Loading...
BRES2015-0085 Truss CalcsCITY . o E -� BUILDING & SAFETY DEPT '1� �,l N FOR CON RUC DATE 17 . 4 J. : CTS 6• .909 t• -Vista, Ck,'92083 I �SY, `3k aa{ 4.+ `_. k r � �.cv 2 r+, ., r .� Ir ;'���y Crt•,�,: r ice- s ^t t. �. '2'r, -` '�L h �,•' �^ .x•:a:, a,� +. 2 y+r� -., '!r ck •i rk "�("t�ft�+ �1i r�r �'{'`Z J-''�; S7 `• 5 7''�7�. F fit"` v` T; JUN 2 '15 d4.. 4• a- y. SIXk • `.. ;,+t,' .. + 4 ,cis 2jd'� .� �, 5 L: � ten, t *s� ti r,�✓•-r'. �u.n,,. "T 4M •. . r :ai -:# `•:r+rr�'�`w A `a."�'Fw [' =.i y4 : �i yyt•7.t. : ' ,.�. '%� .eJ z`.i✓ ' - R&CM VED W < IAr Crry OF LA QUINTA TOMEI COMMUNnY �.: / •MElif VI MALLORCA LA.,Jwo%UINTA'CA RESIDENCE' T440 Ply: 1 SEQN: 251005/ T75 / SCIS TOMEI RESIDENCE TOMEI RESIDENCE Qty: 14 FROM: SGH DRW: A SCIS Wgt: 161.0 lbs / ... 02/10/15 676 11'2"9 15'6" 19'97 24'2"10 31' 6'9"6 4'5"3 4'3'7 4'3"7 ., 45"3 6'9"6 D =6X6 12 4 ,3X4 C Ea3X4 .n - ,3X4 B FIQ3X4 in J =10X10 3X6(F9) K3X4=3X 3X6(F9) A � =3X6( 9) �= M 12X4 a 1112X4 3X6(F9) 0 2 � . 12 10 4'6"15 4'6"15 4'3"7 67"10 Tr: T'10 10'11"1 15'6" 20'0"15 24'4"6 31' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA ` Ce: NA VERT(LL): 0.495 J 744 240 M 1392 / - /1175/- / 149 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 1.726 J 213 180 G 1392 / - /1175/- / - /5.5 BCDL: 10.00 Risk Category: 11 Snow Duration: NA HORZ(LL): 0.226 H '- Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.789 H M Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 2.0 G Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.754 Bearings M & G are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.752 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.983 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCp!: 0.00 Plate Type(s): A - B 0 -6M D - E 0 -4353 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 B - C 0 -5547 E - F 0 -5547 Lumber C- D 0 -4353 F- G 0 -6228 Top chord 2x4 DF-L#1 y Bot chord 2x6 DF-L Maximum Bot Chord Forces Per Pty (Ibs) F-L SS(g) Webs 2x4 DF-L Standard(g) Chords Tens.Comp. Chords Tens. Comp. ' , ' Plating Notes A- L 5948 0 J- 1 5262 0 Connectors in green lumber (g) designed using L - K 5968 0 I - H 5968 0 NDS/TPI reduction factors. K - J . 5252 0 H - G 5948 0 Purlins Maximum Web Forces Per Ply (Ibs) r In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. Webs Tens. Comp. to laterally brace chords as follows: 91 91 27 J - E 0 -1135 Chord Spacing(in oc) Start(ft) End(ft) L-13 BC 120 0.15 30.85 - K -648 E - I 385 0 Apply purlins to any chords above or below fillers `• ' K - C 385 0 I - F 38 -651 at 24" OC unless shown otherwise above. C - J 0 -1135 F - H 91 -Z7 +' D - J 2420 0 Loading - ESS�pNq Bottom chord checked for 10.00 psf non-concurrentOQ�Qf live load. ON M Wind Member design based on both MWFRS and C&C. r" } 0028710 JTgl C1\A\1 giitallly O�A\ 016 'OF CA1�F 09-30- "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, b TPI SBCA) r ane safety practices prior to performing these functions. Installers shall provide temporary bracin Der SCSI. Unless noted o herwise,top chord shall have goperigY attached structural sheathin and bottom hord ¢Ball have a properly attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing ins�alled per BCI sections B3, B7 or 810, as applicable. Apply plates to each face of Wss and position as shown above and on the JoinCDetails, unless noted otherwise. (tefer to drawings 160A-Z for standard plate positions. ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,an failure to build the truss in conformance with ANSI 41 1, 8r for ha dling h' in installation and bracing of•trusses. A seal on this draw Ii tin , or cover ppacctts this drawingg indicates acceptance o' pro ssponalq enggsneering res�onsib!lity solely for the design shown. The sui3a6i% an% use of th3 drawing for any structure is the responsibl"rty of the Building Designer per AlSI/TPI gSec.2. For more information see this'ob's general notes a e and these web sites: ITWBCG: www.i .com; TPI: www. inst.o • SBCA: www.slacindustry.00ME ICC: www.iccsafe.o T440 Ply: 1 SEQN: 251021 / T77 / GABL TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH I DRW: BG STUB GABLE Wgt: 176.4 lbs Page 1 of 2 / ... 02/10/15 '- '-''i 'T7f 2�322-" If H 16-"-1 F 9'r-II--1°1 14" 14 257287 1- 3''6" 1--11114 57" 8310'111413714163 1418'11 4217 142431426'11 14297 ,4" f I ." -I I ,414" ,,4.,; ,4 ,.4" L =4X4 K J M N 3p H I O P T F G Q R E D S T B C U V —3X4(A1) 1I A AS 37 { W=3XT(62) 8'14 AR AQ AP AO AN AM AL AK AJ Al AF AE AD AC AB AA Z Y X 1 —5X AG 30'6' 2'11" 1'4" 1'4" 1'4" 1'4" 1'4" 1'4" 1'4" 1'4" 1'4" 1'4" -2-6-„- I- z,,,--i'4 -8f -,a,�FI F F"14I-'4I 17"II-'-4"13"II ,811 F1-4-1 27. 6-—'24 111--43'3-2211 23I '41 F2-1 '41 27.iI --'''" -I 1'4"-II T7 1411-203 2--3 31'6" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Deft/CSl Criteria ♦ Maximum Reactions (lbs), or •=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.006 AR 999 95 AS-2799 / - /2327/- / 135 /366 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.021 AR 563 90 Wind reactions based on C&C BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.001 C - - AS Min Brg Width Req = - Des Ld: 44.00 EXP: C HORZ(TL): -0.004 C Bearing AS is a rigid surface. NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor. 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.089 Maximum Top Chord Fontes Per Ply (lbs) Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.107 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.033 A - B 91 -64 L - M 75 -54 C&C Dist a: 3.00 ft FT/RT: 20iO%(O.0%)/O(0) Mfg Specified Camber. B - C 70 -50 M - N 67 -45 GCp!: 0.00 Plate Type(s): I C - D 71 -45 N-0 58 -37 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 D - E 63 -42 O - P 50 -29 Lumber E-F 58 -38 P-Q 50 -23 Top chord 2x4 DF-L t(g) F-G 58 -35 Q-R 51 -26 Bot chord 2x4 DF-L 1&Be ) G - H 58 -32 R - S 51 -29 Webs 2x4 DF-L Standd ard(g)rd(g) H -1 58 - 29 S - T 54 - 32 1-1 58 -37 T - U 61 -36 Plating Notes J - K 67 -45 U - V 66 -39 Connectors in green lumber (g) designed using K - L 75 -54 V - W 77 -51 NDS/TPI reduction factors. All plates are 2X4 except as noted. Maximum Bot Chord Forces Per Pty (lbs) Chords Tens.Comp. Chords Tens. Comp. Purlins A-AR 129 -171 AH-AG 54 -88 In lieu of structural panels or rigid ceiling use purlins AR-AQ 65 -93 AG-AF 53 -87 to laterally brace chords as follows: Chord Spacing(in oc) StEnd(ft) AQ-AP 66 94 AF-AE 53 86 0.00 BC 75 0.00 31.466 AP-AO 66 -96 AE-AD 53 -85 Apply purlins to any chords above or below fillers AO-AN 66 -97 AD-AC 53 -84 at 24" OC unless shown otherwise above. pf EJS/Q AN-AM 67 -99 AC-AB 53 -83 QR N.Q Loading �,0 N �. AM-AL 67 -100 AL-AK 67 AB-AA AA-Z 53 -82 -101 AK-AJ 67 -101 Z - Y ' 52 52 -81 -79 Bottom chord checked for 10.00 psf non-concurrent �w� Q� live load. _ �, AJ-AI 67 -102 Y - X 52 -77 C9 AI-AH 67 -103 X-W 51 -71 Wind CO280 Member design based on both MWFRS and C&C: Maximum Gable Forces Per Ply (Ibs) Left cantilever is exposed to wind * Gables Tens.Comp. Gables Tens. Comp. Additional Notes �%9j CIVtL 0��, DigitallysealedB-AR 25 -196 AG-M 13 -102 See DWGS Al 1515ENC1002012, GBLLETIN0212, & EUF CA�Fe C-AQ 10 -57 AF-N 13 -91 GABRST100212 for more requirements. F.�P D-AP 13 -95 AE-O 13 -91 o�6 09-30 2 E -AO 13 -91 AD- P 13 -92 F-AN 13 -91 AC-Q 13 -91 G-AM 13 -91 AB-R 13 -91 H-AL 13 -92 AA-S 13 -91 1-AK 13 -91 Z-T 13 -92 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT— FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition Component Safety Information, by TPI SBCA) t of BCSI (Building an c7 safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI.. Unless noted o){herwise,top chord shall have proper )Yy attached structural sheathing and bottom gftord shall have a progerrly attached riggid ceillnp. Locations shown for Permanent lateral restraint Of webs shall have bracingg installed per SCSI sections B3, B7 or 610, as appllcab�e. Apply places to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. ITW Buildiqn4 Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, r for handling, shipping, instpilatiori and bracing of trusses. A seal on this drawing or cover ppaccl1e listing this drawingg� indicates acceptance of proTessionaT en neering responsibility sole for the design shown. The sutta6ility and use of thi3 drawing for any structure s the responsiblity of the Building Designer er ANSI/ TPI gSec.2. For more information see this job's Aeneral notes page and these web sites: ITWBCG: wwwAybog.00m TPI: www. insLo SBCA: www.sbcindu .com; ICC: wwwAocsafe.o r T440 Ply: 1 SEON: 251021 / T77 / GABL ' TOMEI RE_ SIDENCE , Qty: 1 " FROM: SGH DRW: BG STUB GABLE Wgt: 176.4 lbs Page 2 of 2 / ... 02/10/15 J -AJ 13 - 91 Y - U 11 -84 K -AI 13 -102 X -V 23 -126 L -AH 0 . -97 itallysealed Feb.11,2015 FC FkP 09-30-2��0 4 a —WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS - Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI anc7 WTCA) for safety practices prior to performing these functions. Installers shall provide temporary bracin Per BCSI. Unless noted o�herwise,top chord shall have property attache structural sheathing and bottom hord shall have a property attach�a rigid ceiling. Locations shown for rrnanent lateral restraint bf webs s all have bracing ins ]led per BC I sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Joinf"Details, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildingq Components Group Inc. shall not be responsible for am deviation from this drawing,any failure to build the truss in conformance with ANSIl7P1 1, r for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pang listing this drawing, Indicates acceptance of ProTessionar engineering responsibility solei for the design shown. The sui 6i�ity an use of this drawing for any structure is the responsibility of the Budding Designer per ANSIrrPI 9Sec.2. Far more information see this'ob's general notes page and these web sites: ITWBCG: www.i .com• TPI: www.tpinsLoMm WfCA www.sbcindu .com& ICC: www.iocsare.o - T440 Ply: 1 SEQN: 251015 / T76 / COMN TOMEI RESIDENCE TOMEI RESIDENCE Qty: 4 FROM: SGH DRW: B STUB COMN Wgt: 137.2 Ibs / ... 02/10/15 8712 167 23'8'4 31'6" r 8'9"12 T TS"4 TS"4 + T9"12 1 2 D=5X6 T3 t ` o -_3X4 C E=3X4 _ 'a v g =3X6�C6X4 W2 F 3X4 =3X4(C6 A G=3X.8 1I III 4 =5X8 1112) J I H r 1r 1 30'6" TT' TT' T8„ 16'3" 23'10" 31'6" 4 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.224 1 999 240 A 1451 / - /12061- / 135 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.777 1 465 180 G 1349 / - / 1121 / _ BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.057 H - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.196 H A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor. 2.0 G Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.731 Bearing A is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.886 Spacing: 24.0 ", MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.891 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 0 -1239 D - E 0 - 2715 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.06.0219.19 B - C 0 -3598 E - F 0 -3750 Lumber C- D 0 -2710 F- G 68 -3793 Top chord 2x4 DF-L #1&Bet.(g) Bot chord 2x4 DF-L #1&Bet.(g) Maximum Bot Chord Forces Per Pty (Ibs) Webs 2x4 DF-L Standard(g) Chords Tens.Comp. Chords Tens. Comp. :W2, W4 2x4 DF-L #1 &Bet.(g): A - J 3441 0 I - H 3596 0 :Lt Slider 2x4 DF-L Standard(g): BLOCK LENGTH = 2.333' J-1 3437 0 H - G 3602 0 :Rt Slider 2x4 DF-L Standard(g): BLOCK LENGTH = 2.333' Maximum Web Forces Per Ply (Ibs) Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using NDS/TPI reduction factors. A-13 49 -2510 D - I 748 0 J- C 244 0 I- E 52 -1065 Purlins C-1 76 -899 E- H 257 0 In lieu of structural panels or rigid ceiling use purlinsQf EJlto a to laterally brace chords as follows: Q(><S�QNq Chord Spaclng(in oc) Start(ft) End(ft) c`� N M BC 120 0.00 31.50 Apply purlins to any chords above or below fillers ti 4 at 24" OC unless shown otherwise above. - C� Hangers / Ties C�2� Hanger support required, by others. �► * Loading fl CM Bottom chord checked for 10.00 psf non-concurrent' .qJ O�l igitally sealed live load. of CN ��C Feb. 11, 2015 �X�'.0930- Wind 09302Member Member design based on both MWFRS and C&C. r Left cantilever is exposed to wind "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingg shipping, installing and bracing.. Refer to and follow the latest edition of BCSI (Building Component Safety Information, byy TPI and SBCA) foP safety to these functions. Installers practices prior performing shall provide temporary bracing per BCSI. Unless noted otherwise,top chord shall have property attached sVuctural shpathinp and bottom hord shall have a property attaches rigid ceiling Locations shown for Aennanent lateral restraint yf webs shall have brawngg installed per BCI sections 63, B7 or 870, as applicable. Ap Ty plates to each face of truss and position as shown above and on the JoinTDetails, unless noted otherwise. {2efer to drawings 160A-Z for standard plate positions. ITW Buildincl Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI 41 1, or for handling• installation shipping, and bracing of trusses. A seal on this drawing or cover cafe Iistincithis drawin Indicates acceptance of pro essiona en ineering responsibility solely for the design shown. The sufta6ility anTl use of thl drawing for any structure is the responsibility of the Building Designer per ANSI/TPI QSec.2. For more information see this mob's general notes page and these web sites: ITWBCG: www.i .00mE TPI: www. insl o • SBCA: www.abcindustry.00mm ICC: www.iocsafe.o T440 Ply: 1 SEQN: 251025 / T78 / COMN TOMEI RESIDENCE TOMEI RESIDENCE Qty: 4 FROM: SGH DRW: B1 STUB COMN Wgt: 121.8 Ibs / ... 02/10/15 t 8'9"12 16'3" 23,8"4 256" t 8'9"12 f' 7-5..4 7-5,.4 1'9"12 'I D= 5X6 12 3 C::— ::—s3X4 :—:::3X4C E 3X4 F 4X6 a T B =3X6(06 X4 W2 l =2X4(06 N 714 1112X4 =5X8 =4X6 II2X4 J I H G f Z 24'6" 8'8" 77" 7 8' 121 6 4 8'8" 16'3" 23'11"12 25 6" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in lot Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf. NA Ce: NA VERT(LL): 0.122 C 999 240 A 1190 / - /988 / - 1122 /5.5 BOLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.421 C 692 180 G 1077 / - /896- BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.026 G - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.091 G A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 it Code / Misc Criteria Creep Factor. 2.0 G Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.520 Bearing A is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.648 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.862 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): I A - B 0 -877 D - E 0 -1723 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 B - C 0 -2730 E - F 0 -840 Lumber C - D 0 -1721 Top chord 2x4 DF-L #1 &Bet.(g) Bot chord 2x4 DF-L #1&Bet.(g) Maximum Bot Chord Forces Per Pty (Ibs) Webs 2x4 DF-L Standard(g) Chords Tens.Comp. Chords Tens. Comp. :W2, W4 2x4 DF-L #1 &Bet.(g): A , J 2606 0 I - H 931 0 :Lt Slider 2x4 DF-L Standard(g): BLOCK LENGTH = 2.333' J-1 2601 0 H - G 1 0 Plating Notes Maximum Web Forces Per Pty (Ibs) Connectors in green lumber (g) designed using : Webs - Tens.Comp. Webs Tens. Comp. NDS/TPI reduction factors. A- B 67 -2066 I- E 712 0 Purlins J- C 263 0 E- H 40 -851 In lieu of structural panels or rigid ceiling use purlins C-1 44 .-1030 H - F 1280 0 to laterally brace chords as follows: D-1 386 0 F - G 0 -1102 Chord Spacing(in oc) Start(ft) End(ft) e, BC 120 0.00 25.50 Apply purlins to any chords above or below fillers EJSIQNq at 24" OC unless shown otherwise above. OQ�9f Hangers / Ties Hanger by � d support required, others. 0028710 Loading Bottom chord checked for 10.00 psf non-concurrent �! live load * Windfl QVA A��� igitalrysealed Feb. 11, 2015 . Member design based on both MWFRS and C&C. F OF IC A��� Right end vertical not exposed to wind pressure. ��A 09-30-1W(C) Left cantilever is exposed to wind "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI SBCA) an cJ for safety practices prior to performing these functions. Installers shall provide temporary bracin er BCSI. Unless noted otherwise,top chord shall have proper )vV attached structural sheathing and bottom chord shall hav a properly attach),frigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, �7 or 810, Apply as applicable. plates to each face of truss and position as shown above and on the Join T Details, unless noted otherwise. kefer to drawings 160A-Z for standard plate positions. ITW BuildingQ Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/1P1 1, r for handlin shi pin , inst Ilation and bracing o trusses. A seal o this drawing or cover paf II tin this drawfnq' indicates acceptance of pro�'esstPonal engineering res ponsibility solei for the design shown. The sup J ity anti use of tnQ gSec.2. drawing for any structure is the responsiti lty of the Building Designer ler ANSVTPI For more information see this mob's general notes page and these web sites: ITWBCG: www.i .com• TPI: www. inst.o ; SBCA: www.sbcindu .00m• ICC: www.iCasafe.o T440 Ply: 1 SEQN: 251028 / T79 / GABL TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: B1G STUB GABLE Wgt: 151.2 lbs Page 1 of 2 .. / ... 02/10/15 57" 8'3" 10'11" 137" 16'3" 18'11" 217" 24'3" 2'11" 4-3"6-11" 9'7" 12'3" 14'11" 177" f' 20'3" 22'11" 25'6" 2,11,. 1-4„ — 4" 1,4„ �,4„ 1-4„ 1,4„ 1,4„ 1-3- -3-L=4X4 L 4X4 K M T 12 J N C:---- 3 I 0 H pq G F R E S v C ° T . e = 2X4(A1) AAL N F14 0 8 U b1 AK AJ At A A A E AD AC AB AA Z Y X V =5X5 24,6„ L� 11:: 14„ '1 1—"� i t�l 2'1 1" 4'3" „ 6'11" „ 9'7" 12'3' 4 14'11" 177" 1-4" 20'3" 4 22'11" 25'6" u �� f '1 f � � � f � 4 57" 8�'3" 10'11" 137" 16'3" 18'11" 217" 24'3" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or'=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.007 AK 999 95 AL-2266 / - /1884/- / 122 /294 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(fL): 0.024 AK 503-90 Wind reactions based on C&C BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.002 R - - AL Min Brg Width Req = - Des Ld: 44.00 EXP: C HORZ(TL): -0.007 C Bearing AL is a rigid surface. NCBCLL: 10.00 Mean Height: 15.00 It Code I Misc Criteria Creep Factor. 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.081 Maximum Top Chord Forces Per Pty (Ibs) Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.140 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.030 A - B 111 -109 J - K 65 -62 C&C Dist a: 3.00 ft FT/RT; 20.0%(0.0%)/0(0) Mfg Specified Camber. B - C 92 -93 K - L 64 -59 GCpi: 0.00 Plate Type(s): 1 C - D 91 -85 L - M 60 -55 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 D - E 84 -82 M - N 51 -46 Lumber E-F 77 -78 N-0 42 -38 Top chord 2x4 DF-L #1&Be11 F - G 70 - 75 O - P 34 - 30 Bot chord 2x4 DF-L .(g)) G - H 66 -72 P-0 25 -22 Webs 2x4 DF-L Standard(g) Standard(g) H - I 66 -68 Q - R 16 -15 1 - J 66 -65 R - S 13 -8 Plating Notes Connectors in green lumber (g) designed using Maximum Bot Chord Forces Per Pty (Ibs) NDS/TPI reduction factors. Chords Tens.Comp. Chords Tens. Comp. All plates are 2X4 except as noted. A -AK 209 -216 AC-AB 105 -122 Purlins - AK-AJ 104 -113 AB-AA 105 -123 AJ-AI 104 -115 AA- Z 2 - 8 In lieu structural panels or rigid ceiling use purlins AI-AH 104 -116 Z - Y 2 -7 al to laterally brace chords) follows: AH-AG 104 -117 Y - X 2 -6 Chord Spaclng(in oc) Start(ft) End(ft).50 BC 120 0.00 25lle AG-AF 105 -119 X - W 1 -5 Apply purlins to any chords above or below fillers AF-AE 105 -120 W-V 1 -4 at 24" OC unless shown otherwise above. AE-AD 105 -121 V - U 1 -3 AD-AC 105 -122 U - T 1 -2 Loading QRp4ESSI0N9 Bottom chord checked for 10.00 psf non-concurrent �' Maximum Web Forces Per Pty (lbs) live load. ��� �N Webs Tens.Comp. Wind �, S-T 4 -34 Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Maximum Gable Forces Per Pty (Ibs) Left cantilever is exposed to wind Gables Tens.Comp. Gables Tens. Comp. Additional Notes J+ C10,\Q .. l9l B -AK 25 -197 C-AJ 12 -56 K -AB L-AA 14 0 -101 O�� Feb�111,2otsd See DWGS All 1515ENC1002012, GBLLETIN0212, & f OF C AL�� D -Al 13 -95 Z - M 13 -82 -102 GABRST100212 for more requirements. b E -AH 13 -91 Y - N 14 -91 kP �9-30-21 F-AG 13 -91 X-0 13 -91 G-AF 13 -91 W-P 13 -91 H -AE 13 -92 V - Q 13 -92 -WARNING— READ AND FOLLOW ALL NOTES ON THIS DRAWING! —IMPORTANT— FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, byY TPI SBCA) fo'r anc7 safety practices prior to performing these functions. Installers shall bracin per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathin� and bottom hord provide temporarryY shall have a propeify attach�rigid ceiling Locations shown for pennanent lateral restraint 8f webs shall have bracing ins ailed per BCI sections 63, 67 or BB10, as applicable. Apply plates to each face of truss and position as shown above and on the JoinT Details, unless noted otherwise. drawings 160A-Z for standard plate positions. Refer to ITW Buildin Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI 11, or for handling, shipping, instpllation and bracing of trusses. A seal on this drawing or coverppm�e listinggthis drawingg Indicates acceptance of ppro essiona engineering responsibility sole for the design shown. The suiTa6ility gSec.2. and use of this) drawing for any structure is the responsibfiity of the Building Designer oar ANSI/TPI For more information see this iob's neneral notes page and these web sites: ITWBCG: www.i .com; TPI: www. inst.o • SBCA: www.sbcindu .mm• ICC: www.imsafe.o t T440 Ply: 1 SEAN: 251028 / T79 / GABL TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: B1 G STUB GABLE Wgt: 151.2 lbs Page 2 of 2 / ... 02/10/15 J -AC 13 -91 'inn t A A. ,. } oQROf ESSCz IpN� 0028710 - - sjglc CIry ���Q DDigitallysealed oitCNV Feb. 11. 2015 - R FkP �9-30-206 A , r "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricat*n , handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and WTCA) for saf�ty practices Prior to performing these functions. Installers shall provide temporary bracin per BCSI. Unless noted olherwise,top chord shall have gropej attached structural sheathing and bottom chord shall have a progeny attach�d rigid ceiling Locations shown for permanent lateral restraint 0Of webs shall have bracing installed per BCSI sections B3, 87 or B10y as applicable. Apply Agates to each face of truss and position as shown above and on the JoinCDataIIs, unless noted otherwise. {defer to drawings 160A -Z for standard plate positions. ITW Build*np Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, r for hapolin% shipping, installation and bracing of trusses. A seat on this drawing or cover ppaccl1e listingg� this drra�wingg'' Indicates acceptance of pro essiona engrneering responsibility solely for the des*gn shown. The sulal3llity an use of thr8 drawing for any structure is the responsibility of the Building Designer iter ANSI/TPI TSec.2. For more information see this job's neneral notes page and these web sites: ITWBCG: www.i .eom% TPI: www. inst.o ; WfCA: www.sbcindu .com; ICC: www.iccsafe.o T440 Ply: 1 SEAN: 251044 / T81 / GABL TOMEI RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW: CG GABLE Wgt: 88.2 lbs / ... 02/10/15 n f 2'5"8 '1 1-4" 1 1'4'8 1 1'4" 1 1'4'8 + 9'4'8 10'5"8, '4" 8 1 8 1 1 1'4" 1 1'4" 81 14" '1 1 ' 1'4" 1 2'5"8 3 12 D G= -4X4 iF 1' 17'3" 1 2'5"8 1 1'4" 1 1'4" 1 1'4" 1'4" 1'4" 1 1'4" 1 1'4" 1 1'4" 1'4" 1'4" 1 2'5"8 2'5"8 1 3'9"8 5'1"8 6'5"8 7'9"8 9'1"8 10'5"8 11'9"8 13'1"8 14'5"8 15'9"8 18'3" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefi L/# TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.004 N 999 95 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(fL): 0.015 X 794 90 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.001 N - - Des Ld: 44.00 EXP: C 102 HORZ(TL): -0.003 B Code I Misc Criteria NCBCLL: 10.00 Mean Height: 17.52 ft Creep Factor. 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.073 Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.080 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.019 C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber: GCpi: 0.00 Plate Type(s): VIEW Ver. 13.02.06.0219.19 Wind Duration: 1.33 WAVE Lumber Top chord 2x4 DF -L #1&Bet.(g) Bot chord 2x4 DF -L #1&Bet(g) Webs 2x4 DF -L Standard(g) Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. All plates are 2X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 18.25 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading �pf ESS A, q COQ N M Bottom chord checked for 10.00 psf non -concurrent 0 live load.Q- Wind t.7 Member design based on both MWFRS and C&C. C�28Jt O 1 Left and right cantilevers are exposed to wind * dl Additional Notes if►J CIO- \Q See DWGS A11530ENC100212, GBLLETIN0212, 8 GABRST100212 igisealed '9%E' �(��� Feb. 111'01 1 11, 2015 OF CN for more requirements. FSA 09-30-206 ♦ Maximum Reactions (lbs), or •=PLF Loc R /U /Rw /Rh /RL /W Y' 1622 / - /1363/- / 80 /195 Wind reactions based on C&C Y Min Brg Width Req = - Bearing Y is a rigid surface. Maximum Top Chord Forces Per Pty (Ibs) Chords Tens.Comp. Chords Tens. Comp A -B 101 -29 G -H 106 0 B -C 93 -15 H -I 106 0 C -D 102 -7 I -J 104 0 D -E 104 0 J -K 102 0 E -F 106 0 K -L 93 0 F -G 106 0 L -M 101 -14 Maximum Bot Chord Forces Per Pty (Ibs) Chords Tens.Comp. Chords Tens. Comp A -X 62 -186 S -R 19 -94 X -W 21 -87 R -Q 18 -92 W -V 21 -88 Q -P 18 -90 V -U 20 -90 P-0 18 -88 U -T 19 -92 O -N 17 -85 T -S 19 -94 N -M 32 -153 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp B -X 24 -167 R -H 15 -103 C -W 12 -71 Q-1 14 -90 D -V 14 -94 P -J 14 -94 E -U 14 -90 0-K 11 -62 F -T 15 -103 N -L 24 -168 G -S 0 -124 "WARNING'* READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses re uire extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) toi safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSI. Unless noted oyherwise,top chord shall have proper)Y attached structural sheathing and bottom hord shall hav a properyy attach�d rigid ceiling Locations shown for permanent lateral restraint Of webs shall have bradng installed per BCI sections B3, �7 or 610, as applicable. Apply plates to each face of truss and position as shown above and on the JoingDetails, unless noted otherwise. (tefer to drawings 160A -Z for standard plate positions. ITW Buildincl Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in Conformance with ANSI/TP1 1, pr for handling, shipping, installation and bracing of,trusses. A seal on this drawing or cover Par listin4this drawing indicates acceptance of pro) sslonal engineering responsibility solely for the design shown. The suitability anTl use of th3' drawing for any structure lathe responsibility of the Building Designer er ANSI/TPI gSec.2. T440 Ply: 1 SEQN: 251039 / T80 / COMN TOMEI RESIDENCE TOME[ RESIDENCE Qty: 19 FROM: SGH [DR: C COMN Wgt: 77.0 Ibs / ... 02/10/15 5'5"4 9.1"8 12'9"12 18'3" r• 5'5"4 r 3'8"4 } 3'8"4 + 5'5"4 I� , C = 3 4X4 T. 2X4 B D�2X4 v N 1113X7 1113X7 3X5(A1) A E=3X4(A1) 314 3X7 F 1 16'3" 1'8" , 7'5"8 7'5"81'8" 1'8" + 9'1"8 + 16'7" '�' 18'3" , Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Deft/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.149 D 999 240 A 813 /43 /934 / - /3348/5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.281 F 675 180 E 813 /43 /934 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.069 F - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.105 F " - A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 17.52 ft Code / Misc Criteria Creep Factor. 2.0 E Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.356 Bearings A & E are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.983 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.137 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 272 -1898 C - D 0 -1405 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 1 B - C 0 -1422 D - E 208 -1835 Lumber Top chord 2x4 DF-L #1 &Bet.(g) Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x4 DF-L #1&Bet(g) Chords Tens.Comp. Chords Tens. Comp. Webs 2x4 DF-L Standard(g) A - F 2682 -1137 F - E 2145 600 :Lt Wedge 2x4 DF-L Standard(g): :Rt Wedge 2x4 DF-L Standard(g): Maximum Web Forces Per Ply (Ibs) Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using B - F 170 -346 F - D 226 403 NDS/TPI reduction factors. C - F 337 0 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 70 0.00 18.25 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading oQ�Q4 ESSI'QNq Truss transfers a maximum horizontal load of �� O(J M . 3350 # ( 183.56 plf ) along top chord, from either direction, to supports where indicated. Diaphragm and ?� connections are to be designed by Engineer of Record. Drag Loads: Force(#) (PLF) Mbr Start End CO281 O Case 1: 3350 183.56 TC 0.00 18.25 3350 BC 1.00 * �► Bottom chord checked for 10.00 psf non-concurrent live load.Cc CM gitally \F� Fen. zoos ly sealed Wind OF CA1 Member design based on both MWFRS and C&C. b pg-30 Z . Left and right cantilevers are exposed to wind "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT- FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI an r7 SBCA) for safety practices prior to performing these functions. Installers shall provide temporary bracih per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a property attachotl rigid ceiling Locations shown for permanent lateral restraint Of webs shall have bracing ins ]led per BCSI sections 43, B7 or 810, as applicable. Apply lates to each face. of truss and position as shown above and on the Joinf Details, unless noted otherwise. kefer to drawings 160A-Z for s�andard plate positions. ITW Build in4 Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI g l 1, pr for handling shipping, installation and bracing9 of trusses. A seal on this drawing or cover pa4e listing this dr Ini indicates acceptance of profiesslonar engineering responsibility solely for the desi n shown. The suitability an use o this' drawing for any structure is the responsibility of the Building Designer per ANSI/TPI ( Sec.2. For more information see this'ob's general notes pane and these web sites: ITWBCG: WwwAwbCQ.0om TPI: www. insto • SOCA: www.sbandu .00m& ICC: www.iccsafe.o T440 Wind Criteria Ply: 1 SEQN: 251049 / T82 / CHIP TCDL: 14.00 TOMEI RESIDENCE TOMEI RESIDENCE BCLL: 0.00 Qty: 2 FROM: SGH Risk Category: II DRW: D HIP H6 NCBCLL: 10.00 Wgt: 70.0 lbs Soffit: 2.00 TCDL: 8.4 psf / ... 02/10/15 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 u: NA Cs: NA 5,5„ 911„1 GCpi: 0.00 15' 5'5” } 3'81 Top chord 2x4 DF -L #1&Bet.(g) 5'10"15 123 :Lt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' :Rt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Loading Bottom chord checked for 10.00 psf non -concurrent ,4X6 C #1 hip supports 5-10-15 jacks. Jacks are BC D :6X8 Extend sloping top chord of truss and jacks to hip rafter. Support extensions every 2.00 ft to flat TC. Spacing of supports originates from #1 hip. Attach 2x4 lateral bracing to flat TC @ 32" OC with 2-16d Box or Gun nails(0.135"x3.5",min.) and diagonally brace per 5� 3X4 B cripples at 2-9-15 OC. Purlins In lieu of structural panels use purlins to brace all flat E Z 3X4 9) o,=3X6(C6) Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind C - D 215 -2493 D - E =3X6(C6) 2X4(C6 I Ver. 13.02.06.0219.19 A - B 0 -740 E - F 0 -820 Additional Notes =2X4(C6) B - C 200 -2602 Building designer is responsible for conventional framing. 14 Maximum Bot Chord Forces Per Pty (lbs) _=3X4 Tens. Comp. 11124 A - H 2759 -149 G - F 2560 -148 1' 13' 5'5" 5'5" Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear L BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 17.12 ft Soffit: 2.00 TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 u: NA Cs: NA C&C Dist a: 3.00 ft F F 1182 /125 /186 / - / - GCpi: 0.00 Duration: NA Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1&Bet.(g) Bot chord 2x4 DF -L #1 &Bet.(g) Webs 2x4 DF -L Standard(g) :Lt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' :Rt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Loading Bottom chord checked for 10.00 psf non -concurrent live load. #1 hip supports 5-10-15 jacks. Jacks are BC supported. Corner sets are conventionally framed. Extend sloping top chord of truss and jacks to hip rafter. Support extensions every 2.00 ft to flat TC. Spacing of supports originates from #1 hip. Attach 2x4 lateral bracing to flat TC @ 32" OC with 2-16d Box or Gun nails(0.135"x3.5",min.) and diagonally brace per DWG. BRCALHIP1213. Support hip rafter with cripples at 2-9-15 OC. Purlins In lieu of structural panels use purlins to brace all flat TC @ 32" OC. Wind Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind Snow Pg: Snow Code Bldg TPI Rep Plate WAVEVIEW 4'3"1 2 5'3"4 l 9,8"12 f 15' Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (lbs) NA Ct: NA CAT: NA PP Deflection in loc Udefi L/# Loc R /U / Rw / Rh / RL /W If. NA Ce: NA VERT(LL): 0.083 D 999 240 A 1179 /125 /186 / - /12 /5.5 u: NA Cs: NA VERT(TL): 0.293 D 512 180 F 1182 /125 /186 / - / - /5.5 Duration: NA HORZ(LL): 0.022 E - - Wind reactions based on C&C HORZ(TL): 0.078 E A Min Brg Width Req = 1.5 I M!sc Criteria Creep Factor: 2.0 F Min Brg Width Req = 1.5 Code: CBC 2013 Res Max TC CSI: 0.603 Bearings A & F are a rigid surface. Std: 2007 Max BC CSI: 0.721 Factors Used: No Max Web CSI: 0.733 Maximum Top Chord Forces Per Pty (Ibs) T/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. Type(s): C - D 215 -2493 D - E 198 -2669 Ver. 13.02.06.0219.19 A - B 0 -740 E - F 0 -820 Additional Notes B - C 200 -2602 Building designer is responsible for conventional framing. Maximum Bot Chord Forces Per Pty (lbs) Chords Tens.Comp. Chords Tens. Comp. A - H 2759 -149 G - F 2560 -148 H - G 2543 -152 Maximum Web Forces Per Pty (lbs) Webs Tens.Comp. Webs Tens. Comp. A- B 314 -2008 D- G 205 0 H -D 56 -81 E -F 312 -1929 OQ�pf E�SIQN� M $ O eb.11,2015 eb.11,2015 gTFOF CAS.