Loading...
06-1863 (RC) Revision 1 Title 24TITLE 24 REPORT Title 24 Report for: Land America Commonwealth' w,a 78 -982_ -Highway 111_STE La Quinta, CA 92253 Project Designer: Carl Cox, AIA 81-557 Dr. Carreon Blvd. Indio, CA 92201 (760) 547-4007 Report Prepared By: John Jolly C+J Technical Solutions and Services, Inc. 1320 Valley Vista Dr. Suite 206 Diamond Bar, CA 91765 (909) 896-3631 CITY OF LA QUINTA BUILDING & SAFETY DEPT. ..,. APPROVED Job Number: FOR CONSTRUCTION C06107 DA Y Q wN 0 1006 Date: 6/6/2006 ey The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.1 by EnergySoft Job Number: C06107 User Number: 5950 TABLE OF CONTENTS Cover Page Table of Contents Form LTG -1-C Certificate of Compliance Form LTG -2-C Indoor Lighting Schedule Form LTG -3-C Portable Lighting Worksheet Form LTG -4-C Lighting Controls Credit Worksheet Form LTG -5-C Indoor Lighting Power Allowance Form LTG -MM Lighting Mandatory Measures 1 2 3 7 8 10 11 12 EnergyPro 4.1 by EnergySoft Job Number: C06107 User Number: 5950 CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG - PROJECT NAME DATE Land America Commonwealth 6/6/2006 PROJECT ADDRESS--=-+.---• 78-982 Highway 111 STE 1-B La Quinta ` PRINCIPAL DESIGNER - LIGHTING TELEPHONE Building.Permit# { DOCUMENTATION AUTHOR C+J Technical Solutions and Services, Inc. TELEPHONEChecked 909 896-3631 by/Date Enforcement Agency. Use GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 2,643 sq.Ft. 15 BUILDING TYPE ® NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM ❑X CONDITIONED SPACES ❑ UNCONDITIONED SPACES ❑ INDOOR & OUTDOOR SIGNS PHASE OF CONSTRUCTION NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION METHOD OF LIGHTING ❑ COMPLETE BUILDING ® AREA CATEGORY ❑ TAILORED ❑ PERFORMANCE COMPLIANCE ❑ COMMON LIGHTING STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR IG T E I p T John Jolly The Principal Lighting Designer hereby certifies that the pr sed building esign represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 - 132, 146, 148 & 149 of Title 24, Part 6. KThe plans & specifications meet the requirements of Part 6 (Sections 10-103a). he installation certificates meet the requirements of Part 6 (10-103a 3). ❑ The operation & maintenance information meet the requirements of Part 6 (10-103c). Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsib its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. ❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structur type of work described as exempt pursuant to Business and Prof ons Cod"e0'ej 5537, 5538 and 6737.1. PRINCIPAL nING DESIGNS - AME SI NA URE DATE LI # LIGHTING NDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ®LTG -1-C, Parts 1 of 4 and 2 of 4: Certificate of Compliance. Part 1 of 4 and 2 of 4 are required for all submittals ®LTG -1-C, Part 3 of 4: Certificate of Compliance. Part 3 of 4 submittal is required only if Control Credits are claimed ®LTG -1-C, Part 4 of 4: Certificate of Compliance. Part 4 of 4 submittal is required when lighting controls are installed ®LTG -2-C: Indoor Lighting Schedule ®LTG -3-C: Portable Lighting Worksheet ®LTG -4-C: Lighting Controls Credit Worksheet (9 LTG -5-C: Indoor Lighting Power Allowance OLTG-6-C: Tailored Method Worksheet O LTG -7-C: Room Cavity Ratio Worksheet OLTG-8-C: Common Lighting Systems Method Worksheet OLTG-9-C: Line Voltage Track Lighting Worksheet EnergyPro 4.1 by EnergySoft User Number: 5950 Job Number: C06107 Page:3 of 12 a for .he or CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1-C PROJECT NAME DATE Land America Commonwealth 6/6/2006 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑X AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 3,137 IALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) Check