04-7603 (CSCS) Geotechnical InvestigationGEOTECHNICAL INVESTIGATION
LA QUINTA OLD TOWN
CALLE TAMPICO & AVENIDA BERMUDAS
LA QUINTA, CALIFORNIA
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
By. �GL�
D"rte S�
-Prepared By-
Sladden Engineering
39-725 Garand Lane, Suite G
Palm Desert, California 92211
(760) 772-3893
I
s
-
GEOTECHNICAL INVESTIGATION
LA QUINTA OLD TOWN
CALLE TAMPICO & AVENIDA BERMUDAS
LA QUINTA, CALIFORNIA
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
By. �GL�
D"rte S�
-Prepared By-
Sladden Engineering
39-725 Garand Lane, Suite G
Palm Desert, California 92211
(760) 772-3893
I
(W
Sladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
April 17, 2002
Project No. 544-1478
02-04-246
Marvin Investments
78-080 Calle Estado, Suite 201
La Quinta, California 92253
Attention: Mr. Wells Marvin
Project: La Quinta Old Town
Calle Tampico & Avenida Bermudas
La Quinta, California
Subject: Geotechnical Investigation
Presented herewith is the report of our Geotechnical Investigation conducted at the site of the proposed
mixed use commercial development to be located on the south side of Calle Tampico between Avenida
Bermudas and Desert Club Drive in the City of La Quinta, California. The investigation was performed
in order to provide recommendations for site preparation and to assist in foundation design for the
proposed retail/commercial structures as well as the related site improvements.
This report presents the results of our field investigation and laboratory testing along with conclusions
and recommendations for foundation design and site preparation. This report completes our original
scope of services as understood.
We appreciate the opportunity to provide service to you on this project. If you have any questions
regarding this report, please contact the undersigned
Respectfully submitted,
SLADDEN ENGINES
BI
Pr
SF
Copies: 6/Marvin Investments
S/ndden Engineering
GEOTECHNICAL INVESTIGATION
LA QUINTA OLD TOWN
CALLE TAMPICO & AVENIDA BERMUDAS
LA QUINTA, CALIFORNIA
April 17, 2002
TABLE OF CONTENTS
INTRODUCTION....................................................................................................................... ►
SCOPEOF WORK.....................................................................................................................1
PROJECTDESCRIPTION......................................................................................................... 1
SUBSURFACE CONDITIONS.................................................................................................. 2
CONCLUSIONS AND RECOMMENDATIONS...................................................................... 2
FoundationDesign................................................................................................................ 3
Settlements............................................................................................................................ 3
LateralDesign............................................................................................•.......................... 3
RetainingWalls..................................................................................................................... 4
ExpansiveSoils..................................................................................................................... 4
ConcreteSlabs-on-Grade....................................................................................................... 4
SolubleSulfates.................................................................................................................... 4
Tentative Pavement Design.................................................................................................. 4
Shrinkage and Subsidence.................................................................................................... 5
GeneralSite Grading............................................................................................................. 5
1. Clearing and Grubbing............................................................................................... 5
2. Preparation of Building and Foundation Areas.......................................................... 5
3. Preparation of Surfaces to Receive Compacted Fill ................................................... 5
4. Placement of Compacted Fill..................................................................................... 5
5. Preparation of Slab and Paving Areas........................................................................ 6
6. Testing and Inspection................................................................................................ 6
GENERAL................................................................................................................................. 6
APPENDIX A - Site Plan and Boring Logs
Field Exploration
APPENDIX B - Laboratory Testing
Laboratory Test Results
APPENDIX C - 1997 UBC Seismic Design Criteria
April 17, 2002 -1- Project No. 544-1478
02-04-246
INTRODUCTION
This report presents the results of our Geotechnical Investigation performed in order to provide
recommendations for site preparation and the design and construction of the foundations for the proposed
multi -unit retail/commercial complex. The project site is located on the south side of Calle Tampico
between Avenida Bermudas and Desert Club Drive in the City of La Quinta, California. The preliminary
pians indicate that the proposed project will include a multi -unit retail/commercial complex. The
associated site improvements are expected to include paved roadways and parking areas, concrete
walkways, landscape areas and various underground utilities.
SCOPE OF WORK
The purpose of our investigation was to determine certain engineering characteristics of the near surface
soils on the site in order to develop recommendations for foundation design and site preparation. Our
investigation included field exploration, laboratory testing, engineering analysis and the preparation of
this report. Evaluation of environmental issues or hazardous wastes was not within the scope of services
provided. Our investigation was performed in accordance with contemporary geotechnical engineering
principles and practice. We make no other warranty, either express or implied.
PROJECT DESCRIPTION
The project site is located on the south side of Calle Tampico between Avenida Bermudas and Desert
Club Drive in the City of La Quinta, California. The preliminary plans indicate that the project will
include multi -unit retail buildings and commercial structures along with various associated site
improvements. It is our understanding that the proposed structures will be of relatively lightweight wood -
frame, steel -frame or reinforced masonry construction and will be supported by conventional shallow
spread footings and concrete slabs on grade. The associated site improvements will include paved
roadways and parking areas, concrete walkways, landscape areas, and various underground utilities.
The majority bf the project site is presently vacant and the site has been cleared and leveled. There are
several residential structures on the southeastern portion of the site. There are existing underground
utilities along Calle Tampico, Avenida Bermudas and Desert Club Drive adjacent to the site. The
majority of the ground surface is covered with scattered short grass and weeds. Avenida Bermudas forms
the west property boundary, Avenida La Fonda forms the south property boundary, Desert Club Drive
forms the east property boundary and Calle Tampico forms the north property boundary.
