003365 (SFD) Title 249
u
CAL I FORfh4 I A ENERGY CALCULAT I 0"S
i
1
i FOR
K E N D A L L A I R C O N D I T I O N I N G
1 2`4 0 SQ.FTk. RESIDENCE
i L A 0 U I N T ti C A L I F 0 R N I A.
I
i
I
i
i
i
ARCI��TECTURAI. "
' COMPUTER
SERVICE
290 North 10th Street, Suite 200, Colton, California 92324 (714)3.70-3344
TITLE 24 SUMMARY'SHEET =PAGE I
sDOCUMENTED BY ARCHITECTURAL COMPUTER SERVICE
OWNER — KENDALL AIR CONDITIONING
PROJECT TITLE — RESIDENCE
LOCATION — LA QUINTA CHECKED BY —
JOB NUMBER — 22242—R DATE — '
RUN DATE — 12/09/86 RUN BY — AML
-----------------------------------------------------------------
-----------------------------------------------------------------
SPECIAL NOTES :
IPJ ORDER FOR THE OWNER TO MEET THE CALIFORNIA:ENERGY
COMMISSION'S MINIMUM REQUIREMENTS FOR A BUILDING
ENVELOPE, HE MUST -COMPLY WITH ALL THE STANDARD
REQUIREMENTS AS SHOWN ON THE STANDARD CHECK LIST AS
WELL AS MEETING ALL OF THE REQUIREMENTS SHOWN FOR
X X PACKAGE ' A.B. 163 — POINTS FOR*ZONE' 15 X
IT IS THE OWNERS RESPONSIBILITY TO SEE THAT THE
INFORMATION PROVIDED IN THESE CALCULATIONS ARE
INCORPORATED ON THE ORIGINAL PLANS.
A.C.S. I'S NOT DESIGNING OR RESPONSIBLE FOR THE
ACTUAL H.V.A.0 SYSTEM
THIS SHALL BE DETERMINED BY THE SYSTEM DESIGNER OR
ItJSTALLER.
THESE CALCL ILAT I C llJ' r;RE BASEL) UPON I t•JFORMPT I C d,J UPPL I•ED t%( THE
0611-4ER AtJD..'OR HI:= Ai_CP-dT. VAP.IATICiN'S' IPJ THIS It••JFC RPlATIOtJ COULD
VC -11C) THE CAL CULAT I 0tJ A
. LL CALCULAT I OP•d'_ COMPL`i' Ind I TH THE
I NFGR11AT I � �P-J PROVIDED TO US BY THE STATE OF CALIFORNIA Tf—D Ur'=;TE
WE M =' r M"