if SPACE CONTROLLED Daylighting NOTE TO FIELD, NOTES TO FIELD - For Buildina Department Use Only INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 3,492 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 364 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 3,128 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑X AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 3,137 IALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) Check if SPACE CONTROLLED Daylighting NOTE TO FIELD, NOTES TO FIELD - For Buildina Department Use Only v EnergyPro 4.1 by Energysoft User Number: 5950 Job Number: C06107 Page:4 of 12 CERTIFICATE OF COMPLIANCE (Part 3 of 4) LTG - PROJECT NAME DATE Land America Commonwealth 6/6/2006 C0NTP0I S FnP rRFnlT IN rnNnITInNGn Akin I1NrnunrTi^Kien enwre0 CONTROL LOCATION (Room # or Dwg. #) ADA Restroom ADA Restroom Server Room Office 2 Office 3 Office 4 CONTROL IDENTIFICATION CONTROLTYPE (Occupant, Daylight, Dimming, etc.) Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Occ Sensor - — 250 sqft Dimming - Manual LUMINA S CONTROLLED TYPE # OF LUMINAIRES 75 1 75 1 2x4 2 2x4 2 2x4 2 2x4 2 2x4 2 2x4 2 2x4 2 75 2 NOTE TO FIELD NOTES TO FIELD - For Buildina Department Use Only `,fi '-'. 4 �x 'd t 3 '4 4g a r 9 n x t K ,.s<�wff i, L EnergyPro 4.1 by EnergySoft User Number: 5950 Job Number: C06107 Page:5 of 12 CERTIFICATE OF COMPLIANCE (Part 4 of 4) LTG-1-C PROJECT NAME Land America Commonwealth DATE 6/6/2006 Designer:' This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Descri tion Test Performed BY: ❑ LTG-2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing 0 LTG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro 4.1 by EnergySoft User Number: 5950 . Job Number: C06107 Page:6 of 12 1 U N o N J � CC) W Q N O N a_ W J s .r W W CO 2 C 0 V Z 2 Q 0 J � W O Q O Z 0 Z 0 n00c JOLILI� Q m H IM W G a o a U e � J E U N J E Q o C14 c is 0 U t7 Z m J O O � Q H Z U a 7 Installed M Watts M (G x 1) IT Number 00 N of �p Luminaires CEC C= Default? X X 0 0 Watts per r ti Luminaire r' Number of LL Ballast per Luminaire C14 LO Watts Ch ~ W per U) Lamp Number of m 0 Lamps per to Luminaire E w J U Lamp Type co N c+� LL U d W C m c ccy U o .-- N n N C .0 N Q CO C C n � � J 2 LL U) � 3 r` a� v Zcc N n00c JOLILI� Q m H IM W G a o a U e � J E U N J E Q o O z (7 JG is 0 U t7 Z m J O O � Q H Z U a Q 0 U L: E z z 0 0 n E z D PORTABLE LIGHTING WORKSHEET LTG - PROJECT NAME Land America Commonwealth DATE 6/6/2006 TOTAL WATTS BUILDING TOTAL TABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B C D ROOM # OR ZONE ID DEFAULT /s ft AREA SF TOTAL WATTS B X C TOTAL WATTS (C x E) ADA Restroom 62 1 62 ADA Restroom 62 1 62 Server Room 137 1 137 Break Room 148 1 148 Office 1 167 1 167 Office 2 TOTAL 0 0 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET TOTAL WATTS BUILDING TOTAL A B C D E F G ROOM # OR ZONE ID . PORTABLE LIGHTING Description # OF FIXT. LUMIN. TASK # OF WATTS PER AREA TASK FIXTURE (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) ADA Restroom 62 1 62 ADA Restroom 62 1 62 Server Room 137 1 137 Break Room 148 1 148 Office 1 167 1 167 Office 2 167 1 167 Office 3 167 1 167 Office 4 167 1 167 TOTAL 1,077 =0 TABLE 3 - PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # TOTAL AREA OR ZONE ID (SF) TOTALI 0 BUILDING SUMMARY - PORTABLE LIGHTING Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details Include luminaire types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 2,643 0 EnergyPro 4.1 by EnergySoft User Number: 5950 Job Number: C06107 Page:8 of 12 PORTABLE LIGHTING WORKSHEET LTG -3 C] PROJECT NAME Land America Commonwealth DATE 6/6/2006 FEET A TABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 S DARE