 CONTROL IDENTIFICATION I Note 10 sheet E-2 Note 6 sheet E-2 CONTROLTYPE (Auto Time Switch, Dimming, etc.) Manual daylighting control Automatic tie switch Check if SPACE CONTROLLED Daylightin Room 100 X Room 100 I EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number:783577 Paoe:4 of 17 r CERTIFICATE OF COMPLIANCE (Part 4 of 4) LTG-1- PROJECT NAME T-Mobile DATE 8/9/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptanc tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type require a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, .desig professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building departmen that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of 10-103(b) and Title 24 Part 6. Test Descri tion Test Performed By: D LTG-2-A: Lighting Control Acceptance Document -Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing Manual Daylight and Automatic Time Switch Controls El LTG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number:783577 Page:5 of 17 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2 -CI PROJECT NAME DATE T -Mobile 8/9/2007 INSTALLED LIGHTING POWER FOR CONDITIONED SPACES Luminaire Lam s/Ballasts Installed Watts D I E F G H I I J Name Type Description m3 U ' 33� gym —.� CD o G SDUG .0 3cD CWI 3w3 'w^� m o C ��� m o CD cn — = z 3 C °Q — <D N_ x�m N N a A 2'X2'9 cell parabolic 31 1. 58.0 X 42 2,436 E V) 4 ft Fluorescent T8 Energy Savings P 15w per ft Track Light (with Current Limiter 1 0 P 45w per ft Track Light 1 4 45.0 X 8 360 PAGE TOTAL 4,620 BUILDING TOTAL (sum of all pages) 4,620 PORTABLE LIGHTING (From LTG -3-C) 0 CONTROL CREDIT (From LTG -4-C) O ADJUSTED ACTUAL WATTS 4.620 EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 783577 Page:6 of 17 )AA p INDOOR LIGHTING POWER ALLOWANCE LTG -5 - PROJECT NAME DATE T -Mobile I s/9/?nn7 UNCONDITIONED SPACES Complete Building and Area Catagory Methods Category (From Section 146 Table 146 -B&C) BUILDING CATEGORY (From Section 146 Table 146-13) WATTS. COMPLETE ALLOWED PER SF BLDG. AREA WATTS UNCONDITIONED SPACES Complete Building and Area Catagory Methods Category (From Section 146 Table 146 -B&C) WATTS PER SF AREA (SF) ALLOWED WATTS PAGE TOTAL O BUILDING TOTAL AREA D D WATTS TAILORED METHOD - UNCONDITIONED SPACES TOTAL UNCONDITIONED SPACES ALLOWED WATT (From LTG -5-C and LTG -6-C) EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 783577 Page:7 of 17 LINE VOLTAGE TRACK LIGHTING WORKSHEET LTG -9—C PROJECT NAME DATE T—Mobile Highway 111 & Dune Palms 8/9/2007 X METHOD 1 — VOLT—AMPERE (VA) RATING OF THE BRANCH CIRCUIT(S) OR WATTAGE OF THE CURRENT LIMITERS Only current limiters certified to the commission can be used with this method A B C D I E F G Branch Circuit Option Current Limiter Option BRANCH CIRCUIT NAME OR ID VOLT—AMPERE (VA) RATING OF -THE BRANCH CIRCUIT (Fill this column only if branch circuit option is used for for compliance) TRACK EQUIPPED WITH CURRENT MULTIPLY LIMITER (CL)? TRACK LENGTH (Columns C thru G IF COLUMN C IS (E) BY 15 W/LF TRACK may be left blank if YES, LIST IF THERE IS CL WATTAGE — the branch circuit CURRENT OR 45 W/LF HIGHER OF option is used for LIMITER TRACK IF THERE COLUMNS (D) compliance) WATTAGE LENGTH IS NO CL OR (F) check IF YES (W) (FT) I (W) (W) IXI 300 34 510 510 X1 300 34 510 510 X 300 32 480 480 X X SUBTOTAL WATTS FOR TRACKS ON BRANCH CIRCUIT — USE COLUMN (B) VA IF BRANCH CIRCUIT METHOD IS USED, OR TOTAL OF TRACK WATTS IN COLUMN (G) IF THE CL METHOD IS USED. 1500 LI SUBTOTAL WATTS FOR TRACKS ON BRANCH CIRCUIT — USE COLUMN (B) VA IF BRANCH CIRCUIT METHOD IS USED, OR TOTAL OF TRACK WATTS IN COLUMN (G) IF THE CL METHOD IS USED. SUBTOTAL WATTS FOR TRACKS ON BRANCH CIRCUIT — USE COLUMN (B) VA IF BRANCH CIRCUIT METHOD IS USED, OR TOTAL OF TRACK WATTS IN COLUMN (G) IF THE CL METHOD IS USED. TOTAL WATTS — ADD ALL SUBTOTALS1 1320 1OFMETHOD 2 — USE THE HIGHER OF: 45 WATTS/LINEAR FOOT OF TRACK — OR TOTAL RATED WATTAGE ALL LUMINAIRES A B C D E F TRACK # OR NAME LINEAR B X C TOTAL RATED WATTAGE LARGER OF FEET OF TRACK (W/LF) (W) OF ALL LUMINAIRES (D OR E) 2 45 90 26 90 2 45 90 26 90 ' S O 2 45 90 26 90 45 TOTALl 360 LIGHTING MANDATORY MEASURES LTG - (PROJECT NAME DATE T -Mobile 1 8/9/2007 DESCRIPTION Designer Enforcement ❑X 131(d)1For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements Section 119 and may be an occupancy sensor, automatic time switch, or other devi e capable of automatically shutting off the lighting. XJ 131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. 