2020-04-05 thru 2020-06-28 Cert PayrolleCPR Online Confirmation
_Your payroll submission request has been processed.
'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8645398
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-28
Payroll Number: 52
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10840644
Print this Page
iew your submission Adobe
Submit another set of payroll records
Public Works Certifie' ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-28 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC Il, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 52 - 1 Ctr Payroll #: 52-1 Week Ending: 06/28/2020
❑ Statement of Non -Performance?
❑ Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/ Health
Total
06/22 06123 06/24 06/25 06/26
06127
06128
Hours
Base Hourly Fringe
Holiday & Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
40 Qd Ttl
15.00 0.00
0.00 0.00
0.00 0.00 0.00 f,5.: -o"
O LANDSCAPE MAINTENANCE LABORER 0.50 0.50 0.50 0.50 0.00
0.00
0.00'>
TO„0
22.50 0.00
0.00 0.00
0.00 0.00 0.00ML __
NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM
THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
0.00 Total Deductions 64.33
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works CertifiE ayroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 06/28/2020
Payroll Number:52-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
Mon Tue Wed Thu Fri Sat
Sun Total Total
Vac/ Health
Total
06122 06/23 06/24 06/25 06/26 06/27
06/28 Hours Base Hourly Fringe
Holiday & Welf. Pension
Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00 0.00
0.00 �W�4:tl for? 13.80 0.00
0.00 0.00 0.00
0.00 0.00 1MMi
NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM
THE EMPLOYEE'S CHECK, SHOULD =
0.00, 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Travel & Subsistence 0.00
Total Deductions 60.43
Public works Certified Payroll Reporting Form 04/08/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
—Please review the results of your submission. Should you have any questions please contact the eCPR unit at
blicworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-28
Payroll Number. 52
Amendment Number. 0
10 employee payroll record(s) processed
Your Transaction ID is: 8645398
Print J�lg egg
View your submission
Submit another set of payroll records
Public Works Certified- yroll Reporting Form
Certification under, ilty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-28 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-07-02."
Contractor Name: PWLC II, INC.
Contractor PWCR: 1000037373
License Type: CSLB
License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS,
CA
FEIN:
510532726
Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
DIR Project ID: 290440
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA
County: RIVERSIDE
Location Description: LIGHTING
AND LANDSCAPE DISTRICT 89-1
LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 52- 0
For Week Ending: 06/28/2020
❑ Is this a 'Statement of Non -Performance?'
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Social SecurityNumber of Worker
Withholding
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal State
Vac/
Health
1
Date
Earned
Tax FICA Tax SDI
Hollda y
& Welf.
Pension
Net
ALAN RAMIREZ RAYA
Total
Hourly
Wage
Check
Work
06122
06/23
06/24 06/25 06/26
06/27
06/28
Hours
Pay Rate This All
63.91 55.08 14.56 7.20
0.00
0.00
o.0o
Paid For
Number
84037 MAGNOLIA ST
Classification
Hours Worked Each Day
Project Projects
Week
COACHELLA
LANDSCAPE
S
8.00
8.00
8.00
8.00
0.00
0.00
0.00
32.00
18.00
576.00
720.00
Fund
Trav/Subs
Total
579.25
30165
CA
MAINTENANCE
Training
g
Admin
Dues
Subs
Savings
g
Other
Deduct
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
140.75
92236
p
0.00
�00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
State
V3c1
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& WeEf.
Pension
Wage
Check
3
Date
APOLINAR GONZALEZ MARTINEZ
Hours
Pay Rate
Paid For
Number
Work
06/22
06123
06124 06/25 06126
06/27
06/28
This
All
24.86
42.84
2.36
5.60
0.00
0.00
0.00
31325 AVE LA PALOMA
Classification
Project
Projects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Fund
Trav/
Total
484.34
30160
CA
MAINTENANCE
Training
g
Admin
Dues
Subs
Savings
g
Other
Deduct
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
75.66
92234
[EO.00
0.00
0.00
0.00
E
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions,
and Payments
Name, Address and
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
State
Vac!
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Wage
Check
3
Date
ARMANDO RICO CHAVEZ
Hours
Pay Rate
Paid For
Number
Work
06/22
06/23
06/24 06/25 06/26
06127
06/28
This
All
68.06
70.38
22.58
9.20
0.00
0.00
0.00
2103 JACQUES DR
Classification
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
920.00
920.00
Fund
Trav/
Total
749.78
30157
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
1.00
1.00
1.00
1.00
0.00
0.00
0.00
4.00
30.00
LABORER
0.00
0.00
0.00
0.00
0.00
0,00
170.22
92262
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public Works certified Payroll Reporting Form 07/02/2020 - Page 1
Public Works Certifier-' lyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 06/28/2020 Payroll Number: 52-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday&
Health
Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Worst
Classification
06/22 06/23 06/24 06/25 06126 06/27 06/28
This
t
Project
j
All
Proj
Projects
0.00
34.28
0.00
4.46
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
lmmmmmmmm6.
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
0.00
8.00
8.00
8.00
0.00
0.00
32,00
14.00
448.00
448,00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
409.24
30159
0
0.00
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
38.76
D
j 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday&
Health
Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
work
Classification
06/22 06/23 06/24 06/25 06/26 06/27 06/28
Thls
Project
1
All
Pects
ro 1
0.00
46.05
0.00
6.02
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
602.00
602,00
Training
9
Fund
Admin
Dues
Trav/Subs
Subs
Savings
9
Other
Total
549.93
30168
0
0.50
0.50
0.50
0.50
0.00
0.00
0.00
2.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
52.07
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
06/22 06/23 06124 06/25 06126 06/27 06/28
This
Project
All
Projects
8.54
49.34
0.00
6.45
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
645.00
645.00
Training
9
Fund
Admin
Dues
Subs
Subs
Savings
9
Other
Total
580.67
30156
0
0.50
0.50
0.50
0.50
0.00
0.00
0.00
2.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
84.33
D
1 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Ho liday
Health
& Welf.
Pension
Net
Wage
PFor
We
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
06/22 06/23 06/24 06/25 06/26 06/27 06/28
This
Project
All
Projects
0.00
41.17
0.00
5.38
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
552,00
552.00
Training
Admin
Dues
Subs
Savings
Other
Total
491.57
30164
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.70
0.00
0.00
0.00
0.00
0.00
13.88
60.43
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
Public Works Certified Payroll Reporting Form 07/02/2020 - Page 2
Public Works Certifier'- iyroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 06/28/2020
Payroll Number:52-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday&
Health
Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
0
Date
Work
Ciasslflcatlon
06/22 06/23 06/24 06/25 06/26 06/27 06/28
This
Project
j
All
Projects
Pro j
60.43
45.90
12.86
6.00
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
��
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
g
Fund
Admin
Dues
Subs
Subs
Savings
g
Other
Total
474.81
30163
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
125,19
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSARODRIGUEZ
PO BOX 580332
Work
Classification
06/22 06/23 06/24 06/25 06/26 06/27 06/28
This
Project
All
Projects
24.86
42.84
7.52
5.60
224.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
dEppooppmopm
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
0.00
8.00
0.00
0.00
0.00
0.00
8.00
14.00
112.00
560.00
Training
g
Fund
Admin
Dues
Travl
Subs
Savings
g
Other
Total
479.18
30166
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
80.82
D
o.00
0.00
0.00
1 0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
ERIK M VILLALOBOS VALDEZ
68060 ENCINITAS RD
Work
Classification
06/22 06/23 06/24 06/25 06/26 06/27 06/28
This
Project
All
Projects
58.41
45.25
8.91
5.92
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
comemoom
LANDSCAPE
MAINTENANCE
LABORER
S
4.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
56.00
591.50
Trainin 9
Fund
Admin
Dues
Trav/
Subs
Savings
9
Other
Total
473.01
30151
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118.49
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NOTE: BASE HOURLY RATE = $14.00
Public works certified Payroll Reporting Form 07/02/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
?lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8589001
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-21
Payroll Number: 51
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10840466
Print this Page
iew your submission Adobe
Submit another set of payroll records
Public Works Certifi( ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for'.he week ending 2020-06-21 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 51 - 1 Ctr Payroll #: 51-1 Week Ending: 06/21/2020
❑ Statement of Non -Performance?
❑ Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
S S 4joilownuft Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/ Health
Total
06/15 06/16 06117 06118 06/19
06120
06/21
Hours
Base Hourly Fringe
Holiday & Welf.
Pension
Olher Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
x40"6tFT !
15.00 0.00
0.00 0.00
0.00
0.00 0.00
f517om
O LANDSCAPE MAINTENANCE LABORER 0.00 1.00 0.50 0.00 0.00
0.00
0.00
Gt'9`50?i,
22.50 0.00
0.00 0.00
0.00
0.00 0.00
j22?SO
NOTE: ORIGINAL PAYROLL NUMBER 51-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED
FROM THE EMPLOYEE'S CHECK,
SHOULD = 0.00
Travel & Subsistence
0.00
Total Deductions
62.23
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works Certifi( ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 Week Ending: 06/21/2020 Payroll Number: 51-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
Mon Tue Wed Thu Fri Sat Sun Total Total Vac/ Health Total
06/15 06/16 06117 06/16 06/19 06/20 06/21 Hours Base Hourly Fringe Holiday & Welt. Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 0.00 8.00 8.00 0.00 0.00 x'M1300! 13.80 0.00 0.00 0.00 0.00 0.00 0.00 %804p
NOTE: ORIGINAL PAYROLL NUMBER 51-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = Travel & Subsistence 0.00 Total Deductions 60.41
0.00, 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Public works certified Payroll Reporting Form 04/08/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
iblicworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-21
Payroll Number. 51
Amendment Number. 0
9 employee payroll record(s) processed
Your Transaction ID is: 8589001
View your submission -R
Submit another set of payroll records
Public Works Certifie'� iyroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-21 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-06-25."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 51- 0 For Week Ending: 06/21/2020 Is this a 'Statement of Non -Performance?'
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Man Tue Wed Thu Fri Sat Sun
Gross Amount
Earned
Total Hourly !
Hours Pay Rate This All
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
06/15 06/16 06/17 06/18 06/19 06/20 06/21
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720,00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
579.25
30017
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Ne t
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
06/16 06/16 06/17 06/18 06119 06/20 06/21
This
Protect
All
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
484.34
30012
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.66
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf,
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
06/15 06/16 06/17 06118 06119 06/20 06/21
This
Project
All
Projects
62.66
66.94
19.61
8.75
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92282
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
875.00
875,00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
717.04
30009
Q
1.00
0.00
0.50
1.00
0.00
0.00
1
0.00
2.50
30.00
0.00
0.00 1
0.00
0.00
0.00
0.00
157.96
D
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
0.00
40.00
NOTE:
Public Works Certified Payroll Reporting Form 06/25/2020 - Page 1
Public Works Certifie iyroll Reporting Form
'Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/21/2020 Payroll Number: 51-0
i
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
Net
FICA SDI Pension
Earned Tax Tax Holiday & Waif.
0 Date Total Hourly Wage Check
CARLOS I. ESPARZAALVAREZ
06/15 06/16 06/17 06/18 06119 06120 06/21 Hours Pay Rate This All 0.00 42.84 2.36 5.60 0.00 0.00 0.00 Paid For Number
Work
33822 SHIFTING SANDS #B Classification Protect Protects Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
509.20
30011
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
50.80
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE;
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social Security Number of Worker
Withholding
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Pension
Net
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Wage
Check
5
Date
Total
GENARO VARGAS
Pay Rate
Paid For
Number
06/15 06/16 06117 06118 06/19 06/20 06/21
Hours
This
All
0.00
45.26
0.00
5.92
0.00
0.00
0.00
69130 VICTORIA DR
Work
Classification
Project
Protects
Week
W
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
591.50
591.50
nd
540.32
30020
CA
MAINTENANCE
Tralning
Adm n
Dues
Subs
Savings
Other
Total
Q
0.00
1.00
0.50
0.00
0.00
0.00
0.00
1.50
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
51.18
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Holiday
& Welf.
Wage
Paid For
Check
Number
4
Date
LETICIA BONILLA
06115 06116 06/17 06/18 06119 06/20 06/21
This
All
7.41
48.48
0.00
6.34
0.00
47.39
0,00
33477 NAVAJO TR #B
Work
Classification
Project
Projects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
Boo
8.00
0.00
0.00
40.00
15.00
633.75
633.75
Fund
Trav/
571.52
30007
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
1.00
0.50
0.00
0.00
0.00
0.00
1.50
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
62.23
g2234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE;
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
I
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Holiday
& Waif.
Paid For
NuWage meck
ber
4
Date
MARCELINO RAMIREZ
06/15 06/16 06/17 06/18 06/19 06/20 06/21
This
All
0.00
41.15
0.00
5.38
0.00
47.39
0.00
1500 E SAN RAFAEL DR #164
Work
Classification
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
0.00
8.00
8.00
0.00
0.00
32.00
13.80
441.60
552.00
Fund
Trav/
491.59
30016
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.70
LABORER
0.00
0.00
0.00
0.00
0.00
13.88
60.41
92462
D
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
27.60
NOTE; $13.86 THFP. = FH125
Public Works certified Payroll Reporting Form 06/25/2020 - Page 2
Public Works Certifierr ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/21/2020 Payroll Number: 51-0
i
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
FICA SDI Pension Net
Date Earned Tax Tax Holiday & Welf.
� PASTOR R. PEREZ NEGRON 0 Total Hourly Wage Check
Work 06/15 06116 06117 06/18 06119 06/20 06/21 Hours Pay Rate This All 60.43 45.90 12.86 6.00 0.00 0.00 0.00 Paid For Number
67365 ONTINA RD Classification Hours Worked Each Day Protect Projects Week
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00 600.00
Fund
Trav/
474.81
30015
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
125.19
92234
p
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
30.00
�
NOTE:
i
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Wage
Check
3
Date
ROSARODRIGUEZ
Hours
Pay Rate
Paid For
Number
06/15 06/16 06/17 06/18 06/19 06/20 06/21
This
All
18.28
38.56
5.06
5.04
336.00
0.00
0.00
PO BOX 580332
Work
Classification
Project
Projects
Week
Hours Worked Each Day
N PALM SPRINGS
LANDSCAPE
S
8.00
4.00
0.00
0.00
0.00
0.00
0.00
12.00
14.00
168.00
504.00
437.06
30018
CA
MAINTENANCE
Training
Admn
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
66.94
92258
p
0.00
o.00
o.00
o.00
o.00
o.00
o.00
o.o0
28.00
�
NDTE:
Public Works certified Payroll Reporting Form 06/25/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
.'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8555867
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-14
Payroll Number: 50
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10840311
Print this Page
iew your submission Adobe
Submit another set of payroll records
1_'
Public Works Certifi ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-14 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 50 - 1 Ctr Payroll #: 50-1
Week Ending: 06/14/2020
❑ Statement of Non -Performance?
❑ Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSNANNEINW
Mon
Tue Wed Thu
Fri Sat
Sun
Total
Total
Vac/
Health
Total
06/08
06/09 06110 06/11
06/12 06/13
06/14
Hours
Base Hourly
Fringe
Holiday
& Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER
8.00
8.00 8.00 8.00
8.00 0.00
0.00
40.00
15.00
0.00
0.00
0.00
0.00 0.00 0.00
O LANDSCAPE MAINTENANCE LABORER
0.50
0.00 1.00 0.00
0.00 0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00 0.00 0.00 2�5
NOTE: ORIGINAL PAYROLL NUMBER 50-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00 Travel & Subsistence 0.00 Total Deductions 62.24
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Contractor Name: PWLC II, INC.
Public Works CertifiE tyroll Reporting Form
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 06/14/2020
Payroll Number:50-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSN:IllmlmmmL.. Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/
Health
Total
06/08 06109 06110 06/11 06/12
06/13
06/14
Hours Base Hourly
Fringe
Holiday
& Welf.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00d{dOl00if
13.80
0.00
0.00
0.00
0.00
0.00 0.00
93!6U)
0 LANDSCAPE MAINTENANCE LABORER 0.50 0.00 0.00 0.00 0.00
0.00
0.00
11.6 20.70
0.00
0.00
0.00
0.00
0.00 0.00
?PW2W
NOTE: ORIGINAL PAYROLL NUMBER 50-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM
THE EMPLOYEE'S CHECK, SHOULD =
Travel & Subsistence
0.00
Total Deductions
61.36
0.00, 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Public Works certified Payroll Reporting Form 04/08/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
__Please review the results of your submission. Should you have any questions please contact the eCPR unit at
i blicworks@d irca.gov.
Contractor Name: PWLC Il, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-14
Payroll Number: 50
Amendment Number. 0
9 employee payroll record(s) processed
Your Transaction ID is: 8555867
Print 's P 9e
View your submission "� r
Submit another set of payroll records
Public Works Certifie '- Tyroll Reporting Form
Certification under, aity of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER
(position in business) with the authority
to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty
of
perjury that the records or copies
thereof submitted
and consisting of certified payroll records for the
week ending 2020-06-14 are the originals or true, full, and correct copies of the originals
which
depict
the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual
or individuals named. I certify this on 2020-06-19."
Contractor Name: PWLC II, INC.
Contractor PWCR: 1000037373
License Type: CSLB License Number,855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS,
CA
FEIN: 510532726
Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
i
Awarding Body: CITY OF LA QUINTA
DIR Project ID: 290440
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA
County: RIVERSIDE
Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 50- 0
For Week Ending: 06/14/2020
71Is this a'Statement of Non -Performance?'
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Social SecurityNumber of Worker
Withholding
Mon
Tue Wed Thu Fri Sat Sun
Gross Amount Federal Slate Vac/ Health
1
Data
Earned Tax FICA Tax SDI Holiday
ollda & Welf.
y
Penslon
Net
ALAN RAMIREZ RAYA
Total
Hourly
Wage
Check
Work
06/08
06/09 06/10 06/11 06112 06/13 06/14
Hours
Pay Rate This All 63.91 55.08 14.56 7.20 0.00 0.00
0.00
Paid For
Number
84037 MAGNOLIA ST
Classification
Hours Worked Each Day
Project Pro acts
� j
Week
COACHELLA
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
18.00
720.00
720.00
Fund
Travl
Total
579.25
29987
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
140.75
92236
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE: N:
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Mon
Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
lax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Net
Wage
Check
3
Date
APOLINAR GONZALEZ MARTINEZ
Work
06/08
06/09 06/10 06/11 06/12 06/13 06/14
This
All
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours
Pay Rate
Paid For
Number
31325 AVE LA PALOMA
Classification
Project
Projects
I
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560,00
Total
484.34
29982
CA
MAINTENANCE
TrainingFund
Admin
Dues
Subs
Subs
Savings
9
Other
Deduct
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
75.66
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker
Withholding
Mon
Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vacl
Health
Net
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Hailday
& Weif.
