Loading...
Project 2020-07 SilverRock Retention Basin Soil Stabilization (Oct 13 & 20, 2021)750 N Gene Autry Trail mediagrou p Palm Springs, CA Fax 7 Tel: 760-778-457878/Fan 6477811731 PART OF DIE USA TODAY NETWORK LInail, legals@111edesells[1I7.4iOlYi PROOFOF PUBLICATION STATE OF CALIFORNIA SS. COUNTY OF RIVERSIDE CITY OF LA QUINTA ATTN: CARLEY ESCARREGA 78495 CALLE TAMPICO LA QUINTA, CA 92253 1 am over the age of 18 years old, a citizen of the United States and not a party to, or have interest in this matter. I hereby certify that the attached advertisement appeared in said newspaper (set in type not smaller than non pariel) in each and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit: 14/13/21, 10/29/21 I acknowledge that I am a principal clerk of the printer of The Desert Sun, printed and published weekly I the City of Palm Springs, County of Riverside, State of California. The Desert Sun was adjudicated a Newspaper of general circulation on March 24, 1988 by the Superior Court of the County of Riverside, State of California Case No. 191236. I certify under penalty of perjury, under the laws of the State of California, that the foregoing is true and correct. Executed on this 1 st of November 2021 in Green Bay, Wisconsin, County of Brown C, a,,__ )4 f DECLARANT Ad#: 0004949621 P O: Bid Project 2021-07 Basin Soil # of Affidavits: 1 SECTION 1100 INVITATION TO WD PROJECT NO.202"7 AROCK RETM"ON BASIN SOIL STABIt1ZATION BIDS will be received by the City ilnta (Cityy) at the OHice of the IsIocat at 78495 Calie Tam pl- uima, Callfornia, 92253, utiT[z- of the folIowin- methods: n sealed bid paI I''gge: The bid received by the Crry no later bid onenina time. t t:00 A.M. after 2. Drop off sealed hid package at City Hall prlor to bid opening date. City all s v$en to the pu611r Moncig throuvh rl ay from 8:00 a.m. to 4:3 p,m.. You are encouraged to make an appoint - in fcr.the dro�-off b1 contacting the ri.., nF-X. �r g r-71aa n, please notethat the main Entrance lob- by doors remain locked and you must ring the "doorbell" located by the entry doon to alert City Staff of your res- erice; once alerted City 5tatt wl[�meet yyou at the door and auept the Id. 3. Drop sealed, bid patksge c,11 at City Hall at the ofhcia! puhlic operarrur�� at 11:00 A.M. err Wednesday, Dctoher 2,7. 2021. Bids will not hr accepted after this time_ The public opening will take �ace of City Hall In the lobby. opased work is as follows: e proposed work includes the clear- 9 and rubbing along the retention bbasin, lrr qation,,fandscapjng insWlla- tlqn ofsoil stabilizer. Additionai work incucies installation of decomposed aranito to carkino Iot and accord roil m- are to be constructed in a r manner, Ieadng the eo- n a neat and presentable condlN6n. Refer to Sections 3000 and 4000 for more information. This projact shall be completed within 90 workm dayyss from the date speci- f fed in the�Iotlee to Proceed, Time for the commencoment and comoletion of the work is Imparrant and is to bei of the essence.of the n, ct The suc- cessful hi drier shouId plan to order any Ion lead time equippment items imme- dia�elyfoilowing "hlntice of Award". A re-iskd con lien'" is srhad" ed for 1:�0 P.M., Monday. October 18 2021. The pre -hid conference will be �1eld in the parking lot attire S11verRo[k Park VEnue near the comer of verftock Way and Avenue 52. When visiting the interior of public Fa- cllIdes, for any purpose, oyeryona is re- qquired to comply with the following CgVlD-t9 safe rotoroE; • Use south City Hall entrance • race coverings are mandatorryy at all times while ving Public atlilties • 7emparature check (tau •free) is re• guired upon your arrival rf mpIation of the "COVID-19 Heafth Self Certification" fort A required; ei- ther on your mobile device or Citytab- let. • Social distancing of at least 6-feet apart please note, that if you chose not to fol- 6ow the City's safety protocol, you will e asked to leave. Complete sets of the bidding docu- ments may, be purchased online at: v WW.planitplanroom.com IMPORTANT: If you are not on the plan holders list through Planit Planroorq you will not receive addc!Mums.. It Is the respansihlll��yy of the bidder to en- surethat they aye placed an the plan holders Ilst Bidding procedures are prescribed in the Project Specifications. Bids shall be executed upanthe farms bound and made a part aFsaid Specifications. Hid security in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding, procedures