0 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. X❑ 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. X❑ 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - ceiling walls. ' ❑ 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. X❑ 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. ® 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number:783577 Page:8 of 16 CERTIFICATE OF COMPLIANCE (Part 1 of 2) MECH-1-CI PROJECT NAME T -Mobile DATE 8/16/2007 PROJECT ADDRESS Building Permit # Checked by/Date Enforcement Agency Hwy 111 & Dune Palms La Quinta PRINCIPAL DESIGNER -MECHANICAL Dennis Lewis TELEPHONE 937-439-4400 DOCUMENTATION AUTHOR Design Forum TELEPHONE (937) 439-4400 GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA 3,120Sq.Ft. CLIMATE ZONE 1 15 BUILDING TYPE © NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION ❑ ADDITION ® ALTERATION ❑ UNCONDITIONED(File Affidavit) METHOD OF MECHANICAL ® PRESCRIPTIVE ❑ PERFORMANCE COMPLIANCE PROOF OF ENVELOPE COMPLIANCE ❑ PREVIOUS ENVELOPE PERMIT❑ ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building mechanical requirements. The documentation preparer hereby certifies that the docum n is ac e d complete. DOCUMENTATION AUTHOR SIG E DATE 90 The Principal Mechanical Designer hereby certifies t a e pro ed building design represented in this set of construct documents is consistent with the other compliance forms an orksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in the applicable parts of Sections 100, 101, 102, 110 through115, 120 through 125, 142, 144, a ® The plans & specifications meet the requirements of Part 1 (Sections 10-103a). ® The installation certificates meet the requirements of Part 1 (10-103a 3). ® The operation & maintenance information meets the requirements of Part 1 (10-103c). Please check onejhese sectionsof the Business and Professions Code are printed in full in the Nonresidential Manual.) ® I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, or mechanical engineer or I am a licensed architect. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains structure or type of work described pursuant to Business and Profe Code s on 537, 5538, and 6737.1. PRINCIPAL MECHANICAL DESIGNER - NAME U DAT E LIC. # Dpnn's Lewis > 33835 INSTRUCTIONS TO APPLICANT ® MECH-1-C: Certificate of Compliance. Part 1, 2, 3 of 3 are required on plans for all submittals. IN MECH-2-C:Air/Water/Service/Water Pools Requirements. Part 1 of 3, 2 of 3, 3 of 3 are required for all submittals, but plans. ® MECH-3-C: Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation, but may be ® MECH-4-C: HVAC Misc. Prescriptive Requirements is required for all prescriptive submittals, but may be on plans. ❑ MECH-5-C: Mechanical Equipment Details are required for all performance submittals. EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number783577 Page9 of 17 on td 145. to a nay be on ,n plans. (CERTIFICATE OF COMPLIANCE (Part 2 of 2) MECH-1-C1 PROJECT NAME DATE T -Mobile 8/16/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for, performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and oDeratina and maintenance information meet the renuirements of Sectinn 1n-1n3th1 anrt Title 9d Parr R STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing RTU -1 &RTU -2 are existing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Documer cATU-1 & RTU -2 are existing Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing RTU -1 8r RTU -2 are existing vith the Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified i commission do not require equipment testing but do require construction inspection. x❑ MECH-5-A: Air Distribution Acceptance Document RTU -1 8r RTU -2 Equipment requiring acceptance testing like an This test required If the unit serves 5, 000 ft2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned spaco attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace lucts or replace the packaged unit. HERS rater ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btu/hr. -Water-loop Heat Pump Controls Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Control Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equi ment requiring acceptance testin EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 683517 Page:10 of 17 MR SYSTEM REQUIREMENTS Part 1 of 2 MECH-24 PROJECT NAME DATE T -Mobile 8/16/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacityx 1.43 2 Proposed Heating Capacity2 Calculated Sensible Cooling Capacityx 1.212 Proposed Sensible Cooling Capacit)? Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS, Central or Single Zone RTU -1 RTU -2 • 1 1 Reference on Plans or Specification' 112(a) 82% AFUE 80% AFUE 17,028 btuh 112(a) 10.1 EER 13.0 SEER / 11.0 EER 84,000 btuh 112(b) n/a n/a 31,826 btuh 112(c), 115(a) n/a n/a 42,906 btuh 121 b Yes Yes Constant Volume 121 b 50 cfm 260 cfm 121 c No No Yes 121 c No No No 121(c), 122(e) Programmable Switch Programmable Switch No Economizer 122(e) Heating & Cooling Require I Heating & Cooling Require Constant Tem 122 Auto Auto Constant Tem 122 n/a n/a No 123 124 R-8.0 R-8.0 144 a & b 24,952 btuh 17,028 btuh 144 a & b 104,000 btuh 84,000 btuh 144 a & b 56,193 btuh 31,826 btuh 144 a & b 68,763 btuh 42,906 btuh 144 c Constant Volume Constant Volume 144 c 144 c Yes Yes 144 d No No 144 a Diff. Tem (Integrated) No Economizer 144 Constant Temp Constant Tem 144 Constant Temp Constant Tem 144 k No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 783577 Page•11 of 17 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C NAME 113 a Water Heater Efficiency (PROJECT T-Mobile Service Water Heating Installation r8/1'6/2007 SYSTEM FEATURES 114 a Pool and Spa Installation 114 b 2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops ITEM OR SYSTEM TAG(S) Spa Heater - No Pilot Light 115 d Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specificatidn Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Water Heater Certification 113 a Water Heater Efficiency 113 b Service Water Heating Installation 113 c Pool and Spa Efficiency and Control 114 a Pool and Spa Installation 114 b Pool Heater - No Pilot Light 115 c Spa Heater - No Pilot Light 115 d Service Hot Water, Pool Heating DHW Heater 1 Reference on Plans or Specificatidn I A O Smith ELJF-10 I n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. L EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number:783577 Page:12 of 17 Z 6 (0 W 00 § 0 z 0 � Q J � Z W � -j @_ Q � 0 2 z LUFL Q � Z z U LUW 04 co 6 E FF Z Transfer Air Lo © Wisp Min. Ai §� ��°~ } \ _ §\ \ \ 2 ucounsHJ >n Ko300CFM = RzBxo4 k. \R > CFM/sq. « 20 .0 20 ® / £% @team (\ )E , 2 _ Zone Supply CF |f =q } § Design 2 8% r r - G - Vent. Air ©± {& CFM REQ'D v A 3 3$®© r® G» |£ Eq LO _ Mn ofCD (Dorm f§ §/ -E0 f Min CFM R= g a Ln Ln Ln 2 2CC m o � Occupant / / + £ .§k $M / }a/ CF » \ § �{ Z| §LL per E C G IL �r _ _ L) Number of q CI) « - \k ƒ o� %p® / k} kk) ��f * F Min C S $ _ _ © « & o -«_ c by Area ® /\; 1 2\ E �(n #�G {f| j © ) ~ «f ., 2 CF m » a e»» m CO04 o per a 6 6 6 6 6 6 ¥ f f 2 k ]- f c w Square o ;k £ ' a -2 ) Condition \ @ - m kco Area )2/k& \¥f (SF)~ ,@a&E -68>3: C2 0 e §k§*/\jk�� -i®a ] / ■ {8<0E &§(®b 3 LU - - /�D \�k I > f \�,}kwk§ -j@ >>2! « z E§�ma0z] t /;]\\)®|,R ƒ ƒ §)J£3a) z \ f ƒ ƒ C LLI ° kk}k § u2zk {§ \ , :qual MECHANICAL SIZING AND FAN POWER ME PROJECT NAME DATE T -Mobile 8/16/2007 SYSTEM NAME FLOOR AREA RTU -1 203 FAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1.490 C I D E F EFFICIENCY NUMBER OF FANS PEAK WATTS B x E x 746 I (C X D MOTOR DRIVE 82.5% 97.0% 1.0 1,389 6 Fan Adjustment = 1- SPa -1 ISPf 144 i 7 ADJUSTED FAN POWER INDEX Line 3 x Line 0.463 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. ITEM or SYSTEM TAG(S) Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION 144-A A) If filter pressure drop is greater than 1 inch W.C. enter filter pressure drop. SPa on line 4 and Total Fan pressure SPf on Line 5. B) Calculate Fan Adjustment and enter on Line 6. C) Calculate Adjusted Fan Power Index and enter on Line 7. 