j
TITLE 24 SUMMARY, SHEET ; 1
i Page 2
DOCUMENTED BY Arc.hitectural Computer Service
OWNER - KENDALL AIR CONDITIONING
PROJECT TITLE - 1240 SCl.FT. RESIDENCE CHECKED BY -
LOCATION - LA QUINTA
JOB NUMBER - 2242-R DATE -
RUN DATE - 12/09/86 RUN.BY - AML
1. TOTAL FLOOR AREA................ 1240 SQ. FT.
2. RAISED FLOOR R -VALUE ........................... R -NA
3. SLAB PERIMETER INSULATION ....................... R-0
4. CEILING INSULATION VENTED ATTIC? ' R-38
5. WALL INSULATION ................................ R-11
6. GLAZING ........................................ All Double pane
. SHADING COEFFICIENT ............................ E.49 S.62 W.46 N.66
8. HORIZONTAL SOUTH OVERHANG ' LEt••1GTH ............... 0 FT.
i
9. THERMAL MASS..... NA FT.
10. HVAC ............ ....Coaling................ 5'.1 SEEP,
;He•tiriy.................. .'1 SE
HeatPump ................ NA
k
1 I. ACT I'•:: E SOLAR (NET '_0LAR FRACT I ON . ........... I111A � s
1 A":' . ZONALLY CONTROL ELEC SPACE HE; ;'1' I hJG ............ NO
1'13. HOT WATER HEATER.. .............................. NATURAL GAS
14. MAX INUI HEATING 8TU' '_ ALLOWED ......... . ....... 3 3, 4 "'2 22 BTUS i BONNET?
15. MAXIMUM COOL I PIG BTU"'3 ALLOWEC•. ................. ?4 , 59 0 BTU'S
i
16. SOLAR HOT 6IATEI' EF F I C I EFIC`i' ............. NA
O%A:02 R5 4/03/84. b'HO
Attachment A'
*The AB 163 compliance goals for climate zones 1 and 12 calculated to positive
scores, but the standards require no greater than a zero score (a zero point
system score equals the energy budget for the particular climate zone).
a
Point System Compliance
Goal
for Assembly Bill 163
AB -163
Compliance Goal
AB 163
Compliance Goal
Package D Slab Floor _
___, Package E (Raised .Floor)_
Climate
For 1 -Story
For 2- or 3 -story
For 1 -Story
For 2-• or 3 -story
Zone
Buildings
Buildings_
Buildings_
Buildings T_
1
0*
-1
0*
2
-7
-13
-16
-16
3
-6
-10
-3
-3
4
-9
-13
-10
-10
<'
k�
5
-3
-9
-10
-10
6
-5
-9
-1I
-11
7
-2
-8
- 9
�9
8
-7
-1.3
-12
-12
9
-2
-10
- 9
-11
10
-8
-14
-15
-15'
11
4
-11
-12
-12
12
0*
-1
0
-2
r,
13
-5
-11
-9
-11
14
.-9
-13
-17
-17
-8
-6
-8
,16
-6
-8
-4
-4
*The AB 163 compliance goals for climate zones 1 and 12 calculated to positive
scores, but the standards require no greater than a zero score (a zero point
system score equals the energy budget for the particular climate zone).
Documented By: Architectural Computer $ervice.
COMPLIANCE CHECK LIST '
STANDARD-i-FORM2--ZONE, 015
COMPLIES WITH AB-163 FOR SLAB FLR.
Building Shell
Measure
Points
XTOTAL FLOOR AREA1240
ft.2
1. Slab-on-Ground Perimeter ft; Depth in..
R-0
-4
2. Raised Floor R-Value . . . . . . . . . . . . . . . .
R-NA
NA
3. Ceiling Insulation or Construction Assy R-Value
R-38
0
Attic, Percent of Roof Over Conditioned Space 100
% 12404t.2
4
4. Wall Insulation or Construction Assembly, R-Value
R-II
Glazing Total V. Floor, Area Single Double
Triple
(sq.ft) (sq.ft)
(sq.4t) .
5. North-Facing. . . 3.06 % 0 38
=
Q
6. East -Facing . . . 2.42 % 0 30
0 ;
7. South -Facing. . . 2.66 % 0 - 33
0 ;
8. West-Facing . . . 3.63 7. 0 45
-2
9. Skylight. . . . . 0.00 % 0 0
0
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . . . . 0 ..49SC .
. . . . . . .
-2
b. South . . . . . . . . . . . . . . . .. . 0.62SC.
. . . . . . .
-1'
c. West . . . . . . . . . . . . . . . . 0.46SC .
. .
-4
d. North . . . . . 0.66SC .
`. ,. ...
0
e. Skylight NA SC.
. . . . . .
.0
11. Horizontal South Overhang length . . , . . 0 ft.
.
-1
12. Movable Insulation, % Floor Area . . . . . NA V. .
. . . . . . .
NA
13. Infiltration (indicate Standard, Medium or Tight)
MEDIUM'
-1
14. Thermal Mass
Exterior Wall Thermal Mass Area, Heat Capacity, R-Value
ft.2
"HC R-
Interior Thermal Mass Area, Heat Capacity, R-Value
125 ft.2 5.2
HC R- .2
4
HVAC SYSTEM XX
15. GAS FURNACE WITHOUT REFRIGERATION
3.
