Loading...
2021 07 13 PC PLANNING COMMISSION AGENDA Page 1 of 4 JULY 13, 2021 PLANNING COMMISSION AGENDA CITY HALL COUNCIL CHAMBER 78-495 Calle Tampico, La Quinta REGULAR MEETING on TUESDAY, JULY 13, 2021, AT 5:00 P.M. **************************** SPECIAL NOTICE Teleconferencing and Telephonic Accessibility In Effect Pursuant to Executive Orders N-25-20, N-29-20, N-33-20, N-35-20, N-60-20, and N-08-21 executed by the Governor of California, in response to the state of emergency relating to novel coronavirus disease 2019 (COVID-19) and enabling teleconferencing accommodations by suspending or waiving specified provisions in the Ralph M. Brown Act (Government Code § 54950 et seq.), members of the Planning Commission, the City Attorney, City Staff, and City Consultants may participate in this meeting by teleconference. Members of the public may listen to this meeting by tuning-in live via http://laquinta.12milesout.com/video/live. Members of the public wanting to address the Planning Commission, either for public comment on matters not on the agenda or for a specific agenda item, or both, are requested to follow the instructions listed below: Written public comments – can be provided in-person during the meeting or emailed to the Planning Commission Secretary, Tania Flores, at TFlores@LaQuintaCA.Gov, no later than 3:00 p.m. the day of the meeting, and will be distributed to the Planning Commission and incorporated into the agenda packet and public record of the meeting, and will not be read during the meeting unless, upon the request of the Chairperson, a brief summary of any public comment is asked to be read, to the extent that the Planning Commission Secretary can accommodate such request. If emailed, the mail subject line must clearly state “Written Comments” and the email should list the following: 1) Full Name 4) Public Comment or Agenda Item Number 2) City of Residence 5) Subject 3) Phone Number 6) Written Comments Planning Commission agendas and staff reports are now available on the City’s web page: www.LaQuintaCA.Gov PLANNING COMMISSION AGENDA Page 2 of 4 JULY 13, 2021 ***** TELECONFERENCE PROCEDURES ***** Verbal Public Comment via Teleconference – members of the public may join the meeting virtually via Zoom and use the “raise your hand” feature when public comments are prompted by the Chairperson; Planning Staff will facilitate the ability for a member of the public to be audible to the Planning Commission and general public and allow him/her to speak on the item(s) requested. Please note – members of the public must unmute themselves when prompted upon being recognized by the Chairperson, in order to become audible to the Planning Commission and the public. Only one person may speak at a time by teleconference and only after being recognized by the Chairperson. ZOOM LINK: https://us06web.zoom.us/j/88146423364 Meeting ID: 881 4642 3364 Or join by phone: (720) 707 - 2699 **************************** CALL TO ORDER ROLL CALL: Commissioners Caldwell, Currie, Hassett, McCune, Nieto, Tyerman and Chairperson Proctor PLEDGE OF ALLEGIANCE PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA At this time, members of the public may address the Planning Commission on any matter not listed on the agenda by providing written public comments either in-person or via email as indicated above; or provide verbal public comments either in-person or via teleconference by joining the meeting virtually at https://us06web.zoom.us/j/88146423364 and use the “raise your hand” feature when prompted by the Chairperson. Members of the public attending the meeting in- person are requested to complete a “Request to Speak” form. Please limit your comments to three (3) minutes (or approximately 350 words). The Planning Commission values your comments; however, in accordance with State law, no action shall be taken on any item not appearing on the agenda unless it is an emergency item authorized by Government Code § 54954.2(b). CONFIRMATION OF AGENDA ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN COMMUNICATIONS 1. INTRODUCTION OF NEWLY APPOINTED COMMISSIONERS AND RECOGNITION OF OUTGOING COMMISSIONERS CONSENT CALENDAR NOTE: Consent Calendar items are routine in nature and can be approved by one motion. PAGE 1. APPROVE MEETING MINUTES OF APRIL 27, 2021 5 PLANNING COMMISSION AGENDA Page 3 of 4 JULY 13, 2021 BUSINESS SESSION PAGE 1. APPOINT A PLANNING COMMISSION CHAIRPERSON AND VICE CHAIRPERSON FOR FISCAL YEAR 2021/22 9 2. APPROVE CANCELLING THE REGULAR PLANNING COMMISSION MEETINGS OF AUGUST 10 AND 24, 2021 11 STUDY SESSION - NONE PUBLIC HEARINGS For all Public Hearings on the agenda, a completed “Request to Speak” form must be filed with the Planning Commission Secretary prior to consideration of that item. Members of the public may submit written comments to the Planning Commission before a public hearing or speak in-person or via teleconference accessibility in support or opposition to the approval of a project(s). If you challenge a project(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing or in written correspondence delivered to the City at, or prior to the public hearing. PAGE 1. ADOPT A RESOLUTION RECOMMENDING APPROVAL OF SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013-924, AMENDMENT 2) TO AMEND SIGNATURE AT PGA WEST CONDOMINIUM RESIDENTIAL PLANS; CEQA: THE PROJECT IS CONSISTENT WITH PREVIOUSLY CERTIFIED SUBSEQUENT ENVIRONMENTAL IMPACT REPORT COMPLETED FOR EDEN ROCK AT PGA WEST SPECIFIC PLAN; LOCATION: WITHIN THE PGA WEST SPECIFIC PLAN AREA 13 2. ADOPT A RESOLUTION APPROVING REVISION NO. 1 TO THE CITY’S VEHICLE MILES TRAVELED ANALYSIS POLICY IN COMPLIANCE WITH STATE SENATE BILL 743; CEQA: EXEMPT PURSUANT TO CEQA GUIDELINES SECTIONS 15308, 15307 AND 15061 (b)(3) 94 REPORTS AND INFORMATIONAL ITEMS - NONE COMMISSIONERS’ ITEMS - NONE STAFF ITEMS 1. VERBAL UPDATE ON CITYWIDE PROJECTS ADJOURNMENT **************************** The next regular meeting of the Planning Commission will be held on July 27, 2021, commencing at 5:00 p.m. with the Call to Order, at the City Hall Council Chamber, 78495 Calle Tampico, La Quinta, California. PLANNING COMMISSION AGENDA Page 4 of 4 JULY 13, 2021 DECLARATION OF POSTING I, Tania Flores, Commission Secretary, do hereby declare that the foregoing Agenda for the La Quinta Planning Commission meeting of July 13, 2021, was posted on the City’s website, near the entrance to the Council Chamber at 78-495 Calle Tampico, and the bulletin boards at the Stater Brothers Supermarket at 78-630 Highway 111, and the La Quinta Cove Post Office at 51-321 Avenida Bermudas, on July 8, 2021. DATED: July 8, 2021 TANIA FLORES, Commission Secretary City of La Quinta, California Public Notices  The La Quinta City Council Chamber is handicapped accessible. If special equipment is needed for the hearing impaired, please call the Planning Division of the Design and Development Department at (760)777-7023, twenty-four (24) hours in advance of the meeting and accommodations will be made.  If special electronic equipment is needed to make presentations to the Commission, arrangements should be made in advance by contacting the Planning Division of the Design and Development Department at (760) 777-7023. A one (1) week notice is required.  If background material is to be presented to the Commission during a Planning Commission meeting, please be advised that ten (10) copies of all documents, exhibits, etc., must be supplied to the Executive Assistant for distribution. It is requested that this takes place prior to the beginning of the meeting.  Any writings or documents provided to a majority of the Commission regarding any item(s) on this agenda will be made available for public inspection at the Design and Development Department’s counter at City Hall located at 78-495 Calle Tampico, La Quinta, California, 92253, during normal business hours. PLANNING COMMISSION MINUTES 1 APRIL 27, 2021 PLANNING COMMISSION MINUTES TUESDAY, APRIL 27, 2021 CALL TO ORDER A regular meeting of the La Quinta Planning Commission was called to order at 5:02 p.m. by Chairperson Proctor. This meeting provided teleconferencing accessibility pursuant to Executive Orders N-25-20, N-29-20, N-33-20, N-35-20, and N-60-20 executed by the Governor of California, in response to the state of emergency relating to novel coronavirus disease 2019 (COVID-19) and enabling teleconferencing accommodations by suspending or waiving specified provisions in the Ralph M. Brown Act (Government Code § 54950 et seq.). PRESENT: Commissioners Bettencourt, Caldwell, Currie, McCune, Nieto, and Chairperson Proctor ABSENT: None STAFF PRESENT: Design & Development Director Danny Castro, Planning Manager Cheri L. Flores, Senior Planner Carlos Flores, Associate Planner Siji Fernandez, Commission Secretary Tania Flores PLEDGE OF ALLEGIANCE Vice Chair Nieto led the Planning Commission in the Pledge of Allegiance. CONFIRMATION OF AGENDA MOTION – A motion was made and seconded by Commissioners Caldwell/Bettencourt to approve the Agenda as presented. AYES: Commissioners Bettencourt, Caldwell, Currie, McCune, Nieto, and Chairperson Proctor. NOES: None. ABSENT: None. ABSTAIN: None. Motion passed ayes 6, noes 0, absent 0, vacant 1. ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN COMMUNICATION - NONE Consent Calendar was taken out of order, prior to Public Comment on Matters Not on the Agenda. CONSENT CALENDAR ITEM NO. 1 5 PLANNING COMMISSION MINUTES 2 APRIL 27, 2021 CONSENT CALENDAR 1.APPROVAL OF MINUTES DATED JANUARY 26, 2021 2.APPROVAL OF MINUTES DATED FEBRUARY 17, 2021 Commissioner Bettencourt requested that language be added to the minutes of February 17, 2021 to reflect the Pavilion Palms item stating that Commission received clarification by the City Attorney that this item was only to approve the corner design of this project and not the specific plan for the project as a whole and that the item was being considered with the materials that were being presented at that time. MOTION – A motion was made and seconded by Commissioners Bettencourt/Nieto to approve the Consent Calendar with additional language added to the minutes of February 17, 2021 as requested. AYES: Commissioners Bettencourt, Caldwell, Currie, McCune, Nieto, and Chairperson Proctor. NOES: None. ABSENT: None. ABSTAIN: None. Motion passed ayes 6, noes 0, absent 0, vacant 1. Public Comment on Matters Not on the Agenda was taken out of order and following the approval of items on the Consent Calendar. PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA PUBLIC SPEAKER: Richard Mills, Resident (via Zoom): Financial Adviory Chairperson Mills spoke on behalf of the Financial Advisory Commisisoner and requested the Planning Commission provide additional information regarding a strategy for future needs and and expenses for electric vehicle charging stations. BUSINESS SESSION - NONE STUDY SESSION - NONE PUBLIC HEARINGS 1.ADOPT A RESOLUTION RECOMMENDING THAT THE CITY COUNCIL AMEND SECTIONS 9.50.090 AND 9.200.015 OF TITLE 9 OF THE LA QUINTA MUNICIPAL CODE; CEQA: EXEMPT FROM CEQA PURSUANT TO SECTION 15061(B)(3) REVIEW FOR EXEMPTIONS – COMMON SENSE RULE; LOCATION: CITYWIDE [RESOLUTION NO. 2021-005] Senior Planner Flores presented the staff report which is on file in the Design and Development Department. CHAIR PROCTOR DECLARED THE PUBLIC HEARING OPEN AT 5:16 p.m. 6 PLANNING COMMISSION MINUTES 3 APRIL 27, 2021 PUBLIC SPEAKER OR COMMENT: None CHAIR PROCTOR DECLARED THE PUBLIC HEARING CLOSED AT 5:16 p.m. MOTION – A motion was made and seconded by Commissioners Currie/Caldwell to adopt Planning Commission Resolution No. 2021-0005 to recommend to the City Council a amend Sections 9.50.090 and 9.200.015 of Title 9 of the La Quinta Municipal Code relating to renumbering and administration of the section. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA QUINTA, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL AMEND SECTIONS 9.50.090 AND 9.200.015 OF TITLE 9 OF THE LA QUINTA MUNICIPAL CODE RELATING TO RENUMBERING AND ADMINISTRATION OF THE SECTION CASE NUMBER:ZONING ORDINANCE AMENDMENT 2021-0001 APPLICANT: CITY OF LA QUINTA AYES: Commissioners Bettencourt, Caldwell, Currie, McCune, Nieto and Chairperson Proctor. NOES: None. ABSENT: None. ABSTAIN: None. Motion passed ayes 6, noes 0, absent 0, vacant 1. REPORTS AND INFORMATIONAL ITEMS - NONE COMMISSIONERS’ ITEMS Commissioner Currie reported out on attendance in the 2021 League of California Cities Planning Commission Academy and expressed her appreciation of the presentations. Commissioners Bettencourt, Caldwell, Vice Chair Nieto and Chair Proctor concurred and added appreciation for the recorded sessions as well. Chair Proctor thanked Commissioner Libolt Varner for her time and consideration and wished her the best in her future endeavors as she has resigned from the Commission due to relocation. Chair Proctor made a formal request on behalf of the entire commission for in- person meetings and project review materials. The Commission agreed in general and Commmissioner Caldwell added that administrative matters could continue to be held via Zoom. Staff advised the Commission that staff was reviewing options with regard to returning to in-person meetings and advised the Commission that individual meetings and project reviews will be made available upon request. Chair Proctor reported his and Commissioner Caldwell and Vice Chair Nieto’s attendance at the Ribbon Cutting Ceremony at the SilverRock Event Site and commended City Staff on the event and the site itself. 7 PLANNING COMMISSION MINUTES 4 APRIL 27, 2021 STAFF ITEMS 1. CITYWIDE PROJECT UPDATES Planning Manager Flores provided a verbal update on varios citywide projects. Staff answered questions regarding the Desert Club Apartments status, additional businesses contracted for the anchor pad at the Village Shopping Center, Housing Element affordable housing site review. Design and Development Director Castro added a verbal update on the changes to the City’s Short-Term Vacation Rental program including updating the municipal code, additional regulations and increased fines on violations; noise monitoring device pilot program; current and indefinite permit issuance moratorium with the exception of tourist and village commercial zones; RV Parking ordinance changes. ADJOURNMENT There being no further business, it was moved and seconded by Commissioners Caldwell/McCune to adjourn at 5:49 p.m. AYES: Commissioners Bettencourt, Caldwell, Currie, McCune, Nieto, and Chairperson Proctor. NOES: None. ABSENT: None. ABSTAIN: None. Motion passed ayes 6, noes 0, absent 0, vacant 1. Respectfully submitted, TANIA FLORES, Commission Secretary City of La Quinta, California 8 City of La Quinta PLANNING COMMISSION MEETING: July 13, 2021 STAFF REPORT AGENDA TITLE: APPOINT A PLANNING COMMISSION CHAIRPERSON AND VICE CHAIRPERSON FOR FISCAL YEAR 2021/22 RECOMMENDATION Appoint a Planning Commission Chairperson and Vice Chairperson to serve for fiscal year 2021/22. EXECUTIVE SUMMARY The July 13, 2021, meeting is the first regularly scheduled meeting of the Planning Commission (PC) for the 2021/22 fiscal year. Pursuant to La Quinta Municipal Code 2.06.050, the PC, at its first meeting held after June 30, shall vote to elect one of its members as Chairperson and elect another as Vice-Chairperson. BACKGROUND/ANALYSIS In accordance with La Quinta Municipal Code 2.06.050, “unless otherwise provided by law, ordinance or resolution of the city council, each board, commission and committee shall choose one of its members as chairperson and one as vice chairperson at its first meeting held after June 30th of each fiscal year.” Pursuant to this section, staff has placed this item on the agenda for selection of a Chairperson and Vice Chairperson. Previous appointments are as follows: Election Date Chairperson Vice Chairperson 09/08/2020 Michael Proctor Stephen Nieto 07/09/2019 Mary Caldwell Michael Proctor 07/24/2018 Kevin McCune Mary Caldwell 07/25/2017 Paul Quill Kevin McCune 07/12/2016 Philip Bettencourt Frank Blum Voting Procedures: All actions must be taken on a majority vote or by a majority of the quorum present. On the passage of every motion, the vote shall be taken by voice or roll call as appropriate. The presiding Chairperson will open and close nominations to the Commission for Chairperson and Vice Chairperson. The vote will be taken, and the Chairperson and Vice Chairperson selected. BUSINESS SESSION ITEM NO. 1 9 Tie Votes: In the case of a tie vote, an additional motion is made which obtains a majority vote to break the tie. If a tie vote results at a time when less than all members are present, the matter shall automatically be continued to the next regular meeting, unless otherwise ordered by the body. ALTERNATIVES This action is required as stated in the Municipal Code, staff does not recommend an alternative. Prepared by: Tania Flores, Administrative Technician Approved by: Cheri Flores, Planning Manager 10 City of La Quinta PLANNING COMMISSION MEETING: July 13, 2021 STAFF REPORT AGENDA TITLE: APPROVE CANCELLING THE REGULAR PLANNING COMMISSION MEETINGS OF AUGUST 10 AND 24, 2021 RECOMMEDATION Approve cancelling the regular Planning Commission meetings of August 10 and 24, 2021. EXECUTIVE SUMMARY  Planning Commission (PC) traditionally modifies its meeting schedule during summer months if there are no known time-sensitive matters requiring Commission action.  Advance notice of cancelled meetings allows Planning Commissioners, Staff, and the public to properly plan for deadlines and workflow. FISCAL IMPACT There would be a cost savings consisting of the time and materials associated with production of agenda packets and Commissioner stipend payments. BACKGROUND/ANALYSIS The Design and Development Director and the Planning Department have reviewed the items requiring PC consideration, and all matters that require Commission review can be scheduled for the July 27, 2021, meeting or subsequent meetings in September. The recommended summer meeting schedule is as follows:  July 27 regular meeting  August 10 CANCELLED  August 24 CANCELLED  September 14 regular meeting  September 28 regular meeting Should a pressing situation or matter requiring PC direction or action arise before the next regular meeting, a special meeting will be called. BUSINESS SESSION ITEM NO. 2 11 ALTERNATIVES PC may select alternate dates for cancelled meetings, cancel only one meeting, cancel two meetings, or cancel no meetings. Prepared by: Tania Flores, Administrative Technician Approved by: Cheri Flores, Planning Manager 12 City of La Quinta PLANNING COMMISSION MEETING: JULY 13, 2021 STAFF REPORT AGENDA TITLE: ADOPT A RESOLUTION RECOMMENDING APPROVAL OF SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013-924, AMENDMENT 2) TO AMEND SIGNATURE AT PGA WEST CONDOMINIUM RESIDENTIAL PLANS; CEQA: THE PROJECT IS CONSISTENT WITH PREVIOUSLY CERTIFIED SUBSEQUENT ENVIRONMENTAL IMPACT REPORT COMPLETED FOR EDEN ROCK AT PGA WEST SPECIFIC PLAN. LOCATION: WITHIN THE PGA WEST SPECIFIC PLAN AREA PROJECT INFORMATION PROJECT: SIGNATURE AT PGA WEST AMENDMENT APPLICANT: WOODBRIDGE PACIFIC OWNER: WOODBRIDGE PACIFIC & CALWEST CEQA: THE DESIGN AND DEVELOPMENT DEPARTMENT HAS DETERMINED THAT THIS PROJECT IS CONSISTENT WITH THE EDEN ROCK AT PGA WEST SPECIFIC PLAN SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (EA 2006-562), CERTIFIED BY THE LA QUINTA CITY COUNCIL ON APRIL 15, 2008. NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT. LOCATION: BOUNDED BY PGA BOULEVARD ON THE SOUTH AND WEST, PGA STADIUM COURSE AND CLUBHOUSE TO THE NORTH AND EAST. RECOMMENDATION Adopt a resolution to recommend approval of new architectural plan set for condominiums for Signature at PGA West within the Eden Rock at PGA West Specific Plan Area and find the project consistent with previously certified Subsequent Environmental Impact Report. EXECUTIVE SUMMARY  Site Development Permit 2013-924 (SDP 2013-924) was approved on December 3, 2013, which included approval of 130 single family residential detached and 100 condominium units within the central area of PGA West. PUBLIC HEARING ITEM NO. 1 13  A total of 14 condominium units have been constructed but the project has not been recently active.  The applicant has proposed an amendment to SDP 2013-924, for three (3) new plan types and change in building types for the remaining condominium units (Attachment 1). BACKGROUND/ANALYSIS In 2008, the Eden Rock at PGA West development was approved for a 264-unit residential development within a ~42-acre project site within PGA West (Attachment 2). This project allowed a mix of single family attached and detached units and condominium units. After a change in market conditions, the project was revised and changed to the Signature at PGA West project, which was approved in December 2013, for a 130 single family detached and 100 condominium unit residential development. The approval included SDP 2013-924, which approved the overall site, architectural, and landscaping design of all of the residential units, including the 100 condominium units. This SDP was amended earlier in 2021 to change the architectural plan types for the single-family residential units, changing the square footages, architecture, and changing to mostly 1-story plans. The condominium units were approved as multiple buildings with three or four units attached within each building, ranging in size from 1,458 sf to 2,261 sf per unit (Attachment 3). The applicant is proposing to revise the design for the remaining 86 condominium units to be to be made up of 60 detached units and 13 duplex units, ranging in size from 1,562 sf to 2,444 sf (Attachment 4). The applicant is proposing three (3) plan types for the units, each with three (3) different elevations. The buildings will incorporate Santa Barbara, Spanish Colonial, and Tuscany architectural styles, which are compatible with the existing and previously approved architectural styles of the condominium units as well as the existing and approved architectural styles of the single family residential detached units. The applicant is proposing the changes due to market changes. According to the applicant, the desire in the residential market is to provide more privacy, building separation and useable outdoor living spaces for each prospective owner. The project proposes no change in number of total units or changes in circulation. The project meets all requirements under the City of La Quinta Municipal Code and the Eden Rock specific plan, including parking requirements. The project proposes 395 parking stalls for the 100 total condominium units, well above the required 236 parking stalls. AGENCY AND PUBLIC REVIEW Public Agency Review 14 This request was sent to all applicable City departments and all applicable comments have been adequately addressed and/or incorporated in the recommended Conditions of Approval. Public Notice The public hearing notice was advertised in The Desert Sun newspaper on July 2, 2021, and was sent to property owners and occupants within a 500-foot radius of the project site. No comments have been received as of this date. The PGA West Fairways Association Board of Directors has reviewed and approved of the proposed changes to the plan types. ENVIRONMENTAL REVIEW The Design and Development Department has determined that the proposed project is within and consistent with the Eden Rock at PGA West Specific Plan Subsequent Environmental Impact Report EA 2006-562 (SCH #2007061056) certified by the La Quinta City Council on April 15, 2008. Prepared by: Carlos Flores, Senior Planner Approved by: Danny Castro, Design and Development Director Attachments: 1. Project Information 2. Vicinity Map 3. SDP 2013-924 Plan Set 4. SDP 2021-0003 Plan Set 15 PLANNING COMMISSION RESOLUTION 2021 - A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA QUINTA, CALIFORNIA, RECOMMENDING APPROVAL OF A SITE DEVELOPMENT PERMIT AMENDMENT FOR NEW CONDOMINIUM PLANS FOR SIGNATURE AT PGA WEST AND FINDING THE PROJECT CONSISTENT WITH SUBSEQUENT ENVIRONMENTAL IMPACT REPORT CERTIFIED FOR EDEN ROCK AT PGA WEST CASE NUMBERS: SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013- 024, AMENDMENT 2) APPLICANT: WOODBRIDGE PACIFIC WHEREAS, the Planning Commission of the City of La Quinta, California did, on the 13th day of July, 2021, hold a duly noticed Public Hearing to consider a request by Woodbridge Pacific for approval of amendments to the approved single family residential architectural plans for Signature at PGA West development, generally located, within the PGA West Specific Plan, Planning Area III, more particularly described as: Tract 36537 WHEREAS, the Design and Development Department published a public hearing notice in The Desert Sun newspaper on July 2, 2021, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and Site Development Permit 2021-0003 (SDP 2013-924, Amd 2) WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said Planning Commission did make the following mandatory findings pursuant to Section 9.210.010 of the Municipal Code to justify approval of said Site Development Permit: 1. Consistency with General Plan The proposed development is consistent with the General Plan land use designation of Tourist Commercial. The City’s General Plan policies relating to Tourist Commercial permits residential development that include single family residential. Under 16 Planning Commission Resolution 2021 - Site Development Permit 2021-0003 (SDP 2013-924, Amendment 2) Signature at PGA West Amendment July 13, 2021 Page 2 of 4 Amendment 6 to the PGA West Specific Plan, this residential community is integrated into the existing Tourist Commercial land use as set forth in the Specific Plan. 2. Consistency with Zoning Code and PGA West Specific Plan (SP 83- 002) The proposed development, as conditioned, is consistent with the development standards of the City’s Zoning Code and the PGA West Specific Plan, as amended in terms of project location, architectural style, and standards. 3. Compliance with CEQA The La Quinta Design and Development Department has determined that this project is within the Eden Rock at PGA West Specific Plan, which had a Subsequent Environmental Impact Report EA 2006-562 (SCH #2007061056) certified by the La Quinta City Council on April 15, 2008, and is consistent with this analysis. 4. Architectural Design The architecture and layout of the project is compatible with, and not detrimental to, the existing surrounding residential land uses, and is consistent with the development standards in the Municipal Code. The units are concluded to be appropriate for the proposed locations, and supplemental design elements appropriately enhance the architecture of the buildings. The architecture and layout of the project is compatible with the subject specific plan. The architecture is compatible with the existing units within the development, including the entire PGA West development, incorporating similar architectural styles, materials, and features. 5. Site Design The site design of the project is compatible with surrounding development and with the quality of design prevalent in the City. No site design is proposed to be changed as part of this amendment. 6. Landscape Design The proposed project is consistent with the landscaping standards and plant palette and implements the standards for landscaping and aesthetics established in the General Plan and Zoning Code. 17 Planning Commission Resolution 2021 - Site Development Permit 2021-0003 (SDP 2013-924, Amendment 2) Signature at PGA West Amendment July 13, 2021 Page 3 of 4 NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of La Quinta, California, as follows: SECTION 1. That the above recitations are true and constitute the Findings of the Planning Commission in this case; SECTION 2. That the above project be determined by the Planning Commission to be consistent with previously certified Subsequent Environmental Impact Report for Eden Rock at PGA West Specific Plan (EA 2006-562); SECTION 3. That it does hereby recommend approval of Site Development Permit 2021-0003 (SDP 2013-924, Amendment 2) for the reasons set forth in this Resolution and subject to the attached Conditions of Approval. PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La Quinta Planning Commission, held on this the 13th day of July 2021, by the following vote: AYES: NOES: ABSENT: ABSTAIN: _________________________________ MICHAEL PROCTOR, Chairperson City of La Quinta, California 18 Planning Commission Resolution 2021 - Site Development Permit 2021-0003 (SDP 2013-924, Amendment 2) Signature at PGA West Amendment July 13, 2021 Page 4 of 4 ATTEST: _______________________________________________ DANNY CASTRO, Design and Development Director City of La Quinta, California 19 PLANNING COMMISSION RESOLUTION 2021- DRAFT CONDITIONS OF APPROVAL SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013-924 AMENDMENT 2) SIGNATURE AT PGA WEST ADOPTED: JULY 13, 2021   GENERAL 1. The applicant agrees to defend, indemnify and hold harmless the City of La Quinta (“City”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Site Development Permit. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 2. Site Development Permit 2021-0003 (SDP 2013-924 Amendment 2) shall comply with all applicable conditions and/or mitigation measures for the following related approval: Site Development Permit 2020-0006 Site Development Permit 2013-924 Specific Plan 83-002 and all subsequent amendments (PGA West Specific Plan, including Amendment #6: Eden Rock at PGA West) Tract Map 36537 Development Agreement 2006-011 Environmental Assessment 2006-562; Subsequent EIR SCH #2007061056 3. In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Design and Development Director shall adjudicate the conflict by determining the precedence. 4. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies, if required:  Riverside County Fire Marshal  La Quinta Public Works Department (Grading Permit, Green Sheet (Public Works Clearance) for Building Permits, Water Quality Management Plan(WQMP) Exemption Form – Whitewater River Region, Improvement Permit)  Design & Development Department  Riverside Co. Environmental Health Department  Coachella Valley Unified School District  Coachella Valley Water District (CVWD)  Imperial Irrigation District (IID)  California Water Quality Control Board (CWQCB)  State Water Resources Control Board  SunLine Transit Agency 20 PLANNING COMMISSION RESOLUTION 2021- DRAFT CONDITIONS OF APPROVAL SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013-924 AMENDMENT 2) SIGNATURE AT PGA WEST ADOPTED: JULY 13, 2021    SCAQMD Coachella Valley The applicant is responsible for all requirements of the permits and/or clearances from the above listed agencies. When these requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvement plans for City approval. 