2011-05 Dune Palms Bridge - Plans & DrawingsMHMHMHAHEA
D
AHEA
D
SIGNAL
SIGN
A
L STOPSTOPSTOPMHMHMHMHMHMHMHMHMHMHMHMHMH2
4
1
3
31
28
30
OFFICE
85
61
86
60
37
36 MHBIKELANEBIKELANEBIKELANEMH12+00 13+00 14+0011+00 15+00 16+0010+00 24+00 25+00 26+00 34+0027+00 28+00 29+00 30+00 31+00 32+00 33+00 35+00 36+0023+0018+00 21+0019+00 22+0020+0017+00
CVSCWSWS
WSM
VNOPARKINGPR
O
J
E
C
T
AVE 48JEFFERSON STLa Quinta
SI
T
EWASHINGTON STMILES
AVE
HWY 111 INDIO BLVDFRED WARING DR
Indian
Wells
Indio
DUNE PALMS DRADAMS STDUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
LOCATED IN A PORTION OF THE N.E. 1/4 OF SECTION 29, TOWNSHIP 5 SOUTH, RANGE 7 EAST, S.B.M.
FEDERAL AID PROJECT #BRNBIL(537)
VICINITY MAP
N.T.S.
GENERAL NOTES:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA AND THE LATEST EDITION OF
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO APPLY TO THE CITY OF LA QUINTA DESIGN & DEVELOPMENT DEPARTMENT FOR THE NECESSARY
PERMITS AND TO BE RESPONSIBLE FOR SATISFACTORY COMPLIANCE FOR ALL CURRENT ENVIRONMENTAL REGULATIONS DURING THE LIFE OF CONSTRUCTION
ACTIVITIES FOR THE PROJECT. ADDITIONAL STUDIES AND/OR PERMITS MAY BE REQUIRED.
3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AS REQUIRED BY THE CITY OF LA QUINTA OR OTHER GOVERNING AGENCIES.
4. THE CONTRACTOR SHALL NOTIFY THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT FORTY-EIGHT (48) HOURS PRIOR TO ANY GRADING, BRUSHING, OR
CLEARING AND EACH PHASE OF CONSTRUCTION AT (760) 777-7048.
5. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL, REPLACEMENT, OR RELOCATION OF ALL REGULATORY, WARNING AND GUIDE SIGNS.
7. THE CITY ENGINEER SHALL APPROVE THE DESIGN AND INSTALLATION OF ALL STREET NAME SIGNS, TRAFFIC CONTROL SIGNS, TRAFFIC STRIPING,
LEGENDS, AND PAVEMENT MARKERS TYPE AND LOCATION.
8. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS OR BENCH MARKS NOTED ON THE PLANS, OR FOUND DURING CONSTRUCTION. REMOVAL
AND REPLACEMENT SHALL BE DONE BY A REGISTERED CIVIL ENGINEER WITH AN R.C.E. NUMBER BELOW 33,966, OR A LICENSED LAND SURVEYOR ONLY.
9. CONSTRUCTION OPERATIONS AND MAINTENANCE OF EQUIPMENT WITHIN ONE HALF MILE OF HUMAN OCCUPANCY SHALL BE PERFORMED ONLY DURING THE TIME
PERIODS AS FOLLOWS, UNLESS OTHERWISE APPROVED BY THE CITY:
MONDAY THROUGH FRIDAY 8:00 AM TO 5:30 PM
WORK SHALL BE PROHIBITED ANY TIME ON SUNDAYS OR ON FEDERAL HOLIDAYS. NO REDUCTION OF THE TRAVELED WAY WIDTH SHALL BE PERMITTED ON
ANY CITY STREET ON WEEKENDS OR HOLIDAYS, OR WHEN ACTIVE WORK IS NOT BEING DONE, UNLESS PRIOR AUTHORIZATION TO DO SO IS GRANTED BY THE
CITY ENGINEER.
NO LANE CLOSURES SHALL BE PERMITTED OR ALLOWED ON ANY CITY STREET BEFORE 9:00AM AND AFTER 3:00PM UNLESS AUTHORIZATION TO DO SO IS
GRANTED BY THE CITY ENGINEER.
10. ALL TRAVELED WAYS MUST BE CLEANED DAILY OF ALL DIRT, MUD AND DEBRIS DEPOSITED ON THEM AS A RESULT OF THE GRADING OPERATION. CLEANING
IS TO BE DONE TO THE SATISFACTION OF THE CITY ENGINEER.
11. ALL CONSTRUCTION AREAS SHALL BE PROPERLY POSTED AND LIGHTED IN CONFORMANCE WITH THE CALIFORNIA STATE MANUAL OF WARNING SIGNS, LIGHTS,
AND DEVICES FOR USE IN THE PERFORMANCE OF WORK UPON HIGHWAYS IN ORDER TO ELIMINATE ANY HAZARDS.
12. CONSTRUCTION PROJECTS DISTURBING MORE THAN 1-ACRE MUST OBTAIN A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT.
OWNERS/DEVELOPERS ARE REQUITED TO:
A) FILE A NOTICE OF INTENT (NOI) WITH THE STATE WATER RESOURCES CONTROL BOARD (SWRCB);
B) PREPARE A STORM WATER POLLUTION PREVENTION PLAN (SWPPP); AND
C) HAVE A MONITORING PLAN FOR THE SITE. THE NPDES IS A NATIONAL PROGRAM TO CONTROL NON-POINT SOURCE POLLUTANTS CARRIED BY
STORM WATER. THE PROGRAM IS IMPLEMENTED AND ENFORCED BY THE SWRCB.
13.THE CITY RETAINS THE RIGHT TO REQUIRE PLAN REVISIONS, AS NECESSARY, SUBSEQUENT TO PLAN APPROVAL, BUT PRIOR TO COMPLETION OF THE IMPROVEMENTS SHOWN
ON THESE PLANS, IF ANY NEW STREET IMPROVEMENTS HAVE BEEN INSTALLED BY THE CITY OR A THIRD PARTY WITHIN THE IMMEDIATE VICINITY OF THE IMPROVEMENTS
PROPOSED BY THESE PLANS THAT IMPACT THE DESIGN INTEGRITY OF THE IMPROVEMENT PROPOSED IN THESE PLANS AS ORIGINALLY APPROVED. ALL COSTS, INCLUDING,
BUT NOT LIMITED TO, DESIGN AND IMPROVEMENT COSTS, INCURRED AS A RESULT OF ANY DESIGN REVISIONS SHALL BE BORNE BY THE IMPROVEMENT SPONSORS.
14.CONTRACTOR SHALL REMOVE AND REPLACE EXISTING SIDEWALK AS NEEDED AT ALL LOCATIONS WHERE IT IS CRACKED, UNEVEN AT JOINTS, OR OTHERWISE DAMAGED,
PURSUANT TO STREET & HIGHWAYS CODE SECTION 5610. THIS REQUIREMENT APPLIES TO ALL SIDEWALK LOCATED IN PUBLIC RIGHT OF WAY ADJACENT TO PROPERTY BEING
DEVELOPED.
1. ALL UNDERGROUND FACILITIES, INCLUDING SERVICE LATERALS, SHALL BE IN PLACE WITH TRENCHES COMPACTED AND TESTED PRIOR TO BASE GRADE
INSPECTION AND PAVING. THE CONTRACTOR SHALL SUBMIT TO THE CITY WRITTEN EVIDENCE ISSUED BY THE RESPECTIVE UTILITY PURVEYOR INDICATING
THE SUBSURFACE PORTION OF THEIR UNDERGROUND FACILITIES HAS BEEN INSTALLED AND ACCEPTED.
2. LANE CLOSURES AND DETOURS SHALL BE POSTED, DELINEATED, AND LIGHTED IN CONFORMANCE WITH THE CALTRANS MANUAL OF TRAFFIC CONTROLS FOR
CONSTRUCTION AND MAINTENANCE WORK ZONES AND ANY ADDITIONAL REQUIREMENTS DEEMED NECESSARY BY THE CITY ENGINEER.
3. ASPHALT CONCRETE PAVING, EXCEPT FOR OVERLAYS, SHALL BE INSTALLED IN TWO (2) OR MORE COURSES WITH MIX DESIGNS THAT CONFORM TO SECTION
400 OF THE REVISED STANDARD SPECIFICATIONS (GREEN BOOK), NOTED AS FOLLOWS:
WEARING COURSE (UPPER COURSE): IIIA-C2-PG70-10
BASE COURSE (LOWER COURSES): IIIB-B3-PG70-10
THE WEARING COURSE SHALL BE 0.1 FEET THICK; THE BASE COURSE(S) SHALL CONTAIN THE BALANCE OF THE REQUIRED ASPHALT CONCRETE THICKNESS.
4. MIX DESIGN REQUIRED: FOURTEEN (14) DAYS PRIOR TO COMMENCEMENT OF PAVING OPERATIONS, THE CONTRACTOR SHALL SUBMIT FOR CITY APPROVAL, A
COMPLETE PROPOSED MIX DESIGN IDENTIFYING THE MIX CHARACTERISTICS SUCH AS AGGREGATE GRADATIONS, VOIDS IN MINERAL AGGREGATE (VMA), AIR
VOIDS, AND S-VALUE FOR VARIOUS OIL CONTENTS FOR EACH MIX.
5. A TACK COAT SHALL BE APPLIED TO EXISTING PAVEMENT, P.C.C. SURFACES, AND THE A.C. BASE COURSE, IF TRAFFIC HAS DRIVEN ON IT. THE TACK
COAT SHALL BE SLOW SETTING ANIONIC EMULSIFIED ASPHALT TYPE "SS-1H" CONFORMING TO SECTION 203-3 OF THE STANDARD SPECIFICATIONS. THE
LIQUID ASPHALT SHALL BE GRADE 60-70 AND APPLIED AT THE RATE OF 0.1 GALLONS/YARD.
6. NEW IMPROVEMENTS THAT JOIN EXISTING IMPROVEMENTS SHALL JOIN OR MATCH IN A MANNER SATISFACTORY TO THE CITY ENGINEER. CONSTRUCTION
OPERATIONS REQUIRED TO ACHIEVE A SAFE, DURABLE, AESTHETICALLY PLEASING TRANSITION BETWEEN THE NEW AND EXISTING IMPROVEMENTS MAY
INCLUDE SAW CUTTING, REMOVAL, REPLACEMENT, CAPPING, AND/OR COLD PLANNING, AS NEEDED.
7. ALL MANHOLES AND VALVE BOX FRAMES SHALL BE ADJUSTED TO FINAL GRADES AFTER PAVEMENT INSTALLATION IS COMPLETED.
8. THE CURB SHALL BE ETCHED OR STAMPED SHOWING UTILITY SERVICE LATERAL LOCATIONS AS FOLLOWS:
"S" FOR SEWER
"G" FOR GAS
"E" FOR ELECTRICAL POWER.
PAVING NOTES:
SCALE: 1"=100'
LOCATION MAP
EARTHWORK QUANTITIES - RAW
FILL (CY)CUT (CY)
RAW - STREET 830 6,074
THE ABOVE MENTIONED EARTHWORK QUANTITIES ARE BASED ON
RAW CUT AND FILL VOLUMES. CONTRACTOR IS RESPONSIBLE
TO VERIFY THEIR OWN EARTHWORK QUANTITIES. THE ABOVE
EARTHWORK QUANTITIES WERE DERIVED FROM TOPOGRAPHY
OBTAINED FROM AN AERIAL FLIGHT ON 4/26/10 SUPPLEMENTED
WITH CONVENTIONAL GROUND SURVEY IN COMPLIANCE WITH THE
NATIONAL MAP STANDARDS FOR HORIZONTAL ACCURACY OF
1"=40' AND VERTICAL ACCURACY OF ±
1
2
CONTOUR INTERVAL
(1.0' CONTOUR).
CVSC R/W
LA QUINTA PROJECT #2011-05
DUNE PALMS ROAD BRIDGE IMP - CIP #2011-051
TITLE SHEET
DESCRIPTIONSHEET
INDEX OF SHEETS
1 TITLE SHEET
2-3 TYPICAL SECTIONS, DETAILS &
CONSTRUCTION NOTES
4-6 REMOVAL AND EX. UTILITY PLAN
7-9 STREET IMPROVEMENT PLAN
10 STAGING AREA SITE PLAN
11-12 CONSTRUCTION BYPASS
13 SIGNING AND STRIPING PLAN
14 STORM DRAIN PLAN
15 RETAINING WALL PLAN
16 RETAINING WALL & FENCING DETAILS
17-19 CONCRETE LINING PLANS
20-21 CONCRETE LINING DETAILS
22 CONCRETE LINING CROSS SECTIONS
23 CHANNEL GRADING PLAN
24 BRIDGE LIGHTING PLAN
25 UTILITY TRENCHING / CONDUIT PLAN
26 CV LINK SECONDARY TRAIL PLAN
27-30 CV LINK TRAIL DETAILS
31-35 CV LINK BRIDGE SOFFIT PANEL DETAILS
B1-B26 BRIDGE PLANS
L1-L11 LANDSCAPE & IRRIGATION PLAN
PLANS UNDER SEPARATE COVERS
1-2 CVWD DOMESTIC WATER RELOCATION PLAN
1-3 CVWD SEWER RELOCATION PLAN
1-5 IID CONDUIT PLAN
1 IID SHOO FLY PLAN
THIS PLAN PACKAGE CONTAINS 77 PLAN SHEETS.
**COUNT DOES NOT INCLUDE THE IID PLANS.**
LEGEND
(100.50)
W
E
CATV
T
G
101.50FINISHED ELEVATION
EXISTING ELEVATION
CENTERLINE
EXIST. GAS LINE (SCG)
LINE (IID)
EXIST. TV LINE (TIME WARNER)
EXIST. TELEPHONE LINE (VERIZON)
PROPERTY LINE
PROP. BLOCK WALL
EXIST. WATER LINE (CVWD)
RIGHT-OF-WAY (R/W)
EXIST. ELECTRICAL OVERHEAD
REMOVE AC PAVEMENT OR STRUCTURE
EXIST. STORM DRAIN (CVWD)
EXIST. FIBER OPTIC (VERIZON)
OH
SD
SAWCUT
FO
EXIST. SEWER (CVWD) S
P
POTHOLE UTILITY INFORMATION
EASEMENT LINE
CONST 4.5" AC OVER 6" CLASS II AB
E
LINE (IID)
EXIST. ELECTRICAL UNDERGROUND
CONSTRUCT TYPE II SLURRY SEAL
FINISHED SURFACE...........FS
GRADE BREAK..................GB
TOP OF CURB..................TC
PROPERTY LINE.................⅊
RIGHT OF WAY..............R/W
EDGE OF PAVEMENT.........EP
FINISHED GRADE...............FG
SANITARY SEWER.............SS
EXISTING...........................EX
CURB & GUTTER .........C&G
ASPHALT CONCRETE........AC
CONCRETE....................CONC
DRIVEWAY.......................DWY
WATER METER..................WM
WATER VALVE..................WV
POWER POLE....................PP
DOMESTIC WATER............DW
LOCAL DEPRESSION..........LD
CATCH BASIN...................CB
PROPOSED....................PROP
MANHOLE..........................MH
FIBER OPTIC.....................FO
TOP AC BERM..................TB
P
LA QUINTA HIGH SCHOOL
BLACKHAWK WAY
06/2021
CHANNEL BOTTOM EARTHWORK INCLUDES THE REMOVAL OF THE EMBANKMENT
FOR THE LOW WATER CROSSING. HOWEVER, IT DOES NOT INCLUDE REMOVAL
OF THE BYPASS ROAD NOR GRADING FOR SLOPE PROTECTION.
WESTWARD HO DR
CITY OF LA QUINTA, CALIFORNIA
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I
L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33",
SET IN TOP OF CONCRETE MONUMENT IN
THE MEDIAN AT THE INTERSECTION OF
LA QUINTA CENTER AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE
BASED ON THE LINE BETWEEN
STATIONS "TMAP" AND "PSAP"
(POSITIONS PER NATIONAL GEODETIC
SURVEY, NAD83, EPOCH 2009.00) AS
SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS,
BEING NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
360 S HOPE AVENUE
SUITE C-110
SANTA BARBARA, CA 93105
PHONE: 805.563.0788
CVWD GENERAL STORMWATER
AND OTHER CONSTRUCTION
NOTES, SEE SHEET 3
HIGHWAY 111
HIGHWAY 111 CORPORATE CENTER DR
DUNE PALMS ROAD
CVSC R/W CVSC R/W
CVSC R/W TO POTENTIAL
CONTRACTOR
STAGING AREA
VIA PARKING LOT
BEGIN PROJECT
BASE BID #2
STA. 10+82.0
24902-24903
26054-26055
CVWD REFERENCE DRAWINGS
18" SEWER
8" & 12" SEWER
DWG NO.PLAN DESCRIPTION LOCATION
S. OF CHANNEL, EAST SIDE
NORTH OF CHANNEL
20752-20753 15" SEWER N. OF CHANNEL & W. OF DPRd C/L
600-030-018
600-010-009
CVSC RIGHT OF WAY INFORMATION
APN DOCUMENT #LOCATION
WEST & EAST OF DUNE PALMS RD
26050 8" SEWER CORPORATE CENTRE DRIVE
22349 15" SEWER EAST OF C/L, DUNE PALMS RD.
12502 18" WATER EAST OF C/L, DUNE PALMS RD.
23146 18" WATER CHANNEL XING, W. OF C/L
26047 18" WATER CORPORATE CENTRE DRIVE
MVP-203-204 54" RECLAIMED MAIN NORTH OF CHANNEL C/L
39069-39072 SLOPE PROTECTION N. OF CHANNEL, W. OF DPRd
19514-19520 N. OF CHANNEL, E. OF DPRd
25854 S. OF CHANNEL, W. OF DPRd
35788 S. OF CHANNEL, E. OF DPRd
SLOPE PROTECTION
SLOPE PROTECTION
SLOPE PROTECTION
FINAL ORDER OF CONDEMNATION
BK 691, PG 223
S.CHANNEL C/L, E.OF DUNE PALMS RD
SEWER EASEMENT, INSTRUMENT
#2006-224094, RECD 3/29/06
FRONTIER COMMUNICATIONS
909-748-6676
UTILITIES COMPANIES
IID, IMPERIAL IRRIGATION DISTRICT
CARLOS PUENTE
950-453-5089
SOUTHERN CALIFORNIA GAS CO.
ROMAN HERNANDEZ
760-904-5448
SPECTRUM
760-398-5837
DANIELLE SAMANIEGO
PETER QUINTANA
TYLER HULL
760-398-2651
COACHELLA VALLEY WATER DISTRICT
SHEET 7 SHEET 8 SHEET 9
SCALE: 1" = 100'
DUNE PALMS MOBILE ESTATES KINGDOM HALL OFJEHOVAH'S WITNESSES
LA QUINTA HOUSING
AUTHORITY
J PAUL BUILDING
DWGC1, LLC
USA GASOLINE
RAW - CHANNEL BOTTOM 3,200 3,200
760-864-1580
LARRY MOORE
IID SHOO FLY IID SHOO FLY
END BASE BID #2
BEG BASE BID #1
STA. 16+50.0
END BASE BID #1
BEG BASE BID #2
STA. 25+62.0
END PROJECT
& BASE BID #2
STA. 36+05.0
06/23/2021
R/W
DUNE PALMS TYPICAL SECTION
STATION 27+00.00 TO 28+00.00
℄
53'44'
6'6'
1
1
1
C&G
2'
WALK
40'
R/W
1
32'
42
AC PVT
AC PVT
40'
2%
16
6'
4
44
20
2
19
7'
30'
17
2
19
R/W
℄
60-50'
7.5'
1
1
1
C&G
WALK
42
AC PVT
48-36'
2%
5.5'
37'
16
1C&G
49'
R/W
1
AC PVT
42
VAR
VAR
DUNE PALMS TYPICAL SECTION
STATION 11+01.05 - 12+99.00
R/W
℄
50-45'
7.5'
1
1
1
C&G
WALK
42
AC PVT
38-32'
VAR
DUNE PALMS TYPICAL SECTION
STATION 12+99.00 - 15+75.00
49'
R/W
22'
43
VAR
7-2.6'
VAR
8-12.4'
5.5'
37'
2%
16
2
29
15
42
1
AC PVT
VAR
2-3%
42
R/W
℄
45-44'
7.5'
16
17
42
32'
2%
DUNE PALMS TYPICAL SECTION
STATION 15+75.00 - 17+49.90
49'
R/W
5.5'
37'
2%
16
29
42
15
2%
15
2%
TCE
SE
3:1 MAX
0-19.3'
10-24.5
5.5-
6.5'
6.5'
6.5'
R/W
℄
44'
7.5'
16
17
42
32'
2%
53'
R/W
5.5'
37-39.67'
2%
16
29
42
15
2%
15
2%
TCE
SE
3:1 MAX
15.3-23.2'
20.4-28.4'
10.5-6.5'
4.5'
DUNE PALMS TYPICAL SECTION
STATION 17+49.90 - 17+85.00
R/W
℄
44'
7.5'
16
17
42
32'
2%
53'
R/W
5.5'
37-39.67'
2%
16
17
42
15
2%
15
2%
TCE
SE
3:1 MAX
23.2-29.6'
28.4-34.3'
6.5'
4.5'
DUNE PALMS TYPICAL SECTION
STATION 17+85.00 - 18+23.77 (LT)
18+47.05 (RT)
℄
6'31'31'6'9.67'
1'4.83'3.83'
2%
2%
DUNE PALMS TYPICAL SECTION
STATION (LT) 18+23.77 - 23+66.86
(RT) 18+47.05 - 23+90.14
NOTES:
1. SEE BRIDGE PLANS FOR BRIDGE DETAILS.
2. THE "DP" LINE IS THE CENTER OF THE
BRIDGE.
(1)
(1) SEE CHART FOR ADDITIONAL
MEDIAN CURB DETAILS.
R/W
℄
44'
7.5'
16
17
42
32'
2%
53'
R/W
5.5'
39.67-40'
2%
16
17
42
15
2%
15
2%
TCE
75'
6.5'
4.5'
DUNE PALMS TYPICAL SECTION
STATION 23+66.86 - 23+76.86 (RT ONLY)
(1) SEE CHART FOR ADDITIONAL MEDIAN CURB
DETAILS.
(2) SEE SHEET 15 FOR RETAINING WALL DETAILS.
(3) PROVIDE SWALE BETWEEN WALL AND RIGHT OF
WAY.
19
19
20
44
1'VAR (1)
31'31'
25
(2)
R/W
℄
44'
7.5'
16
17
42
32'
2%
53'
R/W
5.5'
39.67-40'
2%
16
17
42
15
2%
15
2%
TCE
75-5'
6.5'
4.5'
DUNE PALMS TYPICAL SECTION
STATION 23+76.86 (RT) - 27+00.00
23+90.14 (LT) - 27+00.00
19
19
20
44
VAR (1)
31'31'
25
(2)
26
VAR (1)
"DP"LINE=
BRIDGE C/L
81 81(3)(3)
42
47 47
EX.WALL
43
VAR
0-7.9'
VAR
15.9-8.0'
2-3%
2
15
42
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
2
TYPICAL SECTIONS &
CONSTRUCTION NOTES
1. ALL UNDERGROUND FACILITIES, INCLUDING SERVICE LATERALS, SHALL BE IN PLACE WITH TRENCHES COMPACTED AND
TESTED PRIOR TO BASE GRADE INSPECTION AND PAVING. THE CONTRACTOR SHALL SUBMIT TO THE CITY WRITTEN
EVIDENCE ISSUED BY THE RESPECTIVE UTILITY PURVEYOR INDICATING THE SUBSURFACE PORTION OF THEIR
UNDERGROUND FACILITIES HAS BEEN INSTALLED AND ACCEPTED.
2. THE FOLLOWING ARE THE MINIMUM COMPACTION REQUIREMENTS FOR ITEMS CONSTRUCTED IN THE PUBLIC RIGHT OF WAY:
A.TRENCH BACKFILL 90%
B.EMBANKMENT FILL 90%
C.TOP 12" OF SUBGRADE (NON-ROADWAY)90%
D.TOP 12" OF SUBGRADE (ROADWAY, C&G, DRIVE APPROACH)95%
E.AGGREGATE BASE 95%
3.ALL EXISTING SIGNING WITHIN THE PROJECT LIMITS SHALL BE REMOVED AND REPLACED PER THE SIGNING AND
STRIPING PLANS. ALL REGULATORY SIGNS SHALL REMAIN IN PLACE AND/OR A TEMPORARY SIGN PLACED UNTIL THE
PERMANENT SIGN IS INSTALLED.
STREET GRADING NOTES:
NOTES:
(1) QUANTITY PROVIDED FOR INFORMATION ONLY. ITEMS OF WORK PER THE SPECIFICATIONS ARE INCIDENTAL TO OTHER
CONSTRUCTION ITEMS LISTED IN THE BID SCHEDULE.
(2) SEE SEPARATE PLAN FOR INFORMATION AND QUANTITIES.
(3)QUANTITY EXCLUDES THE PORTION OF MEDIAN PAVING, MEDIAN CURB AND SIDEWALK BETWEEN THE BRIDGE APPROACH
PANELS (C/L STA 1836.66 - 23+89.74).
(4)DRIVEWAY APPROACH QUANTITY INCLUDES THE GUTTER, CURB, DRIVEWAY, AND SIDEWALK BETWEEN THE CURB TRANSITIONS
AND FROM THE LIP OF GUTTER TO THE END OF THE DRIVEWAY CONSTRUCTION.
(5)QUANTITY NOTED IS FOR LENGTH OF SLEEVE PER CROSSING, NOT TOTAL REQUIRED CONDUIT LENGTH.
QUANTITIES LISTED HEREON ARE PROVIDED FOR CONTRACTOR INFORMATION. THE BID ITEMS LISTED IN THE PROJECT BID PACKAGE
UNDER THE BID SCHEDULE WILL GOVERN IN THE CASE OF A DISCREPANCY IN THE ABOVE LISTED QUANTITIES.
UNITS QUANTITY
----
CONSTRUCTION NOTES
1 PROTECT IN PLACE
2 SAWCUT AC OR CONCRETE SURFACE
3 SAWCUT CONC. SLOPE PROTECTION
4 REMOVE AC/CONCRETE PAVEMENT/SURFACE
5 REMOVE CURB RAMP INCLUDING C&G, WALK & X-GUTTER
6 REMOVE CURB & GUTTER
7 REMOVE AC BERM
8 REMOVE SHORT BLOCK (BRICK) WALL/PILASTER w/ LIGHT
9 REMOVE FENCE (WOOD)
10 REMOVE TREES/SHRUBS
11 REMOVE CONC SLOPE PROTECTION TO NEAREST CONTROL JOINT
12 REMOVE SD OUTLET STRUCTURE
13 REMOVE SD OUTLET GRATE
14 REMOVE CHANNEL ACCESS GATE
15 CONSTRUCT 4.5" AC OVER 6" AB CLASS II
16 CONSTRUCT SIDEWALK PER COLQ STD. 200, 240 & 241
17 CONSTRUCT 6" CURB & GUTTER PER COLQ STD. 200 & 201
18 CONSTRUCT DRIVEWAY APPROACH PER COLQ STD. 200 & 221
19 CONSTRUCT 8" MEDIAN CURB PER RCTD STD 204
20 CONSTRUCT COLORED STAMPED CONC MEDIAN PER COLQ STD 720
21 CONSTRUCT & REMOVE BYPASS ROAD
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
23 CONSTRUCT CONC. TRAIL UNDERCROSSING PER DETAIL ON SHEET 21
24 CONSTRUCT CROSS GUTTER PER COLQ STD 230 & 231
25 CONSTRUCT RETAINING WALL (TYPE 1A) PER CALTRANS STD PLAN B3-3A
26 CONSTRUCT 6' (TALL) GARDEN WALL, PER SPPWC STD 601-4, TYPE 1, DBL REIN.
27 MASONRY WALL PILASTER PER COLQ BUILDING DEPT DETAIL
28 CONSTRUCT CURB RAMP CASE A PER COLQ STD. 250
29 CONSTRUCT 6" ASPHALT DIKE PER COLQ STD. 204
30 CONSTRUCT LOCAL DEPRESSION PER RCTD STD 311, CASE C (SUMP)
31 CONSTRUCT CATCH BASIN PER COLQ STD. 200 & 300
32 RECONSTRUCT TO GRADE, STORM DRAIN MANHOLE FRAME & COVER, w/ CONC. COLLAR
33 CONSTRUCT MH NO. 2 PER RCFC&WCD STD MH252
34 CONSTRUCT COMBO CB/DRYWELL SYSTEM "A" PER DETAIL ON SHEET 3
35 CONSTRUCT 18" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
36 CONSTRUCT 24" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
37 CONSTRUCT 42" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
38 CONSTRUCT CONC COLLAR PER RCFC&WCD STD M803
39 CONSTRUCT 6" CONCRETE TRAIL OVER 4" CL II AGG. BASE
40 18" HDPE, N-12 WT JT SD PIPE
41 24" HDPE, N-12 WT JT SD PIPE
42 CRACK SEAL & APPLY TYPE II SLURRY SEAL
43 COLD PLANE & AC OVERLAY (T=0.10') PER DETAIL ON SHEET 3
44 SUITABLE BACKFILL MATERIAL TO +/- 4" OF TOP OF MEDIAN CURB
45 CONNECT TO EX CONC SLOPE PROTECTION PANEL PER DETAIL "F" ON SHEET 20
46 METAL GATE ASSEMBLY PER DETAIL ON SHEET 16
47 METAL FENCING (RETAINING WALL) PER DETAIL ON SHEET 16
48 12" ARTIUM GRATE PER DETAIL ON SHEET 16
49 6" PVC (SCHEDULE 40) STORM DRAIN PIPE
50 INSTALL 2 - 4" PVC CONDUIT SLEEVES PER IRRIGATION PLAN
51 TEMPORARY CONCRETE BARRIER (TYPE K)
52 CHAIN LINK FENCE PER SPPWC STD 600-3 w/ DUST FABRIC (STAGING AREA)
53 24' WIDE VEHICLE GATE ASSEMBLY w/LOCK PER SPPWC STD 600-3
54 CRUSHED MISC. BASE (THICKNESS PER PLAN)
55 TEMPORARY FENCING (HIGH VISIBILITY)
56 METAL RAILING (ON RETAINING WALL @ TRAIL) PER DETAILS ON SHEET 16
57 CONSTRUCT 8" CONC. OVER 6" CMB
58 UTILITY TRENCHING
59 3" SCH 40 PVC, IID CONDUIT
60 4" SCH 40 PVC, IID CONDUIT
61 5" SCH 40 PVC, IID CONDUIT
62 6" SCH 40 PVC, IID CONDUIT
63 LARGE VAULT (6'x9.5') PER IID STANDARD
64 3" SCH 40 PVC, w/ PULL ROPE (CV LINK)
65 CONSTRUCT PR. DOM. WATER MANIFOLD & CONNECT TO EX PIPE PER DETAIL ON SHEET 3
66 REMOVE COMMUNICATIONS MH/VAULT
67 REMOVE RCP STORM DRAIN PIPE
68 2" SHC 40 PVC, CITY COMM. CONDUIT
69 PULL BOX NO. 3.5 (PCC) PER SWPPP STD 405-1
70 REMOVE LANDSCAPING (J PAUL BLDG FRONTAGE, ESMT AREA)
71 CLEAR BUILDING PAD AREA
72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN
73 CONSTRUCT IRR. STUB / SLOPE PROTECTION CONNECTION PER DETAIL "H" ON SHEET 20
74 ADJUST TO GRADE, WATER VALVE CAN & COVER PER WATER PLAN
75 ADJUST TO GRADE, SEWER MANHOLE FRAME & COVER PER SEWER PLAN
76 RELOCATE WATER MAIN PER WATER PLAN
77 REMOVE SEWER MAIN PER SEWER PLAN
78 REMOVE/ABANDON SEWER MH PER SEWER PLAN
79 RECONSTRUCT SEWER MH PER SEWER PLAN
80 ADJUST TO GRADE, SD MANHOLE FRAME & COVER, w/ CONC. MH COLLAR
81 4" THICK DECOMPOSED GRANITE
LF
LF
SF
SF
LF
LF
LF
LF
LS
SF
EA
EA
EA
SF
SF
LF
SF
LF
SF
LS
SF
SF
SF
SF
LF
EA
EA
LF
EA
EA
LF
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
EA
EA
EA
EA
EA
EA
SF
LF
SF
SF
CY
LS
EA
LF
EA
LF
LF
LF
LF
LF
EA
SF
LF
LF
SF
LF
LF
LF
LF
EA
EA
LF
EA
EA
LF
LF
EA
SF
LS
--
EA
2,380
151
86,201
524
839
190
1
25,600
2
2
1
41,860
9,382
796
--
2,490
1
1,829
7
2
487
4
3
7
1
1
1
1
1
3,360
105
1
2
1
1
1
(2)
(1)
(1)
(1)
(1)
MEDIAN CURB TABLE
WEST CURB LINE
STATION
18+23.20
17+71.03
24+00.00
25+00.00
29+28.45
℄ OFFSET
4.77' RT
1.0' LT
1.0' LT
2.0' LT
2.0' LT
NOTES
AP
AP
END
EAST CURB LINE
STATION
18+23.20
23+66.67
24+44.73
25+06.33
25+64.34
℄ OFFSET
8.67' RT
9.45' RT
4.73' RT
0.0' RT
NOTES
AP, BC
PRC
EC
BEGIN, BC BEGIN
EC
29+25.97
8.0' RT BEGIN
29+25.97
10.0' RT BEGIN
29+35.36
8.0' RT BC
29+79.24
BC
29+61.88
1.15' LT PRC
29+81.71
9.15' RT PRC
29+64.34
2.0' LT EC
30+08.23
0.0' RT EC
30+17.62
2.0' LT END
30+17.62
0.0' RT END
30+15.14
9.0' RT BEGIN, AP
30+15.14
BEGIN
30+28.62
8.0' RT AP
31+45.53
BC
31+45.53
8.0' RT BC
32+05.15
5.0' RT PRC
32+04.82
3.03' RT PRC
32+64.78
0.0' RT EC
32+64.78
2.0' LT EC
35+94.16
0.0' RT END
35+94.16
2.0' LT END
8.67' RT
AP
29+14.97
0.0' RT AP
29+27.49
1.0' LT END
--
--
--
--
10.0' RT
10.0' RT
10.0' RT
--
--
1
--
--
--
--
EA
(1)
(2)
(2)
(2)
(2)
(1)
(1)
(1)
(1)
(1)
11/2020
SF
2,370
110
1,123
2,800
82.010
10,734
1,215
360
3
9,585
58
232
135,680
438
1
5
44
3,360
397
1
30,425
700
274
1,132
100
520
725
1
1
53
2,042
10
3,450
(2)
(2)
(2)
(2)
(2)
(2)
(2)
5,130
(1)
(1)
--
--
(3)
(1)
(1)
(3)
900
4,000
30
(4)
(5)
730
18
1,588
180
1
1
LF
2
82
83
84
85
86
87
88
METAL RAILING (TRAIL UNDERCROSSING) PER DETAILS ON SHEET 29-30
EA
SF
LF
LS
LS
EA
INSTALL CITY FURNISHED IN PAVEMENT SOLAR GUIDE LIGHT PER DETAILS ON SHEET 28
THERMOPLASTIC BANDING (UNDERCROSSING) PER DETAILS ON SHEET 27
6" SOLID WHITE STRIPE (PAINT) (TRAIL)
PAINT BRIDGE SOFFIT & EXTERIOR GIRDER w/ STREET NAME PER DETAILS ON SHEET 28
F&I SOFFIT PANELS w/ ELECTRICAL CONNECTIONS PER DETAILS ON SHEETS 30-34
(1)
CONSTRUCT CURB RAMP CASE B TYPE1 PER SPPWC STD 111-5
CONSTRUCTION NOTES CONT.
189EAMETER PEDESTAL PER COLQ STD 730
190EATRANSFORMER PAD (SINGLE PHASE) PER IID STD
28891LFCONSTRUCT WEDGE CURB PER DETAIL ON SHEET 26
06/23/2021
(3)
(2)
(2)
18"18"560-C-4500
CONCRETE COLLAR
FIBER MESH
18"
CONCRETE MH COLLAR (STORM DRAIN)
NOT TO SCALE80
NOTES:
1.FINISHED CONCRETE COLLAR
TO BE 3/8" BELOW FINISHED
PAVEMENT OR GRADE.
2.COMPACT SUBGRADE UNDER
CONCRETE COLLAR TO MIN 95%
RELATIVE COMPACTION.
AC PAVEMENT
REMOVE & REPLACE EX
STORM DRAIN FRAME,
COVER & LID
COLD PLANE & OVERLAY DETAIL (LONGITUDINAL)
NOT TO SCALE43
NOTE:
1.AC OVERLAY OF COLD PLANE
AREA SHALL BE COMPLETED
AT THE TIME OF FINAL
PAVEMENT LIFT OF THE
ADJACENT WIDENED SECTION.
15
0.1'
PER PLAN
SAWCUT LINE
COLD PLANE &
OVERALY AC PAVT
1AC PVT
SIDEWALK MEANDER DETAIL
NOT TO SCALE
R/W
6'7'
SIDEWALK
MASONRY BLOCK WALL SHALL B
E
S
I
N
G
L
E
S
I
D
E
D
S
P
L
I
T
FACE (SMOOTH SIDE AWAY FROM THE STRE
E
T
)
,
T
A
N
COLOR (AS APPROVED BY THE CITY) & G
R
O
U
T
C
E
L
L
S
CONTAINING REINFORCEMENT. LL=25 PS
F
.
PILASTERS SHALL BE CONSTRUCTED
P
E
R
T
H
E
C
I
T
Y
O
F
LA QUINTA COMMUNITY DEVELO
P
M
E
N
T
D
E
P
A
R
T
M
E
N
T
MASONRY PILASTER STANDARD.
6'
PLACE FACE OF
WALL ON RIGHT
OF WAY LINE
MASONRY GARDEN WALL DETAIL
NOT TO SCALE26
AC PAVEMENT13.53.510452520ESTIMATED TOTAL DEPTH WITH 10' PENETRATION INTO PERMEABLE SOILSSETTLING CHAMBER DEPTHCLCL
PRIMARY SETTLING CHAMBEROVERFLOW HEIGHTINTAKEINLETHEIGHTOUTLETPIPEINVERT24"Ø
6"Ø''''''CHAMBER SEPARATION10'
ITEM NUMBERS
1.MANHOLE CONE - MODIFIED FLAT BOTTOM.
2.CONCRETE SLURRY BACKFILL - CONCRETE CLASS 100-E-100.
3.BOLTED RING & GRATE/COVER - DIAMETER AS SHOWN. CLEAN
CAST IRON WITH WORDING "STORM WATER ONLY" IN RAISED
LETTERS. BOLTED IN 2 LOCATIONS AND SECURED TO CONE
WITH MORTAR. RIM ELEVATION ±0.02' OF PLANS.
4.PAVEMENT REPAIR PER CONTRACTOR NOTE #2.
5.DELETED
6.PUREFLOTM DEBRIS SHIELD (OR APPROVED EQUAL) - ROLLED
16 GA. STEEL X 24" LENGTH WITH VENTED ANTI-SIPHON AND
INTERNAL .265" MAX. SWO FLATTENED EXPANDED STEEL
SCREEN X 12" LENGTH. FUSION BONDED EPOXY COATED.
7.PRE-CAST LINER - 4000 PSI CONCRETE 48" ID. X 54" OD.
CENTER IN HOLE AND ALIGN SECTIONS TO MAXIMIZE BEARING
SURFACE.
8.MIN. 6' Ø DRILLED SHAFT.
9.SUPPORT BRACKET - FORMED 12 GA. STEEL. FUSION BONDED
EPOXY COATED.
10.OVERFLOW PIPE - SCH. 40 PVC MATED TO DRAINAGE PIPE AT
BASE SEAL.
11.DRAINAGE PIPE - ADS HIGHWAY GRADE WITH TRI-A COUPLER.
SUSPEND PIPE DURING BACKFILL OPERATIONS TO PREVENT
BUCKLING OR BREAKAGE. DIAMETER AS NOTED.
12.BASE SEAL - GEOTEXTILE, POLY LINER OR CONCRETE SLURRY.
13.ROCK - CLEAN AND WASHED, SIZED BETWEEN 3/8" AND 1-1/2"
TO BEST COMPLEMENT SOIL CONDITIONS.
14.FLOFASTTM DRAINAGE SCREEN (OR APPROVED EQUAL) - SCH.
40 PVC 0.120" SLOTTED WELL SCREEN WITH 32 SLOTS PER
ROW/FT. DIAMETER VARIES 96" OVERALL LENGTH WITH TRI-B
COUPLER.
15.MIN. 4' Ø SHAFT - DRILLED TO MAINTAIN PERMEABILITY OF
DRAINAGE SOILS. PLACE GEOTEXTILE FABRIC ALONG THE
VERTICAL EDGES OF THE SHAFT TO SEPARATE NATIVE FROM
ROCK.
16.CATCH BASIN (MOD. W/ NO BOTTOM) - INSTALL CATCH BASIN
PER LA QUINTA STD. 300, 311, 315 & 300. CATCH BASIN SHALL
BE INSTALLED OVER PRIMARY CHAMBER OF DRYWELL.
17.ABSORBENT - HYDROPHOBIC PETROCHEMICAL SPONGE. MIN.
128 OZ. CAPACITY.
18.CONNECTOR PIPE - 8" Ø SCH. 40 PVC .
19.VENTED ANTI-SIPHON INTAKE WITH FLOW REGULATOR.
20.INTAKE SCREEN - SCH. 40 PVC 0.120" MODIFIED SLOTTED
WELL SCREEN WITH 32 SLOTS PER ROW/FT. 48" OVERALL
LENGTH WITH TRI-C END CAP.
21.FREEBOARD DEPTH - 4.0' MIN. INCREASE PRIMARY/
SECONDARY SETTLING CHAMBER DEPTHS AS NEEDED
TO MAINTAIN ALL INLET PIPE ELEVATIONS ABOVE
CONNECTOR PIPE OVERFLOW.
22.OUTLET PIPE - 24" RCP PIPE.
23.DELETED
24.INLET PIPE - PIPE SIZE PER PLAN.MAX DEPTH2'2'COMBINATION CATCH BASIN / DRYWELL SYSTEM "A"
MODIFIED MAXWELL PLUS OR APPROVED EQUAL
NOT TO SCALE
34
##
16
21
24 17
2 4
18
3
21 1
17
6
8
10
9
7
13
12
11
22
7
12
8
20
13
15
14
13
19
BEGIN MEANDER
24+92.8
27+62.8
5.5'
L=9.56'
R=10.5'
L=12.93'
END CURVE
25+29.6
28+00.0 JOIN EX.
END MEANDER
25+21.7
27+92.0BACK OF CURB
IID
STRUCTURE
R=10.5'
L=12.93'
R=10'
L=7.51'
R=16'
L=12.02'
L=9.56'
BEGIN CURVE
24+84.5
27+55.0
16
17
LIP OF
GUTTER
FACE OF CURB
COLD PLANE & OVERLAY DETAIL (PERPENDICULAR)
NOT TO SCALE43
NOTE:
1.AC OVERLAY OF COLD PLANE
AREA SHALL BE COMPLETED
AT THE TIME OF FINAL
PAVEMENT LIFT OF THE
ADJACENT WIDENED SECTION.
15
0.1'
10'
SAWCUT LINE
COLD PLANE &
OVERALY AC PAVT
1AC PVT
DRIVEWAY DETAIL - C/L STA 25+39.8 RT
NOT TO SCALE
DRIVEWAY DETAIL - C/L STA 26+07.4 RT
NOT TO SCALE
16
17
16
17
27
26
27
26
BACK OF CURB
LIP OF
GUTTERFACE OF
CURB
63
.
6
7
F
L
63
.
7
5
L
I
P
63
.
7
9
F
L
63
.
8
7
L
I
P
BACK OF WALK
63.85 FS
GB
64.05 FS
GB
63.93 FS
GB
63.97 FS
GB2.0%19'
21.3'
64.45 FS
AP
64.25 FS
AP
(64.71 FS)
JOIN EX.
(65.03 FS)
JOIN EX.