\F�� Fk '09 -30 - "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI anc7 SBCA)1oi safety practices prior to performing these functions. Installers shall provide temporary bracifl er BCSI. Unless noted oy erwise,top chord shall have propedY attached structural sheathing and bottom chord shall have a propeily attach��rigld ceiling Locations shown for permanent lateral restraint yf webs shall have bracing installed per BCSI sections 63, 67 or 610, as applicable. Apply plates to each face of truss and position as shown above and on the JoingDetails, unless noted otherwise. Refer to drawings 160A -Z for standard plate positions. ITW Buildingq Compponents Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handling shipping, installation and bracing of trusses. A seal on this drawmg or cover page listin this drawing indicates acceptance of pro ess ona enggineering responsibility solely for the des i n shown. The sulc ility an use of thQ' drawing for any structure is the responsibi ity of the Building Designer per ANSUTPI IpSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.itwbcg.com; TPI: www.tpinst.org; SBCA: www.sbcindusW.com: ICC: www.iccsafe.oro T440 Pty: 1 SEQN: 251057 / T83 / COMN TOMEI RESIDENCE TOMEI RESIDENCE Qty: 9 FROM: SGH DRW: D1 COMN Wgt: 61.6 Itis / ... 02/10/15 4'9"8 T6" 10'2"8 1 15' 4,9„8 2'8"8 2'8"8 4,9„8 12 3 E C=4X4 T2X4 B D 02X4 N 1113X7 1113X7 2X4(A1) 2X4(A1) 3 41 1' 1' 13 5'10” 5'10" 1'8” 7'6" 13,4" 15' '1 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) DefI1CSl Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl l./# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph. Pf: NA Ce: NA VERT(LL): 0.048 F 999 240 A 669 1133 /188 / - /15 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.167 F 898 180 E 669 / 133 /188 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.010 F - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.035 F A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 17.32 ft Code I Misc Criteria Creep Factor. 2.0 E Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSL 0.190 Bearings A & E are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.245 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.094 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 ft . FT/RT: 20.0%(0.0%)/0(0) . Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): IA - B 222 -1102 C - D 171 -963 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 B - C 171 -963 D - E 222 -1102 Lumber + Top chord 2x4 DF -L #1&Bet.(g) :. Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Chords Tens. Comp. Webs 2x4 DF -L Standard(g) :Lt Wedge 2x4 DF -L Standard(g): A'- F 1036• -175 F - E 1036 -175 :Rt Wedge 2x4 DF -L Standard(g): + " Maximum Web Forces Per Ply (Ibs) Plating Notes ' , Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using _ NDS/TPI reduction factors. � � � B - F 89 -124 F - D- 89 -124 C - F 231 0 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) , BC 120 0.00 15.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. E ESS/QNq Loading ��0 0� M. Bottom chord checked for 10.00 psf non -concurrent �w Q live load. Wind Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind bitir. ois -OF CA1�� 9-30-1'3 \b -302'31b "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI —IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing.. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSI. Unless noted otherwise,top chord shall have groper�v attached structu I sheathing and bottom chord shall hav a propeily attachod rigid ceiling Locations shown for Dennanent lateral restraint Gf webs shall have bracing installed per BCS( sections B3, �7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Join 9Details, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildinqcl Components Group Inc. shall not be responsible for any deviation from this drawing ry failure to build the truss in conformance with ANSI/TP1 1, r for handl% shipping, installation and bracing of trusses. A seal on this drawing or cover pag listin this drawing indicates acceptance of pro'essione en sneering responsibility sole) for the design shown. The suitability an�l use of thM drawing for any structure Is the responsibi4 of the Building Designer per ANSI/TPI QSec.2. For more information see this mob's general notes pane and these web sites: ITWBCG: www.itw .comb TPI: www. inst.o • SBCA: wwwsbcindustry.00mm ICC: www.iccsafe.org T440 Ply: 1 SEAN: 251060 / T84 / MONO - TOMEI RESIDENCE TOMEI RESIDENCE Qty: 10 FROM: SGH DRW: E MONO Wgt: 23.8 lbs .. / ... 02/10/15 2X4(A1; r 3 12 1112X4 B "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! ' —IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme can: in fabricating, handlingshipping, installing and bracing.. Refer to and follow the latest edition of BCSI (Building Component Safety Information, b TPI an c3 SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSI. Unless noted c1herwise,top chord shall have goperW attached structural sheathing and bottom chord g ell have a properly attach�d rigid ceiling. Locations shown for permanent lateral restraint Of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to drawings 160 -Z for standard plate positions. ITW Buildi_n4 Components Group Inc. shall not be responsible for any deviation from this drawing,awV failure to build the truss in conformance with ANSI/TP1 1, or for handling, shipping, installation and bracing of,trusses. A seal on this draw ng or cover page listing this drawing' Indicates acceptance of pro-fessional en sneering responsibility so el for the desi n shown. The suitability an% use of thi drawing for any structure is the responsib�'rty of the Building Designer ger ANSI/TPI igSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.i .mm: TPI: www. inst.org; SBCA: www.sbcinduslry.com; ICC: www.iccsafe.oru i 1112X4 i� 6' L71 7• �I Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Deft/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): -0.030 C 493 117 D 377 / 109 / 108 / - /92 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.077 C 191 90 C 250 / 105 /68- BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.007 B - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): -0.018 B D Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / M!sc Criteria Creep Factor. 2.0 C' Min Brg Width Req = Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.544 Bearing D is a rigid surface Load Duration: 1.25 BCDL: 6.0 psf - TPI Std: 2007 Max BC CSI: 0.316 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2. Rep Factors Used: No Max Web CSI: 0.490 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. GCpi: 0.00 Plate Type(s): A _ B 21 _94 Wind Duration: 1.33. WAVE VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Bot chord 2x4 DF -L #1&Bet.(g) 4 . A - C 118 14 - Webs 2x4 DF -L Standard(g) Plating Notes ' Maximum Web Forces Per Ply (Ibs) Connectors in green lumber (g) designed using , Webs Tens.Comp. NDS/TPI reduction factors. B - C 145 -216 Purlins ,' Y In lieu of structural panels or rigid ceiling use purlins , to laterally brace chords as follows: ' Chord Spacing(in oc) Start(ft) • End(ft) .. BC 84 0.00 7.00 , Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers I Ties , '. Q�pf ES'to Hanger support required, by others. �O M , ON Loading 1/� Bottom chord checked for 10.00 psf non -concurrent Ch • live load. CO2871O zo Wind * dt Member design based on both MWFRS and C&C. - fl C10,��� Right end vertical not exposed to wind pressure. ,� lF Digitally sealed Left cantilever is exposed to wind OF GA���� Feb. 11, 2015 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! ' —IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme can: in fabricating, handlingshipping, installing and bracing.. Refer to and follow the latest edition of BCSI (Building Component Safety Information, b TPI an c3 SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSI. Unless noted c1herwise,top chord shall have goperW attached structural sheathing and bottom chord g ell have a properly attach�d rigid ceiling. Locations shown for permanent lateral restraint Of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to drawings 160 -Z for standard plate positions. ITW Buildi_n4 Components Group Inc. shall not be responsible for any deviation from this drawing,awV failure to build the truss in conformance with ANSI/TP1 1, or for handling, shipping, installation and bracing of,trusses. A seal on this draw ng or cover page listing this drawing' Indicates acceptance of pro-fessional en sneering responsibility so el for the desi n shown. The suitability an% use of thi drawing for any structure is the responsib�'rty of the Building Designer ger ANSI/TPI igSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.i .mm: TPI: www. inst.org; SBCA: www.sbcinduslry.com; ICC: www.iccsafe.oru T440 4 Ply: 1 SEAN: 251071 / T86 / GABL TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: FG MONO GABLE Wgt: 43.4 lbs / ... 02/10/15 78" 4'5.4" 8,8,. 8' 10"4 1 2,8" V4" �' 1,4" 1,4" 1.4" 'I A2 19 G 2X4(A1) 2,8" 1'4" , 1'4" + 1,4.. . 1'4" 11,12 Ig' + } + 2'8" 4' 64" 8,8,. g' 10..4 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria g imum Reactions (lbs), or'=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA , Ce: NA VERT(LL): 0.006 M 999 95 N' 800 / 162 / 227 / - /106 /96.0 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.021 M 556 90 Wind reactions based on C&C BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.002 G •- N Min Brg Width Req = - Des Ld: 44.00 EXP: C HORZ(TL): -0.006 G Bearing N is a rigid surface. NCBCLL: 10.00 Mean Height: 15.00 ft _ Code I Misc Criteria Creep Factor: 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.080 Maximum Top Chord Forces Per Ply (Ibs) Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.132 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No ' Max Web CSI: 0.020 A - B 7 -95 D - E 8 -48 C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. ' B - C 0 -72 E - F 10 -29 GCpi: 0.00 Plate Type(s): C - D 6 -62 F - G 7 -10 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Ply (Ibs) Top chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF -L #1 &Bet.(g) t ' A - M 197 0 K - J 105 0 Webs 2x4 DF -L Standard(g) M - L 104 0 J-1 106 0 Plating Notes * L = K 104 0 , i - H 106 1 Connectors in green lumber (g) designed using NDS/TPI reduction factors. Maximum Gable Forces Per Ply (Ibs) All plates are 2X4 except as noted. _ Gables Tens.Comp. Gables Tens. Comp. Purlins B -M 117 -184 E -J 63 -94 C -L 25 -62 F -I 62 -86 In lieu of structural panels or rigid ceiling use purlins D - K 36 -94 G - H 21 -28 to laterally brace chords as follows: , Chord Spacing(in oc) Start(ft) End(ft) - BC 108 0.00 9.00 . -- Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading N ' QRpEESS Bottom chord checked for 10.00 psf non -concurrent live load. w�tv0 ON Wind r _ Member design based on both MWFRS and C&C. �OZQ a Right end vertical not exposed to wind pressure. r' Left cantilever is exposed to wind Additional Notes fl�T clv\\- e Rally 01ed Ot`l� See DWGS Al 1515ENC1002012, GBLLETIN0212, & . E OF AVIkF GABRST100212 for more requirements. ' 0g-30-20�� "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI SBCA) an r7 toy safety practices prior to performing these functions. Installers shall�pprovide temporarryY brad In per BCSI. Unless noted otherwise,top chord shall have prope�v attached sVucturdl sheathing and bottom hob glial) have a propeity attach �d rigid ceilingg Locations shown for permanent lateral restraint df webs shall have bracing installed per BCI sections B3, B7 or B10, as applicable. Appply plates to each face of truss and position as shown above and on the Join f Details, unless noted otherwise. kefer to drawings 160A -Z fbr standard plate positions. ITW Buildin4q Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the truss with ANSI%I 1, or for handling installation in conformance shipping, and bracing of trusses. A seal on this drawing or cover Crstingg� this drawing Indicates acceptance of pro ess ona engineering res ponsrbihty solely for the desi n shown. The surTa6ility an71 use of this drawing for any structure Is the responsib�ity of the Building Designer per ANSI/TPI igSec.2. For more information see this'ob•s general notes page and these web sites: ITWBCG: www.i .00m• TPI: www. inst.o • SBCA: www.sbcindustry.comm ICC: www.iccsafe.org T440 Pty: 1 SEQN: 251066 / T85 / MONO TOMEI RESIDENCE TOMEI RESIDENCE Qty: 3 FROM: SGH DRW: F MONO Wgt: 39.2 lbs / ... 02/10/15 5,0„8 g, 5'0"8 3'11 "8 5 12 1112X4 C 3 p T r' 2X4 B • a io 1113X7 2X4(A1) T 3"14 Li L i "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI ((Building Component Safety Information, byy TPI an' SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracingg per BCSI. Unless noted 0 herwise,top chord shall have properlyy attached structural sheathing and bottom gghord ghall have a properly attach€tl ri Id ceiling Locations shhown for permanent lateral restraint Of webs shall have bracingg installed per BC51 sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. refer to drawings 160A -Z for standard plate positions. ITW Buildingp Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handlind. shipping, installation and bracing of trusses. A seal on this drawing or coverpa�e listingg� this drawing indicates acceptance of pro) essionaf engineering respons bility sole) for the design shown. The suitability an71 use of th l drawing for any structure is the responsibility of the Building Designer ler ANSI/'TPI TSec.2. For more information see this'ob's general notes page and these web sites: rWBCG: wwwAwbco.comm TPI: www. inst.o ; SBCA www.sbcindu .com• ICC: www.iccsafe.org - =14A'+ - - 1' 6 1'8" g' 1 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.013 B 999 240 A 463 /105 /133 / - /106 / 5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.044 B 999 180 D 341 /112 /94- BCDL: 10.00 Risk Category: 11 Snow Duration: NA HORZ(LL): -0.003 C - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.013 D A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 it Code I Mlsc Criteria Creep Factor: 2.0 D Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.156 Bearing A is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.314 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.253 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A -8 121 -547 B - C 19 -49 Wind Duration: 1.33 WAVE r VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Bot chord 2x4 DF -L #1&Bet.(g) A - D 517 -179 Webs 2x4 DF -L Standard(g) :Lt Wedge 2x4 DF -L Standard(g): Maximum Web Forces Per Pty (Ibs) Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using B - D 188 -532 C - D 92 -119 NDS/TPI reduction factors. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 108 0.00 9.00 Apply purlins to any chords above or below fillers 24” OC r Qf Milo Nq unless shown otherwise above. OQR Hangers I Ties Hanger support required, by others. Loading 0012 7710 Bottom chord checked for 10.00 psf non -concurrent - live load. Wind + fl C10, Member design based on both MWFRS and C&C. �r£OF CA���O� gitaltysealed Right end vertical not exposed to wind pressure. , , F'�" Feb. 11 2015 Left cantilever is exposed to wind , . 09_30-201 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI ((Building Component Safety Information, byy TPI an' SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracingg per BCSI. Unless noted 0 herwise,top chord shall have properlyy attached structural sheathing and bottom gghord ghall have a properly attach€tl ri Id ceiling Locations shhown for permanent lateral restraint Of webs shall have bracingg installed per BC51 sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. refer to drawings 160A -Z for standard plate positions. ITW Buildingp Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handlind. shipping, installation and bracing of trusses. A seal on this drawing or coverpa�e listingg� this drawing indicates acceptance of pro) essionaf engineering respons bility sole) for the design shown. The suitability an71 use of th l drawing for any structure is the responsibility of the Building Designer ler ANSI/'TPI TSec.2. For more information see this'ob's general notes page and these web sites: rWBCG: wwwAwbco.comm TPI: www. inst.o ; SBCA www.sbcindu .com• ICC: www.iccsafe.org 11 V T440 TOMEI RESIDENCE TOMEI RESIDENCE F1 2PLY MONO GIRDER =3X6(A 3 14 Pty: 2 SEQN: 251075 / T87 / Qty: 1 FROM: SGH Wgt: 46.2 Itis 5'2"4 i 9' 5'2"4 3'9"12 12 1112X4 C T� N 1 f' f 8' 510"8 '3'11"8 I r 5,0„8 9, '1 DRW ... / ... 02/10/15 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.038 E 999 240 A 3791 / - /375 / - / - /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA . Cs: NA VERT(TL): 0.130 E 740 180 D 2949 / - /292 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.007 D - - Wind reactions based on MWFRS Des Ld: 44.00 EXP: C HORZ(TL): 0.024 D - A Min Brg Width Req = 1.6 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor. 2.0 D Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.333 Bearing A is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.890 Spacing: 24.0 ” MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.546 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 it FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 0 -2660 B - C 3 -29 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber Wind Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF -L #1 &Bet.(g) Wind loads and reactions based on MWFRS. Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x6 DF -L #2(g) Webs 2x4 DF -L Standard(g) Right end vertical not exposed to wind pressure. A - E 2563 0 E - D 2445 0 Left cantilever is exposed to wind Nailnote Maximum Web Forces Per Ply (Ibs) Nail Schedule:0.128"x3", min. nails Webs Tens.Comp. Webs Tens. Comp. Top Chord: 1 Row @12.00" o.c. E - B 1322 0 C - D 0 74 Bot Chord: 2 Rows @ 5.50" o.c. (Each Row) Webs : 1 Row @ 4" o.c. B - D 0 -2550 Use equal spacing between rows and stagger nails - in each row to avoid splitting. Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) - End(ft) BC 96 1.00 9.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers I Ties Hanger support required, by others. ILoading Girder supports 32-0-0 span to BC one face and 2-0-0 • span to TC/BC split opposite face. "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of SCSI (Building Component S fety Information, by TPI and SBCA) y safety practices prior to performing these functions. Installers shall provide temporary bracing per BG�SI. Unless noted olherwise,top chord shall have roper attached structur�I sheathing and bottom fiord ghall have a properly attach etl rigid ceiling Locations shown for permanent lateral restraint Of webs shall have bracingg installed per BCSI sections 83, 67 or 810, as applicable. Apply plates to each face, of truss and position as shown above and on the Join Details, unless noted otherwise. (tefer to drawings 160A -Z for standard plate positions. ITW Buildingq Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover Cg listinithis drawing' indicates acceptance of professtonar engineering responsibility solely for the design shown. The suitability anal use of this drawing for any structure is the responsibi ity of the Bui ding Designer per ANSI1TPI gSec.2. For more information see this job's Aeneral notes page and these web sites: ITWBCG: www.itwbcg.com; TPI: www.tpinsLoro: SBCA www.sbcindusW.com: ICC: www.icasafe.om JI T440 Ply: 1 SEQN: 251077 / T88! CHIP TOME[ RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW: G HIP H4 Wgt 44.8 lbs / ... 02/10/15 TY } 2'81 �- 3,10"15 3 12 D T ;3X4 B C=6X8 " M=2X4(A1) G - H=2X4(Al A 3"14 =3X4 1112X4 68"12 3.3„4 6'8"12 10' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Loc R / U / Rw / Rh / RL /W TCDL: - 14.00 Speed: 110 mph Pf: NA , Ce: NA VERT(LL): 0.041 B 999 240 G 612 / 140 / 124 / 0 /8 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.141 B 641 -180 H 616 / 140 /124 /0 / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.005 E - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.016 E G Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 16.87 ft Code / Misc Criteria Creep Factor: 2.0 H Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.136 Bearings G & H are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.753 Spacing: 24.0 " MWFRS Parallel Dist:0 to h/2 Rep Factors Used: No Max Web CSI: 0.037 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): I B - C 163 -820 C - D 137 -882 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 A - B 145 -869 Lumber Top chord 2x4 DF -L #1&Bet.(g) Maximum Bot Chord Forces Per Ply (Ibs) Bot chord 2x4 DF -L #1&Bet.(g) ` Chords Tens.Comp. Chords Tens. Comp. Webs 2x4 DF -L Standard(g) A - F 1641 -221 E - D 1658 206 Plating Notes F - E 846 -115 Connectors in green lumber (g) designed using NDS/TPI reduction factors. Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. Loading • � Bottom chord checked for 10.00 psf non -concurrent F -C 41 -90 C -E 96 -124B - F 97 -98 live load. #1 hip supports 3-10-15 jacks. Jacks are BC supported. Corner sets are conventionally framed. Extend sloping top chord of truss and jacks to hip rafter. Support extensions every 2.00 ft to flat TC. Spacing of supports originates from #1 hip. Attach 2x4 lateral bracing to flat TC @ 32" OC with 2-16d Box or Q�pf ESSI04,, Gun nails(0.135"x3.5",min.) and diagonally brace per 5 DWG. BRCALHIP1213. Support hip rafter with M • cripples at 2-9-15 OC. C9 R� ns VA In esu of structural panels use purlins to brace all Flat TC @ 32" OC. - Wind >!t Member design based on both MWFRS and C&C. (,'10- igita y sealed Feb. 11, 2015 Left and right cantilevers are exposed to wind 9jF OF Ch Additional Notes FAN 09-30-201 Building designer is responsible for conventional - framing. '"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, ha dl' shippin installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI an c7 SBCA) fo'r safety �ractices prior to performing these functions. Installers shall provide te4orary bracing per SCSI. Unless noted otherwise,top chord shall have proper )Y attached structural sheathing and bottom chord shall have a erly attach8tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing insTalled per SCSI sections B3, 137,E9 10, as applicable. Apply Plates to each face of truss and position as shown above and on the JolnfDetails, unless noted otherwise. r to drawings 160A -Z for standard plate positions. ITW Buildin Components Group Inc. shall not be responsible for any deviation from this drawing,an failure to build the truss in conformance with ANSI A 11, pr for handlins, shipping, installation and bracing of trusses. A seal on this draw or cover Pa a listing this drawing Indicates acceptance of proiessionaf encqlsneering responsibility sole for the design shown. The suiia�lky anal use of tints drawing for any structure is the responsibtiity of the Building Designer er ANSI1 TPI gSec.2. For more information see this job's general notes pane and these web sites: ITWBCG: www.itwb .com• TPI: www. inst.o ; SBCA: www.sbcindus .comm ICC: www.imwe.o W• T440 Ply: 1 SEQN: 251085 / T90 / GABL - TOMEI RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW: HG MONO GABLE Wgt: 25.2 lbs / ... 02/10/15 2.8" 4' 5.1 "4 1 2 2.8„ 1'4" 1'1"4 12 3 C D B 2X4(A1) A .. H 2.8" 4• 5'1'•4 1 2 T o 1 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria _ ♦ Maximum Reactions (Ibs), or'=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA • Ce: NA VERT(LL): 0.006 G 999 95 H' 467 /155 /132 /- /77 /51.0 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.021 G 577 90 Wind reactions based on C&C BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.002 D - H Min Brg Width Req = - Des Ld: 44.00 EXP: C HORZ(TL): -0.006 D Bearing H is a rigid surface. NCBCLL: 10.00 Mean Height: 15.00 ft, Code / Misc Criteria Creep Factor. 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.079 a Maximum Top Chord Forces Per Ply (Ibs) Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.128 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 • Rep Factors Used: No Max Web CSI: 0.020 A - B 14 -63 C - D 11 -12 C&C Dist a: 3.00 It FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber: B - C 3 -32 GCpi: 0.00 - Plate Type(s): Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Maximum Bot Chord Forces Per Ply (Ibs) Lumber Chords Tens.Comp. Chords Tens. Comp. Top chord 2x4 DF -L #1 &Bet.(g)- s. A - G 140 0 F - E 77 1 Bot chord 2x4 DF -L #1&Bet.(g) G - F 77 1 Webs 2x4 DF -L Standard(g) Plating Notes Maximum Gable Forces Per Ply (Ibs) Connectors in green lumber (g) designed using Gables Tens.Comp. Gables Tens. Comp. NDS/TPI reduction factors. r - • B - G 137 -183 D - E 31 39 All plates are 2X4 except as noted. „ C - F 69 -69 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: ' Chord Spacing(in oc) Start(ft) End(ft) . BC 63 0.00 5.25 Apply purlins to any chords above or below fillers ' at 24" OC unless shown otherwise above. Loading pf ESSIpN� o� Bottom chord checked for 10.00 psf non -concurrent live load. Z Wind .. Member design based on both MWFRS and C&C. CO2� Left cantilever is exposed to wind >� * Additional Notes `rlgj C'V!� ly sealed 11, 015 See DWGS Al 1515ENC1002012, GBLLETIN0212, & Q��� ebt GABRST100212 for more requirements. OF CN ~ ON (0 -09-30- t "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, ti TPI an9 SBCA) for safety to these functions. Installers tempora practices prior performing shall provide bracin per BCSI.• Unless noted oiherwise,top chord shall have property attached structural sheathing and bottWn ghord shall attach otl rigid ceillnp Locations shown for permanent lateral re§traint df webs shall have bracing installed CSI have a pro pefly B3, B7 per sections or 810, as applicable. Apply plates to each face. oftrussand position as shown above and on the Join Details, unless noted otherwise. Defer to drawings 160 -Z for standard plate positions., Q ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI 11, or for handlin j shipping, installation and bracing of trusses. A seal on this drawing or cover Calistin this drawing, indicates acceptance of pproTesslonal engineering responsibility solety for the design shown. The suiTa6ility an use of thus drawing for any structure is the responsiblity of the Building Designer Per ANSVTPI TSec.2. For more information see this job's general notes page and these web sites: ITWBCG: www i .com� TPI: wwwApinsLorq& SBCA: www.sbcindu .comes ICC: www.tccsafe.o T440 Ply: 1 SEAN: 251080 / T89 / MONO TOMEI RESIDENCE TOMEI RESIDENCE Qty: 13FROM: SGH DRW H MONO Will: 19.6 lbs / ... 02/10/15 12 3 :B 1112X4 O 2X4(A1) A p ti 3+4 1112X4 L 5m3mi • 51311 - Loading Criteria (psi) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc•Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph - Pf: NA Ce: NA VERT(LL): -0.023 C • 626 117 D 305 / 108 / 88 / - /77 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.078 C 188 90 C 169 / 89 /45- BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.006 B - Wind reactions based on C&C Des Ld 44.00 EXP: C HORZ(TL): -0.020 B - - D Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code I Misc Criteria Creep Factor. 2.0 C Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.296 Bearing D is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf - TPI Std: 2007 . Max BC CSI: 0.215 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.213 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 It FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. GCpi: 0.00 Plate Type(s): q B 26 -60 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF-L #1&Bet.(g) Chords Tens.Comp. Bot chord 2x4 DF-L #1 &Bet.(g) a A - C 88 9 Webs 2x4 DF-L Standard(g) Plating Notes Maximum Web Forces Per Ply (Ibs) Connectors in green lumber (g) designed using Webs Tens.Comp. NDSfrPI reduction factors. B - C 125 -163 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) - BC 63 0.00 5.25 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers I Ties Of ESS/Q Hanger support required, by others. OQ� Nq Loading Bottom chord checked for 10.00 psf non-concurrent Q4VA live toad. Wind Member design based on both MWFRS and C&C: , Left cantilever is exposed to wind. fJ C101\Q Digitally sealed ' 91E.0F CAFeb. 11, 2015 09 -30'201 r —WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI anc7 SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSI. Unless noted otherwise,top chord shall have proper)Y attached structural sheathing and bottom chord shall have a properly attachltl rigid ceilingq Locations shown for permanent lateral restraint bf webs shall have bracingg installed per BCSI sections B3, B7 or 810, as applicable. Ap iy plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. kefer to drawings 160A-Z fgr standard plate positions. ITW Buildingp Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handling shipping, installation and bracing of trusses. A seal on this dravnng or cover pag listin4 this drawing' indicates acceptance of pro ess ona engineering responsibility sole) for the design shown. The suita6llity anal use of thrs drawing for any structure is the responslbi f of the Building Designer ger ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.i .corn; TPI: www. inst.o ; SBCA: www.sbdndustry.00rnalCQ www.iccsafe.o .✓ T440 Ply: 1 SEQN: 251096 / T93 / GABL TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: KG MONO GABLE Wgt: 79.8 lbs / ... 02/10/15 =2X4(A1 3"74 t 2'8" 4' 1 5'4" 6'8"8' 9'4" 10,8" 12' i 13'4" r 2,8„ 1--1,4, 1 1,4,E 1,4„ 1' 1,4„ 'i- 1,4,E -f- 1,4„ '1 . r4„ r 14„ '1 1"12 OM K U T-` S R 13' Q ,P O N M - � 2'8" + 1W' 1'4" 1'4" 1'4" 1'4" 1'4"1'4" _ 1-4" 1"'2 r I$' 2,8„ 4' 5,4„ 6 " 8, 9,4„ 10'8" "{' 12, ��.. 134„'ii 6„ 1{ Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximu R tUlons (Ibs), or.=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W V' 1244 / 139 / 353 / - /137 /156 Wind reactions based on C&C TCDL: 14.00 BCLL: 0.00 Speed: 110 mph Enclosure: Open Clear Pf: NA Ce: NA Lu: NA Cs: NA VERT(LL): 0.006 U 999 95 VERT(TL): 0.022 U 543 90 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.003 J - - V Min Brg Width Req = - Des Ld: 44.00 EXP: C I 0 HORZ(TL): -0.006 K Bearing V is a rigid surface. Code / Misc Criteria NCBCLL: 10.00 Mean Height: 15.00 It Creep Factor: 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code; CBC 2013 Res Max TC CSI: 0.080 Maximum Top Chord Forces Per Pty (Ibs) Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.135 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 C&C Dista: 3.00 ft GCpi: 0.00 Rep Factors Used: No FT/RT: 20.0%(0.0%)/0(0) Plate Type(s): Max Web CSI: 0.038 Mfg Specified Camber. ` A-13 3 -129 F - G 7 -65 B - C 0 -109 G - H 8 -54 C - D 1 -99 H - I 9 -41 VIEW Ver. 13.02.06.0219.19 Wind Duration: 1.33 WAVE D - E 3 -88 I - J 9 -21 E- F 5 -77 J- K 4 -7 Lumber Top chord 2x4 DF -L #1 &Bet.(g) Bot chord 2x4 DF -L #1&Bet.(g) Webs 20 DF -L Standard(g) Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. All plates are 2X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.00 14.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Bottom chord checked for 10.00 psf non -concurrent live load. Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Additional Notes See DWGS Al 1515ENC1002012, GBLLETIN0212, & GABRST100212 for more requirements. , ' Maximum Bot Chord Forces Per Ply (Ibs) 99 -184 Chords Tens.Comp. Chords Tens. Comp. A -U 260 0 Q -P 136 0 U -T 134 0 P -O 136 0 T -S 134 0 O -N 137 0 S -R 135 0 N -M 137 0 R -Q 135 0 M -L 137 0 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp B -U 99 -184 G -P 26 -91 C -T 22 -62 H-0 34 -92 D - S 27 -95 I - N 58 -96 E -R 25 -91 J - M 45 -72 F - Q 26 -91 K -L 11 -18 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabricatingg, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building t Safety Information, byY TPI anc7 SBCA ) 9i safety practices prior to performing these functions. Installers shall provide temporary BCSI. Unless noted olherwise,to chord shall have pro erlY attached structural sheathing and bottom chord shall havg a property ]id ceiling Locations shown for prmanent lateral reptraPnt of webs shall have bracingg installed per BCSI sections 63, B7 or 810, le. Ap Ty plate'to each face ot�Vuss and position as shown above and on the JOinTDetaflS, unless noted otherwise. kefer to 60A -Z for standard plate positions. i Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance fPl 1, Or for handling shipping, instpllation and bracing of trusses. A seal on this drawing or cover pacie listing this drawing acceptance of pro ss ona en�rneering responslbili�v solely for the design shown. The sup 4lity ant! use of thi8' r any structure ps the responsiblity of the Building Designer per ANSI/TPI If Sec.2. T440 Ply: 1 SEAN: 251088 / T91 / MONO TOMEI RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW: K MONO Wgt: 63.0 lbs / ... 