Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
04-3726 (SFD) Title 24
TITLE 24 REPORT Title 24 Report for: The Clarke Residence - Lot #25 @ The Quarry 58-631 Banfield Drive La Quinta, CA 92253 Project Designer: Gordon Ross 42-829 Cook Street, Suite 104 Palm Desert, CA 92260 (760) 568-1712 Report Prepared By: CJ Mcfadden BREEZE AIR CONDITIONING 75-145 ST. CHARLES PLACE PALM DESERT, CA 92211 (760) 346-0855 CITY OF LA Q.UINTA BUILDING &SAFETY DEPT. � o40 3 ' Z ZL APPROVED FOR CONSTRUCTION DATE -7A9, 0 BY S I Job Number: Dater 6/11/2004 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: User Number. 3665 TABLE OF CONTENTS Cover Page Table of Contents Form CF -1 R Certificate of Compliance Form MF -1 R Mandatory Measures Checklist Form C -2R Computer Method Summary Form ENV -3 Proposed Construction Assembly HVAC System Heating and Cooling Loads Summary Room Load Summary Room Heating Peak Loads Room Cooling Peak Loads" 1 2 3 10 12 22 25 31 37 44 EnergyPro 3.1 By EnergySoft Job Number: User Number: 3665 r r r 1 11 Component Type Certificate of Compliance: Residential (Part 1 of 2) CF -1 R Location/Comments (attic, garage, typical, etc.) The Clarke Residence - Lot #25 (.8- The Quarry 6/11/2004 0.028 Project Title Date Wood 58-631 Banfield Drive La Quinta Exterior Wall W-2 Wall (W.21.2x6.16) Project Address Building Permit # Exterior Wall BREEZE AIR CONDITIONING (760) 346-0855 Plan Check / Date n/a Documentation Author Telephone Exposed Slab w/R-0.0 Perimeter Insulation Slab On Grade Computer Performance - 15 Field Check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only 0.756 GENERAL INFORMATION Solid Wood Door Wood Total Conditioned Floor Area: 6,884 ft2 Average Ceiling Height: 12.5 ft Exterior Door Total Conditioned Slab Area: 5,624 f? Wood 0.027 Building Type: W-1 Wall (W.21.2x6.16) (Underground) Wood (check one or more) Exterior Wall 0.30 X❑ Single Family Detached ❑ Addition ❑ X❑ ❑ Single Family Attached ❑ Existing Building Rear j❑ Multi -Family ❑ Existing Plus Addition 0.72 0.60 Front Orientation: (South) 180 deg Floor Construction Type: ® Slab Floor X❑ Number of Dwelling Units: 1.00 Rear (Northeast) Number of Stories: 2 ® Raised Floor r r r 1 11 Component Type Frame Type Const. Assembly U -Value Location/Comments (attic, garage, typical, etc.) R-38 Roof (R.38.2xl4.16) Wood 0.028 Exterior Roof W-1 Wall (W.21.2x6.16) Wood 0.057 Exterior Wall W-2 Wall (W.21.2x6.16) Wood 0.057 Exterior Wall Slab On Grade n/a 0.756 Exposed Slab w/R-0.0 Perimeter Insulation Slab On Grade n/a 0.756 Covered Slab w/R-0.0 Perimeter Insulation Solid Wood Door Wood 0.387 Exterior Door R-38 Floor (F.38.2xl2.16) Wood 0.027 Exterior Floor / Over Open Space W-1 Wall (W.21.2x6.16) (Underground) Wood 0.046 Exterior Wall FENESTRATION Shadinci Devices Type Orientation, Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Skylight 4.0 0.80 0.43 None ❑ X❑ ❑ X❑ Rear (North) 70.5 0.35 0.38 Bug Screen ❑ X❑ ❑ X❑ Rear (North) 34.0 0.38 0.30 Bug Screen ❑ X❑ . ❑ X❑ Rear (North) 6.0 0.72 0.60 Bug Screen ❑ X❑ ❑ X❑ Rear (Northeast) 6.0 0.72 0.60 Bug Screen ❑ x❑ ❑ X❑ Right (East) 108.7 0.35 0.38 Bug Screen ❑ x❑ ❑ x❑ Front (South) 54.0 0.50 0.49 Bug ScreenX❑ ❑ ❑ X❑ Left (West) 108.0 0.53 0.36 Bug Screen ❑ X❑ ❑ X❑ Left (West) 54.0 0.50 0.49 Bug Screen ❑ X❑ ❑ X❑ Left (Northwest) 6.0 0.72 0.60 Bug Screen ❑ X❑ ❑X❑ Right (East) 160.0 0.53 0.36 Louvered Sunscreen X❑ • ❑ ❑ x❑ Front (South) 36.9 0.35 0.38 Bug Screen ❑ x❑ ❑ X❑ Run Initiation Time: 06111104 07:30:24 Run Code: 1086964224 Ener Pro 3.1 By Ener Soft User Number: 3665 Job Number: Pa e:3 of 51 t 1 r Const. Component Frame Assembly Location/Comments Type Type U -Value (attic, garage, typical, etc.) FENESTRATION Shadina Devices Type Certificate of Compliance: Residential (Part 1 of 2) CF -1 R Fenestration The Clarke Residence - Lot #25 a- The Quarry 6/11/2004 Project Title SF Date SHGC 58-631 Banfield Drive La Quinta Yes / No Project Address (West) Building Permit # 0.53 BREEZE AIR CONDITIONING (760) 346-0855 Plan Check/Date Bug Documentation Author Telephone ❑ ' Computer Performance 15 Field Check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only Left GENERAL INFORMATION 38.7 0.35 0.38 Total Conditioned Floor Area: 6,884 fl? Average Ceiling Height: 12.5 ft ❑ Total Conditioned Slab Area: 5,624 ft2 X❑ Right Building Type: 54.0, 0.50 0.49 (check one or more) Screen X❑ ❑ X❑ Single Family Detached 9 Y El Addition Right (East) ❑ Single Family Attached ❑ Existing Building 0.30 Bug ❑ Multi -Family ❑ Existing Plus Addition ❑ ❑ Front Orientation: (South) Number of Dwelling Units: 180 deg Floor Construction Type: 1.00 ® Slab Floor 108.0 Number of Stories: 2 ® Raised Floor t 1 r Const. Component Frame Assembly Location/Comments Type Type U -Value (attic, garage, typical, etc.) FENESTRATION Shadina Devices Type 'Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Left (West) 160.0 0.53 0.36 Bug Screen X❑ ❑ ❑ X❑ Left (West) 38.7 0.35 0.38 Bug Screen ❑ X❑ ❑ X❑ Right (East) 54.0, 0.50 0.49 Bug Screen X❑ ❑ ❑ X❑ Right (East) 24.0 0.38 0.30 Bug Screen X❑ ❑ ❑ X❑ Right (Southeast) 108.0 0.53 0.36 Bug Screen ❑ X❑ ❑ X❑ Front (South) 70.0 0.85 0.59 Bug Screen ❑ X❑ ❑ X❑ Front (Southwest) 51.0 0.38 0.30 Bug Screen ❑ X❑ ❑ X❑ Rear (North) 60.0 0.50 0.49 Bug Screen X❑ ❑ ❑ X❑ Rear (Northeast) 25.8 0.38 0.30 Bug Screen ❑ X❑ ❑ X❑ Right (Southeast) 69.0 0.50 0.49 Bug Screen ❑ X❑ ❑ X❑ Right (Southeast) 86.7 0.38 0.30 Bug Screen ❑ X❑ ❑ X❑ Left (Northwest) 87.0 0.38 0.30 Bug Screen ❑ X❑ ❑ X❑ Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 Ener Pro 3.1 By Ener Soft User Number: 3665 Job Number: Pa e:4 of 51 Component Const. Frame Assembly Type U -Value Location/Comments (attic, garage, typical, etc. FENESTRATION Shadina Devices Type Certificate of Compliance: Residential (Part 1 of 2) CF -1 R The Clarke Residence - Lot #25 a- The Quarry 6/11/2004 Overhang Side Fins Project Title Date SF 58-631 Banfield Drive La Quinta SHGC Shading Project Address Building Permit #' Left BREEZE AIR CONDITIONING (760) 346-0855 Plan Check/ Date 54.0 Documentation Author Telephone 0.49 Bug Screen Computer Performance 15 Field Check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only ❑ X❑ GENERAL INFORMATION (Northeast) ' Total Conditioned Floor Area: 6,884 ft2 Average Ceiling Height: 12.5 ft 0.49 Total Conditioned Slab Area: 5,624 ft2 ❑ X❑ ❑ X❑ Building Type: (East) 24.0 (check one or more) 0.30 Bug Screen X❑ Single Family Detached ❑ Addition ❑ X❑ Right ❑ Single Family Attached ❑ Existing Building 35.2 0.35 ❑ Multi -Family ❑ Existing Plus Addition Buq Screen ❑ X❑ Front Orientation: (South) 180 deg Floor Construction Type: ® Slab Floor (West) Number of Dwelling Units: 1.00 0.38 0.30 Number of Stories: 2 ® Raised Floor Component Const. Frame Assembly Type U -Value Location/Comments (attic, garage, typical, etc. FENESTRATION Shadina Devices Type Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Left (Northwest) 54.0 0.50 0.49 Bug Screen ❑ X❑ ❑ X❑ Rear (Northeast) 75.4 0.50 0.49 Bug Screen ❑ X❑ ❑ X❑ Right (East) 24.0 0.38 0.30 Bug Screen ❑ X❑ ❑ X❑ Right (Southeast) 35.2 0.35 0.38 Buq Screen ❑ X❑ ❑ X❑ Left (West) 8.0 0.38 0.30 Bug Screen ❑ X❑ ❑ X❑ Left (Northwest) 15.8 0.35 0.38 Bug Screen ❑ X❑ ❑ X❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 E 0 ❑ ❑ ❑ ❑ 0 E El F-1 ❑❑ El E-1 Run Initiation Time: 06111/04 07:30:24 Run Code: 1086964224 Ener Pro 3.1 By Ener Soft User Number: 3665 Job Number: Pa e:5 of 51 r Certificate of Compliance: Residential (Part 2 of 2) CF -1 R The Clarke Residence - Lot #25 IW The Quarry 6/11/2004 California Code of Regulations, and the administrative regulations to Project Title Date overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load. and field verification by an approved HERS rater. Distribution Designer or Owner (per Business & Professions Code) Heating Equipment Minimum Type and Duct or Name: Type (furnace, heat Efficiency Location Piping Thermostat Location / Title/Firm: Gordon Ross pump, etc.) (AFUE/HSPF) (ducts, attic, etc.) R -Value Type Comments Address: 42-829 Cook Street, Suite 104 Central Furnace 80% AFUE Ducts in Attic 4.2 Setback HVAC -1 (Master Suite/Office) Palm Desert, CA 92260 Telephone: (760) 568-1712 Central Furnace 80% AFUE Ducts in Attic 42 Central Furnace 80% AFUE Ducts in Attic 4.2 Central Furnas 80% AFUE Ducts in Attic 4.2 Sethack HVAC -2 (Great Rm/Fnyeo Setback HVAC -3 (Entry/Dining/Hall) Setback HVAC -4 (Kitch/SunRm/Lndry) Lic. Central Furnace 80% AFUE Ducts in Attic 4.2 Setback HVAC -5 (Guest Suites 1 &2) Cep Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / (signature) (date) heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type Comments Enforcement Agency Split Air Conditioner 14.0 SEER Ducts in Attic 42 Split Air Conditioner 14.0 SEER Ducts in Attic 42 Sethack HVAC -1 (Master Suite/Offirp) Sethack HVAC -2 ((treat Rm/Fnyer_.) Name: Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -3 ( nt /Dining/Hall) Title/Firm: Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -4 (Kitch/SunRm/Lndry) Setback HVAC -5 (Guest Suites 1&2) Address: WATER HEATING SYSTEMS Rated 1 Tank Energy Facts 1 External Telephone: Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby Tank Insul. System Name Type Type Syst. Btu/hr (gal) Efficiency Loss (%) R -Value Rheem HE -119-130 Large Gas Standard 2_ 130,000 130 0.94 0.0000 0.0 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. Run Codea 1086964224 For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS Job Number: Paae:6 of 51 r COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Documentation Author Name: Name: CJ Mcfadden Title/Firm: Gordon Ross Title/Firm: BREEZE AIR CONDITIONING Address: 42-829 Cook Street, Suite 104 Address: 75-145 ST. CHARLES PLACE Palm Desert, CA 92260 Telephone: (760) 568-1712 PALM DESERT, CA 92211 Telephone: (760) 346-0855 Lic. Cep (signature) (date) (signature) (date) Enforcement Agency Name: Title/Firm: Address: Telephone: (signature/stamp) (date) Run Initiation T*me: 06111/04 VwX24 Run Codea 1086964224 EnemvPro 3.1 By EnergvSoft User Number: 3665 Job Number: Paae:6 of 51 r 1 t �l Certificate of Compliance: Residential (Part 2 of 2) CF -1 R The Clarke Residence - Lot #25 A The Quarry 6/11/2004 Project Title Date HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load. Distribution Heating Equipment Minimum Type and Duct or Type (furnace, heat Efficiency Location Piping Thermostat Location / pump, etc.) (AFUE/HSPF) (ducts, attic, etc.) R -Value Type Comments Central Furnace 80% AFUE Ducts in Attic 42 Setback HVAC -6 (StairMin /Th atr -) Cooling Equipment Minimum Duct. Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type Comments Split Air Conditioner 14.0 SEER Ducts in Attic 42 Setback HVAC -6 (StairMlinPlrheatrP.) WATER HEATING SYSTEMS Rated 1 Tank Energy Fact*1 1 External Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby Tank Insul. System Name Type Type Syst. Btu/hr (gal) Efficiency Loss (%) R -Value 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Documentation Author Name: Title/Firm: Gordon Ross Address: 42-829 Cook Street, Suite 104 Palm Desert, CA 92260 Telephone: (760) 568-1712 Lic. #: Address: User Number: 3665 Name: CJ Mcfadden Title/Firm: (signature) Address: Enforcement Agency Name: Telephone: Title/Firm: ' Address: Telephone: Energypro 3.1 By EnergySo User Number: 3665 Name: CJ Mcfadden Title/Firm: BREEZE AIR CONDITIONING Address: 75-145 ST. CHARLES PLACE PALM DESERT, CA 92211 Telephone: (760) 346-0855 (date) (signature) Job Number: (date) of 51 Certificate of Compliance: Residential (Addendum) CF -1 R The Clarke Residence -Lot #25 (d)- The Quarry 6/11/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. I Plan I Field The HVAC System "HVAC -1 (Master Suite/Office)" must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping HIGH MASS Design(see C -2R) - Verify Thermal Mass: 155 sqft Tile in Mortar Interior Mass, 0.75" thick at Master Suite/Office HIGH MASS Design(see C -2R) - Verify Thermal Mass: 155 sqft Exposed Slab Floor, 3.50" thick at Master Suite/Office HIGH MASS Design(see C -2R) - Verify Thermal Mass: 1395 sqft Covered Slab Floor, 3.50" thick at Master Suite/Office The HVAC System "HVAC -2 (Great Rm/Foyer)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas HIGH MASS Design(see C -2R) - Verify Thermal Mass: 947 sqft Tile in Mortar Interior Mass, 0.75" thick at Great Room/Foyer HIGH MASS Design(see C -2R) - Verify Thermal Mass: 947 sqft Exposed Slab Floor, 3.50" thick at Great Room/Foyer HIGH MASS Design(see C -2R) - Verify Thermal Mass: 105 sqft Covered Slab Floor, 3.50" thick at Great Room/Foyer The HVAC System "HVAC -3 (Entry/Dining/Hall)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. HIGH MASS Design(see C -2R) - Verify Thermal Mass: 848 sqft Tile in Mortar Interior Mass, 0.75" thick at Entry/Dining/Hallway HIGH MASS Design(see C -2R) - Verify Thermal Mass: 848 sqft Exposed Slab Floor, 3.50" thick at Entry/Dining/Hallway HIGH MASS Design(see C -2R) - Verify Thermal Mass: 94 sqft Covered Slab Floor, 3.50" thick at Entry/Dining/Hallway The HVAC System "HVAC4 (Kitch/SunRm/Lndry)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Area . HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R. plan Field The HVAC System "HVAC -1 (Master Suite/Office)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -2 (Great Rm/Foyer)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 (Entry/Dining/Hall)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -4 (Kitch/SunRm/Lndry)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -5 (Guest Suites 1 &2)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -6 (Stair/Winefrheatre)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rate must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:8 of 51 Certificate of Compliance: Residential (Addendum) CF -1 R 1i The Clarke Residence -Lot #25 (d-) The Quarry 6/11/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. I DI.. I c;siA HIGH MASS Design(see C -2R) - Verify Thermal Mass: 951 sqft Tile in Mortar Interior Mass, 0.75' thick at Kitchen/SunRoom/Laund HIGH MASS Design(see C -2R) - Verify Thermal Mass: 951 sqft Exposed Slab Floor, 3.50" thick at Kitchen/SunRoom/Laundry HIGH MASS Design(see C -2R) - Verify Thermal Mass: 106 sqft Covered Slab Floor, 3.50" thick at Kitchen/SunRoom/Laundry The HVAC System "HVAC -5 (Guest Suites 1&2)" must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping The HVAC System "HVAC -6 (Stair/Winelfheatre)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. HIGH MASS Design(see C -2R) - Verify Thermal Mass: 20 sqft Tile in Mortar Interior Mass, 0.75' thick at Powder/Hall Rotunda HIGH MASS Design(see C -2R) - Verify Thermal Mass: 20 sqft Exposed Slab Floor, 3.50" thick at Powder/Hall Rotunda HIGH MASS Design(see C -2R) - Verify Thermal Mass: 120 sqft Covered Slab Floor, 3.50" thick at Powder/Hall Rotunda HIGH MASS Design(see C -2R) - Verify Thermal Mass: 88 sqft Tile in Mortar Interior Mass, 0.75" thick at Wine/Theatre HIGH MASS Design(see C -2R) - Verify Thermal Mass: 88 sqft Exposed Slab Floor, 3.50" thick at Wine/Theatre HIGH MASS Design(see C -2R) - Verify Thermal Mass: 795 sqft Covered Slab Floor, 3.50" thick at Wine/Theatre HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS 1-w W.. 1 nC nG1lJ IOLWi 1111101 UUl.U111Q111 1110 11W1U VW1J111.d11U11 4111U UIQa11U0i1U ICOUIIa UI UICOC 11MCMUMb wi A wim lir-OR. I Plan I Field Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 nergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:9 of 51 Mandatory Measures Checklist: Residential (Page 1 of 2) MF -1 R ' NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. I 1 DESCRIPTION instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Building Envelope Measures ❑X 1150(.): Minimum R-19 ceiling insulation. ❑ § 150(b): Loose fill insulation manufacturer's labeled R -Value. §150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in'metal frame walls (does not apply to exterior mass walls). [_]*§150(d): Minimum R-13 raised floor insulation in framed floors or equivalent. ❑§150(1): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 permfinch. ❑X §118: Insulation specified or installed meets insulation quality standards. Indicate type and form. ® §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. § 150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards. Y§150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures ❑X §110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. § 150(i): Setback thermostat on all applicable heating and/or cooling systems. ❑X §1500): Pipe and Tank Insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined intemal/extemal insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55 degrees F. insulated. 6. Piping insulating between heating source and indirect hot water tank. EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 10 of 51 Mandatory Measures Checklist: Residential (Page 2 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (") may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) X❑ '§ 150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL181, UL181A, or UL181B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such a tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers. 5.'Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually operated dampers. 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. ❑ § 114: Pool and Spa Heating Systems and Equipment 1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating, and no pilot. 2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas. a. At least 36" of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. § 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) ❑ §118 (f): Cool Roof material meet specified criteria Lighting Measures © §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an entrance to the kitchen. n§150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. 1 3.1 By EnergySoft User Number: 3665 Job Number: Page: 11 of 51 t 1 1 fl r Computer Method Summary (Part 1 of 3) C -2R The_ClarkeBesidence-L.ot#2The_G?laarry ■11111111MI-111: We -CIMAER 6/11/2004 Project Title /./ Date _51631B.anfi.e.ld_Qr_i_�ce I a ouinta Project Address 1111111=73 KA71 I KT Building Permit # BREEZE AIR CONDITIONING (760) 346-0855 ■WATS Documentation Author Telephone Plancheck/Date Cofl1J]titeLPerformance ENTATE 15 Field Chock/Date Compliance Method (Package or Computer) Climate Zone Source Energy Use Standard Proposed Compliance (kBtu/sf-yr) Design Design Margin Space Heating 4.61 4.90 -0.29 l:R Space Cooling 36.36 37.13 -0.77 ►/ Domestic Hot Water 4.14 2.41 1.73 ■=TATaRTATF11 Totals 45.11 44.45 0.66 Total Conditioned Floor Area: 6,884 ft2 Building Type: Single Fam Detached Building Front Orientation: (South) 180 deg Number of Dwelling Units: 1.00 Number of Stories: 2 BUILDING ZONE INFORMATION Zone Name Floor Area Volume J±VAC-1 Waster_9miteLOffice) .IiVAG2(CkeatRm/Ea , _H_VAC 3_(Entcy/Dining/Halq HVAC -4 (Kitch/SunRm/Lndrya OPAQUE SURFACES Act. Type Area U -Fac. Azm. Tilt 550 1.052 942 1,057 Solar Gains Y/N Roof_ 1,546 0,02.85 Q Wall- X39 0.057 n 90 Wall_ 65_ -01157- -0 ____9.0_ Wall 24 0.057 45 90 Wall 283 0.057 90 90 Wall X00_ 0 057 90 go Wall_ x..01 0.057 180 90 Wall 248 0.057 270 So Wall_ 24 0.052 -315. 