EX.EOP
EX.EOP
R/W
10'4.6%5.8%18
END DWY
PAY LIMITS
18
R/W
17
LIP OF
GUTTERFACE OF
CURB
17
16
27
26
16
BACK OF CURB
BACK OF WALK
26
272.0%21'
64
.
2
5
F
L
64
.
3
3
L
I
P
64
.
5
2
F
L
64
.
6
0
L
I
P
64.43 FS
GB
64.51 FS
GB
64.92 FS
AP
64.78 FS
GB
64.70 FS
GB
65.24 FS
AP
(65.96 FS)
JOIN EX.
(66.41 FS)
JOIN EX.5.8%6.5%21.4'
EX.EOP
EX.EOP
18'
MEDIAN CROSSING DETAIL
NOT TO SCALE
16
20
20
20
BACK OF CURB
FACE OF CURB
19
19
BEG TRANS.
2" TO 8" CF
23+67.00
END TRANS.
2" TO 8" CF
23+70.00
END TRANS.
8" TO 2" CF
23+44.00
BEG TRANS.
8" TO 2" CF
23+41.00
BEG TRANS.
8" TO 2" CF
23+38.00
BEG TRANS.
2" TO 8" CF
23+64.00
END TRANS.
8" TO 2" CF
23+41.00
END TRANS.
2" TO 8" CF
23+67.00
20
2"CF
2"CF
SECTION A-A
2" CURB FACE DETAIL
NOT TO SCALE
13"
2"
R 3/4"
GARDEN WALL NOTE:
DRIVEWAY DETAIL - C/L STA 26+07.4 RT
NOT TO SCALEDRIVEWAY DETAIL - C/L STA 23+67.8 LT
NOT TO SCALE
18
18
18
64.67 FS
GB
64.81 FS
GB
BRIDGE
BARRIER
RETAINING
WALL
RETAINING
WALL
FACE OF
8" CURB
64.49 FL
64.57 LIP
64.35 FL
64.43 LIP
64.59 FS
GB
64.73 FS
GB
64.46 FS
2.
0
%0.5%64.30 FS
GB
0.5%64.30 FS
GB
64.22 FS
GB
2.
0
%
2.
0
%1.7%57
57
54
11
.
5
%
END PAY
LIMITS
DRIVEWAY
18
54
18
BRIDGE
BARRIER
RETAINING
WALL
18
.
4
'
64.42 FL
64.50 LIP
64.52 FL
64.60 LIP
64.67 FS
GB
64.77 FS
GB
64.75 FS
GB
64.85 FS
GB
64.75 FS
GB
1.
0
%
64.85 FS
GB
0.
6
%0.5%BACK OF WALK
BACK OF WALK
16
.
8
'32.4'20'END PAY
LIMITS
DRIVEWAY
19.2'
21.1'
8.
1
'
END DWY
PAY LIMITS
4"(TYP)
SUITABLE NATIVE BACKFILL
90% COMPACTION
PLACED IN 6" LIFTS
3/4" (MAX) CRUSHED
AGGREGATE 95% COMPACTION
PLACED IN 6" LIFTS
PIPE BEDDING, 95% COMPACTION,
UNLESS ONSITE GEOTECHNICAL
ENGINEER DETERMINES OTHERWISE
MIN WIDTHPIPEO.D.4"MIN18"HDPE = 39"
PIPE
CENTERED IN
TRENCH
PAVED OR UNPAVED SURFACE
NOTES:
1.THE NATIVE SOIL MATERIAL MAY BE USED IN THE TRENCH
BACKFILL PROVIDED IT IS FREE FROM UNSUITABLE
MATERIAL INCLUDING MATERIAL THAT CANNOT BE
STABILIZED BY COMPACTION, MATERIAL GREATER THEN 6"
IN SIZE, VEGETATION, TRASH, CONSTRUCTION DEBRIS,
HIGHLY EXPANSIVE CLAYS, HIGHLY ORGANIC SOILS AND
CONTAMINATED SOILS. THE FINE SILT AND CLAY
MATERIALS MAY BE USED PROVIDED THEIR MOISTURE
CONTENT CAN BE CONTAINED WITHIN THE RANGE THAT
ALLOWS FOR THEIR PROPER COMPACTION. THE NATIVE SOIL
SHALL BE PLACED IN 6" LIFTS (LOOSE) AND COMPACTED
TO AT LEAST 90% COMPACTION PER ASTM D1557.
COMPACTION SHALL BE VERIFIED BY TESTING. IF NATIVE
SOIL IS DEEMED NOT SUITABLE, USE BACKFILL PER SSPWC
SECTIONS 200-1.2 AND 306-1.3.
2.THE SELECT MATERIAL SHALL BE FINE GRAINED
NON-ORGANIC MATERIALS FREE OF DEBRIS, ROCKS AND
STONES.
HDPE SD PIPE TRENCH DETAIL
NOT TO SCALE4140
24"HDPE = 48"
8"THICK
4"(TYP)
9.67'
R=10'
L=7.51'
R=16'
L=12.02'
BRIDGE DECK
18
2.0%2.0%GRADE BREAK
LEGEND
NOTE:
SEE CITY OF LA QUINTA STD. 221
FOR ADDITIONAL DETIALS
NOTE:
SEE CITY OF LA QUINTA STD. 221
FOR ADDITIONAL DETIALS2.0%2.0%2.0%2.0%2.0%2.0%DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
3
CONSTRUCTION
NOTES & DETAILS
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
06/2021
1.UNLESS NOTED OTHERWISE, THE WORK SHOWN ON THESE PLANS SHALL BE PERFORMED IN
ACCORDANCE WITH THE CURRENT EDITION OF THE FOLLOWING STANDARD SPECIFICATIONS:
·STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (SSPWC OR GREEN BOOK).
2.THE CONTRACTOR SHALL POSSESS A VALID CLASS A STATE OF CALIFORNIA CONTRACTORS
LICENSE.
3.CONTRACTOR SHALL CONTACT CVWD’S CHIEF INSPECTOR UPON RECEIPT OF APPROVED DRAWINGS
TO ARRANGE THE PRECONSTRUCTION CONFERENCE. NO CONSTRUCTION SHALL BEGIN PRIOR TO
THE PRECONSTRUCTION CONFERENCE.
4.CONTRACTOR SHALL SUBMIT TO CVWD A LIST OF MATERIALS TO BE USED PRIOR TO THE
PRECONSTRUCTION CONFERENCE. ONLY MATERIALS ON THE APPROVED LIST MAY BE USED.
LIST SHALL INCLUDED QUANTITY, MANUFACTURER, MODEL, SIZE AND OTHER PERTINENT DATA.
5.ALL WORK SHALL BE INSPECTED BY CVWD. THE CHARGES FOR INSPECTION SHALL BE IN
ACCORDANCE WITH CVWD’S REGULATIONS.
6.CONTRACTOR SHALL SCHEDULE HIS CONSTRUCTION ACTIVITIES DAILY WITH THE INSPECTION
DEPARTMENT BETWEEN 3:30 P.M. AND 4:30 P.M. FOR THE FOLLOWING WORKING DAY. IF
CVWD IS UNABLE TO PROVIDE AN INSPECTOR OR INSPECTORS, CONTRACTOR SHALL RESCHEDULE
THE WORK FOR ANOTHER TIME.
7.IF CONTRACTOR ELECTS TO CANCEL SCHEDULED WORK WITHOUT PRIOR NOTICE TO CVWD,
CONTRACTOR SHALL BE CHARGED ONE HOUR OF INSPECTION TIME FOR EACH DAY OF
OCCURRENCE.
8.WORK PERFORMED WITHOUT INSPECTION SHALL BE REJECTED.
9.CONTRACTOR MUST SECURE A CONSTRUCTION ENCROACHMENT PERMIT FROM CVWD PRIOR TO
COMMENCEMENT OF WORK.
10.THE CONTRACTOR SHALL VERIFY ALL ELEVATIONS AND DIMENSIONS SHOWN ON THESE PLANS
WITHIN CVWD RIGHT-OF-WAY PRIOR TO STARTING WORK. THE CONTRACTOR SHALL NOTIFY THE
OWNER’S REPRESENTATIVE OF ANY DISCREPANCY IN THE PLANS OR SITE CONDITIONS SO THAT
PROPER CLARIFICATIONS CAN BE MADE BEFORE CONSTRUCTION BEGINS.
11.THESE PLANS MAY BE SUBJECT TO REVIEW AND/OR REVISION BY CVWD IF CONSTRUCTION HAS
NOT STARTED WITHIN 12 MONTHS FROM DATE OF APPROVAL AS SHOWN IN CVWD DRAWING
APPROVAL BLOCKS.
12.CONTRACTOR SHALL CALL UNDERGROUND SERVICE ALERT (USA) AT 1-800-422-4133 AT LEAST
TWO WORKING DAYS PRIOR TO START OF CONSTRUCTION AND PROVIDE THE CVWD INSPECTOR
THE USA NUMBER PRIOR TO EXCAVATION.
13.PRIOR TO APPROVAL OF A PERMANENT ENCROACHMENT PERMIT FOR OUTLETS DISCHARGING INTO
CVWD FACILITIES, THE PERMITTEE SHALL PROVIDE A LETTER FROM THE LAND USE AUTHORITY
FOR THE PROJECT CERTIFYING THAT THE PROJECT HAS BEEN REVIEWED AND DETERMINED TO
MEET THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
PERMIT AND WASTE DISCHARGE REQUIREMENTS FOR THE DISCHARGE OF STORMWATER IN THE
WHITEWATER RIVER WATERSHED, WHICH IS KNOWN AS THE MS4 PERMIT. THIS CERTIFICATION
APPLIES TO REQUIREMENTS INCLUDED IN THE DRAINAGE AREA MANAGEMENT PLAN, STORM
WATER MANAGEMENT PLAN, STORM WATER POLLUTION PREVENTION PLAN AND WATER QUALITY
MANAGEMENT PLAN DESCRIBED IN THE MS4 PERMIT AND APPLICABLE TO THE PROJECT AT THE
TIME OF THE APPLICATION.
CVWD REQUIRES THE PERMITTEE TO IMPLEMENT CONTROL MEASURES TO THE MAXIMUM EXTENT
PRACTICABLE TO PREVENT THE DISCHARGE OF NON-STORMWATER GENERATED RUNOFF INTO THE
CHANNEL. THE PERMITTEE SHALL REPAIR AND MAINTAIN THE OUTLET STRUCTURE AND THE
CHANNEL TO MITIGATE ANY CONDITION OF NUISANCE AND/OR DAMAGE TO THE OUTLET
STRUCTURE AND THE CHANNEL CAUSED BY THE PERMITTE’S DISCHARGE OF NON-STORMWATER AS
DETERMINED BY CVWD. THIS MAINTENANCE AND REPAIR SHALL INCLUDE, BUT NOT BE
LIMITED TO OUTLET CONCRETE REPAIRS, CHANNEL BOTTOM SCOUR REPAIR, SLOPE PROTECTION
REPAIR, VEGETATION CLEARING, PONDED/NUISANCE WATER REMOVAL, ETC. FAILURE TO
COMPLY WITH THESE CONDITIONS OF APPROVAL MAY RESULT IN CVWD REVOKING THE
PERMANENT ENCROACHMENT PERMIT ASSOCIATED WITH THE OUTLET AND REMOVAL OR SEALING
OF THE OUTLET.
COACHELLA VALLEY WATER DISTRICT
GENERAL NOTES FOR STORMWATER FACILITIES:
06/23/2021
WWWWRWRWRWRWRWRWRWRWRWRWRWS S S S S S S S S S
SSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W
W
W W W W W W W W W W W W W
WGASGASGASGASGASGASGASGASGASGASGASGASGASGASE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
EEE
E
E
E
E
EEEEEEEEEEEE
EEE E E ATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVSSSSSSDFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO F
MHAHEA
D
AHEA
D
SIGN
A
L
SIG
N
A
L STOPSTOPSTOPMHPLACED ON CHANNEL R/W
END 50' EAST OF EX
SLOPE PROTECTION
7 BEG 13+00.0
R/W
R/W
R/W
R/W
R/W
TCE4 AC
1
C&G
1WALK
55
PLACED
ON TCE
55
2
1
AC
43
43
7
12
1
1
1 SIGN
2
29'
22'
49'S.EMTCVSCAPN 600-390
-
0
3
3
J PAUL BUILDIN
G
APN 600-030
-
0
1
8
DWGC1, LLC
APN 600-390-02
3
COMMERCIA
L
B
L
D
G
S
APN 600-390-0
1
0
USA GASOLIN
E
APN 600-010
-
0
0
9
CVWD
1
4AC
CV
S
C
R
/
W
12+00 13+00 14+0011+00 15+0010+00
R/W
R/W
END 17+47.0 7
BEG 15+75.0 5 6
5
4 X-GUTTER
6
4
4 AC
WALK
43END 15+75.0
4 CONC.
2
2
59'
82.5'
53'
4CONC.
5
APN 600-010-00
9
CVWD
16+00 18+00 21+0019+00 22+0020+0017+00
1
1
11
70
70
S.EMTS.EMT11
11
℄
℄
CVSC C/L
CVSC C/L
CVSC18"SD
67
13
LIGHT
CURB
LIGHT
LIGHT
43
SHEET 17 FOR FULL
REMOVAL LIMITS
1
WALL
CVSC R/W
TCE
WWWWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWS S S S S S S S S S
SSSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W
W
W W W W W W W W W W W W W
WGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
EEE
E
E
E
E
EEEEEEEEEEEEEE
EEE E E CATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVSSSSSSDFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO F
MHAHEA
D
AHEA
D
SIGN
A
L
SIG
N
A
L STOPSTOPSTOPMH4
IID PP
& OVHD LINE
4
IID PP
& OVHD LINE
4
IID PP &
OVHD LINE
1 SWR MH
1 18"WM
1
112"SWR
1 8"SWR
154"RW
R/W
R/W
R/W
R/W
R/W
TCE29'
22'
49'S.EMTCVSCAPN 600-390-0
3
3
J PAUL BU
I
L
D
I
N
G
APN 600-030-01
8
DWGC1, LLC
APN 600-39
0
-
0
2
3
COMMERCIAL
B
L
D
G
S
APN 600-3
9
0
-
0
1
0
USA GASOLINE
APN 600-010-0
0
9
CVWD
CV
S
C
R
/
W
12+00 13+00 14+0011+00 15+0010+00
75
74
X3
79
2
76
76
8"SWR
1 8"SWR
1 8"SWR
76
2
IID OVHD
LINE
R/W
R/W
59'
82.5'
53'
APN 600-01
0
-
0
0
9
CVWD
16+00 18+00 21+0019+00 22+0020+0017+00 3 FRONTIER
1 FRONTIER
1
GAS CO
1 SPECTRUM
1 FRONTIER
1 SPECTRUM
1
IID (UND)
1 IID (TRANS)
S.EMTS.EMT1 18"WM
℄
℄
CVSC C/L
CVSC C/L
CVSCVACANT
CONDUIT
4IID PP
CVWD A/V
ASSMBLY
CVSC R/W
IID INTERIM
SHOO FLY
TCE
5 IID PP
5
IID INTERIM
SHOO FLY
5
5 IID PP
DUNE PALMS ROAD
SCALE: 1"=40'
04020 40 80 120
SCALE: 1"=40'
1
UTILITY NOTE INDEX
PROTECT IN PLACE
2 RELOCATE BY UTILITY COMPANY
CORPORATE CENTRE DR
3 ADJUST TO GRADE BY UTILITY COMPANY
4 REMOVED BY UTILITY COMPANY
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
4REMOVAL &
EX. UTILITY SHEET
1. ALL UNDERGROUND FACILITIES, INCLUDING SERVICE LATERALS, SHALL BE
IN PLACE WITH TRENCHES COMPACTED AND TESTED PRIOR TO BASE GRADE
INSPECTION AND PAVING. THE CONTRACTOR SHALL SUBMIT TO THE CITY
WRITTEN EVIDENCE ISSUED BY THE RESPECTIVE UTILITY PURVEYOR
INDICATING THE SUBSURFACE PORTION OF THEIR UNDERGROUND FACILITIES
HAS BEEN INSTALLED AND ACCEPTED.
2. THE FOLLOWING ARE THE MINIMUM COMPACTION REQUIREMENTS FOR ITEMS
CONSTRUCTED IN THE PUBLIC RIGHT OF WAY:
A.TRENCH BACKFILL 90%
B.EMBANKMENT FILL 90%
C.TOP 12" OF SUBGRADE (NON-ROADWAY)90%
D.TOP 12" OF SUBGRADE (ROADWAY, C&G, DRIVE APPROACH)95%
E.AGGREGATE BASE 95%
3.ALL EXISTING SIGNING WITHIN THE PROJECT LIMITS SHALL BE REMOVED
AND REPLACED PER THE SIGNING AND STRIPING PLANS. ALL REGULATORY
SIGNS SHALL REMAIN IN PLACE AND/OR A TEMPORARY SIGN PLACED UNTIL
THE PERMANENT SIGN IS INSTALLED.
STREET GRADING NOTES:
STREET REMOVALS
DUNE PALMS ROAD
EX. UTILITY PLAN
HIGHWAY 111
HIGHWAY 111
CORPORATE CENTRE DR
HIGHWAY 111
HIGHWAY 111
SCALE: 1"=40'MATCHLINE 22+25.00 - SEE SHEET 5MATCHLINE 22+25.00 - SEE SHEET 5CONSTRUCTION NOTES
1 PROTECT IN PLACE
2 SAWCUT AC OR CONCRETE SURFACE
3 SAWCUT CONC. SLOPE PROTECTION
4 REMOVE AC/CONCRETE PAVEMENT/SURFACE
5 REMOVE CURB RAMP INCLUDING C&G, WALK & X-GUTTER
6 REMOVE CURB & GUTTER
7 REMOVE AC BERM
11 REMOVE CONC SLOPE PROTECTION TO NEAREST CONTROL JOINT
12 REMOVE SD OUTLET STRUCTURE
13 REMOVE SD OUTLET GRATE
43 COLD PLANE & AC OVERLAY (T=0.10') PER DETAIL ON SHEET 3
55 TEMPORARY FENCING (HIGH VISIBILITY)
67 REMOVE RCP STORM DRAIN PIPE
70 REMOVE LANDSCAPING (J PAUL BLDG FRONTAGE, ESMT AREA)
74 ADJUST TO GRADE, WATER VALVE CAN & COVER PER WATER PLAN
75 ADJUST TO GRADE, SEWER MANHOLE FRAME & COVER PER SEWER PLAN
76 RELOCATE WATER MAIN PER WATER PLAN
79 RECONSTRUCT SEWER MH PER SEWER PLAN
06/2021
FOR ALL SIGNING AND STRIPING REMOVALS
SEE SHEET 13 FOR DETAILS.
REMOVAL NOTE
LEGEND
REMOVE AC PAVEMENT
SAWCUT
2
POTHOLE UTILITY INFORMATIONP
0.10' COLD PLANE AC PAVEMENT 43
REMOVE CONCRETE
4
4 5 6 11
THE FOLLOWING NOTES THE RECORD THICKNESS OF PAVEMENT AND
SLOPE PROTECTION.
·ROADWAY SOUTH OF CHANNEL IS 4.5" AC OVER 6" AB
·CONCRETE LOW WATER XING IS 6" CONC. w/ #4 REINF. 18"
O.C. BOTH DIRECTIONS AS IS THE SCOUR PROTECTION UP AND
DOWNSTREAM SIDE OF ROAD. SLOPE PROTECTION EXTENDS
APPROX.10' DEEP AT A 1:1 SLOPE.
·CONCRETE SLOPE PROTECTION UPSTREAM OF ROAD XING IS 6"
THICK WITH #4 REINF. @ 18" O.C. BOTH DIRECTIONS.
REMOVAL THICKNESS NOTES:
CONTRACTOR IS RESPONSIBLE TO MAINTAIN
PROPER DRAINAGE WITHIN THE CONSTRUCTION
ZONE FOR BOTH THE ROADWAY AND CHANNEL,
FOR THE DURATION OF THE PROJECT.
DRAINAGE NOTE
CONTRACTOR IS RESPONSIBLE FOR THE
REGULAR REMOVAL OF ALL BLOW SAND ON
PAVEMENT AND PEDESTRIAN SURFACES FOR
THE DURATION OF THE PROJECT, TO THE
SATISFACTION OF THE CITY.
BLOW SAND REMOVAL
5 INSTALLED & REMOVED BY UTILITY COMPANY
06/23/2021
SSSS S S S S S SSSS
S
S
S
S
S
S
S SWWWM
WM
WWM
WM
WM
WM
WM
WEOHEOHEOHEOHS S S S S S S
SSSSSSSSSSSSSSSSSRWRWRWRWRWRWRWRWRWRWW W W W W W
WWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W WSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS
SDSDSDSDSDSDGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGAS
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
EEEEEE
E E E E E E E E E E E
E
E
E
E E EEEEEEEECATVCATVCATVCATVCATVT
T T T T T
TPP
PP
O FO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FO FO FO FO
FO
FO FO FO FO FO FO FO FO FO FO FO
FOWWE
E
FO FO FOFOFO
FO
FO
MMMMMMMME
E E E E E EEEE
E E
E E E
E E E E E E
E
FO
FO FO FO FO FO
FO
FO
EWWWWS
S S
S
S SSSSSMHMHMHMHMHMHMH2
1
3
31
30
OFFICE BIKELANEMHCVSCAPN 600-01
0
-
0
0
9
LA QUINTA HO
U
S
I
N
G
A
U
T
H
O
R
I
T
Y
APN 600-030
-
0
2
1
&
0
0
4
1
1
R/W
APN 600-030-01
9
KINGDOM HAL
L
O
F
JEHOVAH'S
W
I
T
N
E
S
S
1
APN 600-010
-
0
0
4
LA QUINTA
H
I
G
H
S
C
H
O
O
L
APN 600-03
0
-
0
1
0
DUNE PALM
S
M
O
B
I
L
E
E
S
T
A
T
E
S
1
24"SD
13
CVWD
APN 600-010-
0
0
9
CVWD
AC PVT
1
1
1 FENCE
FENCE
1
1
24'
TCE
5'
4 6
END 27+00.0
BL.WALL1
8
CV
S
C
R
/
W
R/W
42" SD
WALK
1
R/W
43
1
1 42"SD
R/W
R/W
R/W
4CONC.
4AC
2
4AC
4AC
2
2
2
2
2
4AC
2
2
22'
4 AC
4
30'
1 C&G
4 WALK
1 C&G
1 WALK
1 WALK
11WALK
WALK
WALK
C&G1
C&G1
C&G
53'
63'
30'
38'
30'
30'
30'
30'
44'
TCE
AC
2
2
AC
1AC
1AC
1AC
10
10
10
10
53'
44'
7
7
7
7
14
8
44'
SD MH
24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+0023+00
11
11
6
6
11
80
BL.WALL1
MOBILE HOME
TCE
AC
HOUSE
TCE
21'TOPOTENTIALSTAGINGAREA43
SHEET 17 FOR FULL
REMOVAL LIMITS
67
42",L=6'
66
65
FENCE
CV
S
C
R
/
W
75'
7
12
71
71
71
71
9
9
10
10
4
R/W
R/W
67L=13'SSSSSSSSSSS S S S S S SSSSSSSSSSS
S
S
S
S
S
S
S SWWWM
WM
WWM
WM
WM
WM
WM
WEOHEOHEOHEOHS S S S S S S
SSSSSSSSSSSSSSSSSRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWW W W W W W
WWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W WSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS
SDSDSDSDSDSDSDSDSDGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGAS
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH E
OH
E
OH
E
OH
E
OH
E
OH
EEEEEE
E E E E E E E E E E E
E
E
E EEE E EEEEEEEEECATVCATVCATVCATVCATVT
T T T T T
TPP
PP
O FO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FO FO FO FO
FO
FO FO FO FO FO FO FO FO FO FO FO
FOWWE
E
FO FO FOFOFO
FO
FO
MMMMMMMME
E E E E E EEEE
E E
E E E
E E E E E E
E
FO
FO FO FO FO FO
FO
FO
EWWWWS S
S
S
S SSSSSMHMHMHMHMHMHMH2
1
3
31
30
OFFICE BIKELANEMHCVSCAPN 600-010-009
LA QUINTA H
O
U
S
I
N
G
A
U
T
H
O
R
I
T
Y
APN 600-030
-
0
2
1
&
0
0
4
1
1 WM X2
1
1 WM X5
FRONTIER MH
R/W
1
IID
TRANFORMER
APN 600-030-
0
1
9
KINGDOM HA
L
L
O
F
JEHOVAH'S WITN
E
S
S
APN 600-0
1
0
-
0
0
4
LA QUINTA
H
I
G
H
S
C
H
O
O
L
APN 600-030-010
DUNE PALMS MO
B
I
L
E
E
S
T
A
T
E
S
78
78
1
54"RW
118"SWR
118"SWR
1 12"SWR
CVWD
APN 600-010
-
0
0
9
CVWD
FRONTIER
CONDUIT
24'
TCE
5'
CV
S
C
R
/
W
R/W
1
1
1 12" SEWER
1
1
1
1
1
1
12"SEWER
FRONTIER
R/W
79
2
1
1
1
74
SEWER MH
18"WATER
1 HYDRANT
24" SD
WATER
VAULT
1
IID
VAULT
1 FRONTIER
75
79
74
X3
R/W
R/W
78
79
76
76
2
IID OVHD
LINE
3" GAS
R/W
22'
30'
53'
63'
30'
38'
30'
30'
30'
30'
44'
TCE
53'
44'
SD MH
44'
WV
18" WATER
3" GAS
24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+0023+00
TCE
CVWD A/V
ASSMBLY
IID PP
& OVHD LINE
IID PP
& OVHD LINE
TCE
21'TOPOTENTIALSTAGINGAREA2 FRONTIER
2-2"FRT
D=2.17'
2-2"SPC
D=2.83'
1"GAS
D=3.50'
4
IID PP
& OVHD LINE
1
IID
VAULT
1
FRONT.
PB
CV
S
C
R
/
W
5
5
IID PP
IID INTERIM
SHOO FLY
75'
5 IID PP
2 SPECTRUM
66
2
R/W
R/W
4
72
4
P
DUNE PALMS ROAD
SCALE: 1"=40'
04020 40 80 120
SCALE: 1"=40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
5REMOVAL &
EX. UTILITY SHEET
1. ALL UNDERGROUND FACILITIES, INCLUDING SERVICE LATERALS, SHALL BE IN PLACE WITH
TRENCHES COMPACTED AND TESTED PRIOR TO BASE GRADE INSPECTION AND PAVING. THE
CONTRACTOR SHALL SUBMIT TO THE CITY WRITTEN EVIDENCE ISSUED BY THE RESPECTIVE
UTILITY PURVEYOR INDICATING THE SUBSURFACE PORTION OF THEIR UNDERGROUND FACILITIES
HAS BEEN INSTALLED AND ACCEPTED.
2. THE FOLLOWING ARE THE MINIMUM COMPACTION REQUIREMENTS FOR ITEMS CONSTRUCTED IN THE
PUBLIC RIGHT OF WAY:
A.TRENCH BACKFILL 90%
B.EMBANKMENT FILL 90%
C.TOP 12" OF SUBGRADE (NON-ROADWAY)90%
D.TOP 12" OF SUBGRADE (ROADWAY, C&G, DRIVE APPROACH)95%
E.AGGREGATE BASE 95%
3.ALL EXISTING SIGNING WITHIN THE PROJECT LIMITS SHALL BE REMOVED AND REPLACED PER
THE SIGNING AND STRIPING PLANS. ALL REGULATORY SIGNS SHALL REMAIN IN PLACE AND/OR
A TEMPORARY SIGN PLACED UNTIL THE PERMANENT SIGN IS INSTALLED.
STREET GRADING NOTES:
STREET REMOVALS
DUNE PALMS ROAD
SCALE: 1"=40'
EX. UTILITY PLAN MATCHLINE 33+75.00 - SEE SHEET 6MATCHLINE 33+75.00 - SEE SHEET 6MATCHLINE 22+25.00 - SEE SHEET 4MATCHLINE 22+25.00 - SEE SHEET 41
UTILITY NOTE INDEX
PROTECT IN PLACE
2 RELOCATE BY UTILITY COMPANY
3 ADJUST TO GRADE BY UTILITY COMPANY
4 REMOVED BY UTILITY COMPANY
CONSTRUCTION NOTES
1 PROTECT IN PLACE
2 SAWCUT AC OR CONCRETE SURFACE
4 REMOVE AC/CONCRETE PAVEMENT/SURFACE
5 REMOVE CURB RAMP INCLUDING C&G, WALK & X-GUTTER
6 REMOVE CURB & GUTTER
7 REMOVE AC BERM
8 REMOVE SHORT BLOCK (BRICK) WALL/PILASTER w/ LIGHT
9 REMOVE FENCE (WOOD)
10 REMOVE TREES/SHRUBS
11 REMOVE CONC SLOPE PROTECTION TO NEAREST CONTROL JOINT
12 REMOVE SD OUTLET STRUCTURE
13 REMOVE SD OUTLET GRATE
14 REMOVE CHANNEL ACCESS GATE
43 COLD PLANE & AC OVERLAY (T=0.10') PER DETAIL ON SHEET 3
65 CONSTRUCT PR. DOM. WATER MANIFOLD & CONNECT TO EX PIPE PER DETAIL ON SHEET 3
66 REMOVE COMMUNICATIONS MH/VAULT
67 REMOVE RCP STORM DRAIN PIPE
71 CLEAR BUILDING PAD AREA
72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN
74 ADJUST TO GRADE, WATER VALVE CAN & COVER PER WATER PLAN
75 ADJUST TO GRADE, SEWER MANHOLE FRAME & COVER PER SEWER PLAN
76 RELOCATE WATER MAIN PER WATER PLAN
78 REMOVE/ABANDON SEWER MH PER SEWER PLAN
79 RECONSTRUCT SEWER MH PER SEWER PLAN
80 ADJUST TO GRADE, SD MANHOLE FRAME & COVER, w/ CONC. MH COLLAR
06/2021
1.FOR ALL SIGNING AND STRIPING REMOVALS SEE
SHEET 13 FOR DETAILS.
2.SEE THE SPECIFICATIONS FOR DETAILS ON PAD
CLEARING REQUIREMENTS, PER CONSTRUCTION
NOTE #71.
3.UNLESS OTHERWISE NOTED ON THE PLAN, ALL
ITEMS WITHIN THE TCE AREA SHALL BE REMOVED
AND PROPERLY DISPOSED OF OFF SITE IN
ACCORDANCE WITH THE SPECIFICATIONS.
REMOVAL NOTES:
LEGEND
REMOVE AC PAVEMENT
SAWCUT
2
POTHOLE UTILITY INFORMATIONP
0.10' COLD PLANE AC PAVEMENT 43
REMOVE CONCRETE
4
4 5 6 11
PAD CLEARING 71
THE FOLLOWING NOTES THE RECORD THICKNESS OF PAVEMENT AND
SLOPE PROTECTION.
·ROADWAY NORTH OF CHANNEL IS 4" AC OVER 12" AB
·CONCRETE LOW WATER XING IS 6" CONC. w/ #4 REINF. 18"
O.C. BOTH DIRECTIONS AS IS THE SCOUR PROTECTION UP AND
DOWNSTREAM SIDE OF ROAD. SLOPE PROTECTION EXTENDS
APPROX.10' DEEP AT A 1:1 SLOPE.
·CONCRETE SLOPE PROTECTION UPSTREAM OF ROAD XING IS 6"
THICK w/ #4 REINF. @ 18" O.C. BOTH DIRECTIONS.
·CONCRETE SLOPE PROTECTION DOWNSTREAM OF ROAD XING IS 6"
THICK w/ 4X4X4WX4W WELDED WIRE FABRIC.
REMOVAL THICKNESS NOTES:
CONTRACTOR IS RESPONSIBLE TO MAINTAIN
PROPER DRAINAGE WITHIN THE CONSTRUCTION
ZONE FOR BOTH THE ROADWAY AND CHANNEL,
FOR THE DURATION OF THE PROJECT.
DRAINAGE NOTE
CONTRACTOR IS RESPONSIBLE FOR THE
REGULAR REMOVAL OF ALL BLOW SAND ON
PAVEMENT AND PEDESTRIAN SURFACES FOR
THE DURATION OF THE PROJECT, TO THE
SATISFACTION OF THE CITY.
BLOW SAND REMOVAL
5 INSTALLED & REMOVED BY UTILITY COMPANY
06/23/2021
WWSSSSSW W W W W W W W W W W W W W W W W W
SD SD SD SD SD SD SD SD SD
SD
SD SDSDGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASCATVCATVCATVCATVWWWWWWWWWWWWWWWWWWWWWWWWWS S S S S S
SSSSSSSFO FO FO FO FO FO FO FO
FOFO FO
FOFOFOFOFOFO FO FO
FOFOFOFOFOFOFOFO FO FO
MME
E
E E E E E E
ES S S S S S
SE
E
E
MHMHMHMHMHMHBIKELANEBIKELANEN 2,203,651.4088E 6,553,312.1498TS CONTROLLER
LOCAL DEPRESION
CATCH BASIN &
1
1
APN 600-030-02
0
1
1
R/W
SIGNAL POLE
SIGNAL POLE
APN 600-01
0
-
0
0
4
LA QUINTA HIG
H
S
C
H
O
O
L
C&G1
1 WALK
LA QUINTA
H
O
U
S
I
N
G
A
U
T
H
O
R
I
T
Y
R/W
1
24" SD
1
1 SIGNAL POLE
1
4AC
2
2
1 C&G
1
63'
50'
30'
44'
WALK
1AC
1AC
SD MH
34+00 35+00 36+00
1 18" SD
1
TS METER
TS CONDUIT
WWSSSSSW W W W W W W W W W W W W W W W W W
SD SD SD SD SD SD SD SD SD
SD
SD SDSDSDSDGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GASGASGASGASGASGASGASGASGASGASGASG CATVCATVCATVCATVWWWWWWWWWWWWWWWWWS S S S S S
SSSSSSSFO FO FO FO FO FO FO FO
FOFO FO
FOFOFOFOFOFO FO FO
FOFOFOFOFOFOFOFO FO FO
MME
E
E E E E E E
ES S S S S S
SE
E
E
MHMHMHMHMHMHBIKELANEBIKELANEN 2,203,651.4088E 6,553,312.1498APN 600-03
0
-
0
2
0
R/W
SIGNAL POLE
SIGNAL POLE
APN 600-010-0
0
4
LA QUINTA
H
I
G
H
S
C
H
O
O
L
LA QUINTA HO
U
S
I
N
G
A
U
T
H
O
R
I
T
Y
1 SEWER MH
1
1
WV X4
GV
R/W
1 SEWER MH
1
1 SIGNAL POLE
1
63'
50'
30'
44'
34+00 35+00 36+00
1 18" WATER
1 12" SEWER
1 3" GAS
DUNE PALMS ROAD
SCALE: 1"=40'
04020 40 80 120
SCALE: 1"=40'
WESTWARD HO DRIVE
BLACKHAWK WAY
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
6REMOVAL &
EX. UTILITY SHEET
1. ALL UNDERGROUND FACILITIES, INCLUDING SERVICE LATERALS, SHALL BE IN PLACE WITH TRENCHES COMPACTED
AND TESTED PRIOR TO BASE GRADE INSPECTION AND PAVING. THE CONTRACTOR SHALL SUBMIT TO THE CITY
WRITTEN EVIDENCE ISSUED BY THE RESPECTIVE UTILITY PURVEYOR INDICATING THE SUBSURFACE PORTION OF
THEIR UNDERGROUND FACILITIES HAS BEEN INSTALLED AND ACCEPTED.
2. THE FOLLOWING ARE THE MINIMUM COMPACTION REQUIREMENTS FOR ITEMS CONSTRUCTED IN THE PUBLIC RIGHT
OF WAY:
A.TRENCH BACKFILL 90%
B.EMBANKMENT FILL 90%
C.TOP 12" OF SUBGRADE (NON-ROADWAY)90%
D.TOP 12" OF SUBGRADE (ROADWAY, C&G, DRIVE APPROACH)95%
E.AGGREGATE BASE 95%
3.ALL EXISTING SIGNING WITHIN THE PROJECT LIMITS SHALL BE REMOVED AND REPLACED PER THE SIGNING AND
STRIPING PLANS. ALL REGULATORY SIGNS SHALL REMAIN IN PLACE AND/OR A TEMPORARY SIGN PLACED UNTIL
THE PERMANENT SIGN IS INSTALLED.
STREET GRADING NOTES:
STREET REMOVALS
DUNE PALMS ROAD
SCALE: 1"=40'
WESTWARD HO DRIVE
BLACKHAWK WAY
EX. UTILITY PLANMATCHLINE 33+75.00 - SEE SHEET 5MATCHLINE 33+75.00 - SEE SHEET 51
UTILITY NOTE INDEX
PROTECT IN PLACE
2 RELOCATE BY UTILITY COMPANY
3 ADJUST TO GRADE BY UTILITY COMPANY
4 REMOVE BY UTILITY COMPANY
LEGEND
REMOVE AC PAVEMENT
SAWCUT
2
4
CONSTRUCTION NOTES
1 PROTECT IN PLACE
2 SAWCUT AC OR CONCRETE SURFACE
4 REMOVE AC/CONCRETE PAVEMENT/SURFACE
06/2021
FOR ALL SIGNING AND STRIPING REMOVALS
SEE SHEET 13 FOR DETAILS.
REMOVAL NOTE
THE FOLLOWING NOTES THE RECORD THICKNESS OF PAVEMENT.
·ROADWAY NORTH OF CHANNEL IS 4" AC OVER 12" AB
REMOVAL THICKNESS NOTES:
CONTRACTOR IS RESPONSIBLE TO MAINTAIN
PROPER DRAINAGE WITHIN THE CONSTRUCTION
ZONE FOR BOTH THE ROADWAY AND CHANNEL,
FOR THE DURATION OF THE PROJECT.
DRAINAGE NOTE
CONTRACTOR IS RESPONSIBLE FOR THE
REGULAR REMOVAL OF ALL BLOW SAND ON
PAVEMENT AND PEDESTRIAN SURFACES FOR
THE DURATION OF THE PROJECT, TO THE
SATISFACTION OF THE CITY.
BLOW SAND REMOVAL
06/23/2021
WWS S S S S S S S S S
SSSSSSW W W W W W W W W W W W W W W W W W W W
W
W W W W W WGASGASGASGASGASGASGASGASGASGASGASGASE
E
E
E
E
E
EEEEEEEEEE
EEE E E CATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVSSSSDFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
MHMH12+00 13+00 14+0011+00 15+00 16+00 18+00 19+00 20+0017+00
1278+0016
APN 600-030-018
DWGC1, LLC
APN 600-390-
0
2
3
COMMERCIAL BLD
G
S
APN 600-390
-
0
1
0
USA GASOLINE
BEG CONST
JOIN EX.WALK
11+00.00 6.5'5.5'6.5'8'R/W
R/W
R/W
R/W
16
29
BEG AC BERM
JOIN EX.C&G
12+98.97
(TC 69.36)
INTERSECTION
16+32.69 DUNE PALMS =
40+00.00 CORPORATE CENTRE49'10'29
16
43
15 43 +4615
1
1
22.5'BEG RDWY CONST.
15+75.00
1 C&G
1
1
1 WALK
WALK
WALK
1
2
75
42
42
43
JOIN EX.C&G
15+75.00
(TC 67.45)
JOIN EX.C&G
39+32.87 BCR
(TC 66.00)
C&G
APN 600-390-033
J PAUL BUILDING
R/W
R/W
BEG TAPER
17+49.89
TC 65.52
END TAPER &
AC BERM
BEGIN 6" C&G
17+84.89
TC 65.40
24
TCE
TCETCE TAPER, AP
16+86.21
28
28
29
17
16
17
30
34
30 31
16
15
3
4
5
6
7
9
10
79
75
74X3
16+87.92 BCR
TC 65.95
CVSCAPN 600-010-0
0
9
CVWD
APN 600-010-009
CVWD
76
32'39.67'20
35
11
CONC APPROACH PANEL
BEGIN 18+36.66
SEE BRIDGE PLANS
22 SEE SHEET 17
22 SEE SHEET 18
41
8
SEE BRIDGE PLANS
FOR DETAILS
19
19
19ST STA 17+96.65SD STA 10+00.00 CB #1, W=7'H=3.50'15
42
76 RELOCATED
REMOVED
23
56
36
56
23 SEE SHEET 21
39
39
56
40
SEE SHEET 21
SEE SHEET 26
SEE BRIDGE PLANS
FOR WALL DETAILS
SEE SHEET 26
JOIN EX.C&G
39+32.03 ECR
(TC 65.15)
1 WALL
1 LIGHT
1 LIGHT
1
FRONTIER
MH
BEG BRIDGE
STA 18+68.20
88
88
ST STA 17+96.65SD STA 10+75.67 CB #2, W=7'W=10'29'49'49'C&G60'48'37'49'0.5
0
%1.67%15+75.01 BP67.9116+35.00 BVC66.9918+45.00 EVC65.7616+85.0066.2917+35.0065.8417+85.0065.6518+35.0065.7217+96.64 LP65.6419+40.00 BVC66.2419+90.0066.4420+40.0066.5420+68.49 HP66.5619+00.0066.0416+00.0067.5818+50.0065.79210' VC
PVI @ 17+40.00 EL = 65.24
18+23.40TC 66.1718+45.00 GBTC 66.2819+00.00TC 66.5319+40.00 BVCTC 66.7320+68.49 HPTC 67.05320' VC
PVI @ 21+00.00 EL = 67.53
20+68.49 HPTC 66.4419+40.00 BVCTC 66.1219+00.00TC 65.96320' VC
PVI @ 21+00.00 EL = 66.92
JOIN EX.12+98.97(TC 69.36)14+00.00 GBTC 69.2015+00.00 GBTC 68.6115+85.00 GBTC 67.5916+35.00 BVCTC 66.75BEG TAPER17+49.89 GBTC 65.52END TAPER17+84.88 GBTC 65.40POR OF 210' VC
PVI @ 17+40.00 EL = 65.00
1.67%0.
