WNL #15 2020-01-20 To: Leonard, Construction Project Manager – City of La-Quinta From: Zack Faqih, P.E., Senior CM – Patrick Fraire CM/Site Inspector Date: January 20, 2019 Subject: Weekly Newsletter: # 15 WORK DONE THIS PAST WEEK: • Contractor placed mud cap on irrigation screen wall. • Contractor completed final coat of plaster on cross over wall. • Subcontractor poured 12’ wide sidewalk. • Subcontractor sawcut 12’ wide sidewalk. • Subcontractor stripped, sacked/finished and formed terrace walls. • CM conducted drone flyover for project progress photos. • Continue reviewing RFI’s and submittals, forward to designer upon prelim CM review. WORK SCHEDULED FOR NEXT WEEK: • Parking lot light fixture footings to be placed. • Electrical conduit installation. • Irrigation main line installation. • Terrace walls to be poured. • Concrete sidewalk to continue being formed and poured. COMMENTS: January 20th is a city holiday thus there will be no work. Next progress meeting will be held on January 28th, 2020 at 10:30am. Week Ending: January 18, 2020 ‘% Time Elapsed: 51.7 % Completion Date: April 09, 2020 Estimate of Actual Completion Date: April 09, 2020 City Of La Quinta 78495 Calle Tampico- La Quinta, CA 92253 The SilverRock Park Venue Site CIP Project No. 2016-08