BRES2015-0380 Geotechnical UpdateSladden Engineering
45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (769) 863-0847
6782 Stanton Avenue, Suite C, Buena Park, CA 90621 (714) 523-0952 Fax (716.) 523-1369
450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845 -EM
800 E. Florida Avenue, Hemet, CA 92543 (951) 766-8777 Fax (951) 766-3778
August 3, 2015
Mr. & Mrs. Scott Spehar
c/o Ochoa Design Associates
73-626 Highway 111
Palm Desert, California 92260
Project: Proposed Custom Residence
80-750 Via Montecito — Lot 74D
The Hideaway
La Quinta, California
Subject: IGeoteehni" calCUpdW
Project No. 544-15186
15=08-322
R F --- E V F D
NOV 2 A, 1-00
CITY (_)t LP, "4upk VTA
COMMUNITY DEVELOPMENT
Ref: Geotechnical Engineering Report prepared by Earth Systems Southwest (ESSW) dated
September 22, 2000; File No. 07117-10, Report No. 00-09-772
Report of Testing and Observation During Rough Grading prepa-ed by ESSW dated
August 28, 2002; File No. 07117-11, Report No. 01-07-718
Report of Testing and Observation During Rough Grading prepared by Sladden
Engineering dated October 12, 2003; Project No. 544-2199 Report Ne. 03-10-647
As requested, we have reviewed the above referenced geotechnical reports as they relate to the
design and construction of the proposed custom residence. The project site is located at 80-750
Via Montecito within the Hideaway Golf Club development in the City of LE Quinta, California.
It is our understanding that the proposed residence will be a relatively light-rveight wood -frame
structure supported by conventional shallow spread footings and concrete slays on grade.
The subject lot was previously graded during the rough grading of the Hideaway project site and
was subsequently regraded. The rough grading included over -excavation of the native surface
soil along with the placement of engineered fill soil to construct the building pads. The regrading
included processing the surface soil along with minor cuts and fills to construct the individual
building pads to the current configurations. Some additional over -excavation was performed in
areas where the building envelopes were reconfigured. The most recent site grading is
summarized in the referenced Report of Testing and Observations During Rough Grading
prepared by Sladden Engineering along with the compktko t� 5tfte.� �Z. l A Q 1 ! I NTA
vu�i v• ru i ..
The referenced reports include recommendations pertaining fr�o, e_cons t o esiden ial
structure foundations. Based upon our review of the ref erenced--eportrts i -r o nidn that he
structural values included in the referenced grading report Fpre�a r i}T
� li ineer ng
remain applicable for the design and construction of the proposeddential strut re
foundations. I DATE 1212�f11.5
S'adden Engineering
August 3, 2015 -2- Project No. 544-15186
15-08-322
Because the lot has been previously rough graded, the remedial grading required at this time
should be minimal provided that the building falls within the previously established building
envelope. The building area should be cleared of surface vegetation, scarified and moisture
conditioned prior to precise grading. The exposed surface should be compacted to a minimum of
90 percent relative compaction is attained prior to fill placement. Any fill material should be
placed in thin lifts at near optimum moisture content and compacted to at least 90 percent
relative compaction.
The allowable bearing pressures recommended in the referenced grading report prepared by
Sladden Engineering remain applicable. Conventional shallow spread footings should be
bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent
grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be
at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing
allowable bearing pressures of 1500 psf and 2000 psf, respectively. Allowable increases of 300 psf
for each additional 1 foot of width and 300 psf for each additional 6 inches of depth may be
utilized if desired. The maximum allowable bearing pressure should be 3000 psf. The
recommended allowable bearing pressures may be increased by one-third for wind and seismic
loading.
Lateral forces may be resisted by friction along the base of the foundation.,/slabs and passive
resistance along the sides of the footings. A friction coefficient of 0.50 times the normal dead load
forces is recommended for use in design. Passive resistance may be estimated using an
equivalent fluid weight of 300 pcf. If used in combination with the pas3ive resistance, the
frictional resistance should be reduced by one third to 0.33 times the normal dead load forces.