02/10/15 t 7'8"4 14' i r 7,8„4 } 6'3"12 �l eb. 11, 2015 gT£OF CA11�� " .09 -30- -WARNING— 09 -30 -"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricatin , handling shipping, installing and bracing. -Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI anr3 SBCA) tiny safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSt. Unless noted otherwise,top chord shall have properly attached structu%I sheathing and bottom ghord shall have a progeny attach�tl rigid ceiling Locations shown for permanent lateral restraint 8f webs shall have bracingp installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Joint"Details, unless noted otherwise. kefer to drawings 160 _Z for standard plate positions. ITW Buildiqng Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover ppa4ge listin this drawing Indicates acceptance of pro essrona enggineering responsibility solely for the desiggn shown. The surTa6ility ant! use of this drawing for any structure is the responsibMIty of the Building Designer per ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.i .com% TPI: www.tpinst.omw SBCA: www.sbdndustry.00rnd ICC: www.iocsafe.o „ - 3 12 1112X4 C 3X4 B . c 'o) 1113X7 2X4(A1) rya 1112)4 D f =4X4 13 1'8" I 5'10"8 " 6,5„8 1-8” t 7'6"8 + 14' , Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) DefI/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.042 E 999 240 A 682 / 87 /196 / - 1137 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.145 E 999 180 D 565 / 112 /158 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.010 C Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(rL): -0.035 C A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 2.0 D Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.385 Bearings A & D are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.343 Spacing: 24.0 ” MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.818 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): 1A - B 54 -1135 B - C 30 -76 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber - Maximum Bot Chord Forces Per Pty (lbs) Top chord 2x4 DF -L #1 &Bet.(g) Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF -L #1 &Bet.(g) Webs 2x4 DF -L Standard(g) A - E 1065 -140 E - D 1058 -145 :Lt Wedge 2x4 DF -L Standard(g): Maximum Web Forces Per Pty (Ibs) Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using ' E - B 259 0 C - D 101 -185 NDS/TPI reduction factors. B - D 148 -1090 Purlins s In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.00 14.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading EJS/�iN9 Bottom chord checked for 10.00 psf non -concurrent live load. OQ��� Q Wind Member design based on both MWFRS and C&C. Qj Right end vertical not exposed to wind pressure. ' Left cantilever is exposed to wind gitaltysealed �l eb. 11, 2015 gT£OF CA11�� " .09 -30- -WARNING— 09 -30 -"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricatin , handling shipping, installing and bracing. -Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI anr3 SBCA) tiny safety practices prior to performing these functions. Installers shall provide temporary bracin per BCSt. Unless noted otherwise,top chord shall have properly attached structu%I sheathing and bottom ghord shall have a progeny attach�tl rigid ceiling Locations shown for permanent lateral restraint 8f webs shall have bracingp installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the Joint"Details, unless noted otherwise. kefer to drawings 160 _Z for standard plate positions. ITW Buildiqng Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover ppa4ge listin this drawing Indicates acceptance of pro essrona enggineering responsibility solely for the desiggn shown. The surTa6ility ant! use of this drawing for any structure is the responsibMIty of the Building Designer per ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.i .com% TPI: www.tpinst.omw SBCA: www.sbdndustry.00rnd ICC: www.iocsafe.o T440 Ply: 1SEAN: 251091,/ T92 / MONO TOMEI RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW:' K1 STUB MONO Wgi 60.2 Ibs / ... 02/10/15 L 6,8„4 >` 13 r 6.8"4 6.312 1 1112X4 C . 3 112 3X4 B . v ` Cl) 3X4(82) III X7 I F 6.14 1 1112)4 D �.. 5'10'x8 ' 6.5..6 =4X4 ♦ 6.6..8 r. 13' H Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria" ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA . Ce; NA VERT(LL): 0.029 E 999 240 A 579 / 81 /166 / - /132 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.099 E 999 180 D 576 / 118 /162 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.007 D - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.024 'D A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 it Code / Misc Criteria Creep Factor. 2.0 D Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.379 Bearings A & D are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.363 Spacing: 24.0” MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.871 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT' 20.0%(0.0%)/0(0) Mfg Specified Camber. • Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate,Type(s): A - B 80 -1204 B - C 30 -76 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219:19 Lumber Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF-L #1 &Bet.(g) Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF-L #1 &Bet.(g) Webs 2x4 DF-L Standard(g) A - E 1132 -153 E - D 1124 157 :Lt Wedge 2x4 DF-L Standard(g): Maximum Web Forces Per Ply (Ibs), Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using E-13 279 0 C - D 104 -180 NDS/TPI reduction factors. B - D 163 -1161 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft), BC 120 1.04 14.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Q�pf ESS N Bottom chord checked for 10.00 psf non-concurrent live load, Wind Member design based on both MWFRS and C&C. Right end vertical not exposed to wind pressure: + C[I/V.I, igitalrysealed F-�p- _ . "• ATC U1 litt�.``O` Feb. 17, 2015 q . 09-30- 0.\ "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require exfreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, byY TPI and SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bract' per BCSI., Unless noted oTherwise,top chord shall have proper`Y attached structural sheathing and bottom C►�ord shall have a pro 9efly attach d rigid ceillnp Locations shown for Dernanent lateral restraint of webs shall have bracing9 installed per BCSI sections B3, B7 or 610, as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. ITW Buildin��gq Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSIlTP1 1, or for handling, shippinlq, installation and bracing of trusses. A seal on this drawing or coverpage listing� this drawing indicates acceptance of pro essiona engineering responsibility sole for the design shown. The, suitability an use of thfs' drawing for any structure Is the responsibility of the Building Designer er ANS_ I/TPI gSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.i .comm TPI: www. insLo • SBCA: www.sbcindu .com• ICC: www.ic safe.o . T440 Ply: 1 SEAN: 251104 / T95 / GABL TOMEI RESIDENCE TOME[ RESIDENCE Qty: 1 FROM: SGH DRW: LG GABLE W9t: 23.8 Itis / ... 02/10/15 3,6.. 7- 3'6" 3,6„ 12 B =4X4 E _. A C 14 Li 1112X4. D 6, r 7' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (lbs), or'=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udell L/# Loc R /U / Rw / Rh / RL /W E' 622 / 231 / 177 / - /6 /60.0 TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): -0.005 D 999 95 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(fL): 0.017 D 684 90 Wind reactions based on C&C BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.001 D - E Min Brg Width Req = - Des Ld: 44.00 EXP: C HORZ(TL): -0.002 B Bearing E is a rigid surface. Code / Misc Criteria NCBCLL: 10.00 Mean Height: 15.00 ft Creep Factor: 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.187 Maximum Top Chord Forces Per Pty (lbs) Load Duration: 1.25 BCDL: 6.0 psf ' TPI Std: 2007 Max BC CSI: 0.110 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.077 A-13 241 -125 B - C 241 -125 C&C Dist a: 3.00 It FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. GCpi: 0.00 Plate Type(s):. Maximum Bot Chord Forces Per Pty (lbs) Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Chords Tens.Comp. Chords Tens. Comp. Lumber Top chord 2x4 DF-L #1 &Bet.(g) . • � _ •A- D 283 -419 D - C 283 -419 Bot chord 2x4 DF-L #1&Bet.(g) Webs 2x4 DF-L Standard(g) Maximum Gable Forces Per Pty (lbs) Gables Tens.Comp. Plating Notes ° B - D 203 -326 Connectors in green lumber (g) designed using • - NDS/TPI reduction factors. All plates are 2X4(A1) except as noted: j Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: ,. Chord Spacing(in oc) Start(ft) End(ft) BC 75 -1.00 6.00 . Apply purlins to any chords above or below fillers ESS/0 at 24' OC unless shown otherwise above.. pf Loading titi���ON. Bottom chord checked for 10.00 psf non-concurrentr Q -1/� live load. 0028710 Wind Member design based on both MWFRS and C&C . - Left and right cantilevers are exposed to wind �lq CIVIL igilally ��sealed Feb. 11, 2015 jEOF Additional Notes 0 CA1��� See DWGS Al 1515ENC1002012, GBLLETIN0212, &. +, p 01(p GABRST100212 for more requirements. 09-30 2 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlin shigpin installing and bracing.. Refer to and follow the latest edition of BCSI ((Building Component Safety Information, by TPI an c7 SBCA) toF safety �ractices to these functions. Installers prior performing shall provide terhpora bracing r BCSI. Unless noted otherwise,top chord shall have groperIv attached structurdl sheathing and bottom ghord shall have a progpeeflly attache ri id ceiling Locations shown for permanent lateral regtralnt bf webs shall have bracingg installed per BCSI sections B3, B7 or B10, as applicable. Appijr plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. kefer to drawings 160A-Z for standard plate positions. ITW Build ingp Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance ANSI/TPI 1, r for haDdlincl shipping, installation and bracingg of trusses. A seal on this drawngor coverppale listin this drawingg �nith dicates acceptance of proTesstonar enggineering responsibility solely for the design shown. The surTability an% use of this drawing for any structure is the responsiblAity of the Building Designer ANSI/TPI 'Sec.2. 15er For more information see this'ob•s general notes page and these web sites: ITWBCG: www.itw .coma TPI: www. inst.o ; SBCA: www.sbcindusbry.com ICC: www.io safe.o T440 -I Ply: 1 SEQN: 251098 / T94 / COMN TOMEI RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW: L COMN Wgt: 23.8 Ibs / ... 02/10/15 f 3,6„ 7' 3-15" T6 , "1 - - 12 ' 3 p B =4X4 , 2X4(A1A E„ =2X4(A1)C ` 1` D 1112X4 r 5, L�ti 7�. Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NAA - Ce: NA VERT(LL): 0.011 B 999 240 E 318 / 124 /88 / - /6 /5.5 BCLL: 0.00 Enclosure: Open Clear .. Lu: NA Cs:,NA VERT(TL): 0.039 B 999 180 F 318 / 124 /88 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.001 B - - - Wind reactions based on C&C Des Ld: ; 44.00 EXP: C HORZ(TL): 0.003 B ' - E Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 it Code / Misc Criteria Creep Factor. 2.0 F Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSL 0.089 Bearings E & F are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.233 Spacing: 24.0 " MWFRS Parallel Dist:'0 to h/2',, Rep Factors Used: No Max Web CSI: 0.057 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 it • FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 59 -163 B - C 59 -163 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF -L #1&Bet.(g) - Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF -L #1 &Bet.(g) Webs 2x4 DF -L Standard(g) A - D 261 45 D - C 261 -45 Plating Notes Maximum Web Forces Per Ply (Ibs) Connectors in green lumber designed usi ng Webs Tens.Comp. _ NDS/TPI reduction factors. _ r B -,D 150 -199 Purlins In lieu of structural panels or rigid ceiling use purlins , to laterally brace chords as follows: Chord . Spacing(in oc) Start(ft) End(ft) BC 84 0.00 7.00 Apply purlins to any chords above or below fillers •' ' at 24" OC unless shown otherwise above. Loading Bottom chord checked for 10.00 psf non -concurrent • �pE ESS/0 De M 9 live load. Wind Member design based on both MWFRS and C&C:+, Left and right cantilevers are exposed to wind qlE.�`F b=` 111, 0154 OF CAI -N t F'F"P 09-30-2O —WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS' Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component S fety Information, by TPI and SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracin per B SI. Unless noted olherwise,top chord shall have proper attached structurdl sheathing and bottom ghord ghall have a property attachod rigid ceiling Locations shown for permanent lateral restraint�f webs shall have bracingg insla!led per BG51 sections B3, B7 or B10, as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildin4q Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for hapolin9 shippin , installation and bracing of,trusses. A seal on this drawing or cover pa3e Ilstin4this drawl n indicates acceptance of pr Ressfonar an rneering res c .bility solely for the desiggn shown. The suitability and use of th ' drawing for any structure is the responsibr of the Bui din, Deslioner der ANSI/TPI TSec.2. T440 Ply: 1 SEAN: 251117 / T97 / GABL TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: MG GABLE Wgt: 107.8 Ibs / ... 02/10/15 3�9"12� 6'5"12 2� 5"12 1'4" 5� 1'4' 7'9"12 2'5"12 1'4' 1'4" 3 12 9�'1 11�� 14�� 17�� 2�"I 1'4" 1'4" 1'4" 1'4" 2'0"4 �� 10'5"12 13'1"12 15'9"12 18'5"12 1�� H =4X4 AB AA Z Y X W V U T S R Q P �- 1' — 5X5 19'6" 2'5"12 J 5'1"12 7'9"12 10'5"12 J13'1"12 15'9"12 18'5"12 1-4",1f" Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 15.00 ft Soffit: 2.00 TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft GCpi: 0.00 Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1&Bet.(g) Bot chord 2x4 DF -L #1&Bet(g) Webs 2x4 DF -L Standard(g) Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. All plates are 2X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 20.35 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Bottom chord checked for 10.00 psf non -concurrent live load. Wind . Member design based on both MWFRS and C&C. Left cantilever is exposed to wind Additional Notes See DWGS At 1515ENC1002012, GBLLETIN0212, & GABRST100212 for more requirements. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct NA CAT: Ni Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Code I Misc Criteria Bldg Code: CBC 2013 Res TPI Std: 2007 Rep Factors Used: No FT/RT: 20.0%(0.0%)/0(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.005 AB 999 95 VERT(TL): 0.017 AB 701 90 HORZ(LL): -0.001 B - - HORZ(TL): -0.003 B Creep Factor. 2.0 Max TC CSI: 0.074 Max BC CSI: 0.090 Max Web CSI: 0.019 Mfg Specified Camber. VIEW Ver: 13.02.06.0219.19 Fkp 09-30-20b '-2X4(A1) sa ♦ Maximum Reactions (Ibs), or •=PLF Loc R /U /Rw /Rh /RL /W AC'1822 / - /1514/- / 88 /234 Wind reactions based on C&C AC Min Brg Width Req = - Bearing AC is a rigid surface. Maximum Top Chord Forces Per Pty (Ibs) Chords Tens.Comp. Chords Tens. Comp A - B 70 -37 H-1 60 -20 B -C 55 -23 I -J 60 -11 C -D 55 -18 J -K 59 -4 D -E 56 -15 K -L 56 -7 E -F 59 -12 L -M 54 -11 F -G 60 -11 M -N 51 -17 G - H 60 -20 N-0 60 -25 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp A -AB 76 -132 V - U 32 -71 AB -AA 39 -73 U - T 31 -70 AA- Z 40 -75 T - S 31 -68 Z -Y 40 -77 S -R 31 -67 Y -X 40 -79 R -Q 31 -65 X - W 40 -80 Q - P 30 -62 W -V 41 -81 P-0 29 -57 Maximum Gable Forces Per Pty (Ibs) Gables Tens.Comp. Gables Tens. Comp B -AB 22 -171 U-1 14 -102 C -AA 11 -68 T - J 13 -90 D -Z 13 -94 S -K 13 -91 E -Y 13 -91 R -L 13 -92 F -X 13 -90 Q -M 12 -85 G -W 14 -102 P -N 16 -118 H -V 0 -102 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabricating, handlingq shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building t Safety Information, byy TPI ancJ SBCA) ioF safety practices prior to performing these functions. Installers shall provide temporarny BCSI. Unless noted oiherwise,top chord shall have proper)Yy attached structural sheathin and bottom hob $hall have a propeily 'iid ceiling Locations shown for permanent lateral restraint Of webs shall have braclngg ins�alled per BCI sections 63, B7 or 810, e. Apply plate. to each face of truss and position as shown above and on the JoinfDetails, unless noted othervvise. )tefer to 60A -Z for standard plate positions. r Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance IPI 1, r for handling shipping, installation and bracing o trusses. A seal on this drawing or cover p icle ilstin this drawin acceptance of pro essrona en33rneering res ponsrbilitt�y solely for the design shown. The suitability anis use of thil, it any structure is the responsiblity of the Building Deslgner der ANSI/TPI 'FSec.2. If T440 TOMEI RESIDENCE TOMEI RESIDENCE M COMN T 1 5'9"6 + 10'5"12 5'9"6 4'8"6 12 Ply: 1 SEQN: 251112 / T96 / COMN Qty: 4 FROM: SGH DRW: Wgt:88.2Itis ! .. 1572 + 20'6" 4'8"6, 51"14 C= 4X6 02/10/15 1) "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricatin , handlin shipping, installing and bracing. , Refer to and follow the latest edition of BCSI (Building omponent S fety Information, b TPI an� SBCA) fo'r safety practices prior to performing these functions. Installers shall provide tempora bracingbracin per B SI. Unless noted oY�herwise,top chord shall have roperlY attached sfcturdl sheathing and bottom fiord *Mall have a props y attach �tl rigid ceilingg Locations shown for permanent lateral re�traint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Ap 7y plates to each face of truss and position as shown above and on the JoinfDetails, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildi_n_gct Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSIlTP1 1, gr for handling shipping, installation and bracing of trusses. A seal on this drawing or cover pacts listin4this drawin indicates acceptance of proTessfonaf englneerin responsibility solety for the desi n shown. The surta6iifty anti use of ini drawing for any structure is the responsibility of the Bui ding Designer per ANSUTPI igSec.2. For more information see thisJob's general notes page and these web sites: ITWBCG: www.itwb .com: TPI: www.lpinst.or% SBCA: www.sbdndu .00m& ICC: www.iocsafe.org 19'6" 1-8" 8'912 10,0,"4 .1.8., 10"5"12 20"6"". Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pfin PSF)- Defl/CSI Criteria A Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl L/# Loc R / U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf NA 'Ce: NA VERT(LL): 0.108 B 999 240 A 963 / - /801 / - /88 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.373 B 616 180 E 860 / - /713 BCDL: 10.00 Risk Category: 11 Snow Duration: NA HORZ(LL): 0.022 F - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(rL): 0.075 F A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor: 2.0 - E Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.484 Bearing A is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.660 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.247 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3-00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. ' Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 0 -2021 C - D 0 -1705 Wind Duration: 1.33 WAVE' VIEW Ver. 13.02.06.0219.19 B - C 0 -1698 D - E 0 -2266 Lumber i Top chord 2x4 DF -L #1 &Bet.(g) r Maximum Bot Chord Forces Per Pty (Ibs) Bot chord 2x4 DF -L #1&Bet.(g) , Chords Tens.Comp. Chords Tens. Comp. Webs 2x4 DF -L Standard(g) + ' ' ' :Lt Wedge 2x4 DF -L Standard(g): A - F 1916 0 F - E 2159 0 Plating Notes Maximum Web Forces Per Ply (Ibs) Connectors in green lumber (g) designed using Webs Tens.Comp. Webs Tens. Comp. NDS/TPI reduction factors. B - F 116 -321 F - 0 97 564 Purlins C - F 490 0 In lieu of structural panels or rigid ceiling use purlins } to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.00 20.38 Apply purlins to any chords above or below fillers OQRaEESSIQN� at 24" OC unless shown otherwise above. Hangers / Ties Q s Hanger support required, by others. X020 Loading Bottom chord checked for 10.00 psf non -concurrent live load. ff Cl'W_ Wind qT� OCA OF CA1�\F Fbitall1,2015tl Member design based on both MWFRS and C&C. kP 1b Left cantilever is exposed to wind 09-30-20 ` "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricatin , handlin shipping, installing and bracing. , Refer to and follow the latest edition of BCSI (Building omponent S fety Information, b TPI an� SBCA) fo'r safety practices prior to performing these functions. Installers shall provide tempora bracingbracin per B SI. Unless noted oY�herwise,top chord shall have roperlY attached sfcturdl sheathing and bottom fiord *Mall have a props y attach �tl rigid ceilingg Locations shown for permanent lateral re�traint of webs shall have bracing installed per BCSI sections B3, B7 or 810, as applicable. Ap 7y plates to each face of truss and position as shown above and on the JoinfDetails, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildi_n_gct Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSIlTP1 1, gr for handling shipping, installation and bracing of trusses. A seal on this drawing or cover pacts listin4this drawin indicates acceptance of proTessfonaf englneerin responsibility solety for the desi n shown. The surta6iifty anti use of ini drawing for any structure is the responsibility of the Bui ding Designer per ANSUTPI igSec.2. For more information see thisJob's general notes page and these web sites: ITWBCG: www.itwb .com: TPI: www.lpinst.or% SBCA: www.sbdndu .00m& ICC: www.iocsafe.org V T440 Ply: 1 SEQN: 251128 / T98 / CHIP TOMEI RESIDENCE TOMEI RESIDENCE Qty: 2 FROM: SGH DRW N HIP H8 Wgt: 102.2 lbs .. / ... 02/10/15 16' 4'9"15 2'1"5 4'3"4 1'11119 4'915 4'9"15 6-11 "4 11'2"8 113'2"1 1 18' Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 17.37 ft Soffit: 2.00 TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 It GCpi: 0.00 Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1 &Bet.(g) :T2 2x6 DF -L #2(g): Bot chord 2x4 DF -L #1&Bet.(g) Webs 2x4 DF -L Standard(g) :Lt Slider 2x4 DF -L #1 &Bet.(g): BLOCK LENGTH = 2.333' :Rt Slider 2x4 DF -L #1&Bet.(g): BLOCK LENGTH = 2.333' Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Loading Bottom chord checked for 10.00 psf non -concurrent live load. #1 hip supports 7-10-15 jacks. Jacks are BC supported. Corner sets are conventionally framed. Extend sloping top chord of truss and jacks to hip rafter. Support extensions every 2.00 ft to flat TC. Spacing of supports originates from #1 hip. Attach 2x4 lateral bracing to flat TC @ 32" OC with 2-16d Box or Gun nails(0.135"x3.5",min.) and diagonally brace per DWG. BRCALHIP1213. Support hip rafter with cripples at 2-9-15 OC. Purlins In lieu of structural panels use purlins to brace all flat TC @ 32" OC. Wind Member design based on both MWFRS and C&C. Snow Criteria (Pg,Pf in PSF) 4'11"11 7'1" L 1011"1 13'0"5 18' Pg: NA Ct NA CAT: NA 4'11"11 2'1"5 T 3'0"1 } 2'11"4 + 4'1111 Pf: NA Ce: NA 12 A 1723 / - /666 / - /69 /5.5 Lu: NA Cs: NA 3 D C T2 :r_4X10X10 E =8T /5.5 Snow Duration: NA B Wind reactions based on C&C F ; 3X4 3X5 v A Min Brg Width Req = 1.5 G =3X5 N =3X6(C6) H Min Brg Width Req = 1.5 =3X6(C6) Bldg Code: CBC 2013 Res 2X4(C6)ri Bearings A & H are a rigid surface. =2X4(C6) TPI Std: 2007 F14 Rep Factors Used: No Max Web CSI: 0.332 Maximum Top Chord Forces Per Ply (Ibs) FT/RT: 20.0%(0.0%)/0(0) 1112X4 -3X7 -3Xd 1112XA 16' 4'9"15 2'1"5 4'3"4 1'11119 4'915 4'9"15 6-11 "4 11'2"8 113'2"1 1 18' Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 17.37 ft Soffit: 2.00 TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 It GCpi: 0.00 Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1 &Bet.(g) :T2 2x6 DF -L #2(g): Bot chord 2x4 DF -L #1&Bet.(g) Webs 2x4 DF -L Standard(g) :Lt Slider 2x4 DF -L #1 &Bet.(g): BLOCK LENGTH = 2.333' :Rt Slider 2x4 DF -L #1&Bet.(g): BLOCK LENGTH = 2.333' Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Loading Bottom chord checked for 10.00 psf non -concurrent live load. #1 hip supports 7-10-15 jacks. Jacks are BC supported. Corner sets are conventionally framed. Extend sloping top chord of truss and jacks to hip rafter. Support extensions every 2.00 ft to flat TC. Spacing of supports originates from #1 hip. Attach 2x4 lateral bracing to flat TC @ 32" OC with 2-16d Box or Gun nails(0.135"x3.5",min.) and diagonally brace per DWG. BRCALHIP1213. Support hip rafter with cripples at 2-9-15 OC. Purlins In lieu of structural panels use purlins to brace all flat TC @ 32" OC. Wind Member design based on both MWFRS and C&C. Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (lbs) Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl L/# Loc R IU / Rw / Rh / RL /W Pf: NA Ce: NA VERT(LL): 0.122 E 999 240 A 1723 / - /666 / - /69 /5.5 Lu: NA Cs: NA VERT(TL): 0.439 E 424 180 H 1725 / - /666 / - / - /5.5 Snow Duration: NA HORZ(LL): 0.032 1 - - Wind reactions based on C&C HORZ(TL): 0.117 1 A Min Brg Width Req = 1.5 Code / Misc Criteria Creep Factor. 2.0 H Min Brg Width Req = 1.5 Bldg Code: CBC 2013 Res Max TC CSI: 0.747 Bearings A & H are a rigid surface. TPI Std: 2007 Max BC CSI: 0.853 Rep Factors Used: No Max Web CSI: 0.332 Maximum Top Chord Forces Per Ply (Ibs) FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. Plate Type(s): D- E 0 -4092 E- F 0 -4329 WAVE VIEW Ver: 13.02.06.0219.19 A - B 0 -1045 F - G 0 -3774 Additional Notes B- C 0 -3812 G- H 0 -925 Building designer is responsible for conventional C - D 0 -4211 framing. Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A- L 3624 0 J-1 3592 0 L- K 3635 0 I- H 3583 0 K - J 4277 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - B 16 -2924 E - J 149 -165 L -C 43 -126 J - F 816 -63 C -K 566 -81 F -I 39 -113 K -D 210 0 G -H 16 -2954 K - E 133 -220 Left and right cantilevers are exposed to wind,.i a F'rP 09-30'9-0\b "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses re ire extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component S felly Information, by TPI an c7 SBCA) r safety practices prior to performing these functions. Installers shall pprovide tempora bracing per BG�St. Unless noted 0 herwise,top chord shall have properly attached structural sheathin aril bottom hord slSall have a properyrly attach ri id ceiling Locations shown for permanent lateral restraint bf webs shall have bracingQ ins �alled per BC I sections B3, B7 or B10, as applicable. Apply plates to each face oftrussand position as shown above and on the Join Details, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildingq Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, or for hapoling shipping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing Indicates acceptance of proTesstonar engineering responsibility sole) for the desiggn shown. The suiTa6ility an71 use of this' drawing for any structure s the responsibil-rty of the Building Designer per ANSI/TPI TSec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: www.itwbco.com: TPI: www.toinst.om: SBCA: www.sbdndushv.mm• ICC www.ic sof nm T440 TOMEI RESIDENCE TOMEI RESIDENCE N1 COMN v co (V =2X4(CE F14 5'0"8 5'0"8 12 3 p Pty: 1 SEAN: 251132 / T99 / Qty: 2 FROM: SGH Will: 78.4 Ibs 9' 12'11 "8 3'11 "8 3'11 "8 D=4X4 DRW: 18' 5'0"8 02/10/15 - 16' (4(C6) 9. 9 9' 18' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defi/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl L/# Loc R / U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.048 H 999 240 A 802 / - /672 / - /78 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.167 H 999 180 G 802 / - /672 / - / - /5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.013 H - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.045 H A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 17.51 it Code / Misc Criteria Creep Factor. 2.0 G Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.179 Bearings A & G are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.426 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.513 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 it FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 0 -409 D - E 0 -1296 Wind Duration: 1.33 WAVE VIEW Ver: 13.02.06.0219.19 B - C 0 -1533 E - F 0 -1533 Lumber C- D 0 -1296 F- G 0 -409 Top chord 2x4 DF -L #1&Bet.(g) , Bot chord 2x4 DF -L #1&Bet.(g) Maximum Bot Chord Forces Per Ply (Ibs) Webs 2x4 DF -L Standard(g) Chords Tens.Comp. Chords Tens. Comp. :Lt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' A - H 1466 0 H - G 1466 0 :Rt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' - Maximum Web Forces Per Ply (Ibs) Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using NDS/TPI reduction factors. A - B 95 -1338 H - E 116 260 C - H 115 -259 F - G 95 -1338 Purlins D - H 347 0 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.00 18.00 Apply purlins to any chords above or below fillers t QE ESS�Q at 24" OC unless shown otherwise above. Nq OQR Loading Bottom chord checked for 10.00 psf non -concurrent ~ live load. " i2� s co2a7 0 Wind Member design based on both MWFRS and C&C: r Left and right cantilevers are exposed to wind C,'V`� ��� igitally sealed OF CALF Feb. 11, 2015 .09- 09-30-2016 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI an � SBCA) r safety practices prior to performing these functions. Installers shall provide terhporary bracing Per BCSI.. Unless noted oiherwise,top chord shall have groper)y attached sructural sheathing and bottom chord ghall have a proAefly attached rigpid ceilingg Locations shown for permanent lateral re tralnt Of webs shall have bracing ins all ed per BCSI sections B3, B7 or B10, as applicable. Appply Tates to each face of truss and position as shown above and on the Joinf Details, unless noted otherwise. {defer to drawings 160A-7 fbr standard plate positions. ITW Buildiqncl Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, gr for handling, shippintq, installation and bracing of trusses. A seal on this drawing or cover page listin4thia drawing' Indicates acceptance of pro) essionar an nearing res�onslbllity solely for the design shown.. The suitaeility anal use of the drawing for any structure is the responsibl Ity of the Building Designer er ANSI/TPI inec.2. For more information see this lob's general notes page and these web sites: ITWBCG: www.i .com; TPI: www.tipinsLoncid SBCA: www.sbdndu :oom; ICC: www.iccsafe.o T440 Ply: 2 SEQN: 251134 / T100 / COM TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: P 2PLY GIRDER Wgt: 58.8 Itis.. / ... . 02/10/15 4'0"4 + 6' I 7'11"12 .1 12' 4'0"4 1'11"12 1'11"12 1 4'0"4 3 p 11 v -3X5(A1) 3"14 3'10"8 3'10"8 Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 17.13 ft Soffit: 2.00 TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft GCpi: 0.00 Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1&Bet.(g) Bot chord 2x6 DF -L #2(g) Webs 2x4 DF -L Standard(g) Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 5.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC- From 69 plf at 0.00 to 69 plf at 6.00 TC- From 69 plf at 6.00 to 69 plf at 12.00 BC- From 20 plf at 0.00 to 20 plf at 12.00 BC- 2250 Ib Conc. Load at 6.00 Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 1.00 11.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. C =4X4 3X4 B_ D ; 3X4 3X5(A1) H G F 1112X4 = 5X8 1112X4 101- 2'1 0' 2'1 "8 2'1 "8 1 3,10"8 6' 8-1 "8 112' Snow Criteria (Pg,Pf in PSF) Defl/CSl Criteria ♦ Maximum Reactions (lbs) Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W Pf: NA Ce: NA VERT(LL): 0.038 G 999 240 A 1660 / 138 / 151 / - /12 /5.5 Lu: NA Cs: NA VERT(TL): , 0.129 G 930 180 E 1660 / 138 /151 / - / - /5.5 Snow Duration: NA HORZ(LL): 0.007 F - - Wind reactions based on C&C HORZ(CL): 0.023 F A Min Brg Width Req = 1.5 Code / Misc Criteria Creep Factor. 2.0 E Min Brg Width Req = 1.5 Bldg Code: CBC 2013 Res Max TC CSI: 0.131 Bearings A & E are a rigid surface. TPI Std: 2007 Max BC CSI: 0.467 Rep Factors Used: No Max Web CSI: 0.403 Maximum Top Chord Forces Per Pty (Ibs) FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. Plate Type(s): A - B 110 -2027 C - D 101 -2343 WAVE VIEW Ver. 13.02.06.0219.19 B - C 101 -2343 D - E 110 -2027 Loading Bottom chord checked for 10.00 psf non -concurrent Maximum Bot Chord Forces Per Pty (lbs) live load. Chords Tens.Comp. Chords Tens. Comp. Wind A -H 1944 -91 G -F 1968 -94 H - G 1968 -94 F - E 1944 -91 Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind Maximum Web Forces Per Pty (itis) F�-P o�16 Webs Tens.Comp. Webs Tens. Comp. H - B 26 -209 G - D 373 -36 B - G 373 -36 D - F 26 -209 C -G 992 -16 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! -IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabricating, h and lin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building t S fety Information, bhTPI and SBCA) fo'r safety prapcticesr�prior to performing these functioans. Installers shall provide terhporpae id�ceilin9nl Locations shown fo�tpoerma^ent letehral reeStroa t df Webs shall haV braGna9th s�alled pettBCSI sect onsl 8387 oro610y e. Apply pplates to each face of truss and posdion as shown above and on the JomTDetails, unless noted otherwise. (2efer to 60A -Z for standard plate positions. rp Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance TPI 1, or for handling, shipping, installation and bracing Qf trusses. A seal on this drawing or coverpage Ilstin4this drawing' acceptance of pro7essionar engineering responsibility solely for the design shown. The surZa6illty an use of thi rr any structure s the responslbr rty of the Building Designer per ANSI/TPI gSec.2. e ---- - - - --- T440 Ply: 1 SEQN: 251141 / T1 01 / COM TOMEI RESIDENCE TOMEI RESIDENCE Qty: 6 FROM: SGH DRW: P1 MONO GIRDER Wgt: 29.4 lbs .. / ... 02/10/15 = 2X 12 3 r77:— rll ^W I 4'10"8 —� 5'10"8 5'10"8 ' T 1 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg, Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Loc R /U / Rw / Rh / RL 1W TCDL: 14.00 Speed: 110 mph . Pf: NA Ce: NA VERT(LL): 0.011 C 999' 240 A 629 /195 /'180 / - /158 /5.5 BOLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.042 C 999 180 C 423 /178 /116 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.004 C Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(fL): 0.016 C A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 17.12 ft Code l Misc Criteria Creep Factor. 