9604-031 (SFD) Title 24i
TITLE 24 REPORT FOR:
a' BELNAP CONSTRUCTION
EISHENHOWER, LA QUINTA
1410 S9.FT:/N_ORTH FACE
PROJECT DESIGNER:
BELNAP CONSTRUCTION
REPORT PREPARED BY:
GINA TROOLINES
MJT Construction Services
4277 Main St.
Riverside, Calif. 92501--3822
( 909 ) 369-1700
Job Number: 5364-1
Date= 11/26/1995
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has.approval arid is
authorized by the California Energy Commission for- use with both the
Residential and Nonresidential.Bui.lding Energy Efficiency Standards.
TLh; nrr.riram .-J�1l r,aA by (Zmk� I n^rA i_N on ; atcc ( r,1 n ) A -->s -05: nO q
Table Of Contents for Title 24 Report
CoverPage
.......................................................:
1
Table
.of Contents
.............................. ....................
2
Form
CF --1P,
Certificate of.Compliance: Residential ...................
3
Form
MF -1R
Mandatory Measures Checklist: Residential ................
S
Form
P -2R
Point System Summary .... .................................
7
HVAC
Zone
& Space Loads Summary .....................................
a.
:-ERTIFICATE OF COMPLIANCE. Residential (part. 1 of 2) CF -1R Page 3 of 10
---------------------------------------------------------------------------
lroject Name:.BELNAP CONSTRUCTION oDate: 11i26/1995
Address: EISHENHOWER, LA QUINTA o
1410 SQ.FT./NORTH FACE 6Building Permit No
6
Designer: BELNAP' CONSTRUCTION 6Checked by / Date
6
Docume-ntation: MJT Construction Services .6COMPLY 24 User 1160
------------------------------------------------------------------------------
GENERAL INFORMATION
Compliance Method:
Climate -Zone=
Conditioned Floor- Area:
Building Type:
Building Front Orientation:
Number of Dwelling Units:
Floor Construction Type:
BUILDING SHELL INSULATION
Component
------------------------
R-15
--------------------
R-15 Wall w/1" EPS
R-38 Roof(R .38 .2x14.16 )
Slab Perimeter w/R-0.0
Slab Perimeter w/R-0.0
FENESTRATION
Orient.
Area
U -Val
Type
---------
Front
( N )
------
S1.5
-----
0.55
------
Double
Front
ON)
31.0
0.55
Double
Left
(E)
6.0
0.55
Double
Left
(E)
S6.0
0.55
Double
Back
(S)
37.3'
0.55
Double
Right
( W )
9.0
0.55
Double
Right
( W )
48.0
0.55
Double
Right
( W )
40.0
0.6s
Double
Skylight
16..0
0.80
Double
THERMAL MASS
Type
----------------------
Concrete, Heavyweight
Concrete, Heavyweight
Tile in Mortar
COMPLY 24 version 4.10
1S
.1410 sqft
Single Fam Det
0 deg ( N )
1
Slab on Grade
U -Value Location/Comments
------- ------------------------------------
0.065 WHOLE HOUSE.
0.028 WHOLE HOUSE
0.900 WHOLE HOUSE
0.720 WHOLE. HOUSE
Shading
Devices
4
Frame
OH
Interior
Exterior
N
N
----------------
Std DrapeStandard
---------------
Bug
Scr
Std Drape
Standard
Bug
Scr
Std Drape
Standard
Bug
Scr
Light Blind
Standard
Bug
Scr
Light Blind
Standard
Bug
Scr
Std Drape
Standard
Bug
Scr
Light Blind
Standard
Bug
Scr
Std.Drape.
