Loading...
05587 (SFD) Title 24TITLE 24 REPORT FOR: BUETTNER RESIDENCE AVENIDA EL NIDO LA QUINTA, CA. PROJECT" DESIGNER: JOHN ROBERT BUND, ARCHITECT P.O. BOX 1575 LA OUINTA, CA. 92253 (b 19) 564-3363 OWNER: BUD & LOIS BUETTNER REPORT PREPARED BY: MECHANICAL SYSTEMS DESIGN 74-304 HWY. 111 PALM DESERT, CA. 92260 60 (619) 340-2414 Job Number: Date: 4/8/1989 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has interim approval and is authorized by the California Energy Commission for use with the Second Generation Nonresidential Building Energy Efficiency Standards for Nonresidential Occupancies. Second Generation Residential Occupancies shown to comply with this program conform to the results produced by the Public Domain Paint System, developed by the California Energy Commission. This program developed by Michael Gabel Associates x:415) 428-0803. Table Of Contents for Title 24 Report "Cover Page......................................................... 1 Tableof Contents ................................................... 2 i Form CF-1R.Certificate _-f C----mpliance: Residential ................... 3 Form MF -1R Mandatory Measures Checklist: Residential ................ 6 Form P -2R Points System Summary ..................................... 8 'Form'S Shading Coefficient (SC) Worksheet ........................... 9 ' e Form -WS -1R Points Thermal Mass Worksheet 11 ,Form, WS -2R Interpolation Wor 4::shee-t.................................. 12 ,Domestic Hot Water Wor�;sheet........................................ 13 Form CF -3 Construction Assemblies 14 HVAC Zone ,& Space Leads Summary ..................................... 21 CERTIFICATE OF COMPLIANCE: Residential.(part 1 of 3) CF-1R page ' -----------------------------------------•---------------------------------- 3 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT + BUND, ARCHITECT BuildingPermit No Location:.Palm Desert ----------- Date: 4/28/1989 Checked By Documentation: MECHANICAL ---------------------------------------------------------------------=----- ------------------ SYSTEMS DESIGN 1 Date (User* 1965) PROJECT.ADDRESS AVENIDA EL NIDO LA OUINTA, CA. GENERAL INFORMATION Compliance Method: Point System Climate Zone: 15 Total Conditioned Floor Area: 3037 sqft Building Occupancy: Single Fam Det Front Entry Orientation: North/East/South/West (circle one) Floor Construction Type: Slab Infiltration Control: Standard ' BUILDING SHELL INSULATION Component '--------- Area ---- U-Value Location/Comments. ------- --------------------- R-19 Frame Wall 329 -------------- 0.0655 LIVING R-19 Frame Wall 295 0.0655 DEN R-19 Frame Wall 900 0.0655 MASTER BEDROOM - R-19 Frame Wall 496 0.0655 BEDROOM #' R-19 Frame Wall 478 0.0655 ENTRY & HALL R-19 Frame Wall 115 0.0655 KITCHEN R-19 Frame Wall 147 0.0655 DINING , R-38 ROOF TILE/GYP 575 0.0300 LIVING R-38 ROOF TILE/GYP 335 0.0300 DEN R-38 ROOF TILE/GYP 927 0.0300 MASTER BEDROOM R-38 ROOF TILE/GYP 450 0.0300 BEDROOM #2 " R-38 ROOF TILE/GYP 33:1 0.0300 ENTRY & HALL R-38 ROOF TILE/GYP 240 0.0300 KITCHEN R-38 ROOF TILE/GYP 180 0.0300 DINING Carpeted Slab 180 0.2899 DINING /Over Open Carpeted Slab 575 0.7200 LIVING /Slab F2 Val Carpeted Slab 335 0.7200 DEN /Slab F2 Val Carpeted Slab 475 0.7200 MASTER BEDROOM /Slab F2 Val Exposed Slab 452 0.9000 MASTER BEDROOM /Slab F2,Va1, Carpeted Slab 280 0.7200 BEDROOM #2 /Slab F'2 Val Exposed Slab 170 0.9000 BEDROOM #2 /Slab F2 Val' Exposed Slab 330 0.9000 ENTRY & HALL /Slab F2 Val Exposed Slab 240 0.9000 KITCHEN /Slab F2 Val THERMAL MASS Thick: Mass Material Area (in) Type Location/Description Concrete, Heavyweight 575 4.000 Covered LIVING /Int Mass Concrete, Heavyweight 335 4.000 Covered DEN /Int Mass Concrete, Heavyweight 475 4.000 Covered MASTER BEDROOM /Int',Mass Concrete, Heavyweight 452 4.000 Exposed MASTER BEDROOM /Int"Mass Concrete, Heavyweight 280 4.000 -Covered BEDROOM #2 /Int Mass Concrete, Heavyweight 170 4.000 Exposed BEDROOM #2 /Int'Mass Concrete, Heavyweight 330 4.000 Exposed ENTRY & HALL /Int,Mass, Concrete, Heavyweight 240 4.000 Exposed KITCHEN /Int Mass' Concrete, Heavyweight 180 4.080. Covered DINING /Int'.MaBs,, CERTIFICATE OF COMPLIANCE: Residential. (part 2 of S) CF -1R page 4 of 29 ----------------------------------------------- A --------------------------- Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT _ _ 1 Buildin, Permit No Lgcation: Palm Desert Date: ' - ----- - 4/28/1989 1 Checked By _ Documentation: --------------------------------------------------------------------------- MECHANICAL SYSTEMS DESIGN ' - -- 1 Date,(User # 1965) SHADING COEFF GLAZING Glass Glass Glass w/Int Orientation Area Type U -Val Only Shade Description ----------- Northeast ------ 145.0 ------ Special ----- 0.40 ----- ----- 0.82 4.33 ----------------------- ' IMPERIAL DOUBLE GL. Southwest 160.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. Northeast 60.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. Southeast 15.0 Special 0.40 0.82 0.33. IMPERIAL DOUBLE GL. Southeast 15.0 Special 0.54 0.20 0.20 OBSCURE GLASS Southwest 15.0 Special 0.54 0.20 0.20 OBSCURE GLASS Northwest 120.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. Southeast 80.0 Special 0.40 0.8' 0.33 IMPERIAL DOUBLE GL. Southwest 24:0 Special 0.54 0.20 0.20 OBSCURE GLASS North 56.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. West 26.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. i. West 20.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE -OL. Northwest 25.