3
3
%
0.50
%
0.5
0
%11+00.00(TC 64.28)11+50.00(TC 65.76)12+00.00(TC 67.24)12+43.20(TC 68.51)12+68.70(TC 69.12)320' VC
PVI @ 21+00.00 EL = 67.0411+00.00(TC 64.58)11+50.00(TC 65.45)12+00.00(TC 66.91)12+50.0(TC 68.15)13+00.00(TC 69.12)13+42.10 ECR(TC 69.30)14+27.60 BCR(TC 68.69)15+00.00(TC 68.29)14+50.00(TC 68.42)JOIN EX.15+75.00 ECR(TC 67.45)16+87.92 BCRTC 65.9218+45.00 EVC GBTC 65.41POR OF 210' VC
PVI @ 17+40.00 EL = 64.94
17+96.64 LPTC 65.2919+00.00TC 66.0719+40.00 BVCTC 66.2720+68.49 HPTC 66.59320' VC
PVI @ 21+00.00 EL = 66.95
0.5
0
%BEGIN CURB18+71.00TC 66.5519+40.00 BVCTC 66.8919+00.00TC 66.6920+68.49 HPTC 67.210.5
0
%
320' VC
PVI @ 21+00.00 EL = 67.69
1.20%0.05%
0.3
6
%0.59
%13+50.00 GBTC 69.3817+96.64
CB & LD(1.12%)1.48%1.12%15+75.00FL 66.9516+14.00 GBFL 66.5116+87.92FL 65.4555.18'BCR66.00 TCΔ/4=13.80'67.22 TC66.44 TC66.86 TC55.62'65.15 TCECRΔ/4=13.91'65.37 TC66.05 TC65.93 TC18+49.71 GBTC 65.4618+54.71 GBTC 64.9818+70.00 GBTC 65.0618+78.00 GBTC 65.9617+96.64
POR OF 210' VC
PVI @ 17+40.00 EL = 65.01
18+25.36 GBTC 65.4418+31.36 GBTC 64.9218+45.36 GBTC 64.9718+53.36 GBTC 65.68LINE / CURVE DATA
DELTA/BRG RADIUS LENGTH REMARKTANGENT
1 N00°09'52"W --1089.52'--CENTERLINE
2 N00°09'52"W --451.28'--AC BERM
3 N04°11'33"E --35.10'--AC BERM
4 N00°09'52"W --70.31'--C&G
5 Δ= 90°19'58"35.00'55.18'35.20'CURB RETURN
6 Δ= 91°03'12"35.00'55.62'35.65'CURB RETURN
7 N00°09'52"W --190.67'--C&G
8 N00°09'52"W --251.59'--MED CURB
9 Δ= 166°25'45"2.00'5.81'16.81'MED CURB
10 Δ= 13°34'15"204.97'48.55'24.39'MED CURB
11 N00°09'52"W --203.97'--MED CURB
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72MATCHLINE 20+75.00 - SEE SHEET 8SCALE: 1"=40'
04020 40 80 120
SCALE: 1"=40'
LEGEND
4.5" AC OVER 6" CLASS II AB 15
DUNE PALMS ROAD
TYPE II SLURRY SEAL 42
CONCRETE CONSTRUCTION
7
STREET IMPROVEMENT PLAN
STA 11+00.0 - 20+75.00
16 17
65 TC MED LT -
65 TC MED RT -
EX GND @ C/L
TOP AC BERM
37' RT
14 15 16 17
18
19
0.1' AC OVERLAY 43 MATCHLINE 21+75.00 - SEE SHEET 820131211
MEDIAN CONC PAVING 20
24 28 30
65 FS C/L -
65 TC LT -
65 TC RT -
EX GND @ C/L
8"CURB @
8.67' RT
8"CURB @
1.0' LT
8"CURB @
30.0' LT
6"C&G @
30.0' LT
8"CURB @
39.67' RT
EX 6"C&G LT
EX 6"C&G LT
EX 6"C&G RT
- 65 TC MED LT
- 65 TC MED RT
- 65 FS C/L
- 65 TC LT
- 65 TC RT
PR FS @ C/L
CONSTRUCTION NOTES
1 PROTECT IN PLACE
15 CONSTRUCT 4.5" AC OVER 6" AB CLASS II
16 CONSTRUCT SIDEWALK PER COLQ STD. 200, 240 & 241
17 CONSTRUCT 6" CURB & GUTTER PER COLQ STD. 200 & 201
19 CONSTRUCT 8" MEDIAN CURB PER RCTD STD 204
20 CONSTRUCT COLORED STAMPED CONC MEDIAN PER COLQ STD 720
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
23 CONSTRUCT CONC. TRAIL UNDERCROSSING PER DETAIL ON SHEET 21
24 CONSTRUCT CROSS GUTTER PER COLQ STD 230 & 231
28 CONSTRUCT CURB RAMP CASE A PER COLQ STD. 250
29 CONSTRUCT 6" ASPHALT DIKE PER COLQ STD. 204
30 CONSTRUCT LOCAL DEPRESSION PER RCTD STD 311, CASE C (SUMP)
31 CONSTRUCT CATCH BASIN PER COLQ STD. 200 & 300
34 CONSTRUCT COMBO CB/DRYWELL SYSTEM "A" PER DETAIL ON SHEET 3
35 CONSTRUCT 18" SD OUTLET W/ TRASH GRATE, PER DETAILS ON
SHEET 21
36 CONSTRUCT 24" SD OUTLET W/ TRASH GRATE, PER DETAILS ON
SHEET 21
39 CONSTRUCT 6" CONCRETE TRAIL OVER 4" CL II AGG. BASE
40 18" HDPE, N-12 WT JT SD PIPE
41 24" HDPE, N-12 WT JT SD PIPE
42 CRACK SEAL & APPLY TYPE II SLURRY SEAL
43 COLD PLANE & AC OVERLAY (T=0.10') PER DETAIL ON SHEET 3
56 METAL RAILING (ON RETAINING WALL @ TRAIL) PER DETAILS ON
SHEET 16
74 ADJUST TO GRADE, WATER VALVE CAN & COVER PER WATER PLAN
75 ADJUST TO GRADE, SEWER MANHOLE FRAME & COVER PER SEWER PLAN
76 RELOCATE WATER MAIN PER WATER PLAN
79 RECONSTRUCT SEWER MH PER SEWER PLAN
88 CONSTRUCT CURB RAMP CASE B TYPE 1 PER SPPWC STD. 111-5
HIGHWAY 111
06/2021
EX GND @ CURB
EX GND @ CURB
39
SEE BRIDGE PLANS
FOR WALL DETAILS
CORPORATE CENTRE DRHIGHWAY 111
ALL EXISTING STRIPING SHALL BE REMOVED
PRIOR TO THE APPLICATION OF SLURRY, TO
THE SATISFACTION OF THE CITY.
NOTE:
SEE SHEET 26 FOR ADDITIONAL DETAILS ON
THE SECONDARY TRAIL.
SECONDARY TRAIL NOTE:
06/23/2021
SS S S S S S SS
S
S SM
WM
WM
WM
WM
WEOHEOHS S S S S S S
SSSSSRWRWRWRWRWRWW W W W W W W
WWW W W W W W W W W W W W W W W W WSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
EEEEE
E E E E
E
E
EEPP
PP
FO FO FO FO FO FO FO FO
FO
E
E
MMME
E E E E E E
E
FO
FO FO FO FO FO
FO
FO
EWWSSSMHMHMHMHMHMH2
30
24+00 25+00 26+00 27+00 28+00 29+00 30+0023+0021+00 22+00
1279+001280+00⅊APN 600-030-0
1
9
KINGDOM HALL
JEHOVAH'S W
I
T
N
E
S
S
E
S
R/W
20
1 WALK
19
19
20
76
32'39.67'20
37
43
19
15
1
1 WALK
19
WALK97'1
1 FENCE(CL)
1
44
44
SEE BRIDGE PLANS
FOR DETAILS
19
15
16
17
18
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
END RDWY CONST.
27+00.00
37
38
41
19
17
19
R/W
APN 600-010-004
LA QUINTA HIGH
S
C
H
O
O
L
30
31
16
30 31
1
72
25
31
20
79
R/W
15
15
16
16
20
1 FENCE(CL)
75
72
25
44
4412
14
19
20
21
R/W
39
40
42
17
17
19
19
19
19
19
18
18
22SEE SHEET 19
22
FENCE(CL)
APN 600-010-0
0
9
ST STA 24+78.27SD STA 20+00.00 CB #4, W=14'H=3.50'26
27
27
26
26
27
26
27 27 26
26 JOIN EX.
46
46
L=18'
80
74
SEE SHEET 9 FOR
MASONRY BLOCK
WALL INFORMATION
76
1
COLQ FO
CONDUIT
42
42
42
42
43
43
48
L=30'
49 ST STA 24+73.85SD STA 30+00.00 CB #3, W=14'H=3.50'81
79
47
57
CO
57
54
54
T=6"
T=6"
SEE BRIDGE PLANS
FOR WALL DETAILS
72
END
JOIN EX.
27+00.00
(TC 66.75)
17
17
IID 1
16 17
APN 600-030-010
16
DUNE PALMS MOBI
L
E
E
S
T
A
T
E
S
END
JOIN EX.
28+00.00
(TC 67.63)
TW 23+52.5
25+39.8 DWY W=19'SEE SHEET 326+07.4 DWY W=21'SEE SHEET 3TCE
TCE
TC
E 24'21'65'76 RELO
5050
A/V
L=21'L=23'
REMOVED
18
18
CONC APPROACH PANEL
END 23+89.74
SEE BRIDGE PLANS
23+42.2 DWY
W=21.1'
SEE SHEET 3
23+65.7 DWY
W=21.1'
SEE SHEET 3
CVSC R/W
CVSC R/W
SEE BRIDGE PLANS
FOR WALL DETAILS
SEE SHEET 19
APN 600-010-00
9 CVSC21+05.26 DUNE PALMS
1279+47.72 CVSC
1913
CVWD
RELOCATED
MEDIAN DEPRESSION PER
DETAIL ON SHEET 3
END BRIDGE
STA 23+48.20
CVWD
76
SIDEWALK MEANDER PER
DETAIL ON SHEET 3 (**)
(**)
W=10'
C&G
30'32'12'40'C&G
SEE SHEET 15
TW 25+28.0TW
25+51.0TW 25+95
.
0
TW 26+20.0TW 26+92
.
3
1.
5
9
%0.75%22+60.00 EVC65.8420+90.0066.5521+40.0066.4621+90.0066.2722+40.0065.9924+05.00 BVC64.7626+35.00 EVC65.7427+00.00 EP66.7824+55.0064.5225+05.0064.5325+55.0064.7926+05.0065.3124+78.27 LP64.4923+50.0065.1723+00.0065.55230' VC
PVI @ 25+20.00 EL = 63.91
24+00.0064.8026+50.0065.9822+60.00 EVCTC 66.3323+00.00TC 66.0426+35.00 EVCTC 66.4127+00.00 GBTC 67.4525+06.33 PRCTC 65.1025+64.33 ECTC 65.54POR OF 230' VC
PVI @ 25+20.00 EL = 64.58
24+75.53 GBTC 65.0425+35.35 GBTC 65.2827+41.50 GBTC 65.0628+63.00 GBTC 69.3629+14.97 GBTC 69.8929+28.49TC 70.0224+05.00 BVCTC 64.3024+78.27 LPTC 64.03320' VC
PVI @ 21+00.00 EL = 67.53
END TAPER23+76.86 GBTC 64.51230' VC
PVI @ 25+20.00 EL = 63.45 END C&GJOIN EX.27+00.00 GB(TC 66.75)BEGIN TAPER23+66.86TC 64.7023+46.86 GBTC 65.0823+00.00TC 65.43320' VC
PVI @ 21+00.00 EL = 66.92 0.75%0
.
75%1.86%1.
5
9
%
1.
5
9
%
1.
4
7
%
1.0
7
%
1.
0
0
%
0.86%0.75%0.5
4%
0.00%0.6
0
%
0.
9
1
%
0.20%27+50.00(TC 67.36)28+00.00(TC 67.66)28+50.00(TC 67.98)29+00.00(TC 68.59)29+50.00(TC 69.15)30+00.00(TC 69.59)30+50.00(TC 70.15)28+50.00(TC 68.10)29+00.00(TC 68.56)29+50.00(TC 69.03)30+00.00(TC 69.64)30+50.00(TC 70.24)320' VC
PVI @ 21+00.00 EL = 67.04 22+60.00 EVCTC 65.87320' VC
PVI @ 21+00.00 EL = 66.95
230' VC
PVI @ 25+20.00 EL = 63.61
24+05.00 BVCTC 64.4723+85.00 GBTC 64.9523+00.00TC 65.5824+73.85 LPTC 64.2126+35.00 EVCTC 65.630.75%2.43%22+60.00 EVCTC 66.4923+00.00TC 66.2025+00.00 GBTC 65.1726+35.00 EVCTC 66.3727+00.00 GBTC 67.4127+50.00 GBTC 68.1028+00.00TC 68.6928+50.00TC 69.1829+00.00TC 69.6929+28.45TC 69.9629+25.97TC 69.8429+64.34 GBTC 70.3630+15.10TC 70.8430+28.62 GBTC 71.0630+50.00TC 71.410.75%0.
54
%
0.04%
1.
5
9
%
1.
5
1
%
1.
0
2
%
1.43%
1.52%
0.81%
0.
8
4
%
1.19%
1.63%
320' VC
PVI @ 21+00.00 EL = 67.69
29+25.97TC 69.8129+50.00 GBTC 70.1029+79.24 GBTC 70.5429+81.71 GBTC 70.5630+17.62TC 70.871.
5
0
%
0.81%
0.6
8
%
1.38%30+15.14TC 70.8430+50.00 GBTC 71.411.
6
4
%
1.
3
1
%
24+73.85
CB & LD
24+78.27
CB & LD
CURB HT
TRANSITION
8" TO 6"
CURB HT
TRANSITION
8" TO 6"24+00.00 GBTC 65.4524+52.25 GBTC 65.17PVI @ 25+20.00 EL = 64.54
END TAPERBEG BAY TAPER24+44.73 BCTC TC 65.0424+05.00 GBTC 65.25BEGIN TAPER23+66.67TC 65.5422+60.00 EVCTC 65.7225+50.00TC 64.4326+35.00 EVCTC 65.2827+00.00 GBTC 66.32END C&GJOIN EX.28+00.00(TC 67.63)(1
.
2
9
%
)
(1
.
3
5
%
)
1.
7
1
%
POR OF 230' VC
1.
2
1
%
1.32
30+08.23 GBTC 70.741.17%29+35.36 BC GBTC 69.9529+49.39 GBTC 70.1529+61.88 EC GBTC 70.361.43%30+17.62TC 70.8730+00.00 GBTC 70.66LINE / CURVE DATA
DELTA/BRG RADIUS LENGTH REMARKTANGENT
11 N00°09'52"W --203.97'--CENTERLINE
12 N00°09'52"W --1000.00'--MED CURB
13 N00°09'52"W --325.00'--MED CURB
14 N00°44'15"W --100.01'--MED CURB
15 N00°09'52"W --428.45'--MED CURB
16 Δ= 175°45'49"0.50'1.53'13.52'MED CURB
17 N04°24'03"W --13.56'--MED CURB
18 N00°09'52"W --350.63'--MED CURB
19 Δ= 09°19'36"358.00'58.28'29.20'MED CURB
20 Δ= 09°53'58"358.00'61.85'31.00'MED CURB
21 N00°24'30"E --78.06'--MED CURB
22 N00°09'52"W --291.67'--MED CURB
23 N00°09'52"W --53.27'--MED CURB
24 Δ= 180°00'00"1.00'3.14'--MED CURB
25 N00°09'52"W --9.39'--MED CURB
26 Δ= 38°04'20"43.00'28.57'14.84'MED CURB
27 Δ= 38°04'20"4.00'2.66'1.38'MED CURB
28 N00°09'52"W --53.27'--MED CURB
29 Δ= 180°00'00"1.00'3.14'--MED CURB
30 N00°09'52"W --9.39'--MED CURB
31 Δ= 38°04'20"43.00'28.57'14.84'MED CURB
32 Δ= 38°04'20"4.00'2.66'1.38'MED CURB
33 N00°09'52"W --59.84'--MED CURB
34 Δ= 175°45'49"0.50'1.53'13.52'MED CURB
35 N04°24'03"W --13.56'--MED CURB
36 N00°09'52"W --46.36'--MED CURB
37 N00°09'52"W --31.54'--C&G
38 N01°44'41"E --10.01'--C&G
39 N00°09'52"W --149.43'--C&G
40 N00°09'52"W --39.54'--C&G
41 N00°09'52"W --178.08'--C&G
42 N00°09'52"W --341.71'--C&G MATCHLINE 30+65.00 - SEE SHEET 904020 40 80 120
SCALE: 1"=40'
SCALE: 1"=40'
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
8
STREET IMPROVEMENT PLAN
STA 20+75.0 - 30+65.00
27 28 29 3021 MATCHLINE 30+65.00 - SEE SHEET 9MATCHLINE 20+75.00 - SEE SHEET 7MATCHLINE 20+75.00 - SEE SHEET 72625
24
2322
4.5" AC OVER 6" CLASS II AB 15
TYPE II SLURRY SEAL 42
CONCRETE CONSTRUCTION 16 17
0.1' AC OVERLAY 43
MEDIAN CONC PAVING 20
18
65 TC MED LT -
65 TC MED RT -
65 FS C/L -
65 TC LT -
65 TC RT -
- 65 TC MED LT
- 65 TC MED RT
- 65 FS C/L
- 65 TC LT
- 65 TC RT
EX 6"C&G RT
EX 6"C&G LT
EX GND @ C/L
EX GND @ C/L
PR FS @ C/L
8"CURB @
8.67' RT
8"CURB @
0.0' RT
8"CURB @
2.0' LT
8"CURB @
1.0' LT
8"CURB @
39.67' RT
6"C&G @
40.0' RT
CONSTRUCTION NOTES
1 PROTECT IN PLACE
15 CONSTRUCT 4.5" AC OVER 6" AB CLASS II
16 CONSTRUCT SIDEWALK PER COLQ STD. 200, 240 & 241
17 CONSTRUCT 6" CURB & GUTTER PER COLQ STD. 200 & 201
18 CONSTRUCT DRIVEWAY APPROACH PER COLQ STD. 200 & 221
19 CONSTRUCT 8" MEDIAN CURB PER RCTD STD 204
20 CONSTRUCT COLORED STAMPED CONC MEDIAN PER COLQ STD 720
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
25 CONSTRUCT RETAINING WALL (TYPE 1A) PER CALTRANS STD PLAN B3-3A
26 CONSTRUCT 6' (TALL) GARDEN WALL, PER SPPWC STD 601-4, TYPE 1,
DBL REIN.
27 MASONRY WALL PILASTER PER COLQ BUILDING DEPT DETAIL
30 CONSTRUCT LOCAL DEPRESSION PER RCTD STD 311, CASE C (SUMP)
31 CONSTRUCT CATCH BASIN PER COLQ STD. 200 & 300
37 CONSTRUCT 42" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
42 CRACK SEAL & APPLY TYPE II SLURRY SEAL
43 COLD PLANE & AC OVERLAY (T=0.10') PER DETAIL ON SHEET 3
44 SUITABLE BACKFILL MATERIAL TO +/- 4" OF TOP OF MEDIAN CURB
46 METAL GATE ASSEMBLY PER DETAIL ON SHEET 16
47 METAL FENCING (RETAINING WALL) PER DETAIL ON SHEET 16
48 12" ARTIUM GRATE PER DETAIL ON SHEET 16
49 6" PVC (SCHEDULE 40) STORM DRAIN PIPE
50 INSTALL 2 - 4" PVC CONDUIT SLEEVES PER IRRIGATION PLAN
54 CRUSHED MISC. BASE (THICKNESS PER PLAN)
57 CONSTRUCT 8" CONC. OVER 6" CMB
72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN
74 ADJUST TO GRADE, WATER VALVE CAN & COVER PER WATER PLAN
75 ADJUST TO GRADE, SEWER MANHOLE FRAME & COVER PER SEWER PLAN
76 RELOCATE WATER MAIN PER WATER PLAN
79 RECONSTRUCT SEWER MH PER SEWER PLAN
80 ADJUST TO GRADE, SD MANHOLE FRAME & COVER, w/ CONC. MH COLLAR
81 4" THICK STABILIZED DECOMPOSED GRANITE, PER DETAIL ON SHEET 27
06/2021
BETWEEN STATION 27+00.00 AND 35+94.16,
MEDIAN CURB SHALL BE PLACED 8" ABOVE
EXISTING GROUND, FOLLOWING THE PROFILE
PROVIDED TO THE EXTENT POSSIBLE.
RAISED MEDIAN NOTE:
EX GND @ CURB
EX GND @ CURB
EX GND @ CURB
EX GND @ CURB
DUNE PALMS ROAD LEGEND
CRUSHED MISC. BASE 54
ALL EXISTING STRIPING
SHALL BE REMOVED PRIOR
TO THE APPLICATION OF
SLURRY, TO THE
SATISFACTION OF THE
CITY.
NOTE:
06/23/2021
WWWWWM
WM
WWSSSSSSSSW W W W W W W W W W W W W W W W W
SD SD SD SD SD SD SD SD SD SD SD SD
SD
SD
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GASGASGASGASE E E E E E
E
CATVCATVCATVWWWWWS S
SSSFO FO FO FO FO FO FO FO FO FO FO
FOFO FO
FOFOFOFOFOFO FO FO
FOFOWWFO FO FOFOFO
FO
FO
MMMMMMME
E
E E E E E E
EE
EE
E E
E E
S S S S S S
SE
E
E
MHMHMHMHMH34+0031+00 32+00 33+00 35+00 36+00
R/W
JEHOVAH'S WIT
N
E
S
S
E
S
KINGDOM HAL
L
JEHOVAH'S
WITNESSES
APN 600-030-0
1
9
1
1 WALK
1 WALK
APN 600-010-004
LA QUINTA H
I
G
H
S
C
H
O
O
L
107'20
20
1
1
1 WALK
1 WALK
1 WALK
1 WALK
⅊1
20
44
44
44
43
44
45
46
47
48
49
50
51
52
19
19
19
19
19
19
19
19
TOPOTENTIALSTAGINGAREA1
1 WM(x3)
1
FIRE LINE
VAULT
42
42
42
42
1
COLQ FO
CONDUIT
C&G
C&G
50'30'C&G
18"SD
C&G
1
TS CONDUIT
WSWS
WSM
VNOPARKINGLA QUINTA X
P
A
R
K
APN 600-030-
0
2
131+00.00(TC 70.92)31+50.00(TC 71.45)32+00.00(TC 71.69)32+50.00(TC 71.74)33+00.00(TC 71.56)33+50.00(TC 71.14)34+00.00(TC 70.50)34+50.00(TC 69.54)35+00.00(TC 68.63)35+50.00(TC 67.71)31+00.00(TC 70.74)31+00.00 GBTC 72.0831+45.53 BC GBTC 72.4731+75.28 GBTC 72.5932+04.82 PRC GBTC 72.7132+34.69 GBTC 72.6732+64.78 EC GBTC 71.9533+00.00 GBTC 72.3833+50.00 GBTC 71.9534+00.00 GBTC 71.3634+50.00 GBTC 70.4835+00.00TC 69.3435+50.00 GBTC 68.1935+94.16TC 67.410.8
6
%
0.40
%
0.41
%
0.12%
0.
4
1
%
0.
47
%0.87%1.18%1.76%2.29%1.77%1.
4
3
%31+00.00 GBTC 72.0731+45.53 BC GBTC 72.4831+75.44 GBTC 72.5732+05.15 PRC GBTC 72.6832+34.69TC 72.6332+64.78 EC GBTC 72.5833+00.00 GBTC 72.4833+50.00 GBTC 71.9634+00.00 GBTC 71.3534+50.00 GBTC 70.4735+00.00 GBTC 69.2735+50.00 GBTC 68.2035+94.16TC 67.451.
3
2
%
0.9
0
%
0.30%
0.37
%
0.17%
0.2
8
%1.04%1.22%1.76%2.40%2.14%1.70%31+45.98(TC 71.19)32+45.60(TC 71.52)34+00.00(TC 69.82)34+50.00(TC 68.96)35+00.00(TC 67.92)35+50.00(TC 66.80)33+00.00(TC 71.15)33+50.00(TC 70.49)LINE / CURVE DATA
DELTA/BRG RADIUS LENGTH REMARKTANGENT
43 N00°09'52"W --565.39'--CENTERLINE
44 N00°09'52"W --70.55'--MED CURB
45 Δ= 09°35'14"356.00'59.57'29.85'MED CURB
46 Δ= 09°35'14"360.00'60.24'30.19'MED CURB
47 N00°09'52"W --329.38'--MED CURB
48 Δ= 180°00'00"1.00'3.14'--MED CURB
49 N00°09'52"W --329.38'--MED CURB
50 Δ= 09°35'14"358.00'59.90'30.02'MED CURB
51 Δ= 09°35'14"358.00'59.90'30.02'MED CURB
52 N00°09'52"W --70.56'--MED CURB
DUNE PALMS ROAD
04020 40 80 120
SCALE: 1"=40'
SCALE: 1"=40'
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
9
STREET IMPROVEMENT PLAN
STA 30+65.0 - 36+00.00MATCHLINE 30+65.00 - SEE SHEET 8MATCHLINE 30+65.00 - SEE SHEET 836353433
LEGEND
TYPE II SLURRY SEAL 42
MEDIAN CONC PAVING 20
65 TC MED LT -
65 TC MED RT -
65 FS C/L -
65 TC LT -
65 TC RT -
- 65 TC MED LT
- 65 TC MED RT
- 65 FS C/L
- 65 TC LT
- 65 TC RT3231
EX GND @ C/L EX GND @ C/L
EX 6"C&G LT
EX 6"C&G RT
EX 6"C&G LT
8"CURB @
2.0' LT
8"CURB @
1.0' LT
8"CURB @
10.0' RT
8"CURB @
2.0' LT
8"CURB @
8.0' RT
CONSTRUCTION NOTES
1 PROTECT IN PLACE
19 CONSTRUCT 8" MEDIAN CURB PER RCTD STD 204
20 CONSTRUCT COLORED STAMPED CONC MEDIAN PER COLQ STD 720
42 CRACK SEAL & APPLY TYPE II SLURRY SEAL
44 SUITABLE BACKFILL MATERIAL TO +/- 4" OF TOP OF MEDIAN CURB
WESTWARD HO DRIVE
BLACKHAWK WAY BLOCK (PERIMETER) WALL DATA
ST STA.
23+52.5
TF ELEV
64.48
FS ELEV TW ELEV NOTES
65.22 71.15 PILASTER/BEGIN SEGMENT
23+70.0 64.48 64.98 71.15 FOOTING STEP
23+70.0 63.81 64.98 71.15 FOOTING STEP
24+11.0 63.81 64.52 71.15 PILASTER/TOP WALL STEP
24+11.0 63.81 64.52 70.48
25+28.0 63.81 64.41 70.48 PILASTER/END SEGMENT
25+51.0 64.05 64.55 70.72
25+95.0
26+20.0 64.80 65.30 71.47
26+65.0 64.80 66.01 71.47
65.47 66.01 72.14
PILASTER/TOP WALL STEP
PILASTER/END SEGMENT
PILASTER/BEGIN SEGMENT
64.05 64.97 70.72
PILASTER/BEGIN SEGMENT
26+92.3 65.47 67.00 72.14
26+65.0
PILASTER/TF & TW STEP
PILASTER/TF & TW STEP
PILASTER/JOIN EX. WALL
FACE OFFSET
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
53.0' RT
23+26.0 63.81 64.32 70.48 PILASTER/BEGIN SEGMENT
23+44.5
128.0' RT
73.1' RT 65.00
23+44.5 73.1' RT 64.48 65.00 71.15
PILASTER/END SEGMENT
TF & TW STEP
TF & TW STEP
23+52.5 65.2253.0' RT
63.81 70.48
64.48 71.15
06/2021
BETWEEN STATION 27+00.00 AND 35+94.16,
MEDIAN CURB SHALL BE PLACED 8" ABOVE
EXISTING GROUND, FOLLOWING THE PROFILE
PROVIDED TO THE EXTENT POSSIBLE.
RAISED MEDIAN NOTE:
EX GND @ CURB
EX GND @ CURB
ALL EXISTING STRIPING SHALL BE REMOVED
PRIOR TO THE APPLICATION OF SLURRY, TO
THE SATISFACTION OF THE CITY.
NOTE:
06/23/2021
MH
MH
MH
MH
MH
MH
MH
BIKE
LANE
BIKE
LANE
34+0031+0032+0033+0035+0036+00℄℄℄
℄R/WR/WR/WR/W
R/W
APN 600-03
0
-
0
1
9
KINGDOM HAL
L
JEHOVAH'S
W
I
T
N
E
S
S
E
SLA QUIN
TA H
IGH
SCHOOL
APN 60
0-010
-004
10'
200'110'54
52
52
52
⅊
⅊
1
BLOCK WALL
1 BLOCK WALL666565
64
61
616562⅊⅊⅊RUMBLE PLATES
AS NECESSARYWSWSWSMV
NO
PARKING
FIREFIREFI
R
E
T=4"(MIN)
53
LA QUINTA
X
P
A
R
K
APN 600-0
3
0
-
0
2
1
10
STAGING AREA SITE PLAN
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
30 15 30 60 90
SCALE: 1"=30'
0 SCALE 1"=30'DUNE PALMS ROADWESTWARD HO DRIVE
STAGING AREA NOTES:
1.THE STAGING AREA NOTED ON THIS SHEET HAS BEEN CLEARED THROUGH THE
ENVIRONMENTAL PROCESS, AND IS BEING OFFERED TO THE CONTRACTOR FOR
USE. THE CONTRACTOR WILL NEED TO OBTAIN PERMISSION FROM THE CITY ON
THE USE OF THE AREA, IF IT IS DECIDED FOR USE IN STAGING OF
TRAILERS, EQUIPMENT, MATERIALS AND VEHICLES.
2.THE CONTRACTOR WILL BE REQUIRED TO OBTAIN ALL UTILITY SERVICES FOR
USE IN THIS AREA.
3.THE CONTRACTOR SHALL REMOVE ALL FENCING, MATERIALS AND AGGREGATE
SURFACING TO THE SATISFACTION OF THE CITY.
4.THE CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTORS IN THE AREA.
THE AREA TO THE NORTH OF THE STAGING AREA MAY BE UNDER CONSTRUCTION
DURING THE BRIDGE PROJECT.
5.ALL CLEARING, GRUBBING AND SITE GRADING TO PREPARE THE AREA FOR USE
AS A STAGING AREA SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AND
NO ADDITIONAL COMPENSATION WILL ALLOWED.
6.THE CONTRACTOR SHALL LEAVE THE STAGING AREA CLEAN OF ALL DEBRIS AND
STABILIZED, ALL TO THE SATISFACTION OF THE CITY.
7.THE CONTRACTOR SHALL KEEP THE EXISTING PARK LOT AND DRIVE AISLE
CLEAN OF DIRT AND DEBRIS TO THE EXTENT POSSIBLE.
CONSTRUCTION NOTES
1 PROTECT IN PLACE
52 CHAIN LINK FENCE PER SPPWC STD 600-3 w/ DUST FABRIC (STAGING AREA)
53 24' WIDE VEHICLE GATE ASSEMBLY w/LOCK PER SPPWC STD 600-3
54 CRUSHED MISC. BASE (THICKNESS PER PLAN)
06/23/2021
MHAHEA
D
AHEA
D
SIGN
A
L
SIGN
AL STOPSTOPSTOPMHMHMHMHMH8
9
14
10 11 12 13
15
CVSCAPN 600-010-
0
0
9
CVWD
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
CVSC R/W
APN 600-010-0
0
9
CVWD
CVSC
CENTERLINE
CVSC
CENTERLINETCESL ESMTCVSC R/W
"K" RAIL EOP
EOP
12+00 13+00 14+0011+00 15+00 16+0010+00 24+0023+0018+00 21+0019+00 22+0020+0017+00
14'
14'
BYPASS
14'
14'
CVSC R/W
CVSC R/W
13+00.00
BEGIN AC
WIDENING
1
2
3
4
5
22
38A
28
RP
12"GORE STRIPE
@ 30' O.C.
27B
27B
21
21
IS
W20-1
(500 FT)
RS
IS W20-2
R5-2
E W9-1
EW4-2
E R8-3
RS
R2-1(45)
IS
W1-4(R)
W13-1P(25)
R3-1(X2)
IS
R2-1(25)
G20-5aP
RS R5-2
R8-3RS
R3-1(X2)
S1-1
RS
R8-3
S5-1 RS
IS
R2-1(25)
G20-5aP
IS
G20-5aP
IS
W1-4(L)
W13-1P(25)CMSCMSCMS R2-1(25)
IS
W1-4(R)
IS G20-2
E
RP BEGIN
RPEND
E
W13-1P(25)
"K" RAIL
"K" RAIL
HIGH SCHOOL
APN 600-010-004
LA QUINTA
68
.
8
6
F
S
(6
8
.
7
E
G
)
68
.
8
8
F
S
(6
8
.
8
E
G
)
62
.
8
3
F
S
(6
3
.
8
E
G
)
61.53 FS
(63.7 EG)
59.32 FS
(63.6 EG)
49.30 FS
(41.0 EG)
46.41 FS
(38.3 EG)
44.61 FS
(36.5 EG)
43.91 FS
(37.1 EG)
43.75 FS
(37.7 EG)
44.46 FS
(39.4 EG)
46.44 FS
(42.2 EG)
49.69 FS
(46.3 EG)
53.80 FS
(55.3 EG)
60
.
7
5
F
S
(6
2
.
8
E
G
)
68
.
1
1
F
S
(6
7
.
8
E
G
)
68
.
4
1
F
S
(6
7
.
9
E
G
)
68
.
7
0
F
S
(6
8
.
4
E
G
)
SL ESMT
15+50.00
BEGIN K-RAIL
REMOVE C&G AND PLACE
RAMP AS NECESSARY
FOR WALKWAY.
56.14 FS
(62.6 EG)
EOP
49.70 FS
46.81 FS45.01 FS
56.54 FS
64.81 PS
"K" RAIL
SHORING
61.93 FS
64.48 PS
SHORING
IID INTERIM
SHOO FLY
IID INTERIM
SHOO FLY
APN 600-030-010
DUNE PALMS M
O
B
I
L
E
E
S
T
A
T
E
S
67
.
2
7
F
S
(6
7
.
4
E
G
)
66
.
6
0
F
S
(6
6
.
8
E
G
)
65
.
1
9
F
S
(6
5
.
5
E
G
)
57.58 FS
(58.7 EG)
52.72 FS
(50.3 EG)
53.12
F
S
44
.
3
1
F
S
44
.
1
5
F
S
44.
8
6
F
S
46
.
8
4
F
S
50.09 FS
65.60 PS
59.72 FS
64.56 PS
54.20 FS
65.47 PS
61.25 FS
65.27 PS
58.05 FS
65.64 PS
MHMHMHMHMHMHMHMHMHMH2
3
30
OFFICE MHBIKELANEBIKELANEBIKELANE15 16 17
18
19
APN 600-030
-
0
1
0
APN 600-030-021
LA QUINTA H
O
U
S
I
N
G
AUTHORITY
APN 600-030-019
KINGDOM HALL
JEHOVAH'S WITN
E
S
S
E
S
R/W
R/W
R/W
R/W
R/W
LA QUINTA HIGH
S
C
H
O
O
L
APN 600-010-00
4
DUNE PALMS M
O
B
I
L
E
E
S
T
A
T
E
S
25+00 26+00 34+0027+00 28+00 29+00 30+00 31+00 32+00 33+00 35+00 36+00
EOP
14'
14'
16'
14'
27B
27B
6
7
8
9
28
RP
RPBEGIN
RPBEGIN
END
21
21
IS R1-1
IS
"K" RAIL
IS
W20-1
(700 FT)
IS
R2-1(25)
G20-5aP
IS
W1-4(L)
E
E
SR4-1ER26(CA)
ER26(CA)
E
R26(CA)
E R26(CA)
IS G20-2 CMSCMS
W1-4(L)
W13-1P(25)
62.73 FS
(63.7 EG)
25+25.00
END K-RAIL
E
REMOVE C&G AND PLACE
RAMP AS NECESSARY
FOR WALKWAY.
IS
R9-9
ON TYPE 3
BARRICADE
RP
66.13 FS
(67.0 EG)
66.48 FS
(67.7 EG)
67.13 FS
(67.1 ES)
65.74 FS
65.84 PS
63.93 FS
64.69 PS
63.13 FS
64.50 PS
SHORING
"K" RAIL
64.76 FS
65.15 PS
66.68 FS
66.64 PS
RP END
R26(CA)
E
IS
R1-1
R3-2
E
IS
R1-1
R3-2
65.24 FS
(66.6 EG)
RP 32
RP 32 BEGIN
END
32
IS
R3-2
W13-1P(25)
63.53 FS
(64.3 EG)
64.36 FS
(65.9 EG)
BYPASS CENTERLINE DATA
NO BEARING/DELTA RADIUS LENGTH
1 Δ=25°20'09"230.00'101.70'
2 Δ=25°18'08"214.00'94.50'
3 N 00°07'51" W --454.23'
4 Δ=16°41'16"236.00'68.74'
5 Δ=16°39'15"264.00'76.74'
6 N 00°09'52" W --231.60'
7 Δ=06°25'21"498.76'55.91'
8 N 06°34'16" W --141.20'
9 Δ=06°24'24"500.00'55.91'
1'2'2'4'
WALKWAY
19'15'
14'14'2'
23'
20'
2'
℄DUNE PALMS BYPASS
℄
DUNE PALMS ROAD
WORK AREA
EX.CONC.PAVEMENT
REMOVED w/ PHASE
1 CONSTRUCTION
EX.CONC.PAVEMENT
OVERLAID w/ MIN
OF 3" AC
6" PCC CUTOFF
WALL PER DETAILS
ON SHEET 20
4"AC OVER 6"CMB
OVER COMPACTED
FILL
10'
FS
P
E
R
P
L
A
N
1:1EX.GROUND
PLACE COMPACTED
FILL @ 3:1 SLOPE
FROM EDGE OF
BYPASS TO EG.
CONCRETE
BARRIER
(TYPE K)
(2.0
%
)
1.0%
1.0%
(1)
(1) K-RAIL ADJACENT TO
TRAFFIC SHALL BE ANCHORED INTO
THE PAVEMENT WITH DOWELS
℄
DUNE PALMS ROAD
14'14'
℄
DUNE PALMS BYPASS
℄
BRIDGE CENTERLINE
40.5'
1
ST
STAGE OF
CONSTRUCTION
60.0'
WORK ZONE
2.5'
20'
EX.CONC.PAVEMENT
REMOVED w/ STAGE
1 CONSTRUCTION
EX.GROUND
K-RAIL ADJACENT TO
TRAFFIC SHALL BE
ANCHORED INTO THE
PAVEMENT WITH DOWELS
RT EOP VERTICAL CURVE DATA
BVC STA
17+35.00
G
IN
BVC EL
61.59
VC LEN
120'
EVC STA
18+55.00
EVC EL
53.39
G
OUT
8.28%
18+90.00 50.50 170'20+60.00 43.76 0.35%
21+00.00 43.90 150'22+50.00 49.30 6.85%
23+65.00 51.18 130'24+95.00 62.65 1.59%
25+57.00 63.64 100'26+57.00 65.35 1.83%
5.38%
8.28%
0.35%
6.85%
1.59%
11
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CONSTRUCTION BYPASS
PHASE 1
PAINT PAVEMENT MARKING OR ARROW AS NOTED.
ON PLANS.
CALTRANS STRIPING DETAIL PER NUMBER NOTED,
PM
#
LEGEND & CONSTRUCTION NOTES:
RS
REMOVE AND SALVAGE SIGN & POST (IF APPLICABLE) AS NOTED.
E EXISTING TO REMAIN
IS FURNISH AND INSTALL SIGN(S) AND POST (IF APPLICABLE).
RP
REMOVE ALL EXISTING CONFLICTING TRAFFIC SIGNING &
STRIPING, PAVEMENT MARKING OR ARROWS AS NOTED, INCLUDING
RAISED PAVEMENT MARKINGS.
ANGLE POINT (AP)
PROPOSED SIGN (ONE POST)
EXISTING SIGN (ONE POST)
SALVAGE TO CITY YARD OR DISPOSE PER CITY DIRECTION.
RELOCATE EXISTING SIGN TO NEW POST (IF APPLICABLE)
RL
CONSTRUCTION AREA (WORK ZONE)
CONCRETE BARRIER (TYPE K) w/ WARNING FLASHERS
TEMPORARY SHORING (LIMITS & METHOD DETERMINED BY CONTRACTOR)
CHANGEABLE MESSAGE SIGNCMS MATCHLINE 24+90.00SEE BELOW LEFTMATCHLINE 24+90.00SEE ABOVE RIGHTCORPORATE CENTRE DR
WESTWARD HO DRIVE
BLACKHAWK WAY HIGHWAY 111
HIGHWAY 111
50 25 50 100 150
SCALE: 1"=50'
0
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
SCALE 1"=50'
SCALE 1"=50'
BYPASS SECTION
NOT TO SCALE
PHASE 1 DETAIL
NOT TO SCALE
STAGED CONSTRUCTION NOTES:
1.DUNE PALMS ROAD SHALL NOT BE CLOSED FOR MORE THAN TWO (2) CALENDAR
DAYS AT A TIME. CONTRACTOR WILL PROVIDE THE CITY WITH TWO (2)
WEEKS NOTICE ON ANY FULL CLOSURE OF DUNE PALMS ROAD.
2.STAGING PLANS ARE FOR THE MAJOR CONSTRUCTION STAGES. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE MEANS AND METHOD IN
CONSTRUCTING THE PROJECT, WITHIN THE PROVIDED STAGING CONCEPT.
CONTRACTOR SHALL PREPARE A DETAILED STAGING PLAN THAT INCORPORATES
ALL CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT WHICH WILL
BE REVIEWED BY THE CITY FOR CONFORMANCE WITH THE OVERALL STAGING
CONCEPT. STAGING BY SHALL BE PREPARED BY A CALIFORNIA REGISTERED
ENGINEER AND APPROVED BY THE CITY. ADDITIONAL CONSTRUCTION PHASES
OUTSIDE OF THE PROVIDED SHALL INCLUDE BUT NOT BE LIMITED TO BYPASS
CONSTRUCTION, UTILITY RELOCATIONS (SEWER AND WATER), CORPORATE
CENTRE DRIVE RECONSTRUCTION, ETC.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DETERMINATION OF THE
LIMITS, DESIGN, PLACEMENT, MAINTENANCE AND REMOVAL OF ALL REQUIRED
SHORING TO CONSTRUCT THE PROJECT.
4.FOR THE MAJORITY OF THE STAGE 1 CONSTRUCTION, CORPORATE CENTRE
SHALL REMAIN OPEN TO TRAFFIC. FOR THE DUNE PALMS ROAD AND
CORPORATE CENTRE DR. RECONSTRUCTION, THE CONTRACTOR SHALL CLOSE THE
ACCESS TO CORPORATE CENTRE FOR 30 CALENDAR DAYS.
5.CONTRACTOR SHALL COORDINATE WITH THE CITY ON THE LOCATIONS AND THE
MESSAGE ON THE CHANGEABLE MESSAGE SIGNS.
6.CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING, REPLACING AND
REMOVAL OF ALL DELINEATORS AND K-RAIL BARRIERS, INCLUDING TRAFFIC
DAMAGE AND/OR VANDALISM.
7.CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING AND PROVIDING
ACCESS INTO THE WORK AREA.
8.CONTRACTOR SHALL PROTECT ALL WORK IN THE CHANNEL, SPECIFICALLY WHEN
THE CHANNEL CARRIES STORM WATER. CONTRACTOR SHALL LIMIT THEIR
PROTECTION OPERATIONS TO THE LIMITS NOTED ON SHEET 23.
9.THE CONTRACTOR SHALL NOT STORE EQUIPMENT OR MATERIALS WITHIN THE
CHANNEL (BANK TO BANK) IN ACCORDANCE WITH THE CVWD CONSTRUCTION
PERMIT.
10.FOR THE BYPASS EMBANKMENT, THE CONTRACTOR MAY UTILIZE EXISTING ON
SITE CHANNEL MATERIAL, IF DEEMED ACCEPTABLE FOR UNCLASSIFIED FILL.
IF CHANNEL MATERIAL IS USED FOR THE BYPASS, UPON REMOVAL, THE
CONTRACTOR SHALL EVENLY SPREAD THE CLEAN MATERIAL WITHIN THE
CHANNEL AS APPROVED BY CVWD AND THE CITY.
11.FOLLOWING COMPLETION OF PHASE 1 CONSTRUCTION OPERATIONS AND
RELOCATION OF TRAFFIC PER PHASE 2 BYPASS PLANS, THE CONTRACTOR
SHALL REMOVE THE BYPASS ROAD AND ALL CONCRETE CUT OFF WALLS. SAID
WORK SHALL BE INCIDENTAL TO THE INSTALLATION OF THE BYPASS AND NO
ADDITIONAL COMPENSATION WILL BE ALLOWED THEREFORE.
DUNE PALMS ROAD
DUNE PALMS ROAD
SEE SHEET 12 FOR SIGN LEGEND
TYPE 3 BARRICADE
ELEVATIONS NOTED HEREON ARE AS FOLLOWS:
EG - EXISTING GND/SURAFCE @ EOP
FS - FINISHED SURFACE OF BYPASS SURFACE
PS - PROPOSED SURFACE OF FINAL ROADWAY
ELEVATION NOTE:
DUE TO CHANGING CONDITIONS WITHIN THE
CHANNEL THROUGH ONGOING MAINTENANCE AND/OR
STORM EVENTS, THE DOWNSTREAM EG ELEVATIONS
WILL BE DIFFERENT FROM THOSE NOTED HEREON.