Standard
Bug
Scr
none
none -
Area Thick
Covering (sf ) (in)
Exposed 980 3.50
Covered 430 3.50
Exposed 58 1.50
Location/Description-
-----------
ocation/Description
Slab on Grade
Slab on Grade
WHOLE HOUSE/Int Mass
4
Frame
OH
SF
Type
N
N
Vinyl
Y
N
Vinyl
Y
N
Vinyl
N
N
Vinyl
N
N.Vinyl
Y
N
Metal
N
N
ViTryl
Y
N
Wood
N
N
Metal .
Location/Description-
-----------
ocation/Description
Slab on Grade
Slab on Grade
WHOLE HOUSE/Int Mass
I 'k
0
CERTIFICATE OF COMPLIANCE: Residential (part 2 of 2) CF" -1R page 4 of 10
Project Name. BELNAP CONSTRUCTION 6Date: 11/26/1995
6
Documentation: MJT Construction Services 6COMPLY 24 User 1160
---------------------- =------ ------------------------=---------------------
HVAC SYSTEMS Minimum Distrib Type Duct TStat
`yst.em.Type Efficiency and Location RVal Type Location/Comments
-------------------------------------- ---- ------ -----------------------
Furnace 0.785 AFUE Ducts in Attic 4.2 SetBck WHOLE HOUSE
Sp1t.AirCond12.000 SEER Ducts in Attic 4.2 SetBck
Water No. Tank Ext.
WATER HEATING SYSTEMS Heater in Energy Size Insul
System Name Distribution Type Type Sys Factor (gal) R• -Val
AMERCIAN/OR EQUAL Standard StorGas 1 0.62 50.0 0-0
AFUE
WATER HEATER EQUIPMENT DETAIL /Rec Rated Stdby Tank Pilot
System Name System Type Eff Input Loss R -Val Light
AMERCIAN/OR EQUAL DomesticHW 0.790 50000 0.032 16.0 01,
SPECIAL FEATURES/REMARKS
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Parts 1 & 6 of the Califor-
r,ia Code of Regulations, and the administrative regulations to implement
them. This certificate has been signed.by the individual with overall .
design responsibility. When this certificate of compliance is submitted for
a.single building plan to be built in multiple orientations, any shading
feature that is varied is indicated in the Special Features/Remarks section
DESIGNER or OWNER
( Per Business &Professions Code)
BELNAP CONSTRUCTION
Lic #:
(signature) (date)
ENFORCEMENT AGENCY
Name:
Titie:
Agancy:_
Telephone:
DOCUMENTATION AUTHOR
GINA TROOLINES
MJT Construction Services
4277 Main St.
Riverside, Calif. 92501-3822
(90 69-170
( signat re ) (date)
(signature/stamp)
( date )
MANDATORY MEASURES C.'HECKLIST ( part 1. of 2; MF -1R page 5 of 10
Project Name: BELNAP CONSTRUCTION . .6Date: 11;/26/1995
_ o
Documentation: MJT Construction Services- 6COMPLY 24 User 1160
---------------------------------------------------------------------------
NO TE: Lowrise residential buildings subject to the Standards must contain
these measures regardless of the compliance approach used. Items marked
with an asterisk (*) may be superseded by more stringent compliance
requirements lisr_ed on the Certificate of Compliance. When.this checklist
is incorporated into the permit documents, the features noted shall be
considered.by all parties as binding minimum component performance
specifications for the mandatory measures whether they are shown elsewhere
in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
o Sec. 150(a): Minimum R-19 ceiling insulation.
o Sec. 1SO(b): Loose fill insulation manufacturers
labeled R -Value.
o Sec. 150(c): Minimum R-13 wall insulation in.framed walls
(does not apply to exterior mass walls).*
o Sec. 150(d): Minimum R-13 raised floor insulation in framed
floors; Minimum R-8 in concrete raised floors. *
o Sec. 150(1): Slab edge insulation —water absorption rate
no greater than 0.3%, water vapor transmission rate no
greater than 2.0 perm/inch.
o Sec. 118: Insulation specified.or installed meets California
Energy Commission quality standards. Indicate Type & form.
o Sec.
e.
b.
c..