2.0 C Min Brg Width Req = - Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSL 0.392 Bearing A is a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.339 Spacing: 48.0" MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.278 Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0°/x)/0(0) Mfg Specified Camber. Chords Tens.Comp. GCpi: 0.00 Plate Type(s): I A - B 33 -106 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Ply (Ibs) Top chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Bot chord 2x6 DF -L #2(g) A - C 32 17 Webs 2x4 DF -L Standard(g) Plating Notes Maximum Web Forces Per Ply (Ibs) Connectors in green lumber (g) designed using - / - Webs Tens.Comp. NDS/TPI reduction factors. B - C 188 -265 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in.oc) Start(ft) End(ft) TC 24 0.00 . 5.88 BC 59 1.00 5.88 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. ` �pf ESSI�N Hangers / Ties Hanger support required, by others. Loading Q �, Bottom chord checked for 10.00 psfnon-concurrent�Q28] 0 ' live load. Wind Member design based on both MWFRS and C&C:' J'J (,'w�\• t>�� Digitalry sealed Left cantilever is exposed to wind �Tf lJF CAL�!(O� Feb. 11, 2015 FkP 09-30-2P1%b . "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) handling, safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted 0 erwise,top chord shall have proper lyy attached structurdl sheathing and bottom fiord shall have a propetly attached rad ceiling Locations shown for permanent lateral restraint of webs shall have bracingg installed per BCSI sections B3, B7 or 810, as applicable. Apply plates to each face of truss and position as shown above and on the JoinfDetails, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildingg Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSIffP1 1, or for handling shippin , installation and bracin of truss s. A seal on this drawing or coverpa listing this drawing indicates acceptance of proTessionalq en%!neering responsibility solely for the desiggn shown. The sufta�Tty an, use of this drawing for any structure Is the responsitil ty of the Building Designer per ANSUTPI TSec.2. For more information see this'ob's general notes page and these web sites: ITWBM www.i .comw TPI: www.tpinsLomm SBCA: www.sbdndustry.comr ICC: www.iocsafe.org IT440 Ply: 1 SEQN: 251151 / T103 / GAB TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: RG GABLE Wgt: 78.4 lbs / ... 02/10/15 n 3'5" + 4'9" 6'1" + 7'5" 1 8'9" 1 10'1"+ 11 '5" 12'9"+ 14'1" 17'6" TY 1'4 1'4" 1'4" 1 1'4" 1 1'4" 1'4" 1'4" 1'4" + 35' 3 12 F =4X4 ^ �- 1' 1 16'6" i 3'5" 14" 1'4" 1'4" 1 1'4" 1 1'4" 1 1'4" 1 1'4" 1 1'4" 1 35" 35" 4'9" 6'1" 7'5 8'9" 1 10'1" 1 11'5" 1 12'9" 1 14'1" 1 17'6" Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 15.00 ft Soffit: 2.00 TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Max Web CSI: 0.025 C&C Dist a: 3.00 ft Mfg Specified Camber. GCpi: 0.00 E -F Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1&Bet(g) Bot chord 2x4 DF -L #1 &Bet.(g) Webs 2x4 DF -L Standard(g) Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. All plates are 2X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 17.50 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Bottom chord checked for 10.00 psf non -concurrent live load. Wind Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind . Additional Notes See DWGS At 1515ENC1002012, GBLLETIN0212, & GABRST100212 for more requirements. Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Pf: NA Ce: NA VERT(LL): 0.005 L 999 95 Lu: NA Cs: NA VERT(TL): 0.019 L 627 90 Snow Duration: NA HORZ(LL): -0.001 L - - 1380 HORZ(TL): -0.004 B C -D Code / Misc Criteria Creep Factor: 2.0 Bldg Code: CBC 2013 Res Max TC CSI: 0.121 TPI Std: 2007 Max BC CSI: 0.100 Rep Factors Used: No Max Web CSI: 0.025 FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Plate Type(s): E -F WAVE - VIEW Ver. 13.02.06.0219.19 ♦Maximum Reactions (Ibs), or •=PLF Loc R /U /Rw /Rh /RL /W U' 1555 / - /1292/- / 74 /186 Wind reactions based on C&C U Min Brg Width Req = - Bearing U is a rigid surface. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp A -B 145 -24 F -G 138 0 B -C 122 -3 G -H 1380 22 C -D 137 0 H-1 137 0 D -E 138 0 1-1 122 0 E -F 138 0 J - K 145 -18 Maximum Bot Chord Forces Per Ply (Ibs) 31 -224 Chords Tens.Comp. Chords Tens. Comp. „ A - T 52 -223 P-0 23 -125 T - S 22 -120 O - N 22 -123 S -R 22 -121 N -M 22 -121 R -Q 22 -123 M -L 22 -120 Q - P 23 -125 L - K 42 -223 F�-p 09-30'?-O'\ ��fo Maximum Gable Forces Per Pty (Ibs) Gables Tens.Comp. Gables Tens. Comp B -T 31 -224 O -G 14 -103 C -S 6 -45 N -H 14 -94 D -R 14 -94 M-1 6 -37 E -Q 14 -103 L -J 31 -224 F. -P 0 -139 '"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! —IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabricating, handling9 shipping, installing and bracing.. Refer to and follow the latest edition of BCSI (Building t Safety Information, by TPI and SBCA) fo) safety practices prior to pertormmg these functions. Installers shall provide temporary BCSI. Unless noted olherwise,top chord shall have grope,y attached structural sheathingg aand bottom chord shall have a proAeity id ceilingp Locations shown for Dernanent lateral restraint bf webs shall have bracingq ms7alled per BCSI sections B3, 67 or 810, e. Ap Ty lates to each face of truss and position as shown above and on the Join et unless noted otherwise. i2efer to 60A -Z for standard plate positions. i from this drawing,any failure to build the trussin conformance A seal on this drawing or cover pa4e� anti use of in, for the desi n shown. The suf it ANSI/TPI TSec.2. u T440 I I 1 Ply: 1 SEQN: 251145 / T102 / COM TOMEI RESIDENCE TOMEI RESIDENCE Qty: 9 FROM: SGH DRW: R COMN Wgt: 75.6 lbs . / ... 02/10/15 4'11" 8'9" - 127" 17'6" r' 4'11" + 310" 3-10" '} 4'11° '1 12 3 C= 4X4 N 2X4 B D - 2X4 N 1113X7 1113X7 3X4(A1) A E =3X4(A1) F1_4 Li =3X7 F 1' 166" 1' 1,8„ 7,1,, 7-1, 1.8" 1.8.. 8,9„ 15'10, 17'6" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (lbs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R / U / Rw / Rh / RL /W TCDL: 14.00_ . Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.072 F 999 240 A 780 / - /646 / - /74 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(fL): 0.249 F 724 '180 E 780 / - /646 / - ! - / 5.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.016 F - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.055 F A Min Brg Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor. 2.0 E Min Brg Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.263 Bearings A & E are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.331 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.123 Maximum Top Chord Forces Per Pty (lbs) C&C Dist a: 3.00 It FT/RT: 20.0%(0.0%)/0(0) - Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): A - B 0 -1436 C - D 0 -1231 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 B - C 0 -1231 D - E 0 -1436 Lumber Top chord 2x4 DF -L #1 &Bet.(g) Maximum Bot Chord Forces Per Pty (Ibs) Bot chord 2x4 DF -L #1&Bet(g) Chords Tens.Comp. Chords Tens. Comp. Webs 2x4 DF -L Standard(g) :Lt Wedge 2x4 DF -L Standard(g): • ° A - F 1356 , 0 F - E 1356 0 :Rt Wedge 2x4 DF -L Standard(g): + Maximum Web Forces Per Ply (lbs) Plating Notes Webs Tens.Comp. Webs Tens. Comp. Connectors in green lumber (g) designed using B - F 94 -213 F - D 95 215 NDS!TPI reduction factors. - C - F 302 0 Purlins In lieu of structural panels or rigid ceiling use purlins , to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) z - BC 120 0.00 17.50 Apply purlins to any chords above or below fillers r at 24" OC unless shown otherwise above.. „ Q�Qf ESS/0 Loading Bottom chord checked for 10.00 psf non -concurrent live load. _ trVA Wind C�2� Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind J'lgT CIVIL" � e itally e sd y ' f OF CA1�ti F�'f. 09-30-20�� "WARNING" READ AND FOLLOW ALL NOTES ON THIS —IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS It as shown above and on THE INSTALLERS ' id follow the latest edition of BCSI(Building inctions. Installers shall provide terhporary iinp and twttom ghord shall have a progeny Installed per BC51 sections B3, B7 or 910, )etails, unless noted otherwise. refer to no. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance ;hipping, installation and bracing of truss s. A seal on this drawing or cover pale IisUnctthis drawing :sronaT engineering responsibility sol7ely for the design shown. The suitatjility an use of thil, responsibl of the Building Designer per ANSI/TPI TSec.2. notes page and these web sites: ITWBCG: www.iW0cg.com; TPI: www.tpinst.orgo SBCA: www.sbcindustry.com• ICC: www.iccsafe I if T440 Ply: 1 SEAN: 251153 / T104 / COM TOMEI RESIDENCE TOMEI RESIDENCE Qty: 4 FROM: SGH DRW: S COMN Wgt: 44.8 lbs / ... 02/10/15 691 13'6" 6,9,. 6,9„ '1 12 - 3 l� B= 5X5 N=2X4(A1) F =2XA/A 3" 41 11124 V 1' 11'6" 1, 6'9" 6'9" 6'9". 136" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.070 B 999 240, E 603 / 127 / 170 / - /11 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.240 B 552 180 F 603 / 127 /170 ! - / - /5.5 . BCDL: 10.00 Risk Category: 11 Snow Duration: NA HORZ(LL): 0.006 D - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.022 D- - E Min Brg Width Req = 1.5 NCBCLL: 10.00: Mean Height: 15.00 ft Code / Misc Criteria Creep Factor. 2.0 F Min Brg Width Req = 1.5 Soffit: 2.00 - TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSL 0.343 Bearings E & F are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.636 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.050. Maximum Top Chord Forces Per Ply (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): , A - B 162 -870 B - C 162 -870 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Pty (Ibs) Top chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF -L #1 &Bet.(g) Webs 2x4 DF -L Standard(g) A - D 1581 -205 D - C 1581 205 Plating Notes Maximum Web Forces Per Ply (Ibs) Connectors in green lumber (g) designed using Webs Tens.Comp. NDS/TPI reduction factors. B - D 131 95 Purlins In lieu of structural panels or rigid ceiling use purlins r ' to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) • . _. BC 120 0.00 13.50 . Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading N Bottom chord checked for 10.00 psf non -concurrent live load. OQROEEJS Wind VA d Member design based on both MWFRS and C&C. ' ��qo Left and right cantilevers are exposed to wind OF CAOP F b't 11� seal01ed 1 0^1 -09-30 "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating handlingshipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI anc7'SBCA) y to safety practices prior performing these functions. Installers shall provide temporary bracingg er BCSI. Unless noted otherwise,top chord shall have proper lyy attached structural sheathing and bottopm hord ghall have a propedy attache rigid ceiling Locations shown for rmanent lateral restraint of webs shall have bracingg installed per eCS�I sections B3, B7 or 610, as applicable. Apply plates to each face oftrussand position as shown above and on the Join Details, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. - ITW Buildi�n�4g Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance ANSIlTP1 1, for hafidlinn with r shi ping, installation and bracing of trusses. A seal on this drawing or cover ppag4e listing this drawing Indicates acceptance of pro�essYponalq enclineering responsibility sole) for the design shown. The suiTa6illty ants use of this' drawing for any structure is the responsibe-rty of the Building Designer Der ANSI/TPI TSec.2. For more information see this'ob•s general notes page and these web sites: ITNBCG: www.i .com• TPI: www.tPinst.om SBCA: www.sbandu .comE ICC: www.iocsafe.org IN T440 Ply: 1 SEAN: 251160 / T106 / GAB TOMEI RESIDENCE TOMEI RESIDENCE Qty: 1 FROM: SGH DRW: TG GABLE Wgt: 61.6 Ibs / ... 02/10/15 3' 1 1'4" 1 1,4" 1'4" 1-4" i 9 4" 1'4" 'f 3' i T N=2X4(A1Y 1 3"14 3 p E=4X4 �1 } P •O N ML K J 13 3' 1-4" 1'4" 1'4" 1,4" 1'4" 1-4" 3' 3' 4'4" 5'8" 7' 8'4" 9'8" 11' 14' Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or.=PLF TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Loc R /U / Rw / Rh / RL /W Q' 1244 / 203 / 353 / - /11 /144 Wind reactions based on C&C TCDL: 14.00 BCLL: 0.00 Speed: 110 mph Enclosure: Open Clear Pf: NA Ce: NA Lu: NA Cs: NA VERT(LL): 0.004 J 999 95 VERT(TL): 0.016P P 740 90 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.001 J - - Q Min Brg Width Req = - Des Ld: 44.00 EXP: C HORZ(TL): -0.003 B Bearing Q is a rigid surface. Code / Misc Criteria NCBCLL: 10.00 Mean Height: 15.00 it Creep Factor. 2.0 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.117 Maximum Top Chord Forces Per Ply (Ibs) Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.089 Chords Tens.Comp. Chords Tens. Comp. Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 It GCpi: 0.00 Rep Factors Used: No FT/RT: 20.0%(0.0%)/0(0) Plate Type(s): Max Web CSI: 0.042 Mfg Specified Camber. A-13 145 -50 E - F 141 0 B - C 130 -27 F - G 142 -14 C - D 142 -14 G - H 130 -77 VIEW Ver. 13.02.06.0219.19 Wind Duration: 1.33 WAVE D - E 141 0 H-1 145 -50 Lumber Top chord 2x4 DF -L #1 &Bet.(g) Bot chord 2x4 DF -L #1&Bet(g) Webs 2x4 DF -L Standard(g) Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. All plates are 2X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 14.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Bottom chord checked for 10.00 psf non -concurrent live load. Wind Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind Additional Notes See DWGS Al 1515ENC1002012, GBLLETIN0212, & GABRST100212 for more requirements. Maximum Bot Chord Forces Per Ply (Ibs) Gables Chords Tens.Comp. Chords Tens. Comp. A - P 109 -231 M - L 60 -128 P -O 59 -124 L -K 59 -126 O -N 59 -126 K -J 59 -124 N -M 60 -128 J-1 109 -231 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. B -P 109 -197 L - F 65 -106 C-0 37 -57 K - G 37 -48 D -N 65 -106 J -H 109 -198 E -M 26 -140 0�b \ "WARNING— READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building t Safety Information, by TPI anr7 SBCA) to) safety practices prior to performing these functions. Installers shall provide temporary BCSI. Unless noted 0 he-._ top chord shall have properlyy attached structural sheathing and bottom chord shall have a properryly ilid ceiling Locations shown for permanent lateral restraint Of webs shall have bracingg installed per BCSI sections B3, B7 or 810, e. Apply plates to each face, of truss and position as shown above and on the JoinTDetails, unless noted otherwise. kefer to 60A -Z for standard plate positions. iqQ Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance fP1 1, or for handl!n shipping, installation and bracing of trusses. A seal on this drawing or cover pa 44e IisUng this drawingg'' accepacceptance of pro) essional en3Ineering responsibility solely for the design shown. The suitability ants use of tha tance structure is the responsibl-ity of the Budding Designer Fier ANSIITPI 9Sec.2. I T440 Pty: 1 SEQN: 251167 / T105 / COM TOMEI RESIDENCE TOMEI RESIDENCE Qty: 3 FROM: SGH DRW: T STUB COMN Wgt: 49.0 lbs / ... 02/10/15 I 7' 13' I 7, 6,12 1 3 B =4X4 T. P IA=3X4(B2) 1113VC_B2 2X4(A1) T ) X14 11124 1' 12' Loading Criteria (par) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (lbs) TCLL: 20.00 Wind Std: ASCE 7-10 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Loc R /U / Rw / Rh / RL /W TCDL: 14.00 Speed: 110 mph Pf: NA Ce: NA VERT(LL): 0.028 D 999 240 A 636 / 134 /181 / - /14 /5.5 BCLL: 0.00 Enclosure: Open Clear Lu: NA Cs: NA VERT(TL): 0.097 D 999 180 C 522 / 118 /147 / - / - 16.5 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.006 D - - Wind reactions based on C&C Des Ld: 44.00 EXP: C HORZ(TL): 0.019 D A Min Big Width Req = 1.5 NCBCLL: 10.00 Mean Height: 15.00 ft Code / Misc Criteria Creep Factor. 2.0 C Min Big Width Req = 1.5 Soffit: 2.00 TCDL: 8.4 psf Bldg Code: CBC 2013 Res Max TC CSI: 0.228 Bearings A & C are a rigid surface. Load Duration: 1.25 BCDL: 6.0 psf TPI Std: 2007 Max BC CSI: 0.243 Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 Rep Factors Used: No Max Web CSI: 0.085 Maximum Top Chord Forces Per Pty (Ibs) C&C Dist a: 3.00 ft FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.00 Plate Type(s): I A-13 215 -1001 B - C 223 -1001 Wind Duration: 1.33 WAVE VIEW Ver. 13.02.06.0219.19 Lumber Maximum Bot Chord Forces Per Ply (lbs) Top chord 2x4 DF -L #1&Bet.(g) Chords Tens.Comp. Chords Tens. Comp. Bot chord 2x4 DF -L #1 &BeL(g) A - D 935 -163 D - C 935 163 Webs 2x4 DF -L Standard(g) :Lt Wedge 2x4 DF -L Standard(g): :Rt Wedge 2x4 DF -L Standard(g): Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. Plating Notes ' Connectors in green lumber (g) designed using B - D 208 0 NDS/TPI reduction factors. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(inoc) Startift) End(ft) R�EE$S/pN BC 120 0.00 12.96 Apply purlins to any chords above or below fillers �Q A at 24" OC unless shown otherwise above. C. ON M Loading IM Bottom chord checked for 10.00 psf non -concurrent 1 ago live load. Wind * dt Member design based on both MWFRS and C&C. 'vt A ' Left cantilever is exposed to wind q �`� p�bt 1111.2015d _ IFOF CA1�F� F�"A 09-30-2016 "WARNING— READ AND FOLLOW ALL NOTES ON THIS DRAWING! —IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handlingshipping, installing and bracing.. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI an c7 SBCA) r safety practices prior to performing these functions. Installers shall provide temporary bracin r SCSI. Unless noted olherwise,top chord shall have proper tyry attached structurdl sheathing and bottom chord shall have a proAeriy attach rigid ceiling Locations shown for Dennanent lateral restraint df webs shall have bracing installed per BCSI sections B3, B7 or p10, as applicable. Apply plates to each face of truss and position as shown above and on the Join9Details, unless noted otherwise. kefer to drawings 160A -Z for standard plate positions. ITW Buildin__qq Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build the truss in conformance with ANSI/TP1 1, r for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover npge listing� this drawn i, acceptance of pro essiona engineering responsibility solei for the design shown. The surTa6ility an use of th' drawing for any structure is the responsibility of the Building Designer ler ANSI/TPI 9Sec.2. For more information see this'ob's general notes page and these web sites: ITWBCG: wwwAwbeii.com TPI: www. insl.o � SBCA www.sbcindu .com: ICC: www.iocWe.org • 41 T440 TOMEI RESIDENCE TOMEI RESIDENCE V HIP H6 9) 2X4(C6) 1 3 5'5" 5'5" 3 p Ply: 1 SEQN: 251172 / T107 /CHIP Qty: 2 FROM: SGH DRW Wgt:64.4lbs / ... 14' 2'81 5'10"15 c'IY7 C D�RYQ 02/10/15 1' 12' 1 L 5'5" r 5'5" Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-10 TCDL: 14.00 Speed: 110 mph BCLL: 0.00 Enclosure: Open Clear BCDL: 10.00 Risk Category: II Des Ld: 44.00 EXP: C NCBCLL: 10.00 Mean Height: 17.12 it Soffit: 2.00 • TCDL: 8.4 psf Load Duration: 1.25 BCDL: 6.0 psf Spacing: 24.0 " MWFRS Parallel Dist: 0 to h/2 CBC Dist a: 3.00 it GCpi: 0.00 Wind Duration: 1.33 Lumber Top chord 2x4 DF -L #1 &Bet.(g) Bot chord 2x4 DF -L #1&Bet(g) Webs 2x4 DF -L Standard(g) :Lt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' :Rt Slider 2x4 DF -L Standard(g): BLOCK LENGTH = 2.333' Plating Notes Connectors in green lumber (g) designed using NDS/TPI reduction factors. Loading Bottom chord checked for 10.00 psf non -concurrent live load. #1 hip supports 5-10-15 jacks. Jacks are BC supported. Corner sets are conventionally framed. Extend sloping top chord of truss and jacks to hip rafter. Support extensions every 2.00 ft to flat TC. Spacing of supports originates from #1 hip. Attach 2x4 lateral bracing to flat TC @ 32" OC with 2-16d Box or Gun nails(0.135"x3.5",min.) and diagonally brace per DWG. BRCALHIP1213. Support hip rafter with cripples at 2-9-15 OC. Purlins In lieu of structural panels use purlins to brace all flat TC @ 32" OC. Wind Member design based on both MWFRS and C&C. Left and right cantilevers are exposed to wind - Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: Ni Pf. NA Ce: NA Lu: NA Cs: NA Snow Duration: NA 3'3"12 8'8"12 Defl/CSI Criteria PP Deflection in loc Udefl L/# VERT(LL): 0.069 D 999 240 VERT(TL): 0.245 D 566 180 HORZ(LL): 0.018 E - - HORZ(TL): 0.069 E - - Code / Misc Criteria Creep Factor: 2.0 Bldg Code: CBC 2013 Res Max TC CSI: 0.523 TPI Std: 2007 Max BC CSI: 0.612 Rep Factors Used: No Max Web CSI: 0.656 FT/RT: 20.0%(0.0%)/0(0) Mfg Specified Camber: Plate Type(s): WAVE VIEW Ver. 13.02.06.0219.19 Additional Notes - Building designer is responsible for conventional framing. X4(C6) 5'3"4 14' ♦ Maximum Reactions (Ibs) Loc R /U /Rw /Rh /RL /W A 1107 /131 /174 /- /12 /5.5 F 1110 /131 /174 !- /- /5.5 Wind reactions based on CBC A Min Big Width Req = 1.5 F Min Brg Width Req = 1.5 Bearings A & F are a rigid surface. Maximum Top Chord Forces Per Pty (Ibs) Chords Tens.Comp. Chords Tens. Comp C - D 219 -2238 D - E 202 -2401 A- B 0 -650 E- F 0 -751 B - C 203 -2336 Maximum Bot Chord Forces Per Pty (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - H 2450 -151 G - F 2304 -150 H - G 2293 -154 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A -B 331 -1829 D -G 136 0 H - D 49 -84 E - F 329 -1750 Ftp 09\(o "WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS quire extreme care in fabncatin!handn, shipping, installS fety Informationb TIanSBCA) to)fetypracticesBSnlessnoted oherwisetop chord shallhave propeid celingLocationss own fopemtanent lateral restraint f webs shall have bracing9 installed per BCSI sections B3, 87 or 8810, e. Apply plates to each face of truss and position as shown above and on the JoinTDetails, unless noted otherwise. Refer to 60A -Z for standard plate positions. r�pComponents Group Inc. shall not be responsible for an deviation from this drawing,any failure to build the truss in conformance fP1 1, or for handling, shipping, installation and bracing Q trusses. A seal on this drawing or cover ale listin4this drawing' acceptance of pro essiona engineering respons tooility sole) for the design shown. The suiPtagMY anal use o thrs it any structure is the responsibl-tty of the Building Designer ger ANSI/TPI 9Sec.2. L Earth. Systems �,. Southwest 79-811 ii Cuunlry Club Drive liernwda Dunes, CA 92201 (760) 345-1588 (800)924-7015 FAX (760) 345-7315 August 28, 2002 171 le No.: 07117-11 01-07-718 NRI-LQ.LP, L.L.C. c/o Country Club of the Desert_ P.O. Box 1,5=10 La Quinta, California 92253 Attention: Mr, Jolulny Potts Project: Country Club of the.Desert La Quinta, California Subject: Reportof Testing and Observations Performed During Rough Grading Reference: 1. Geotechnical Engineering Report, prepared by Earth Systems Consultants Southwest, dated September 22, 2000, Report No.: 00-09-772. 2. Interinl.Repol t of Testing and Observation for the Maintenance area, prepared by Earth Systeins' Southwest, dated January 25, 2001 Report No.: 01-01-746. 3. Interim Report of Testing and Observation for the Clubhouse area, prepared by .Earth Systems Southwest, dated June 6, 2001, .Report No:A1-06-713. , Submitted herewith is a report of testing' and intermittent observations performed during the grading on the above referenced project. Grading operations were performed by Nuevo Engineering Using COI]Ventiollail heavy equipment. Testing was per.fonned as per authorization of Mr. Johnny Potts. Test results are presented on (he 'attached test report sheet with their estimated locations plotted on the accompanying plan. Compaction tests were performed in accordance with ASTM D 2922- 8l , Method A or B, _and AS: N4 D 3017-88 Nuclear Density Test Procedures. Maximum Density-Optinlurrl Moisture were determined in the .laboratory in accordance with ASTM D 1557-91, Method.A or C. , ':fest results are as follows: Soil Description ° USCS " MaxinlunrDensity I Optimum Moisture Gray brown silty Sand, SP -SM 105.5 pcf 15.50 fine grained Gray brown silty Sand, SM .106.0 pcf 15.5% fine grained a i August 2S. He No.: 071 17-1 1 01-07-718 Soil Descrimion LJSCS Maxinlum Density Gptinlrml lmolsture Brown silty Sand, tine SM 120.0 pcf 11.00/4) to'nledllllll `'ramcd Brown Saliva, fine to SP-S.M 12].0 pcf 10.01if, mcdlunl 4.11'allled with silt Jumps Gray brown sandy Silt. NIL 108.0 pcf 17.0°% w/ silt lenses Brown silty Sand, SP, -SM, 109.0 pcf 12 01A line grained Brown sandy Silt ML 109.0 pcf 18.0% Brown sand, line to SP=SM 7 11.0 pcf 12.5°/� medium grained Brown silty Sand, fine SM 112:0 pcf 14.5% grained w/silt layer " Dark yellow brown silty SM 114.5 pcf I2.5'Yo Sand, fine grainer] DISCUSSION: 1. The project .is located oil- the south side of Avenue 52 between Jefferson Street and Madison Street in.the City o.fLa Quinta, California. 2. .Prior to grading, the site consisted of a mixture of undeveloped land, agricultural land and ranches. 3. The .proposed development will consist of one eighteen -hole golf course, one nine -hole golf course, and approximately GOO homes of wood frame and stucco construction., 4. The scope of our work was based on the referenced geotechnical engineering report, and plans and staking by others. S. The site was cleared of any p.re-existing vegetation and prewatered prior to grading operations. - G. The building pails were over -excavated to a depth o.f 2.5 feet below existing grade or 2 feet below bottom of footings, whichever was greater, and to a distance of 5 feet beyond the perimeter footings., The exposed surface was processed by scarification, moisture conditioning and recompaction. 7. The wall grade areas were over -excavated. toa depth of 2.5 feet below existing grade or 2 feet below bottom -of footings; whichever was greater, and to a distance of 3 feet beyond EARTH SYSTEMS SOUTHWEST. e August 28'2002 3 1-ile No.: 071 17-I 1 01-07-718 S. 9. l 0. ll. 12. 13. 14. 15. 16. 17. is. 19. 20. 21: 21 . 23. the perimeter .foonnos. The exposed surfrce was processed by scari.licatiorr. 1110isture conditioning and recompaction. .In areas where the bottoms of the oyer -excavations were unstable due to high moisture cotnent, the bottorims Nvere either _excavated_ to 7 feet below pad grade or to 'a depth where stable soils we.re.encountered. The wall grade area along, Avenue 52 .upas not over -excavated due to the existing IlTigation'line_ This area Was pre -watered and compacted from the existing'gradc. Fill materials consisting ole previously removed soils as well as otlier on-site soils were placed in relatively'thin lilts and compacted into place Debris, roots, and large pieces of concrete Were 'either placed in large golf course fills or were exported from the site. During grading .operations, concrete irrigation lines were either removed or crushedin place, andplastic irrigation lines were removed from all structural areas. Avenue 53 was pulverized between Jefferson Street and Madison. Street. The grindings were placed in deep fills in parking lot and street areas. During grading a contaminated trash pit was encountered in the back yards of Lots 273 and 274, and into the.golf course. During cleanup of the pit, iwo abandoned wells were 'found. The wells were cut to approximately l0 feet below pad and recapped. Lots 222 thru 236 were left approximately 6 to S feet low, except for the backyards which were brought to grade to build the golf course.. A total of 2145 compaction tests were performed. Test results indicate that after reworking areas of low density and/or low moisture a minimum of 90% of maxinnim dry density, and moisture near optimum has-been obtained in the areas tested. The test locations are approximate and were determined by pacing and sighting from prominent field .features. . In our work, we' have relied on ..topographic and survey information provided by others.' Bearing values given in the referenced report remain applicable. The foundation designs criteria as outlined in the referenced report still apply. Please refer,to the reference Geotech.mcai 1✓ngineering.Report .for a:urther inforniation. Based upon fulltirile` observations and testing. during the grading operations, from December 11, 2000 through June 7, 2001 on this project, it is our opinion that the grading has met the intent of the recommendations of the referenced Geoteclinical Engineering Report, as well as the grading ordinances of the City of La Quinta, .Californ.ia. ALIOUst ?S, 2002 4 _ File .No.: 07117-11 01-07-718 24. As used herein. the _ tont " observation" implies only'Ahat we observed :the progress of work we agreed to be involved with, and performed test on which together we based our opinion as to whether the %v rk essentially complies with job requirements. 25. With any manufactured prOduct, there are statistical variations in its uni.formity and in tile' accuracy of tests used to measureits quality. As compared with other manufactured. products, field construction usually presents lame statistical variations in Its 'Uni- Ornllty and accuracy of test results used to measure its quality. Thus, even with very careful observation and testing, it cmulot be said that all parts of the product comply with the job requirements and the degree of certainly is greater Nvith full-time observation than it is with intennittent observations and testing. Therefore, oiir opinion based oil observing and testing the work means that there 'is only,a statistically-based, reasonable certainty that the work essentially complies with the job requirements. 26. We make no warranty, express or implied, except. that our services were performed in accordance with engineering principles generally accepted at this time and location. 27. It is recommended thatEarth Systems Southwest (ESSW) be provided the opportunity .for •a general review .of any changes to the findl design and/or location of the proposed structures in order that earthwork .and foundation recommendations may be properly interpreted. If ESSW is not accorded the privilege of making this recommended review,' we can assume no responsibi lity, for misinterpretation of our recommendations. 28. This report is issued with the understanding that it is the responsibility of the owner, or of his representative; to insure.that.the information and recommendations contained herein are called to the attention of the architect and engineers for the project and are incorporated into the plans' and- specifications for the project. It is also the owners. responsibility, or his representative, to ensure that the necessary'steps are taken to see that . the general contractor and all subcontractors carry out such recommendations. in the field. It is further. understood that the owner or his representative is responsible for submittal of this report to the,appropriate governing agencies. If there are any questions concerning this report, please do not hesitate' to contact this office. Respectfully submitted, EARTH SYSTEMS SOUTIMES'T Reviewed by, Steven Clanton Shelton L. Stringer Field Technician GE 2266 Grading/sc/csh/dac vv OF E SSlpN Distribution: 4/NRI-LQLP; L.L.C. c/o Country Club of the Desert 1/RC File LU w No. 2266 2/13D rile Exp.. 6-30-04 FOTfCHN��P 9lFOF Cpl_IF��� EAR"rt•1 SYSTEMS SOUTHWEST REPORT OF RI?LA'r1VE CONIPAGI'IONS JOB NAME: Country Club of the Desert JOB NO: 07117-11 LOCA'T'ION: La Quinta, California REPORT NO: 01-07-715 Pape 1 of 60 Test No Date Tested Description Elevation (feet) %Moistu.rcDry Densit Relative . klaxlnIM11 In Place IIl Place Compaction Density 1 12/11/00 PerPlan-MV Lot 124 5.0 18.3 -- -- -- 12/11/00 Per Plan -MV Lot. 12 3) 4.5 25.4 -- -- -- 12/11/00 Per Plan -MV Lot 122 3.5 17.3 -- -- 4 12/11/00 Per Plan Lot 121 3.5 9.0 95.0 90 105.5 5 12/I1/00 Per Plan Lot 121 3.5 12.2 96.5 91 105.5 6 12/11/00 Per Plan Lot 122 4.0 18.2 99.4 94 105.5 7 12/11/00 Per Plan Lot 123 4.5 16.4 97.6 93 105.5 8 12/11/00 Per Plan Lot 123/124 . 4.5 15.3- 96.3 91 105.5 9 12/11/00 Per Plan Lot 124 5.0 18.1 99.8 95 105.5 10 12/11/00 Per Plan Lot 124 5.0 17.2 97.1 .92 105.5 Tests 11-14' 15 12/12/00 Per Plan Lot 124 6.0 1.1.8 103.9 9S 105.5 16 • 12/12/00 Per Plan Lot 124 7.0 16.1 97.9 93 105.5 17 12/12/00 Per Plan Street 5.5 14.6 97.8 93 105.5 18 12/12/00 Per Plan Street 6.5 10.9 100.8 96 105.5 19 12/12/00 Per Plan Lot 123 55 7.6 98.7 94 105.5 20 .12/12/00 Per Plan Lot 123 6.5 12.7 97.5 93 105.5 21 12/12/00 Per .Plan Street 6.0 8.7 101.1 96 105.5 22 12/12/00 Per Plan. :Street 7.0 18.1 94.9 90 105.5 23 12/12/00 Per Plait Lot 122 5.0 9.1 100.3 95 105.5 24 12/12/00 Per Plan Lot 122 6.5 15.1 96.3 91 105.5 25 12/12/00 Per Plan Strut 5.5 10.7 99.4 94 105.5 26 12/12/00 Per Plan Street 7.0 1.3.2 96.1 91 105.5 27 12/12/00 Per Plan Lot 121. 3.5 7.8 100.2 95 105.5 28 12/12/00 Per PIan Lot 121 5.0 9.6 97.6 93 105.5 29 12/12/00 Per Plan Lot 121 7.0 15.2 98.1 93 105.5 30 12/12/00 Per Plan Street 5.5 10.7 100.2 95 105.5 31 12/12/00 Per.Plan. Street 7.0 12.4 95.9 91 105.5 32 12/13/00 Per Plan -MV Lot.] I 1 9.0 11.6 92.1 87* 105.5 33 12/13/00 Per Plan -MV Lot 114 10.0 11.1 95.8 91 105.5 34 12/13/00 Per Plan -MV Lot 117 9.5 7.6 95.1 90 105.5 35 12/13/00 Per Plan -MV Lot 89 8.5 20.1 89.5 84* 105.5 36 12/13/00 Retest #35 17.6 99.1 94** 105.5 37 12/13/00 Per Plan Lot 88 10.0 12.7 96.1 91 . 