CHANNEL ELEVATIONS:
06/23/2021
12+00 13+00 14+0011+00 15+00 16+0010+00 24+0023+0018+00 21+0019+00 22+0020+0017+00 MHAHEA
D
AHEA
D
SIGN
A
L
SIGN
AL STOPSTOPSTOPMHMHMHMHMH4
10 11 12 13
5 6 7 8 9 14
CVSCAPN 600-010-009
CVWD
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
APN 600-010-009
CVWD
CVSC
CENTERLINE
CVSC
CENTERLINETCESL ESMT
SL ESMTCVSC R/W
"K" RAIL
14'
14'
BYPASS
14'
14'
CVSC R/W
CVSC R/W
22
27B
21
21
IS
W20-1
IS W20-2
E W9-1
W4-2
E R8-3
IS
W1-4(R)
W13-1P(25)
IS
R2-1(25)
G20-5aP
R3-1(X2)
IS
IS
G20-5aP CMSCMSCMS R2-1(25)IS
W1-4(R)
IS G20-2
E
RP BEGIN
RP
W13-1P(25)
"K" RAIL
HIGH SCHOOL
APN 600-010-
0
0
4
LA QUINTA
APN 600-030-0
1
0
DUNE PALMS MOB
I
L
E
E
S
T
A
T
E
S
CVSC R/W
22
EDGE STAGE 1
BRIDGE
R2-1(25)
G20-5aP
21
E
RP
IS
W1-4(R)
W13-1P(25)
CHANNELIZERS
@ 25' O.C.
RPBEGIN
RP END
1
2
3
4
(500 FT)
25+00 26+00 34+0027+00 28+00 29+00 30+00 31+00 32+00 33+00 35+00 36+00MH
MHMHMHMHMHMHMHMHMH2
3
30
OFFICE MHBIKELANEBIKELANEBIKELANE16 1715
18
APN 600-030-
0
1
0
APN 600-030-021
LA QUINTA H
O
U
S
I
N
G
AUTHORITY
APN 600-030-019
KINGDOM HALL
JEHOVAH'S WITN
E
S
S
E
S
R/W
R/W
R/W
R/W
R/W
LA QUINTA HIGH S
C
H
O
O
L
APN 600-010-004
DUNE PALMS MOB
I
L
E
E
S
T
A
T
E
S
14'
14'
27B
21
"K" RAIL
IS
W20-1
IS
E
E
SR4-1ER26(CA)
ER26(CA)
E
R26(CA)
E R26(CA)
ER26(CA)
IS G20-2 CMSCMS
22
22
R2-1(25)
G20-5aP
IS
R2-1(25)
G20-5aP
IS
R2-1(25)
G20-5aP
5
6
7
IS
R9-9
ON TYPE 3
BARRICADE
IS
R11-2
ON TYPE 3
BARRICADE
E R1-1
R3-2
IS
R3-2
℄
DUNE PALMS ROAD
℄
BRIDGE CENTERLINE
14'14'7.17'
40.5'
COMPLETED 1
ST
STAGE OF CONSTRUCTION
45.5'
2
ND
STAGE OF CONSTRUCTION
WORK ZONE
3.83'
GRADED
CHANNEL
BOTTOM
CONCRETE
BARRIER
(TYPE K)
CLOSURE POUR &
RAISED MEDIAN
CENTERLINE DATA
NO BEARING/DELTA RADIUS LENGTH
1 Δ=07°48'07"250.00'34.04'
2 N 07°57'59" W --98.50'
3 Δ=07°48'07"250.00'34.04'
4 N 00°09'52" W --1167.27'
5 Δ=08°54'29"250.00'38.87'
6 N 08°44'37" E --77.29'
7 Δ=08°54'29"250.00'38.87'
14'14'
℄
DUNE PALMS BYPASS
PHASE 2
PHASE 1
SHORING
MAX
HT
±8.3'
PHASE 1
BYAPSS
12
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CONSTRUCTION BYPASS
PHASE 2
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
DATE APPR.
DWG. No.
DATE
SCALE 1"=50'
50 25 50 100 150
SCALE: 1"=50'
0
PAINT PAVEMENT MARKING OR ARROW AS NOTED.
ON PLANS.
CALTRANS STRIPING DETAIL PER NUMBER NOTED,
PM
#
LEGEND & CONSTRUCTION NOTES:
RS
REMOVE AND SALVAGE SIGN & POST (IF APPLICABLE) AS NOTED.
E EXISTING TO REMAIN
IS FURNISH AND INSTALL SIGN(S) AND POST (IF APPLICABLE).
RP
REMOVE ALL EXISTING CONFLICTING TRAFFIC SIGNING &
STRIPING, PAVEMENT MARKING OR ARROWS AS NOTED, INCLUDING
RAISED PAVEMENT MARKINGS.
ANGLE POINT (AP)
PROPOSED SIGN (ONE POST)
EXISTING SIGN (ONE POST)
SALVAGE TO CITY YARD OR DISPOSE PER CITY DIRECTION.
RELOCATE EXISTING SIGN TO NEW POST (IF APPLICABLE)
RL
CONSTRUCTION AREA (WORK ZONE)
CONCRETE BARRIER (TYPE K) w/ WARNING FLASHERS
CHANGEABLE MESSAGE SIGNCMS
CORPORATE CENTRE DR
WESTWARD HO DRIVE
BLACKHAWK WAY HIGHWAY 111
HIGHWAY 111
MATCHLINE 24+90.00SEE BELOW LEFTMATCHLINE 24+90.00SEE ABOVE RIGHTPHASE 2 DETAIL (BRIDGE)
NOT TO SCALE
DUNE PALMS ROAD
DUNE PALMS ROAD
CHANNELIZER (SURFACE MOUNTED)
STAGED CONSTRUCTION NOTES:
1.DUNE PALMS ROAD SHALL NOT BE CLOSED FOR MORE THAN TWO (2)
CALENDAR DAYS AT A TIME. CONTRACTOR WILL PROVIDE THE CITY WITH
TWO (2) WEEKS NOTICE ON ANY FULL CLOSURE OF DUNE PALMS ROAD.
2.ALL CONFLICTING SIGNING AND STRIPING FROM STAGE 1 SHALL BE
REMOVED AND/OR RELOCATED.
3.STAGING PLANS PROVIDED HEREIN ARE FOR THE MAJOR CONSTRUCTION
STAGES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MEANS AND
METHOD IN CONSTRUCTING THE PROJECT, WITHIN THE PROVIDED STAGING
CONCEPT. CONTRACTOR SHALL PREPARE A DETAILED STAGING PLAN THAT
INCORPORATES ALL CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS
PROJECT WHICH WILL BE REVIEWED BY THE CITY FOR CONFORMANCE WITH
THE OVERALL STAGING CONCEPT. STAGING BY SHALL BE PREPARED BY A
CALIFORNIA REGISTERED ENGINEER AND APPROVED BY THE CITY.
ADDITIONAL CONSTRUCTION PHASES OUTSIDE OF THE PROVIDED SHALL
INCLUDE BUT NOT BE LIMITED TO TRAFFIC SWITCHING BETWEEN PHASES,
BYPASS REMOVAL, UTILITY RELOCATIONS, MOBILE HOME PARK ENTRANCE
RECONSTRUCTION, ETC.
4.WITHIN 60 CALENDAR DAYS OF INITIATING PHASE 2 OPERATIONS THE
CONTRACTOR SHALL HAVE A SECOND ACCESS POINT INTO THE MOBILE HOME
PARK OPEN FOR USE.
5.CONTRACTOR SHALL COORDINATE WITH THE CITY ON THE LOCATIONS AND
THE MESSAGE ON THE CHANGEABLE MESSAGE SIGNS.
6.CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING, REPLACING AND
REMOVAL OF ALL DELINEATORS AND K-RAIL BARRIERS, INCLUDING TRAFFIC
DAMAGE AND/OR VANDALISM.
7.CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING AND PROVIDING
ACCESS INTO THE WORK AREA.
8.CONTRACTOR SHALL PROTECT ALL WORK IN THE CHANNEL, SPECIFICALLY
WHEN THE CHANNEL CARRIES STORM WATER. CONTRACTOR SHALL LIMIT
THEIR PROTECTION OPERATIONS TO THE LIMITS NOTED ON SHEET 23.
9.THE CONTRACTOR SHALL NOT STORE EQUIPMENT OR MATERIALS WITHIN THE
CHANNEL (BANK TO BANK) IN ACCORDANCE WITH THE CVWD CONSTRUCTION
PERMIT.
10.FOR THE BYPASS EMBANKMENT, THE CONTRACTOR MAY UTILIZE EXISTING ON
SITE CHANNEL MATERIAL, IF DEEMED ACCEPTABLE FOR UNCLASSIFIED FILL.
IF CHANNEL MATERIAL IS USED FOR THE BYPASS, UPON REMOVAL, THE
CONTRACTOR SHALL EVENLY SPREAD THE CLEAN MATERIAL WITHIN THE
CHANNEL AS APPROVED BY CVWD AND THE CITY.
11. FOLLOWING COMPLETION OF PHASE 1 CONSTRUCTION OPERATIONS AND
RELOCATION OF TRAFFIC PER PHASE 2 BYPASS PLANS, THE CONTRACTOR
SHALL REMOVE THE BYPASS ROAD AND ALL CONCRETE CUT OFF WALLS.
SAID WORK SHALL BE INCIDENTAL TO THE INSTALLATION OF THE BYPASS
AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED THEREFORE.
R26(CA)
STOPPING
ANY
TIME
NO
SIGN LEGEND
STOP
12"x18"30"x30"
SPEEDLIMIT25
30"x36"24"x24"
SPEEDLIMIT25
SCHOOL
WHEN
CHILDREN
ARE PRESENT
S5-1
24"x48"
R1-1 R2-1 R3-1
24"x24"
R5-2
24"x24"
R8-3
CLOSED
SIDEWALK
24"x12"
R9-9
W1-4R
36"x36"
W1-4L
36"x36"
M.P.H.
25
24"x24"
W13-1P
W20-1
36"x36"
STREETWORKXXX FT
W20-2
36"x36"
DETOURAHEAD
S1-1
36"x36"
ROAD WORK
END
36"x18"
G20-2
WORK
ZONE
30"x24"
G20-5AP
TYPE 3 BARRICADE
CLOSED
ROAD
48"x30"
R11-2
24"x24"
R3-2
PHASE 2 DETAIL (ROADWAY)
NOT TO SCALE
06/23/2021
MHMH12+00 13+00 14+0011+00 15+00 16+0010+00 18+00 19+00 20+0017+00
6"WHITE CHEVRON,
10' O.C.
12
12
12
12
12
CVSCAPN 600-010-0
0
9
CVWD
JOIN EX.
12+78.0 RT
29
25
25
R/W
R/W
R/W
R/W
R/W
R/W
R/W
38
39
39
39
39
39
AP END
18+16.00
RP RP
11'
12'
11'
5'
11'
15'
12
RS W9-1R
RS R5-2
RS R7-2 RS W4-2
RS
R2-1(45)
R3-1(L)x2
RS R5-2
RS R7-2
RS R7-2
RS
RS
R2-1(45)
S5-2
RS
IS
W14-1A
W14-2
R26(S)(CA)E
R3-7E
R3-7
IS
R7-9A
IS
R7-9A
IS
W1-7
IS
IS
IS
R4-7
OM1-3
APN 600-010-009
CVWD
CVSC R/W
11'
12'
12'
11'
8'
8'
SR4-1(CA)
RS IS R1-1
IS
RS SPECIAL
RS
RE PM RE PM
RE PM
RE PM
RE 12
RE 12
RE DETAIL "A"
RE 38
RE 29
RE 29
RE DETAIL "A"
SL ESMT
SL ESMTTCESL ESMT
RE PM
"SIGNAL AHEAD"
39A
W11-1
W16-1P
CVSC R/W
RE PM
MHMHMHMHMHMH2
30 BIKELANEMH24+00 25+00 26+00 27+00 28+00 29+00 30+0023+0021+00 22+00
APN 600-0
3
0
-
0
1
0
DUNE PALMS M
O
B
I
L
E
E
S
T
A
T
E
S
BL
CVSCAPN 600-010-
0
0
9
CVWD BIKELANEBIKELANEBIKELANEBIKELANEBIKELANEJOIN EX.
28+57.0 RT
12
12
12
12
12
12
12
APN 600-010-00
9
CVWD
25
25
25
25
25 25
25
R/W
R/W
R/W
R/W
39
39
39
39
39
25
38
11'
11'
11'
11'
11'
8'
8'
11'
12'
12'
11'
8'
8'
BL
BL BL
R26(S)(CA)
IS
IS
R7-9A
IS
IS
IS
IS
ISTYPE K-2
R6-1 IS
R6-1 IS
R6-1 IS
R6-1 IS
IS R1-1
CVSC
CENTERLINE
CVSC
CENTERLINE
R7-9A
IS
IS R1-1
R26(CA)E
RS R26(CA)
RS
LA QUINTA HIG
H
S
C
H
O
O
L
APN 600-01
0
-
0
0
4
R26(CA)
RPBEGIN
RPBEGIN
RE 12
RE 39
RE PM
RP
RP
8.5
'
8.5
'
TYPE K-2
TYPE K-2
TYPE K-2
R26(S)(CA)
R7-9A E
R5-1
IS R5-1
CVSC R/W
CVSC R/W
R1-1
E
R3-2
PM
PM
END
PM
MHMHMHMHMHBIKELANEBIKELANE34+0031+00 32+00 33+00 35+00 36+00
APN 600-030-02
1
LA QUINTA HO
U
S
I
N
G
AUTHORITY
R/W
R3-7
R/W
R26S
LA QUINTA HIG
H
S
C
H
O
O
L
APN 600-01
0
-
0
0
4
12'
11'
6'
11'
12'
R3-7
14'
R26S
E SR4-1(CA)
11'
CITY OF LA QU
I
N
T
A
CITY OF INDIO
APN 600-030-019
KINGDOM HA
L
L
JEHOVAH'S
W
I
T
N
E
S
S
E
SBIKELANE BIKELANEBIKELANEBIKELANE12
CITY OF LA QUI
N
T
A
25
25
25
R/W
R/W
R/W
℄
℄
38
11'
8'
11'
11'
11'
11'
11'
8'
8'
BL
BL
39
39
PMDETAIL "A"
E
E
E
E
IS
R4-7
OM1-3
R6-1 IS
R6-1IS
E
11'
10'
13'
5'
14'
11'
RE 12
RE 12
RE 39A
RE 39A RE 39
RE PM
RE PM
RE PM REDETAIL "A"
RE 38
RP
END
RP
RPGORE STRIPING
RP
GORE STRIPING
RP
RP
R26S
R7-9A E W3-3 E
PM
PM
13
SIGNING & STRIPING PLAN
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
DUNE PALMS ROAD
04020 40 80 120
SCALE: 1"=40'
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRIPING WITHIN THE
PROJECT LIMITS TO ENSURE COMPATIBILITY WITH THE SIGNING AND
STRIPING PLANS.
2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST
EDITION, AND CITY OF LA QUINTA STANDARD PLANS, LATEST EDITION,
HEREAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS AND
STANDARD PLANS, UNLESS OTHERWISE SPECIFIED.
3. TRAFFIC STRIPES, RAISED PAVEMENT MARKERS, AND SIGNS, (EXCEPT
PAVEMENT LEGENDS), SHALL COMPLY WITH THE LATEST EDITION OF
THE CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS,
HEREAFTER REFERRED TO AS THE STATE STANDARD SPECIFICATIONS AND
STATE STANDARD PLANS.
4. PAVEMENT LEGENDS SHALL MATCH CITY-OWNED STENCILS. CALL CITY
MAINTENANCE MANAGER AT (760) 777- 7052 TO MAKE ARRANGEMENTS
FOR RENTAL OF CITY STENCILS OR INFORMATION REGARDING MODEL NOS.
OF CITY STENCILS.
5. RAISED PAVEMENT MARKERS SHALL CONFORM TO THE PROVISIONS IN
SECTION 85 OF THE STATE STANDARD SPECIFICATIONS, ENTITLED
PAVEMENT MARKERS. ADHESIVE FOR PAVEMENT MARKERS SHALL
CONFORM TO THE PROVISIONS IN SECTION 95-2.04 OF THE STATE
STANDARD SPECIFICATIONS ENTITLED RAPID SET EPOXY
ADHESIVE FOR PAVEMENT MARKERS.
6.TRAFFIC STRIPES AND MARKINGS SHALL BE APPLIED IN TWO COATS, WITH
REFLECTORIZED MATERIAL IN BOTH COATS, AND SHALL CONFORM TO
SECTION 84-3, ENTITLED PAINTED TRAFFIC STRIPES AND PAVEMENT
MARKINGS, AS SPECIFIED IN THE STATE STANDARD SPECIFICATIONS.
THERE SHALL BE A MINIMUM OF 7 DAYS BETWEEN THE APPLICATION OF
THE FIRST AND SECOND COATS.
7. ALL TRAFFIC STRIPING AND PAVEMENT LEGENDS AND RAISED PAVEMENT
MARKERS THAT CONFLICT OR CONFUSE TRAFFIC AS A RESULT OF THE
NEWLY INSTALLED WORK SHOWN ON THIS PLAN SHALL BE REMOVED BY
GRINDING. SANDBLASTING MAY BE UTILIZED WITH PRIOR AUTHORIZATION
BY CITY ENGINEER.
8. DEBRIS FROM REMOVAL OPERATION SHALL BE CONTAINED WITHIN THE WORK
AREA AND THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO
PROTECT PERSONS AND PROPERTY ADJACENT TO THE GRINDING OR
SANDBLASTING OPERATIONS. THE DEBRIS RESULTING FROM THE GRINDING
OR SANDBLASTING SHALL BE IMMEDIATELY REMOVED AND DISPOSED OF
BY THE CONTRACTOR. DEBRIS WITHIN THE ROADWAY SHALL BE REMOVED BY
MECHANICAL SWEEPING OR HIGH-POWER VACUUM.
9. SCARRED PAVEMENT SURFACE RESULTING FROM REMOVAL OPERATIONS SHALL
BE SEALED WITH ASPHALT PAINT CONFORMING TO SECTION 203-8 OF THE
STANDARD SPECIFICATIONS. SCARRED AREAS RESULTING FROM WORK OR
GRAPHIC LEGEND REMOVAL SHALL BE FULLY COVERED WITH AN ASPHALTIC
PAINTED SQUARE OR RECTANGULAR SHAPE THAT COMPLETELY OBLITERATES
THE OLD LEGEND FORM.
10. ALL SIGNS SHALL CONFORM TO SECTION 56-2, ENTITLED "ROADSIDE
SIGNS," AS SPECIFIED IN THE STATE STANDARD SPECIFICATIONS. SIGNS
SHALL BE REFLECTORIZED SHEET ALUMINUM USING HIGH INTENSITY GRADE
SHEETING WITH 3M #1160 PROTECTIVE OVERLAY FILM OR APPROVED
EQUAL. ALL SIGNS SHALL BE MOUNTED WITH THEFT/VANDAL-PROOF
FASTENERS. CONTRACTOR SHALL INSTALL ROADWAY SIGNS AND POSTS PER
THE SIGN AND POST SCHEDULE ON THESE PLANS UNLESS OTHERWISE
NOTED.
11. PER GOVERNMENT CODE SECTION 4216, IF THE WORK IS IN AN AREA
WHICH IS KNOWN, OR REASONABLY SHOULD BE KNOWN, TO CONTAIN
SUBSURFACE INSTALLATIONS, CONTRACTOR SHALL CONTACT UNDERGROUND
SERVICE ALERT (U.S.A.) AT 1-800-422-4133 AND OBTAIN AN INQUIRY
IDENTIFICATION NUMBER AT LEAST TWO WORKING DAYS (48 HOURS) PRIOR
TO COMMENCING ANY WORK THAT PENETRATES THE EXISTING SURFACE.
12. STRIPING LAYOUT SHALL BE APPROVED BY CITY ENGINEERING DEPARTMENT
PRIOR TO APPLICATION OF PERMANENT PAINT. CONTACT THE CITY
ENGINEERING DEPARTMENT 48 HOURS PRIOR TO LAYOUT.
13. STEEL SIGN POSTS INSTALLED IN CONCRETE AREAS SHALL BE INSTALLED
IN STEEL SLEEVES TO FACILITATE REPLACEMENT; WOOD POSTS, IF
APPROVED BY CITY ENGINEER, SHALL HAVE 12" X 12" CONCRETE FILLED
BLOCKOUTS AROUND THE POST.
SIGNING & STRIPING NOTES
PAINT PAVEMENT MARKING OR ARROW AS NOTED.
ON PLANS.
CALTRANS STRIPING DETAIL PER NUMBER NOTED,
PM
#
STRIPING LEGEND & CONSTRUCTION NOTES:
RS
REMOVE AND SALVAGE SIGN & POST (IF APPLICABLE) AS NOTED.
E EXISTING TO REMAIN.
IS FURNISH AND INSTALL SIGN(S) AND POST (IF APPLICABLE).
RP
REMOVE ALL EXISTING CONFLICTING TRAFFIC SIGNING &
STRIPING, PAVEMENT MARKING OR ARROWS AS NOTED, INCLUDING
RAISED PAVEMENT MARKINGS.
ANGLE POINT (AP)
PROPOSED SIGN (ONE POST)
EXISTING SIGN (ONE POST)
DETAIL "A"2"25'
(TYP)
RIGHT LANE
TURN RIGHT
MUST
R3-7
LANEBIKE
R7-9A R26(CA)
STOPPINGANYTIME
NOP
STRIPING NOTES
4" SKIP WHITE LINE W/ RPM'S12
6" DASHED WHITE LINE (BIKE LANE)
8" SOLID WHITE CHANNELIZING LINE W/ RPM'S38
6" SOLID WHITE BIKE LANE LINE39
4" DOUBLE YELLOW SOLID LINE W/ RPM'S29
39A
SIGN LEGEND
SALVAGE TO CITY YARD OR DISPOSE PER CITY DIRECTION.
REFRESH PAVEMENT MARKING/STIPE W/ 1 COAT OF PAINT
RE
BL
PAINT WHITE "BIKE" & "LANE", "HELMETED BIKE RIDER"
SYMBOL, & SMALL BIKE LANE ARROW PER CALTRANS STD.
PLANS A24A, A24C, & A24D, LOCATED PER MUTCD FIG. 9C-3
DETAIL C. PAINT CENTERED ON GREEN RECTANGULAR
BACKGROUND 3.5' X 37.0'
STOP
BD
PAINT WHITE "HELMETED BIKE RIDER" SYMBOL PER CALTRANS
STD. PLAN A24C, CENTERED ON GREEN RECTANGULAR
BACKGROUND.
36"x36"12"x18"12"x18"30"x30"
100'
4" WHITE
R1-1
SCALE: 1"=40'
CORPORATE CENTRE DR
SCALE: 1"=40'
SCALE: 1"=40'
WESTWARD HO DRIVE
BLACKHAWK WAY MATCHLINE 20+25.00SEE BELOW LEFTMATCHLINE 30+25.00SEE BELOW LEFTMATCHLINE 20+25.00SEE ABOVE RIGHTMATCHLINE 30+25.00SEE ABOVE RIGHTDUNE PALMS ROAD
DUNE PALMS ROAD
SPEEDLIMIT45
30"x36"
R2-1
24"x24"
R3-2
DO NOT
ENTER
30"x30"
R5-1
ONE WAY
36"x18"
R6-1
W1-7
48"x24"
W14-2
30"x30"
NO
OUTLET
SPEEDLIMIT25
SCHOOL
WHEN
CHILDREN
ARE PRESENT
SR4-1(CA)
24"x48"
S5-3
24"x30"
END
SCHOOL
SPEED
LIMIT
HIGHWAY 111
HIGHWAY 111
BIKE LANE DETAILBIKELANE GREEN PAINT
37'
4" SOLID YELLOW LINE W/ RPM'S25
W11-1
36"x36"
W16-1P
SHARE
THE
ROAD
18"x24"
06/23/2021
IF THE SLURRY SEAL CONSTRUCTION OPERATION IS
ADDED TO THE OVERALL PROEJCT CONTRACT, THE
CONTRACTOR SHALL GRIND OFF ALL STRIPING PRIOR
TO APPLICATION OF THE SLURRY SEAL MATERIAL
AND ALL STRIPING SHALL HAVE TWO COATS.
ADDITIVE ALTERNATE NOTE:
SSS S S S S S SSS
S
S SEOHEOHRWRWRWW W W
WWW W W W W W WSDSDSDSDSDSDSDSDSDSD
GAS GAS GAS GAS GASMHMHMHMH24+00 25+00 26+0023+00
CVSCAPN 600-010-004
LA QUINTA HIGH
S
C
H
O
O
L
30
31
30 31
1
R/W
1 FENCE(CL)
R/W
FENCE(CL)
LAT"C"
37
41
41
RET.WALL SEE
SHEET 14
PR.C&G
PR.MED
PR.MED
PR.C&G
3
4
OUTLET "A"
42" OUTLET STRUCT.
CVSC STA. 1280+62.60
OUTLET ELEV 49.90
32
76REMOVED
76RELOCATED
48
CVSC R/W
APN 600-010-
0
0
9
CVWD
80
R/W
49
RAISE 7.0'
67 42",L=6'
33
MH #1
ST STA 24+67.33
LAT"D" 20+66.66
LAT"C" 30+06.63
RIM 63.98
LAT"D"
76A/V
CB #4ST STA 24+78.27SD STA 20+00.00 CB, W=14'H=3.50'CB #3ST STA 24+73.85SD STA 30+00.00 CB, W=14'H=3.50'26
26
26
CVSC R/W
APN 600-030-010
DUNE PALMS MOBI
L
E
E
S
T
A
T
E
S
RIM 64.57
RIM 58.05
SD LINE DATA TABLE
DELTA/BRG RADIUS LENGTH REMARKTANGENT
1 N89°50'08"E --67.67'--24" HDPE SD
2 N15°55'55"E --86.50'--24" HDPE SD
3 N70°55'57"W --5.63'--24" HDPE SD
4 N80°22'21"E --65.66'--24" HDPE SD
APN 600-390
-
0
3
3
J PAUL BUILDING
APN 600-030-018
DWGC1, LLC
R/W
R/W
49'10'TCE30
34
30 31
CVSCAPN 600-010-00
9
CVWD
APN 600-010-00
9
CVWD32'35
36
LAT"A"44'53'LAT"B"
34
41
41
39.67'CB #2ST STA 17+96.65SD STA 10+75.67 CB, W=7'H=3.92'CB #1ST STA 17+96.65SD STA 10+00.00 CB, W=7'H=3.50'2
1
40
OUTLET "B"
18" OUTLET STRUCT.
CVSC STA. 1279+45.10
SD STA. 10+00.00
ELEV. 43.03
JOIN EX.18"
SD PIPE
OUTLET "B"
76
RELOCATED
76
REMOVED
CVSC R/W
67
24" OUTLET STRUCT.
CVSC STA. 1277+94.40
SD STA. 11+64.17
ELEV. 42.24
12 13
18",L=40'10+02.0061.34 INV.24" HDPEST STA 17+96.65LAT "A" 10+00.00TC 65.34W=7', H=3.50'ST STA 17+96.65LAT "A" 10+75.67TC 65.40W=7', H=3.92'10+73.6760.98 INV.10+77.6760.48 INV.S=
0.
0
0
5
71.67'CB #1CB #210+40.00 XING
(EX.18" WM)
PROTECT IN PLACE
DUNE
PALMS
ROAD
CB #2 10+75.67
BOTTOM INV. 50.48
LA
T
"
A
"
10+57.15 XING
(EX.8" SWR)
PROTECT IN PLACE
31
34
N-12
WT JTS 10+77.6753.11 INV.87.28'10+73.6760.98 INV.10+83.62 XING
(EX.12" SWR)
~1.10' CLEAR
PROTECT IN PLACE ST STA 17+96.65LAT "A" 10+75.67TC 65.40W=7', H=3.92'CB #2CB #2 10+75.67
BOTTOM INV. 43.11 LAT "B"11+64.1742.82 INV.24" OUTLET STRUCT.
CVSC STA. 1277+94.40
ELEV. 42.24S=0.145CONC. COLLAR
11+48.11 AP
INV. 42.90
S=0.005
10+99.96 XING
PR.18" WM
SEE WATER RELOCATION
PLANS FOR DETAILS
23
22
36
34
RETAINING WALL
PER BRIDGE PLANS
24" HDPE
N-12
WT JTS
100-YR WSE
57.09 ST STA 24+78.27LAT "C" 20+00.00TC 64.03W=7', H=3.50'ST STA 24+73.85LAT "C" 30+00.00TC 64.21W=14', H=3.50'65.7'CB #4CB #3
DUNE
PALMS
ROAD
20+32.20 XING
(EX.18" WM)
PROTECT IN PLACE
PLACE V-BIO WRAP 10'
20+46.08 XING
(EX.12" SWR)
PROTECT IN PLACEST STA 24+67.33LAT "D" 20+66.66 =LAT "C" 30+06.63RIM 63.98MH #120+65.6659.87 INV.20+00.00
60.53 INV.
LA
T
"
D
"
S=
0
.
0
1
0
30+00.0060.69 INV.30+05.6360.61 INV.LAT "C"
24" HDPE, N-12
WT JTS
L= 5.6', S=0.015
20+25.12 XING
(EX.4" GAS)
PROTECT IN PLACE
EX. 42" RCP
BOT INV. ~(51.33)
31
31
33
NORTH & SOUTH OF XING
24" HDPE
N-12
WT JTS
RETAINING WALL
SEE SHEET 15
18" OUTLET STRUCT.
CVSC STA. 1277+45.10
SD STA. 10+00.00
ELEV. 43.03
CONC. COLLAR
10+26.00 AP
INV. 44.33
JOIN EX. SD
CONC. COLLAR
10+54.05 AP
INV. (58.05)S=0.05018" HDPE
N-12
31.2'
18" HDPE
26.0'
23
22
67
35
38
38
L=40.0'(18")
RETAINING WALL
PER BRIDGE PLANS
EX. BLOCK
WALL
WT JTS S=0.4733N-12
WT JTS
100-YR WSE
57.09
04020 40 80 120
SCALE: 1"=40'
SCALE: 1"=40'
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
14
STORM DRAIN PLAN
1110
50 -
60 -
CONSTRUCTION NOTES
1 PROTECT IN PLACE
12 REMOVE SD OUTLET STRUCTURE
13 REMOVE SD OUTLET GRATE
26 CONSTRUCT 6' (TALL) GARDEN WALL, PER SPPWC STD 601-4, TYPE 1, DBL REIN.
30 CONSTRUCT LOCAL DEPRESSION PER RCTD STD 311, CASE C (SUMP)
31 CONSTRUCT CATCH BASIN PER COLQ STD. 200 & 300
32 RECONSTRUCT TO GRADE, STORM DRAIN MANHOLE FRAME & COVER, w/ CONC. COLLAR
33 CONSTRUCT MH NO. 2 PER RCFC&WCD STD MH252
34 CONSTRUCT COMBO CB/DRYWELL SYSTEM "A" PER DETAIL ON SHEET 3
35 CONSTRUCT 18" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
36 CONSTRUCT 24" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
37 CONSTRUCT 42" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
40 18" HDPE, N-12 WT JT SD PIPE
41 24" HDPE, N-12 WT JT SD PIPE
48 12" ARTIUM GRATE PER DETAIL ON SHEET 16
49 6" PVC (SCHEDULE 40) STORM DRAIN PIPE
67 REMOVE RCP STORM DRAIN PIPE
76 RELOCATE WATER MAIN PER WATER PLAN
80 ADJUST TO GRADE, SD MANHOLE FRAME & COVER, w/ CONC. MH COLLAR
50 -
60 -
DUNE PALMS ROAD
LATERAL A & B, AND OUTLET "B"DUNE PALMS ROAD
LATERAL C & D
20
LATERAL A LATERAL B
40 -
LATERALS C & D
50 -
60 -
40 -
OUTLET "B"
30
06/2021
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
50 -
60 -
SCALE: 1"=40'
40 -
10
FOR ALL WATER MAIN PIPE CROSSINGS, BOTH
EXISTING AND RELOCATED WATER PIPE, THE
CONTRACTOR SHALL CENTER A 20' LENGTH OF
STORM DRAIN PIPE OVER THE WATER MAIN,
TO ENSURE THE JOINTS ARE LOCATED
APPROXIMATELY 10' AWAY FROM THE WATER
MAIN.
WATER MAIN XING NOTE:
06/23/2021
SEE SHEET 26 FOR ADDITIONAL DETAILS ON
THE SECONDARY TRAIL.
SECONDARY TRAIL NOTE:
MHMH11+0010+0012+00
24+00 25+00 26+0012+50.00TW 65.25TF 60.87TF 62.3712+10.00TW 64.89TF 59.37TF 60.8711+60.00TW 64.67TF 57.87TF 59.3711+16.00TW 64.71TF 56.37TF 57.87SSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSS
SSSRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO
FO
FO
FOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FOFOFO FO FO FO FO
BEG WALL
9+88.00
TW 60.55
TF 57.87
10+23.00 GB
TW 64.75
23+78.10 DPRD
10+50.00 AP,GB
TW 65.00
TF 56.37
DUNE PALMS ROAD 44'38'44'30'6'1 CHAIN LINK FENCE
1
25
47
25 47
25 47
25 47
PR.C&G
PR.C&G
PR.CB
PR.MEDIANPR.MEDIAN
CVSC R/W
PR.MEDIAN
R/W
R/W
R/W
℄
℄
APN 600-010-004
LA QUINTA HIG
H
S
C
H
O
O
L
46
1
2
EX.42"
RCP SD
RELOCATED
SEWER PER
RELOCATION
PLAN
EX.18"
SEWER
47
SEE BRIDGE
PLANS FOR
WALL
DETAILS
48 49
81
81
81
81
CHAIN LINK FENCE
32
54
57
10+16.00
TW 63.79
TF 57.87
TF 56.37
L=28'
34
'
T=6"
RIM 58.05 END WALL26+13.65 DPR STA12+90.00TW 65.80TF 62.3710+38.00
WIDENED FOOTING
SEE DETAIL HEREON
POR OF 230'
VC PVI @ 11+92.24 EL = 64.20
BEG WALL9+88.00TW 60.5510+23.00 GBTW 64.7523+77.65 DRR 10+50.00 AP,GBTW 65.0024+05.00 DPR10+77.35 BVCTW 64.9124+73.85 DPR11+46.16 LPTW 64.65END WALL26+14.00 DPR12+90.00TW 65.809+88.00TF 57.8710+16.00TF 56.3711+16.00TF 56.3711+60.00TF 57.8712+10.00TF 59.3712+50.00TF 60.8712+90.00TF 62.37TOP PIPE ~50.48
42" RCP SD
FS SIDEWALK
ADJ TO WALL
FS WEST SIDE
OF WALL
FS NORTH SIDE
OF WALL
FS RAMP ADJ
TO WALL
TOP FOOTING
TOP FOOTING
TOP 24" RCP SD
@ RET. WALL STA
11+36.0 ~53.1
INLET GRATE
CONNECT TO SD
MANHOLE PER
SHEET 14
12" SEWER
18" SEWER
RETAINING WALL TABLE
NO BEARING/DELTA RADIUS LENGTH NOTE
1 N 71°20'45" W --62.00'SOUTH FACE OF WALL
2 N 00°10'01" W --236.00'EAST FACE OF WALL
WIDENED FOOTING DETAIL
NOT TO SCALE
11'-0"
2'-3"
8'-9"
d
SHORT c
VERTICAL
3'-8"
c
DESIGN HFG
#5 @ 18"
CONSTRUCTION JOINT
LOL
3" CLEAR
2" CLEAR
OPTIONAL KEY
2"
CLEAR
2"
CLEAR
EXPOSED
FACE
#5 @ 16"
#4 @ 16"
R=9"
8"
16"
1'-0"8"1'-0"
2" CLEAR
FG
LOL
32
1/2" EXPANSION
JOINT FILLER
25
2'
SCALE: 1"=20'
15
RETAINING WALL PLAN
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
20 10 20 40 60
SCALE: 1"=20'
0
- 65
-60
10+00 10+50 11+00 11+50 12+00 12+50
-55
65 -
60 -
55 -
CONSTRUCTION NOTES
1 PROTECT IN PLACE
25 CONSTRUCT RETAINING WALL (TYPE 1A) PER CALTRANS STD PLAN B3-3A
32 RECONSTRUCT TO GRADE, STORM DRAIN MANHOLE FRAME & COVER, w/ CONC. COLLAR
46 METAL GATE ASSEMBLY PER DETAIL ON SHEET 16
47 METAL FENCING (RETAINING WALL) PER DETAIL ON SHEET 16
48 12" ARTIUM GRATE PER DETAIL ON SHEET 16
49 6" PVC (SCHEDULE 40) STORM DRAIN PIPE
54 CRUSHED MISC. BASE (THICKNESS PER PLAN)
57 CONSTRUCT 8" CONC. OVER 6" CMB
81 4" THICK STABILIZED DECOMPOSED GRANITE, PER DETAIL ON SHEET 27
-5050 -
06/2021
CONTRACTOR SHALL PLACE DECOMPOSED GRANITE (DG)
BETWEEN THE FACE OF THE RETAINING WALL TO THE
RIGHT OF WAY LINE. AREA SHALL BE GRADED WITH
A SWALE IN THE MIDDLE SPACE AND DIRECT
DRAINAGE TO THE NOTED INLET.
DECOMPOSED GRANITE NOTE:
H = 8'H = 4'H = 6'
40.0'90.0'44.0'
H = 6'
28.0'
H = 10'
100.0'
06/23/2021
CONTRACTOR MAY TEMPORARILY REMOVE EXISTING CHAIN LINK
FENCE AND PLACE TEMPORARY FENCE IF NECESSARY FOR
CONSTRUCTION OF RETAINING WALL. REMOVAL AND FURNISHING
OF TEMPORARY FENCE SHALL BE INCIDENTAL TO THE
INSTALLATION OF THE RETAINING WALL.
SCHOOL CHAIN LINK FENCE
WEEP HOLE W/ PERVIOUS BACKFILL
OR 6" GEOTEXTILE WRAPPED
PERFORATED PVC PIPE PER
CALTRANS STANDARD PLAN BO-3
25
48
49
CONC.COLLAR
PER DETAIL
HEREON.
TYPICAL INLET DETAIL
NOT TO SCALE48
CONC. COLLAR DETAIL
NOT TO SCALE
2'
3"
2"
5"1'-4"
2"
1"
8"
25
SECTION VIEW
NOT TO SCALE
2'
25
PLAN VIEW
NOT TO SCALE3"2'1'-4"3"2"2"FL OFSWALE4'-9"
2'-3"
2'-6"
4"
10'-0"10'-0"
4"
1" GAP
SEE BRIDGE PLAN
SHEET B21 FOR
ADDITIONAL DETAILS
TOP OF FINISHED SURFACE
DATUM = 0'-0"
+8'-6"
+7'-6"
3" GAP
1
2
"∅ x18"x3"
GATE RETAINING
DEVICE (x2)
1"∅ x42"(x4)
ANCHOR BOLTS
LOCKING DEVICE.
LOCK PROVIDED BY
OTHERS
18"∅ x6'-0"
CIDH PILE
FOUNDATION
SEE BASE PLATE AND
ANCHOR DETAILS HEREON
ANTECH LARGE STANDARD HINGE
ITEM #2000 OR APPROVED EQUAL
(4 TOTAL)
FENCING/GATE COLOR
FENCING SHALL BE PAINTED A
NATURAL RUST COLOR, PER THE
SPECIFICATIONS AND APPROVED BY
THE CITY PRIOR TO APPLICATION.
GATE TO OPEN AWAY
FROM THE STREET
SEE BRIDGE PLAN
SHEET B21 FOR
ADDITIONAL DETAILS
8' PANEL (TYP)
4'-9"
2'-3"
1'-9"
3"
BACK OF WALK
TOP OF RETAINING
WALL, MIN. 0.5'
ABOVE BACK OF WALK
3" GAP
SEE POST
DETAIL HEREON
BACK OF WALK
METAL FENCE DETAILS
NOT TO SCALE47
METAL GATE ASSEMBLY
NOT TO SCALE
℄5'-0" (MAX)B B
1'-0"MINIMUMEMBEDMENT3
1
2
"∅ FORMED OR CORED
HOLE FILLED WITH
NON-SHRINK GROUT
POR-ROK OR EQUAL
CAST IN PLACE WALL
PER CALTRANS STD.
PLAN B3-1
FENCE POST 2"
SQUARE POST @
8' O.C.
RETAINING WALL FENCE POST DETAIL
NOT TO SCALE
3
1
2
"∅ FORMED OR CORED
HOLE FILLED WITH
NON-SHRINK GROUT
POR-ROK OR EQUAL
CAST IN PLACE WALL
PER CALTRANS STD.
PLAN B3-1
FENCE POST 2"
SQUARE POST @
8' O.C.
SECTION B-B
NOT TO SCALE#3 TIES @ 6" OR #3
SPIRAL @ 6" PITCH w/18"
LAP AT SLICE AND 135°
HOOK @ TERMINATIONS
NON-SHRINK
GROUT, 1
1
2
" GAP
2"CLR
#6, 10 TOTAL
CIDH FOUNDATION
NOT TO SCALE
PLAN VIEW
NOT TO SCALE
DETAIL A
NOT TO SCALE
ELEVATION
BASED PLACE & ANCHORAGE DETAILS
NOT TO SCALE
TACK WELD
1"x
1
4
"
BACKING BAR
3
8
" THICK
WALL (POST)
1" BASE
PLATE
BOLT DIA +
1
8
"
AXIS OF GATE
8" DIA (BOLT CIRCLE)
57" GATE POSTS
TS 5"x5"x
3
8
"14" SQUARE
3'-6"6'-0"2"
3"
3"
6"
(TYP)
57" GATE POSTS
TS 5"x5"x
3
8
"
1" BASE
PLATE
DETAIL A
FINISHED
GRADE
(4) 1"∅ 42" LONG
ANCHOR BOLTS w/ HEX
NUT, LEVELING NUT &
2 WASHERS
1"∅ RECEIVING
BORE IN CONCRETE
METAL GATE ASSEMBLY DETAIL
NOT TO SCALE46
INLET DRAIN
NOT TO SCALEMETAL FENCE - RETAINING WALL
NOT TO SCALE
METAL RAILING (CV LINK TRAIL) DETAILS
NOT TO SCALE56
END POST ASSEMBLY
SEE DETAIL HEREON
SURFACE MOUNT:
4 HIT-HY 200 + HAS-R
316 - 7/8"
EMBEDMENT DEPTH = 9"
SURFACE MOUNT:
6 HIT-HY 200 + HAS-R
316 - 7/8"
EMBEDMENT DEPTH = 9"
3/4" MIN GROUT
AT POST C/L
NOTES:
1.RAILING SYSTEM SHALL BE CUSTOM FABRICATED AND CONSISTS OF WELDED AND MECHANICALLY
FASTENED PIECES.
2.PROVIDE FULL SHOP DRAWINGS PRIOR TO FABRICATION OF ALL COMPONENTS. DRAWINGS SHALL
INCLUDE ALL REQUIRED MOUNTING HARDWARE FOR A COMPLETE RAILING SYSTEM WHETHER SHOWN
OR NOT ON THESE DRAWINGS.
3.SHOP DRAWINGS SHALL INCLUDE INSTRUCTIONS FOR PROPER FIELD INSTALLATION.
4.ALL POSTS SHALL BE INSTALLED PERPENDICULAR TO MATCH RUNNING SLOPE OF PATH AND
GROUTED TO VERTICAL IN RESPECT TO PATH CROSS SLOPE.
5.CABLES SHALL BE 316L MARINE GRADE STAINLESS STEEL. MAXIMUM CABLE LENGTH PER INDUSTRY
STANDARDS.
6.CONTRACTOR SHALL VERIFY ALL DEPENDENT DIMENSIONS IN THE FIELD BEFORE ORDERING OR
FABRICATING ANY MATERIAL.
7.ALL HARDWARE SHALL BE VANDAL AND THEFT RESISTANT.
PAINT SCHEDULE:
1.SEE SHEET 30 FOR POST ASSEMBLY PAINT SCHEDULE.
2.ALL TOP RAILS SHALL BE GALVANIZED AND POWDER COATED [WHITE].
3.CABLES AND CABLE HARDWARE SHALL NOT BE PAINTED.