The bearing soil is non -expansive and falls within the "very low" expansion category in
accordance with 2013 California Building Code (CBC) classification criteria. Slab thickness and
reinforcement should be determined by the structural engineer. We recommend a minimum
floor slab thickness of 4.0 inches and minimum reinforcement of #3 bars at 24 inches on center in
both directions. All slab reinforcement should be supported on concrete chairs to ensure that
reinforcement is placed at slab mid -height.
Slabs with moisture sensitive surfaces should be underlain with a moisture vapor retarder
consisting of a polyvinyl chloride membrane such as 10 -mil Visqueen, or equivalent. All laps
within the membrane should be sealed and at least 2 inches of clean sand should be placed over
the membrane to promote uniform curing of the concrete. To reduce the potEntial for punctures,
the membrane should be placed on a pad surface that has been graded smooth without any sharp
protrusions. If a smooth surface can not be achieved by grading, consideratiora should be given to
placing a 1 -inch thick leveling course of sand across the e-r-ie=e.lacemPnt n
membrane. MYpn P I A n " i K rr
Based on our field observations and understanding of ]c
type judged applicable to this site is So, generally descril
additional coefficients and factors relevant to seismic miti
the 2013 California Building Code (CBC).
BUILDING &.SAFETY DEPT.
as
DATE BY
Shidden Engineering
August 3, 2015 -3- P=oject No. 544-15186
15-08-322
The seismic design category for a structure may be determined in accordance with Section 1613
of the 2013 CBC or ASCE7. According to the 2013 CBC, Site Class D may :)e used to estimate
design seismic loading for the proposed structures. The 2013 CBC Seismic Design Parameters are
summarized below.
Risk Category (Table 1.5-1): I/II/III
Site Class (Table 1613.3.2): D
Ss (Figure 1613.3.1): 1.500g
Si (Figure 1613.3.1): 0.683g
Fa (Table 1613.3.3(1)): 1.0
Fv (Table 1613.5.3(2)):1.5
Sms (Equation 16-37 (Fa X Ss)): 1.500g
Smi (Equation 16-38 (Fv X SI)): 1.024g
SDS (Equation 16-39 (2/3 X SMS)): 1.000g
SDI (Equation 16-40 12/3 X Smi)): 0.683g
Seismic Design Category: D
If you have questions regarding this letter or the referenced reports, please contact the
undersigned.
Respectfully submitted,
SLADDEN ENGINEERING
Brett L. Anderson
Principal Engineer
SER/gvm
Copies: 4 / Addressee
VxO BBETT L. a
GOANcR80N
No. C4439
41
Fxp. Ei3G/16
CIVIL
ENG,NE EP,ING
_
CA' .
CITY OF LAQUINTA
BUILDING & SAFETY DEPT.
APP�iOVED
FOR CONSTRUCTION
DATE BY
Skdden Engineering
1571 8C
/S- of$-3zZ
Please verify that soils reports contain all of the above information. In addition, to assure
continuity between the investigation/reporting stage and the execution stag a, please use
the following checklist to verify that the conclusions and recommendations on the report
cover all the required elements. Only then can we be assured that the construction
documents address all of the site soil conditions.
La Quinta Geotechnical Report Checklist
Does the "Conclusions and Recommendations" section of the report address each of the
following criteria?
"Address" means:
(a) the criterion is considered significant and mitigation measure(s) noted, or;
(b) the criterion is considered insignificant and explicitly so stated.
Yds . No Criterion
❑ Foundation criteria based upon bearing capacity of natural or ccmpacted soil.
❑ Foundation criteria to mitigate the effects of expansive soils.
❑ Foundation criteria based upon bearing capacity. of natural or ccmpacted soil.
❑ Foundation criteria to mitigate.the effects of liquefaction.
❑ Foundation criteria to mitigate the effects of seismically induced differential
settlement.
❑ . Foundation criteria to mitigate the effects of long-term differential settlement.
❑ Foundation criteria to mitigate the effects of varying soil strep* gtl;..
f ❑ Foundation criteria to mitigate expected total and differential set-Jement.
Any "No" answers to the .above checklist should be noted as
corrections.