Based upon our previous experience with lightweight wood -frame structures, we expect that isolated
column loads will be less than 50 kips and wall loading will be less than to 5.0 kips per linear foot. We
expect that the commercial structures will be a maximum of 2 stories in height. Grading is expected to
include minor cuts and fills to match the nearby elevations -and to construct slightly elevated building pads
to accommodate site drainage. This does not include removal and recompaction of the foundation bearing
soils within the building areas. If the anticipated foundation loading or site grading varies substantially
from that assumed; the recommendations included in this report should be reevaluated.
April 17, 2002 -2- Project No. 544-1478
02-04-246
SUBSURFACE CONDITIONS
The near surface soils observed within our borings consist primarily of clayey silts and sandy silts with
scattered fine-grained silty sand layers. The soils within the upper 20 feet consisted primarily of sandy
clayey silts, silty clays and silty sand layers were also observed within our borings. In general, the site
soils appeared somewhat loose throughout but laboratory test results and sampler penetration resistance
(as measured by field blowcounts) suggest that the site soils become somewhat firmer with depth. The
site soils were found to be dry throughout the majority of our borings but some of the silt and silty sand
layers were wet.
Laboratory classification testing indicates that the near surface soils consist primarily of a somewhat
inconsistent combination of sandy clayey silts and silty clays. Expansion testing indicates that the
majority of the surface soils are non -expansive and fall within the "very low" expansion category in
accordance with the Uniform Building Code classification system. Consolidation testing indicates that
the near surface sandy silts and silty sands are potentially compressible and may be susceptible to
detrimental hydroconsolidation and/or compression related settlements.
Groundwater was not encountered within our borings that extended to a maximum depth of
approximately 50 feet below the existing ground surface. Groundwater should not be a factor in
foundation design or construction.
CONCLUSIONS AND RECOMMENDATIONS
Based upon our field and laboratory investigation, it is our opinion that the proposed multi -unit
retail/commercial development is feasible from a soil mechanic's standpoint provided that the
recommendations included in this report are considered in building foundation design and site
preparation. Due to the somewhat loose and compressible conditions of the near surface soils, remedial
grading including overexcavation and recompaction is recommended for the proposed building areas. We
recommend that remedial grading within the proposed building areas include overexcavation and
recompaction of the primary foundation bearing soils. Specific recommendations for site preparation are
presented in the Site Grading section of this report.
Groundwater was not encountered within our borings that extended to a depth of approximately 50 feet
below the existing ground surface. Due to the depth to groundwater, specific liquefaction analyses were
not performed. Based upon the depth to groundwater and the prominence of non -liquefiable silts
underlying the site, the potential for liquefaction and the related surficiai affects of liquefaction impacting
the site are considered negligible.
The site is located within an active seismic area of Southern California within approximately 12.5
kilometers of the San Andreas Fault system. Strong ground motion resulting from earthquake activity
along the nearby San Andreas or San Jacinto fault systems is likely to impact the site during the
anticipated lifetime of the structure. Structures should be designed by professionals familiar with the
geologic and seismic setting of the site. As a minimum, structure design should conform to Uniform
Building Code (UBC) requirements for Seismic Zone 4. Pertinent seismic design criteria as outlined in
the I997 UBC, is summarized in Appendix C of this report.
April 17, 2002 -3- Project No. 544-1478
02-04-246
Caving did occur to varying degrees within each of our exploratory borings and the surface soils may be
susceptible to caving within deeper excavations. All excavations should be constructed in accordance
with the normal CalOSHA excavation criteria. On the basis of our observations of the materials
encountered, we anticipate that the subsoils will conform to those described by CalOSHA as Type B or C.
Soil conditions should be verified in the field by a "Competent person" employed by the Contractor.
The majority of the surface soils encountered during our investigation were found to be non -expansive.
Laboratory testing indicated expansion indices less than 20 for the surface sandy silts and silty sands,
which corresponds with the "very low" expansion category in accordance with UBC Standard 18-2. If
imported soils are to be used during grading, they should have an Expansion Index of less than 20.
The following recommendations present more detailed design criteria, which have been developed on the
basis of our field and laboratory investigation.
Foundation Design: The results of our investigation indicate that either conventional shallow
continuous footings or isolated pad footings, which are supported upon properly compacted soils,
may be expected to provide satisfactory support for the proposed structure. Overexcavation and
recompaction should be performed as described in the Site Grading Section of this report.
Footings should extend at least 12 inches beneath lowest adjacent grade. Isolated square or
rectangular footings at least 2 feet square may be designed using an allowable bearing pressure of
2000 pounds per square foot. Continuous footings at least 12 inches wide may be designed using
an allowable bearing pressure of 1500 pounds per square foot. Allowable increases of 200 psf for
each additional 1 foot of width and 200 psf for each additional 6 inches of depth may be utilized
if desired. The maximum allowable bearing pressure should be 3000 psf. The allowable bearing
pressures are for dead and frequently applied live loads and may be increased by 1/3 to resist
wind, seismic or other transient loading.
Care should be taken to see that bearing soils are not allowed to become saturated from the
ponding of rainwater or irrigation. Drainage from the building areas should be rapid and
complete.
The recommendations made in the preceding paragraphs are based on the assumption that all
footings will be supported upon properly compacted soil. All grading shall be performed under
the testing and inspection of the Soils Engineer or his representative. Prior to the placement of
concrete, we recommend that the footing excavations be inspected in order to verify that they
extend into compacted soil and are free of loose and disturbed materials.
Settlements: Settlements may result from the anticipated foundation loads. These estimated
ultimate settlements are calculated to be a maximum of 1 inch when using the recommended
bearing values. As a practical matter, differential settlements between footings can be assumed as
one-half of the total settlement.
Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting
at the base of the slabs or foundations and passive earth pressure along the sides of the
foundations. A coefficient of friction of 0.40 between soil and concrete may be used with dead
load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may
be used for the sides of footings, which are poured against properly compacted native soils.