3" ∅ O.D. STEEL
PIPE [TOP RAIL]
CABLE, TYP OF 6
BASE PLATE
CAP END
TOP RAIL BRACKET,
BR-1 OR BR-2
WELD TO POST
TOP RAIL
BOLT w/ WASHER,
TYP OF 4
TOP RAIL
TOP RAIL BRACKET
SEE DETAIL BR-1
HEREON
CABLE, TYP OF 6
POST / END POST
SEE DETAILS ON
SHEET 30
NO CABLE IN
ALTERNATING
HOLES
CABLE END HARDWARE:
FIELD SWAGED ASSEMBLY INCLUDES:
1x TENSIONING END
1x TERMINAL END
2x ACORN NUT
2x HEX NUT
2x WASHER
END POST INCLUDES
BASE PLATE SEE
DETAILS ON SHEET 30
POST INCLUDES
BASE PLATE
SEE DETAILS
ON SHEET 30
BASE PLATE
BASE PLATE
CABLE, TYP OF 6
1/4" STEEL PLATE,
SHAPE AND ANGLE TO
MATCH EDGE OF POST
HALF SECTION OF 3" ∅
INSIDE DIAMETER
STEEL PIPE,
MIN 1/4" THICKNESS
WELDED FABRICATION
SLOT FOR FASTENER
SLOT, SIZE FOR
FASTENER, TYP OF 4
SLOT, SIZE FOR
FASTENER,
TYP OF 4
TOP RAIL
END POST ASSEMBLY
SEE DETAIL HEREON
METAL RAILING ELEVATION
NOT TO SCALE
8"6"3'-5"3'-6"POST/END POST DETAIL
NOT TO SCALE
POST DETAIL (FRONT)
NOT TO SCALE
END POST DETAIL (FRONT)
NOT TO SCALE
TOP RAIL BRACKET
SEE DETAIL BR-2
HEREON
TOP RAIL BRACKET (BR-1 & BR-2)
NOT TO SCALE
MATCH POST1'-6"75°
BRACKET BR-1 & BR-2 (SIDE)
NOT TO SCALE
BRACKET BR-1, POST (FRONT)
NOT TO SCALE
3"TYP
1'-1 1/2"
1 1/2"CLEAR
BRACKET BR-2, END POST (FRONT)
NOT TO SCALE
R=
5
"
3"TYP
2'-0"
1'-2 1/4" CLEAR
NOTE:
ONLY 6 OF THE 14
HOLES IN POST
INCLUDE CABLES.
16
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72RETAINING WALL &
FENCING DETAILS
CONSTRUCTION NOTES
CONSTRUCT RETAINING WALL PER CALTRANS STD PLAN B3-3A
METAL GATE ASSEMBLY PER DETAIL ON SHEET 16
METAL FENCING (RETAINING WALL) PER DETAIL ON SHEET 16
12" ARTIUM GRATE PER DETAIL ON SHEET 16
6" PVC (SCHEDULE 40) STORM DRAIN PIPE
METAL RAILING (ON RETAINING WALL @ TRAIL) PER DETAILS ON SHEET 16
25
46
47
48
49
56
06/23/2021
S S S S S S S S S S S S S S S S S S S S S S
S
S
SWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
EOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEO HEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEEEEEEEEEEESD
SDSDSDSD
SD
FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOCVSC
JOIN EX.
1282+34.00
(32.08) CO
11
11
11 2.0
0%
2.
00
%
1280+00.00
37.57 TOE
1281+00.00
37.79 TOE
1281+46.65 AP
37.89 TOE
1279+14.70 AP
15.24 CO
1280+00.00
15.43 CO
1281+00.00 AP
15.65 CO
1281+69.61 AP
25.20 CO
1281+69.61 AP
37.94 TOE
1282+19.98 GB
25.27 CO
CVSC ESMT
22
76
23
23
23
22
35
36
TOE OF SLOPE
PROTECTION
CUTOFF OF SLOPE
PROTECTION
CUTOFF OF
SLOPE
PROTECTION
EX.CO SLOPE
PROTECTION
CVWD DWG #25854
1
EX.DOM WATER
CVWD DWG #23146
SEE BRIDGE PLANS
FOR DETAILS
BRIDGE RET WALL
BRIDGE RET WALL
1312
JOIN EX.
1282+34.00
(38.08) TOE
1281+18.87 AP
25.09 CO
TOE OF SLOPE
PROTECTION
1281+46.65 AP
25.15 CO
1278+07.00 AP
15.01 CO
1278+07.00 AP
37.15 TOE
SEE BRIDGE PLANS
FOR DETAILS
TOP OF SLOPE
PROTECTION
3
45
REMOVE
CVSC ESMT
100' CVWD CVSC ESMT
RECORDED 3/6/62 PER
INST. NO. 20717
CVSC ESMT
CV LINK SPUR
SEE SHEET 26
FOR DETAILS
67
JOIN EX.
1282+34.00
(60.90) TOP
BEGIN TRAIL, OUTSIDE EDGE
1281+76.68
60.61 TOP
BEGIN TRAIL, INSIDE EDGE 2.00%2.0
0%
1279+14.70 AP,GB
47.12 FS,TRAIL
1279+14.70 AP,GB
47.44 FS,TRAIL
1281+46.65 BC
58.74 FS,TRAIL
1281+45.98 BC
59.06 FS,TRAIL
1281+69.61 EC
59.74 FS,TRAIL
1281+65.20 EC
60.06 FS,TRAIL
1279+14.70 AP
37.38 TOE
1280+22.00 AP
60.45 TOP
1278+04.00 AP
57.55 TOP
1279+03.04 AP
60.32 TOP
1278+97.50 GB
57.55 TOP
1278+01+00 GB
60.09 TOP
1278+07.00 AP,GB
47.28 FS,TRAIL
1278+07.00 GB
46.96 FS,TRAIL
JOIN EX.
1282+34.00
(60.90) TOP
BEG TRAIL INSIDE EDGE
1281+76.68 GB
60.61 TOP
1282+00.00
60.73 TOP
1281+00.00
60.53 TOP
1280+00.00
60.42 TOP
1279+03.04 GB
60.32 TOP
1279+18.00 AP
60.34 TOP
1278+97.50 GB57.55 TOP1278+01.00 GB57.55 TOP1281+00.00 GB AP15.65 COJOIN EX.
1282+34.00 GB
(32.08) CO
1282+19.98 GB
25.32 CO
1278+00.0014.99 CO1279+00.0015.21 CO1280+00.0015.43 CO1280+22.00 AP
60.45 TOP
1279+14.70 AP
37.38 TOE
50.00%50.00%0.22%
0.22%
0.22%
PR. SLOPE
PROTECTION TOE
PR. SLOPE
PROTECTION TOP
PR. INSIDE EDGE
OF TRAIL
PR. INSIDE EDGE
OF TRAIL
PR. SLOPE PROTECTION
CUTOFF WALL5.00%5.
0
0
%
0.15%
1279+14.70 GB
47.44 FS TRAIL
1278+04.00 GB,AP
47.27 FS TRAIL
1277+50.00
59.97 TOP
1277+50.0014.88 CO1277+50.00
49.97 FS TRAIL
1280+00.00
51.71 FS TRAIL
0.22%
1281+00.00
56.75 FS TRAIL
1277+95.92 GB
60.09 TOP
1277+94.40
24" SD OUTLET
1279+45.10
18" SD OUTLET
1279+14.70 AP
15.24 CO**GRADE NOTED IS ALONG THE
ALIGNMENT OF INSIDE EDGE WHICH
INCLUDES CURVES AND TANGENTS
THAT ARE NOT PARALLEL WITH TOP
OF SLOPE PROTECTION.
FUTURE ANTICIPATED
CHANNEL BOTTOM @ C/L
FUTURE ANTICIPATED
CHANNEL BOTTOM @ C/L
PR. SLOPE
PROTECTION TOP
0.00%1281+18.87 GB AP25.09 COREMOVED SLOPE
PROTECTION
REMOVED SLOPE
PROTECTION
REMOVED SLOPE
PROTECTION
EX.SLOPE
PROTECTION TOP
1278+04.00 AP
57.55 TOP
1277+50.0037.02 TOE1278+00.0037.13 TOE1279+00.0037.35 TOE1280+00.0037.57 TOE1281+00.0037.79 TOE1282+00.0038.01 TOEJOIN EX.1282+34.00(38.08) TOE*1281+46.65 AP25.15 CO1281+69.61 AP25.20 CO1282+00.0025.27 COWSE
FUT.100
WSE
FUT.100
0.10%
0.5
2
%
0.10%
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
17
06/2021
CONCRETE LINING PLAN
1822+33.44 - 1276+50.00 RT
20 10 20 40 60
SCALE: 1"=20'
0 SCALE: 1"=20'1281+001282+00
55 -
1280+00 1279+00 1278+00
45 -
35 -
25 -
15 -
- 55
- 45
- 35
- 25
- 15
MATCHLINE 1277+50.00 - SEE SHEET 18MATCHLINE 1277+50.00 - SEE SHEET 18J PAUL BUILDING
400' CVWD CVSC ESMT
PER BOOK 591, PG 223
LEGEND
REMOVE CONC. SLOPE PROTECTION 11
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
THE REMOVED CONCRETE SLOPE PROTECTION IS 6" THICK
WITH #4 REINFORCEMENT @ 18" O.C. BOTH DIRECTIONS.
REMOVAL THICKNESS NOTE:
CONSTRUCTION NOTES
1 PROTECT IN PLACE
3 SAWCUT CONC. SLOPE PROTECTION
11 REMOVE CONC SLOPE PROTECTION TO NEAREST CONTROL JOINT
12 REMOVE SD OUTLET STRUCTURE
13 REMOVE SD OUTLET GRATE
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
23 CONSTRUCT CONC. TRAIL UNDERCROSSING PER DETAIL ON SHEET 21
35 CONSTRUCT 18" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
36 CONSTRUCT 24" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
45 CONNECT TO EX CONC SLOPE PROTECTION PANEL PER DETAIL "F" ON SHEET 20
67 REMOVE RCP STORM DRAIN PIPE
76 RELOCATE WATER MAIN PER WATER PLAN
AT STATION 1282+33.44 (JOIN EXISTING SLOPE
PROTECTION), CONTRACTOR SHALL EXPOSE
THE FULL LENGTH OF THE JOIN AND VERIFY
CONNECTION ELEVATIONS PRIOR TO THE
PLACEMENT OF ANY CONCRETE
*GRADE NOTED IS ALONG THE
ALIGNMENT OF INSIDE EDGE WHICH
INCLUDES CURVES AND TANGENTS
THAT ARE NOT PARALLEL WITH TOP
OF SLOPE PROTECTION.
06/23/2021
S S S S S S S S S S S S S S S S S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
EOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHCVSC
JOIN EX.
1274+87.60
(59.27) TOP
JOIN EX.
1274+87.60
(38.79) TOE
JOIN EX.
1274+87.60
(29.79) CO
1276+02.27 EC
57.64 FS,TRAIL
1276+01.74 EC
57.32 FS,TRAIL
1275+77.78 BC
58.41 FS,TRAIL
1275+82.24 BC
58.73 FS,TRAIL
2.00%2.00%
1276+02.27 AP
36.70 TOE
1277+00.00
36.91 TOE
1275+18.49 GB AP
14.37 CO
1275+72.64 AP
36.63 TOE
1276+02.27 AP
14.56 CO
1277+00.00
14.77 CO
23
23
22
22
CUTOFF OF SLOPE
PROTECTION
CUTOFF OF SLOPE
PROTECTION
EX.TOP SLOPE
PROTECTION
CVWD DWG #35788
1
EX.TOE SLOPE
PROTECTION
CVWD DWG #35788
1
EX.CO SLOPE
PROTECTION
CVWD DWG #35788
1
TOE OF SLOPE
PROTECTION
100' CVWD CVSC ESMT
RECORDED 3/6/62 PER
INST. NO. 20717
1274+92.30 GB
36.44 TOE
45
CV LINK SPUR
SEE SHEET 26
FOR DETAILS
TOP OF SLOPE
PROTECTION
CVSC ESMT
CVSC ESMT
CV LINK
BY OTHERS
END TRAIL OUTSIDE EDGE
1275+20.05
59.35 TOP
END TRAIL INSIDE EDGE
1275+72.64
59.49 TOP
(0.07%)
(0.17%)
(0.07%)1277+00.0059.84 TOP1276+00.0059.57 TOP1275+00.0059.30 TOPJOIN EX.1274+87.60 GB(59.27) TOPEND TRAIL INSIDE EDGE
1275+68.90
59.49 TOP
JOIN EX.1274+87.60(38.79) TOEJOIN EX.1274+87.60(29.79) CO1276+00.0014.55 CO1277+00.0014.77 CO0.22%
PR. SLOPE PROTECTION
CUTOFF WALL
0.22%
PR. SLOPE
PROTECTION TOE
5.
0
0
%
PR. INSIDE EDGE
OF TRAIL
PR. SLOPE
PROTECTION TOP
1277+50.00
59.97 TOP
1277+50.0014.88 CO1277+00.00
52.47 FS TRAIL
1277+50.00
49.97 FS TRAIL
1276+00.00
57.68 FS TRAIL
50
.
0
0
%
*
FUTURE ANTICIPATED
CHANNEL BOTTOM @ C/L
FUTURE ANTICIPATED
CHANNEL BOTTOM @ C/L
1275+18.49 GB AP14.37 COEX.SLOPE
PROTECTION TOP
1277+50.0037.02 TOE1277+00.0036.91 TOE1276+00.0036.69 TOE1275+00.0036.47 TOE1274+92.30 GB36.44 TOE*GRADE NOTED IS ALONG THE
ALIGNMENT OF INSIDE EDGE WHICH
INCLUDES CURVES AND TANGENTS
THAT ARE NOT PARALLEL WITH TOP
OF SLOPE PROTECTION.
50
.
0
0
%1276+02.27 AP14.56 COWSE
FUT.100
WSE
FUT.100
0.27%
0.27%
18
06/2021
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CONCRETE LINING PLAN
1276+50.00 - 1274+87.60 RT
20 10 20 40 60
SCALE: 1"=20'
0 SCALE: 1"=20'1276+00
55 -
1275+00
45 -
35 -
25 -
15 -
- 55
- 45
- 35
- 25
- 151277+00
MATCHLINE 1277+50.00 - SEE SHEET 17MATCHLINE 1277+50.00 - SEE SHEET 17VACANT COMMERCIAL PROPERTY
400' CVWD CVSC ESMT
PER BOOK 591, PG 223
30' CVWD SEWER ESMT
INST.NO.PER 2006-224094
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
CONSTRUCTION NOTES
1 PROTECT IN PLACE
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
23 CONSTRUCT CONC. TRAIL UNDERCROSSING PER DETAIL ON SHEET 21
45 CONNECT TO EX CONC SLOPE PROTECTION PANEL PER DETAIL "F" ON SHEET 20
AT STATION 1274+82.00 (JOIN EXISTING SLOPE
PROTECTION), CONTRACTOR SHALL EXPOSE THE FULL
LENGTH OF THE JOIN AND VERIFY CONNECTION
ELEVATIONS PRIOR TO THE PLACEMENT OF ANY CONCRETE
06/23/2021
ADDITIVE ALTERNATE NOTE:
MH
MH
JOIN EX.
1278+87.00 AP
(39.16) TOE
1281+00.00 AP
39.15 TOE
JOIN EX.
1282+70.00
(26.10) CO
1281+10.00 AP
15.34 CO
1279+37.00 AP
14.96 CO
1277+38.53 GB
14.53 CO
JOIN EX.
1277+04.81 GB
(31.37) TOE
1278+00.00
14.66 CO
JOIN EX.
1278+00.00
(31.57) TOE
EX.TOE SLOPE
PROTECTION
CVWD DWG #19514
EX.TOP SLOPE
PROTECTION
CVWD DWG #19514
CVSC ESMT
CVSC ESMT
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSRW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RWRWRWRWRWRWRWRWRW
RW
RW
RW
W
WWWWWWWWWWWWWWWWWWW
W
W
W
W
W
W WWS
S
S
S
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SDSDSDEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO
FO
FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO
1
MVP AIR
VALVE
1
MVP 36" STEEL
SERVICE PIPE
CVWD DWG #MVP-203
EX.18" VCP SEWER
CVWD DWG #24903
EX.18" VCP SEWER
CVWD DWG #24902
CVSC ESMT
1
1
1
EX.12" VCP SEWER
CVWD DWG #20753
1
MVP TEST
STATION
1
11
11
11
22
22
TOP OF SLOPE
PROTECTION
TOE OF SLOPE
PROTECTION
76
73
72
72
77
72
37
1
26
1FENCE
℄CVSCCVSCEX.DOM WATER
CVWD DWG #23146
CUTOFF OF SLOPE
PROTECTION
CUTOFF OF SLOPE
PROTECTION
1280+61.00 AP
15.24 CO
77
BRIDGE RET WALL
BRIDGE RET WALL
12
1281+00.00
60.54 TOP
76RELOCATED
SEE BRIDGE PLANS
FOR DETAILS
1282+48.34 GB AP
15.65 CO
1279+37.00 AP
39.15 TOE
400' CVWD CVSC ESMTPER BOOK 591, PG 2231278+62.95 AP
14.80 CO
1279+00.00 AP
39.15 TOE
76
3 45
3 45
REMOVE
MVP BLIND FLANGE
& BF VALVE
FENCE
JOIN EX.
1282+70.00
(39.14) TOE
1280+61.00 AP
39.15 FS,TOE
1282+63.00 GB
60.54 TOP
JOIN EX.
1282+70.00 AP,GB
(59.14) TOP
1279+00.00 AP
60.32 TOP
1279+37.00 AP
60.41 TOP
1279+51.50 GB
57.00 TOP
1279+44.65 GB
60.43 TOP
1280+48.50 GB
57.00 TOP
1280+55.59 GB
60.54 TOP
1280+61.00 AP
60.54 TOP
JOIN EX.
1278+87.00 AP,GB
(59.15) TOP
1278+92.79 GB
60.30 TOP
1
NEW SEWER MH PER
SEWER PLANSJOIN EX.1282+70.00 GB(59.14) TOP1282+00.0060.54 TOP1281+00.0060.54 TOP1280+00.0057.00 TOP1279+37.00 AP60.41 TOP1279+00.00 AP60.32 TOPJOIN EX.1282+70.00 GB(39.14) TOE1282+00.0039.14 TOE1281+00.0039.15 TOE1280+00.0039.15 TOEJOIN EX.1278+87.00 GB(39.16) TOE1282+70.00 GB(26.10) CO1282+00.0015.54 CO1281+10.00 AP15.34 CO1281+00.0015.32 CO1280+00.0015.10 CO1277+04.81 GB
(31.37) CO
JOIN EX. CO
1278+87.00
(31.75) FS
JOIN EX. CO
1278+00.00
(31.57) FS
0.01%
0.22%
0.21%
50
.
0
0
%
(0.19%)
(0.20%)
(0.20%)
(0.
6
0
%
)
(0
.
6
0
%
)
(0
.
8
5
%)
EX.SLOPE
PROTECTION TOP
EX.SLOPE
PROTECTION TOE
EX.SLOPE
PROTECTION CO
PR. SLOPE
PROTECTION TOP
PR. SLOPE
PROTECTION TOE
PR. SLOPE PROTECTION
CUTOFF WALL1280+61.00 AP60.54 TOP1280+61.00 AP15.24 CO1279+37.00 AP14.96 COREMOVED SLOPE
PROTECTION
REMOVED SLOPE
PROTECTION
REMOVED SLOPE
PROTECTION
REMOVED SLOPE
PROTECTION
1280+62.60
42" SD OUTLET JOIN EX.1278+87.00 GB(59.15) TOP1280+55.59 GB60.54 TOP1280+48.50 GB57.00 TOP1279+51.50 GB57.00 TOP1279+44.65 GB60.43 TOP0.00%
0.00%
FUTURE ANTICIPATED
CHANNEL BOTTOM @ C/L
50.00%0.22%
1282+48.34 GB
15.65 CO
1279+00.0014.88 CO1278+62.95 AP14.80 CO1278+00.0014.66 CO1277+38.53 GB14.53 CO1281+10.00 AP39.15 TOE1279+37.00 AP39.15 TOE1279+00.00 AP39.15 TOE1280+61.00 AP
39.15 TOE
PR. SLOPE PROTECTION
CUTOFF WALL
50
601282+63.00 GB60.54 TOP5:1 TRANSITION
5:1 TRANSITION 1278+92.79 GB60.30 TOP0.25%
WSE
FUT.100
WSE
FUT.100
WSE
FUT.100
PROFILE SCALE:
VERT: 1" = 4'
HORIZ: 1" = 40'
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 9/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR/CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
19
06/2021
CONCRETE LINING PLAN
1282+70.00 - 1277+04.81 LT
1281+001282+00
60 -
1280+00 1279+00 1278+00 1277+00
50 -
40 -
30 -
20 -
1
MVP AIR VALVE LINE
CVWD DWG #MVP-203
20 10 20 40 60
SCALE: 1"=20'
0
SC
A
L
E
:
1
"
=
2
0
'
EX.TOE SLOPE
PROTECTION
CVWD DWG #39069
1
EX.TOP SLOPE
PROTECTION
CVWD DWG #39069
1
EX.CUTOFF SLOPE
PROTECTION
CVWD DWG #39069
1
EX.CUTOFF SLOPE
PROTECTION
CVWD DWG #19514
1
- 60
- 50
- 40
- 30
- 20
LA QUINTA HIGH SCHOOL
LEGEND
REMOVE CONC. SLOPE PROTECTION 11
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
THE REMOVED CONCRETE SLOPE PROTECTION WEST OF
DUNE PALMS IS 6" THICK WITH #4 REINFORCEMENT @
18" O.C. BOTH DIRECTIONS, AND EAST OF DUNE PALMS
IS 6" THICK WITH 4X4X4WX4W WELDED WIRE FABRIC.
REMOVAL THICKNESS NOTE:
CONSTRUCTION NOTES
1 PROTECT IN PLACE
3 SAWCUT CONC. SLOPE PROTECTION
11 REMOVE CONC SLOPE PROTECTION TO NEAREST CONTROL JOINT
12 REMOVE SD OUTLET STRUCTURE
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
26 CONSTRUCT 6' (TALL) GARDEN WALL, PER SPPWC STD 601-4, TYPE 1, DBL REIN.
37 CONSTRUCT 42" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
45 CONNECT TO EX CONC SLOPE PROTECTION PANEL PER DETAIL "F" ON SHEET 20
72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN
73 CONSTRUCT IRR. STUB / SLOPE PROTECTION CONNECTION PER DETAIL "H" ON
SHEET 20
76 RELOCATE WATER MAIN PER WATER PLAN
77 REMOVE SEWER MAIN PER SEWER PLAN
IRRIGATION LATERAL NOTE:
PRIOR TO ANY EXCAVATION OPERATIONS IN THE
IMMEDIATE VICINITY OF THE 36" STEEL SERVICE PIPE,
THE CONTRACTOR SHALL EXPOSE THE PIPELINE AND
VERIFY THE ELEVATION/LOCATION OF THE SLOPE
PROTECTION CROSSING.
AT STATION 1282+70.00 & 1279+00.00 (JOIN
EXISTING SLOPE PROTECTION), CONTRACTOR
SHALL EXPOSE THE FULL LENGTH OF THE JOIN
AND VERIFY CONNECTION ELEVATIONS PRIOR TO
THE PLACEMENT OF ANY CONCRETE
06/23/2021
MOBILE HOME PARK
COLD JOINT
#4 REBAR
AT 18" O.C.
12"
MIN. LAP
6"
COLD JOINT
WEEP HOLE DETAIL
NOT TO SCALE
CHANNEL SIDE
EXISTING CONCRETE LINING
WALL PROTECT IN PLACE
(REINFORCEMENT NOT SHOWN)
PROPOSED CONCRETE LINING
(REINFORCEMENT NOT SHOWN)
DRILL AND PLACE #4 @ 18"O.C.
DOWELS TO EXIST. CONCRETE
LINING CENTERED WITH NON-
SHRINK EPOXY GROUT (TYP.)
12"12"
6"
DOWEL CONNECTION DETAIL
FOR ANCHOR WALL (PLAN VIEW)
DOWEL CONNECTION DETAIL
FOR SLOPE PROTECTION
PROPOSED
CHANNEL LINING
EXISTING
CHANNEL LINING
#4 x 24"@ 18" O.C.
@ C SLAB LINING
L
#4 CONT.
FLOW
#4 BARS @
18" O.C.
ROUGHENED JOINT CONT.
CHANNEL SIDE
DEVELOPMENT SIDE
12"
MIN.
12"
MIN.
TOP OF SLOPE
PROTECTION
CONTROL JOINTS AT
20'-0" SEE DETAIL
TOE OF SLOPE
PROTECTION1.5:11:1CONTROL JOINT PLAN
DEVELOPMENT SIDE
CVWD ROW
ACCESS ROAD AND
OTHERS IF APPLICABLE
#4 REBAR AT 18"O.C.
CONTROL JOINT
WITH ASPHALT FILLER
1"
CONTROL JOINT
1/4" @ BOTTOM
6"
SLOPE ANCHOR DETAIL
SEE DETAIL D2 HEREON
6" THICK P.C.C. LINING
BEGIN CUT-OFF WALL @
DESIGN INVERT
BOTTOM OF CUT-OFF WALL
(ELEV. AS SHOWN ON PROFILE)
#4 BARS
1
1
1-#4 CONT. HORIZONTAL AND
VERTICAL AT BEGINNING AND
END OF LINING
1.5
1
VARIESVARIES
@ 18" O.C.
24"
SLOPE PROTECTION DETAIL
#4 BARS
@ 18" O.C.
GRADE TO DRAIN TOWARDS
CENTER LINE OF CHANNEL
TOP OF SLOPE
PROTECTION
TOP OF SLOPE
@ 18" O.C.
#4 BARS
3-#4 CONT.
12"24"24"NATIVE SOIL COMPACTED TO
95% OF MAX DRY DENSITY
PER ASTM D698 (FILL
CONDITION ONLY)
BOTTOM OF CUTOFF
WALL (CHANNEL SIDE)
NOTES: 1)CONCRETE CLASS 560-C-3250 OF SUBSECTION 201-1.1.2 OF THE SSPWC (560 lbs/cy PORTLAND
CEMENT, GRADE C AGGREGATE GRADATION, MIN. COMPRESSIVE STRENGTH OF 3250 PSI, 4-IN MAX SLUMP).
WHEN APPLICABLE HIGHER STANDARDS MAY BE REQUIRED PER APPROVED SOILS REPORT.
2)MINIMUM REBAR COVERAGE = 1.5"
3)ALL REBAR SHALL BE DEFORMED BARS AND CONFORM TO ASTM A-615 GR 60 OR A706 GR 60.
TOP OF SLOPE PROTECTION
(ELEV. AS SHOWN ON PROFILE)
A
B
C
D2
G
E
F
NOTE:
AT CONTRACTOR'S OPTION THE LINING
MAY BE EXTENDED AT 1.5:1 TO BOTTOM
OF CUT-OFF ELEVATION INSTEAD 1:1 AS
SHOWN ON THIS DETAIL
MIN. 1"DIA. DRILL HOLE
AND GROUT SOLID
MIN. 1"DIA. DRILL HOLE
AND GROUT SOLID
WEEP HOLES (SEE
DETAIL "G" HEREON)
36
"
I
R
R
I
G
A
T
I
O
N
L
A
T
E
R
A
L
IRRIGATION LATERAL SLOPE LINING XING DETAIL
H
3" CLR
3" CLR
#4 BARS @
18" O.C.
PROPOSED SLOPE
PROTECTION
SIDE SECTION VIEWFRONT VIEW
#4 BARS @
18" O.C.
#4 BARS 3" CLEAR OF
PIPE, TERMINATING 12
CLEAR OF PIPE O.D.
12"(TYP)
STEEL IRRIGATION PIPE SHALL
BE POLY WRAPPED AT THE
INTERSECTION WITH THE SLOPE
PROTECTION, 24 INCHES CLEAR.
EX. 6" CONC. w/ #4
REBAR @ 18" O.C.
SLOPE TOP @ RETAINING WALL DETAIL
D3
RETAINING WALL PER
BRIDGE PLANS
6" THICK
P.C.C. LINING
TOP OF SLOPE
PROTECTION
24"
1
1.5
@ 18" O.C.
#4 BARS
#4 BARS @ 18"
O.C. (CONTINUOUS)
3"
6"
2'
MIN.
36"
1/4" EXPANSION
JOINT FILLER
NOTE:
WEEP HOLES SHALL BE
CONSTRUCTED WITH 3"
CLEARANCE FROM REBAR
2' LONG PERFORATED PIPE
W/ PERFORATIONS DOWN
2.5 CU. FT. OF CLASS II
PERMEABLE MATERIAL WRAPPED
IN FILTER FABRIC MIRAFI 140N
OR APPROVED EQUAL AND TIED
SECURELY (TYP.)
WEEP HOLES 3" DIA.
PVC SCH 40 @ 10'
O.C. STAGGERED
1
4
" MESH 16-GAGE
GALVANIZED HARDWARE (TYP.)
NON-PERFORATED PIPE
1
1.5
2%
2%
A
A
TOP OF SLOPE
PROTECTION
3"∅ PIPE WITH 2%
GRADE TO OUTLET
SECTION A-A
NOT TO SCALE
3'10'10'2'
1'
1'
1'
4
1
2
"
4
1
2
"
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
BYPASS CUTOFF WALL DETAIL
NOTES: 1)CONCRETE CLASS 560-C-3250 OF SUBSECTION 201-1.1.2 OF THE SSPWC (560 lbs/cy
PORTLAND CEMENT, GRADE C AGGREGATE GRADATION, MIN. COMPRESSIVE STRENGTH OF 3250
PSI, 4-IN MAX SLUMP). WHEN APPLICABLE HIGHER STANDARDS MAY BE REQUIRED PER
APPROVED SOILS REPORT.
2)MINIMUM REBAR COVERAGE = 1.5"
3)ALL REBAR SHALL BE DEFORMED BARS AND CONFORM TO ASTM A-615 GR 60 OR A706
GR 60.
NOT TO SCALE
SEE DETAIL D2 HEREON
6" THICK P.C.C. LINING
#4 BARS
1
1
1-#4 CONT. HORIZONTAL AND
VERTICAL AT BEGINNING AND
END OF LINING
10'
@ 18" O.C.
24"
#4 BARS
@ 18" O.C.
GRADE TO DRAIN TOWARDS
CENTER LINE OF CHANNEL
NATIVE SOIL COMPACTED TO
95% OF MAX DRY DENSITY
PER ASTM D698 (FILL
CONDITION ONLY)
TOP OF SLOPE PROTECTION
(ELEV. AS SHOWN ON PLAN)
NOTE:
AT CONTRACTOR'S OPTION THE LINING
MAY BE EXTENDED AT 1.5:1 TO BOTTOM
OF CUT-OFF ELEVATION INSTEAD 1:1 AS
SHOWN ON THIS DETAIL
I
20
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CONCRETE LINING
CONSTRUCTION DETAILS
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
06/23/2021
ELEV PER
PLAN
TOP ELEV
PER PLAN
WEEPHOLE PER DETAIL
ON SHEET 20
SLOPE PROTECTION PER
DETAILS ON SHEET 20
R/W
1
1.5
TOE OF SLOPE
ELEV PER PLAN
MULTI-TRAIL UNDERCROSSING SECTION
2% SLOPE
1
1
2% SLOPE
1
VAR
SLOPE PROTECTION
ANCHOR PER DETAILS
ON SHEET 20
VARIES 2'TRAIL SPUR16'VARIES
6" (TYP)
6" (TYP)
6" (TYP)
CUTOFF ELEV
PER PLAN
SLOPE PROTECTION PER
DETAILS ON SHEET 20
REGRADE CHANNEL
BOTTOM TOWARDS
CENTERVARIESVARIES
VARIESNATIVE SOIL COMPACTED TO
95% OF MAX DRY DENSITY
PER ASTM D698 (FILL
CONDITION ONLY)
TYPICAL SECTION - CHANNEL SLOPE PROTECTION
℄
CVSC
250'
SLOPE PROTECTION PER
DETAILS ON SHEET 20
R/W
CVSC
WORKING AREA VARIES VARIES
TOP ELEV
PER PLAN
TOE ELEV
PER PLAN
CUTOFF ELEV
PER PLAN
EXISTING
GROUND
BACKFILL
LIMIT
LIMITS OF SLOPE
PROTECTION
CONSTRUCTION
EXCESS EXCAVATED MATERIAL MAY
BE UTILIZED FOR EMBANKMENT FILL
OR SPREAD EVENLY WITHIN CHANNEL,
SLOPE TO DRAIN TO CENTER.
15"
30"
12"
12"12""W"
"C"
"B"
15"
#4 @12"
E.F., E.W.
#4 @12"
OC TYP.
2"CLR
TYP
3"CLR TYP
#4 @12"
OC TYP.
1-#4 E.F.@ 2"
CLR TYP
2-ADD'L #4
4 TOTAL
"L"
"X"
#4 @ 12" OC
E.F., E.W.
"L"
"W"
12"
12"
AA
B
B
SECTION A-A
RCP OUTLET DETAIL
SECTION B-B
#4 @ 12" OC
E.F., E.W.
VERT #4 REBAR, BEND
& EMBED MIN.18"
INTO EX. CONC. (TYP)
OUTSIDE VERT. #4 REBAR,
BEND & EMBED MIN 18" INTO
EX. CONC., 18" O.C. (TYP)
#4 @ 12"OC
EACH WAY (TYP)
12" THICK
PCC WALL
#4 @12"OC
STOP @ PIPE
35
3.5" PIPE
EMBEDMENT
12" THICK
PCC WALL
"B"+"C"
OUTLET DEBRIS SCREEN DETAIL
PIPE DIA.+ 8"PIPE DIA.+ 8"BOLTED LATCH
HINGE
HINGE
STORM
DRAIN PIPE
1-
1
2
"X1-
1
2
"X
3
16
" ANGLE
STEEL FRAME
HORIZ.WELDED
5
8
"∅
STEEL ROD OR
#5 REBAR @ 6"
O.C.
VERT.WELDED
5
8
"∅
STEEL ROD OR
#5 REBAR @ 6"
O.C.
NOTES
1.LOCKABLE HINGE AND LATCH CLASP SHALL BE SUPPLIED BY
THE CONTRACTOR AS APPROVED BY THE CITY. CITY TO
PROVIDE LOCK.
2.DEBRIS SCREEN GRATE AND FRAME SHALL BE GALVANIZED.
CONC. SLOPE
@ 1.5:1 (TYP)
RCP STORM
DRAIN PIPE
"D"
36 37
PLAN VIEW
RCP STORM
DRAIN PIPE
"Y"
CABLE RAIL PER
CALTRANS STD B11-47
ALONG TOP & SIDES
"A" - DISTANCE TO CVSC
CENTERLINE INT. W/ PIPE
℄ EXTENDED
PROPOSED SLOPE
PROTECTION
PROPOSED SLOPE
PROTECTION
OUTLET DATA TABLE
CVSC STA
1277+94.40 LT
1279+45.10 LT
1280+62.60 RT
"A"
184.44'
184.98'
256.06'
"B"
1.25'
1.50'
2.25'
"D"
24"
18"
42"
"L"
4.25'
5.03'
7.35'
"W"
3.50'
3.00'
5.00'
"X"
42.82
43.03
49.90
"C"
1.50'
1.75'
2.50'
2%
"D"
"X" ELEVATION SHALL BE
0.5' ABOVE OUTLET SLAB
"Y"
42.24
42.43
49.76
REBAR OMITTED FROM SLOPE PROTECTION
DETAILS HEREON FOR CLARITY. SEE
SHEET 20 FOR DETAILS.
REBAR NOTE:
SEE SHEET 25 FOR
TRAIL SPUR DETAILS
45° ANGLE
(TYP)12" (TYP)(2) #4 X 3'-0" LG @ 12" O.C.
(TYP. EACH CORNER)
(2) #4 X 3'-0" LG @ 12" O.C."W""L"
L
C
STORM DRAIN
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
SEE ABOVE DETAIL FOR PLAN
VIEW REINFOREMENT.
PLAN VIEW REINFORCEMENT
NOT TO SCALE
12" THCIK PCC
WALLS (TYP)
#4 REBAR @ 12"
O.C. EACH WAY
3" CLR"D"21
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CONCRETE LINING
CONSTRUCTION DETAILS
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
06/23/2021
ADDITIVE ALTERNATE NOTE:
PROFILE SCALE:
VERT: 1" = 10'
HORIZ: 1" = 50'
℄
R/W
1275+00
R/W
℄
1276+00
10
20
30
40
50
60
10
20
30
40
50
60
10
20
30
40
50
60
10
20
30
40
50
60
10
20
30
40
50
60
R/W
℄
1277+00
10
20
30
40
50
60
10050100150200250
050100150200250
050100150200250
R/W
℄
1278+00
R/W
10
20
30
40
50
60
10
20
30
40
50
60
050100150200250
10
20
30
40
50
60
10
20
30
40
50
60
050100150200250 50 100 150 200 250
50 100 150 200 250
10
20
30
40
50
60
10
20
30
40
50
60
050100150200250 50 100 150 200 250
10
20
30
40
50
60
10
20
30
40
50
60
050100150200250 50 100 150 200 250
℄
R/W R/W
1279+00
R/W
℄
R/W
1280+00
10
20
30
40
50
60
10
20
30
40
50
60
050100150200250 50 100 150 200 250
R/W
℄
R/W
1281+00
R/W
℄
R/W
1282+00
WSE
EX.100
=50.4
WSE
FUT.100
=56.3
WSE
EX.100
=50.6
WSE
FUT.100
=56.6
WSE
EX.100
=50.8
WSE
FUT.100
=56.8
WSE
EX.100
=51.1
WSE
EX.100
=54.0
WSE
EX.100
=56.8
WSE
EX.100
=57.2
WSE
EX.100
=57.0
WSE
FUT.100
=57.1
WSE
FUT.100
=57.3
WSE
FUT.100
=57.5
WSE
FUT.100
=57.5
WSE
FUT.100
=57.5
EX.GND
EX.GND
EX.GND
EX.GND
EX.GND
EX.GND
EX.GND
EX.SLOPE
PROTECTION
59.32 FS
TOP
EX.GND
EQUILIBRIUM SLOPE
60.73 FS
TOP
59.57 FS
TOP
59.84 FS
TOP
60.09 FS
TOP
60.32 FS
TOP
60.54 FS
TOP
60.53 FS
TOP
(58.98) FS
TOP
60.32 FS
TOP
60.54 FS
TOP
60.54 FS
TOP
60.54 FS
TOP
39.14 FS
TOE
39.15 FS
TOE
39.15 FS
TOE
39.15 FS
TOE
(39.00) FS
TOE
(31.57) FS
JOIN & EXTEND
15.54 FS
CUT OFF
15.32 FS
CUT OFF
15.10 FS
CUT OFF
14.88 FS
CUT OFF
20.60 FS
TOE
14.55 FS
CUT OFF
14.77 FS
CUT OFF
15.21 FS
CUT OFF
15.43 FS
CUT OFF
15.65 FS
CUT OFF
25.27 FS
CUT OFF
38.01 FS
TOE
37.79 FS
TOE
37.57 FS
TOE
37.35 FS
TOE
37.13 FS
TOE
36.91 FS
TOE
36.69 FS
TOE
36.47 FS
TOE
EQUILIBRIUM SLOPE
EQUILIBRIUM SLOPE
EQUILIBRIUM SLOPE
EQUILIBRIUM SLOPE
EQUILIBRIUM SLOPE
EQUILIBRIUM SLOPE
EQUILIBRIUM SLOPE
CROSS SECTION
INTERSECTS
ROADWAY SECTION,
NOT SHOWN
EX.MASONRY
WALL
CROSS SECTION
INTERSECTS
ROADWAY SECTION,
NOT SHOWN
CONSTRUCTION
GRADING
CONSTRUCTION
GRADING
CONSTRUCTION
GRADING
BRIDGE STRUCTURE
SECTION (1)
BRIDGE STRUCTURE
SECTION (1)
PIER #2 PIER #3
ABUT #5
PIER #4
54" REC. WATER
~18.6 TOP PIPE
54" REC. WATER
66" STEEL SLEEVE
~18.8 TOP SLEEVE
54" REC. WATER
66" STEEL SLEEVE
~18.6 TOP SLEEVE
~16.0'
14.99 FS
CUT OFF
14.66 FS
CUT OFF
22
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CONCRETE LINING
CONSTRUCTION DETAILS
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
06/23/2021
CONTRACTOR SHALL VERIFY LOCATION OF 54"
RECLAIMED WATER AND 36" SERVICE LINE
FACILITIES PRIOR TO PEIR 4 AND SLOPE
PROTECTION INSTALLATION OPERATIONS.
RECLAIMED WATER NOTE:
PARTIAL BRIDGE SECTION SHOWN FOR
INFORMATION ONLY WITH LINEWORK SHOWN ON
A SKEW, PERPENDICULAR TO THE CHANNEL
CENTERLINE. CONTRACTOR SHALL REFER TO
THE BRIDGE PLANS FOR ALL DETAILS IN
CONSTRUCTING THE BRIDGE.
XS BRIDGE NOTE (1):
MH
MH
MH 413724+0023+0018+0021+0019+0022+0020+001278+00 1277+001279+001280+001281+001282+001283+00 1276+00 1275+00
S
S
S
S
S
S
S
S
S
S SS
S
S
S
S
S
S
S
S
S SSSSSSSSSW RW
RW
RW RW RW
RW RW RW RW
RW RW RW
RW RW RW RW
RW RW RW
RW
RWRWRWRWRW W
SSSSSS S S S S S S
S
S
S
S
S
S
S
S
S
S
S
WWWWWS
S
S
S
S
S
S
S
S
S
S
S
SD
SD SDSD SD SD SD SD
SDRW RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
EEEEEEESD(4
6
)
(48)
CVSC R/W
CVSC R/W
50
37
22
72
72
22
LA QUINTA HIGH
SCHOOL
CVWD
CVSC CHANNELDUNE PALMS ROADCVSC
N71°20'45"W 3141.87'
(3
4
)
(
4
4
)
(4
4
)
(3
6
)CHANNEL GRADING LIMITS STA 1278+00.0403836
34
CVWD
CVSC CHANNEL
℄CVSC
400' CVWD CVSC ESMT
PER BOOK 591, PG 223
(46)(5
0
)
(4
2
)
(3
8
)(36)(34)(4
8
)
(3
6
)
(36
)
(
4
0
)
(44)
48
46
44
42
40
38
76
CV LINK TRAIL
BY OTHERS
CV LINK TRAIL
BY OTHERS
J PAUL BUILDING
DWGC1, LLCR/W22
R/WCVSC R/W
CVSC R/W
CVWD SWR ESMT
100' CVWD CVSC ESMT
RECORDED 3/6/62 PER
INST. NO. 20717
100' CVWD CVSC ESMT
RECORDED 3/6/62 PER
INST. NO. 20717(46)(38)(42)
(46)
(44)(40)(48)4244444623
23
CV LINK SPUR
SEE SHEET 26
22
35
36
40
41
76
CV LINK SPUR
SEE SHEET 26
1 12" VCP SEWER
1 54" STEEL MVP
1 54" STEEL MVP
1
73
1
1
CONC. SLOPE
PROTECTION
1 18" VCP SEWER
1 12" VCP SEWER
EC 1276+75.52
Δ=04°1 6'03" R=291 4.93' L=1 558.28' T=1 08.61'
1
1
1
INTERIM POLE
w/ GUYS (x2)
INTERIM POLE
w/ GUYS (x2)
INTERIM POLE
18" VCP SEWER
DUNE PALMS
MOBILE
ESTATES
IID OVERHEAD DIST. LINE
INTERIM SHOO FLY
CVWD DWG 38374
CVWD DWG 38374
CVWD DWG 38374
36" STEEL MVP LAT
CVWD DWG 20753
CVWD DWG 24902
CVWD DWG 24903
CVWD DWG 26054
1
CHANNEL GRADING LIMITS STA 1280+50.0APPROX. CHANNEL PROJECT LIMTSAPPROX. CHANNEL PROJECT LIMTSA/V ASSEMBLY MVP
INTERSECTION
21+05.26 DUNE PALMS RD =
1279+27.69 CVSC
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
23
CHANNEL GRADING
PLAN
06/2021 SCALE 1"=30'DUE TO CHANGING CONDITIONS WITHIN THE
CHANNEL THROUGH ONGOING MAINTENANCE AND/OR
STORM EVENTS, BOTH THE UPSTREAM AND
DOWNSTREAM CONTOUR DEPICTED HEREON MAY NOT
REFLECT THE CURRENT SITE CONDITIONS.