is re; qulred to he submitted with each bid as a guaranty to he forfeited should tyre hiddor, if awarded the contract fail to enter Into the same, or fails to furnish in a time manner the hands and/or proof of insurance. The City rasorves the right to reject or all bids, and to waive any irregularities in the folds. old log sheets ten his found at httpJ/w ww.I aqui ntaca,gavlbuslnessldel lg n-alld- developmenHbr d-o n-jobs, Pursuant to the provisiora of Callfornle Labor Code Section 6707, each bid. sub- mitred in rcrcssppanse to his Invitation to 6fd sha f corftpin, as a bid item, ade- yuate aUU sg shoring, and bracing, or eqqulva enk method, for the protection o?lifearod limb in trenches and open excavation which shall conform to ap- pllcable sal orders. By Iist!rig this sum, the bider warrants that its acHgn does not convey tort liability the City, its consultants, and their employee; agents, and str , cgnsuitarrts Pursuant to Sectlon 1770, ot-saq., of the California Labor Cade, the success- faul biddnerr shall pay not Less than the tcinin[erf 6�yy the pieciormof the es as d� California 17epartmentaf Ihdustrlal Re- Iatluns. These wage mtes are available from the California Department of IA- dvstr€el fief atio ns' I ntarmet website at h ttp-1twww.d ir.ca.g ov. Pur�ssuant to W5eon 1725.5 of the California Labor Code, no contractor Or subcontractor may be awarded a can - tract for public work on a puhlic works rwo� ect unless reglstered with the 0e- partirient of Industrial Relations at the time the of is awarded. Contras tars and subcontractors may find addi- tional [nformationfor rccyg[sterkng at the 'Drpartmentnflndustf;1 elations vrobslte at httppllrr — d ir,ca.govlPubl [c- Works!PuhIILWorks.h-Q . Pursuant to Labor Code section 1771.1, no cosort or or subcontractor may be listed on a. hid proposal for a public Wv rks pro ect submitted on or after March 1, �015 unless registered with the Departmen of IndustrlaI Relations. Furthermore all bidden and contrac- tors are hereby notified that no con- tractor or subcontractor may be award- ed, on ar after AprII 1, 2015, a contract For public work on a public works proj- ect unless registered wlth the Depart- ment of industrial Relations. Pursuant to Labor Mode section 1771.4, all bidders are hereby notified that this pproject is subject to compliance mom- toring Arid enforcement by the Depart- ment of [ndustrlal Relations, Pursuant to 50654, all contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of La- bor Standards Enforcement). Ali con- tractors and subcontractors must also provide a copyg and pproof to the City of online submittal within 2 days of online submission. Pursuant to Public Contract Cvde Sec- tion 2Z300, far monies earned the Contractor and withheld by the City to ensure the performance of the Con- tratt, the Contractor may, at its option, choose to substitute securit meeting the requirements of sold Pu es IIc contract Code Section Z23D0. All bidders shall be licensed undarthe frovisf ons of Chapter 9, Division 3 of he Business and Professions Code of the State of California to do thetype df work rnntEmnlated in the nrolect. In ac- a valid Class A jite successful bidder will he required to fturnish a Labor and Materiels bond in the amount Equal. to one hundred par - cent (10D%5 of the Contract price,. as well as a Faithful Performance Bond, in the a��nncunt eeqqual to one hundred per- cent {100°A] of the Contract price. Each bidder shall submit with Its bid a statement setting forth its exaerience on the forms included inthe Bid Pro- posal. Telephones will not bq available to bid- ders. Bid forms received after the des- ignated time wl[I not be accepted. Bid- ders and their authorized agents arc in- vited to attend. . No bidder may withdraw Its bid for a period of sixty (69) days after the date set for the opening of bids. Approved By: 6ryin McKinney, P.E. Public Works Director/ City Engine Date: Publl bed By: Monla Ra ova Gty Clerk Date.: Publl:hed: 10113, 10/20/2021 SECTION 1100 IN VI TATiON TO 810 PR OIECT 140. 2020.07 SILVERIRO CK RETENTION BASIN 5OIL STABILIZATION SEALED BIDS will be received by the Cty of La QuinIa [City] at the Offlce of the City Clerk, Iotaty at 78495 CaIIe iampi- cCr, La Qumta, Callfornia, 92253, utilix- ing pne-of Shp 1uflowirtq methods: 1. Mail insealed hid package: The bid must he received by the City no later than the bid openin time, 11.00 A.M. on Wednesday, Octoer 27, 2021- City will not be responsible for mail dolar and vviII not accept bids after the hid opening time and date regardless of postmark. 