9.0 .Root x.,.052 0...028_ 34.1; Wall 211 .0057 0 90 -WAIL-- 246 O-057- 90 90 Wall- 107 0.057 180 9.0 Wall 219 0.057 270 _.o .Roof- -942 0028. 345 0 Nall 125 0.057 45 --- K Wall 102 0.057 9.0_ 9.0_ WAIL_ 32 _0.05Z 135 9.o Wall- 176 0.057 180 9.0 Wall 82 0.057 225 ___99 Wall_ 84 0.057 _225_ _9D Wall- 75 ___0_05Z 270 ____9.0 Root ---J..057- -0-028- 34.5 ----a Wall_ 115 0-057 0. 9.0_ Wall_ 48 0..052 45_ 9.0 Wall 120 O -Q57- 135 90 Wall_ 210 0.057 135 90 Wall- 56 0-115Z 180 -0 D.noL 24 0.382 180 90 17 0.5.0 X8„936 10.362 i 4.79.8 Floor Construction Type: ❑X Raised Floor g] Slab Floor Total Fenestration Area: 24.6% Total Conditioned Volume: 86,350 ft 3 Total Conditioned Slab Area: 5,624 ft 2 # of Thermostat Vent Units Zone Type Type Hgt. Area _0,.23_ Sleeping- _RIP epingStat _8 n/ _0_i5_ 0_i5 Living LivjngStat 8 n a -0,14_ Lavang Liv, ngStat 8 n/a 0.15 Living Livi gStat 8 _O/a Form 3 Reference -v/ ■11111111MI-111: We -CIMAER //■MIFITSWITF11111WITAIAWOM /./ ■ 1Wgi 1111111=73 KA71 I KT /�/ ■_iffivAT&AWOMM / ■WATS WiTF1u ■MTATA 1I ►/ ENTATE ■ ►1 ■ l:R ►1 ■ A A. ►/ ■Wiva RTITFIu ►./ ■=TATaRTATF11 ►'/ ■WAYARTATF11u 1111111MVITZI RTATF1u ►/ ■EVITZSTATTI I RVAT&A /1 ■MTAT&ATATF11 ►1 ■:.. / 111111111AWATATF1111 .v, Zone 1 Zone 1 Zone 1 Zone 2 Zone 4 Zone 4 Zone 4 Zone 4 Zone 4 Location / Comments EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:12 of 51 1 J 1 Fi 1 ` I 1 Computer Method Summary ■ � 1 11 (Part 1 of 3) C -2R The Clarke -Residence -I of #95 4 The Quarry ►�i 6/11/2004 Project Title ■ , .. 911OWWWA Date _58-631 Banfield Drive La Quinta Project Address v/ ■ Building Permit # BREE7F AIR CONDITIONING (760) 346-0855 Documentation Author Telephone Plan Check/Date Computer Performance 'v 15 Field Check/Date Compliance Method (Package or Computer) /� Climate Zone Source Energy Use Standard Proposed Compliance (kBtu/sf-yr) Design Design Margin W Space Heating 4.61 4.90 -0.29 -vl Space Cooling 36.36 37.13 -0.77 Domestic Hot Water 4.14 2.41 1.73 Totals 45.11 44.45 0.66 rd: 1.5% Total Conditioned Floor Area: 6,884 ft Floor Construction Type: FX-] Raised Floor ❑X Slab Floor Building Type: Single Fam Detached Building Front Orientation: (South) 180 deg Total Fenestration Area: 24.6% Number of Dwelling Units: 1.00 Total Conditioned Volume: 86,350 ft' Number of Stories: 2 Total Conditioned Slab Area: 5,624 ft 2 BUILDING ZONE INFORMATION # of Thermostat Vent Zone Name Floor Area Volume Units Zone Type Type Hgt. Area -HVAC--9-(Guest S_u fifes 192.) 050 X1.,55.0 -015_ Sleeping_ _SleepingStat- 8 n/a HVAC-64S_tairLl neQheaire) 1233 OPAQUE SURFACES Act. Type Area U -Fac. Azm. Tilt Wall- 227 QQ5Z _226 9-0 -Wall- 30 0-057- 225 90 Wall_ 254 0-.57_ -315. 9.0 ElaoL- 167 0,027 0 18.0 .Boot ---LMO 0,028 _346 0 Wall_ 171 _0.057 45. 9_0_ Wall_ 201 ---0-0-7- 90 9.0 Wall- 326 0.057 135 90 Wall_ 19 _0 052 _180 9.0 Wall- 137 0.057 225 9.0_ Wall- 281 0.057 270 90 Wall- 119 0.057 _315 90 floor 210 _0 Q27 0_ X8.0 Boot- -3.5.0 0.028 _345 Wall_ X15- -0_052 45 90 Wall_ 60 0_0.57- 135 30 Wall_ 190 Q.057 270 90 Wall_ 75 ---D-057- -315 9.0 Wall- 330 0.046 45 9-0 -Wall- 364 0.046 135 9Q Wall_ �.3 --O-Q57- X35 9.0 Wall- 73- Q-OA6 225 9Q Wall- X16- 0.057 225 90 .Qo.OL 24 0.387 _225. 90 Wall- --- AZ8 Q_.046- _315 90_ Wall- 23 U37- 315 9-0 Solar Gains Y / N Form 3 Reference v ■ � 1 11 ■ ►�i .. v/ ■ , .. 911OWWWA v/ ■ 1 1 • U -v/ ■ .. 'v ■ /� L .• /1 ■ W -vl // ■ .. & ...... Zone 4 Zone 4 Zone 4 Zone 5 7nne 5 Zone 5 Zone 5 Zone 5 Zone 5 Zone 5 Zone 5 Zone 5 9.77 Location / Comments Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By Energysoft User Number. 3665 Job Number: Page: 13 of 51 1� 1 Computer Method Summary (Part 2 of 3) C -2R The Clarke Residence - Lot #25 @, The Quarry 6/11/2004 Project Title Date FENESTRATION SURFACES U- Act. Glazing Type Location/ # Type Area Factor SHGC Azm. Tilt Comments 11 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 3 Zone 3 Zone 3 Zone 3 Zone 3 Zone 3 Zone 3 Zone 4 Zone 4 Zone 4 Zone 4 Z Skylight Rear (North) 4.0 _0.800 0.43 345 _Q Biistolite Skylite Wd. 2 Window Rear (North) 6.8 0.350 0.38 0 90 Sierra Pacific Clad (Lo/E) 3 Window Rear (North) 8.0 0.380 0.30 0 90 Sierra Pacific Clad (Lo/E) 4 Window Rear (North) 6.0 0.720 0.60 0 90 Default Double Metal Tinted 5 Window Rear (North) 50.0 0.350 0.38 0 90 Sierra Pacific Clad (Lo/E) 6 L Window Window Rear Right (Northeast) (East) 6.0 74.0 0.720 0.350 0.60 0.38 45 90 90 Default Double Metal Tinted 90 Sierra Pacific Clad (Lo/E) 6 8 Window Front (South) 54.0 0.500 0.49 180 90 Sierra Pacific Clad (Lo/E) Bug Screen 6 Window Left (West) 108.0 0.530 0.36 270 90 Sierra Pacific Clad (Lo/E) 0.76 9.0 Window Left (West) 54.0 0.500 0.49 270 90 Sierra Pacific Clad (Lo/E) 11 Window Left (Northwest) 6.0 0.720 0.60 315 90 Default Double Metal Tinted '1Q 12 Window Rear (North) 26.0 0.380 0.30 0 90 Sierra Pacific Clad (Lo/E) 13 Window Rear (Noitb) _13.7 .0350 0.38 0 90 Sierra Pacific Clad (I o1E) 14 Window Right (East) 160.0 0.530 0.36 90 90 Sierra Pacific Clad (Lo/E) 15 Window Right (East) 34.7 0.350 0.38 90 90 Sierra Pacific Clad (Lo/E) 0.1 16 Window Front (South) 18.3 0.350 0.38 180 90 Sierra Pacific Clad (Lo/E) 17 Window Left (West) 160.0 0.530 0.36 270 90 Sierra Pacific Clad (Lo/E) 18 Window Left (West) 34.7 0.350 0.38 270 90 Sierra Pacific Clad (Lo/E) 18 19 Window Right (East) 54.0 0,500 0.49 90 90 Sierra Pacific Clad (Lo/ Bug Screen 20 Window Right (East) 24.0 0.380 0.30 90 90 Sierra Pacific Clad (Lo/E) 0.76 21 Window Right (Southeast) 108.0 0.530 0.36 135 90 Sierra Pacific Clad (Lo/E) .22 Window Front (South) 70.0 0.850 0.59 180 90 Default Double Metal Tinted 23 24 Window Window Front Front (South) (South) 12.3 6.3 0.350 0.350 0.38 0.38 180 180 90 Sierra Pacific Clad (Lo/E) 90 Sierra Pacific Clad (Lo/E) 25 Window Front (Southwest) 18.0 0.380 0.30 225 90 Sierra Pacific Clad (Lo/E) 26 Window Rear (North) 60.0 0.500 0.49 0 90 Sierra Pacific Clad (Lo/E) 27 Window Rear (Northeast) 22.0 0.380 0.30 45 90 Sierra Pacific Clad (Lo/E) 10.0 28 Window Right (Southeast) 24.0 0.500 0.49 135 90 Sierra Pacific Clad (Lo/E) 28 29 Window Right (Southeast) 11.3 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Bug Screen INTERIOR AND EXTERIOR SHADING 11 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 1 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 3 Zone 3 Zone 3 Zone 3 Zone 3 Zone 3 Zone 3 Zone 4 Zone 4 Zone 4 Zone 4 Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 14 of 51 Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt. REA Dist. Len. Hgt. Dist. Len. Hgt. 1 None 1.00 2 Bug Screen 0.76 3 Bug Screen 0.76 _ 4 Bug Screen 0.76 5 Bug Screen 0.76 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9.0 6.0 9.0 0.1 9.0 _ 9.0 9 Bug Screen 0.76 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Bug Screen 0.76 13 Bug Screen 0.76 14 Louvered Sunscreen 0.27 10.0 16.0 10.0 0.1 10.0 10.0 15 Bug Screen 0.76 16 Bug Screen 0.76 17 Bug Screen 0.76 10.0 16.0 10.0 0.1 10.0 10.0 18 Bug Screen 0.76 19 Bug Screen 0.76 9.0 6.0 9.0 0.1 9.0 9.0 20 Bug Screen 0.76 6.0 4.0 6.0 0.1 6.0 6.0 21 Bug Screen 0.76 22 Bug Screen 0.76 23 Bug Screen 0.76 24 Bug Screen 0.76 _ 25 Bug Screen 0.76 26 Bug Screen 0.76 10.0 6.0 10.0 0.1 10.0 10.0 27 Bug Screen 0.76 28 Bug Screen 0.76 29 Bug Screen 0.76 _ Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 14 of 51 11 u f] Computer Method Summary (Part 2 of 3) C -2R The Clarke Residence - Lot #25 (cD- The Quarry 6/11/2004 Project Title Date FENESTRATION SURFACES # Type Area U- Factor SHGC Act. Azm. Glazing Type Tilt Location/ Comments 31 Window Front (Southwest) 33.n 0.380 n.30 295_ -90 Sierra Pacific Clad (Lo/E) Zone 4 31 Window Left (Northwest) 18.0 0.380 0.30 315 90 Sierra Pacific Clad (Lo/E) Zone 4 32 Window Left (Northwest) 6.0 0.380 0.30 315 90 Sierra Pacific Clad (Lo/E) Zone 4 33 Window Left (Northwest) 54.0 0.500 0.49 315 90 Sierra Pacific Clad (Lo/E) Zone 4 34 Window Left (Northwest) 33.0 0.380 0.30 315 90 Sierra Pacific Clad (Lo/E) Zone 4 35 Window Rear (Northeast) 54.0 0.500 0.49 45 90 Sierra Pacific Clad (Lo/E) Zone 5 X Window Right (East)_ 24.0 0.380 0.30 90 90 Sierra Pacific Clad (Lo/E) Zone 5 37 Window Right (Southeast) 45.0 0.500 0.49 135 90 Sierra Pacific Clad (Lo/E) Zone 5 3$ Window Right (,Southeast) 7.9 0.350 0.38 135 90 Sierra Pacific Clad (Lo/E) Zone 5 39 Window Right (Southeast) 7.5 0.350 0.38 135 90 Sierra Pacific Clad (Lo/E) Zone 5 44 Window Right (Southeast) 30.0 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Zone 5 41 Window Left (West) 8.0 0.380 0.30 270 90 Sierra Pacific Clad (Lo/E) Zone 5 _42 Window Left ()Nest) 4.0 0.350 0.38 270 -90 Sierra Pacific Clad (Lo/E) Zone 5 43 Window Left (Northwest) 15.8 0.350 0.38 315 90 Sierra Pacific Clad (Lo/E) Zone 5 44 Window Rear (Northeast) 21.4 0.500 0.49 45 90 Sierra Pacific Clad (Lo/E) Upstairs 45 Window Rear (Northeast) 3.8 0.380 0.30 45 90 Sierra Pacific Clad (Lo/E) Upstairs 46 Window Left (Northwest) 30.0 0.380 0.30 315 90 Sierra Pacific Clad (Lo/E) Upstairs 47 Window Right (Southeast) 9.3 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Downstairs 4$ Window Right (Southeast) 9.3 0.350 0.38 135 90 Sierra Pacific Clad (Lo/E) Downstairs 49 Window Right (Southeast) 9.3 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Downstairs 50 Window Right (Southeast) 5.8 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Downstairs 51 Window Right (Southeast) 10.5 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Downstairs 52 Window Right (Southeast) 10.5 0.350 0.38 135 90 Sierra Pacific Clad (Lo/E) Downstairs 53 Window Right (Southeast) 10.5 0.380 0.30 135 90 Sierra Pacific Clad (Lo/E) Downstairs INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LEA REA Dist. Len. Hgt. Dist. Len. Hgt. 