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. Northeast 95:0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. Northwest 28.0 Special 0.40 0.82 0.33 IMPERIAL DOUBLE GL. SHADING (four Glazing above) Over Orientation Exterior Device Sc hang Framing Type Northeast Nene 1.00 8>0 Metal w/o Mullions Southwest None 1.00 3.0 Metal w/o Mullions Northeast None 1.00 8.0 Metal w/o Mullions Southeast Nene 1.00 0.0 Metal w/o Mullions' Southeast Nene 1.00 0.0 No Framing Southwest Nene 1.00 0.0, No Framing Northwest None 1.00 3.0 Metal w/o Mullions Southeast None 1.00 3.0 Metal w/o Mullions Southwest None 1.00 0.0 No Framing North None 1. 00 0. Q Metal w/o Mullions West None 1.00 8.0 Metal w/p Mullions' West None 1.00 3. 6 Metal. w/.o Mullions L Northwest Nene 1.00 3.0 Metal w/o Millions Northeast Nene 1.00 0.0 Metal,w/o Mullions Northwest None 1.00 0.0 Metal w/o Mullions =I "CERTIFICATE OF. COMPLIANCE: Residentiai (part 3 of 3) CF -1R page 5 of 29 Project: BUETTNER RESIDENCE ; COMPLY 24 v 2.20 ------------------ Designer: JOHN ROBERT BUND, ARCHITECT f. Building Permit No Location:,: Palm Desert Date: 4/28/1989 Checked By Documentation: MECHANICAL SYSTEMS DESIGN Date (User # 1565) ------------------------------------------------------------------------------ HVAC SYSTEMS Min Output Duct Duct ManlAfacturer/Model No. System"Type Eff (BtL(h) Location RVal (or approved equal) --------------- ----- ----------------------- ---- ----------------------- Gas Fired 0.882 12200C-) 0C-) Vent. Attic Space 4.2 BDP 398A06U120/568EBCa60 Air Conditioner10.000 55000 Gas -Fired , hr " 0.864 1000 Vent. Attic Space 4.2 BDP 398A036060/566EJC�36 Air Conditioner10.000 35800 Max. Furnace Output: 56016 Btuh + 1(87% - 71%) x 70001 = 171437. Btuh Cooling Exception:-____-- CFM Cooling (see Load Calcs) requires Btuh HOT WATER SYSTEMS Tan;: Manufacturer/Model No. # of Energy # of System Type 'Volume (car approved equal) Units Credits Pumps Gas Fired 50.0 Std Gas 50 gal � �r less 1 0 0 SPECIAL FEATURES/REMARKS (Add extra sheets if necessary) --------------------------------------------------------------------------- ---------------------------------------------------------------------------- COMPLIANCE STATEMENT This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Chapter -53 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Administrative Code. This certificate has been signed by the individual with overall design responsibility and the building owner, who shall retain a copy of it and transmit the certificate to any subsequent purchaser of the building. When this Certificate of Compliance is submitted 'for a single building plan to be built in multiple orientations, all building conservation features which vary are -,indicated in the Special Features/Remarks section. DESIGNER'. JOHN ROBERT,BUND, ARCHITECT Pr 0.. BOX 1575 LA p QUI NTA;_ CA. 92253 .(619) 564-3363 ' License. No: —_ ________ 1. Signed: - --------------- DOCUMENTATION AUTHOR MECHANICAL SYSTEMS DESIGN 74-304 HWY. 111 PALM DESERT, CA. 92260 (619) 340-2 Signed:- -/------------- BUILDING OWNER BUD & LOIS BUETTNER Signed ....................... ENFORCEMENT AGENCY Name:------------------------ --- Agency:------------- - Telephone: ------------------------ Signed.-----------r-------------. MANDATORY MEASURES CHECKLIST (part 1 of 2) MF -IR page 6 of 2'3 --------------------------------------------------------- `,Project: BUETTNER RESIDENCE ; COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT ; Building Permit No Location: Palm Desert Date: 4/28/1989 ; Checked By Documentation: MECHANICAL SYSTEMS DESIGN ; Date (User # 1965) ----------------------------------------------------------------------------- NOTE: -Lowrise residential buildings subject to the Standards must contain these measures regardless c -f the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is ,incorporated into the permit doClAments, the features noted ,shall be considered by all. parties as binding minimUm component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this chec k.l i.st only. BUILDING ENVELOPE MEASURES o Sec. 2-5352(a): Minimum ceiling insulation R-19 weighted average. o Sec. 2-5352(b): Loose fill insulation manufacturers labeled R -Value. o Sec. 2-5352(c): Minimum wall insulation in framed walls R-11 •weighted average (does not apply to exterior mass walls). � r o Sec..2-5352(k): Slab edge insulation - water absc-rpticnn rate no greater than 0.3%, water vapor transmission rate no -greater than 2.0 perm/inch. o Sec. 2-5341: Insulation specified or installed meets California Energy Commission (CEC) quality standards. ..Indicate type and form. o .Sec. 2-5352(f): Vapor barriers mandatory in Climate Zones 14 and -16 -only. o Sec. 2-5317: Infiltratic-n/Exfi'ltration Controls a. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. b. Doors and windows certified. c. Doers and windows weatherstripped; all joints and penetrations caulked and sealed. o-,Sec•.2-5352(e): Special infiltration barrier installed to comply with Sec. -5351 meets CEC quality standards. o Sec. 2-5352(d): Installation of Fireplaces 1. Masonry and factory -built fireplaces have: a. Tight fitting, closeable metal or glass do -=,r b.. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allc_-wed. Enforcement MANDATORY -`MEASURES CHECKLIST (part C of 2) MF -1R page 7 of 29 Project: BUETTNER RESIDENCE : COMPLY 24 v 2.20 Designer:.JOHN ROBERT BUND, ARCHITECT Location: .Palm Desert Date: 4/28/1989 Documentation: MECHANICAL SYSTEMS DESIGN HVAC AND PLUMBING SYSTEM MEASURES o Sec. 2-5352(g) and '-5303: Space conditioning equipment -sizing: 'attach' calculations. o Sec. 2-5352(h) and 2-5315: Setback thermostat on all applicable heating systems. ------------------ Building Permit No ------------------ - - -------- Checked k: edBy Date (User # 1965:1 k o Sec. 2-5316(a): Ducts constructed, installed and insulated per Chapter 10, 1976 UMC. * o Sec. 2-5316(b): Exhaust systems have damper contrc-ls. o Sec. 2-5314(c): Gas-fired space heating equipment has intermittent ignition devices. o -Sec. 2-5314: HVAC equipment, water heaters, showerheads and .faucets "certified by the CEC. o 'Sec..2-5352(i) : Water heater insulation blanket (R-12 or greeter.) or, combined interior/exterior insulation (R-16 or ..'greater.); first 5 feet of pipes closest to tank insulated (R-3 or greater). Enforcement o Sec.•2-5312(Exception I): Pipe insulation on steam and steam condensate return & recirculating piping. ----------- Sec. 2-5318(d): Swimming Pool Heating 1... System has: a. On/cuff switch on heater. b. Weatherproof instruction plate on heater. c. Plumbed to allow for solar. 2. 75..,percent thermal efficiency. 3. Pool cover. 4. Time clock. 5. Directional water inlet. LIGHTING -AND APPLIANCE MEASURES o Sec. 2-5352(j) : Lighting -- 25 lumens/watt or greater for general lighting in kitchens and bathrooms. o Sec. .2-5314(c,): Gas fired appliances egi..tipped with intermittent 'ignition devices. o Sec. 2-5314(a): Refrigerators, refrigerator -freezers, freezers and fluorescent lamp ballasts certified by the CEC. Indicate make and model number. POINTS SYSTEM SUMMARY: CLIMATE ZONE 15 ------------------------------------------------------------------------------ P -2R page 8 of 29 -_ Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT I ------------------ Building PermitNo ' Location: Palm Desert Date: 4/28/1989 1 -------- Checked By Documentation: MECHANICAL SYSTEMS ------------------------------------------------------------------------------ DESIGN ' 1 ------ -- Date (User # 1965) BUILDING DATA ------------- Conditioned Floor Area 30317 sqft Number of Stories 1 Occupancy Type Single Fam Det SCORE -CARD Measure Paints 1. Roof Insulation 0.0300 (U -Value) G 3 c 2. Wall Insulation 0. C?655 (U -Value) 3. ',,.Raised* Floor Insulation 0.'2899. (U -Value) 1 '3a:,Controlled Vent Crawlspace 0.0 (R -Value) 1 -5 4. Slab Edge Insulation CJ.8332 (f2 factor) 1 5. Infiltration Standard G 6. 'Glass Heat Loss 0.41 29.1% 2 Sum 1-6 -3 7. Shade Open Area Y. Glass Sc OH Eff r. a. North 356.0 11.7 x 0.72 = 8.5 -4 b., East 110. 0 3.6 x 0. 65 x 0.94 = 2.2 0 --c. South 199.0 6.6 x 0.6'2 x 0.92- 3.7 0 d., -.,West 219.0 7.2 x 0.72 x 0.87 = 4.5 1 e. Skyl i'ght 0.0 Ot, 0 x 0. 00 = 0.0 o 8. - Shade Closed Area % Glass. SC OH Eff % a. North 356.0 11.7 x 0.29 - 3.4 -1 b. ' East 110.0 3.6 x 0.28 x 0.90 = 0.9 1 c...South 199.0 6.6 x 0.27 x 0.76 = 1.4 U d. West 219.0 7.2 x 0.29 x 0.82 = 1.7 -2 e. , Skylight 0.0 o. 0 x 0.00 - 0. 0 0 9: .hn,terior Thermal Mass 2.95 1 10. Exterior Wall Mass O. c_)0 0 ' Sum 7-10 -4 11. 'Heating System 0.875 SE x 0.82, Duct Eff = 0.72 Eff SE 2 Zonal Contra: No 12. Cooling; System 10.000 SEER x 0.81 Duct Eff = 8.10 Eff SEER 12 13. Water Heating (see DI -IW Worksheet) - 0 Point Total: 7 SHADING COEFFICIENT (SC) WORKSHEET FORM S page 9 of 29 Project:-BUETTNER RESIDENCE COMPLY 24 v 2.20 '-Designer: JOHN ROBERT BUND, ARCHITECT 1 Building Permit No ' -------- Location: Palm Desert Date: 4/28/1989 Checked By -- Documentation: MECHANICAL SYSTEMS DESIGN 1 Date (User # 1965) GENERAL`INFORMATION 1. Glazing Type: Special 0; Vraming Type: Metal w/o Mullions .5: Framing/Mullion Factor: 0.88 (from Table G-10) '4 Q1.I.nte"rior Shade Type: IMPERIAL DOUBLE GL. .7.,SC Shade Open: 0.82 (from Table G-9 or show calculation) ..vZS&Shade Closed: 0.33 (from Table G-9 or show calculation) GLAZING, INTERIOR SHADE & FRAMING - Sa. 0.82 (SC #7) x 0.88 (FMF #5) _ 0.72 SC Shade Open 10a.0.33 (SC #8) k 0.88 (FMF #5) = 0.29 SC Shade Closed EXTERIOR SHADE OVERHANG FACTOR, Dist Glass Glass Fti Orientation ----------- Area ----- Southwest 160.0 Northwest 120.0 Southeast, 80.0 West 26.0 West 20.0 Northwest 25.0 Exterior Shade Type: NO EXTERIOR SHADE Ovrhng Dist Glass Proj OH Factor OH Factor Depth Above ----- Height Ratio Shade Open Shade Clsd ------- 3.0 / ( 0.0 ------ + 10.0) ----- = 0.30 ---------- 0.90 ---------- 0.73 3.0 / ( 0.0 + 10.0) = 0.30 0,91 0.86 3.0 / ( 0.0.+ 10.0) = 0.30 0.92 0.86 8.0 / ( 0.0 + 7.5) = 1.07 0.68 0.58 3.0 / ( 0.0 + 5.0) = 0.60 0.81 0.74 3.0 / ( 0.0 0 + 5.0) = 0.60 0.81 0.74 SHADING COEFFICIENT (SC) WORKSHEET FORM S page 10 of '23 Pro ject: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer.: JOHN ROBERT BUND, ARCHITECT Building Permit Na " .locatiron: Palm Desert Date: 4/28/1989 - --------- Checked By Documentation: MECHANICAL SYSTEMS DESIGN ---------------------------------------------------------------------------- Date (User # 1'365) GENERAL, INFORMATION I. -Glazing Type: Special 3. Framing Type: No Framing .5. .Framing/Mullion Factor: 1.00 (from Table G-10) -Interior Shade Type: OBSCURE GLASS 7: ,;SC Shade Open: 0.20 (from Table G-9 or show calculation) SC Shade Closed: 0.20 (from Table G -S or show calculation) GLAZING, INTERIOR SHADE & FRAMING " 9a.. 0:20 (SC #7) x 1.00 (FMF #5) = 0.20 SC Shade Open 10a.0.2O (SC #8) x 1.00 (FMF #5) = 0.20 SC Shade Closed EXTERIOR'SHADE Exterior Shade Type: NO EXTERIOR SHADE OVERHANG:FACTOR Glass Ovrhng Dist Glass Proj OH Factor OH Factor Orientation Area Depth Above Height Ratio Shade Open Shade Clsd ---- ----- ------ ----- ------ ------------------------- NO OVERHANGS n .THERMAL MASS WORKSHEET WS -1R page 11 of 29 Project: BUETTNER RESIDENCE 1 COMPLY 24 v 2.20 -,Designer: -JOHN ROBERT BUND, ARCHITECT 1 Building Permit No 'Location: Palm Desert Date: 4/28/1989 1 Checked By 475.0 .,'Documentation:. MECHANICAL SYSTEMS DESIGN 1 Date (User # 1965) INTERIOR'THERMAL MASS 280.0 Interior Interior Mass Mater.ial ------------- Concrete, Heavyweight Concrete, 'Heavyweight Concrete,'Heavyweight Concrete, .Heavyweight ..Concrete, Heavyweight Concrete, --Heavyweight Concrete,,Heavyweight Concrete, Heavyweight Concrete,•Heavyweight TOTAL 8960.3 INTERIOR MASS FACTOR 8960.3 IMC / 3037 sqf t = 2.95 *-Mass listed above with a Wall U -Value denotes the Interior Mass credit for. Exterior' Mass Walls, and are repeated below for Exterior Mass credit. 