7- prop off sealed bid package at Citq Hall prior to bid o erj ing date. City Hall Is open to thr�uh�ic Monday through Fri dy from 8. 0 a.m. to 4:30 p.m; You art encouraged to make an appoint- ment for the dr❑pp-off byy contacting the Ctcrk's Office at:{760] 777 - 7123 or . C7.60 777 - 7092. If you wish to drop— off"Ibid without an appointment please note that the mom entrance jot - by doors remain locked and you must ring the "doorbell" located by the entry doors to aleit Chy Staff of yyour pres- ence; once alerted City 5taf# will meet yyou at the door and accept the bid. 3- prop ?yeaIad, bid package off at City Hail at tlia aHit lal ublic opera ng at 11:00 A.M. on Wednesday, October 27. 2021- Bids will opt he accepted aker this %A e. 'rhe oub lic aoenrna wllll take the clear• retention granite to parking lot and guard rail in- stallation at Along ramp and drainage Strutture- All project work and Inciden• sal items to complete the project shall be performed in accordance with the plans. ^oficatiom, and other provi- sions of the c0n5ract- All the above im- provements are to be constructed in a v;orkmantike manner, leaving the em Lire EEuofect in a neat and presumable Cong cum Refer to Sections 3000 and 400for more information. This project shall be Completed within 90 workmg days from the date speci- fied in the Notice to Proceed- Time for the commencement and completion of the wnrk is impottara and is to be of the essence of the Contract. The suc• cessful blefdor should plan to order any long lead time equipment items iitrme- diately following "Notice of Award`. A pre -bid conference is scheduled for 1'00 P'M Monday, October 18.2021- The pre -hid conference will be held in the parking lot at the Silverkock park Venue near the corner of SilverRock Way and Avenue 52. When visiting the interior of Public Fa- vlltier for any purpose, everyone k re- qquired to com ply with the to llowi ng COV1D-19 Safety pru meal; • Lhe south City Hall entrance • Facc Coverings arc Inanddtdry avail times while vl citing Public Facilities • Temperature check (touch•free) is re- quiretl upon your arrival • Comp lrLion of the 'C0VlD•19 Health 50It Car t ificatlon" form is required; el'.they on your mobile device or City tah- let- • Social distancing of at least 6-feet a arF P east note, that if you these not to fol- low the Ows safety protocol, you will be asked to leave Complete sets of the bidding docu• ments may he purchased arsine at v.ww, p la n it p l an r opm-rpm IM PbRTANT- If you are not on The plan holders list through Planit Planraom you will riot recelve addendum5-. It is the respon;ibitity of the bidder to en- sure Lhat they are placed on the plan holders list. Ridding procedwres are pre tribed in the Project Specifications. Bids snail be executed upon The forms hound and made a part of said 5peciflcatlons: Bid securlty in an amount not less than ten percent (10%) of the total bid dollar anng unt and conforming to the prescribed laiddinq procedures i5 re- quired to he submgltted with each bid, as a guaranty to be forfeited shawls the kidder, If awarded the contract fail to enter into the same, or fa IN. to furnish in a timely manner the hen& andlor proof of insurance. Th _City resrrves the right to reject or all Ids, and to waive any irregularities in t e bids. Bid log sheets can be found at http://w ww.la q uint aca-g ovlbusin esslde s i g n-a n d- d evel opmentlb i d- any ohs. Pursuant to the provisions of California Labor Code 5ectron 6707. each bid sub- mitted in response to this Invitation to Hid shall contain, as a bid Item, ade- quate sheeting sharing, and bracing, or eqqu Iva lent method, for the protection of fife and limb In trenches and open ekeavael❑re, which shall conform to ap- plicable safet�yy orders. By listingq this sum, the bidder warrants that its anion does not convey tort liability to the City, its consultants and their employees, agents, and sXcansultants. Pursuant to 5ectlon 1770, et- seq., of the California Labor Code, the success- ful bidder shall pay not less than the Crev�llin rate of per diem wages as de- lcrmme the Director of the California apartment of Industrial ryryr lations. Those wage rates are available from the California Department of in- dustrial Relations' Internet wehsite at h ttp:/lwvm.di r,ca. qov. Pursuant to section 1725.5 of the California Labor Code, no con tracer or subcontractor may be awarded a con- tract for public work on a public works prefect unless registered with the De- fafri�ment of Industrial Relations at tale time the contract is awarded. Contrac• tors an d su bcentracto rs mayy find addi- tianaf information fir re isterinq at the De a Cra of Industrial9R0 ano.ns wehsite at httpp:/lwww.dir.ca.gov/Public- WorPu hl c W kslork s-html . Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be Ilsled on a hid proposal for a public works pro ect.submitted on or after March 1, �015 unless registered With the Department of Industrial Rol ations- rurthermore all hiddersand contrac- tors are hereby notified that no con- tractor Or Subcontractor may be award- ed, on of after Apr 11 T. 2015, a contract for public work on a public works pros ect,unIo" registered with the Depart- ment of Industrial Relations, Pursuant to Labor Code section 1771A, all bidders arc hereby notified that th is project Is subject to compliance moni- ton ng and onforcement by the Depart- ment of Industrial Relations. Pursuant to SB854, all contractors and subcontractors must furnish electronic cert If] ed payroll records directly to the Labor Commissioner [aka Division of La- bor Standards Enforcement). All Een- tractors and subcontractors must also p ravide a copy and proof to the Cl ly or amine submittal within 2 days of online submission. Pursuant to Public Contract Code Sec- tion 22300. for monies earned by the Contractor and withheld by the City to ensure the performance of the Con- tract, She Contractor may, at its option. Choose to substitute secuntict meetinel ,be requirements of said Public Contract Code SCC[i 0n 27300. All bidders shall he licensed under the previsions of Chapter 4, Division 3 of phe Buslness and Professions Code or the 51 ate of Cal if ornia to do the type of work contemnlate d in Lhe aroiett. In aC- shall possess a valid Class A s 27 (tandscapin Contrac- time chat the hid is submit- ntractorsshall possess valid, !nses Tar the work they will i t ure to possess th a speci f l ed license(s) shall render the bid as non- responsive. The. succesOul bidder will be required to furnish a Labor and Materials bond In the amount equal to onr hundred per- cent (100%) of the Contract price, as Well as a Faithful Performance Bond, 1n the amountsqual to one hundred per- cent (100%) of the Contract price. Each bidder shall submit with its bid a statement setting forth its experience on the forms included in the Bid Pro- posal. Telephones will not be available to bid- ders. Bid forms received after the des- TI naled time will not be accepted. Bid- ders and thelr authorized agents are in- v}ted torattend. No bidder may withdraw it& bid for a period of sixty f6pj days after the date set for the opening of bids. Approved By: Bryan McKinney, P.E. Public Works Director/ City Engine Date: Published B Monika Ra%va City Clerk Date: Published: 10113, 10/20/2021 Order Confirmation for Ad #: 0004949621 Customer: Address: Acct. #: Phone: Ordered By: CITY OF LA QUINTA CITY OF LA QUINTA TDS-CIT051 Carley Escarrega 78495 CALLE TAMPICO LA QUINTA CA 92253 USA 7607777057 OrderStart Date: 10/13/2021 Special PricingTear Sheets Affidavits Net Amount Blind Box Tax Amount Promo Type Total Amount Materials Payment Method Payment Amount Amount Due 0 0 $1,144.00 $0.00 $1,144.00 $0.00Invoice $1,144.00 Order End Date: 10/20/2021 Size 1 X 260.00 Sales Rep: KTheodore Order Taker: KTheodore 10/08/2021Order Created Ad Order Notes: End DateStart Date# InsProduct 10/13/2021 10/20/2021 2TDS-The Desert Sun 10-13-21, 10-20-21, * ALL TRANSACTIONS CONSIDERED PAID IN FULL UPON CLEARANCE OF FINANCIAL INSTITUTION Text of Ad: 10/08/2021 Order Confirmation for Ad #: 0004949621 Customer: Address: Acct. #: Phone: Ordered By: CITY OF LA QUINTA CITY OF LA QUINTA TDS-CIT051 Carley Escarrega 78495 CALLE TAMPICO LA QUINTA CA 92253 USA 7607777057 OrderStart Date: 10/13/2021 Special PricingTear Sheets Affidavits Net Amount Blind Box Tax Amount Promo Type Total Amount Materials Payment Method Payment Amount Amount Due 0 0 $1,144.00 $0.00 $1,144.00 $0.00Invoice $1,144.00 Order End Date: 10/20/2021 Size 1 X 260.00 Sales Rep: KTheodore Order Taker: KTheodore 10/08/2021Order Created Ad Order Notes: End DateStart Date# InsProduct 10/13/2021 10/20/2021 2TDS-The Desert Sun 10-13-21, 10-20-21, * ALL TRANSACTIONS CONSIDERED PAID IN FULL UPON CLEARANCE OF FINANCIAL INSTITUTION Text of Ad: 10/08/2021 Invitation