COOLING (SEASONAL EFFICIENCY) . . . . . . . . . .
SE i
16. HEAT PUMP (ENERGY EFFICIENCY RATIO) . . . . . . .
EER
17. GAS FURNACE WITH REFRIGERATION COOLING
('SEASONAL EFFICIENCY (SE) SEASONAL ENERGY
EFFICIENCY RATIO (SEER)). . . . . . . . .?1
SE 9.1 SEER
9
18. ACTIVE SOLAR (NET SOLAR FRACTION, i:). . . . . . .
7NSF
19. ZONALLY CONTROLLED ELECTRIC
RESISTANCE SPACE HEATING. . . . (Yes/No). .
DOMESTIC WATER HEATING );)c
20. SOLAR WITH GAS BACKUP (NET SOLAR FRACTION, Y).
:NSF
21. OTHER NATER HEATING (DESCRIBE TYPE). . . . . . . NATURAL GAS
0
POINT SYSTEM COMPLIANCE TOTAL. . . . . . . . . . .
. . . .....
-4
1-STORY
X CHECKLIST ITEMS; NOT A POINT.SYSTEM MEASURE.
} X OWNER TO ATTACH DOCUMENTATION FOR EFFICIENCIES AND
NSF.
•i
SHADING COEFFICIENT•.
TYPE
COEFFICIENT
Regular Window Glass
single
glazing. .
1.00
double
glazing. .
0.88
triple
glazing. .
Solarcoole bronze (reflective)
single
glazing. .
0.45
double
glazing.
0.36
SolarbronzeO
(tinted)
single.glazing.
0.76
double
glazing.
0.63
Solargrayo (tinted)
single
glazing. .
0.75
double
glazing. .
0.62
Clear Plastic
Skylight . .
0.99
Inside Dark Roller Shade 0.81
drawn
Inside Dark Venetian Blind. . 0.75
fully drawn
Clear Plastic Domed Skylight . 0.61
with translucent diffuser
Fenestration Fabric Curtain . 0.58
dark gray
Translucent.(frosted). • 0.57
Plastic Domed Skylight
Inside White Venetian Blind . 0.56
fully drawn
Fenestration Fabric Curtain . 0.47
light gray
Inside Venetian Blind. . 0.45,
reflective aluminum
Fenestration Fabric Curtain 0.40
off-white
Inside White Roller Shade 0.41
fully drawn
TYPE
Stevens Comfort Screen .
COEFFICIENT
Translucent (dark "solar- .
bronze" plastic
domed skylight)
Outside Vertical Fixed Fins
east, west sides
Outside Canvas Awning. .
dark or medium
Shadescre8n-Kaiser . .
30 profile angle
Koolshad.e-Regular
30° profile angle
40° profile angle
Koolshade-Low Sun Angle.
30° profile angle
Outside Venetian Blind . .
.white -cream colored
Outside Venetian Blind . .
awning type, white
. 0-34-
0. 25
.34-0.25
0.31
..0.18..
0.15--
O-1 , 5
.15--0.15
0,1�
Outside Moveable. 0.15
Horizontal.Louvers
�✓�2 FiETTrR)
sc o sc Of s -'c'-
glazing device 1 device 2
adapted from: Design with Climate,, ,
Victor Olgyay, Princeton University
Press, Princeton, New Jersey, 1963,:
pp. 68-71
registered trade mark, from PPG
industries
1
/NEI;MAL MASS �l3LE t 1.
JQ.
TROOM NAmg REA
N'�► L L G3 ATS famed M I
TAC �' 1 r5-
FORM 1 T`
• � I of 3 . .
.MANDATORY FEATURES AND, DEVICES'CHECKLIST
NOTE: All new residential buildings subject to these standards must contain f
the following features and devices regardless of the compliance
approach used.