0 Sides Exposed indicates mass covered with surface material >= R-2. EXTERIOR MASS WALLS Exterior Exterior Sides Wall Mass Mass Mass Mass Material- ThicL:: Exposed U -Value Area Factor Capacity NONE Mi Sides Wall Mass Thick: Exposed U -Value Area 4. 00 0 575.o 4.00 0 C l 335.0 4.00 C) 475.0 4. 00 1 452.0 4. Ot i i 280.0 4. 00 1 170. 0 4.00 1 330.0 4.00 1 240.0 4.00 C) 180.0 TOTAL 8960.3 INTERIOR MASS FACTOR 8960.3 IMC / 3037 sqf t = 2.95 *-Mass listed above with a Wall U -Value denotes the Interior Mass credit for. Exterior' Mass Walls, and are repeated below for Exterior Mass credit. 0 Sides Exposed indicates mass covered with surface material >= R-2. EXTERIOR MASS WALLS Exterior Exterior Sides Wall Mass Mass Mass Mass Material- ThicL:: Exposed U -Value Area Factor Capacity NONE Mi Mass Mass Factor Capacity x 1.8 1046.5 x 1.8 = 609.7 x 1.8 = 864.5 x 4.7 = 2124.4 x 1.8 = 509.6 x 4.7 = 799.0 X 4.7 _. 1551.0 x 4.7 = 1128.0 x 1.8 = 327.6 TOTAL 8960.3 INTERIOR MASS FACTOR 8960.3 IMC / 3037 sqf t = 2.95 *-Mass listed above with a Wall U -Value denotes the Interior Mass credit for. Exterior' Mass Walls, and are repeated below for Exterior Mass credit. 0 Sides Exposed indicates mass covered with surface material >= R-2. EXTERIOR MASS WALLS Exterior Exterior Sides Wall Mass Mass Mass Mass Material- ThicL:: Exposed U -Value Area Factor Capacity NONE Mi INTERPOLATION, ------------------------------------------------------------------------- WEIGHTED AVERAGE & ADDITION WORKSHEET WS --2R page 12 of 29 •-Project: BUETTNER RESIDENCE ; COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT ; Building Permit No Location: Palm Desert Date: 4/28/1989 1 Checked -ey ~•Documentation: ------------------------------------------------------------------------------ MECHANICAL SYSTEMS DESIGN - -- 1 Date (User # 1965) INTERPOLATION Point Paint Point Scare Actual Vali-te Sc ----re Score Va11-ie Value Point Item i Va.lLte 1 2 1 2 1 Score ------- ----- 'Roof 4 +( ------ 0. 0300 .... -•--- - 0. 0 :) x ----- ( -4 - ----- 4) / ( ----- 0.04 ----- - 0.02) ----- _ -0 Wall 1 +( 0.0655 - o. 06) x ( -3 - 1) / ( 0. 08 - 0.06) _ -0 Raised Floor -34 +( 0. 2899 - 0.20) x ( -55 - -34) / ( 0. 30 - 0. 20) _ -53 Slab Edge -1 +( 0.83312 - 0.80) x ( -3 - -1) / C 0.90 - 0.80) _ -2 Glass -Type 3 -9 +(29.1077 -2 9.00) x ( -_10 - -9) / (30.00 -29.00) 0) _ -9 Glass Type 5 3 +(29.1077 -29.00) x ( 3 - 3) /('30.00 .00 -29.00) = 3 N Shade Open -4 +( 8.4587 - 8. 00) x ( -5 - -4) / ( 9.00 - 8.00) _ -4 E Shade Open 0 +( 2. x'-189 - 2.00) x ( -1 - 0) / ( 3.00 - 2.00) _ -0 S ' Shade Open '0 +( 3. 7322'' - 3. 00) x ( 0 - 0) / ( 4. 00 - 3.00) = 0 W Shade Open .1 +( 4.5493 - 4_00) x ( 1 - 1) / ( 5.00 - 4.00) = 1 N Shade C15d' -1 +( 3.4041 - 3. 00) x ( -2 - -1) / ( 4. 00 - 3.00) _ -1 ` E Shade C l sd 4 +( 0.9046 - 0.00) x ( 1 - 4) / ( 1.00 - 0.00) = 1 S Shade Clsd 2 +( 1.3989 - 1.00) x ( --2 - 2) /C 2.00 - 1.00) = 0 W Shade C l sd 2 +( 1.7167 - 1.00) x ( - 3 - ) / ( 2.00 - 1.00) _ -2 Int Mass " 0 +( 2.9504 - 2.50) x ( i - 0) / ( 3.00 - 2. 50) _ � 1 Heating 2 +( 0.7174 - 0.70) x ( 4 - 2) / C 0.80 - 0.70) = 2 Cooling 11 +( 8. 1000 - B. (-)i)) x ( 20 - 11) / ( 9.00 - 8.00) = 12 WEIGHTED AVERAGE POINTS Type Item. Points Raised/CVC/Slab (-52.9 x Glass Total ( -9.1 x 1 Type 2 Type 3 Total Average Area Points Area Paints Area Area Points 180 +-15.0 x 0 + -1.7 x 2857) / 3037 = -5 54 + 3. i) x 1330 + Q. O x o) / 884 = 2 DHW,WORKSHEET ONE: STORAGE TYPE GAS OR ELECTRIC page 13 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No Location: Palm Desert 10539.4 Date: 4/28/1389 1 Checked By ;,Do_cumentation: MECHANICAL SYSTEMS DESIGN 1 Date (Userr# 1565) ---------------------...------_....------ - _- ------------------------------- A ' ECIUIPMENT DATA 2 Recovery ' energy -------------------------------------------------------------•------------------ D1 / A6 t 1 Water heater type SG Enter,SG or SE .2 Manufacturer & - I (D ' x 1000) / CAB x A9 3 Model- number Std Gas 50 gal or less 4 'Ignition device GP GP, gas pilot or IID, int. ignition device 5 Tank volume 50.0 Total gallons, from CEC Appliance Directory 6 Recovery efficiency 76.0 Percent from CEC Appliance Directory .7 ; Standby loss 3.1 Percent/hOUr, from CEC Appliance Directory 8 'Rated input 55000 Btu/hr, from CEC Appliance Directory (1 kWh = 3413 E{tu) 9 : Number of Heaters 1 From building plans (total) B OPERATING DATA ----------------------------------------------------------------------------- 1, Climate Zone 15 See Appendix D 2 Water heating budget 18700 KBtu/yr/Linit, see Table 1 3 Tank set temp. 140 F, fixed input 4 Water main temp. 70.0 F, see Table 1 5 Daily hot water load 50 50 or 35 gallons/unit, see Table 1 6 Ambient air temp. 72.6 F, see Table 1 7 Adj Standby Losses 0.0'.205 See Table 2 or Appendix B 8 No. dwelling Units 1 From building plans (total) 9 Number of pumps C.) From building plans 10 Pumping energy 0.0 Watt-hr/yr per Pump, see, Table 3 C WATER HEATING ENERGY.CREDITS 1 Credit name See Table 5 2 Annual savings 0.0 K.Bti.t/yr/dwelling unit, see Table 5 D CALCULATE ANNUAL WATER HEATING ENERGY (KBtu/yr) 1 -------------------------------------------------------------------------- Recovery load 10539.4 €CBS x 8.25 x ( 140 -B4) x 365 x 0. 