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen _Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen Bug Screen 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 U.10 0.76 0.76 0.76 0.76 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 15 of 51 1 1 Cooling Equipment Type (air conditioner, heat pump, evap. cooling) Minimum Duct Efficiency Location Duct Thermostat (SEER) (attic, etc,) R -Value Type Location / Comments Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -1 (Master Suite/Office) Computer Method Summary 14.0 SEER Ducts in Attic 4.2 Setback (Part 3 of 3) C-2R ' The Clarke Residence - Lot #25 A The Quarry HVAC -3 (Entry/Dining/Hall) 6/11/2004 14.0 SEER Ducts in Attic 4.2 Setback Project Title WATER HEATING SYSTEMS Ratedl Tank Date Water Heater THERMAL MASS FOR HIGH MASS DESIGN or Recovery Standby R -Value System Name Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. Area Thick. Heat Large Gas Standard 2_ 130,000 130 Inside Location 1 For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. Type (so (in.) Cap. Cond. Form 3 Reference R-Val. Comments Tile in Mortar 155 0.75 -24_ x_67 n/a _Q Zone 1 / Interior Mass Concrete. Heavyweight 155 3_50 28 0_98 n/a 0 Zone 1 / Slab on Grade Concrete, Heavyweight 1,395 3.50 28 0.98 n/a 2 Zone 1 / Slab on Grade Tile in Mortar 947 0_75 24 0_67 n/a 0 Zone 2 / Interior Mass Concrete HeaiW eight 947 3.50 28 0.98 n/a 0 Zone 2 / Slab on Grade PERIMETER LOSSES F2 Insulation Type Length Factor R-Val. Depth Location / Comments Slab Perimeter 17 0.76 0.0 0 Zone 1 Slab�erimeier 155 0.76 0.0 0 Zone 1 Slab Perimeter 49 0.76 0.0 0 Zone 2 Slab Perimeter 6 0.76 Q,Q _Q Zone 2 .Sl 78 0.76 0.0 0 Zone 3 HVAC SYSTEMS 'Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiencyy and Location Duct Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R-Value Type Comments Central Furnace 80% AFUE Ducts in Attic 80% AFUE Ducts in Attic 4.2 4.2 Setback HVAC-1 (Master Suite/Office) Setback HVAC-2 (Great Rm/Foyer) Central Furnace Central Furnace 80% AFUE Ducts in Attic 4.2 Setback HVAC-3 (Entry/Dining/Hall) Central Furnace 80,% AFUE Ducts in Attic 4.2 Setback HVAC-4 (Kitch/SunRm/Lndry) Pipe Pipe Insul. Hydronic Piping System Name Length Diameter Thick. 1 Cooling Equipment Type (air conditioner, heat pump, evap. cooling) Minimum Duct Efficiency Location Duct Thermostat (SEER) (attic, etc,) R -Value Type Location / Comments Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -1 (Master Suite/Office) Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -2 (Great Rm/Foyer) Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -3 (Entry/Dining/Hall) Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -4 (Kitch/SunRm/Lndry) WATER HEATING SYSTEMS Ratedl Tank Energy Fact! 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. Rheem HE -119-130 Large Gas Standard 2_ 130,000 130 0.94 0.0000 0.0 1 For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. Run Initiation Time: 06111/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 16 of 51 1 1 11 1 Computer Method Summary F2 (Part 3 of 3) 1. C -2R Type Length Factor R -Val. Depth Location / Comments The Clarke Residence - Lot #25 0-) The Quarry 9 0.76 6/11/2004 Project Title 120 0.76 0.0 —0 Zone 4 Date THERMAL MASS FOR HIGH MASS DESIGN 0.0 0 Zone 4 Slab_Betimeter 5 0.76 Area Thick. Heat Slab_Peru meter Inside Location Type (sf) (in.) Cap. Cond. Form 3 Reference R -Val. Comments Concrete Heavyweight 105 -3-.0 __28. 0.98 n/a _2 Zone 2 / Slah on Grade Tile in Mortar 848 0_75 24 0_67 n/a 0 Zone 3 / Interior Mass Concrete He__y-weight 84$ 3.50 _28 0.98 n/a 0 Zone 3 / Slab on Grade Concrete, Heavyweight 94 3_50 28 0_98 n/a 2 Zone 3 / Slab on Grade Tile in Modar 951 0.75 _24 0.67 n/a 0 Zone 4 / Interior Mass PERIMETER LOSSES HVAC SYSTEMS Heating Equipment F2 Insulation Type Length Factor R -Val. Depth Location / Comments Slab Perimeter 9 0.76 0.0 0 Zone 3 S1ab_Perimeter 120 0.76 0.0 —0 Zone 4 Slab Perimeter 13 0.76 0.0 0 Zone 4 Slab_Betimeter 5 0.76 0.0 _Q SlpSSairs Slab_Peru meter 45 0.76 0.0 _0 Upstairs HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiency and Location Duct Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type Comments Central Furnace 80%AFUE Ducts in Attic 2_ Setback HVAC -5 (Guest Suites 1&2) Central Furnace 80% AFUE Ducts in Attic 4.2 Setback HVAC -6 (Stair/Wine/Theatre) ' Hydronic Piping Pipe Pipe Insul. System Name Length Diameter Thick. 1 1 1 1 1 Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -5 (Guest Suites 1&2) Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -6 (StairMinelrheatre) WATER HEATING SYSTEMS Ratedl Tank Energy Fact! 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. 1 For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. REMARKS Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 17 of 51 1 Computer Method Summary (Part 3 of 3) C -2R The Clarke Residence - Lot #25 A The Quarry 6/11/2004 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Duct Thermostat R -Value Type Area Thick. Heat Type (sf) (in.) Cap. Concrete Heavyweight _951 3.50 2R Concrete, Heavyweight 106 3_50 28 Tile in Mortar 20 0.75 24 Concrete. Heavvweioht 20 3.50 28 Concrete. Headeight 120 3.50 28 Inside Location Cond. Form 3 Reference R -Val. Comments _0_.98. n/a 0 Zone 4 / Slab on Grade 0_98 n/a 2 Zone 4 / Slab on Grade 0.67 n/a 0 Upstairs / Interior Mass 0_98 n/a 0 Upstairs / Slab on Grade 0.98 n/a 2 Upstairs / Slab on Grade PERIMETER LOSSES Duct Thermostat R -Value Type Location / Comments Hydronic Piping Pipe F2 Insulation Type Length Factor R -Val Depth Location / Comments Perimeter _144 0.76 0.0 0 Downstairs 'Slab Slab Perimeter 122 0.76 0.0 0 Downstairs �I t✓ i� HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiency and Location pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) Duct Thermostat R -Value Type Location / Comments Hydronic Piping Pipe Pipe Insul. System Name Length Diameter Thick. Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments WATER HEATING SYSTEMS Ratedl Tank Energy Fact! 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type Svst. (Btu/hr) (gal) Efficiency Loss M Ext. 1 For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 18 of 51 1 1 11 1 Computer Method Summary (Part 3 of 3) C -2R The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Location Type (so (in.) Cap. Cond. Form 3 Reference R -Val. Comments Tile in Mortar _88 —0.75 24: 0"67 n/a _0 Downstairs / Interior Mass Concrete. Heavyweight 88 3_50 28 0_98 n/a 0 Downstairs / Slab on Grade Concrete Heavyweight 795 3.50 8 0.98 n/a 2 Downstairs / Slab on Grade PERIMETER LOSSES F2 Insulation Type Length Factor R -Val. Depth Location / Comments HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiency and Location . Duct Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type Comments For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. Run Initiation Time: 06/11104 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 19 of 51 Insul. Hydronic Piping Pipe Pipe System Name Length Diameter Thick. Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments WATER HEATING SYSTEMS Rated Tank Energy Fact! Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type Svst. (Btu/hr) (gal) Efficiencv Loss M) Ext. For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. Run Initiation Time: 06/11104 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 19 of 51 1 I I Computer Method Summary (Addendum) C -2R The Clarke Residence - Lot #25 a, The Quarry 6/11/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. I Plan I Field The HVAC System "HVAC -1 (Master Suite/Office)" must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas HIGH MASS Design(see C -2R) - Verify Thermal Mass: 155 sqft Tile in Mortar Interior Mass, 0.75" thick at Master Suite/Office HIGH MASS Design(see C -2R) - Verify Thermal Mass: 155 sqft Exposed Slab Floor, 3.50" thick at Master Suite/Office HIGH MASS Design(see C -2R) - Verify Thermal Mass: 1395 sqft Covered Slab Floor, 3.50" thick at Master Suite/Office The HVAC System "HVAC -2 (Great Rm/Foyer)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas HIGH MASS Design(see C -2R) - Verify Thermal Mass: 947 sqft Tile in Mortar Interior Mass, 0.75" thick at Great Room/Foyer HIGH MASS Design(see C -2R) - Verify Thermal Mass: 947 sqft Exposed Slab Floor, 3.50" thick at Great Room/Foyer HIGH MASS Design(see C -2R) - Verify Thermal Mass: 105 sqft Covered Slab Floor, 3.50" thick at Great Room/Foyer The HVAC System "HVAC -3 (Entry/Dining/Hall)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. HIGH MASS Design(see C -2R) - Verify Thermal Mass: 848 sqft Tile in Mortar Interior Mass, 0.75' thick at Entry/Dining/Hallway HIGH MASS. Design(see C -2R) - Verify Thermal Mass: 848 sqft Exposed Slab Floor, 3.50" thick at Entry/Dining/Hallway HIGH MASS Design(see C -2R) - Verify Thermal Mass: 94 sqft Covered Slab Floor, 3.50" thick at Entry/Dining/Hallway The HVAC System "HVAC -4 (Kitch/SunRm/Lndry)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Area;. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R. I Plan I Field The HVAC System "HVAC -1 (Master Suite/Office)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -2 (Great Rm/Foyer)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 (Entry/Dining/Hall)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC4 (Kitch/SunRm/Lndry)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -5 (Guest Suites 1&2)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -6 (Stair/Wine/Theatre)" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rate must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page: 20 of 51 Computer Method Summary (Addendum) C -2R The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. I PI,. I rim'i HIGH MASS Design(see C -2R) - Verify Thermal Mass: 951 sqft Tile in Mortar Interior Mass, 0.75" thick at Kitchen/SunRoom/Laund HIGH MASS Design(see C -2R) - Verify Thermal Mass: 951 sqft Exposed Slab Floor, 3.50" thick at Kitchen/SunRoom/Laundry HIGH MASS Design(see C -2R) - Verify Thermal Mass: 106 sqft Covered Slab Floor, 3.50" thick at Kitchen/SunRoom/Laundry The HVAC System "HVAC -5 (Guest Suites 1 &2)" must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Amdb The HVAC System "HVAC -6 (Stair/Winelrheatre)" must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. HIGH MASS Design(see C -21R) - Verify Thermal Mass: 20 sqft Tile in Mortar Interior Mass, 0.75" thick at Powder/Hall Rotunda HIGH MASS Design(see C -2R) - Verify Thermal Mass: 20 sqft Exposed Slab Floor, 3.50" thick at Powder/Hall Rotunda HIGH MASS Design(see C -2R) - Verify Thermal Mass: 120 sqft Covered Slab Floor, 3.50" thick at Powder/Hall Rotunda HIGH MASS Design(see C -2R) - Verify Thermal Mass: 88 sqft Tile in Mortar Interior Mass, 0.75" thick at Wine/Theatre HIGH MASS Design(see C -2R) - Verify Thermal Mass: 88 sqft Exposed Slab Floor, 3.50" thick at Wine/Theatre HIGH MASS Design(see C -2R) - Verify Thermal Mass: 795 sqft Covered Slab Floor, 3.50" thick at Wine/Theatre 'HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS JI Wv al. 1lIV nc RJ IdlCl IIIUSI UVGUlllellr LIM IICIU V6IIIIUdrIVI1 dllU UIdUI10511G W511"U Or Trlebe mea5Ure5 on d TOrM tr-am. Run Initiation Time: 06/11/04 07:30:24 Run Code: 1086964224 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:21 of 51 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 COMPONENT DESCRIPTION DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 stucco 2 Membrane, Vapor -Permeable Felt 3 Plywood 4 Insulation, Mineral Fiber, R-21 5 ASSEMBLY NAME W-1 Wall .21.24.16 0.31 7 0.37 8 2.60 ASSEMBLY Floor INSIDE SURFACE AIR FILM 0.680 23.11 TYPE (check one) wall LU Ceiling Ceiling /Roof Q a FRAMING MATERIAL Wow p Z FRAMING % 15 % Framing 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Cell.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) THICK- NESS 4MING (in.) ❑ 0.875 ❑ 0.010 ❑ 0.375 © 5.500 ❑ 0.625 El SUBTOTAI R -VALUE DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 stucco 2 Membrane, Vapor -Permeable Felt 3 Plywood 4 Insulation, Mineral Fiber, R-21 5 Gypsum or Plaster Board 6 0.31 7 0.37 8 2.60 9 0.68 INSIDE SURFACE AIR FILM THICK- NESS 4MING (in.) ❑ 0.875 ❑ 0.010 ❑ 0.375 © 5.500 ❑ 0.625 El SUBTOTAI R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.1751 0.175 0.060 0.060 0.465 0.465 21.000 5.445 0.5621 0.562 0.31 2.63 0.37 0.98 2.60 0.26 0.68 0.6801 0.680 23.11 7.56 KC KT nen 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) 8.46 0.20 1.69 0.06 0.35 0.02 1.06 0.29 0.31 2.63 0.37 0.98 2.60 0.26 0.68 14.81 TOTAL HC 3 •NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0433 X 0.85 ] + [ 0.1323 X L 0.15 ] 1 / Rc 1 - (Fr -/6 / 100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE I EnergvPro 3.1 By EnergvSoft User Number: 3665 Job Number: Paae:22 of 51 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 .PROJECT NAME The Clarke Residence - Lot #25 @ The Quar DATE 6/11/2004 COMPONENT DESCRIPTION DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Gypsum or Plaster Board 2 Insulation, Mineral Fiber, R-21 3 Gypsum or Plaster Board ' - 0.37 5 ASSEMBLY NAME W-2 Wall .21.2x6.16 0.68 7 8 ASSEMBLY Floor INSIDE SURFACE AIR FILM 0.680 22.98 TYPE (check one) X Wall W w W Ceiling / Roof yFRAMING MATERIAL Wood p z FRAMING % 15 % Framing % - 15% (16" o.c. Wall) 12% (24" o.c. Wall) '10%'(16" o.c. Floor/Cell.) SKETCH OF ASSEMBLY '7% (24".o.c. Floor/Cell.) CONSTRUCTION COMPONENTS THICK- NESS FRAMING ❑ ,. .❑ t R -VALUE DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Gypsum or Plaster Board 2 Insulation, Mineral Fiber, R-21 3 Gypsum or Plaster Board 4 - 0.37 5 2.60 6 0.68 7 8 9 INSIDE SURFACE AIR FILM FRAMING ❑ ,. .❑ t R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.562 0.562 21.000 5.445 0.562 0.562 - 0.37 0.98 2.60 -0.26 0.68 ASSEMBLY U-VALU 0.680 0.680 22.98 7.42 SUB TOTAL� Rc R "HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) 0.0435 X 0.85 ] 2.60 -0.26 0.68 2.63 - 0.37 0.98 2.60 -0.26 0.68 ASSEMBLY U-VALU 7 $ TOTAL HC 2.3 )TE: Weight and Specific Heat values for materials penetrated by wood framing include the effects -of the framing members. 0.0435 X 0.85 ] + [ 0.1348 X 0.15 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U-VALU COMMENTS ' Page: 23 of 51 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. �� I PROPOSED CONSTRUCTION ASSEMBLY ENV -3 • PROJECT NAME The Clarke Residence - Lot #25 @ The Qua DATE 6/11/2004 COMPONENT DESCRIPTION DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Earth 2 Concrete, 140 Ib, Not Dried 3 Air Space 4 Membrane, Vapor -Permeable Felt 5 ASSEMBLY NAME W-1 Wall .21.24.16 (Underground) Insulation, Mineral Fiber, R-21 7 Gypsum or Plaster Board 8 ASSEMBLY Floor 0.31 2.63 INSIDE SURFACE AIR FILM 0.680 TYPE (check one) wall 0.68 0 0 /Roof Ceiling FRAMING MATERIAL Wood 42.3 p Q FRAMING % 15 % Framing % 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Cell.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) ' CONSTRUCTION COMPONENTS FRAMING a El I SUBTOTAL 1 1 1 1 R -VALUE DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Earth 2 Concrete, 140 Ib, Not Dried 3 Air Space 4 Membrane, Vapor -Permeable Felt 5 Plywood 6 Insulation, Mineral Fiber, R-21 7 Gypsum or Plaster Board 8 1.06 9 0.31 2.63 INSIDE SURFACE AIR FILM FRAMING a El I SUBTOTAL 1 1 1 1 R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 2.000 2.000 0.800 0.800 0.840 0.840 0.0601 0.060 0.465 0.465 21.000 5.445 0.562 0.562 1.06 0.29 0.31 2.63 0.6801 0.680 26.58 11.02 Kc KT owe 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) 85.00 0.20 17.00 116.67 0.20 23.33 0.00 0.00 0.00 0.06 0.35 0.02 1.06 0.29 0.31 2.63 0.37 0.98 2.60 0.26 0.68 208 0 TOTAL HC 42.3 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0376 X 0.85 ] + [ 0.0907 ' X 0.15 1 / Rc 1 - (Fr -/6 / 100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE I EnergvPro 3.1 By EnergvSoft User Number. 3665 Job Number. Page:24 of 51 1 1 t 1 1 1 1 1 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 SYSTEM NAME FLOOR AREA HVAC -1 Master Suite/Office 1,550 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 1 Heating System Output per System 89,400 Total Output (Btuh) 89,400 Output (Btuh/sgft) 57.7 Cooling System Output per System 58,500 Total Output (Btuh) 58,500 Total Output (Tons) 4.9 Total Output (Btuh/sqft) 37.7 Total Output (sgftrron) 317.9 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.29 Airflow (cfm/Ton) 410.3 Outside Air (%) 5.8 Outside Air (cfm/sqft) 0.08 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK 11COILHTG.PEAK CFM I Sensiblel Latent I I CFM I Sensible 2,092 39,114 4,527 707 28,589 114.1 / 80.3 of 0 of 1,956 1,429 0 0 116 4,417 2,308 116 5,690 0 116 cfm 0 1,9561 1,429 47 443 6,835 37 138 HS26-060/G40UH60C-110 (5) 45,719 7,063 89,400 Total Adjusted System Output 45,719 7,063 89,400 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 24.0 OF 66.7 OF 108.10F 108.1 OF Outside Air 0 Supply Air Ducts 116 cfm 107.4 of Heating Coil Supply Fan 2000 cfm ROOMS 70.0 OF 69.3 of K Return Air Ducts 4 (COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) I 114.1 / 80.3 of 81.0 / 66.6 of 59.8 / 58.4 of 59.8 / 58.4 of Outside Air O 4 g, Supply Air Ducts ' 116 cfm Cooling Coil Supply Fan 60.7 / 58.7 of 2000 cfm 51.1% R.H. ROOMS 78.9/65.6 of 78.0 / 65.3 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:25 of 51 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Clarke Residence - Lot #25 The Quarry 6/11/2004 SYSTEM NAME FLOOR AREA HVAC -2 Great Rm/Fo er 1,052 Number of Systems 1 Heating System Output per System 89,400 Total Output (Btuh) 89,400 Output (Btuh/sqft) 85.0 Cooling System Output per System 58,500 Total Output (Btuh) 58,500 Total Output (Tons) 4.9 Total Output (Btuh/sgft) 55.6 Total Output (sgft/Ton) 215,8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.90 Airflow (cfmrron) 410.3 Outside Air (%) 3.9 Outside Air (cfm/sgft) 0.08 Note: values above given at ARI conditions 24.0 of ) ;0 Outs 79 cfm 69.5 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 1,589 31,485 4,358 568 23,624 114.1 / 80.3 of 0 of 1,574 1,181 0 0 79 3,013 1,696 79 3,872 Outside Air 0 0 1,574 1,181 37,6:476F776 054 29 858 HS26-060/G40UH60C-110 (5) 45,785 6,293 89,400 Total Adjusted System Output 45,785 6,293 89,400 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am eam Temueratures at Time of Heating Peak) 67.70F . 