Avenue 52 Round-a-Bout SpecificationsAve 52 Round-a-Bout
The specifications for this plant replacement are under Project No 2018-30, Sections 1400; 2000; and 3000. A general
concept for high level maintenance plant replacement created in photo shop is shown below. City staff laid out rock and
plant placement, PWLC staff removed existing aged/damaged plants and replaced with new, the existing irrigation system
is intact. Before and after pictures are attached. Per the Construction Industry Force Account Council, Force account limits
do not apply to maintenance work.