Loading...
2021-03-07 Thompson VMonday, March 8, 2021 at 07:47:51 Pacific Standard Time Page 1 of 1 Subject:Coral Mountain Wave Park objec4on Date:Sunday, March 7, 2021 at 2:15:00 PM Pacific Standard Time From:Valerie Thompson To:consul4ngplanner@laquintaca.gov AKen4on: City of La Quinta planning dept. I am absolutely furious and flabbergasted that this project has even made it this far without being voted on by the neighboring developments of Andalusia, Trilogy and the Quarry. Doesn't such a large project such as this require the approval of the neighboring communi4es? There are a lot of us homeowners in all three of these developments that are totally unaccep4ng of this kind of project amongst these high-end homes. The noise level and traffic will be astronomical. Any liKle bit of noise in this area Echoes off of Coral Mountain. Many of us moved out here for the peace and quiet and how far away it is from all of the noise and traffic from Highway 111. This is not an acceptable loca4on by any means for such a project! Why can't they put it out off Highway 86 for easy access and in an area where there's lots of open land with no housing developments near by? Is it too late to get a pe44on going on this issue and how many signatures would be needed? Valerie Thompson 60553 Juniper Lane, La Quinta, California 92253 (661) 755-7600 (760) 777-9898 realtorvaleriethompson@gmail.com