109.10F Heating Coil 109.1 of 0 Supply Air Ducts • Supply Fan 108.5 of 2000 cfm ROOMS 70.0 of 114.1 / 80.3 of 80.1 / 65.8 of 58.9 / 57.5 of 58.9 / 57.5 of Supply Air Ducts O Outside Air ' 79 cfm Cooling Coil Supply Fan 59.6 / 57.8 of 2000 cfm 49.5% R.H. ROOMS 78.7/65.1 of 78.0 64.9 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:26 of 51 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 SYSTEM NAME FLOOR AREA HVAC -3 (Entry/Dining/Hall) 942 Number of Systems 1 Heating System Output per System 72,100 Total Output (Btuh) 72,100 Output (Btuh/sqft) 76.5 Cooling System Output per System 48,000 Total Output (Btuh) 48,000 Total Output (Tons) 4.0 Total Output (Btuh/sqft) 51.0 Total Output (sgft/Ton) 235.5 Air System CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cfm/sqft) 1.70 Airflow (cfm/Ton) 400.0 Outside Air (%) 4.4 Outside Air (cfm/sgft) 0.08 Note: values above given at ARI conditions 24.0 of Outs1 " 71 cfm 69.5 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 1,226 25,845 2,75 452 18,861 114.1 / 80.3 of 0 1,292 943 0 0 7 2,696 1,714 71 3,467 0 71 cfm 0 1,292 943 31,1226E4 465 HS26-048/G40UH48B-090X (4) 39,016 3,233 Peak 114.1 / 80.3 of 80.3 / 65.1 of 57.7 / 56.3 OF 57.7 / 56.3 of Total Adjusted System Output (Adjusted for Peak Design Conditions) 39,016 3,233 72,100 72,100 TIME OF SYSTEM PEAK I Aug 2 pm Jan 12 am RICS (Airstream Tem 67.40F . 109.20F Heating Coil -�@J Supply Fan 1600 cfm 109.2 of Supply Air Ducts 108.6 of ROOMS 70.0 of h Return Air Ducts `{ DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 114.1 / 80.3 of 80.3 / 65.1 of 57.7 / 56.3 OF 57.7 / 56.3 of 0 Supply Air Ducts Outside Air ' 71 cfm Cooling Coil Supply Fan 58.5 / 56.6 of 1600 cfm 46.7% R.H. ROOMS . , 78.7/64.3 of 78.0 / 64.0 of Return Air Ducts ' EnergyPro 3.1 By Energysoft User Number: 3665 Job Number. Page:27 of 51 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Clarke Residence - Lot #25 0 The Quarry 6/11/2004 SYSTEM NAME FLOOR AREA HVAC -4, Kitch/SunRm/Lnd 1,057 ENGINEERING CHECKS ISYSTEM LOAD 24.0 OF ) ;0 Outside Air 79 cfm 69.4 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,31 26,780 3,64 535 22,062 114.1 / 80.3 OF 0 1,339 1,103 0 0 79 3,023 1,792 79 3,882 59.1 / 57.2 ° 0 0 1,339 1,103 32,48f 5 433 28 150 HS26-048/G40UH48B-090X (4) 38,394 4,250 72,1001 Total Adjusted System Output 38,394 4,250 72,100 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am -earn Temperatures at Time of Heating Peak) 67.1°F 108.9°F Heating Coil 108.9 OF Supply Air Ducts Supply Fan 108.2 OF 1600 cfm ROOMS 70.0 OF Return Air Ducts I POOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak), 114.1 / 80.3 OF 80.5 / 65.6 OF 58.3 / 56.9 OF 58.3 / 56.9 OF �. Supply Air Ducts Outside Air 79 cfmF Cooling Coil . Supply Fan 59.1 / 57.2 ° 1600 cfm 48.4% R.H. ROOMS 78.8/64.8 of 78.0 64.5 OF ec Return Air Ducts �. EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:28 of 51 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 SYSTEM NAME FLOOR AREA HVAC -5 Guest Suites 1 &2 1,050 Number of Systems 1 Heating System Output per System 72,100 Total Output (Btuh) 72,100 Output (Btuh/sgft) 68.7 Cooling System Output per System 48,000 Total Output (Btuh) 48,000 Total Output (Tons) 4.0 Total Output (Btuh/sqft) 45.7 Total Output (sgftrron) 262.5 Air System CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cfm/sqft) 1.52 Airflow (cfmrron) 400.0 Outside Air (%) 4.9 Outside Air (cfm/sqft) 0.08 Note: values above given at ARI conditions EATING S 24.0 of 311, 0 Outs 79 cfm 69.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 1,20 24,963 3,067 324 13,531 114.1 / 80.3 of 0 311, ;0O 1,248 677 0 0 79 3,008 1,850 79 3,877 58.8 / 56.9 of 0 411 0 1,2481 677 30,4671 4,9171 18 761 HS26-048/G40UH48B-090X (4) 38,749 3,708 72,100 Total Adjusted System Output 38,749 3,708 72,100 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am 67.40F . 109.10F Heating Coil 0 Supply Fan 1600 cfm 109.1 of -� Supply Air Ducts 108.7 of ROOMS 70.0 of 1% Return Air Ducts 'I COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Coolin Peak 114.1 / 80.3 of 80.5 / 65.4 of 58.0 / 56.6 of 58.0 / 56.6 of 311, ;0O Supply Air Ducts Outside Air 79 cfm Cooling Coil Supply Fan 58.8 / 56.9 of 411 1600 cfm 47.5% R.H. ROOMS 78.7/64.5 of 78.0 o164.3 F Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 29 of 51 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY -� ,PROJECT NAME DATE The Clarke Residence - Lot #25 The Quarry6/11/2004 SYSTEM NAME FLOOR AREA HVAC -6 Stair/Wine/Theatre 1,233 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 72,100 Total Output (Btuh) 72,100 Output (Btuh/sqft) 58.5 Cooling System Output per System 48,000 Total Output (Btuh) 48,000 Total Output (Tons) 4.0 Total Output (Btuh/sqft) 38.9 Total Output (sgft/Ton) 308.2 Air System CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cfm/sgft) 1.30 Airflow (cfmrron) 400.0 Outside Air (%) 5.8 Outside Air (cfm/sqft) 0.07 Note: values above given at ARI conditions 24.0 OF Outside Air 92 cfm 69.4 °F OGLING S 114.1 /80.3OF Outside 92 cfm 78.7/64.9°F Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sen iblel Latent CFM I Sensible 1,139 23,102 3,617 529 21,633 0 1,155 1,082 0 0 92 3,537 2,052 92 4,530 0 0 1,1551 1 1,082 28 949 5,669 28 326 HS26-048/G40UH48B-090X (4) 38,306 4,498 72,100 Total Adjusted System Output 38,306 4,498 72,100 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am 66.8 OF . 108.5 OF Heating Coil 108.5 of O " Supply Air Ducts Supply Fan 107.9 OF 1600 cfm ROOMS 70.0 OF Return Air Ducts I 80.7 / 65.9 OF . 58.5 / 57.1 OF 58.5/57 ' 1 OF Supply Air Ducts Cooling Coil Supply Fan 59.2 / 57.4 °F lsoo cfm 48.8% R.H. ROOMS 78.0 / 64.6 OF Return Air Ducts `Sit EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page: 30 of 51 t t ROOM LOAD SUMMARY PROJECT NAME The Clarke Residence - Lot #25 @ The Quarry DATE 6/11/2004 SYSTEM NAME HVAC -1 Master Suite/Office FLOOR AREA 1,550 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE. Zone 1 Master Suite/Office 1 2,092 39,114 4,527 2,092 39,114 4,527 707 28,589 PAGE TOTAL 1 2,092 39,114 4,527 707 28,589 TOTAL 1 2,092 39,114 4,527 707 28,589 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page:31 of 51 11 1 ROOM LOAD SUMMARY PROJECT NAME The Clarke Residence - Lot #25 @ The Quarry' DATE 6/11/2004 SYSTEM NAME HVAC -2 Great km/Foyer) FLOOR AREA 1,052 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 2 Great Room/Foyer 1 1,589 31,485 4,358 1,589 31,485 4,358 568 23,624 PAGE TOTAL 1 1,589 31,485 4,358 568 23,624 TOTAL 1 1,589 31,485 4,358 568 23,624 F EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page: 32 of 51 JR00M LOAD SUMMARY . . ; . PROJECT NAME • •. - The Clarke Residence - Lot #25 The Quarry6/11/2004 DATE SYSTEM NAME HVAC -3 Ent /Dinin /Hall FLOOR AREA . -942 ROOMIOAD SUMMARY - - " ROOM COOLING PEAK' COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT .CFM SENSIBLE LATENT CFM SENSIBLE Zone 3 Entry/Dining/Hallway 1 1,226 25,845 2,751 1,226 25,845 2,751 452 18,861 ♦ Y - 1 • 1 PAGE TOTAL 1 1-,226 25,845 2,751 452 18,861 f TOTAL 1 1,226 25,845 1 2,751'11 452 18,861 ■ ? EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:33 of 51 11 1 11 t 1 1 ROOM LOAD SUMMARY PROJECT NAME The Clarke Residence - Lot #25 @ The Quarry DATE 6/11/2004 SYSTEM NAME HVAC -4 Kitch/SunRm/Lnd FLOOR AREA 1,057 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 4 Kitchen/SunRoom/Laundry 1 1,311 26,780 3,641 1,311 26,780 3,641 535 22,062 PAGE TOTAL 1 1,311 26,780 3,641 535 22,062 TOTAL 1 1,311 26,780 3,641 535 22,1)62 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:34 of 51 1 r 'I 1 ROOM LOAD SUMMARY PROJECT NAME The Clarke Residence - Lot #25 @ The Quarry DATE 6/11/2004 SYSTEM NAME HVAC -5 Guest Suites 1 &2 FLOOR AREA 1,050 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 5 Guest Suites 182 1 1,201 24,963 3,067 1,201 24,963 3,067 324 13,531 PAGE TOTAL 1 1,201 24,963 3,067 324 13,531 TOTAL 1 1,201 24,963 3,067 324 13,531 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 35 of 51 1 1 1 1 r F 11 ROOM LOAD SUMMARY PROJECT NAME The Clarke Residence - Lot #25 @ The Quarry DATE 6/11/2004 SYSTEM NAME HVAC -6 Stair/Wine/Theatre FLOOR AREA 1,233 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Upstairs Powder/Hall Rotunda 1 372 7,556 961 372 7,556 961 163 6,666 Downstairs Winelrheatre 1 766 15,546 2,656 766 15,546 2,656 366 14,967 PAGE TOTAL 1 1,139 23,102 3,617 529 21,633 TOTAL 1 1,139 23,102 3,617 529 21,633 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page:36 of 51 11 1 1 1 1 1 1 i 1 1 ROOM HEATING PEAK LOADS. Project Title t11/2004 te The Clarke Residence - Lot #25 @ The Quarry Room Information Desi n Conditions Room Name Master Suite/Office Time of Peak Jan 12 am Floor Area 1,550 Outdoor Dry Bulb Temperature 24°F Indoor Dry Bulb Temperature 7A OC Conduction Area U -Value AT OF Btu/hr 1546.0 X x x x x x X x x x x X x x X x X X X X X X X x X x x x x x x x x x x x x x x 0.0280 X X X X X x X X X x x X X X x X X X X x X X X X X X' X x x x x x x x x x I x x x 46.0 = = = = = = = = = = = = _ = = = = = = = = = = = 1,992 4.0 0.8000 46.0 147 1219.2 0.0566 46.0 3,176 130.8 0.3500 46.0 2,106 8.0 0.3800 46.0 140 18.0 0.7200 46.0 596 165.0 0.0572 46.0 434 108.0 0.5000 46.0 2,484 108.0 0,5300 46.0 2.633 perimeter =172.0 7,826 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 