Pension
Wage
Check
3
Date
ARMANDO RICO CHAVEZ
Hours
Pay Rate
Paid For
Number
Work
06/08
06/09 06/10 06/11 06/12 06/13 06114
This
All
68.06
70.38
22.58
9.20
0.00
0.00
0.00
2103 JACQUES DR
Classification
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
920.00
920,00
Fund
Travl
Total
749,78
29979
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
1.00
1.00
1.00
1.00
0.00
0.00
0.00
4.00
30.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
170.22
922fi2
D
0.00
o.00 I
0.00
0.00
0.00
0.00
0.00 1
0.00 1
40.00
NOTE:
Public works certified Payroll Reporting Form 06/19/2020 - Page 1
Public Works Certifie!' -tyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 06/14/2020
Payroll Number:50-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
06/08 06/09 06110 06/11 06/12 06/13 06/14
This
Project
All
Projects
0.00
43.64
2.82
5.71
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
• CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
570.50
570.50
Admin
Dues
Subs
Savings
Other
Total
518.33
29981
Q
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.50
21.00
Elno'n
0.00
0.00
0.00
0.00
0.00
52.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
06/OB O6I09 06/10 06/11 06112 06113 O6/14
This
Project
All
Projects
0.00
45.25
0.00
5.92
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY LANDSCAPE
CA MAINTENANCE
LABORER
92234
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
591.50
591.50
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
540.33
29990
Q
0.50
0.00
1.00
0.00
0.00
0.00
0.00
1.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
51.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
06/08 06109 06/10 06/11 06/12 06/13 06/14
This
Project
All
Protects
7.41
48.49
0.00
6.34
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
633.75
633.75
Training
Admn
Dues
Subs
Savings
Other
Total
571.51
29977
O
I 0.50
0.00
1.00
0.00
0.00
0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00
0.00
0,00
62.24
D
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
06/08 06/09 06/10 06111 06112 06/13 06/14
This
Project
All
Projects
0.00
42.00
0.00
5.48
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8A0
8.00
8.00
8.00
0.00
0.00
40.00
13.80
562.35
562.35
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
500.99
299B6
Q
0.50
0.00
0.00
0.00
0.00
0.50
20.70
0.00
0.00
0.00
0.00
0.00
13.88
61.36
D
0.00
ig
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
Public Works certified Payroll Reporting Form 06/19/2020 - Page 2
Public Works Certifier' ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/14/2020 Payroll Number:50-0
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
Net
FICA SDI Pension
Earned Tax Tax Holiday & Welf.
0 Date Total I e Check
PASTOR R. PEREZ NEGRON
Work 06/08 06/09 06/10 06/11 06/12 06/13 06/14 Hours PHourly ay Rate This All 46.03 36.72 7.78 4.80 0.00 0.00 0.00 Paid For Number
+
67365 ONTINA RD Classification Hours Worked Each Day Protect Protects Week 11
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
0.00
8.00
0.00
0.00Fund
32.00
15.00
480.00
480.00
384.67
29985
CA
MAINTENANCE
Training
Adm n
Dues
Subs
Savings
Other
Total
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
95.33
92234
M
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
��
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
Tax
Holiday
& Welf.
Wage
Check
3
Date
ROSARODRIGUEZ
Hours
Pa Rate
y
Paid For
Number
Wok
06108 O6I09 O6/10 06/11 O6/12 06113 06114
This
All
15.48
36.41
4.11
4.76
0.00
0.00
0.00
PO BOX 580332
Classification
Project
Projects
I
Week
Hours Worked Each Day
N PALM SPRINGS
LANDSCAPE
S
8.00
2.00
8.00
8.00
8.00
0.00
0.00
34.00
14.00
476.00
476.00
415.24
29988
CA
MAINTENANCE
Training
Admit
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
60.76
92258
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
!
NOTE:
Public Works certified Payroll Reporting Form 06/19/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8479668
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-07
Payroll Number: 49
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10839955
Print this Page
iew your submission
Adol)e
Submit another set of payroll records
Public Works Certifie iyroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-07 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 49 - 1 Ctr Payroll #: 49-1 Week Ending: 06/07/2020 ❑ Statement of Non -Performance? Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSN� Mon Tue Wed Thu
Fri
Sat
Sun
Total
Total
Vac/
Health
Total
06/01 06/02 06/03 06/04
06/05
06/06
06/07
Hours
Base Hourly Fringe
Holiday
& Welf. Pension,
Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00
8.00
0.00
0.00
0.00
15.00 0.00
0.00
0.00 0.00
0.00 0.00 1 5.00
O LANDSCAPE MAINTENANCE LABORER 0.50 0.00 0.00 0.00
0.50
0.00
0.00
1.00
20.70 0.00
0.00
0.00 0.00
0.00 0.00 20.70
NOTE: ORIGINAL PAYROLL NUMBER 49-0 SHOWS 47.39 IN HEALTH 8 WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00 Travel & Subsistence 0.00 Total Deductions 60.14
Public Works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works CertifiE Ayroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 06/07/2020
Payroll Number:49-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSN� Mon Tue Wed Thu Fri
Sat
Sun
Total Total
Vac/
Health
Total
06/01 06/02 06/03 06/04 06/05
06106
06/07
Hours Base Hourly Fringe
Holiday
& Welf.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
r{4.0 66 7{ 13.80 0.00
0.00
0.00
0.00
0.00 0.00
- it
t _
O LANDSCAPE MAINTENANCE LABORER 0.50 0.00 0.00 0.00 0.00
0.00
0.00
0 $U 20,70 0.00
0.00
0.00
0.00
0.00 0.00
mn
NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD =
0.00, 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Travel & Subsistence
0.00
Total Deductions
61.32
Public Works certified Payroll Reporting Form 04/08/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
bl c:woftQdlr.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-06-07
Payroll Number 49
Amendment Number. 0
9 employee payroll record(s) processed
Your Transaction ID is: 8479668
PrEnt ihi; Pagg
View your submission
Submit another set of payroll records
Public Works Certifier lyroll Reporting Foriii
Certification under, .alty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-07 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-06-10."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
Payroll Number: 49- 0
For Week Ending: 06/07/2020
MAINTENANCE OF CITYWIDE MEDIANS
❑ Is this a 'Statement of Non -Performance?'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
I
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
06/01 06102 06103 06/04 06/05 06/06 06/07
This
Project
All
Projects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
18.00
720.00
720.00
Training
g
Fund
Admin
Dues
Trav/
Subs
Savings
g
Other
Total
Deduct
579.25
29841
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140,75
p
0.00
0,00
0,00
0.00
0.00
0.00
0.00
1 0.00
36.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
06/01 06102 06/03 06/04 06/05 06/06 06/07
This
Project
All
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
Deduct
484.34
29836
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.86
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and Number of
Social SecurityNumber of Worker Withholding
ARMANDO RICO CHAVEZ 3
Work
2103 JACQUES DR Classification
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
Date
O6/01 O6IO2 O6/03 06l04 O6/OS O6I06 06107
This
Project
All
Protects
69.86
71.53
23.57
9.35
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
935.00
935.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
760.69
29833
Q
1.00
1.00
1.00
1.00
0.50
0.00
0.00
4.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
174.31
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public Works certified Payroll Reporting Form 06/10/2020 - Page 1
Public Works Certifier' )yroll Reporting Foi rn
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/07/2020 Payroll Number:49-0
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vacl Health
Net
Pe
Date Earned Tax FICA Tax SDI Holiday & Welf. nsion
0 Total Hourly Wage Check
CARLOSI.ESPARZAALVAREZ
Work 06101 06/02 06/03 06104 06/05 06/06 06/07 Hours Pay Rate This All 0.00 42.84 2.36 5.60 0.00 0.00 0,00 Paid For Number
33822 SHIFTING SANDS #B Classification Hours Worked Each Day Project Projects Week
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Fund
Trav/
509.20
29835
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
50.80
92234
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
SDI
Vac/
Health
Pension
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
I
Tax
Holiday
& Welf.
Wage
Check
5
Date
GENARO VARGAS
Hours
Pay Rate
This All
PFor
Number
06/01 06/02 06/03 06/04 06/05 06/06 06/07
0.00
44.44
0.00
5.81
0.00
0.00
0.00
69130 VICTORIA DR
Work
Classificatlon
+
Project I Projects
Week
We
Hours Worked Each Day
i CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
581.00
581.00
Fund
Trav/
530.75
29844
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.50
0.00
0.00
0.00
0.50
0.00
0.00
1.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
50.25
92234
p
o.00
o.oa
o.00
o.00
o.00
o.00
O.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
Tax
Holiday
& Welf.
Wage
Check
4
Date
LETICIABONILLA
Hours
Pay Rate
This All
Paid For
Number
06/01 06/02 06/03 06/04 06/05 06/06 06/07
6.29
47.62
0.00
6.23
0.00
47.39
0.00
33477 NAVAJO TR #B
Work
Classification
Project Projects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
622.50
622,50
562.36
29831
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.50
0.00
0.00
0.00
0.50
0.00
0.00
1.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
60,14
92234
p
0.00
0.00
1 0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
This All
Tax
Tax
Holiday
& Welf.
Wage
Paid For
Check
Number
4
Date
MARCELINO RAMIREZ
06/01 06/02 06/03 06104 06105 06/06 06/07
0.00
41.96
0.00
5.48
0.00
47.39
0.00
Work
Week
1500 E SAN RAFAEL DR #164
Classlficatlon
Project Projects
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
562.35
562.35
Fund
Trav/
501.03
29840
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.50
0.00
O.o0
0.00
0.00
0.00
0.00
0.50
20.70
LABORER
0.00
0.00
0.00
0.00
0.00
13.88
61.32
92262
p
o.ao
o.00
o.00
o.o0
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
I
Public works certified Payroll Reporting Form 06/10/2020 - Page 2
Public Works Certifie,- -iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/07/2020
Payroll Number:49-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
i
Mon Tue Wed Thu Frl Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
i
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
06/01 06/02 06/03 06/04 06/05 06/06 06/07
This
Project
All
Projects
61.78
46.76
13.36
6.11
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
B.00
8.00
B.00
8.00
0.00
0.00
40.00
15.00
611.25
611.25
Trainin 9
Fund
Admin
Dues
Trav/Subs
Subs
Savings
9
Other
Total
483.24
29839
p
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0.50
22.50
0.00
0.00
0.00
0.00
0.00
0.00
126.01
D
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Frl Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf,
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSARODRIGUEZ
PO BOX 580332
Work
Classification
06/01 06102 06/03 06/04 06/05 06/06 06/07
This
Protect
All
Protects
24.86
42.84
7.52
5.60
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
B.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
9
Fund
Admin
Dues
Travl
Subs
Savin s
9
Other
Total
479.18
29842
�
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
80.82
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Public works Certified Payroll Reporting Form 06/10/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8421445
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-31
Payroll Number: 48
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10839801
Print this Page
r iew your submission I
Submit another set of payroll records
Public Works Certifi ayroll Reporting Form
Certification uno., penalty of perjury:
"I, KRiSTY SOUTH, the undersigned, am the CONTROLLER (posltlon In business) with the authority to act for and an behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-31 are the originals or true, full, and correct coples of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or indlviduals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 48 - 1 Ctr Payroll #: 48-1
Week Ending: 05/31/2020
Statement of Non -Performance?
Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B,
CATHEDRAL CITY, CA, 92234
SSMINEW
Mon Tue Wed Thu Fri Sat
Sun Total
Total
Vac/ Health
Total
05/25 05/26 05/27 05/28 05/29 05130
05/31 Hours
Base Hourly Fringe
Holiday & Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER
0.00 8.00 8.00 8.00 8.00 0.00
0.00 ""7 32 00 !
15.00 0.00
0.00 0.00
0.00 0.00 0.00 lamf�>7 ;
O LANDSCAPE MAINTENANCE LABORER
0.00 0.50 0.50 0.50 0.00 0.00
0.00 Fzi 5t'
22.50 0.00
0.00 0.00
0.00 0.00 0.00 5
NOTE: ORIGINAL PAYROLL NUMBER 48-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK,
SHOULD = 0.00
Travel & Subsistence
0.00 Total Deductions 44.44
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works Certifies iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SS Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
05/25 05/26 05/27 05/28 05/29
05/30
05/31
Hours Base Hourly
Fringe
S LANDSCAPE MAINTENANCE LABORER 0.00 8.00 8.00 8.00 8.00
0.00
0.00
'00 ? 13.80
0.00
O LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.50 0.00
0.00
0.00
., 1i50 20.70
0.00
NOTE: ORIGINAL PAYROLL NUMBER 48-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD
=
0.00. 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Week Ending: 05/31/2020
Vac/
Health
Holiday
Pension
& Welt.
0.00
0.00 0.00
0.00
0.00 0.00
Travel & Subsistence 0.00
Payroll Number:48-1
Other Training
Total
Hourly Rate
0.00 0.00
T..!mwJ
0.00 0.003Z`!aD
Total Deductions
53.56
Public works certified Payroll Reporting Form 04/08/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
-Please review the results of your submission. Should you have any questions please contact the eCPR unit at
blicworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-31
Payroll Number: 48
Amendment Number. 0
11 employee payroll record(s) processed
Your Transaction ID is: 8421445
Prini this page
Elm -
View your submission Qdab,
Submit another set of payroll records
Public Works Certifier- )yroll Reporting Form
Certification under,. ,alty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-31 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-06-03."
C tno rector Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
Payroll Number: 48- 0
FEIN: 510532726
DIR Project ID: 290440
County: RIVERSIDE
For Week Ending: 05/31/2020
Contractor Email: KRISTYS@PWLC2.COM
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 1
MAINTENANCE OF CITYWIDE MEDIANS
�] Is this a 'Statement of Non -Performance?'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
i
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount Federal
Earned Tax
FICA
State
Tax
SDI
Vac'
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
05/25 05126 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
46.63
44.06
8.23
5.76
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32,00
18.00
576.00
576.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
471.32
29810
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
104.68
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE;
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
SDI
Tax
Vecl
Holiday
Health
& Welf.
Pension
Net
Wage
Pa ld For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
05/25 05/26 05/27 05128 05129 05/30 05/31
This
Project
All
Projects
12.68
34.28
0.00
4.48
1 0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448.00
448.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
396.56
29805
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
51.44
D
0.00
0.00
0.00
1 0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
yyo
Classiflcatlon
05/25 05/26 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
j
39.86
52.40
7.86
6.85
0.00
0.00
0.00
-
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
20.00
685.00
685.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
578.03
29802
Q
1 0.00
P
0.50
0.50
0.50
0.00
0.00
0.00
1.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
106.97
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public works Certified Payroll Reporting Form 06/03/2020 - Page 1
Public Works Certifier' �yroll Reporting Forin
Contractor Name: PWLC II, INC.
I
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/31/2020 Payroll Number:48-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday&
Health
Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classiflcatlon
05/25 05/26 05/27 05/28 05129 05/30 05/31
This
Pro act
J
All
Pro acts
J
0.00
21.42
0.00
2.80
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
�
LANDSCAPE
MAINTENANCEAdmin
S
0.00
4.00
0.00
8.00
8.00
0.00
0.00
20.00
14.00
280.00
280.00
Fund
Dues
Travl
Subs
Savin s
gLABORER
Other
Total255.78
29804
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.0092234
La.in
0.00
0.00
0.00
0.00
0.00
24.22
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
05/25 05/26 05/27 05/28 05/29 05/30 05/31
Thls
Project
All
Protects
0.00
36.68
0.00
4.80
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
479.50
479.50
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
438,02
29013
Q
0.00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
41.48
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
05/25 05/26 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
0.00
39.30
0.00
5.14
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
15.00
513,75
513.75
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
469.31
29799
Q
0.00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00
0.00
0.00
44.44
D
0.00
I 0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
05/25 05/26 05/27 05128 05/29 05130 05/31
This
Project
All
Projects
26.78
44.06
10.81
5.76
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
18.00
576.00
576.00
Training
Adm n
Dues
Subs
Savings
Other
Total
488.59
29798
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
87.41
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Public works certified Payroll Reporting Form 06/03/2020 - Page 2
'" Public Works Certifier' ),yroll Reporting Form •e-�\
tName:ctor PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 05/31/2020 Payroll Number:48-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Penslon
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
05/25 05126 05/27 05I28 05129 05/30 05/31
Thls
Protect
All
Protects
21.35
34.28
0.91
4.48
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
�
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448,00
448,00
Training
AdmI
Dues
Subs
Savings
Other
Total
386.98
29800
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
61.02
p
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
pal d For
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
05/25 05126 05/27 05128 05/29 05/30 05/31
This
Project
All
Projects
0.00
35.09
0.00
4.59
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
�
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
13.80
472.65
472.65
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
419.09
29809
QPO00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
20.70
0.00
0.00
0.00
0.00
0.00
13:88
53.56
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classlflcatlon
05/25 05/26 05/27 05128 05129 05/30 05/31
This
Project
A11
Projects
46.03
36.72
1 7.78
4.80
0.00
0.00
0.00 1
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
15.00
480.00
480.00
Training
Admin
Dues
Subs
Savings
Other
Total
384.67
29808
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
1 0.00
95.33
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSA RODRIGUEZ
PO BOX 580332
Work
Classification
05/25 05/26 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
12.68
34.27
3.49
4.48
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
�
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448.00
448.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
393.08
29811
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
54.92
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
Public works Certified Payroll Reporting Form 06/03/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
?lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8377560
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC Il, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-24
Payroll Number: 47
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10839650
Prini this Page
iew your submission Adobe
Submit another set of payroll records
Public Works Certifi( 'ayroll Reporting Form
Certification under penalty of perjury:
1, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC Il, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-24 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC ll, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 47 - 1 Ctr Payroll #: 47-1 Week Ending: 05/24/2020
Statement of Non -Performance?
Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSA Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/ Health
Total
05/18 05/19 05/20 05121 05/22
05/23
05/24
Hours
Base Hourly Fringe
Holiday & Welt.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
40;QO;ii!
15.00 0.00
0.00 0.00
0.00
0.00 0.00
M.5;U[Yy
0 LANDSCAPE MAINTENANCE LABORER 0.50 0.50 0.50 0.00 0.00
0.00
0.00
T50! t,
22.50 0.00
0.00 0.00
0.00
000 0.00
�Sb ;
4 NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
0.00
Total Deductions
62.23
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works Certifie'� iyroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-21 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-06-25."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 51- 0 For Week Ending: 06/21/2020 Is this a 'Statement of Non -Performance?'
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Man Tue Wed Thu Fri Sat Sun
Gross Amount
Earned
Total Hourly !
Hours Pay Rate This All
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
06/15 06/16 06/17 06/18 06/19 06/20 06/21
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720,00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
579.25
30017
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Ne t
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
06/16 06/16 06/17 06/18 06119 06/20 06/21
This
Protect
All
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
484.34
30012
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.66
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf,
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
06/15 06/16 06/17 06118 06119 06/20 06/21
This
Project
All
Projects
62.66
66.94
19.61
8.75
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92282
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
875.00
875,00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
717.04
30009
Q
1.00
0.00
0.50
1.00
0.00
0.00
1
0.00
2.50
30.00
0.00
0.00 1
0.00
0.00
0.00
0.00
157.96
D
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
0.00
40.00
NOTE:
Public Works Certified Payroll Reporting Form 06/25/2020 - Page 1
Public Works Certifie iyroll Reporting Form
'Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/21/2020 Payroll Number: 51-0
i
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
Net
FICA SDI Pension
Earned Tax Tax Holiday & Waif.
0 Date Total Hourly Wage Check
CARLOS I. ESPARZAALVAREZ
06/15 06/16 06/17 06/18 06119 06120 06/21 Hours Pay Rate This All 0.00 42.84 2.36 5.60 0.00 0.00 0.00 Paid For Number
Work
33822 SHIFTING SANDS #B Classification Protect Protects Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
509.20
30011
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
50.80
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE;
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social Security Number of Worker
Withholding
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Pension
Net
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Wage
Check
5
Date
Total
GENARO VARGAS
Pay Rate
Paid For
Number
06/15 06/16 06117 06118 06/19 06/20 06/21
Hours
This
All
0.00
45.26
0.00
5.92
0.00
0.00
0.00
69130 VICTORIA DR
Work
Classification
Project
Protects
Week
W
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
591.50
591.50
nd
540.32
30020
CA
MAINTENANCE
Tralning
Adm n
Dues
Subs
Savings
Other
Total
Q
0.00
1.00
0.50
0.00
0.00
0.00
0.00
1.50
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
51.18
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Holiday
& Welf.
Wage
Paid For
Check
Number
4
Date
LETICIA BONILLA
06115 06116 06/17 06/18 06119 06/20 06/21
This
All
7.41
48.48
0.00
6.34
0.00
47.39
0,00
33477 NAVAJO TR #B
Work
Classification
Project
Projects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
Boo
8.00
0.00
0.00
40.00
15.00
633.75
633.75
Fund
Trav/
571.52
30007
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
1.00
0.50
0.00
0.00
0.00
0.00
1.50
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
62.23
g2234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE;
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
I
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Holiday
& Waif.
Paid For
NuWage meck
ber
4
Date
MARCELINO RAMIREZ
06/15 06/16 06/17 06/18 06/19 06/20 06/21
This
All
0.00
41.15
0.00
5.38
0.00
47.39
0.00
1500 E SAN RAFAEL DR #164
Work
Classification
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
0.00
8.00
8.00
0.00
0.00
32.00
13.80
441.60
552.00
Fund
Trav/
491.59
30016
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.70
LABORER
0.00
0.00
0.00
0.00
0.00
13.88
60.41
92462
D
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
27.60
NOTE; $13.86 THFP. = FH125
Public Works certified Payroll Reporting Form 06/25/2020 - Page 2
Public Works Certifierr ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/21/2020 Payroll Number: 51-0
i
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
FICA SDI Pension Net
Date Earned Tax Tax Holiday & Welf.
� PASTOR R. PEREZ NEGRON 0 Total Hourly Wage Check
Work 06/15 06116 06117 06/18 06119 06/20 06/21 Hours Pay Rate This All 60.43 45.90 12.86 6.00 0.00 0.00 0.00 Paid For Number
67365 ONTINA RD Classification Hours Worked Each Day Protect Projects Week
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00 600.00
Fund
Trav/
474.81
30015
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
125.19
92234
p
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
30.00
�
NOTE:
i
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Wage
Check
3
Date
ROSARODRIGUEZ
Hours
Pay Rate
Paid For
Number
06/15 06/16 06/17 06/18 06/19 06/20 06/21
This
All
18.28
38.56
5.06
5.04
336.00
0.00
0.00
PO BOX 580332
Work
Classification
Project
Projects
Week
Hours Worked Each Day
N PALM SPRINGS
LANDSCAPE
S
8.00
4.00
0.00
0.00
0.00
0.00
0.00
12.00
14.00
168.00
504.00
437.06
30018
CA
MAINTENANCE
Training
Admn
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
66.94
92258
p
0.00
o.00
o.00
o.00
o.00
o.00
o.00
o.o0
28.00
�
NDTE:
Public Works certified Payroll Reporting Form 06/25/2020 - Page 3
1_'
Public Works Certifi ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-14 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 50 - 1 Ctr Payroll #: 50-1
Week Ending: 06/14/2020
❑ Statement of Non -Performance?
❑ Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSNANNEINW
Mon
Tue Wed Thu
Fri Sat
Sun
Total
Total
Vac/
Health
Total
06/08
06/09 06110 06/11
06/12 06/13
06/14
Hours
Base Hourly
Fringe
Holiday
& Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER
8.00
8.00 8.00 8.00
8.00 0.00
0.00
40.00
15.00
0.00
0.00
0.00
0.00 0.00 0.00
O LANDSCAPE MAINTENANCE LABORER
0.50
0.00 1.00 0.00
0.00 0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00 0.00 0.00 2�5
NOTE: ORIGINAL PAYROLL NUMBER 50-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00 Travel & Subsistence 0.00 Total Deductions 62.24
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Contractor Name: PWLC II, INC.
Public Works CertifiE tyroll Reporting Form
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 06/14/2020
Payroll Number:50-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSN:IllmlmmmL.. Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/
Health
Total
06/08 06109 06110 06/11 06/12
06/13
06/14
Hours Base Hourly
Fringe
Holiday
& Welf.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00d{dOl00if
13.80
0.00
0.00
0.00
0.00
0.00 0.00
93!6U)
0 LANDSCAPE MAINTENANCE LABORER 0.50 0.00 0.00 0.00 0.00
0.00
0.00
11.6 20.70
0.00
0.00
0.00
0.00
0.00 0.00
?PW2W
NOTE: ORIGINAL PAYROLL NUMBER 50-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM
THE EMPLOYEE'S CHECK, SHOULD =
Travel & Subsistence
0.00
Total Deductions
61.36
0.00, 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Public Works certified Payroll Reporting Form 04/08/2021 - Page 2
Public Works Certifie '- Tyroll Reporting Form
Certification under, aity of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER
(position in business) with the authority
to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty
of
perjury that the records or copies
thereof submitted
and consisting of certified payroll records for the
week ending 2020-06-14 are the originals or true, full, and correct copies of the originals
which
depict
the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual
or individuals named. I certify this on 2020-06-19."
Contractor Name: PWLC II, INC.
Contractor PWCR: 1000037373
License Type: CSLB License Number,855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS,
CA
FEIN: 510532726
Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
i
Awarding Body: CITY OF LA QUINTA
DIR Project ID: 290440
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA
County: RIVERSIDE
Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 50- 0
For Week Ending: 06/14/2020
71Is this a'Statement of Non -Performance?'
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Social SecurityNumber of Worker
Withholding
Mon
Tue Wed Thu Fri Sat Sun
Gross Amount Federal Slate Vac/ Health
1
Data
Earned Tax FICA Tax SDI Holiday
ollda & Welf.
y
Penslon
Net
ALAN RAMIREZ RAYA
Total
Hourly
Wage
Check
Work
06/08
06/09 06/10 06/11 06112 06/13 06/14
Hours
Pay Rate This All 63.91 55.08 14.56 7.20 0.00 0.00
0.00
Paid For
Number
84037 MAGNOLIA ST
Classification
Hours Worked Each Day
Project Pro acts
� j
Week
COACHELLA
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
18.00
720.00
720.00
Fund
Travl
Total
579.25
29987
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
140.75
92236
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE: N:
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Mon
Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
lax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Net
Wage
Check
3
Date
APOLINAR GONZALEZ MARTINEZ
Work
06/08
06/09 06/10 06/11 06/12 06/13 06/14
This
All
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours
Pay Rate
Paid For
Number
31325 AVE LA PALOMA
Classification
Project
Projects
I
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560,00
Total
484.34
29982
CA
MAINTENANCE
TrainingFund
Admin
Dues
Subs
Subs
Savings
9
Other
Deduct
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
75.66
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker
Withholding
Mon
Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vacl
Health
Net
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Hailday
& Weif.
Pension
Wage
Check
3
Date
ARMANDO RICO CHAVEZ
Hours
Pay Rate
Paid For
Number
Work
06/08
06/09 06/10 06/11 06/12 06/13 06114
This
All
68.06
70.38
22.58
9.20
0.00
0.00
0.00
2103 JACQUES DR
Classification
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
920.00
920,00
Fund
Travl
Total
749,78
29979
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
1.00
1.00
1.00
1.00
0.00
0.00
0.00
4.00
30.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
170.22
922fi2
D
0.00
o.00 I
0.00
0.00
0.00
0.00
0.00 1
0.00 1
40.00
NOTE:
Public works certified Payroll Reporting Form 06/19/2020 - Page 1
Public Works Certifie!' -tyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 06/14/2020
Payroll Number:50-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
06/08 06/09 06110 06/11 06/12 06/13 06/14
This
Project
All
Projects
0.00
43.64
2.82
5.71
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
• CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
570.50
570.50
Admin
Dues
Subs
Savings
Other
Total
518.33
29981
Q
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.50
21.00
Elno'n
0.00
0.00
0.00
0.00
0.00
52.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
06/OB O6I09 06/10 06/11 06112 06113 O6/14
This
Project
All
Projects
0.00
45.25
0.00
5.92
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY LANDSCAPE
CA MAINTENANCE
LABORER
92234
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
591.50
591.50
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
540.33
29990
Q
0.50
0.00
1.00
0.00
0.00
0.00
0.00
1.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
51.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
06/08 06109 06/10 06/11 06/12 06/13 06/14
This
Project
All
Protects
7.41
48.49
0.00
6.34
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
633.75
633.75
Training
Admn
Dues
Subs
Savings
Other
Total
571.51
29977
O
I 0.50
0.00
1.00
0.00
0.00
0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00
0.00
0,00
62.24
D
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
06/08 06/09 06/10 06111 06112 06/13 06/14
This
Project
All
Projects
0.00
42.00
0.00
5.48
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8A0
8.00
8.00
8.00
0.00
0.00
40.00
13.80
562.35
562.35
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
500.99
299B6
Q
0.50
0.00
0.00
0.00
0.00
0.50
20.70
0.00
0.00
0.00
0.00
0.00
13.88
61.36
D
0.00
ig
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
Public Works certified Payroll Reporting Form 06/19/2020 - Page 2
Public Works Certifier' ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/14/2020 Payroll Number:50-0
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
Net
FICA SDI Pension
Earned Tax Tax Holiday & Welf.
0 Date Total I e Check
PASTOR R. PEREZ NEGRON
Work 06/08 06/09 06/10 06/11 06/12 06/13 06/14 Hours PHourly ay Rate This All 46.03 36.72 7.78 4.80 0.00 0.00 0.00 Paid For Number
+
67365 ONTINA RD Classification Hours Worked Each Day Protect Protects Week 11
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
0.00
8.00
0.00
0.00Fund
32.00
15.00
480.00
480.00
384.67
29985
CA
MAINTENANCE
Training
Adm n
Dues
Subs
Savings
Other
Total
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
95.33
92234
M
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
��
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
Tax
Holiday
& Welf.
Wage
Check
3
Date
ROSARODRIGUEZ
Hours
Pa Rate
y
Paid For
Number
Wok
06108 O6I09 O6/10 06/11 O6/12 06113 06114
This
All
15.48
36.41
4.11
4.76
0.00
0.00
0.00
PO BOX 580332
Classification
Project
Projects
I
Week
Hours Worked Each Day
N PALM SPRINGS
LANDSCAPE
S
8.00
2.00
8.00
8.00
8.00
0.00
0.00
34.00
14.00
476.00
476.00
415.24
29988
CA
MAINTENANCE
Training
Admit
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
60.76
92258
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
!
NOTE:
Public Works certified Payroll Reporting Form 06/19/2020 - Page 3
Public Works Certifie iyroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-07 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 49 - 1 Ctr Payroll #: 49-1 Week Ending: 06/07/2020 ❑ Statement of Non -Performance? Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSN� Mon Tue Wed Thu
Fri
Sat
Sun
Total
Total
Vac/
Health
Total
06/01 06/02 06/03 06/04
06/05
06/06
06/07
Hours
Base Hourly Fringe
Holiday
& Welf. Pension,
Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00
8.00
0.00
0.00
0.00
15.00 0.00
0.00
0.00 0.00
0.00 0.00 1 5.00
O LANDSCAPE MAINTENANCE LABORER 0.50 0.00 0.00 0.00
0.50
0.00
0.00
1.00
20.70 0.00
0.00
0.00 0.00
0.00 0.00 20.70
NOTE: ORIGINAL PAYROLL NUMBER 49-0 SHOWS 47.39 IN HEALTH 8 WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00 Travel & Subsistence 0.00 Total Deductions 60.14
Public Works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works CertifiE Ayroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 06/07/2020
Payroll Number:49-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSN� Mon Tue Wed Thu Fri
Sat
Sun
Total Total
Vac/
Health
Total
06/01 06/02 06/03 06/04 06/05
06106
06/07
Hours Base Hourly Fringe
Holiday
& Welf.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
r{4.0 66 7{ 13.80 0.00
0.00
0.00
0.00
0.00 0.00
- it
t _
O LANDSCAPE MAINTENANCE LABORER 0.50 0.00 0.00 0.00 0.00
0.00
0.00
0 $U 20,70 0.00
0.00
0.00
0.00
0.00 0.00
mn
NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD =
0.00, 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Travel & Subsistence
0.00
Total Deductions
61.32
Public Works certified Payroll Reporting Form 04/08/2021 - Page 2
Public Works Certifier lyroll Reporting Foriii
Certification under, .alty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-06-07 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-06-10."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
Payroll Number: 49- 0
For Week Ending: 06/07/2020
MAINTENANCE OF CITYWIDE MEDIANS
❑ Is this a 'Statement of Non -Performance?'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
I
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
06/01 06102 06103 06/04 06/05 06/06 06/07
This
Project
All
Projects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
18.00
720.00
720.00
Training
g
Fund
Admin
Dues
Trav/
Subs
Savings
g
Other
Total
Deduct
579.25
29841
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140,75
p
0.00
0,00
0,00
0.00
0.00
0.00
0.00
1 0.00
36.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
06/01 06102 06/03 06/04 06/05 06/06 06/07
This
Project
All
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
Deduct
484.34
29836
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.86
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and Number of
Social SecurityNumber of Worker Withholding
ARMANDO RICO CHAVEZ 3
Work
2103 JACQUES DR Classification
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
Date
O6/01 O6IO2 O6/03 06l04 O6/OS O6I06 06107
This
Project
All
Protects
69.86
71.53
23.57
9.35
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
935.00
935.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
760.69
29833
Q
1.00
1.00
1.00
1.00
0.50
0.00
0.00
4.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
174.31
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public Works certified Payroll Reporting Form 06/10/2020 - Page 1
Public Works Certifier' )yroll Reporting Foi rn
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/07/2020 Payroll Number:49-0
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vacl Health
Net
Pe
Date Earned Tax FICA Tax SDI Holiday & Welf. nsion
0 Total Hourly Wage Check
CARLOSI.ESPARZAALVAREZ
Work 06101 06/02 06/03 06104 06/05 06/06 06/07 Hours Pay Rate This All 0.00 42.84 2.36 5.60 0.00 0.00 0,00 Paid For Number
33822 SHIFTING SANDS #B Classification Hours Worked Each Day Project Projects Week
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Fund
Trav/
509.20
29835
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
50.80
92234
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
SDI
Vac/
Health
Pension
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
I
Tax
Holiday
& Welf.
Wage
Check
5
Date
GENARO VARGAS
Hours
Pay Rate
This All
PFor
Number
06/01 06/02 06/03 06/04 06/05 06/06 06/07
0.00
44.44
0.00
5.81
0.00
0.00
0.00
69130 VICTORIA DR
Work
Classificatlon
+
Project I Projects
Week
We
Hours Worked Each Day
i CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
581.00
581.00
Fund
Trav/
530.75
29844
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.50
0.00
0.00
0.00
0.50
0.00
0.00
1.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
50.25
92234
p
o.00
o.oa
o.00
o.00
o.00
o.00
O.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
Tax
Holiday
& Welf.
Wage
Check
4
Date
LETICIABONILLA
Hours
Pay Rate
This All
Paid For
Number
06/01 06/02 06/03 06/04 06/05 06/06 06/07
6.29
47.62
0.00
6.23
0.00
47.39
0.00
33477 NAVAJO TR #B
Work
Classification
Project Projects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
622.50
622,50
562.36
29831
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.50
0.00
0.00
0.00
0.50
0.00
0.00
1.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
60,14
92234
p
0.00
0.00
1 0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
This All
Tax
Tax
Holiday
& Welf.