CHANNEL CONTOURS:
C.V.W.D. DRAWING APPROVAL
Revisions:
DIRECTOR OF ENGINEERING
PROJECT ENGINEER
Recommended:
Checked:
DATE APPR.
DWG. No.
DATE
30 15 30 60 90
SCALE: 1"=30'
0
CONSTRUCTION NOTES
1 PROTECT IN PLACE
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS
20-21
23 CONSTRUCT CONC. TRAIL UNDERCROSSING PER DETAIL ON
SHEET 21
35 CONSTRUCT 18" SD OUTLET W/ TRASH GRATE, PER DETAILS ON
SHEET 21
36 CONSTRUCT 24" SD OUTLET W/ TRASH GRATE, PER DETAILS ON
SHEET 21
37 CONSTRUCT 42" SD OUTLET W/ TRASH GRATE, PER DETAILS ON
SHEET 21
40 18" HDPE, N-12 WT JT SD PIPE
41 24" HDPE, N-12 WT JT SD PIPE
72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN
73 CONSTRUCT IRR. STUB / SLOPE PROTECTION CONNECTION PER
DETAIL "H" ON SHEET 20
76 RELOCATE WATER MAIN PER WATER PLAN
INTERIM SHOO FLY TO BE REMOVED AT THE START
OF THE STAGE 2 (EASTERN HALF) CONSTRUCTION
OPERATIONS.
IID SHOO FLY
06/23/2021
SSSS S S S SSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S SSSEOHEOHEOHEOHEOHEOHEOHEOHS S
SSSSSSW W
W W W W WSDSDSDSDSDSDSDSDSDSDSDE
E
E
E
E
T
TSDSD
MHMH1 1
1
1
1
1
1
1
2 2
2
2
2
2
2 2
2 2
2
2
2
2
2
2
1 1
1
1
1
1
1
1
5 (TYP)
5 (TYP)
5 (TYP)
5 (TYP)
9
6
8
4
4 (TYP)
4 (TYP)
3 (TYP)
3 (TYP)
CV
S
C
R
/
W
R/W
APN 600-030-010
APN 600-390-03
3
J PAUL BUILDIN
G
CVSCDUNE PALMS
MOBILE ESTATE
S
R/W
R/W
R/W
R/W
CV
S
C
R
/
W
CV
S
C
R
/
W
19+00
CVWD
APN 600-010-00
4
20+00 21+00 22+00 23+00 24+00
21+05.26 DUNE PALMS
1279+47.72 CVSC
℄
℄
℄
CURB
CURB
BRIDGE
RAILING
BRIDGE
RAILING
BRIDGE
RAILING
BRIDGE
RAILING
CURB
CURB
RAISED
MEDIAN
RAISED
MEDIAN
SLOPE
PROTECTION
CUTOFF
SLOPE
PROTECTION
TOE
SLOPE
PROTECTION
TOP
CV
L
I
N
K
CO
N
N
E
C
T
O
R
CV LINK
UNDERCROSSING
CV
L
I
N
K
CO
N
N
E
C
T
O
R
RELOCATED 18"
DOM. WATER
RELOCATED 18"
DOM. WATER
SLOPE
PROTECTION
CUTOFF
SLOPE
PROTECTION
TOE
SLOPE
PROTECTION
TOP
SEE BRIDGE PLANS
FOR DETAILS
SEE BRIDGE PLANS
FOR DETAILS
1279+001280+00CVSC
CENTERLINE
10
CV
S
C
R
/
W
7
9
2
2
9
9
2
8
LA QUINTA HIGH
SCHOOL
APN 600-010-004
CATALOG NUMBER: PL-902-MCT-40-LED-MT-5-4-WL-BZ-SS
Bollard:
LED:
Lens:
Finish:
11 3/4” SQ
Reinforced Concrete.
SPECIFICATIONS
40 watts, multi-tap.
White impact resistant, UV stabilized, prismatic lens.
Bronze polyester powder fuse coating.
Sequoia sand concrete.
LED ENGINE INFORMATION
LUMINOUS FLUX
WATTAGE
COLOR TEMPERATURE
CRI
14”
MILLIAMPS
OVERHEATING PROTECTION
OPERATING POSITION
AVERAGE LIFETIME 10% FAILURE
DIODE MANUFACTURER
LUMEN MAINTENANCE AT END OF LIFE
INPUT VOLTAGE
6000
40
4000K
>77
530
YES
50000 HOURS
UNIVERSAL
120-277
SYLVANIA
70%
BRONZE - BZ SEQUOIA SAND
PACIFIC LIGHTING & STANDARDS COMPANY
LYNWOOD, CA
EST. 1984BALLAST
COMPARTMENT
SALES PERSON:
JOHN MOORE
DRAWN BY:
CHECKED:
REVISION:
APPROVED:
TYPE:
JOSEPH 03/20/20
DATE:CATALOG NUMBER:PL-902-MCT-40-LED-
MT-5-4-WL-BZ-SS
PROJECT NAME:
BRIDGE LIGHTING
CUSTOMER:
SCALE:
NONE PAGE 1 OF 1
KSS LIGHTING: STEVE
24
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72BRIDGE LIGHTING PLAN
1.ALL WORK SHALL CONFORM TO THE CALTRANS 2018 STANDARD PLANS AND CURRENT
SPECIFICATIONS AND THE PROJECT SPECIFICATIONS.
2.ELECTRICAL SERVICE ENCLOSURES SHALL CONFORM TO THE REQUIREMENTS OF IMPERIAL
IRRIGATION DISTRICT (IID) AND THEIR ELECTRICAL SERVICE PLANS.
3.ALL PULL BOXES SHALL BE NO. 5 PCC (UNLESS OTHERWISE NOTED).
4.REFER TO CALTRANS STD ES-9D FOR PULL BOX INSTALLATION.
5.REFER TO CALTRANS STD ES-9B FOR ELECTRICAL DETAILS AT APPROACH SLABS.
6.REFER TO CALTRANS STD ES-9A FOR ELECTRICAL DETAILS AT WING WALLS.
7.WALKWAY LIGHTING SHALL BE SPACED EVENLY BETWEEN THE PILASTERS.
GENERAL BRIDGE LIGHTING NOTES:
CONSTRUCTION NOTES:
INSTALL SQUARE LED PEDESTAL BOLLARD LIGHT, CATALOG #PL-902-MCT-40-LED-MT-5-4-WL-BZ-SS,
FROM PACIFIC LIGHTING & STANDARDS COMPANY.
INSTALL NO. 5 PULL BOX ADJACENT TO PILASTER LIGHT AS DIRECTED BY THE ENGINEER.
INSTALL 2" SCH 40 PVC CONDUIT, WITH 2-#10, 2-#4 CONDUCTORS AND #4 GROUND.
INSTALL 2" SCH 40 PVC CONDUIT, WITH 2-#10, 2-#3 CONDUCTORS AND 1-#3 GROUND.
INSTALL LED WALKWAY LIGHTING, CATALOG #PL-493-25-LED-MT-7-4-BZ, FROM PACIFIC LIGHTING
& STANDARDS COMPANY.
INSTALL 3" SCH 40 PVC CONDUIT WITH TO IID TRANSFORMER, PER IID PLANS.
INSTALL 120-240 TYPE III-BF SERVICE ENCLOSURE WITH TYPE II PED AND LS-3 METER. METER
PEDESTAL PER CITY OF LA QUINTA STANDARD 730. PLAN CONSTRUCTION NOTE #89.
INSTALL 3" SCH 40 PVC CONDUIT WITH 2-#10, 2-#4, 2-#3 CONDUCTORS AND 1-#4 GROUND.
INSTALL 3" SCH 40 PVC CONDUIT WITH 2-#10, 2-#3 CONDUCTORS AND 1-#3 GROUND.
PROPOSED IID TRANSFORMER PER SHEET 25 & IID PLAN. PLAN CONSTRUCTION NOTE #90.
1
2
3
4
5
6
7
8
9
20 10 20 40 60
SCALE: 1"=20'
0
SCALE 1"=20'
DUNE PALMS ROAD
10
FOR PILASTER AND WALKWAY LIGHTS FIXTURE
INFORMATION, CONTACT:
KSS LIGHTING & CONTROLS
STEVE CLINE
PHONE 909-793-9554
LIGHTING FIXTURE NOTE:
ALL CONDUIT AND CONDUCTORS FROM THE
METER PEDESTAL TO THE BRIDGE SHALL BE
CONSIDERED A PART OF THE BRIDGE
LIGHTING BID ITEM AND NO ADDITIONAL
COMPENSATION WILL BE ALLOWED THEREFORE.
BRIDGE LIGHTING NOTE:
06/23/2021
WWWWWWWWWS S S S S S S S S S S S S S S S S S S S S
SSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASEEE
E
E
E
E
E
E
E
E
E
E
E
EEEEEEEEE
EEEEEEEEEEEEEEEEEEEEE E E E E E CATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVWSSSSSSSSSSSFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
MHMH12+00 13+00 14+0011+00 15+00 16+00 18+00 19+0017+00
R/W
R/W
R/WR/W
R/W
R/W
R/W
68
69
EX.SIGNAL
CONTROLLER
CABINET
69
STA.12+90
69
STA.16+90
69
STA.14+90
68
68
68
68
68
68
62
62X4
J PAUL BUILDING
DWGC1, LLC
USA GASOLINE
COMMERCIAL BUILDINGS
72
41
TCE**CAUTION**
UNDERGROUND
ELECTRICAL
CONDUIT XING
**CAUTION**
UNDERGROUND
ELECTRICAL
CONDUIT XING
**CAUTION**
UNDERGROUND
SPECTRUM
CONDUIT XING
1
SEWER
1WATER
1
SEWER FD1
IID
TRANSFORMER
1
IID
VAULT
1
IID
TRANSFORMER
2-4"
CONDUITS
1
RAISE MH
TO GRADE
IID INTERIM
SHOO FLY
IID INTERIM
SHOO FLY
SEE SHEET 23 FOR
CHANNEL CROSSING
DETAILS OF SHOO FLY
CVWD
DW
SEE BRIDGE
PLANS FOR
DETAILS
43
43
FRONTIER TO
CONNECT TO
2-4" CONDUIT
FROM BRIDGE
1
R=25'
90
43
3
AT VAULT,
INTERCEPT &
CONNECT EX.
6-6" CONDUITS
STA.18+24
R=20'
69
64
64
69
R=20'
R=25'
62
X2
**CAUTION**
UNDERGROUND
ELECTRICAL
CONDUIT XING
STUB 2 OF THE 4
6" CONDUITS ~5'
FROM SOUTHERN
BEND.
R=25'
X4
SEE BRIDGE &
IID PLANS
FOR DETAILS
PP,SHOO FLY
PP,SHOO FLY
TCE
PP,SHOO FLYFSSSSSSSSSSSS
SSSSSS S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S SSSSW WWMWWMWWMWWMWWMWW
EOHEOHEOHEOHEOHEOHEOHEOHS S S S S S S S S S S S S S S
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
EEE
E
E E E E
EEEEEEEEEEEEPP
PP
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO FO FO FO FO FO FO
EE
E
E
E
E
MMME E E E E E E E E E E E EEEE
FO FO
FO FO FO FO FO FO FO FO FO FO
FOFO
FO FO EEWW
W
WWWWW S S S S S S S S S S SSSSSSSSSSSSSDUNE PALMS MOBILE ESTA
T
E
SMMM1
WATER SERVICE/
METER XING
PULLBOX
LA QUINTA HIGH SCHOOL
1
1MHMHMH
2
3
30
OFFICE
24+00 25+00 26+00 27+00 28+00 29+0023+0022+00
R/W R/WR/W
R/W R/W
1
2"CONDUIT
1
PULLBOX
68
R=20'
68
SEE BRIDGE &
IID PLANS
FOR DETAILS
69
STA.25+05
69STA.23+65
EX.BLOCK
WALL
IID
CONDUITS
1
IID
CONDUITS
R/W
SPECTRUM
PULLBOX
1
1
IID
CABINET
1
IID
CONDUITS
WATER SERVICE/
METER RELOCATION
BY CVWD FORCES
2-4"SPEC
CONDUITS
2
PR.FACE
CURB
2-4"
CONDUITS
2
PB
PR.BLOCK
WALL
PR.FACE
CURB
PR.BACK
WALK
3 PP
62
X4
62
68
PR.RET.
WALL
PR.RET.
WALL
PR.RET.
WALL
AC76
72
CVWD
SS
72
CVWD
SS
R=20'BR=25'
PR.BLOCK
WALL
59
X1
62
X4
61
61X2
R=25'
PP
4
PP
3 PP
R=25'
IID INTERIM
SHOO FLY
CVWD
WM
SEE BRIDGE
PLANS FOR
DETAILS
43
PROP.BRIDGE
SPECTRUM TO
CONNECT PB TO
2-4" CONDUIT
FROM BRIDGE
89
90
63
61
X2
62
X1
R=25'
RISER
61
X2
4
PP,SHOO FLY
3
SEE SHEET 23 FOR
CHANNEL CROSSING
DETAILS OF SHOO FLY
X4
60X1
62
X1
PP,SHOO FLY
PP,SHOO FLY
43
PR.BACK
WALK
36" MIN
30"
12"
MIN
IID COND.
2-5" PVC
A
BUTILITY TRENCH
IID & SPECTRUM
NOT TO SCALE
UTILITY TRENCH
IID ONLY
NOT TO SCALE
MIN
58
58
30"
24"
MIN
C UTILITY TRENCH
NOT TO SCALE
58
D UTILITY TRENCH
IID AND CITY CONDUIT
NOT TO SCALE
58IID SERVICE & SPECTRUM
SPECT.COND
2-4" PVC
PLACED BY
UTILITY
SPECT.COND
2-4" PVC
PLACED BY
UTILITY
48"
MIN
30" MIN
24"
MIN
CITY COND.
1-2" PVC
IID COND.
2-6" PVC
48"
MIN
30"
MIN
IID COND.
4-6" PVC
IID COND.
1-3" PVC
1-6" PVC
36" MIN
30"
12"
MIN
IID COND.
2-5" PVC
E UTILITY TRENCH
IID & SPECTRUM
NOT TO SCALE
MIN
58
SPECT.COND
2-4" PVC
PLACED BY
UTILITY
24"
18"
MIN
F UTILITY TRENCH
NOT TO SCALE
58CITY ONLY
CITY COND.
1-2" PVC
MIN
SCALE: 1"=30'
CORPORATE CENTRE DR
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
25
UTILITY JOINT
TRENCHING PLAN
30 15 30 60 90
SCALE: 1"=30'
0
IID BACKBONE ELECTRICAL SYSTEM
FRONTIER BACKBONE SYSTEM (BY UTILITY)
IID ELECTRICAL SERVICE CONDUIT
CITY COMMUNICATIONS CONDUIT
68
59
60 61
HIGHWAY 111
HIGHWAY 111
SPECTRUM BACKBONE RELOCATION (BY UTILITY)
1
IID REMOVAL (BY UTILITY)
2
3
LEGEND
06/2021
IID CONDUIT AND STRUCTURE DEPICTION
HEREON IS FOR INFORMATION ONLY. SEE
IID PLANS FOR CONSTRUCTION DETAILS.
IID PLAN NOTE:
CONTRACTOR SHALL BE RESPONSIBLE FOR
POTHOLING ALL UTILITIES WHICH MAY
BE IN CONFLICT WITH ANY TRENCHING
AND/OR EXCAVATION OPERATIONS.
UTILITY LOCATIONS ARE SHOWN FROM
ATLAS MAPS AND FIELD LOCATES, WHICH
ARE BOTH APPROXIMATE LOCATIONS.
UTILITY POTHOLING
IID INSTALLED (BY UTILITY)4
CONSTRUCTION NOTES
1 PROTECT IN PLACE
41 24" HDPE, N-12 WT JT SD PIPE
59 3" SCH 40 PVC, IID CONDUIT
60 4" SCH 40 PVC, IID CONDUIT
61 5" SCH 40 PVC, IID CONDUIT
62 6" SCH 40 PVC, IID CONDUIT
63 LARGE VAULT (6'x9.5') PER IID STANDARD
64 3" SCH 40 PVC, w/ PULL ROPE (CV LINK), @ MIN DEPTH OF 24", PER DETAIL ON SHEET 27
68 2" SHC 40 PVC, CITY COMM. CONDUIT
69 PULL BOX NO. 3.5 (PCC) PER SWPPP STD 405-1
72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN
76 RELOCATE WATER MAIN PER WATER PLAN
89 METER PEDESTAL PER COLQ STD 730
90 TRANSFORMER PAD (SINGLE PHASE) PER IID STANDARD
IID INSTALLED SHOO FLY, INTERIM (BY UTILITY)
SEE THE BRIDGE PLANS FOR DETAILS ON CONDUIT LOCATED
WITHIN THE BRIDGE STRUCTURE. ALL BRIDGE CONDUIT SHALL
EXTEND A MINIMUM OF 10' BEYOND THE BACK WALL OF THE
ABUTMENT AND SHALL HAVE A PERMANENT MARKING PLACED ON
EITHER THE SIDEWALK OR FACE OF CURB.
BRIDGE CONDUIT
THE FOLLOWING IS A BRIEF DESCRIPTION OF THE UTILITY PROVIDED RELOCATION
ACTIVITIES:
IID - ELECTRICAL
·INSTALLATION OF OVERHEAD SHOO FLY
·REMOVAL OF OVERHEAD SHOO FLY
·CABLING OF NEW UNDERGROUND CONDUIT SYSTEM
·INSTALLATION OF ELECTRICAL EQUIPMENT FOR UNDERGROUND SYSTEM
·CUT OVERS OF ELECTRICAL SYSTEM
·REMOVAL OF EXISTING POLES AND CONDUCTORS
FRONTIER - COMMUNICATIONS
·RAISE MANHOLE TO GRADE, SOUTH SIDE
·INSTALLATION OF CONDUIT AND CONNECT TO BRIDGE CONDUIT, SOUTH SIDE OF
CHANNEL
SPECTRUM - COMMUNICATIONS
·INSTALLATION OF CONDUIT AND HANDHOLE ALONG WITH CONNECTION TO BRIDGE
CONDUIT, NORTH SIDE OF CHANNEL
UTILITY PREFORMED RELOCATIONS
SCALE: 1"=30'
06/23/2021
ITEMS FOR CONTRACTOR INSTALLATION
CAN BE FOUND UNDER BASE BID #4 IN
THE BID SCHEDULE.
BASE BID #4 NOTE
WWWWWWWWWWWWWWWWWWE
EEEEEEEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFO℄CVSC CVWD
R/W56
82
82
RETAINING WALL
SEE BRIDGE PLANS
CVSC R/W
22
23
23
35
22
22
22
22
CUT OFF
CUT OFF
TOE
TOE
13+00
3939
11+00 12+00 DUNE PALMS ROAD14'
VAR
14'
81
A
A
B
B
J PAUL BUILDING
81
2'
3'3'
2'
4'
1BLOCK WALL 1BLOCK WALL 19+00CV LINK TRAIL
BY OTHERS
BEG TRAIL
JOIN EX.
10+20.00
62.27 FS
2.
0
%
1
2
3
4
83
40'O.C.
TYP
83
40'O.C.
TYP
84
69
64
64
69
1
SLOPE
PROTECTION
SEE SHEET 17 FOR
SLOPE PROTECTION
PLAN
40
85
91
91
L=90'
88
8.33%8.33%18+49.71
TC 65.46
18+54.71
TC 64.98
18+70.60
TC 65.06
18+78.60
TC 65.96
2.0%0.
5
0
%66.17 FSEVC - 60'11
3
+
3
0
.
0
0
65
.
0
9
P
V
I
3.94
0.54%
11
3
+
0
5
.
0
0
64
.
1
1
F
S
BV
C
-
6
0
'
11
2
+
3
3
.
0
0
61
.
2
7
P
V
I
11
2
+
6
3
.
0
0
62
.
4
5
F
S
EV
C
-
6
0
'
11
2
+
0
3
.
0
0
61
.
4
3
F
S
BV
C
-
6
0
'
61
.
5
8
F
S
61
.
7
2
F
S
61
.
8
5
F
S
61
.
9
9
F
S
62
.
1
2
F
S
62
.
2
6
F
S
62
.
4
1
F
S
SSSSSSSSSS S S S S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
WWWWWWWWWFOFOFOFOFOFOFOFOFOFOMH
MH
DWGC1, LLC
CVSC
56
56
82
23
23
36
76
82
82
CV LINK TRAIL
BY OTHERS
22 TOE
22 TOE
22 TOE
22
CUT OFF
22
CUT OFF
22
CUT OFF
RETAINING WALL
SEE BRIDGE PLANS
CVSC R/W
R/WVAR
39
39
20
+
0
0
21+00
22+00DUNE PALMS ROAD14'
C
C
D
D
CVWD SWR ESMT
6'
6'
14'
81
81
81
18+00CVWD
1
SEWER
2.
0
%8.33%8.33%5
6
7
8
83
40'O.C.
TYP
84
69
64
64
69
1
SLOPE
PROTECTION
SEE SHEET 18 FOR
SLOPE PROTECTION
PLAN
41
85
END TRAIL
JOIN EX.
22+90.00
60.64 FS
60
.
8
8
F
S
18+25.36
TC 65.44
18+31.36
TC 64.92
0.27%60.78 FS60
.
8
2
F
S
60.95 FS4.11%21+80.0061.07 FSEVC - 80'21+40.0061.18 PVI21+00.0062.82 FSBVC - 80'20+85.0063.44 FSEVC - 80'20+45.0065.09 PVI20+05.0065.09 FSBVC - 80'2.0%9191
L=90'
88
18+49.71
TC 65.46
S
S
S
S
CONNECTOR TRAIL CENTERLINE DATA
NO BEARING/DELTA RADIUS LENGTH NOTE
1 N 71°20'25" W --284.23'WESTERN CONNECTOR
2 Δ=04°18'44"143.00'10.76'WESTERN CONNECTOR
3 N 67°01'41" W --43.97'WESTERN CONNECTOR
4 Δ=18°54'40"27.00'8.91'WESTERN CONNECTOR
5 N 89°50'08" E --4.26'EASTERN CONNECTOR
6 Δ=18°46'52"93.00'30.48'EASTERN CONNECTOR
7 N 71°22'59" W --139.91'EASTERN CONNECTOR
8 Δ=02°06'33"3135.62'115.43'EASTERN CONNECTOR
2%
39
7'7'
SECTION A-A
5'
5%
MAX
4'
23
81
81
0.5'
R/W
℄
2'
VAR
2:1 MAX
EX.BLOCK
WALL
2%
39
7'7'
SECTION B-B
5'
5%
MAX
VAR
23
81
81
0.5'
R/W
℄
3'
2%
EX.BLOCK
WALL
(1)
(1) 3.4'-5.7'
RET.WALL PER
BRIDGE PLANS
56
2%
39
7'7'
SECTION C-C
6'
5%
MAX
VAR
23 81
R/W
℄
2'
5%
(2)
(2) 2.2'-3.3'
RET.WALL PER
BRIDGE PLANS
56
SECTION D-D
5.5'
VAR
2:1 MAX 2%
39
7'7'6'
5%
MAX
VAR
23
81
81
R/W
℄
5%
6.4'-5.6'
5.5'
VAR
2:1 MAX
10+20.0 - 12+49.7
12+49.7 - 13+67.9 20+00.0 - 21+59.70
21+59.7 - 22.90.0
(3)
(3) COMPACTED NATIVE
(3)
(3) COMPACTED NATIVE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
2%
91
81
91
24"9"
12"12"
1.75"
3/8" RAD
3/8" RAD
FOR FLOWLINE CONSTRUCTION,
SUSPEND A 2"X4" OR SIMILAR
ALIGNMENT BOARD ON STAKES TO
SET FLOWLINE.
1.5"
3"7.5"CLASS 560-C-3250
CONCRETE
WEDGE CURB
NOT TO SCALE
81
COMPACTED
SUBGRADE
91
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72
26
CV LINK SECONDARY
TRAIL PLAN
CONSTRUCTION NOTES
1 PROTECT IN PLACE
22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21
23 CONSTRUCT CONC. TRAIL UNDERCROSSING PER DETAIL ON SHEET 21
35 CONSTRUCT 18" SD OUTLET W/ TRASH GRATE, PER DETAILS ON SHEET 21
39 CONSTRUCT 6" CONCRETE TRAIL OVER 4" CL II AGG. BASE
40 18" HDPE, N-12 WT JT SD PIPE
56 METAL RAILING (ON RETAINING WALL @ TRAIL) PER DETAILS ON SHEET 16
64 3" SCH 40 PVC, w/ PULL ROPE (CV LINK), @ MIN DEPTH OF 24", PER DETAIL ON SHEET 27
69 PULL BOX NO. 3.5 (PCC) PER SWPPP STD 405-1
81 4" THICK STABILIZED DECOMPOSED GRANITE, PER DETAIL ON SHEET 27
82 METAL RAILING (TRAIL UNDERCROSSING) PER DETAILS ON SHEET 29-30
83 INSTALL CITY FURNISHED IN PAVEMENT SOLAR GUIDE LIGHTS PER DETAILS ON SHEET 28
84 THERMOPLASTIC BANDING (UNDERCROSSING) PER DETAILS ON SHEET 27
85 6" SOILD WHITE STRIPE (PAINT) (TRAIL)
88 CONSTRUCT CURB RAMP CASE B TYPE 1 PER SPPWC STD. 111-5
91 CONSTRUCT WEDGE CURB PER DETAIL ON SHEET 26
LEGEND
CONCRETE CONSTRUCTION 39
WESTERN CONNECTOR TRAIL
EASTERN CONNECTOR TRAIL 20 10 20 40 60
SCALE: 1"=20'
0SCALE 1"=20'SCALE 1"=20'06/2021
DECOMPOSED GRANITE 81
64
64
06/23/2021
18+45.36
TC 64.97
18+53.36
TC 65.68
PLAN
NOTES:
1.PAVEMENT MARKINGS INCLUDE UNDERCROSSING THERMOPLASTIC
BANDING (UTB) AND A CHANNEL-SIDE SOLID WHITE EDGE STRIPE (PAINT).
2.ADJUST BANDING AS NECESSARY AROUND CURVES. MARK BANDING
LAYOUT AND LIGHT LOCATIONS IN FIELD FOR APPROVAL PRIOR TO
CONSTRUCTION.
PLAN PLAN
CHANNEL SIDE
PATH PATH
PATH
CHANNEL SIDE
CHANNEL SIDE
2'-0"
5'-0"
6" SOLID WHITE STRIPE
EDGE OF BRIDGE DECK ABOVE EDGE OF BRIDGE DECK ABOVE
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
2'-0"
5'-0"
1'-0"
CENTERLINE GUIDE LIGHT,
40' O.C. SPACING, TYP
SEE SHEET 28 FOR DETAILS
CENTERLINE GUIDE LIGHT,
40' O.C. SPACING, TYP
SEE SHEET 28 FOR DETAILS
CENTERLINE GUIDE LIGHT,
40' O.C. SPACING, TYP
SEE SHEET 28 FOR DETAILS
END BANDING
CONTROL POINT
BEGIN BANDING
CONTROL POINT
40'-0" O.C.
40'-0" O.C.
40'-0" O.C.
THERMOPLASTIC 'UTB
BANDING' (ORANGE)
THERMOPLASTIC 'UTB
BANDING' (ORANGE)
THERMOPLASTIC 'UTB
BANDING' (BLUE)
THERMOPLASTIC 'UTB
BANDING' (BLUE)
THERMOPLASTIC 'UTB
BANDING' (ORANGE)
EDGE OF CONCRETE TRAIL
EDGE OF CONCRETE TRAIL
EDGE OF CONCRETE TRAIL
EDGE OF CONCRETE TRAIL
EDGE OF CONCRETE TRAIL
EDGE OF CONCRETE TRAIL
2'-0"
THERMOPLASTIC 'UTB
BANDING' (ORANGE)
THERMOPLASTIC 'UTB
BANDING' (BLUE)
2'-0"
32'-0"
44'-0"
8'-0"4'-0"
14'-0"
7'-0"
7'-0"
8'-0"20'-0"4'-0"
40'-0"
8'-0"
THERMOPLASTIC BANDING (UNDERCROSSING) DETAIL
NOT TO SCALE84
TRAIL BANDING - UNDER BRIDGE
NOT TO SCALE
TRAIL BANDING - RAMP DOWN
NOT TO SCALE
TRAIL BANDING - UP RAMP
NOT TO SCALE
TYPICAL BANDING SEGMENT
NOT TO SCALE
PLAN
TRAIL CONCRETE JOINT & FINISH DETAIL
NOT TO SCALE
SJ SJSJ
SJ SJSJ
SJSJSJSJSJSJSSJ - FULL WIDTHSSJ - FULL WIDTHSSJ - FULL WIDTHSSJ - FULL WIDTH10' TYP 5' TYP LONGITUDINAL SCORE JOINT (SJ)
TYP BOTH SIDES OF PATHTRAVERSE SAWCUT
JOINT (SSJ)
CENTER PANELS: MEDIUM
BROOM FINISH PERPENDICULAR
TO TRAFFIC FLOW
SIDE PANELS: MEDIUM BROOM
FINISH PERPENDICULAR TO
TRAFFIC FLOW2'2'TOOLED 12" RADIUS @EDGE OF PATH 1" LIP
TO ADJACENT GROUND NOTES:
1.CONCRETE JOINTS, SEE DETAILS HEREON.
2.DOWEL CONSTRUCTION JOINTS SHALL BE PLACED EVERY 60
FEET ALONG TRAIL. SEE CALTRANS STANDARD PLAN P10.
3.EDGE OF PATH SHALL BE DOWELED TO ADJACENT
CONCRETE AT ACCESS POINTS. SEE CALTRANS STANDARD
PLAN P10.
CJ CONSTRUCTION JOINT (EXPANSION)
DCJ DOWEL CONSTRUCTION JOINT (EXPANSION)
SJ CONTROL / SCORE JOINT
SSJ SAWCUT CONTROL JOINT
39
SECTION
DECOMPOSED GRANITE (DG) DETAIL
NOT TO SCALE81
FINISH GRADE
DECOMPOSED
GRANITE
GEOTEXTILE
FABRIC
COMPACT SUBGRADE
TO 90% MODIFIED
PROCTOR, 12" DEPTH
NOTES:
1.SEE SPECIFICATIONS FOR BOTH
DECOMPOSED GRANITE AND
GEOTEXTILE FABRIC.
CL
PLAN
CV LINK CONDUIT PLACEMENT DETAIL
NOT TO SCALE
CL
NOTES:
1.CONTRACTOR SHALL CONNECT TO EXISTING
CONDUIT / PULL BOX FROM PREVIOUS
INSTALLATION.
2.CONDUIT SHALL BE INSTALLED ALONG THE
LANDWARD SIDE OF THE SECONDARY TRAIL, PER
THE PLAN.
3.ALL CONDUIT SHALL BE SCHEDULE 40 PVC.
4.PULL ROPE SHALL BE INCLUDED IN ALL CONDUIT.
5.PULL BOXES SHALL BE NO. 3.5 (PCC) WITH A BOX
EXTENSION TO A DEPTH OF 24" PER SWPPP
STANDARD 405-1.
6.ALL PULL BOXES SHALL BE FURNISHED WITH A 6"
DEPTH OF 12" MINUS DRAIN ROCK.
7.CONDUIT SHALL BE INSTALLED TO A MINIMUM
DEPTH OF 24" BELOW FINISHED SURFACE.
PULL BOX PULL BOX
3" SCH 40 PVC CONDUIT
1,000 FT MAX
CHANNEL SIDE
CENTER PANELS: MEDIUM
BROOM FINISH PERPENDICULAR
TO TRAFFIC FLOW14'CLCL
69 69
64
27
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK TRAIL DETAILS
CONSTRUCTION NOTES
CONSTRUCT 6" CONCRETE TRAIL OVER 4" CL II AGG. BASE
3" SCH 40 PVC, w/ PULL ROPE (CV LINK)
PULL BOX NO. 3.5 (PCC) PER SWPPP STD 405-1
3" THICK DECOMPOSED GRANITE
THERMOPLASTIC BANDING (UNDERCROSSING) PER DETAILS ON SHEET 27
39
64
69
81
84
06/23/2021
NOTES:
1.CITY TO FURNISH PATH LIGHTS, CONTRACTOR TO INSTALL.
2.SEE SPECIFICATIONS FOR GUIDE LIGHT MANUFACTURER OPTIONS.
3.INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
4.EDGE LIGHTS IN [ORANGE] BANDING, RIGHT SIDE OF PATH (HEADING NORTH OR WESTBOUND)
SHALL BE [ORANGE] (RGB: 255, 102, 15) OR AS APPROVED.
5.EDGE LIGHTS IN [BLUE] BANDING, RIGHT SIDE OF PATH (HEADING SOUTH OR EASTBOUND) SHALL
BE [BLUE] (RGB: 102, 204, 255) OR AS APPROVED.
6.FOR CENTERLINE GUIDE LIGHT SPACING, SEE 2/CD806. FOR EDGE GUIDE LIGHT LAYOUT, SEE
1/CD804 & 2/CD804.
7.NO CENTERLINE GUIDE LIGHTS IN BANDING AREAS, UNDERCROSSING RAMPS, AND CONNECTOR
PATHS UNLESS OTHERWISE SHOWN.
TYPICAL PATH LAYOUT
CENTERLINE GUIDE LIGHT
[BLUE/ORANGE]
CENTER LIGHT
LED CONFIGURATION
CENTERLINE & EDGE GUIDE LIGHT DETAIL
CENTERLINE GUIDE LIGHT
TOP
SIDE
LED LIGHT, TYP OF 6
SEE LED CONFIGURATION
FOR LIGHT BULB COLOR
SOLAR PANEL
LEVELING SCREW, TYP OF 2
COVER SCREWS, TYP OF 4
(3) LED LIGHTS [ORANGE]
(3) LED LIGHTS [BLUE]
ANCHOR TAB, TYP OF 4
PLASTIC ENCLOSURE
CONCRETE
SOLAR LED PATH LIGHT
NOTES:
1.INSTALL LIGHT ACCORDING TO MFR SPECIFICATIONS.
2.CORE DRILL DIAMETER AND DEPTH SHALL BE ADJUSTED AS
REQUIRED TO PROPERLY INSTALL LIGHT HOUSING.
3.CONTRACTOR TO PROVIDE SAMPLE INSTALLATION FOR
APPROVAL PRIOR TO CONSTRUCTION.
SECTION
SET IN MORTAR
FINISH GRADE
CL
IN PAVEMENT SOLAR GUIDE LIGHT
INSTALLATION DETAIL
NOT TO SCALE
83
PLAN
SOLAR LED PATH LIGHT LOCATION
NOT TO SCALE
10' TYP 5' TYP
14'83
CLCL
40' O.C. SPACING NOTES:
1.LIGHTS SHALL NOT BE INSTALLED WITHIN BANDING
AREAS, ACCESS POINTS, ON CONNECTOR PATHS
OR PATH JUNCTIONS, UNLESS OTHERWISE NOTED
ON THE PLANSSOLAR PED PATH LIGHT
NOT TO SCALE
FLUSHFLUSH
4 12" ∅, SEE NOTE 2
83
DUNE PALMS
3'-0"WESTBOUND EASTBOUND
CLEQ.EQ.STREET NAME LEFT
ALIGNED w/ EDGE
OF PATH
PATH PATH
BRIDGE DECK SLABBRIDGE DECK SLAB
PAINT BRIDGE SOFFIT AND STREET NAME
NOT TO SCALE86
DUNE PALMSCL
10'3'-0"FONT DETAILS
PER NOTE 1.
PAINT BRIDGE
EDGE PER NOTE
2 (ORANGE).
BRIDGE PIER
BRIDGE PIER STREET NAME
RIGHT ALIGNED w/
EDGE OF PATH
PAINT BRIDGE
EDGE PER NOTE
2 (BLUE).
10'FONT DETAILS
PER NOTE 1.
NOTES:
1.STREET NAME FONT IS TO BE NEUTRA BOLD, 36" HEIGHT. THE TEXT
COLOR SHALL BE WHITE. TEXT TO BE CENTERED ON THE BRIDGE
VERTICAL SOFFIT AND ALIGNED WITH THE INNER PATH EDGE.
2.FOR THE WESTBOUND DIRECTION, THE BRIDGE SOFFIT SHALL BE
PAINTED SATIN ORANGE (PMS 172C) OR AS APPROVED BY THE CITY. FOR
THE EASTBOUND DIRECTION, THE BRIDGE SOFFIT SHALL BE PAINTED
SATIN BLUE (PMS 297C) OR AS APPROVED BY THE CITY.
SEE SHEETS 31-35
FOR SOFFIT PANELS
AND PAINTING
SEE SHEETS 31-35
FOR SOFFIT PANELS
AND PAINTING
28
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK TRAIL DETAILS
CONSTRUCTION NOTES
INSTALL CITY FURNISHED IN PAVEMENT SOLAR GUIDE LIGHTS PER
DETAILS ON SHEET 27
PAINT BRIDGE SOFFIT & STREET NAME PER DETAILS ON SHEET 28
83
89
06/23/2021
RUB RAIL RUB RAIL
CAP END
CURVED RAIL
END PER DETAIL
HEREON
TOP RAIL TOP RAIL
RUB RAIL BRACKET
SEE DETAIL BR-3 ON
SHEET 30
TOP RAIL BRACKET
SEE DETAIL BR-1
HEREON
CABLE, TYP OF 12
RUB RAIL BRACKET
SEE DETAIL BR-4
ON SHEET 30
BASE PLATE
BASE PLATE
CABLE, TYP
OF 12
5" ∅ O.D.
STEEL PIPE
[RUB RAIL]
RUB RAIL BRACKET,
BR-3 OR BR-4
WELD TO POST
3" ∅ TOP RAIL
FINISH GRADE
5" ∅ RUB RAIL
1/4" ∅ 1x19 CABLE,
TYP OF 14
TOP RAIL
RUB RAIL
CAP END
END POST ASSEMBLY
BASE PLATE
CABLE
SURFACE MOUNT:
4 HIT-HY 200 + HAS-R
316 - 7/8"
EMBEDMENT DEPTH = 9"
3" ∅ TOP RAIL
1" GAP
NOTES:
1.RAILING SYSTEM SHALL BE CUSTOM FABRICATED AND CONSISTS OF WELDED AND MECHANICALLY
FASTENED PIECES.
2.PROVIDE FULL SHOP DRAWINGS PRIOR TO FABRICATION OF ALL COMPONENTS. DRAWINGS SHALL
INCLUDE ALL REQUIRED MOUNTING HARDWARE FOR A COMPLETE RAILING SYSTEM WHETHER SHOWN
OR NOT ON THESE DRAWINGS.
3.SHOP DRAWINGS SHALL INCLUDE INSTRUCTIONS FOR PROPER FIELD INSTALLATION.
4.ALL POSTS SHALL BE INSTALLED PERPENDICULAR TO MATCH RUNNING SLOPE OF PATH AND
GROUTED TO VERTICAL IN RESPECT TO PATH CROSS SLOPE.
5.CABLES SHALL BE 316L MARINE GRADE STAINLESS STEEL. MAXIMUM CABLE LENGTH PER INDUSTRY
STANDARDS.
6.CONTRACTOR SHALL VERIFY ALL DEPENDENT DIMENSIONS IN THE FIELD BEFORE ORDERING OR
FABRICATING ANY MATERIAL.
7.ALL HARDWARE SHALL BE VANDAL AND THEFT RESISTANT.
PAINT SCHEDULE:
1.SEE SHEET 30 FOR POST ASSEMBLY PAINT SCHEDULE.
2.ALL TOP RAILS SHALL BE GALVANIZED AND POWDER COATED [WHITE].
3.CABLES AND CABLE HARDWARE SHALL NOT BE PAINTED.
METAL RAILING ELEVATION
NOT TO SCALE
SURFACE MOUNT:
6 HIT-HY 200 + HAS-R
316 - 7/8"
EMBEDMENT DEPTH = 9"
3/4" MIN GROUT
AT POST C/L
END POST ASSEMBLY
SEE DETAIL HEREON
END POST ASSEMBLY
SEE DETAIL HEREON
METAL RAILING (TRAIL UNDERCROSSING) DETAILS
NOT TO SCALE82
POST/END POST DETAIL
NOT TO SCALE
POST DETAIL (FRONT)
NOT TO SCALE
END POST DETAIL (FRONT)
NOT TO SCALE
METAL RAILING ELEVATION (GRADE BREAKS)
NOT TO SCALE
END POST ASSEMBLY
SEE DETAIL HEREON
END POST ASSEMBLY
SEE DETAIL HEREON
1/4" ∅ 1x19 CABLE,
TYP OF 14
8"6"3'-5"3'-6"2'-1"3" ∅ O.D. STEEL
PIPE [TOP RAIL]
CABLE, TYP OF 12
BASE PLATE
TOP RAIL BRACKET,
BR-1 OR BR-2
WELD TO POST
BOLT w/ WASHER,
TYP OF 4
POST / END POST
8 1/2"
BOLT w/ WASHER,
TYP OF 4
POST INCLUDES
BASE PLATE
CABLE END HARDWARE:
FIELD SWAGED ASSEMBLY
INCLUDES:
1x TENSIONING END
1x TERMINAL END
2x ACORN NUT
2x HEX NUT
2x WASHER
TOP RAIL BRACKET
SEE DETAIL BR-1
HEREON
1/4" STEEL PLATE,
SHAPE AND ANGLE TO
MATCH EDGE OF POST
HALF SECTION OF 3" ∅
INSIDE DIAMETER
STEEL PIPE,
MIN 1/4" THICKNESS
WELDED FABRICATION
SLOT FOR FASTENER
SLOT, SIZE FOR
FASTENER,
TYP OF 4
TOP RAIL
TOP RAIL BRACKET (BR-1 & BR-2)
NOT TO SCALE
MATCH POST1'-6"75°
BRACKET BR-1 & BR-2 (SIDE)
NOT TO SCALE
BRACKET BR-1, POST (FRONT)
NOT TO SCALE
3"TYP
1'-1 1/2"
1 1/2"CLEAR
BRACKET BR-2, END POST (FRONT)
NOT TO SCALE
R=
5
"
3"TYP
2'-0"
1'-2 1/4" CLEAR
SLOT, SIZE FOR
FASTENER,
TYP OF 4
CURVED RAIL (RUB RAIL END) DETAIL
NOT TO SCALE
29
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK TRAIL DETAILS
06/23/2021
FRONT FRONT
BASE PLATE
BASE PLATE
1/2" STEEL PLATE
1/2" STEEL PLATE,
TYP OF 2
WELDED CONNECTION
PER FABRICATOR
WELDED CONNECTION
PER FABRICATOR
TOPTOP
HOLE SIZE FOR
7
8
"
ANCHOR, TYP OF 4
1
2
" STEEL
PLATE
[BLUE]
[WHITE]
[ORANGE]COLOR KEYEASTBOUNDWESTBOUNDPOST, TYP
EDGE OF PATH, TYP
END POST, TYP
PATH
PATH
BARRIER RAILING, TYP
BARRIER RAILING, TYP
INDICATES FACE
OF VERTICAL POST,
TYP
RUB RAIL, TYP
RUB RAIL, TYP
TYPE B & C POST
ASSEMBLIES
PAINTED
AREA, TYP
PAINTED
AREA, TYP
PAINTED
AREA, TYP
TYPE A POST
ASSEMBLY
CABLES/RAIL, TYP
SIDE
FRONT
FRONT TOP
TOP
75°
MATCH ANGLE OF POST
RUB RAIL
SLOT FOR FASTENER
WELDED FABRICATION
1/4" STEEL PLATE
HALF SECTION OF 5"
INSIDE DIAMETER
STEEL PIPE,
MIN
1
4
" THICKNESS
SLOT, SIZE FOR
FASTENER,
TYP OF 4
SLOT, SIZE FOR
FASTENER,
TYP OF 4
1
4
" STEEL
PLATE
1
4
" STEEL
PLATE
18'-0"26'-3"
9"
SIDE
POST/END POST DETAIL
NOT TO SCALE
POST DETAIL (FRONT)
NOT TO SCALE
END POST DETAIL (FRONT)
NOT TO SCALE
BR-3 / BR-4 BRACKET DETAIL
NOT TO SCALE
BR-3 BRACKET DETAIL (POST)
NOT TO SCALE
BR-4 BRACKET DETAIL (END POST)
NOT TO SCALE3'-2"1/2" STEEL PLATE
BASE PLATE
WELDED CONNECTION
PER FABRICATOR
3/8" ∅ HOLE,
TYP OF 14
1"
3"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2
3
4
"
2"
2"
8"
4
1
2
"
1"TYP
1
2
"CLEAR
CL
CL
CL
CL
1
1
2
"TYP
8"8"
16"112"TYP8"
3
3
4
"
1
1
2
"TYP
8"11 2"TYP8"8"
16"
HOLE SIZE FOR
7
8
"
ANCHOR, TYP OF 6
1
2
" STEEL
PLATE
3
3
4
"6
1
8
"6
1
8
"
8"
1"TYP
4
3
4
"CLEAR
1
4
" STEEL
PLATE
1
4
" STEEL
PLATE
RAILING POST PAINT SCHEDULE
NOT TO SCALE
TYPICAL EASTBOUND, SECTION A-A
NOT TO SCALE
TYPICAL WESTBOUND, SECTION B-B
NOT TO SCALE
CL
CL
POST ASSEMBLY TYPE
NOT TO SCALE
PLAN VIEW, POST PAINTING
NOT TO SCALE
B
O
B
O
B
W
O
B
O
W
BB
AA
O
O
O
B
B
B
W
O
O
B
B
30
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK TRAIL DETAILS
06/23/2021
31
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK BRIDGE SOFFIT
PANEL DETAILS
06/23/2021
32
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK BRIDGE SOFFIT
PANEL DETAILS
06/23/2021
33
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK BRIDGE SOFFIT
PANEL DETAILS
06/23/2021
34
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK BRIDGE SOFFIT
PANEL DETAILS
06/23/2021
35
06/2021
DESCRIPTION:
BENCHMARK: BASIS OF BEARINGS:
R E V I S I O N S
DATE BY DESCRIPTION APP'D DATE
CHECKED DATE
DATE
DRAWN
DESIGNED
SCALE
JOB NUMBER
CITY OF LA QUINTA
77100021
S H E E T
DWG. NAME
OF
FILE NO.