FEET A B C D ROOM # OR ZONE ID DEFAULT /s ft AREA TOTAL WATTS SF B X C # OF FIXT. LUMIN. WATTS PER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) Conference Room 200 1 200 Offices 1,366 1 1,366 TOTAL 0 0 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B 0 C D E F G ROOM # OR ZONE ID PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTS PER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) Conference Room 200 1 200 Offices 1,366 1 1,366 TOTAL 1,566 0 TABLE 3 - PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # TOTAL AREA OR ZONE ID (SF) TOTALI 0 BUILDING SUMMARY - PORTABLE LIGHTING Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details Include luminaire types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 2,643 0 EnergyPro 4.1 by Energysoft User Number: 5950 Job Number: C06107 Page:9 of 12 LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG -4-C] CONTROL CREDITS FOR CONDITIONED SPACES PROJECT NAME DATE Land America Commonwealth 1 6/6/2006 1 A B C D E I F I G H I J ROOM # ZONE ID CONDITIONED AREAS LIGHTING CONTROL DESCRIPTION PLAN REF. ROOM AREA (SF) DAYLIGHTING WATTS OF CONTROL LIGHTING LIGHTING ADJUST. FACTOR' CONTROL CREDIT WATTS (H X 1) WINDOW WALL RATIO GLAZING VLT SKYLIGHT EFFECTIVE APERTURE' ADA Restroom Occ Sensor - <= 250 sqft 75 62 75 0.20 15 ADA Restroom Occ Sensor <= 250 75 62 751 0.20 15 Server Room Occ Sensor - <= 250sqft 2X4 137 228 0.20 46 Break Room Occ Sensor - <= 250sqft 2x4 148 228 0.20 46 Office 1 Occ Sensor sqft <- 250 2X4 167 228 0.2046 Office 2 Occ Sensor ft- <= 250 2X4 167 228 0.20 46 offices Occ Sensor <- 250 ft 2x4 167 228 0.20 46 Office 4 Occ Sensor <= 250 2x4 167 228 0.20 46 Conference Room Occ Sensor - <= 250sqft 2X4 200 228 0,20 46 Offices Dimming - Manual 75 1,366 150 0.10 15 1) From Equation 146-A 2) From Table 146-A PAGE TOTAL 364 BUILDING TOTAL 364 Enter In LTG -2-C: Lighting Control Credit EnergyPro 4.1 by EnergySoft User Number: 5950 Job Number. C06107 Pape: 10 of 12 1 INDOOR LIGHTING POWER ALLOWANCE LTG -5--7C PROJECT NAME Land America Commonwealth DATE 6/6/2006 ALL9A9Q LIGHTING POWER (Choose One Method) COMPLETE BUILDING METHOD - CONDITIONED SPACES COMPLETE ALLOWED BLDG. AREA WATTS BUILDING CATEGORY (From Section 146 Table 146-B) WATTS PER SF AREA CATEGORY METHOD - CONDITIONED SPACES AREA CATEGORY (From Section 146 Table 146-0) WATTS PER SF AREA (SF) ALLOWED WATTS Corridor/Restroom/Support 0.60 124 74 Office 1.20 2,319 2,783 Convention/Conference/Meeting 1.40 200 280 PAGE TOTAL BUILDING TOTAL 2,643 3,137 2,643 3,137 AREA WATTS TAILORED METHOD - CONDITIONED SPACES TOTAL ALLOWED WATTS (From LTG -6-C or from computer run.) �� UNCONDITIONED SPACES Complete Building and Area Category Methods Category (From Section 146 Table 146 -B&C) WATTS PER SF AREA (SF) ALLOWED WATTS PAGE TOTAL BUILDING TOTAL AREA WATTS TAILORED METHOD - UNCONDITIONED SPACES TOTAL UNCONDITIONED SPACES ALLOWED WATTS (From LTG -5-C and LTG -6-C) 0 �.=gyrru �. uy ui"iyyOun user Numoer: aaau JOD Number: 606107 Page: 11 Of 12 1 LIGHTING MANDATORY MEASURES LTG -MM ECT NAME Land America Commonwealth DATE 6/6/2006 DESCRIPTION Designer Enforcement §131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X] §131 (d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. X] §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and Installed as directed by the manufacturer. a§111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. ❑ §132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. X❑ §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - ceiling walls. §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. ❑ §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.1 by EnergySoft User Number: 5950 Job Number: C06107 Page: 12 of 12