Loading...
ENC2021-0057 AY 10-13-2021 10-13-2022 51 PROJECT LOCATION MAP AVENUE 52 MONROE STAVENUE 53 AVENUE 50 VANBUREN STJACKSON STCALHOUN STPROJECT THE APPLICATION OF THE SPECIFICATION FOR THE WORKSITE TRAFFIC CONTROL SHALL CONFORM TO THE STATE OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES ( CA MUTCD ), CHAPTER 6 OF THE 2014 EDITION, THE WORK AREA TRAFFIC CONTROL HANDBOOK ( WATCH MANUAL ), LATEST EDITION, CALTRANS SPECIFICATIONS AND STANDARD PLANS, AND THE COUNTY OF RIVERSIDE STANDARDS LATEST EDITIONS. THE COUNTY OF RIVERSIDE HAS THE RIGHT TO OBSERVE THE TRAFFIC CONTROL IN USE AND TO MAKE ANY CHANGES DEEMED NECESSARY BY FIELD CONDITIONS. ANY CHANGES SHALL SUPERSEDE THESE PLANS AND WILL BE DONE SOLELY AT THE CONTRACTORS EXPENSE. 5.1. 2.THE NAME AND PHONE NUMBER ( 24-HOUR AVAILABILITY ) OF THE CONTRACTOR’S SAFETY COORDINATOR AND TRAFFIC CONTROL DEVICE MAINTENANCE INSPECTOR SHALL BE PROVIDED TO THE CITY INSPECTOR. ANY CHANGE IN THE ASSIGNED PERSONNEL OR PHONE NUMBER SHALL BE REPORTED IMMEDIATELY TO THE INSPECTOR. THE CONTRACTORS SAFETY COORDINATOR AND/OR TRAFFIC CONTROL DEVICE MAINTENANCE INSPECTOR SHALL MAKE PERIODIC INSPECTIONS OF TRAFFIC CONTROL DEVICES THROUGHOUT THE DAY AND NIGHT TO INSURE THAT CONTROLS ARE PROPERLY LOCATED AND IN GOOD REPAIR. THE ABOVE PERSONNELL SHALL HAVE THE WORKSITE TRAFFIC CONTROL PLANS ON SITE AND AVAILABLE AT ALL TIMES. 3.IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING WORK FOR THE PROJECT TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE COUNTY. THE TRAFFIC CONTROL PLAN INSTALLED SHALL PROVIDE FOR SAFE MOVEMENT OF VEHICULAR AND PEDESTRIAN TRAFFIC THROUGH AND AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 6.ORANGE COLORED ENGINEERING GRADE REFLECTIVE OR BRIGHTER SHEETING SHALL BE USED AS THE BACKGROUND FOR ALL CONSTRUCTION MAINTENANCE WORK ZONE AND WARNING SIGNS USED WITHIN THE WORKSITE TRAFFIC CONTROL AREA. IF NOT SPECIFIED BY THE STANDARDS LISTED IN NOTE 1 ON THIS PLAN. 7.ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE REMOVED FOLLOWING THE COMPLETION OF THE CONSTRUCTION PHASE. THE PERMANENT TRAFFIC CONTROL DEVICES SHALL BE RESTORED BY THE CONTRACTOR AS OPERATIONS REVERT BACK TO THE DEVICES’ INTENDED USE. 8.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ACCESS TO ALL PUBLIC AND PRIVATE DRIVEWAYS IN THE CONSTRUCTION AREA NOT RELATED TO THE SPECIFIC PROJECT. CONTRACTOR IS TO NOTIFY NEIGHBORING BUSINESSES 72-HOURS IN ADVANCE OF CONSTRUCTION. 4.ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 9.ALL NECESSARY ENCROACHMENTS PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 10.ALL CONFLICTING SIGNS SHALL BE COVERED. 11.THE CONTRACTOR SHALL REMOVE ANY EXCESS AND/OR CONFLICTING STRIPING AND PAVEMENT MARKERS AS NECESSARY BY GRINDING. 12.THE CONTRACTOR SHALL PLATE OPEN TRENCHES AT THE END OF EACH WORK DAY PER CALTRANS STEEL PLATE BRIDGING UTILITY PROVISIONS TR-0157. GENERAL TRAFFIC CONTROL NOTES: All traffic control devices shall conform to the latest edition of California Manual on Uniform Traffic Control Devices(CA MUTCD), and the Standard Specifications for Public Works latest edition. All traffic control devices shall be removed from view when not in use. Trenches must be back filled or plated during non-working hours. Pedestrian controls shall be provided as shown on the plans. Temporary “NO PARKING” signs will be posted 72 hours prior to commencing work. Access to driveways will be maintained at all times unless other arrangements are made. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction. All striping removed or damaged, will be replaced by the contractor within 24 hours ( or replaced with temporary tape ). All workers shall be equipped with an class three vest ( or a reflective vest at night ). All flaggers shall also be equipped with a hard hat, C28 “Stop/Slow” paddle and shall be trained in the proper fundamentals of flagging traffic. Any work that disturbs normal traffic signal operations shall be coordinated with the Traffic Division, 48 hours prior to beginning of construction. The contractor shall maintain all traffic control devices 24 hours per day and 7 days a week. A minimum of ten ( 10 ) foot travel lanes must be maintained unless otherwise approved by Public Works. A solar powered flashing arrow board shall be required on all arterial street closures. CONTRACTOR INSTRUCTIONS 3. 12. 13. 14. 15. 2. 4. 5. 6. 7. 8. 9. 10. 11. 1. TWENTY FOUR HOUR CONTACT FOR THIS PROJECT WILL BE: ALEJANDRO SALAZAR (760) 909-1709. 1. 2. 3. WORK PERFORMED IS FOR RESURFACING. WORK HOURS WILL BE: SEE SPECS. THIS PROJECT IS EXPECTED TO TAKE: SEE SPECS. NOTE: The County Engineer or his representative has the authority to initiate field changes to assure public safety. 4. Work hours shall be: See specs. NO. TEMPORARY TRAFFIC CONTROL PLANS COUNTY OF RIVERSIDE PORTABLE CONE / WITH WHITE SLEEVE TYPE III BARRICADE WITH SIGN TEMPORARY TRAFFIC CONTROL SIGN DIRECTION OF TRAVEL SIGNALIZED INTERSECTIONS FLASHING ARROW SIGN SPRING STAND AREA OF CONSTRUCTION FLAGGER STATION N.T.S. NN GRANITE CONSTRUCTION 52ND AVENUE RESURFACING FROM MONROE STREET TO VAN BUREN ST 10/04/2021(760) 501-1716 019 1135263 238-1 RA ITE DESIGNED BY: DRAWN BY: CHECKED BY: CRAIG PITTS 21 JARED ROBB (909) 223-1898 patriottdinc@gmail.com DESCRIPTION OF REVISION DATE CITY APPROVED SEAL OF DRAWING NO SHEET patriot traffic designs.inc.patriot traffic designs.inc. CRAIG PITTS (951) 379-2425 patriottdinc@gmail.com D I RT 1-800-227-2600 JARED ROBB CRAIG PITTS CRAIG PITTS JARED ROBB JARED ROBB JOB #ACCOUNT # DATE:PHONE: PRIME CONTRACTOR: PROJECT NAME: REVISED SIGNATURE DATE OCT 04 2021 GRANITE CONSTRUCTION 52ND AVENUE RESURFACING FROM MONROE STREET TO VAN BUREN ST 10/04/2021(760) 501-1716 019 1135263 238-1 RA ITE DESIGNED BY: DRAWN BY: CHECKED BY: CRAIG PITTS 21 JARED ROBB (909) 223-1898 patriottdinc@gmail.com DESCRIPTION OF REVISION DATE CITY APPROVED SEAL OF DRAWING NO SHEET patriot traffic designs.inc.patriot traffic designs.inc. CRAIG PITTS (951) 379-2425 patriottdinc@gmail.com D I RT 1-800-227-2600 JARED ROBB CRAIG PITTS CRAIG PITTS JARED ROBB JARED ROBB JOB #ACCOUNT # DATE:PHONE: PRIME CONTRACTOR: PROJECT NAME: REVISED SIGNATURE DATE OCT 04 2021STOPSTOPAHEAD STOPAHEAD STOPSTOPBIKELANEMONROE ST (50 MPH)STOPSTOPSTOPSTOPSTOPSTOPBIKELANEMONROE ST (50 MPH) STOP COUNTY OF RIVERSIDECITY OF LA QUINTA CITY OF INDIO STOPSTOPSTOPSTOPAHEAD STOPAHEAD JACKSON ST (50 MPH)STOPSTOPJACKSON ST (55 MPH) STOP STOPSTOPSTOPAVENUE 52 (55 MPH) CITY OF INDIO COUNTY OF RIVERSIDE COUNTY OF RIVERSIDE COUNTY OF RIVERSIDE CITY OF INDIO MONROE ST AVENUE 52 JACKSON ST AVENUE 50 AVENUE 53 500’ W20-1 ROAD WORK AHEAD M4-10(L) DETOUR R11-2 ROAD CLOSED R5-1 DO NOT ENTER 350’ 350’ W20-1 ROAD WORK AHEAD W20-2 DETOUR AHEAD R3-1 SC3(CA) DETOUR 350’ W20-3 ROAD CLOSED AHEAD W20-2 DETOUR AHEAD 25’ MAX C30(CA) LANE CLOSED M4-10(L) DETOUR C30(CA) LANE CLOSED C30(CA) LANE CLOSED SC3(CA) DETOUR R3-2 G20-2 END ROAD WORK G20-2 END ROAD WORK AVENUE 52 (55 MPH) MATCH LINE A SEE ABOVE RIGHT AVENUE 52 (55 MPH) SEE BELOW LEFT MATCH LINE A