Wage
Paid For
Check
Number
4
Date
MARCELINO RAMIREZ
06/01 06/02 06/03 06104 06105 06/06 06/07
0.00
41.96
0.00
5.48
0.00
47.39
0.00
Work
Week
1500 E SAN RAFAEL DR #164
Classlficatlon
Project Projects
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
562.35
562.35
Fund
Trav/
501.03
29840
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.50
0.00
O.o0
0.00
0.00
0.00
0.00
0.50
20.70
LABORER
0.00
0.00
0.00
0.00
0.00
13.88
61.32
92262
p
o.ao
o.00
o.00
o.o0
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
I
Public works certified Payroll Reporting Form 06/10/2020 - Page 2
Public Works Certifie,- -iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 06/07/2020
Payroll Number:49-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
i
Mon Tue Wed Thu Frl Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
i
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
06/01 06/02 06/03 06/04 06/05 06/06 06/07
This
Project
All
Projects
61.78
46.76
13.36
6.11
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
B.00
8.00
B.00
8.00
0.00
0.00
40.00
15.00
611.25
611.25
Trainin 9
Fund
Admin
Dues
Trav/Subs
Subs
Savings
9
Other
Total
483.24
29839
p
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0.50
22.50
0.00
0.00
0.00
0.00
0.00
0.00
126.01
D
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Frl Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf,
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSARODRIGUEZ
PO BOX 580332
Work
Classification
06/01 06102 06/03 06/04 06/05 06/06 06/07
This
Protect
All
Protects
24.86
42.84
7.52
5.60
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
B.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
9
Fund
Admin
Dues
Travl
Subs
Savin s
9
Other
Total
479.18
29842
�
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
80.82
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Public works Certified Payroll Reporting Form 06/10/2020 - Page 3
Public Works Certifi ayroll Reporting Form
Certification uno., penalty of perjury:
"I, KRiSTY SOUTH, the undersigned, am the CONTROLLER (posltlon In business) with the authority to act for and an behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-31 are the originals or true, full, and correct coples of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or indlviduals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 48 - 1 Ctr Payroll #: 48-1
Week Ending: 05/31/2020
Statement of Non -Performance?
Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B,
CATHEDRAL CITY, CA, 92234
SSMINEW
Mon Tue Wed Thu Fri Sat
Sun Total
Total
Vac/ Health
Total
05/25 05/26 05/27 05/28 05/29 05130
05/31 Hours
Base Hourly Fringe
Holiday & Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER
0.00 8.00 8.00 8.00 8.00 0.00
0.00 ""7 32 00 !
15.00 0.00
0.00 0.00
0.00 0.00 0.00 lamf�>7 ;
O LANDSCAPE MAINTENANCE LABORER
0.00 0.50 0.50 0.50 0.00 0.00
0.00 Fzi 5t'
22.50 0.00
0.00 0.00
0.00 0.00 0.00 5
NOTE: ORIGINAL PAYROLL NUMBER 48-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK,
SHOULD = 0.00
Travel & Subsistence
0.00 Total Deductions 44.44
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works Certifies iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SS Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
05/25 05/26 05/27 05/28 05/29
05/30
05/31
Hours Base Hourly
Fringe
S LANDSCAPE MAINTENANCE LABORER 0.00 8.00 8.00 8.00 8.00
0.00
0.00
'00 ? 13.80
0.00
O LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.50 0.00
0.00
0.00
., 1i50 20.70
0.00
NOTE: ORIGINAL PAYROLL NUMBER 48-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD
=
0.00. 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Week Ending: 05/31/2020
Vac/
Health
Holiday
Pension
& Welt.
0.00
0.00 0.00
0.00
0.00 0.00
Travel & Subsistence 0.00
Payroll Number:48-1
Other Training
Total
Hourly Rate
0.00 0.00
T..!mwJ
0.00 0.003Z`!aD
Total Deductions
53.56
Public works certified Payroll Reporting Form 04/08/2021 - Page 2
Public Works Certifier- )yroll Reporting Form
Certification under,. ,alty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-31 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-06-03."
C tno rector Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
Payroll Number: 48- 0
FEIN: 510532726
DIR Project ID: 290440
County: RIVERSIDE
For Week Ending: 05/31/2020
Contractor Email: KRISTYS@PWLC2.COM
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 1
MAINTENANCE OF CITYWIDE MEDIANS
�] Is this a 'Statement of Non -Performance?'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
i
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount Federal
Earned Tax
FICA
State
Tax
SDI
Vac'
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
05/25 05126 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
46.63
44.06
8.23
5.76
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32,00
18.00
576.00
576.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
471.32
29810
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
104.68
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE;
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
SDI
Tax
Vecl
Holiday
Health
& Welf.
Pension
Net
Wage
Pa ld For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
05/25 05/26 05/27 05128 05129 05/30 05/31
This
Project
All
Projects
12.68
34.28
0.00
4.48
1 0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448.00
448.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
396.56
29805
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
51.44
D
0.00
0.00
0.00
1 0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
yyo
Classiflcatlon
05/25 05/26 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
j
39.86
52.40
7.86
6.85
0.00
0.00
0.00
-
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
20.00
685.00
685.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
578.03
29802
Q
1 0.00
P
0.50
0.50
0.50
0.00
0.00
0.00
1.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
106.97
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public works Certified Payroll Reporting Form 06/03/2020 - Page 1
Public Works Certifier' �yroll Reporting Forin
Contractor Name: PWLC II, INC.
I
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/31/2020 Payroll Number:48-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday&
Health
Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classiflcatlon
05/25 05/26 05/27 05/28 05129 05/30 05/31
This
Pro act
J
All
Pro acts
J
0.00
21.42
0.00
2.80
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
�
LANDSCAPE
MAINTENANCEAdmin
S
0.00
4.00
0.00
8.00
8.00
0.00
0.00
20.00
14.00
280.00
280.00
Fund
Dues
Travl
Subs
Savin s
gLABORER
Other
Total255.78
29804
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.0092234
La.in
0.00
0.00
0.00
0.00
0.00
24.22
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
05/25 05/26 05/27 05/28 05/29 05/30 05/31
Thls
Project
All
Protects
0.00
36.68
0.00
4.80
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
479.50
479.50
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
438,02
29013
Q
0.00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
41.48
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
05/25 05/26 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
0.00
39.30
0.00
5.14
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
15.00
513,75
513.75
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
469.31
29799
Q
0.00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00
0.00
0.00
44.44
D
0.00
I 0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
05/25 05/26 05/27 05128 05/29 05130 05/31
This
Project
All
Projects
26.78
44.06
10.81
5.76
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
18.00
576.00
576.00
Training
Adm n
Dues
Subs
Savings
Other
Total
488.59
29798
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
87.41
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Public works certified Payroll Reporting Form 06/03/2020 - Page 2
'" Public Works Certifier' ),yroll Reporting Form •e-�\
tName:ctor PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 05/31/2020 Payroll Number:48-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Penslon
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
05/25 05126 05/27 05I28 05129 05/30 05/31
Thls
Protect
All
Protects
21.35
34.28
0.91
4.48
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
�
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448,00
448,00
Training
AdmI
Dues
Subs
Savings
Other
Total
386.98
29800
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
61.02
p
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
pal d For
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
05/25 05126 05/27 05128 05/29 05/30 05/31
This
Project
All
Projects
0.00
35.09
0.00
4.59
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
�
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
13.80
472.65
472.65
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
419.09
29809
QPO00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
20.70
0.00
0.00
0.00
0.00
0.00
13:88
53.56
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classlflcatlon
05/25 05/26 05/27 05128 05129 05/30 05/31
This
Project
A11
Projects
46.03
36.72
1 7.78
4.80
0.00
0.00
0.00 1
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
15.00
480.00
480.00
Training
Admin
Dues
Subs
Savings
Other
Total
384.67
29808
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
1 0.00
95.33
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSA RODRIGUEZ
PO BOX 580332
Work
Classification
05/25 05/26 05/27 05/28 05/29 05/30 05/31
This
Project
All
Projects
12.68
34.27
3.49
4.48
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
�
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448.00
448.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
393.08
29811
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
54.92
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
Public works Certified Payroll Reporting Form 06/03/2020 - Page 3
Public Works Certifi( 'ayroll Reporting Form
Certification under penalty of perjury:
1, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC Il, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-24 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC ll, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 47 - 1 Ctr Payroll #: 47-1 Week Ending: 05/24/2020
Statement of Non -Performance?
Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSA Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/ Health
Total
05/18 05/19 05/20 05121 05/22
05/23
05/24
Hours
Base Hourly Fringe
Holiday & Welt.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
40;QO;ii!
15.00 0.00
0.00 0.00
0.00
0.00 0.00
M.5;U[Yy
0 LANDSCAPE MAINTENANCE LABORER 0.50 0.50 0.50 0.00 0.00
0.00
0.00
T50! t,
22.50 0.00
0.00 0.00
0.00
000 0.00
�Sb ;
4 NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
0.00
Total Deductions
62.23
Public works certified Payroll Reporting Form 04/08/2021 - Page 1
Public Works Certifi ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 05/24/2020
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
Ssvml�ii: Mon Tue Wed Thu Fri Sat Sun Total
Total
Vac/ Health
05/18 05/19 05/20 05/21 05/22 05/23 05/24 Hours Base Hourly
Fringe
Holiday & Welf.
Pensio
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00 0.00 0.00 ;,;�d0 00zE'y"; 13.80
0.00
0.00 0.00
0.00
O LANDSCAPE MAINTENANCE 0.50 0.50 0.50 0.00 0.00 0.00 0.00 ?y Ff50,Mi 20.70
0.00
0.00 0.00
0.00
NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD
= 0.00
AND 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Travel & Subsistence
0.00
Payroll Number:47-1
J
Other Training
Total
Hourly Rate
i
0.00 0.00
,�'3t90
0.00 0.00
prsi
Total Deductions
64.07
Public Works certified Payroll deporting Form 04/08/2021 - Page 2
Public Works Certifi ayroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 05/24/2020
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
Ssvml�ii: Mon Tue Wed Thu Fri Sat Sun Total
Total
Vac/ Health
05/18 05/19 05/20 05/21 05/22 05/23 05/24 Hours Base Hourly
Fringe
Holiday & Welf.
Pensio
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00 0.00 0.00 ;,;�d0 00zE'y"; 13.80
0.00
0.00 0.00
0.00
O LANDSCAPE MAINTENANCE 0.50 0.50 0.50 0.00 0.00 0.00 0.00 ?y Ff50,Mi 20.70
0.00
0.00 0.00
0.00
NOTE: ORIGINAL PAYROLL NUMBER 47-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD
= 0.00
AND 13.88 WAS DEDUCTED FOR HEALTH INSURANCE
Travel & Subsistence
0.00
Payroll Number:47-1
J
Other Training
Total
Hourly Rate
i
0.00 0.00
,�'3t90
0.00 0.00
prsi
Total Deductions
64.07
Public Works certified Payroll deporting Form 04/08/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
bl icworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-24
Payroll Number. 47
Amendment Number. 0
11 employee payroll record(s) processed
Your Transaction ID is: 8377560
ant this Pagg
View your submission*
Submit another set of payroll records
Public Works Certifier' - iyroll Reporting Form
Certification under, .aity of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-24 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-05-28."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
Payroll Number: 47- 0
For Week Ending: 05/24/2020
MAINTENANCE OF CITYWIDE MEDIANS
Is this a 'Statement of Non -Performance?'
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vaday cl
Holi
Health
& Wolf .
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
05/18 05119 05/20 05/21 05/22 05/23 05/24
This
Project
All
Protects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
B.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
579.25
29665
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
OSl18 05/19 OSI20 O5121 O5122 OSl23 05124
This
Project
All
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560,00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
484.34
29660
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.66
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
05/18 05/19 05/20 05/21 05/22 05123 05/24
This
Project
All
Projects
58.46
64.64
17.30
8.45
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
g22g2
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
845.00
845.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
696.15
29657/6
134
Q
0.50
0.50
0.50
0.00
0.00
0.00
0.00
1.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
148.85
D
0.00
0.00
0.00 1
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public works certified Payroll Reporting Form 05/28/2020 - Page 1
Public Works Certifier``--,yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/24/2020 Payroll Number:47-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
05/18 05/19 05/20 05121 05/22 05123 05/24
This
Project
All
Projects
0.00
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
509.20
29659
Q
0.00
0.00
0.00
0.Oo
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
50.80
D
o.00
0.00
0.00
0.00
0.00
D.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Earned
Total Hourly
Hours Pa Rate This All
Y
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac!
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Worts
Classification
05I18 05119 05I20 05121 05(22 05123 05/24
0.00
45.25
0.00
5.92
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
�Nll
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
591.50
591.50
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
540.33
29668
Q
0.50
0.50
0.50
0.00
0.00
0.00
0.00
1.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
51.17
D
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIA BONILLA
33477 NAVAJO TR #B
Work
Classification
05/18 05119 05120 05/21 05/22 05123 05124
This
Project
All
Projects
7.41
48.48
0.00
6.34
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
mommom
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
0.00
0.00
40.00
15.00
633.75
633.75
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
571.52
29654
Q
0.50
to-00
0.00
0.00
0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00
0.00
0.00
62.23
D
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
blaY
Deductions,
Contributions,
and Payments
Man Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
INDIO
CA
92201
Work
Classification
05/18 05/19 05/20 05/21 05/22 05/23 05124
This
Project
All
Projects
44.06
55.08
17.14
7.20
0.00
0.00
0.00
Hours Worked Each Day
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
0.00
0.00
18,00
27.00
36.00
720.00
720.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
596.52
29653
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
123.48
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NOTE:
Public Works certified Payroll Reporting Form 05/28/2020 - Page 2
Public Works Certifie-- -tyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
f
For Week Ending: 05/24/2020
Payroll Number:47-0
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Social SecurityNumber of Worker
Withholding
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
State
Vacl
Health
2
Date
Earned
Tax
FICA
Tax
SDI
Hollda y
I
$ Welf.
Pension
Net
MARCELINO BRIONES
Total
Hourly
Wage
Check
Work
05/18
05119
05/20
05/21
05122
05/23
05/24
Hours
Pay Rate
This All
34.79
42.84
4.94
5.60
0.00
0.00
0.00
Paid For
Number
50700 CALLE MENDOZA
Classlflcatlon
Hours Worked Each Day
Project Projects
Week
COACHELLA
LANDSCAPE
S
8.00
8.00
8.00
B.00
8.00
0.00
0.00
40.00
14.00
560.00 560.00
Fund
Travl
471.83
29655
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
LABORER
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
92236
0.00
0.00
0.00
0.00
0.00
0.00
88.17
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE;
Number of
Day
Deductions,
Contributions,
and Payments
Name, Address and
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
State
Vecl
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
$ Welf.
Pension
Wage
4
Date
MARCELINO RAMIREZ
Hours
Pay Rate
Paid For
NuCheck
mber
O5/18 0S119 0SI20 0Sl21 0S122 0Sl23 05124
0.96
43.54
0.00
5.69
0.00
47.39
0.00
1500 E SAN RAFAEL DR #164
Work
Classification
This All
Project Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPELO.50
8.00
8.00
8.00
8.00
0.00
0.00Trav/
40.00
13.80
583.05
583.05
Fund
518.98
29664
CA
MAINTENANCE
Training
Admin
Dues
Subs
Subs
Savings
Other
Total
0.50
0.50
0.00
0.00
0.00
0.0092262
1.50
20.70
LABORER
0.00
0.00
0.00
0.00
0.00
13.88
84.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
z7.60
NOTE: $13.88 OTHER = FH125
Number of
Day
Deductions,
Contributions,
and Payments
Name, Address and
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
State
V13
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holds y
& Welf.
Pension
Wage
Check
0
Date
PASTOR R. PEREZ NEGRON
Hours
Pay Rate
Paid For
Number
05118 05/19 05/20 05/21 05/22 05/23 05/24
This
All
60.43
45.90
12.86
6.00
0.00
0.00
0.00
67365 ONTINA RD
Work
Classlflcatlon
Project
Protects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Fund
Travl
474.81
29663
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
LABORER
0.00
0.00
0.00
0.00
0.00
0.001
125.19
92234
p
0.00
0.00
0.00
0.00
0.00 1
0.00
0.00
0.00
30.00
imam
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSARODRIGUEZ
PO BOX 580332
Work
Classification
05118 05119 05120 05/21 0S122 0S123 05/24
This
Project
All
Projects
12.68
34.29
3.49
4.48
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
0.00
8.00
0.00
0.00
32.00
14.00
448.00
448.00
Tralning
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
393.06
29666
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
54.94
p
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
28.00
NOTE:
Public works certified Payroll Reporting Form 05/29/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
.'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 10837547
This certified payroll will be treated as an amendment #: 2
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-17
Payroll Number: 46
Amendment Number: 2
1 employee payroll record(s) processed
Your Transaction ID is: 10839444
Print this Page
iew your submission Adobe
Submit another set of payroll records
Public Works Certifil ayroll Reporting Form
Certification unae. penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-17 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSL13 License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 46 - 2 Ctr Payroll #: 46-2
Week Ending: 05/17/2020
❑ Statement of Non -Performance?
[-]Final payroll for this project?
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SS
Mon
Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/
Health
Total
05/11
05/12 05/13 05/14 05/15
05/16
05/17
Hours
Base Houdy
Fringe
Holiday
& Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER
8.00
8.00 8.00 8.00 8.00
0.00
0.00
40.00
13.80
0.00
0.00
0.00
0.00 0.00 0.00 "13:807
O LANDSCAPE MAINTENANCE LABORER
0.00
0.50 0.50 0.50 0.00
0.00
0.00
1.50
20.70
0.00
0.00
0.00
0.00 0.00 0.00 20.,70� '
NOTE: 13.88 DEDUCTION FOR HEALTH INSURANCE
Travel & Subsistence 0.00 Total Deductions 64.07
Public Works certified Payroll Reporting Form 04/08/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8349548
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-17
Payroll Number: 46
Amendment Number: 1
2 employee payroll record(s) processed
Your Transaction ID is: 10837547
Print this Page
iew your submission
' Adohe
Submit another set of payroll records
Public Works Certifi( ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-17 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 46 - 1 Ctr Payroll #: 46-1 Week Ending: 05/17/2020 Statement of Non -Performance? Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
Sw Mon Tue Wed Thu
Fri
Sat
Sun
Total
Total
Vac/
Health
05/11 05/12 05/13 05/14
05/15
05/16
05/17
Hours Base Hourly
Fringe
Holiday
& Welf.