April 17, 2002 -4- Project No. 544-1478
02-04-246
Passive earth pressure should be ignored within the upper I foot except where confined (such as
beneath a floor slab). When used in combination, either the passive resistance or the coefficient
of friction should be reduced by one-third.
Retaining Walls: Retaining .calls may be required to accomplish the proposed construction.
Cantilever retaining walls may be designed using "active" pressures. Active pressures may be
estimated using an equivalent fluid weight of 35 pcf for native backfill soils with level drained
backfill conditions.
For walls that are restrained, "at rest" pressures should be utilized in design. At rest pressures
may be estimated using an equivalent fluid weight of 55 pcf for native backfill soils with level
drained backfill conditions.
Expansive Soils: Due to the prominence of non -expansive soils on the site, special expansive
soil design criteria should not be necessary for the design of foundations and concrete slabs -on -
grade. Because the mixing and blending associated with the recommended remedial grading may
change expansion potential, final design criteria should be established by the Structural Engineer
based upon post grading expansion test results.
Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain
by recompacted soils as described in the Site Grading Section of this report. Where slabs are to
receive moisture sensitive floor coverings or where dampness of the floor slab is not desired, we
recommend the use of an appropriate vapor barrier. Vapor barriers should be protected by sand
in order to reduce the possibility of puncture and to aid in obtaining uniform concrete curing.
Reinforcement of slabs -on -grade in order to resist expansive soil pressures may not be required.
However, reinforcement will have a beneficial effect in containing cracking due to concrete
shrinkage. Temperature and shrinkage related cracking should be anticipated in all concrete
slabs -on -grade. Slab reinforcement and the spacing of control joints should be determined by the
Structural Engineer.
Soluble Sulfates: The soluble sulfate concentrations of the surface soils were determined to be
156 and 230 parts per million (ppm). This is within the usual allowable limits for the use of Type
II cement and the use of Type V cement or special sulfate resistant concrete mixes should not be
necessary.
Tentative Pavement Design: All paving should be underlain by a minimum compacted fill
thickness of 12 inches (excluding aggregate base). This may be performed as described in the
Site Grading Section of this report. The following preliminary pavement sections are based upon
a design R -Value of 50.
Onsite Roadways (Traffic Index = 6.0)
Use 3.0 inches of asphalt on 4.5 inches of Class 2 base material
Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of
CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section
39 of the CalTrans Standard Specifications. The recommended sections should be provided with
a uniformly compacted subgrade and precise control of thickness and elevations during
placement.
April 17, 2002 -5- Project No. 544-1478
02-04-246
Shrinkage and Subsidence: Volumetric shrinkage of the material, which is excavated and
replaced as controlled compacted fill should be anticipated. We estimate that this shrinkage
could vary from 20 to 30 percent. Subsidence of the surfaces which are scarified and compacted
should be between 0.2 and 0.3 tenths of a foot. This will vary depending upon the type of
equipment used, the moisture content of the soil at the time of grading and the actual degree of
compaction attained.
These values for shrinkage and subsidence are exclusive of losses, which will occur due to the
stripping of the organic material from the site, the removal of deleterious materials and the
removal of debris, trees and other subsurface obstructions.
General Site Grading: All grading should be performed in accordance with the grading
ordinance of the City of La Quinta, California. The following recommendations have been
developed on the basis of our field and laboratory testing:
1. Clearing and Grubbing: Proper clearing of any existing vegetation, debris,
foundations, slabs, pavements and underground utilities will be very important. All
surfaces to receive compacted fill should be cleared of roots, vegetation, debris, and other
unsuitable materials that should be removed from the site. Soils that are disturbed due to
site clearing should be replaced as controlled compacted fill under the direction of the
Soils Engineer.
2. Preparation of Building and Foundation Areas: Building areas should be
overexcavated to a depth of at least 5 feet below existing grade or 4 feet below the
bottom of the footings, whichever is deeper. The exposed surface should be scarified,
moisture conditioned and compacted so that a minimum of 90 percent relative
compaction is attained. Once roots and other unsuitable materials are removed, the
native material may be placed as controlled compacted fill. Overexcavation should be
observed by a representative of Sladden Engineering and compaction should be verified
by testing.
Wet soils removed during excavation should be dried back to near optimum moisture
content or mixed with dry soils prior to placement as engineered fill material. The
bottom of the excavations should be stable and unyielding prior to fill placement.
3. Preparation of Surfaces to Receive Compacted Fill: Other areas to receive compacted
fill should be brought to near optimum moisture content and compacted to a minimum of
90 percent relative compaction.
4. Placement of Compacted Fill: Fill materials consisting of on-site soils or approved
imported granular soils, should be spread in thin lifts, and compacted at near optimum
moisture content to a minimum of 90 percent relative compaction. Imported material
shall have an Expansion Index not exceeding 20. The contractor shall notify the Soils
Engineer at least 48 hours in advance.of importing soils in order to provide sufficient
time for the proper evaluation of proposed import materials.
The contractor shall be responsible for delivering material to the site, which complies
with the project specifications. Approval by the Soils Engineer will be based upon
material delivered to the site and not the preliminary evaluation of import sources.
April 17, 2002
-6- Project No. 544-1478
02-04-246
Our observations of the material encountered during our investigation indicate that
compaction will be most readily obtained by means of heavy rubber -wheeled equipment
and/or vibratory compactors..
5. Preparation of Slab and Paving Areas: All surfaces to receive asphalt concrete paving
or concrete slabs -on -grade, should be underlain by a minimum compacted fill thickness
of 12 inches. This may be accomplished by a combination of scarification and
recompaction of the surface soils and placement of the fill material as controlled
compacted fill. Compaction of the slab and pavement areas should be to a minimum of
90 percent relative compaction.