SHEETS
APPROVAL BY:
R.C.E. NO. 49418 EXP. 09/30/2022
PER PLANELEV. = 81.620'
BRYAN McKINNEY, PE
V
CCISTATEOF I L
A L
I
F
O
RNIA
J
No. 68828
YEL
DA
R
B
EF
O
R
PDERETSIGERSIANOD.REENIGNELANOISS
FOR:
CITY OF LA QUINTA, CALIFORNIA
CITY PROJECT #2011-05
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DATE:
PREPARED UNDER THE DIRECT SUPERVISION OF:
BRADLEY J. DONAIS, PE
R.C.E. 68828 EXP. 09/30/2021
8413 E BASELINE ROAD
SUITE 106
MESA, AZ 85209
PHONE: 480.757.0997
BM = NGS AH9136; DATUM: NAVD88
SURVEY DISK STAMPED "931+48.33", SET IN
TOP OF CONCRETE MONUMENT IN THE MEDIAN
AT THE INTERSECTION OF LA QUINTA CENTER
AND HIGHWAY 111.
THE BEARINGS SHOWN HEREON ARE BASED ON
THE LINE BETWEEN STATIONS "TMAP" AND
"PSAP" (POSITIONS PER NATIONAL
GEODETIC SURVEY, NAD83, EPOCH 2009.00)
AS SHOWN ON THE NATIONAL GEODETIC
SURVEY PUBLISHED DATA SHEETS, BEING
NORTH 57°23'28.38"WEST.
DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN
BDBD
UNDERGROUND SERVICE ALERT
1-800-227-2600
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
72CV LINK BRIDGE SOFFIT
PANEL DETAILS
06/23/2021
553535404045
45
50
50
55 6062
63
45
4550
505555
45406055 42
333331
BldgSD OutletPPConcParkingDITransf PadLtgWallConc WallGrouted RSPGrouted RSPConcConcConcConcSWSW484452 626361
536058
Dirt Rd 1819202122232438*Abut 1Abut 5373639BB
EBDATUM = 20'5Pier 2Pier 4105'-0"135'-0"4041135'-0"105'-0"Pier 3OG1231' min. Freeboard480'-0"1235CV Link TrailPLANScale: 1" = 40'"LAYOUT" LineN0°09'52"WEB 23+48.2BB 18+68.2EL 65.88EL 65.19CV LINK TRAILCV LINK TRAIL 41212433GENERAL PLANPROFILE GRADESCALE: 1" = 40'ELEVATIONScale: 1" = 40'TYPICAL SECTIONScale: 1" = 10'Legend:= High water elevation for Bridge = 57.0' (SPF): "LAYOUT" Line = Street ℄, See Civil Plan= Closure PourNotes*STANDARD PLANS, 2018A3-A,B&C ABBREVIATIONSA62-A EXCAVATION AND BACKFILL - MISCELLANEOUS DETAILSA62-C LIMITS OF PAYMENT FOR EXCAVATION AND BACKFILL-BRIDGEB0-1 BRIDGE DETAILSB0-3 BRIDGE DETAILSB0-5 BRIDGE DETAILSB0-13 BRIDGE DETAILSB2-3 16" AND 24" CAST-IN-DRILLED-HOLE CONCRETE PILEB3-1 RETAINING WALL TYPE 1 (CASE 1)B3-7A RETAINING WALL TYPE 6 (CASE 1)B3-7B RETAINING WALL TYPE 6 (CASE 2)B7-1 BOX GIRDER DETAILSB7-10 UTILITY OPENING - BOX GIRDERB8-5 CAST-IN-PLACE POST TENSIONED GIRDER DETAILSB9-1 STRUCTURE APPROACH TYPE N (30)B9-5 STRUCTURE APPROACH SLAB DETAILSB9-6 STRUCTURE APPROACH DRAINAGE DETAILSB11-47 CABLE RAILINGB11-58, 59 CONCRETE BARRIER TYPE 732SWB14-5 WATER SUPPLY LINE (DETAILS) (PIPE SIZES LESS THAN 4")SHEET No. SHEET TITLEINDEX TO BRIDGE PLANSB1 GENERAL PLANB2 DECK CONTOURSB3 FOUNDATION PLANB4 ABUTMENT 1 LAYOUTB5 ABUTMENT 5 LAYOUTB6 ABUTMENT FOOTING LAYOUTB7 ABUTMENT DETAILS No. 1B8 ABUTMENT DETAILS No. 2B9 PIER LAYOUTB10 PIER DETAILSB11 TYPICAL SECTIONB12 GIRDER LAYOUTB13 GIRDER REINFORCEMENTB14 MISCELLANEOUS DETAILSB15 BRIDGE RAIL LAYOUT No. 1B16 BRIDGE RAIL LAYOUT No. 2B17 BRIDGE RAIL DETAILS No. 1B18 BRIDGE RAIL DETAILS No. 2B19 BRIDGE RAIL DETAILS No. 3B20 BRIDGE RAIL DETAILS No. 4B21 BRIDGE RAIL DETAILS No. 5B22 JOINT ASSEMBLY (MAX MOVEMENT RATING = 4")B23 RETAINING WALL DET. NO. 1B24 RETAINING WALL DET. NO. 2B25 LOG OF TEST BORINGS No. 1B26 LOG OF TEST BORINGS No. 2
12'B1ABCFFF1 Cast "Br. No. TBD"2 Cast "DUNE PALMS BRIDGE"3 Barrier Rail (La Quinta Bridge Rail)4 Structure Approach Slab5 Concrete Channel Lining6 Soffit Lighting - See "Bridge Lighting Plan"A Imperial Irrigation District Conduits (Possible)B Frontier CommunicationsC Utility - City of La QuintaD City FiberE SpectrumF Future UtilityG Future UtilityH Electrical Conduit - CV LinkI Soffit Art Panel & Painting - See Civil PlansJ Painting & Street Name - See Civil PlansBENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-078886'-0"1'-2"1'-2"41'-10"41'-10"40'-6"Stage 140'-6"Stage 23'-10"5'-0"2%Rail Width IncludingArch. Treatment2%5' Dia. Column5'-6"3CIP/Box Girder"LAYOUT" Line**℄Bridge18°18°18°18°18°86'-0"7'-2"7'-2"6'6'39'-8"32'-0"3'-10"℄BridgeN0°09'52"W℄Pier 2℄Pier 3
℄Pier
4 320' VCR = 0.39% \ STA22+60Elev 65.84-0.75%+0.50%19+40Elev 66.24Rail Width IncludingArch. TreatmentN2202411.0204E6553315.7125N2201811.0228E6553317.4359DCEG1'-2"6'8'11'12'9'-8"12'11'8'1'-2"6'Bike/CartPathLane 1Lane 2Lane 2Lane 1MedianBike/CartPathClosurePour2-18" CMP
66"
R
.
W
a
t
e
r
S
l
e
e
v
e Retaining Wall No. 1Retaining Wall No. 2Retaining Wall No. 3Retaining Wall No. 4Notes:1. Retaining Walls not shown for clarity2. Part Barrier Rail shown, it is continuous across thebridgeSDSDSDConc. Lining Cut-OffConc. Lining ToeConc. Lining TopConc. Lining Cut-OffConc. LiningConc. Lining ToeConc. Lining TopConc. Lining18"Ø DIP Water MainSewer PipesConc. (E)HIJIJ6**6/16/2021 4:57:02 PM72
18192021222324DECK CONTOURSScale: 1" = 20' DECK CONTOURS NOTES:1.2. X - Denotes 10' interval along "DP" line.3. Contours do not include Camber.4. Contour interval is 0.10'- Indicates 0.50' contours.ACCELERATION RESPONSE SPECTRA CURVE LOAD RESISTANCE FACTOR DESIGN GENERAL NOTESDESIGN: AASHTO LRFD Bridge Design Specifications, Sixth Edition, 2012 with Caltrans Amendments (AASHTO-CA BDS-6)SEISMIC DESIGN: Caltrans Seismic Design Criteria (SDC), V 1.7, April 2013DEAD LOAD: Includes 35 psf for future wearing surfaceAdditional 0.1 k/ft assumed for future utilitiesLIVE LOADING: HL-93 and permit design loadingSEISMIC LOADING: Site Specific Acceleration Response Spectra CurveREINFORCEDCONCRETE: fy = 60,000 psif`c = See "Concrete Strength and Type Limits"n = 8PRESTRESSEDCONCRETE: See "Prestressing Notes" on "Girder Layout" SheetSTRUCTURAL STEEL: ASTM A709 Grade 50STEEL PIPE PILES: ASTM A252, Grade 3CONCRETE STRENGTH AND TYPE LIMITSStructural Concrete, Bridge Footing (4,000 psi @ 28 days)Structural Approach Slab, Bridge (4,000 psi @ 28 days)No ScaleStructural Concrete, Bridge (Polymer Fiber) (4,500 psi @ 28 days)Cast-In-Drilled Hole Concrete (4,000 psi @ 28 days)B2BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788EB 23+48.2BB 18+68.2"LAYOUT" LineN0°09'52"W℄BridgeN0°09'52"W℄ Pier 2
℄ Pier
3
℄ Pier
4
℄ BRG Abut 1
℄ BR
G
A
b
u
t
5Edge of DeckEdge of DeckApproach SlabApproach SlabStructural Concrete, Bridge (4,000 psi @ 28 days)6/16/2021 4:57:31 PM72
5535354
040
45
45
50
50
55 6062
63
4
5
4550
505555
4540606055
42
333331
BldgPPConcParkingDILtgWallGrouted RSPGrouted RSPConcConcConcConcSWSW48
4452
6058
Dirt Rd 18192021222324Ret Wall No. 4N65°35'09"EBENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788FOUNDATION PLANScale: 1" = 20' PLAN Drainage Area:Frequency (years)Discharge (CFS)Water Surface(elev. at bridge)FloodOvertopping110,00062.6HYDROLOGIC SUMMARY51.443,00010040082,00057.0= 788 square milesSPFFloodBase / DesignFlood500NOTES:1. Utilities locations shown are approximate. See Civil Plans for additional information.2. See Roadway Plans for R/W & TCE.Flood plain data are based upon information available when the plans wereprepared and are shown to meet Federal requirements. The accuracy of saidinformation is not warranted by the City and interested or affected parties shouldmake their own investigation.BENCH MARKS:Benchmark:BM = NGS AH9136; DATUM: NAVD88Survey Disk Stamped "931+48.33", Set in Top of Concrete Monument in theMedian at the Intersection of La Quinta Center and Highway 111.Elevation: 81.620', NAVD 88Basis of Bearings:The Bearings shown hereon are Based on the Line Between Stations "TMAP"and "PSAP" (Positions per Geodetic Survey, NAD 83, EPOCH 2009.00) asshown on the National Geodetic Survey Published Data Sheets, being North57°23'28.38" West.SCOUR DATA TABLESUPPORTNO.LONG TERM (DEGRADTION ANDCONTRACTION) SCOUR ELEVATION (FT)ABUT 1 0 0BENT 2 39.3 21.9BENT 3 39.3 21.9BENT 4 39.3 21.9ABUT 5 0 0SHORT TERM (LOCAL)SCOUR DEPTH (FT)NOTES:XX.XIndicates PileIndicates bottom of abutment, footing or anchor block elevation.Indicates CIDH Pile23+46.6218+69.7819+73.2021+08.2022+43.20"LAYOUT" LineN0°09'52"WWWLOLWWLOLWWLOLWWLOLN72°09'52"W℄PIER 2
N72°
0
9
'
5
2
"
W
℄PIE
R
3
N72°
0
9
'
5
2
"
W
℄PIER
4
N72°09'52"W℄BRG ABUT 1
N72°
0
9
'
5
2
"
W
℄BRG
A
B
U
T
5
B351.051.018'-11 116"17'-11316"9'-138"18'-1118"
18'-1
1 1
16"
9'-13
8"18'-1
11
8"
18'-1
1 1
16"
9'-13
8"18'-1
11
8"
17'-113
16"
17'-113
16"N0°09'52"WN0°09'52"WN0°09'52"WN0°09'52"WLocation Pile TypeAbut. 1 24" CIDH 51.25 970 750 160 0 N/A N/A 0.0 (a), 20.0 (c) 0.0Design TipElevation (ft)Note 1, 2, 4SpecifiedTip Elevation (ft)Note 3Pier 2 60" CIDH 35.00 3100 2500 2300 0 1300 0 -68.0(a), 18.0(b) -68.0Abut. 5 24" CIDH 51.25 980 760 160 0 N/A N/A 0.0 (a), 20.0(c) 0.0Pile Data Table-67.0(c)-69.0(c)-67.0(c)Pier 3 60" CIDH 35.00 3200 2600 2550 0 1260 0 -75.0(a), 19.0(b) -75.0Pier 4 60" CIDH 35.00 3100 2500 2500 0 1230 0 -73.0(a), 16.5(b) -73.0Notes:1. Design pile tip elevations are controlled by the required:(a) Minimum factored nominal resistance in axial compression for Strength Limit State, (b) Minimumfactored nominal resistance in axial compression for Extreme Event I (Seismic) Limit State, (c) Critical length for laterally loaded pile.2. Design tip elevation (a) is based on: resistance factor (Øs=0.7) with end bearing neglected and a group reduction factor of 0.65 for the abutment piles, andresistance factors (Øs=0.7, Øb=0.5) and no group reduction for the pier piles. Design tip elevation (b) is based on resistance factors (Øs=1.0) with end bearingneglected.3. The Specified Pile Tip Elevations shall not be raised.4. For the piles tipped at the Specified Pile Tip Elevation, the estimated total support settlement due to the design Service Limit State 1 load is less than thepermissible value of 1.0 inch. The estimated differential settlement between any two adjacent supports is less than 0.5 inches. Design tip elevation for settlement isnot provided or necessary since the piles tip cannot be raised above the Specified Pile Tip Elevation as per Note 3 below.Cut-OffElevation (ft)Total PermanentSevice Limit State ILoad Per Support (Kips)Required Minimum FactoredNominal Resistance (kips) Per PileCompression Tension Compression TensionStrength Limit State Extreme (Seismic) Limit StateØs=0.7,Øb=0.5Ret Wall No. 2N71°53'13"WRet Wall No. 1N72°53'22"W
Ret Wall No. 3N71°20'45"W2-18
"
C
M
P
66"
S
l
e
e
v
e
-
5
4
W
a
t
e
r
L
i
n
eSlope paving (E)Slope paving (E)Slope paving (E)Slope paving (E)Ret Wall No. 4N69°13'59"WConc. (E)Øs=0.7,Øb=0.5Øs=0.7,Øb=0.5Øs=0.7Øs=0.718"Ø DIP Water Main (N)Sewer Pipes (N)6/16/2021 4:58:15 PM72
ABUTMENT 1 LAYOUTPLANSCALE: 1/4" = 1'-0"B0-1℄ABUT BEARING20'-0" along WWLOL, typStructure ApproachSlab Type N(30)B7-10U-8WWLOL49'-21516"41'-2316"90'-518"ELEVATIONSCALE: 1/4" = 1'-0"B4BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788Steel Reinforced Elastomeric Bearing Pad, 16"x16"x5", tot 10Expanded PolystyreneFuture Utility Opening, TypInternal Shear KeyExternal Shear KeyB7-10U-4Future Utility Opening, TypInternal Shear KeyExternal Shear KeyExpanded PolystyreneExternal Shear KeyExternal Shear Key1st Stage Construction2nd Stage Construction"℄ Bridge""LAYOUT" LineBearing Pad, TypTop of BackwallBarrier Rail Not ShownBarrier Rail Not ShownFG Approx.AA10'-6316"6'-71516"9'-5916"9'-5916"6'-778"2'-5716"6'-71516"9'-5916"9'-5916"6'-71516""LAYOUT" Line"℄ Bridge"WWLOLNotes:1. For Typical Section see "Abutment Details No. 2" Sheet.2. For Section A-A and B-B, Bearing Pad Details, External Shear Key, andInternal Shear Key Details see "Abutment Details No. 2" Sheet.3. For Casing Detail see4. For Utility Opening Dimensions at Abutment, see "Typical Section" Sheet.5. Abutment and Footing Longitudinal Reinforcement Bars shall be Lap Splicedat Stage Construction Joint.6. For Wingwall Details, see "Abutment Details No. 1" Sheet.7. Not all Piles are shown in Elevation View.B7-10U-8Edge ofDeckEdge ofDeck18+50AABBConst. JointNote:Retaining Walls and CVWD Trail not shown forclarity.6/16/2021 4:58:35 PM72
ABUTMENT 5 LAYOUTPLANSCALE: 1/4" = 1'-0"B0-1℄ABUT BEARING6'-0" along WWLOLEdge ofDeck41'-2316"49'-21516"90'-518"Edge ofDeckELEVATIONSCALE: 1/4" = 1'-0"B0-1B5BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788B7-10U-4Future Utility Opening, TypExpanded PolystyreneExternal Shear KeyExternal Shear Key1st Stage Construction2nd Stage Construction"℄ Bridge""LAYOUT" LineBearing Pad, TypTop of BackwallBarrier Rail Not ShownBarrier Rail Not ShownFG Approx.AABBStructure ApproachSlab Type (N)B7-10U-8WWLOLSteel Reinforced Elastomeric Bearing Pad, 16"x16"x5", tot 10Expanded PolystyreneFuture Utility Opening, TypInternal Shear KeyExternal Shear KeyInternal Shear KeyExternal Shear Key2'-5716"6'-71516"9'-5916"6'-778"10'-6316"6'-71516"9'-5916"9'-5916"6'-71516""LAYOUT" Line"℄ Bridge"WWLOLNotes:1. For Typical Section see "Abutment Details No. 2" Sheet.2. For Section A-A and B-B, Bearing Pad Details, External Shear Key, andInternal Shear Key Details see "Abutment Details No. 2" Sheet.2. For Casing Detail see3. For Utility Opening Dimensions at Abutment, see "Typical Section" Sheet.4. Abutment and Footing Longitudinal Reinforcement Bars shall be Lap Splicedat Stage Construction Joint.5. For Wingwall Details, see "Abutment Details No. 1" Sheet.6. Not all Piles are shown in Elevation View.B7-10U-89'-5916"23+50AAConst. Joint12'-0" along WWLOLNote:Retaining Walls not shown for clarity4"Ø Conduit6/16/2021 4:59:00 PM72
BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788ABUTMENT FOOTING LAYOUTABUTMENT 5 FOOTING PLANSCALE: 1/4" = 1'-0"B0-1B637'-178"46'-1018"91'-534"6 Spaces @ 6'-0" = 36'-0"6 Spaces @ 6'-0" = 36'-0"84'-0"2'-938"3'-858"6 Spaces @ 6'-0" = 36'-0"6 Spaces @ 6'-0" = 36'-0"1'-178"5'-418"2'-6"2'-6"2'-0"2'-0"9'-0"WWLOLWWLOL45'-258"38'-938"91'-534"ABUTMENT 1 FOOTING PLANSCALE: 1/4" = 1'-0"B0-16 Spaces @ 6'-0" = 36'-0"6 Spaces @ 6'-0" = 36'-0"84'-0"5'-418"1'-178"7 Spaces @ 6'-0" = 36'-0"6 Spaces @ 6'-0" = 36'-0"3'-858"2'-938"2'-6"2'-6"2'-0"2'-0"9'-0"WWLOLWWLOL"LAYOUT" Line"℄ Bridge""LAYOUT" Line"℄ Bridge"Const. JointConst. Joint4" Chamfer, Typ4" Chamfer, Typ℄ABUT FOOTING℄ABUT FOOTING2'-4"2'-4"5'-6"5'-6"5'-6"5'-6"6/16/2021 4:59:19 PM72
BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788ABUTMENT DETAILS NO. 1B7TYPICAL SECTIONSCALE: 1/2" = 1'-0"#5 @ 12"BB or EB#5 x 2'-0" @ 12"#5 @ 12" *#6 @ 12"#7 @ 12" *#7 x 7'-0" @ 12" *20 - #5, total24" Ø CIDH Pile#7 cont. total 6CL Abutment Bearing Expanded polystyrene#5 @ 12" *3'-0"3" clr. typ.#7 @ 9" *3" clr. typ.6" clr.3"#7 @ 9"*Structure Approach Slab2'-6"1'-0"3'-0"11#4 @ 9" *1'-6"C Abutment FootingLConst. jointB0-1313-22'-6"2'-0"2'-6"2'-0"Detail AExpanded polystyrene1'-6"Breakout for joint assembly, for detailssee "Joint Seal Assembly" Sheet#6 @ 12"*Concrete Barriernot shownC Abut BrgL3'-0"C#4 tot 2#9inside face#4 12" #9 #5 tot 9, evenly spaced,extend into Ftg2" Clr, Typ#4 outside faceC#4 @18#9 @9B11-58#9 tot 4BO-1WWLOL1'Outside Face#4 @ 18,outside faceScale: 1/2" = 1' SECTION C-C GeocompositeDrain, See Sheet B8for details2" clr. typ.B0-13 DETAIL ANo ScaleExpandedpolystyrene"a" + 12"12 " Expansion Jt. fillerAbut seatConst jointGeocomp.drain1'-4"BackwallB6-21WINGWALL ELEVATIONSCALE: 1/4" = 1'-0"Drainage Details (See Note 1)2'-6"Decorative railingSee Civil Plans for Slope LiningBridge Super StructureFinish GradeChannel Lining#4 @ 24"Joint Seal Assembly (MR = 212")See "Joint Seal Assembly" SheetNotes:1. For Drainage Details, See2. * Place parallel to ℄ Bridge and place along ℄ abutment FootingB9-6B9-6B9-52" ExpandedPolystyreneGeocomposite Drain,See Sheet B8 for details#9#4, outside face#5Abutment FtgOutside FaceWingwall Section at Abutment FootingGeocompositeDrain, See Sheet B8for detailsConst. Jt.6"Footing rebars not shownLPile6/16/2021 4:59:53 PM72
BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788ABUTMENT DETAILS NO. 2B8DETAIL CNo Scale3"Filter fabricwrap aroundNotes: A. 4" Dia drains at intermediate sag points and at 25' max center to center.Exposed wall drains shall be located 3"± above finished grade. B. Geocomposite drain, cement treated permeable base, and 3" Dia slottedplastic pipe continuous behind abutment. Cap ends of pipe. Provide"Tee" connection at each 4" Dia drain. C. Connect the low end of plastic pipe to the main outlet pipe as applicable.SECTION C-CNo Scale3" unslottedplastic pipeCap, Typ. see Note B3" slotted plasticpipe, see Note BTee connection3"Backface of abutment orretaining wallABUTMENT SECTIONNo ScaleFinished GradeSee "Detail C"See Note BSee "Detail B"See Note A3'-0"Geocomposite Drain-2%DETAIL BNo Scale1'-0"Bond 6" to wall. Cuthole for 3" pipe.Bond to geocompositedrain, 3" MinLevel or slopedtoward wall10 mil polyethylene sheetCement treatedpermeable baseCC3"-2%Backfill sideBackfill side3" slottedplastic pipeNo Scale BEARING PAD DETAIL B0-1313-1Expanded Polystyrenesame thickness as BearingPadC Interior Bearing PadLGalv. sheet metal 116" thick, Typ2" all around, TypFace of exteriorshear keyBearing PadLevel3"3"Bearing PadLevel3"3"C Exterior Bearing PadLWEEP HOLE AND COMPOSITE DRAINAlternative to Bridge DetailB0-33-1Notes: 1. Abut 1 shown, Abut 5 similar, except noted. 2. Coat top of Bearing Pad with grease prior to placing sheet metal2'-0"1" Exp Joint Filler2" Expanded PolystyreneB0-1313-2B0-33-1Scale: 1/4" = 1'-0" INTERNAL SHEARKEY ELEVATION Scale: 1/4" = 1'-0" EXTERNAL SHEARKEY ELEVATION Scale: 1/2" = 1'-0" SECTION B-B Scale: 1/2" = 1'-0" SECTION A-A #5 Tot. 4#10 Tot. 46'-0"#5 Tot. 4MandatoryConst. Joint(See Note 1)#7Not all Abut.Reinf. Shown#10 Tot. 86'-0"#5 Tot. 4#5 Tot. 8Bridge Deck4" ExpandedPolystyreneB0-1313-11'2ndt Stage Construction1st Stage ConstructionMandatory Const. Joint(See Note 1)Notes:1. Mandatory Joint Surface to be Smooth and Lined with 15 PoundConstruction Paper.2. Do not Extend the Shearkey Rebars into Abutment Stem, except asshown.#5#5 Tot. 12#5#5 Tot. 4#10 Tot. 46'-0"#5 Tot. 12#5 Tot. 4#10 Tot. 86'-0"#5 Tot. 10#5 Tot. 10Mandatory Const. Joint (See Note 1)1'-0"#5 Tot. 84'-0"
4'-0"Scale: 1/2" = 1'-0" WINGWALL CORNER DETAILS #5 @ 9"Abutment WingwallAbutment Reinf., not all shownB0-11-5Const. JointAbut. Reinf.℄Bridge6"6"See "Typical Section",Sheet B7 for AbutmentDetails4" Conduit @ Abut 54" Conduit @ Abut 5 only6/16/2021 5:00:22 PM72
45PIER LAYOUTScale: 3/16" = 1'-0" PLAN B9BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788Scale: 3/16" = 1'-0" ELEVATIONScale: 3/8" = 1'-0" PIER CAP STIRRUP PLAN SpecifiedTip Elev3" Clr 1'-0" SeeNote 6#7 Hoops @ 4" (See Note 2)No splice allowed in main column reinf.)45'#7 Hoops @ 6"Limits of payment for CIDH Pile OGUtilityOpening, TypB7-10U-7#14#6 @ 9" (Typ)2'-0"2'-0"#6 @ 9" (Typ)2'-0"2'-0"@ 6"@ 12"@ 6"@ 12"@ 6"#7 Stirrup spacingPlace parallel to ℄ "DP" andspace along ℄ Pier℄Bridge℄PierColumnTyp#11Tot 9#14 Tot 18(9 Bundles)Edge of exterior GirderEdge of DeckB7-10U-7B7-10U-7#11Bottom Reinforcement Top ReinforcementReinforcement Symmetrical about Phase 1and Phase 2 Bridge Deck Construction#7 @ 6"#7 @ 12"#7 @ 6"#7 @ 12"#7 @ 6"Notes:1. For Section D-D, E-E, F-F and G-G see "Pier Details" sheet.2. All hoops shall be butt welded and shall meet the "Ultimate Splice" requirements.3. CIDH reinforcing where permitted and all hoops shall be butt welded and shall meet the "Ultimate Splice" requirement.4. No splices permitted in pier cap reinforcement.5. For utility opening dimensions at piers, see "Typical Section" sheet.6. If necessary, a maximum of 4 main column bars may be trimmed to 1'-3" below Top of Deck to clear prestressing ducts.7. For detail of bar placement through columns, see "Pier Details" sheet.LEGEND:Indicates Closure PourIndicates Bundled BarsClosure Pour℄Bridge℄Bridge℄PierEdge of exterior GirderEdge ofexterior GirderEdge of DeckEdge of DeckDDEEFFGGCIDH TopElevation 32.0CIDH TopElevation 32.0Column below. TypSoffit Vent, Typ6/16/2021 5:01:12 PM72
PIER DETAILSB10BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788Scale: 1" = 1'-0" SECTION D-D Scale: 1" = 1'-0" SECTION E-EConst. Jt.#7#73'-6"LapColumn Reinforcement7'-0"Measured normal to ℄ Pier (Typ)6" Clr to
Main Reinf 3'-6"3'-6"4" Clr to
Main Reinf
Const Joint℄Pier#14 Total 18(9 Bundles)#11 Total 94" Fillet (Typ)3" ClrMin1'-3" to ClrPS Ducts
#11 Cont Total 7See Note 1#9 Cont Total 4 Each Face(See Note 1)112" Clr (Typ)(See Note 1)B0-5B0-55-105-11or3" ClrB0-5B0-55-105-11orLimits of distribution reinf. #5 Tot 15Scale: 1" = 1'-0"CIDH PILESECTION G-GScale: 1" = 1'-0"SECTION F-F#14 Tot 30(15 Bundels)#7 Hoops℄Pile = ℄ Column5'-0"5"Clr#14 Tot 30(15 Bundels)#7 Hoops℄Pile = ℄ Column5'-0"5
"Clr Notes:1. Reinforcement may be adjusted to clear prestressingducts.2. Inspection Pipes in the CIDH Pile terminates 2' abovethe Top of CIDH Pile Elevation.2" I.D. Inspection Pipe, Typ812 "Min 7'-0"Measured normal to ℄ Pier (Typ)3'-6"3'-6"4" Clr toMain ReinfConst Joint℄Pier#14 Total 18(9 Bundles)B0-5B0-55-105-11or3" ClrB0-5B0-55-105-11orLimits of distribution reinf.Limits of distribution reinf.#5 Tot 156/16/2021 5:01:43 PM72
TYPICAL SECTIONTYPICAL SECTIONScale: 1/4" = 1'-0"PART TYPICAL SECTIONScale: 1/2" = 1'-0"86'-0"1'-2"6'-0"4'-10"4'-10"6'-0"1'-2"31'-0"31'-0"3'-0"2'-3"7'-3"2-Spaces @ 9'-0" = 18'-0"7'-3"2'-3"3'-0"3'-0"2'-3"2-Spaces @ 9'-0" = 18'-0"7'-3"7'-3"3'-0"2'-3"5'-6"6"TYP.8"6"1'-0"& VAR.Rail With Arch. TreatmentRail With Arch. Treatment-2%-2%1'-0"ConcreteMedian6"34" DripGrove, Typ"LAYOUT" LineB7-10U-4B7-10U-5B11-58B0-5B0-55-105-11#5, S= 11or1'-7"2" Clr@ 11#41'-7"#4 cont @ 18#4 @ 12#5orStirrups, Typ1 1/2" Clr
#8 cont tot 2per girder, Typ#5 tot 6, Typ1" Clr
#4 cont tot 4, Typ#5 cont tot 6, Typ#4 @ 11 Spacealong "℄ Bridge" and parallel toAbutment#4 @ 9, Typ#8 cont tot 2per girder, Typ#8 cont tot 2per girder, TypConstruction joint, Typ#4 @ 12, Typ1" ClrB0-5B7-1B8-5#5 tot 8 per bay, Typ6"6"6"6"B112"2"3'-0"Lap#5 Tot 14#5 @11Raised Median END DIAPHRAGMScale: 1" = 1'B7-10B7-1S-2B0-5B0-55-10 5-11C Abut BrgL#5 @ 11"Place parallel to girdersand space alongC AbutLBlockout for recess#8 tot 6#6 tot 4#4 @ 4" Grillage placed 1"from PS Bearing Plate#5 @ 123"Limits of transverseslab reinf.3"1'-10"Limits of distribution reinf.8'-0"4" Min filletor#5 @ 113'-0"Joint Seal Assembly Blockout (See "Joint Assembly" Sheet)Notes:1. Falsework Release:Alternative 1:Falsework shall be released as soon as permitted by the specifications. Closure pour shall not be placed sooner than 60days after the falsework has been released.Alternative 2:Falsework shall not be released less than 28 days after the last concrete has been placed. Closure pour shall not beplaced sooner than 14 days after the falsework has been released. When falswork Alternative 2 is used, camber valuesare 0.75 times shown.2. Reinforcement may be bent or lowered to clear prestressing ducts.3. Reinforcement bars may be adjusted, as necessary, to install joint seal assembly (upon approval of the joint sealassembly shop drawings an as directed by the engineer).4. For K Rail placement, see "Road Plans" and Standard Plan T3.℄Bridge3'-10"See Note 435'-0", Typ8'-0", Typ1'-10"
TypPlace parallel to ℄ of Abut. Brg. and place along ℄ BridgeUtility Pipe Size Casing Opening Opening at Piers at End Diaph (HxW) (HxW)A IID 4 - 6"Ø 18"x21" 18"x21"B Frontier 2 - 4"Ø (1)C City 2 - 4"Ø (1)D City Fiber 1 - 3"ØE Spectrum 2 - 4"Ø (1)F Fut. Utility 18"x18" 18"x18"G Fut. Utility 1 - 4"Ø (1)H CV Link 1 - 4"Ø(1) Conduit shall extend a minimum of 10' beyond the back of bridgeabutment. Conduit ends shall be marked on the sidewalk or curb face.AFFFBCBENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788LEGEND:Indicates Closure PourNote:#8 Reinforcement shown shall be made continuous andmeet "Service Splice" requirements.34" Drip Grove, Typ6"112" Clr (Typ)# 4B11-58#5DCGE4" Fillet(Optional-Contractor)8"℄Bridge#5 @ 5 12"Place parallel to girders andspace along ℄ Abut#5 Cont.(See Note 3)Utility openingsB8-5#5, add'l, typH6/16/2021 5:02:13 PM72
1920212223BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788Scale: 1" = 20' GIRDER LAYOUT B12Denotes width of girder.PRESTRESSING NOTES270 ksi Low Relaxation Strand:PJack = 7,832 kips (Each Bridge)Anchor Set= 38"Total Number of Girders = 5 (Each Bridge)Distribution of Prestress force (Pjack) between girders/ducts shall not exceed the ratio of 3:2. Maximum final forcevariation between girders shall not exceed 725 kips.Concrete: f'c = 4,500 psi @ 28 days f'ci = 3,500 psi @ time of stressingContractor shall submit elongation calculations based on initial stress at = 0.8612 times jacking stress.µ = 0.15; K = 0.0002 = Indicates theoretical point of no movement for both ends stressing. CAMBER DIAGRAM No Scale12B14-5Soffit Access Openingtot 16, TypB7-10U-8, Typ18121812121212181812121812121812121812121812121218121812121218181212181212121218121218121212181218121212121818121218121218121218121218121212181218121212121818121218121218121218121218121216'-0"Girder Flare16'-0"Girder Flare16'-0"Girder Flare16'-0"Girder Flare16'-0"Girder Flare16'-0"Girder Flare16'-0"Girder Flare16'-0"Girder FlareB7-10U-8, TypB7-10U-8, TypB7-10U-7, TypC Abut 1 BrgLC Pier 2L
C Pi
e
r
4
L
C Ab
u
t
5
B
r
g
L
C Pi
e
r
3
LEdge of deckEdge of deckGIRDER LAYOUTDenotes width of girder.Notes:1. For additional top and bottom reinf. see "Typical Section" sheet.2. Camber values shown do not include allowances for falsework settlement.12B7-10U-8, Typ1812181212121218181212181212181212181212181212121812181212121218181212181212181212181212181212121812181212121218181212181212181212181212181212121812181212121218181212181212181212181212181212℄ Bridge16'-0"Girder FlareB7-10U-8, TypB7-10U-8, TypC Abut 1 BrgLC Pier 2L
L
C Ab
u
t
5
B
r
g
L
L
2'-11"L1L2L3L4.1L312"
10"
10"
C Pier 3L
C Pier 4L
C Pier 2LC Abut1 BrgL
C Abut5 BrgL3"16'-0"Flare, Typ.5L3.1L2.5L2.1L412".4L4.1L3.4L1.1L1.1L212"10"3'-1058"
3'-91
4"
10"
5'-6"
2'-11"
5'-6"20@63"20@612@1212@12@183"20@620@123"20@63"20@620@12@18#5 orStirrup spacing3"20@612@12@183"3"12@1220@620@12@1820@1220@616'-0"Flare, Typ12", Typ16', Typ3'-105
8"
3'-91
4"
3'-91
4"
3'-91
4" PART LONGITUDINAL SECTION No ScaleB7-1B8-5"LAYOUT" LineB7-1Soffit Vent, TypInflection pointCenter of gravityof cable path isparabolic between points shown0.00'0.00'0.00'0.06'
0.05'
0.06'
C Abut1 BrgLC Pier2L
C Pier 3L
C Pier 4L
C Abut5 BrgL
ProfileGradeCamber Line14 span12 span34 span14 span12 span34 span
1
4 span
1
2 span
3
4 span
1
4 span
1
2 span
3
4 span
0.00'
0.00'
0.00'
0.08'0.05'
0.08'
C Pier2
C Pier 3
ProfileGradeCamber Line14 span12 span34 span
1
4 span
1
2 span
3
4 span
SoffitSoffit6/16/2021 5:02:36 PM72
21BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788B13GIRDER REINFORCEMENTScale: 1/4" = 1'-0" ADDITIONAL TOP LONGITUDINAL REINFORCEMENTNOTES:1. No Splices permitted in additional longitudinal reinforcement2. Numbers at the end indicate the distance to ℄ of Pier.30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"30'-0"20'-0"20'-0"30'-0"℄Pier, TypEdge of Bridge Deck"LAYOUT" Line℄Bridge#9 X 50'-0" Total 8 (Each BayEvenly Spaced), Typ℄Girder6/16/2021 5:02:58 PM72
18192324MISCELLANEOUS DETAILSScale: 1" = 10' PLAN Note:1. Colored Stamped Concrete per City of La Quinta STD 720B14BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788Scale: 1/2" = 1'-0" SECTION A-A Scale: 1/2" = 1'-0" SECTION B-B Scale: 1/2" = 1'-0" SECTION C-C Scale: 1/2" = 1'-0" SECTION D-D Scale: 1/2" = 1'-0" SECTION E-E 4'-10"4'-10"# 4 @ 12"1'-0"#4 @ 12" Each Way2"8"See Note 1℄Bridge4'-10"4'-10"# 4 @ 12"1'-0"#4 @ 12" Each Way2"8"See Note 1℄Bridge1'-0"1'-0"8"# 4 @ 12"1'-0"Place Parallel to JointSee Note 1BB/EB#4 Place Parallelto Approach SlabApproach Slab# 4 @ 12"1'-0"See Note 1#4See Road Plans#4 x 1'-0" @ 18"#4 @ 18"8"Approach SlabSidewalk# 4 @ 18"1'-0"# 4 @ 12"4""CENTERLINE" Line℄BridgeApproach SlabApproach SlabBBEBDAABBEEDCCEECCDDAABBBridge DeckBridge DeckSidewalkSidewalkSidewalkSidewalkMedian"LAYOUT" LineR=34", TypR=34", TypR=34", Typ6/16/2021 5:03:18 PM72
18192021222324BRIDGE RAIL LAYOUT No. 1BRIDGE WEST (UPSTREAM) RAIL ELEVATIONScale: 1/8" = 1'-0"BRIDGE WEST (UPSTREAM) RAIL ELEVATIONScale: 1/8" = 1'-0"MATCH LINE
(see below left)BBMATCH LINE(See above right)BRIDGE WEST (UPSTREAM) RAIL ELEVATIONScale: 1/8" = 1'-0"71'-0" PANEL51'-6 78" PANEL7'-8"71'-0" PANEL71'-0" PANEL71'-0" PANEL71'-0" PANEL66'-3 18" PANEL62'-10" PANEL7'-8"BRIDGE PLANScale: 1" = 30'"LAYOUT" LineN0°09'52"WEB 23+48.2BB 18+68.2EL 65.88EL 65.19℄BridgeN0°09'52"W71'-0" PANELMETAL BRIDGE RAILING(WEST SIDE)METAL BRIDGE RAILING(EAST SIDE)MATCH LINE
(see below left)
MATCH LINE(See above right)479'-8"479'-8"EB18+80.9318+44.8123+60.6023+32.98BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788METAL RAILING DETAIL PANEL R-1SECTION 1METAL RAILING DETAIL PANEL R-2SECTION 2METAL RAILING DETAIL PANEL R-4SECTION 3METAL RAILING DETAIL PANEL R-4SECTION 3METAL RAILING DETAIL PANEL R-3SECTION 4METAL RAILING DETAIL PANEL R-4SECTION 5METAL RAILINGDETAIL PANEL R-4SECTION 5METAL RAILING DETAIL PANEL R-2SECTION 7METAL RAILING DETAIL PANEL R-5SECTION 6ABUT 1
PIER
2
PIER
3
PIER
4
ABU
T
5
CV LINKTRAIL
B15479'-8"SEE 'BRIDGE RAIL DETAILS NO.2' SHEET FOR BARRIER RAILPORTION ENCROACHING OVEREXPANSION JOINT6/16/2021 5:07:38 PM72
18192021222324BRIDGE EAST (DOWNSTREAM) RAIL ELEVATIONScale: 1/8" = 1'BRIDGE EAST (DOWNSTREAM) RAIL ELEVATIONScale: 1/8" = 1'BRIDGE EAST (DOWNSTREAM) RAIL ELEVATIONMATCH LINE
(see below left)
MATCH LINE(See above right)
MATCH LINE
(see below left)
MATCH LINE(See above right)7'-8"71'-0" PANEL71'-0" PANEL71'-0" PANEL71'-0" PANEL66'-3 18" PANEL7'-8"71'-0" PANEL51'-6 78" PANEL71'-0" PANEL66'-3 18" PANELEB488'-2"488'-2"BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788BRIDGE RAIL LAYOUT No. 2METAIL RAILING DETAIL PANEL R-2SECTION 7METAIL RAILING DETAIL PANEL R-4SECTION 6METAIL RAILINGDETAIL PANEL R-4SECTION 5METAIL RAILING DETAIL PANEL R-4SECTION 5METAIL RAILING DETAIL PANEL R-3SECTION 4METAIL RAILING DETAIL PANEL R-4SECTION 3METAIL RAILING DETAIL PANEL R-4SECTION 3METAIL RAILING DETAIL PANEL R-2SECTION 2METAIL RAILING DETAIL PANEL R-1SECTION 1488'-2"B16Scale: 1/8" = 1'BRIDGE PLANScale: 1" = 30'N0°09'52"WEB 23+48.2BB 18+68.2EL 65.88EL 65.19℄BridgeN0°09'52"WMETAL BRIDGE RAILING(WEST SIDE)METAL BRIDGE RAILING(EAST SIDE)18+80.9318+44.8123+60.6023+32.98ABUT 1
PIER
2
PIER
3
PIER
4
ABU
T
5
CV LINKTRAILSEE 'BRIDGE RAIL DETAILS NO.2' SHEET FOR BARRIER RAILPORTION ENCROACHING OVEREXPANSION JOINTBB"LAYOUT" Line6/16/2021 5:08:02 PM72
CONCRETE BARRIER DETAIL - SECTIONS 2,3,4,5 & 7Scale: 3/8" = 1'CONCRETE BARRIER DETAIL - SECTION 6Scale: 3/8" = 1'CONCRETE BARRIER DETAIL - SECTION 1Scale: 3/8" = 1'BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788BRIDGE RAIL DETAILS No. 151'-6 78" PANEL71'-0" PANEL66'-3 1/8" PANEL2'-10 12"10'-0"5'-0"10'-0"10'-0"5'-0"7'-412"PANEL 1 INVMOD 3PANEL 1PANEL 2PANEL 3PANEL 3 INVPANEL 2 INVPANEL 1 INVMOD 17'-412"5'-0"PANEL 3 INVMODPANEL 2 INV10'-0"PANEL 1 INV10'-0"PANEL 1 INV5'-0"PANEL 210'-0"PANEL 310'-0"PANEL 3 INV5'-0"PANEL 2 INV7'-412"PANEL 1 INVMOD15'-0"10'-0"PANEL 2 INVPANEL 1 INV10'-0"PANEL 15'-0"PANEL 210'-0"PANEL 310'-0"PANEL 3 INV5'-0"PANEL 2 INV10'-0"PANEL 1 INVWINGWALL AS OCCURSAT SECTION 7B176/16/2021 5:09:14 PM72
1'-0"1'-0"8"4"FRONT FACE OF CONC.BARRIER PARAPET (TYP.)EDGE OF BRIDGE DECKSYMMETRICAL ABOUT CL OF PILASTEREDGE OF BRIDGE DECK ANDREAR FACE OF CONC. BARRIERPARAPETTYPICAL PILASTER ELEVATIONScale: 1" = 1'-0"TYPICAL PILASTER SECTIONScale: 1" = 1'-0"SECTION Y-YScale: 1" = 1'-0"FLARED END BLOCK SECTIONScale: 1" = 1'-0"2'-3"2'-4"
CONC.