21 PROJECT INFORMATION CASE NUMBERS: SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013- 924 AMENDMENT 2) APPLICANT: WOODBRIDGE PACIFIC PROPERTY OWNER: WOODBRIDGE PACIFIC & CALWEST COMMUNITIES REQUESTS: ADOPT A RESOLUTION RECOMMENDING APPROVAL OF SITE DEVELOPMENT PERMIT 2021-0003 (SDP 2013-924 AMENDMENT 2) TO AMEND ORIGINALLY APPROVED SIGNATURE AT PGA WEST CONDOMINIUM PLANS LOCATION: BOUNDED BY PGA BOULEVARD ON THE SOUTH AND WEST, PGA STADIUM COURSE AND CLUBHOUSE TO THE NORTH AND EAST GENERAL PLAN DESIGNATION: TOURIST COMMERCIAL ZONING DESIGNATION: TOURIST COMMERCIAL SURROUNDING ZONING/LAND USES: NORTH: LOW DENSITY RESIDENTIAL/GOLF COURSE; EXISTING RESIDENTIAL DEVELOPMENT/GOLF COURSE SOUTH: LOW DENSITY RESIDENTIAL/GOLF COURSE; EXISTING RESIDENTIAL DEVELOPMENT/GOLF COURSE EAST: LOW DENSITY RESIDENTIAL/GOLF COURSE; EXISTING RESIDENTIAL DEVELOPMENT/GOLF COURSE WEST: LOW DENSITY RESIDENTIAL/GOLF COURSE; EXISTING RESIDENTIAL DEVELOPMENT/GOLF COURSE ATTACHMENT 1 22 ATTACHMENT 2 23 ATTACHMENT 324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SHEET INDEX: ARCHITECTURAL - PLANS & ELEVATIONS COVER SHEET & INDEX A-1 A-2 A-3 A-4 TOWNHOMES La Quinta, CA Cover Sheet / Index C-1 PLAN 1 FRONT ELEVATIONS A-5 A-6 PLOT PLAN SITE PLAN P-1 C-1 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020027 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/21 PLAN 1A FLOOR PLANS PLAN 1A ELEVATIONS - REAR & SIDE A-7 A-8 A-9 A-10 A-11 A-12 A-13 A-14 A-15 A-16 A-17 A-18 A-19 A-20 A-21 A-22 A-23 A-24 A-25 A-26 A-27 A-28 E-1A COLORED ELEVATION - PLAN 1A E-1B COLORED ELEVATION - PLAN 1B E-1C COLORED ELEVATION - PLAN 1C E-2A COLORED ELEVATION - PLAN 2A E-2B COLORED ELEVATION - PLAN 2B E-2C COLORED ELEVATION - PLAN 2C E-2&3 DUP A COLORED ELEVATION - PLAN 2&3 DUPLEX A E-2&3 DUP B COLORED ELEVATION - PLAN 2&3 DUPLEX B E-2&3 DUP C COLORED ELEVATION - PLAN 2&3 DUPLEX C E-3 DUP A COLORED ELEVATION - PLAN 3 DUPLEX A E-3 DUP B COLORED ELEVATION - PLAN 3 DUPLEX B E-3 DUP C COLORED ELEVATION - PLAN 3 DUPLEX C ARCHITECTURAL - COLORED ELEVATIONS LA QUINTA PLAN 1B FLOOR PLANS PLAN 1B ELEVATIONS - REAR & SIDE PLAN 1C FLOOR PLANS PLAN 1C ELEVATIONS - REAR & SIDE PLAN 2 FRONT ELEVATIONS PLAN 2A FLOOR PLANS PLAN 2A ELEVATIONS - REAR & SIDE PLAN 2B FLOOR PLANS PLAN 2B ELEVATIONS - REAR & SIDE PLAN 2C FLOOR PLANS PLAN 2C ELEVATIONS - REAR & SIDE PLAN 2&3 DUPLEX FRONT ELEVATIONS PLAN 2&3 DUPLEX-A FLOOR PLANS PLAN 2&3 DUPLEX-A ELEVATIONS - REAR & SIDE PLAN 2&3 DUPLEX-B FLOOR PLANS PLAN 2&3 DUPLEX-B ELEVATIONS - REAR & SIDE PLAN 2&3 DUPLEX-C FLOOR PLANS PLAN 2&3 DUPLEX-C ELEVATIONS - REAR & SIDE PLAN 3 DUPLEX FRONT ELEVATIONS PLAN 3 DUPLEX-A FLOOR PLANS PLAN 3 DUPLEX-A ELEVATIONS - REAR & SIDE PLAN 3 DUPLEX-B FLOOR PLANS PLAN 3 DUPLEX-B ELEVATIONS - REAR & SIDE PLAN 3 DUPLEX-C FLOOR PLANS PLAN 3 DUPLEX-C ELEVATIONS - REAR & SIDE PLOT PLANP-2 PLOT PLANP-3 PLOT PLANP-4 P-1 PARKING ANALYSIS F-1 FIRE ACCESS L-1 LANDSCAPE PLAN ATTACHMENT 4 46 LOT 94 GGGGGGGGGGGGGG GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG G G G G G G G G G G G G G G G G G G GG G G G G G G G 52 51 50 49 48 47 REDSTO N E W A Y ROYAL OAKS WAY1 2 3 4 5 6 7 1920 21 18 53 54 55 56 57 46 45 58 CLUBHOUSE EXISTING CONDOMINIUM 25' 18'EX. DRIVEWAY4' 4' EX. 4' PUE EX. E/P EX. PARKING STALLS25'4'EX. 4' PUE EX. E/P EX. C/L 4'37' 10' 10'EX. 10' PUE EX. CURB 25'4'4'EX. 4' PUE EX. E/P Plan 2A Plan 2C Plan 3B Plan 3B Plan 1A Plan 2B Plan 2C Plan 2BPlan 1APlan 2B Plan 1C 11'13.2'11.1'8'5'5'11' 10'5.1'5'24.2'12.3'10.6'11.6'16.7' 17'5.5'8.1' 12.4'5'5'5'16.6'16.3'16.3'9.7'5'5.5'10.7'17.6'16.9'37' 28' 36' 10'10'5'10'13.2'11.8'5'8.3' 34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com MSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING LA QUINTA TOWNHOMES @ PGA WEST SDP SITE PLAN WOODBRIDGE PACIFIC GROUP, LLC APRIL 4, 2021 1 of 4 Sheet Index Map N.T.S. PGA BOULEVARDPGA BOULEVARDSHEET 1 Proposed and Existing Masonry Wall SHEET 2 SHEET 3 SHEET 4 ROYAL OAKS WAYSIGNATURE WAY CHAMPIONS WAY PLATIN U M WAYISLEWORT H 28 27 26 2524232221201918171615141312 11 10 9 8 7 6 5 4 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 40 39 38 31 30 29 28 27 36 35 34 33 32 41 82 83 84 85 86 87888990919218192021 22 23 24 25 26 37 38 1 2 3 4 5 6 8 9 10 11 12 13 14 15 61 62 63 64 65 66 67 68 69 70 71 72 7 29 30 31 32 33 34 35 36 37 58 59 601 2 3 1716 73 74 75 76 77 78 79 80 81 CLUBHOUSE Plan Matrix Plan 1: Plan 3: 31 Units 14 Units Total: 86 Units Note: 1. Duplex Plan 2 & 3: 10 Duplex Buildings 2. Duplex Plan 3 & 3: 2 Duplex Buildings 3. Building Setbacks will need to be reviewed 4. Existing Condominium Lot Lines will need to be confirmed and possibly adjusted to new unit plotting. and approved by City. 5. Existing utilities and site improvements will need to be field verified and surveyed for accurate locations before final design. SDP SITE PLAN DATA TABLE ASSESSOR'S PARCEL NUMBERS:775-400-074, 775-401-005, 775-401-061, 775-401-075, 775-401-076, EXHIBIT DATE: MAY 4, 2021 EXISTING ZONING: PROPOSED ZONING: EXISTING GENERAL PLAN LAND USE: PROPOSED GENERAL PLAN LAND USE: SPECIFIC PLAN SPECIFIC PLAN SPECIFIC PLAN EXHIBIT PREPARER: ADDRESS: MSA CONSULTING, INC. 34200 BOB HOPE DRIVE RANCHO MIRAGE, CALIFORNIA 92270 CONTACT:PAUL SEPULVEDA TELEPHONE:(760) 320-9811 REVISIONS NO. DATE SPECIFIC PLAN IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA LEGAL DESCRIPTION: DESCRIPTION TRACT NO. 36537-1 & -2, BEING A SUBDIVISION OF PARCEL 2 AS SHOWN BY LOT LINE ADJUSTMENT NO. 2004-411, AS RECORDED ON OCTOBER 8, 2004 AS INSTRUMENT NO. 2004-0803272 OF OFFICIAL APPLICANT / ADDRESS: CONTACT: 27271 LAS RAMBLAS, STE#100 MISSION VIEJO, CALIFORNIA 92691 STEVE CARROLL WOODBRIDGE PACIFIC GROUP, LLC TELEPHONE:(949) 254-5299 LAND OWNER: FOR APPROVED TRACT MAP NO. 36537-1 & -2 LA QUINTA TOWNHOMES @ PGA WEST PROJECT NAME: RECORDS, RIVERSIDE COUNTY, CALIFORNIA, NORTHWEST 1/4, SECTION 21, TOWNSHIP 6 SOUTH, RANGE 7 EAST, SAN BERNARDINO MERIDIAN. EXISTING LAND USE: PROPOSED LAND USE: VACANT AND EXISTING TOWNHOMES TOWNHOMES INDEX SHEET Existing Sewer Line Existing Water Line Existing Dry Utilities Existing Storm Drain Existing Right-Of-Way Existing Lot Line Existing Public Utility Easement Existing Project Boundary Existing Water Meter Existing Sewer Line Lateral Building Setbacks Existing Irrigation Existing Gas Legend: Townhome Number78 Proposed A/C Unit Plan 2: 41 Units & 775-410-040, 775-411-011, 775-420-041 VICINITY MAP NTS AVENUE 58 WEISKOPF MADISON ST.JEFFERSONNICKL A US JACK SPANISH BAYAVENUE 54 AIRPORT BOULEVARD MONROE ST.PGA BLVD.PGA WEST PROJECT SITE Legend:(Continued)R:\2215\Woodbridge\Acad\Planning\Exhibits\Plot Plan\2215 Overall Preliminary Condo Plot Plan.dwg, 5/4/2021 8:08:02 AM, ddewegeli, MSA Consulting, Inc.47 LOT 95 PLATIN U M W AY G G G G G G G G G G G G G G G GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG G G G G G G G G GGGG G G G G G G G G G G GGGG G G G G G G G G GGG47 SIGNATURE WAY KIAWAH ISLAND REDSTO N E W A YROYAL OAKS WAY5 6 7 1920 8 9 10 11 12 13 14 32 31 30 29 28272625242322 1516 1718 46 45 44 43 42 41 40 39 38 37 36 35 37' 10'10'EX. 10' PUE EX. CURB 25'4'4'EX. 4' PUE EX. E/P 25'EX. 4' PUE EX. E/P 4'37'10'EX. 10' PUE EX. R/W & BACK OF CURB EX. R/W & BACK OF CURB EX. C/L Plan 1A Plan 2B Plan 2C Plan 2BPlan 1APlan 2B Plan 1C 5.1'5'24.2'12.3'10.6'11.6'16.7' 17'5.5'8.1' 12.4'5'5'5'16.6'16.3'16.3'9.7'5'5.5'17.6'16.9'37' 28' 36' 10'10'5'Plan 2A Plan 1B Plan 2C Plan 1A Plan 2B Plan 1C Plan 2A Plan 3APlan 2A Plan 2C Plan 1C Plan 1A Plan 2C Plan 1B Plan 2C Plan 3B Plan 2BPlan 1CPlan 2APlan 1BPlan 2C 12.7'13.5'13.6 ' 1 1 . 9 ' 1 0 . 8 ' 1 1 . 3 '12.8'8.3'8.5'13' 8.7'8' 13' 11.8'5'5.1'5'5' 5 ' 5 . 2 ' 5' 10'5'10.1' 8.1'19.7'20.5'20.7'20.9'20.7'20.7'20.9'21'20.2'18.7'8' 8' 8.2' 8' 9.3' 8' 8' 8' 5. 4 ' 2 0 . 3 ' 27'5.1'5.2'5'5'5'5'18.9'18.9'18.8'18.9'18.3'20.8'1 9 ' 8.3' 1 0 . 8 ' 13.8'20.7'22.3 '6.5'5'21.1' 18.8'23'20.9'5.1'18.9'34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com MSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING LA QUINTA TOWNHOMES @ PGA WEST SDP SITE PLAN WOODBRIDGE PACIFIC GROUP, LLC APRIL 4, 2021 2 of 4 Sheet Index Map N.T.S. PGA BOULEVARDPGA BOULEVARDSHEET 1 Legend: Proposed and Existing Masonry Wall 33 Existing Sewer Line Existing Water Line Existing SCE and Joint Trench Utilities Existing Storm Drain Existing Right-Of-Way Existing Lot Line Existing Public Utility Easement Existing Tract 32233-4 Boundary Existing Gas Line Existing Irrigation Line SHEET 2 SHEET 3 SHEET 4 ROYAL OAKS WAYSIGNATURE WAY CHAMPIONS WAY PLATIN U M WAYISLEWORT H 28 27 26 2524232221201918171615141312 11 10 9 8 7 6 5 4 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 40 39 38 31 30 29 28 27 36 35 34 33 32 41 82 83 84 85 86 87888990919218192021 22 23 24 25 26 37 38 1 2 3 4 5 6 8 9 10 11 12 13 14 15 61 62 63 64 65 66 67 68 69 70 71 72 7 29 30 31 32 33 34 35 36 37 58 59 601 2 3 1716 73 74 75 76 77 78 79 80 81 CLUBHOUSE Unit Number R:\2215\Woodbridge\Acad\Planning\Exhibits\Plot Plan\2215 Overall Preliminary Condo Plot Plan.dwg, 5/4/2021 8:06:23 AM, ddewegeli, MSA Consulting, Inc.48 ROYAL OAKS WAYLOT 93 LOT 96 GG G G G G G G G G G G G G G G G G G G G G G G G G G G G G GGGGGGGGGGG GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGSIGNATURE W A Y SIGNATURE WAY WHISPER ROCK WAY WHISPER R O C K W A Y 29 28272625242322 33343536373839 4041 42 43 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 59 60 21 20 19 18 92 91 90 89 88 87 45 44 46 47 37'10'EX. 10' PUE EX. R/W & BACK OF CURB EX. R/W & BACK OF CURB EX. C/L 4'25'4'EX. 4' PUE EX. E/P EX. E/P4'25'4'EX. 4' PUE EX. E/P EX. LOT LINE EX. LOT LINE EX. R/W 4' 25' 4' 4'25'4'EX. DRIVEWAY4'25'4' 18' 25' 4'LOT 131 Plan 1B Plan 2C Plan 3B Plan 2BPlan 1CPlan 2APlan 1BPlan 2C 20.9'20.7'20.7'20.9'21'20.2'9.3' 8'8' 5. 4 ' 2 0 . 3 ' 27' Plan 1A Plan 1BPlan 2CPlan 2APlan 1BPlan 2CPlan 3C Plan 3BPlan 2B Plan 2A Plan 1B Plan 1C Plan 2A Plan 1B Plan 2C Plan 1C Plan 3B Plan 2B Plan 3C Plan 2C Plan 1A Plan 1C Plan 2B Plan 2A Plan 3A Plan 1B Plan 1A Plan 3C Plan 3C Plan 3A Plan 2A Plan 2B Plan 1C Plan 1A Plan 2C Plan 1B Plan 2A 18.9'18.9'18.8'18.9'18.8'18.3'20.8'5'19'18.5'18.8'18.5'18.5'18.9'8.5' 8' 10.4' 10.8' 13.6' 26.4'5'5'5'5'5'5'5'21.9'8.9'17.3'5'5'5.7'5'5'5'5'14.9' 7.7' 8' 9.9' 9.5'12.9'12' 21.5' 30.3' 33.1' 39.8' 14.9' 9.5'8'19.5'8'8'13.4'5' 5' 5' 5'19.6'8'8'15.6'5' 5' 5' 5' 20.3' 18.4' 18.6'7.2'8'8'19.9'5' 5' 5' 5' 18.1'8'5'8'5'11.1'1.1'5' 5' 5'8'29.7'11.7'10' 37'18.2' 37'23'20.9'5' 5'14'20.1' 18.2' 5' 5' 5'19'18.2'9'37. 6 '13.6'29.8'18.9'34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com MSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING LA QUINTA TOWNHOMES @ PGA WEST SDP SITE PLAN WOODBRIDGE PACIFIC GROUP, LLC APRIL 4, 2021 3 of 4 Sheet Index Map N.T.S. PGA BOULEVARDPGA BOULEVARDSHEET 1 SHEET 2 SHEET 3 SHEET 4 ROYAL OAKS WAYSIGNATURE WAY CHAMPIONS WAY PLATIN U M WAYISLEWORT H 28 27 26 2524232221201918171615141312 11 10 9 8 7 6 5 4 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 40 39 38 31 30 29 28 27 36 35 34 33 32 41 82 83 84 85 86 87888990919218192021 22 23 24 25 26 37 38 1 2 3 4 5 6 8 9 10 11 12 13 14 15 61 62 63 64 65 66 67 68 69 70 71 72 7 29 30 31 32 33 34 35 36 37 58 59 601 2 3 1716 73 74 75 76 77 78 79 80 81 CLUBHOUSE Legend: Proposed and Existing Masonry Wall 33 Existing Sewer Line Existing Water Line Existing SCE and Joint Trench Utilities Existing Storm Drain Existing Right-Of-Way Existing Lot Line Existing Public Utility Easement Existing Tract 32233-4 Boundary Existing Gas Line Existing Irrigation Line Unit Number R:\2215\Woodbridge\Acad\Planning\Exhibits\Plot Plan\2215 Overall Preliminary Condo Plot Plan.dwg, 5/4/2021 8:06:47 AM, ddewegeli, MSA Consulting, Inc.49 G G G G G GGGGGGG G G G G G G G G G G G G G G G G G G GGGGGG GGGGGGGGGGGGGGGGGGGGGGGGGGGSIGN A T U R E W A Y WHISPER ROC K W A Y WHISP E R R O C K W A Y 44 45 46 47 484950 51 52 53 54 55 56 57 58 59 60 61 62 63 64 31 30 29 28 26 25 24 23 22 66 67 65 21 20 19 68 69 70 71 72 73 43 42 41 74 4'25'4'EX. R / W EX. 4' PU E EX. E/P 4'25'4' 25'4.5' 18'4'18' 25'4.5'EX. DRIVEWAYEX. PARKING STALLSEX. DRIVEWAYEX. DR IVEWAY 4' 25' 4'18.5'18.8'18.5'18.5'18.9'18.4'10' 8.5' 8' 10.4' 10.8' 13.6'5'5'5'5'5'5'5'5'18.1'8'5'8'5'11.1'1.1'5' 5' 5'8'29.7'11.7'Plan 3C Plan 2C Plan 1A Plan 1C Plan 2B Plan 2A Plan 3A Plan 2B Plan 3B Plan 1C Plan 2B Plan 1A Plan 2CPlan 3A Plan 2A Plan 1C Plan 2B Plan 1A Plan 2C Plan 3C Plan 2A Plan 1B Plan 2C Plan 2A Plan 1C Plan 2B Plan 1A Plan 2C Plan 1B Plan 2A Plan 1C Plan 1B Plan 2A Plan 2B 8'5'5'5'8.1' 13.7' 8.3'5.3'16.1'5.4'5'13.8'5'11.3' 13.5' 5' 10.2' 5' 5'18.2'8'8'13.6 ' 23.4 ' 28.2 '37.1'33.4'42.2'32.9'49.1'33.7 '23.3'19.1'8'8'14.4'32.5' 24.8' 10' 5' 5' 5'10.5'10.1'5' 5' 5' 18.2' 5' 5'14'20.1' 18.2' 5' 5' 5'19' 18.2'9' 37.6'13.6 '29.8' 22.6'20'34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com MSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING LA QUINTA TOWNHOMES @ PGA WEST SDP SITE PLAN WOODBRIDGE PACIFIC GROUP, LLC APRIL 4, 2021 4 of 4 Sheet Index Map N.T.S. PGA BOULEVARDPGA BOULEVARDSHEET 1 SHEET 2 SHEET 3 SHEET 4 ROYAL OAKS WAYSIGNATURE WAY CHAMPIONS WAY PLATIN U M WAYISLEWORT H 28 27 26 2524232221201918171615141312 11 10 9 8 7 6 5 4 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 40 39 38 31 30 29 28 27 36 35 34 33 32 41 82 83 84 85 86 87888990919218192021 22 23 24 25 26 37 38 1 2 3 4 5 6 8 9 10 11 12 13 14 15 61 62 63 64 65 66 67 68 69 70 71 72 7 29 30 31 32 33 34 35 36 37 58 59 601 2 3 1716 73 74 75 76 77 78 79 80 81 CLUBHOUSE Legend: Proposed and Existing Masonry Wall 33 Existing Sewer Line Existing Water Line Existing SCE and Joint Trench Utilities Existing Storm Drain Existing Right-Of-Way Existing Lot Line Existing Public Utility Easement Existing Tract 32233-4 Boundary Existing Gas Line Existing Irrigation Line Unit Number EX. 4' PUE EX. E/P EX. LOT LINE R:\2215\Woodbridge\Acad\Planning\Exhibits\Plot Plan\2215 Overall Preliminary Condo Plot Plan.dwg, 5/4/2021 8:07:11 AM, ddewegeli, MSA Consulting, Inc.50 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 1A E-1A Scheme 1 51 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 1B E-1B Scheme 2 52 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 1C E-1C Scheme 3 53 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 2A E-2A Scheme 4 54 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 2B E-2B Scheme 5 55 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 2C E-2C Scheme 6 56 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 2&3 DUPLEX A E-2&3 DUP-A Scheme 10 57 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN2&3 DUPLEX B E-2&3 DUP-B Scheme 11 58 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN2&3 DUPLEX C E-2&3 DUP-C Scheme 12 59 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 3-DUPLEX A E-3DUP-A Scheme 7 60 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 3 DUPLEX B E-3DUP-B Scheme 8 61 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020010 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/2021 PLAN 3 DUPLEX C E-3DUP-C Scheme 9 62 9'-1"9'-1" 22'-11 1/2"T.O.ST.P.T.PF.F9'-1"9'-1"T.O.ST.P.T.PF.F1A1B1C1D1GT.O.S9'-1"9'-1" 22'-11 1/2"T.P.T.PF.F9'-1"9'-1"T.O.ST.P.T.PF.F2A2B2C2D2G2E2F2DT.O.ST.P.9'-1"9'-1" 22'-11 1/2"T.PF.F9'-1"9'-1"T.O.ST.P.T.PF.F3A3B3C3D3G3E3DTUSCANYSANTA BARBARASPANISH COLONIALPLAN 1BPLAN 1APLAN 1CFRONT ELEVATIONS0418LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21A-163 64 9'-1"T.O.S T.P 9'-1"9'-1"T.O.S T.P F.F. T.P 1A 1B1C 1G T.O.S9'-1"9'-1"T.P. T.P F.F T.O.S T.P 1A1B1C 1G 22'-11 1/2"T.O.S 9'-1"9'-1"T.P. T.P. F.F.9'-1"9'-1"T.O.S T.P. T.P. F.F. 1A1B1C1C 1G REAR ELEVATION ELEVATIONS 0 82 16 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION PLAN 1A LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020027 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/21 SPANISH COLONIAL A-3 65 66 T.O.ST.P9'-1" 9'-1"9'-1"T.O.ST.PF.F.T.P2A2B2C2G2F2ET.O.S9'-1"9'-1"T.P.T.PF.F2A2E2C2G2FT.O.S9'-1"9'-1"T.P.22'-11 1/2"T.P.F.F.3'-6" 9'-1"9'-1"T.O.ST.P.T.P.F.F.2A2B2C2C2GELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 1BTUSCANYA-567 68 9'-1"T.O.ST.P9'-1"9'-1"T.O.ST.P.F.F.T.P.3A3B3C3G3ET.O.S9'-1"9'-1"T.P.T.PF.F9'-1"T.O.ST.P3A3E3C3G T.O.S9'-1"9'-1"T.P.22'-11 1/2"T.P.F.F.9'-1"9'-1"T.O.ST.P.T.P.F.F.3A3B3C3C3GELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 1CSANTA BARBARAA-769 T.O.S T.P.23'-5"9'-1"9'-1"T.P. F.F9'-1"9'-1"T.O.S T.P. T.P. F.F 4A4B4C 4D 4G4D 23'-5"9'-1"9'-1"T.O.S T.P. T.P. F.F T.O.S T.P. T.P. F.F 5A5B5C 5D 5G 5E 5F 5D23'-5"9'-1"9'-1"T.O.S T.P. T.P. F.F 9'-1"9'-1"T.O.S T.P. T.P. F.F 6A6B6C 6D 6G 6E 6D TUSCANY SANTA BARBARA SPANISH COLONIAL PLAN 2BPLAN 2A PLAN 2C ELEVATIONS 0 41 8 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020027 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 4/27/21 A-8 70 WDUP 17 R 2-CAR GARAGEKITCHENLAUNDRY/CRAFTS10'-7" X 10'-6"W.I..C.POWDERMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"VEN-H T CHWALL-LOWWNDW-DO OR WALL-HTC H VEN-L OWWALLWALL-HID N SOFF- H TC H VEN-H I GH OVHDOPTN FLCH DSGN - F UR N SOFF- E DG E PLUM CBNT- S TR S APPLPRCHGUIDDSGN - RM N MWALL-CON C ABVBELWPLUM - H TC H DSGN - D IM S NOTEWALL-HTC H -C ON C DSGN - D IM S P R ES ACCE S S 000DSGN - T EX TWALL-FUR R TEXT _XFIR S T ELECT R IC A L 30'-0"62'-0" DN 17 R VEN-H T CHWALL-LOWWNDW-DO OR WALL-HTC H VEN-L OWWALLWALL-HID N SOFF- H TC H VEN-H I GH OVHDOPTN FLCH DSGN - F UR N SOFF- E DG E PLUM CBNT- S TR S APPLPRCHGUIDDSGN - RM N MWALL-CON C BELW AREA- 2 AREA- 3 NOTE AREA- 4 AREA- 5WALL-HTC H -C ON C DSGN - D IM S P R ES 000DSGN - T EX TWALL-FUR R TEXT _XSEC ON D ELECT R IC A L BONUS ROOM15'-7" X 15'-9"BEDROOM 210'-10" X 13'-3"BEDROOM 313'-2" X 11'-3"BATH 217'-8 1/2"HIPHIPRIDGE RIDGEHIPHIPVALLEYHIPRIDGE HIPHIPHIPVALLEYHIPRIDGE 1ST FLOOR PLANFLOOR PLANSPLAN 2A1,960 SFROOF PLANROOF PITCH = 5:122ND FLOOR PLAN084161,246 SF714 SFA-9LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/2171 T.O.S 9'-1"9'-1"T.P. F.F. T.P.9'-1"9'-1"T.O.S T.P. F.F. T.P. 4A 4B4C 4G 9'-1"T.O.S 9'-1"T.P. F.F. T.P.9'-1"9'-1"T.O.S T.P. F.F. T.P. 4A4B4C 4G T.O.S 9'-1"9'-1"T.P. F.F T.P 23'-5"9'-1"9'-1"T.O.S T.P. F.F T.P 4A4B4C 4G 4C REAR ELEVATION ELEVATIONS 0 82 16 LEFT SIDE ELEVATION LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020027 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 4/27/21 RIGHT SIDE ELEVATION PLAN 2A SPANISH COLONIAL A-10 72 WDUP 17 R 2-CAR GARAGEKITCHENLAUNDRY/CRAFTS10'-7" X 10'-6"W.I..C.POWDERMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"VEN-H T CHWALL-LOWWNDW-DO ORWALL-HTC H VEN-L OWWALLWALL-HID N SOFF- H TC H VEN-H I GH OVHDOPTN FLCH DSGN - F UR N SOFF- E DG E PLUM CBNT- S TR S APPLPRCHGUIDDSGN - RM N MWALL-CON C ABVBELWPLUM - H TC H DSGN - D IM S NOTEWALL-HTC H -C ON C DSGN - D IM S P R ES ACCE S S 000DSGN - T EX TWALL-FUR R TEXT _XFIR S T ELECT R IC A L 30'-0"62'-0" DN 17 R VEN-H T CHWALL-LOWWNDW-DO ORWALL-HTC H VEN-L OWWALLWALL-HID N SOFF- H TC H VEN-H I GH OVHDOPTN FLCH DSGN - F UR N SOFF- E DG E PLUM CBNT- S TR S APPLPRCHGUIDDSGN - RM N MWALL-CON C BELW AREA- 2 AREA- 3 NOTE AREA- 4 AREA- 5WALL-HTC H -C ON C DSGN - D IM S P R ES ACCE S S 000DSGN - T EX TWALL-FUR R TEXT _XSEC ON D ELECT R IC A L BONUS ROOM15'-7" X 15'-9"BEDROOM 210'-10" X 13'-3"BEDROOM 313'-2" X 11'-3"BATH 2RIDGE RIDGEHIPHIPVALLEYHIPHIPHIPHIP RIDGEVALLEYVALLEYRIDGE RIDGEHIP 1ST FLOOR PLANFLOOR PLANSPLAN 2B1,960 SFROOF PLANROOF PITCH = 5:122ND FLOOR PLAN084161,246 SF714 SFA-11LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/2173 9'-1"9'-1"T.O.ST.P.F.F.T.P.9'-1"9'-1"T.O.ST.P.F.F.T.P.5A5B5C5G5E5F9'-1"9'-1"T.O.ST.P.F.F.T.P.9'-1"9'-1"T.O.ST.P.F.F.T.P.5A5E5C5G5F9'-1"9'-1" 23'-5"T.O.ST.P.F.FT.PT.O.ST.P.F.FT.P5A5B5C5G5CELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 4/27/21PLAN 2BTUSCANYA-1274 WDUP 17 R 2-CAR GARAGEKITCHENLAUNDRY/CRAFTS10'-7" X 10'-6"W.I..C.POWDERMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"VEN-H T CHWALL-LOWWNDW-DO ORWALL-HTC H VEN-L OWWALLWALL-HID N SOFF- H TC H VEN-H I GH OVHDOPTN FLCH DSGN - F UR N SOFF- E DG E PLUM CBNT- S TR S APPLPRCHGUIDDSGN - RM N MWALL-CON C ABVBELWPLUM - H TC H DSGN - D IM S NOTEWALL-HTC H -C ON C DSGN - D IM S P R ES ACCE S S 000DSGN - T EX TWALL-FUR R TEXT _XFIR S T ELECT R IC A L 30'-0"62'-0" DN 17 R VEN-H T CHWALL-LOWWNDW-DO ORWALL-HTC H VEN-L OWWALLWALL-HID N SOFF- H TC H VEN-H I GH OVHDOPTN FLCH DSGN - F UR N SOFF- E DG E PLUM CBNT- S TR S APPLPRCHGUIDDSGN - RM N MWALL-CON C BELW AREA- 2 AREA- 3 NOTE AREA- 4 AREA- 5WALL-HTC H -C ON C DSGN - D IM S P R ES ACCE S S 000DSGN - T EX TWALL-FUR R TEXT _XSEC ON D ELECT R IC A L BONUS ROOM15'-7" X 15'-9"BEDROOM 210'-10" X 13'-3"BEDROOM 313'-2" X 11'-3"BATH 2HIPHIPRIDGE RIDGEHIPHIPVALLEYHIPRIDGE HIPHIPHIPVALLEYHIPRIDGE 1ST FLOOR PLANFLOOR PLANSPLAN 2C1,960 SFROOF PLANROOF PITCH = 5:122ND FLOOR PLAN084161,246 SF714 SFA-13LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/2175 9'-1"9'-1"T.O.ST.P.F.F.T.P.9'-1"9'-1"T.O.ST.P.F.F.T.P.6A6B6C6G6E9'-1"9'-1"T.O.ST.P.F.F.T.P.9'-1"9'-1"T.O.ST.P.F.F.T.P.6A6E6C6G 9'-1"9'-1" 23'-5"T.O.ST.P.F.FT.P9'-1"9'-1"T.O.ST.P.F.FT.P6A6B6C6GELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 4/27/21PLAN 2CSANTA BARBARAA-1476 T.O.S 23'-6 1/4"13'-3 1/4"T.O.S 9'-1"T.P. 10A10B10C10D 10G 10D T.O.S T.P.23'-6 1/4"9'-1"9'-1"9'-1"T.P. F.F. T.O.S T.P. 11A11B11C11D11D11F11E 11G T.O.S13'-1"23'-6 1/4"9'-1"9'-1"9'-1"T.O.S T.P. T.P. T.P. F.F. T.P. 12A12B12C12D12D12E12E 12G TUSCANY SANTA BARBARA SPANISH COLONIAL PLAN 2, 3 DUPLEX BPLAN 2, 3 DUPLEX A PLAN 2, 3 DUPLEX C ELEVATIONS 0 41 8 LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020027 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/21 A-15 PLAN 2C PLAN 3C PLAN 2A PLAN 3A PLAN 2B PLAN 3B 77 W DWDUP 17 R VEN-HT C H WALL-LO W WNDW-D OO R WALL-H T CH VEN-LO W WALLWALL-H I DN VEN-HIG H OVHDOPTN FLCH DSGN-F U RN SOFF-E D GE PLUM CBNT-S T RS APPLPRCHGUIDDSGN-R MN M WALL-C O NC ABVBELWPLUM-H T CH NOTEWALL-H T CH - CO N C DSGN-D I MS PR E S ACCESS000DSGN-T E XT WALL-F U RR TEXT _XFIRSTELECTR I CA L 2-CAR GARAGEKITCHENLAUNDRY/CRAFTS10'-7" X 10'-6"W.I..C.POWDERMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"2-CAR GARAGEKITCHENW.I..C.MASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"POWDERLAUNDRYBEDROOM 212'-0" X 13'-2"VEN-HT C H WALL-LO W WNDW-D OO R WALL-H T CH VEN-LO W WALLWALL-H I DN SOFF-H T CH VEN-HIG H OVHDOPTN FLCH DSGN-F U RN SOFF-E D GE PLUM CBNT-S T RS APPLPRCHGUIDDSGN-R MN M WALL-C O NC ABVBELWPLUM-H T CH AREA-2AREA-3NOTEAREA-4AREA-5WALL-H T CH - CO N C DSGN-D I MS PR E S ACCESS000DSGN-T E XT WALL-F U RR TEXT _XSECO ND _XFIRSTELECTR I CA L 30'-0"60'-0"30'-0"62'-0" DN17 R BONUS ROOM15'-7" X 15'-9"BEDROOM 210'-10" X 13'-3"BEDROOM 313'-2" X 11'-3"BATH 2RIDGE RIDGEHIP HIPHIPHIPVALLEYVALLEYHIPHIP VALLEYHIPRIDGERIDGERIDGEHIPVALLEYHIPRIDGERIDGEVALLEYVALLEYVALLEY 1ST FLOOR PLANFLOOR PLANSPLAN 2&3-DUPLEX-A3,173 SFROOF PLANROOF PITCH = 5:12084162,459 SF2ND FLOOR PLAN714 SFA-16LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 2APLAN 3A78 9'-1"9'-1"T.P. T.P. T.O.S F.F.9'-1"9'-1"T.P. T.P. T.O.S F.F. 10A 10C 10B 10G 9'-1"9'-1"T.O.S T.P. T.O.S T.P. 10A10B 10C 10G 9'-1"9'-1"23'-6 1/4"T.O.S T.P. F.F. T.P. T.O.S T.P.9'-1"10A 10B10C 10G REAR ELEVATION ELEVATIONS 0 82 16 LEFT SIDE ELEVATION RIGHT SIDE ELEVATION LA QUINTA - CA. LA QUINTA TOWNHOMES 949.261.2070 20250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660 HANNOUCHE ARCHITECTS SAMIR HANNOUCHE, ARCHITECT COPYRIGHTC PROJECT # 2020027 Preliminary WoodBridge Pacific Group, LLC 27271 LAS RAMBLAS, STE #100 MISSION VIEJO, CA 92691 949-348-8162 DATE: 5/4/21 PLAN 2, 3 DUPLEX A SPANISH COLONIAL A-17 PLAN 3A PLAN 2A PLAN 3A PLAN 2A 79 W DWDUP 17 R VEN-HT C H WALL-LO W WNDW-D OO R WALL-H T CH VEN-LO W WALLWALL-H I DN VEN-HIG H OVHDOPTN FLCH DSGN-F U RN SOFF-E D GE PLUM CBNT-S T RS APPLPRCHGUIDDSGN-R MN M WALL-C O NC ABVBELWPLUM-H T CH NOTEWALL-H T CH - CO N C DSGN-D I MS PR E S ACCESS000DSGN-T E XT WALL-F U RR TEXT _XFIRSTELECTR I CA L 2-CAR GARAGEKITCHENLAUNDRY/CRAFTS10'-7" X 10'-6"W.I..C.POWDERMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"2-CAR GARAGEKITCHENW.I..C.MASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"POWDERLAUNDRYBEDROOM 212'-0" X 13'-2"VEN-HT C H WALL-LO W WNDW-D OO R WALL-H T CH VEN-LO W WALLWALL-H I DN SOFF-H T CH VEN-HIG H OVHDOPTN FLCH DSGN-F U RN SOFF-E D GE PLUM CBNT-S T RS APPLPRCHGUIDDSGN-R MN M WALL-C O NC ABVBELWPLUM-H T CH AREA-2AREA-3NOTEAREA-4AREA-5WALL-H T CH - CO N C DSGN-D I MS PR E S ACCESS000DSGN-T E XT WALL-F U RR TEXT _XSECO ND _XFIRSTELECTR I CA L 30'-0"60'-0"30'-0"62'-0" DN17 R BONUS ROOM15'-7" X 15'-9"BEDROOM 210'-10" X 13'-3"BEDROOM 313'-2" X 11'-3"BATH 2RIDGE RIDGE HIPVALLEYVALLEYHIPRIDGE RIDGERIDGEHIPVALLEYRIDGEVALLEYVALLEYRIDGEVALLEYVALLEY 1ST FLOOR PLANFLOOR PLANSPLAN 2&3-DUPLEX-B3,174 SFROOF PLANROOF PITCH = 5:12084162,460 SF2ND FLOOR PLAN714 SFA-18LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 2BPLAN 3B80 9'-1"9'-1" 9'-1"T.O.ST.P.T.O.ST.P.F.F.T.P.9'-1"F.F.T.P.11A11C11B11G11E11F9'-1" 9'-1"T.O.ST.P.T.O.ST.P.11A11C11B11G11E11F9'-1"9'-1" 9'-1"T.O.ST.P.T.O.ST.P.F.F.23'-6 1/4"T.P.11A11B11C11G11BELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 2, 3 DUPLEX BTUSCANYA-19PLAN 3BPLAN 2BPLAN 2BPLAN 3B81 W DWDUP 17 RVEN-HTC HWALL-LO WWNDW-D O OR WALL-HT C H VEN-LOWWALLWALL-HID N VEN-HIG H OVHDOPTN FLCH DSGN-FU RNSOFF-ED G E PLUM CBNT-ST R S APPLPRCHGUIDDSGN-RM NMWALL-CO NC ABVBELWPLUM-HT C H NOTEWALL-HT C H- C ON C DSGN-DI M S P RE S ACCESS000DSGN-TE X TWALL-FU R R TEXT _XFIRSTELECTRI C AL 2-CAR GARAGEKITCHENLAUNDRY/CRAFTS10'-7" X 10'-6"W.I..C.POWDERMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"2-CAR GARAGEKITCHENW.I..C.MASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"POWDERLAUNDRYBEDROOM 212'-0" X 13'-2"VEN-HTC HWALL-LO WWNDW-D O OR WALL-HT C H VEN-LOWWALLWALL-HID N SOFF-HT C HVEN-HIG H OVHDOPTN FLCH DSGN-FU RNSOFF-ED G E PLUM CBNT-ST R S APPLPRCHGUIDDSGN-RM NMWALL-CO NC ABVBELWPLUM-HT C H AREA-2AREA-3NOTEAREA-4AREA-5WALL-HT C H- C ON C DSGN-DI M S P RE S ACCESS000DSGN-TE X TWALL-FU R R TEXT _XSECON D_XFIRSTELECTRI C AL 30'-0"60'-0"30'-0"62'-0" DN17 R BONUS ROOM15'-7" X 15'-9"BEDROOM 210'-10" X 13'-3"BEDROOM 313'-2" X 11'-3"BATH 2RIDGE RIDGE HIPHIPHIPVALLEYVALLEYVALLEYVALLEY HIPRIDGERIDGERIDGEHIPVALLEYRIDGERIDGEVALLEYVALLEY 1ST FLOOR PLANFLOOR PLANSPLAN 2&3-DUPLEX-C3,173 SFROOF PLANROOF PITCH = 5:12084162,459 SF2ND FLOOR PLAN714 SFA-20LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 2CPLAN 3C82 9'-1"9'-1" 23'-6 1/4" 9'-1"T.O.ST.P.T.O.ST.P.F.F.T.P.12A12B12C12G12B9'-1"9'-1"T.O.ST.P.T.P.F.F.T.O.ST.P.T.P.F.F.9'-1"9'-1"12A12C12B12G12E9'-1" 9'-1"T.O.ST.P.T.O.ST.P.12A12C12B12G12EELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 2, 3 DUPLEX CSANTA BARBARAA-21PLAN 3CPLAN 2CPLAN 2CPLAN 3C83 84 W D W D 2-CAR GARAGEKITCHENMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"POWDERLAUNDRYBEDROOM 212'-0" X 13'-2"W.I.C.LIVINGMASTERBEDROOM12'-0" X 15'-0"DININGKITCHENW.I.C.MASTERBATHBEDROOM 212'-0" X 13'-2"LAUNDRY2-CAR GARAGEPOWDER30'-0"60'-0"30'-0"60'-0"HIPVALLEYVALLEY HIPRIDGERIDGEHIPHIPHIPHIPRIDGEVALLEYHIPHIPVALLEYRIDGEVALLEYVALLEY 1ST FLOOR PLANFLOOR PLANSPLAN 3-DUPLEX-A2,444 SFROOF PLANROOF PITCH = 5:12084162,444 SFA-23LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 3ARPLAN 3A85 86 W D W D 2-CAR GARAGEKITCHENMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"POWDERLAUNDRYBEDROOM 212'-0" X 13'-2"W.I.C.LIVINGMASTERBEDROOM12'-0" X 15'-0"DININGKITCHENW.I.C.MASTERBATHBEDROOM 212'-0" X 13'-2"LAUNDRY2-CAR GARAGEPOWDER30'-0"60'-0"30'-0"60'-0"VALLEYVALLEYRIDGERIDGERIDGEVALLEYVALLEYRIDGEVALLEYVALLEY 1ST FLOOR PLANFLOOR PLANSPLAN 3-DUPLEX-B2,444 SFROOF PLANROOF PITCH = 5:12084162,444 SFA-25LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 3BRPLAN 3B87 9'-1"T.O.ST.P.T.O.ST.P.9'-1"8A8B8C8E8F8G8G9'-1" 9'-1"T.O.ST.P.T.O.ST.P.8E8F8B8C8A8G9'-1" 9'-1"T.O.ST.P.T.O.ST.P.8A8B8C8GELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 4/27/21PLAN 3 DUPLEX BTUSCANYA-2688 W D W D 2-CAR GARAGEKITCHENMASTERBATHDININGLIVINGMASTERBEDROOM12'-0" X 15'-0"POWDERLAUNDRYBEDROOM 212'-0" X 13'-2"W.I.C.LIVINGMASTERBEDROOM12'-0" X 15'-0"DININGKITCHENW.I.C.MASTERBATHBEDROOM 212'-0" X 13'-2"LAUNDRY2-CAR GARAGEPOWDER30'-0"60'-0"30'-0"60'-0"HIPVALLEYVALLEYHIPRIDGERIDGERIDGEVALLEYVALLEYRIDGEVALLEYVALLEY 1ST FLOOR PLANFLOOR PLANSPLAN 3-DUPLEX-C2,444 SFROOF PLANROOF PITCH = 5:12084162,444 SFA-27LA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 5/4/21PLAN 3CRPLAN 3C89 9'-1"T.O.ST.P.T.O.ST.P.9A9B9C9G9G9E9'-1" 9'-1"T.O.ST.P.T.O.ST.P.9A9B9C9E9G9'-1" T.O.ST.P.T.O.ST.P.9'-1"9A9B9C9GELEVATIONS08216REAR ELEVATIONLEFT SIDE ELEVATIONRIGHT SIDE ELEVATIONLA QUINTA - CA.LA QUINTA TOWNHOMES949.261.207020250 SW ACACIA ST. #145 NEWPORT BEACH, CA 92660HANNOUCHEARCHITECTSSAMIR HANNOUCHE, ARCHITECTCOPYRIGHTCPROJECT # 2020027PreliminaryWoodBridge Pacific Group, LLC27271 LAS RAMBLAS, STE #100MISSION VIEJO, CA 92691949-348-8162DATE: 4/27/21PLAN 3 DUPLEX CSANTA BARBARAA-2890 PLATIN U M W A Y CHAMPIONS WAY ROYAL OAKS WAYPLATINUM WAYPLATIN U M W A YPGA BOULEVARDEX. CONDOMINIUM SIGNATURE WAY SIGNATURE WAY WHISPER ROCK WAY W H I S P E R R O C K W A Y KIAWAH ISLAND REDSTO N E W A Y ROYAL OAKS WAY70 Plan 3 69 Plan 2 68 Plan 1 73 Plan 2 72 Plan 2 71 Plan 3 74 Plan 1 R E D S T O N E W A Y 65 Plan 2 66 Plan 3 67 Plan 1 62 Plan 2 63 Plan 1 64 Plan 2 59 Plan 3 60 Plan 2 61 Plan 1 58 Plan 2 57 Plan 1 56 Plan 2 55 Plan 3 54 Plan 2 53 Plan 1 52 Plan 2 51 Plan 2 50 Plan 1 49 Plan 2 48 Plan 1 47 Plan 2 46 Plan 1 45 Plan 2 44 Plan 1 43 Plan 1 42 Plan 2 41 Plan 2 40 Plan 3 39 Plan 3 38 Plan 2 37 Plan 1 36 Plan 2 35 Plan 2 34 Plan 1 33 Plan 1 83 Plan 1 84 Plan 2 85 Plan 1 86 Plan 279 Plan 3 80 Plan 2 81 Plan 2 82 Plan 175 Plan 1 76 Plan 1 77 Plan 3 78 Plan 3 22 Plan 2 23 Plan 1 24 Plan 2 25 Plan 1 26 Plan 2 27 Plan 3 28 Plan 2 29 Plan 1 30 Plan 2 31 Plan 1 32 Plan 1 21 Plan 1 20 Plan 2 19 Plan 1 18 Plan 2 17 Plan 2 16 Plan 2 15 Plan 3 14 Plan 2 13 Plan 1 12 Plan 2 11 Plan 1 10 Plan 29 Plan 18 Plan 27 Plan 26 Plan 2 5 Plan 1 4 Plan 3 3 Plan 3 2 Plan 2 1 Plan 2 EX. CONDOMINIUM EX. CONDOMINIUM EX. CONDOMINIUM PGA B O ULE V AR D CLUBHOUSE 2 3 4 5 10 6 7 9 12 11 13 57 54 58 56 55 47 50 48 49 51 52 27 26 30 28 29 31 32 33 34 444645 43 42 38 41 40 39 37 36 86 92 91 90 89 88 87 84 85 82 83 79 81 80 71 70 73 72 74 181920 21 24 22 23 25 30 93 131 94 8 35 26 31 59 53 95 601 95 96 39 34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com MSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING OVERALL TOWNHOME PARKING ANALYSIS: PGA WEST SIGNATURE WOODBRIDGE PACIFIC GROUP, LLC MAY 4, 2021 1 of 1 Sheet Index Map N.T.S. PGA BOULEVARDPGA BOULEVARDROYAL OAKS WAYSIGNATURE WAY CHAMPIONS WAY PLATIN U M WAYISLEWORT H 28 27 26 2524232221201918171615141312 11 10 9 8 7 6 5 4 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 40 39 38 31 30 29 28 27 36 35 34 33 32 41 82 83 84 85 86 87888990919218192021 22 23 24 25 26 37 38 1 2 3 4 5 6 8 9 10 11 12 13 14 15 61 62 63 64 65 66 67 68 69 70 71 72 7 29 30 31 32 33 34 35 36 37 58 59 601 2 3 1716 73 74 75 76 77 78 79 80 81 CLUBHOUSE PARKING ANALYSIS LEGEND CONDOMINIUM LOTS # OF SPACES SPECIFIC PLAN PARKING REQUIREMENTS: EXISTING 2 BEDROOM CONDOMINIUMS = 1.5 COVERED PARKING PER UNIT:14 STALLS PROPOSED 3 BEDROOM CONDOMINIUMS = 2 COVERED PARKING PER UNIT:172 STALLS TOTAL PARKING REQUIRED:236 STALLS RESIDENCE PARKING EXISTING RESIDENCE PARKING 172 STALLS 26 STALLS 197 STALLS PARKING PROVIDED 395 STALLS GUEST PARKING PARKING PROVIDED: GUEST PARKING = 0.5 PER UNIT:50 STALLS R:\2215\Woodbridge\Acad\Planning\Exhibits\SDP\2215 Parking Analysis Exhibit - Condo.dwg, 5/4/2021 4:11:52 PM, ddewegeli, MSA Consulting, Inc.91 PLATIN U M W A Y CHAMPIONS WAY ROYAL OAKS WAYPLATINUM WAYPLATIN U M W A YPGA BOULEVARDEX. CONDOMINIUM SIGNATURE WAY SIGNATURE WAY WHISPER ROCK WAY W H I S P E R R O C K W A Y KIAWAH ISLAND REDSTO N E W A Y ROYAL OAKS WAY70 Plan 3 69 Plan 2 68 Plan 1 73 Plan 2 72 Plan 2 71 Plan 3 74 Plan 1 R E D S T O N E W A Y 65 Plan 2 66 Plan 3 67 Plan 1 62 Plan 2 63 Plan 1 64 Plan 2 59 Plan 3 60 Plan 2 61 Plan 1 58 Plan 2 57 Plan 1 56 Plan 2 55 Plan 3 54 Plan 2 53 Plan 1 52 Plan 2 51 Plan 2 50 Plan 1 49 Plan 2 48 Plan 1 47 Plan 2 46 Plan 1 45 Plan 2 44 Plan 1 43 Plan 1 42 Plan 2 41 Plan 2 40 Plan 3 39 Plan 3 38 Plan 2 37 Plan 1 36 Plan 2 35 Plan 2 34 Plan 1 33 Plan 1 83 Plan 1 84 Plan 2 85 Plan 1 86 Plan 279 Plan 3 80 Plan 2 81 Plan 2 82 Plan 175 Plan 1 76 Plan 1 77 Plan 3 78 Plan 3 22 Plan 2 23 Plan 1 24 Plan 2 25 Plan 1 26 Plan 2 27 Plan 3 28 Plan 2 29 Plan 1 30 Plan 2 31 Plan 1 32 Plan 1 21 Plan 1 20 Plan 2 19 Plan 1 18 Plan 2 17 Plan 2 16 Plan 2 15 Plan 3 14 Plan 2 13 Plan 1 12 Plan 2 11 Plan 1 10 Plan 29 Plan 18 Plan 27 Plan 26 Plan 2 5 Plan 1 4 Plan 3 3 Plan 3 2 Plan 2 1 Plan 2 EX. CONDOMINIUM EX. CONDOMINIUM EX. CONDOMINIUM PGA B O ULE V AR D CLUBHOUSE 2 3 4 5 10 6 7 9 12 11 13 57 54 58 56 55 47 50 48 49 51 52 27 26 30 28 29 31 32 33 34 444645 43 42 38 41 40 39 37 36 86 92 91 90 89 88 87 84 85 82 83 79 81 80 71 70 73 72 74 181920 21 24 22 23 25 30 93 131 94 8 35 26 31 59 53 96 95 601 95 96 39 34200 Bob Hope Drive, Rancho Mirage, CA 92270 760.320.9811 msaconsultinginc.com MSA CONSULTING, INC. > PLANNING > CIVIL ENGINEERING > LAND SURVEYING OVERALL TOWNHOME FIRE ACCESS: PGA WEST SIGNATURE WOODBRIDGE PACIFIC GROUP, LLC MAY 4, 2021 1 of 1 Sheet Index Map N.T.S. PGA BOULEVARDPGA BOULEVARDROYAL OAKS WAYSIGNATURE WAY CHAMPIONS WAY PLATIN U M WAYISLEWORT H 28 27 26 2524232221201918171615141312 11 10 9 8 7 6 5 4 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 40 39 38 31 30 29 28 27 36 35 34 33 32 41 82 83 84 85 86 87888990919218192021 22 23 24 25 26 37 38 1 2 3 4 5 6 8 9 10 11 12 13 14 15 61 62 63 64 65 66 67 68 69 70 71 72 7 29 30 31 32 33 34 35 36 37 58 59 601 2 3 1716 73 74 75 76 77 78 79 80 81 CLUBHOUSE CONDOMINIUM LOTS FIRE ACCESS LEGEND DENOTES DOOR ACCESS DENOTES GATE ACCESS R:\2215\Woodbridge\Acad\Planning\Exhibits\SDP\2215 Fire Access Exhibit - Condo.dwg, 5/4/2021 4:22:24 PM, ddewegeli, MSA Consulting, Inc.92 LOT 95CHAMPIONS WAYROYAL OAKS WAY PLATINUM WAYPGA BOULEVARD LOT 93LOT 94LOT 96PGA BOULEVARD52 515049EX. RESIDENCE SIGNATURE WAYPLATINUM WAY SIGNATURE WAYSIGNATURE WAYWHISPER ROCK WAYWHISPER ROCK WAYWHISPER ROCK WAYKIAWAH ISLANDREDSTONE WAYREDSTONE WAYROYAL OAKS WAY12345 671920218910111213143231302928272625242322151617183334353637383940414243484950515253545556575859606162636465666768697071727374757677787980818283848586535455565744434241403938373635585960313026252423222120191892919089888786858483CLUBHOUSE45442120194647EXISTING CONDOMINIUM25'18'EX. DRIV E W A Y 4'4'EX. 4' PUEEX. E/PEX. PAR K I N G S T A L L S 25' 4'EX. 4' PUEEX. E/PEX. C/L4'37'10'10'EX. 10' PUEEX. CURB25'4' 4'EX. 4' PUEEX. E/P25'EX. 4' PUEEX. E/P4' 37'10'EX. 10' PUEEX. R/W & BACK OF CURBEX. R/W & BACK OF CURBEX. C/L4'25'4'EX. 4' PUEEX. E/PEX. E/P4' 25' 4'EX. 4' PUEEX. E/PEX. LOT LINEEX. LOT LINEEX. R/WEX. 4' PUEEX. E/P4'25'4'25'4.5'18'4'18'25'4.5'EX. DRIVEWAYEX. PARKING STALLSEX. DRIVEWAYEX. DRIVEWAY4'25'4'EX. DRIVEWAY 4'25'4'18'25'4'LOT 131Plan 2APlan 2CPlan 3BPlan 3BPlan 1APlan 2BPlan 2CPlan 2BPlan 1APlan 2BPlan 1C11'13.2' 11.1'8'5' 5'11'10'5.1' 5'24.2'12.3' 10.6' 11.6'16.7'17'5.5'8.1'12.4'5' 5' 5'16.6'16.3' 16.3'9.7'5' 5.5'10.7'17.6' 16.9'37'28'36'10'10'5'Plan 2APlan 1BPlan 2CPlan 1APlan 2BPlan 1CPlan 2APlan 3APlan 2APlan 2CPlan 1CPlan 1APlan 2CPlan 1BPlan 2CPlan 3BPlan 2BPlan 1CPlan 2APlan 1BPlan 2C12.7' 13.5'13.6'11.9'10.8'11.3'1 2 . 8 ' 8 . 3 ' 8 . 5 ' 1 3 ' 8 .7 '8'13'11.8'5'5.1'5'5'5'5.2'5'10'5'10.1'8.1'19.7' 20.5' 20.7' 20.9' 20.7' 20.7' 20.9' 21' 20.2'18.7'8'8'8.2'8'9.3'8'8'8'5.4'20.3'27'5.1' 5.2' 5' 5' 5' 5'Plan 1APlan 1BPlan 2CPlan 2APlan 1BPlan 2CPlan 3CPlan 3BPlan 2BPlan 2APlan 1BPlan 1CPlan 2APlan 1BPlan 2CPlan 1CPlan 3BPlan 2BPlan 3CPlan 2CPlan 1APlan 1CPlan 2BPlan 2APlan 3APlan 1BPlan 1APlan 3CPlan 3CPlan 3APlan 2APlan 2BPlan 1CPlan 1APlan 2CPlan 1BPlan 2A18.9' 18.9' 18.8' 18.9' 18.8' 18.3' 20.8'5'19'18.5' 18.8' 18.5' 18.5' 18.9'18.4'10'8.5'8'10.4'10.8'13.6'26.4'5' 5' 5' 5' 5' 5' 5'5'21.9'8 . 9 ' 1 7 . 3 ' 5' 5' 5.7' 5' 5' 5' 5'14.9'7.7'8'9.9'9.5'12.9'12'21.5'30.3'33.1'39.8'14.9'9.5'8' 19.5' 8' 8' 13.4'5'5'5'5'19.6' 8' 8' 15.6'5'5'5'5'20.3'18.4'18.6'7.2'8' 8' 19.9'5'5'5'5'18.1'8'5'8'5'11.1' 1.1'5'5'5'8' 29.7' 11.7'Plan 2BPlan 1APlan 2CPlan 3APlan 2APlan 1CPlan 2BPlan 1APlan 2CPlan 3CPlan 2APlan 1BPlan 2CPlan 2APlan 1CPlan 2BPlan 1A8'5'5'5'8.1'13.7'8.3'5.3'16.1'5.4'5'13.8'5'11.3'13.5'5'10.2'5'5'18.2'8'8'13.6'23.4'28.2'37.1'33.4'42.2'32.9'49.1'33.7'23.3'19.1'8'8'14.4'32.5'24.8'10'5'5'5'10.5'10.1'5'5'5'37'18.2'37'13.2'11.8'5'8.3'10.8'13.8'20.7'22.3'6.5' 5'21.1'18.8'23' 20.9'5.1'5'5'14'20.1'18.2'5'5'5'19'18.2'9'37.6'13.6'29.8'22.6'20' 18.9'N/AEACS LL-1UFOEEHS NT REBMYSSVER I NOIWARD BNTAD ESTEEHSLTEHS E TIT EEED OLEV P R ECTPROJ JYW15-5-2021MISSION VIEJO, CA. 92691 27271 LAS RAMBLAS SUITE 100 Townhomes WOODBRIDGE PACIFIC PGA WEST SIGNATURE LA QUINTA, CA. TRACT# 36537-1,2 CONTACT: STEVE CARROLL 949-254-5299Conceptual Planting Legend .Tree:Acacia salicina Willow AcaciaBrahea armata Mexican Blue PalmCitrus spp. Fruit TreeLagerstroemia indica Crape MyrtleOlea europaea 'Swan Hill' Swan Hill OliveParkinsonia x 'Desert Museum' Desert Museum Palo VerdeTipuana tipu TIpu TreeVitex agnus-castus Monk's Pepper TreeVine:Calliandra inaequilatera/ Pink Powder PuffRosa Banksiae/ Lady Banks RoseShrubs:Agave spp./ AgaveAloe spp./ AloeBougainvillea x 'Raspberry Ice'/ BougainvilleaBuxux m. 'Green Beauty'/ Green Beauty BoxwoodCallistemon 'Little John'/ Little John BottlewashDasylirion wheeleri/ Greay Desert SpoonDuranta erecta/ Golden DewdropsElaeocarpus decipiens 'Little Emperor'/ Dwarf Japanese Blueberry TreeEremophila maculata/ Spotted Emu BushEuphorbia millii 'Sticks on Fire'/ Pencil TreeFurcraea macdougalii/ False AgaveGossypium harknessii/ San Marcos HibiscusHesperaloe parviflora/ Red YuccaLantana m. 'New Gold'/ Trailing LantanaLavandula angustifolia/ English LavenderLeucophyllum laevigatum/ Chihuahuan SageLeucophyllum l. 'Rio Bravo'/ BarometerbushLeucophyllum z. 'Cimarron'/ CimmeronMuhlenbergia c. 'Regal Mist'/ MuhlyMuhlenbergia l. 'Autumn Glow'/ Lindheimer's MuhlyMuhlenbergia rigens/ Deer GrassMyrtus c. 'Compacta'/ Dwarf MyrtleNandina domestica/ Heavenly BambooOlea e. 'Little Ollie'/ Little Ollie OlivePedilanthus bracteatus/ SlipperRosa x 'Knockout'/ RoseRosmarinus o. 