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00
8.00
0.00
0.00
jj"4;0{6 I 15.00
0.00
0.00
0.00
O LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.50
0.00
0.00
0.00
W60 22.50
0.00
0.00
0.00
NOTE: ORIGINAL PAYROLL NUMBER 46-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
Pension Other Training Total
Hourly Rate
0.00 0.00 0.00 fa�t1l5�1
0.00 0.00 0.00
0.00 Total Deductions 62.24
Public works certified Payroll Reporting Form 04/07/2021 - Page 1
Contractor Name: PWLC II, INC.
Public Works Certifi( ;ayroll Reporting Form
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Week Ending: 05/17/2020 Payroll Number:46-1
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSN-61010M Mon Tue Wed Thu Fri
Sat
Sun
Total Total
Vac/
Health
Total
05/11 OS/12 OSl13 05/14 OS/15
OS/16
OS/17
Hours Base Houdy Fringe
9
Holiday
Y
& Welt.
Pension
Other Training
Hourly Rate
Y
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
40.00 13.80 0.00
0.00
0.00
0.00
0.00 0.00
13.80 -'
O LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.50 0.00
0.00
0.00
20.70 0.00
0.00
0.00
0.00
0.00 0.00
2010..
NOTE: ORIGINAL PAYROLL NUMBER 46-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM
THE EMPLOYEE'S
CHECK, SHOULD = 0.00
Travel & Subsistence
0.00
Total Deductions
64.07
Public works Certified Payroll Reporting Form 04/07/2021 - Page 2
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
iblieworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-17
Payroll Number. 46
Amendment Number. 0
17 employee payroll record(s) processed
Your Transaction ID is: 8349548
Print IN5 Page
I ..
View your submission Fd06C
Submit another set of payroll records
Public Works Certifies -iyroll Reporting Form
Certification under. elty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position In business) with the authority to act for and on behalf of PWLC II, INC. (hams of business andlor contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020.05-17 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-05-22."
Contractor Name: PWLC ll, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 46- 0 For Week Ending: 05/17/2020 Is this a 'Statement of Non -Performance?'
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social Security Number of Worker
Withholding
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
FICA
State
SDI
Vac!
Health
Pension
Net
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Hollday
& Welf.
Wage
PW For
Check
Number
1
Date
ALAN RAMIREZ RAYA
05/11 05/12 05113 05114 05/15 05/16 05/17
This
Ail
63.91
55.08
14.56
7.20
0.00
0.00
0.00
84037 MAGNOLIA ST
Work
Classification
Project
Projects
Week
Hours Worked Each Day
COACHELLA
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00 720.00
Fund
Travl
Total
579.25
29632
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABORER
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
92236
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Idd
0.00
36.00
NOTE:
Day
Deductions, Contributions, and Payments
Name, Address and
Number of
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Hollday
& Welf.
Wage
Paid For
Check
Number
p
Date
ALEJANDRO CHAVEZ
05/11 05112 05/13 05114 05115 05116 05117
This
All
104.79
82.84
43.61
10.83
0.00
0.00
0.00
2103 JACQUES DRIVE
Work
Classification
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
TREE
g
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
27.07
1,082.80 1,082.80
Fund
Travl
Total
840.73
29623
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
LABORER
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.61
0.00
0.00
0.00
0.00
0,00
0.00
242.07
92262
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.14
NOTE:
Day
Deductions, Contributions, and Payments
Name, Address and
Number of
Social Security Number of Worker
Withholding
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
FICA
State
SDI
Vac/
Health
Pension
Net
3
Date
Total
Hourly
Earned
Tax
Tax
Holiday
& Welf.
Wage
Check
APOLINAR GONZALEZ MARTINEZ
05/14
05/15
05116
05117
Hours
Pay Rate
26.12
43,64
2.82
5.71
0.00
0.00
0.00
PWe For
Number
Work
05/11
05112
05/13
Thisaid I All
Week
31325 AVE LA PALOMA
Classification
Hours Worked Each Day
Project Projects
CATHEDRAL CITY
LANDSCAPE
g
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
570.50 570.50
Fund
Dues
Travl
Savings
Other
Total
92.2
CA
MAINTENANCE
Training
Admin
Subs
Deduct
LABORER
Q
0.00
0,00
0.00
0.50
0.00
0.00
0.00
0.50
1 21.00
0.00
0.00
0.00
0.00
0.00
0.00
78.29
92234
p
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Public Works Certified Payroll Reporting Form 05/22/2020 - Page 1
Public Works Certifier- Zyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/17/2020
Payroll Number:46-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Gross Amount
Earned
Hourly
Pay Rate This All
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac!
Hollday
Health
& Well.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
05111 05/12 05/13 05114 05/15 05/16 05/17
59.06
64.64
17.63
8.45
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
845.00
845.00
Training
Admix
Dues
Subs
Savings
Other
Total
695.22
29624
Q
0.00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
149.78
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Welf.
Pension
Net
Wage
PW For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
05/11 05/12 05/13 05114 05/16 05/16 05/17
This
All
Projects
0.00
43.64
2.82
5.71
0.00
0.00
0.00
Hours Worked Each Day
Hours
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14,00
570.50
570.50
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
518.33
29626
Q
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
52.17
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and ;Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holl day
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
q
Date
CARLOS LUNAGONZALEZ
66145 7TH ST
Work
Classlflcatlon
05111 05112 05/13 05/14 05/15 05116 05117
This
Project
I All
Projects
83.61
100.95
18.67
13.20
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
$
B.00
8.00
8.00
B.00
8.00
0.00
0.00
40.00
24.87
994.80
1,319.64
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
1,103.21
29629
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
216.43
p
O.oO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
CARLOS LUNA GONZALEZ
66145 7TH ST
Work
Classlflcatlon
05/11 05112 05/13 05/14 05/15 05116 05/17
Thls
Project
All
Projects
83.61
100.95
18.67
13.20
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS TREE
CA MAINTENANCE
LABORER
92240
$
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.07
324.84
1,319.64
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
1,103.21
29629
Q
0.00
0.00
0.00
0.00
0.00
8.00
0.00
8.00
40.61
0.00
0.00
0.00
0.00
0.00
0.00
216.43
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.14
NOTE:
Public works certified Payroll Reporting Form 05/22/2020 - Page 2
Public Works Certifier' yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/17/2020 Payroll Number:46-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wege
Pald For
Week
Check
Number
0
Date
EDUARDO ESCAMILLA MORENO
84039 LINGAYAN AVE
Work
Classification
05l11 05l12 OS/13 05/14 05/15 O5/16 05/17
This
Project
All
Projects
0.00
98.93
55.73
12.93
0,00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
TREE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
24.87
1,293.24
1,293.24
Training
Admin
Du
Trav/es Subs
Savings
Other
Total
1,125.65
29625
Q
0.00
0.00
0.00
0.00
0.00
8.00
0.00
8.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
167.59
D
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rale
Gross Amount
Earned
Federal
Tax
FICA
State I
Tax
SDI
Vac!
Holiday
H6�1lh
& Welf.
Pension
Net
Wage
PW For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
05/11 O5112 05/13 O5114 O5I15 05116 05117
ThIs
Project
All
Projects
0.00
43.64
0.00
5.67
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
0.00
8.00
0.00
0.00
32.00
14.00
458.50
570.50
Training
Admin
Dues
Subs
Savings
Other
Total
521.19
29635
Q
0.00
0.00
0.50
0.00
0.00
0.00
0.00
0.50
21.00
0.00
0.00
0.00
0.00
0,00
0.00
49.31
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
HUMBERTO S. VALDEZ
12966 CACTUS DR #A
Work
Classification
05111 05112 O5113 O5l14 05115 05116 O5117
This
Project
All
Projects
154.30
87.41
46.28
11.42
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
21.97
1.142,44
1,142.44
Training
Fund
Dues Dues
Subs
Savings
Other
Total
843.03
29634
Q
0.00
0.00
0.00
0,00
0.00
8.00
0.00
8.00
32.96
0.00
0.00
0,00
0.00
0.00
0.00
299.41
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf,
Pension
Net
Wage
Paid For
Week
Check
Number
q
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
05/11 05/12 05/13 05/14 05/15 05/16 O5117
This
Project
All
Projects
7.41
48.49
0.00
6.34
0,00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
8.00
8.00
D.00
0.00
40.00
15.00
633.75
633.75
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
571.51
29621
Q
0,00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
22.50
0.00
0.00
0.00
0.00
0.00
0.00
62.24
D
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
30.00
NOTE;
Public Works Certified Payroll Reporting Form 05/22/2020 - Page 3
Public Works Certifier" iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/17/2020 Payroll Number:46-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
05111 05/12 05/13 05/14 05/15 05/16 05/17
This
Project
All
Projects
45.68
56.12
18.01
7.34
0.00
0.00
0.00
Hours Worked Each Day
INDIO LANDSCAPE
CA MAINTENANCE
LABORER
92201
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
18.00
733.50
733.50
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
606.35
29620
0
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.50
27.00
0.00
0.00
0.00
0.00
0.00
0.00
127.15
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
05/11 05/12 05/13 05/14 05/15 05/16 05/17
This
Project
All
Projects
22.61
35.08
1.14
4.59
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00Fund
32.00
14.00
458.50
458.50
Training
Admin
Dues
Subs
Savings
Other
Total
395.08
29622
0
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.50
21.00
0.00
0.00
0.00
0.00
0.00
0.00
63.42
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
05/11 05112 05113 05114 05115 05116 05/17
This
Project
All
Projects
0.96
43.54
0.00
5.69
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
LANDSCAPE
MAINTENANCE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
583,05
583.05
TralningLAdmIn
Fund
uesSubsTotalLABORER
Trav/
518.98
29631
0
0.00
0.50
0.50
0.50
0.00
0.00
0.00
1.50
20.7092262
0.00
L0.00
0.00
0.00
13.88
64.07
p
o.00
o.00
o.00
o.00
o.00
o.00
o.00
0.00
27.so
NOTE: $13.88 OTHER = FH125
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac)
Holiday
Health
& Wolf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classlflcatlon
05/11 O5112 05113 05114 O5/15 05l16 05117
This
Project
All
Projects
61.78
46.76
j
13.36
6.11
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
611,25
611.25
Tralning
Adrnin
Dues
Subs
Savings
Other
Total
483.24
29630
0
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.50
22.50
0.00
0.00
0.00
1 0.00
1 0,00
0.00
128.01
p
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Public works certified Payroll Reporting Form 05/22/2020 - Page 4
Public Works Certifie,--gyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING
DISTRICT 89-1
For Week Ending: 05/17/2020
Payroll Number:46-0
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Social SecurityNumber of Worker
Withholding
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
State
Vac/
Health
3
Date
Earned
Tax
FICA
Tax
SDI
Holiday
Y
& Welf.
Pension
Net
ROSA RODRIGUEZ
Total
Hourly
Wage
Check
Work
05/11
05/12
05/13 05/14 05/15
05116
05/17
Hours
Pay Rate
This All
26.12
43.63
7.98
5.71
0.00
0.00
0.00
Paid For
Number
PO BOX 580332
Classlflcatlon
Hours Worked Each Day
Project ect Projects
Week
N PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
570.50
570.50
Fund
Travl
487.06
29833
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.50
I 21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
83.44
92258
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.0Usemb 0
NOTE:
Number of
Day
Deductions,
Contributions,
and Payments
I
Name, Address and
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
.
State
Vac/
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Wage
Check
0
Date
RUBEN F. HENRIOUFz
Hours
Pay Rate
Paid For
Number
Work
05/11
05/12
05/13 05/14 05/15
05/16
05/17
This
All
154.30
87.40
48.86
11.42
0.00
0.00
0.00
15687 PALM DR #83
Classlflcatlon
Project
Projects
Week
Hours Worked Each Day
DESERT HOT SPRINGS
TREE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
21.97
1,142.44
1,142.44
Fund
Travl
840.46
29628
CA
MAINTENANCE
Training
g
Admin
Dues
Subs
Savings
g
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
8.00
0.00
8.00
32.96
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
301.98
92240
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
s��
NOTE:
Public works certified Payroll Reporting Form 05/22/2020 - Page 5
eCPR Online Confirmation
Your payroll submission request has been processed.
.'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 10837374
This certified payroll will be treated as an amendment #: 3
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-10
Payroll Number: 45
Amendment Number: 3
1 employee payroll record(s) processed
Your Transaction ID is: 10839309
Print this Page
__J
iew your submission Adobe
Submit another set of payroll records
Public Works Certifi, ayroll Reporting Form
Certification under penalty of perjury:
1, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to
act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-10 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-08."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373
License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726
Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE
Location Description:
Payroll #: 45 - 3 Ctr Payroll #: 45-3 Week Ending: 05/10/2020
❑ Statement of Non -Performance? ❑ Final payroll for this project?
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSNIMM� Mon Tue Wed Thu Fri Sat
Sun Total Total Vac/ Health Total
05/04 05/05 05/06 05/07 05/08 05/09
05/10 Hours Base Hourly Fringe Holiday & Welf. Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00 0.00
0.00 .10.00 13.80 0.00 0.00 0.00 0.00 0.00 0.00 M- W.-
0 LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.00 0.00 0.00
0.00 1.00 20.70 0.00 0.00 0.00 0.00 0.00 0.00 ;W'q O
NOTE: 13.88 DEDUCTION FOR HEALTH INSURANCE
Travel & Subsistence 0.00 Total Deductions 62.21
Public Works certified Payroll Reporting Form 04/08/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
.-lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 10837280
This certified payroll will be treated as an amendment #: 2
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-10
Payroll Number: 45
Amendment Number: 2
1 employee payroll record(s) processed
Your Transaction ID is: 10837374
Print this Page
t
'iew your submission AM)e
Submit another set of payroll records
Public Works Certifi ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-10 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 45 - 2 Ctr Payroll #: 45-2 Week Ending: 05/10/2020
Statement of Non -Performance?
FIFInal payroll for this project?
Employee: MARCELINO RAMIREZ 1500 E SAN RAFAEL DR #164, PALM SPRINGS, CA, 92262
SSN Mon Tue Wed Thu Fri
Sat
Sun
Total
Total
Vac/ Health
Total
05/04 05/05 05/06 05107 05/08
05109
05/10
Hours
Base Hourly Fringe
Hollday & Welf.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00
0.00
'40) OU I
13.80 0.00
0.00 0.00
0.00
0.00 0.00
summ
O LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.00 0.00
0.00
0.00
I'0_0";.
20.70 0.00
0.00 0.00
0.00
0.00 0.00
b
NOTE: ORIGINAL PAYROLL NUMBER 45-1 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED
FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
0.00
Total Deductions
62.21
Public works Certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
.Tease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8282274
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-10
Payroll Number: 45
Amendment Number: 1
1 employee payroll record(s) processed
Your Transaction ID is: 10837280
Print this Page
'iew your submission
Submit another set of payroll records
Public Works Certifi ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC ll, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-10 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 45 - 1 Ctr Payroll #: 45-1 Week Ending: 05/10/2020 ❑ Statement of Non -Performance? Final payroll for this project?
I
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSN:� Mon Tue Wed Thu
Fri
Sat
Sun
Total
Total
Vac/
Health
Total
05/04 05/05 05/06 05107
05/08
05109
05/10
Hours Base Hourly
Fringe
Holiday
& Welf.
Pension
Other Training
Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00
0.00
0.00
0.00
rvla-m 15.00
0.00
0.00
0.00
0.00
0.00 0.00
15,00
O LANDSCAPE MAINTENANCE LABORER 0.00 0.50 0.50 0.00
0.00
0.00
0.00
DaWl. 22.50
0.00
0.00
0.00
0.00
0.00 0.00
22.50
NOTE: ORIGINAL PAYROLL NUMBER 45-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
0.00
Total Deductions
60.14
Public works certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
_ Please review the results of your submission. Should you have any questions please contact the eCPR unit at
iblicworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-10
Payroll Number 45
Amendment Number. 0
15 employee payroll record(s) processed
Your Transaction ID is: 8282274
Print this Pa9e
View your submission l•1n7r
Submit another set of payroll records
Public Works Certifier' iyroll Reporting Form
Certification under, aity of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-10 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-05-14."
Contractor Name: PWLC 11, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANIA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA
Payroll Number: 45- 0
County: RIVERSIDE
For Week Ending: 05/10/2020
Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
I Is this a 'Statement of Non -Performance?'