105.5 38 12/13/00 Per Plan Lot l 18/1 19 9.0 14.4 103.8 98 105.5 39 1 12/13/00 1 Per Plan Lot 118/119 10.5 11.0 102.2 97 105.5 August 28, 2.002 EARTH SYSTEMS SOUTHWEST REVO.R'I' OI R1+.LATIVE COAJP:ICTIONS . .JOB NAa\7E Country Club of the Desert .LOCATION:. La Quinta. California .JOB NO: 07117-11 RE PO.RT' N O: 0 1 -07-71 S Pnon 7 of hit Test No Date Tested .Description_ Elevation (feet) %,.Moister Dry Density Relative Maximum In Place In Place Compaction Density 40 12/13/00 Per Plan 1lot 116/117 9.5 16.2 103.5 98 105.5 41 12/13/00 Per Plan Lot 1'1;6/1 17 11.0 7.74 100.2 95 105.5 42 12/13/00 Per Plan Lot 115/116, 10.0 11.7 104:3 98 105.5 43 12/13/00 Per Plan Lot 115/116 11.5 18.8 97.3 92 105.5 44 12/13/00 Per Plan Lot 114/115 10.5 12.6 100.6 95 105.5 45 12/13/00 Per Plan Lot 114/115 12.0 7.9# 96:2 91 105.5 46 12/13/00 Per Plan Lot 113 10.5. 15.7 101.0 96 105.5 47 12/13/00 . Per Plan-. Lot 113 12.0 7.1 # 98.2 93 105.5 48 1.2/13/00 Retest #32 1'4.9 100.6 95`" 105.5 49 12/13/00 Per Plan Lot 111/112 '' 10.5 8.7# 96.7 92 105.5 Tests 50-67' 68 12/14/00 Per Plan Lot 109 _ 12.0 19.8 .97:6 93 105.5 69 12/14/00 Per Plan Lot 109 13.5 19.6 99.1 94 105.5 70 12/1'4/00 Per .Plan L.ot 102/103 10.5 20.7 97.1 93 105.5 71 12/1.4/00 Per Plan Lot 102/103 12.5 17.4 100.4 95 105.5 72. 12/14/00 Per Plan Lot 105/109 10.5 19.6 96.6 92 105.5 73 12/14/00 Per Plan Lot 108/109 12:5 13.2 99.8 95 105.5 74 12/14/00 Per Plan Lot 108/109 1.4.0 14.6 95.2 90 105.5 75 12/14/00 Per Plan Lot 105 10.5 10.0 .99.8 95 105.5 76 12/14/00 Per Plan Lot 105 12.5 16.9 95.6 91 105.5 77 12/14/00 Per Plan Lot. 1,01 12.5. 13.8 96.9 92 105.5 78 12/14/00 Per Plan Lot 101 14.5 16.8 95.1 90 105.5 79 12/14/00 Retest 441 for ttiloisture . 12.7# 99.7 95 105.5 80 12/14/00 Retest #45 for Moisture 11.90 100.2 95 105.5 81 12/14/00 Retest #47 for Moisture - 13.204 98.6 94 105.5 82 12/14/00- Retest #49 for Moisture 12. IA .993 95 105.5 Tests 83-94' 95 12/15/00 Per Plan Lot 97/98 10.0 ,21.5 95.4 90 105.5 96 12/15/00 Per Plan Lot 97/98 10.5 11.4 100.5. 95 105.5 97 12/15/00 Per Plan . Lot 97/9S 1 l .5 13.6 94.9 90 105.5 98 12/15/00 Per Plan Lot, 99 10.01-,. 12.1 99.8 95 105.5 99 12/15/00 Per Plan Lot 99 11.0 13.6 95:6 91 105.5 100 12/15/00 Per Plan Lot 100 12.5 179 .97.2 92 105.5 101 12/15/00 Per Plan Lot. 100 13.5 12.1 100.2 95 '105.5 102 12/15/00 Per Plan Lot 100 14.5 14.6 95.9 , 91 105.5 103 .12/15/00 Per Plan Lot 101/102 13.0 19.6 94.5 90 105.5 104 12/15/00 Per Plan Lot 101/102 14.0 14.7 102.4 97 105.5 105 12/15/00 Per Plan Lot 102/103; I3.5 17.1 104.6 99 105.5 IRLPORC Or RELATIVE COMPACTIONS JOB NAME: Country Club of the Desert LOCATION: La Quintet, California JOB NO: 071.17-11 REPORT NO: 01-07-71 S Peron 1 of 9(1 Test No Date Tested Description Elevation (feet) '%Moister Dry Density Relative Maximum 111 Place 1.11 Place C0111paGllon Density 106 12/15/00 Per Plan Lot 102/103: 15.0 14.4 103.2 97 105.5 107 12/15/00 Per Plan Lot 103/104 14.0 13.6 97.6 93 105.5 108. 12/15/00 Per Plan Lot 103/104 15.5 12.1 99.4 94 105.5 109 12/15/00 Per Plan Lot 106/107 13.5' 14.2 101.3 96 105.5 110 12/15/00 Per Plan Lot 106/1.07. 14.5 10.8 98.5. 93 105.5 111, 12/15/00 Per Plan Lot 108 13.5 11.7 102.6 97 105.5 112 12/15/00 Per Plan Lot l 01 ' 13.0 15.3 98.7 94 105.5 .113 12/15/00 Per Plan Lot 101 14.5 22.1 95.4 90 105.5 114 12/15/00 Per Plan Lot 96 12.0 10.4 95.0 90 105.5 115, 12/15/00 Per Plan Lot 96 13.0 12.5 95.7 90 105.5 116 12/15/00 Per Plan Lot 97 14.5 13.6 98.1 93 105.5 117 12/15/00 Per Plan Lot 94- 13.5 14.7 9.9.3 94 I05.5 Hs 12/15/0.0 Per Plan Lot 94 14.5 12.8 95.7 91 105.5 119 12/15/00. Per Plan Lot 92 14.0 11.9 98.1 93 105.5 120 12/15/00 Per Plan Lot 92 15.0 16.7 99.2 94 105.5 121 12/15/00 Per Plan Lot 95 12.0. 15.2 101..3 96 105.5 122 12/15/00 Per Plan Lot 95 13.5 18.9 94.9 90 105.5 123 12/15/00 Per Plan Lot 99 12.5 12.6 101.4 96 105.5 124 12/15/00 Per Plan Lot 99 74.5 14.7 98.1 93 105.5 125 12/15/00 Per Plan Lot 96 14.5 10.7 .97.3 92 105.5 126 12/15/00 Per Plan Lot 96 15.5 11.9. 96.5 91 105.5 127 12/18/00 Per Plan Lot 120 3.0 10.5 97.3 92 105.5 128 12/18/00 .Per Plan Lot 120 5.0 10.0. 949 90 105.5 129 12/18/00. Per Plan Lot 120 5.0 . 9.9 99.4 94 105.5 130 12/18/00 Per Plan Lot 120 7.0 9.0 95.8 91 105.5 Tests 131-1321 133 12/18/00 .Per Plan Lot 121 8.0 10.7 99.9 95- 105.5 134 12/18/00 Per Plan Lot 121. 9.5 12.3 96.7 92 105.5 135 12/18/00 Per Plan Lot 122 5.0 10.7 98.3 93 105.5 136 12/18/00 Per Plan Lot 122 9.5 11.1 . 95.9 91 105.5 '137 12/18/00 Per Plan Lot 123 8.0 12.7 100.4 95 105.5 138 12/18/00 Per 'Plan Lot 120 8.5 13.2 94.9 .90 105.5 139 12/18/00 Per .Plan Lot 120 10.5 11.4 95.7 91 105.5 140 12/18/004 Per Plan Lot 91 17.0 13.7 102.2 97 105.5 141 12/18/00 Per Plan Lot 91 18.0 15.9 97.3 92 105.5 142 12/18/00 Per Plan Lot 93 16.0 16.2 100.2 95 105.5 143 12/18/00 1 Per Plan Lot 93 18.0 18.3 96.1 91 105.5 August 28, 2002 EARTH SYSTEMS SOUTHAVEST REPORT Or RELATI VE CONIPACTIONS JOB NAME: Country Club of the .Desert LOCATION: La Quinta, California JOB NO: 071 17-1 1 REPORT NO: 0 1 -07 -71 S Test No Date Tested Description Elevation (.feet) -. %Moistur- Dry Densit Relative Max.imuni hi .Place In Place Compaction Density 144 12/18/00 Per Plan Lot 95 17.0 14.1 95.3 93 105.5 145 12/18/00 Per Plan Lot 95 18.5 17.4 95.1 90 105.5 146 12/19/00 Per Plan Lot i S9 9.5 12.5 99.8 95. 105.5 147 12/19/00 Per Plan Lot 'l 89 10.5 13.3 99.2 94 105.5 . 148 12/19/00 Per Plan Lot '191 11.0 10.4 96.9 92 105.5 149 12/19/00 Per Plan Lot 193 14.0 9.5 97.9 93 105.5 150 12/19/00 Per Plan Lot 193 15.0 9.8 101:6 96 105.5 151 12/19/00 Per Plan Lot 197. 14.0 9.5 110.5 92 120.0 152 12/19/00 Per Plan Lot 197 15.0 15.6 99. ] 94 105.5 153 12/19/00 Per Plan Lot 195 11.5. 9.2 962 9I 105.5 154 12/19/00 Per PlanLot 198 13.0 9.0 99.9 95 105.5 155 12/19/00 Per Plan Lot 200 11.5 I0.2 96.7 92 105.5 156 12/19/00 Per Plan Lot 200 12.5 11.4. 100.3 95 105.5 157 12/19/00 Per Plan Lot 192 12:5 10.2. 97.2 92 105.5 158 12/19/00 Per Plan Lot 192 13.5. 11.1 99.3 94 105.5 159 12/19/00 Per Plan, Lot 194 14.0 9.6. 95.9 91 105.5 160 12/19/00 Per Plan Lot 194. 15.0 11.3 98:3. 93 105.5 161 12/19/00 Per Plan Lot 199 11.5 10.7 99.3 94 105.5 162 12/19/60 Per Plan Lot 199 12.5 11.9 100.2 95 105:5 163 12/19/00 Per Plan Lot ISS 9.5 9.6 97.6 93 105.5 164 12/19/00 Per Plan Lot-] 88 . 10.5 10.2 99.9 95 1.05.5 165 12%19/00 Per Plan Lot 193 15:0 6.4 103.7 98 105.5 166 12/19/00 Per Plan Lot 193 16.0 14.2 99.5 94 105.5 167 12/19/00 Per Plan Lot 194 15.5 1.4:4 101.1 96 105.5 168 12/19/00 Per Plan Lot 194 16.5 18.6 96.7 92 105.5 169 12/19/00 Per Plan Lot 198 13.5 14.0 98.6 94 105.5 170 12/19/00 Per Plan Lot 198 14.5 10.6 102:9 93 105.5 171,12/20/00 Per Plan Lot 125 5.5 16:4 95.3 93 105.5 172 12/20/00 Per Plan Lot 125 6.5 110 99.1 94 105.5 173 12/20/00 Per Plan Lot 179 .6.5 11.4 100.9 96 105.5 174 12/20/00 Per Plan Lot 179 7;5 11.0. 104.1 98 105.5 175 12/20/00 Per Plan Lot 180 6.5 11.3 94.9 90. 105.5 176 12/20/00 Per Plan Lot 180 ' 7.5 14.3 101.3 96 I05.5 177 12/20/00 Per Plan Lot_ 18 1 7.0 15.2 101.1 96 105.5 178 12/20/00 Per Plan Lot 1 S 1 8.0 10.0 101.3 96 106.0 179 12/20/00 Per Plan Lot 182 8.0 15.5 1 101.0- 95 106.0 August 25,,2002 EARTH SYSTEMS SOUTHWEST REPORT' OF REI-ATIVE COINIPACTIONS .1013 NAME: COLH-itry Club -of -the Desert JOB NO: 07117-11 LOCATION: La QuInta, California REPORT NO: 01-07-718 Test No Date Tested Description Elevation (feet) %moistureDi-yDensit): Relative Maximum In Ilace, In Place Compaction Density ISO 12/20/00 Per Plan Lot 182 9.0 14.7 104.7 .99 106.0 181 12/20/00 Per Plan Lot 183 .8-5 13.4 103.6 98 106.0 1 S2 12/20/00 Per Plan Lot 183 9.5 14.5 104.0 98 106.0 183 12/20/00 Per Plan Lot 184 9.0 15.9 98.6 93 105.5 184 12/20/00 Per Plan Lot 184 10.5 17.1 103.8 9S 105.5 IS5 12/20/00 Per Plan Lot 186 8.5 13.1 100.3 95 105.5 186 12/20/00 Per Plan Lot 186 10.0 16.3 103.2 93 105.5 187 12/20/00 Per Plan Lot 186 1.1.0 17.3 99.8 95 105.5 188 12/20/00 Per Plan Lot 184 11-5 15.2 97.6. 93 105.5 189 12/20/00 Per Plan Lot 183 11.0 14.19 101.3 96 105.5 190 12/20/00 Per Plan Lot 182 10.0. 15.3 100.8 96 105.5 191 12/20/00 Per Plan Lot ISO 9.0 12.1 97.6 93 105.5 192 12/20/00 Per Plan Lot 179 8.5. 15.7 99 1 .7 95 105.5 19.31 12/20/00 Per.Plan Lot 125 9.0 . 14. 2 101.2 96 105.5 194 12/21/00 Per Plan Lot 174 5.5 13. 4 103.1 95 109.0 .195 12/21/00 Per Plan Lot 174 6.5 10.2 103.2 95 109.0 I * 96 12/21/00 Per Plan Lot 174 7.5 12.7 98.7 94 105.5 197 12/21/00 Per Plan Lot 175 6.0. 10.8 101.2 96 105.5 198 12/21/00 Per Plan Lot 175 7.5 12.4 100.2 95 105.5 199 12/21/00 Per Plan Lot 175 S.5 14.6 99.3 94 105.5 200 12/21/00 Per Plan Lot 175 6.5 10.5 1 Ol �9 97 105.5 201 12/21 /00 Per Plan Lot 175 S.0 11.2 100.1 95 105.5 202 12/21/00 Per Plan Lot 176 7.0 12.3 103.3 95 109.0 203 12/21/00 Per Plan Lot 176 8.0 14.1 104.3 96 109.0 204 12/21/00 Per Plan Lot 176 9.0 14.9 95.5 91 105.5 205 12/21/00 Per Plan Lot 177 7.0 13.7 l 00.1 95 105.5 206 12/21/00 Per Plan Lot 177 8.5 14.2 97.6 93 105.5 207 12/21/00 Per Plan Lot 178, 6.5 9.2 96.3 91 105.5 208 12/21/00 Pei Plan Lot 178 S.0 11-4 90.0 85* 105.5 209 12/21/00 Retest #208 10.7 95.4 90** 105.5 Tests 210-2121 213 12/21/00 Per.Plan Lot 186 11.5 11.2 99.5 94 105.5 214 .12/21/00 Per Plan' Lot IS6 13.0 13.0 97.9 93 105.5 2.15 12/21/00 Per Plan Lot I S5 12.0 14.2 98.7 94 105.5 2,16 12/21 Per Plan Lot I SS 12.0 116.8 104.0 95 109.0 217 12/21/00 Per Plan Lot I SS 13.0 13.0 100.3 95 105.5 218 12/21/00 Per Plan Lot 191 13.0 '12.7 99.7 95 105.5 ALIgUst, 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF RELATIVE COi11PACTIONS JOB NAME: Country Club of -the Desert LOCATION: Lei QUIrita, California JOB NO: 07117-11 REPORT NO: 0 1 -07-71 S Pa e o '60 Test No Date Tested Description 'Elevation (feet) %MoisturDry ry eJ llt�sit� Relative . Maximum 1.11 Place In Place Compaction Density 219 12/21/00 Per Plan Lot 191 14.5 14.2 96.7 92 105.5 220 12/21/00 Per Plan Lot 193 15.5 13.6 101.2 96 105.5 221. 12/21/00' Per Plan Lot 193 16.5 14.5 98.7 94 105.5 222 12/21/00 Per Plan. Lot 190 12.5 10.9 95.1 93 105.5 223 12/21/00 Per Plan Lot 190 14.0 13.6 94.8 90 105.5 224 12/27/00 Per Plan Lot 90 18.0 6.5 110.9 99 112.0 225 12/27/00 Per Plan .Lot 90 19.5 9.5 95? 90 105.5 226 12/27/00 Per Plan Lot 91 16.5 .19.5 101.2 93 109.0 227 12/27/00 Pet Plan Lot 91 18.0 9.0. 108.2 97 112.0 22S 12/27/00 Per Plan Lot 91 19.0 7.4 97.1 92 105.5 229 12/27/00 Per Plan Lot 93 16.5 13.0 105.6 .94 112.0 230 12/27/00' Per Plan Lot 93 18.5 10.5 1 l 2.3 100 112.0 231 12/27/00 Per Plan Lot 94 16.0. 9.6 105.9 97 112.0 232 12/27/00 Per Plan Lot 94 18.0 10.2 98.7 99 105.5 233 12/27/00 Per Plan .Lot. 95 15.5 12.7 105.S 94 112.0 234 12/27/00 Per .Plan Lot 95 17.5 10.4 99.4 99 105.5 235 12/29/00 Per Plan Lot 125 8.4 8.7 96.3 91 105.5 236 12/29/00 Per Plan. Lot 124 8.7 9.6 99.2 94 105.5 237 12/29/00 .Per Plan Lot 123 9.4 7.3 95.5 91 105.5 238 12/29/00 Per Plan Lot 122 10.2 9.1 96.'9 92 105.5 239 12/29/00 Per .Plan Lot 121 11.0 8.4 99.6 94 105.5 240 12/29/00 Per Plan Lot 120 11.S 7.9 100.3 95 105.5 241 12/29/00 Per Plan Lot 89 11.2 9.2 97.6 93 105.5 242 12/29/00 Per Plan Lot 88 11.6 8.7 99.2 94 105.5 243 12/29/00 Per Pian Lot 119 12.0 9.8 96.1 91 105.5 244 12/29/00 Per Plan Lot 11 S 12.3 7.6 97.3 92 105.5 245 12/29/00 Per Plan Lot 117 12.5 '10.1 95.9 94 105.5 246 12/29/00 Per Plan Lot'] 16 12.8 8.5 98.1 93 105.5 247 12/29/00 Per Plan Lot 115 13.0 9.1 99.4 93 105.5 248 1.2/29/00 Per Plan Lot 114 13.3 7.3 97.8 93. 105.5 249 12/29/00 Per Plan Lot l 13 13.6 7.9 96.5 91 105.5 250 12/29/00, Per Plan Lot 112 13.9 8.4 95.3 93 105.5 251 12/29/00 Per Plan Lot 190 10.0 BPG 28.9 S6.9 82* 105.5 252 12/29/00 Per Plan Lot 191 11.0 BPG 21.7 91.5 8V: 105.5 ALl ll5t 25, 2002 EARTH SYSTEMS SOUTHIVEST REPORT 0 REL.ATIV CONI.PACTIONS .JOB NA.ME: Colintry Club of the Descrt JOB NO: 071 17-1 1 LOCATION: La Quints, California REPORT NO: U1-07-715 :Pi nn 7 -f A Test No -Date Tested DescriptionElevation (feet) 1/uMoistureDry-Density Relative TvIaximum 1.n Place 1n Place, Compaction Density 253 01/03/01 I Per Plan Lot 83 16.5 15.0 101.8 96 105.5 254 01/03/01 Per Plan Lot S3 17.5 11.4 97.8 93 105.5 255 01/03/01 Per Plan Lot 84 16.5 13.7 100.2 95 105.5 256 01/03/01 Per Plan Lot Sl 13.5 22.5 95.7 91 105.5 257 01/03/01 Per Plan Lot S1 15.0 18.6 95.7 94 105.5 258 01/03/01 Per Plan Lot 82 14:0 14.2 100.9 96 105.5 259 01/03/01 Per Plan Lot 79 16.0 15.3 97.6 93 105.5 260 01/03/01 .Per Plan Lot 79 17.0 13.2 96.1 91 105.5 261 01/03/01 Per Plan Lot SO 17.0 I4.2 9 9. 3 94 105.5 262 01/03/01 Per Pian Lot SO 18.0 13.7 9S.7 94 105.5 263 01/03/01 Per Plan Lot 77 19.0 14.2 95.6 91 105.5 264 01/04/01 Per .Plan Lot S4 18.0 15.1 99.5 94 105.5 265 01/04/01 Per Plan Lot 84. 19.0 11.8 99.6 94 105.5 266 01/04/01 Per Plan Lot S3 19.0 14.6 98.7 .94 105.5 267 01/04/01 Per Plan Lot 92 18.0 16.5 96.9 92 105.5 268 01/04/01 I Per Plan Lot 82 19.0 11.2. 99.1 94 105.5 269 01/04/01, Per Plan Lot 81 18.0 13.1. 100.2 95 105.5 270 01/04/01 Per Plan Lot.80 17.5 13.7 101.2. 96 109.0 271 01/04/01 .Per Plan Lot SO 19.5 9.2 105.8 97 109.0 272 01/04/01 Per Plan Lot 79 18.0 12.7 98.3 93 105.5 273 01/04/01 Per Plan Lot 205 7.5 9.3 105.8 97 109.0 274 01/04/01 Per Plan ': Lot 205 9.0 15.7 100.6 92 109.0 275. 01/04/01 Per Plan Lot 205 .10.5 6.5 97.4 93 105.5 276 0I/04/01 Per Plan Lot 206 7.5 7.8 107.8 96 112.0 277 01%04/01 Per Plan. Lot 206 9.0 13.6 106.4 95 112.0 278 01/04/01 Per Plan Lot 206 10.5 8.2 95.1 90 105.5 279 01/04/01 Per Plan Lot 207 8.0 9.2 103.1 98 . 105.5 280 01/04/01 Per Plan Lot 207 9.5 16.0 102.1 100+ 109.0 281 01 /04/01 Per Plan Lot 208 3.0 10.6. 104.9 96 109.0 282 01/04/01 Per Plan Lot 208 I0.0 . 14.2 101.7 93 109.0 293 01/04/01 Per Plan Lot 209 7.0 9.3 104.0 95 109.0 284 01/04/01 Per Plan Lot 209 8.5 12.3 100.1 92 109.0 285 U1/04/01. Per Plan Lot 210 6.5 10.2 105.6 97 109.0 286 01104101 Per .Plan Lot 210 8.0 14.2 101.8 93 109.0 287 01/04/01 Per Plan Lot 211 7.0 8.6 107.2 98 109.0 289 01/04/01 Per Plan Lot 2 L 1 8.5 12.3 102.2 94 109.0 289 01/04/01 1 Per Plan Lot 212 6.0 10.1 1 104.3 96 109.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST 11EPORT OF RELATIVE CO11IP 1C'TIONS JOB NAI IE: Country Club of the -Desert LOCATION: La Quinta.. California JOB NO: 07117-11 1111" PORT NO: 0 1 -07-71 S Paae 4 of 61) Test No Date Tested Description Elevation (feet) %Ivloistur Dry Densit} Relative Maximum In Place In Place Compaction Density 290 01/04/01 Per Plan Lot 212 8.0. 15.2 99.7 91 109.0 291 01/04/01 Per Plan Lot 213 5.0 8.3. 106-4 9S 109.0 292 01/04/01 Per Plan Lot '213 . 7.0 14.3 99.9 9.1 109.0 . 293 01/04/01 Per Plan Lot 75 18.0 6.9 102.4 9S 105.5 294 01/04/01 Per Plan Lot 75 19.0 15.4 97.9. 93 105.5 295 01/04/01 Per'Plan Lot 190 7.5 7.9 100.3 95 105.5 296 01/04/01 Per Plan Lot 190 8.5 7.8 105.6 97 109.0 .297 01/04/01 Per Plain "Lot 191 7.5 9.2 101.2 96 105-5 298 01./04/01 Per Plan Lot 191 8:5 S.7 104-1 95 109.0 299 01/08/01 Per Plan Lot I 0 FPG 7:6 100.1 95 105.5 300 01/08/01 Per Plan Lot 107 FPG 6.3 98.3 93 105.5 301 01./0S/01 Per Plan Lot 106, FPG 8.1 .99.2 94 105.5 302 01 /OS/O1. Per Plan Lot 105 FPG 7.4 96.8 92 105.5 303 01 /OS/01 Per Plan Lot 104 FPG 7.9 99.4 94 105.5 . 304 01/08/01 Per Plan Lot 103 FPG . 6.7 98.7 94 105.5 305 01/08/01 Per Plan .-Lot 102 FPG 7.1 100.6 95 105.5 306 01/0S/01 Per Plan Lot 101 FPG S.3 102.3 94 109.0 307 01/08/01 Per Plan Lot 100- :. FPG 6.9 104.7. 96 109.0 308 0HOS/01 Per Plan Lot 99 FPG 7.5 1.03.6 95 109.0 309 01/OS/01 Per Plein Lot 98 FPG 7-7 101.9 93 109.0 310 01/08/01 Per Plan. Lot*97FPG 6.S - 104.2 96 109.0 311 0110S101 Per Plan Lot 96 FPG S.7 103.1 95 109,0 312 01/08/01 Per Plan Lot 95 FPG 7.4 '98.7 94 105.5 313 01/08/01 Per Plan Lot 94 FPG 6.6 101.3 93 109.0 314 01/OS/01 Per Plan Lot 93 FPG 7.2 107.6 96 112.0 315 01/08/01 Per Plan 'Lot 92 FPG 6.7 .103.1 95 109.0 316 01/08/01 Per Plan Lot 91 FPG .7:5 104.7 96 109.0 317 01/08/01 Per Plan Lot 90 FPG 8.1 101.2 93 109.0 318 01/08/01 Per Plan . Lot 74 21,0 10.1 111.6.'- 99 112.0 319 01/08/01 Per Plan Lot 74" 22:5 8.2 109.3 98 112.0 320 01/08/01 Per Plan Lot 74 24.0 7.9 101.8 93 109.0 321 01/08/01 Per Plan Lot 76 21.0 9.9 " 102.8 94 109.0 . 322 01/OS/0I Per Plan Lot 76 22.0 9.0 105.5 97 109.0 323 01/08/01 Per Plan Lot 76 24.0 S:3 101.3 93 .109.0 324. 01/08/01 Per Plan Lot 78 20.0 13.9. 107.3 96 1.12.0 325 01/08/01 Per Plan Lot 78 21.5- 7.9 108.8 97 112.0 326 - 01/08/01 Per Plan Lot 78 23:0 8.3 1 102:7 92 1 112.0 August 28, 2002 EA.RTII SYSTEMS SOUTI:IWEST REPORT OFRELATIVL COMPACTIONS .JOB NAME: Country Club of the Desert LOC:ITION:.La Quinta, California .JOB NO: 071.17-11 REPORT NO: 0l -07-718 Page 9 of 60 Test No Date Tested Description Elevation (feet) . %Moisture Dry Density Relative Maximum In Place In Place Compaction Density 327 01/08/01 Per Pian Lot 81 21.0 13.3 104.3 93 1 12.0 32S 01/08/01 Per Plan Lot 81 23.0 10.9 10'1.5 93 112.0 329 01/08/0.1 Per .Plan Lot S3 21.5 12.2 105.3 94 l 12.0 330 01/08/01 Per Plan Lot 83 22.5 10.9 103.7 93 112.0 331 ' 01/09/01 Per Plan Street 3.5 .BSG 10.2 101.3 93 109.0 332 01/09/01 Per Plan Street 1.5 BSG 9.7 100.1 92 109.0 333 01/09/01 Per Plan Street 3.0 BSG. 11.3 103.7 95 109.0 334 01/09/01 Per Plan Street 1.5 BSG 8.9 104.2 96 109.0 335 01/09/01 Per Plan Street 3.0 _BSG 10.8 102.8 94 109.0 336 01/09/01 Per Plan _ Street - 1.5 BSG- 11.2 101.7 93 109.0 337 01/09/01 Per Plan Lot 213 8.5 8.7 101.8 93 109.0 3.38 01/09/01 Per Plan Lot 212 9.0 7.9 100.7 92 109.0 339 01/09/01 Per Plan Lot 211 9.0 . 9:1 104.8 96 109.0 340 01/09/01. o Per Plan Lot. 210 9.0 8.3 . 103.6 95 109.0 341 01/10/01 Per Plan 14.0 10.2 98.7 94 105.5 342 01/10/01 Per Plan 16.0 11.6 99.1 94 105.5 343 01/10/01 Per Plan 15.0 10.9 96.7 92 105.5 344 01/10/01 Per Plan , 16.5 9.3 98.9 94 105.5 345 01/10/01 Per Plan 17.5 10.4 95.8 91 105.5 346 01/10/01 Per Plan 20.0 9.7 102.7 94 109.0 347 01/10/01 Per Plan 21.5 . 10.2 103.5 95 109.0 348 01/10/01 Per Plan '20.5 11.3 101.6 93 109.0 349 01/10/01 .Per Plan 22.5 12.4 105.7 97 109.0 350 01/10/01 Per Plan '24.0 10.9 100.9 93 109.0 351 01/16/01 Per Plan Street 15.5 6.3 104.7 96 109.0 352 01/16/01 Per Plan Street 16.5 14.3 103.3 95 -109.0 353 01/16/01 Per Plan Street 16.0 5.6 101.0 96 105.5 354 01/16/01 Per Plan Street 18.0 18.6 103.7 95 109.0 355 01/16/01 Per Plan Street 20.0 21.6 101.7 93 109.0 356 01/16/01 Per Plan Street 16.5 7.2 100.6 95 105.5 357 01/16/01 Per Plan Street 18.5 16.8 107.3 97 109.0 358 01/16/01 Per Pian. Street 20.5 19.1 104.1 96' 109.0 359 01/16/01. Per Plan Street 17.5 17.2 105.2 97 109.0 360 01/16/01 .Per Plan Street 19.5 18.8 101.8 93 109.0 361 01/16/01 Per Plan Street 18.0 7.6 101.1 96 109.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT, 011 RI' l-ATIVE COiNIPACTIONS JOB NAIME: Country Club of the Desert JOB NO: 07117-11 LOCATION: La Quinta, California REPORT NO: 0 1 -07-71 S Paor 10 of 110 Test No Date Tested Description Elevation (feet) %Moistur DryDensit Relative Mia"imam in Place In Place Compaction Density 362 01/1.6/01 Per Plan Street 20.0 16.3 102.7 94 109.0 363 01/16/01 Per Plan Lot 186 14.5 12.3 I04.7 96 109.0 364 01/16/01 Per Plan Lot 185 13.5 13.6 102.8 94 109.0 365 01/16/01 Per Plan Lot 184 12.5' 14.2 105.6 97 109.0 366 01/16/01 Per Plan Lot 183 11.5 12. 3, 106.1 97 109.0 367 01/16/01 Per PIan Lot 182 10.5 13.2 103.3 95 109.0 3.68 01/16/01 Per Plan Lot 1 S l 10.0 10.9 104.1 95 109.0 369 01/16/01 Per Plan Lot ISO 10.0' 11.6 104.7 96 109:0 370 01/16/01 Per Plan Lot 179 9.5 11.3. 103..9 95 109.0 371 01/16/01 Per Plan Lot 205 14.0 12.1 102.5 94 109.0 372 01/16/01 Per Plan Lot 206 13.5. 14.2 105.7 97. 109.0 373 01/16/01 Per Plan Lot. 207 1.2.5 13.6 104.1. 96 109.0 374 01/16/01 Per Plan Lot 208 11.5 14.1 103.9 95 109.0 375 01/16/01 Per Plan Lot 209 10.5. 12.8 102.8 94 .109.0 376. 01/17/01 Per Plan. Building 8.5 12.3 101.2 96 105.5 377 01/17/01 Per Plan Building 13.0, 14.2 99.7 95 105.5 373 01/17/01 Per Plan Building 10.0 19.1 96.6 86* 112.0 379 01/17/01 Per Plan . Building 11.0 17.3 97.1 87* 112.0 3SO 01/18/01 Per Plan Lot 63 11.0 10.6 96.8 92 •105.5 381 01/18/01 Per Plan Lot 63 12.5 9.S 97.5 92 105.5 382 01/18/01 Per Plan Lot 62 12.0. 10.5 95.7 91 105.5 383 01/18/01 Per Plan Lot 62 13.5 9.9 96.6 92 105.5 384 O1/l S/O1 Per Plan Lot 61 14:5 9.6 97.2 93 105.5 385 01/18/01 Per Plan Lot 61 16.0 10.7 96.7 92 105.5 3S6 O1/18/O1 Per Plan Lot 60 14.0 11.6 98.9 94 105.5 387 01/18/01 Per Plan Lot 60 15.5 11.9 1.01.0 96 105.5 3SS 01/18/01 Per Plan Lot 59 11.5 9.1 103.4 95 109.0 389 01/18/01 Per Plan Lot 59 13.0 13.1 103.3 95 109.0 390 01/18/01 Per Plan Lot 58 .15.0 10.7 102.3 93 109.0 391 01/18/01 Per Plan Lot 58 16.5 14.2 104.2 96 109.0 392 01/18/01 Per. Plan Lot 57 16.0 10.1 103.8 95 109.0 393 01/I8/01 Per Plan Lot 57 17.5 13.2 101.7 93 109.0 394 01/18/01 Per Plan Lot 56 14.5 11.1 111.5 99 112.0 395 01/18/01 Per Plan Lot 56 16.5 11.7 102.0 90 112.0 396 Ol/l S/Ol Per Plan Lot 52 14.5 14.0. 99.8 91 109.0 397 01 /18/01 1 Per Plan Lot 52 15.5 .13.8 1 100.8 1 91 1 109.0 August 28, 2002 EARTH SYSTLINIS SOUTHWEST REP0)12T OF REI,A'1'IVE coivwACTIONS ..JOB NA11'I.E: Country Club of the Desert LOCATION: La nui►ita, California JOB NO: 07117-11 REPORT NO: 0 1 -07-718 13-10p 1 1 nf' 11h Test No Date Tested Description Elevation (feet) %moister Dry Density Relative ]vla�imurn In Place In Place Compaction Density 398 01/18/01 Per Plan Lot 49 14.5 10.7 100.9 95 105.5 399 01/18/01 Per Plan Lot 49 15.5 10.3 98.3 93 105.5 400. 01/18/01 Per Plan Lat 4S , . 15.0 10.7 l Ol .5 93 109.0 401 01/18/01 Per Plan Lot 45 16.5 11.6 105.1 96 109.0 402 01/18/01 Per Plan Lot 47 15:5 10.8 103.6 95 109.0 403 01/18/01 Per Plan Lot 51. 15.5 11.2 102.8 94 109.0 404 01/18/01 Per Plan Lot 51 17.0 9.7 104.6 96 109.0 405 01 /18/01 Per Plan Lot 54, ` ] 6:5 10.1 107.2 96 112.0 406 01/18/01 Per Plan Lot 53 17.0 9.6 106.3 95 112.0 407 01/18/01 Retest#378 19.6 103.0 91** 112.0 408 01/18/01 Per Plan Building 12.0 17.2 1019 91 112.0 409 01/18/01 Retest #379 12.7 101.8 W" . 105.5 410 01./18/01 Per Plan Building 13.0 11.3 97.1 92 105.5 411 01/151,01 Per Plan Building 15.0 18.2 107.0 95 112.0 412 01/18/01 Per Plan Building 17.0 15.9 107.9 96 1 12.0 413 01/18/01 Per Plan Lot ISS 12.5 12.5 .105.2 97 109.0 414 01/18/01 Per Plan Lot 188 14.0 9.1 107.2 98 109:0 415 01/18/01 Per .Plan- Lot 188 15.5 10.8 100.1 92 109.0 416 01/18/61 Per Plan Lot 190 13.0 13.4 101.8 96 105.5 417 0.1/18/01 Per Plan. Lot 190 15.0 10.8 98.8 93 105.5 418 01 /18/01 .Per Plan Lot 190 16.5 11.3 100.0 95 105.5 419 01/18/01 Per Plan Lot 191 11.0 12.6 10113 96 105.5 420 01/18/01 Per Plan Lot 191 13.0 14.2 99.7 95 105.5 421 01/18/01 Per Plan Lot 192 14.5 13.8 104.2 96 109.0 422 01/18/01 Per Plan Lot 192 16.5 12.0 1.07.2 96 112.0 423 01/18/011 Per Plan Lot 192 18.0 11.8 105.7 94 112.0 424 01/18/01 Per Plan Lot 193 14.5, 12.1 I04.3 93 112.0 425 01/18/01 Per Plan Lot 193 16.0 10.4 107.8 96 112.0 426 , 01/18/01 Per Plan Lot 1.93 18.0 10.3 101.7 91 112.0 427 01/18/01 Per Plan Lot 194 16.0 10.6 104.0 93 112.0 . 428 01/18/01 Per Plan Lot 194 18.0 11.7 102.6 92 112.0 429 01/18/01 Per Plan Lot 194 19.0 9.7 95.9 91 105.5 4 30 : 01/18/01 Per Plan .Lot 191. 14.5 12.6 99.7 95 105.5 431 01/18/01 Per Plan Lot 191 16.5 13.2 96.7 92 105.5 432 01/18/01 . Per Plan Lot 189 14.5 12.6 101.2 93 109.0 433 01/18/01 Per Plan Lot 159 16.0 10.8 100.3 92 109.0 434 01/18/01 Per Plan Lot 192 .19.0 13.7 100.9 93 109.0 435 1 01/18/01 Per Plan Lot 192 20.5 11.6 101.2 93 109.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST a 11 REPORT OF RI LATIVE COMPACTIONS JOB NAME: Country Club of the Desert J013 NO.: 071 17-1 1 LOCATION: La nlll.ntel, CaliJoi-nia 01/19/0I Per Plan Lot 61 17.0 9.7 REPORT NO: Pa 0 1 -07-71 S e 12 o1' 60 Test No Date Tested Description Elevation (feet) %VIoistur- DryDensit Relative MaxiMLIIII 01/19/01 Per Plan Lot 197 17.0 10.8 96.7 92 I:n Place* In Place Compaction Density 436 01/18/01 Per Plan Lot 194 20.0 10.2 103.7 95 109.0 437 01/18/01 Per Plan Lot 194 21.0. 14.2 100.3 92 109.0 43 8 01/1S/01 Per Plan Lot 175 9.4 10.3 99.S 95 10-5.5 439 01/18/01 Per Plan Lot 176 9.7 9.6 100.2 95 105.5 440 01/18/01 Per Plan Lot 177 10.0 .9.6 96.7 92 105.5 441 01/18/01 Per Plan Lot 178 9.5 10.2 99.8 95 105.5 4=42 01/18/01 Per Plan Lot 212 9.4 8.7 97.3 92 105.5 443 01/18/01 Per Plan Lot 2-11 9.7 9.3 982 93 105.5 444 01/18/01 Per Plan Lot 210 10.0 8.5 100.1 95 105.5 =445 01/18/01 Per Plan Lot 203 10.0- 7.9 106.8 98 109.0 446 01/18/01 Per Plan Lot 203 11.5 8.7 99.5 92 109.0 447 01/18/01 Per Plar Lot 202 10.0 13.6 94.5 90 105.5 44S 01/18/01 Per Plan Lot 202 12.0 10.2 95.2 90 105.5 449 01/18/01 Per Plan 'Lot 201 09.0 9.6 103.6 9S 105.5 450 01/19/-01 Per Plan Lot 201 10.0 10.2 104.1 99 105.5 451 01/18/01 Per Plan Lot 200 12.0 10.8 103.9 98 1055 452 01/18/01 Per Plan Lot 200 13.5 12.2 103.1 98 105.5 453 01/18/01 Per Plan Lot 199. 14.0 9.7 104.2 99 105.5 45=4 01/18/01 Per Plan Lot 199 15.0 12.8 103.9 9S 105.5 =455 01/18/01 Per Plan . Lot 198 15.5 1 l .7 101.3 96 105.5 456 01/18/01 Per Plan Lot 198 16.5 14.2 99.7 95 105.5 457 01/19/0I Per Plan Lot 61 17.0 9.7 96.5 92 105.5 -158 01/19/01 Per Plan Lot 197 14.5 12.3 99.8 95 105.5 459 01/19/01 Per Plan Lot 197 17.0 10.8 96.7 92 105.5 460' 01/19/01 Per Plan Lot 197 19.0 .11.6 96.9 92 105.5 461 01/19/01 Per Plan Lot 203 12.5 11.5 101.7 96 105.5 4(i2 01/19/01 Per Plan Lot 203 14.5 10.8 99.1 94 105.5 463 01/19/01 Per Plan Lot 201 12.0. 12.6 100.2 95 105.5 464 01/19/01 Per Plan Lot 201 13.5 10.4. 98.3 93 105.5 465 01/19/01 Per Plan Lot 201 15.0 11.4 95.3 90 105.5 466 01/19/01 Per Plan Lot 199 16.5 8.1 105.1 92 112.0 467 01/19/01 Per Plan Lot 199 .18.0. 17.2 96.9 92 105.5 468 01/19/01- Per Plan Lot 19S 19.0 15.7 102.0 97 105.5 46.9 01/19/01 'Per Plan Lot 198 20.0 10.5 102.1 97 105.5 470 01/19/01 Per Plan Lot 200 17.5 12.3 101.1 96 105.5 471 01/19/01 Per Plan Lot202 16.0 14.2 99.6 95 105.5 ALH"I t 28 2002 EARTH SYSTEMS SOUTHWEST' RE 11010", OF IU COI•I:I'.4C"I IONS .JOB NAME: Country.Club of the Desert LOCATION: La Quinta, California" JOB NO: 07117-11 REPORT NO: 01-07-718 Pnnn 7 Z of A(1 Test No .Date Tested Description Elevation (feet) %Moistur Dr_y Densit Relative Maximum In Place In Place Compaction Density 472 01/22/0) Per Plan Lot 58 17.5 9.S 99.2 95 I05.5 473 01/22/01 Per Plan Lot 58 19.0 9.1 l 12.5- 97 1.16.0 474 01/22/01 Per Plan Lot '55 16.5 12.2 103.2 95 109.0 475. 01/22/01 Per Plan Lot 55 1S.0 10.9 101.9 93 109.0 476 01/22/01 Per Plan Lot 60. 17.5 12.6 101.1 96 105.5 477 01/22/01 Per Plan Lot 60 19.01 10.1 1132 98 116.0 47S 01/22/01 Per Plan Lot 63 15.0 10.7 102.7 94 109.0 479 01/22/01 Per Plan Lot 63 16.5 8.7 100.1 92 109.0 480 01/22/01 Per Plan Lot 48 15.5 14.1 97.7 93 105.5 481 01/22/01 Per Plan Lot 48 17.5 17.8 105.9 95 112.0 432 01/22/01 Per Plan Lot 51 16.0 13.6 99.3 95 105.5 483 01/22/01 Per Plan Lot 51 17.5 15.8 106.5 96 112.0 484 01/22/01 Per Plan Lot 45 15.0 .14.7 103.2 95 109.0 4S5 01/22/01. Per Plan Lot 45 16.5 .10.8 100.8 92 109.0 4S6 01/22/01 Per Plan Lot 37 10.5 20.2 101.6 93 109.0 487 01/22/01 Pei Plan Lot 37- 12.0 10.8 101.3 90 112.0 488 01/22/01Per Plan Lot 39 13.0 12..8 102.7 94 109.0 489 01/22/01 Per Plan Lot 39 14.5 10.3 105.6 94 112.0 490 01/22/01 Per Plan Lot 41 12.0 11.6 102.9 94 109.0 491 01%22/0] Per Plan.Lot 41 13.5 - 10.9 100.4 92 109.0 492 01/22/01 Per Plan Lot 43 .13.5 11.6 102.3 94 109.0 493 01/22/01 Per Plan Lot 43 15.0 10.2 100.1 92 109.0 .494 01/22/01 Per Plan Lot 43 16-0 12.6 99.8 92 109.0 495 01/22/01 Per Plan Lot 40 15.0 10.9 101-3 93 109.0 496 O1 /22/01. Per Plan Lot 42 16.0 11.3 102.7 94 109.0 497 01/23/01 Per Plan Lot 52 17.5 11.2 109.9 96 114.5 49S 01/23/01 Per Plan Lot'52, 1S.5 18.7 108.1 94 114.5 499 01/24/01 Per Plan Lot 15 110 9.9 96.8 92 105.5 500 01/24/01 Per Plan Lot 15` : 14.0 7.6 97.8 93 105.5. 501 01/24/01 Per Plan Lot 15 15.0 10.6 96.6 92 105.5 502 01/24/01 Per Plan LotIs 14.0 10.9 99.8 95 105.5 503 01/24/01 Per Plan Lot IS 15.0 8.7 97.2 92 105.5 504 01/24/01 Per Plan Lot IS 16.0 9.6 100.1 95 105.5 505 01/24/01 Per Plan Lot 21 16.5 .9.3 95.9 91 105.5 506 01/24/01 Per Plan Lot 21 1,7.5 10.2 97.3 92 105.5 nugust 2S, 2002 EARTH SYSTI.Ci MS SOUTI-INVEST IIE,PORT OF RELA'riv1:; R.I.P012'I'.Ofl' RELATIVI? COMPACTIONS JOB N:i.1\rIE: Country Club of the Desert LOCATION: La Quinta, CaliJIbmia JOB NO: 07117-11 REPORT NO: 01-07-71 S August 28, 2002 EARTH SYSTEMS SOUTHWEST Page 15 of 60 'Test No Date Tested Description Elevation (feet) %Moister- Dry Densit Relative Maximum In Place In Place Compaction Density 543 01/29/01 Per Plan Lot I SS 16.4 6.8 102.8' 94 109.0 544 01 /29/01 Per Plan Lot 189 17.5 8.9 .102.2 94 109.0 545 01,/29/01 Per. Plan Lot 190 18.5 7.S 95.3 90 105.5 546 01/29/01 Per Plan Lot 191 19.1 8.9 96.1 91 105.5 547 01/29/01 Per Plan Lot 191 20.3 9.3 98.5 94 105.5 545 01/29/01 Per Plan Lot 193 21.6 7.8 99.1 94 105.5 549 01/29/01 Per Plan Lot, 194 22.0 7.5 96.3 91 105.5 550 01/29/01 Per Plan _ Lot 197 22.0 16.4 96.1 91 105.5 551 01/29/01 Per Plan Lot 198 21:6 15.3 99.7, 95 105.5 ' 552 01/29/01 Per Plan Lot 199 20.1 8.2 99.0 94 105.5 553 01/29/01 Per Plan" Lot.200 19.0 " 8.7 101..1 96 105.5 554 01/29%01 Per Plan Lot 201 18.4 13.3 94.9 90 105.5 555 01/29/01 Per Plan Lot -202 17.5 9.7 100.2' 95 105.5 556 01 /29/01. Per Plan.: Lot 203 16.4 8.6 98.3 93 105.5 557. 01/30/01 Per Plan 13.0 14.9 112.3 98 114.5 55S 01/30/01 Per Plan 15'.0' 12:2 107.1 94114.5 559 01/30/01 Per Plan 12.5 10.4 109.8 96 114.5 560 01/30/01 Per Plan 14.5 . 10.2 105.0' 92 114.5 561 01/30/01' Per Plan 11.0. 9.8 102.5 .97 105.5 562 01/30/01 Per Plan 13.0 12.0 99.2 91 109.0 56 3 01/30/01 Per Plan 10.5 10.1 101.3 96 105.5 564 01/30/01 Per Plan 12.5 10.9 100.3 92 109.0 565 02/01/01 Per Plan 17:5. 14.4 110.5 97 114.5 566 02/01/01 Per Plan 19.0 15.2 109.5 96 114.5 567 02/01/01 Per Plan 16.0 14.1 100.6 92 109.0 56S 02/01/01 -Per Plan 17.5 1.0.8 96.6 92 105:5 569 02/01/01 Per Plan 16.0 1 13.6 102.6 '94 109.0 570 02/01./01 Per Plan ] 7:5 14.2 97.1 92 105.5 571' " -02/02/01 Per Plan Lot 63 21:0 11.1 102.8 94 109.0 572 02/02/01 Per Plan Lot 63 .23.0. 12.3 96.7 92 . 105.5 573 02/02/01 Per.Plan Lot"60 20.0 10.9 100.1 92 109.0 5.74 02/02/01 Per Plan Lot 60 21.5 10.1 95.7 91 105.5 575 02/02/01 Per Plan Lot -57 19.0 11.3 99.7 91 109.0 576 02/02/0I .Per Plan Lot 57 21.0 9.7 `100.1 92 " 109.0 577 02/02/01 1 Per Plan Lot 53 18.5 10.8 103.2 95 109.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF RELATIVE COINIPACT.IONS JOB NAME: Country Club of the Desert JOB NO: 07117-11 LOCATION: La Quinta, California REPORT NO: 01-07-718 Annn 1 ( of �!1 Test No .Date Tested Description Elevation (feet) `:4,MoistureDry Densit) Relative Maximum In Place In Place Compaction Density 578 02/02/01 Per .Plan Lot 53 20.0 12.2 104.5 96 I09.0 579 02/02/01 _ Per Plan Lot 48 17.0 13.3 101.9 93 109.0 580 02/02/01 Per Plan Lot 48 19.0 16.0 104.7 96 109.0 581 02/02/01 Per Plan Lot 45 16.0 14.2 100.1 92 109.0 582 02/02/01 Per,Plan Lot 45 17.5 13.9 99:3 91 109.0 583 02/02/01 Per Plan Lot 41 16.0 16.7 IO2.3 94 109.0 584 02/02/01 Per Plan Lot 41 17.0 15.7 101.1 93 109.0 585 02/02/01 Per Plan Lot 38 15.0 14.3 104.3 96 109.0 586 02/02/01 Per Plan Lot 38 16.5 16.9 101.1 93 109.0 ° 587 02/02/01 Per Plan Lot 37 14.5 15.7 100.1 92 109.0 588 02/02/01 Per Plan Lot 37 16.0 18.1 102.3 94 109.0 589 02/02/01 Per :Plan Lot 37 19.0 15.6 97.6 93 105-5 590 02/02/01 Per Plan Lot 37 21.0 14.2 99.7 95 105.5 591 (\o test taken 592 ,02/05/01 Per Plan Lot 15.. 18.0 { 8.4 99.5 92 109.0 593 02/05/01 Per Plan Lot 15 19.5 102 99.2 92 109.0 594, 02/05/01 Per Plan Lot 18 17.0 14.9 102.7 92 112.0 595 02/05/01 Per Plan Lot•18 18.5 13.2 103.2 92 112.0 596 02/05/01 Per Plan Lot 23/24 15.5 9.4 102.6 92 112.0 597 02/05/01 Per Plan Lot 24 17.0 9.8 101.1 90 112.0 598 02/05/01 Per Plan Lot 2.5/26 15.0 18.1 104.7 91 114.5 599 02/05/01 Per .Plan Lot 25 16.5 9.8 103.4 90 114.5 600 02/05/01 Per Plan Lot 63 24.5 18.7 9S.5 90 109.0 601 02/05/01 Per Plan Lot 62 24.0 1.5.5 102.9 94 109.0 602 02/05/01 Per Plan Lot 6,1 23.1 14.4 104.3 96 109.0 603 02/05/01 Per Plan Lot 60 22.7 12.0 101.6 93 109.0 604 02/06/01 Per Plan 20.0 9.3 103.3 90 114.5 605 02/06/01 Per Plan 22.0 8.5, 104.7 91 114.5 606 02/06/01 Per Plan 18.5 17.2 109.5 96 114.5 607 02/06/01 Per Plan 20.5 15.4 110.8 97 114.5 608 02/06/01 Per Plan 16.5 11.1 104.3 93 1110 609 02/06/01 Per Plan 18.5 14.7 101.7 91 1 12.0 610 02/06/01 Per Plan 15.0 12.9 103.4 92 112.0 611 02/06/01 Per Plan 20.0 152 100.9 90 112.0 612 02/06/01 Per Plan 17.5 11.9 107.6 94 114.5 613 1. 02/06/01 Per Plan 19.5 12.3 104.9 92 114.5 August 28, 2002 EARTH SYSTEMS SOUTH�VF,ST REPORT Or 12ELA`I'IVE CONIPACTIONS JOB NAME: Country Club.of the Desert JOB NO: 07117-1'l -.LOCATION: La Quinta. California REPORT NO: 0 1 -07-718 pubo 17 n1' ('n Test No Date Tested Description Elevation (feet) MuNloistur- Dry Densit� Relative Maxin711111 In Place In Place Compaction Density 614 02/06/01 Per Plan 16.0. 9.8 103.8 91 114.5 61.5 02/06/01 Per .Plan 18.0 10.9 104.5 91 114.5 616 02/06/01 Per Plan Lot'59 X2.5 10.9 110,.5 97 114.5 617 02/06/01 Per Plan Lot 5S .222 6.4 103.7 91114.5 618 02/06/01 Per Plan Lot 57 22.0 14.1 105.6 92 114.5 619 02/06/0.1 Per Plan Lot 56 21.7 11.3 103.3 90 114.5 , 620 ..02/06/01 Per Plan Lot 55 21.5 13.1 106.1 93 114.5 621 02/06/01 Per Plan Lot 54 21.2 10.9 110.5 97 114.5 622 02/06/01 Per Plan Lot 53 21.1 S.2 :. 103.8 91 114.5 623 02/09/01 Per Plan Lot 229 9.5 12.4 105.5 94 112.0 624 02/09/01 Per Plan Lot 229 11.5 8.5 103.9, 93 112.0 625 02/09/01 Per Plan Lot 227 -10.0 :11.1 106.1 95 112.0 626 02/09/01- Per Plan Lot 227 12.0 9.2 103.4 92 112.0 627 02/09/01 Per Plan Lot 225 10.0 10.1 109.0 95 114.5 . 628 02/09/01 Per Plan Lot 225 12.0 10.3 104:2 91 114.5 629 02/09/01 Per Plan Lot 228 14.0 9.8 105.2 94 112.0 630 02/09/01 Per Plan Lot 226 I3.5 10.2 I 04.9 92 l 14.5 631 02/09/01 Per Plan Lot 52 20.8 13.9 102.8 90 114.5 632 02/09/01. Per Plan Lot 51 20.6 9.8 110.3 96 114.5- 633 -02/09/01 Per Plan Lot 50 20.4 11.3 111.4 97 114.5 634 02/09/01 Per PlanLot 49 20.2 12.2 109.2 95 114.5 635 02/09/01 'Per Plan Lot 48 20.0- 14.1 111.4 97 114.5 636 02/09/01 Per Plan Lot 47 19.7 10.8 113.9 " 99 637 02/09/01 Per Plan Lot 46 19:5 8.9 103.1 95 109.0 638 02/09/01 Per Plan - Parking Lot 17.5 10.9 .107.6 94 114.5 639 02/09/01 Per Plan Parking Lot , 19.5 11.2 .104.3 91' 114.5 640 02/09/01 Per Pian Lot 14 17.5 9.7 105:6 92 114.5 64.1 02/09/01 Per Plan Lot 14 19.5 11.3 103.9 91 114.5 642 02/09/01 Per Plan Lot 16. 