6. Testing and Inspection: During grading tests and observations should be performed by
the Soils Engineer or his representative in order to verify that the grading is being
performed in accordance with the project specifications. Field density testing shall be
performed in accordance with acceptable ASTM test methods. The minimum acceptable
degree of compaction should be 90 percent of the maximum dry density as obtained by
the ASTM D1557-91 test method. Where testing indicates insufficient density,
additional compactive effort shall be applied until retesting indicates satisfactory
compaction.
GENERAL
The findings and recommendations presented in this report are based upon an interpolation of the soil
conditions between the exploratory boring locations and extrapolation of these conditions throughout the
proposed building area. Should conditions encountered during grading appear different than those
indicated in this report, this office should be notified.
This report is considered to be applicable for use by Marvin Investments for the specific site and project
described herein. The use of this report by other parties or for other projects is not authorized. The
recommendations of this report are contingent upon monitoring of the grading operation by a
representative of Sladden Engineering. All recommendations are considered to be tentative pending our
review of the grading operation and additional testing, if indicated. If others are employed to perform any
soil testing, this office should be notified prior to such testing in order to coordinate any required site
visits by our representative and to assure indemnification of Sladden Engineering.
We recommend that a pre job conference be held on the site prior to the initiation of site grading. The
purpose of this meeting will be to assure a complete understanding of the recommendations presented in
this report as they apply to the actual grading performed.
QIni d— F.va;"Por%n0
APPENDIX A
Site Plan
Boring Logs
APPENDIX A
FIELD EXPLORATION
For our field investigation, 8 exploratory borings were excavated on March 26, 2002, using a truck
mounted hollow stem auger rig (Mobile B61) in the approximate locations indicated on the site plan
included in this appendix. Continuous logs of the materials encountered were made on the site by a
representative of Sladden Engineering. Boring logs are included in this appendix.
Representative undisturbed samples were obtained within our borings by driving a thin-walled steel
penetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT) sampler with a
140 -pound hammer dropping approximately 30 inches (ASTM D1586). The number of blows required to
drive the samplers 18 inches was recorded in 6 -inch increments and blowcounts are indicated on the
boring logs.
The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of
2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5
inches. Undisturbed samples were removed from the sampler and placed in moisture sealed containers in
order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation
spoils and samples were then transported to our laboratory for further observations and testing.
3-1) TopoQuads Copyright ®1999 DeLorme Yarmouth, ME 040% Source Data: USGS 1 250 ft Scale: 1 : 6,400 Detail: 15-0 Datum: WGS84
-N33'-41'
'0
-N33 40
V �EW
ze
it
q
4
b
1 Calle
Tampico
Im
-5
f
SITES
AN
Avenida La Fonda
IL
16-V
a a
-;r7 a
a*
a
ift
ir
4F
4r
A
4r
2D
!Tr
N33'
rz
z
3-1) TopoQuads Copyright ®1999 DeLorme Yarmouth, ME 040% Source Data: USGS 1 250 ft Scale: 1 : 6,400 Detail: 15-0 Datum: WGS84
a
North
Approximate Boring Locations
Avenida Bermudas
Desert Club Drive
La Quinta Old Town
Calle Tampico & Avenida Bermudas ! La Quinta, California
Date: 3-26-02 BoringNo.
1 Job No.: 544-1478
aD
yo
DESCRIPTION
�;
sem.
> -o
REMARKS
yo
W
v�
¢
o
o U
0
-
Silty Sand: Brown,
SM
very silty, fine grained
5
15/22/37
Sandy Silt: Brown,
ML
97
2.6
slightly clayey
to
13/25/40
Sd Silt: Brown,
y an
ML
96
1.5
-
-
very sandy
15
22/30/42
Silty Clay: Brown
CL
83
9.9
---
20
10/22/27
Silty Clay: Brown,
CL
95
17.0
---
slightly sandy
25
3/5/8
---
25.0
---
30
51718
---
24.2
35
6/8/9
Silty Clay: Brown
CL
---
30.7
---
40
5/7/15
.. ..
.,
-__
24.2
---
Total Depth = 41.5'
® Recovered Sample
No Bedrock
-45
No Groundwater
Standard Penetration
m
-
Sample
50
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas / La Quinta, California
Date: 4-25-01 Boring No. 2 Job No.: 544-1478
2Y
o
DESCRIPTION
q
Sr
' O
REMARKS
ES.
a� q
A'
>1
co
O0.
O
.O
(n
t', U
�Z) aI
a
O
oil
0
Sandy Silt: Brown,
ML
slightly clayey
5
10/16/35
Sandy Silt: Brown, clayey
ML
95
5.8
---
10
10/15/22
Silty Clay: Brown, sandy
CL
87
2.6
---
15
17/30/40
Clayey Silt: Brown
ML
100
4.7
---
20
16/24/37
Silty Clay: Brown
CL
93
13.6
Total Depth = 21.5'
Recovered Sample
No Bedrock
-
No Groundwater
25
30
35
40
45
50
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas / La Quinta, California
Date: 4-25-01 Boring
No. 3 Job No.: 544-1478
3
1
0DESCRIPTION
REMARKS
o
ao
co
O
Sandy Silt: Brown,
ML
_
slightly clayey
5
7112/14
Silty Clay: Brown, sandy
CL
91
8.7
---
io
8/9/10
Silty Sand: Brown,
SM
95
5.8
---
fine grained
15
4/6/15
Silty Clay: Brown
CL
95
25.0
---
20
:4/9/11
96
21.2
---
-
Total Depth = 21.5'
® Recovered Sample
No Bedrock
-
No Groundwater
25
30
35
40
45
50
-
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas / La Quinta, California
Date: 4-25-01 oring
No. 4 Job No.: 544-1478
� a)
o
�QC
DESCRIPTION
°;
A
a
REMARKS
�'
F
a)
s.