001 ] -C21 x B8 2 Recovery ' energy 13867..6 D1 / A6 3". -Standby loss energy 4839.6 i24 - I (D ' x 1000) / CAB x A9 x 365) ] } x 8.25 x A5 x B7 x 365 x (140-86) x 0.001 x A5 .4• Pumping energy ()-0 B'3 x B10 x 3.413 x 3 x i),0i)1 5 Total energy 18707.2 GAS SYSTEMS: (D2 + D3 + D4) / B8 ELECTRIC: ,'C(D2 + D3) x 31 + D41 / B8 6 Water heating budget comparison -7.2 KB•tu/yr/unit B2 - D5 7 Water heating budget -0.0 Paints (DC / Floor Area) x 2 x B8 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 14 of 29 Project: BUETTNER RESIDENCE i COMPLY 24 v 2.20 Designery JOHN ROBERT BUND, ARCHITECT building Permit -No Location: Palm Desert Date: 4/8/1989 Checked By Documentation: MECHANICAL SYSTEMS DESIGN ------------------------------------------------------------------------------ ------------------ f Date (User # 1965) Assembly Name:'R-19 Frame'Wall 'Assembly- Type: Wall Assembly Tilt: 90 deg (Vertical) Th R -Value Construction Components ------------------------------------------------------------------------------ Fr (in) Summer Winter Outside Air Film 0.25 0.17 1. Stucco 0.875 0.17 0.17 2. Membrane, Vapor -Permeable Felt 0.010 - 0.06 0.06 3.' Imsulation, Mineral Wool, R-17.8 5.500 17.80 17.80 4. Gypsum, or Plaster Board 0.500 0.45 0.45 5. 6. 7. 8: 9. Inside Air Film -------------- 0.68 0.68 Total' Framing Percentage: 15.0 Framing Material: Sciftwiod, Douglas Fir -Larch ------------------------------- Sketch of' Construction Assembly Absorpt-ivity: Roughness: Stucco, Weight: Heat Capacity: o.70 19.4:' 19.33 Calculation for Framing Adjustment Summer U -Value 0.0515 x 0.85 + 0.1416 x 0.15 = 0.065(-') Winter U -Value 0.0517 x 0.85 + 0.1433 x 0.15 = 0.0655 OVERALL VALUES ADJUSTED FOR FRAMING W%i,_,d Shingles 13.' lb/sqft 3.23 R -Value U -Va 1 ue 15.38 15.28 0.0650 0.0655 CONSTRUCTI.ON ASSEMBLY COMPLIANCE FORM CF -3 page 15 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Desi.gner:, JOHN ROBERT BUND, ARCHITECT 1 Building Permit No • Location:'Palm Desert Date: ------------------ 4/28/1989 Checked By 'Don:�cumentatioMECHANICAL SYSTEMS DESIGN -- 1 Date -(User # 1965) Assembly Name: R-38 ROOF TILE/GYP Assembly Type: Roof Assembly Tilt: 0 deg (Horizontal Roof) Th R -Value Congtruction Components Fr (in) Summer Winter Outside Air Film 0.25 0.17 1. Roofing, Slate 0.500 0.05 0.05 2. Plywood 0.500 0.63 0.63 3. Membrane, Vapor -Permeable Felt 0.010 0.06 0.06 4. Insulation, Mineral Wool, R-38 11.500 38.00 38.00 5. Gypsum or Plaster Beard 0.500 0.45 0.45 6. 7. 8. 9. Inside Air Film 0.92 0.61 Total 40.35 39.97 Framing Percentage: 10.0 % Framing Material: Softwood, Sketch of Construction.Assembly Douglas Fir -Larch Calculation for Framing Adjustment Summer U -Value 0.0248 x 0.90 + 0.0728 x 0.10 = 0.0296 Winter U -Value 0, (_1250 x 0.90 + 0.0749 x 0.10 = 0.0300 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 13.7 lb/sgft Heat Capacity: 4.24 R -Value 33.81 33.32 U -Value 0.0296• 0.0300 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 16 of 29 ----------------------------------------------------------------------------- Project: BUETTNE•R RESIDENCE COMPLY 24 v 2.20 Designer::JOHN"ROBERT BUND, ARCHITECT Building Permit No ------------------ Loca.ti,on: -Palm Desert Date: 4/28/1989 f Checked By 1 ------------------ Documentation: _________________Documentation: MECHANICAL SYSTEMS DESIGN 1 Date (User # 1965) ---------------------- 7 ------------------------------------------------------ i Assembly Name: Carpeted Slab • t Assembly - Type: Floor 1 ' Assembly Tilt: 180 deg (Horizontal Floor) Th R -Value Construction Components Fr (in) Summer Winter --------------------------- Outside Air Film - � 0.25 0.17 1. Concrete, 140 1b, Not Dried 3.507 0.28 0.28 2. Flooring, Carpet and Fibrl us Pad 0.2.50 2.08 2.08 3. � , 4. • 1 5. , � 1 6. "i 7. 9.' • Inside Air Film --------------------------------------------------------------------------------- 0.61 0.92 Total 3.22 3.45 Framing Percentage: 0.0 Framing Material: NONE Sketch of Construction Assembly OVERALL VALUES ADJUSTED FOR FRAMING 'Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.9 lb/sqft .Heat Capacity: 9.01 R -Value 3.22 3.45 U -Va 1 ue 0. 3106 0.2899 • r z• 1 - � 1 1 • � , 1 • 1 , � 1 1 "i Sketch of Construction Assembly OVERALL VALUES ADJUSTED FOR FRAMING 'Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.9 lb/sqft .Heat Capacity: 9.01 R -Value 3.22 3.45 U -Va 1 ue 0. 3106 0.2899 CONSTRUCTION ASSEMBLY COMPLIANCE FORM ---------'------------------ --- -- ---- CF-3 page ------ -- --- - --------------- 17 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT ------------------ Building Permit No Location: 'Palm Desert Date: 4/28/1989 Checked By Documentation: MECHANICAL SYSTEMS DESIGN ------------------ Date (User # 1965) Assembly Name: Exposed Slab Assembly Type: Floor Assembly Tilt: 180 deg (Horizcnntal Floor) Th R-Value Construction Components Fr (in) Summer Winter Outside Air Film -. 0.25 0.17 1.Concrete, 140 lb, Not Dried 3. 500 0.8 0.28 2. Flooring, Asphalt, Lino, Vinyl cir- Rubber 0.010 0.05 0.05 3. 4. 5. 6. 7. 8. 