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
OSI04 05105 05/O6 OSl07 05I08 05/09 05/10
This
Project
All
Protects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8,00
8.00
0.00
0.00
40,00
18.00
720.00
720.00
Training
Fund
Admin
Dues
Trav/Subs
Subs
Savings
Other
Total
Deduct
579.25
29492
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
[NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Gross Amount
Earned
Hourly
Pa Rate This All
Y
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
q
Date
ALEJANDRO CHAVEZ
2103 JACQUES DRIVE
Work
Classification
OS/04 O5I05 O5I06 OS/07 OSI08 OS/09 05/10
104.54
82.74
43.51
10,82
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
9P282
TREE
MAINTENANCE
LABORER
$
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
27.07
866.24
1,081.64
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
840.03
29483
Q
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
40.61
0.00
0.00
0.00
0.00
0.00
0.00
241.61
D
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
54.14
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
05104 05105 05/06 05/07 05/08 05109 05/10
This
Project
All
Projects
59.06
64.64
17.63
8.45
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
845.00
845.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
695.22
29484
Q
0.00
0.50
0.50
0.50
0.00
0,00
0.00
1.50
30.00
0.00
0.00
0.00
0.00
0.00
0.00
149.78
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public works certified Payroll Reporting Form 05/14/2020 - Page 1
Public Works Certifier- yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/10/2020 Payroll Number:45-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
05/04 05/05 05/06 05/07 05/08 05/09 05/10
This
Project
All
Projects
0.00
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Dues Dues
Sudhs
Savings
Other
Total
509.20
29486
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0,00
0.00
50.80
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
d
Date
CARLOS LUNA GONZALEZ
66145 7TH ST
Work
Classlflcatlon
05/04 05/05 05/06 05/07 05/OB OSI09 OS/10
This
Project
All
Projects
37.22
71.28
2.61
9.32
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
$
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
24.87
795.84
931.84
Training
AFund dm n
Dues
Subs
Savings
Other
Total
811.41
29488
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
120.43
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay RateThls
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
EDUARDO ESCAMILLA MORENO
84039 LINGAYAN AVE
WorkWorkOS/04
Classification
05I05 05I06 O5I07 O5/08 05/09 O5/10
Project
All
Projects
0.00
71.90
23.89
9.40
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
VENOM
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
24.87
795.84
939.84
Admin
Dues
Subs
Savings
Other
Total
834.65
29485
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
Lain
0.00
0.00
0.00
0.00
0.00
105.19
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Penslon
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
O5/04 05I05 05/06 05107 05/O8 05109 O5/10
This
Project
All
Projects
0.00
44.44
0.00
5.81
1 0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
6.00
8.00
B.00
8.00
0.00
0.00
40.00
14.00
581.00
581.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
530.75
29495
Q
0.00
0.50
0.50
0.00
0.00
0.00
0.00
1.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
50.25
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Public Works certified Payroll Reporting Form 05/14/2020 - Page 2
Public Works Certifie,-ayroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/10/2020 Payroll Number:45-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
HUMBERTO S. VALDEZ
12966 CACTUS DR #A
Work
Classification
05/04 05/05 05/06 05/07 05/08 05/09 05110
This
Project
All
Projects
85.24
62.35
20.81
8.15
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
21.97
703.04
815.04
Training
Adma
Dues
Subs
Savings
Other
Total
638.49
29494
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0.00
0.00
0.00
0.00
0.00
0.00
176.55
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
[NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
05/04 05/05 05/06 05/07 05/08 05/09 05/10
This
Project
All
Projects
6.29
47.62
0.00
6.23
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
0.00
0.00
0.00
32.00
15.00
502.50
622.50
Training
Admi
Dues
Subs
Savings
Other
Total
562.36
29481
Q
0.00
0.50
0.50
0.00
0.00
0.00
0.00
1.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
60.14
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wege
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
05/04 05/05 05/06 05107 05/08 05/09 05/10
This
Protect
All
Protects
44.06
55.08
17.14
7.20
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720,00
720.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
596.52
29480
Q
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
123.48
D
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holldey
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classlflcatlon
05104 05/05 05/06 05/07 05106 05109 05/10
This
Project
All
Projects
34.79
42.84
4.94
5.60
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560,00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
471.83
29482
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
88.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Public works certified Payroll Reporting Form 05/14/2020 - Page 3
Public Works Certifie' -ayroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/10/2020 Payroll Number:45-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
DsY
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Gross Amount
Earned
Hourly
Pay Rate This All
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vacl
Hollday
Health
& Welf.
Pension
Ne t
Wage
PFor
W
Week
Check
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
05/04 05105 05/06 05/07 05/08 05/09 05/10
0.00
42.74
0.00
5.59
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
572.70
572.70
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
510.49
29491
0
0.00
0.50
0.50
0.00
0.00
0.00
0.00
1.00
20.70
0.00
0.00
0.00
0.00
0.00
13.88
62.21
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.88 OTHER = FH125
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Ne t
Wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
05I04 05105 05I06 05107 05I08 05/09 05110
This
Project
All
Projects
60.43
45.90
12.86
I
6.00
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
I
15.00
600.00
600.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
474.81
29490
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
125.19
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Wolf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSA RODRIGUEZ
PO BOX 580332
Wok
Classification
05/04 05/05 05/06 05/07 05/08 05/09 05110
This
Project
All
Projects
12.68
34.28
3.49
4.48
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
$
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
14.00
448.00
448,00
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
393.07
29493
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
54.93
p
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
RUBEN F. HENRIOUEZ
15687 PALM DR #83
Work
Classification
05/04 05105 05/06 05/07 05/08 05/09 05/10
This
Project
A[
Projects
86.20
62.96
23.92
8.23
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
$
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
21.97
703.04
823.04
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
641.73
29488
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0.00
0.00
0.00
0.00
0.00
0.00
181.31
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE:
Public works certified Payroll Reporting Form 05/3-4/2020 - Page 4
eCPR Online Confirmation
Your payroll submission request has been processed.
'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8236427
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-03
Payroll Number: 44
Amendment Number: 1
1 employee payroll record(s) processed
Your Transaction ID is: 10837199
Print this Page
o
'iew your submission Adobe
Submit another set of payroll records
Public Works Certify ayroll Reporting Form
Certification under penalty of perjury:
1, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-03 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 44 - 1 Ctr Payroll #: 44-1 Week Ending: 05/03/2020
Statement of Non -Performance?
Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSN� Mon Tue Wed Thu Fri Sat
Sun Total Total
Vac/ Health
Total
04/27 04/28 04/29 04/30 05/01 05/02
05/03 Hours Base Hourly Fringe
Holiday & Welf.
Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00 0.00
0.00 &T46;(JORI 15.00 0.00
0.00 0.00
0.00 0.00 0.00 ggmrglam
NOTE: ORIGINAL PAYROLL NUMBER 44-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence
0.00 Total Deductions 55.94
Public Works Certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
j blicworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-05-03
Payroll Number: 44
Amendment Number. 0
11 employee payroll record(s) processed
Your Transaction ID is: 8236427
Print this Pag2
View your submission
Submit another set of payroll records
Public Works Certifier'- )yroll Reporting Form
Certification under,. .alty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-05-03 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-05-07."
[Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address. 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 44- 0 For Week Ending: 05/03/2020 u ❑ Is this a 'Statement of Non -Performance?'
Number of Day Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal State Vac/ Health
Net
FICA SDI Pension
Earned Tax Tax Holiday & Welf.
1 Date Total Hourly Wage Check
ALAN RAMIREZ RAYA r
04127 04I28 04129 04I30 05/01 05/02 05/03 Hours Pay Rate This All 63.91 55.08 14.56 7.20 0.00 0.00 0.00 Paid FoNumber
Work
84037 MAGNOLIA ST Classification Hours Worked Each Day Project Projects Week
COACHELLA
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720.00
Fund
Trav/
Total
579.25
29458
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
140.75
92236
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
SDI
Vac!
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
Holiday
& Welf.
Wage
Check
3
Date
APOLINAR GONZALEZ MARTINEZ
Hours
Pay Rate
Paid For
Number
04/27 04/28 04/29 04/30 05/01 05/02 05/03
Thls
All
24.86
42.84
2.36
5.60
0.00
0.00
0.00
31325 AVE LA PALOMA
Work
Classification
Protect
Projects
Week
Hours Worked Each Day
CATHEDRAL CITY
LANDSCAPE
$
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Fund
Trav!
Total
484.34
29453
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
75.66
92234
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Mon Tue Wed Thu Fri Sat Sun
Gross Amount
Federal
State
Vac/
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Hollday
& Welf.
Wage
Check
3
Date
ARMANDO RICO CHAVEZ
Hours
Pay Rate
Paid For
Number
04/27 04/28 04/29 04/30 05/01 05102 05/03
This
All
59.06
64.64
17.63
8.45
0.00
0.00
0.00
2103 JACQUES DR
Work
Classlflcatlon
Project
Projects
Week
Hours Worked Each Day
PALM SPRINGS
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
845.00
845.00
Fund
Trav/
Total
695.22
29450
CA
MAINTENANCE
Training
Ad.!.
Dues
Subs
Savings
Other
Deduct
Q
0.00
0.50
0.00
1.00
0.00
0.00
0.00
1.60
30.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
149.78
92262
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Public Works certified Payroll Reporting Form 05/07/2020 - Page 1
r--
Public Works Certifier-- yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 05/03/2020 Payroll Number:44-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Numeck
ber
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
04/27 04/28 04/29 04/30 05/01 05/02 05103
This
Project
All
Projects
0.00
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560,00
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
509.20
29452
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
50.80
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classiflcatlon
04/27 04/28 04/29 04130 05/01 05102 05/03
This
Project
All
Projects
0.00
42.84
0.00
5.60
0.00
0.00
0,00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
511.56
29461
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.0
0.00
0.00
0.00
0.00
0.00
0.00
48.44
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
I
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
PW For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
04/27 04/28 04/29 04/30 05/01 05/02 05/03
This
Project
All
Projects
4.04
45.90
0.00
6,00
0.00
47,39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
544.06
29447
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0,00
0.00
0.00
55.94
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
N et
Wage
Paid For
Week
Check
Number
3
Date
LUIS E.ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
04/27 04l2B 04/29 04/30 05I01 O5/02 05I03
This
Project
All
Projects
69.98
71.60
31.37
9.36
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
B.00
8.00
0.00
0.00
40.00
18.00
720.00
936.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
753.69
29446
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
182.31
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE: 71
Public Works Certified Payroll Reporting Form 05/07/2020 - Page 2
Public Works Certifie'- ayroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 05/03/2020
Payroll Number:44-0
I
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
04/27 04128 04/29 04/30 05/01 05/02 05/03
This
Project
All
Projects
34.79
42.84
4.94
5.60
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
g
Fund
Admin
Dues
Trav/
Subs
Savings
9
Other
Total
471.83
29448
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
88.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Welf.
Pension
Ne t
Wag
Paid For
Week
Number
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
04/27 04128 04/29 04I30 05I01 05/02 05/03
This
Project
All
Projects
0.00
42.75
0.00
5.59
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
g2262
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
572.70
572.70
Training
Admin
Dues
Subs
Savings
Other
Total
510.48
29457
Q
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
20.70
0.00
0.00
0.00
0.00
0.00
13.88
62.22
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 27.60
NOTE: $13.88 OTHER = FH125
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
aid For
P F
Week
W
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
04/27 04/28 04/29 04130 05/01 05102 05/03
This
Project
All
Projects
60.43
45.90
12.86
6.00
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
Admin
Dues
Subs
Savings
Other
Total
474.81
29456
Q
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
125.19
D
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
PayRate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Nat
Wage
Paid For
Week
Check
Number
3
Date
ROSA RODRIGUEZ
PO BOX 580332
Work
Classification
04127 04128 04/29 04l30 05I01 05IO2 05103
This
Project
All
All
24.86
42.84
7.52
5.60
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Admin
Dues
Subs
Savings
Other
Total
479.18
29459
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
80.82
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
28.00
NOTE:
Public Works certified Payroll Reporting Form 05/07/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8229127
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-26
Payroll Number: 43
Amendment Number: 1
1 employee payroll record(s) processed
Your Transaction ID is: 10837141
Print this Page
iew your submission
Submit another set of payroll records
Public Works Certifi
ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-04-26 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440
Contract With: CITY OF LA QUINTA County: RIVERSIDE
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Location Description:
Payroll #: 43 - 1 Ctr Payroll #: 43-1 Week Ending: 04/26/2020 Statement of Non -Performance? FIFinal payroll for this project? i
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
I
SSN� Mon Tue Wed Thu
Fri Sat Sun Total Total
Vac/ Health
Total
04/20 04/21 04122 04/23
04/24 04/25 04/26 Hours Base Hourly Fringe
Holiday & Welf. Pension
Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00
8.00 0.00 0.00 " 4o[Q0 '; 15.00 0.00
0.00 0.00 0.00
0.00 0.00 Emsrgaf tj
NOTE: ORIGINAL PAYROLL NUMBER 43-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence 0.00
Total Deductions 55.94
Public Works Certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
blicworks@dir. ca. g av_
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-26
Payroll Number. 43
Amendment Number. 0
11 employee payroll record(s) processed
Your Transaction ID is: 8229127
Print this Pagg
View your submission
Submit another set of payroll records
Public Works Certifier-iyroll Reporting Form
Certification under . Aty of perjury:
"I, KRISTY L SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC 11, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or collies thereof submitted and consisting of certified payroll records for the week ending 2020-04-26 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-05-06."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
Payroll Number: 43- 0
MAINTENANCE OF CITYWIDE MEDIANS
For Week Ending: 04/26/2020 Is this a 'Statement of Non -Performance?'
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vecl
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
04I20 04/21 04/22 04/23 04/24 04/25 04/26
This
Project
All
Projects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
Deduct
579.25
29313
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
D
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
I
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
04/20 04121 04122 04123 04/24 04/25 04/26
This
Project
A11
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
484.34
29307
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.66
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Hold
Health
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
04/20 04/21 04122 04/23 04124 04I25 04126
This
Project
All
Projects
64.46
68.09
20.60
8.90
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
S
B.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
20.00
890.00
890.00
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
Deduct
727.95
29304
Q
1.00
1.00
1.00
0.00
0.00
0.00
0.00
3.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
162.05
D
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
L0.00
40.00
NOTE:
Public works certified Payroll Reporting Form 05/06/2020 - Page 1
Public Works Certifier-iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/26/2020 Payroll Number:43-0
I
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& W,
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CARLOS I. ESPARZAALVAREZ
33822 SHIFTING SANDS #B
Work
Classification
04/20 04/21 04/22 04/23 04/24 04125 04/26
This
Project
All
Projects
9.75
25.70
3.61
3.36
0.00
0.00
0,00
Hours Worked Each Day
CATHEDRAL CITY LANDSCAPE
CA MAINTENANCE
LABORER
92234
$
0.00
0.00
8.00
8.00
8.00
0.00
0.00
24.00
14.00 336.00
21.00
28.00
336.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
293.58
29306
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42.42
D
2fi
0.00
0.00
0.00
0.00
0.00
1 0.00
0.00
NOTE;
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/y
Holida
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classlflcatlon
04I20 04121 04l22 04/23 04/24 04125 04/26
This
Project
All
Projects
0.00
42.84
0.00
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
14.00
560.00
560.00
Training
Admin
Dues
Travt
Subs
Savings
Other
Total
511.56
29316
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
48.44
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
04/20 04/21 04/22 04/23 04/24 04/25 04/26
This
Project
All
Projects
4.04
45.90
0.00
6.00
0.00
47.39
0,00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
Fund
Admin
Dues
Trav!
Subs
Savings
Other
Total
544.06
29301
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
55.94
D
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
04/20 04121 04l22 04123 04/24 04I25 04126
This
Project
All
Projects
44.06
55.08
17.14
7.20
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.O0
0.00
0.00
40.00
18.00
720.00
720.00
Training
Admin
Dues
Subs
Savings
Other
Total
596.52
29300
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
123.48
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Public Works Certified Payroll Reporting Form 05/06/2020 - Page 2
Public Works Certifie,- iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/26/2020
Payroll Number:43-0
Pension Net
Name, Address and
Social Securit Number of Worker
y
Number of
Withholding
Dey
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
I State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
04120 04/21 04/22 04/23 04/24 04/25 04/26
This
Project
All
Projects
34.79
42.84
4.94
5.60
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
�
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
471.83
29302
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
88.17
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wag
Paid For
Week
Nuheck mber
4
Date
MARCELINO RAMIREZ
1500 E SAN RAFAEL DR #164
Work
Classification
04/20 04/21 04/22 04123 04/24 04/25 04/26
This
Project
All
Projects
0.00
41.16
0.00
5.38
0.00
47.39
0.00
Hours Worked Each Day
PALM SPRINGS
CA
g22g2
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
13.80
552.00
552.00
Training
Admn
Dues
Subs
Savings
Other
Total
491.58
29312
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.70
0.00
0.00
0.00
0.00
0.00
13.88
60.42
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.60
NOTE: $13.86 OTHER = FH125
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
04/20 04/21 04/22 04/23 04/24 04/25 04/26
This
Project
All
Projects
60.43
45.90
12.86
6.00
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
15.00
600.00
600.00
Training
Fund
Dues
Subs
Savings
Other
Total
474.81
29311 i
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
125.19
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSA RODRIGUEZ
PO BOX 580332
Work
Classlflcatlon
04/20 04/21 04/22 04/23 04/24 04/25 04/26
This
Project
All
Projects
24.86
42.84
7.52
5.60
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
479.18
29314
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
80.82
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Public works certified Payroll Reporting Form 05/06/2020 - Page 3
eCPR Online Confirmation
Your payroll submission request has been processed.
.'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8129397
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-19
Payroll Number: 42
Amendment Number: 1
1 employee payroll record(s) processed
Your Transaction ID is: 10837070
Print this Page
.f
'iew your submission Adobe
Submit another set of payroll records
Public Works Certifi'
ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC ll, INC. (name of business andlor contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-04-19 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
Contract With: CITY OF LA QUINTA
DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
County: RIVERSIDE Location Description:
Payroll #: 42 - 1 Ctr Payroll #: 42-1 Week Ending: 04/19/2020 ❑ Statement of Non -Performance? [—]Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
S Mon Tue Wed Thu Fri
Sat Sun Total Total
Vac/ Health
Total
04/13 04114 04115 04116 04/17
04/18 04/19 Hours Base Hourly Fringe
Holiday & Welf. Pension
Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00
0.00 0.00 M4%Crfa l 15.00 0.00
0.00 0.00 0.00
0.00 0.00 IMMM
NOTE: ORIGINAL PAYROLL NUMBER 42-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00
Travel & Subsistence 0.00
Total Deductions 55.94
Public Works Certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
_Please review the results of your submission. Should you have any questions please contact the eCPR unit at
blicworks@dir.ca.gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-19
Payroll Number: 42
Amendment Number. 0
17 employee payroll record(s) processed
Your Transaction ID is: 8129397
Print this Page
View your submission
Submit another set of payroll records
Public Works Certifief--yroll Reporting Form
Certification under, -iIty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-04-19 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-04-22."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAF
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 42- 0
For Week Ending: 04/19/2020
Is this a 'Statement of Non -Performance?'
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
I
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& WeIF.