�+
A-
ra
rn
U
p
w
.�..
�Da
o
o U
o
_
Sandy Silt: Brown,
slightly clayey
ML
5
7/15/24
92
3.1
---
10
15/25/43
Silty Clay: Brown, sandy
CL
91
7.5
---
15
18/50-6"
Silty Clay: Brown
CL
86
7.5
---
20
15!50-6"
92
9.3
---
-
25
Recovered Sample
Total Depth = 21.5'
No Bedrock
No Groundwater
30
35
40
45
50
-
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas / La Quinta, California
Date: 4-25-01 Borina
No. 5 Job No.: 544-1478
a�
y
o
DESCRIPTION
M Cd
REMARKS
3
F
A
P
o
A
Q t.:11
r/;
0
U
o
Pa
0
CQ
0
Sandy Silt: Brown,
ML
slightly clayey
5
5/10/15
^ ^
"
93
4.7
---
:15/25/43
10
Sandy Silt: Brown, clayey
ML
84
4.2
---
15
14/26/36
Clayey Silt: Brown
ML
100
8.1
---
20
16/5,0-6"
102
13.6
---
Total Depth = 21.5'
® Recovered Sample
No Bedrock
-
No Groundwater
25
30
35
40
45
50
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas / La Quinta, California
Date: 4-25-01 Borina
No.6 Job No.: 544-1478
3
0
r +-
o
DESCRIPTIONA
.1
�
REMARKS
^a
Ei
(:I
ri
C?
PQ
cn
�
U
O
Sandy Silt: Brown,
ML
slightly clayey
5
12/25/26
95
2.6
---
10
10/12/19
95
t t
9.3
---
15
10/14/19
Sandy Silt: Brown, clayey
ML
87
6.4
---
Silty Clay: Brown
CL
91
20.4
20
9/14/29
Total Depth = 21.5'
Recovered Sample
No Bedrock
-
No Groundwater
25
30
35
40
45
50
-
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas i La Quinta, California
Date: 4-25-01 Boring
No. 7 Job No.: 544-1478
so.
D o
o
DESCRIPTION
�;
A
REMARKS
a
c.
Amoco
>,
0
U
W
0
0
-
Sandy Silt: Brown, clayey
ML
5
14/37/50
"
"
90
3.6
---
10
11/14/19
Sandy Silt: Brown,
ML
-
slightly clayey
15
25/50-5"
Silty Clay: Brown
CL
89
8.1
---
20
Silty Sand: Brown,
SM
-
50-6"
very silty, fine grained
92
1.5
-
Total Depth = 21.5'
® Recovered Sample
No Bedrock
-
No Groundwater
25
30
35
40
45
50
-
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
La Quinta Old Town
Calle Tampico & Avenida Bermudas / La Quinta, California
Date: 4-25-01 Borin
No. 8 Job No.: 544-1478
�✓
(U
v o
MTj .�
y
a
DESCRIPTION
�;
A
14
a to
REMARKS
0
P� �
Q : -
rn
CO)
PQ
V1
O
-
Clayey Silt: Brown, sandy
ML
5
14/50-6"
••
••
90
3.1
---
10
15/22/29
Silty Sand: Brown,
SM
93
2.6
---
fine grained
Silty Clay: Brown
CL
86
8.7
---
15
25/50-6"
20
Sandy Silt: Brown,
ML
16/26!42
slightly clayey93
4.2
Total Depth = 21.5'
® Recovered Sample
No Bedrock
-
No Groundwater
25
30
35
40
45
50
Note: The stratification lines
55
represent the approximate
boundaries between the soil types;
the transitions may be gradual.
APPENDIX B
Laboratory Testing
Laboratory Test Results
Vadda►i Frrvinnarinf,
APPENDIX B
LABORATORY TESTING
Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our
laboratory for additional observations and testing. Laboratory testing was generally performed in two
phases. The first phase consisted of testing in order to determine the compaction of the existing natural
soil and the general engineering classifications of the soils underlying the site. This testing was
performed in order to estimate the engineering characteristics of the soil and to serve as a basis for
selecting samples for the second phase of testing. The second phase consisted of soil mechanics testing.
This testing including consolidation, shear strength and expansion testing was performed in order to
provide a means of developing specific design recommendations based on the mechanical properties of
the soil.
CLASSIFICATION AND COMPACTION TESTING
Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and
measured in order to determine its unit weight. A small portion of each sample was then subjected to
testing in order to determine its moisture content. This was used in order to determine the dry density of
the soil in its natural condition. The results of this testing are shown on the Boring Logs.
Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for
maximum density determinations. This testing was performed in accordance with the ASTM Standard
D1557-91, Test Method A. The results of this testing are presented graphically in this appendix. The
maximum densities are compared to the field densities of the soil in order to determine the existing
relative compaction to the soil. This is shown on the Boring Logs, and is useful in estimating the strength
and compressibility of the soil.
Classification Testing: Soil samples were selected for classification testing. This testing consists of
mechanical grain size analyses and Atterberg Limits determinations. These provide information for
developing classifications for the soil in accordance with the Unified Classification System. This
classification system categorizes the soil into groups having similar engineering characteristics. The
results of this testing are very useful in detecting variations in the soils and in selecting samples for
further testing.
SOIL MECHANIC'S TESTING
Direct Shear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the
shear strength of the soil under various normal pressures and is used in developing parameters for
foundation design and lateral design. Testing was performed using recompacted test specimens, which
were saturated prior to testing. Testing was performed using a strain controlled test apparatus with
normal pressures ranging from 800 to 2300 pounds per square foot.