9'. Inside-Air Film --------------------------------------------------------------------------- 0.61 0.92 Framing-Percentage: 0.0 Framing. Material: NONE Sk'etch of Construction Assembly Total OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Weight: 40.9 l b/sqf t Heat Capacity: 9.00 R-Va.l ue 1.19 1.42 U -Value 0.8403 0.7042 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 18 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No Location: Palm Desert Date: 4/28/1989 f Checked By Documentation: MECHANICAL SYSTEMS DESIGN Date (User # 1965) --------------------------------------------------------------------------- Assembly Name: Solid Wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) -------------------------------- r i Sketch of Construction Assembly Absorptivity: Roughness: Clear Pine Weight': Heat Capacity: 0. 70 OVERALL VALUES ADJUSTED FOR FRAMING 6.1 lb/sq•ft 2.39 R -Value .47 2.39 U -Va 1 ue 0. 4049 0.4184 Th R -Value :Construction Components Fr (in) Summer Winter - - T - - - - - - - - - - - - - - - - - - - - - - -- - - -- - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Outside Air Film 0.25 0.17 1. Hardwood, Maple 1.750 1.54 1.54 2. 3. 4. 5. 6. 7. EN 9. 'Inside Air Film ---------------'--------------------_--------------------------------------- 0.68 0.68 Total 2.47 2.39 -Framing.Percentage: 0.0 .-Framing'Material: NONE -------------------------------- r i Sketch of Construction Assembly Absorptivity: Roughness: Clear Pine Weight': Heat Capacity: 0. 70 OVERALL VALUES ADJUSTED FOR FRAMING 6.1 lb/sq•ft 2.39 R -Value .47 2.39 U -Va 1 ue 0. 4049 0.4184 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF --3 page 19 of 29 -----------------------------------.---------------------------------------- Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 ------------------ Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No -------- Location: Palm Desert Date: 4/28/1989 Che6::ed By Documentation: MECHANICAL SYSTEMS DESIGN Date (User # 1965) Assembly'Name: OBSCURE GLASS Assembly Type: Glazing 9 Framing Percentage: (-).0 Y. Framing Material: NONE ----------------------- Sketch of Construction Assembly Visible Transmittance: 0.84 Winter Shading Coefficient: 0.20 Summer Shading Coefficient: 0.2i) OVERALL VALUES ADJUSTED FOR FRAMING R -Value 1.94 1.86 U -Value 0.5148 0.5369 Th R -Value Construction Components Fr (in) Summer Winter Outside Air Film 0.25 0.17 1. OBSCURE GLASS 0.250 0.34 0.34 2. 3. 4.. 5. 6. 7: - 9.. Inside Air -Film 1.35 11.35 -_ --- -------------------------••-----.---•-------------------------------------- Total 1.94 1.86 Framing Percentage: (-).0 Y. Framing Material: NONE ----------------------- Sketch of Construction Assembly Visible Transmittance: 0.84 Winter Shading Coefficient: 0.20 Summer Shading Coefficient: 0.2i) OVERALL VALUES ADJUSTED FOR FRAMING R -Value 1.94 1.86 U -Value 0.5148 0.5369 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF=3 page'20 of 29 Project:• BUETTNER RESIDENCE 1 COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building -Permit No ------------------ Location: Palm Desert Date: 4/28/1989 f Checked By Documentation: MECHANICAL SYSTEMS DESIGN Date (User # 1965) ---------------------------------------------------------------------------- Assembly Name: IMPERIAL DOUBLE GL. Assembly Type: Glazing Th R -Val ue _Construction Components Fr (in) Summer Winter ----------------------------------------------------------------------------- Ou:t.side Air Film 0.25 0.17 I.,. -IMPERIAL DOUBLE .GL. 0.500 0.89 1.00 2., 3.' 4. 5. ' V,B. • =. ,. Inside.Air Film 1.35 1.35 ------------------------------------------------------------------------ Framing Percentage: 0.0 % y'Framing Material: NONE Sketch 'of ConstrUction Assembly Visible Transmittance: 0.91 Winter Shading Coefficient: 0.82 Summer Shading Coefficient: -0.33 Total 2.49 2.52 OVERALL VALUES ADJUSTED FOR FRAMING R -Va,l ue 2.49 2.52 U -Va 1 ue 0.4008 0.3968 HVAC ZONE HEATING & COOLING LOAD SUMMARY --------------------------------------------------------------------------------- page 21 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT. ' ' - - Building Permit No Location: Palm Desert Date: 4/23/1939 - -------- Checked By Documentation: MECHANICAL SYSTEMS --------------------------------- --------------- DESIGN ' ------------------------- - -- Date (User # 1965) HVAC ZONE DESCRIPTION HVAC Zone Name: A/C --1 HVAC System Name: EDP 39BA060120/568EB060 System Multiplier: ' 1 Heating Schedule: Residential' Heating, -Cooling Schedule: Residential Cooling Fan Schedule: Residential HVAC & Fans ; Sizing Method: COINCIDENT Relative Humidity: ' 501 COOLING SPACES IN THIS ZONE PEAK HEATING PEAK SENSIBLE LATENT, LIVING (Jan 12am) 11142 (Aug •2pm) 14569 259' DEN (Jan 12am) 5501 (Aug wpm) 5437` .151— MASTER BEDROOM (Jan 12am) 1367: (Aug 2pm) 12396. 417 TOTAL SPACE LOAD 30315 32402 827 Bypass Ventilation Air ( 0 cfm) 0 ( i) cfm) 0 -0" Supply Duct Conduction 1516 1620 ` Supply Duct Leakage 606 648 1.7 Supply.Fan Heat Gain O , EFFECTIVE SPACE LOAD 32437 34670 844 Ventilation ( 0 cfm) 0 ( 0 cfm) 0 -0 Return Air Lighting Gain 01,_ Return Duct Conduction 324 347 Return Duct Leakage 649 ` 03; , - 17 ' Return Fan Heat Gain -1819 1819 TOTAL SYSTEM LOAD 31592 37529 860 3.1 tons .. 0.1 tons SYSTEM PERFORMANCE 122000 40738 8799 AT DESIGN CONDITIONS 3.4 tons 0.7'tons • SPACE HEATING & COOLING LOAD SUMMARY page 22 of 29 ....-Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 '- - ------- --- ------ Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No -------- Location: Palm Desert Date: 4/28/1389 f Checked By Documentation: MECHANICAL SYSTEMS DESIGN Date (User # 1965) ------------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: .DESIGN CONDITIONS -------------------- Peak ..Hour: Indoor Conditions: ., Outdoor..Conditions: LOAD -COMPONENT Wall Conduction Window Conduction -Door Conduction Roof- Conduc-tion Skylight. Conduction 'Floor Conduction Slab Conduction Interior Conduction Infiltration Solar Gain Lighting, Equipment Occupants SPACE LOADS HEATING Jan 1'2am 70 F DB 32 F DB Btu/hr 818 4599 0 656 0 0 1411 i� 3658 11142 Btu/hr LIVING COOLING SENSIBLE LATENT Aug 2pm 78 F DB 50 Z RH 112 F DB 73 F WB Btu/hr 590 4156 C) 816 A 0 3273 4592 39J 2 J J i. 491 259 14569 Btu/hr 1. 2 t� ins btu/hr 0 255 259 Btu/hr 0.0 tons .,-,SUPPLY-.'AIR QUANTITIES Heating: 11142 Btu/hr / 11.10 * (105 F Supply - 65'F TStat)] = 253 cfm Cooling: 14569 Btu/hr / 11.08 * ( 78 F TStat - 55.F Supply)] = 587 cfm ' SPACE HEATING °( COOLING LOAD SUMMARY ---------------------------------------------------------------------------- page 23 of 29 .Project- BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No Location: Palm Desert Date: 4/::8/ 1'38'3 Checked By Documentation: MECHANICAL SYSTEMS DESIGN -------- � Date CUser -------- #.1965) SUMMARY OF PEAK; HOUR'LOADS FOR SPACE Space Name: DEN COOLING DESIGN CONDITIONS HEATING ------- SENSIBLE LATENT Peak-Hour: Jan 12am Aug 2pm Indoor Conditions: 70-F DB 78 F DB 50,% RH Outdoor Conditions: 32 F DB 1122 F DB 73:F WB LOAD COMPONENT Btu/hr ------ Btu/hr Bt,u/hr' --------------------- Wall Conduction 734 ------ 529 -•---- Window Conduction 1131 10'22 Doerr Conduction 0 n Roof Conduction 382 476 Skylight Conduction 0 0 Floor Conduction 0 c7 Slab Conduction 1536 Interior C---)nductii@n 0 Infiltration 1719 1538 Solar Gain 1207 Lighting 229 w Equipment 286 , Occupants 151 .151 SPACE LOADS 5501 BtU/hr 5437 Btu/hr 151 Btu/hr 0.5 tons 0.0 .tans SUPPLY AIR QUANTITIES ----------------------- Heating: 5501 Bti-t/hr / 11. 10 * ( 105 F Supply - 65 F TStat) 1 = 125 cfm Cooling: 5437 Btu/hr / 11.08 * ( 78 F TStat - 55 F Supply)] = 219 cfm'. • " s • C ' SPACE HEATING & COOLING LOAD SUMMARY ---------------------------------------------------------------------------- page 24 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No Location: Palm Desert Date: 4/28/1989 Checked By Documentation: MECHANICAL -------------------- -------------------------------------------------------- ----------------,-=-------------------------------------------------------- SYSTEMS DESIGN ---- --- '- -- Date (User -------- #•1965) SUMMARY OF PEAK: HOUR LOADS SUMMAR FOR SPACE Space Name: MASTER BEDROOM ' COOLING ' DESIGN CONDITIONS HEATING SENSIBLE LATENT Peak Hour: Jan 12am Aug 2pm Indoor Conditions: 70 F DB 78 F DB 50 Y.•RH Outdoor C6nditions: 32 F DB 11:=' F DB 73 F WB LOAD COMPONENT Btu/hr Btu/hr Btu/hr Wall Conduction 2238 1615 Window Conduction 24'2'2 2160 Doer Conduction 0 Roof Conduction 1057 1316 " Skylight Conduction 0 0 Floor Conduction 0 0 Slab Conduction 3818 Interior Conduction 0 0 Infiltration 4137 3702 Solar Gain 1761 Lighting 633 Equipment 731 0 '. Occupants 417 417 SPACE LOADS 13672 BtLI/hr 12396 Btu/hr 417 Btu/hr 1.01 tons '10'.0 tons.. SUPPLY -AIR QUANTITIES ---------------------- --------------------Heating: 13672 Btl.A/hr / Heating: [1. 10 * ( 105 F Supply - 65 F TStat) ] = 311 cfm Cooling: 12396 Btu/hr / C1.08 * ( 78 F TStat - 55 F Supply)] = 499 cfm HVAC ZONE HEATING& COOLING LOAD SUMMARY ---------------------------------------------------------------------------------- page 25 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT ! ------------------ Building Permit No Location: Palm Desert Date: 4/28/1'389 � Chectied By Documentation: MECHANICAL SYSTEMS ------------------------------------------------------------------------------- DESIGN Date (User # 1965) ,HVAC ZONE DESCRIPTION HVAC Zone Name: A/C -2 HVAC System Name:. BDP 398Ao36060/568EJ036 System Multiplier: 1 Heating Schedule: Residential Heating Cooling Schedule: Residential Cooling Fan,Schedule: Residential Occupancy Si Method: Sizing eth COINCIDENT Relative Humidity: 50 X COOLING' SPACES IN THIS ZONE PEAK HEATING PEAK SENSIBLE LATENT ------------- BEDROOM #2t(Jan 12am) -- 8202 - (Aug 2pm) - 7510 ---202 ENTRY & HALL (Jan 12am) .7314 (Aug 2pm) 6382 148 KITCHEN (Jan. 12am) 2503 (Aug 2pm) 2529 108 DINING (Jan 12am) 5332 (Aug wpm) 6165 B1 TOTAL SPACE LOAD 23351 •22586 539 Bypass Ventilation Air ( 0 cfm) 0 c: i) cfm)' 0 -0 Supply Duct Conduction 1168 1129 Supply Duct Leakage 467 452 11' Supply Fan Heat Gain -1273 1273 EFFECTIVE SPACE LOAD 23713 25440 .550 Ventilation ( 0 cfm) 0 ( 0 cfm) .0 `' -0 Return Air Lighting Gain 0 .Return Duct Conduction 237 254 Return Duct Leakage 474 X09 it Return Fan Heat Gain 0 TOTAL SYSTEM LOAD 24424 26203 561 2.2 tons 0'.0 tons SYSTEM PERFORMANCE 61000) 24560 7684 ,.,- AT DESIGN' CONDITIONS 2.0 tons 0.6.tons-;,-, �t5 t • f ' SPACE HEATING & COOLING LOAD SUMMARY page 26 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT 5UND, ARCHITECT Building -Permit No Location: Palm Desert Date: 4/'28/1989 ' ------------------ 1 Checked By Documentation: MECHANICAL -------------------------------------------------------------------------------- SYSTEMS DESIGN Date (User # 1965) SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: BEDROOM #� COOLING DESIGN CONDITIONS HEATING SENSIBLE. LATENT { Peak Hour: Jan 12am Aug 2pm Indoor Conditions: 70 F DB 78 F DB 50 % RH Outdoor Conditions: 32 F DB 112 F DB 73 F. 