R3-4 10’ MINIMUM 10’ MINIMUM 50’ MAX G20-2 END ROAD WORK 500’ W20-1 ROAD WORK AHEADG20-2 END ROAD WORK 350’ W20-1 ROAD WORK AHEAD G20-2 END ROAD WORK R11-2 ROAD CLOSED PROJECT M4-10(L)DETOURM4-10(L)DETOURM4-8a END DETOUR M4-10(R) DETOUR M4-10(R)DETOURM4-8aENDDETOURDETOUR DETAIL AVENUE 52 (50 MPH) G20-2 END ROAD WORK 350’ 350’ 350’ 350’ M4-10(L) DETOUR M4-10(R) DETOUR GRAPHIC SCALE [ IN FEET ] 060 30 60 120 1 INCH = 60 FEET 2 SEE PAGE ONE FOR CONTRACTOR NOTES. -DRIVEWAY NOT SHOWN ON PLAN SHALL REMAIN OPEN AT ALL TIMES AS CONSTRUCTION PERMITS. NN 25' MAX W20-1 ROAD WORK AHEAD W20-2 DETOUR AHEAD W20-5(L) LEFT LANE TURNS LEFT AHEAD 5 GRANITE CONSTRUCTION 52ND AVENUE RESURFACING FROM MONROE STREET TO VAN BUREN ST 10/04/2021(760) 501-1716 019 1135263 238-1 RA ITE DESIGNED BY: DRAWN BY: CHECKED BY: CRAIG PITTS 21 JARED ROBB (909) 223-1898 patriottdinc@gmail.com DESCRIPTION OF REVISION DATE CITY APPROVED SEAL OF DRAWING NO SHEET patriot traffic designs.inc.patriot traffic designs.inc. CRAIG PITTS (951) 379-2425 patriottdinc@gmail.com D I RT 1-800-227-2600 JARED ROBB CRAIG PITTS CRAIG PITTS JARED ROBB JARED ROBB JOB #ACCOUNT # DATE:PHONE: PRIME CONTRACTOR: PROJECT NAME: REVISED SIGNATURE DATE OCT 04 2021 M4-10(L) DETOUR M4-10(R) DETOUR R11-2 ROAD CLOSED R5-1 DO NOT ENTERSTOPSTOPSTOPSTOPAHEAD STOPAHEAD JACKSON ST (50 MPH)STOPSTOPJACKSON ST (55 MPH) STOP STOPSTOPSTOPAVENUE 52 (55 MPH) CITY OF INDIO COUNTY OF RIVERSIDE COUNTY OF RIVERSIDE COUNTY OF RIVERSIDE 500’500’ C30(CA) LANE CLOSED R3-2 SC3(CA) DETOUR 350’ C30(CA) LANE CLOSED R3-2 W20-2 DETOUR AHEAD 350’ W20-1 ROAD WORK AHEAD C30(CA) LANE CLOSED R3-2 BIKE LANEBIKELANE12’ MINIMUMSC3(CA) DETOUR C30(CA) LANE CLOSED R3-2 250’ W20-1 ROAD WORK AHEADG20-2 END ROAD WORK R3-7(R) RIGHT LANE MUST TURN RIGHT C30(CA) LANE CLOSED AVENUE 52 (55 MPH) S TRAFFIC LIGHT SHALL BE PLACED ON RED FLASHING FOR SIGNAL OPERATIONS 72 HOUR ADVANCE NOTICE. S BIKE LANE BIKE LANE BIKE LANE SIGNALAHEADAVENUE 52 50 MPH VAN BUREN AVE 45 MPH VAN BUREN AVE 45 MPH M4-10(L) DETOUR M4-10(R) DETOUR R11-2 ROAD CLOSED R5-1 DO NOT ENTER R3-1 SC3(CA) DETOUR R3-1 SC3(CA) DETOUR 350’ W20-1 ROAD WORK AHEAD 350’350’ 500’ 350’ CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA PHASE 2PHASE 1AVENUE 52 JACKSON ST VAN BUREN STCALHOUN STAVENUE 53 M4-10(L)DETOURM4-10(R)DETOURR11-2ROADCLOSED350’W20-3ROADCLOSEDAHEAD350’M4-8aENDDETOURM4-8aENDDETOURM4-10(R) DETOUR M4-8aENDDETOURM4-8aENDDETOURM4-10(L) DETOUR DETOUR DETAIL AVENUE 54 AVENUE 55 R11-4 ROAD CLOSED TO THRU TRAFFIC M4-10(L) DETOUR M4-10(R) DETOUR R11-2 ROAD CLOSED M4-10(L)DETOURM4-10(R)DETOURSC3(CA) DETOUR SC3(CA) DETOUR SC3(CA) DETOUR 350’ W20-3 ROAD CLOSED AHEAD SC3(CA)DETOURSC3(CA)DETOURSC3(CA)DETOURSC3(CA)DETOURM4-10(R)DETOURM4-10(L)DETOUR350’R11-4ROAD CLOSEDTOTHRU TRAFFICM4-10(L)DETOURM4-10(R)DETOUR350’350’ SC3(CA) DETOUR350’350’W20-3ROADCLOSEDAHEAD350’R11-2ROADCLOSEDR11-2ROADCLOSED350’W20-3ROADCLOSEDAHEADR11-4ROAD CLOSEDTOTHRU TRAFFICM4-10(L)DETOURM4-10(R)DETOUR350’350’ 350’350’R11-2ROADCLOSEDR11-2ROADCLOSEDW20-3ROADCLOSEDAHEAD350’W20-3ROADCLOSEDAHEAD350’W20-1ROADWORKAHEAD350’W20-1ROADWORKAHEAD350’W20-2DETOURAHEADW20-2DETOURAHEADW20-2DETOURAHEADW20-2DETOURAHEADW20-2 DETOUR AHEADM4-10(L)DETOURM4-10(R)DETOURW20-3ROADCLOSEDAHEADW20-3ROADCLOSEDAHEADW20-3ROADCLOSEDAHEADW20-3ROADCLOSEDAHEADW20-3 ROAD CLOSED AHEAD M4-10(L)DETOURM4-10(R)DETOUR350’W20-2DETOURAHEADW20-1ROADWORKAHEAD350’W20-1ROADWORKAHEAD350’ DETOUR DETAIL 500’ W20-1 ROAD WORK AHEAD G20-2 END ROAD WORK R3-1 GRAPHIC SCALE [ IN FEET ] 060 30 60 120 1 INCH = 60 FEET 3 SEE PAGE ONE FOR CONTRACTOR NOTES. -DRIVEWAY NOT SHOWN ON PLAN SHALL REMAIN OPEN AT ALL TIMES AS CONSTRUCTION PERMITS.AVENUE 52JACKSON STVAN BUREN STCALHOUN ST AVENUE 51AVENUE 53R11-4ROAD CLOSEDTOTHRU TRAFFICM4-10(L)DETOURM4-10(R)DETOURM4-10(L)DETOURM4-10(R) DETOUR R11-4ROAD CLOSEDTOTHRU TRAFFICM4-10(L)DETOURM4-10(R)DETOURW20-3ROADCLOSEDAHEADW20-3ROADCLOSEDAHEADSC3(CA)DETOURM4-8a END DETOURM4-8aENDDETOURM4-10(L) DETOURSC3(CA)DETOURSC3(CA)DETOURSC3(CA)DETOURM4-10(R)DETOURM4-8a END DETOURM4-8aENDDETOURM4-10(L)DETOURM4-10(R)DETOURDETOUR DETAIL SEE DETOUR DETAIL ABOVE LEFT FOR CALHOUN ST ROAD CLOSURE. SC3(CA) DETOUR W20-2 DETOUR AHEAD W20-2 DETOUR AHEAD G20-2 END ROAD WORK G20-2 END ROAD WORKM4-10(R)DETOURM4-10(L)DETOUR350’350’W20-2DETOURAHEADM4-10(L)DETOURM4-10(R)DETOURW20-3 ROAD CLOSED AHEAD W20-3 ROAD CLOSED AHEADR11-2ROADCLOSEDR11-2ROADCLOSED350’350’W20-2DETOURAHEADM4-10(L)DETOURM4-10(R)DETOUR350’ 350’ NNW20-3ROADCLOSEDAHEADPHASE 1R3-7(R) RIGHT LANE MUST TURN RIGHT R61-19(CA) ONLY ONLY R61-19(CA) ONLY ONLY NN NN W20-3ROADCLOSEDAHEAD5 COUNTY OF RIVERSIDE GRANITE CONSTRUCTION 52ND AVE RESURFACING FROM MONROE STREET TO VAN BUREN ST 10/04/2021(760) 501-1716 019 1135263 DESIGNED BY: DRAWN BY: CHECKED BY: CRAIG PITTS 21 JARED ROBB (909) 223-1898 patriottdinc@gmail.com ENGINEER, TRAFFIC DIVISION DATE TRAFFIC DIVISION DATE RECOMMENDED BY: APPROVED BY: PERMIT ENGINEER OPERATIONS SUPPORT DIVISION DATE DESCRIPTION OF REVISION DATE CITY APPROVED SEAL OF DRAWING NO DEPARTMENT OF PUBLIC WORKS SHEET patriot traffic designs.inc.patriot traffic designs.inc. CRAIG PITTS (951) 379-2425 patriottdinc@gmail.com D I RT 811 JARED ROBB CRAIG PITTS CRAIG PITTS JARED ROBB JARED ROBB JOB #ACCOUNT # DATE:PHONE: PRIME CONTRACTOR : PROJECT NAME : REVISEDOCT 04 2021 GRAPHIC SCALE [ IN FEET ] 060 30 60 120 1 INCH = 60 FEET 4 NN S BIKE LANE BIKE LANE BIKE LANE SIGNALAHEADBIKE LANE SIGNAL AHEADSIGNALAHEAD SIGNALAHEADAVENUE 52 50 MPH VAN BUREN AVE 45 MPH VAN BUREN AVE 45 MPH AVENUE 52 50 MPH BIKELANECITY OF COACHELLA CITY OF COACHELLA S BIKE LANE BIKE LANE BIKE LANE SIGNALAHEADBIKE LANE SIGNAL AHEADSIGNALAHEAD SIGNALAHEADAVENUE 52 50 MPH VAN BUREN AVE 45 MPH VAN BUREN AVE 45 MPH AVENUE 52 50 MPH BIKELANECITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA 100’350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 100’ GATE CONE 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK 12’ MIN.12’ MIN.100’350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 12’ MIN. 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE12’ MIN.TRAFFIC LIGHT SET TO FLASHING RED 350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 100’ GATE CONE 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK 12’ MIN.12’ MIN.100’350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 12’ MIN. 100’ 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE12’ MIN.TRAFFIC LIGHT SET TO FLASHING RED 25' MAX R4-7a KEEP RIGHT 25' MAX R4-7a KEEP RIGHT 5 238-1 COUNTY OF RIVERSIDE GRANITE CONSTRUCTION 52ND AVE RESURFACING FROM MONROE STREET TO VAN BUREN ST 10/04/2021(760) 501-1716 019 1135263 DESIGNED BY: DRAWN BY: CHECKED BY: CRAIG PITTS 21 JARED ROBB (909) 223-1898 patriottdinc@gmail.com ENGINEER, TRAFFIC DIVISION DATE TRAFFIC DIVISION DATE RECOMMENDED BY: APPROVED BY: PERMIT ENGINEER OPERATIONS SUPPORT DIVISION DATE DESCRIPTION OF REVISION DATE CITY APPROVED SEAL OF DRAWING NO DEPARTMENT OF PUBLIC WORKS SHEET patriot traffic designs.inc.patriot traffic designs.inc. CRAIG PITTS (951) 379-2425 patriottdinc@gmail.com