Pension
Net
Pala FoWage r
Week
Check
0
Date
ADAN DIAZ SIERRA
46725 CLINTON #79
Work
Classification
04/13 04114 04/15 04/16 04/17 04/18 04/19
This
Project
All
Projects
0.00
8.56
0.00
1.12
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
14.00
112.00
112,00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
102.32
6110
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
9.68
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
04/13 04/14 04/15 04116 04/17 04/18 04/19
This
Project
All
Projects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8,00
8.00
0.00
0.00
40.00
18.00
720.00
720.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
579.25
29276
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
ALEJANDRO CHAVEZ
2103 JACQUES DRIVE
Work
Classification
04/13 04114 04/15 04116 04/17 04/18 04/19
This
Project
All
Projects
52.01
80.81
7.08
10.56
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
TREE
MAINTENANCE
LABORER
5
8.00
8.00
8.00
8,00
8.00
0.00
0.00
40.00
27.07
1,082.80
1,082.80
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
905.91
29268
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.61
0.00
0.00
0.00
0.00
0.00
26.43
176.89
p
0.00
1 0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.14
NOTE: $26.43 OTHER = FH125
Public works Certified Payroll Reporting Form 04/22/2020 - Page 1
Contractor Name: PWLC II, INC.
Public Works Certifiee-,yroll Reporting Form
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/19/2020
Payroll Number:42-0
i
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
I Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
eck
Nuhmber
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work04113
Classification
04114 04/15 04/16 04/17 04118 04119
This
Project
All
Projects
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
484.34
29271
Q
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
75.66
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Welf.
Pension
Net
a
Wage
9
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
04/13 04/14 04/15 04/16 04/17 04/18 04119
This
Project
All
Projects
71.66
72.64
24.56
9.50
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
g22g2
LANDSCAPE
MAINTENANCE
LABORER
$8.00
8.00
8.00
8.00
I8.00
0.00
0.00
40.00
20.00
950.00
950.00
Training
Fund
Dues Dues
Subs
Savings
Other
Total
771.64
29269
Q
1.00
1.00
1.00
1.00
1.00
0.00
0.00
5.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
178.36
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CANDELARIO MATA HERRERA
32615 AURORA VISTA #A
Work
Classification
04/13 04114 04/15 04116 04/17 04I18 04/19
This
Project
All
Projects
0.00
76.10
22.96
9.95
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
TREE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
24.87
994.80
994.80
Training
Admin
Dues
Subs
Savings
Other
Total
885.79
29274
Q
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
109.01
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
CARLOS LUNA GONZALEZ
66145 7TH ST
Work
Classification
04/13 04114 04115 04116 04117 04118 04/19
This
Project
All
Projects
44.63
76.10
4.37
9.95
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
I 9P240
TREE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
24.87
994.80
994.80
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
859.75
29273
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
135.05
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Public works certified Payroll Reporting Form 04/22/2020 - Page 2
r" Public Works Certifies''-`-,yroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/19/2020
Payroll Number:42-0
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
Slate
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
EDUARDO ESCAMILLA MORENO
84039 LINGAYAN AVE
Work
Classification
04/13 04114 04/15 04/16 04/17 04/18 04/19
This
Project
All
Projects
0.00
76.09
28.12
9.95
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
TREE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
24.87
994.80
994.80
Training
Fund
Admin
Dues
Trav/
Subs
f
I Savings
Other
Total
880.64
29270
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
1 0.00
0.00
114.16
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Paid For or
Week
eck
Number
0
Date
EUGFNIO COPENO IZOTECO
46299 ARABIA #C-13
Work
Classification
04113 04114 04115 04116 04117 04I18 04/19
This
Project
All
Protects
0.00
8.57
0.00
1.12
0,00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
Opw
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
0.00
0.00
0.00
0.00
0.00
0.00
8,00
14.00
112,00
112.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
102.31
6109
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
9.69
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
04/13 04/14 04/15 04/16 04/17 04/18 04/19
This
Project
All
Projects
0.00
42.85
0.00
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.O0
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
511.55
29279
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.01)
0.00
0.00
0.00
0.00
0.00
0.00
48.45
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
HUMBERTO S. VALDEZ
12966 CACTUS DR #A
Work
Classification
04/13 04114 04I15 04116 04/17 04l18 04119
This
Project
I All
Projects
96.30
67.23
25.02
8.79
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
S
8.00
8,00
8.00
8.00
8.00
0.00
0.00
40.00
21.97
878.80
878.80
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
681.46
29278
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0.00
0.00
0.00
0.00
0.00
0.00
197.34
D
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
43.94
NOTE:
Public Works Certified Payroll Reporting Form 04/22/2020 - Page 3
Public Works Certifiee- ,yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/19/2020 Payroll Number:42-0
Name, Address and
Social Security Number of Worker
y
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIA BONILLA
33477 NAVAJO TR #B
Work
Classification
04/13 04/14 04/15 04/16 04117 04/18 04/19
This
Project
Alt
Projects
4.04
45.90
0.00
6.00
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
Adman
Dues
Subs
Savings
Other
Total
544.06
29266
Q
0.00
0.00
D.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
55.94
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
olida
Hy
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
04/13 04/14 04/15 04116 04117 04/18 04119
This
Project
All
Projects
44.06
55.09
17.14
7.20
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720.00
Training
Adman
Dues
Subs
Savings
Other
Total
596.51
29265
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
123.49
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
04/13 04/14 04/15 04/16 04/17 04/18 04119
This
Project
All
Projects
34.79
42.84
4.94
5.60
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
I
14.00
560.00
560.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
471.83
29267
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
88.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
p
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Wok
Classification
04113 04114 04/15 04116 04/17 04118 04/19
This
Project
All
Projects
60.43
45.90
12.86
6.00
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
B.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
474.81
29275
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
711
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Public Works certified Payroll Reporting Form 04/22/2020 - Page 4
Public Works Certifier-iyroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/19/2020
Payroll Number:42-0
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social SecurityNumber of Worker
Withholding
Mon
Tue
Wed Thu Fri Sat Sun Gross Amount
Federal
State Vac/
Health
Date Earned
Tax
FICA Tax SDI Holiday&
Welf.
Pension
Net
ROSARODRIGUEZ
3
Total Hourly
Wage Check
Work
04113
04/14
04/15 04/16 04/17 04/18 04/19 Hours Pay Rate This All
24.86
42.84 7.52 5.60 0.00
0.00
0.00
Paid For Number
PO BOX 580332
Classification
Hours Worked Each Day Project Projects
Week
N PALM SPRINGS
LANDSCAPE
8.00
8.00
8.00
8.00
8.00
0.00
0.00Trav/S
40.00
14.00
560.00
560.00
Fund
479.18
29277
CA
MAINTENANCE
Training
9
Admin
Dues
Subs
Subs
Savings
9
Other
Total
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
•
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
80.82
92258
p
o.00
o.00
o.00
o.00
o.00
o.00
o.00
o.o0
26.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
IDeductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
RUBEN F. HENRIOUEZ
15687 PALM DR #83
Work
Classification
04/13 04/14 04/15 04/16 04/17 04118 04119
_
This
Protect
All
Protects
93.77
66.34
26.84
8.67
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
TREE
MAINTENANCE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
21.97
878.80
878.80
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
671.68
29272
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
92240
LABORER
0.00
0.00
0.00
0.00
0.00
11.50
207.12
p
0.00
0.00
0.00
0.00
1 0.00
0.00
0.00
0.00
43.94
NOTE: $11.50 OTHER = FH125D
Public Works certified Payroll Reporting Form 04/22/2020 - Page 5
eCPR Online Confirmation
Your payroll submission request has been processed.
'lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8101815
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-12
Payroll Number: 41
Amendment Number: 1
1 employee payroll record(s) processed
Your Transaction ID is: 10836900
Print this Page
iew your submission Atlal�e
Submit another set of payroll records
Public Works Certifi ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-04-12 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC.
Contractor PWCR: 1000037373
License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA
FEIN: 510532726
Contractor Email: KRISTYS@PWLC2.COM
92262
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA
DIR Project ID: 290440
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA
County: RIVERSIDE
Location Description:
Payroll #: 41 - 1 Ctr Payroll #: 41-1
Week Ending: 04/12/2020
Statement of Non -Performance?
FIFInal payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SSI1VMNN� Mon
Tue Wt.d Thu Fri Sat
Sun Total Total Vac/ Health
Total
04/06
04/07 04r08 04/09 04/10 04111
Hours Base Hourly Fringe Holiday & Welf.
04112 9 y
Pension Other Training Hour Rate
y
S LANDSCAPE MAINTENANCE LABORER 0.00
8.00 0.00 8.00 0.00 0.00
0.00 ,Wf8(Q0l1, 15.00 0.00 0.00 0.00
0.00 0.00 0.00 g
NOTE: ORIGINAL PAYROLL NUMBER 41-0 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00 Travel & Subsistence
0.00 Total Deductions 20.76
Public works certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
Please review the results of your submission. Should you have any questions please contact the eCPR unit at
Cublicworks@dir,ca_gov.
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-12
Payroll Number: 41
Amendment Number. 0
17 employee payroll record(s) processed
Your Transaction ID is: 8101815
Print this Pa9e
View your submission ASlC6f
Submit another set of payroll records
Public Works Certifiee' yroll Reporting Form
Certification under r. Aty of perjury:
"I, KRI STY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business anWor contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-04-12 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-04-17."
'ontractor Name: PWLC II, INC.
Contractor PWCR: 1000037373
License Type: CSLB
License Number 855783
4ddress: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA
FEIN: 510532726
Contractor Email: KRISTYS@PWLC2.COM
92202
nsurance Number: WCV5504144
4warding Body: CITY OF LA QUINTA
DIR Project ID: 290440
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
'ontract With: CITY OF LA QUINTA
County: RIVERSIDE
Location
Description: LIGHTING
AND LANDSCAPE DISTRICT
89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 41- 0
For
Week Ending: 04/12/2020
Is
this a 'Statement of Non -Performance?'
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social Security Number of Worker
Withholding
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal State
FICA SDI
Vac/
Health
Pension
Net
0
Date
Total
Earned
Hourly
Tax Tax
Holiday
& Welf.
Wage
Check
ADAN DIAZ SIERRA
04/06
04107
04I08 04/09 04I10
04111
04112
Hours
PaY Rate This All
0.00 25.70 0.00 3.36
0.00
0.00
0.00
Paid For
Number
46725 CLINTON #79
Work
Classification
Hours Worked Each Day
Project Projects
Week
INDIO
LANDSCAPE
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
14.00
336.00
336.00
Fund
Trav/
Total
306.94
29234
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
29.06
92201
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
i
Number of
Day
Deductions, Contributions,
and Payments
Name, Address and
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
FICA
Slate
SDI
Vacl
Health
Pension
Net
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Holiday
& Welf-
Wage
Paid For
Check
Number
1
Date
ALAN RAMIREZ RAYA
04/06 04/07 04I08 04109 04l10 04111 04112
This
All
29.35
33.04
3.14
4.32
0.00
0.00
0.00
84037 MAGNOLIA ST
Work
Classlflcation
Project
Projects
Week
Hours Worked Each Day
COACHELLA
LANDSCAPE
$
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
18.00
432,00
432.00
Fund
Travl
Total
362.15
29241
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
69.85
92236
D
0.00
0.00
0.00
0.00
0.00
0.00 1
0.00
1 0.00
36.00
NOTE:
Number of
Day
Deductions, Contributions,
and Payments
Name, Address and
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
FICA
State
I
SDI
Vac/
I
Health
Pension
N at
Social Security Number of Worker
Withholding
Total
Hours
Hourly
Pay Rate
Earned
Tax
Tax
Holiday
& Welf.
Wage
Paid For
Check
Number
4
Date
ALEJANDRO CHAVEZ
04l06 04I07 04I08 04/09 04/10 04111 04112
This
All
51.74
80.62
6.98
10.54
0.00
0.00
0.00
Work
1
Week
2103 JACQUES DRIVE
Classification
Project
Pro acts
j
Hours Worked Each Day
PALM SPRINGS
TREE
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
27.07
649.68
1,080.48
Fund
Travl
Total
904.17
29231 i
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Deduct
O
0.00
0.00
0.00
0.00
10.00
0.00gl��
40.61
LABORER
0.00
0.00
0.00
0.00
0.00
26.43
176.31
92262
D
0.00
0.00
0.00
0.00
0.00
0.0054.14
NOTE: $26.43 OTHER = FH125
Public Works certified Payroll Reporting Form 04/17/2020 - Page 1
Public Works Certifies'--yroll Reporting Forin
'Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 04/12/2020 Payroll Number: 41-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
04/06 04107 04108 04/09 04/10 04/11 04/12
This
Project
All
Projects
1.48
25.70
0.00
3.36
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00Fund
24.00
14.00
336.00
336,00
Training
Adm n
Dues
Subs
Savings
Other
Total
305.46
29236
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
30.54
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif,
Pension
Net
PaidF or
Week
Check
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
04/06 04/07 04/08 04/09 04/10 04/11 04/12
This
Project
All
Projects
15.88
36.72
0.00
4.80
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
LANDSCAPE
MAINTENANCE
LABORER
$
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
20.00
480.00
480.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
422.60
29232
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
57.40
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hourly
Gross Amount Federal
Earned Tax
FICA
State
Tax
SDI
Vac!
Hollday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
CANDELARIO MATA HERRERA
32615 AURORA VISTA #A
Work
Classification
04106 04I07 04/OB 04I09 04l10 04111 04/12
Hours
Pa Rate
Y
This
Project
All 0.00
Projects
45.66
0.00
5.97
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
TREE
MAINTENANCE
LABORER
5
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
24.87
596.88
596.88
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
545.25
29239
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
51.63
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac(
Hollday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
q
Date
CARLOS LUNA GONZALEZ
66145 7TH ST
Work
Classlflcatlon
04/06 04/07 04/08 04/09 04110 04/11 04/12
This
Project
All
Projects
3.73
45.65
0.00
5.97
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
$
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
24.87
596.88
596.88
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
541.53
29238
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
55.35
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Public Works certified Payroll Reporting Form 04/17/2020 - Page 2
Contractor Name: PWLC II, INC.
Public Works Certified- -yroll Reporting Form
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 04/12/2020
Payroll Number: 41-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Weif.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
EDUARDO ESCAMILLA MORENO
84039 LINGAYAN AVE
Work
Classification
04/06 04/07 04/08 04/09 04110 04/11 04/12
This
Project
All
Projects
0.00
45.67
3.98
5.97
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
TREE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
24.87
596.88
596.88
Training
Admin
Dues
Subs
Savings
Other
Total
541,26
29235
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
55.62
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
j Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
EUGENIO COPENO IZOTECO
46299 ARABIA #C-13
Work
Classification
04I06 04/07 04I08 04/09 04I10 04111 04/12
This
Project
All
Projects
0.00
25.70
0.00
3.36
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
LANDSCAPE
MAINTENANCELABORER
8.00
8.00
0.00
8.00
0.00
0.00LO.0024.00S
14.00
336.00
336.00
Training
Admin
Dues
Subs
Savings
Other
Total
306.94
29233
Q
0.00
0.00
0.00
0.00
0.00
0.00
21.0092201
0.00
0.00
0.00
0.00
0.00
0.00
29.06
D
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE;
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
I FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Pa ld For
Week
Check
Number
5
Date
GENARO VARGAS
69130 VICTORIA DR
Work
Classification
04/06 04/07 04/08 04/09 04/10 04/11 04/12
This
Project
All
Projects
0.00
25.70
0.00
3.36
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
somp
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
14.00
336.00
336.00
Training
Admn
Dues
Subs
Savings
Other
Total
306.94
29244
Q
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
29.06
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
HourlyWag
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
a
Paid For
Week
Check
Number
0
Date
HUMBERTO S. VALDEZ
12966 CACTUS DR #A
Work
Classification
04/06 04107 04108 04/09 04/10 04/11 04/12
This
Project
All
Projects
50.71
40.34
6.08
5.27
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
21.97
527.28
527.28
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
424.88
29243
Q
0.00
O.DO
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0,00
0.00
0.00
0.00
0.00
0.00
102.40
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE;
I
Public Works certified Payroll Reporting Form 04/17/2020 - Page 3
Contractor Name: PWLC II, INC.
Public Works Certifiec",yroll Reporting Form
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/12/2020 Payroll Number: 41-0
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIA BONILLA
33477 NAVAJO TR #B
Work
Classification
04/06 04/07 04/08 04109 04/10 04/11 04/12
This
Project
All
Projects
0.00
18.36
0.00
2.40
0.00
47.39
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
law
LANDSCAPE
MAINTENANCE
LABORER
S
0.00
8.00
0.00
8.00
0.00
0.00
0.00
16.00
15.00
240.00
240.00
Training
Admin
Dues
Subs
Savings
Other
Total
219.24
29229
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
20.76
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Man Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
Slate
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wag
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
04I06 04107 04I08 04/09 04I10 04111 04112
This
Project
All
Projects
11.08
33,04
5.72
4.32
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
18.00
432.00
432.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
377.84
29228
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
54.16
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
I
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
04/06 04/07 04/08 04/09 04/10 04/11 04112
This
Project
All
Projects
9.75
25.70
0.00
3.36
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
14.00
336.00
336.00
Training
Admin
Dues
Subs
Savings
Other
Total
297,19
29230
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
38.81
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
oily
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
04/06 04/07 04/08 04109 04/10 04111 04/12
This
Project
All
Projects
31.63
27.54
5.14
3.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
15.00
360.00
360.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
292.09
29240
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00slow
67.91
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Public works certified Payroll Reporting Form 04/17/2020 - Page 4
Public Works Certifier'"- yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/12/2020
Payroll Number:41-0
Number of
Day
Deductions, Contributions, and Payments
Name, Address and
Social Securlt Number of Worker
Y
Withholding
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
State
Vac/
Health
Date
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Net
ROSARODRIGUEZ
3
Total
Hourly
Wage
Check
Work
04/06
04/07
04/08
04/09
04/10
04/11
04/12
Hours
Pay Rate
This All
1.48
25.70
1.03
3.36
0.00
0.00
0.00
Paid For
Number
PO BOX 580332
Classification
Hours Worked Each Day
Project Projects
Week
N PALM SPRINGS
LANDSCAPE
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
14.00
336.00
336.00
Fund
Trav/
304.43
29242
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
31.57
92258
1
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Number of
Day
Deductions,
Contributions,
and Payments
Name, Address and
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Gross Amount
Federal
State
Vac/
Health
Net
Social SecurityNumber of Worker
Withholding
Total
Hourly
Earned
Tax
FICA
Tax
SDI
Holiday
& Welf.