CHECK COMMENT
MANDATORY FEATURES ( IF NOT IN IPAGX# ON PLANS or
AND DEVICES COMPLIANCE DOCUMENTATION/MOD i
PLAN FIELD
Building Envelope (CHECK INSPECTIONI '
1. Minimum . Ceiling Insulation, I I I
R-19 weighted average
2. Minimum Wall Insulation in I I I
framed walls R-11 weighted i I
average* ( ( I
3. Ducts constructed, installed I ( I
and insulated per Chapter 10 I
of 1976 UMC. I I
4. Doors and Windows, weather- i I I yL
stripped I
5. All joints and penetrations I I I
caulked and sealed
6. Doors and windows certified
and labeled
I I I
7. Exhaust Fans and fan system, ( I
have damper controls ( I I
8. Masonry and Factory Built.1
Fireplaces,
o Tight fitting, closable
metal or glass door
o Outside air intake with
damper ( :'
o Flue damper
o Continuous burning gas
pilot, prohibited
9. Vapor Barriers (Climate Zones
1, 14 and 16 only)
*Does not apply to exterior mass walls.
C-48 ECM 1-16
FORM 1
' � � •gage � of �.,,
A
MANDATORY FEATURES AND DEVICES CHECKLIST'
NOTE: All new residential buildings subject to these standards must contain
the following features and devices regardless of the compliance
approach used:.
MANDATORY FEATURES I IF NOT IN TPAGE # ON'PLANS or
AND DEVICES COMPLIANCE IDOCUMENT IO L:f
Plan Field
Space Conditioning ESipment (Check Ins ectionl
l-
1.
1. Sizing (attach heating and I
cooling calculations. to plans) l I I
2. Setback Thermostat (electric
heat pumps exempt)
3. HVAC Equipment, indicate oul I i
plans and certified by CEC I
Domestic Water Heating System
1. Tank Insulation has externall I I
blanket, R-12 or greater I l
I I
2. Hot water inlet and outletl I l
pipe insulated, exte=nallyl I l
wraped, with R-3 or greater I I I
(first five feet .in uncondi-I I I
tion space) _ I I I
I
3. Water Heating Equipment, ind i -I I l
cate on plans and certified byl I I
CEC
4. Showerhead s and Faucets, • indi-I
cate on plans and certified b yl I I -
CEC
Lighting Efficiency I I I
1. General Lighting for Kitchens I l l
and Bathrooms, 25 lumens/watt
or greater I I I
• I I I .
I I I
Gas CookinS Appliances l I I
I I
1. Appliance has intermittent ig-1 I I
nition device. I ( I
C-48 ECM 1716
i ~ a • •r ( it yr T
•, i _( ! ,4 1 } 1. it (1...3 it F Y �II 111• .�•
MANDATORY FEATIIgES .ANS DEVICESi:CdS' ;, r' }}; t ; • ��
�.y• s - t. _,L -'H 7i ,..L., .;s 1j,n f.f 'sfai f4.
NOTE: All new residential . buildin s suD ect .to, .thgse st ar a";q.
g j #�": {�r °
the following ! features and devicesregardless q;.`
apPrgacb ysed. - ,.: .
V!J Y4
IF NOT IN
MANDATORY FEATURES I COMPLIANCE PAGE" .ON'.pL�id$
AND DEVICES I MODEL
Plan I Field
Swimming Pool Heating (Check IIns ectionl
1. On/Off Switch on heater i I
2. -Weatherproof Card on heater
I I I •
3. Plumbed to allow for Solar I I
4: 75 Percent Thermal Efficiency ( ( I
for gas heater I I I
5. Pool Cover if heated ( I
I I
6. Time Clock on recirculating I I I
PUMP I
7. Directional water I I I
Inlets
State Owned Buildings
1. Solar Water Heating, required
if building exceeds 10,000 ( ( I
sq. ft. and HVAC, water I I I
heating, S or lighting 14 use I I I
over 1000 hours per year I I I
Steam and Steam Condensate Return I I I ,<i'i
and Recirculating Hot Water Pipe I I
Insulation I I
1. Pipe insulation I I I
C-48 ECM 1-16