D I RT 811 JARED ROBB CRAIG PITTS CRAIG PITTS JARED ROBB JARED ROBB JOB #ACCOUNT # DATE:PHONE: PRIME CONTRACTOR : PROJECT NAME : REVISEDOCT 04 2021 GRAPHIC SCALE [ IN FEET ] 060 30 60 120 1 INCH = 60 FEET 5 NN S BIKE LANE BIKE LANE BIKE LANE SIGNALAHEADBIKE LANE SIGNAL AHEADSIGNALAHEAD SIGNALAHEADAVENUE 52 50 MPH VAN BUREN AVE 45 MPH VAN BUREN AVE 45 MPH AVENUE 52 50 MPH BIKELANECITY OF COACHELLA CITY OF COACHELLA S BIKE LANE BIKE LANE BIKE LANE SIGNALAHEADBIKE LANE SIGNAL AHEADSIGNALAHEAD SIGNALAHEADAVENUE 52 50 MPH VAN BUREN AVE 45 MPH VAN BUREN AVE 45 MPH AVENUE 52 50 MPH BIKELANECITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA CITY OF COACHELLA 100’350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 100’ GATE CONE 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK 12’ MIN.12’ MIN.350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 12’ MIN. 100’ 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE12’ MIN.TRAFFIC LIGHT SET TO FLASHING RED 100’350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE GATE CONE 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK 12’ MIN.12’ MIN.100’350’350’350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE 12’ MIN. 100’ 350’ 350’ 350’ W20-1 ROAD WORK AHEAD W20-4 ONE LANE ROAD AHEAD C9A(CA) G20-2 END ROAD WORK GATE CONE12’ MIN.TRAFFIC LIGHT SET TO FLASHING RED 25' MAX R4-7a KEEP RIGHT 25' MAX R4-7a KEEP RIGHT 5 238-1 5/26/2021969-UU 05/28/21969-UU City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number ENC2021-0057 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta’s right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK-LAYING CONSTRUCTION EQUIPMENT: Cleated track-laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother-faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber-tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2”) of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE-WATER OPERTATIONS: If de-watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: R1 NOTIFICATION: Permittee shall notify the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub-base course having an “R” value of not less than ( ** N/A ** ) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (¼”) to one foot (1’). R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( ** N/A ** ) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 ½”) of A.C. paving on ( ** N/A ** ) of class ( ** N/A ** ) aggregate base. R9 SIGHT CLEARANCE: Sight Clearance of six-hundred feet (600’) in all directions shall be assured and maintained at all times. R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer’s specifications. City of La Quinta R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one-thousand feet (1000’) of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit-mix sand or equivalent and shall be placed on lifts not greater than three feet (3’) and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5’) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one- thousand (1000’) feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2”) of SC-800 shall be placed on a prepared sub-grade. The SC-800 temporary paving shall be placed after a maximum of three-thousand linear feet (3000’) or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of two inches (2”) of SC-800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La Quinta Standard 600 shall be placed no later than ( 5 ) days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five-hundred feet (500’) at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO. ENC2021-0057 Riverside County Road Resurfacing and Reconstruction Project / Traffic Control Only Within City of La Quinta / Ave 52 at Monroe St Special Conditions Page 1 of 5 In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. The permittee may only work at night if approved by the City Manager. Night work may be halted if the city receives complaints about the work. 3. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 4. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097 before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection. 5. Prior to commencing the excavation of a trench 5 feet in depth or greater and into which a person will be required to descend, the Contractor shall first obtain a permit to do so from the Division of Industrial Safety pursuant to 7-10.4.1. 6. Granite Construction Company (Ricardo Campos), hereinafter referred to as “Permittee”, shall be responsible for providing continuous dust and erosion control. 7. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 8. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday-Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday-Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) neither before 8:30 a.m. nor after 4:30 p.m. 9. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the City Traffic Signal Maintenance Division at (760) 777-7070 if signal operation at the intersection is to be altered in any way. PERMIT NO. ENC2021-0057 Riverside County Road Resurfacing and Reconstruction Project / Traffic Control Only Within City of La Quinta / Ave 52 at Monroe St Special Conditions Page 2 of 5 10. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 11. The permittee shall place temporary no parking signs along the parking area affected by the construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and removed immediately after the construction completion date. 12. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 811. It shall be the Permittee’s responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 13. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), at residential streets, advance warning signs and traffic control shall be installed and maintained in accordance the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). On Collectors to Arterial Streets, the permittee must submit a traffic control plan which shall be from or prepared under the guidance of the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). Traffic Control plans not from the CA MUTCD or the WATCH shall be signed and stamped by a civil or traffic engineer registered in the State of California. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 14. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 15. The City of La Quinta reserves the right to require modifications of the work be made at permittee’s sole cost for proper sight distance requirements per guidelines in the AASHTO “A Policy on Geometric Design of Highways and Streets, 5th Edition” or latest, in the installation of all appurtenances abutting and within the public street right-of-way. 16. The issuance of this permit and the City approval of the related construction improvement plans do not provide a vested entitlement for all design parameters that may have been utilized for the plans. As such, plans approved for this permit may be “at risk” for further modifications as it relates to any follow up improvement plan requirements as required by the city or existing errors & omissions by the architect or engineer of record. PERMIT NO. ENC2021-0057 Riverside County Road Resurfacing and Reconstruction Project / Traffic Control Only Within City of La Quinta / Ave 52 at Monroe St Special Conditions Page 3 of 5 17. The permittee is responsible for obtaining a valid separate permit from other Cities, County jurisdictions, or other agencies if any of the work or traffic control devices extend into the other Cities, County, or agencies right of way. 18. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 19. Work within 500 feet of any designated School Zone shall be performed between the hours of 8 a.m. – 1:30 p.m. Traffic control shall be set up after 8 a.m. and removed before 1:30 p.m. 20. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Associate Engineer) of the private land owner whom is being encroached upon. 21. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, a traffic control plan for review and approval prior to start of construction or parking on the paved R/W. 22. The permittee is required to provide an informative message board (approved by the City Engineer) informing the commuters using the affected roadways of a. Possible traffic delays b. Time of construction c. Alternate routes. The message board shall be provided for the commuters 48 hours prior to the start of traffic delays, and the entire message should be readable at the posted speed limit. 23. All landscaping, irrigation, decorative rock, decorative concrete, sidewalk, lighting, etc., shall be replaced to its original condition. 24. Access and egress to all local properties shall be maintained at all times. 25. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 26. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. PERMIT NO. ENC2021-0057 Riverside County Road Resurfacing and Reconstruction Project / Traffic Control Only Within City of La Quinta / Ave 52 at Monroe St Special Conditions Page 4 of 5 27. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 28. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 29. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. 30. Flagger Requirements A. Minimum Requirements 1. Receive and communicate specific instructions clearly, firmly, and courteously; 2. Move & maneuver quickly; 3. Provide clear and positive guidance; 4. Understand and apply safe traffic control practices; 5. Recognize dangerous traffic situations in sufficient time to avoid injury. B. Flagger Safety Apparel 1. Background a. Fluorescent orange-red, or b. Fluorescent yellow-green 2. Retroreflective material (Orange, yellow, white, silver, yellow-green, or fluorescent version. 3. Material shall be visible at 1000 ft 4. Apparel shall be designed to identify the wearer as a person 5. Law enforcement personnel should adhere to the same standard C. Hand-Signaling Devices 1. Stop/Slow paddle octagonal in shape with minimum 18” width and 6” letters. Must have white legend on red background. D. Directing Traffic 1. Only three (3) signals are required. STOP SLOW PROCEED PERMIT NO. ENC2021-0057 Riverside County Road Resurfacing and Reconstruction Project / Traffic Control Only Within City of La Quinta / Ave 52 at Monroe St Special Conditions Page 5 of 5 E. Flagger Communications 1. If work area is too long for relay (2 flaggers can’t see each other) a. One flagger given the responsibility to coordinate b. Use Radios or c. Field phones F. Flagger warning signs must be removed or covered when flagging is finished, when work is not going to start immediately, or when work is completed.