Enforcement
116-117: Fenestration Products, Ext Doors & Infil/Exfil Controls
Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage.
Manufactured fenestration products have label w/certified U -Value
Exterior doors and windows weatherstripped;.all joints
and -penetrations caulked and sealed.. __
o Sec. 150(g): Vapor barriers mandatory in Climate Zones 14
and 16• only.
o Sec. 1SO(f): Special infiltration barrier installed to
comply with Sec. 151 meets Commission quality standards.
o Sec...15O(e)': Installation of Fireplaces, Decorative Gas
Appliances.and Gas Logs
1. Mlasonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
?. No continuous burning gas pilots allowed.
'A.
MA=NDATORY MEASURES CHECKLIST (part 2 of -2) MF -1R page 6 of 10
---------------------------------------------------------------------------
Project Name: BELNAP CONSTRUCTION 6Date: 11/26/1995
Documentation: MJT Construction Services 6COMPLY 24 User 1160
---------------------------------------------------------------------------
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES Enforcement
o Sec. 110-13: HVAC equipment, water heaters, showerheads
and faucets certified by the Commission. _
o Sec. 150(i): Setback thermostat on all applicable
heating systems.
o • Sec.
1
o Sec.
1.
2.
3.
150(j): Pipe and Tank Insulation
Indirect hot water tanks (eg unfired storage tanks or
backup solar hot water tanks) have insulation blanket
(R-12 or greater) or combined interior/exterior insulation
(R-16.or greater).
First 5 feet of pipes closest to water heater tank,
non -recirculation systems, insulated (R-4 or greater.
All buried or exposed piping insulated in recircula.tio.n
sections of hot water system.
Cooling system piping below 55 F insulated.
Piping insulated between heating source and indirect hot
water tank. _
15,0(m) Ducts and Fans *
Ducts constructed, installed and sealed to comply with
UMC Sections 1002 and 1004; ducts insulated -to a minimum
R-4.2 or ducts.enclosed entirely within conditioned space..
Exhaust systems have backdraft or automatic dampers.
Gravity ventilating systems serving conditioned space have
either automatic or readily accessible manually operated
dampers. _
o Sec. 114:Pool and Spa Heating Systems and Equipment
1. System is certified with 78m thermal efficiency, on-off
switch, weatherproof oper.ating instructions, no electric
resistance heating and no pilot light.
2. System is installed with:
a..At least-.3&pipe between filter and heater for future
solar heati.ng":,-
'b. Cover, for outdoor pools or outdoor spas
3. Pool system has directional inlets and a circulation
pump time switch.
o Sec. 115: Gas-fired central furnace, pool heater, spa heater
or household cooking appliance have no continuously
burning pilot light. (Exception: Non -electrical cooking .
appliance with pilot < 150 Btuh)
LIGHTING - MEASURES
o Sec. 150(k): Lighting.- 40 lumens/watt or greater for
general lighting in kitchens•and rooms with water closets;
and recessed ceiling fixtures IC (insulation cover) approved.
F-,�,
I
POINT SYSTEM SUMMARY P -2R cage 7 of 10
Project. Name= BEL -NAP CONSTRUCTION 6Date= 11/26/1995
0
Documentation: MJT Construction Services .6COMPLY 24 User 1160
BUILDING DATA
Conditioned Floor area 1410 sgft Number of Stories '1
.Occupancy Type Single
Fam Det
5.9
x
SCORE CARD
Measure
0.86
-1
1.
Roof Insulation
-------
0 .02.83
(U -Value)
0.67 =
2.
Wall Insulation
0.0645
(U -Value)
. 37 .3
3.
Raised Floor Insulation
0.0000
(U -Value)
o
1
West
97.0
6.9
6
3a.
Controlled Vent Crawlspace
0.0
(R -Value)
o->
16.0
1.1
x
0.79 =
6
4.