BARRIER
RECESS 1 12"GAP1 12"GAP1'-0"1" RECESS
(TYP.)
1'-0"1 12"CLR.TYP.2" TYP.
6" TYP.
1" TYP.7'-8"C OF PILASTERLTOP OFWALKWAYTOP OF CONC.BARRIER1'-0"1 12"GAP1 12"GAPSQUARE PEDESTAL BOLLARDBY 'PACIFIC LIGHTING &STANDARDS COMPANY' TOMATCH ADAMS STREETBRIDGE OR OWNERAPPROVED EQUAL. SEE CIVILPLANSYYNOTE: METAL RAILING NOTSHOWNTOP OF CONC.BARRIER (TYP.)TOP OF CONC. BARRIERRECESS (TYP.)TOP OF WALKWAYFINISHED SURFACE OFBRIDGE DECKBOTTOM SURFACEOF DECK1'-1"2"WWBENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788SECTION W-WScale: 1" = 1'-0"3" TYP.1'-0"10"3" TYP.
VARIES
1" RELIEFTYP.RAILING LOLNO RELIEF(TYP.)#6 @ 6" EACH WAY(EXTEND HORIZBARS 9" INTOPILASTERSECTION X-XScale: 1" = 1'-0"TOP OF WALKWAYFINISHED SURFACE OFBRIDGE DECKBOTTOM SURFACEOF DECK±1'-2"4'-7"
5'-11"#5 (TOT 4)#3 @ 6" (TYP.)#6 @ 6" EACH WAY(EXTEND HORIZBARS 9" INTOPILASTERNOTE: FOR INFORMATIONNOT SHOWN, SEESECTION Y-Y2" CLR.#6212" GAP#6NOTES:1. FOR CONCRETE BARRIER DETAILS NOT SHOWN, SEECALTRANS STD PLAN B11-542. FOR CONCRETE BARRIER ARCHITECTURAL TREATMENT,SEE "METAL RAILING DETAILS NO. 3" SHEET.3. FOR FLARED END BLOCK DETAILS NOT SHOWN, SEE"METAL RAILING LAYOUT (WEST SIDE) AND "METALRAILING LAYOUT (EAST SIDE)" SHEETS.XXB18TOP OFWALKWAYTOP OFWALKWAY2" CLR.#6SECTION Z-Z AT EXPANSION JOINTScale: 1" = 1'-0"TOP OFWALKWAYEXP. JOINT2" CLR.#6ELEVATION VIEW AT EXPANSION JOINTScale: 1" = 1'-0"TOP OFWALKWAYEXP. JOINT6" CLR.BRIDGE DECKZZ1058"1316"1316"2"±1'-2"4'-7"5'-11"BRIDGE RAIL DETAILS No. 26/16/2021 5:10:33 PM72
FLARED END BLOCK AND END PILASTERScale: 1/2" = 1'CONCRETE BARRIER ARCHITECTURAL TREATMENT DETAILScale: 1/2" = 1'PANEL NO. 3 (MOD)PANEL NO. 3PANEL NO. 2PANEL NO. 1 INVERTED (MOD 1)PANEL NO. 1PANEL NO. 1 INVERTED (MOD 2)PANEL NO. 1INVERTED(MOD 3)PANEL NO. 3 INVERTED (MOD)FIELD PAINT CONCRETE,"SPANISH GOLD" DAVISCOLORS, OR APPROVEDEQUALCONCRETE BARRIER TYPICAL SECTIONScale: 1" = 1'-0"BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-078810'-0"5'-0"10'-0"7'-412"8'-412"7'-412"7'-412"2'-1012"EDGE OF BRIDGE DECKCONCRETE BARRIER TYPE 732SWMETAL BRIDGE RAILING2" RELIEF1'-0"1" RELIEFNO RELIEFFS OF WALKWAY2'-3"3"6"6"6"2"1"2"2"3"FINISHED SURFACE OFWALKWAY4" SQUARE GRIDFOR LAYOUTPURPOSES (TYP.)C OF END PILASTERL2" RELIEF1" RELIEFNO RELIEFLEGENDB11-58FOR DETAILSNOT SHOWNSEESEEB11-51FOR POSTANCHORAGEDETAIL8"NOTES:1. FOR METAL RAILING TUBE SPLICE AND POST ANCHORAGE DETAILS, SEE CALTRANS STD. PLAN B11-51.2. FOR FLARED END BLOCK DIMENSIONS NOT SHOWN, SEE "METAL RAILING LAYOUT (WEST SIDE) AND"METAL RAILING LAYOUT (EAST SIDE)" SHEETS.B19PANEL NO. 2 INVERTED (MOD 1)3'-1034"PANEL NO. 1INVERTED(MOD 4)2'-912"BRIDGE RAIL DETAILS No. 36/16/2021 5:11:09 PM72
51'-678"5'-218"1'-712"8'-0"8'-0"4'-11"8'-0"8'-0"6'-512"1'-412"24'-912"6'-034"8'-0"8'-0"1'-412"1'-312"3'-1114"3'-612"2'-134"8'-0"7"12'-512"3'-012"4'-1112"3'-7"71'-0"1'-312"3'-11"1'-412"6'-3"9"4'-712"2'-7"6'-5"3'-034"4'-934"5'-014"2'-834"8'-0"8'-0"1'-412"45°26'-614"2'-6"71'-0"3'-6"
3'-2"8'-0"8'-0"35'-6"35'-6"METAL RAILING DETAIL R-1Scale: 1/4" = 1'METAL RAILING DETAIL R-3Scale: 1/4" = 1'METAL RAILING DETAIL R-2Scale: 1/4" = 1'BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788NOTES:1. ALL LAYOUT DIMENSIONS ARE MEASURED ALONG BARRIER.2. ALL DIMENSIONS MEASURED TO ℄ OF MEMBERS.3. METAL RAILING TO BE POWDER COATED W BEHR 'ICE TEA' ORAPPROVED EQUAL TO MATCH ADAMS STREET BRIDGE AND WHICH ISAPPROVED BY THE ENGINEER PRIOR TO ITS APPLICATION.4. UNLESS OTHERWISE SHOWN, CLEAR SPACING BETWEEN ADJACENTPARALLEL RAIL MEMBERS SHALL BE UNIFORM AND NOT EXCEED 7".5. FOR METAL RAILING TUBE SPLICE AND POST ANCHORAGE DETAILS,SEE CALTRANS STD. PLAN B11-51.6. ALL STEEL TUBING TO BE SQUARE, UNLESS NOTED OTHERWISE.B20BRIDGE RAIL DETAILS No. 46/16/2021 5:11:47 PM72
1'-412"3'-3"7'-4"4'-8"8'-0"8'-0"8'-0"1'-10"3'-212"8'-212"4'-912"8'-0"1'-412"3'-212"2'-212"2'-6"71'-0"8'-0"2'-7"66'-318"8'-0"8'-0"1'-412"1'-412"8'-034"7'-212"8'-0"4'-1134"3'-3"8'-0"8'-0"K-CONNECTION DETAILINTERMEDIATE POST DETAILTYPICAL METAL RAILING DETAILSScale: 1" = 1'END POST DETAILTOP-CONNECTION DETAILMETAL RAILING DETAIL R-4Scale: 1/4" = 1'METAL RAILING DETAIL R-5Scale: 1/4" = 1'BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-07882"X2"X14" STEEL TUBING1"X1" 11 GA. STEELTUBING (TYP.)TOP OF CONC.BARRIERPROVIDE MINIMUM GAPREQUIRED FOR WELDING2"X2"X14" STEELTUBING14" CAP PLATE1"X1" 11 GA. STEELTUBING (TYP.)2"X2"X14" STEEL TUBING14" CAP PLATE2"X2"X14" STEEL TUBING7" CLR.MAX. TYP.2'-6"1"X1" 11 GA.STEEL TUBING(TYP.)2"X2"X14" STEELTUBING14" CAP PLATETOP OF CONC.BARRIER2'-6"END OFCONCRETE14" CAP PLATE7" CLR.MAX. TYP.BRIDGE RAIL DETAILS No. 5TYPTYPGGTYPGGTYPTYPTYPGTYPGGTYP45°1"X1" 11 GA. STEELTUBING (TYP.)TYPTYPTYPTYPGTYPGTYPTYPSEE NOTE 5SEE NOTE 5TYPICAL METAL RAILING DETAILSScale: 1" = 1'B21NOTES:1. ALL LAYOUT DIMENSIONS ARE MEASURED ALONG BARRIER.2. ALL DIMENSIONS MEASURED TO ℄ OF MEMBERS.3. METAL RAILING TO BE POWDER COATED W BEHR 'ICE TEA' ORAPPROVED EQUAL TO MATCH ADAMS STREET BRIDGE AND WHICH ISAPPROVED BY THE ENGINEER PRIOR TO ITS APPLICATION.4. UNLESS OTHERWISE SHOWN, CLEAR SPACING BETWEEN ADJACENTPARALLEL RAIL MEMBERS SHALL BE UNIFORM AND NOT EXCEED 7".5. FOR METAL RAILING TUBE SPLICE AND POST ANCHORAGE DETAILS,SEE CALTRANS STD. PLAN B11-51.6. ALL STEEL TUBING TO BE SQUARE, UNLESS NOTED OTHERWISE.
6/16/2021 5:12:11 PM72
SKEW > 20°NORMAL TO JOINTEXPANDED POLYSTYRENE,MATCH EXISTING JOINTWIDTH FOR CLOSURE POURSHEETNEOPRENE1/2" @ MAXIMUM TEMPERATURE,EXACT WIDTH TO BE DETERMINEDBY ENGINEERSTEEL EDGEMEMBERFACE OFBARRIER@ HIGHSIDEAATOP OFDECKSTEEL EDGEMEMBERTO SET MINIMUM JOINT OPENING "W"** "W" =NO SCALEFACE OF BARRIER@ LOW SIDEINITIAL POURLIMITS412" STAGGERED ONCENTER, Typ1/4" BEVEL,TypJOINT INFORMATION"a" DIMENSIONSLOCATIONSKEWWINTERSUMMER1" Min,3" Max, Typ"W"1/2" Minimumac = 0.0000060as = 0.0000065TYP"a"116" GAP5/8" x 8" ANCHORSTUDS, (5/8" X 6"IN OVERHANG AREA)STAGGER AS SHOWN1/2"+[(Max Str temperature in °F )-(actual Str temperature in °F)]*(ac or as )(12)(contributory L in feet)PAVINGNOTCH ORCLOSUREPOURLIMITSSTEEL EDGEMEMBERSIDEWALK DETAILTYP1/16" GAP5/8"ØANCHORAGE,SEE NOTE 6APPROVAL DATEFILE NO.xs8-010ClrTyp112" Ø HOLE FORCOUNTERSUNK 58" ØANCHORAGE. PLACEANCHOR BOLTS ONAPPROACHINGTRAFFIC END01/460°SMAWNOTE:SHADED AREASTO BE WELDEDSCHEMATICFIELDWELD DETAIL01/460°01/460°01/460°GRINDTOPSURFACEONLYSCHEMATICSHOPWELD DETAILTOPOFDECKSCHEMATICSTEEL EDGE MEMBERFACE OF BARRIER@ LOW SIDEBARRIER DETAIL3" = 1'-0"3" = 1'-0"NO SCALENO SCALEJuly 2016STEEL BARRIER3/8" X 812"X 18"STEEL BARRIER3/8" X 812" X 18"STEEL BARRIER3/8" X 6" X 18"BAR 2" X 1/4" X 8"CENTERED @ BOLTS,WITH 3/4" Ø HOLES10"8"2"2"SECTION A-A3" = 1'-0"2"2"2"2"6"
6"116" GAP6"9"1 12"12"SECTION B-B6" = 1'-0"4 12"4 12"HIGH SIDE LOW SIDEPLAN3" = 1'-0"B22BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788NOTES:1. Alternatively, fillet or complete penetration welds may be used at anchor studs.2. Alternate types of anchor studs may be permitted subject to the authorizationby the Engineer.3. Joint seal assembly to be used in conjunction with closure pour. (See othersheets for limits). Closure pour shall not be placed until final deck surface is withinthe tolerances specified.4. Use joint at crown of roadway, at any change in traverse slope in deck and atchanges in horizontal direction. Place other joints at or near lanes. All metal partsto be painted or galvanized after fabrication.5. Sheet Neoprene shall be fabricated in one continuous piece and shall befabricated to bend around corners. Field splices of the neoprene are not allowed.6. Insert assembly or expansion anchorage for 5/8" x 1 3/4" bolts. Use installationbolts extended 1/2" minimum past nut and coat with bond breaker, after concretehas cured, remove installation bolts, install HS bolts and sheet neoprene.7. Use sidewalk detail at all sidewalk joints. Use barrier detail low side at bothsides if the roadway is crowned, or if the difference in elevation between the endsof the seal is 6 inches or less.8. ac , as, are the thermal expansion coefficients for concrete and steelrespectively.9. Anchor studs shall conform to ASTM 108.5/8" X 8" ANCHOR STUDS@ 4 12" ± STAGGERED,(6" LONG IN OVERHANG)SKEW < 20°PLAN3" = 1'-0"MOVEMENTRATING(MR)SPRING& FALLAbut 1 212" 18° 1 14" 78" 58"'Abut 5 212" 18° 1 14" 78" 58"'JOINT ASSEMBLY(MAX MOVEMENT RATING = 4")6/16/2021 4:55:13 PM72
55RETAINING WALL DET. NO. 1PLAN VIEW - RETAINING WALL NO. 1SCALE: 1/8" = 1'-0"B23BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-078872'-0"H=12'PLAN VIEW - RETAINING WALL NO. 2SCALE: 1/8" = 1'-0"39'-2"H=10'ELEVATION VIEW - RETAINING WALL NO. 1SCALE: 1/8" = 1'-0"72'-0"H=12'90'-0"H=10'ELEVATION VIEW - RETAINING WALL NO. 2SCALE: 1/8" = 1'-0"B3-3AB3-3ARet. Wall LOLRet. Wall LOLAbutment 1 FootingAbutment 1 FootingAbutment 1 FootingOGBottom of FootingElev 55.0Top of WallFinished GradeBehind WallOGBottom of FootingTOW 66.30Elev 53.5Elev 55.5Finished GradeBehind WallElev 53.0TOW 62.0TOW 66.0TOW 61.5Footing Step (typ)B3-8Finish Surface in Front of WallFooting Step (typ)B3-83" Plastic Pipe(slotted), See Note 1Outlets to SlopeCap End3" Plastic Pipe(slotted), See Note 1Cap EndOutlets to SlopeFinish Surface in Front of Wall18" Storm Drain,see Civil Plans24" Storm Drain,see Civil PlansAbutment 1 FootingWall Exp. JointB0-33-4FlowWall Exp. JointB0-33-4FlowWeakened Plane, (Typ)B0-33-3Fencing perCivil plansFencing perCivil plansBegin Ret Wall No. 1 Sta 10+0039.17' LT of 'CENTERLINE'Sta18+81.98Begin Ret Wall No. 1 Sta 20+0046.83' RT of 'CENTERLINE'Sta18+54.04N72°53'22"WN71°53'13"WExpansion Joint, (Typ)B0-33-436'-0"36'-0"Top of Wall36'-0"36'-0"Weakened Plane, (Typ)B0-33-330'-0"30'-0"Notes:1. See B9-6 "Structure Approach Drainage Details" for3" Plastic Pipe Detail with Footing. Adjust Profile ofthe Drainage as directed by the Engineer.2. Channel Lining Not Shown.3. See Sheet B24 for "Typical Section Retaining Wall".24" Storm Drain18" Dom.Water line30'-0"Weakened Plane, (Typ)B0-33-36/16/2021 4:52:54 PM72
RETAINING WALL NO. 2B24BENGAL ENGINEERING360 S. HOPE AVE. SUITE C-110SANTA BARBARA, CA 93105(805) 563-0788PLAN VIEW - RETAINING WALL NO. 3SCALE: 1/8" = 1'-0"55'-0"H=12'ELEVATION VIEW - RETAINING WALL NO. 3SCALE: 1/8" = 1'-0"B3-3AAbutment 5 FootingRet. Wall LOLAbutment 5 FootingPLAN VIEW - RETAINING WALL NO. 4SCALE: 1/8" = 1'-0"B3-3ARet. Wall LOLAbutment 5 FootingOGBottom of FootingDESIGN 'H'OGType 1Retaining WallTop of Wall ElevAbutment 5 FootingOGBottom of FootingELEVATION VIEW - RETAINING WALL NO. 4SCALE: 1/8" = 1'-0"21'-0"H=12'64'-11"H=12'TOW ±65.2TOW 60.0TOW ±65.2ELEV 53.5ELEV ±53.5Railing per civilplans.Retaining wallLOLB3-1Concrete SlopeProtectionsee "Road Plans"4'-0" Min.See Note 1GeocompositeDrain2'-0"
Var.
6" - 1'-0"FGTYPICAL SECTIONRETAINING WALLNo Scale3" Plastic Pipe(slotted), See Note 1Elevation View hasbeen Projected forClarityOutlets to SlopeOutlets to SlopeCap EndWall Exp. JointB0-33-4FlowFlowWall Exp. JointB0-33-4Fencing perCivil plansFencing perCivil plansBegin Ret Wall No. 3 Sta 30+0046.83' RT of 'CENTERLINE'Sta 23+29.83S69°13'59"ERe
t
.
W
a
l
l
LO
LS6
5
°
3
5
'
0
9
"WBegin Ret Wall No. 4 Sta 40+0039.17' LT of 'CENTERLINE'Sta 23+57.77S71°20'45"E42" SD, See Civil Plans for detailsTop of Pipe Elev +/-50.6Notes:1. See B9-6 "Structure Approach Drainage Details" for 3"Plastic Pipe Detail with Footing. Adjust Profile of theDrainage as directed by the Engineer.2. Channel Lining Not Shown.Elev ±65.2Exist 42" SD18" DIP Waterline. Top at+/-37.1. See Civil PlansB0-33-3WeakenedPlane, (Typ)B0-33-3Finished Gradein Front of WallFinished Gradein Front of Wall±16'-0"Cap EndTop of WallFinished GradeBehind WallTOW 61.25Finished GradeBehind WallWeakened Plane, (Typ)Top of Wall6/16/2021 4:53:37 PM72
35354040
45
45
50
50
55 6062
63
4
5
4550
505555
45406055
42
333331
BldgSD OutletPPConcParkingDITransf PadLtgWallConc
Wall
Grouted RSPGrouted RSPConcConcConcConcSWSW48
4452
55 626361
536058
Dirt Rd 18192021222324B-1B-2B-3B-4B-5PLANScale: 1" = 40'"CENTERLINE" LineN0°09'52"WEB 23+48.2BB 18+68.2EL 65.88EL 65.19CV LIN
K
T
R
A
I
L
CV LINK TRAIL
LOG OF TEST BORINGS No. 1B25BENGAL ENGINEERING360 S. Hope Avenue, Suite C-110Santa Barbara, CA 93105(805) 563-078818°18°18°18°18°℄BridgeN0°09'52"W℄Pier
2
℄Pier
3
℄Pier
4
Note:1. Sampling was accomplished using a CME 75, 140-lbauto hammer dropping 30 inches in accordance withASTM D-1586.403020100-10-20-30-40-50-6050403020100-10-20-30-40-50-60Elevation in FT (MSL)-70-7050Elevation in FT (MSL)2.431228"7B-1Alluvium (Qal)34 44.3'15Fine-grained Silty Sand (SM) - light brown, medium dense, slightly moist(alluvium)Silt (ML) - olive brown, medium stiff, moist2.442-512.411 1.4same as above (SM)-PIFine-grained Sand with Silt (SP/SM) - light brown, dense, slightly moist2.4same as above (SM)1.41217-Sandy Silt (ML) - light olive brown, medium stiff, slightly moist to moistFine-grained Silty Sand (SM) - light brown, medium dense, moist2622.41.433Clayey Silt (ML) - brown to olive brown, medium stiff, moist, in sharpcontact with Sand (SP) - light brown, dense, slightly moistSilt (ML) with laminated Clayey Silt (ML) in sampler tip - brown to olivebrown, medium stiff, moistLaminated Clayey Silt (ML) to Silty Clay (CL) - olive brown to brown, stiff,moist291.444- 27Fine-grained Silty Sand (SM), Sandy Silt (ML) and Silt (ML) - light brownto brown, dense/stiff, moist, 4"-6" thick beds242.42.4 121C292.4Fine-to medium-grained Sand (SP), fine-grained Sand (SP) andmedium- to coarse-grained Sand with Gravel (SW) - tan, dense, slightlymoist, 3"- 4" layers39C8952.4401201.4Silt with some Clay (ML) and fine-grained Silty Sand (SM) - olive brown tolight brown, very stiff/dense, moist1.454Fine-grained Sand (SP) with trace Silt and scattered pebbles - light brown,very dense, slightly moistFine- to coarse-grained Sand (SW) with some Gravel - light tan, verydense, slightly moist10-13-14Boring terminated at ~ El.= -57.1 ft.1357213710115129811713131.4-13same as above, (ML) and (ML/CL), medium stiff, moistPI31161-3-8"B-2 44.0'141.4-1412.4Alluvium (Qal)Fine- to medium-grained Sand with some Silt (SP-SM) - light brown, slightlydense, dry, with laminated Silt (ML) in sampler tip - light gray, medium stiffFine- to medium-grained Sand (SP) with some Silt - light brown, mediumdense, dry to slightly moist201.4Very fine-grained Sand with some Silt (SM) - light brown, medium dense,slightly moist, contains 1.5" thick Sandy Silt (ML) bed-2262.4Laminated Silt (ML) and fine-grained Silty Sand (SM) - olive brown to brown,medium stiff/medium dense, moist, 4"-6" thick beds111.4-19Clayey Silt (ML) - olive brown, slightly stiff, moist, occasional orange mottling402.4Fine-grained Sand (SP) - light brown, medium dense, moist161.4-10Fine-grained Silty Sand (SM) and Sandy Silt (ML) - light olive brown, mediumdense/ medium stiff, moist502.4Fine- to medium-grained Sand (SP) with olive brown Clayey Silt (ML) rip-upclasts - light gray, very dense, moist191.4-4Fine-grained Sand with some Silt (SP/SM) - light brown, medium dense,moist with Silt (ML) in sampler tip312.4Fine-grained Sand (SP) with some Silt w/ 3" thick olive brown, mottled ClayeySilt (ML) lens - medium dense, moist to very moist-Laminated Clayey Silt (ML) to Silty Clay (CL) - olive brown to brown, stiff,moist20 1.4122.4Gravelly Sand (SW) grading to fine- to medium-grained Sand (SP/SW) -light gray, dense, moist441425 1.421-1.4Fine-grained Silty Sand (SM) with 5" thick lens of Clayey Silt (ML) - lightbrown to olive brown, medium dense/stiff, moist1.461Fine- to medium-grained Sand (SW) - light brown, very dense, slightly moistFine- to medium-grained Sand (SW) - light gray to light brown, grading tomedium- to coarse-grained Gravelly Sand (SW) - dense, slightly moist to moist10-13-14Boring terminated at ~ El.= -57.5 ft.1162319341041181212032161242-3-DS608"B-3 53.1'102.41155161.4Alluvium (Qal)Fine-grained Sand with some Silt (SP/SM) - light brown to tan, slightly dense,slightly moistsame as above (SP/SM) - very thinly bedded172.4Interbedded fine-grained Sand (SP) and Silt (ML) - light brown to brown, mediumdense/medium stiff, slightly moist to moist10912121.4Fine-grained Sand with Silt (SP/SM) with 5" thick Sandy Silt (ML) bed - tan tolight brown, slightly dense / medium stiff, slightly moist to moist, laminated sands252.41147Fine-grained Sand with Silt (SP) and fine-grained Silty Sand (SM) - light brown,medium dense, moist201.4Fine-grained Sand with some Silt (SP) - tan, medium dense, slightly moist,faintly laminated322.41054Fine-grained Sand (SP) - tan, medium dense, moist221.4Fine- to medium-grained Sand (SP) with some Silt - light brown, mediumdense, moist, occasional rust orange oxidation mottling282.41116Silty Sand (SM) and Clayey fine-grained Sand (SC) - light brown to olivebrown, medium dense/medium stiff, moist181.4Silt with Clay (ML) - olive brown, stiff, moist, mottled; grading to Sandy Silt(ML) - light brown120Fine- to medium-grained Sand (SW) with widely scattered small gravel -light tan, medium dense, moist562.4301.4Fine- to medium-grained Sand (SP) with widely scattered small gravel -light brown to tan, dense, slightly moist34441 1.429-1.4Medium- to fine-grained Sand (SP) - light gray, dense, moist; 2" thick Silt(ML) in sampler tip1.417Clayey Silt (ML) to fine-grained Sand with Silt (SM) - olive brown to lightbrown, medium stiff, moistInterbedded Silt with some Clay (ML), Sandy Silt (ML), Clayey, fine-grainedSand (SC) and fine- to medium-grained Sand (SP) - olive brown to brown tolight gray, medium stiff/medium dense, moist10-14-14Boring terminated at ~ El. = -68.4 ft.-61-2--3-53-15-25-SVSV1.45231.4403Fine-to medium-grained Sand with widely scattered gravel (SW) - lightbrown, dense to very dense, slightly moistClayey Silt (ML) to fine-grained Sand with Silt (SM) - olive brown to lightbrown, medium stiff, moist--ProfileScale: 1" = 10' VAbut
.
5
Abut. 1
6/16/2021 4:55:52 PM72
35354040
45
45
50
50
55 6062
63
4
5
4550
505555
45406055
42
333331
BldgSD OutletPPConcParkingDITransf PadLtgWallConc
Wall
Grouted RSPGrouted RSPConcConcConcConcSWSW48
4452
55 626361
536058
Dirt Rd 18192021222324B-1B-2B-3B-4B-5PLANScale: 1" = 40'N0°09'52"WEB 23+48.2BB 18+68.2EL 65.88EL 65.19CV LIN
K
T
R
A
I
L
CV LINK TRAIL
LOG OF TEST BORINGS No. 2B26BENGAL ENGINEERING360 S. Hope Avenue, Suite C-110Santa Barbara, CA 93105(805) 563-078818°18°18°18°18°℄BridgeN0°09'52"W℄Pier
2
℄Pier
3
℄Pier
4
Note:1. Sampling was accomplished using a CME 75, 140-lbauto hammer dropping 30 inches in accordance withASTM D-1586.403020100-10-20-30-40-50-6050403020100-10-20-30-40-50-60Elevation in FT (MSL)-70-7050Elevation in FT (MSL)8"B-5 46.3'281.4-4282.4Earth Fill (ef)Fine-grained Silty Sand (SM/ML) - light brown, dense, slightly moist, occasionalbit of trash, poor recoveryFine-grained Sandy Silt (ML) and laminated Silt (ML) - light brown to brown,medium stiff, slightly moist101.4Fine-grained Sand (SP) with some Silt - light brown to tan, slightly dense,slightly moist-8222.4Fine-grained Sand (SP) in sharp contact with Silt (ML) with some fine Sand - tanto olive/olive brown, medium dense/medium stiff, slightly moist to moist221.4-2Fine-grained Sand (SP) with some Silt - tan, medium dense, slightly moist222.4Fine- to medium-grained Sand (SP) - tan, medium dense, slightly moist261.4-2same as above (SP)492.4Laminated Silt (ML) in sharp contact with fine-grained Sand with little Silt(SP) - brown to olive brown to light tan, medium stiff/medium dense, moist231.4-6Very fine-grained Silty Sand (SP/ML) grading to Sandy Silt (ML) - lightbrown to brown, medium dense/medium stiff, moist362.4Silt with some Clay (ML) - olive brown, medium stiff, moist, mottled-Bedded Silt (ML) grading to Silty with some Clay (ML) and very fine-grained SiltySand (SM/ML) - light tan to brown/olive brown, medium stiff/medium dense,slightly moist to moist131.4292.4Fine- to medium-grained Sand (SP) - light tan to light gray, very dense, slightlymoist923450 1.451-1.4Fine- to coarse-grained Sand (SW) with scattered small Gravel - light tan, verydense, moist1.434Fine-grained Sand (SP) - tan, dense, slightly moistsame as above (SW) and Sand with Gravel (SW) - light tan, very dense, moist10-15-14Boring terminated at ~ El. = -75.2 ft.1188151172119111611118511729-5-1.43461.4647Medium- to fine-grained Sand (SP) with interbeds of coarser Sand with Gravel(SW/GW) - light tan, very dense, slightly moistMedium- to coarse-grained Sand (SW) with scattered, small Gravel - light tan,very dense, slightly moist--ProfileScale: 1" = 10' V8"B-4 43.9'51.4-302.4Alluvium (Qal)Sandy Silt (ML), Silt w/ Clay (ML) and fine-grained Sand with Silt (SP/SM) - dark brown tolight brown, slightly dense/slightly stiff, moist, mottled with occasional rootletFine-grained Sandy Silt and Silty Sand (ML/SM) - light olive brown, medium stiff, moist51.4Silt with some Clay (ML) with 3" thick Silty Clay (CL) seam - olive to olive brown, slightlystiff, very moist to wet9372.4Silt with some Clay (ML) in sharp contact with fine-grained Silt with some Sand (ML) - lightbrown to olive brown, slightly stiff, very moist81.4-36Laminated Clayey Silt (ML) with 3" Silty Clay (CL) seam - olive brown to brown, mediumstiff, very moist2.4Fine-grained Silty Sand / Sandy Silt (SM/ML) - light olive brown, medium dense / mediumstiff, moist; in sharp contact with olive brown Silt with Clay (ML)161.4-22Fine-grained Sandy Silt (ML/SM) in sharp contact with fine-grained Sand with Silt (SP) -brown to light brown, medium stiff, moist662.4Fine-grained Sand (SP) - light brown, dense, slightly moist201.4Sandy Silt (ML) in sharp contact with Clayey Silt (ML) - light brown to brown and olive,medium stiff, slightly moist to moist282.4Fine-grained Silty Sand (SM) - light brown, medium dense, moist; with 4" thick brown Silt bedor lens-Laminated Clayey Silt (ML) - olive brown, medium stiff, very moist to wet281.4182.4Fine- to coarse-grained Sand with scattered gravel (SW) - light gray, dense, slightly moist703414 1.445-1.4Mottled Clayey Silt (ML) - olive brown, medium stiff, moist2.441Fine- to medium-grained Sand (SP/SW) with scattered Gravel - tan, very dense, slightly moistInterbedded Silt with some Clay (ML), Sandy Silt (ML), Clayey, fine-grained Sand (SC) andfine- to medium-grained Sand (SP) - olive brown to brown to light gray, medium stiff/mediumdense, moist10-15-14Boring terminated at ~ El. = -77.6 ft.-283-10-1175123345110141253-SVSV1.44031.44810same as above (SP) - dense, moistCSilty Sand (SM) gradiing into 12" thick Sandy Silt (ML) in sharp contact with fine-tomedium-grained Sand (SW) with scattered Gravel - orange brown to olive brown to light gray,medium stiff to dense, moist---80-80SVPICCSVHYSVDSAlluvium (Qal)DSDSPI"CENTERLINE" LineAbut
.
5
Abut. 1
6/16/2021 4:56:12 PM72
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
D U N E P A L M S R DD U N E P A L M S R DD U N E P A L M S R DD U N E P A L M S R D77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
D U N E P A L M S R DC O R P O R A T EC E N T R E D R
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
D U N E P A L M S R DD U N E P A L M S R DD U N E P A L M S R DD U N E P A L M S R D77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
D U N E P A L M S R DC O R P O R A T EC E N T R E D R
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
D U N E P A L M S R DD U N E P A L M S R DD U N E P A L M S R DD U N E P A L M S R D77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
D U N E P A L M S R DC O R P O R A T EC E N T R E D R
D U N E P A L M S R DC O R P O R A T EC E N T R E D R
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 10272
77-899 WOLF RD.PH. (760) 777-9131FAX (760) 777-9132PALM DESERT, CALIC# 2754, EXP 04/30/2092211HERMANNDESIGNGROUPSUITE 102···L72
DESIGN'D:CKT:SERV. ORDER:DATE:SHEET OF1:80T.5, R.7,SEC.29SCALE:SERV. NOTIF.:SUB:FILE NAME:JAG660119417N. LA QUINTACONDUIT LAYOUT02/03/202125CITY OF LA QUINTA402739640084027396 BRIDGE INSTALLATION NOTES: DETAIL A1. Sliding spacer assemblies (Item A) will be placed:1.1. seven feet from each bridge abutment, and1.2. on either side of bridge joints.At the abutments, a second sliding spacer assembly(Item A) will be installed six feet from the first sliding spacer assembly (Item A).Each 20' length of conduit will have a minimum of four supports , spaced as shownin Section A (Typical Conduit Installation in bridges) (See Detail 2).For thoselocations not specified above, fixed spacer assemblies will be used for conduitsupport (Item B)(See Detail 3).2. The conduit expansion sleeve (Item F) shall be installed 10' from the abutments and asclose as possible to each bridge joint between sliding spacer assemblies.See typicalconduit installation.3. A 1/2" steel shear plate (item E) is to be placed from the bridge abutment wall extending5' minimum outside the abutment to support the conduits against shear fromembankment settlement. (See Detail 1)4. The conduit spacer assembly (Items A and B) shall be securely attached to the bridgeslab with epoxy binder (Item G). The concrete surface shall be leveled andthoroughly cleaned prior to application of the epoxy.5. The epoxy binder (CalTrans approved) is a two-component adhesive. Approximatelyone gallon of mixed epoxy will be needed for every 15 assemblies.6. The space between the conduits and the bridge abutment opening shall be sealed.Tightly wrap two layers of #15 building paper around conduits or expansion sleeve,through the cell opening and seal with mortar at a minimum thickness of 4".7. Total weight includes conduit, conduit spacers, conduit brackets and conductors.8. Consult bridge design engineer for seismic movement requirements. Then consultcivil/structural and standards engineer for appropriate seismic design and constructionmaterial.9. When communications duct is installed, it shall be in same installation pattern as thelarger conduit. 2-3" inch schedule 40 conduit shall be used.(2)PL. 12" x 2'-85" x 5'(1-SOUTH/1-NORTH SIDE)SHEET/SECTION/DETAILDEPG
DESIGN'D:CKT:SERV. ORDER:DATE:SHEET OF1:N.T.ST.5, R.7,SEC.29SCALE:SERV. NOTIF.:SUB:FILE NAME:JAG660119417N. LA QUINTASPACER02/03/202135CITY OF LA QUINTA402739640084027396 21.00"18.00"polystyrene spacers6" spacer 6-Way W/ support block 6 3/4"EMPTY CONDUITS 1,4OCCUPIED CONDUITS 2,3
DESIGN'D:CKT:SERV. ORDER:DATE:SHEET OF1:N.T.ST.5, R.7,SEC.29SCALE:SERV. NOTIF.:SUB:FILE NAME:JAG660119417N. LA QUINTASIDE VIEW02/03/202145CITY OF LA QUINTA402739640084027396 INSIDE OF BRIDGE CELLS5'TYP.4'TYP.3' TYP.3' TYP.5'TYP.6'TYP.7'TYP.3'TYP.ABUTMENT SEAT6" spacer 6-Way W/ support block (fixed)6" spacer 6-Way W/ support block (sliding)SIDE VIEWTHROUGH BRIDGE CELL.WINDOW OPENINGpolystyrene spacers
DESIGN'D:CKT:SERV. ORDER:DATE:SHEET OF1:N.T.ST.5, R.7,SEC.29SCALE:SERV. NOTIF.:SUB:FILE NAME:JAG660119417N. LA QUINTAWINDOW BRIDGE02/03/202155CITY OF LA QUINTA402739640084027396
11+0010+0012+0024+00 25+00 26+00 27+0023+006'TO BE RELOCATED CVSWC37CORPORATE CENTRE DR-45'1042105-45'T-4625-40'903255-40'909976
-40'90325665 N 3697, 70 P 171 K 1593 #6HDCU 7.2/12.5kV 2Ø70'950663-45'1237908CAPOH244-AUN1237909S25CUT & RE-ROUTE EX. 1-6" CNDAFTER CA. IS REMOVED175'PICK-UP 5-6" & 2-5" CND-40'1241331-40'124086925P85'1680'PP25RISERPUN1241425P1315'S14100'P46P345'PICK-UP EX. EMPTY 1-6" CNDGG26+0070'T-462370'T-4623UN1241302V46P550'DUNE PALMS SCH. 80 PVCUN1240868SCEX. 6-6" CND. FROM JOB# P-0890CONNECT 4-6" CND. COMING FROM THEBRIDGE LEAVE 2-6"CND.STUBBED AT30' SOUTH OF ABUTMENTINTERCEPT EX. 6-6"Ø STUBOUTS& CONNECT TO UN1241302VEX. 6-6" CND. FROM JOB# P-08901316Ø holes12"4"18º72º60"34"4"4"12" DETAIL "C"1316Ø holes4"72º12"108º12"60" DETAIL "B"34"SEE DETAIL "C" ON SHEET 2 OF 5FOR STEEL PLATESEE DETAIL "B" ON SHEET 2 OF 5FOR STEEL PLATESEE DETAIL "A" SHEET 226P30'STUBOUT110'DESIGN'D:CKT:SERV. ORDER:DATE:SHEET OF1:80T.5, R.7,SEC.29SCALE:SERV. NOTIF.:SUB:FILE NAME:JAG660119417N. LA QUINTACONDUIT LAYOUT02/09/20211 5CITY OF LA QUINTA402739640084027396 CONDUIT NOTES: INSTALL 2-5" SCH. 40 PRI. CND. PER SHOWN LENGTH.(REFER TO SHEETS 104-108 & 112-116 OF THE D.E.P.G. REV. 5.0 2020)25PINSTALL 1-3" SCH. 40 SEC. CND. PER SHOWN LENGTH.(REFER TO SHEETS 104-108 & 112-116 OF THE D.E.P.G. REV. 5.0 2020)13S2-5" SCH. 80 PVC CND.10' ABOVE GROUND 90Ø SWEEP(REFER TO SHEETS 104-108, 112-116 & 242 OF THE D.E.P.G. REV. 5.0 2020)INSTALL:25RISERPINSTALL 1-6" SCH. 40 PRI. CND. PER SHOWN LENGTH.(REFER TO SHEETS 104-108 & 112-116 OF THE D.E.P.G. REV. 5.0 2020)16PINSTALL 4-6" SCH. 40 PRI. CND. PER SHOWN LENGTH.(REFER TO SHEETS 104-108 & 112-116 OF THE D.E.P.G. REV. 5.0 2020)46P1-6" SCH. 80 PVC CND.10' ABOVE GROUND 90Ø SWEEP(REFER TO SHEETS 104-108, 112-116 & 242 OF THE D.E.P.G. REV. 5.0 2020)INSTALL:16RISERPINSTALL 1-4" SCH. 40 PRI. CND. PER SHOWN LENGTH.(REFER TO SHEETS 104-108 & 112-116 OF THE D.E.P.G. REV. 5.0 2020)14P TRENCHING DETAILS: E EREFER TO SHEETS 109, 115 &116 OF THE D.E.P.G. REV. 5.0 2020 STRUCTURE DETAILS: C CALL SECONDARY REFER TO SHEETS 109, 115 &116 OF THED.E.P.G. REV. 5.0 2020REFER TO SHEET 242 OF THE D.E.P.G. REV. 5.0 2020REFER TO SHEETS 151-152 & 167-168 OF THE D.E.P.G. REV. 5.0 2020REFER TO SHEETS 187-193 OF THE D.E.P.G. REV. 5.0 2020G GREFER TO SHEETS 109, 115 &116 OF THE D.E.P.G. REV. 5.0 2020 CURVE DATA TABLE <# RADIUS LENGTH25.0' 45° 19.63'LAST REVIEW: 06/09/2021
750P180'P2-45'1241312-50'1241313 195'331'P4P5DGDGDG120'W1PW1PDG11+0010+0012+0024+00 25+00 26+00 27+0023+006'TO BE RELOCATED CVSWCDUNE PALMS RD-40'1240869 -40'1241331P3DGSWGW1P166'RW1P1,000'331'166'315'-45'1042105-45'T-4625-40'90325570'950663-45'1237908UN1237909S3 #6HDCU 7.2/12.5kV 2ØCAPOH244-A-40'909976 -40'90325665 N 3697, 70 P 171 K 159
-50'124131470'T-4623-45'T-2422P5P6DGDGDGW1PTO BE RELOCATED
D70'T-4623-45'1241329-45'T-2421UN1036969SUN1103106H-50'1241330DUNE PALMS RDRPRPP7W3P185'210'171'RDGRW1P1,000'395'171'SWG-35'1210783RPS72'RPDESIGN'D:CKT:SERV. ORDER:DATE:SHEET OF1:80T.5, R.7, SEC.29SCALE:SERV. NOTIF.:SUB:FILE NAME:JAG60119417LA QUINTAEXIHIBIT A (C) SHOO FLY02/03/20211 1CITY OF LA QUINTA402739640084027396 WIRE NOTES: IN: 3-750MCM 7.2/12.47kV 3Ø PRI. CA.PER SHOWN LENGTH. STRUCTURE NOTES: S1ADD:L750P3P2IN:421P49SEDP4ZP353P3B750P333PIN-LINE DISCONNECTSAP3P3IN:421P49SEDP817P48P1W2B48P1W3BP5IN:621P49SEDP421P49SEDP448P1W3BP6IN:IN: 4-397.5 AAC 7.2/12.47kV 3Ø PRI. CA.PER SHOWN LENGTH.DGIN. 7/16": 35 42 43 44 L = 25'W/ JUMPERSW/ JUMPERSEXHIBIT A(C) Spanning the Channel NOTE: THE REMOVAL OF THE OH LINE &TEMPORARY UNDERGROUND CABLETO BE REMOVED ONCE THEUNDERGROUND SYSTEM IS IN PLACEP4IN:517P48P1W3B621P49SEDP421P49SEDP448P1W3BW/ JUMPERSMATCHLINE A-AMATCHLINE A-AP750PW1RPREMOVE POLE COMPLETEP7IN:517P48P1W3BRDGREMOVE DOWN GUY COMPLETEPRW1SWGIN. 7/16": 35 42 43 45 L = 10''RE-USE EX. 4-397.5 AAC 7.2/12.47kV3Ø PRI. CA. PER SHOWN LENGTH.PW3REMOVE AND RE-USE CABLE ONPORTIONS WHERE "W3" IS INDICATEDREMOVE SPAN GUY COMPLETEPRPSALLEY ARMANGLE PINS
IID Information Highlighted
IID Information Highlighted