'Irene'/ Irene Trailing RosemaryRuellia brittonana 'Katie'/ Dwarf BLue BellsRusellia equisetiformis/ Cora FountainTemoca x 'Sierra Apricot'/ NCNThevetia peruviana/ Yellow OleanderXylosma c. 'Compacta'/ Compact XylosmaYucca pendula/ Soft Leaf YuccaGroundcover:Acacia angustissima hirta/ Dwarf Fern AcaciaCarex divulsa/ Berkeley SedgeCarissa m. 'Green Carpet'/ Green Carpet Natal PlumDalea g. 'Sierra Gold'/ Sierra Gold DaleaMyoporum p. 'Pink'/ Trailing MyoporumTrachelospermum jasminoides/ Star JasminIrrigation Note:The following items will beincorporated into the finalirrigation design plans andspecifications:·Smart controller with an Etgage with access toreal-time ET (minimumcontroller rating shall belight commercial).·No overhead irrigationwithin 24" ofnon-permeable surfaces.(no restrictions to methodif adjacent to permeablesurface with norunoff/overspary)·Low-volume irrigation suchas drip and emitter will beused.Note:The final landscape plan isrequired compliance with theCity of La Quinta WaterEfficiency Ordinance and theCoachella Valley WaterDistrict's Landscape andIrrigation System DesignOrdinance.Total Proposed Common LandscapeArea = 75,120 s.f.Total Project Area = 445,450 s.f./10.23 Acres% of Common Landscape Area = 17%PROJECTSITENectse ArchiLandscapt(909) 949-6159 / fax (909) 985-3405Upland, California 91786-42971793 W. Arrow HighwayEPROFESSIONALOSSSAEDTAICGISNCONCEPTUALLANDSCAPEPLAN93 City of La Quinta PLANNING COMMISSION MEETING: July 13, 2021 STAFF REPORT AGENDA TITLE: ADOPT A RESOLUTION APPROVING REVISION NO. 1 TO THE CITY’S VEHICLE MILES TRAVELED ANALYSIS POLICY IN COMPLIANCE WITH STATE SENATE BILL 743; CEQA: EXEMPT PURSUANT TO CEQA GUIDELINES SECTIONS 15308, 15307 AND 15061 (b)(3) RECOMMENDATION Adopt a resolution to approve Revision No. 1 to the City’s Vehicle Miles Traveled Analysis Policy and a finding that approving this policy is exempt from environmental review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15308, Actions by Regulatory Agencies for Protection of the Environment, Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources, and Section 15061(b)(3), Review for Exemptions – Common Sense Rule and approve a Vehicle Miles Traveled Analysis Policy in compliance with State Senate Bill 743. EXECUTIVE SUMMARY June 23, 2020, the Planning Commission adopted a Vehicle Miles Traveled (VMT) Policy consistent with Senate Bill (SB) 743 requirements regarding the analysis of transportation impacts. Staff has continued to review VMT policies of other jurisdictions to help better streamline the City’s development process. The County of Riverside (County) revised their VMT policy in December 2020 to further address the intent of SB 743. Staff has reviewed the County’s policy and has revised the City’s policy to be consistent. BACKGROUND/ANALYSIS The State has for many years been addressing the reduction of greenhouse gas (GHG) emissions to combat climate change. VMT measures how much actual auto travel (additional miles driven) a proposed project would create on roads. If the project adds excessive car travel onto our roads, the project may cause a significant transportation impact and increase GHG emissions. In order to achieve the State’s long-term climate goals and promote the reduction of GHG emissions, the development of multimodal transportation networks, and a diversity of land uses, the Governor’s Office of Planning and Research (OPR) and the California Natural Resources Agency have determined that VMT is the most appropriate metric to evaluate a project’s transportation impacts. SB 743 PUBLIC HEARING ITEM NO. 2 94 changes how transportation impacts are analyzed under CEQA to use VMT as the appropriate metric to evaluate a project’s transportation impacts. Planning Commission adopted a policy in June 2020 to address this change. Staff has since worked with applicants on incorporating VMT analysis into their projects and has also monitored how other jurisdictions are implementing their VMT policies. The County revised their VMT policy in December 2020 to further refine the initial screening process for projects to determine if a full VMT analysis is necessary. The screening process helps quickly identify projects that are not expected to cause a significant impact and therefore, do not require a full VMT analysis. Since VMT affects GHG emissions, the initial project screening thresholds have been revised to match the GHG threshold of 3,000 metric tons of carbon dioxide equivalent (MTCO2e), pursuant to the County’s revised VMT policy and South Coast Air Quality Management District’s draft interim guidance for assessing project-level GHG impacts. If projects are found to be under that threshold, VMT impacts are considered less than significant. Seven project scenarios were modeled using the California Emissions Estimator Module (CalEEMod) software to determine intensities that would fall below the 3,000 MTCO2e threshold (Attachment 1). These project scenarios are listed below along with other types of projects that would be considered to have less than significant VMT impacts. These are also listed in the VMT policy (Exhibit A). Staff believes that revising the screening criteria in this way will help streamline the development process. • Single Family Housing projects less than or equal to 140 Dwelling Units (DU); or • Multi Family (low-rise) Housing projects less than or equal to 200 DU; or • Multi Family (mid-rise) Housing projects less than or equal to 245 DU; or • General Office Building with area less than or equal to 160,000 SF; or • Retail buildings with area less than or equal to 70,000 SF; or • Warehouse (unrefrigerated) buildings with area less than or equal to 410,000 SF; or • General Light Industrial buildings with area less than or equal to 170,000 SF; or • Small Infill Projects; or • Transportation Projects that reduce or do not increase VMT; or • Project GHG emissions less than 3,000 MTCO2e as determined by a methodology acceptable to the Design and Development Department; or • Unless specified above, project trip generation is less than 110 trips per day per the ITE Manual or other acceptable source determined by the City. PUBLIC REVIEW This project was advertised in The Desert Sun newspaper on July 2, 2021. To date, no comments have been received. Comments from other City Departments and Divisions were considered. 95 ENVIRONMENTAL REVIEW The Design and Development Department has determined that the proposed revisions are exempt from environmental review under CEQA, pursuant to CEQA Guidelines Section 15308, Actions by Regulatory Agencies for Protection of the Environment, Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources and Section 15061(b)(3), Review for Exemptions – Common Sense Rule. The revised CEQA thresholds and other requirements within the Policy, are compliant with a State mandate (Senate Bill 743) and will be used in a regulatory process that involves procedures for the protection of the environment. The policy provides the City with project specific transportation information that can be used in the local regulatory process in which protection of the environment is considered. Additionally, the decision to revise the policy will have no direct impact on the environment as it will inform the analysis of future projects and does not include any activity that would directly impact the environment. Prepared by: Cheri Flores, Planning Manager Approved by: Danny Castro, Design and Development Director Attachment: 1. VMT Policy Memo 96 PLANNING COMMISSION RESOLUTION 2021 – A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA QUINTA, CALIFORNIA, ADOPTING REVISION NO. 1 TO THE VEHICLE MILES TRAVELED ANALYSIS POLICY INCLUDING THRESHOLDS OF SIGNIFICANCE FOR PURPOSES OF ANALYZING TRANSPORTATION IMPACTS UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT WHEREAS, the Planning Commission of the City of La Quinta, California did, on the 13th day of July, 2021, hold a duly noticed Public Hearing to consider Revision No. 1 to the City’s Vehicle Miles Traveled Analysis Policy (Revision), attached hereto as Exhibit A, which includes thresholds of significance for purposes of analyzing transportation impacts under the California Environmental Quality Act (CEQA); and WHEREAS, the Planning Commission of the City of La Quinta, California did, on the 23rd day of June, 2020, adopt a Resolution 2020-006, following a public review process, establishing Vehicle Miles Traveled (VMT) thresholds of significance for purposes of analyzing transportation impacts under CEQA; and WHEREAS, said Revision has complied with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" as amended (Resolution 83-63). The Design and Development Department has determined that the proposed Revision is exempt from environmental review pursuant to CEQA Guidelines Sections 15308 (Actions by a Regulatory Agency for Protection of the Environment), 15307 (Actions by Regulatory Agencies for Protection of Natural Resources) and 15061(b)(3) (Review for Exemptions – Common Sense Rule), in that the Revision is compliant with a State mandate (Senate Bill 743) and will be used in a regulatory process that involves procedures for the protection of the environment, will provide the City with project specific transportation information that can be used in the local regulatory process in which protection of the environment is considered and the decision to adopt the Revision will have no direct impact on the environment as it will inform the analysis of future projects and does not include any activity that would directly impact the environment; and WHEREAS, the Design and Development Department published a public hearing notice in The Desert Sun newspaper on July 2, 2021 as prescribed by the Municipal Code; and 97 Planning Commission Resolution 2021- Vehicle Miles Traveled Analysis Policy-Revision #1 July 13, 2021 Page 2 of 5 WHEREAS, the CEQA Guidelines encourage public agencies to develop and publish generally applicable thresholds of significance to be used in determining the significance of a project’s environmental effects; and WHEREAS, CEQA Guidelines Section 15064.7(a) defines a threshold of significance as “an identifiable quantitative, qualitative or performance level of a particular environmental effect, noncompliance with which means the effect will normally be determined to be significant by the agency and compliance with which means the effect normally will be determined to be less than significant”; and WHEREAS, CEQA Guidelines Section 15064.7(b) requires that thresholds of significance must be adopted by ordinance, resolution, rule, or regulations, developed through a public review process, and be supported by substantial evidence; and WHEREAS, pursuant to CEQA Guidelines Section 15064.7(c), when adopting thresholds of significance, a public agency may consider thresholds of significance adopted or recommended by other public agencies provided that the decision of the agency is supported by substantial evidence; and WHEREAS, Senate Bill 743, enacted in 2013 and codified in Public Resources Code Section 21099, required changes to the CEQA Guidelines regarding the criteria for determining the significance of transportation impacts of projects; and WHEREAS, in 2018, the Governor’s Office of Planning and Research (OPR) proposed, and the California Natural Resources Agency certified and adopted, new CEQA Guidelines Section 15064.3 that identifies VMT – meaning the amount and distance of automobile travel attributable to a project – as the most appropriate metric to evaluate a project’s transportation impacts; and WHEREAS, in December of 2018, the OPR issued a technical advisory, entitled “Technical Advisory: On Evaluating Transportation Impacts in CEQA”, that contains technical recommendations regarding the assessment of VMT, thresholds of significance, and mitigation measures, and provides guidance and recommendation to implement the requirements of Public Resources Code Section 21099; and 98 Planning Commission Resolution 2021- Vehicle Miles Traveled Analysis Policy-Revision #1 July 13, 2021 Page 3 of 5 WHEREAS, as a result, automobile delay, as measured by level of service and other similar metrics, generally no longer constitutes a significant environmental effect under CEQA; and WHEREAS, CEQA Guidelines Section 15064.3 went into effect on July 1, 2020; and WHEREAS, in December 2020, the County of Riverside adopted revisions to their document titled, “Transportation Guidelines for Level of Service Vehicle Miles Traveled” for the purpose of providing further consistency with the intent of SB 743; and WHEREAS, the City of La Quinta, following a public review process consisting of a public hearing before the Planning Commission, wishes to revise the VMT Analysis Policy to include certain provisions that have been adopted by the County of Riverside. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of La Quinta as follows: SECTION 1. The City of La Quinta Pla nning Commission hereby approves, and adopts and incorporates by reference, Revision No. 1 to the VMT Analysis Policy, attached hereto as Exhibit A, and finds that the revisions and policies therein are consistent with the policies of the City’s existing General Plan and the purpose of the City’s Zoning Code (City of La Quinta Municipal Code, Title 9). After reviewing the OPR’s Technical Advisory, the Planning Commission further finds that the Revision is consistent with the recommendations and analysis found therein. SECTION 2. The Revision has been promulgated pursuant to State CEQA Guidelines Section 15064.7, formally subject to a public review process, and is supported by substantial evidence. SECTION 3. This project has been assessed in accordance with the authority and criteria contained in CEQA (Public Resources Code Sections 21000 et seq.), the State CEQA Guidelines (California Code of Regulations, Title 14, Sections 15000 et seq.), and the environmental regulations of the City. The project qualifies for a Class 8 Categorical Exemption (Actions by a Regulatory Agency for Protection of the Environment) in accordance with the requirements of Section 15308 of the State CEQA Guidelines. Likewise, the 99 Planning Commission Resolution 2021- Vehicle Miles Traveled Analysis Policy-Revision #1 July 13, 2021 Page 4 of 5 project qualifies for a Class 7 Categorical Exemption (Actions by Regulatory Agencies for Protection of Natural Resources) in accordance with the requirements of Section 15307 of the State CEQA Guidelines. Lastly, the project is exempt from CEQA review under the Common Sense Exemption in accordance with the requirements of Section 15061(b)(3) of the State CEQA Guidelines. The Revision is compliant with a State mandate (Senate Bill 743) and will be used in a regulatory process that involves procedures for the protection of the environment. The Revision provides the City with project specific transportation information that can be used in the local regulatory process in which protection of the environment is considered. Additionally, the decision to adopt the Revision will have no direct impact on the environment as it will inform the analysis of future projects and does not include any activity that would directly impact the environment. Therefore, the Planning Commission finds the project exempt from further review under CEQA. SECTION 4. This Resolution shall take effect immediately upon its adoption by the Planning Commission. PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La Quinta Planning Commission, held on this the 13th day of July 2021, by the following vote: AYES: NOES: ABSENT: ABSTAIN: _____________________________ MICHAEL PROCTOR, Chairperson City of La Quinta, California 100 Planning Commission Resolution 2021- Vehicle Miles Traveled Analysis Policy-Revision #1 July 13, 2021 Page 5 of 5 ATTEST: _________________________________________ DANNY CASTRO, Design and Development Director City of La Quinta, California 101   1  Adopted: June 23, 2020 Revised: June 2021 CITY OF LA QUINTA VEHICLE MILES TRAVELED ANALYSIS POLICY Senate Bill (SB) 743, signed in 2013, requires changes to the guidelines implementing the California Environmental Quality Act (CEQA) regarding the analysis of transportation impacts. A key element of SB 743 is the elimination of automobile delay and Level of Service (LOS) as the sole basis of determining CEQA impacts and analyzing Vehicle Miles Traveled (VMT), with the goal of reducing greenhouse gas emissions to meet State mandates for 2030 and beyond. The most recent CEQA guidelines, effective January 1, 2020, recommend VMT as the most appropriate measure of project transportation impacts. However, SB 743 does not prevent a city or county from continuing to analyze delay or LOS as part of other plans (i.e., the general plan), studies, or ongoing network monitoring. The following policy assists in determining VMT impact thresholds and mitigation requirements for Traffic Impact Analysis (TIA) preparation as recommended by the Technical Advisory on Evaluating Transportation Impacts in CEQA published by the Governor’s Office of Planning and Research (OPR) (https://www.opr.ca.gov/docs/20190122- 743_Technical_Advisory.pdf). VMT Analysis Methodology All projects may be required to submit a TIA or Focused Traffic Impact Memo as determined by the City Engineer. For purposes of SB 743 compliance, these may include a VMT analysis, as deemed necessary by the Traffic Division, depending on screening criteria, and also analyze the effects of a project on transportation, access, circulation, and related safety elements proximate to the Project and establish consistency with the General Plan and other City requirements. Project Screening Projects will first go through a screening process to determine if a VMT analysis is necessary. The purpose of this screening is to determine if a presumption can be made that a project would not have a significant transportation related CEQA impact. If a project meets the screening criteria, the project would not need to conduct a VMT analysis. If a project does not meet screening criteria, the project will need to conduct the VMT analysis. EXHIBIT A 102   2  Adopted: June 23, 2020 Revised: June 2021 There are three types of screening that can apply to effectively screen projects from project-level assessment. The following describes the available screening criteria pursuant to California Environmental Quality Act (CEQA) guidance provided by the Office of Planning and Research (OPR). Step 1: Project Type Screening Certain project types can be determined to have a less than significant effect on the environment and therefore would not need to provide a full VMT analysis. A detailed CEQA assessment will not be required for land use elements of a project that meet the screening criteria listed below. Small Projects This applies to projects with low trip generation per existing CEQA exemptions or result in a 3,000 Metric Tons of Carbon Dioxide Equivalent (MTCO2e) per year screening level threshold, based on the Riverside County Climate Action Plan and South Coast Air Quality Management District’s draft interim guidance for assessing project-level greenhouse gas impacts.  Single Family Housing projects less than or equal to 140 Dwelling Units (DU); or  Multi Family (low-rise) Housing projects less than or equal to 200 DU; or  Multi Family (mid-rise) Housing projects less than or equal to 245 DU; or  General Office Building with area less than or equal to 160,000 SF; or  Retail buildings with area less than or equal to 70,000 SF; or  Warehouse (unrefrigerated) buildings with area less than or equal to 410,000 SF; or  General Light Industrial buildings with area less than or equal to 170,000 SF; or  Small Infill Projects; or  Transportation Projects that reduce or do not increase VMT; or  Project GHG emissions less than 3,000 Metric Tons of Carbon Dioxide Equivalent (MTCO2e) as determined by a methodology acceptable to the Design and Development Department; or  Unless specified above, project trip generation is less than 110 trips per day per the ITE Manual or other acceptable source determined by the City. 103   3  Adopted: June 23, 2020 Revised: June 2021 Local Serving Projects Projects that introduce local serving land uses are determined to shorten non- discretionary trips by putting goods and services closer to residents, resulting in an overall reduction in VMT. These land uses can be presumed to have a less than significant impact, absent substantial evidence to the contrary. Local serving land uses are listed below. Local serving retail projects less than 50,000 square feet may be presumed to have a less than significant impact absent substantial evidence to the contrary. Local serving retail generally improves the convenience of shopping close to home and has the effect of reducing vehicle travel. In addition to local serving retail, the following uses can also be presumed to have a less than significant impact absent substantial evidence to the contrary as their uses are local serving in nature:  Local serving retail projects less than 50,000 square feet  Local-serving K-12 schools  Local parks  Day care centers  Local-serving gas stations  Local-serving banks  Local-serving hotels (e.g. non-destination hotels)  Small Infill Projects  Local-Serving Public Facilities  Transit Supportive Projects in Planned Growth Areas with Low VMT and High-Quality Transit  Restricted Affordable, Transit Supportive Residential Projects in Planned Growth Areas with High-Quality Transit  Transportation Projects that reduce or do not increase VMT  Student housing projects  Local serving community colleges that are consistent with the assumptions noted in the RTP/SCS  Affordable Housing  Projects generating less than 110 daily vehicle trips1   1 This threshold ties directly to the OPR technical advisory and notes that CEQA provides a categorical exemption for  existing facilities, including additions to existing structures of up to 10,000 square feet, so long as the project is in an area  where public infrastructure is available to allow for maximum planned development and the project is not in an  environmentally sensitive area. (CEQA Guidelines, § 15301, subd. (e)(2).) Typical project types for which trip generation  104   4  Adopted: June 23, 2020 Revised: June 2021  This generally corresponds to the following “typical” development potentials: o 11 single family housing units o 16 multi-family, condominiums, or townhouse housing units o 10,000 sq. ft. of office o 15,000 sq. ft. of light industrial2 o 63,000 sq. ft. of warehousing2 o 79,000 sq. ft. of high cube transload and short-term storage warehouse2 Step 2: Transit Priority Area (TPA) Screening Projects located within a TPA3 may be presumed to have a less than significant impact absent substantial evidence to the contrary. Projects may include but are not limited to the following:  Transit Supportive Projects in Planned Growth Areas with Low VMT and/or High-Quality Transit  Restricted Affordable, Transit Supportive Residential Projects in Planned Growth Areas with Low VMT and/or High-Quality Transit This presumption may NOT be appropriate if the project: 1. Has a Floor Area Ratio (FAR) of less than 0.75; 2. Includes more parking for use by residents, customers, or employees of the project than required by the jurisdiction (if the jurisdiction requires the project to supply parking);   increases relatively linearly with building footprint (i.e., general office building, single tenant office building, office park, and  business park) generate or attract an additional 110‐124 trips per 10,000 square feet. Therefore, absent substantial  evidence otherwise, it is reasonable to conclude that the addition of 110 or fewer trips could be considered not to lead to a  significant impact.  2 Threshold may be higher depending on the tenant and the use of the site. This number was estimated using rates from  ITE’s Trip Generation Manual.  3 A TPA is defined as a half mile area around an existing major transit stop or an existing stop along a high‐quality transit  corridor.  105   5  Adopted: June 23, 2020 Revised: June 2021 3. Is inconsistent with the applicable Sustainable Communities Strategy (as determined by the City of La Quinta, with input from the Southern California Association of Governments); or 4. Replaces affordable residential units with a smaller number of moderate or high-income residential units. Step 3: Low VMT Area Screening Residential and office projects located within a low VMT-generating area may be presumed to have a less than significant impact absent substantial evidence to the contrary. In addition, other employment-related and mixed-use land use projects may qualify for the use of screening if the project can reasonably be expected to generate VMT per resident, per worker, or per service population that is similar to the existing land uses in the low VMT area. For this screening in the CVAG / City of La Quinta area, the Riverside County Travel Demand Model (RIVTAM / RIVCOM) is used to measure VMT performance for individual jurisdictions and for individual traffic analysis zones (TAZs). TAZs are geographic polygons similar to Census block groups used to represent areas of homogenous travel behavior. Total daily VMT per service population (population plus employment) is estimated for each TAZ. Those TAZs that perform at or below the jurisdictional (City, Subarea, County, or CVAG) average of total VMT per service population under base year conditions are considered low VMT areas. This presumption may not be appropriate if the project land uses would alter the existing built environment in such a way as to increase the rate or length of vehicle trips. To identify if the project is in a low VMT-generating area, the analyst must identify if the project is consistent with the existing land use within that TAZ and use professional judgement that there is nothing unique about the project that would otherwise be mis-represented utilizing the data from the travel demand model. VMT Assessment for Non-Screened Land Use Development Projects Projects not screened through the steps above should complete VMT analysis and forecasting through the RIVTAM / RIVCOM model to determine if they have a significant VMT impact. This analysis should include ‘project generated VMT’ and 106   6  Adopted: June 23, 2020 Revised: June 2021 ‘project effect on VMT’ estimates for the project TAZ (or TAZs) under the following scenarios:  Baseline Conditions - Typically baseline conditions align with the project’s Notice of Preparation (NOP). Baseline VMT for the year of the NOP can be interpolated between VMT estimates calculated using the base and future year model.  Baseline Plus Project – This scenario represents the “project generated VMT” and is determined by adding the project land use to the project TAZ or a separate TAZ would be created to contain the project land uses. A full base year model run would be performed and VMT changes would be isolated for the project TAZ and across the full model network. The model output must include reasonableness checks of the production and attraction balancing to ensure the project effect is accurately captured. If this scenario results in a less-than-significant impact, then additional cumulative scenario analysis may not be required.  Cumulative No Project – This scenario would consider background/ambient growth including other proposed projects (other than proposed project) in the City but without the proposed project’s contribution.  Cumulative Plus Project - The project land use would either be added to the project TAZ or a separate TAZ would be created to contain the project land uses. The addition of project land uses should be accompanied by a reallocation of a similar amount of land use from other TAZs; especially if the proposed project is significant in size such that it would change other future developments. Land use projects will generally not change the cumulative no project control totals for population and employment growth. Instead, they will influence the land use supply through changes in general plan land use designations and zoning. If project land uses are simply added to the cumulative no project scenario, then the analysis should reflect this limitation in the methodology and acknowledge that the analysis may overestimate the project’s effect on VMT. The model output should include total VMT, which includes all vehicle trips and trip purposes, and VMT per service population (population plus employment). Total VMT 107   7  Adopted: June 23, 2020 Revised: June 2021 (by speed bin) is needed as an input for air quality, greenhouse gas (GHG), and energy impact analysis while total VMT per service population is recommended for transportation impact analysis4 Both “plus project” scenarios noted above will summarize two types of VMT: (1) project generated VMT per service population and comparing it back to the appropriate benchmark noted in the thresholds of significance, and (2) the project effect on VMT, comparing how the project changes VMT on the network looking at a sub-regional VMT per service population and comparing it to the no project condition. Project-generated VMT shall be extracted from the travel demand model using the origin-destination trip matrix and shall multiply that matrix by the final assignment skims. The project-effect on VMT shall be estimated using a sub-regional boundary (City limit) and extracting the total link-level VMT for both the no project and plus project condition. VMT Metrics VMT should always be normalized based on the number of residents and employees present in the zone, City, or regional area for comparative purposes to determine impacts. The following presents the metrics to normalize VMT. The metrics used in the VMT analysis are dependent upon the method in which the VMT is calculated.  Total VMT per service population - includes the VMT generated divided by the population and employment in a given area (TAZ, City, or sub-region). An important note regarding service population is that the calculation includes the employment and population coded into the travel demand model. This calculation excludes VMT-generating groups such as visitors, patients, guests and students. Each project should consider if it is appropriate to add VMT- generating groups to its service population.   4 This assumes that the lead agency will use VMT per service population for its impact threshold. If a lead agency decides to  isolate VMT by trip purpose, then the lead agency would need to update this section of the recommended guidelines.  108   8  Adopted: June 23, 2020 Revised: June 2021  Home-based VMT per resident - includes the VMT generated only by home- based work and home-based other productions divided by the population in a given area (TAZ, City, or sub-region). This method does not include trips with one trip end outside of the model. Zones without any residential uses will generate zero home-based VMT per resident.  Home-based work VMT per worker - includes the VMT generated only by home-based work attractions divided by the number of employees in a given area (TAZ, City, or sub-region). This method does not include trips with one trip end outside of the model. Zones with no commercial uses will generate zero home-based VMT per worker. VMT Analysis Methodology for Land Use Plans Land use plans are not subject to screening and require specific VMT analysis. Land use plans should be tested for significant impacts under cumulative conditions using the same cumulative threshold options (or lead agency thresholds) as the land use projects. These thresholds require modeling land use plan changes to determine VMT impacts. To capture the project effect on VMT, the same cumulative year population and employment growth totals should be used model-wide. VMT Analysis Methodology for Transportation Projects Use of VMT as an environmental impact metric for transportation projects is discretionary under the Section 15064.3(b)(2) of the updated CEQA Guidelines. Using VMT as a transportation project impact metric would allow for a variety of transit, bicycle, and pedestrian projects to be presumed to have a less than significant impact. Smaller roadway network modifications such as intersection restriping could also be presumed to have a less than significant impact. Roadway capacity expansion projects are types of projects that can increase vehicle travel and VMT by changing people’s travel behavior including making new vehicle trips and making longer vehicle trips. 109   9  Adopted: June 23, 2020 Revised: June 2021 Thresholds for Determination of Significant Transportation Impact Project-Generated VMT Impacts Residential Uses  VMT per resident exceeding a level of: o 15 percent below the Citywide per resident VMT, OR o 15 percent below regional VMT per resident, whichever is more stringent General Employment Uses  Includes offices and R&D establishments  VMT per employee exceeding a level of 15 percent below existing regional VMT per employee Industrial Employment Uses  Includes warehouse, manufacturing and distribution uses  VMT per employee exceeding existing regional VMT per employee Retail Uses  Includes Hotels  A net increase in the total existing VMT for the region Public/Quasi-Public Uses  Public/Quasi-Public land use projects will be analyzed using the most relevant threshold as determined by the Public Works Director for the proposed use on the site Mixed-Uses  Each land use component of a mixed-use project will be analyzed independently, applying the significance threshold for each land use component Change of Use or Additions to Existing Development  Changes of use or additions to existing development will be analyzed applying the significance threshold for each land use component 110   10  Adopted: June 23, 2020 Revised: June 2021 Urban Village, Station Area Plans, Development Policy, Specific Strategy or Other Area Plans  Each land use component will be analyzed independently, applying the significance threshold for each land use component General Plan Amendments  General Plan Amendments will be analyzed in conformance with the General Plan’s definition of VMT. An increase in City total VMT is a significant transportation impact Transportation Projects  Net increase in VMT greater than that consistent with the SCAG’s Regional Transportation Plan/Sustainable Communities Strategy Project-Generated VMT Impacts A project would result in a significant project-generated VMT impact if either of the following conditions are satisfied: 1. The baseline project-generated VMT per service population exceeds the City of La Quinta baseline VMT per service population, or 2. The cumulative project-generated VMT per service population exceeds the City of La Quinta baseline VMT per service population Project Effect on VMT Impacts The project’s effect on VMT would be considered significant if it resulted in either of the following conditions to be satisfied: 1. The baseline link-level boundary VMT per service population (City or sub- regional boundary) to increase under the plus project condition compared to the no project condition, or 2. The cumulative link-level boundary VMT per service population (City or sub- regional boundary) to increase under the plus project condition compared to the no project condition. 