Slab Edge Insulation
0.7946
(f2 factor)
-6
S.
Infiltration
Standard
6.
Glass Heat Loss
.0.56
20.9%
7.
Fenestration Heat Gain
SC
Orientation Area % Glass
Open
Eff % SER
Points
.0
North
82.5
5.9
x
0.68 _
4.0
0.86
-1
East
62.0
4.4
x
0.67 =
2.9
0.65
-2
South-
. 37 .3
2-6--
x
0.68 =
1.8
0.64
1
West
97.0
6.9
x
0.60
4.1
0.71
-5
Skylight
16.0
1.1
x
0.79 =
0.9
1.00
-5
8. Interior.Thermal Mass 3.84
9. Exterior Wall Mass 0.00
10. Heating System
Zonal Control: No
'11. Cooling System
12. Water Heating
Point Total
-2
0
-2
Sum 1-6?
9
0
Sum 7-9
-5
-7
0
9
3
0
HVAC =ONE HEATING & COOLING LOAD SUMMARY page 8 of 10
Project Name: BELNAP CONSTRUCT ION 6Date: 11/26/1995
_ o
Documentation: MJT Construction Services 6COMPLY 24 User 1160
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humidity:
WHOLE HOUSE
Day&Night 398BAZO42071
Day&Night 597BNO42-A
1
Day Fans STD
NONCOINCT_DENT
50
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note that Sensible arid Latent Cooling Loads -are
indicated to allow for accurate comparison with manufacturer's output data.
COOLING
SPACES
IN THIS ZONE PEAK
HEATING
PEAK SENSIBLE
LATENT
-----------------------
WHOLE
----
HOUSE (Jan 12am)
-------
31.507
------------
(Aug 2pm) 30855
------
858
TOTAL SPACE LOAD
31507
30855
858
Duct Gains
& Losses:
3151
3086
-
Return
Air Lighting Gain
-------
0
--------
---TOTAL
-
TOTAL SYSTEM LOAD
34658
33941
858
SYSTEM
OUTPUT AT DESIGN CONDITIONS
71000
27216
9967
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note that Sensible arid Latent Cooling Loads -are
indicated to allow for accurate comparison with manufacturer's output data.
l -
RESIDENTIAL ;PACE HEATING LOAD SUMMARY page 9 of 10.
Project Name: BELNAP CONSTRUCTION 6Date: 11/26/1995
Documentation: MJT Construction Services 6COMPLY 24 User 1160
Space Name= WHOLE HOUSE
Design Indoor Dry Bulb Temperature: 70 F
Design Outdoor Winter Dry Bulb Temperature: 29 F
Design Temperature Difference: 41 F
Conduction
R-15 Wall w/1" EPS
Double Clear (NR Std)
Double Clear (Res Std)
.R-38 Roof(R.38.2x14.16)
Double Clear ( Res Dflt )
Slab on Grade
Slab on Grade
Infiltration: 1.00 x' 0.018 x
Ventilation:, 1.080 x
TOTAL HOURLY HEAT. LOSS FOR SPACE 'x1507
Heating AirFlow: 31507 Btu/hr / A1.08 x 35 F DeltaT)O = 834 cfm
Area
U -Value
TD
Btu/hr
1865.2
x
0.0645
x
41.0
- 4933
238.8.
x
0.5500
x
41.0
= 5385
40.0
-x
0.6500
x-41.0
= 1066
1394.0
x
0.0283
x
41.0
= 1620.
16.0..x
0.8000
x
41.0.
= 525
Perim =
63.0-
x
43.