Expansion Testing: One bulk sample was selected for Expansion testing. Expansion testing was
performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4 -inch diameter
by 1 -inch thick test specimens to a moisture content and dry density corresponding to approximately 50
percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed
to reach equilibrium. At that point the specimens are inundated with distilled water. The linear
expansion is then measured until complete.
Consolidation Testing: Four relatively undisturbed samples were selected for consolidation testing. For
this testing one -inch thick test specimens are subjected to vertical loads varying from 575 psf to 11520 psf
applied progressively. The consolidation at each load increment was recorded prior to placement of each
subsequent load. The specimens were saturated at the 575 psf or 720 psf load increment.
C'I...t�Jn.+ r+'r.ninnnriNo
Job No_: 544-1478
113 I ! I I
i
I
p, 111
I
d
A
110
A
i
I � l
109
I
I i
I
108 !
12 12.5 13 13.5 14 14.5 15 15.5
Moisture Content (%}
METHOD OF COMPACTION
ASTM D-1557-91, METHOD A OR C
BORING MAXIMUM UNIT WEIGHT OPTIMUM MOISTURE CONTENT
1@0-5' 112 14.0
MAXIMUM DENSITY -OPTIMUM. MOISTURE CURVE
Job No.: 544-1478
122
121
C
p 120
as
A
d
Q
w 119
Q
118 i f ,
1 � j
117
7.5 8 8.5 9 9.5 10 10.5 11
Moisture Content (°�)
METHOD OF COMPACTION
ASTM D-1557-91, METHOD A OR C
BORING MAXIMUM UNIT WEIGHT OPTIMUM MOISTURE CONTENT
8@0-5' 121 9.3
MAXIMUM DENSITY -OPTIMUM -MOISTURE CURVE
DIRECT SHEAR TEST
1.8
,
,
/
{
i
1.6
1.4
O
O
1.2
1.0
v3
1
1
v�
,
.8
H
{
!
1
6
,
1
t
r
i
i
.4
/
.2
,
0
0 .2
.4 .6 .8 1.0 1.2 1.4 1.6 1.8
NORMAL LOAD (KIPS / FOOT
0=26°
e = 380psf
where
0 =Shear
Angle
C =Cohesion
Boring 1 @ O - 5`
La Quinta Old Town
Calle Tampico & Avenida Bermudas
La Quinta, California
Sladden Engineering
DATE: 4-25-02 OB NO.: 544-1478
J
,
,
/
{
i
1
1
,
{
!
1
,
1
t
r
i
i
/
r
,
DIRECT SHEAR TEST
1.8
1
+
+
1
1
g
1
1
I
,
1
,
1.6
!
+
1
1
g
t
t
1
1.4
g
1
i
1
O
1
1
1
g
r
O
t
1
{
t
!
1.2
1
!
,
v�
1
g
1
1
1
g
1
1
1
g
r
1.0
g
1
1
i
1
1
C/)
1
g
1
i
1
p4
.8
g
1
i
1
V1
,
1
6
,
1
i
1
1
!
i
,
t
!
,
.4
!
1
1
1
g
1
1
1
1.000
!
.2
00
.2
.4
.6 .8 1.0 1.2 1.4 1.6 1.8
NORMAL LOAD (KIPS / FOOT
= 280
c = 200 psf
where 0 =
Shear Angle
c =Cohesion
Boring 8 @ 0 - 5'
La Quinta Old Town
Calle Tampico & Avenida Bermudas
La Quinta, California
Sladden Engineering
DATE: 4-25-02 JOB NO.: 544-1478
1
+
+
1
1
g
1
1
I
,
1
,
!
+
1
1
g
t
t
1
g
1
i
1
g
1
1
1
g
r
t
1
{
t
!
1
!
,
1
g
1
1
1
g
1
1
1
g
r
i
g
1
1
i
1
1
1
g
1
i
1
g
1
i
1
,
,
1
,
1
i
1
1
!
i
,
t
!
,
!
1
1
1
g
1
1
1
!
.1
90
7011'
60
r
m
z 50
G
U
m 40
30
20
10
0
U.S. SIANOARO SIEVE OPENING IN INCHES U. S. STANDARD SIEVE NUMBERS
A , 1 11 1 1 1 1 . e e in It to -Jn of Ah AA 91`1 fro fAA 9M
HYDROMETER
no
i
iii
IN
I
oi�0i�
nlook,mommmmm
OR=
iiimiiiiiini�
iiiiiiii�iiiiiiii
11111mmmullimmom
1111l111m=I111l111m=
IN
oil
11
RUN
oil
Immi
ISO
MOM=
GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL SAND
oouu rant CLAM Mt01VM ►rnt
S4mple No. Eley of D•pIn Ctawkilom Net w % LL PL PI
GRADATION CURVES
ENG I FA
MAY ;, 2087 Project No.: 544-1478
Boring 2 @ 10'
SILT OR CLAY
Y
ENGMAY ;, 2087 Project No.: 544-1478
Boring 8 @ 10'
.ONE
.��i��i�
.::N0
i■i��i0�0i
iiia
o0ii0�ii�i00i��i�iiii�i
II
�'
oiiii0iiminiiiii�iiiiii■i�iiiiiii�
i0�0i�i■�On��i■��ir����■��m���es
I
0C
ICC:NMI
MINE
�����C�:::����C�CC:C
�iiiiii�i�iiiiiiii■�i
.
`
CEP
1M11111111111
GRADATI ON CURVES
ENGMAY ;, 2087 Project No.: 544-1478
Boring 8 @ 10'
ANAIMIM TEST LABORATORY
3008 S. ORANGE AVENUE
SANTA ANA, CALIFORNIA 92707
PHONE (714) 549-7267
TO: SLADDEN ENGINEERING:
6782 STANTON AVE. SUITE E
BUENA PARK, CA. 90621
DATE: 4/04/02
e0. No. Chain of Custody
ATTN: BRETT/DAVE $hppwNO.