111   11  Adopted: June 23, 2020 Revised: June 2021 Public Transit Impacts Potential impacts to public transit, pedestrian facilities and travel, and bicycle facilities and travel can be evaluated using the following criteria. • A significant impact occurs if the project conflicts with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decreases the performance or safety of such facilities. The TIA should include analysis of a project to examine if it is inconsistent with adopted policies, plans, or programs regarding active transportation or public transit facilities, or otherwise decreases the performance or safety of such facilities and make a determination as to whether it has the potential to conflict with existing or proposed facilities supporting these travel modes. VMT Mitigation Measures To mitigate VMT impacts, the following choices are available to the applicant: 1. Modify the project’s built environment characteristics to reduce VMT generated by the Project 2. Implement Transportation Demand Management (TDM) measures to reduce VMT generated by the project consistent with La Quinta Municipal Code Chapter 9.1805   5 For non‐residential developments, mitigation measures should consider Transportation Demand Management Strategies  which are designed to reduce the overall trip generation for the project and the need for road related improvements. Such  strategies may include the following:   Establishing preferential parking for carpool or vanpool vehicles.   Providing bus pass or Vanpool subsidies.   Allowing employees that arrive to work by alternative modes some level of leeway on their arrival times due to the  unforeseen transit delays.   Implement alternate work schedules to reduce employee trips during peak hours.   Provide shower facilities and lockers for employees that arrive to work by walking, bicycling, or other alternative  modes.   Providing bicycle parking where bicycles can be locked to an appropriate device or lockable bicycle lockers.  112   12  Adopted: June 23, 2020 Revised: June 2021 For proposed improvements to intersections or road segments located outside the City of La Quinta, if an agency such as another City or the County of Riverside has adopted a program to mitigate impacts from future development that commits that agency to construct the improvement projects included in the program or to obtain the balance of the funding needed to construct the improvements through some other means, the applicant in the City of La Quinta shall be required to pay its fair share into the program of that agency. 113   13  Adopted: June 23, 2020 Revised: June 2021 APPENDIX A GLOSSARY OF TERMS Active Transportation - A means of getting around that is powered by human energy, primarily walking and biking. Alternative Transportation Modes - Sustainable transportation methods that are alternative to personal motorized vehicles, primarily walking, biking, and riding transit. Approved Trip Inventory (ATI) - A City-maintained database of vehicle-trips generated by projects for which an entitlement to build has been granted that have yet been built or occupied. Consists of assigned vehicle-trips by turn movement at signalized intersections. Area Development Policy (ADP) - A City-adopted implementation policy of an Area Plan. Area Plan - A City-adopted plan that coordinates transportation infrastructure improvements and land use development in support of a unique vision for a subarea of the City (e.g. an Urban Village Plan). Boundary VMT Method - A method used to calculate total VMT on roadways bounded within the City. VMT per service population, a performance metric for General Plan amendments, is based on this method. Effect - Project-related effects on elements of the transportation system for which no transportation standards or CEQA thresholds of significance have been established by the City. Distinct from “impact”. Existing VMT - Current VMT levels for the existing buildings within a one-half mile buffer of a development project. High-Quality Transit Areas - Areas are within half a mile of a high-quality transit corridor or major transit stop. 114   14  Adopted: June 23, 2020 Revised: June 2021 High-Quality Transit Corridor - A corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours (Pub. Resources Code § 21155 (b)). Impact - Refer to a project’s impacts as determined by the transportation standards or CEQA thresholds of significance established by the City. Distinct from “effect”. Improvement - A change that addresses the effects, particularly adverse effects, of a project on elements of the transportation system for which no transportation standards or CEQA thresholds of significance have been established by the City. Distinct from “mitigation’. Induced Trips - Increase in traffic volume that occurs soon after a new road is opened, or a previously congested road is widened. Increases in roadway capacity are typically quickly filled up with additional traffic. Infill Opportunity Zone (IOZ) - Areas designated by the City that exempt intersection operations standards in the Congestion Management Program (CMP). CMP facilities located within IOZs are exempt from provisions of the CMP’s operations standard requirements. Internal Trips - Trips between different land use types within the same development project that are accommodated at the project site. Trips that are not internal are those with the project at one end and other locations at the other end. Intersection Operations Standard - A measure of automobile vehicle delays through a signalized intersection, graded on a scale A through F. Major Transit Stop - A rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods (Pub. Resources Code § 21064.3). Mitigation - A change that addresses the CEQA impacts of a project on elements of the transportation system for which transportation standards or CEQA thresholds of significance have been established. Distinct from “improvement”. 115   15  Adopted: June 23, 2020 Revised: June 2021 Mixed-Use Project - A development project that combines two or more land uses. Mode Share - The share of all person-trips to and from a project taken by each transportation mode (personal motorized vehicles, transit, bicycle, and pedestrian). Multimodal Improvement Plan (MIP) - VTA terminology for “Deficiency Plan” as defined by CMA statue. VTA’s plans developed to identify offsetting measures to improve transportation conditions on CMP facilities in lieu of making physical traffic capacity improvements such as widening a roadway. Multimodal Transportation Improvement Plan (MTIP) - The City’s area-based prioritized list of projects and programs intended to facilitate realization of goals and objectives identified in a long-range plan. Net Change in Total VMT - Difference in total VMT in the area with and without the project. Performance metric for regional retail projects and transportation projects. Origin-Destination (O-D) VMT Method - A method used to calculate the total vehicle-miles traveled a study area (e.g. a development project, the City, or the region) is expected to generate in a day. For a personal motorized vehicle-trip to be included in the VMT calculation using the OD VMT method, one of the trip ends must be within the study area. The OD Method accounts for all trips, including external trips that have one trip end outside of the model boundary, and therefore provides a more complete capture of all travel within the study area. Production/Attraction (PA) VMT Method - A method used to calculate the total vehicle-miles traveled a study area (e.g. a development project, the City, or the region) is expected to generate in a day. The PA Method allows project VMT to be evaluated based on trip purpose which is consistent with OPR’s recommendations. PA matrices do not include external trips that have one trip end outside of the model boundary, and therefore do not include those trips in the VMT estimates. Passive Parks - Less structured recreational activities and casual pursuit of hobbies that allow for the preservation of natural habitat. 116   16  Adopted: June 23, 2020 Revised: June 2021 Peak Hour - The highest morning or evening hour of travel reported on a transportation network or street. Personal Motorized Vehicles - Mainly personal motor vehicles that transport people rather than goods. VMT is based on only personal motor vehicles. Physical VMT Reduction Strategies - Strategies that development projects can physically construct to encourage the shift from driving alone to walking, biking, and riding transit. Include three of the four VMT reduction strategies – project characteristics, multimodal network improvements, and parking measures. Project VMT - Calculated VMT generation of a development project. Service Population - The sum of residents and workers in an area such as the City of La Quinta. Sphere of influence - Area in which travel patterns are expected to change due to a transportation project. Transportation Demand Management (TDM) - Programmatic measures that discourage drive-alone trips and encourage pedestrian, bicycle, and transit use. One of the four categories of VMT reduction strategies for development projects. Trip Cap - A maximum number of vehicle-trips that a development project is allowed to generate in a day. Trip Adjustments - Effort to reduce the number of vehicle-trips to and from a project. Trip Assignment - An assignment of vehicle-trips to transportation facilities based on trip distribution percentages. Trip Distribution - A forecast of the travel direction of vehicle-trips to and from a project. Trip Generation - The estimated total number of vehicle-trips to and from a project. 117   17  Adopted: June 23, 2020 Revised: June 2021 Vehicle-Miles Traveled - The total miles of travel by motorized on-road passenger vehicles in a day. A measure on which a project’ transportation impact(s) are based. VMT per Capita - The sum of VMT for personal motorized vehicle-trips made by all residents of a development project, divided by the total number of residents of the project. VMT per Employee - The sum of VMT for personal motorized vehicle-trips made by all workers of an office or industrial development project, divided by the total number of workers at the project. 118 MEMO Date: June 30, 2021 To: Cheri Flores, Planning Manager, City of La Quinta From: Kelly Clark, Associate Planner, Terra Nova Planning and Research Re: “Small Project” Screening Criteria Recommendations for VMT Analysis This memo provides analysis and recommendations for “Small Projects” screening criteria to be used in assessing the need for quantitative VMT analyses as required by SB 743. The Governor’s Office of Planning and Research (OPR) recommends agencies use screening criteria to identify projects known to reduce VMT or be low VMT generators, and that are thus expected to have a less than significant VMT impact and would exempt such projects from quantitative VMT analyses. Per the proposed revisions of the City of La Quinta’s Vehicle Miles Traveled Analysis Policy, the “Small Project” screening category applies to projects with low trip generation per existing CEQA exemptions or result in a 3,000 Metric Tons of Carbon Dioxide Equivalent (MTCO2e) per year screening level threshold. This screening method is consistent with the Riverside County Climate Action Plan and the South Coast Air Quality Management District’s draft interim guidance for assessing project-level greenhouse gas impacts. Therefore, if a project meets the “Small Projects” screening criteria proposed in this memo, a quantitative VMT analysis would not be required.1 ANALYSIS The analysis herein provides estimates of operational greenhouse gas (GHG) emissions for seven “Small Project” scenarios using the California Emissions Estimator Model (CalEEMod) version 2016.3.2 software, a modeling platform recommended by the California Air Resources Board (CARB) and accepted by the South Coast Air Quality Management District. The following input assumptions were used when modeling each project screening scenario. It should be noted that future development projects should 1 The CEQA analysis would still include a qualitative discussion of VMT. If there is substantial evidence showing that the presumption did not apply for a particular project, a quantitative analysis would be required. ATTACHMENT 1 119 adjust inputs as necessary to reflect project-specific construction and operational activities and characteristics. • Assumes default CalEEMod construction phasing and equipment lists. • Assumes earthen cut/fill material would balance on-site and would not require additional import or export of such materials. • Assumes all roadways with access to the site are paved. • Does not apply mitigation measures during construction. • Greenhouse gas emissions from construction were amortized over 30 years and added to the operational greenhouse gas emissions total. • Assumes default CalEEMod factor sets and demand rates for energy, water, and waste were used based on the land use and size metrics of a particular scenario. • Vehicle trip rates were modified to reflect the current ITE 10th edition of the Trip Generation Manual.2 • Assumes default trip lengths and trip distribution RECOMMENDATIONS Based on the modeling, the following seven development project scenarios pass the 3,000 MTCO2e per year screening level threshold: • Single Family Housing projects less than or equal to 140 Dwelling Units (DU); or • Multi Family (low-rise) Housing projects less than or equal to 200 DU; or • Multi Family (mid-rise) Housing projects less than or equal to 245 DU; or • General Office Building with area less than or equal to 160,000 SF; or • Retail buildings with area less than or equal to 70,000 SF; or • Warehouse (unrefrigerated) buildings with area less than or equal to 410,000 SF; or • General Light Industrial buildings with area less than or equal to 170,000 SF. The following table provides project details and GHG emission results for each scenario that should be considered when screening a proposed development project. (See Appendix A for CalEEMod outputs for each project scenario.) 2 The current version of CalEEMod utilizes trip generation rate information from the Institute of Transportation Engineers (ITE) 9th edition of the Trip Generation Manual. For purposes of this analysis, default trip rates were modified to reflect the current ITE 10th edition of the Trip Generation Manual. 120 Scenario Weekday Trip Rate ITE Code, 10th Edition Avg. Weekday Trips Annual VMT Operation Emissions1 (MTCO2e) Single Family, 140 DU 9.44/DU 210 1,321 2,940,656 2,947 Multi Family (low-rise, 1-2 story) 200 DU 7.32/DU 220 1,464 3,184,736 2,865 Multi Family (mid-rise, 3-10 story) 245 DU 5.44/DU 221 1,333 2,981,368 2,902 General Office 160,000 SF 9.74/KSF 710 1,558 2,546,822 2,895 Retail 70,000 SF 37.75/KSF 820 2,642 3,085,862 2,868 Warehouse (Unrefrigerated) 410,000 SF 1.74/KSF 150 713 2,322,749 2,934 General Light Industrial 170,000 SF 4.96/KSF 110 843 2,044,88 2,891 Source: CalEEMod Version 2016.3.2. See Appendix A for scenario GHG emission outputs. KSF = thousand square feet 1. Construction emissions have been amortized over 30 years and added to the operational emissions. Prior to screening, a project-specific air quality analysis should be conducted to confirm that operational greenhouse gas emissions are below the 3,000 MTCO2e per year screening level threshold. Also, the City’s VMT thresholds and methodology should be updated on an as needed basis to reflect changes in CEQA requirements, new methodology development, or refinement of process moving forward. As such, the City should continually review these guidelines for applicability and consultants should contact the city to ensure that they are applying the most recent guidelines for project impact assessment. 121 APPENDIX A CalEEMod Outputs for “Small Project” Scenarios CalEEMod Version 2016.3.2 122 Single-Family Housing 140 Dwelling Units CalEEMod Version 2016.3.2 123 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Single Family Housing 140.00 Dwelling Unit 45.45 252,000.00 452 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: 140 Single Family DU Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 1 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 124 Project Characteristics - Scenario: Single family housing projects less than or equal to 140 dwelling units. Land Use - Assumes default acreage, square footage, and population. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - Weekday rate based on ITE Trip Generation 10th Edition code 210. Assumes default weekend trips and trip percentage breakdown. Road Dust - All roads are/will be paved. Energy Use - CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 2 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 125 2.0 Emissions Summary Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblVehicleTrips WD_TR 9.52 9.44 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 3 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 126 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.2626 2.7200 1.7785 3.4000e- 003 0.5521 0.1261 0.6782 0.2567 0.1164 0.3731 0.0000 298.7566 298.7566 0.0907 0.0000 301.0245 2022 0.2713 2.4121 2.4755 4.6800e- 003 0.2142 0.1132 0.3273 0.0568 0.1062 0.1630 0.0000 409.4888 409.4888 0.0876 0.0000 411.6796 2023 0.2353 2.0172 2.3362 4.3900e- 003 0.0634 0.0914 0.1548 0.0171 0.0860 0.1031 0.0000 383.4782 383.4782 0.0755 0.0000 385.3653 2024 0.2145 1.8476 2.2988 4.2900e- 003 0.0596 0.0790 0.1386 0.0160 0.0742 0.0902 0.0000 375.0599 375.0599 0.0764 0.0000 376.9696 2025 1.5976 0.1658 0.2889 4.7000e- 004 4.2000e- 003 7.9300e- 003 0.0121 1.1100e- 003 7.4100e- 003 8.5200e- 003 0.0000 41.0476 41.0476 0.0105 0.0000 41.3107 Maximum 1.5976 2.7200 2.4755 4.6800e- 003 0.5521 0.1261 0.6782 0.2567 0.1164 0.3731 0.0000 409.4888 409.4888 0.0907 0.0000 411.6796 Unmitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 4 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 127 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.2626 2.7200 1.7785 3.4000e- 003 0.5521 0.1261 0.6782 0.2567 0.1164 0.3731 0.0000 298.7563 298.7563 0.0907 0.0000 301.0241 2022 0.2713 2.4121 2.4755 4.6800e- 003 0.2142 0.1132 0.3273 0.0568 0.1062 0.1630 0.0000 409.4884 409.4884 0.0876 0.0000 411.6792 2023 0.2353 2.0172 2.3362 4.3900e- 003 0.0634 0.0914 0.1548 0.0171 0.0860 0.1031 0.0000 383.4778 383.4778 0.0755 0.0000 385.3650 2024 0.2145 1.8476 2.2988 4.2900e- 003 0.0596 0.0790 0.1386 0.0160 0.0742 0.0902 0.0000 375.0596 375.0596 0.0764 0.0000 376.9692 2025 1.5976 0.1658 0.2889 4.7000e- 004 4.2000e- 003 7.9300e- 003 0.0121 1.1100e- 003 7.4100e- 003 8.5200e- 003 0.0000 41.0476 41.0476 0.0105 0.0000 41.3106 Maximum 1.5976 2.7200 2.4755 4.6800e- 003 0.5521 0.1261 0.6782 0.2567 0.1164 0.3731 0.0000 409.4884 409.4884 0.0907 0.0000 411.6792 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-24-2021 9-23-2021 1.2185 1.2185 2 9-24-2021 12-23-2021 1.6051 1.6051 3 12-24-2021 3-23-2022 0.9206 0.9206 4 3-24-2022 6-23-2022 0.6255 0.6255 5 6-24-2022 9-23-2022 0.6257 0.6257 6 9-24-2022 12-23-2022 0.6174 0.6174 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 5 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 128 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 1.1735 0.0145 1.0408 7.0000e- 005 5.9600e- 003 5.9600e- 003 5.9600e- 003 5.9600e- 003 0.0000 4.6558 4.6558 1.6900e- 003 5.0000e- 005 4.7142 Energy 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 932.0530 932.0530 0.0204 7.5100e- 003 934.8023 Mobile 0.4437 3.4761 4.5662 0.0187 1.1382 8.9000e- 003 1.1471 0.3058 8.3200e- 003 0.3141 0.0000 1,743.924 3 1,743.924 3 0.1023 0.0000 1,746.482 3 Waste 0.0000 0.0000 0.0000 0.0000 37.6183 0.0000 37.6183 2.2232 0.0000 93.1977 Water 0.0000 0.0000 0.0000 0.0000 2.8939 105.2984 108.1923 0.2996 7.5200e- 003 117.9225 Total 1.6403 3.6880 5.6911 0.0201 1.1382 0.0308 1.1691 0.3058 0.0302 0.3360 40.5121 2,785.931 4 2,826.443 5 2.6473 0.0151 2,897.119 0 Unmitigated Operational 7 12-24-2022 3-23-2023 0.5614 0.5614 8 3-24-2023 6-23-2023 0.5704 0.5704 9 6-24-2023 9-23-2023 0.5706 0.5706 10 9-24-2023 12-23-2023 0.5629 0.5629 11 12-24-2023 3-23-2024 0.5311 0.5311 12 3-24-2024 6-23-2024 0.5352 0.5352 13 6-24-2024 9-23-2024 0.5354 0.5354 14 9-24-2024 12-23-2024 0.4758 0.4758 15 12-24-2024 3-23-2025 0.9954 0.9954 16 3-24-2025 6-23-2025 0.7969 0.7969 Highest 1.6051 1.6051 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 6 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 129 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 1.1735 0.0145 1.0408 7.0000e- 005 5.9600e- 003 5.9600e- 003 5.9600e- 003 5.9600e- 003 0.0000 4.6558 4.6558 1.6900e- 003 5.0000e- 005 4.7142 Energy 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 932.0530 932.0530 0.0204 7.5100e- 003 934.8023 Mobile 0.4437 3.4761 4.5662 0.0187 1.1382 8.9000e- 003 1.1471 0.3058 8.3200e- 003 0.3141 0.0000 1,743.924 3 1,743.924 3 0.1023 0.0000 1,746.482 3 Waste 0.0000 0.0000 0.0000 0.0000 37.6183 0.0000 37.6183 2.2232 0.0000 93.1977 Water 0.0000 0.0000 0.0000 0.0000 2.8939 105.2984 108.1923 0.2996 7.5200e- 003 117.9225 Total 1.6403 3.6880 5.6911 0.0201 1.1382 0.0308 1.1691 0.3058 0.0302 0.3360 40.5121 2,785.931 4 2,826.443 5 2.6473 0.0151 2,897.119 0 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 7 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 130 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/24/2021 9/1/2021 5 50 2 Site Preparation Site Preparation 9/2/2021 10/13/2021 5 30 3 Grading Grading 10/14/2021 1/26/2022 5 75 4 Building Construction Building Construction 1/27/2022 11/27/2024 5 740 5 Paving Paving 11/28/2024 2/12/2025 5 55 6 Architectural Coating Architectural Coating 2/13/2025 4/30/2025 5 55 OffRoad Equipment Residential Indoor: 510,300; Residential Outdoor: 170,100; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 187.5 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 8 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 131 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 3 8.00 158 0.38 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Building Construction Cranes 1 7.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 9 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 132 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0791 0.7860 0.5391 9.7000e- 004 0.0388 0.0388 0.0360 0.0360 0.0000 85.0020 85.0020 0.0239 0.0000 85.6001 Total 0.0791 0.7860 0.5391 9.7000e- 004 0.0388 0.0388 0.0360 0.0360 0.0000 85.0020 85.0020 0.0239 0.0000 85.6001 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 50.00 15.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 10.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 10 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 133 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7700e- 003 1.2800e- 003 0.0130 3.0000e- 005 3.1000e- 003 2.0000e- 005 3.1200e- 003 8.2000e- 004 2.0000e- 005 8.4000e- 004 0.0000 2.5588 2.5588 1.0000e- 004 0.0000 2.5614 Total 1.7700e- 003 1.2800e- 003 0.0130 3.0000e- 005 3.1000e- 003 2.0000e- 005 3.1200e- 003 8.2000e- 004 2.0000e- 005 8.4000e- 004 0.0000 2.5588 2.5588 1.0000e- 004 0.0000 2.5614 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0791 0.7860 0.5391 9.7000e- 004 0.0388 0.0388 0.0360 0.0360 0.0000 85.0019 85.0019 0.0239 0.0000 85.6000 Total 0.0791 0.7860 0.5391 9.7000e- 004 0.0388 0.0388 0.0360 0.0360 0.0000 85.0019 85.0019 0.0239 0.0000 85.6000 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 11 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 134 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7700e- 003 1.2800e- 003 0.0130 3.0000e- 005 3.1000e- 003 2.0000e- 005 3.1200e- 003 8.2000e- 004 2.0000e- 005 8.4000e- 004 0.0000 2.5588 2.5588 1.0000e- 004 0.0000 2.5614 Total 1.7700e- 003 1.2800e- 003 0.0130 3.0000e- 005 3.1000e- 003 2.0000e- 005 3.1200e- 003 8.2000e- 004 2.0000e- 005 8.4000e- 004 0.0000 2.5588 2.5588 1.0000e- 004 0.0000 2.5614 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2710 0.0000 0.2710 0.1490 0.0000 0.1490 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0583 0.6075 0.3173 5.7000e- 004 0.0307 0.0307 0.0282 0.0282 0.0000 50.1536 50.1536 0.0162 0.0000 50.5591 Total 0.0583 0.6075 0.3173 5.7000e- 004 0.2710 0.0307 0.3017 0.1490 0.0282 0.1772 0.0000 50.1536 50.1536 0.0162 0.0000 50.5591 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 12 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 135 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e- 003 9.2000e- 004 9.3400e- 003 2.0000e- 005 2.2300e- 003 1.0000e- 005 2.2500e- 003 5.9000e- 004 1.0000e- 005 6.1000e- 004 0.0000 1.8423 1.8423 8.0000e- 005 0.0000 1.8442 Total 1.2800e- 003 9.2000e- 004 9.3400e- 003 2.0000e- 005 2.2300e- 003 1.0000e- 005 2.2500e- 003 5.9000e- 004 1.0000e- 005 6.1000e- 004 0.0000 1.8423 1.8423 8.0000e- 005 0.0000 1.8442 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2710 0.0000 0.2710 0.1490 0.0000 0.1490 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0583 0.6075 0.3173 5.7000e- 004 0.0307 0.0307 0.0282 0.0282 0.0000 50.1535 50.1535 0.0162 0.0000 50.5590 Total 0.0583 0.6075 0.3173 5.7000e- 004 0.2710 0.0307 0.3017 0.1490 0.0282 0.1772 0.0000 50.1535 50.1535 0.0162 0.0000 50.5590 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 13 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 136 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e- 003 9.2000e- 004 9.3400e- 003 2.0000e- 005 2.2300e- 003 1.0000e- 005 2.2500e- 003 5.9000e- 004 1.0000e- 005 6.1000e- 004 0.0000 1.8423 1.8423 8.0000e- 005 0.0000 1.8442 Total 1.2800e- 003 9.2000e- 004 9.3400e- 003 2.0000e- 005 2.2300e- 003 1.0000e- 005 2.2500e- 003 5.9000e- 004 1.0000e- 005 6.1000e- 004 0.0000 1.8423 1.8423 8.0000e- 005 0.0000 1.8442 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2711 0.0000 0.2711 0.1051 0.0000 0.1051 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1195 1.3224 0.8800 1.7700e- 003 0.0566 0.0566 0.0521 0.0521 0.0000 155.3107 155.3107 0.0502 0.0000 156.5665 Total 0.1195 1.3224 0.8800 1.7700e- 003 0.2711 0.0566 0.3276 0.1051 0.0521 0.1571 0.0000 155.3107 155.3107 0.0502 0.0000 156.5665 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 14 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 137 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.6900e- 003 1.9500e- 003 0.0197 4.0000e- 005 4.7100e- 003 3.0000e- 005 4.7400e- 003 1.2500e- 003 3.0000e- 005 1.2800e- 003 0.0000 3.8893 3.8893 1.6000e- 004 0.0000 3.8933 Total 2.6900e- 003 1.9500e- 003 0.0197 4.0000e- 005 4.7100e- 003 3.0000e- 005 4.7400e- 003 1.2500e- 003 3.0000e- 005 1.2800e- 003 0.0000 3.8893 3.8893 1.6000e- 004 0.0000 3.8933 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.2711 0.0000 0.2711 0.1051 0.0000 0.1051 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1195 1.3224 0.8800 1.7700e- 003 0.0566 0.0566 0.0521 0.0521 0.0000 155.3105 155.3105 0.0502 0.0000 156.5663 Total 0.1195 1.3224 0.8800 1.7700e- 003 0.2711 0.0566 0.3276 0.1051 0.0521 0.1571 0.0000 155.3105 155.3105 0.0502 0.0000 156.5663 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 15 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 138 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.6900e- 003 1.9500e- 003 0.0197 4.0000e- 005 4.7100e- 003 3.0000e- 005 4.7400e- 003 1.2500e- 003 3.0000e- 005 1.2800e- 003 0.0000 3.8893 3.8893 1.6000e- 004 0.0000 3.8933 Total 2.6900e- 003 1.9500e- 003 0.0197 4.0000e- 005 4.7100e- 003 3.0000e- 005 4.7400e- 003 1.2500e- 003 3.0000e- 005 1.2800e- 003 0.0000 3.8893 3.8893 1.6000e- 004 0.0000 3.8933 Mitigated Construction Off-Site 3.4 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1536 0.0000 0.1536 0.0405 0.0000 0.0405 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0326 0.3496 0.2614 5.6000e- 004 0.0147 0.0147 0.0135 0.0135 0.0000 49.0811 49.0811 0.0159 0.0000 49.4780 Total 0.0326 0.3496 0.2614 5.6000e- 004 0.1536 0.0147 0.1683 0.0405 0.0135 0.0541 0.0000 49.0811 49.0811 0.0159 0.0000 49.4780 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 16 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 139 3.4 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Total 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1536 0.0000 0.1536 0.0405 0.0000 0.0405 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0326 0.3496 0.2614 5.6000e- 004 0.0147 0.0147 0.0135 0.0135 0.0000 49.0811 49.0811 0.0159 0.0000 49.4779 Total 0.0326 0.3496 0.2614 5.6000e- 004 0.1536 0.0147 0.1683 0.0405 0.0135 0.0541 0.0000 49.0811 49.0811 0.0159 0.0000 49.4779 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 17 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 140 3.4 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Total 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2065 1.8895 1.9800 3.2600e- 003 0.0979 0.0979 0.0921 0.0921 0.0000 280.3876 280.3876 0.0672 0.0000 282.0669 Total 0.2065 1.8895 1.9800 3.2600e- 003 0.0979 0.0979 0.0921 0.0921 0.0000 280.3876 280.3876 0.0672 0.0000 282.0669 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 18 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 141 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6900e- 003 0.1537 0.0359 4.1000e- 004 9.0300e- 003 2.5000e- 004 9.2700e- 003 2.6000e- 003 2.3000e- 004 2.8400e- 003 0.0000 39.0668 39.0668 3.0100e- 003 0.0000 39.1420 Worker 0.0267 0.0188 0.1925 4.4000e- 004 0.0500 3.0000e- 004 0.0503 0.0133 2.8000e- 004 0.0136 0.0000 39.7701 39.7701 1.5300e- 003 0.0000 39.8084 Total 0.0314 0.1725 0.2284 8.5000e- 004 0.0591 5.5000e- 004 0.0596 0.0159 5.1000e- 004 0.0164 0.0000 78.8369 78.8369 4.5400e- 003 0.0000 78.9504 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2065 1.8895 1.9800 3.2600e- 003 0.0979 0.0979 0.0921 0.0921 0.0000 280.3872 280.3872 0.0672 0.0000 282.0665 Total 0.2065 1.8895 1.9800 3.2600e- 003 0.0979 0.0979 0.0921 0.0921 0.0000 280.3872 280.3872 0.0672 0.0000 282.0665 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 19 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 142 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6900e- 003 0.1537 0.0359 4.1000e- 004 9.0300e- 003 2.5000e- 004 9.2700e- 003 2.6000e- 003 2.3000e- 004 2.8400e- 003 0.0000 39.0668 39.0668 3.0100e- 003 0.0000 39.1420 Worker 0.0267 0.0188 0.1925 4.4000e- 004 0.0500 3.0000e- 004 0.0503 0.0133 2.8000e- 004 0.0136 0.0000 39.7701 39.7701 1.5300e- 003 0.0000 39.8084 Total 0.0314 0.1725 0.2284 8.5000e- 004 0.0591 5.5000e- 004 0.0596 0.0159 5.1000e- 004 0.0164 0.0000 78.8369 78.8369 4.5400e- 003 0.0000 78.9504 Mitigated Construction Off-Site 3.5 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2045 1.8700 2.1117 3.5000e- 003 0.0910 0.0910 0.0856 0.0856 0.0000 301.3462 301.3462 0.0717 0.0000 303.1383 Total 0.2045 1.8700 2.1117 3.5000e- 003 0.0910 0.0910 0.0856 0.0856 0.0000 301.3462 301.3462 0.0717 0.0000 303.1383 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 20 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 143 3.5 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9600e- 003 0.1287 0.0335 4.3000e- 004 9.7000e- 003 1.0000e- 004 9.8000e- 003 2.8000e- 003 1.0000e- 004 2.9000e- 003 0.0000 41.0267 41.0267 2.2900e- 003 0.0000 41.0840 Worker 0.0269 0.0185 0.1909 4.6000e- 004 0.0537 3.1000e- 004 0.0541 0.0143 2.9000e- 004 0.0146 0.0000 41.1053 41.1053 1.5100e- 003 0.0000 41.1430 Total 0.0309 0.1472 0.2244 8.9000e- 004 0.0634 4.1000e- 004 0.0639 0.0171 3.9000e- 004 0.0175 0.0000 82.1320 82.1320 3.8000e- 003 0.0000 82.2270 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.2045 1.8700 2.1117 3.5000e- 003 0.0910 0.0910 0.0856 0.0856 0.0000 301.3458 301.3458 0.0717 0.0000 303.1380 Total 0.2045 1.8700 2.1117 3.5000e- 003 0.0910 0.0910 0.0856 0.0856 0.0000 301.3458 301.3458 0.0717 0.0000 303.1380 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 21 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 144 3.5 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9600e- 003 0.1287 0.0335 4.3000e- 004 9.7000e- 003 1.0000e- 004 9.8000e- 003 2.8000e- 003 1.0000e- 004 2.9000e- 003 0.0000 41.0267 41.0267 2.2900e- 003 0.0000 41.0840 Worker 0.0269 0.0185 0.1909 4.6000e- 004 0.0537 3.1000e- 004 0.0541 0.0143 2.9000e- 004 0.0146 0.0000 41.1053 41.1053 1.5100e- 003 0.0000 41.1430 Total 0.0309 0.1472 0.2244 8.9000e- 004 0.0634 4.1000e- 004 0.0639 0.0171 3.9000e- 004 0.0175 0.0000 82.1320 82.1320 3.8000e- 003 0.0000 82.2270 Mitigated Construction Off-Site 3.5 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1751 1.5998 1.9239 3.2100e- 003 0.0730 0.0730 0.0687 0.0687 0.0000 275.9004 275.9004 0.0652 0.0000 277.5315 Total 0.1751 1.5998 1.9239 3.2100e- 003 0.0730 0.0730 0.0687 0.0687 0.0000 275.9004 275.9004 0.0652 0.0000 277.5315 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 22 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 145 3.5 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5300e- 003 0.1173 0.0293 3.9000e- 004 8.8800e- 003 9.0000e- 005 8.9700e- 003 2.5600e- 003 9.0000e- 005 2.6500e- 003 0.0000 37.4266 37.4266 2.0300e- 003 0.0000 37.4774 Worker 0.0233 0.0157 0.1651 4.1000e- 004 0.0492 2.9000e- 004 0.0495 0.0131 2.7000e- 004 0.0133 0.0000 36.5940 36.5940 1.3000e- 003 0.0000 36.6265 Total 0.0268 0.1330 0.1944 8.0000e- 004 0.0581 3.8000e- 004 0.0585 0.0156 3.6000e- 004 0.0160 0.0000 74.0206 74.0206 3.3300e- 003 0.0000 74.1039 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1751 1.5998 1.9239 3.2100e- 003 0.0730 0.0730 0.0687 0.0687 0.0000 275.9001 275.9001 0.0652 0.0000 277.5312 Total 0.1751 1.5998 1.9239 