= 2709
Perim =
89.0
x
43
= :.3827
1410 sf
x 11.0
ft
x 1.00 AC
x
41.0.'.=':;
11442
1410 sf
x 0.0
cfm
/ 333.0
x
41.0
==- 0
TOTAL HOURLY HEAT. LOSS FOR SPACE 'x1507
Heating AirFlow: 31507 Btu/hr / A1.08 x 35 F DeltaT)O = 834 cfm
J
r`
F:E',:';IDF-NTIAL =•PACS
CC-OLING LOAD SUMMARY
page iO of 10
----------------------
*
Name:
BELNAP CONSTRUCTION
6Date:
11/26/1995
o
Documentation:
-----------------------------------
MJT
Construction Services
6COMPLY 24 User 1160
,pace Name:
WHOLE HOUSE
Design Indoor
Dry
Bulb Temperature:
78 F
Design Outdoor
Summer Dry Bu1b'Temperatu.re:
112 F
Design Temperature
Difference-
34 F
Conduction
Area
U-Value
DETD
Btu/hr
-----------------------
R.-15 Wall w/1"
.EPS
------
1865.2
x
-------
0.0645 x
-----
29.h
-----
31562
Double Clear
(NR
Std)
238.8
x
0.5500 x
34.0 -
446
Double Clear
(Res
Std)-
' 40.0-
x
0.6500 x
34 .0 . =
884
R-38 Roof(R.38.2x14.16)
1394.0
x
0.0283 x
50.0 =
1976
Double Clear (Res
Dflt)
48.0
x
0.8000 x
34.0 =
1306
Infiltration:
1.00,x
0.018 x 1410 sf
x 11.0 ft
x 1.00 AC x
34.0 =
9488
Ventilation:
1.080.x 1410 sf
x 0.0 cfm:/
333.0 x
34.0 =
0
Shaded
Unshaded
So:lar Gain
Orient.
Area SGF
Area SGF
Sc
---------=--------------
Double Clear
(NR
---------
Std) North A
---- ---
0.0 x 15
+
---- ---
51.5 x 150
----
is 0.59
= 452
Double Clear
(NR
Std) North A
0.0 x 15
+
31.0 x 150
x 0.59
= : 272
Double Clear
(NR
Std) South A
.0.0 x 15'+
37.3 x 320
x 0.44
= 520
Double Clear
(NR
Std) West A
0.0 x 15
+
48.0 x 730
x 0.44
= 1526
Double Clear
(NR
Std) East A
22.4 x.15
+
33.6 x 730
x 0.44
= 1214
Double Clear
(NR
Std) East A
3.3 x 15
+
2.7 x 730
x 0.S9
= 143
Double Clear
(NR
Std)-West A
5.9 x 15
+
3.1 x 730
x 0.66
= 209
Double Clear
(Res
Std) West A
22.3 x 15
+
17.7 x 730
x 0.56
= 905
Double Clear (Res
Dflt) Skylight A
0.0 x 1S
+
16.0 x1520
x 0.79
= 1926
Internal Gain
---------------------
Op-Frac.
----------
Area
------
Heat
---------
Gain
Conv.
-----
Lighting
1.00 x
1410.0
x
0.200 x
3.413
= 962
Equipment"
1.00.. x
1410.0
x
0.100 x
3.413
= .481
Occupants
.1.00 x
1410.0
x
225 /
333
= 953
TOTAL HOURLY SENSIBLE
HEAT
GAIN FOR SPACE
308SS
Latent Gain
Op Frac.
Area
Heat
---------
Gain
Conv.
-----
Btu/hr
------
-----------------------
Equipment
--------
1.00 x
------
1410.0
x
0.000 x
3.413
= 0
Occupants
1.00 x
1410.0.
x
225 /
333
= 953
Infiltration:
1.00
x 0.018 x 1410 sf
x 11.0 ft
x 1.00 AC x
-0.3
= ---87
Ventilation:
1.080 x 1410 sf
x 0.0 cfm
/ 333.0 x
--0.3
- -0
TOTAL HOURLY
LATENT HEAT
GAIN FOR SPACE
858
Cooling AirFlow:
30855 Btu/hr /
A1.08 x 23
F DeltaT)O
= 1243
cfm