to Bid 1100-1 SECTION 1100 INVITATION TO BID PROJECT NO. 2020-07 SILVERROCK RETENTION BASIN SOIL STABILIZATION SEALED BIDS will be received by the City of La Quinta (City) at the Office of the City Clerk located at 78495 Calle Tampico, La Quinta, California, 92253, utilizing one of the following methods: 1. Mail in sealed bid package: The bid must be received by the City no later than the bid opening time, 11:00 A.M. on Wednesday, October 27, 2021. City will not be responsible for mail delays and will not accept bids after the bid opening time and date regardless of post-mark. 2. Drop off sealed bid package at City Hall prior to bid opening date. City Hall is open to the public Monday through Friday from 8:00 a.m. to 4:30 p.m. You are encouraged to make an appointment for the drop-off by contacting the Clerk’s Office at (760) 777 – 7123 or (760) 777 – 7092. If you wish to drop-off the bid without an appointment, please note that the main entrance lobby doors remain locked and you must ring the “doorbell” located by the entry doors to alert City Staff of your presence; once alerted City Staff will meet you at the door and accept the bid. 3. Drop sealed bid package off at City Hall at the official public opening at 11:00 A.M. on Wednesday, October 27, 2021. Bids will not be accepted after this time. The public opening will take place at City Hall in the lobby. Proposed work is as follows: The proposed work includes the clearing and grubbing along the retention basin, irrigation, landscaping installation of soil stabilizer. Additional work includes installation of decomposed granite to parking lot and guard rail installation at Alongi ramp and drainage structure. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. Refer to Sections 3000 and 4000 for more information. This project shall be completed within 90 working days from the date specified in the Notice to Proceed. Time for the commencement and completion of the work is important and is to be of the essence of the Contract. The successful bidder should plan to order any long lead time equipment items immediately following “Notice of Award”. Invitation to Bid 1100-2 A pre-bid conference is scheduled for 1:00 P.M., Monday, October 18, 2021. The pre-bid conference will be held in the parking lot at the SilverRock Park Venue near the corner of SilverRock Way and Avenue 52. When visiting the interior of Public Facilities for any purpose, everyone is required to comply with the following COVID-19 safety protocol:  Use south City Hall entrance  Face coverings are mandatory at all times while visiting Public Facilities  Temperature check (touch-free) is required upon your arrival  Completion of the “COVID-19 Health Self Certification” form is required; either on your mobile device or City tablet.  Social distancing of at least 6-feet apart Please note, that if you chose not to follow the City’s safety protocol, you will be asked to leave. Complete sets of the bidding documents may be purchased online at: www.planitplanroom.com IMPORTANT: If you are not on the plan holders list through Planit Planroom you will not receive addendums. It is the responsibility of the bidder to ensure that they are placed on the plan holders list. Bidding procedures are prescribed in the Project Specifications. Bids shall be executed upon the forms bound and made a part of said Specifications. Bid security in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. The City reserves the right to reject or all bids, and to waive any irregularities in the bids. Bid log sheets can be found at http://www.laquintaca.gov/business/design- and-development/bid-on-jobs. Invitation to Bid 1100-3 Pursuant to the provisions of California Labor Code Section 6707, each bid submitted in response to this Invitation to Bid shall contain, as a bid item, adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life and limb in trenches and open excavation, which shall conform to applicable safety orders. By listing this sum, the bidder warrants that its action does not convey tort liability to the City, its consultants, and their employees, agents, and sub-consultants. Pursuant to Section 1770, et. seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. These wage rates are available from the California Department of Industrial Relations’ Internet website at http://www.dir.ca.gov. Pursuant to Section 1725.5 of the California Labor Code, no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations at the time the contract is awarded. Contractors and subcontractors may find additional information for registering at the Department of Industrial Relations website at http://www.dir.ca.gov/Public-Works/PublicWorks.html . Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be listed on a bid proposal for a public works project submitted on or after March 1, 2015 unless registered with the Department of Industrial Relations. Furthermore, all bidders and contractors are hereby notified that no contractor or subcontractor may be awarded, on or after April 1, 2015, a contract for public work on a public works project unless registered with the Department of Industrial Relations. Pursuant to Labor Code section 1771.4, all bidders are hereby notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Pursuant to SB854, all contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement). All contractors and subcontractors must also provide a copy and proof to the City of online submittal within 2 days of online submission. Pursuant to Public Contract Code Section 22300, for monies earned by the Contractor and withheld by the City to ensure the performance of the Contract, the Contractor may, at its option, choose to substitute securities meeting the requirements of said Public Contract Code Section 22300. Invitation to Bid 1100-4 All bidders shall be licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code of the State of California to do the type of work contemplated in the project. In accordance with provisions of California Public Contract Code Section 3300, the City has determined that the General Contractor shall possess a valid Class A and/or Class 27 (Landscaping Contractor), at the time that the bid is submitted. Subcontractors shall possess valid, suitable licenses for the work they will perform. Failure to possess the specified license(s) shall render the bid as non-responsive. The successful bidder will be required to furnish a Labor and Materials bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. Each bidder shall submit with its bid a statement setting forth its experience on the forms included in the Bid Proposal. Telephones will not be available to bidders. Bid forms received after the designated time will not be accepted. Bidders and their authorized agents are invited to attend. No bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening of bids. Approved By: Date: Bryan McKinney, P.E. Public Works Director/ City Engineer Published By: Date: Monika Radeva City Clerk End of Section 1 From:Carley Escarrega Sent:Friday, October 8, 2021 7:33 AM To:Gannett Legals Public Notices 4 Cc:Monika Radeva; City Clerk Mail Subject:RE: 4949621 City of La Quinta project no. 2020-07 Attachments:OrderConf.pdf Looks good, thank you! Carley Escarrega | Management Assistant Public Works/Engineering Department City of La Quinta 78495 Calle Tampico | La Quinta, CA 92253 Ph. 760.777.7096 www.laquintaca.gov www.playinlaquinta.com  From: Gannett Legals Public Notices 4 <ganlegpubnotices4@gannett.com>   Sent: Friday, October 8, 2021 6:32 AM  To: Carley Escarrega <cescarrega@laquintaca.gov>  Subject: RE: 4949621 City of La Quinta project no. 2020‐07  ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening  attachments, clicking links or responding to requests for information. **  Hello,  Your notice is scheduled to publish October 13th & 20th in the Desert Sun. The total cost of your ad is $1,144.00. Please  review your proof carefully and advise of any corrections needed.  Thank you,  Keyonna Theodore  Public Notice Representative  Office: 844‐254‐5287  From: Carley Escarrega <cescarrega@laquintaca.gov>   Sent: Thursday, October 7, 2021 7:04 PM  To: Email, TDS‐Legals <legals@thedesertsun.com>  Cc: Monika Radeva <mradeva@laquintaca.gov>; City Clerk Mail <CityClerkMail@laquintaca.gov>; Lorissa Gruehl  <lgruehl@naiconsulting.com>; Ubaldo Ayon <uayon@laquintaca.gov>  Subject: 4949621 City of La Quinta project no. 2020‐07  2 Good afternoon, The City of La Quinta would like to run the attached invitation to bid for project no. 2020-07, SilverRock Retention Basin Soil Stabilization on Wednesday, October 13, 2021 and again on Wednesday, October 20, 2021. I await your confirmation and quote. Thank you,   Carley Escarrega | Management Assistant Public Works/Engineering Department City of La Quinta 78495 Calle Tampico | La Quinta, CA 92253 Ph. 760.777.7096 www.laquintaca.gov www.playinlaquinta.com