Lab. NO. A-1078 1-2
Speclttcanon:
Matedad: SOIL
PROJECT #544-1478
#1 H-1 @ 0-5'
#2 H-8 @ 0-5'
.2
ANALYTICAL REPORT
CORROSION SERIES
SUMMARY OF DATA
pH SOLUBLE SULFATES SOLUBLE CHLORIDES MIN. RESISTIVITY
per Ca. 417 per Ca. 422 per Ca. 643
ppm ppm ohm -cm
8.8 880 25 600 max
8.5 1,062 282 600 max
APPENDIX C
1997 UBC Seismic Design Criteria
Clniillnsr Fxil i"ppri"A
1997 UNIFORM BUILDING CODE INFORMATION
The International Conference of Building Officials 1997 Uniform Building Code contains substantial
revisions and additions to the earthquake engineering section summarized in Chapter 16. Concepts
contained in the 1997 code that will likely be relevant to construction of the proposed structure are
summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity
to significant faults capable of generating large earthquakes. Major fault zones considered to be most
likely to create strong ground shaking at the site are listed below.
Fault Zone
Approximate Distance
From Site
Fault Type
1997 UBC
San Andreas
12.5 km
A
San Jacinto
30.5 km
A
Based on our field observations and understanding of local geologic conditions, the soil profile type
judged applicable to this site is So, generally described as stiff or dense soil. The site is located within
UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic
mitigation for new construction upon adoption of the 1997 code.
Madden Eneineerini-
Near -Source
Near -Source
Seismic
Seismic
Seismic
Acceleration
Velocity
Coefficient
Coefficient
Source
Factor, Na
Factor, N,
Ca
C,
San Andreas
1.0
1.1
0.44 Na
0.64 N,
San Jacinto
1.0
1.0
0.44 Na
0.64 N„
Madden Eneineerini-
i
++++*++++++++++*+++++++
+
* E Q F A U L T
*
* version 3.00
+
DETERMINISTIC ESTIMATION OF
PEAK ACCELERATION FROM DIGITIZED FAULTS
JOB NUMBER: 544-1478
JOB NAME: La Quinta Old Town
Calle Tampico and Avenida Bermudas
La Quinta, California
CALCULATION NAME: Test Run Analysis
FAULT -DATA -FILE NAME: CDMGFLTE.DAT
SITE COORDINATES:
SITE LATITUDE: 33.6772
SITE LONGITUDE: 116.3025
SEARCH RADIUS: 100 mi
DATE: 04-25-2002
ATTENUATION RELATION: 5) Boore et al. (1997) Horiz. - SOIL (310)
UNCERTAINTY (M=Median, S=Sigma): M Number of Sigmas: 0.0
DISTANCE MEASURE: cd_2drp
SCOND: 0
Basement Depth: 5.00 km Campbell SSR: Campbell SHR:
COMPUTE PEAK HORIZONTAL ACCELERATION
FAULT -DATA FILE USED: CDMGFLTE.DAT
MINIMUM DEPTH VALUE (km): 0.0
•-
---------------
EQFAULT SUMMARY
---------------
-----------------------------
DETERMINISTIC SITE PARAMETERS
Page 1
------------------------------------------------------------------
( ►ESTIMATED MAX. EARTHQUAKE EVENT
1 APPROXIMATE I -------------------------------
ABBREVIATED 1 DISTANCE I MAXIMUM I PEAK JEST. SITE
FAULT NAME I mi (km) IEARTHQUAKEI SITE (INTENSITY
( I MAG.(Mw) I ACCEL. g JMOD.MERC.
SAN ANDREAS - Coachella
SAN ANDREAS - Southern
SAN JACINTO-ANZA
BURNT MTN.
SAN JACINTO-COYOTE CREEK
SAN ANDREAS - San Bernardino
EUREKA PEAK
PINTO MOUNTAIN
SAN JACINTO - BORREGO
EMERSON So. - COPPER MTN.