3.2100e- 003 0.0730 0.0730 0.0687 0.0687 0.0000 275.9001 275.9001 0.0652 0.0000 277.5312 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 23 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 146 3.5 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5300e- 003 0.1173 0.0293 3.9000e- 004 8.8800e- 003 9.0000e- 005 8.9700e- 003 2.5600e- 003 9.0000e- 005 2.6500e- 003 0.0000 37.4266 37.4266 2.0300e- 003 0.0000 37.4774 Worker 0.0233 0.0157 0.1651 4.1000e- 004 0.0492 2.9000e- 004 0.0495 0.0131 2.7000e- 004 0.0133 0.0000 36.5940 36.5940 1.3000e- 003 0.0000 36.6265 Total 0.0268 0.1330 0.1944 8.0000e- 004 0.0581 3.8000e- 004 0.0585 0.0156 3.6000e- 004 0.0160 0.0000 74.0206 74.0206 3.3300e- 003 0.0000 74.1039 Mitigated Construction Off-Site 3.6 Paving - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0119 0.1143 0.1755 2.7000e- 004 5.6200e- 003 5.6200e- 003 5.1700e- 003 5.1700e- 003 0.0000 24.0318 24.0318 7.7700e- 003 0.0000 24.2262 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0119 0.1143 0.1755 2.7000e- 004 5.6200e- 003 5.6200e- 003 5.1700e- 003 5.1700e- 003 0.0000 24.0318 24.0318 7.7700e- 003 0.0000 24.2262 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 24 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 147 3.6 Paving - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 004 4.7000e- 004 5.0000e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1071 1.1071 4.0000e- 005 0.0000 1.1080 Total 7.0000e- 004 4.7000e- 004 5.0000e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1071 1.1071 4.0000e- 005 0.0000 1.1080 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0119 0.1143 0.1755 2.7000e- 004 5.6200e- 003 5.6200e- 003 5.1700e- 003 5.1700e- 003 0.0000 24.0318 24.0318 7.7700e- 003 0.0000 24.2261 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0119 0.1143 0.1755 2.7000e- 004 5.6200e- 003 5.6200e- 003 5.1700e- 003 5.1700e- 003 0.0000 24.0318 24.0318 7.7700e- 003 0.0000 24.2261 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 25 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 148 3.6 Paving - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.0000e- 004 4.7000e- 004 5.0000e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1071 1.1071 4.0000e- 005 0.0000 1.1080 Total 7.0000e- 004 4.7000e- 004 5.0000e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1071 1.1071 4.0000e- 005 0.0000 1.1080 Mitigated Construction Off-Site 3.6 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0142 0.1330 0.2260 3.5000e- 004 6.4900e- 003 6.4900e- 003 5.9700e- 003 5.9700e- 003 0.0000 31.0299 31.0299 0.0100 0.0000 31.2807 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0142 0.1330 0.2260 3.5000e- 004 6.4900e- 003 6.4900e- 003 5.9700e- 003 5.9700e- 003 0.0000 31.0299 31.0299 0.0100 0.0000 31.2807 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 26 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 149 3.6 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.6000e- 004 5.7000e- 004 6.0500e- 003 2.0000e- 005 1.9200e- 003 1.0000e- 005 1.9300e- 003 5.1000e- 004 1.0000e- 005 5.2000e- 004 0.0000 1.3727 1.3727 5.0000e- 005 0.0000 1.3739 Total 8.6000e- 004 5.7000e- 004 6.0500e- 003 2.0000e- 005 1.9200e- 003 1.0000e- 005 1.9300e- 003 5.1000e- 004 1.0000e- 005 5.2000e- 004 0.0000 1.3727 1.3727 5.0000e- 005 0.0000 1.3739 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0142 0.1330 0.2260 3.5000e- 004 6.4900e- 003 6.4900e- 003 5.9700e- 003 5.9700e- 003 0.0000 31.0298 31.0298 0.0100 0.0000 31.2807 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0142 0.1330 0.2260 3.5000e- 004 6.4900e- 003 6.4900e- 003 5.9700e- 003 5.9700e- 003 0.0000 31.0298 31.0298 0.0100 0.0000 31.2807 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 27 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 150 3.6 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.6000e- 004 5.7000e- 004 6.0500e- 003 2.0000e- 005 1.9200e- 003 1.0000e- 005 1.9300e- 003 5.1000e- 004 1.0000e- 005 5.2000e- 004 0.0000 1.3727 1.3727 5.0000e- 005 0.0000 1.3739 Total 8.6000e- 004 5.7000e- 004 6.0500e- 003 2.0000e- 005 1.9200e- 003 1.0000e- 005 1.9300e- 003 5.1000e- 004 1.0000e- 005 5.2000e- 004 0.0000 1.3727 1.3727 5.0000e- 005 0.0000 1.3739 Mitigated Construction Off-Site 3.7 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.5768 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.7000e- 003 0.0315 0.0498 8.0000e- 005 1.4200e- 003 1.4200e- 003 1.4200e- 003 1.4200e- 003 0.0000 7.0215 7.0215 3.8000e- 004 0.0000 7.0310 Total 1.5815 0.0315 0.0498 8.0000e- 005 1.4200e- 003 1.4200e- 003 1.4200e- 003 1.4200e- 003 0.0000 7.0215 7.0215 3.8000e- 004 0.0000 7.0310 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 28 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 151 3.7 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0200e- 003 6.8000e- 004 7.1500e- 003 2.0000e- 005 2.2700e- 003 1.0000e- 005 2.2900e- 003 6.0000e- 004 1.0000e- 005 6.2000e- 004 0.0000 1.6236 1.6236 6.0000e- 005 0.0000 1.6250 Total 1.0200e- 003 6.8000e- 004 7.1500e- 003 2.0000e- 005 2.2700e- 003 1.0000e- 005 2.2900e- 003 6.0000e- 004 1.0000e- 005 6.2000e- 004 0.0000 1.6236 1.6236 6.0000e- 005 0.0000 1.6250 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.5768 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.7000e- 003 0.0315 0.0498 8.0000e- 005 1.4200e- 003 1.4200e- 003 1.4200e- 003 1.4200e- 003 0.0000 7.0214 7.0214 3.8000e- 004 0.0000 7.0310 Total 1.5815 0.0315 0.0498 8.0000e- 005 1.4200e- 003 1.4200e- 003 1.4200e- 003 1.4200e- 003 0.0000 7.0214 7.0214 3.8000e- 004 0.0000 7.0310 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 29 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 152 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0200e- 003 6.8000e- 004 7.1500e- 003 2.0000e- 005 2.2700e- 003 1.0000e- 005 2.2900e- 003 6.0000e- 004 1.0000e- 005 6.2000e- 004 0.0000 1.6236 1.6236 6.0000e- 005 0.0000 1.6250 Total 1.0200e- 003 6.8000e- 004 7.1500e- 003 2.0000e- 005 2.2700e- 003 1.0000e- 005 2.2900e- 003 6.0000e- 004 1.0000e- 005 6.2000e- 004 0.0000 1.6236 1.6236 6.0000e- 005 0.0000 1.6250 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 30 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 153 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.4437 3.4761 4.5662 0.0187 1.1382 8.9000e- 003 1.1471 0.3058 8.3200e- 003 0.3141 0.0000 1,743.924 3 1,743.924 3 0.1023 0.0000 1,746.482 3 Unmitigated 0.4437 3.4761 4.5662 0.0187 1.1382 8.9000e- 003 1.1471 0.3058 8.3200e- 003 0.3141 0.0000 1,743.924 3 1,743.924 3 0.1023 0.0000 1,746.482 3 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Single Family Housing 1,321.60 1,387.40 1206.80 2,940,656 2,940,656 Total 1,321.60 1,387.40 1,206.80 2,940,656 2,940,656 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 86 11 3 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Single Family Housing 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 31 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 154 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 703.4712 703.4712 0.0161 3.3200e- 003 704.8622 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 703.4712 703.4712 0.0161 3.3200e- 003 704.8622 NaturalGas Mitigated 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 228.5818 228.5818 4.3800e- 003 4.1900e- 003 229.9401 NaturalGas Unmitigated 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 228.5818 228.5818 4.3800e- 003 4.1900e- 003 229.9401 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Single Family Housing 4.28346e +006 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 228.5818 228.5818 4.3800e- 003 4.1900e- 003 229.9401 Total 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 228.5818 228.5818 4.3800e- 003 4.1900e- 003 229.9401 Unmitigated 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 32 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 155 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Single Family Housing 4.28346e +006 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 228.5818 228.5818 4.3800e- 003 4.1900e- 003 229.9401 Total 0.0231 0.1974 0.0840 1.2600e- 003 0.0160 0.0160 0.0160 0.0160 0.0000 228.5818 228.5818 4.3800e- 003 4.1900e- 003 229.9401 Mitigated 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Single Family Housing 1.22031e +006 703.4712 0.0161 3.3200e- 003 704.8622 Total 703.4712 0.0161 3.3200e- 003 704.8622 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 33 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 156 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 1.1735 0.0145 1.0408 7.0000e- 005 5.9600e- 003 5.9600e- 003 5.9600e- 003 5.9600e- 003 0.0000 4.6558 4.6558 1.6900e- 003 5.0000e- 005 4.7142 Unmitigated 1.1735 0.0145 1.0408 7.0000e- 005 5.9600e- 003 5.9600e- 003 5.9600e- 003 5.9600e- 003 0.0000 4.6558 4.6558 1.6900e- 003 5.0000e- 005 4.7142 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Single Family Housing 1.22031e +006 703.4712 0.0161 3.3200e- 003 704.8622 Total 703.4712 0.0161 3.3200e- 003 704.8622 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 34 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 157 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.9842 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 3.0000e- 004 2.5500e- 003 1.0900e- 003 2.0000e- 005 2.1000e- 004 2.1000e- 004 2.1000e- 004 2.1000e- 004 0.0000 2.9578 2.9578 6.0000e- 005 5.0000e- 005 2.9753 Landscaping 0.0313 0.0120 1.0398 5.0000e- 005 5.7500e- 003 5.7500e- 003 5.7500e- 003 5.7500e- 003 0.0000 1.6980 1.6980 1.6300e- 003 0.0000 1.7389 Total 1.1735 0.0145 1.0408 7.0000e- 005 5.9600e- 003 5.9600e- 003 5.9600e- 003 5.9600e- 003 0.0000 4.6558 4.6558 1.6900e- 003 5.0000e- 005 4.7142 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 35 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 158 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1577 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.9842 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 3.0000e- 004 2.5500e- 003 1.0900e- 003 2.0000e- 005 2.1000e- 004 2.1000e- 004 2.1000e- 004 2.1000e- 004 0.0000 2.9578 2.9578 6.0000e- 005 5.0000e- 005 2.9753 Landscaping 0.0313 0.0120 1.0398 5.0000e- 005 5.7500e- 003 5.7500e- 003 5.7500e- 003 5.7500e- 003 0.0000 1.6980 1.6980 1.6300e- 003 0.0000 1.7389 Total 1.1735 0.0145 1.0408 7.0000e- 005 5.9600e- 003 5.9600e- 003 5.9600e- 003 5.9600e- 003 0.0000 4.6558 4.6558 1.6900e- 003 5.0000e- 005 4.7142 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 36 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 159 Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 108.1923 0.2996 7.5200e- 003 117.9225 Unmitigated 108.1923 0.2996 7.5200e- 003 117.9225 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Single Family Housing 9.12156 / 5.75055 108.1923 0.2996 7.5200e- 003 117.9225 Total 108.1923 0.2996 7.5200e- 003 117.9225 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 37 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 160 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Single Family Housing 9.12156 / 5.75055 108.1923 0.2996 7.5200e- 003 117.9225 Total 108.1923 0.2996 7.5200e- 003 117.9225 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 37.6183 2.2232 0.0000 93.1977 Unmitigated 37.6183 2.2232 0.0000 93.1977 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 38 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 161 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Single Family Housing 185.32 37.6183 2.2232 0.0000 93.1977 Total 37.6183 2.2232 0.0000 93.1977 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Single Family Housing 185.32 37.6183 2.2232 0.0000 93.1977 Total 37.6183 2.2232 0.0000 93.1977 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 39 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 162 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:05 AMPage 40 of 40 LQ VMT Policy Scenario: 140 Single Family DU - Salton Sea Air Basin, Annual 163 Multi-Family Housing (Low-Rise) 200 Dwelling Units CalEEMod Version 2016.3.2 164 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 200.00 Dwelling Unit 12.50 200,000.00 646 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 1 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 165 Project Characteristics - Scenario: Multi family (low rise) housing projects less than or equal to 200 dwelling units. Land Use - Assumes default acreage, square footage, and population. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - ITE Trip Generation 10th Edition for weekday trips code 210. Assumes default weekend trip rate and trip distribution. Road Dust - All roads are/will be paved. Energy Use - CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 2 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 166 2.0 Emissions Summary Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblVehicleTrips WD_TR 6.59 7.32 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 3 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 167 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.2181 1.9771 1.6505 3.1900e- 003 0.2748 0.0929 0.3676 0.1181 0.0863 0.2044 0.0000 280.7049 280.7049 0.0661 0.0000 282.3566 2022 1.3454 2.1138 2.5556 4.9900e- 003 0.1477 0.0977 0.2454 0.0395 0.0919 0.1313 0.0000 439.1224 439.1224 0.0766 0.0000 441.0367 2023 0.1882 2.0800e- 003 3.9900e- 003 1.0000e- 005 3.6000e- 004 1.1000e- 004 4.7000e- 004 1.0000e- 004 1.1000e- 004 2.0000e- 004 0.0000 0.6581 0.6581 3.0000e- 005 0.0000 0.6589 Maximum 1.3454 2.1138 2.5556 4.9900e- 003 0.2748 0.0977 0.3676 0.1181 0.0919 0.2044 0.0000 439.1224 439.1224 0.0766 0.0000 441.0367 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.2181 1.9771 1.6505 3.1900e- 003 0.2748 0.0929 0.3676 0.1181 0.0863 0.2044 0.0000 280.7047 280.7047 0.0661 0.0000 282.3563 2022 1.3454 2.1138 2.5556 4.9900e- 003 0.1477 0.0977 0.2454 0.0395 0.0919 0.1313 0.0000 439.1221 439.1221 0.0766 0.0000 441.0363 2023 0.1882 2.0800e- 003 3.9900e- 003 1.0000e- 005 3.6000e- 004 1.1000e- 004 4.7000e- 004 1.0000e- 004 1.1000e- 004 2.0000e- 004 0.0000 0.6581 0.6581 3.0000e- 005 0.0000 0.6589 Maximum 1.3454 2.1138 2.5556 4.9900e- 003 0.2748 0.0977 0.3676 0.1181 0.0919 0.2044 0.0000 439.1221 439.1221 0.0766 0.0000 441.0363 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 4 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 168 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-24-2021 9-23-2021 1.3962 1.3962 2 9-24-2021 12-23-2021 0.7290 0.7290 3 12-24-2021 3-23-2022 0.6561 0.6561 4 3-24-2022 6-23-2022 0.6681 0.6681 5 6-24-2022 9-23-2022 0.6685 0.6685 6 9-24-2022 12-23-2022 1.1887 1.1887 7 12-24-2022 3-23-2023 0.5440 0.5440 Highest 1.3962 1.3962 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 5 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 169 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.9514 0.0208 1.4869 1.0000e- 004 8.5200e- 003 8.5200e- 003 8.5200e- 003 8.5200e- 003 0.0000 6.6511 6.6511 2.4100e- 003 8.0000e- 005 6.7345 Energy 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 726.5823 726.5823 0.0160 5.6900e- 003 728.6781 Mobile 0.4805 3.7646 4.9452 0.0203 1.2327 9.6400e- 003 1.2424 0.3311 9.0100e- 003 0.3401 0.0000 1,888.673 3 1,888.673 3 0.1108 0.0000 1,891.443 6 Waste 0.0000 0.0000 0.0000 0.0000 18.6752 0.0000 18.6752 1.1037 0.0000 46.2669 Water 0.0000 0.0000 0.0000 0.0000 4.1341 150.4263 154.5604 0.4280 0.0107 168.4608 Total 1.4487 3.9289 6.4932 0.0213 1.2327 0.0298 1.2625 0.3311 0.0291 0.3603 22.8092 2,772.332 9 2,795.142 2 1.6609 0.0165 2,841.583 9 Unmitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 6 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 170 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.9514 0.0208 1.4869 1.0000e- 004 8.5200e- 003 8.5200e- 003 8.5200e- 003 8.5200e- 003 0.0000 6.6511 6.6511 2.4100e- 003 8.0000e- 005 6.7345 Energy 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 726.5823 726.5823 0.0160 5.6900e- 003 728.6781 Mobile 0.4805 3.7646 4.9452 0.0203 1.2327 9.6400e- 003 1.2424 0.3311 9.0100e- 003 0.3401 0.0000 1,888.673 3 1,888.673 3 0.1108 0.0000 1,891.443 6 Waste 0.0000 0.0000 0.0000 0.0000 18.6752 0.0000 18.6752 1.1037 0.0000 46.2669 Water 0.0000 0.0000 0.0000 0.0000 4.1341 150.4263 154.5604 0.4280 0.0107 168.4608 Total 1.4487 3.9289 6.4932 0.0213 1.2327 0.0298 1.2625 0.3311 0.0291 0.3603 22.8092 2,772.332 9 2,795.142 2 1.6609 0.0165 2,841.583 9 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 7 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 171 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/24/2021 7/21/2021 5 20 2 Site Preparation Site Preparation 7/22/2021 8/4/2021 5 10 3 Grading Grading 8/5/2021 9/15/2021 5 30 4 Building Construction Building Construction 9/16/2021 11/9/2022 5 300 5 Paving Paving 11/10/2022 12/7/2022 5 20 6 Architectural Coating Architectural Coating 12/8/2022 1/4/2023 5 20 OffRoad Equipment Residential Indoor: 405,000; Residential Outdoor: 135,000; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 75 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 8 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 172 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 3 8.00 158 0.38 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37 Building Construction Cranes 1 7.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 6.00 78 0.48 Grading Scrapers 2 8.00 367 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 9 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 173 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 144.00 21.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 29.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 10 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 174 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 11 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 175 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0194 0.2025 0.1058 1.9000e- 004 0.0102 0.0102 9.4000e- 003 9.4000e- 003 0.0000 16.7179 16.7179 5.4100e- 003 0.0000 16.8530 Total 0.0194 0.2025 0.1058 1.9000e- 004 0.0903 0.0102 0.1006 0.0497 9.4000e- 003 0.0591 0.0000 16.7179 16.7179 5.4100e- 003 0.0000 16.8530 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 12 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 176 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Total 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0194 0.2025 0.1058 1.9000e- 004 0.0102 0.0102 9.4000e- 003 9.4000e- 003 0.0000 16.7178 16.7178 5.4100e- 003 0.0000 16.8530 Total 0.0194 0.2025 0.1058 1.9000e- 004 0.0903 0.0102 0.1006 0.0497 9.4000e- 003 0.0591 0.0000 16.7178 16.7178 5.4100e- 003 0.0000 16.8530 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 13 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 177 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Total 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1301 0.0000 0.1301 0.0540 0.0000 0.0540 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0629 0.6960 0.4632 9.3000e- 004 0.0298 0.0298 0.0274 0.0274 0.0000 81.7425 81.7425 0.0264 0.0000 82.4034 Total 0.0629 0.6960 0.4632 9.3000e- 004 0.1301 0.0298 0.1599 0.0540 0.0274 0.0814 0.0000 81.7425 81.7425 0.0264 0.0000 82.4034 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 14 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 178 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4200e- 003 1.0200e- 003 0.0104 2.0000e- 005 2.4800e- 003 2.0000e- 005 2.5000e- 003 6.6000e- 004 1.0000e- 005 6.7000e- 004 0.0000 2.0470 2.0470 8.0000e- 005 0.0000 2.0491 Total 1.4200e- 003 1.0200e- 003 0.0104 2.0000e- 005 2.4800e- 003 2.0000e- 005 2.5000e- 003 6.6000e- 004 1.0000e- 005 6.7000e- 004 0.0000 2.0470 2.0470 8.0000e- 005 0.0000 2.0491 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.1301 0.0000 0.1301 0.0540 0.0000 0.0540 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0629 0.6960 0.4632 9.3000e- 004 0.0298 0.0298 0.0274 0.0274 0.0000 81.7424 81.7424 0.0264 0.0000 82.4033 Total 0.0629 0.6960 0.4632 9.3000e- 004 0.1301 0.0298 0.1599 0.0540 0.0274 0.0814 0.0000 81.7424 81.7424 0.0264 0.0000 82.4033 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 15 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 179 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4200e- 003 1.0200e- 003 0.0104 2.0000e- 005 2.4800e- 003 2.0000e- 005 2.5000e- 003 6.6000e- 004 1.0000e- 005 6.7000e- 004 0.0000 2.0470 2.0470 8.0000e- 005 0.0000 2.0491 Total 1.4200e- 003 1.0200e- 003 0.0104 2.0000e- 005 2.4800e- 003 2.0000e- 005 2.5000e- 003 6.6000e- 004 1.0000e- 005 6.7000e- 004 0.0000 2.0470 2.0470 8.0000e- 005 0.0000 2.0491 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0732 0.6711 0.6382 1.0400e- 003 0.0369 0.0369 0.0347 0.0347 0.0000 89.1804 89.1804 0.0215 0.0000 89.7182 Total 0.0732 0.6711 0.6382 1.0400e- 003 0.0369 0.0369 0.0347 0.0347 0.0000 89.1804 89.1804 0.0215 0.0000 89.7182 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 16 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 180 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 2.2500e- 003 0.0723 0.0173 1.8000e- 004 4.0200e- 003 1.3000e- 004 4.1500e- 003 1.1600e- 003 1.2000e- 004 1.2800e- 003 0.0000 17.5501 17.5501 1.4400e- 003 0.0000 17.5862 Worker 0.0262 0.0189 0.1918 4.2000e- 004 0.0458 2.9000e- 004 0.0461 0.0122 2.6000e- 004 0.0124 0.0000 37.8287 37.8287 1.5400e- 003 0.0000 37.8673 Total 0.0285 0.0913 0.2091 6.0000e- 004 0.0499 4.2000e- 004 0.0503 0.0133 3.8000e- 004 0.0137 0.0000 55.3788 55.3788 2.9800e- 003 0.0000 55.4535 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0732 0.6711 0.6381 1.0400e- 003 0.0369 0.0369 0.0347 0.0347 0.0000 89.1803 89.1803 0.0215 0.0000 89.7181 Total 0.0732 0.6711 0.6381 1.0400e- 003 0.0369 0.0369 0.0347 0.0347 0.0000 89.1803 89.1803 0.0215 0.0000 89.7181 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 17 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 181 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 2.2500e- 003 0.0723 0.0173 1.8000e- 004 4.0200e- 003 1.3000e- 004 4.1500e- 003 1.1600e- 003 1.2000e- 004 1.2800e- 003 0.0000 17.5501 17.5501 1.4400e- 003 0.0000 17.5862 Worker 0.0262 0.0189 0.1918 4.2000e- 004 0.0458 2.9000e- 004 0.0461 0.0122 2.6000e- 004 0.0124 0.0000 37.8287 37.8287 1.5400e- 003 0.0000 37.8673 Total 0.0285 0.0913 0.2091 6.0000e- 004 0.0499 4.2000e- 004 0.0503 0.0133 3.8000e- 004 0.0137 0.0000 55.3788 55.3788 2.9800e- 003 0.0000 55.4535 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1903 1.7411 1.8245 3.0000e- 003 0.0902 0.0902 0.0849 0.0849 0.0000 258.3737 258.3737 0.0619 0.0000 259.9211 Total 0.1903 1.7411 1.8245 3.0000e- 003 0.0902 0.0902 0.0849 0.0849 0.0000 258.3737 258.3737 0.0619 0.0000 259.9211 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 18 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 182 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 6.0400e- 003 0.1982 0.0463 5.3000e- 004 0.0116 3.2000e- 004 0.0120 3.3600e- 003 3.0000e- 004 3.6600e- 003 0.0000 50.3994 50.3994 3.8800e- 003 0.0000 50.4964 Worker 0.0709 0.0500 0.5110 1.1700e- 003 0.1327 8.0000e- 004 0.1335 0.0352 7.4000e- 004 0.0360 0.0000 105.5452 105.5452 4.0700e- 003 0.0000 105.6470 Total 0.0769 0.2482 0.5572 1.7000e- 003 0.1444 1.1200e- 003 0.1455 0.0386 1.0400e- 003 0.0396 0.0000 155.9446 155.9446 7.9500e- 003 0.0000 156.1433 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1903 1.7411 1.8245 3.0000e- 003 0.0902 0.0902 0.0849 0.0849 0.0000 258.3733 258.3733 0.0619 0.0000 259.9208 Total 0.1903 1.7411 1.8245 3.0000e- 003 0.0902 0.0902 0.0849 0.0849 0.0000 258.3733 258.3733 0.0619 0.0000 259.9208 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 19 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 183 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 6.0400e- 003 0.1982 0.0463 5.3000e- 004 0.0116 3.2000e- 004 0.0120 3.3600e- 003 3.0000e- 004 3.6600e- 003 0.0000 50.3994 50.3994 3.8800e- 003 0.0000 50.4964 Worker 0.0709 0.0500 0.5110 1.1700e- 003 0.1327 8.0000e- 004 0.1335 0.0352 7.4000e- 004 0.0360 0.0000 105.5452 105.5452 4.0700e- 003 0.0000 105.6470 Total 0.0769 0.2482 0.5572 1.7000e- 003 0.1444 1.1200e- 003 0.1455 0.0386 1.0400e- 003 0.0396 0.0000 155.9446 155.9446 7.9500e- 003 0.0000 156.1433 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0276 20.0276 6.4800e- 003 0.0000 20.1895 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0276 20.0276 6.4800e- 003 0.0000 20.1895 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 20 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 184 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Total 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0275 20.0275 6.4800e- 003 0.0000 20.1895 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0275 20.0275 6.4800e- 003 0.0000 20.1895 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 21 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 185 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Total 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.0637 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.7400e- 003 0.0120 0.0154 3.0000e- 005 6.9000e- 004 6.9000e- 004 6.9000e- 004 6.9000e- 004 0.0000 2.1703 2.1703 1.4000e- 004 0.0000 2.1738 Total 1.0655 0.0120 0.0154 3.0000e- 005 6.9000e- 004 6.9000e- 004 6.9000e- 004 6.9000e- 004 0.0000 2.1703 2.1703 1.4000e- 004 0.0000 2.1738 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 22 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 186 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0900e- 003 7.7000e- 004 7.8400e- 003 2.0000e- 005 2.0400e- 003 1.0000e- 005 2.0500e- 003 5.4000e- 004 1.0000e- 005 5.5000e- 004 0.0000 1.6204 1.6204 6.0000e- 005 0.0000 1.6220 Total 1.0900e- 003 7.7000e- 004 7.8400e- 003 2.0000e- 005 2.0400e- 003 1.0000e- 005 2.0500e- 003 5.4000e- 004 1.0000e- 005 5.5000e- 004 0.0000 1.6204 1.6204 6.0000e- 005 0.0000 1.6220 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.0637 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.7400e- 003 0.0120 0.0154 3.0000e- 005 6.9000e- 004 6.9000e- 004 6.9000e- 004 6.9000e- 004 0.0000 2.1703 2.1703 1.4000e- 004 0.0000 2.1738 Total 1.0655 0.0120 0.0154 3.0000e- 005 6.9000e- 004 6.9000e- 004 6.9000e- 004 6.9000e- 004 0.0000 2.1703 2.1703 1.4000e- 004 0.0000 2.1738 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 23 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 187 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0900e- 003 7.7000e- 004 7.8400e- 003 2.0000e- 005 2.0400e- 003 1.0000e- 005 2.0500e- 003 5.4000e- 004 1.0000e- 005 5.5000e- 004 0.0000 1.6204 1.6204 6.0000e- 005 0.0000 1.6220 Total 1.0900e- 003 7.7000e- 004 7.8400e- 003 2.0000e- 005 2.0400e- 003 1.0000e- 005 2.0500e- 003 5.4000e- 004 1.0000e- 005 5.5000e- 004 0.0000 1.6204 1.6204 6.0000e- 005 0.0000 1.6220 Mitigated Construction Off-Site 3.7 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.1877 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.9000e- 004 1.9500e- 003 2.7200e- 003 0.0000 1.1000e- 004 1.1000e- 004 1.1000e- 004 1.1000e- 004 0.0000 0.3830 0.3830 2.0000e- 005 0.0000 0.3836 Total 0.1880 1.9500e- 003 2.7200e- 003 0.0000 1.1000e- 004 1.1000e- 004 1.1000e- 004 1.1000e- 004 0.0000 0.3830 0.3830 2.0000e- 005 0.0000 0.3836 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 24 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 188 3.7 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.8000e- 004 1.2000e- 004 1.2800e- 003 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2751 0.2751 1.0000e- 005 0.0000 0.2753 Total 1.8000e- 004 1.2000e- 004 1.2800e- 003 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2751 0.2751 1.0000e- 005 0.0000 0.2753 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.1877 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.9000e- 004 1.9500e- 003 2.7200e- 003 0.0000 1.1000e- 004 1.1000e- 004 1.1000e- 004 1.1000e- 004 0.0000 0.3830 0.3830 2.0000e- 005 0.0000 0.3836 Total 0.1880 1.9500e- 003 2.7200e- 003 0.0000 1.1000e- 004 1.1000e- 004 1.1000e- 004 1.1000e- 004 0.0000 0.3830 0.3830 2.0000e- 005 0.0000 0.3836 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 25 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 189 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.8000e- 004 1.2000e- 004 1.2800e- 003 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2751 0.2751 1.0000e- 005 0.0000 0.2753 Total 1.8000e- 004 1.2000e- 004 1.2800e- 003 0.0000 3.6000e- 004 0.0000 3.6000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.2751 0.2751 1.0000e- 005 0.0000 0.2753 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 26 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 190 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.4805 3.7646 4.9452 0.0203 1.2327 9.6400e- 003 1.2424 0.3311 9.0100e- 003 0.3401 0.0000 1,888.673 3 1,888.673 3 0.1108 0.0000 1,891.443 6 Unmitigated 0.4805 3.7646 4.9452 0.0203 1.2327 9.6400e- 003 1.2424 0.3311 9.0100e- 003 0.3401 0.0000 1,888.673 3 1,888.673 3 0.1108 0.0000 1,891.443 6 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 1,464.00 1,432.00 1214.00 3,184,736 3,184,736 Total 1,464.00 1,432.00 1,214.00 3,184,736 3,184,736 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 86 11 3 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 27 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 191 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 560.3593 560.3593 0.0128 2.6500e- 003 561.4674 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 560.3593 560.3593 0.0128 2.6500e- 003 561.4674 NaturalGas Mitigated 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 166.2229 166.2229 3.1900e- 003 3.0500e- 003 167.2107 NaturalGas Unmitigated 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 166.2229 166.2229 3.1900e- 003 3.0500e- 003 167.2107 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low Rise 3.1149e +006 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 166.2229 166.2229 3.1900e- 003 3.0500e- 003 167.2107 Total 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 166.2229 166.2229 3.1900e- 003 3.0500e- 003 167.2107 Unmitigated 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 28 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 192 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low Rise 3.1149e +006 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 166.2229 166.2229 3.1900e- 003 3.0500e- 003 167.2107 Total 0.0168 0.1435 0.0611 9.2000e- 004 0.0116 0.0116 0.0116 0.0116 0.0000 166.2229 166.2229 3.1900e- 003 3.0500e- 003 167.2107 Mitigated 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Low Rise 972052 560.3593 0.0128 2.6500e- 003 561.4674 Total 560.3593 0.0128 2.6500e- 003 561.4674 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 29 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 193 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.9514 0.0208 1.4869 1.0000e- 004 8.5200e- 003 8.5200e- 003 8.5200e- 003 8.5200e- 003 0.0000 6.6511 6.6511 2.4100e- 003 8.0000e- 005 6.7345 Unmitigated 0.9514 0.0208 1.4869 1.0000e- 004 8.5200e- 003 8.5200e- 003 8.5200e- 003 8.5200e- 003 0.0000 6.6511 6.6511 2.4100e- 003 8.0000e- 005 6.7345 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Low Rise 972052 560.3593 0.0128 2.6500e- 003 561.4674 Total 560.3593 0.0128 2.6500e- 003 561.4674 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 30 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 194 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.7811 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 4.3000e- 004 3.6500e- 003 1.5500e- 003 2.0000e- 005 2.9000e- 004 2.9000e- 004 2.9000e- 004 2.9000e- 004 0.0000 4.2254 4.2254 8.0000e- 005 8.0000e- 005 4.2505 Landscaping 0.0448 0.0171 1.4854 8.0000e- 005 8.2200e- 003 8.2200e- 003 8.2200e- 003 8.2200e- 003 0.0000 2.4258 2.4258 2.3300e- 003 0.0000 2.4841 Total 0.9514 0.0208 1.4869 1.0000e- 004 8.5100e- 003 8.5100e- 003 8.5100e- 003 8.5100e- 003 0.0000 6.6511 6.6511 2.4100e- 003 8.0000e- 005 6.7346 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 31 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 195 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1252 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.7811 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 4.3000e- 004 3.6500e- 003 1.5500e- 003 2.0000e- 005 2.9000e- 004 2.9000e- 004 2.9000e- 004 2.9000e- 004 0.0000 4.2254 4.2254 8.0000e- 005 8.0000e- 005 4.2505 Landscaping 0.0448 0.0171 1.4854 8.0000e- 005 8.2200e- 003 8.2200e- 003 8.2200e- 003 8.2200e- 003 0.0000 2.4258 2.4258 2.3300e- 003 0.0000 2.4841 Total 0.9514 0.0208 1.4869 1.0000e- 004 8.5100e- 003 8.5100e- 003 8.5100e- 003 8.5100e- 003 0.0000 6.6511 6.6511 2.4100e- 003 8.0000e- 005 6.7346 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 32 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 196 Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 154.5604 0.4280 0.0107 168.4608 Unmitigated 154.5604 0.4280 0.0107 168.4608 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Low Rise 13.0308 / 8.21507 154.5604 0.4280 0.0107 168.4608 Total 154.5604 0.4280 0.0107 168.4608 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 33 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 197 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Low Rise 13.0308 / 8.21507 154.5604 0.4280 0.0107 168.4608 Total 154.5604 0.4280 0.0107 168.4608 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 18.6752 1.1037 0.0000 46.2669 Unmitigated 18.6752 1.1037 0.0000 46.2669 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 34 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 198 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Low Rise 92 18.6752 1.1037 0.0000 46.2669 Total 18.6752 1.1037 0.0000 46.2669 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Low Rise 92 18.6752 1.1037 0.0000 46.2669 Total 18.6752 1.1037 0.0000 46.2669 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 35 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 199 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:15 AMPage 36 of 36 LQ VMT Policy Scenario: 200 Multi Family DU (Low Rise) - Salton Sea Air Basin, Annual 200 Multi-Family Housing (Mid-Rise) 245 Dwelling Units CalEEMod Version 2016.3.2 201 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Mid Rise 245.00 Dwelling Unit 6.45 245,000.00 791 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 1 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 202 Project Characteristics - Scenario: Multi family (mid rise) housing projects less than or equal to 245 dwelling units. Land Use - Assumes default acreage, square footage, and population. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - Assumes ITE Trip Generation 10th Edition LU code 221. Default trip distribution. Road Dust - All roads are/will be paved. Energy Use - CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 2 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 203 2.0 Emissions Summary Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblVehicleTrips ST_TR 6.39 5.44 tblVehicleTrips SU_TR 5.86 5.44 tblVehicleTrips WD_TR 6.65 5.44 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 3 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 204 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1979 1.6512 1.5036 2.9100e- 003 0.2280 0.0796 0.3076 0.1026 0.0743 0.1769 0.0000 256.9860 256.9860 0.0520 0.0000 258.2852 2022 1.7307 1.4400 1.7870 3.5600e- 003 0.1174 0.0652 0.1827 0.0314 0.0613 0.0927 0.0000 314.2868 314.2868 0.0527 0.0000 315.6051 Maximum 1.7307 1.6512 1.7870 3.5600e- 003 0.2280 0.0796 0.3076 0.1026 0.0743 0.1769 0.0000 314.2868 314.2868 0.0527 0.0000 315.6051 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1979 1.6512 1.5036 2.9100e- 003 0.2280 0.0796 0.3076 0.1026 0.0743 0.1769 0.0000 256.9857 256.9857 0.0520 0.0000 258.2850 2022 1.7307 1.4399 1.7870 3.5600e- 003 0.1174 0.0652 0.1827 0.0314 0.0613 0.0927 0.0000 314.2865 314.2865 0.0527 0.0000 315.6049 Maximum 1.7307 1.6512 1.7870 3.5600e- 003 0.2280 0.0796 0.3076 0.1026 0.0743 0.1769 0.0000 314.2865 314.2865 0.0527 0.0000 315.6049 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 4 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 205 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 1.1655 0.0254 1.8215 1.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 8.1476 8.1476 2.9600e- 003 9.0000e- 005 8.2498 Energy 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 838.5416 838.5416 0.0184 6.5900e- 003 840.9666 Mobile 0.4498 3.5242 4.6295 0.0190 1.1540 9.0200e- 003 1.1630 0.3100 8.4300e- 003 0.3184 0.0000 1,768.068 0 1,768.068 0 0.1037 0.0000 1,770.661 5 Waste 0.0000 0.0000 0.0000 0.0000 22.8771 0.0000 22.8771 1.3520 0.0000 56.6770 Water 0.0000 0.0000 0.0000 0.0000 5.0642 184.2722 189.3364 0.5244 0.0132 206.3644 Total 1.6349 3.7166 6.5220 0.0202 1.1540 0.0330 1.1870 0.3100 0.0324 0.3424 27.9413 2,799.029 4 2,826.970 8 2.0015 0.0198 2,882.919 3 Unmitigated Operational Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-24-2021 9-23-2021 1.0249 1.0249 2 9-24-2021 12-23-2021 0.7524 0.7524 3 12-24-2021 3-23-2022 0.6778 0.6778 4 3-24-2022 6-23-2022 0.6911 0.6911 5 6-24-2022 9-23-2022 1.8785 1.8785 Highest 1.8785 1.8785 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 5 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 206 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 1.1655 0.0254 1.8215 1.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 8.1476 8.1476 2.9600e- 003 9.0000e- 005 8.2498 Energy 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 838.5416 838.5416 0.0184 6.5900e- 003 840.9666 Mobile 0.4498 3.5242 4.6295 0.0190 1.1540 9.0200e- 003 1.1630 0.3100 8.4300e- 003 0.3184 0.0000 1,768.068 0 1,768.068 0 0.1037 0.0000 1,770.661 5 Waste 0.0000 0.0000 0.0000 0.0000 22.8771 0.0000 22.8771 1.3520 0.0000 56.6770 Water 0.0000 0.0000 0.0000 0.0000 5.0642 184.2722 189.3364 0.5244 0.0132 206.3644 Total 1.6349 3.7166 6.5220 0.0202 1.1540 0.0330 1.1870 0.3100 0.0324 0.3424 27.9413 2,799.029 4 2,826.970 8 2.0015 0.0198 2,882.919 3 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 6 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 207 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/24/2021 7/21/2021 5 20 2 Site Preparation Site Preparation 7/22/2021 8/4/2021 5 10 3 Grading Grading 8/5/2021 9/1/2021 5 20 4 Building Construction Building Construction 9/2/2021 7/20/2022 5 230 5 Paving Paving 7/21/2022 8/17/2022 5 20 6 Architectural Coating Architectural Coating 8/18/2022 9/14/2022 5 20 OffRoad Equipment Residential Indoor: 496,125; Residential Outdoor: 165,375; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 10 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 7 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 208 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 3 8.00 158 0.38 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Building Construction Cranes 1 7.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 8 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 209 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 176.00 26.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 35.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 9 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 210 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 10 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 211 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0194 0.2025 0.1058 1.9000e- 004 0.0102 0.0102 9.4000e- 003 9.4000e- 003 0.0000 16.7179 16.7179 5.4100e- 003 0.0000 16.8530 Total 0.0194 0.2025 0.1058 1.9000e- 004 0.0903 0.0102 0.1006 0.0497 9.4000e- 003 0.0591 0.0000 16.7179 16.7179 5.4100e- 003 0.0000 16.8530 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 11 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 212 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Total 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0194 0.2025 0.1058 1.9000e- 004 0.0102 0.0102 9.4000e- 003 9.4000e- 003 0.0000 16.7178 16.7178 5.4100e- 003 0.0000 16.8530 Total 0.0194 0.2025 0.1058 1.9000e- 004 0.0903 0.0102 0.1006 0.0497 9.4000e- 003 0.0591 0.0000 16.7178 16.7178 5.4100e- 003 0.0000 16.8530 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 12 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 213 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Total 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0229 0.2474 0.1586 3.0000e- 004 0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2644 Total 0.0229 0.2474 0.1586 3.0000e- 004 0.0655 0.0116 0.0771 0.0337 0.0107 0.0443 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2644 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 13 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 214 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0229 0.2474 0.1586 3.0000e- 004 0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2643 Total 0.0229 0.2474 0.1586 3.0000e- 004 0.0655 0.0116 0.0771 0.0337 0.0107 0.0443 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2643 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 14 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 215 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7622 100.7622 0.0243 0.0000 101.3700 Total 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7622 100.7622 0.0243 0.0000 101.3700 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 15 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 216 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.1400e- 003 0.1012 0.0242 2.6000e- 004 5.6200e- 003 1.8000e- 004 5.8100e- 003 1.6200e- 003 1.7000e- 004 1.8000e- 003 0.0000 24.5506 24.5506 2.0200e- 003 0.0000 24.6010 Worker 0.0362 0.0262 0.2648 5.8000e- 004 0.0633 3.9000e- 004 0.0637 0.0168 3.6000e- 004 0.0172 0.0000 52.2397 52.2397 2.1300e- 003 0.0000 52.2930 Total 0.0393 0.1273 0.2891 8.4000e- 004 0.0689 5.7000e- 004 0.0695 0.0184 5.3000e- 004 0.0190 0.0000 76.7903 76.7903 4.1500e- 003 0.0000 76.8940 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7621 100.7621 0.0243 0.0000 101.3698 Total 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7621 100.7621 0.0243 0.0000 101.3698 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 16 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 217 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.1400e- 003 0.1012 0.0242 2.6000e- 004 5.6200e- 003 1.8000e- 004 5.8100e- 003 1.6200e- 003 1.7000e- 004 1.8000e- 003 0.0000 24.5506 24.5506 2.0200e- 003 0.0000 24.6010 Worker 0.0362 0.0262 0.2648 5.8000e- 004 0.0633 3.9000e- 004 0.0637 0.0168 3.6000e- 004 0.0172 0.0000 52.2397 52.2397 2.1300e- 003 0.0000 52.2930 Total 0.0393 0.1273 0.2891 8.4000e- 004 0.0689 5.7000e- 004 0.0695 0.0184 5.3000e- 004 0.0190 0.0000 76.7903 76.7903 4.1500e- 003 0.0000 76.8940 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6836 165.6836 0.0397 0.0000 166.6759 Total 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6836 165.6836 0.0397 0.0000 166.6759 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 17 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 218 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.8000e- 003 0.1574 0.0367 4.2000e- 004 9.2400e- 003 2.5000e- 004 9.5000e- 003 2.6700e- 003 2.4000e- 004 2.9100e- 003 0.0000 40.0139 40.0139 3.0800e- 003 0.0000 40.0909 Worker 0.0556 0.0392 0.4005 9.2000e- 004 0.1040 6.3000e- 004 0.1047 0.0276 5.8000e- 004 0.0282 0.0000 82.7217 82.7217 3.1900e- 003 0.0000 82.8015 Total 0.0604 0.1965 0.4372 1.3400e- 003 0.1133 8.8000e- 004 0.1142 0.0303 8.2000e- 004 0.0311 0.0000 122.7356 122.7356 6.2700e- 003 0.0000 122.8924 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6834 165.6834 0.0397 0.0000 166.6757 Total 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6834 165.6834 0.0397 0.0000 166.6757 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 18 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 219 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.8000e- 003 0.1574 0.0367 4.2000e- 004 9.2400e- 003 2.5000e- 004 9.5000e- 003 2.6700e- 003 2.4000e- 004 2.9100e- 003 0.0000 40.0139 40.0139 3.0800e- 003 0.0000 40.0909 Worker 0.0556 0.0392 0.4005 9.2000e- 004 0.1040 6.3000e- 004 0.1047 0.0276 5.8000e- 004 0.0282 0.0000 82.7217 82.7217 3.1900e- 003 0.0000 82.8015 Total 0.0604 0.1965 0.4372 1.3400e- 003 0.1133 8.8000e- 004 0.1142 0.0303 8.2000e- 004 0.0311 0.0000 122.7356 122.7356 6.2700e- 003 0.0000 122.8924 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0276 20.0276 6.4800e- 003 0.0000 20.1895 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0276 20.0276 6.4800e- 003 0.0000 20.1895 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 19 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 220 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Total 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0275 20.0275 6.4800e- 003 0.0000 20.1895 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0275 20.0275 6.4800e- 003 0.0000 20.1895 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 20 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 221 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Total 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.5330 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.0500e- 003 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Total 1.5351 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 21 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 222 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5500e- 003 1.0900e- 003 0.0111 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.8000e- 004 0.0000 2.3008 2.3008 9.0000e- 005 0.0000 2.3030 Total 1.5500e- 003 1.0900e- 003 0.0111 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.8000e- 004 0.0000 2.3008 2.3008 9.0000e- 005 0.0000 2.3030 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.5330 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.0500e- 003 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Total 1.5351 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 22 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 223 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5500e- 003 1.0900e- 003 0.0111 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.8000e- 004 0.0000 2.3008 2.3008 9.0000e- 005 0.0000 2.3030 Total 1.5500e- 003 1.0900e- 003 0.0111 3.0000e- 005 2.8900e- 003 2.0000e- 005 2.9100e- 003 7.7000e- 004 2.0000e- 005 7.8000e- 004 0.0000 2.3008 2.3008 9.0000e- 005 0.0000 2.3030 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 23 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 224 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.4498 3.5242 4.6295 0.0190 1.1540 9.0200e- 003 1.1630 0.3100 8.4300e- 003 0.3184 0.0000 1,768.068 0 1,768.068 0 0.1037 0.0000 1,770.661 5 Unmitigated 0.4498 3.5242 4.6295 0.0190 1.1540 9.0200e- 003 1.1630 0.3100 8.4300e- 003 0.3184 0.0000 1,768.068 0 1,768.068 0 0.1037 0.0000 1,770.661 5 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Mid Rise 1,332.80 1,332.80 1332.80 2,981,368 2,981,368 Total 1,332.80 1,332.80 1,332.80 2,981,368 2,981,368 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 11.00 3.50 4.50 40.20 19.20 40.60 86 11 3 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Mid Rise 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 24 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 225 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 645.1218 645.1218 0.0147 3.0500e- 003 646.3974 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 645.1218 645.1218 0.0147 3.0500e- 003 646.3974 NaturalGas Mitigated 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 193.4198 193.4198 3.7100e- 003 3.5500e- 003 194.5692 NaturalGas Unmitigated 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 193.4198 193.4198 3.7100e- 003 3.5500e- 003 194.5692 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Mid Rise 3.62455e +006 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 193.4198 193.4198 3.7100e- 003 3.5500e- 003 194.5692 Total 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 193.4198 193.4198 3.7100e- 003 3.5500e- 003 194.5692 Unmitigated 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 25 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 226 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Mid Rise 3.62455e +006 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 193.4198 193.4198 3.7100e- 003 3.5500e- 003 194.5692 Total 0.0195 0.1670 0.0711 1.0700e- 003 0.0135 0.0135 0.0135 0.0135 0.0000 193.4198 193.4198 3.7100e- 003 3.5500e- 003 194.5692 Mitigated 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Mid Rise 1.11909e +006 645.1218 0.0147 3.0500e- 003 646.3974 Total 645.1218 0.0147 3.0500e- 003 646.3974 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 26 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 227 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 1.1655 0.0254 1.8215 1.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 8.1476 8.1476 2.9600e- 003 9.0000e- 005 8.2498 Unmitigated 1.1655 0.0254 1.8215 1.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 8.1476 8.1476 2.9600e- 003 9.0000e- 005 8.2498 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Apartments Mid Rise 1.11909e +006 645.1218 0.0147 3.0500e- 003 646.3974 Total 645.1218 0.0147 3.0500e- 003 646.3974 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 27 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 228 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1533 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.9569 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 5.2000e- 004 4.4700e- 003 1.9000e- 003 3.0000e- 005 3.6000e- 004 3.6000e- 004 3.6000e- 004 3.6000e- 004 0.0000 5.1761 5.1761 1.0000e- 004 9.0000e- 005 5.2068 Landscaping 0.0548 0.0210 1.8196 1.0000e- 004 0.0101 0.0101 0.0101 0.0101 0.0000 2.9716 2.9716 2.8600e- 003 0.0000 3.0430 Total 1.1655 0.0254 1.8215 1.3000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 8.1476 8.1476 2.9600e- 003 9.0000e- 005 8.2498 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 28 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 229 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1533 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.9569 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 5.2000e- 004 4.4700e- 003 1.9000e- 003 3.0000e- 005 3.6000e- 004 3.6000e- 004 3.6000e- 004 3.6000e- 004 0.0000 5.1761 5.1761 1.0000e- 004 9.0000e- 005 5.2068 Landscaping 0.0548 0.0210 1.8196 1.0000e- 004 0.0101 0.0101 0.0101 0.0101 0.0000 2.9716 2.9716 2.8600e- 003 0.0000 3.0430 Total 1.1655 0.0254 1.8215 1.3000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 8.1476 8.1476 2.9600e- 003 9.0000e- 005 8.2498 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 29 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 230 Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 189.3364 0.5244 0.0132 206.3644 Unmitigated 189.3364 0.5244 0.0132 206.3644 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Mid Rise 15.9627 / 10.0635 189.3364 0.5244 0.0132 206.3644 Total 189.3364 0.5244 0.0132 206.3644 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 30 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 231 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Apartments Mid Rise 15.9627 / 10.0635 189.3364 0.5244 0.0132 206.3644 Total 189.3364 0.5244 0.0132 206.3644 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 22.8771 1.3520 0.0000 56.6770 Unmitigated 22.8771 1.3520 0.0000 56.6770 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 31 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 232 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Mid Rise 112.7 22.8771 1.3520 0.0000 56.6770 Total 22.8771 1.3520 0.0000 56.6770 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Apartments Mid Rise 112.7 22.8771 1.3520 0.0000 56.6770 Total 22.8771 1.3520 0.0000 56.6770 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 32 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 233 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 3:10 PMPage 33 of 33 LQ VMT Policy Scenario: 245 Multi Family DU (Mid Rise) - Salton Sea Air Basin, Annual 234 General Office Building 160,000 Square Feet CalEEMod Version 2016.3.2 235 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population General Office Building 160.00 1000sqft 3.67 160,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: General Office 160k Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 1 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 236 Project Characteristics - Scenario: General office building with area less than or equlal to 160,000 SF. Land Use - Assumes default acreage, square footage, and population. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - Weekday trip rate based on ITE Trip Generation 10th Edition code 710. Assumes default weekend vehicle trip rate and trip distribution. Road Dust - All roads are/will be paved. Energy Use - CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 2 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 237 2.0 Emissions Summary Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblVehicleTrips WD_TR 11.03 9.74 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 3 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 238 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1669 1.5520 1.3234 2.5300e- 003 0.1021 0.0755 0.1776 0.0466 0.0706 0.1172 0.0000 222.4160 222.4160 0.0479 0.0000 223.6141 2022 1.2501 1.2317 1.3002 2.5200e- 003 0.0369 0.0565 0.0934 9.9900e- 003 0.0531 0.0631 0.0000 221.1758 221.1758 0.0434 0.0000 222.2596 Maximum 1.2501 1.5520 1.3234 2.5300e- 003 0.1021 0.0755 0.1776 0.0466 0.0706 0.1172 0.0000 222.4160 222.4160 0.0479 0.0000 223.6141 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1669 1.5520 1.3234 2.5300e- 003 0.1021 0.0755 0.1776 0.0466 0.0706 0.1172 0.0000 222.4158 222.4158 0.0479 0.0000 223.6139 2022 1.2501 1.2317 1.3002 2.5200e- 003 0.0369 0.0565 0.0934 9.9900e- 003 0.0531 0.0631 0.0000 221.1756 221.1756 0.0434 0.0000 222.2594 Maximum 1.2501 1.5520 1.3234 2.5300e- 003 0.1021 0.0755 0.1776 0.0466 0.0706 0.1172 0.0000 222.4158 222.4158 0.0479 0.0000 223.6139 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 4 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 239 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.7363 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Energy 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 907.7075 907.7075 0.0206 4.6900e- 003 909.6198 Mobile 0.3974 3.1218 4.0093 0.0164 0.9858 7.7700e- 003 0.9936 0.2648 7.2600e- 003 0.2721 0.0000 1,528.483 1 1,528.483 1 0.0912 0.0000 1,530.762 1 Waste 0.0000 0.0000 0.0000 0.0000 30.2051 0.0000 30.2051 1.7851 0.0000 74.8318 Water 0.0000 0.0000 0.0000 0.0000 9.0219 325.0854 334.1073 0.9341 0.0234 364.4361 Total 1.1367 3.1491 4.0337 0.0166 0.9858 9.8500e- 003 0.9956 0.2648 9.3400e- 003 0.2741 39.2269 2,761.278 9 2,800.505 8 2.8309 0.0281 2,879.652 9 Unmitigated Operational Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-24-2021 9-23-2021 0.9316 0.9316 2 9-24-2021 12-23-2021 0.7190 0.7190 3 12-24-2021 3-23-2022 0.6474 0.6474 4 3-24-2022 6-23-2022 0.6572 0.6572 5 6-24-2022 9-23-2022 1.2835 1.2835 Highest 1.2835 1.2835 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 5 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 240 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.7363 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Energy 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 907.7075 907.7075 0.0206 4.6900e- 003 909.6198 Mobile 0.3974 3.1218 4.0093 0.0164 0.9858 7.7700e- 003 0.9936 0.2648 7.2600e- 003 0.2721 0.0000 1,528.483 1 1,528.483 1 0.0912 0.0000 1,530.762 1 Waste 0.0000 0.0000 0.0000 0.0000 30.2051 0.0000 30.2051 1.7851 0.0000 74.8318 Water 0.0000 0.0000 0.0000 0.0000 9.0219 325.0854 334.1073 0.9341 0.0234 364.4361 Total 1.1367 3.1491 4.0337 0.0166 0.9858 9.8500e- 003 0.9956 0.2648 9.3400e- 003 0.2741 39.2269 2,761.278 9 2,800.505 8 2.8309 0.0281 2,879.652 9 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 6 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 241 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/24/2021 7/21/2021 5 20 2 Site Preparation Site Preparation 7/22/2021 7/28/2021 5 5 3 Grading Grading 7/29/2021 8/9/2021 5 8 4 Building Construction Building Construction 8/10/2021 6/27/2022 5 230 5 Paving Paving 6/28/2022 7/21/2022 5 18 6 Architectural Coating Architectural Coating 7/22/2022 8/16/2022 5 18 OffRoad Equipment Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 240,000; Non-Residential Outdoor: 80,000; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 4 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 7 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 242 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 3 8.00 158 0.38 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Building Construction Cranes 1 7.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 1 8.00 130 0.42 Paving Paving Equipment 2 6.00 132 0.36 Paving Rollers 2 6.00 80 0.38 Architectural Coating Air Compressors 1 6.00 78 0.48 Paving Cement and Mortar Mixers 2 6.00 9 0.56 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 8 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 243 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 51.00 26.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 10.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 9 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 244 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 10 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 245 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0452 0.0000 0.0452 0.0248 0.0000 0.0248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.7200e- 003 0.1012 0.0529 1.0000e- 004 5.1100e- 003 5.1100e- 003 4.7000e- 003 4.7000e- 003 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Total 9.7200e- 003 0.1012 0.0529 1.0000e- 004 0.0452 5.1100e- 003 0.0503 0.0248 4.7000e- 003 0.0295 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 11 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 246 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Total 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0452 0.0000 0.0452 0.0248 0.0000 0.0248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.7200e- 003 0.1012 0.0529 1.0000e- 004 5.1100e- 003 5.1100e- 003 4.7000e- 003 4.7000e- 003 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Total 9.7200e- 003 0.1012 0.0529 1.0000e- 004 0.0452 5.1100e- 003 0.0503 0.0248 4.7000e- 003 0.0295 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 12 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 247 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Total 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0262 0.0000 0.0262 0.0135 0.0000 0.0135 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.1600e- 003 0.0990 0.0634 1.2000e- 004 4.6400e- 003 4.6400e- 003 4.2700e- 003 4.2700e- 003 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Total 9.1600e- 003 0.0990 0.0634 1.2000e- 004 0.0262 4.6400e- 003 0.0309 0.0135 4.2700e- 003 0.0177 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 13 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 248 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Total 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0262 0.0000 0.0262 0.0135 0.0000 0.0135 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.1600e- 003 0.0990 0.0634 1.2000e- 004 4.6400e- 003 4.6400e- 003 4.2700e- 003 4.2700e- 003 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Total 9.1600e- 003 0.0990 0.0634 1.2000e- 004 0.0262 4.6400e- 003 0.0309 0.0135 4.2700e- 003 0.0177 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 14 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 249 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Total 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0989 0.9065 0.8619 1.4000e- 003 0.0499 0.0499 0.0469 0.0469 0.0000 120.4514 120.4514 0.0291 0.0000 121.1779 Total 0.0989 0.9065 0.8619 1.4000e- 003 0.0499 0.0499 0.0469 0.0469 0.0000 120.4514 120.4514 0.0291 0.0000 121.1779 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 15 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 250 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7600e- 003 0.1210 0.0290 3.1000e- 004 6.7200e- 003 2.2000e- 004 6.9400e- 003 1.9400e- 003 2.1000e- 004 2.1500e- 003 0.0000 29.3479 29.3479 2.4100e- 003 0.0000 29.4081 Worker 0.0125 9.0600e- 003 0.0917 2.0000e- 004 0.0219 1.4000e- 004 0.0221 5.8200e- 003 1.3000e- 004 5.9500e- 003 0.0000 18.0956 18.0956 7.4000e- 004 0.0000 18.1140 Total 0.0163 0.1300 0.1207 5.1000e- 004 0.0286 3.6000e- 004 0.0290 7.7600e- 003 3.4000e- 004 8.1000e- 003 0.0000 47.4434 47.4434 3.1500e- 003 0.0000 47.5222 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0989 0.9065 0.8619 1.4000e- 003 0.0499 0.0499 0.0469 0.0469 0.0000 120.4512 120.4512 0.0291 0.0000 121.1777 Total 0.0989 0.9065 0.8619 1.4000e- 003 0.0499 0.0499 0.0469 0.0469 0.0000 120.4512 120.4512 0.0291 0.0000 121.1777 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 16 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 251 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.7600e- 003 0.1210 0.0290 3.1000e- 004 6.7200e- 003 2.2000e- 004 6.9400e- 003 1.9400e- 003 2.1000e- 004 2.1500e- 003 0.0000 29.3479 29.3479 2.4100e- 003 0.0000 29.4081 Worker 0.0125 9.0600e- 003 0.0917 2.0000e- 004 0.0219 1.4000e- 004 0.0221 5.8200e- 003 1.3000e- 004 5.9500e- 003 0.0000 18.0956 18.0956 7.4000e- 004 0.0000 18.1140 Total 0.0163 0.1300 0.1207 5.1000e- 004 0.0286 3.6000e- 004 0.0290 7.7600e- 003 3.4000e- 004 8.1000e- 003 0.0000 47.4434 47.4434 3.1500e- 003 0.0000 47.5222 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1075 0.9838 1.0309 1.7000e- 003 0.0510 0.0510 0.0480 0.0480 0.0000 145.9869 145.9869 0.0350 0.0000 146.8613 Total 0.1075 0.9838 1.0309 1.7000e- 003 0.0510 0.0510 0.0480 0.0480 0.0000 145.9869 145.9869 0.0350 0.0000 146.8613 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 17 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 252 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.2300e- 003 0.1387 0.0324 3.7000e- 004 8.1500e- 003 2.2000e- 004 8.3700e- 003 2.3500e- 003 2.1000e- 004 2.5600e- 003 0.0000 35.2570 35.2570 2.7100e- 003 0.0000 35.3248 Worker 0.0142 0.0100 0.1023 2.3000e- 004 0.0266 1.6000e- 004 0.0267 7.0500e- 003 1.5000e- 004 7.2000e- 003 0.0000 21.1209 21.1209 8.2000e- 004 0.0000 21.1412 Total 0.0184 0.1487 0.1346 6.0000e- 004 0.0347 3.8000e- 004 0.0351 9.4000e- 003 3.6000e- 004 9.7600e- 003 0.0000 56.3778 56.3778 3.5300e- 003 0.0000 56.4660 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1075 0.9838 1.0309 1.7000e- 003 0.0510 0.0510 0.0480 0.0480 0.0000 145.9867 145.9867 0.0350 0.0000 146.8611 Total 0.1075 0.9838 1.0309 1.7000e- 003 0.0510 0.0510 0.0480 0.0480 0.0000 145.9867 145.9867 0.0350 0.0000 146.8611 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 18 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 253 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.2300e- 003 0.1387 0.0324 3.7000e- 004 8.1500e- 003 2.2000e- 004 8.3700e- 003 2.3500e- 003 2.1000e- 004 2.5600e- 003 0.0000 35.2570 35.2570 2.7100e- 003 0.0000 35.3248 Worker 0.0142 0.0100 0.1023 2.3000e- 004 0.0266 1.6000e- 004 0.0267 7.0500e- 003 1.5000e- 004 7.2000e- 003 0.0000 21.1209 21.1209 8.2000e- 004 0.0000 21.1412 Total 0.0184 0.1487 0.1346 6.0000e- 004 0.0347 3.8000e- 004 0.0351 9.4000e- 003 3.6000e- 004 9.7600e- 003 0.0000 56.3778 56.3778 3.5300e- 003 0.0000 56.4660 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 19 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 254 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Total 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 20 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 255 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Total 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.1124 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8400e- 003 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Total 1.1142 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 21 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 256 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.0000e- 004 2.8000e- 004 2.8600e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.5916 0.5916 2.0000e- 005 0.0000 0.5922 Total 4.0000e- 004 2.8000e- 004 2.8600e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.5916 0.5916 2.0000e- 005 0.0000 0.5922 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.1124 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8400e- 003 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Total 1.1142 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 22 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 257 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.0000e- 004 2.8000e- 004 2.8600e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.5916 0.5916 2.0000e- 005 0.0000 0.5922 Total 4.0000e- 004 2.8000e- 004 2.8600e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.5916 0.5916 2.0000e- 005 0.0000 0.5922 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 23 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 258 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.3974 3.1218 4.0093 0.0164 0.9858 7.7700e- 003 0.9936 0.2648 7.2600e- 003 0.2721 0.0000 1,528.483 1 1,528.483 1 0.0912 0.0000 1,530.762 1 Unmitigated 0.3974 3.1218 4.0093 0.0164 0.9858 7.7700e- 003 0.9936 0.2648 7.2600e- 003 0.2721 0.0000 1,528.483 1 1,528.483 1 0.0912 0.0000 1,530.762 1 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT General Office Building 1,558.40 393.60 168.00 2,546,822 2,546,822 Total 1,558.40 393.60 168.00 2,546,822 2,546,822 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by General Office Building 12.50 4.20 5.40 33.00 48.00 19.00 77 19 4 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH General Office Building 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 24 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 259 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 878.0799 878.0799 0.0200 4.1500e- 003 879.8162 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 878.0799 878.0799 0.0200 4.1500e- 003 879.8162 NaturalGas Mitigated 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 29.6276 29.6276 5.7000e- 004 5.4000e- 004 29.8037 NaturalGas Unmitigated 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 29.6276 29.6276 5.7000e- 004 5.4000e- 004 29.8037 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr General Office Building 555200 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 29.6276 29.6276 5.7000e- 004 5.4000e- 004 29.8037 Total 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 29.6276 29.6276 5.7000e- 004 5.4000e- 004 29.8037 Unmitigated 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 25 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 260 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr General Office Building 555200 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 29.6276 29.6276 5.7000e- 004 5.4000e- 004 29.8037 Total 2.9900e- 003 0.0272 0.0229 1.6000e- 004 2.0700e- 003 2.0700e- 003 2.0700e- 003 2.0700e- 003 0.0000 29.6276 29.6276 5.7000e- 004 5.4000e- 004 29.8037 Mitigated 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr General Office Building 1.5232e +006 878.0799 0.0200 4.1500e- 003 879.8162 Total 878.0799 0.0200 4.1500e- 003 879.8162 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 26 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 261 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.7363 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Unmitigated 0.7363 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr General Office Building 1.5232e +006 878.0799 0.0200 4.1500e- 003 879.8162 Total 878.0799 0.0200 4.1500e- 003 879.8162 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 27 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 262 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1112 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.6249 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.4000e- 004 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Total 0.7363 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1112 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.6249 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.4000e- 004 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Total 0.7363 1.0000e- 005 1.4700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 2.8600e- 003 2.8600e- 003 1.0000e- 005 0.0000 3.0500e- 003 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 28 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 263 7.1 Mitigation Measures Water Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 334.1073 0.9341 0.0234 364.4361 Unmitigated 334.1073 0.9341 0.0234 364.4361 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr General Office Building 28.4374 / 17.4294 334.1073 0.9341 0.0234 364.4361 Total 334.1073 0.9341 0.0234 364.4361 Unmitigated 7.0 Water Detail CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 29 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 264 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr General Office Building 28.4374 / 17.4294 334.1073 0.9341 0.0234 364.4361 Total 334.1073 0.9341 0.0234 364.4361 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 30.2051 1.7851 0.0000 74.8318 Unmitigated 30.2051 1.7851 0.0000 74.8318 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 30 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 265 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr General Office Building 148.8 30.2051 1.7851 0.0000 74.8318 Total 30.2051 1.7851 0.0000 74.8318 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr General Office Building 148.8 30.2051 1.7851 0.0000 74.8318 Total 30.2051 1.7851 0.0000 74.8318 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 31 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 266 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 1:34 PMPage 32 of 33 LQ VMT Policy Scenario: General Office 160k - Salton Sea Air Basin, Annual 267 General Retail 70,000 Square Feet CalEEMod Version 2016.3.2 268 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population User Defined Retail 70.00 User Defined Unit 1.75 70,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: Retail 70K Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 1 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 269 Project Characteristics - Scenario: Retail buildings with area less than or equal to 70,000 SF. Land Use - Assumes 70K sf on 1.75 acres. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - General retail trip generation is 37.75 daily trips per 1,000 SF, ITE Land Use Code 820, 10th Edition Trip Generation Manual, 2017. Road Dust - All roads are/will be paved. Energy Use - Assumes default for "strip mall" retail in place of user defined. Water And Wastewater - Assumes defaults for "strip mall" retail in place of user defined. Solid Waste - Assumes default for "strip mall" retail for user defined. Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblEnergyUse LightingElect 0.00 5.61 tblEnergyUse NT24E 0.00 2.44 tblEnergyUse NT24NG 0.00 0.30 tblEnergyUse T24E 0.00 4.58 tblEnergyUse T24NG 0.00 1.92 tblLandUse LandUseSquareFeet 0.00 70,000.00 tblLandUse LotAcreage 0.00 1.75 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 2 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 270 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblSolidWaste SolidWasteGenerationRate 0.00 63.00 tblVehicleTrips CC_TTP 0.00 64.40 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 16.60 tblVehicleTrips DV_TP 0.00 40.00 tblVehicleTrips PB_TP 0.00 15.00 tblVehicleTrips PR_TP 0.00 45.00 tblVehicleTrips ST_TR 0.00 37.75 tblVehicleTrips SU_TR 0.00 37.75 tblVehicleTrips WD_TR 0.00 37.75 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 3 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 271 2.0 Emissions Summary tblWater IndoorWaterUseRate 0.00 4,444,351.29 tblWater OutdoorWaterUseRate 0.00 2,723,957.24 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 4 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 272 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1329 1.0592 0.9417 1.7500e- 003 0.0300 0.0506 0.0806 0.0119 0.0484 0.0603 0.0000 148.4531 148.4531 0.0261 0.0000 149.1065 2022 0.5705 0.6421 0.6630 1.2500e- 003 0.0112 0.0285 0.0397 3.0400e- 003 0.0274 0.0305 0.0000 105.4936 105.4936 0.0171 0.0000 105.9212 Maximum 0.5705 1.0592 0.9417 1.7500e- 003 0.0300 0.0506 0.0806 0.0119 0.0484 0.0603 0.0000 148.4531 148.4531 0.0261 0.0000 149.1065 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1329 1.0592 0.9417 1.7500e- 003 0.0300 0.0506 0.0806 0.0119 0.0484 0.0603 0.0000 148.4529 148.4529 0.0261 0.0000 149.1064 2022 0.5705 0.6421 0.6630 1.2500e- 003 0.0112 0.0285 0.0397 3.0400e- 003 0.0274 0.0305 0.0000 105.4935 105.4935 0.0171 0.0000 105.9211 Maximum 0.5705 1.0592 0.9417 1.7500e- 003 0.0300 0.0506 0.0806 0.0119 0.0484 0.0603 0.0000 148.4529 148.4529 0.0261 0.0000 149.1064 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 5 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 273 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.3221 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Energy 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 517.9503 517.9503 0.0118 2.5600e- 003 519.0074 Mobile 0.7682 6.2121 6.0500 0.0241 1.1944 0.0107 1.2051 0.3209 9.9500e- 003 0.3308 0.0000 2,247.360 6 2,247.360 6 0.1660 0.0000 2,251.510 5 Waste 0.0000 0.0000 0.0000 0.0000 12.7884 0.0000 12.7884 0.7558 0.0000 31.6828 Water 0.0000 0.0000 0.0000 0.0000 1.4100 50.8061 52.2161 0.1460 3.6600e- 003 56.9561 Total 1.0912 6.2197 6.0571 0.0241 1.1944 0.0112 1.2057 0.3209 0.0105 0.3314 14.1984 2,816.118 3 2,830.316 7 1.0795 6.2200e- 003 2,859.158 1 Unmitigated Operational Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-24-2021 9-23-2021 0.5984 0.5984 2 9-24-2021 12-23-2021 0.5406 0.5406 3 12-24-2021 3-23-2022 0.4946 0.4946 4 3-24-2022 6-23-2022 0.7675 0.7675 Highest 0.7675 0.7675 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 6 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 274 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.3221 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Energy 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 517.9503 517.9503 0.0118 2.5600e- 003 519.0074 Mobile 0.7682 6.2121 6.0500 0.0241 1.1944 0.0107 1.2051 0.3209 9.9500e- 003 0.3308 0.0000 2,247.360 6 2,247.360 6 0.1660 0.0000 2,251.510 5 Waste 0.0000 0.0000 0.0000 0.0000 12.7884 0.0000 12.7884 0.7558 0.0000 31.6828 Water 0.0000 0.0000 0.0000 0.0000 1.4100 50.8061 52.2161 0.1460 3.6600e- 003 56.9561 Total 1.0912 6.2197 6.0571 0.0241 1.1944 0.0112 1.2057 0.3209 0.0105 0.3314 14.1984 2,816.118 3 2,830.316 7 1.0795 6.2200e- 003 2,859.158 1 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 7 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 275 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/24/2021 7/21/2021 5 20 2 Site Preparation Site Preparation 7/22/2021 7/23/2021 5 2 3 Grading Grading 7/24/2021 7/29/2021 5 4 4 Building Construction Building Construction 7/30/2021 5/5/2022 5 200 5 Paving Paving 5/6/2022 5/19/2022 5 10 6 Architectural Coating Architectural Coating 5/20/2022 6/2/2022 5 10 OffRoad Equipment Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 105,000; Non-Residential Outdoor: 35,000; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 1 Acres of Grading (Grading Phase): 1.5 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 8 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 276 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Rubber Tired Dozers 1 8.00 247 0.40 Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37 Site Preparation Graders 1 8.00 187 0.41 Site Preparation Rubber Tired Dozers 1 7.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37 Grading Graders 1 6.00 187 0.41 Grading Rubber Tired Dozers 1 6.00 247 0.40 Grading Tractors/Loaders/Backhoes 1 7.00 97 0.37 Building Construction Cranes 1 6.00 231 0.29 Building Construction Forklifts 1 6.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Welders 3 8.00 46 0.45 Paving Cement and Mortar Mixers 1 6.00 9 0.56 Paving Pavers 1 6.00 130 0.42 Paving Paving Equipment 1 8.00 132 0.36 Paving Rollers 1 7.00 80 0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 9 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 277 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0199 0.1970 0.1449 2.4000e- 004 0.0104 0.0104 9.7100e- 003 9.7100e- 003 0.0000 21.0713 21.0713 5.3900e- 003 0.0000 21.2060 Total 0.0199 0.1970 0.1449 2.4000e- 004 0.0104 0.0104 9.7100e- 003 9.7100e- 003 0.0000 21.0713 21.0713 5.3900e- 003 0.0000 21.2060 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 5 13.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 3 8.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 3 8.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 7 22.00 11.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 5 13.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 4.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 10 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 278 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.1000e- 004 4.4000e- 004 4.5000e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8870 0.8870 4.0000e- 005 0.0000 0.8879 Total 6.1000e- 004 4.4000e- 004 4.5000e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8870 0.8870 4.0000e- 005 0.0000 0.8879 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0199 0.1970 0.1449 2.4000e- 004 0.0104 0.0104 9.7100e- 003 9.7100e- 003 0.0000 21.0713 21.0713 5.3900e- 003 0.0000 21.2060 Total 0.0199 0.1970 0.1449 2.4000e- 004 0.0104 0.0104 9.7100e- 003 9.7100e- 003 0.0000 21.0713 21.0713 5.3900e- 003 0.0000 21.2060 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 11 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 279 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.1000e- 004 4.4000e- 004 4.5000e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8870 0.8870 4.0000e- 005 0.0000 0.8879 Total 6.1000e- 004 4.4000e- 004 4.5000e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8870 0.8870 4.0000e- 005 0.0000 0.8879 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 5.8000e- 003 0.0000 5.8000e- 003 2.9500e- 003 0.0000 2.9500e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.5600e- 003 0.0174 7.5600e- 003 2.0000e- 005 7.7000e- 004 7.7000e- 004 7.0000e- 004 7.0000e- 004 0.0000 1.5118 1.5118 4.9000e- 004 0.0000 1.5241 Total 1.5600e- 003 0.0174 7.5600e- 003 2.0000e- 005 5.8000e- 003 7.7000e- 004 6.5700e- 003 2.9500e- 003 7.0000e- 004 3.6500e- 003 0.0000 1.5118 1.5118 4.9000e- 004 0.0000 1.5241 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 12 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 280 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.0000e- 005 3.0000e- 005 2.8000e- 004 0.0000 7.0000e- 005 0.0000 7.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 0.0000 0.0546 0.0546 0.0000 0.0000 0.0546 Total 4.0000e- 005 3.0000e- 005 2.8000e- 004 0.0000 7.0000e- 005 0.0000 7.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 0.0000 0.0546 0.0546 0.0000 0.0000 0.0546 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 5.8000e- 003 0.0000 5.8000e- 003 2.9500e- 003 0.0000 2.9500e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.5600e- 003 0.0174 7.5600e- 003 2.0000e- 005 7.7000e- 004 7.7000e- 004 7.0000e- 004 7.0000e- 004 0.0000 1.5118 1.5118 4.9000e- 004 0.0000 1.5241 Total 1.5600e- 003 0.0174 7.5600e- 003 2.0000e- 005 5.8000e- 003 7.7000e- 004 6.5700e- 003 2.9500e- 003 7.0000e- 004 3.6500e- 003 0.0000 1.5118 1.5118 4.9000e- 004 0.0000 1.5241 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 13 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 281 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.0000e- 005 3.0000e- 005 2.8000e- 004 0.0000 7.0000e- 005 0.0000 7.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 0.0000 0.0546 0.0546 0.0000 0.0000 0.0546 Total 4.0000e- 005 3.0000e- 005 2.8000e- 004 0.0000 7.0000e- 005 0.0000 7.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 0.0000 0.0546 0.0546 0.0000 0.0000 0.0546 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 9.8300e- 003 0.0000 9.8300e- 003 5.0500e- 003 0.0000 5.0500e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.5800e- 003 0.0287 0.0127 3.0000e- 005 1.2800e- 003 1.2800e- 003 1.1700e- 003 1.1700e- 003 0.0000 2.4767 2.4767 8.0000e- 004 0.0000 2.4968 Total 2.5800e- 003 0.0287 0.0127 3.0000e- 005 9.8300e- 003 1.2800e- 003 0.0111 5.0500e- 003 1.1700e- 003 6.2200e- 003 0.0000 2.4767 2.4767 8.0000e- 004 0.0000 2.4968 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 14 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 282 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e- 005 5.0000e- 005 5.5000e- 004 0.0000 1.3000e- 004 0.0000 1.3000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1092 0.1092 0.0000 0.0000 0.1093 Total 8.0000e- 005 5.0000e- 005 5.5000e- 004 0.0000 1.3000e- 004 0.0000 1.3000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1092 0.1092 0.0000 0.0000 0.1093 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 9.8300e- 003 0.0000 9.8300e- 003 5.0500e- 003 0.0000 5.0500e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.5800e- 003 0.0287 0.0127 3.0000e- 005 1.2800e- 003 1.2800e- 003 1.1700e- 003 1.1700e- 003 0.0000 2.4767 2.4767 8.0000e- 004 0.0000 2.4968 Total 2.5800e- 003 0.0287 0.0127 3.0000e- 005 9.8300e- 003 1.2800e- 003 0.0111 5.0500e- 003 1.1700e- 003 6.2200e- 003 0.0000 2.4767 2.4767 8.0000e- 004 0.0000 2.4968 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 15 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 283 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e- 005 5.0000e- 005 5.5000e- 004 0.0000 1.3000e- 004 0.0000 1.3000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1092 0.1092 0.0000 0.0000 0.1093 Total 8.0000e- 005 5.0000e- 005 5.5000e- 004 0.0000 1.3000e- 004 0.0000 1.3000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1092 0.1092 0.0000 0.0000 0.1093 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1006 0.7568 0.7159 1.2200e- 003 0.0380 0.0380 0.0367 0.0367 0.0000 100.7589 100.7589 0.0180 0.0000 101.2086 Total 0.1006 0.7568 0.7159 1.2200e- 003 0.0380 0.0380 0.0367 0.0367 0.0000 100.7589 100.7589 0.0180 0.0000 101.2086 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 16 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 284 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.7000e- 003 0.0546 0.0131 1.4000e- 004 3.0400e- 003 1.0000e- 004 3.1300e- 003 8.8000e- 004 9.0000e- 005 9.7000e- 004 0.0000 13.2521 13.2521 1.0900e- 003 0.0000 13.2793 Worker 5.7700e- 003 4.1700e- 003 0.0422 9.0000e- 005 0.0101 6.0000e- 005 0.0102 2.6800e- 003 6.0000e- 005 2.7400e- 003 0.0000 8.3313 8.3313 3.4000e- 004 0.0000 8.3398 Total 7.4700e- 003 0.0588 0.0553 2.3000e- 004 0.0131 1.6000e- 004 0.0133 3.5600e- 003 1.5000e- 004 3.7100e- 003 0.0000 21.5835 21.5835 1.4300e- 003 0.0000 21.6192 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1006 0.7568 0.7159 1.2200e- 003 0.0380 0.0380 0.0367 0.0367 0.0000 100.7588 100.7588 0.0180 0.0000 101.2085 Total 0.1006 0.7568 0.7159 1.2200e- 003 0.0380 0.0380 0.0367 0.0367 0.0000 100.7588 100.7588 0.0180 0.0000 101.2085 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 17 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 285 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.7000e- 003 0.0546 0.0131 1.4000e- 004 3.0400e- 003 1.0000e- 004 3.1300e- 003 8.8000e- 004 9.0000e- 005 9.7000e- 004 0.0000 13.2521 13.2521 1.0900e- 003 0.0000 13.2793 Worker 5.7700e- 003 4.1700e- 003 0.0422 9.0000e- 005 0.0101 6.0000e- 005 0.0102 2.6800e- 003 6.0000e- 005 2.7400e- 003 0.0000 8.3313 8.3313 3.4000e- 004 0.0000 8.3398 Total 7.4700e- 003 0.0588 0.0553 2.3000e- 004 0.0131 1.6000e- 004 0.0133 3.5600e- 003 1.5000e- 004 3.7100e- 003 0.0000 21.5835 21.5835 1.4300e- 003 0.0000 21.6192 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0734 0.5564 0.5663 9.8000e- 004 0.0262 0.0262 0.0253 0.0253 0.0000 80.8017 80.8017 0.0141 0.0000 81.1536 Total 0.0734 0.5564 0.5663 9.8000e- 004 0.0262 0.0262 0.0253 0.0253 0.0000 80.8017 80.8017 0.0141 0.0000 81.1536 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 18 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 286 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2600e- 003 0.0414 9.6700e- 003 1.1000e- 004 2.4300e- 003 7.0000e- 005 2.5000e- 003 7.0000e- 004 6.0000e- 005 7.7000e- 004 0.0000 10.5362 10.5362 8.1000e- 004 0.0000 10.5565 Worker 4.3200e- 003 3.0500e- 003 0.0312 7.0000e- 005 8.0900e- 003 5.0000e- 005 8.1400e- 003 2.1500e- 003 4.0000e- 005 2.1900e- 003 0.0000 6.4355 6.4355 2.5000e- 004 0.0000 6.4417 Total 5.5800e- 003 0.0445 0.0408 1.8000e- 004 0.0105 1.2000e- 004 0.0106 2.8500e- 003 1.0000e- 004 2.9600e- 003 0.0000 16.9717 16.9717 1.0600e- 003 0.0000 16.9982 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0734 0.5564 0.5663 9.8000e- 004 0.0262 0.0262 0.0253 0.0253 0.0000 80.8016 80.8016 0.0141 0.0000 81.1535 Total 0.0734 0.5564 0.5663 9.8000e- 004 0.0262 0.0262 0.0253 0.0253 0.0000 80.8016 80.8016 0.0141 0.0000 81.1535 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 19 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 287 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2600e- 003 0.0414 9.6700e- 003 1.1000e- 004 2.4300e- 003 7.0000e- 005 2.5000e- 003 7.0000e- 004 6.0000e- 005 7.7000e- 004 0.0000 10.5362 10.5362 8.1000e- 004 0.0000 10.5565 Worker 4.3200e- 003 3.0500e- 003 0.0312 7.0000e- 005 8.0900e- 003 5.0000e- 005 8.1400e- 003 2.1500e- 003 4.0000e- 005 2.1900e- 003 0.0000 6.4355 6.4355 2.5000e- 004 0.0000 6.4417 Total 5.5800e- 003 0.0445 0.0408 1.8000e- 004 0.0105 1.2000e- 004 0.0106 2.8500e- 003 1.0000e- 004 2.9600e- 003 0.0000 16.9717 16.9717 1.0600e- 003 0.0000 16.9982 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 3.4400e- 003 0.0339 0.0440 7.0000e- 005 1.7400e- 003 1.7400e- 003 1.6000e- 003 1.6000e- 003 0.0000 5.8848 5.8848 1.8700e- 003 0.0000 5.9315 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.4400e- 003 0.0339 0.0440 7.0000e- 005 1.7400e- 003 1.7400e- 003 1.6000e- 003 1.6000e- 003 0.0000 5.8848 5.8848 1.8700e- 003 0.0000 5.9315 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 20 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 288 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 2.0000e- 004 2.0700e- 003 0.0000 5.4000e- 004 0.0000 5.4000e- 004 1.4000e- 004 0.0000 1.5000e- 004 0.0000 0.4273 0.4273 2.0000e- 005 0.0000 0.4277 Total 2.9000e- 004 2.0000e- 004 2.0700e- 003 0.0000 5.4000e- 004 0.0000 5.4000e- 004 1.4000e- 004 0.0000 1.5000e- 004 0.0000 0.4273 0.4273 2.0000e- 005 0.0000 0.4277 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 3.4400e- 003 0.0339 0.0440 7.0000e- 005 1.7400e- 003 1.7400e- 003 1.6000e- 003 1.6000e- 003 0.0000 5.8848 5.8848 1.8700e- 003 0.0000 5.9314 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.4400e- 003 0.0339 0.0440 7.0000e- 005 1.7400e- 003 1.7400e- 003 1.6000e- 003 1.6000e- 003 0.0000 5.8848 5.8848 1.8700e- 003 0.0000 5.9314 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 21 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 289 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 2.0000e- 004 2.0700e- 003 0.0000 5.4000e- 004 0.0000 5.4000e- 004 1.4000e- 004 0.0000 1.5000e- 004 0.0000 0.4273 0.4273 2.0000e- 005 0.0000 0.4277 Total 2.9000e- 004 2.0000e- 004 2.0700e- 003 0.0000 5.4000e- 004 0.0000 5.4000e- 004 1.4000e- 004 0.0000 1.5000e- 004 0.0000 0.4273 0.4273 2.0000e- 005 0.0000 0.4277 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.4867 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0200e- 003 7.0400e- 003 9.0700e- 003 1.0000e- 005 4.1000e- 004 4.1000e- 004 4.1000e- 004 4.1000e- 004 0.0000 1.2766 1.2766 8.0000e- 005 0.0000 1.2787 Total 0.4877 7.0400e- 003 9.0700e- 003 1.0000e- 005 4.1000e- 004 4.1000e- 004 4.1000e- 004 4.1000e- 004 0.0000 1.2766 1.2766 8.0000e- 005 0.0000 1.2787 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 22 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 290 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.0000e- 005 6.0000e- 005 6.4000e- 004 0.0000 1.7000e- 004 0.0000 1.7000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1315 0.1315 1.0000e- 005 0.0000 0.1316 Total 9.0000e- 005 6.0000e- 005 6.4000e- 004 0.0000 1.7000e- 004 0.0000 1.7000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1315 0.1315 1.0000e- 005 0.0000 0.1316 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.4867 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0200e- 003 7.0400e- 003 9.0700e- 003 1.0000e- 005 4.1000e- 004 4.1000e- 004 4.1000e- 004 4.1000e- 004 0.0000 1.2766 1.2766 8.0000e- 005 0.0000 1.2787 Total 0.4877 7.0400e- 003 9.0700e- 003 1.0000e- 005 4.1000e- 004 4.1000e- 004 4.1000e- 004 4.1000e- 004 0.0000 1.2766 1.2766 8.0000e- 005 0.0000 1.2787 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 23 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 291 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.0000e- 005 6.0000e- 005 6.4000e- 004 0.0000 1.7000e- 004 0.0000 1.7000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1315 0.1315 1.0000e- 005 0.0000 0.1316 Total 9.0000e- 005 6.0000e- 005 6.4000e- 004 0.0000 1.7000e- 004 0.0000 1.7000e- 004 4.0000e- 005 0.0000 4.0000e- 005 0.0000 0.1315 0.1315 1.0000e- 005 0.0000 0.1316 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 24 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 292 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.7682 6.2121 6.0500 0.0241 1.1944 0.0107 1.2051 0.3209 9.9500e- 003 0.3308 0.0000 2,247.360 6 2,247.360 6 0.1660 0.0000 2,251.510 5 Unmitigated 0.7682 6.2121 6.0500 0.0241 1.1944 0.0107 1.2051 0.3209 9.9500e- 003 0.3308 0.0000 2,247.360 6 2,247.360 6 0.1660 0.0000 2,251.510 5 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT User Defined Retail 2,642.50 2,642.50 2642.50 3,085,862 3,085,862 Total 2,642.50 2,642.50 2,642.50 3,085,862 3,085,862 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by User Defined Retail 12.50 4.20 5.40 16.60 64.40 19.00 45 40 15 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH User Defined Retail 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 25 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 293 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 509.6576 509.6576 0.0116 2.4100e- 003 510.6654 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 509.6576 509.6576 0.0116 2.4100e- 003 510.6654 NaturalGas Mitigated 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 8.2927 8.2927 1.6000e- 004 1.5000e- 004 8.3420 NaturalGas Unmitigated 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 8.2927 8.2927 1.6000e- 004 1.5000e- 004 8.3420 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr User Defined Retail 155400 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 8.2927 8.2927 1.6000e- 004 1.5000e- 004 8.3420 Total 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 8.2927 8.2927 1.6000e- 004 1.5000e- 004 8.3420 Unmitigated 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 26 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 294 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr User Defined Retail 155400 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 8.2927 8.2927 1.6000e- 004 1.5000e- 004 8.3420 Total 8.4000e- 004 7.6200e- 003 6.4000e- 003 5.0000e- 005 5.8000e- 004 5.8000e- 004 5.8000e- 004 5.8000e- 004 0.0000 8.2927 8.2927 1.6000e- 004 1.5000e- 004 8.3420 Mitigated 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr User Defined Retail 884100 509.6576 0.0116 2.4100e- 003 510.6654 Total 509.6576 0.0116 2.4100e- 003 510.6654 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 27 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 295 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.3221 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Unmitigated 0.3221 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr User Defined Retail 884100 509.6576 0.0116 2.4100e- 003 510.6654 Total 509.6576 0.0116 2.4100e- 003 510.6654 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 28 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 296 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.0487 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.2734 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 6.0000e- 005 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Total 0.3221 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.0487 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.2734 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 6.0000e- 005 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Total 0.3221 1.0000e- 005 6.4000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2500e- 003 1.2500e- 003 0.0000 0.0000 1.3300e- 003 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 29 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 297 7.1 Mitigation Measures Water Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 52.2161 0.1460 3.6600e- 003 56.9561 Unmitigated 52.2161 0.1460 3.6600e- 003 56.9561 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr User Defined Retail 4.44435 / 2.72396 52.2161 0.1460 3.6600e- 003 56.9561 Total 52.2161 0.1460 3.6600e- 003 56.9561 Unmitigated 7.0 Water Detail CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 30 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 298 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr User Defined Retail 4.44435 / 2.72396 52.2161 0.1460 3.6600e- 003 56.9561 Total 52.2161 0.1460 3.6600e- 003 56.9561 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 12.7884 0.7558 0.0000 31.6828 Unmitigated 12.7884 0.7558 0.0000 31.6828 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 31 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 299 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr User Defined Retail 63 12.7884 0.7558 0.0000 31.6828 Total 12.7884 0.7558 0.0000 31.6828 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr User Defined Retail 63 12.7884 0.7558 0.0000 31.6828 Total 12.7884 0.7558 0.0000 31.6828 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 32 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 300 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 8:56 AMPage 33 of 34 LQ VMT Policy Scenario: Retail 70K - Salton Sea Air Basin, Annual 301 Warehouse (Unrefrigerated, No-Rail) 410,000 Square Feet CalEEMod Version 2016.3.2 302 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Unrefrigerated Warehouse-No Rail 410.00 1000sqft 9.41 410,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 1 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 303 Project Characteristics - Scenario: Warehouse (unrefrigerated) buildings with area less than or equal to 410,000 SF. Land Use - Assumes default acreage, square footage, and population. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - Assumes ITE Trip Generation 10th Edition LU code 150 (warehousing). Assumes default trip distribution. Road Dust - All roads are/will be paved. Energy Use - Water And Wastewater - Solid Waste - CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 2 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 304 2.0 Emissions Summary Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblVehicleTrips ST_TR 1.68 1.74 tblVehicleTrips SU_TR 1.68 1.74 tblVehicleTrips WD_TR 1.68 1.74 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 3 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 305 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.2020 1.8102 1.5357 3.3100e- 003 0.2354 0.0799 0.3153 0.1048 0.0745 0.1793 0.0000 294.5131 294.5131 0.0551 0.0000 295.8907 2022 3.0544 1.6872 1.8355 4.2000e- 003 0.1295 0.0656 0.1952 0.0349 0.0617 0.0966 0.0000 375.4398 375.4398 0.0575 0.0000 376.8776 Maximum 3.0544 1.8102 1.8355 4.2000e- 003 0.2354 0.0799 0.3153 0.1048 0.0745 0.1793 0.0000 375.4398 375.4398 0.0575 0.0000 376.8776 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.2020 1.8102 1.5357 3.3100e- 003 0.2354 0.0799 0.3153 0.1048 0.0745 0.1793 0.0000 294.5129 294.5129 0.0551 0.0000 295.8905 2022 3.0544 1.6872 1.8355 4.2000e- 003 0.1295 0.0656 0.1952 0.0349 0.0617 0.0966 0.0000 375.4395 375.4395 0.0575 0.0000 376.8774 Maximum 3.0544 1.8102 1.8355 4.2000e- 003 0.2354 0.0799 0.3153 0.1048 0.0745 0.1793 0.0000 375.4395 375.4395 0.0575 0.0000 376.8774 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 4 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 306 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 1.8867 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Energy 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 602.2076 602.2076 0.0136 3.4500e- 003 603.5745 Mobile 0.2726 2.0858 3.2830 0.0137 0.8991 6.6900e- 003 0.9058 0.2415 6.2600e- 003 0.2478 0.0000 1,270.102 9 1,270.102 9 0.0657 0.0000 1,271.746 3 Waste 0.0000 0.0000 0.0000 0.0000 78.2327 0.0000 78.2327 4.6234 0.0000 193.8183 Water 0.0000 0.0000 0.0000 0.0000 30.0796 711.6838 741.7634 3.1057 0.0763 842.1461 Total 2.1638 2.1266 3.3210 0.0139 0.8991 9.8000e- 003 0.9089 0.2415 9.3700e- 003 0.2509 108.3124 2,584.001 6 2,692.314 0 7.8085 0.0798 2,911.293 0 Unmitigated Operational Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-24-2021 9-23-2021 1.0542 1.0542 2 9-24-2021 12-23-2021 0.8729 0.8729 3 12-24-2021 3-23-2022 0.7911 0.7911 4 3-24-2022 6-23-2022 0.8071 0.8071 5 6-24-2022 9-23-2022 3.2300 3.2300 Highest 3.2300 3.2300 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 5 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 307 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 1.8867 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Energy 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 602.2076 602.2076 0.0136 3.4500e- 003 603.5745 Mobile 0.2726 2.0858 3.2830 0.0137 0.8991 6.6900e- 003 0.9058 0.2415 6.2600e- 003 0.2478 0.0000 1,270.102 9 1,270.102 9 0.0657 0.0000 1,271.746 3 Waste 0.0000 0.0000 0.0000 0.0000 78.2327 0.0000 78.2327 4.6234 0.0000 193.8183 Water 0.0000 0.0000 0.0000 0.0000 30.0796 711.6838 741.7634 3.1057 0.0763 842.1461 Total 2.1638 2.1266 3.3210 0.0139 0.8991 9.8000e- 003 0.9089 0.2415 9.3700e- 003 0.2509 108.3124 2,584.001 6 2,692.314 0 7.8085 0.0798 2,911.293 0 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 6 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 308 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/24/2021 7/21/2021 5 20 2 Site Preparation Site Preparation 7/22/2021 8/4/2021 5 10 3 Grading Grading 8/5/2021 9/1/2021 5 20 4 Building Construction Building Construction 9/2/2021 7/20/2022 5 230 5 Paving Paving 7/21/2022 8/17/2022 5 20 6 Architectural Coating Architectural Coating 8/18/2022 9/14/2022 5 20 OffRoad Equipment Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 615,000; Non-Residential Outdoor: 205,000; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 10 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 7 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 309 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 3 8.00 158 0.38 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Building Construction Cranes 1 7.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 8 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 310 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 172.00 67.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 34.