Pension
Wag
Check
0
Date
RUBEN F. HENRIOUEZ
Hours
Pay Rate
Paid For
Number
04/06 04/07 04/08 04/09 04/10 04/11 04/12
This
All
49.33
39.46
8.16
5.16
0.00
0.00
0.00
15687 PALM DR #83
Work
Classification
Project
Projects
Week
Hours Worked Each Day
DESERT HOT SPRINGS
TREE
S
8.00
8.00
0.00
8.00
0.00
0.00
0.00
24.00
21.97
527.28
527.28
413.67
29237
CA
MAINTENANCE
Training
Admin
Dues
Subs
Savings
Other
Total
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
LABORER
0.00
0.00
0.00
0.00
0.00
11.50
113.61
92240
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
[NOTE, $11.50 OTHER = FH125D
Public Works certified Payroll Reporting Form 04/17/2020 - Page 5
eCPR Online Confirmation
Your payroll submission request has been processed.
?lease review the results of your submission. Should you have any questions please contact the eCPR unit at
publicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8101332
This certified payroll will be treated as an amendment #: 2
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-05
Payroll Number: 40
Amendment Number: 2
1 employee payroll record(s) processed
Your Transaction ID is: 10836754
Print this Page
'iew your submission f
Submit another set of payroll records
Public Works Certifi, ayroll Reporting Form
Certification under penalty of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certified payroll records for the week ending 2020-04-05 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2021-04-07."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92262
i
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description:
Payroll #: 40 - 2 Ctr Payroll #: 40-2 Week Ending: 04/05/2020 ❑ Statement of Non -Performance? Final payroll for this project?
Employee: LETICIA BONILLA 33477 NAVAJO TR #B, CATHEDRAL CITY, CA, 92234
SShMENINEW Mon Tue Wed Thu Fri Sat Sun Total Total Vac/ Health Total
03/30 03131 04101 04102 04/03 04104 04/05 Hours Base Hourly Fringe Holiday & Welf. Pension Other Training Hourly Rate
S LANDSCAPE MAINTENANCE LABORER 8.00 8.00 8.00 8.00 8.00 0.00 0.00 40!60"1 15.00 0.00 0.00 0.00 0.00 0.00 0.00 1M.Mm
NOTE: ORIGINAL PAYROLL NUMBER 40-1 SHOWS 47.39 IN HEALTH & WELFARE, HOWEVER IT WAS NEVER DEDUCTED FROM THE EMPLOYEE'S CHECK, SHOULD = 0.00 Travel & Subsistence 0.00 Total Deductions 55.94
Public works certified Payroll Reporting Form 04/07/2021 - Page 1
eCPR Online Confirmation
Your payroll submission request has been processed.
°lease review the results of your submission. Should you have any questions please contact the eCPR unit at
blicworks@dir.ca.gov.
There is an existing payroll transaction for this contractor on this project for this week ending date.
Transaction ID for that transaction is: 8101149
This certified payroll will be treated as an amendment #: 1
Contractor Name: PWLC II, INC.
Contractor Address: 3584 E LA CAMPANA WAY PALM SPRINGS CA 92262
Awarding Body: CITY OF LA QUINTA
Project ID: 290440
Contract With: CITY OF LA QUINTA
Week Ending Date: 2020-04-05
Payroll Number. 40
Amendment Number. 1
20 employee payroll record(s) processed
Your Transaction ID is: 8101332
Print this Fagg
View your submission f dr n
Submit another set of payroll records
Public Works Certifies'- yroll Reporting Form
Certification under, .Ity of perjury:
"I, KRISTY SOUTH, the undersigned, am the CONTROLLER (position in business) with the authority to act for and on behalf of PWLC II, INC. (name of business and/or contractor), certify under penalty of
perjury that the records or copies thereof submitted and consisting of certifled payroll records for the week ending 2020-04-05 are the originals or true, full, and correct copies of the originals which depict the
payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. I certify this on 2020-04-17."
Contractor Name: PWLC II, INC. Contractor PWCR: 1000037373 License Type: CSLB License Number 855783
Address: 3584 E LA CAMPANA WAY, PALM SPRINGS, CA FEIN: 510532726 Contractor Email: KRISTYS@PWLC2.COM
92202
Insurance Number: WCV5504144
Awarding Body: CITY OF LA QUINTA DIR Project ID: 290440 Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
Contract With: CITY OF LA QUINTA County: RIVERSIDE Location Description: LIGHTING AND LANDSCAPE DISTRICT 89-1 LANDSCAPE
MAINTENANCE OF CITYWIDE MEDIANS
Payroll Number: 40- 1 For Week Ending: 04/05/2020 Is this a 'Statement of Non -Performance?'
- I
Name, Address and
Social Security Number of Worker
Number of
Withholding
V Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
VELCi
Holioay
Health
& Wekf.
Pension
Net
Wage
Paid For
Week
C eck
Nuhmber
0
Date
ADAN DIAZ SIERRA
46725 CLINTON #79
Work
Classification
03130 03131 04/01 04102 04I03 04I04 04/05
This
Project
All
Projects
0.00
42.84
0.00
5.60
0.00
0,00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
B.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
511.56
29080
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
48.44
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
I
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
1
Date
ALAN RAMIREZ RAYA
84037 MAGNOLIA ST
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
This
Project
All
Projects
63.91
55.08
14.56
7.20
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
18.00
720.00
720.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
Deduct
579.25
29087
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
140.75
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& WeIF.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
ALEJANDRO CHAVEZ
2103 JACQUES DRIVE
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
Thls
Project
All
Projects
51.88
80.72
7.03
10.55
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
92262
TREE
MAINTENANCE
LABORER
$
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
27.07
866.24
1,081.64
Dues
Trav/
Subs
Savings
Other
Total
Deduct
905.03
29076
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.61
EamE
0.00
0.00
0.00
26.43
176.61
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.14
NOTE: $26.43 OTHER = FH125
Public Works certified Payroll Reporting Form 04/17/2020 - Page 1
Public Works Certifies, yroll Reporting Form
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 04/05/2020 Payroll Number:40-1
I
Name, Address and Number of Day Deductions, Contributions, and Payments
Social SecurityNumber of Worker Withholding Mon Tue Wed Thu Fri Sat Sun Gross Amount Federal FICA State SDI Vac/ Health pension Net
! Earned Tax Tax Holiday & Welf.
ALEJANDRO CHAVEZ JR. 0 Date Total Hourly Wage Check
Work 03/30 03/31 04/01 04/02 04/03 04/04 04/05 Hours Pay Rate This All 50.09 52.60 15.71 6.88 0.00 0.00 0.00 Paid For Number
2103 JACQUES DR Classification Hours Worked Each Day Project Projects Week
PALM SPRINGS
CA
TREE
MAINTENANCE
S
0.00
8.00
8.00
0.00
0.00
0.00
0.00
16.00
21.97
351.52
687.52
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
562.24
29078
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
92262
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
125.28
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
This All
Protect Protects
Federal
Tax
FICA
State
Tax
SDI
Vac/
Hollday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
eck
Number
3
Date
APOLINAR GONZALEZ MARTINEZ
31325 AVE LA PALOMA
Work
Classification
03130 03/31 04/01 04/02 04103 04/04 04/05
24.86
42.84
2.36
5.60
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
LANDSCAPE
MAINTENANCE
S
8.00
8.00
8.00
8,00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Admin
Dues
Subs
Savings
Other
Total
484.34
29082
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
92234
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
D
0.00
0.00
a.00
o.o0
0.00
0.00
0.00
0.00
28.00
:75.66
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Thls All
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ARMANDO RICO CHAVEZ
2103 JACQUES DR
Work
Classification
03/30 03/31 04/01 04/02 04103 04/04 04/05
57.2fi
63.50
16.64
8.30
0.00
0.00
0.00
Hours Worked Each Day
PALM SPRINGS
CA
LANDSCAPE
MAINTENANCE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40,00
20.00
830.00
830.00
Training
Admin
Dues
Subs
Savings
Other
Total
684.30
29077
Q
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
30.00
92262
LABORER
0.00
0.00
0.00
0.00
0.00
0.00
145.70
D
0.00
0.00
0.00
O.Oo
0.00
0.00
0.00
0.00
40.00
NOTE:
Name, Address and
Social Security Number of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pa Rate
Y
Gross Amount
Earned
This All
Project Projects
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
p
Date
CANDELARIO MATA HERRERA
32615 AURORA VISTA #A
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04105
0.00
71.91
18.72
9.40
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
24.87
795.84
939.84
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
839.81
29085
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
100.03
D
0.00
1 0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
49.74
NOTE
Public works certified Payroll Reporting Form 04/17/2020 - Page 2
Public Works Certifier'-yroll Reporting Form r
Contractor Name: PWLC II, INC. Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1 For Week Ending: 04/05/2020 Payroll Number:40-1
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Y
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
CARLOSLUNAGONZALEZ
66145 7TH ST
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
This
Pro act
j
All
Projects
1
37.22
71.28
2.61
9.32
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
qwmw
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
24.87
795.84
931.84
Trainin 9
Fund
Admin
Dues
Travl
Subs
Savings
9
Other
Total
811.41
29084
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
120.43
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
EDUARDO ESCAMILLA MORENO
84039 LINGAYAN AVE
Work
Classification
03/30 03131 04/01 04102 04/03 04104 04I05
This
Protect
All
Projects
0.00
71.90
23.89
9.40
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
TREE
MAINTENANCE
LABORER
0.00
8.00
8.00
8.00
8.00
0.00
0.00Trav/S
32.00
24.87
795.84
939.84
Trainin g
Fund
Admin
Dues
Subs
Subs
Savings
9
Other
Total
834.65
29081
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.31
0.00
0.00
0.00
0.00
0.00
0.00
105.19
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.74
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
EUGENIO COPENO IZOTECO
46299ARABIA#C-13
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
This
Project
All
Projects
0.00
42.84
0.00
5.60
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
6.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
Fund
Admin
Dues
Travl
Subs
Savings
Other
Total
511.56
29079
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
48.44
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
p
Date
HUMBERTO S. VALDEZ
12966 CACTUS DR #A
Work
Classification
03/30 03/31 04/01 04/02 04/03 04104 04/05
This
Project
All
Projects
85.24
62.35
20.81
8.15
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
TREE
MAINTENANCE
S
0.00
8.00
6.00
8.00
8.00
0.00
0.00
32.00
21.97
703.04
815.04
Fund
Admin
Dues
Travl
Subs9LABORER
Savin s
Other
Total
638.49
29089
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.9692240
Lan
0.00
0.00
0.00
0.00
0.00
�,55
p
0.00
0.00
0.00
0.00
0.00
0.00 1
0.00
0.00 1
43.94
NOTE:
Public works certified Payroll Reporting Form 04/17/2020 - Page 3
Public Works Certified- yroll Reporting Form
f Contractor Name: PWLC II, INC.
Name, Address and
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/05/2020 Payroll Number:40-1
Social Security Number of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Man Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
j Pay Rate
I
i Gross Amount
Earned
_
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holida Y
Health
& Waif.
Pension
Net
Wage
Paid For
Week
Check
Number
4
Date
LETICIABONILLA
33477 NAVAJO TR #B
Work
Classification
03/30 03131 04/01 04/02 04/03 04/04 04/05
This
Pro ect
1
All
Pro acts
1
4.04
45.90
0.00
6.00
0.00
47.39
0.00
W
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
B.00
8.00
B.00
8.00
B.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
Fund
Admin
Dues
Trav/
Subs
Savings
Other
Total
544.06
29074
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
55.94
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac!
Holiday
I
Ha;fl[li
& Well.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
LUIS E. ALVAREZ SARABIA
45627 SENEGAL PL
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
This
Project
All
Projects
44.06
55.08
17.14
7.20
0.00
0.00
0.00
Hours Worked Each Day
INDIO
CA
92201
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
6.00
8.00
8.00
8.00
0.00
0.00
40.00 1
18.00
720.00
720.00
Training
9
Fund
Admin
Dues
TravtSubs
Subs
Savin s
9
Other
Total
596.52
29073
Q
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
0.00
0.00
0.00
0.00
0.00
0.00
123.48
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
Slate
Tax
SDI
Vac/
Holiday
Health
& Wolf.
Pension
Net
Wag
Paid For
Week
Check
Number
2
Date
MARCELINO BRIONES
50700 CALLE MENDOZA
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
Thls
Project
All
Projects
34.79
42.84
4.94
5.60
0.00
0.00
0.00
Hours Worked Each Day
COACHELLA
CA
92236
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
9
Fund
Admin
Dues
Trav!
Subs
Savings
9
Other
Total
471.83
29075
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
88.17
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Waif.
pension
Net
Wage
Paid For
Week
Check
Number
0
Date
PASTOR R. PEREZ NEGRON
67365 ONTINA RD
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
This
Project
All
Protects
60.43
45.90
12.86
6.00
0.00
0.00
0.00
Hours Worked Each Day
CATHEDRAL CITY
CA
92234
LANDSCAPE
MAINTENANCE
LABORER
S
B.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
15.00
600.00
600.00
Training
9
Fund
Admin
Dues
Trav/
Subs
Savings
9
Other
Total
474.81
29086
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.50
0.00
0.00
0.00
0.00
0.00
0.00
125.19
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
NOTE:
Public Works certified Payroll Reporting Form 04/17/2020 - Page 4
Public Works Certifiee- yroll Reporting Form
Contractor Name: PWLC II, INC.
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/05/2020 Payroll Number:40-1
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions,
Contributions,
and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vacl
Holiday&
Health
Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
2
Date
RAFAEL M. VERA
13040 CACTUS
Work
Classification
03/30 03/31 04/01 04/02 04103 04/04 04/05
This
Project
All
Protects
29.33
52.60
2.40
6.88
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
0.00
0.00
0.00
0.00
16.00
21.97
351.52
687.52
Training
9
Fund
Admin
Dues
Trav/
Subs
Savings
9
Other
Total
596.31
29091
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0.00
0.00
0.00
0.00
0.00
0.00
91.21
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
3
Date
ROSARODRIGUEZ
PO BOX 580332
Work
Classification
03130 03131 04/01 04/02 04/03 04/04 04/05
This
Project
All
Projects
24.86
42.84
7.52
5.60
0.00
0.00
0.00
Hours Worked Each Day
N PALM SPRINGS
CA
92258
LANDSCAPE
MAINTENANCE
LABORER
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
14.00
560.00
560.00
Training
9
Fund
Admin
Dues
Trav/
Subs
Savin s
9
Other
Total
479.18
29088
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
80.82
D
0,00
0.00
0.00
0.00
0.00
0.00
0.00
1 0.00
28.00
NOTE:
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
RUBEN F. HENRIOUEZ
15687 PALM DR #83
Work
Classification
03/30 03/31 04/01 04/02 04/03 04/04 04/05
This
Project
All
Projects
84.82
62.09
23.16
8.12
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
8.00
8.00
0.00
0.00
32.00
21.97
703.04
823.04
Training
9
Fund
Admin
Dues
Trav/
Subs
Savin 9 s
Other
Total
633.35
29083
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0.00
0.00
0.00
0.00
0.00
11.50
189.69
p
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE: $11.50 OTHER = FH125D
Name, Address and
Social SecurityNumber of Worker
Number of
Withholding
Day
Deductions, Contributions, and Payments
Mon Tue Wed Thu Fri Sat Sun
Total
Hours
Hourly
Pay Rate
Gross Amount
Earned
Federal
Tax
FICA
State
Tax
SDI
Vac/
Holiday
Health
& Welf.
Pension
Net
Wage
Paid For
Week
Check
Number
0
Date
SALVADOR VALDEZ CISNEROS
12966 CACTUS DR
Work
Classification
03/30 03131 04/01 04/02 04/03 04104 04/05
This
Project
All
Protects
50.32
54.43
10.01
7.12
0.00
0.00
0.00
Hours Worked Each Day
DESERT HOT SPRINGS
CA
92240
TREE
MAINTENANCE
LABORER
S
0.00
8.00
8.00
0.00
0.00
0.00
0.00
16.00
21.97
351.52
711.52
Trainin 9
Fund
Admin
Dues
Subs
Subs
Savin s
g
Other
Total
589.64
29090
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.96
0.00
0.00
0.00
0.00
0.00
0.00
121.88
D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.94
NOTE:
I
Public works Certified Payroll Reporting Form 04/17/2020 - Page 5
Public Works Certifier" ._yroll Reporting Form
Contractor Name: PWLC II, INC.
I
Project Name: LANDSCAPE & LIGHTING DISTRICT 89-1
For Week Ending: 04/05/2020
Payroll Number:40-1
Name, Address and
Number of
Day
Deductions, Contributions, and Payments
Social SecurityNumber of Worker
Withholding
Mon
Tue
Wed Thu Fri
Sat
Sun
Gross Amount
Federal
1
State Vacl
Health
1
5
Date
Earned
Tax
FICA Tax SDI Holiday
& Welf.
Pension
i
Net
GENARO VARGAS
Total
Hourly
Wage Check
Work
03/30
03/31
04/01 04102 04/03
04/04
04/05
Hours
Pay Rate This I All
0.00
42.84 0.00 5.60 0.00
0.00
0,00
Feld For Number
69130 VICTORIA DR
Classification
Hours Worked Each Day
Project Projects
1 1
Week
CATHEDRAL CITY
LANDSCAPE
S
8.00
8.00
8.00
8.00
8.00
0.00
0.00
40.00
0.00
560.00
560.00
Fund
Travl
511.56
8107
CA
MAINTENANC
I
I
Training
Admin
Dues
Subs
Savings
Other
Total
O
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABORER
0.00
0.00
0.00
0.00
0.00
0,00
48.44
92234
D
0.00
0.00
0.00-1
0.00
0.00
0.00
0.00
0.00
0.00
NOTE: BASE HOURLY RATE _ $14.00
Public works Certified Payroll Reporting Form 04/17/2020 - Page 6