LANDERS
SAN JACINTO-SAN JACINTO VALLEY
PISGAH-BULLION MTN.-MESQUITE L
EARTHQUAKE VALLEY
NORTH FRONTAL FAULT ZONE (East
BRAWLEY SEISMIC ZONE
ELSINORE-JULIAN
JOHNSON VALLEY (Northern)
ELSINORE-TEMECULA
CALICO - HIDALGO
ELMORE RANCH
ELSINORE-COYOTE MOUNTAIN
NORTH FRONTAL FAULT ZONE (West
LENWOOD-LOCKHART-OLD WOMAN SPR
SUPERSTITION MTN. (San Jacintc
SUPERSTITION HILLS (San Jacint
HELENDALE - S. LOCKHARDT
SAN JACINTO-SAN BERNARDINO
ELSINORE-GLEN IVY
CLEGHORN
IMPERIAL
LAGUNA SALADA
CHINO -CENTRAL AVE. (Elsinore)
CUCAMONGA
ROSE CANYON
NEWPORT-INGLEWOOD (Offshore)
WHITTIER
SAN ANDREAS - Mojave
SAN ANDREAS - 1857 Rupture
SAN JOSE
1 7.7(
12.4)1
7.4 1
0.351 1
IX
18.9(
30.4))
7.2 1
0.167 1
VIII
1 19.0(
30.6)►
6.4 1
0.109 I
VII
1 19.3(
31.0)1
6.8 1
0.133 1
VIII
1 19.8(
31.8)1
7.3 1
0.170 1
VIII
1 20.1(
32.4)1
6.4 1
0.104 1
VII
1 31.4(
50.6)1
7.0 1
0.102 1
VII
( 33.6(
54.0)1
6.6 1
0.078 1
VII
1 33.9(
54.5)1
6.9 1
0.091 1
VII
34.2(
55.0)1
7.3 1
0.112 1
VII
{ 35.6(
57.3)1
6.9 1
0.086 1
VII
I 36.1(
58.1)1
7.1 1
0.096 1
VII
1 37.8(
60.8)1
6.5 I
0.068 1
VI
1 38.8(
62.4)1
6.7 1
0.090 1
VII
f 41.1(
66.2)1
6.4 1
0.060 1
VI
i 41.3(
66.4)1
7.1 1
0.087 1
VIZ
( 45.0(
72.5)1
6.7 1
0.066 1
VI
1 45.8(
73.7)1
6.8 1
0.069 1
VI
I 47.1(
75.8)1
7.1 1
0.079 1
VII
1 48.3(
77.7))
6.6 1
0.059 1
VI
1 49.3(
79.4)1
6.8 1
0.065 1
VI
1 50.3(
81.0)1
7.0 1
0.086 1
VII
;SI 50.5(
81.3)1
7.3 1
0.083 1
VII
1 52.1(
83.8)1
6.6 1
0.056 1
VI
>)I 53.1(
85.5)1
6.6 1
0.055 1
VI
1 58.0(
93.3)1
7.1 1
0.067 1
VI
1 58.7(
94.4)1
6.7 1
0.054 1
VI
1 60.1(
96.8)1
6.8 1
0.055 1
VI
1 66.6(
107.2)1
6.5 1
0.044 1
VI
i 67.6(
108.8)1
7.0 1
0.056 1
VI
1 70.1(
112.8)1
7.0 1
0.055 1
VI
1 73.5(
118.3)1
6.7 1
0.055 1
VI
1 73.9(
118.9))
7.0 1
0.064 1
VI
74.1(
119.2)1
6.9 1
0.050 1
VI
i 74.1(
119.3)1
6.9 I
0.050 1
VI
1 77.7(
125.0)1
6.8 1
0.045 1
VI
1 83.0(
133.6)1
7.1 1
0.051 1
VI
1 83.0(
133.6)1
7.8 1
0.073 1
VII
I 85.3(
137.3)1
6.5 1
0.044 1
VI
-----------------------------
DETERMINISTIC SITE PARAMETERS
-----------------------------
Page 2
----------------------------------
1
(ESTIMATED MAX.
EARTHQUAKE
EVENT
j
APPROXIMATE I
-----------" --'---
------------
ABBREVIATED (
DISTANCE I
MAXIMUM I
PEAK
JEST. SITE
FAULT NAME I
mi
(km) JEARTHQUAKEI
SITE
►INTENSITY
J
I
MAG.(Mw) I ACCEL. g
JMOD.MERC.
SIERRA MADRE I
88.2(
141.9)1
7.0 1
0.056
1 VI
CORONADO BANK I
89.2(
143.5)1
7.4 1
0.056
1 VI
GRAVEL HILLS - HARPER LAKE 1
89.9(
144.6)1
6.9 1
0.043
1 VI
ELYSIAN PARK THRUST 1
90.1(
145.0)1
6.7 1
0.047
1 VI
NEWPORT-INGLEWOOD (L.A.Basin) 1
93.4(
150.3)1
6.9 1
0.042
1 VI
COMPTON THRUST 1
96.4(
155.2)1
6.8 1
0.047
1 VI
Ci:=::.iHELL-SAWPIT 1
96.9(
155.9)1
6.5 1
0.040
1 V
_? VERDES 1
97.9(
157.6)1
7.1 1
0.045
1 VI
-END OF SEARCH- 48 FAULTS FOUND
WITHIN
THE SPECIFIED SEARCH
RADIUS.
.".E SAN ANDREAS - Coachella FAULT IS CLOSEST TO THE SITE.
IT IS ABOUT 7.7 MILES (12.4 km) AWAY.
LARGEST MAXIMUM -EARTHQUAKE SITE ACCELERATION: 0.3509 g
CALIFORNIA FAULT MAP
La Quinta Old Town
1100
1/1/4181
m
800
700
.10
6
400
RPM
200
100
til
-100
10 01 00 ii
A&ty1t>0
STRIKE -SLIT' FAULTS
5) Boore et al. (1997) Horiz. - SOIL (3 10)
1
e--.
C:
.1
-1-i
Co
L_
as
a)
U
U
Q .01
.001
M=5 M=6 M=7 M=8
1 10 100
Distance fadist' (km)
DIP -SLIT' FAULTS
5) Boore et al. (1997) Horiz. - SOIL (3 10)
1
a�
U
U
� .01
.001
M=5 M=6 M=7 M=8
1 10 100
Distance fadistl (km)
o
.1
:A -a
Cu
a�
U
U
� .01
.001
M=5 M=6 M=7 M=8
1 10 100
Distance fadistl (km)
BLIND -THRUST FAULTS
5) Boore et al. (1997) Horiz. - SOIL (3 10)
1
M=5 M=6 M=7 M=8
.001
1 10 100
Distance f adistl (km)
o
.1
:,1-1
Cu
M=5 M=6 M=7 M=8
.001
1 10 100
Distance f adistl (km)
f,
MAXIMUM EARTHQUAKES
Ila Quinta Old Town
1
.-1
o
.1
:f -d
Cu
L
_CD
a)
U
U
El
.01
.1 1 1 10 100
Distance (mi)
EARTHQUAKE MAGNITUDES & DISTANCES
7.75
7.50
7.25
a)
7.00
0)
Cu
6.75
6.50
La Quinta Old Town
.1 1 10 100
Distance (mi)