18.0 12.8 102.1 94 109.0 643 02/09/01 Per Plan Lot 16 19:5 13.6 .100.4 92 109.0 644 02/09/01 Per Plan Lot 18 17..0 10.6 101:3 93 109.0 645 02/09/01 Per. Plan Lot 1`S 18.5 9.7 99.7 91 109.0 646 02/09/01 Per Plan Parking -Lot 21.0 11.3 102.7 94 109.0 647 02/09/01: Per Plan Lot 15 20.E 10.5 100.4. 92 109.0 648 02/12/01 Per Plan Lot 45 19.2 4.9 104.3 91 111.5: 649 L 02/12/01 Per Plan : Lot 44 19.0 6.2 108.0 94 114.5 EARTH SYSTEMS SOUTHWEST REPORT OF RELATIVE COMPACTIONS .JOB N.,kME: Country Club of the Desert JOB NO: 07117-11 LOCATION:_I:a Quinta, California REPORT NO: 01-07-715 Pa a 18 of 60 Test No Date Tested Description Elevation (feet) : %,`Ioistur ry Dc.nsit� Relative Maximum In Place In Place Compaction Density 650 02/12/01 Per Plan Lot 43. 15.7 8.4 106.7 93 114:5 651 02/12/01 Per Plan Lot 42 18.5 8.7 106.3 93 114.5 652 02/12/01 Per Plan Lot 41 18.2" 8.8 106.1 93 114.5 653 02/12/01 Per Plan Lot 226 15.0 9.7 101.2. 96 105.5 654 02/12/01 Per Plan Lot 226 16.5 .9.3 99.3 94 105.5 655 02/12/01 Per Plan Lot 22S 16.0 8.5 102.4 94 109.0 656 02/12/0) Per Plan Lot 225 18.0 10.4 102.S 94 109.0 657 02/12/01 Per Plan Lot 22 17.5 16.5 106.8 93 114.5 658 02/12/01 Per Plan Lot 22 19.0 17.5 105.4 92 114.5 659 02/12/01 Per Plan Lot 20 18.0 16.3 109.4 96 114.5 660 02/12/01 Per.Plan Lot 20 19.5 . L5.1 107.0 93 114.5 661 02/12/01 Per Plan Lot 26 17.0 ] 1.9 1 12.0.98 114.5 662 02/12/01 Per Plan Lot 26 18.5 14.9 104.6 93 114.5 663 02/12/01 Per Plan Lot 2S. 16.5 16:9. 106.0 97 109.0 664 02/12/01 Per Plan Lot 28 17.5 14.7. 1.07.6. .94 114.5 665 02/12/01 Per Plan Lot 30 16.5 13.1 112.1 98 1.14.5 666 02/12/01. Per Plan Lot 30 17.5 12.9 112.6 98 11=4.5 667 02/12/01 Per Plan Lot 32 16:0 .10.9 109.7 96 114.5 668 02/12/01 Per Plan Lot 32 17.0 13.1 105.6 92 114.5 669 02/12/01 Per Plan Lot 34 14.5 12.8 106.9 93 114.5 670 02/12/01 Per Plan Lot 34 16.0 14.2 104.3 91 114.5 671 02/12/01 Per Plan Lot 36 14.51 1.2.1 109.4 96 114.5 672 02/12/01 Per Plan Lot 36 16.0 13.4 105.5 92 114.5 673 02/12/01 Per Plan Lot 24 ,, 17.0 12.4 108.7 95 114.5 674 02/12/01 Per.Plan Lot 24 _ 18.5 14.3 103.9 91 114.5 675 02/12/01 Per Plan Lot 227 18.0 8.2 . 99.3 94 106.0 676 02/12/01 Per Plan Lot 227 20.0 17.8 102.1 97 106.0 677 02/12/01 Per Plan Lot 229 14.5 12.8 99.9 94 106.0 678 02/12/01 Per Plan Lot 229 16:5 13.6 97.4 92 106.0 679 02;12/01 Per Plan Bldg N/O Termis 19.0 10.8 101.3 93 109.0 680 02/12/01 . Per Plan Bldg N/O Tennis .21.0 9.6 100.8 92 109.0 681 02/12/01 :Per Plan Bldg N/O Tennis 20.0. 11.7 103.1 95 109.0 682 02/12/01 Per Plan Bldg N/O Tennis 22.0 9.8. 100.1 92 109.0 683 02/12/01 Per Plan Bldg S/O Tennis 11.0 . 10.8 100.3 95 105.5 684 02/12/01 Per Plan Bldg S/O Tennis_ 12:5 11.3 101.9 97 105.5 685 02/12/01 Per Plan Lot 40 18.0 8.4 103.8 93 112.0 686 02/12/01 Per Plan Lot 39 17.S 7.0 105.0 94 112.0 August 28, 2002Er1RTh1 SYSTEI\IS SOUTHWEST REPORT OF RLt-A'fIVE COi1-IPA C"PIONS .JOB NA-NIE: Country Clul) of the Dcscrt JOB NO: 071 17-1 1 LOCATION: La Quinta, California RE, PORT .NO: 01 -07-71 S Prior I Q nf* 6A Test No Date Tested Description Elevation (feet) 'X,Moistur- Dry Densit Relative Maximum In Place Iia Place Compaction Density 687 02/12/01 Per Plan Lot 3S 17.6 7.1 1022 91 112.0 68S 02/12/01 Per Plan Lot 37 17.5 .14.7 105.7 94 112.0 689 02/13/01 Per Plan Bldg S/0 Tennis 14.0 7.S 107.7 99 109.0 690 02/13/01 Per Plan Bldg S/0 Tennis 15.5, 18.3. 106.8 96 112.0 691 02/13/01 Per Plan Bldg S/0 Tennis 13.0 12.0 111.6 99 112.0 692 02/13/01 Per Plan Bldg S/0 Tennis 14.0 10.2 105.4 94 112.0 693 02/13/0 1 Per Plan Parking .Lot 19.5 9.6 101.3 93 109.0 694 02/13/01 Per Plan Parking Lot 21.5 10.2 99.8 91 109.0 695 02/131/01 Per Plan Bldg N/0 Tennis 22.0 9.6 99.3 - 94 106.0 696 02/13/01 Per Plan Bldg N/0 "Tennis 23.5 11.3 97.8 92 106.0 697 02/13/01 Per 'Plan Bldg N/O Tennis 22.0 9.1 101.2 96 106.0 698 02/13/01 Per Plan Bldg N/0 Tennis 23.5 10.8 96.9 91 106.0 699 02/13/0I Per .Plan Parking Lot 20.0 7.6 101.8 93 109.0 700 02/13/01 Per Plan Parking Lot 21.5 9.4 102.4 94 109.0 701 02/13/01 Per. Plan Parking .Lot 20.0 10.3 101.2 93 109.0 .702 02/13/01 Per Plan Parking Lot 21.5 12.7 104.1 96 109.0 703 02/13/01 Per Plan Parking Lot 22.0 11.9 107.6 96 112.0 704 02/13/01 Per Plan Parking Lot 23.5 13.1 105.5 97 109.0 705 02/13/01 Per Plan Teiviis Courts 17.0 9.6 109.7 98 112.0 706 02/13/01 Per Plan Tennis Courts 19.0 -11.7 108.9 97 112'.0 707 02/13/01 Per Plein Teiumis Courts_ 20.0 10.8 110.3 98 112.0 708 02/13/01 Per Plan Termis Courts 21.5 12.2 105.6 97 109.0 709 02/14/01 Per Plan . Lot 27 19.1 11.4 113.9 99 114.5 710 02/14/01 Per Plan Lot 28 18:8 12.1 107.8 94 114.5 711 02/14/01 Per Plan Lot 29 18.6 10.9 105.5 92 114.5 712 02114/01 Per Plan Lot 30 18.4 10.1 104.8 92 112.0 713 02/14/01 Per Plan Lot 31 is.) 6.1 105.7 94 112.0 714 02/14/01 Per Plan Lot 32 17.9 l l .1 101.8 91' 112.0 715 02/14/0.1 Per Plan Lot 33 l T.6 11.4 103.9 93. 112.0 716 02/14/01 Per Plan Lot 34 17.5 11.9 108.5 95 114.5 717 02/14/01 Per :Plan Lot 35 17.5 11.1 102.5 92 112.0 718 02/14/01 Per,Plan Lot 36 17.5 9.9 102.7 92 112.0 Tests 719-7281 729„ 02/14/01 Per Plan Lot 229 21.0 11.1. 1092 95 114.5 73 0 02/14/01 Per.Plan Lot 229 23.0 9.6 11 l .3 97 114.5 731 02/14/01 Per Plan Lot 227 21.0 13.9 104.0 95 109.0 732 02/14/01 Per Plan Lot 227 23.0 8.0 108.8 95 114.5 August 28, 2002 EARTH SYSTEMS SOUTHWEST -- -- REPORTOF RELA'1"1VL COMPACTIONS .JOB NAME: ConntTr Club of the Desert LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 01 -07-71 S 110,1"a'n .,r rn Test No Date Tcsted Description Elevation (.feet) Moisture Dry Densit Relative Maxinnun In Place Ln Place Compaction Density 733 02/14/01 Per Plan Lot 225 17.0. 9.9 104.1 93 112.0 734 02/14/01 Per Plan Lot225 19.0 S.2 105.9 95 112.0 735 02/14/01 Per .Plan Lot 224 12.0 9.6 -.104.3 93 112.0 736 02/14/01 Per Plan Lot 224 14.0 9.9 103.0 92 112.0 737 02/14/01 Per Plan, Lot 223 9.0 8.7 105.2 94 112.0 738 02/14/01 Per Plan Lot 223 .11.0 9.3 102.7 92 112.0 Tests 739-7421 743 .02/15/01 Per Plan Parking Lot 20.0 I4.2 106.6 95 112.0 744 02/15/01 Per Plan Parking Lot 22.0 15.1 104.3 93 112.0 745 02/15/01 Per Plan Parking .Lot 26.0- 10.9 108.8 95 114.5 746 02/15/01 Per Plan Parking Lot 28.0 9.6 105.7 .92 114.5 747 02/15/01 Per Plan Street 18.0 1131 103.2 92 112.0 748 02/15/01 Per Plan Street 20.0 17.3 102.4 91 112.0 749 02/15/01 Per Plan Street 19.0 12.6 105.7 94 112.0 750 02/15/01 Per Plan Street 21.0 16.3 l 03.1 92 1190 Tests 751-756 . 757 02/15/0.1 Per Plan Lot 14 22.6 10.4 104.9 96, 109.0 758 02/15/01 Per Plan Lot 15 22.3 10.0 102.7 94 109.0 759 02/15/01 Per Plan Lot 16 22.1 7.0 102.8 94 109.0 760 02/15/01 Per PIan Lot 17 21.8 13.4 102.5 94 109.0 761 62/15/01 Per Plan Lot 18. 21.6 9.4 101.0 95 106.0 762 02/15/01 Per Plan Lot, 19 21 .3 8.9 - 106.5 95 172.0 763 02/16/01 Per Plan Lot 20 21.1 17.1 108.2 94 114.5. 764 02/16/01 Per Plan Lot 21 20.8 1 l .8 102.7 94 109.0 765 02/16/01 Per Plan Lot 22 20.5 6.3 103.4 95 109.0 766 02/16/01 Per Plan Lot 23 20:2 7.4 106.1 95 112.0 767 02/16/01 Per Plan Lot 24 19.9 8.5 -103.8 93 112.0 768 02/16/01 Per Plan Lot 25 19.7: 8.1 .102.9 92 - 112.0' 769 02/16/01 Per Plan Lot 26 19.4 10.3 105.7 94 112.0 770 02/16/01 Per Plan Lot 224 17.0 10.6 104.2 92 112.0 771 02/16/01 Per Plan Lot 224 18.5 11.3 102.9 92 112.0 772 02/16/01 Per Plan Lot 222" 11.5 11.7 106.8 95 112.0 773 02/16/01 Per Plan Lot 222 13. 5 I3.2 105.1 94 1110 77=4 02/16/01 Per Plan Lot 223 1,6.0 9.7 103.9 93 112.0 775 02/16/01 Per Plan Lot 223 17.5 11.1 101.4 91 112.0 776 02/16/01 Per Plan Building 20.0 13.2 102.7 94 109.0 777 02/16/01 Per Plan Building -)2.0 14.7 I04.3 96 109.0 August 28, 200) EARTH SYSTEMS SOt1THWEST REPORT OF RELATIVE CONIPAC''r`t0)\'S JOB NAME: Country C.lufa of the Desert JOB NO: 071 17-1 l LOCATION: La Quinta, California REPORT NO: 01-07-71 S 13. a 21 of 60 Test No Date Tested Description. Elevalion (Feet) 1x(A1oistLire Dry Dens]t} Relative Maximum l.n Place In Place Compaction Density 77S 02/16/01 Per Plan Parking -Lot 25.0. 12.6 109.66 96 114.5 779 02/16/01 Per Plan Parking Lot 26.0 9.7 107.4 94 11.4.5 780 02/16/01 Per Plan Buildinu 24.0 1,0.3 101.3 93 109.0 781 02/16/01 Per Plan Building 26:0 11.2 100.4 92 109.0 7S2 02/16/01 Per Plan Building 28.0 13.1 - 103.6 95 109.0 Tests 7S3-792 793 02/20/01 Per Plan!'ennis Courts 21.0 9.7 101.3 93 109.0 794 02/20/01 Per Plan Tennis Courts 22.0 10.8 -104:2 96 109.0 795 02/20/01 Per Plan Tennis Courts 21.5 9.6 101.4 93 109.0 796 02/20/01 Per Plan Parking Lot - 27.5 10.2 102.5. 94 109.0 797 02/20/01 Per Plan Parking Lot 26.5 11.1 101.7 93 109.0 798 02/20/01 Per Plan Parking Lot 26.0 9.S 105.2 97 109.0 799 02/20/01 Per Plan Parking Lot 25.5 7.6 104.1 96 109.0 800 02/20/01 Per Plan Building Pad 23. 0 9.7 109.1 97 112.0 Sol 02/20/01 Per Plan Building Pad 24.0 _ 10.1 107.6 96 112.0 S02 02/20/01 Per Plan Building Pad 22.5 12.3 108.3 97 112.0 803 02/20/01 Per Plan Building Pad 23.5 10.9 105.2 94 112.0 804 02/20/01 Per Plan Building Pad 14:0 9.4 104.8 94 112.0 S05 02/20/01 Per Plan Building Pad ` 15.0 10.2 107.9 96 112.0 806 02/20/01 Per Plan Building Pad 27.0 11.1 103.3 92 112.0 S07 02/20/01 Per Plan Building Pad 2S.5 10-S 105.2 94 112.0 SOS 02/20/01 Per Plan Lot 12 999.5. 12.1 105.3 92 1.14.5 809 02/20/01 Per Plan Lot 12 0:5 10.9 104.1 91 114.5 S10. 02/20/01 Per Plan Lot 10 3.0 14.2 106.7 93 114.5 S11 02/20/01 Per Plata Lot 10 5.0 10.1 105.8' 92 114.5 812 02/20/01 Per Plan Lot 8 6.5 12.3 104.7 91 114.5 813 02/20/01 Per Plan Lot S S.5 10.9 103.9 90 114.5 814 02/20/01 Per Plan,', Lot 6 '6 S.0 14.2 107.8 94 114.5 815 02/20/01 Per Plan Lot 10.0 13.9 104.1 91 114.5 816 02/20/01 Per Plan Lot 4 . 10.5 11.6 106.3 93 114.5 817 02/20/01 Per Plan Lot 4 12.5 9.9 103.4' 90 114.5 SIS 02/20/01 Per Plan Lot 2 12.0 12.1 105.6 92 114.5 819 02/20/01 Per Plan Lot ? 13.5 10.1. 104.5 92 114.5 S20 02/20/01 Per Plan Lot 306 12.5 9.7 106.S 93 114.5 821 02/20/01 Per Plan Lot 306 14.5 9.3 105.1 92 114.5 S22 02/20/01 Per Plan Lot 305 14.0 10.2 104.7 93 112.0 823 02/20/01 Per Plan Lot 1 14.0 9.8 105.2 94 112.0 August 28;2002 EARTH SYSTEMS SOUTHWEST REPORT Or REI-ATIVE, COMPACTIONS JOB NAME: COLlntry Club of the Dcsert JOB NO: 07117-11 LOC:�1`ION: La (�uinta, Califort�ia REPORT NO: 01-07-715 1'llu LL OI bll Test No Date Tested Description Elevation 0ect) 4<,Moistur- Dr_y Densil_ Relative Maximum In Place In Place Compaction Density 824 02/20/01 Per Plan Lot 3 12.5 U.3 103.9 93 112.0 825 02/20/01 Per Plan Lot 5 9.5 12.7 107.6 94 114.5 S26 02/20/01 Per Plan Lot 7 .8.0 13.2 105.3 92 114.5 827 02/20/01 Per Alan Lot 9 5.0 10.2 106.1 93 114.5 S 2S 02/20/01 Per Plan Lot 11 4.0 H .3 104.6 91 114.5 S29 02/21/01 Per Plan Lot 305 16.0 10.6 104.4 91 114.5 830 02/21/01 Per Plan Lot 305 1S.0 12.5 97.4 92 106.0 831 02/21/01 .Per Plan :Lot l 15.5 16.6 100.3 92 109.0. S32 02/21/01 Per Plan Lot 1 17.0 8.2 103.5 90 114.5 833 02/21/01 Per Plan Lot 3 14.5 9.1 100.3 92 109.0 834 02/21/01 Pei- Plan Lot 3 16.0. 9.5 99.8 92 109.0 835 02/21/01 Per Plan Lot 5. 12.5 11.2 106.9 93 114.5 S36 02/21/01 Per Plan Lot 5 13.5 16.S 99.7 91 109.0 837 02/21/01 Per Plan Street 9.0 10.21 01.3 93 109.0 83S 02/21/01 Per Plan Street 11.0 9.7 104.2 96 109.0 S39 02/21/01 Per Plan Street 13.0 11.3 103.8 95 109.0 840 02/21/01 Per Plan Street 12.0 8.6 102.1 94 109.0 841 02/21/01 Per Plan Street 14.0 11.4 99.3. 93 106.0 842 02/21/01 Per Plan Street 16.0 12.4 96.8 91 106.0 843 02/21/01 Per Plan Street 17.0 10.7 99.1 93 106.0 S44 02/21/01 Per Plan Street l 9:U 10.1 100.1 94 106.0 845 02/21/01, Per Plan Street 21.0 8.3 97.2 92 106.0 846 02/21/01 Per Plan Lot 7 . 10,0 .11.2 99.3 91 109.0 S47 02/21./01 Per Plan Lot 7 12.0 10.8 102.1 94 109.0 848 02/21/01 Per Plan Lot 9 7.5 9.6 1019 93 109.0 849 02/21/01 Per Plan Lot 9 9.5 10.3 100.4 92 109.0 S50 02/21/01 Per Plan Lot 11 6.5 11.4 101.4 93. 109.0 851 02/21/01 Per Plan Lot 11 8.5 1.2.1 100.7 92 109.0 852 02/21/01. Per Plan Lot 12 5.0 9.7 104.3 96 109.0 853 02/21/01. Per Plan Lot S 9.0 9.9 102.1 94 109.0 854 02/22/01 Per Plan Lot 12 9.0 13.4 112.3 98 114.5 . 855 02/22/01 Per Plan Lot 12 10.0 13.8. .103.9 91 114.5 856 02/22/01 Per Plan Lot 10 10.5 8.4 105.1 94 112.0 857 02/22/01 Per Plan Lot 10 12:5 8.1 102.1 91 112.0 858 02/22/01 Per Plan Street 1.0.0 9.7 103.8 92 112.0 859 02/22/01 Per Plan Street 12.0 13.3 103.1 92 112.0 ALIgust 28, 2002 EARTH SYSTEI1'IS SOUTFINVEST REPORT OF RELATIVE COMPACTIONS JOB NAME: Country Club of the .Desert LOCATION: La Quinta, California .JOB NO: 07117-11 REPORT NO: O 1 -07-71 S Pace 23 o1' 60 Test No Date Tested Description Elevation (feet) Oxokloisture Dry Densit Relative Maximum In Place In Place Compaction Density 860 02/22/01 Per Plan Street 11.0 10.4 104.2 93 112.0 S61 02/22/01 Per Plan Street 13.0 1 1.6 103.1 92 112.0 862 02/22/01 Per Plan Lot 7 13.0 9.8 105.S 94 112.0 S63 02/22/01 Per Plan Lot 7 15.0 1 l . l 102.9 92 112.0 864 02/22/01 Per Plan Lot 5 14.5 12.3 99.6 94 106.0 S65 02/22/0.1 Per Plan Lot 5 16.5 13.1 97.6 92 106.0 866 02/22/01 Per Plan Street 12.5 11.4 109.7 96 114.5 867 02/22/01 'Per Plan Street 14.5 13.7 107.3 94 .114.5 868 02/22/01 Per Plan Lot 3 16.5 11.9 106.9 93 114.5 869 02/22/01 Per Plan Lot 3 18.5 12:3 104.1 91 114.5 870 02/22/01 Per Plan Lot 2 17.0 14.2 105.4 94 112.0 871 02/22/01 Per Plan Lot 2 19.0 10.8 103.1 92 112.0 S72 02/22/01 Per Plan Lot 305 17.0 9.9 104.4 93 112.0 873 02/22/01 Per Plan Lot 305 18.5 '101.9l 91 112.0 S74 02/22/01 Per Plan Lot 1 17.0 , 10.3 109.9 96 114.5 875 02/22/01 Per Plan Lot 1 18.5 10.7 107.3 94 114.5 S76 02/22/01 Per Plan Street 14.0 12.4 JOS.] 94 114.5 877 02/22/01 Per Plan Street 16.0 9.9 104.1 91 114.5 878 02/23/01 Per Plan Building Pad 16.0* 11.4 106.1 95 112.0 879 02/23/01 Per Plan Building Pad 16.0 12.9 105.7 94 112.0 SSO 02/23/01 Per Plan Tennis 23.5 10.0 104.2 93 112.0 S81 02/23/01 Per Plan Tewnis 215 10.6 108.3 97 112.0 882 02/23/01 Per Plan Building Pad 25.3 8.0 102.1 91 112.0 883 02/23/01 Per Plan Building Pad 25.3 9.1 103.2 92 112.0 884 02/23/01 Per Plan Building Pad 26.0 9.9 105.8 94 112.0 885 03/05/01 Per Plan Lot 12 9.5 13.3 107.8* 96 112.0 SS6 03/05/01 Per Plan Lot 12 11.5 10.9 105.6 94 112.0 S87 03/05/01 Per Plan Lot 10 12:0 15.6 109.4 98 112.0 888 03/05/01 Per Plan .Lot 10 14.0 11.7 105.1 94 112.0 889 03/05/01 .Per Plan Lot S 13.5 16.1 106.3 95 112.0 S90 03/05/01 Per Plan Lot S 15.5 12.3 104.1 93 112.0 891 03/05/01 Per Plan Lot 6 15.0 14.2 103.1 95 109.0 892 03/05/01 Per Plan Lot 6 17.0 10.8 100.1, 92 109.0 893 03/05/01 Per Plan Lot 4 17.0. 13.1 105.4 97 109.0 S94 03/05/01 Per Plan Lot 4 19.0 12.S 103.6 95 109.0 895 03/05/01 Per Plan Lot 2 1S.0 13.7 1 113 98 114.5 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF Rf LATIVE COn1IPACTIONS° JOB NAME: Country Club of the Desert LOCA'T'ION: La Quinta, California .JOB NO: 07117-11 R.EP012T NO: 0 1 -07-71 S n.- I,i „#•.<n Test No Date Tested Description Elevation (feet) °ioMoisturt Dry Density Relative Maximum _ I.11.Place In Place Compaction .Density 996 03/05/01 Per.Plan Lot 2 20.0 11.9. 110.4 .96 114.5 897 03/05/01 Per Plan Lot, -3 06 19.5 14.2 103.5 95 109.0 898 03/05/01 Per.Plan Lot 306 ... 21.5: 10.4 101.3 93 109.0 899 03/05/01. Per Plan Lot 11 13:5 11.3 106.8 95 112.0 900 03/05/0.1 Per Plan Lot 1 l 15.5 10.8105 .1 94 112.0 901 03/05/01 Per Plan Lot 9 : 15.0 , 13.2 107.2 96 112.0 902 03/05/01 Per Plan Lot 9 ' 17.0 11.1 103.3 92 112.0 903 03/05/01 Per Plan Lot 7.1 16.5 12.6 104.8 94 112.0 904 03/05/01 Per Plan Lot 7 18.0 10.1 103..1 92 112.0 905 03/05/01 Per Plan Lot 5, 17.5 10.4 106.6 95 112.0 906 03/05/01 Per.Plan Lot 5 19.0 9.7 101.9 91. 112.0 907 03/07/01 Per.Plan Lot 290 - 9.5. I0.3 103.0 94 109.0 908 03/07/01 Per Plan W290:, 1,1.5 13.4 101.3 93 109.0 909 03/07/01 Per Plan Lot 292 10.0., 14.9 1.00.4 92 109.0 910 03/07/01 Per Plan Lot 292 , 12.0 10.7 101:5 93 109.0 91.1 03/07/01 Per Plan Lot 294 9.5 10.8 109.4 .96 114.5 912 03/07/01 Per Plan: Lot 294 11.5 13.5 102.6 92 112.0 913 03/07/01 Per Plan Lot 293 11.0, 12.6 - 102.9 94 109.0 914 03/07/01 Per Pian Lot 291 11.0 10.8 104.3 97 109.0 915 03/07/01 Per Plan Lot 295 SS 11.4 1 10.1 96 114.5 916 03/07/01 Per Pl<<n Lot 295 10:5 12.6 107.5 94 114.5 917 03/07/01 Per Plan Lot 296 8.0 11.6 104.6 96 109.0 918 03/07/01 Per Plan Lot 291 13.0 12.8 10>.3 97 109.0 919 03/07/01 Per Plan. Lot 291 15.0 13.1 103.7 95 109.0 920 03/07/01 Per Plali „Lot 293 13.0 ' 10.9 106.8 95 109.0 921 03/07/01 Per Plan Lot 293 15.0 12.7 103.3 92 112.0 922 03/07/01 Per Plan Lot 296 11:5 11.4 103.1 95 112.0 923 03/07/01 Per Plan ' Lot 296 13.5 13.6 100.4. 92 109.0 924 03/07/01 Per Plan,. Lot 290 1.4:5 10.8 102.7 94 109.0 925 03/0.7/01 Per Plan Lot 290, 16.5 12.4 l 01.4 93 109.0 926 03/07/01 Per Plan Lot 292 14.0 HA. 105.6 97 109.0 927 03/07/01 Per' Plan Lot.29216.0 14.2 104.7 96 109.0 928 03/07/01 Per Plan Lot 2S$ 10.5 10.8 105.7 97 109.0 929 03/07/011 Per Plan Lot 2SS 12.5 12.7 ] 1 -1 95 109.0 930 03/07/01 Per Plan Lot 287 11.0 14.2 110.7 97 114.5 931 03/07/01 Per Plan ' Lot 289 11.E 10.6 106.3 93 114.5 932 03/07/01 Per Plan Lot 286 10.5 12.1 1 108.7 95 114.5 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORTO1+ RELATIVE CONIPACTIONS .IOI3 N MIS: Country Chib ofthe.Descrl LOCATION: La Quinta, Czali.fornia JOB NO: 07117-11 REPORT NO: 0 1 -07-71 S p-Im- 71; nf' ff] Test No Date Tested Description Elevation (feet) . %Moistur D.ry .Densit Relative Maxi.nniirl In Place : hi Place Compaction Density 933 03/07/01 Per Plan Lot 2S7 .12.5 10.9 105.9 92 .114..) 934 03/07/01 Per Plan Lot 287 14.5 11.4 106.9 95 112.0 935. 03/07/01 Per Plan Lot 289 12.5 12.6 102.3 91 112.0 936 03/07/01 Per Plan Lot `289 14.5 11".3 103.3 92 112.0 937 03/08/01 Per Plan Lot 329 3.5 12.4 97.6 92 106.0 938 03/08/01 Per Plan Lot 329 5.5 1 l .3 102.1 91 112.0 939 03/08/01 Per Plan Lot 330 4.5 12.5 -99.3 94 106.0 940 03/08/01 Per Plan Lot 330 6.5 10.8 104.3 93 112.0 941, 03/08/0.1 Per PlanLot 332/331. 6.0 13.1 110.3 96 114.5 942 03/08/01 Per Plan Lot 332/331 8.0 11.8 101.1 .90 112.0 943 03/08/01 Per-PlanLot 333 6.0 13.7 108.6 95 114.5 944 03/08/01 Per Plan Lot 333 8.0 10.9 105.1 92 114.5 945 03/08/01 Per Plan Lot 335 5.5 12.6 101.2 90 112.0 946 03/08/01 Per Plan Lot,335 7.5 1.1.3 100.9 90 112.0 947 03/08/0I Per .Plein Lot, 312 5.0 13.6 97.2 92 106.0 948 03/08/01 Per Plan Lot 312 7.0 15.1 96.3 91 106.0 949 03/08/01 Per. Plan .. Lot 314' . 6.5 15.4 , 98.4 93 106:0 950 03/08/01 Per .Plan Lot 314 8.0. 11.7 102.6 92 112.0 951 03/08/0I Per Plan. Lot 316 5.0 13.9 96.1 91 106.0 952 03/08/01 Per- Plan Lot 31'6 7.0 15.3 99.8 92 109.0 953 03/08/01 Per Plan Lot 318 4.0 14.3 97.6 92 106.0 954 03/08/01 PerPlan Lot 31 S 6.0 14.6 100.1 92 109.0 955 03/12/01 Per Plan Lot'332 10.0 12.7 109.2 95 l 14.5. 956 03/12/01 Per Plan Lot 332 11.5 10.8 104.1 .91 114.5 957 03/12/01 Per Plan Lot 334 8.5 14.4 111.8 98 114.5 958 03/12/01 Per Plan :Lot 334 10.5 15.1 109.8 96 114.5 959 03/12/01 PerPlan Lot 335 9.0 11.9 102.6 94 109.0 960 03/12/01 Per Plan Lot 335 10.5 20.2 100.3 92 109.0 961 03/12/01 Per Plan Lot 336 8.5 14.8 108.9 97 112.0 962 03/12/01 Per Plan Lot 336 10.0 14.9 105.0. 94 112.0 963 03/12/01 Per Plan Lot 305 24.0 5.7 109.3 96 114.5 964' 03/12/01 Per Plan Lot 305 22.8 10.9 108.4 95 114.5 965 03/12/01 Per Plan Lot 2 22.1 7.6 106.7 93 114.5 966 03/12/01 'Per Plana Lot 3 21.5 7.7 100.9 93 114.5 967 03/12/01 Per Plan Lot 4 21.0 10.8 100.4 93 109.0 96S 03/12/01 1 Per Plan Lot 5. 20.6 12.0 99.1 91 112.0 August 2S, 2002 EARTH SYSTEMS SOUTIMEST RUORT O1♦ REU-MVE COA11'ACTIONS JOB NA*NIr: Country Club 01 -the Desert JOB NO: 071 17-1 1 LOCATION: La Quinta, Calif6mia REPORT NO: 0 1 -07-71 S 1'aoe 26 of (i0 Test I��o Dale Tesfed Description Elevation (feet). %Moistur ry Density Relative N/Ifiximum In Place In Place Compaction Density 969 03/12/01 Per Plate Lot 6 19.9 8.9 100.8 92 109.0 970 03/12/01 Per Plan. I_ot 7 19.4 10.4 1.06.S 93 109.0 971 03/12/01 Per Plan Lot S 1S.8 .5.3 1.06.9 93 114.5 972 03/12/01 Per Plan Lot 9 18.4 6-8 106.393 114.5 973 03/12/01 Per Plan Lot 10 18.0 9-6 103.1 90 114.5 974 03/12/01 Per Plan Lot 1117.5" 6.7'. 105.5 92 114.5 975 03/12/01 Per Plan Lot .12 17.1 13.7 99.S 92 109.0 976 03/12/01 Per Plan . Lot 313 8.0 11.3 102.8 94 109.0 977 03/12/01 Per Plan Lot 313 10.0 12.2 101.1 93 109.0 978 03/12/01 Pei -Plan Lot 315 9.5 .14.6 104.3 96 109.0 979 03/12/01 Per Plan Lot 315 11.5 12.7 101.6 93 109.0 980 03/12/01` Per Plan Lot 317 8.0 13.1 109.7 96 114.5 981 03/12/01' Per Plan Lot 31.7 10.0 14.2 105.5 92 114.5 982 03/12/01 Per Plan - Lot 319 6.5 10.8 105.6. 97 109.0 983 03/12/01 Per Plan Lot 319 8.5 1l :1 102.8 94 109.0 984 03/12/01 Per Plan Lot 3l l 7.0 13.1 103.6 95 109.0' 985 03/12/01 Per Plan Lot 31 F 9.0 14.2 101.4 93 109.0 936 03/12/01 Per .Plan Lot 312 9.0 13:7 105.1 96 109.0 987 03/12/01 Per Plan Lot 314 10.0 12.7 107.6 94 114.5 988 03/12/01 Per Plan Lot 316 10.5 10.7 106.3 92 114.5 9S9 03/12/01 Per Plan Lot 318 .9.0' 14-1 108.5 95 114.5 990 03/12/01 Per Plait Lot 320 - 4.0 13-3 106.1 93 .114.5 991. 03/13/01 Per Plan Lot 318 - 2.5 S.7 92.6 87* 105.5 992 03/13/01 Per Plan Lot 315 6.5 8.0 97.3 92 105.5 993 03/13/01 Per Plan Lot 318 7.5 17.2 99.4 91 109.0 994 03/13/01 Per PlanLoC 318 9.5 25.1 99.2 91 109.0 995 03/13/01 Per Plan Lot 319 7.0 15.1 111.5 97 114.5 996 03/13/01 Per Plan Lot 319 $.5 11.9 101.1. 93 - 109.0 997 03/13/01 Per Plan Lot 320 6.0 - S.8 . 110.3 96 114.5 998 03/13/01 Per Plan Lot 320 8.0 8.1 109.7 96 .114.5 999 03/13/01 Per Plan -Lot 321 4.0 8.3 109.1 95 114.5 1000 03/13/01 Per Plan Lot -32I G.0 `10.3 109.6 96 114.5 .1001 03/13/01 Per Plana Lot 322 4.5 9.6 1.11.3 97 114.5 1002 03/13/01 Pe.r,Plan _ Lot 323 3:5 . 12.4 1.12.3 98 114.5 1003 03/13/01 Per Plan Lot 323 5.5 9.3 106.8 93 114.5 1004 03/13/01 Per. Plan Lot 3 33 7.0 14:1 101 .2 92 109.0 1005 03/13/01 Per Plan Lot 333 9.0 15.6 105.8 92 114.5 August 28, 2002 EARTH SYSTEMS SOUTHWEST 17EPOR"1' OF RELATIVE COMPACTIONS JOB NAME: Country Club of the Desert LOCAT.ION:.La Quinta, California JOTS NO: 07117-11 REPORT NO: 01 -07-71 S P_IOP 77 of Fn Test No Date Tested Description EI"evation (feet) `ioMoistur- Dry Density Relative Maximum In Place Ln Place Compaction Density 1006 03/13/01 Per Plan Lot 333 11.0 16.0 99.5 91 109.0 1007 03/13/01 Per Plan . Lot 314 7.0 16.1 95.2 91 105.5 1008 03/13/01 Per Plan Lot 314 9.0 15.2 .100.2 96 105.5 1009 03/13/01 Per Plane Loi 3-14 11.0' 14.6 98.7 94 105.5 1010 03/14/01 Retest #991 6.9 96.5 91 105.5 1011 03/14/01 Per Plan Lot 31 S 3.0 19.6 98.0 90 105.5 1012 03/14/01 Per Plan Lot 3.14 3.0 19.4 101.2 93 105.5 1013 03/14/01 Per Plan Lot 336 12.1 12.9 97.9 90 109.0 . 1014 03/14/01 Per Plan Lot 335 12.0 12.4 105.7 97 109.0 1015 03/14/01 Per Plan Lot 3.34 11.9 15.5 103.5 95 109.0 1.016 03/.14/01 Per Plan Lot 333 12.8 15.7 102.1 94 109.0 1017 03/14/01 Per Plan Lot 332 13.3 13.6 102.3 97 109.0 1018 03/14/01. Per Plan Lot 312 .11.4 7.3 112.2 93 121.0 101.9 03/14/01 Per Plan Lot 313 11.8 12.1 109.2 90 121.0 1020 03/14/01 Per Plan Lot 314 12.8 11.3 109.1 90 121.0 1021 03/14/01 Per Plan Lot 315 13.3 11.6 109.8 91 121.0 1022 03/14/01 Per Plan -MV Lot 370 6.0 13.3 -- -- 105.5 1023 03/14/01 Per Plan Lot 367 6.0 17.7 95.7 91 105.5 1024 03/16/01 Per Plan Lot 329 7.0 15.2 108.7 95 114.5 1025 03/16/01 Per Plan Lot 329 9.0 16.1 106.5 93 114.5 1026 03/16/01 Per Plan Lot 32S 5.5 14.3 104.5 96 109.0 1027 03/16/01 Per Plan Lot 328 7.5 13.8 101.1 93 109.0 1028 03/16/01 Per Plan Lot 326 2.5 12.9 105.8 97 109.0 1029 03/16/01 Per Plan Lot 326 4.5 14.2 101.7 93 109.0 1030 03/16/01 Per Plan Lot 324 1.0 15.1 . 103.3 95 109.0 1031 03/.16/01 Per Plan_ Lot 324 2.5 14.3 102.1 94 109.0 1032 03/16/01 Per Plan Lot 322 .3.0 12.7 105.5 97 109.0 1033 03/1.6/01 Per Plan Lot 322 5.0 14.2 99.6 94 105.5 1034 .03/16/01 Per Plan Lot 327 4,5 13.1 " . 99.1 94 105.5 1035 03/16/01 Per Plan Lot 327 6.5 11.7 97.6 93 105.5 1036 03/16/01 Per Plan Lot 325 3.5 14.5 100.2 95 105.5 1037 03/16/01 Per Plan Lot 325 5.5 13.7 96.5 91 105.5 1038 03/16/01 Per Plan Lot 323 3.5 15.6 101.1 96 105.5 1039 03/16/01 Per Plan Lot 323 .5.5 10.8 97.3 92 105.5 1040 03/16/01 Per Plan Lot 324 6.5 13.1 95.9 94 105.5 1041 1 03/16/01 Per Plan Berm 10.0 10.7 104.3 93 112.0 August 28, 2002EARTII S 1'ST.ENIS SOUTUNVES'1' REPORT OF Rl- LATIVE COMPAC`['IO.NS JOB NAME: Country Club or the Desert JOB NO: 071 17-1 1 LOCATION: La Quinta, California REPORT NO: O1-07-71.5 Pnon 7R of (.(1 Test No :Date Tested Description Elevation (feet) %MoistureDry Density Relative Maximum 'hr Place ' In Place Compaction Density 1042 03/16/01 Per Plan .Berm .. 12.0 11.6 102.1 91 112.0 10'13. 03/16/01 Per Plan Berm 14.0 10.9 101.9 91 112.0 104=1 03/16/01 Per Plan Berm I I•.0 11.6 106.1 97 109.0 1045 03/16/01 Per Plan Bern 13.0 12.7 101.9 93 109.0 1046 03/16/01 Per Plan Benn 15.0 10.1 96.1 91 105.5 1047a 03/16/01 Per Plan Berm 12.0 13.2 99.2 94 105.5 1047b 03/16/01 Per Plan Berm - 14.0 12.S 97.3 , 92 105.5 1048a 03/20/01 Per Plan Lot348 7.0 10.5 95.4 90 I05.5 104Sb 03/20/01 Per Plan Lot 348 .8.5 12.8 95.1 90 105. 5 1049 03/20/01 Per Plan Lot 347 7.5 10.1 95.7 91 105.5 1050 03/20/01 Per Plan Lot 347 9.0 11.6 95.9 91 105.5 1051 03/20/01 Per Plan Lot 346 7.5. 13.4 95.4 90 105.5 1052 03/20/01 Per Plan Lot 346 9.0 14.6 100.3 95 105.5 1053 03/20/01 Per Plan Lot 345 7.0 12.6 96.3 92 105.E 1054 03/20/01 Per Plan Lot 345 8.0 14.2 99.7 95 105.5 1055 03/20/01 Per Plan Lot 286- 11.0 11.6 103.1 94 109.0 l 056 03/20/01 Per Plan Lot 286 12.0 9.8 95.9 91 105.5 1057 03/20/01 Per Plan Lot 285 9.5 20.1 103.8 93 112.0 1058 03/20/01 Per Plan Lot 285 11.5 14.4 101.2 93 109.0 1.059 03/20/01 Per Plan Lot 298 11.0 12.9 100.8 95 106.0 1060. 03/20/01 Per Plan Lot 298 12.5 9.5 101.8 96 106.0 1061 03/20/01 Per Plan Lot 297 - 12.0 10.9 99.0 93 106.0 1062 03/20/01 Per Plan Lot 297 13.5 12.2 96.6 91 106.0 1063 03/20/01 Per Plan Lot 295 13.0 14.3 100.3 95 106.0 1064 03/20/01 Per Plan Lot 295 14.5 16.8 97.3 92 106.0 1065 03/20/01 Per Plan Lot 294 14.0 12.1 101.6 96 106.0 1066 03/20/01 Per Plan Lot 294 15.5 10.9 96.1 90 106.0 1067 03/20/01 Per -Plan Lot 331 12.1 10.9 110.1 96 114.5 1068 03/20/01 Per Plan Lot 330 11.8 10.8 103.1 95 109.0 1069 03/20/01 Per Plan Lot 329 11.0 10.9 105.0 92 114.5 1070 03/20/01 Per Plan Lot 328 10.0 14.3 1079 94 114.5 1071 03/20/01 Per Plan, Lot 327 8.0 15.4 101.6 96 105.5 1072 03/20/01 Per Plan Lot 326 7.6 9.5 98.8 93 '106.0 1073 03/20/01 Per Plan Lot 325 7.3 7.2 97.6 92' 106.0 1074 03/20/01 Per.Plan Lot 324 7.5, 9.6 100.8 95 106.0 1075 03/20/01 Per Plan Lot 323 7.3 . 6.5 96.2 91 106.0 1076 03/20/01 Per Pian Lot 322 7.3 10.3 112.3 93 121.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST IZEPORT OF Rl:LA I'1N'E COMPACTIONS .1013 NAME: Country Club of the Desert LOCATION:.La Qumta, California J0;3 NO: 07117-11 REPORT NO: 01-07-71 S P-100 ,70 nF' I'A Test No Date Tested I Description : Elevation (feet) %Moister Dry Density Relative Maximum In Place In Place Compaction Density 1077 03/20/01 .Per Plan Lot 321 7.8, 10.S 113.4 94 121.0 1078 03/20/01 Per Plan Lot 320 9.0 119 104.9 96 109.0 1.079 03/20/01 Per Plan Lot 319'10.2. 9.7 99.7 94 106.0 1080 03/20/01 Per Plan Lot 318 11.2 - S.2 : 1.11.8 92 121.0 1081 03/20/01 Per Plan Lot 317 12.1 9.2 114.7 95 121.0 1082 03/20/01 Per Plan Lot 316 13:1 7.5 104.7 91 114.5 1053 03/20/01 Per Plan Lot 287 13.0 14.2 99.7 94 106.0 1084 03/20/01 Per Plan Lot 287 1.5.0 15.3 97.1 92 106.0 1085 03/20/01 Per Plan Lot 285 12.5 13.1 101.3' 96 106.0 1086 03/20/01 Per Plan Lot 285 13.5 12J 96.2 91 106.0 1087 03/20/01 Per Plan Lot 284 8:5 15.6 98.6 93 106.0 FOSS 03/20/01 Per Plan . Lot 284 10.5. 14.7 97.3 92 106.0 1089 03/20/01 Per Plan Lot 286 14.0 10.8 100.2 95 106.0 1090 03/20/01 Per Plan Lot 286. ' 15.0. 12.4 95.9 93 106.0 1091. 03/21/01 Per Plan Lot 283 9.0 .14.2 101.1 95 106.0 1092 03/21/01 Per Plan Lot 283 10.0 13.6 96.7 91 106.0 1093 03/21/01 Per Plan Lot 282 9.0 16.1 100.3 95 106.0 1094 03/21/01 Per Plan Lot 282 10.0 118 99.8 94 106.0 1095 03/21/01 Per Plan Lot 285 13.5 14.7 104.7 93 112.0 1096 03/21/01 Per Plan Lot 28S 15.0 10.9 102.3 91 112.0 1.097 03/21 /01 Per Plan . Lot 284 12.0 1 1.3 106.7 95 112.0 1098 03/21/01 Per Plan Lot 284 13.0 12.8 101.4 91 112.0 1099 03/21/01 Per Plan Lot 283. 11.5 14.7 105.8 94 112.0 1100 03/21/01 Per Plan Lot 283 13.0 14.1 100.3 92 109.0 1101 03/21/01 Per Plan Lot 282 11.5 11.9 106.6 95 112.0 1102 03/21/01 Per Plan Lot 282 12.5 12.6 101.3 93 109.0 1 103 03/2.1/01 Per Plan Lot 284 15.0 14.2 103.7 95 109.0 1104 03/21/01 Per Plan Lot 282 -13.5 12.4 100.4 92 109.0 1 105 03/21/01 Per Plan Lot 338 6.0 11.6 99.6. 94 106.0 1 106 03/21/0 * I Per Plan Lot 338 7.0 12.7 96.1 90 106.0 1 107 .03/21/01 Per Plan Lot 340. 8:0 13.1 100.2 95 106.0 1 105 03/21/01 . Per Plan Lot 340 9.0 12.S 97.6 92 106.0 1 109 .03/21/01 Per Plan Lot 342 9.0 11.9 100.8 95 106.0 1 1 10 03/21/01 Per Plan Lot 342 10.0 13.6 96.9 91 106.0 1 11 1 03/21/01 Per Plan Lot 344 7.5 14.2 99.3 94 106.0 1 112 03/21/01 Per Plan Lot 344 8.5 10.8 97.2 92 106.0 1113 1 03/2 I /01 1 Per Plan Lot 341 10.5 16.3 104.1 93 112.0 :August 28, 2002 EAIITHH SYSTEMS SOUTHWEST REPORT Or REI -ATM? COIN11'ACTONS JOB NAAME: Country Club of the Desert LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 0 1 -07-71 S Pave 10 of Clfl Test No Date Tested Description Elevation (feet) %Tvloistur- DryDens.it Relative Maximum In Place In Place Compaction Density l 1 14 03/2 1 /01 Per Plan Lot 341 11.5. 15.7 101:.9 9.1 112.0 1115 03/21/01 Per Plan Lot 343 9.5 15.9 103.2 92 112.0 1116 03/21/01 Per Plan Lot 343 11.0 12.7102.3 91 112.0 1117 03/21/01 Per Plan Lot 340 10.5 14.6 103.1 92 112.0 1118 03/21/01 Per Plan Lot 340 12.5 10.8 99.6 91 109.0 1119 03/21/01 Per Plan Lot 342 11.0 11.2 101.3 93 109.0 1120 03/21/01 Per Plan Lot 342 12.5 12.3 100.1 92 109.0 1121 03/21/01 Per Plan Lot 344 9.5 11.3 108.7 95 114.5 1 122 03/21/01 Per Plan Lot 344 11.0 14.3 103.1 .95 .109.0 1 123 03/''21 /01 Per Plan Lot 341 1_11.0 10.8 102.7 94 109.0 1 124 03/21/01 Per Plan Lot 343 12.5 11.9 102.2 94 109.0 1125 03/22/01 Per Plan Lot 289 17.6 10.7 104.7 93 109.0 1 126 03/22/01 Per Plan Lot 290 17.6 12.3 99.1 90 109.0 1 127 03/22/01 Per Plan Lot 291 17.5 12.4 105.6 94 112.0 1.128 03/22/01 Per Plan Lot 292 17.4 16.4, 99.7 94 106.0 1129, 03/22/01 Per Plan Lot 293 17.0 9.8 100.9 95 106.0 1 130 03/22/01 Per Plan Lot 294 16.7 16.7 98.0 92 106.0 1131 03/22/01 Per Plan Lot 295 16.2 17.4 100.7 95 106.0 113-1 03/22/01 Per Plan. Lot 296 15.5 1-1.1 99.5 94 106.0 1133 03/22/01 Per Plan Lot 297 14.8 11.1 101.9 96 106.0 1 134 03/22/01 Per Plan Lot 298 13.9 12.3 102.3 94 106.0 1.135 03/22/01 Per Plan. Lot 345 9.5 12.3 102.3 94 109.0 1 136 03/22/0.1 Per Plan Lot 345 10,5 13.1 100.7 92 109.0 1 137 03/22/01 Per Plan Lot 346 10.5 14.4 103.9 95 109.0 1138 03/22/01 Per Plan Lot 346 12.0 12.6 I04.7 93 112.0 1 139 03/22/01 Per Plan Lot 347 .10.0 10.8 108.9 95 114.5 1 140 03/22/01 Per Plan Lot 347 11.5 11.7 99.9 92 109.0 1141 03/22/01 Per Plan Lot 348 9.0 13.1 103.8 95 109.0 1 142 03/22/01 Per.Plan Lot 348 10.0 14.3 100.2 92 109.0 1143 03/22/01 Per Plan Lot 345 11.5 111 100.8 92 109.0 1144 03/22/01 Per Plan Lot 345 12:5 14.4 102.4 94 109.0 1 145 03/22/01 Per Plan Lot 346 13.0 14.3 97.8 92 106.0 1 146 03/22/01 Per Plan Lot 347 12:5 13.8 99.2 94 106.0 1 147 03/22/01 Per Plan Lot 350 4.0 11.6 100.1 92 109.0 1 148 03/22/01 Per PIan Lot 350 5.0 10.7 99.3 91 109.0 1 149 03/22/0I Per Plan Lot 352 2.5 12.4 101.3 93 109.0 1 150 1 03/22/01 Per Plan Lot 352 3.5 14.3 99.7 91 109.0 AUoUSt 28, 2002 EARTH SYSTEMS SOUTHWEST REI'OR'.1' O1,' R1:I_A'f'I'N;E COi•IP;ICTIONS . J013 NAME: Country Club of the Desert JOB NO: 07117-11 LOCA'1'1ON:.La Quinta, California RE.POR'1' NO: O1-07-718 Pave 31 o1' 60 Test No Date Tested Description Elevation (feet) %Moisture Dry .Densit Relative Maximum In Place In Place Compaction Density 1151 03/22/01 Per Plan Lot 354 l .0 12.6 101.3 93 109.0 1 152 03/22/01 Per Plan Lot 354 2.0 15.6 100.7 92 109.0 1153 03/22/01 Per Plan Lot 351 4.0 12.7 97.3 92 106.0 1154 03/22/01 Per Plan Lot 353 2.Q 14.3 101.3 93 109.0 1155 03/22/01 Per Plan Lot 349 6.0 1 O.S 104:3 93 112.0 1 156 03/23/01 Per Plan Lot 288 17.5. 10.6 101.3 93 109.0 1157 03/23/01 Per Plan . Lot 287 . 17.2 9.8 1.03.4 -95 109.0 1155 03/23/01 Per Plan Lot 286 16.9 1 1.3. 101.9 93 109.0 1 159 03/23/Q 1 Per Plan Lot 285 16.5 10.4 102.7 94 109.0 1160 03/23/01 Per Plan Lot 284 1.5.9 1 l .9 101.6 96 109.0 1161 03/23/01 Per Plan Lot 283 15.4 12.7 103.1 92 112.0 1162 03/23/01 Per Plan Lot 282 15.0 10.1 101.1 90 112.0 1163 03/23/01 Per Plan Street 11.5 9.7 97.6 92 106.0 1 164 03/23/01 Per Pian -Street 13.5 10.S 96.1 91 106.0 1 165 03/23/01 Per Plan Street . 11.0 9.6 1.00.1 94 106.0 1.166 03/23/01 Per. Plan Street - 13.0 ] 1.3 97.3 92 106.0 1 167 03/23/0.1 Per Plan Street - 10.5 12.1. 102.3 94 109.0 1168 03/23/01. Per Plan Street 12.5 13.2 101.4 93 109.0 1 169 03/23/01 Per Plan Street 10.0 9.8 100.9 93 109.0 1 170 03%23/01 Per Plan Street 12.0 ILS 99.1 91 109.0 1171 03/23/01 Per Plan Street 9.5 10.6 96.8 91 106.0 1172 03/23/01 Per Plan Street 11.5' 11.2 95.9 90 106.0 1 173 03/23/01 Per. Plan Street S.0 9.3 101.3 96 106.0 1 174 03/23/01 Per Plan Street 10.0 8.6 96.7 91 106.0 1 175 03/23/01. Per Plan Street 10.5- 10.3 105.8 94 112.0 1 176 03/23/01 Per Plan Street 12.5 11.7 l 02.1 91 112.0 1 177 03/23/01 Per Plan Street 8.0 9.6103.7 93 I ] 2.0 1.178 03/23/01 Per Plan Street 10.0 10.9 101.7 91 ' 112.0 1 179 03/26/01 Per Plan Lot 359 3.5 11.0 100.8 95 106.0 1 1 SO 03/26/01 Per Plan Lot 359 4.5 12.8 103.7 93 112.0 1 181 03/26/01 Per .Plan Lot 359, 6.0 14.1 105.7 94 112.0 1182 03/26/01 Per Plan Lot 358. 