1) TOTAL FAN SYSTEM POWER(Wafts, Sum Column F 1,389 2 SUPPLY DESIGN AIRFLOW (CFM) 3,000 3 TOTAL FAN SYSTEM POWER INDEX Row 11Row1 4 SPa 144 h 5 SPf 6 Fan Adjustment = 1- SPa -1 ISPf 144 i 7 ADJUSTED FAN POWER INDEX Line 3 x Line 0.463 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating Heat Rejection Systerr? Air Cooled Chiller Limitation T-24 Section Capacity Exception Notes 144 144 h 144 i 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used, explain which exception(s) to Section(g) apply. 2. Are centrifugal fan cooling towers used on this project? (Enter "Yes" or "No") If centrifugal fan cooling tower are used, explain which exception(s) to Section 144(h) apply. I 3. Total installed capacity (tons) of all water and air cooled chillers under this permit. If there are more than 100 tons of air-cooled chiller capacity being installed, explain which exception(s) to Sec 144(1) apply. EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 783577 Page: 14 of 17 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME ' DATE T -Mobile' 8/16/2007 SYSTEM NAME RTU -2 FLOOR AREA FAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan, Exhaust Fan Exhaust Fan B DESIGN BRAKE HP 1.110 0.000 0.000 C I D E F EFFICIENCY NUMBER OF FANS PEAK WATTS B x E x 746 / (C X D MOTOR DRIVE 82.5% 97.0% 1.0 1,035 40.0% 97.0% 1.01 0 40.0% 97.0% 1.0 0 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. ITEM or SYSTEM TAG(S) Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION 144-A A) If filter pressure drop is greater than 1 inch W.C. enter filter pressure drop. SPa on line 4 and Total Fan pressure SPf on Line 5. B) Calculate Fan Adjustment and enter on Line 6. C) Calculate Adjusted Fan Power Index and enter on Line 7. 1) TOTAL FAN SYSTEM POWER acts Sum Column F 1,035 2 SUPPLY DESIGN AIRFLOW CFM 2,000 3 TOTAL FAN SYSTEM POWER INDEX Row 1/Row1 4 SPa 144 h 5 SPf 6 Fan Adjustment = 1 SPa -1)/SPf 144 i 7 ADJUSTED FAN POWER INDEX Line 3 x Line 0.517 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating Heat Rejection Systerr? Air Cooled Chiller Limitation T-24 Section Capacity Exception Notes 144 144 h 144 i 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used, explain which exception(s) to Section(g) apply. 2. Are centrifugal fan cooling towers used on this project? (Enter "Yes" or "No") If centrifugal fan cooling tower are used, explain which exception(s) to Section 144(h) apply. ;tion 3. Total installed capacity (tons) of all water and air cooled chillers under this permit. If there are more than 100 tons of air-cooled chiller capacity being installed, explain which exception(s) to Sect 144(1) apply. EnergyPro 4.3 by EnergySoft User Number: 6341 Job Number: 783577 Page:15 of 17 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME T -Mobile I8L�d=1 8/16/2007 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies R111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. 115(a) Fan type central furnaces shall not have a pilot light. E] 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. X❑ 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls 122(e) Each space conditioning system shall be installed with one of the following: ® 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 122(e)1 B An occupancy sensor to control the operating period of the system; or © 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. X❑ 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. ❑ 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. a122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. ❑ 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: 783528 Page: 15 of 16 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM (PROJECT NAME DATE T -Mobile 8/16/2007 Descri tion Designer Enforcemen Ventilation ❑X 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. ❑ 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings., X❑ 121(01 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or RI 121(02 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or ❑ 121(03 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or ❑ 121(04 Another method approved by the Commission. Service Water Heating Systems ❑ 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. RI 113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro By EnergySoft User Number: User Job Number: 783528 Page: 16 of 16