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 9 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 311 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 10 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 312 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0194 0.2025 0.1058 1.9000e- 004 0.0102 0.0102 9.4000e- 003 9.4000e- 003 0.0000 16.7179 16.7179 5.4100e- 003 0.0000 16.8530 Total 0.0194 0.2025 0.1058 1.9000e- 004 0.0903 0.0102 0.1006 0.0497 9.4000e- 003 0.0591 0.0000 16.7179 16.7179 5.4100e- 003 0.0000 16.8530 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 11 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 313 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Total 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0194 0.2025 0.1058 1.9000e- 004 0.0102 0.0102 9.4000e- 003 9.4000e- 003 0.0000 16.7178 16.7178 5.4100e- 003 0.0000 16.8530 Total 0.0194 0.2025 0.1058 1.9000e- 004 0.0903 0.0102 0.1006 0.0497 9.4000e- 003 0.0591 0.0000 16.7178 16.7178 5.4100e- 003 0.0000 16.8530 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 12 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 314 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Total 4.3000e- 004 3.1000e- 004 3.1100e- 003 1.0000e- 005 7.4000e- 004 0.0000 7.5000e- 004 2.0000e- 004 0.0000 2.0000e- 004 0.0000 0.6141 0.6141 3.0000e- 005 0.0000 0.6147 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0229 0.2474 0.1586 3.0000e- 004 0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2644 Total 0.0229 0.2474 0.1586 3.0000e- 004 0.0655 0.0116 0.0771 0.0337 0.0107 0.0443 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2644 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 13 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 315 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0229 0.2474 0.1586 3.0000e- 004 0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2643 Total 0.0229 0.2474 0.1586 3.0000e- 004 0.0655 0.0116 0.0771 0.0337 0.0107 0.0443 0.0000 26.0537 26.0537 8.4300e- 003 0.0000 26.2643 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 14 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 316 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7622 100.7622 0.0243 0.0000 101.3700 Total 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7622 100.7622 0.0243 0.0000 101.3700 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 15 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 317 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 8.1000e- 003 0.2608 0.0624 6.7000e- 004 0.0145 4.7000e- 004 0.0150 4.1800e- 003 4.5000e- 004 4.6300e- 003 0.0000 63.2650 63.2650 5.2000e- 003 0.0000 63.3950 Worker 0.0354 0.0256 0.2588 5.7000e- 004 0.0619 3.9000e- 004 0.0622 0.0164 3.6000e- 004 0.0168 0.0000 51.0524 51.0524 2.0800e- 003 0.0000 51.1045 Total 0.0435 0.2863 0.3212 1.2400e- 003 0.0763 8.6000e- 004 0.0772 0.0206 8.1000e- 004 0.0214 0.0000 114.3175 114.3175 7.2800e- 003 0.0000 114.4995 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7621 100.7621 0.0243 0.0000 101.3698 Total 0.0827 0.7583 0.7210 1.1700e- 003 0.0417 0.0417 0.0392 0.0392 0.0000 100.7621 100.7621 0.0243 0.0000 101.3698 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 16 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 318 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 8.1000e- 003 0.2608 0.0624 6.7000e- 004 0.0145 4.7000e- 004 0.0150 4.1800e- 003 4.5000e- 004 4.6300e- 003 0.0000 63.2650 63.2650 5.2000e- 003 0.0000 63.3950 Worker 0.0354 0.0256 0.2588 5.7000e- 004 0.0619 3.9000e- 004 0.0622 0.0164 3.6000e- 004 0.0168 0.0000 51.0524 51.0524 2.0800e- 003 0.0000 51.1045 Total 0.0435 0.2863 0.3212 1.2400e- 003 0.0763 8.6000e- 004 0.0772 0.0206 8.1000e- 004 0.0214 0.0000 114.3175 114.3175 7.2800e- 003 0.0000 114.4995 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6836 165.6836 0.0397 0.0000 166.6759 Total 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6836 165.6836 0.0397 0.0000 166.6759 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 17 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 319 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0124 0.4056 0.0946 1.0900e- 003 0.0238 6.5000e- 004 0.0245 6.8700e- 003 6.2000e- 004 7.4900e- 003 0.0000 103.1127 103.1127 7.9300e- 003 0.0000 103.3110 Worker 0.0543 0.0383 0.3914 9.0000e- 004 0.1017 6.1000e- 004 0.1023 0.0270 5.6000e- 004 0.0276 0.0000 80.8417 80.8417 3.1200e- 003 0.0000 80.9197 Total 0.0667 0.4438 0.4860 1.9900e- 003 0.1255 1.2600e- 003 0.1268 0.0339 1.1800e- 003 0.0351 0.0000 183.9544 183.9544 0.0111 0.0000 184.2307 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6834 165.6834 0.0397 0.0000 166.6757 Total 0.1220 1.1165 1.1700 1.9300e- 003 0.0578 0.0578 0.0544 0.0544 0.0000 165.6834 165.6834 0.0397 0.0000 166.6757 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 18 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 320 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0124 0.4056 0.0946 1.0900e- 003 0.0238 6.5000e- 004 0.0245 6.8700e- 003 6.2000e- 004 7.4900e- 003 0.0000 103.1127 103.1127 7.9300e- 003 0.0000 103.3110 Worker 0.0543 0.0383 0.3914 9.0000e- 004 0.1017 6.1000e- 004 0.1023 0.0270 5.6000e- 004 0.0276 0.0000 80.8417 80.8417 3.1200e- 003 0.0000 80.9197 Total 0.0667 0.4438 0.4860 1.9900e- 003 0.1255 1.2600e- 003 0.1268 0.0339 1.1800e- 003 0.0351 0.0000 183.9544 183.9544 0.0111 0.0000 184.2307 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0276 20.0276 6.4800e- 003 0.0000 20.1895 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0276 20.0276 6.4800e- 003 0.0000 20.1895 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 19 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 321 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Total 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0275 20.0275 6.4800e- 003 0.0000 20.1895 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0110 0.1113 0.1458 2.3000e- 004 5.6800e- 003 5.6800e- 003 5.2200e- 003 5.2200e- 003 0.0000 20.0275 20.0275 6.4800e- 003 0.0000 20.1895 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 20 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 322 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Total 6.6000e- 004 4.7000e- 004 4.7700e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 0.9860 0.9860 4.0000e- 005 0.0000 0.9870 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 2.8505 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.0500e- 003 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Total 2.8526 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 21 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 323 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5000e- 003 1.0600e- 003 0.0108 2.0000e- 005 2.8100e- 003 2.0000e- 005 2.8300e- 003 7.5000e- 004 2.0000e- 005 7.6000e- 004 0.0000 2.2350 2.2350 9.0000e- 005 0.0000 2.2372 Total 1.5000e- 003 1.0600e- 003 0.0108 2.0000e- 005 2.8100e- 003 2.0000e- 005 2.8300e- 003 7.5000e- 004 2.0000e- 005 7.6000e- 004 0.0000 2.2350 2.2350 9.0000e- 005 0.0000 2.2372 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 2.8505 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.0500e- 003 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Total 2.8526 0.0141 0.0181 3.0000e- 005 8.2000e- 004 8.2000e- 004 8.2000e- 004 8.2000e- 004 0.0000 2.5533 2.5533 1.7000e- 004 0.0000 2.5574 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 22 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 324 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5000e- 003 1.0600e- 003 0.0108 2.0000e- 005 2.8100e- 003 2.0000e- 005 2.8300e- 003 7.5000e- 004 2.0000e- 005 7.6000e- 004 0.0000 2.2350 2.2350 9.0000e- 005 0.0000 2.2372 Total 1.5000e- 003 1.0600e- 003 0.0108 2.0000e- 005 2.8100e- 003 2.0000e- 005 2.8300e- 003 7.5000e- 004 2.0000e- 005 7.6000e- 004 0.0000 2.2350 2.2350 9.0000e- 005 0.0000 2.2372 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 23 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 325 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.2726 2.0858 3.2830 0.0137 0.8991 6.6900e- 003 0.9058 0.2415 6.2600e- 003 0.2478 0.0000 1,270.102 9 1,270.102 9 0.0657 0.0000 1,271.746 3 Unmitigated 0.2726 2.0858 3.2830 0.0137 0.8991 6.6900e- 003 0.9058 0.2415 6.2600e- 003 0.2478 0.0000 1,270.102 9 1,270.102 9 0.0657 0.0000 1,271.746 3 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Unrefrigerated Warehouse-No Rail 713.40 713.40 713.40 2,322,749 2,322,749 Total 713.40 713.40 713.40 2,322,749 2,322,749 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Unrefrigerated Warehouse-No Rail 12.50 4.20 5.40 59.00 0.00 41.00 92 5 3 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Unrefrigerated Warehouse-No Rail 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 24 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 326 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 557.7929 557.7929 0.0127 2.6300e- 003 558.8958 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 557.7929 557.7929 0.0127 2.6300e- 003 558.8958 NaturalGas Mitigated 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 44.4147 44.4147 8.5000e- 004 8.1000e- 004 44.6786 NaturalGas Unmitigated 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 44.4147 44.4147 8.5000e- 004 8.1000e- 004 44.6786 5.1 Mitigation Measures Energy Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 25 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 327 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Unrefrigerated Warehouse-No Rail 832300 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 44.4147 44.4147 8.5000e- 004 8.1000e- 004 44.6786 Total 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 44.4147 44.4147 8.5000e- 004 8.1000e- 004 44.6786 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Unrefrigerated Warehouse-No Rail 832300 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 44.4147 44.4147 8.5000e- 004 8.1000e- 004 44.6786 Total 4.4900e- 003 0.0408 0.0343 2.4000e- 004 3.1000e- 003 3.1000e- 003 3.1000e- 003 3.1000e- 003 0.0000 44.4147 44.4147 8.5000e- 004 8.1000e- 004 44.6786 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 26 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 328 6.1 Mitigation Measures Area 6.0 Area Detail 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Unrefrigerated Warehouse-No Rail 967600 557.7929 0.0127 2.6300e- 003 558.8958 Total 557.7929 0.0127 2.6300e- 003 558.8958 Unmitigated Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Unrefrigerated Warehouse-No Rail 967600 557.7929 0.0127 2.6300e- 003 558.8958 Total 557.7929 0.0127 2.6300e- 003 558.8958 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 27 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 329 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 1.8867 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Unmitigated 1.8867 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.2851 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 1.6013 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 3.5000e- 004 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Total 1.8867 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 28 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 330 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.2851 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 1.6013 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 3.5000e- 004 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Total 1.8867 3.0000e- 005 3.7700e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 7.3300e- 003 7.3300e- 003 2.0000e- 005 0.0000 7.8100e- 003 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 29 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 331 Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 741.7634 3.1057 0.0763 842.1461 Unmitigated 741.7634 3.1057 0.0763 842.1461 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Unrefrigerated Warehouse-No Rail 94.8125 / 0 741.7634 3.1057 0.0763 842.1461 Total 741.7634 3.1057 0.0763 842.1461 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 30 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 332 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Unrefrigerated Warehouse-No Rail 94.8125 / 0 741.7634 3.1057 0.0763 842.1461 Total 741.7634 3.1057 0.0763 842.1461 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 78.2327 4.6234 0.0000 193.8183 Unmitigated 78.2327 4.6234 0.0000 193.8183 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 31 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 333 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Unrefrigerated Warehouse-No Rail 385.4 78.2327 4.6234 0.0000 193.8183 Total 78.2327 4.6234 0.0000 193.8183 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Unrefrigerated Warehouse-No Rail 385.4 78.2327 4.6234 0.0000 193.8183 Total 78.2327 4.6234 0.0000 193.8183 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 32 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 334 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 2:52 PMPage 33 of 33 LQ VMT Policy Scenario: Warehouse, Unrefrigerated 410K - Salton Sea Air Basin, Annual 335 General Light Industrial 170,000 Square Feet CalEEMod Version 2016.3.2 336 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population General Light Industry 170.00 1000sqft 3.90 170,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 10 Wind Speed (m/s)Precipitation Freq (Days)3.4 20 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023Operational Year CO2 Intensity (lb/MWhr) 1270.9 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) LQ VMT Policy Scenario: General Light Industrial 170K Salton Sea Air Basin, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 1 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 337 Project Characteristics - Scenario:General Light Industrial buildings with area less than or equal to 170,000 SF. Land Use - Assumes default acreage, square footage, and population. Construction Phase - Assumes default construction phasing. Off-road Equipment - Assumes default construction equipment. Trips and VMT - Assumes default construction trips and VMT. On-road Fugitive Dust - The city of La Quinta is largely developed with all/most roadways within the city paved. Demolition - Assumes no demolition. Grading - Assumes cut/fill will balance onsite. Architectural Coating - Assumes default arch. coating. Vehicle Trips - Weekday trips based on ITE Trip Generation 10th Edition code 110. Assumes default weekend trip rates. Road Dust - All roads are/will be paved. Energy Use - Water And Wastewater - Solid Waste - CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 2 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 338 2.0 Emissions Summary Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 0.5 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 40 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust HaulingPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust VendorPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblOnRoadDust WorkerPercentPave 50.00 100.00 tblRoadDust RoadPercentPave 50 100 tblVehicleTrips WD_TR 6.97 4.96 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 3 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 339 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1686 1.5346 1.3321 2.5700e- 003 0.1102 0.0741 0.1843 0.0488 0.0693 0.1181 0.0000 226.6568 226.6568 0.0475 0.0000 227.8433 2022 1.3288 1.2737 1.3727 2.7000e- 003 0.0494 0.0578 0.1072 0.0133 0.0543 0.0677 0.0000 237.4872 237.4872 0.0448 0.0000 238.6077 Maximum 1.3288 1.5346 1.3727 2.7000e- 003 0.1102 0.0741 0.1843 0.0488 0.0693 0.1181 0.0000 237.4872 237.4872 0.0475 0.0000 238.6077 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2021 0.1686 1.5346 1.3321 2.5700e- 003 0.1102 0.0741 0.1843 0.0488 0.0693 0.1181 0.0000 226.6566 226.6566 0.0475 0.0000 227.8430 2022 1.3288 1.2737 1.3727 2.7000e- 003 0.0494 0.0578 0.1072 0.0133 0.0543 0.0677 0.0000 237.4870 237.4870 0.0448 0.0000 238.6075 Maximum 1.3288 1.5346 1.3727 2.7000e- 003 0.1102 0.0741 0.1843 0.0488 0.0693 0.1181 0.0000 237.4870 237.4870 0.0475 0.0000 238.6075 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 4 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 340 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.7823 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Energy 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 1,289.444 2 1,289.444 2 0.0284 0.0101 1,293.162 6 Mobile 0.2455 1.8826 2.9130 0.0121 0.7915 5.9200e- 003 0.7974 0.2126 5.5300e- 003 0.2182 0.0000 1,125.698 5 1,125.698 5 0.0589 0.0000 1,127.171 8 Waste 0.0000 0.0000 0.0000 0.0000 42.7905 0.0000 42.7905 2.5289 0.0000 106.0116 Water 0.0000 0.0000 0.0000 0.0000 12.4720 295.0884 307.5604 1.2877 0.0316 349.1825 Total 1.0575 2.1533 3.1420 0.0137 0.7915 0.0265 0.8180 0.2126 0.0261 0.2387 55.2625 2,710.234 2 2,765.496 7 3.9039 0.0417 2,875.531 8 Unmitigated Operational Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 6-29-2021 9-28-2021 0.9342 0.9342 2 9-29-2021 12-28-2021 0.7302 0.7302 3 12-29-2021 3-28-2022 0.6539 0.6539 4 3-29-2022 6-28-2022 0.6685 0.6685 5 6-29-2022 9-28-2022 1.2540 1.2540 Highest 1.2540 1.2540 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 5 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 341 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.7823 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Energy 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 1,289.444 2 1,289.444 2 0.0284 0.0101 1,293.162 6 Mobile 0.2455 1.8826 2.9130 0.0121 0.7915 5.9200e- 003 0.7974 0.2126 5.5300e- 003 0.2182 0.0000 1,125.698 5 1,125.698 5 0.0589 0.0000 1,127.171 8 Waste 0.0000 0.0000 0.0000 0.0000 42.7905 0.0000 42.7905 2.5289 0.0000 106.0116 Water 0.0000 0.0000 0.0000 0.0000 12.4720 295.0884 307.5604 1.2877 0.0316 349.1825 Total 1.0575 2.1533 3.1420 0.0137 0.7915 0.0265 0.8180 0.2126 0.0261 0.2387 55.2625 2,710.234 2 2,765.496 7 3.9039 0.0417 2,875.531 8 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 6 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 342 Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 6/29/2021 7/26/2021 5 20 2 Site Preparation Site Preparation 7/27/2021 8/2/2021 5 5 3 Grading Grading 8/3/2021 8/12/2021 5 8 4 Building Construction Building Construction 8/13/2021 6/30/2022 5 230 5 Paving Paving 7/1/2022 7/26/2022 5 18 6 Architectural Coating Architectural Coating 7/27/2022 8/19/2022 5 18 OffRoad Equipment Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 255,000; Non-Residential Outdoor: 85,000; Striped Parking Area: 0 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 4 Acres of Paving: 0 CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 7 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 343 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 3 8.00 158 0.38 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Building Construction Cranes 1 7.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Cement and Mortar Mixers 2 6.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Paving Equipment 2 6.00 132 0.36 Paving Rollers 2 6.00 80 0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 8 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 344 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0008 34.0008 9.5700e- 003 0.0000 34.2400 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 71.00 28.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 14.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 9 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 345 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Total 0.0317 0.3144 0.2157 3.9000e- 004 0.0155 0.0155 0.0144 0.0144 0.0000 34.0007 34.0007 9.5700e- 003 0.0000 34.2400 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 10 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 346 3.2 Demolition - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Total 7.1000e- 004 5.1000e- 004 5.1900e- 003 1.0000e- 005 1.2400e- 003 1.0000e- 005 1.2500e- 003 3.3000e- 004 1.0000e- 005 3.4000e- 004 0.0000 1.0235 1.0235 4.0000e- 005 0.0000 1.0246 Mitigated Construction Off-Site 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0452 0.0000 0.0452 0.0248 0.0000 0.0248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.7200e- 003 0.1012 0.0529 1.0000e- 004 5.1100e- 003 5.1100e- 003 4.7000e- 003 4.7000e- 003 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Total 9.7200e- 003 0.1012 0.0529 1.0000e- 004 0.0452 5.1100e- 003 0.0503 0.0248 4.7000e- 003 0.0295 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 11 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 347 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Total 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0452 0.0000 0.0452 0.0248 0.0000 0.0248 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.7200e- 003 0.1012 0.0529 1.0000e- 004 5.1100e- 003 5.1100e- 003 4.7000e- 003 4.7000e- 003 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Total 9.7200e- 003 0.1012 0.0529 1.0000e- 004 0.0452 5.1100e- 003 0.0503 0.0248 4.7000e- 003 0.0295 0.0000 8.3589 8.3589 2.7000e- 003 0.0000 8.4265 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 12 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 348 3.3 Site Preparation - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Total 2.1000e- 004 1.5000e- 004 1.5600e- 003 0.0000 3.7000e- 004 0.0000 3.7000e- 004 1.0000e- 004 0.0000 1.0000e- 004 0.0000 0.3071 0.3071 1.0000e- 005 0.0000 0.3074 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0262 0.0000 0.0262 0.0135 0.0000 0.0135 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.1600e- 003 0.0990 0.0634 1.2000e- 004 4.6400e- 003 4.6400e- 003 4.2700e- 003 4.2700e- 003 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Total 9.1600e- 003 0.0990 0.0634 1.2000e- 004 0.0262 4.6400e- 003 0.0309 0.0135 4.2700e- 003 0.0177 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 13 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 349 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Total 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0262 0.0000 0.0262 0.0135 0.0000 0.0135 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.1600e- 003 0.0990 0.0634 1.2000e- 004 4.6400e- 003 4.6400e- 003 4.2700e- 003 4.2700e- 003 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Total 9.1600e- 003 0.0990 0.0634 1.2000e- 004 0.0262 4.6400e- 003 0.0309 0.0135 4.2700e- 003 0.0177 0.0000 10.4215 10.4215 3.3700e- 003 0.0000 10.5057 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 14 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 350 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Total 2.8000e- 004 2.0000e- 004 2.0800e- 003 0.0000 5.0000e- 004 0.0000 5.0000e- 004 1.3000e- 004 0.0000 1.3000e- 004 0.0000 0.4094 0.4094 2.0000e- 005 0.0000 0.4098 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0960 0.8803 0.8371 1.3600e- 003 0.0484 0.0484 0.0455 0.0455 0.0000 116.9768 116.9768 0.0282 0.0000 117.6824 Total 0.0960 0.8803 0.8371 1.3600e- 003 0.0484 0.0484 0.0455 0.0455 0.0000 116.9768 116.9768 0.0282 0.0000 117.6824 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 15 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 351 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9300e- 003 0.1265 0.0303 3.2000e- 004 7.0300e- 003 2.3000e- 004 7.2600e- 003 2.0300e- 003 2.2000e- 004 2.2500e- 003 0.0000 30.6937 30.6937 2.5200e- 003 0.0000 30.7567 Worker 0.0169 0.0123 0.1240 2.7000e- 004 0.0296 1.8000e- 004 0.0298 7.8700e- 003 1.7000e- 004 8.0400e- 003 0.0000 24.4652 24.4652 1.0000e- 003 0.0000 24.4901 Total 0.0209 0.1388 0.1543 5.9000e- 004 0.0367 4.1000e- 004 0.0371 9.9000e- 003 3.9000e- 004 0.0103 0.0000 55.1589 55.1589 3.5200e- 003 0.0000 55.2469 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0960 0.8803 0.8371 1.3600e- 003 0.0484 0.0484 0.0455 0.0455 0.0000 116.9767 116.9767 0.0282 0.0000 117.6822 Total 0.0960 0.8803 0.8371 1.3600e- 003 0.0484 0.0484 0.0455 0.0455 0.0000 116.9767 116.9767 0.0282 0.0000 117.6822 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 16 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 352 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.9300e- 003 0.1265 0.0303 3.2000e- 004 7.0300e- 003 2.3000e- 004 7.2600e- 003 2.0300e- 003 2.2000e- 004 2.2500e- 003 0.0000 30.6937 30.6937 2.5200e- 003 0.0000 30.7567 Worker 0.0169 0.0123 0.1240 2.7000e- 004 0.0296 1.8000e- 004 0.0298 7.8700e- 003 1.7000e- 004 8.0400e- 003 0.0000 24.4652 24.4652 1.0000e- 003 0.0000 24.4901 Total 0.0209 0.1388 0.1543 5.9000e- 004 0.0367 4.1000e- 004 0.0371 9.9000e- 003 3.9000e- 004 0.0103 0.0000 55.1589 55.1589 3.5200e- 003 0.0000 55.2469 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1101 1.0072 1.0554 1.7400e- 003 0.0522 0.0522 0.0491 0.0491 0.0000 149.4628 149.4628 0.0358 0.0000 150.3580 Total 0.1101 1.0072 1.0554 1.7400e- 003 0.0522 0.0522 0.0491 0.0491 0.0000 149.4628 149.4628 0.0358 0.0000 150.3580 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 17 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 353 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6600e- 003 0.1529 0.0357 4.1000e- 004 8.9800e- 003 2.4000e- 004 9.2300e- 003 2.5900e- 003 2.3000e- 004 2.8300e- 003 0.0000 38.8731 38.8731 2.9900e- 003 0.0000 38.9479 Worker 0.0202 0.0143 0.1457 3.3000e- 004 0.0379 2.3000e- 004 0.0381 0.0101 2.1000e- 004 0.0103 0.0000 30.1036 30.1036 1.1600e- 003 0.0000 30.1327 Total 0.0249 0.1672 0.1814 7.4000e- 004 0.0468 4.7000e- 004 0.0473 0.0126 4.4000e- 004 0.0131 0.0000 68.9767 68.9767 4.1500e- 003 0.0000 69.0805 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1101 1.0072 1.0554 1.7400e- 003 0.0522 0.0522 0.0491 0.0491 0.0000 149.4626 149.4626 0.0358 0.0000 150.3578 Total 0.1101 1.0072 1.0554 1.7400e- 003 0.0522 0.0522 0.0491 0.0491 0.0000 149.4626 149.4626 0.0358 0.0000 150.3578 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 18 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 354 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6600e- 003 0.1529 0.0357 4.1000e- 004 8.9800e- 003 2.4000e- 004 9.2300e- 003 2.5900e- 003 2.3000e- 004 2.8300e- 003 0.0000 38.8731 38.8731 2.9900e- 003 0.0000 38.9479 Worker 0.0202 0.0143 0.1457 3.3000e- 004 0.0379 2.3000e- 004 0.0381 0.0101 2.1000e- 004 0.0103 0.0000 30.1036 30.1036 1.1600e- 003 0.0000 30.1327 Total 0.0249 0.1672 0.1814 7.4000e- 004 0.0468 4.7000e- 004 0.0473 0.0126 4.4000e- 004 0.0131 0.0000 68.9767 68.9767 4.1500e- 003 0.0000 69.0805 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 19 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 355 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Total 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 8.7900e- 003 0.0857 0.1098 1.7000e- 004 4.3900e- 003 4.3900e- 003 4.0500e- 003 4.0500e- 003 0.0000 14.7383 14.7383 4.6300e- 003 0.0000 14.8540 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 20 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 356 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Total 7.9000e- 004 5.6000e- 004 5.7300e- 003 1.0000e- 005 1.4900e- 003 1.0000e- 005 1.5000e- 003 4.0000e- 004 1.0000e- 005 4.0000e- 004 0.0000 1.1832 1.1832 5.0000e- 005 0.0000 1.1844 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.1819 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8400e- 003 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Total 1.1838 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 21 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 357 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.6000e- 004 3.9000e- 004 4.0100e- 003 1.0000e- 005 1.0400e- 003 1.0000e- 005 1.0500e- 003 2.8000e- 004 1.0000e- 005 2.8000e- 004 0.0000 0.8283 0.8283 3.0000e- 005 0.0000 0.8291 Total 5.6000e- 004 3.9000e- 004 4.0100e- 003 1.0000e- 005 1.0400e- 003 1.0000e- 005 1.0500e- 003 2.8000e- 004 1.0000e- 005 2.8000e- 004 0.0000 0.8283 0.8283 3.0000e- 005 0.0000 0.8291 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 1.1819 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8400e- 003 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Total 1.1838 0.0127 0.0163 3.0000e- 005 7.4000e- 004 7.4000e- 004 7.4000e- 004 7.4000e- 004 0.0000 2.2979 2.2979 1.5000e- 004 0.0000 2.3017 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 22 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 358 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.6000e- 004 3.9000e- 004 4.0100e- 003 1.0000e- 005 1.0400e- 003 1.0000e- 005 1.0500e- 003 2.8000e- 004 1.0000e- 005 2.8000e- 004 0.0000 0.8283 0.8283 3.0000e- 005 0.0000 0.8291 Total 5.6000e- 004 3.9000e- 004 4.0100e- 003 1.0000e- 005 1.0400e- 003 1.0000e- 005 1.0500e- 003 2.8000e- 004 1.0000e- 005 2.8000e- 004 0.0000 0.8283 0.8283 3.0000e- 005 0.0000 0.8291 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 23 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 359 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.2455 1.8826 2.9130 0.0121 0.7915 5.9200e- 003 0.7974 0.2126 5.5300e- 003 0.2182 0.0000 1,125.698 5 1,125.698 5 0.0589 0.0000 1,127.171 8 Unmitigated 0.2455 1.8826 2.9130 0.0121 0.7915 5.9200e- 003 0.7974 0.2126 5.5300e- 003 0.2182 0.0000 1,125.698 5 1,125.698 5 0.0589 0.0000 1,127.171 8 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT General Light Industry 843.20 224.40 115.60 2,044,888 2,044,888 Total 843.20 224.40 115.60 2,044,888 2,044,888 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by General Light Industry 12.50 4.20 5.40 59.00 28.00 13.00 92 5 3 5.0 Energy Detail 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH General Light Industry 0.492822 0.035624 0.185121 0.119005 0.014436 0.005121 0.022629 0.112565 0.003037 0.001863 0.006214 0.000779 0.000783 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 24 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 360 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 994.6999 994.6999 0.0227 4.7000e- 003 996.6668 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 994.6999 994.6999 0.0227 4.7000e- 003 996.6668 NaturalGas Mitigated 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 294.7443 294.7443 5.6500e- 003 5.4000e- 003 296.4958 NaturalGas Unmitigated 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 294.7443 294.7443 5.6500e- 003 5.4000e- 003 296.4958 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr General Light Industry 5.5233e +006 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 294.7443 294.7443 5.6500e- 003 5.4000e- 003 296.4958 Total 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 294.7443 294.7443 5.6500e- 003 5.4000e- 003 296.4958 Unmitigated 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 25 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 361 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr General Light Industry 5.5233e +006 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 294.7443 294.7443 5.6500e- 003 5.4000e- 003 296.4958 Total 0.0298 0.2708 0.2274 1.6200e- 003 0.0206 0.0206 0.0206 0.0206 0.0000 294.7443 294.7443 5.6500e- 003 5.4000e- 003 296.4958 Mitigated 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr General Light Industry 1.7255e +006 994.6999 0.0227 4.7000e- 003 996.6668 Total 994.6999 0.0227 4.7000e- 003 996.6668 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 26 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 362 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.7823 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Unmitigated 0.7823 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr General Light Industry 1.7255e +006 994.6999 0.0227 4.7000e- 003 996.6668 Total 994.6999 0.0227 4.7000e- 003 996.6668 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 27 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 363 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1182 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.6639 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.4000e- 004 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Total 0.7823 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.1182 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.6639 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.4000e- 004 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Total 0.7823 1.0000e- 005 1.5600e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.0400e- 003 3.0400e- 003 1.0000e- 005 0.0000 3.2400e- 003 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 28 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 364 7.1 Mitigation Measures Water Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 307.5604 1.2877 0.0316 349.1825 Unmitigated 307.5604 1.2877 0.0316 349.1825 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr General Light Industry 39.3125 / 0 307.5604 1.2877 0.0316 349.1825 Total 307.5604 1.2877 0.0316 349.1825 Unmitigated 7.0 Water Detail CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 29 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 365 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr General Light Industry 39.3125 / 0 307.5604 1.2877 0.0316 349.1825 Total 307.5604 1.2877 0.0316 349.1825 Mitigated 8.0 Waste Detail Total CO2 CH4 N2O CO2e MT/yr Mitigated 42.7905 2.5289 0.0000 106.0116 Unmitigated 42.7905 2.5289 0.0000 106.0116 Category/Year CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 30 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 366 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr General Light Industry 210.8 42.7905 2.5289 0.0000 106.0116 Total 42.7905 2.5289 0.0000 106.0116 Unmitigated Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr General Light Industry 210.8 42.7905 2.5289 0.0000 106.0116 Total 42.7905 2.5289 0.0000 106.0116 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 31 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 367 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 6/29/2021 10:42 AMPage 32 of 33 LQ VMT Policy Scenario: General Light Industrial 170K - Salton Sea Air Basin, Annual 368 POWERPOINTS PLANNING COMMISSION MEETING JULY 13, 2021 PLANNING COMMISSION MEETING JULY 13, 2021 1 Planning Commission Meeting July 13, 2021 Pledge of Allegiance 1 2 PLANNING COMMISSION MEETING JULY 13, 2021 2 Planning Commission Meeting July 13, 2021 PH1 – Site Development Permit 2021-0003 (SDP 2013-924, Amendment 2) Signature at PGA West Condos Background •Eden Rock at PGA West approved in 2008 for ~42 acre residential project within PGA •Changed to Signature at PGA West project, approved in 2013 3 4 PLANNING COMMISSION MEETING JULY 13, 2021 3 Background •Signature was for 130 single family detached and 100 condo units •Single family home plans amended in 2020 •14 condo units constructed Vicinity Map 5 6 PLANNING COMMISSION MEETING JULY 13, 2021 4 SDP2013-924 SDP2013-924 7 8 PLANNING COMMISSION MEETING JULY 13, 2021 5 SDP2013-924 Analysis •Applicant requests Site Development Permit Amendment to change plan types •Changing from mostly 3-4 unit buildings to 60 detached units and 13 duplex units •No changes to lot numbers or development standards 9 10 PLANNING COMMISSION MEETING JULY 13, 2021 6 Analysis •Square footage range changing from 1,458-2,261 sf to 1,562-2,444 sf •Applicant proposing three (3) plan types for the units, each with three elevations Site Plan w/ Parking 11 12 PLANNING COMMISSION MEETING JULY 13, 2021 7 New Plans New Plans 13 14 PLANNING COMMISSION MEETING JULY 13, 2021 8 New Plans New Plans 15 16 PLANNING COMMISSION MEETING JULY 13, 2021 9 Recommendation •Adopt a Resolution recommending approval of Site Development Permit 2021-0003 (SDP 2013-924, Amendment 2) subject to the findings and conditions of approval. 17 18 PLANNING COMMISSION MEETING JULY 13, 2021 10 Planning Commission Meeting July 13, 2021 PH2 – Revision to VMT Analysis Policy Background •SB 743 adopted in 2013 –Requires Vehicle Miles Traveled (VMT) Analysis for transportation impacts –Automobile delay, ie. Level of Service, metrics no longer constitute significant impact –Effective July 1, 2020 19 20 PLANNING COMMISSION MEETING JULY 13, 2021 11 Why VMT? •Achieve Climate goals and preserve the environment •Promote reduction of GHG emissions •Promote development of multimodal transportation networks •Promote diversity of land uses •Improve health and safety State Guidance •December 2018, State Office of Planning and Research (OPR) issued technical advisory –Provide guidance with assessing VMT, adopting thresholds of significance and mitigation measures 21 22 PLANNING COMMISSION MEETING JULY 13, 2021 12 VMT Analysis Process Screening Analysis Significance  determination Mitigation Step 1: Screening •Identify projects that are expected to cause a less than significant impact –Local serving projects –Projects generating less than 110 daily vehicle trips –Projects in transit priority areas –Projects in low VMT generating areas •No full analysis required if criteria is met 23 24 PLANNING COMMISSION MEETING JULY 13, 2021 13 Revision •Added project types that are expected to cause a less than significant impact –Based on GHG emissions threshold •3,000 MTCO2e Project Types • Single Family Housing • less than or equal to 140 DU • Low-rise Multi Family Housing • less than or equal to 200 DU • Mid-rise Multi Family Housing • less than or equal to 245 DU • General Office Building • less than or equal to 160,000 SF • Retail Buildings • less than or equal to 70,000 SF • Warehouse (unrefrigerated) Buildings • less than or equal to 410,000 SF • General Light Industrial Buildings • less than or equal to 170,000 SF 25 26 PLANNING COMMISSION MEETING JULY 13, 2021 14 Step 2: Analysis •Analysis based on Riverside County Travel Demand Model •Measure VMT performance based on total daily VMT per service population Step 3: Significance Determination •Significance of transportation impacts determined by comparing analysis results to thresholds •Thresholds based on land use and project type –Residential, commercial land use –Land Use Planning (ie. General Plan) –Transportation Projects (ie. Roadway modifications) 27 28 PLANNING COMMISSION MEETING JULY 13, 2021 15 Step 4: Mitigation •If impacts are determined to be significant, mitigation must be incorporated into the project –Modify project to reduce VMT generated –Implement Transportation Demand Management Measures •If mitigation would not reduce impacts to less than significant, an EIR must be prepared with Statement of Overriding Considerations. 29 30