2.0 12.9 98.8 93 106.0 1 I S3 03/26/0), Per Plan Lot 358. - 3.5 10.3 9S.5 93 106.0 1 1 S4 03/26/01 Per Plan , Lot 358 4.5 12.6 101.3 93 109.0 1 I S5 03/26/01 Per Plan Lot -357 1.5 9.1 100.5 95 106.0 1 186 03/26/01 Per Plan Lot 357 3.5 11.1 97.0 92 106.0 August 28, 2002 EARTH SYSTEMS SOUI'11WEST RE'T'ORT Or REL',VIIVE, ('OA;I'PAC'1'I6NS JOB NAME: Counirn' Club of the Dcsert JOB NO: 07117-11 - LOCATION':.La Quinta, Califonua REPORT NO: 01-07-7.1S Pnoa 27 n1' Mi Test No Date Testes] Description Elevation (feet) 'YoMoistur Dry Densit Relative Maximum In Place In Place Compaction Density 1187 03/26/01 Per Plan Lot 356 0.5 12.6 99.3 94 106.0 1188- 03/26/01 Per Plan. . Lot 356 .,2.5 14.2 97.8 92 106.0 1189 03/26/0I Per Plan Lot 360 4. _5 12.7 99.3 94 106.0 1190 03/26/01 Per Plan Lot 360 6.0 14.0, 105.9 95 112.0 1191 03/26/01 Per Plan Lot 355 2.5 13.6. 104.7 . 93 112.0 1192 03/26/01 Per Plan Lot 355 3.5 15.2 102.1 91 112.0 1193 03/26/01 Per Plan Lot 353 2.5 10.8 .103.3 92 .112.0 .1194 03/26/01 Per Plan Lot.353 4.0 10.6 101.7 91 112.0 1 195 03/26/01 Per Plan Lot 351 5.0 12.4 101.2 93 109.0. 1196 .03/26/01 Per Plan Lot 351 7.0 10.8 98.9 91 109.0 1 197 03/26/01 Per Plan .Lot 352 4.0 11.7 103.6 95 109.0 1198 03/26/01 Per Plan Lot 352 6.0 12.4 l Q0.2 91 109.0 1199 03/26/01 Per Plan Lot 354 2.5 10.6 106,2 95 112.0 1200 03/26/01. Per Plan Lot.354 4.0 11.7 102.1 91 112.0 1201 03/26/01 Per Plan Lot 355 5.0 12:S 103.1 95 109.0 1202 03/26/01 Per Plan., Lot 355 6.5 13.9 100.4 92 109.0 1203 03/26/01 Per Plan Lot 354 5.0 12.3 101.9 93. 109.0 1204 03/26/01 Per Plan. Lot 351 7.5 14.3 103.7 95 109.0 1205 03/26/01 Per Plan Lot 340. 13.9 10.0 104.5 93 112.0 1206 03/26/01 Per Plan Lot 341 14.5 8.4 103:8 93 112.0 1207 03/26/01 Per .Plan Lot 342 13.9 14.2 98.5 93 106.0 1208 03/26/01 Per Plan Lot 343 13.5 10.6 106.6 95 112.0 1209 03/26/01 Per Plan. Lot 356 4,5 12.7 100.0 94 106.0 1210 03/26/01 Per Pian Lot 356 6.0 12.3, 95.8 90 106.0 1211 03/26/01 Per Plan Lot 358 5.5 10.8 95.7 90 106.0 1212 03/26/01 Per Plan Lot 358 7.0 - 11.6 101.1 95 106.0 1213 03/26/01 Per Plan Lot 357 4.5 11.3 100.2 95 106.0 1214 03/26/01 Per Plan Lot 357 6.0 12.9 96.3 91 106.0 1215 03/26/01 Per Plan Lot 352 4.5 17.7 100.1 92 109.0 1216 03/26/01 Per Plan Lot 352 6.0 10.0 99.4 94 106.0 1217 03/26/01: Per Plan Lot 345 6.0 9.3 102.5 94 109.0 1218 03/26/01 Per Plan . Lot 345 7.5 12:1 99.61 91 109.0 1219 03/26/01 Per Plan Lot 353 8.0 .11.5 101.3 93 109.0 1220 03/26/01 Per Plan Lot 355: 7.5 12.7 99.6 94 106.0 1221 03/26/01 Per. Plan Lot 344 13,1 10.8 104.3 93 112.0 1222 03/27/01 Per Plan Lot 355 7.0 14.2 99.9 90 111.0 1223. 03/27/01 jPer Pian Lot 355. ' 8.5 20.1 1 99.7 1 90 111.0 EARTH SYSTEMS SOUTHIVTST REPORTOIJ RELATIVE COMPACTIONS JOB NAME: Country Club of the Desert -JOB NO: 07117-11 LOCATION: La Quinta, California REPORT NO: 0 1 -07-718 Test No Date Tested Description Elevation (feet) %MoisturcDry Densit Relative Maximum In Place In Place Compaction Density 1224 03/27/01 Per Plan Lot 353 6.5 13.9 100.2 90 111.0 1225. 03/27/01 Per Plan " Lot 353 8.0 16.8 101.5 91 111.0 . 1226 03/27/01 Per Plan Lot 350 5.5 15.4 99.9 90 111.0 1227 03/27/01 Per Plan Lot 350 7.0 18.7 103.1 93 111.0 1228 03/27/01 Per PIan Lot 354 7.5 14.8 1002 90 111.0 1229 03/27/01 Per Plan Lot 354 9.0 16.3 101.9 92 111.0 1230 03/27/01 Per Plan Lot 353 9.5 15.7 100.8 91 111.0 1231 03/28/01 Per Plan 5.5 BG 6.9 104.8 96 109.0 1232 03/28/01 Per Plan 4.0 BG 7.7 105.6 94 112.0 1233 03/28/01 Per Plan 6.0 BG 7.1 I'll.] 97 114.5 1234 03/28/01 Per Plan 5.0 BG 11.2 104.2 93 112.0- 1235 03/28/01 " Per Plan3.5 BG 10.8' ].03.2 92 1 12.0 1236 03/28/01 Per Plan 5.0 BG 8.9 105.8 94 112.0' 1237 03/28/01 Per Plan 3.0 BG 10.6 101.3 90 112.0 1238 03/28/01 Per Plan 5.0 BG 7.2 102.1 94 109.0 1239 03/28/01 Per Plan 3.5 BG 8.9 100.3 92 109.0 1.246 03/28/01 Per :Plan Lot 350 7.0 11.2 101.2 91 111.0 1241 03/28/01 Per Plan Lot 350 8.5 10.1 .100.7 91 111.0 1242 03/28/01 Per.Plan Lot 351 8:0 122 103.4 93 111.0 1243 03/28/01 .Per Plan Lot 351 9.5 9.8 100.5 91 1 l 1.0 1244 03/28/01 Per Plan Lot 349 5.5 12.6 102.5 92 111.'0 1245 03/28/01 Per Plan Lot 349 7.0 11.1 99,6 90 1 l 1.0, 1246 03/28/01 Per Plan Lot 356 5.5 10.7 104.3 94 111.0 1247 03/28/01 Per Plan Lot 357 5.0 7.6 101.3 91 1 1 l .0 1248 03/28/01 Per Plan Lot 359 6.5 8.8 .102.1 92 111.0 1249 03/29/01. Per Plan 2.5 BG 10.8 107.7 94 114.5 1250 03/29/01 Per Plan 1.0 BG 11.7 105.6 92 114.5 1251 03/29/01 Per Pian 2.0 BG 9.7 108.1 94 114.5 1252 03/29/01 Per Plan 0.5 BG 12.6 106.7 93 114.5 1253. 03/29/0I Per Plan 2.5 BG 10.4 104.3 93 112.0 1254 03/29/01 Per Plan 1.0 BG 12.2 102.9 92 112.0 1255 03/29/01 Per Plan Lot 360 6.0 13.1 106.7 96 1 11.0 1256 03/29/01 Per Plan Lot 360 7.0 13.5 103.9 94 111.0 1257 03/29/01 Per Plan Lot 359 6.0. 10.5 110.4 96 114.5 1258 03/29/01 Per Plan Lot 359 7.0 . 16.4- 102.4 92 111.0 1259 1 03/29/01 1 Per Plan Lot 358 5.5 10.4 108.4 95 114.5 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT 017 RELATIVE COMPACTIONS JOB NAME: Country Club of the .Desert LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 01-07-718 Pann 2d of t'n Test No DatcTested Description Elevation (feet) %Moisture Dry Dcnsit Relative Maximum In Place In Place Compaction Density 1260 03/29/Ol Per Plan Lot 358 6.5 17.3- 99.5 92 109.0 1261 03/29/01 Per Plan Lot 349 6.0 9.6- 104.2 94 1 l 1.0 1262 03/29/01 Per Plan Lot 349 7.5 18.7. 9S.2 90 109.0 1263 03/29/01 Per Plan Lot 348 7.0 10.6 106.6 96 111.0 1264 03/29/01 Per Plan Lot 348 9.0 13.3 105.8 95 111.0 1265 03/29/01 Per PIan. Lot 347 10.5 12.3 104.8 94 1 l 1.0 1266 03/29/01 Per Plan Lot 347 12.0. 11.7 103.1 93 111.0 1267 03/29/01 Per Plan Lot 346 11.5 10.8 99.6 94 106.0 1268 03/29/01 Per Plan Lot 346 13:0 12.6 96.6. 91 106.0 1269 03/29/01 Per Plan Lot 345 10.5 10.7 101.3 96 106.0 1270 03/29/01 Per Plan Lot 345 12.0. 11.6 97.2 92 106.0 1271 03/29/01 Per Plan Street 2.0 10.8 103.7 93' 1 ] 1.0 1272 03/29/01 Per Plan Street 4.0 11.7 101.7 92 111.0 1273 03/29/01 Per Plan Street 3.0 9.6 1.01.6 94 111.0 1274 03/29/01 Per Plan Street 4.5 8:2 100.6 91 111.0 1275 03/29/01 Per Plan Street 4.5 10.5 103.1 93 1 1 1.0 1276 03/29/0I Per Plan Street 6.5 11.7 101.9 92 111.0 1277 03/29/01 Per Plan Lot 361 5.0. 123 98.9 93 106.0 1278 03/29/01 Per Plan Lot 361 6.0 10.8 101.3 91 111.0 1279 03/29/01 Per Plan' Lot 363 7.0 13.1 99.2 94 106.0 1250 03/29/01 Per Plan Lot 363 8.0 12.7 103.0 94' 109.0 1.281 03/29/01 Per Plan Lot 362 6.5 10.8 102..1 94 109.0 1282 03/29/01 Per Plan Lot 362 8.0 11.6 100.6 92 109.0 1283 03/29/01 Per Plan Lot 361 6.5 12.3 103.5 94 111.0 1284 03/29/01 Per Plan Lot 361 7.5 13.3 101.9 92 11.1.0 1285 03/29/01 Per Plan Lot 349 7.0 12.6 104.6 . -94 111.0 1286 03/29/01 Per Plan Lot 349 8.5 11.6 101.4 91 111.0 1287 03/29/01 Per Plan Lot 350 7.5 13.2 102.7 94 109.0 1238 03/29/01 Per Plan Lot 350 9.0 10.8 102.3 92 111.0 1289 03/29/01 Per Plan Lot 348 10.0 11.9 105.7 95 111.0 1290 03/29/01 Per Plan Lot 348 .1 I.5 12.6 100.5 91 111.0 1291 03/29/01 Per Plan Lot 350. 10.0 13.2 105.5 95 111.0 1292 03/29/01 Per -Plan Lot350 11.0 12.9 101.9 92 111.0 1293 03/29/01 Per Plan Lot 349 10.0 13.5 104.6 94 111.0 1294 03/29/01 Per Plan Lot 349, 11.5 10.7. 102.3 92 111.0 1295 03/29/01 Per Plan Lot 356, 6.5 12.6 102.4 94 109.0 1296 03/29/01 Per Plan Lot 356 7.5 10.8 100.8 92' 109.0 1297 03/29/01 Per Plan Lot 357 7.0 13.2 103.9 95 109.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT 017 RE LAT.IVE'COMPACTIONS JOB NAME: Country Club of the Desert JOB NO: 07117-11 LOCA'nON:.La Quanta, California REPORT NO: 01-07-718 ra a i� of bu Test No Date Tesiecl- Description Elevation (feet) %Molsture Dry Density Relative Maximum In Place In Place Compaction Density 1298 03/29/01 Per Plan . Lot 357 9.0 12.1, 100.1 92 109.0 1299 03/29/01 .Per Plan Street 5.0 14.3 105.6 95 111.0 1300, 03/29/01 Per. Plan Street 6.5 11.6 100.9 91 1 11.0 130.1 03/29/01 Per Plan Street 5.5 12.7 104.1. 94 1 l 1.0 1302 03/2.9/01 Per Plan Street 7.0 13.8 102.3 92 111.0 1303, 03/29/01 Per Plan Street 6.0 12.9 I00.2 . 92 109.0 1304 03/29/01 PerPlan Street 7.5 11.5 98.9 91 109.0 1305 03/30/01 Per Plan Lot 356 6.5 1.0.0 102.3 92• 111.0 1306 03/30/01 Per Plan .Lot 356 8.0 9.5 '102.6 92 111.0 1307 03/30/01 Per Plan Lot 356 9:5 10.6 104.1 94 111.0 1308 03/30/01 Per Plan Lot 358. 7.0 13.1 105.8 ° 95 111.0 1309 03/30/01' Per Plan Lot 358 8.0 10.3 .105.1 95 111.0 1310 03/30/01 Per Plan Lot 358 9.5 '10.7 98.4 90 109.0 1311 03/30/01 ' Per Plan Lot 359 8.0 12.6 104.8 94 111.0 1312 03/30/01 Per Plan Lot 359 9.5 11.4 I'l10 98 114.5 1313 03/30/01 Per Plan Lot 359 10.5 14.2 108.1 94 114.5 1314 03/30/01 Per Plan Lot 361 8.5 10.0 111.4 97 114.5 1315 03/30/01 Per Plan Lot 361 10.0 11.4 108.6 95 114.5 1316 03/30/01. Per Plan Lot, 357 8.0. 12.7 104.8 94 11 l .0 1317. 03/30/01 Per Plan " Lot 357 9.5 11.6 102.9 93 11 l .0 1318 03/30/01 Per Plan Lot 360 9.0 13.2 108.3 95 '114.5 1319 03/30/01 Per Plan Lot 360 11.0 14.5 105.6 92 114.5 1320 03/30/01 Per Plan Lot 362 9.0 10.81 104.1 .94 111.0 1321 03/30/01 Per Plana Lot 362 10.5 11.9 101.9 92 111.0 1322 03/30/01 Per Plan Lot 364 9.0' 13.1 106.6 96 111.0 1323. 03/30%01 Per PIan Lot 364 11.0 11.6 103.8 94 111.0 1324 03/30/01 Per Plan Lot 36- 8.0., 14.3 101:3 93 .109.0 1325 03/30/01 Per Plan Lot 365 9.5. 10.9 99.7 91 109.0 1326 03/30/01 Per Plan Lot 366 7.0 12.7 103.1 95 109.0 1.327 03/30/01 Per Plan Lot 366 8.5 .1 1.8 101.2 93 109.0 1328 03/30/01 Per Plan Lot 363. 9.0 11.3 1.05.6 95 111.0. 1329 03/30/01 Per Plan Lot 363 10.0 10.1 102.8 93 111.0 1330 04/02/01 Per Plan Lot 362 10.5 10.2 103.1 93 111.0 1331 04/02/01 Per Plan Lot.362. 12.0 12.6 1009 91 1 1 1.0 1332 04/02/01 Per :Plan Lot 363 11.0 13.1 101.7 .92 111.0 1333 04/02/01 Per Plan Lot 363 12.5. 10.8 101.3 91 111.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF RIF, LATJVE COMPACTIONS JOB NAME: Country Club ofthe Desert LOCATION::La Quinta, CaliJbi-pi:1 JOB NO: 07117-11 REPORT NO: 01-07-71 S D-.. zK „r Kn Test No Date Tested Description Elevation (feet) %Moister DryDensith Relative Masimu n In Place In Place Compaction Denslt-v 1334 04/02/01 Per Plan Lot 364 11.0 12.6 102.6 92 111.0 1335 04/02/01 Per Plan. Lot 364 12.5 11.7 101.1 91, 111.0 1336 04/02/01 Per Plan Lot 365 10.5 13.3 ' 105.6 95 111.0 1337 04/02/01 Per Plan Lot 365 12.0 10.8 101.5 91 11 l .0 1338 04/02/01 Per Plan Lot 366 9.5 14.2 103.4 93 111.0 1339 04/02/01 Per Plan Lot 366 11.0 10.6 102.6 92 111.0 1340 04/02/01 Per Plan Lot 367 7.5 12.9 99.6 94 106.0 1341 04/02/01 Per Plan Lot 367 9.0 10.7 100.2 90 111.0 1342 .04/02/071 Per Plan .Lot 369 6.5 13:1 100.3 95 106.0 1343 04/02/01 Per P.Ian Loi 369 7.5 11.7 .98.9 .93 106.0 1344 04/02/01 Per Plan Lot 368 7.5 10.2 102.8 93 111.0 1345 04/02/01 Per Plan Lot 303 6.5 13.8 98.7 91 106.0 1346 04/02/01 Per Plan Lot 303 8.0 14.2 100.1 92 109.0 1347 04/02/01 Per Plan Lot 301 6.0 12.8 99.1 93 106.0 1348 04/02/01 Per Plan Lot 301 7.5 14.1 103.2 95 109.0 1349 04/02/01 Per Plan Lot 299 - 7.5 12.7 97.6 92 106.0 1350 04/02/01 Per Plan Lot 299 8.5 13.2 96.1 91. 106.0 1351 04/02/01 Per Plan .Lot 3.04. 7.5 13.6 98.2 93 106.0 1352 04/02/0.1 Per Plan Lot 302 6.0 11.7 100.3 92 109.0 1353 04/02/01 Per Plan . Lot 300 '8.0 13.1 101.9 93 109.0 1354 04/02/01 Per Plan Lot 303 7.5 14.5 108.9 95 114.5 1355 04/0-2/0 1 Per Plan Lot 303 8.5 9.4 107.1 94 " 114.5 1356 04/02/01 Per Plan Lot 301 7.5 11.8 106.3 92 114.5 1357 04/02/01 Per Plan . Lot 301 8.5 12.9 105.7 92 114.5 1358 04/02/01 Per Plan Lot 304 10.0 13.6 105.4 92 114.5 1359 04/02/01 Per. Plan Lot 302 7.5 14.3 104.8 92 114.5 1360 04/02/01 Per Plan Lot 300, 9.5 13.1 106.7 .93 114.5 1361 04/02/01. Per Plan Lot 279 8.0 12.8 99.6 94 106.0 11362 04/02/01 Per Plan Lot 279 9.5 13.2 103.3 92 112.0 1363 04/02/01 Per Plan Lot 308 7.5 14.9 100.3 95 106.0, 1364 04/02/01 Per Plan Lot 308 9.0 12.5 104.8 91 114.5 1365 04/02/01 Per Plan: Lot 310 6.5 13.6 101.1 93 109.0 1366 04/02/01 .Per Plan Lot 310 8.0 11.9 108.7 95 114.5 1367 04/02/01 Per Plan Lot 307 7.0 14.2 9S.7 93 106.0 - 1368 04/02/0) Per Plan Lot 307 8.0 12.7 103.9 91 114.5 1369 04/02/01 Per Plan. Lot 309 6.5 13.7 99. l 93 106.0 1370 04/02/01 Per Plan Lot 309 8.0 1 1.6 105.8 92 114.5 August 28, 2002 EARTH SYSTEMS SOUTHWEST IZEPOIZ'I' Olr REI..:%TIN.'h, COMPACTIONS JOB NAME: Country Club of the Desert JOB NO: 07117-11 LOCATION: La Quinta, California REPORT NO: 01-07-71S Paue 37 of C10 Test No Date Tested Description Elevation (feet) . `%Moisture ry Density Relative Maximum In Place In Place Compaction Density 1371 04/03/01 Per Plan Lot 310 7.5 17.0 107.2 93 114:5 1372. 04/03/01 Per Plan Lot 310 9.0 16.3 103.6 90 114.5 1373 04/03/01 Per Plan Lot 308 8.5 16.S 10S.7 95 114.5 1374 04/03/01 Per Plan Lot 30S 10.0 15.2, 104.1 91 114.5 1375 04/03/01 Per Plan Lot 279 9.5 15-1 110.5 97 114.5 1376 04/03/01 Per Plan Lot 279 10.E 18.0 104.5 92 114.5 1377 04/03/01 Per Plan Lot 309 8.0 16.3 105.8 92 114.5 13 7 8 04/03/01 Per Plan Lot 307 S.5 14.4 106.7 93 114.5 1379 04/03/01 Per Plan Lot 304 10.5 15.5 10S.7 95 114.5 1350 04/03/01 Per Plan Lot 304 12.0 16.3 103.9 91. 114.5 1381 04/03/01 Per .Plan Lot 302 8.0 . 14.S. 107.3 94 114.5 1352 04/03/01 Per Plim Lot 302 9.5 . 13.7 104.3 91 114.5 1383 04/03/01 Per Plan Lot 300 9.5 15.S 106.9 93 114.5 13S4 04/03/01 Per PIan Lot,300 11.0 13.1 105.2 92 114.5 1355 04/03/01 Per Plan Lot 303 11.5 16.7 10S.8 95 l 1.4.5 1386 04/03/01 Per :Plan Lot 301 10.0 15.? 105.6 92 114.5 1387 04/03/01 Per Plan Lot 299 1 l .5 13.8 107.9 94 114.5 'I3SS 04/03/01 Per .Plan Lot 299 12.5 14.3 104.5 91 114.5 1389 04/03/01 Per Plan Lot 367 8.5 12.7 102.5 93 111.0 1390 04/03/01 Per Plan Lot 367 10.0 10.9 101.3 91 111.0 1391 04/03/01 Per Plan Lot 36S 8.5 13.9 99.9 94 106.0 1392 04/03/01 Per Plan Lot 368 10.0 11.8 96.3 91. 106.0 1.393 04/03/01 Per Plan Lot 369 7.5 15.8 100.3 95 106.0 1394 04/03/01 Per Plan Lot 369 9.0 12.S 102.7 93 111.0 1395 04/03/01 Per Plan Lot 345 13.1 9.0 109.2 98 111.0 1396 04/03/01 Per Plan Lot 346 13.5 9.3 102.4 92 111.0 1397 04/03/01. Per Plan Lot 347 13.3 5.9 104.1 94 111.0 11398 04/03/01 Per Plan Lot 348 13.0 6.0` 98.3 93 106.0 1399 04/03/01 Per Plan Lot 349 T2.8 7.3 100.6 91 111.0 1400 04/03/01 Per Plan Lot 350 l I .S 10.9 104.6 94 111.0 1401 04/03/01 Per Plan Lot 351 11.3 7.5 .104.2 94 1.11.0 1402 04/03/0.1 Per Plan Lot 352 .10.5 1.1.3 110.5 97 114.5 1403 04/03/01 Per Plan Lot 337 6.5 13.1 95.9 93 106.0 1404 04/03/01 Per Plan Lot 337 7.5 15.3 .104.1 91 114.5 1405 04/03/01 Per Plan Lot 339 6.5 12.8 99.6 94' 106.0 1406 04/03/01 Per Plan Lot339 7.5 14.3 105.2 92 114.5 .1407 04/03/01 Per Plan Lot 309 10.0 15.3 106.7 93 114.5 1405 L 04/03/0I 1 Per Plan Lot 308. 11.5 13.2 104.9 1 92 114.5 August 28, 2002 EARTH SYSTEMS SOUTI-INV.EST RLI'OI:'I' (:)h R1 Lz1'1'1�'l COMPACTIONS JOB NAAM Country Club of the Desert LOCATION: La QUinta, Calilornia J013 NO: 07117-11 YtE PORT NO: 0 1 -07-718 Pa a 38 of 60 Test No Date Tested Description Elevation (feet) 'YoMoisture Dry Density Relative Maximum In Place In Place Compaction Density 1400 04/03/01 Per Plan Lot 279 12.5 13.7. 106.1 93 114.5 1410 04/03/01 Per Plan Lot 307 10.5 14.9- 107.2 94 114.5 1411 04/03/01 Per Plan Lot 310 10.0 14.1 104.5 91 114.5 1412 04/03/01 Per .Plan Lot 353 10.4 9.6 103.2 93 111.0 1413 04/03/01 Per Plan Lot 354 10.5 8.1 102.7 93 111.0 1414 04/04/01 Per Plan Lot 355 10.3 1.4.8 106.3 96 11 l .0 1415 04/04/01 Per Plan Lot 356 1.0.3 12.7 104.7 94 111.0 1416 04/04/01 Per Plan Lot 357 10.9 10.3 103.5 93 111.0 1417 04/04/01 Per Plan Lot 35S 11.5 8.6 102.4 92 111.0 1418 04/04/01 Per .Plan Lot 359 12.4 , 8.3 101.0 91 111.0 1419 04/04/01 Per Plan Lot 360 12.5 10.5- 108.3 98 111.0 1420 04/04/01 Per Plan Lot 361 I3.0- 9.1 102.0 92 111.0 1421 04/04/01 Per `Pian Lot 362 13.5 6.2 10 3. 6 93 111.0 1422. 04/04/01 Per Plan Lot 363 14.0 12.2 105.2. 95 111.0 1423 04/04/01 Per Plan Lot 364 14.0 12.4 103.4 94 111.0 1.424 04/04/01 Per Plan Lot 365 13.3 5:9 105.5 95 111.0 1425 04/04/01 Per Plan Lot 366 12.5 5.9 9S.9 93 106.0 1426 04/04/01. Per Plan Lot 273 4.0 . 12.1 95.5 91 106.0 1427 -04/04/01 Per Pian Lot 273 6.0 13.6 100.2 95 106.0 1425 04/04/01 Per .Plan Lot 273 8.0 1 ] .9 99.6 94 111.0 1429 04/04/01 Per Plan Lot 274 8.0 12.0 95.9 90 111.0 1430 04/04/01 Per Plan Lot 274 10.0 14.7 96.5 91 111.0 1431 04/04/01 Per Plan Lot 270 S.CI 7.2# 98.2 93 111.0 1432 04/04/01 Per Plan Lot 270 9.0 8.34 94.5 89* 111.0 1433 -04/04/01 Per Plan L01.268 7.5 4.3# 104.6 94 111.0 1434 04/04/01 Per Plan Lot. 268 8.5 6.91 100.8 91 111.0 1435 04/04/01 Per Plan Lot 266 6.0 6.7# 102.4 92 111.0 1436 04/04/01 Per Plan Lot 266 7.5 5.8# 103.7 93 111.0 1437 04/04/01 Per Plan Lot 264 6:0 10.3 107.0 96. 112.0 1438 04/04/01 Per Plan Lot 264 7.0 7.8# 108.4 97 112.0 1439 04/04/01 Per Plan Lot 278 9.0 12.7 99.7 94 106.0 1440 04/04/01 Per.Pian Lot 278 10.5 13.1 96.S 91 106.0 1441 04/04/01 Per Plan Lot 276 9.0 10.9 100.1 94 106.0 1442 04/04/01 Per Plan Lot 276 10.5 11.1, 98.31 93 106.0 1443 04/04/01 Per Plan Lot 277 9.0 13.6 99.1 93 106.0 August 28, 2002 EARTH SYSTENIS SOUTFIWEST 12EPORr 01+ RELATIVE COMPACTIONS ,JOB NAME: Country Club of the Desert JOB NO: 07117-11 LOC:�'I'.[ON: La Quinta, Calirornia ]REPORT NO: 01-07-718 PiPL 39 of GO Test No Date Tested Description Elevation (legit) °Z1MoisturcDry Density Relative Maximum In Place In Place Compaction Density 1444 04/05/01 Per Plan Lot 277 10.5. 10.9 97.2 92 106.0 1445 04/05/01 Per Plan Lot 275 11.0 12.7 9S.9 93. 106.0 1446 04/05/01 Per Plan Lot 275 12.5 11.9 96.3 91 106.0 l 1447 04/05/01 Per Plan Lot 278 I0.0 12.6 103.1 93 111.0 j 1448 04/05/01 Per Plan Lot 278 11.5 10.9 101.3 91 111.0 1449 04/05/01 Per Plan Lot 275 12.0 l l .S 104.7 94 111.0 1450 04/05/01 Per Plan Lot 275 13.0 12:6 103.3 93 111.0 1451 04/05/01 Per Plan Lot 277/276 11.5 10.6 102.5 92 111.0 1452 04/05/01 Per Plan Lot 277/276 12.5 11.3 100.9 91 111.0 1453 04/05/01 Retest 41431 S.0## . 99.2 94 106.0 145=4 04/05/01 Retest # 1432. S.7## 96.6 91** 106.0 1455 04/05/01 Retest #1433 SS## 101.0 91 111.0 1456 0=4/05/01 Retest #1434 10.94# 101.3 94 111.0 1457 04/05/01 Retest #1435 7.80 103.5 93 111.0 1458 04/05/01 Retest # 1436 14.60 101.5 91 * I l 1.0 1459 04/05/01 Retest It1437 7.9## 106.7 95** 112.0 1460 04/05/0.1 Retest #1435 7.09# 97:7 87.1 112.0 1461 04/05/01 Per Plan Lot 272 10.0 11.2 .99.4 94 106.0 1462 04/05/01 Per Plan Lot 272 11.0 13.4 99.7 94 106.0 1463 04/05/01 Per Plan Lot 271 10.5 12.4 102.4 97 106.0 1464 04/05/01 , Per Plan Lot 271 1 1.5 10.0 .96.8 91 106.0 1465 04/05/0.1 Per Plan Lot 270 9.5 10.7 100.2 95 106.0 1466 04/05/01 Per Plan Lot 270 11.0 10.5 108.0 94 114.5 1467 04/05/01 Per Plan Lot 273 10.5 8.1# 96.6 91 106.0 1468 04/05/01 Per Plan Lot 273 11.5 12.S 99.3 94 106.0 1469 04/05/01 Per Plan Lot 274 10.5 16.0 96.4 91 106.0 1470 04/05/01 Per Plan Lot 274 11.5 9.6 98.0 92 106.0 1471 04/05/01 Per Plan Lot 276 13.0 12.0 96.1 91 106.0 1472 04/05/01 Per Plan Lot 277 11.5 14.6 95.5 90 106.0 1473 04/05/01 Per Plan Lot 275 12.5 12.8 99.4 94 106.0 1474 04/05/01 Per Plan Lot 274 14.0 16.5 100.9' 95 106.0 1475 04/05/01 Per Plan Lot 264 6.5 11.5 90.0 85* 106.0 1.476 04/05/01 Per Plan Lot 264 8.0 13.5 95.4 90 106.0 1477 04/05/01 Per Plan Lot 266/267 7.5 1 l .1 90.2 S8* 106.0 1475 04/05/01 Per Plan, Lot 266/267 9:0 1 l .5 90.1 S5* 106.0 1479, 04/05/01 Per Plan Lot 269 9.5 7.3# 101.0 95 106.0 1450 04/05/01 Per Plan Lot 269 11.0 8.9# 94.5 89`1 106.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF REILATIVE COMPACTIONS jOB NAINIE: Country Club ofthe. Desert LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 01 -07-71 S Page 40 of 60 Test No Date Testes] Description Elevation (feet) °,Moisture Dry Density_ .Relative Maximum Ln Place In Place Compaction Density 14S1 04/06/01 Per Plan Lot 337 S.5 12.6 103.6 9 3 111.0 1452 04/06/01 Per Plan Lot 337 9.5 11.3 101.4 91 11 1:0 1483 04/06/01 Per Plan Lot 33S 9.0 13.4 105.2 95 111.0 1484 04/06/01 Per Plein Lot 338. 10.0 10.9 100.9 91 l 1 1.0 1485 04/06/01 Per Plan Lot 10.0 12.8 A02.7 93 111.0 1456, 04/06/0I Per PIan Lot 339 11.5 11.1 101.3 91 111.0 1487a 04/09/01 Per Plan Lot 368 l l .] 79 100.6 95 106.0 1487b 04/09/01 Per Plan Lot 367 11.6 6.1 97.6 92 106.0 1.488 04/09/01 Per Plan Stake 15050 4.5 11.2 95.3 90 106.0 1489 04/09/01 Per Plan + Stake 15050 6.0 10.2 101.3 90 112.0 1490 04/09/01 Per .Plan Stake 15082 4.0 16.9 97.1 92 106.0 1491 04/09/01 Per Plan Stake 15082 5.5 7.3 103.5 90 114.5 1492 041,109/01 Per Plan Stake 15054 3.5 11.8 98.7 93 106.0 1493 04/09/0] Per Plan Stale 15084 5.5 9.0 104.2 91 114.5 1494 04/09/01 Per Plan Stake 15086 3.0 10.8 98.1 93 106.0 1495 04/09/01 Per Plan Stake 15056 6.0 13.6 99.1 93 106.0 1496 04/09/01 Per Plan Stake 15088 3.0 12.4 97.6 92 106.0 1497 04/09/01 Per Plan Stake 15088 5.5 7.1 104.1 98 106.0 149S 04/09/01 Per Plan . Stake 15090 2.5 8.3 100.9 95 106.0 1499 04/09/01 Per Plan Stake -15090 6.0 9.4 99.3 94 106.0 1500 04/09/01 Per Plan Stake 15092 2.5 7.5 100.5 95 106.0 1501 04/09/01 Per Plan Stale 15092 5.5 10.2 103.3 97 106.0 1502 04/09/01. Per Plan Stake 15092 7.0 7.8 105.9 99 106.0 1503 04/10/01 Per Plan Stake 15073 6.0 8.9 103.2 97 106.0 1504 04/10/01 Per Plan Stake 15073 7.5 . 8.5 104.2 98 106.0 1505 04/10/01 Per Plan Stake 15075 6.5 12.6 100.3 95 106.0 1506 04/10/01 Per Plan Stake 15075 5.5 9.8 103.3 97 106.0 1507 04/10/01 Per Plan Stake 15077 5.0 14.7 101.5 96 106.0 1508 04/10/01 Per Plan Stake 15077 7.0 20.4 95.0 90 106.0 1509 04/10/01 Per Plan. Stake 15079 5.5 10.6 99.9 94 106.0 1510 04/10/01 Per Plan Stake 15079 5.7 10.2 99.2 94 106.0 1511 04/10/01 Per Plan Guardshack 7.5 12.3 96.9 91 106.0 1512 04/10/01 Per Plan Guardshack 7.5 13.8 96.1 91 106.0 1513 04/10/01 Per Plan Lot 279 - 13.7 6.6 100.6 95 106.0 1514 04/10/01 Per Plan Lot 307 12.0 17.2 99.6 94 106.0 1515 04/10/01 Per Plan Lot 308 12.6 9.4 99.3 94 106.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OFR.ELATIVE COMPACTIONS JOB NAME: Country Club of the Desert. JOB NO: 07117-11 LOCATION: La Quinta, California REPORT NO: 0 1 -07-71 S Pa a 41 of 60 Test No Date Tested Description Elevation, (feet) %Moister- Dry Density Relative Maxinnmr In .Place. In Place Compaction Density 1516 04/10/01 Per plan'' Lot 309 11.3 10.1. 110.3 98 112.0 1517 04/10/01 Per Plan Lot 31.0. 11.4 13.4 104.2 96 109.0 .1518 04/10/01 Per Plan Lot 299 14.1 6.6 96.9 91 106.0 1519 04/10/01 Per Plan Lot 300 13.1 11.6 99.4 94 106.0 1520 04/10/01 Per Plan Lot 301 12.2 1.7.4 98.2. 90 109.0 1521 04/10/01 Per Plan Lot 303 13.2 10.1 .100.7 92 109.0 1522 04/10/01 Per Plan Lot 304 13.7 8.1 102.0 94 109.0 1523 04/10/01 Per Plan Lot 302 11.0 9.7 100.9 93 109.0. 1524 04/10/01 Per Plan Lot 378 5.5 13.8 95.5 90 106.0 1525 04/10/01 Per Plan ' Lot 376. 6.5 9.S 99.0 93 106.0 1,526 04%10/01 Per Plan ° Lot 376 5.5 10.4 100.1 94 106.0 1527 04/10/01 Per Plan 'Lot 375 .6.5. 17.3 10.1.5 96 106.0 1528 04/10/01 Per Plan Lot 375 4.5 6.6 101.8 96 106.0 1529 04/10/01 - Per Plan : Lot 385. 3.5 5.6 91.7 87* 106.0 1530 04/10/01 Per Plan Lot3S5 4.5 9.3- 93.8 S9* 106.0 1531 04/10/01 Per Plan Lot 388 2.0 6.9 96.8 91 106.0 1532 04/10/01 Per Plan Lot 388.5 l 5.6 101.5 96 106.0 1533 04/10/01 Per Plan Lot 386. 3.0 7:3 92.6 87* 106.0 l 534 04/10/01 Per Plan Lot 386 4.0 6_8 98.1 93 106.0 1535 04%10/01 Per Plan Lot 387 3.5 10.0 93.0 88* 106.0 1536 04/10/01 Per Plan Lot 387 4.5 12.7 99.3 94 106.0 1537 04/10/01 Per Plan Lot 383 3.5 9.2 103.7 98 106.0 1538 04/10/01 Per .Plan Lot 383 4.5 10.2 9S.8 93 106.0 1539 04/10/01 Per :Plan Guardshack 10.0 12.1 100.1 94 106.0 1540 04/10/01 Per Plan Guardshack 11.5 13.3 102.3. 97 106.0" 1541 04/11/01 Per Plan Lot 380 5.0 13.1 .107.2 '97 111.0 1542 04/.11/01 Per Plan Lot380 6.0 13.5 "103.8 94 111.0 1543 04/11/01 Per Plan Lot 382 5.5 12.7 106.1 96 111.0 1544 04/11/01 Per Plan Lot 382 7.0 13.6 101.9 92 111.0 1545 04/11/01 Per Plan Lot 384 3.5 11.6 104.3 94 111.0 1546 04/11/01 Per Plan Lot 384 4.5 10.9 103.193 111.0 1547` 04/11/01 Retest 41533. 10.4 101.1 91 1548. 04/11/01 Per Plan. Lot 3S6 4.5 11.4 102.6. 92 111.0 1549 04/11/01. Per Plan Lot388, 3.5 12.9 105.3 95 111.0 1550 04/11/01 Per Plan Lot 388 4.5 11.7 103.2 93 111.0 1551 04/11/01 Per Plan Lot 370 4.5 10.6 103.3 93 111.0 1552 04/11/01 Per Plan :Lot 370 5.5 9.1 102.2 92 111.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT O.F RELATIVE COMPACTIONS JOB NAME: Country Club of the Desert LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 0l -07-718 boon d7 of (,(1 Test No Date Tested Description Elevation (feet) , %Moister Dry Density Relative Maximum In Place In Place Compaction Density 1553 04/1.1/01 Per Plan Lot 389 4.0 12.8 107.1 96 111:0 1554. 04/11/01 Retest #1535 13.4 105.4 954'* 111.0 1555 04/11/01 Retest #1529 12.3 .106.2 96** 111.0. 1556 04/11/01 Per Plan Lot 383 4.0 111.9 103.1 93 111.0 1557 04/11/01 Per Plan Lot 38I 4.5 12.9 104.7 94 111.0 1558 04/11/01 Per Plan Lot 389 5.0 10.3 101.6 92 111.0 1559 04/11/01 PerPlan Lot3S9 6.0 11.9. 100.8 91 111.0 1560 04/11/01 Per Plan Lot 387 4.5 10.6 103.2 93 111.0 1561 04/11/01 Per Plan Lot 387 6.5 11.1 1 OU 91 1 l 1.0 1562 64/11/01 Retest #1530 12.6 103.1 93** 111.0 1563 04/11/01 Per Plan Lot 385 5.5 13.2 102.8 93 11 I.0 1564 04/11/01 Per Plan Lot 383 5.0. 10:9 105.7 95 111.0 1565 04/11/01 Per Plan Lot 383 6.0 11.7 102.5 92 111.0 1566 04/11/01 Per Plan Lot.381 5.5 13.2 103.9 '94 111.0 1567 04/11/01 Per Plan Lot 381 6.5 11:9 100.4 90 11 l .0 1568 04/11/01 Per Plan Lot 380 7.0 13..1 104.2 94 111.0 1569 04/11/01 Per Plan Lot 382 7.0 11.7 103.9 93 111.0 1570 04/11/01 Per Plan Lot 384 5.5 11.1 104.6 94 . 111.0 1571 04/11/01 Per Plan Lot 386 5.0 12.6 105.4 '95 111.0 1572 04/11/01 Per Plan Lot 388 5.5 10.8 102.6 92 111.0 1573 .04/11/01 Per Plan Lot 390 6.5 11.9 104.2 94 111.0 1574 04/11/01 Per Plan Lot 378 5:0 13.2 105.8 95 l l 1.0 1.575 04/11/01 Per Plan Lot 378 6.5 13.4 103.1 93 111.0 1576 04/11/01 Per Plan Lot379 5.0 12.7 106.9 96 111.0 1577 04/11/01 Per Plan Lot 379 6.5 13.3 101.7 92 111.0 1578 04/11/01 Per Plan Lot 391, 4.5 11.9 107.7 97 111.0 1579 04/11/01 Per Plan Lot 391 6.0 13.1 102.7 93 111.0 1580 04/12/01 -Per Plan Lot 377 5.0 13.4 102.4 92 111.0 1581 04/12/01 Per Plan Lot 377 6.0 10.8 102.8 93 106.0 1582 04/12/01 Per Plan Loi 376 5.5 10.6 102.1 96 1.06.0 1583 04/12/01 Per Plan Lot 376 6.5 9.9 100.6 95 111.0 1584 04/I2/01 . Per Plan Lot 378 6.5 12.6 105.6 95 111.0 1585 04/12/01 Per Plan Lot 37S 7.5 13.2 101.9 92 111.0 1586 04/12/01 Per Plan Lot 379 6.0 1.2.S 104.8 94 ` 111.0 1537 04/12/01 Per Plan -Lot 379 7.5. 12:1 102.6 92 111.0 1558 04/12/01 Per Plan Lot 3SO 6.0 1 1.9 104.5 94 111.0 1589 04/12/01 Per Plan Lot 380 7.5 13.0 103.2 93 111.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF R.ELAT'1 VE COMPACTIONS JOB NAME': Country Club of the Desert L,OCAT.ION:.La Quinla, California JOB NO: 07117-11 REPORT NO: 01-07-718 PslaP dI n!' Afl Test No Date Tested Description Elevation (feet) °X)Moist.ur- Dry Densit Relative Maxinnum In Place In Place Compaction Density 1590 04/12/01 Per Plan Lot 382 7.0 12.9 102.6 92' 111.0 1591 04/12/01 Per Plan Lot 384 6.0 10.9 104.2 94 1 I 1.0 1592 04/12/01 Per Plan Lot 386 6.0 12.7. 103.2 93 111.0 1593 04/12/01 Per Plan Lot 388 7.0' 11.7 105.6 95 111.0 1594 04/12/01 Per Plan Lot 389 8.0 12.3 103.9 94 111.0 1595 04/12/01 Per Plan Lot 379 8.0 13.1 105.8 95 1 l 1.0 1596 04/12/01 Per Plan Lot 379 9.0 11.6 101.8 92 111.0 1597 04/12/01 Per Plan Lot 377 7.0 12.1 103.6 93 111.0 1598 04/12/01 Per Plan Lot 377 8.0 10.8 100.8. 91 111.0 1599 04/12/01 Per Plan Lot 376 7.5 12.5 102.7 93 111.0 1600 04/12/0), Per Plan Lot 376 8.5 10.1 101.8 92 1 1 1.0 1601 04/12/01 Per Plan Lot 374 7.0 14.2 100.8 95 106.0 1602 04/12/01 Per Plan Lot 374 8.5 12.7 100.1 94 106.0 1603 04/12/01 Per Plan Lot 372 8.5 12.9 99.9 94 106.0 1604 04/12/01 Per Plan Lot 372 10.0 2.1 100.3 95 106.0 1605 -04/12/01 Per Plan Lot 375 7.5 13.7 101.8 96 106.0 1606 04/12/01, Per Plan Lot 373 8.0 12.8 100.5 95 106.0 1607 04/12/01 Per Plan Lot 371 9.0 1.2.1 100.6 95 106.0 1608 04/12/01 Per Plan Lot 371 10.0 10.7 98.6 93 106.0 1609 04/12/01 Per Plan Lot 370 9.0 11.S 1.00.1 94 106.0 1610 04/12/01 Per Plan Lot 370 10.0 9.9 98.9 93 106.0 1611 04/12/01 Per Plan Lot 378 8.5 12.6 103.8 94 111.0 .1612 04/12/01 Per Plan Lot 378 9.5 10.9 101.7 92 111.0 1613 04/12/01 Per Plan Lot 377 9.0 13.1 105.8 95 111.0 1614 04/12/01 Per Plan Lot 377 10.0 12.5 102.8 93 111.0 1615 04/12/01 Per Plan Lot 392 4.5 13.9 97.8. 92 106.0 1616 04/12/01 Per Plan Lot 392 5.5 10.8 101.9 92 111.0 1617 04/12/01 Per Plan Lot 394 5.0 12.8 99:2 94 106.0 1618 04/12/01 Per Plan Lot 394 6.5 11.4 103.1 93 111.0 1619 04/12/01 Per Plan Lot 395 5.5 13.1 99.7 94 106.0 1620 04/12/01 Per Plan Lot 395 7.0 11.6. 102.6 92 111.0 1621 04/12/01 Per Plan Lot 393 5.0 14.7 100.4 95 106.0 1622 04/12/01 Per Plan Lot 393 6.5 1 l .9 101.6 92 111.0 1623 .04/12/01 Per Plan Lot 391 6.5 12.6 105.2 95 111.0 1624 04/12/01 Per .Plan Lot 391 8.0 13.3 102.6 92 111-0 1625 04/12/0I Per Plan' Lot 390 6.5 112 103.1 95 109.0 1626 04/12/01 Per Plan Lot 390 8.0 9.9 100:2 92 109.0 1627 1. 04/12/01 1 Per Plan Lot 392 6.5 1 10.8 101.7 93 109.0 August 28, 2002 EARTI-I SYSTEMS SOUTHWEST REPORT Oh RELATIVE CONIPACr10NS .JOB NAME: Country Club of the .Desert I:OCATION: La Quinta, California ,10B NO: 07117-11 REPORT NO: 0 1 -07-718 n,t«p dd .,r 411 1'est No Date Tested Description Elevation (feet) %Moisture Dry Density Relative lVlasimum l.n Place Ln Place Compaction Density 1628 04/12/01 Per Plan Lot392 8.0 11.6 99.5 91 109.0 1629 04/12/01 Per Plan Lot 393. 7.0 13.9 107.6 94 109.0 1630. 04/12/01 Per Plan Lot 278 14.3 10.2 99.5 90 111.0 1631 04/12/01 Per Plan Lot 277 14.9 10.1 106.0 95 111.0 1632 04/12/01 Per Plan Loi 276 15.3 11.4 108.2 .97 111.0 1633 04/12/01 Per Plan Lot 275 15.7 13:2 108.5 98 111.0 1634 04/12/01 Per Plan Lot 274 ". 16.0 10.2 104.5 94 111.0 1635 04/12/01 Per Plan Lot 273 16.0 6.4 99.8 90 111.0 1636 04/12/01 Per Plan Lot 272 15.8 12.5 107.0 96 111.0 1637 04/12/01 Per Plan Lot 396 ' 6.0 17.9 98.3 93 106.0 1638 04/12/01 Per Plan Lot 397 6.5 11.0 100.3 .95 106.0 1639 04/12/01 Per Plan Lot 370 10.0 I2.6 103.1 93 111.0 1640 04/12/01 Per Plan Lot 370 11.5 10.5 100.9 91 111.0 1641 04/12/01 Per Plan Lot 371 11.5 10.6 101.3 91 111.0 1642 04/12/01 Per Plan Lot 372 11.5 11.9 104.6 94 111.0 1643 04/12/01 Per Plan Lot 372 13.0 9.8 101.8 92 111.0 1644 04/12/01 Per Plan Lot 373 9.0 11.7 103.6 93 111.0 1645 04/12/01 Per Plan Lot 373 10.5 12.6 102.3 92 111.0 1646 04/12/01 Per Plan Lot 270 11.5 13.1 99.7 94 106.0 1647 04/12/01 Per Plan. Lot 270 13.5 12.8 96.3 91 106.0 164S 04/12/01 Per Plan Lot 271 12.0 12.9 100.5 95 106.0 1649 .04/12/01 Per Plan Lot 271 14.0 10.7 99.1 93 106.0 1650 04/I2/01 Per Plan Lot 269 10.0 13.9 98.1 93 106.0 1651 04/12/01 Per Plan Lot 269 11.5 11.7 96.7 91 106.0 1652 04/12/01 Per Plan Lot 374 11.0 12.9 105.6 95 111.0 1653 04/12/01 Per Plan Lot 375 8.5 13.6 100.9 93 109.0 1654 04/12/01 Per Plan Lot 375 10.5 10.7 102.7 93 111.0 1655 04/13/01 Per Plan Lot 394 7.5 10.4 105.5 95 111.0 1656 04/13/01 Per Plan Lot 394 9.0 10.9 100.2 90 111.0 1657 04/13/01 Per Plan Loi 396 8.0 12.7 103.9 94 111.0 1658' 04/13/01 Per Plan Lot 396 9.5 11.1 101.7 92 111.0 1659 04/13/01 Per Plan Lot 398 8.0 15.7 101.8 96 106.0 1660 04/13/01 Per Plan Lot 398 9.5 10.3 101.4 92 111.0 1661 04/13/01 Per Plan Lot 393 8.5 13.9 99.7 94 106.0 1662 04/13/01 Per Plan -. Lot 393 10.0 12.2 97.1 92 106.0 1663 04/13/01 Per Plan Lot 395 8.5 14.7 100.6 95 106.0 1664 1 04/13/01 1 Per Plan Lot 395 10.0- 11.9 99:3 94 106.0 Auc"ust 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OIC RELATIVE COMPACTIONS .JOB NAME: Country Club of the Desert JOB NO: 071 17-1 1 I,OCATI.ON: La Quinta, California12EPORT NO: 01-07-718 n�n� ec .,i• �n Test No Date Tested Description Elevation (feet) %Moister ry Density .Relative Maximum In Place In Place,, Compaction Density 1665 04/13/01 Per Plan Lot 3971 9.0 10.4 " 101.1 93 109.0 1666 04/13/01 Pe.r Plan Lot 397 10.5 " 14.8 100.5 92 1.09.0 1667 04/13/01 Per Plan Lot.399 -8.5 10.6 100.7 98 111.0 1668 04/13/01 Per Plan Lot 399 9.5 12.1 99.8 92 109.0 1669 04/13/01 Per Plan " ." Lot -394 9.5. 13.2 103.2 93 111.0 1670 04/13/01 Per Plan Lot 394 11.0 10.9 100.9 91 111.0 1671- 04/13/01 Per Plan ". Lot 396 10.5 12.7 103.7 93 111.0 1672 04/13/01 Per "Plan Lot 396 12.0 11.1 101.8 92 111.0 1673 04/13/01 Per Plan Lot 398 l 0.0 I0".9 105.8 95 1 I 1.0 1674 04/13/01 Per Plan :Lot 398 11.5 12.1 103,6 93 111.0 1675 04/13/01 Per Plan Lot 400 6.5. 14.2 99.S 94 106.0 1676 04/13/01 Per Plan Lot 400 8.5. 12.3. 100.1 90 l 1 1.0 1677 -04/13/0 ] Per Plan Lot 395 9.5 11.7 101.4 93 109.0 1678 04/13/01 Per .Plan Lot 395 11:0 12.2 100.2 92 " 109.0 1679 04/13/01 Per Plan Lot 397 11.0 14.2 103.1 .95 109.0 1680 04/1-3/01 Per Plan Lot 397 12.5 10.7 100.9 93 109.0 1651 04/16/01 Per Plan Lot 400/4.01 " 10.0 - 10.1 98.5 93 106.0 1682 04/16/01 Per Pian Lot 400/401 11.5 15.8 95.6 90 106.0 1683 04/16/01 Per Plan Lot 402 TO 15.2 103.3" 92 112.0 1.684 04/16/01 Per Plan " Lot 402 9.0 18.5 102.3 91 112.0 1685 04/16/0.1 Per Plan Lot 402 10.5 " 16.8 97.4 92 106.0 1686 04/16/01 Per Plan Lot 3.97 i 1.0 13.1. 103.2 93 111.0 1687" 04/16%01 Per Plan Lot.397 12.5 10.8 101.9 92 111.0 1688 04/16/01 Per Plan Lot 398 12:0 11;6 103.8 94 111.0 1689 04/16/01 Per Plan Lot 398 13.5 9.9 102.1 92 111.0 1690 04/16/01 Per Plan Lot 399 - 11.5 . 14.1 98.6 93 106.0 1691 04/16/01 Per Plan Lot 399 12.5 12:7 96.1 91 106.0 1692 04/16/01 Per Plan Lot 370 13.0 6.3 103.8 94 111.0 1693 04/16/01 Per Plan " Lot 371 13.7 5.1.. 104.3 94 111.0 1694. 04/16/01 Per Plan Lot 372 14.5 5.7 102.6 92 111.0 1695 04/16/01 Per Plan Lot 373 13.7 6.8 103.1 93 111.0 1696 04/16/01 Per Plan. Lot 374 13.0 5.3 1019 92 111.0 1697 04/16/01 Per ,Plan Lot 375 12.3 6.2 102.7 93 111.0 1698 04/I6/01 Per Plan Lot 376 11.7 5.4 104.2 94 111.0 1699 04/16/01. Per Plan Lot 377 11.0 8.7 102.1 92 111.0 1700 04/16/01 Per Plan Lot 378 10.4 7.5 103.7. 93 111.0 1701 04/16/01 j Per Plan Lot 379 9.8 8.1 101.7 92 1.11.