'WB LOAD COMPONENT ---------------------------- Btu/hr Btu/hr ------- Btu/hr ------ Wall Conduction 1234 -890 Window Conduction 1696 1510 Door Conduction 0 0 , Roof Conduction 513 6313 Skylight Conduction 0 0 Floor Conduction 0 o Slab Conduction :635 Interior Conduction 0 0 Infiltration 2124 1900 ' Solar Gain 1676 Lighting 307 Equipment 384 0 Occupants 203 203 SPACE LOADS ------ ------ 8202 Btu/hr 7510 Btu/hr 202 Btu/hr ; 0.6 tons 0.0 tons. ' SUPPLY AIR DUANTITIES --------------- Heating; 8202 Btu/hr / E1.10 * (105 F Supply - 65 F TStat)] _, 186 cfm Cooling; 7510'Btu/hr / E1.08 * ( 78 F TStat - 55 F.Supply)] _, '302 cfm ` SPACE HEATING & COOLING LOAD SUMMARY page 27 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT- ------------------ Building Permit No Location: Palm Desert Date: 4/28/1989 ------------------ Checked By Documentation: MECHANICAL SYSTEMS DESIGN SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: ENTRY.& HALL COOLING ,. DESIGN CONDITIONS HEATING SENSIBLE LATENT -------------------- Peak Hour: ------- Jan 12am -------- Aug 2 pm Indoor Conditions: 70 F DB 78 F DB 50 % RH Outdoor Conditions: 32 F DB 112 F DB 73 F WB LOAD COMPONENT BtLt/hr Btu/hr Btu/hr Wall Conduction 1189 858 Window Conduction 1538 1390 Door Conduction 318 223 Roof Conduction 376 469 Skylight Conduction 0 0 - Floor Conduction 0 c) Slab Conduction 2200 Interior Conduction 0 0 Infiltration 1693 1515 Solar Gain 1272 Lighting 225 Equipment 282 0 Occupants 149 149 SPACE LOADS 7314 Btu/hr 6382 Btu/hr 148 Btu/hr' 0.5 tons 0.0 tons. SUPPLY AIR QUANTITIES ------------------- Heating:, .7314 BtLt/hr / C1.10 * (105 F Supply - 65 F TStat)3 = 166 cfni Cooling: 6382 Btu/hr / C1.08 * c 78 F TStat - 55.F Supply)3 = 257 cfm SPACE HEATING & COOLING LOAD SUMMARY page 28 of 29 Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No ' -------- Location: Palm Desert Date: 4/291/1989 Checked By — Documentation: MECHANICAL SYSTEMS DESIGN Date (User #1565) ----------------------------------------------------------------=------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: KITCHEN DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT ------------ Wall Conduction Window Conduction Door Conduction Roof Conduction - Skyl.ight Conduction Floor Conduction Slab Condu'ction Interior Conduction Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES -------------------- •Heating: 2503 Btu/hr / C1. 10 * (:105 F Supply - 65 F TStat) ] = 57 cfm Cooling: 2529 Btu/hr / 11.08 * ( 78 F TStat - 55 F Supply)] = 102 ,cfm , COOLING HEATING SENSIBLE LATENT .Jan 12am Aug '2pm 70 F DB 78 F DB 50 % RH 32 F DP 112 F DB 73 F WB Btu/hr Btu/hr Btu/hr 286 206 377 341 C) 0 274 341 0 0 0 c� 581 0 0 985 881 283 164 05 0 108 108' 2503 BtLc/hr 2529 BtLc/hr.' 108 btu/hr,' 0.2 tons. ,, 0.0 tons.,' SUPPLY AIR QUANTITIES -------------------- •Heating: 2503 Btu/hr / C1. 10 * (:105 F Supply - 65 F TStat) ] = 57 cfm Cooling: 2529 Btu/hr / 11.08 * ( 78 F TStat - 55 F Supply)] = 102 ,cfm , 0 ' SPACE HEATING & COOLING.LOAD ------------------------------------------------------------------------ SUMMARY. page 29 of 29 -- Project: BUETTNER RESIDENCE COMPLY 24 v 2.20 Designer: JOHN ROBERT BUND, ARCHITECT Building Permit No Location: Palm Desert Date: 4/:28/1989 Checked Py Documentation: MECHANICAL - -- --------------------------------------------------------- SYSTEMS DESIGN -------------- 1 Date (User # 1965) SUMMARY OF .PEAK HOUR LOADS FOR SPACE i Space Name: DINING COOLING DESIGN CONDITIONS HEATING SENSIBLE LATENT }-------------------- ------- -------- --'- - Peak Hour: Jan 12am Aug 2pm Indoor Conditions: 70 F DB 78 F DB 50 X RH ' ' 'Outdoor'Conditions: 32 F DB 112 F DB 73 F WB LOAD COMPONENT Btu/hr Btu/hr BtL(/hr ;j -- - - - - - - - - - - - - - - - - - -- ------ - - - - -- - - - --- } Wall Conduction 366 264 Window Conduction 1855 1676 Door' Conduction 0 Roof Conduction 205 2'56 Skylight Conduction 0 0 Floor Conduction 1'383 1062 Slab Conduction 0 Interior Conduction 0 0 Infiltration 923 826 Solar Gain 1724 Lighting 123 Equipment 154 0 Occupants 81 81 SPACE LOADS 533'2 Btu/ter 6165 Btu/hr 81 Btu/hr 0.5 tons 0.0 tons SUPPLY AIR OUANTITIES --------------------- Heating: 5332 Btu/hr / C1. 10 * x:105 F Supply - 65 F TStat)I = 121 cfm Coaling: 6165 Btu/hr / 11.08 * ( 70 F TStat - 55 F Supply)] = 248 cfm 0 ::;2 __14 PE-iE PA FEE 1-Z E5 N" ` JOHN R. BUND ARCHITECT, 'NAME ------- Buettner ' ^DRESS ---- Ave. El Nido 'J#ATE ------- 3/25/89 . .` LA QUINTA, CA (619)564-3363 .ENERGy CONSERVATION DESIGN 'ANUAL, FORM 2, HEAT`. LOSSES |^.YYANUAL J FOR COOLING LOSSES ' .ARQBLDG 3030 SO. FT..PERIMETER 337.5556 SO. FT. R VALUES FLOOR 0 ..CEILING 38 ..WALL 19 ` ,,INSULATION 419A NORTH WINDOWS 321 SOXT. PERCENT OF ARIA 6 �;AFKA,EAS`T WINDOWS 10S SOXT. PERCENT OF AREA 3.55497 VAREAcSOUTH WINDOWS 144 SO.A. PERCENT OF AREA 739961 QR9P WEST WINDOWS 19S SOXT. PERCENT OF AREA 17446 ATAL.WINDOW AREA 771 SOXT. PERCENT OF AREA 5.37854 THE U VALUE OF THE WINDOWS IS .65, DUAL PANE THIS BLDG USES DRAPES & FLAT SHADING DEVICES* ON WINDOWS :AMiMiAlinds, rollar shades, venetian blinds or vertical blinds) ME TOTAL S.C. OF THE WINDOWS IS 0.30 TINTERIOR THERMAL MASS AREA = 1250 SQ FT JINFILTRATION (STD 0.01e, MED 0.014, TIGHT 0.012) = .018 `f -_ _q--_- 4FOOTING LOSSES ... 11719.93 BTU KEILING LOSSES... 2384.253 BTU WINDOW LOSSES.. 15535.65 BTU WALL LOSSES.... 2917.696 BTU INFILTRATION LOSSES... 13561.63 BTU ,TOTAL HEAT LOSSES BTU/HR.. 4611?.16 `GAS FURNANCE SIZE -413665.1 BTU OR 45,000 BTU EOUTING 83 BTU '`Q-�,._ LOSSES. V. _-._' 456 _.- / /|918.53 BTU ' .867 BTU ~ ILTRATION LOSSES... 5832.96 BTU - wk PEOPLE... 5 COOLING LOSSES'... 2000 'K 1500 BTU LOSSES INCLUDED IN TOTAL C0OLINGAOSSES 59795.57 BTU ^ . , ' . .� . . I]