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF 11FILATIVE COIN]PACTIONS JOB NAME: Country Club of the Desert LOCA'T'ION: La Quinta, Cal1101-111a JOB NO: 071 17-1 I REPORT' NO: 0 1 -07-71 S P•inn A4 n1' K11 Test No Date Tested. Description Elevation (feet) %Moisture Dry Densit Relative Nlaxinrunl In Place In Place Compaction Density 1702 04/16/01 Per Plan Lot 380 9.1 8.9 1.04.1 94 -1 1 l .0 1703 04/16/01 Per Plan. Lot 399 12.5 13.9 99.7 94 106.0 1704 04/16/01 Per Plan ' Lot'399 13.5 12.1 97.2 92 106.0 .1705 04/16/01 Per Plan Lot 400 13.0 14.3 99.1 93 106.0 1706 04/16/01 Per Plan Lot 400 14.5 15.195.5. 93 106.0 1707 04/17/01 Per Plan Lot 407 1.5 10.4 972 92, 106.0 1708 04/17/01 Per Plan . Lot 407. 2.5 12.3 101.2. 95 106.0 1709 04/17/01 Per :Plan Lot 406 2.0 14.0 96.1 91 106.0. 1710 04/17/01 Pei- Plan Lot 406 3.5 13.1 98.1 93 106.0 1711 04/17/01 Per Plan Lot 404 3.0 9.1 101.1 94 108.0 1712 04/17/01 ' Per Plan Lot 404 .4.5 15.8 95.7 91 108.0 1713 04/17/01 Pcr Plan Lot 402 11.0 1 S.5 102.4 95 108.0 1714 04/17/01. Per Plan, Lot 402. - 12.5 17.5 95.9 92 105.0 1715 .04/17/01 Per Plan Lot 405 3.5 13.4 ..97.1 92 106.0 1716 04/17/01 Per Plan Lot 403 7.0 14.1 99.2 92 108.0 1717 04/17/01 Per Plan Lot 403 8.5 13.1 99.2 92 10S.0 1718 04/1.7/01 Per Plan Lot 401 12.5 15.8 100.2 93 108.0 1719 04/17/01 Per Plan Lot 401 14.0 16.,5' 98.3. 91 108.0 1720 04/17/01 Per Plan Loi 381 8.5 7.2 105.7 95 111.0 1721 04/17/01 1 Per Plan Lot 382 7.8 6.1 103.1 93 1 1 1.0 1722 04/17/01 Per Plan Lot 383 7.3 6.7 '103.8 94 11 ] .0 1723 04/17/01 Per Plan Lot 384 6.8 4.3 104.7 94 111.0 1724 04/17/01 Per Plan Lot 385 6.8 5.1 103.4 93 i l ] .0 1725 04/17/01 Per Plan Lot 386 7.0 7.9 101.7 92 111.0 1726 04/17/01 Per Plan Lot 387 7.3 6.1 103.2 93 111.0 1727 04/17/01 Per Plan Lot 388 8.2 6.6 103.9 94 111.0 1728 04/17/01 Per Plan Lot 389 8.7 4.3 102:7 93 111.0 1729 04/17/01 Per Plan Lot 390 9.3 5.7 104.8 94, 111.0 1730 04/17/01 Per Plan Lot 391 10.0 5.5 100.9 91 1731 04/17/01 Per Plan Lot 392 10.6 '6.1 103.3 94 111.0 1732 04/17/01 Per Plan Lot 110, 11.5 10.5 97.2 92 105.5 1733 04/17/01 Per Plan Lot 110 11.5 10.8 05.2 90 105.5 . 1734 04/18/01 Per ]:']an Lot 1.10 13.0 14.1 100.5 95 105.5 1735 04/18/01 Per Plan Lot 110 .14.0 12.4 99.0 94 105.5 1736 04/18/01 Per Plan Berm 54th 10.0 18.7 I01.2 94 108.0 1737 04/18/01 Per Plan Berm 54`h -8.0 13.8 98.1 91 108.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST RI -PORT OF RELATIVIs CONIPACTIONS .JOB NAME: Country Club of the Desert LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 01-07-718 PaoP 47 tf' 60 .Test No 'Date Tested Description Elevation (feet) %Moister- Dry Densit} Relative Maxrrnum In Place In Place Compaction Density 1738 04/)S/01 Per Plan Berm 54"' 10.0 17.3 100.7 93 108.0 1739 04/18/01 Per Plan Berm 54"' 8.0 15.6 973 90 108.0 1740 04/18/01 Per Pian Berth 54°i 10.0 16.1 101.3 94 10S.0 1741 04/18/01 Per Plan Berm 54'h 8.0 14.3 99.2 92 l OS.O 1742. 04/18/01 Per Plan Berm 50' 6.0 12.7 99.9 93 108.0 1743 04/18/01 Per Plan Berm 54"' 4.0 15.1 96.8 90 108.0 1744 04/18/01 Per Plan Berm 54°i 6.0 13.8 100.2 93 108.0 1745 04/18/01 Per Plan Benn 54°' 4.0 12.7 100.1 93 1 OS.O 1746 04/18/01 Per Plan Berm 54`' 6.0 14.8 1009 93 105.0 1747 04/18/01 Per Plan Bernr 54"' 4.0 15.1. 98.7 91 108.0 1748 04/18/01 Per Plan Bcnn 54"' 8.0 14.1 101.3 94 108.0 1749 04/1 SIO I' Per Plan Berm 54"' 6.0 11.7 100.0 93 108.0 1750 04/IS/01 Per Plan Bene 54"' 12.0 10.8 101.0 94 103.0 1751 04/1.8/01 Per Plan Berm 54'x' 10.0 .13.9 99.1 92 108.0 175? 04/18/01 Per Plan Bern 54`' 11.0 10.9 103.3 96 10S.0 1753 04/18/01 Per Plan Berm 5411' 9.0 14.1 98.7 91 108.0 1754 04/18/01 Per Plan Bern 54'h 12.0 11.7 103.1 95 108.0 1755 04/18/01 Per Plan Berm 54"' 10.0 13.1. 100.1 93 10S.0 1756 04/19/01 Per Plan . Lot 110 12.0 10.6 99.9 95 105.5 1757 04/19/01 Per Plan Lot 110 13.0 10.3 100.4 95 105.5 ; 1758 04/19/01 Per Plan Lot IH 11.5 12.2 100.1 95 105:5 1759 04/19/01 Per Plan Lot 111 12.5 10.8 97.3 92 105.5 1760 04/19/01 Per Plan Lot 1 I l 13.5 11.3 98.1 93 105.5 1761. 04/20/01 Per Plan Lot 204 11.0. 10.5. 1.00.9 96 105.5 1762 04/20/01 Per Plan Lot 204 12.5 11.3 99.8 95 105.5 1763 04/20/01 Per Plan Lot 204 14.0 11.9 97.6 93 105.5 1764 04/20/01 Per Plan Lot 187 9.5 11.8 101.3 96 105.5 1765 04/20/01 Per Plan Lot 187 11.5 :'. 10.1 97.6 93 105.5 1766 04/20/01 Per Plan Lot 187 13.5 11.3 97.1 92 105.5 1767 04/23/01 Per Plan Lot 109 14.8 7.3 100.1 95 105.5 1768 04/23/01 Per Plan Lot .1 l 0 14.5 6.1 97.1 92 105.5 1769 04/23/01 Per Plan Lot'] 11 . . 14.2 6.7 98.4 93 105.5 1770 04/23/01 Per Plan Lot 204 15.3. 7.4 98.1 93 105.5 1771 04/23/01 Per Plan Lot 187 15.3 5.3 99..2 94 105.5 1772 1 04/23/01 Per Plan Lot 393 11.3 5.1 102.3 92 1 1 l .0 August 28, 2002 EARTH SYSTEMS SOUTI NVEST 0 REPORTOF RELATIVE CUMPACTIONS JOB N:kiME: Country Club of the Desert LOCATION: La Quinta, California .1013 NO: 07117-11 REPORT NO: 0 1 -07-71 S PaQl. 44 of 60 Test No Date Tested Description Elevation (feet) %M.oistur- Dry Density Relative Ma\imUnl In Place In Place Compaction Density 1773 04/23/01 Per Plan Lot 394 12.0 4.5 100.9 91 111.0 1774 04/23/01 Per Plan Lot 395 12.7 5.6 102.7 93 11 1.0 1775 04/23/01 Per Plan Lot 396 13.4 4.8 101.4 91 111.0 1776 04/23/01 Per Plan Lot 39 % 14.1 5.7 99.7 92 108.0 1777 04/23/01 Per Plan Lot 39S 15.2 5.7 100.2 93 108.0 177S 04/23/01 Per Plan Lot 399 15.7 5.3 99.1 92 108.0 1779 04/23/01 Per Plan Lot 400 16.2 4.6 99.6 92 108.0 17SO 04/23/01 Per Plan Lot 411 16.2 5.2 100.3 93 108.0 1781 04/23/01 Per Plan --Bern 54'x' 3.0 BG 9.9 100.9 93 108.0 1782 04/23/01 Per Plan Berm 54`x' 1.5 BG . 10.2 98.3 91 108.0 1783 04/23/01 Per -Plan Berm 54`}' 3.0 BG 10.8 102.3 95 108.0 1784 04/23/01 Per Plan _ Berm 54°i 1.5 BG 12.7 100.1 93 10S.0 1785. 04/23/01 Per Plan Berm 54'h 3.0 BG 12.6 102.1 95 105.0 17S6 04/23/01 Per Plan Berm 54'x' 1.5 BG 10.5 101.9 94 I OS.O 1757 04/23/01 Per Plan Berm 54'x' 3.0 BG 9.6 100.8 93 108.0 17SS 04/23/01 Per Plan Berm 54`x' 1.5 BG 10.1 99.5 92 108.0 1759 . 04/23/01 Per Plan Lot 420 0.0 12.7 104.4 94 111.0 1790 04/23/01 Per Plan Lot 420 1.0 13.1 .101.1 91 111.0 1791 04/23/01 Per Plan Lot 41 S 999.5 13.3 102.7 93 111.0 1792- 04/23/01 Per Plan Lot 418 0.5 11.6 100.5. 91 111.0 179") 04/23/01 Per Plan Lot 416 909.0 12.5 104.1 94 111.0 1794 04/23/01 Per Plan Lot 416 0.5 11.1 103.7 93 111.0 1795 04/23/01 Per Plan Lot 419 999.5 14.2 104.5 94 1 l 1.0 1796 04/23/01 Per Plan Lot 419 0.5 10.S 101.9 92 111.0 1797 04/23/01 Per Plan Lot 417 999.5 12.6 103.5 93 111.0 . 1798 04/23/01 Per Plan Lot 417 0.5 11.2 100.9 91 111.0 1799 04/23/01 Per Plan Lot 420 2.0 14.7 100.9 93 108.0 1800 04/23/01 Per Plan Lot 420 3.0 15.6 98.7 91 108.0 ISO] 04/23/01 Per Plan Lot 418 1.5 16.4 103.3 96 108.0 1.802 04/23/01 Per Plan Lot 418 3..0 13.7 100.1 93 108.0 1803 04/23/01 Per Plan Lot 417 1.5 14.3 104.1 9.6 108.0 1 SO4 04/23/01 Per Plan Lot 417 3.0 12.6 102.1 95 108.0 1805 04/23/01 . .Per Plan Lot 19 1.5 15.8 103.7 96 108.0 1806 04/23/01 Per .Plan Lot 419 3.0 11.7 99.2 92 108.0 1807 04/23/01 Per Plan Lot 415 999.5 12.6 105.7 95 111.0 1808 04/23/01 Per .Plan Lot 415 1.0 10.9 101.3 91 111.0 1 S09 -04/23/01 Per Plan Lot 413 0.5 11.4 104.2 94 111.0 1810 04/23/01 Per Plan Lot 413 .2.0 10.0 100.7 1 91 111.0 Au�.;ust 28, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF RELA`d'IVE COMPACTIONS JOB NAME: Country Club of the Desert :)018 NO: 07117-11 LOCATION: La nuinta, California REPORT NO: 01-07-718 Pa e 49 of 60 Test No :Date Tested Description Elevation (feet) 'yomoisture Dry Densil Relative Maximum 1:11 Place In Place Compaction Density 1811 04/24/01 Per Plan Lot 421 0.0 11.1 102.3 97 106.0 1 S 12 04/24/01 Per Plan Lot 421 1.0 10.9 104.8 9S 106.0 1813 04/24/01 Per Plan Lot 421 2.5 10.4 101.8 94 108.0 1 S 14i 04/24/01 Per Plan Lot 423 999.0 11.3 100.2 95 106.0 I S 15 04/24/01 Per Plan Lot 423 0.5, 14.0 99.7 94 106.0 1816 04/24/01 Per Plan Lot 423 2.0 10.8 102.9 95 108.0 1817 04/24/01 Per Plan Lot 425 0.0 13.7 100.9 95 106.0 ISIS 04/24/01 Per Plan Lot 425 1.5 15.2 9S.3 91 108.0 1819 04/24/01 Per Plan Lot 425 3.0 12.0 101.4 94 108.0 1820 04/24/01 Per Plan Lot 427 999.5 10.8 101.8 94 108.0 1 821 04/24/01 Per Plan Lot 427 1.0 13.7 100.3 93 108.0 1 S22 04/24/01 Per Plan Lot 427 2.5 11.7 98.7 91. 108.0 1823 04/24/01.. Per Plan Lot 422 1.0 14.3 101.3 94 108.0 1824 04/24/01 Per Plan Lot 422 2.5 13.9 100.1 93 108.0 1 S25 04/24/01 Per Plan Lot 424 0.5 14.9 102.3 95 108.0 1 S26 04/24/01 Per Plan Lot 424 r 2.0 16.7 101.7 94 108.0 1827 04/24/01 Per Plan Lot 426 1.0 15.3 100.9 93 108.0 1828 04/24/01 .Per Plan Lot 426 2.5 16.1 98.2 91 108.0 1829 04/24/01 Per Plan Lot 429 0.5 12.7 99.7 94 106.0 1 S30 04/24/01 Per PIan Lot 429 2.0 13.2 102.7 97 106.0 183 1 04/24/01 Pcr Plan Lot 414 0.0 13.7 992 94 106.0 1832 04/24/01 Per Plan Lot 414 1.5 10.4 98.0 92 106.0 1833 04/24/01 .Per Plan Lot 416 2.0 10.9 101.6 96 106.0 1 S34 04/24/01 Per Plan Lot 416 3.5 13.5 102.3 92 111.0 1835 04/24/01 Per Plan Lot 422 1.0 12.7 103.7 93 111.0 1836 04/24/01 Per Plan Lot 422 2.5 10.9 100 92 111.0 1837 04/24/01 Per Plan Lot 424 1.5 13.7 100.1 93 108.0 183S 04/24/01 Per Plan Lot 424 3.01 14.2 99.0 92 108.0 1839 04/24/01 Per Plan Lot 426 2.0 14.9 101.3 94 108.0 1840 04/24/01 Per .Plan Lot 426 3.5 12.7 98.2 91 108.0 1841 04/24/01 Per Plan Lot 428 1.0 14.8 100.9 93 108.0 1842 04/24/01 Per Plan Lot 428 2.0 15.6 99.7 92 108.0 1843 04/24/01 Per Plan Lot 415 2.5 10.7 103.8 94 111.0 1844 04/24/01 Per Plan Lot 415. 4.0 14.8 101.3: 91 1 1 1.0 1845 04/25/01 Per Plan Lot 42S 2.0 14.6 103.9 93 112.0 1846 04/25/01 Per Plan Lot 428 3.1) 11.5 102.7 92 112.0 1847 04/25/01 Per Plan Lot 430 0.0 .13.1 96.7 91 106.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST REP0.111' Oh RI+.LATIVE CONI ACTIONS .1013 NAME: Country Club of the Desert LOC:A'I'ION: La Quinta, California. JO.13 NO: 07117-11 REPORT NO: 01-07-71 S Denn Gn „r,<n Test No Date Tested Description Elevation (feet) '.'•-b1\••IoisturcDry Densil Relative Maximum (n Place In Place Compaction Density 1848 04/25/01 Per Plan Lot 430 1.5 15.2 97.1 92 106.0 1849 04%25/01 Per Plan Lot 432 0.5 12.8 100.1 94 106.0 1850 04/25/01 Per Plan Lot 432 2.0' 14.2 96.1 91 106.0 1851 04/25/01 Per Plan Lot 429 1.5 15.3 102.6 92 112.0 1852 04/25/01 Per Plan Lot 429 3.0 12.7 101.9 91 112.0 1853 04/25/01 Per Plan Lot 431 0.5' 12.1" 104.2 93 112.0 1854 04/25/01 Per Plan Lot 43.1 2.0. 13.3 102.5 92 112.0 1855 04/25/01 Per Plan, Lot 433 1.5 , 15.1 103.6 93 112.0 1 S56 , 04/25/01 Per Plan Lot 433 3.0 12.7 101.7 91 1.12.0 1857 04/25/01 Per Plan Lot 428 5.0 14.5 105.6 94 112.0 1858 04/25/01 Per Plan Lot 429 5.0 13.3 104.1 93 112.0 I S59 04/25/01 " Per Plan Lot 427 4.5 12.5 103.2 92 112.0 1860 04/25/01 Per Plan Lot 426 4.0 14.3 101.1 94 1.08.0 1861 04/25/01 Per Plait Lot 425. 3.5 15.2 104.5 97 .. 10S.0 1862 04/25/01 Per Plan Lot 421 3.0 12.7 102.8 95 105.0 1863 04/26/01 Per Plan Lot 412 999.5 14.3 99.8 94 106.0 1864 04/26/01 Per Plan Lot 412 1.0 12.7 103.1 92 112.0 1865 04/26/01 Per Plan Lot 4.10 999.5 12.8 100.1 94 106.0 1866 04/26/01 Per Plan Lot 410 l .Q 13.1 102.7 92 112.0 1867 04/26/01 Per Playa Lot 40S- 999.5 12.9 9S.3 93 106.0 1 868 04/26/01 Per Plan Lot 40S 1.0 . 12.5 101.1 90, 112.0 1869 04/26/01 Per Plan Lot 414 2.5- 14.2 105.1 94 112.0 1870 04/26/01 Per Plan .Lot 414 4.0 11.7 :. 102.3 91 112.0 l S71 04/26/01 Per Plan Lot 413 2.0 12.8 103.7 93 112.0 1872 04/26/01 Per Plan Lot 413 3.5 11.5 101 .7' 91 112.0 1873 04/26/01 Per Plan Lot 411 999.5 13.9 98.8 93 106.0 1874 04/26/01 Per Plan Lot 411 0.5 10.6 1.03.2 92 112.0 1875 04/26/01 Per Plan Lot 409 999.5 12.9 99.5 94 106.0 1876 04/26/01 Per Plan Lot 409 0.5 11.5 1'04.7 93 112.0 1877 04/26/01 Per Plan Lot 430 -2.5 14.2 101.3 94 108.0 1875 04/26/01 Per Plan Lot 430 4.0 15.6 100.1 93 108.0 1879 04/26/01 Per Plan Lot 432 2.5 12.3 103.1 95 108.0 1880 04/26/01 Per Plan Lot 432 4.0 14.4 100.9 93 108.0 1881 04/26/01 Per Plan Lot 431 2.5 . 12.1 101.3 94 " 108.0 1 SS2 04/26/01 Per Plan Lot 431 4.0 . 11.9 98.7 91 108.0 1883. 0=4/26/01 Per Plan Lot 412 2.0 13.1 99:S 92 108.0 1 SS4 04/26/01 Per Plan Lot 412 3.5 12.7 9S.1 91 108.0 August 28', 2002 EARTH SYSTEMS SOUTIWES'T 12EPORT OI+ RELATIVE CO�IIPACTIONS .1013 NAME: Country Club of the Desert JOI3 NO: 071 '17-1 } LOCATION: La Quinti. California REPORT NO: U1 -U7 -71S Vn- ci A 411 Test No Date Tested Description Elevation (feet) %Moisture Dry Densit) Relative IVlaziinum In .Place hi Place Compaction Density 1 SSS 04/26/01 Per Plan Lot 413 5.5 14.2 101.3 94 108.0 1 SS6 04/26/01 Per Plan Lot 414 - 5.0 13.6 99.2 92 108.0 1 SS7 0=1/26/01 Per Plan Lot 411 2.0 11.9 103.2 93 111.0 1 SSS 04/26/01 Per Plan Lot 411 3.5 13.1 101.6 92 111.0 1 889 04/30/01 Per Plan Lot 402 13.0 9.4 102.9 90 114.5 1890 04/30/01 Per Plan Lot 402 .14.0 14.5 106.6 94 114.5 1 S91 04/30/01 Per Plan Lot 404 10.0 11.4 97.8 92 . 106.0 1892 04/30/01 Per Plan Lot 404 9.0 7.0 99.5 94 106.0 1893 04/30/01 Per .Plan Lot 406 8.0 11.9 103.1 .92 109.0 1 S94 04/30/01 Per Plan Lot 406 9.5 10.5 99.7 91 109.0 1895 04/30/01 Per Plan Lot 40S 6.5 9.0 102.1 94 109.0 1896 04/30/01 Per Plan Lot 408 5.5 7.1 104.6 96 109.0 1897 05/01/01 Per Plan Lot 438 999.0 12.6 102.9 97 106.0 1 S98 05/01/01 Per Plan Lot 438 1.0 13.2 99.7 94 106.0 1899 05/01/01 Per Plan 'Lot 436 0.0 12.5 103.7 98 . 106.0 1900 05/01/01 Per Plan Lot 436 2.0 13.5 98.3 93 106.0 1901 05/01/01 Per Plan Lot 434 3.5 13.8 105.4. 98 108.0 1902 05/01/01 Per Plan Lot 434 5.5 14.2 102.1 95 10S.0 1.903 05101 /01 Per Plan Lot 439 998.5 13.3 101.9 96 106.0 1904 05/01/01 Per Plan Lot.439 0.5 10.8 100.1 94 106.0 1905 05/01/01 Per Plan Lot 437 0.5 12.6 99.7 94 106.0 1906 0510I101 Per Plan Lot 437 2.5 1 3.2 96.5 91 106.0 1907 05101101 Per Plan Lot 435 1.5 12.1 101.3 96 106.0 1905 05/01/01 Per Plan Lot 435 3.5 11.7 97.6 92 106.0 1909 05/01/01 Per Plan Lot 433 5.0 14.2 101.3 94 108.0 1910 05/01/01 'Per Plan Lot 433 6.5 12.4 99.1 92 108.0 1911 05/01/01 Per Plan Lot 250 0.0 14.3 101.9 96 106.0 1912 05/01/01 Per Plan Lot 250 1.5 12.7 96.8. 91 106.0 1913 05/01/01. Per Plan Lot 252 999.0 13.S 103.1 97 106.0 1914 05/01/01 Per .Plan Lot 252 0.5 10.2 97.2 92 106.0 1915 05/01/01 Per Plan Lot 281 0.0 15.? 103.1 97 106.0 1916 05/01/01 Per Plan Lot 281 1.5 11.799.2 94 106.0 1917 05/01/01 Per Plan Lot 254 1.0 13? 100.5 95 106.0 1918 05101101 Per Plan Lot 254 2.5 10.5 96.3 91 106.0 1919 .05/01/01 Per Plan Lot 256 3.5 14.7 101.7 96 1.06.0 1920 05/01/01 Per Plan Lot 256 4.5 12.6 96.1 91 106.0 August 28, 2002 EARTH SYSTLivIS SOUTHWEST REPORTOF R.11"LATIVE C 0,NIP.1-kCTIONS JOB NAME: COLIJI(I-NI Club of the Desert JOB NO: 07117-11 LOCATION: La Quinta, California REPORT NO: 01-07-715 Pape 52 of 60 Test No Date Tested Description Elevation (.feet) "XoMoisturdDry Densit), Relative MaxiiiiiIIII In Place In Place Compaction Density 1921 05/01/01, Per Plan Lot 258 3.5 13.1 1013 96 106,0 1922 05101101 Per Plan Lot 258 5.0 10.5 98.8 93 106.0 1'923 05101101 Per Plan Lot 260 2.0 14.2 103.4 98 106.0 1924 05/01/01, Per Plan Lot 260 3.5 I1.6 97.5 92 106.0 1925 05101101 Per Plan Lot 249 1.0 12.8 102.6 97 106.0 1926 05101101 Per Plan Lot 251 0.0 11.1 100.4 95 106.0 1927 05/01/01 Per Plan Lot 253 1.5 13.2 101.1 95 106.0 1928 05101101 Per Plan Lot 255 3.0 10.4 103.2 97 .106.0 1929 05/01/01 Per Plan Lot257 2.5 14.3 100.9 95 106.0 1930 05/01/01. Per Plan Lot 259 1.5 12.6 102.5 97 106.0 1'931 05/02/01 Per Plan Lot 403 9.5 13.2 99.1 93 106.0 102 05/02/01 Per Plan Lot, 403 11.0 10.9 96.8 91 106.0 1933 05/02/01 Per Plan Lot 405 6.0 13.9 100.4 95 106.0 1934 05/02/01 Per Plan Lot 405 7.5 12.6 99.5 94 106.0 1935 05/02/01 Per Plan Lot 407 6.0 121 100.1 94 106.0 1936 05/02/01 Per Plan Lot 407 7.5 10.4 97.6 92 106.0 1937 05/02/01. Per Plan Lot 409 4.5 14.2 99.9 94 106.0 1938 05/02/01 Per Plan -Lot 409 6.0 12.1 98.1 93 106.0 1939 05/02/01 Per Plan Lot 402 12.0 13.3 101.3 96 106.0 1940 05/02/01 Per Plan Lot 404 9.0 11.7 1,00.9 95 106.0 1941 05/02/01 Per Plan Lot 406 7.0 12.6 100-5 95 106.0 1942 05/02/01 Per Plan Lot 408 6.5 13.1 101.1 95 106.0 1943 05/02/01 Per Plan Lot 435, 5.0 11.6 103.1- 93 106.0 1944 05/02/01 Per Plan Lot435 6.0 12.7 100.1 90 111.0 1945 05/02/01 Per Plan Lot 437 4.0 13.5 .100.2 95 111.0 1946 05/02/01 Per Plan Lot 437 5.5 10.9- 95.9 90 106.0 1947 05/02/01 Per Plan Lot 439 2.5 12.1 99.7 94 106.0 1948 05/02/01 Per Plan Loi 439 4.0 11.1 97.4 02 106.0 1949 05/02/01 Per Plan Lot 438 3.5 13.2 102.6 92 111.0 1950 05/02/01 Per 'Plan Lot 436 5.5 10.9 103.4 93 111.0 1951. 05/02/01 Per Plan Lot 434 5.5 - 13.8 99.7 94 106.0 1952 05/02/01 Per Plan Lot 402 12.5 12.0 100.3 95 106.0 1953 05/02/01 Per Plan Lot 402 14.0 10.9 98.2 93 '106.0 1954 05/02/01 Per Plan Lot 404 -9.0 '14.2 101.3 96 106.0 1955 05/02/01 Per Plan Lot,404 10.5 12.6 97.2 92 106.0 1956 05/02/01 Per Plan Lot 406 9.0 13.9 99.7 94 106.0 1957 05/02/01 Per Plan Lot 405 9.0 10.8 100.9 95 106.0 August 2S, 2002 EARTH SYSTEMS SOUTHWEST REPORT OF R1�,LATIVE. COM]"AC:TIONS 3013 NAi1IE: Country Club of theDesert LOCATION: La Quinta, California 30B NO: 07117-11 REMIT NO: 01-07-715 pncu- 1;1 nr rn Test leo .Date Tested . Description Elevation (feet) %Moistur- Dry Density Relative Maximum In Place In :Place Compaction Density 195S 05/02/01 Per Plan Lot 403 12.5 12.6 99-3- 94 106.0 1959 05/02/01 Per Plan Lot 433 5.0 13.1. 103.2 93 111.0 1960 05/02/01 Per Plan Lot 433 6.5 11.8 101.9 92 111.0 1961 05/02/01 Per Plan Lot 259. 5.0 14.3 105.6 95 1111.0 1962 05/02/01 Per Plan Lot 259 6.5 11.7 101.7 92 111.0 1963 05/02/01 Per Plan Lot 257 4:0 12.6 102.9 93 111.0 1964 05/02/01 Per Plan- Lot 257 5.5 10.9 100.8 91 111.0 1965 05/02/01 Per Plan Lot 255 3.5. 13.8 103.1 93 111.0 1966 05/02/01 Per Plein Lot 255 5.0 12.6 101.7' 92 111.0 1967 05/02/01 Per Plan Lot 253 3.0 11.7 103.9 94 111.0 1965 05/02/01 Per. Plan Lot 253 4.5 12.1 102.4 92 111.0 1969 05/04/01 Per Plan Lot 409 7.9 4.2 100 9 93 109.0 1970 05/04/01 Per Plan Lot 410 7.5 5.6 102.3 94 .109.0 1971 05/04/01 Per Plan Lot 411 7.1 3.S 100.7 92 109.0 1972. 05/04/01 Per Plan Lot 412 6.7 4.7 101.6 93 109.0 1973 05/04/01 Per Plan Lot 413 6.3 4.9 99.9 92 109.0 1974 05/04/01 Per Plan Lot 414 5.9 4.1 101.1 93 109.0 1975 05/04/01 Per Plan Lot 415 5.5 5.2 103.6 95 109.0 1976 05/04/01 Per Plan Lot 416. 5.1 5.7 l 01.8 93 109.0 1977 05/04/01 Per Plan Lot 417 4.7 3.6 105.7 95 111.0. 1.978 05/04/01 Per Plan Lot 418 4.3 3.8 1'03.9 94 111.0 1979 05/04/01 Per Plan Lot 419 4.0 3.9 106.5 96 111.0 1980 05/04/01 Per Plan Lot 420 A.0 4.4 102.7 93 111.0 1951 05/04/01 Per Plan Lot 421 4.0 5.8 103.1. 93 111.0 1982 05/04/01 Per Plan Lot 422 4.0 4.2 104.8 94 111.0 1983 05/04/01 Per Plan Lot 423 4.0 4.4 99.3 94 106.0 1984 05/04/01 Per Plan Lot 4244.4 4.7 9$. l 93 106.0 1985 05/04/01 Per Plan Lot 425 4.8 59 100.1 94 106.0 1986 05/04/01 Per Plan Lot 426 5.2 4.1 99.7 94 106.0 1987 05/04/01 :Per Plan Lot 427 5.6 4.5 100.7 95 106.0 19S8 05/04/01 Per Plan Lot 428 6.0 5.1 98.9 9 3 106.0 1959 05/04/01 Per Plan Lot 429 6.4 3.6 102.7 94 109.0 1990 05/04/01 Per Plan Lot 430 6.8 4.S 100.4 95 109.0 1991 05/04/01 Per Plan Lot 431 7.2 4.1 103.8 95 109.0 1992 05/04/01 Per Plan Lot 432 7.6 4.7 100.2 92. 109.0 1993 05/04/01 Per Plan .Lot 433 8.0 5.2 101.4 93 109.0 1994 05/04/01 Per Plan Street . 9.5 13.1 105.8 95 111.0 August 28, 2002 _ EARTH SYSTEI\IS SOUTHWEST y 4 REPORT OF RELATIVE CONIPACTiONS ,IO NAIVIE: CuuntIy Club of the Desert ,JOB NO: 07117-11 LOCATION: La Qeinta, California REPORT NO: 0 1 -07-718 n.irrn C1 of An Test No Date Tested Description Elevation (feet) %Moister- Dry Density .Relative - Maxims rn 1n -Place hi Place Compaction Density 1995 05/04/01 Per Plan Street 1.1.0 ILS 100.9 91 ' 1.1 l .0 1996 05/04/01 Per Plan Street 9.0 10.6. 103.6 93 111.0 1997 05/04/01 Per Plan Street 11.0 12.3 101.4 91 111.0 1998 05/04/01 Per Plan Street 9.0 12.1 103.9 94 111.0 1999 05/04/01 Per Plan Street ' l 1.0 11.6 102.5 92 111.0 2000. 05/04/01 Per Plan Lot 249 2.5 13:6 .107.5 94 yI 14.5 2001 05/04/01 Per Plan Lot 249 , 3.5 10.9 105.2 92 114.5 2002 05/04/01 Per Plan Lot 251 1.5 12.5 105.9 92 114.5 2003 05/04/01 Per Plan Lot 251 3.0 13. 2 104.1 91 114.5 2004 05/04/01 Per Plan Lot 250 2.5 14.1 106.8 93 114.5 2005 05/04/01 Per Plan Lot 252 2.5 12.7 104:0 91 114.5 2006 05/04/01 Per Plan Lot 2S 1 3.0 15.2 108.9 95 114.5 2007 05/04/01 Per Plan Lot 281 4.5. 13-1 - _ 105.3 92 9 114.5 2008 05/07/01 Per Plan Lot 25S 5.0 16.9 107.8 94 114.5 2009 05/07/01 Per Plan Lot 258 6.5 18.9 104.3 91 114.5 2010 05/07/01 Per Plan Lot 256 4.5 , 14.9 101..5 96 106.0 2011 05/07/01 Per Plan Lot 256 6.0 15.0 107.4- 94 114.5 2012 05/07/01 Per Plan Lot 254. 3.5 13.8 102.7 97 106.0 2013 05/07/01 Per Plan Lot 25.4 5.0 16.3 105.9 92 114.5 2014 05/07/01 Per Plan Lot 253 3.5 15.1 100.9 95 106.0 2015 05/07/01 Per Plan Lot -.253 "5.0 17.2 108.3 95 114.5 2016 05/07/01 Per Plan Lot 255 4.0 13.1 97.6 92 106.0 2017 05/07/01 Per Plan Lot 255 5.5 15.8 105.7 92 , 114.5 2018 05/07/01 Per Plan Lot 257 4.5 16.3 107.9 94 114.5 2019 05/07/01 Per Plan Lot 257 6.0 17.2 105.5 92 11.4.5 2020 05/07/01 Per Plan Lot 260 4.5 13.9 102.1 96 106.0 2021 05/07/01 Per Plan Lot 260 6.0 14.5 99.6 94 106.0 2022 05/07/01 Per Plan Lot 262 5.0 11.8 100.5 95 106.0 2023 05/07/01 Per Plan Lot 262 6.5 13.7 98.3 93 106.0 2024 05/07/01 Retest #1475 _ 13.10 h 100.1 94 106.0 '2025 05/07/01 Retest #1476 12.6#4 96.1 91 106.0 2026. 05/07/01 Retest #1477 14.711# 101.9 96 106.0 2027 05/07/01 Retest #1478 12.9## • 99.2 94 106.0 2028 05/07/01 Retest # 1455 1.4.0##t 103.9 9S 1.06.0 2029 05/07/01 Retest #1456 - 1.1.7#0 100.6 95 106:0 2030 05/07/01 Retest#1479 12.9### 101.2 95 106.0 2031 05/07/01 Retest #1480 14.2# 96.5 91 1 106.0 EARTH SYSTEMS SOUT.I-IWEST REPORT Oh RELATIVE COMPACTIONS .1013 NAME: Country Club of the Desert LOCATION: La Qiiinta, Calil:ornia JOB NO: 07117-11 REPORT NO: 0 1 -07-718 'Fest No Date Tested Description Elevation (feet) %Moistur- Dry Densit Relative Maximum 1» .Place In Place Compaction Density 2032 05/07/01 Per Plan Lot 259 4.5 15.9 107.9 .94 114.5 2033. 05/07/01 Per Plan Lot 259 6.0 13.9 105.8 92 114.5 2034 05/07/01 Per Plan Lot 261 5.0 15.1 1079 94 1 14.5 2035 05/07/01 Per Plan Lot 261 6.5 14.7 105.1 92 114.5 2036 05/07/01 Per Plan Lot 263. 5.5 16.8 105.9 92 114.5 'M7 05/07/01 Per Plan Lot 263 7.0 13.9 104.1 91 114.5 2038 05/07/0.1 Per Plan Lot 265 7.0. 14.2 106.9 93 114.5 2039 05/07/01 Per Plan Lot265 8.5 11.9 1052 '92 114.5 2040 05/07/01 Per PIan Lot 267 7.5 15.3 108.3 95 1.14.5 2041 05/07/01 Per Plan Lot 267. 9.0 12.8 I04.0 91 114.5 2042 05/07/OI Per Plan Lot 269 8.5 13.8 107.1 94 114.5 2043 .05/07/01 Per Plan Lot 269 10.0 12.1 103.5 91 114.5 2044 05/07/01- Per -Plan Lot 270 11.0 14.7 107.9 94 114.5 . 2045 05/07/01 Per Plan Lot 268 9.5 1.6.9 108.7 95 114.5 2046 05/07/0I Per Plan Lot 266 8.0 12.8 105.6 92 114.5 2047 05/07/01 Per Plan Lot 264 S.5 13.9 106.1 93 114.5 2048 05/07/01 Per Plan Lot 262 6.0 15.2 104.2 91 114.5 2049 05/07/01 Per Plan Lot 260 6.0 13.1 107.7 94 114.5 2050 05/08/01 Per Plan Lot 23I 11.'5 8.9 100.2 95 106.0 2051 05/08/01 Per Plan Lot 231 13.0 9.3 98..2 93 106.0 2052 05/08/01 Per Plan Lot 231 14.5. 9.9 105.6 92 114.5 2053 05/08/01 Per Plan Lot 233 10.0. 10.3 102.1 96 106.0 2054 05/08/01 Per.Plan Lot 233 11.5 9.7 99.4 94 106.0 2055 05/08/01 Per Plan Lot 233 13.0 11.3 104.5 91 114.5 2056 05/08/01 Per Plan Lot 235 9.0 8.3 101.7 96 106.0 2057 05/08/01 Per Plan . Lot.235 10.5 10.4 99.1 93 106.0 205S 05/08/01 Per Plan Lot 235 11.5 11.1 106.8 - 93 114.5 2059 05/08/01 Per Plan Lot 236 8.5 8.2 100.9 95 106.0 2060 05/08/01 Per Plan Lot 236 10.5 10.7. 105.3 92 114.5 2061 05/08/01 Per Plan Lot 234 1.0.0 9.6 99.7 94 106.0 2062 05/08/01 Per Plan Lot 234 l 2.0 ' 12:2 107.4 94 114.5 2063 05/08/01 Per Plan Lot 232 11.0 10.6 .96.1 91 106.0 2064 05/08/01 Per Plan Lot 232 13.0 13.2 106.5* 93 114.5 2065 05/OS/01 Per Plan Lot 230 12.0 8.2 100.6 95 106.0 2066 05/08/01 Per Plan Lot 230 l 4.0, 12.4 104.5 91' 114.5 2067 05/08/01 - Per Plan Lot 438 6.5 11.3 100.2- 93 108.0 2068, 05/08/01 Per Plan Lot 436 7.5 13.8 103.1. 95 108.0 August 28; 2002 EARTH SYSTEMS SOUTHWEST 12EI'OQZT C.)1' RFLP\"['IVI_; COMPACTIONS JOB NAME: Country Club of the Dcscrt LOCATION: La QuInta, California JOB NO: 071,17-11 REPORT NO: 01-07-718 pnoP G(. of (.fl Test No Date Tested Description Elevation (feet) %Moisture Dry De.ns.it Relative Maximum In Place In Place Compaction Density 2069 05/08/01 Per Plan Lot 261 6.0 12.6 107.9 94 114.5 2070 05/08/01 Per Plan Lot 261" 7.5 10.5 104.2 91 114.5 2071 05/OS/01 Per Plan Lot 263 6.5 14.S 108.9 95 114.5 2072 05/OS/01 Per Plan Lot 263 8.0 13.1 104.9 92 114.5 2073 05/08/01 Per Plan Lot 265 S.0 14.1 105.6 92 114.5 ='074 05/08/01 Per Plan Lot 265 9.5 12.5 103.7 91 114.5 2075 05/08/01 Per Plan Lot 267 10.0 15.2 106.2 93 114.5 2076 05/08/01 Per Plan Lot 267 11.5 12.9 105.7 92 114.5 2077 05/08/01 Per Plan Lot 269 11.5 13.6 108.9 95 114.5 2078 05/08/01 Per Plan Lot 269 13.0 12.4 105.1 92 114.5 2079 05/08/01 Per Pian Lot -270 14.5 14.2 106.2 93 114.5 2U80 05/08/01 Per Plan Lot 26S 12.5 12.7 104.9 92 114.5 2081 05/08/01 Per Plan Lot 266 11.0 13.1 105.1 92 114.5 20S2 05/08/01 Per Plan l=ot 264 10.5 I L5 104.2 91 114.5 2083 05/08/01 Per Plan Lot 262 S.0 13.3 106.8 93 114.5 20S4 05/03/01 Per Plan Lot 260 8.0 12.7 106.1 93 114.5 2085 05/09/01 Per Plan Lot 233 14.0 10.9 107.2 94 114.5 2086 05/09/01 Per :Plan Lot 233 16.0. 11.3 105.9 92 114.5 2057 05/09/01 - Per Pian' Lot 231 13.0 11.7 106.2 93 114.5 2088 05/09/01 Per Plan Lot 231 15.0 11.1 105.3 92 114.5 2089 05/09/01 Per Plan Lot 230 17.5 13.2 103.9 93 112'.0 2090 05/09/01 Per Plain Lot 230 19.5. 14.2 101.9 91 112.0 2091 05/09/01 Per Plan Lot 232 16.0 12.5 105.7 94 112.0 2092 05/09/01 Per Plan Lot 232 18.0 13.2 103.0 92 112.0 2093 05/09/01 Per'Plan ` Lot 233 19.5 10.7 .104.6 93 112.0 2094 05/09/01 Per Plan Lot 233 20.5 12.9 102.7 92 112.0 2095 05/09/01 .Per Plan Lot 230 20.5 11.6 106.9 95 112.0 2096 05/09/01 Per Plan Lot 230 22.5 12.4 101.3 90 112.0 2097 05/17/01 Per Plan Lot 72 14.5 12.4. 107.7 94 114.5 2098 05/17/01 Per Plan Lot 72 16.0 12.2 1062 93 114.5 2099 05/17/01 Per Plan Lot 70 15.0 13.1 108.2 94 114.5 2100 05/17/01 Per Plan Lot 70 16.5 11.9 105.4 92 114.5 2101 05/17/01 Per Plan Lot 71 15.0 "12.6 107.1 94 114.5 2102 0.5/17/01 Per Plan Lot 71 16.5. 109 105.7 92 114.5 2103 05/17/01 Per Plan Lot 403 13.9 3.9- 102.1 92 111.0 2104 05/17/01 1 Per Plan Lot 404 I2.2 4.2 101.7 92 111.0 August 28, 2002 EARTH SYSTEMS SOUTHWEST 1 REPORT OIRLL:AMVE COMPACTIONS JOB N:A11IE: Country Club.of the Desert JOB NO: 071 17-11 LOCATION: La Quinta, California REPORT NO: 0 1 -07-718 Pape 57 of 60 Test No Date Tested Description Elevation (feet) %.Moistur ry Densit} Relative Maxi]IILIm I.n Place In Place Compaction Density 2105 05/17/01 Per Plan Lot 40 10.6 4.1 100.9 92 I 1 1.0 2106 05/17/01 Per Plan, Lot 406 I0.2 3.7. 101.6 91 111.0 2107 05/17/01 Per Plan Lot 407 9.8 4.2 103.7 93 1 11.0 2108 05/17/01 Per Plan Lot 408 .` 8.6" 3.9 100.6 91 '111.0 2109 05/17/01 Per.Plan Lot 434 8.7 4.7 95.7 93 106.0 2110 05/17/01 Per Plan Lot 435 9.5 5.6 100.1 94 106.0 21 11 .05/17/01 Per Plan Lot 436 S.6 3.7 - 99.6 94 106.0 2112 05/17/01 Per Plan Lot 437 8.1 4.2 97.3 92 106.0 2113 05/17/01 Per Plan Lot 438 7.6 3.1 102.4 92 111.0 2114 05/17/01 Per Plan Lot 439 6.3 4.5. .100.9 91 111.0 2115 05/17/01 Per -Plan Lot 68 16.0 I _ 10.7 106.1 93 114.5 2116 05/17/01 Per Plan Lot 68 -17.5 12.9 I 104.0 91 114.5 2117. 05/17/01 :Per Plan Lot 66 16.5 13.'] 107.9 94 114.5 2118 05/17/01 Per Plan Lot 66 18.0 i 1 l .2 104.1 91 114'.5 2119 .05/17/01 Per Plan Lot 64 16.E 11.7 106.3_ 93 114.5 2120 05/17/01 Per Plan Lot 64 18.0 12.7 • 104.1 91 114.5 2121 05/17/01 Per Plan Lot 72 18.0 J 14.0 105.3 92 114.5 2122 05/17/01 Per Plan Lot 72 19.5 12.3 11"0.5 97 114.5 2123 05/17/01 Per Plan Lot 69 17.0 13.2 102.4 94 109.0 2124 05/17/01 Per Plan Lot 69 19.0 114.1 106.4 93 114.5 2125 05/17/01 Per Plan Lot 65' 18.5 13.9 103.1 90 109.0 2126 05/17/01 Per Plan Lot 65_ 19.5 12.2 101.1 93 109.0 2127 05/17/01 Per Plan Lot 73 ?0.0 ( 15.2 101.2 93 109.0 2128 05/17/01 Per Plan Lot 73 22.0 16.3 99.7 91 109.0 2129 05/17/01 Per Plan Lot 71 19.5 14.7 104.6 96 109.0 2130 05/17/01 Per Plan Lot 71 2I.5 16.8 100.0 92 109.0 2131 05/17/01 Per Plan Lot 70 19.5 16.9 102.7 94 109.0 2132 05/17/01 Per Plan. Lot 70 21.5. 15.8. 95.9 91 109.0 2133 05/17/01 Per Plan Lot 68 1.S.5 14.2 103.4 95 109.0 2134 05/17/01 Per Plan Lot 68 20.5 15.5 100.2 92 109.0 21.35 05/17/01 Per Plan Lot 66 18.0 15.9 103.1 95. 109.0 2136 05/17/01 Per Plan Lot 66 20.0 13.1 101.7 93 109.0 2137 05/17/01 Per.Pian Lot 64 17.5 16.3 101.3 93 109.0 2138 05/17/01 Per Plan Lot 64, 19.0 14.6 99.2 91 109.0 2139 0_15/ 17 ' /01 'Per Plan Lot 72 23.0 15.7 100.7 92 109.0 2140 05/1701 Per,Plan Lot 70 23.0 13.9 101.5 93' 109.0 2141 05/17/01 Per Plan Lot 68 22.0 15.1 - 100.6' 92 109.0 2142 05/17/01 1 Per Plan Lot 67 22.0 14.9 102.3 94 109.0 August 2S, 2002 EARTIJ SYSTEMS SOUTHWEST v REPORT OF RELATIVE COMPACTIONS JOB NAME: Country Club of the Desert LOCATION: 1_a Quinta, California. JOB NO: 07117-11 REPORT NO: 01 -07-71 S August 28, 2002 . EARTH SYSTEMS SOUTHWEST Pag, 58 of 60 Test No Dale Tested Description Elevation (feet) `%Moistur Dry Densit Relative Maximum In Place In Place Compaction Density 2143 05/17/01 Per Plan Lot 65 .9-1.0 13.2 101.8 93 109.0 2144 05/17/01 Per Pian Lot 270. 15.7. 3.7 105.8 95 111.0 2145 05/17/01 Per Plan ." Lot 269 14.7 4.1 103.1 93 1 1 1.0 2146 05/17/01 Per Plan Lot 268 13.7 3.6 104.5 94 111.0 2147 05/17/01 Per Pian Lot 267 12.8 4.2 . 97.2 92 106.0 2148 05/17/01 Per Plan Lot'266 11.9 39 100.9 95 106.0 2149 05/17/01 Per Pian Lot 265 12.1' 3.1 98.3 93 106.0 2150 05/17/01 Per Plan Lot 264 11.1 3.7 97.1 92 106.0 2151 05/17/01 Per Plan Lot 263 9.5 4.1 102.0 92 111.0 2152 05/17/01 Per Plan Lot 262 9.2 3.9 101.3 91 111.0 2153 05/17/01 Per Plan Lot 261 9.0 4.3 101.6 92 111.0 2154 05/17/01. Per Plan Loi 260 S.S 4. F 100.7 91 1 ] 1.0 2155 05/17/01 Per Plan Lot 259 S.5 3.2 102.3 92 111.0 2156 05/17/01 Per Plan Lot 258 $.1 57 101.8 92 111.0 2157 05/21/01 ' Per Plan Carport 6.5 BG 12.7 103.7 93 1 1 1.0 2155. 05/21/01 Per Plan Carport 5.013G 10.9 1.00.5. 91 111.0 2159 05/21/01 Per Plan Carport 6.0 BG " 13.1 105.7" 95 111.0 2160 05/21/01 Per Plan Carport 4.5 BG 12.2 101.1 91 1 11.0 2161 05/21%01 Per Plan Carport 6.0,BG 12.5 104.7 94 111.0 2162 05/21/01 Per Plan Carport 4.5 BG 13.2 103.1 93 111.0 2163 05/21/01 Per Plan Carport 5.0 BG 12.6 106.2 96 111.0 2164 05/21/01 Per Plan Carport 3.5 BG 11.4 . -102.9 93 1.1 1.0 2165 05/21/01 Per Plan Carport 3.5 BG 142 102.3 94 109.0 2166 05/21/01 . Per Plan Carport 2.0 BG 15.4 100.1 92 109.0 2167 05/21/01 Per Plan Carport , 3.0 BG 13.7 103.7 95 109.0 2168 05/21/01 Per Plan Carport 1.5 BG 12.9 99.8 92 109.0 2169 05/21/01 Per Plan _ Carport,- -3.0 BG 15.2 102.1 94 109.0 2170. 05/21/01 Per Plan Carport 1.5 1313. 13.1 100.8 92 109.0 2171 05/21/01 Per Plan Lot 257 " 7:7 3.1 97.6 92 106.0 . 2172 05/21/01 Per Plan Lot 256 7.4 3.7 98.1 93 106.0 2173 05/21/01 Per Plan Lot 255 6.9 2.9 96.1. 91 106.0 2174.. 05/21/01 Per Plan Lot 254 6.3 3.8 99.7 94 106.0 2175 05/21/01 Per Plan Lot 253. 6.3 4.0 100.1 94 106.0 2176 05/21/01 Per Plan Lot 28 1, 5.9 3.3 95.2 93 106.0 2177 05/21/01 Per Plan Lot 252 4.1 4.2 97.3 92 : 106.0 2178 05/21/01 Per Plan Lot 251 " 4.3 4.5 97.1 92 106.0 August 28, 2002 . EARTH SYSTEMS SOUTHWEST y REPORT OF RELA` IVE COM P,ACTIONS JOB NANTE: Cotintry Club of the Desert LOCATION:_ La Quinta, Califonua JOB NO: 07117-11 .REPORT NO: 01-07-71.8 P;tvr 4;n of 6f) Test No .Date Tested Description, Elevation (feet) %,Moistu.rc Dry Densit 'Relative Maximum III Place In Place Compaction Density 2179 05/211/01 Per Plan Lot 250 4.5 3.9 96.7 90 106.0 21SO 05/21/01 Per Plan Lot 249 4.9 4.7 98.3 93 106.0 21 S 1 05/22/01 Per Plan Lot 11 5.5 11.4 102:7 93 111.0 2182 05/22/01 Per Plan' Lot 11 " 7:0 13-1 103.7 95 109.0 2183 05/22/01. Per Plan Lot l 1 8.5 13.8 105;2 97 109.0 2.184 05/22/01 Per Plan Lot 12, 6.0 10.7 107.7 97 111.0 2185. 05/22/01 Per Plan Lot 12 8:0 1 T.8 l 02.1 98 109.0 2186 05/23/01 Per Plan Lot 12 9.5 10.1 , 106.7 95 112.0 2187 05/23/01 Per Plan Lot 12 11.S 14.2' 100.7 90 112.0 2188 05/23/01 Per Plan Lot 11 1.0.0 17.0 108.1 97 112.0 2189 05/23/01 Per Plan Lot 11 11.0 11.1 105.0 94 112.0 2190 05/23/01 Per Plan Lot 12 _ 5.0 12.7 103.1 92 112.0 2191 05/23/01 Per Plan Lot 12 7.0 11.6 108.3 97 112.0 2192 .05/23/01 Per Plan Lot 12. 9:0 13.2 105.1 94 112.0 2193 05%23/01 Per ]),]ail Lot 12 11.0 12.3 106.S .95 112.0 2194 05/23/01 Per Plan, Lot 17 /12. 13.5 .13.1 1.07.9 96 112.0 2195 05/23/01 Per Plan Lot 11/12 15.5 11.8 l 04.5 , "93 112.0 2196 05/23/01 Per Plan Lot 12 13.0 12.5 105.8 94 112.0 2197 05/23/01 Per. Plan Lot 12' 15.0 10.8 1.02.1 91 112.0 21.98 05/29/01 Per Plan Lot 12 FPG 6.9 103.9 93 112.0 2199 05/29/01 Per Plan Lot l l FPG S.2 102.1 91 112.0 2200 05/29/01 Per Plan Lot 64 FPG 3.2 99.8 92 109.0 2201 05/29/01 Per Plan Lot 65 FPG 4.1 100.1 92 109.0 2202 05/29/01 Per Plan Lot 66. FPG .3.6 100.7 92 109.0 2203 05/29/01 Per Plan Lot 67 FPG 3.9 100.3 92 109.0 2204 05/29/01 Per Plan Lot 68 FPG 4.3 101.8 93 109.0 2205 05/29/01 Per Plan Lot 69 FPG 3.1 99.1 91 109.0 2206 05/29/01 Per.Plan Lot 70 FPG 3.6 100.3 92 . 109.0 2207 05/29/01 Per Plan Lot 71, FPG -.3.1 102.7. 94 109.0 2205 06/04/01 Per Plan 994.5 4.7 95.4 90 105.5 2209 06/04/01 Per Plan 996.0 9.7 100.7 92 109.0 2210 06/04/01 Per Plan 997.5 11 .1 99.8 92 109.0 2211 06/04/01 Per Plan 999.0 10.3 101.3 93 109.0 REPORT OF RELATIVE COMPACTIONS J013 NAA -1E: Country Club of the Desert .LOCATION: La Quinta, California JOB NO: 07117-11 REPORT NO: 01-07-718 Test No Date Tested Descriptioii': -Elevation (feet} : %ivloistUre ry Densit a-u�a. -Relative vV Vl VV Maximum Iii Place .Ln Place Compaction Density 2212 06/07/01 Per Plan 993.5 8.3 . 102.8 1 '93 111.0 2213 06/07/01 Per Plan 994:5 12.7 105.9 95 111.0 2214. • 06/07/01 Per Plan 995.5 11.1 105.0 95 111.0 BPG , = Below Pad Grade FPG _: Finish Pad Grade BG' ._ Below Grade MV ' = Moisture Verification # = Failing Moisture Test ## = Failing Moisture Retest ### = Passing Moisture Retest * _ . Failing Test _ Passing Retest 1 = Missing test numbers were reported on previous reports as ` referenced August 28 2002 a l L