21 534 Infiltration: 1 1.001 X 1.080 X 1 550 X 11.00 X 6] X 46 = 7 056 chedule Air Sensible Area Ceiling Height ACH Fraction AT TOTAL HOURLY HEAT LOSS FOR ROOM 28,589 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page:37 of 51 I1 ROOM HEATING PEAK LOADS Project Title Date The Clarke Residence - Lot #25 , The Quarry 6/11/2004 Room Information Desi n Conditions Room Name Great Room/Foyer Time of Peak Jan 12 am Floor Area 1,052 Outdoor Dry Bulb Temperature 24°F ' Indoor Dry BUIb Temperature 7o°F Conduction Area U -Value AT OF Btu/hr 1 1 i 1 1 1 1 1052.0 x X x X X X x x X X x X X X X X X X X X X X X X X X X X X X X X X X X x X X x 0.0280 X X X X x X X X X x X X X x x x X x x X X X X X X X X X X X X X X X X X X X X 46.0 = = = = = = = = = 1,355 783.6 0.0566 46.0 2,041 26.0 0.3800 46.0 454 101.4 0.3500 46.0 1,633 320.0 0.5300 46.0 7,802 perimeter = 55.0 45.5 2,502 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 15 787 Infiltration: r 1.001X 1.080 x 1 052 X 18.00 X 0.50 / 60] X 46 = 7 836 ' `schedule Air Sensible Area Ceiling Height ACH Fraction DT TOTAL HOURLY HEAT LOSS FOR ROOM 23,624 ' —71 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:38 of 51 ROOM HEATING PEAK LOADS Project Title Date The Clarke Residence - Lot #25@ The Quarry 6/11/2004 —A Room Information Desicin Conditions Room Name Entry/Dining/Hallway Time of Peak Jan 12 am Floor Area 942 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature -71% OC 942.0 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 0.0280 x x x x x x x x x x x x x x x x x X x x x x x x x x x x x x x x x x x x x x x 46.0 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 1,213 517.4 0.0566 46.0 1,348 54.0 0.5000 46.0 1,242 42.0 0.3800 46.0 734 108.0 0.5300 46.0 2.633 70.0 0.8500 46.0 2,737 18.6 0.3500 46.0 299 155.0 0.0572 46.0 408 perimeter=87, 45.5 3,958 Items shown with an asterisk ('r) denote conduction through an interior surface to another room. Page Total: 14 573 Infiltration: 1.001 x x 942 x 11.00 x 6] x 46 = 4 288 Sensible chedule Air Sensible Area Coiling Height ACH DT ' Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 18,861 ' EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:39 & 51 ROOM HEATING PEAK LOADS Project Title Date The Clarke Residence = Lot #25 @ The Quarry 6/11/2004 Room Information Desion Conditions Room Name Kitchen/SunRoom/Laundry Time of Peak Jan 12 am Floor Area 1,057 Outdoor Dry Bulb Temperature 24 OF ' Indoor Dry. Bulb Temperature 70°F Conduction Area LI -Value AT of Btu/hr 17, 1057.0 x x x x x x x x X X x X x x x x x X x x x x X x x X X x X x x x x x X X x x X 0.0280 x x X X x x x x x x x x x X x X x X x x x x X x X X x x X x x X X x x x x x X 46.0 = = = = = = = = = = = = = 1.362 763.7 0.0566 46.0 1,989 138.0 0.5000 46.0 3,174 123.3 0.3800 46.0 2,155 296.0 0.0572 46.0 779 24.0 0.3872 46.0 427 perimeter = 133.0 45.5 6,052 17, Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 15 938 Infiltration: � 1.00 x 1.080 x 1 057 x 14.00 x 0.50 / 6] x 46 = 6 124 ' chedule Air Sensible Area Ceiling Height ACH Fraction 6T TOTAL HOURLY HEAT LOSS FOR ROOM 22,062 ' EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 40 of 51 17, ROOM HEATING PEAK LOADS Project Title Date The Clarke Residence - Lot #25 @ The Quar 6/11/2004 Room Information Design Conditions Room Name Guest suites 1&2 Time of Peak Jan 12 am Floor Area 1,050 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 7o°F Conduction Area U-ValueDT F ° Btu/hr 167.0 X X X x x x X x X x x X x x x x x x x X X x X x x X X x X x X X x X X x X x x 0.0267 x x X x X X x X X x x x x x x x x x x X X x X x x x X x X x x x x X x x x x X 46.0 = = = = = = = = = = = = = 205 1050.0 0.0280 46.0 1,353 1,253.8 0.0566 46.0 3,266 99.0 0.5000 46.0 2,277 62.0 0.3800 46.0 1,084 35.2 0.3500 46.0 567 Items shown with an asterisk (•f) denote conduction through an interior surface to another room. Page Total: 8 751 Infiltration: 1.001 x 1.080 x 1 050 x 11.00 x 60] x 46 = 4 780 ' chedule Air Sensible Area Coiling Height ACH Fraction OT TOTAL HOURLY HEAT LOSS FOR ROOM 13,531 ' EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:41 of 51 ROOM HEATING PEAK LOADS Project Title Date The Clarke Residence - Lot #25 @ The Quarry 6/11/2004 Room information Design Conditions Room Name Powder/Hall Rotunda Time of Peak Jan 12 am Floor Area 350 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr L i 1 210.0 x x X x x x x x X x x X X X X x X X X X X x X x X X X X x x x x x x x x x x x 0.0267 x x X x X X x X X x X X X X X X X x x X X x X x X X x X x x x x x x x x x x x 46.0 = = = = = = = = = = = = = 258 350.0 0.0280 46.0 451 249.8 0.0566 46.0 651 21.4 0.5000 46.0 492 33.8 0.3800 46.0 591 190.0 0.0572 46.0 500 perimeter = 50.0 45.5 2,275 Items shown with an asterisk (f') denote conduction through an interior surface to another room. Page Total: 5,218 Infiltration: 1 1.001 x 1.080 x 350 x 10.00 x 6] x 46 = 1448 ' chedule AIr Sensible Area Ceiling Height ACH Fraction AT TOTAL HOURLY HEAT LOSS FOR ROOM 6,666 ' EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:42 of 51 ROOM HEATING PEAK LOADS Project Title Date The Clarke Residence - Lot #25 The Quay6/11/2004 Room information Desion Conditions Room Name winerrheatre Time of Peak Jan 12 am Floor Area 883 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 7n Or: Conduction Area U -Value AT of Btu/hr 883.0 x x x x X x x x X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x X 0.1730 x x x x x . x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 0.0 = = = = = = = = = = = = = = = = _ = = = = = _ = = = = = = = = = = = 0 1,244.8 0.0456 46.0 2,610 45.4 0.3800 46.0 794 19.8 0.3500 46.0 319 162.0 0.0572 46.0 426 24.0 0.3872 46.0 427 perimeter =136.0 45.5 6,188 Items shown with an asterisk ('rr) denote conduction through an interior surface to another room. Page Total: 10.76 Infiltration: I1 1.001 x 1A80 x 883 x x 6] x 46 = 4202 chedule Alr Sensible Area Ceiling Height ACH Height OT ' Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 14,967 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Pa e:43 of 51 t 1 f� L� i� 11 .RESIDENTIAL ROOM COOLING LOAD SUMMARY The Clarke Residence - Lot #25 � The Quarry 6/11/2004 Project Title Date Room Name Master Suite/Office Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction -38 Roof R.38.2x14.16 Bristolite Sk lite -1 Wall .21.2x6.16 ierra Pacific Clad Lo/E ierra Pacific Clad Lo/E Default Double Metal Tinted -2 Wall .21.2x6.16 ierra Pacific Clad Lo/E 'errs Pacific Clad (W Area U -Value DETD 1 56.0 37.0 35.6 37.0 37.0 37.0 35.6 37.0 17 0 78°F 115°F 370E Btu/hr 2,424 118 2,458 1,694 112 480 336 1,998 21181 1. Design Equivalent Temperature Difference (DETD) Page Total 11 738 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr Bristolite Skylight 24"x24" (Skylight) (3)ExdGlsWdw 012) (North) CsmntWdw 13 (North) FxdSiteBlt 14 (North) FxdGlsWdw (W15) (North) FxdSiteBlt 14 (Northeast) FxdGlsWdw W16 (East) 2 FrnchDr 14 (South) SIdgGIsDr 10 (West) 2 FrnchDr 11 est ( 0.0 X1 x x x X x x x X X + + + + + + + + + + 4.0 X X X x X x x x x x 152) X ) X ) X x X ) x 0.494 = = = = = = = = = = 301 ( 0.0 1 6.8 15 0.423 43 ( 0.0 1 8.0 15 0.334 40 ( 0.0 1 6.0 15) 0.668 60 ( 0.0 1 50.0 15)x 0.423 317 ( 0.0 1 6.0 48)X 0.668 192 ( 0.0 1 74.0 73)X 0.423 2,285 ( 54.0 1 0.0 32) 0.545 442 ( 0.0 1 108.0 73)x 0.40 3,160 ( 0.0 1 54.0 73 0.545 2,150 Sched. Page Total 8 990 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,550 x 0.500 Watts/sgft x 3.41 BtuhlWaft = 2,645 Occupants 1.00 X 1,550 X 250 Btuh/occ. / 200 sgft/occ. = 1,938 Receptacle 1.00 x 1,550 x 1.500 Watts/sgft x 3.413 Btuh/Waft = 7,935 Process 1.00 x 1,550 x 0.000 Watts/sgft x 3.412 Btuh/Waft = 0 Infiltration: QO x x �,5;;9 x11.00 x / 60] 0 = chedule Air Sensible Area Ceiling Height ACH n T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 39,1141 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1 550 x 200 Btuh/occ. I 20 sgft/occ. = 1 550 Receptacle 1.00 X 1 550 x 0.000 Watts/sqft x 3.41 Btuh/Waft = 0 Process 1.00 x 1 550 X 0.000 Watts/sgft X 3.41 Btuh/Waft = o Infiltration: 1.00 x 4,8401 x 1 55 x 11.00 x 0.50 / 60] 1 0.00433 = 2 977 chedule Air Latent Area Ceiling Height ACH QW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4,527 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 44 of 51 1 [I 1 1 J 11 RESIDENTIAL ROOM COOLING LOAD SUMMARY The Clarke Residence - Lot #25 Ca-- The Quarry 6/11/2004 Project Title Date Room Name Design Indoor Dry. Bulb Temperature: . Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Master Suite/Office 780E 115DF 37°F Conduction Area U -Value DETD 1 Btu/hr 1. Design Equivalent Temperature Difference (DETD) Page Total Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr FASiteBlt 14 (Northwest) ( 0.0 x 1 + 6.0 X 48)X 0.668 = 192 ( x + x )x = ( x + x )x = ( x + x )x = ( x + X )x ( X + X )X ( x + X )X ( x + X )X ( X + X )X ( X + X )x = Sched. Page Total 192 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 X 1,550 x 0.500 Watts/sgft x 3.413 BtuhlWatt — 2,645 Occupants 1.00 X 1,550 X 250 Btuh/occ. / 200 sgft/occ. = 1,938 Receptacle 1.00 x 1,550 x 1.500 Watts/sgft X 3.413 Btuh/Watt = 7,935 Process 1.00 X 1,550 x 0.000 Watts/sgft X 3.413 Btuh/Watt = 0 Infiltration: 9J x [:�--J-Q x x E� x / 60] 0 = 5 75 chedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 39,114 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occu ants1.00 x 1 550 x 200 Btuh/OCC. / 200 sgft/occ. = 1 550 Receptacle 1.00 x 1 550 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Process 1.00 x 1 550 X 0.000 Watts/sgft X 3.41 Btuh/Watt = o' Infiltration: 1.00 x 4840 x 1 55 x 11.00 x 0.50 / 60] 0.00433 = 2 977 —Schedule Air Latent Area Ceiling Height' ACH QW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4,527 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:45 of 51 r RESIDENTIAL ROOM COOLING LOAD SUMMARY ' The Clarke Residence - Lot #25 Ca-- The Quarry 6/11/2004 Project Title Date 1 J ILI Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Great Room/Foyer 780F 115°F 370E Conduction Area U -Value DETDBtu/hr X (North) 56.0 = 1,650 X FxdGlsWdw (HW2 Abv. 35.6 = 1,580 X (West) 37.0 = 366 X 87 37.0 = 1 313 X 0.265 37.0 = 6.275 X X X 1. Design Equivalent Temperature Difference (DETD) Page Total 11 183 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF Sc Btu/hr CsmntWdw 11 (North) (.3) Fxd ,Is (North) Sld GlsDr 15 (East) FxdGlsWdw (HW2 Abv. (East) (4) FxdGlsWdw (HW1 Abv.) (South) Sld GlsDr 9 (West) FxdGlsWdw HW2 Abv. West 15 0.423 87 ( 126.4 1 33.6 ( 0.0 X1 X x x X x x x x x + + + + + + + + + + 26.0 X X X X X X X X x)X X 15 ) X ) X X x X X )X )X ' 0.334 = = = = = = = 130 ( 0.0 1 13.7 15 0.423 87 ( 126.4 1 33.6 73) 0.265 1,152 ( 0.0 1 34.7 73)x 0.423 1,072 ( 0.0 1 18.3 32) 0.423 248 ( 126.4 1 33.6 73) 0.40 1,743 ( 0.0 1 34.7 73) 0.423 1 072 ( ( ( Sched. Page Total. 5 503 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 X 1,052 X 0.500 Watts/sgft x 3.412 Btuh/Watt = 1,795 Occupants 1.00 X 1,052 X 250 Btuh/occ. / 200 sgft/occ. = 1,315 Receptacle 1.00 X 1,052 X 1.500 Watts/sqft x 3.413 BtuhlWatt = 5,386 Process 1..000 x 10,5,2, x 0.000 Wafts/sqft X 3.41 Btuh/Watt = 0 Infiltration: �ch� x Ai -I-Q Ceilin X � / 60] _ Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 31,4851 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1 052 x 200 Btuh/occ. / 200 sgft/occ. = 1 052 Receptacle 1.00 X 1 052 x 0.000 Watts/sqft x 3.41 Btuh/Watt = o Process 1.00 x 1 052 x 0.000 Wafts/sqft x 3.41 BtuhlWatt = 0 Infiltration: 1 1.00 x 4840 x 1 052 x 18.00 x 0.50 / 60] 0.00433 = 3 306 chedule Air Latent Area Ceiling Height ACH InW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4,358 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 46 of 51 1 Ll RESIDENTIAL ROOM COOLING LOAD SUMMARY The Clarke Residence - Lot #25 Ca- The Quarry 6/11/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Entry/Dining/Hallway 780E 115°F 370F Conduction Area U -Value DETD 1 Btu/hr R-38 Roof R.38.2x14.16 -1 Wall .21.2x6.16 Terra Pacific Clad Lo/E Terra Pacific Clad Lo/E Terra Pacific Clad Lo/E Default Double Metal Tinted Terra Pacific Clad Lo/E -2 Wall W.21.2x6.16 X X X X X X X X 56.0 = = = = = = = = 1,477 35.6 1,043 37.0 999 37.0 591 37.0 2 118 37.0 2 202 37.0 241 35.6 316 X 1. Design Equivalent Temperature Difference (DETD) Page Total 8 986 ' Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF Sc Btu/hr 1 1 1 1 2 FrnchDr 16 (East) Ci$mntWrtW (W17 (East) Sld GlsDr 2 (Southeast) 2 Swn GlsEnt Dr 1 (South) FxdGlsWdw (1 Abv.) (South) FxdGlsWdw (HW4 Abv. (South) CsmntWdw W27 (Southwest) 73 0.334 221 ( 0.0 1 108.0 ( 42.6 X1 X X x X X x X X + + + + + + + + + 11.4 x X X x X X X X X 73) X ) x ) X x X X )X )x 0.545 = = = = = = = 803 ( 18.8 1 5.2 73 0.334 221 ( 0.0 1 108.0 62 0.40 2,683 ( 0.0 1 70.0 32)x 0.657 1,471 ( 0.0 1 12.3 32) 0.423 167 ( 0.0 1 6.3 32) 0.423 85 ( 0.0 1 18.0 62) 0.334 373 ( ( Sched. Page Total 5 803 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 942 x 0.500 Watts/sgft X 3.413 Btuh/Waft = 1,608 Occupants 1.00 X 942 X 250 Btuh/occ. / 200 sgft/occ. = 1,178 Receptacle 1.00 x 942 x 1.500 Wafts/sqft x 3.413 Btuh/Waft = 4,823 Process 1.00 X 942 X 0.000 Wafts/sqft X 3.413 Btuh/Watt = 0 Infiltration: �� x � x � x x � / 60] 0 = 3,449 Schedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 25,8451 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 942 x 200 Btuh/OCC. / 200 sgft/occ. = 942 Receptacle 1.00 x 942 x 0.000 Watts/sgft X 3.41 Btuh/Waft = 0 Process 1.00 x 942 x 0.000 Wafts/sgft x 3.41 Btuh[Waft = 0 Infiltration:-Schedulex AlrLatent0 x nt Area 94 x Ceiling Height x 0.00433 ACH50 / 60] Q. 1 809 Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,751 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 47 of 51 Ll RESIDENTIAL ROOM COOLING LOAD SUMMARY The Clarke Residence - Lot #25 (CD The Quarry 6/11/2004 Project Title Date Room Name Kitchen/SunRoom/Laundry Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: ' Conduction R-38 Roof R.38.2x14.1 -1 Wall .21.2x6.16 ierra Pacific Clad(Lo/I Terra Pacific Clad Lo/I -2 Wall W.21.2x6.16 Solid Wood Door CsmntWdw (W8) (Southwest) CsmntWdw 6 Area U -Value X DETD 1 56.0 35.6 37.0 37.0 35.6 35.6 78°F 115°F 37°F Btu/hr 1,658 1,539 2,553 1,734 603 331 1. Design Equivalent Temperature Difference (DETD) Page Total 8 417 I Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr 1 2 FrnchDr 8) (North) smntWdw (W9) _(Northeast) FrnchDr 6 (Southeast) CsmntWdw W5 (Southeast) CsmntWdw (W8) (Southwest) CsmntWdw 6 (Northwest) CsmntWdw W7 (Northwest) 2 FrnchDr 7 (Northwest) CsmntWdw W10 (Northwest) 1 24.0 ( 0.0 X x x x x x1 x x x x 1 + + + + + + + + + + 60.0 x x x x x x x x X x 15 )X )x x x )x 0.545 = = = = = = = = _ = 491 ( 0.0 1 22.0 48 0.334 353 ( 0.0 1 24.0 62)X 0.545 812 ( 0.0 1 11.3 62) 0.334 234 ( 0.0 1 33.0 62) 0.334 683 ( 0.0 18.0 48)X 0.334 289 ( 0.0 1 6.0 48)X 0.334 96 ( 0.0 1 54.0 48)X 0.545 1,414 ( 0.0 1 33.0 48)X 0.334 529 ( Sched. Page Total 1 4,900 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,057 X 0.500 Watts/sgft x 3.413 Btuh/Watt = 1,804 Occupants 1.00 X 1,057 X 250 Btuh/occ. / 200 sgft/occ. = 1,321 Receptacle 1.00 x 1,057 x 1.500 Watts/sqft X 3.413 Btuh/Watt = 5,411 Process 1.00 x 1,057 X 0.000 Watts/sqft x 3.413 Btuh/Watt = 0 Infiltration: �scn� xAirs Area x x Ceiling14DQ x / 60] eight ACH 0 = X926 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 26,78-01 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1 057 x 200 Btuh/OCC. / 200 sgft/occ. = 1 057 Receptacle 1.00 x 1 057 x 0.000 Watts/sqft x 3.41 Btuh/Watt = 0 Process 1.00 x 1 057 x 0.000 Watts/sqft x 3.a1 Btuh/Waft = 0 Infiltration: 1.00 x 4840 x 1 05 x 14.00 x 0.50 / 60] 0.00433 = 2 584 chedule Air Latent Area Ceiling Height ACH Z -\W Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,641 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 48 of 51 C RESIDENTIAL ROOM COOLING LOAD SUMMARY The Clarke Residence - Lot #25 P The Quarry 6/11/2004 Project Title Date Room Name Guest Suites 1 &2 Design Indoor Dry Bulb Temperature: 780F Design Outdoor Dry Bulb Temperature: 1150F Design Temperature Difference: 37°F ' 'ierra Conduction R-38 Floor F.38.2x12.1 R-38 Roof R.381A4.1 -1 Wall .21.2x6.16 Pacific Clad(Lo/I Sierra Pacific Clad Lo/I Sierra Pacific Clad Lo/1 (2) FxdGlsWdw (W20) (Southeast) CsmntWdw 21 11 11 t 1 1 Area U -Value DETD1 X 27.0 X 56.0 X 35.6 X 37.0 X 37.0 X 37.0 X X 1. Design Equivalent Temperature Difference (DETD) Page Total Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Btu/hr 120 1,647 2,527 1,832 872 456 7 454 Solar Gain Orientation Area SGF Area SGF SC Btu/hr 2 FrnchDr 18 (Northeast) k3)-CsmntWdw ( (East) 2 FrnchDr 19 x X X x X X X X X x FxdGlsWdw (HW3 Abv. _(Southeast) (Southeast) (2) FxdGlsWdw (W20) (Southeast) CsmntWdw 21 (Southeast) CsmntWdw W23 (West) FXdGISWdW W24 (West) FXdGISWdW 25 (Northwest) 1 45.0 ( 0.0 x1 X x x x x x x X x + + + + + + + + + + 54.0 x X X x X X X X X x 48)X )x x x x X X )x 0.545 = = = = = = = = __ = 1,414 ( 0.0 1 24.0 73 0.334 585 ( 0.0 1 45.0 62) 0.545 1,522 ( 0.0 1 7.9 62) 0.423 207 ( 0.0 1 7.5 62) 0.423 197 ( 0.0 1 30.0 62) 0.334 621 ( 0.0 1 8.0 73) 0.334 195 ( 0.0 1 4.0 73)X 0.423 124 ( 0.0 1 15.8 48)x 0.423 321 ( Sched. Page Total 5 185 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 X 1,050 X 0.500 Watts/sgft x 3.412 BtuhlWatt = 1,792 Occupants 1.00 X 1,050 X 250 Btuh/occ. / 200 sgft/occ. = 1,312 Receptacle 1.00 x 1,050 x 1.500 Watts/sgft x 3.413 Btuh/Watt = 5,375 Process 1.00 x 1,050 X 0.000 Watts/sgft x 3.412 Btuh/Watt = 0 Infiltration: �c� x Atrsx I Area Ceiling x ceiiin x / 60] ACH 0 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 24 963 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1 050 X 200 Btuh/OCC. / 200 sgft/occ. = 1 050 Receptacle 1.00 X 1 050 x 0.000 Watts/sgft X 3.41 BtuhlWatt = 0 Process f 1.00 x 1 050 x 0.000 Watts/sgft x 3.41 Btuh/Watt = 0 Infiltration: I1 1.00 x 4840 x 1 OS x 11.00 x 0.50 / 60] 1 0.00433 = 2 017 chedule Alr Latent Area Ceiling Height ACH Qyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,067 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 49 of 51 7 I-7 L I� 1 11 7 L LI RESIDENTIAL ROOM COOLING LOAD SUMMARY The Clarke Residence; Lot #25 Cad The Quarry 6/11/2004 Project Title Date Room Name Powder/Hall Rotunda Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction R-38 Floor F.38.2x12.16 R-38 Roof R.38.2x14.16 -1 Wall .21.2x6.16 Terra Pacific Clad Lo/E Terra Pacific Clad Lo/E -2 Wall .21.2x6.16 Area U -Value X DETD1 27.0 56.0 35.6 37.0 37.0 35.6 780F 115°F 370E Btu/hr 151 549 504 396 475 387 1. Design Equivalent Temperature Difference (DETD) Page Total 2A621 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr FrnchDr 17 (Northeast) ( 0.0 X 1 + 21.4 X 48) X 0.545 = 560 C.smntWdw pI1L1 (Northeast) ( 0.0 X 1 + 3.8 X 48 )x 0.334 = 61 3 CsmntWdw 26 (Northwest) ( 0.0 X 1 + 30.0 X 48) X 0.334 = 481 ( x + x )x = ( X + X )X = ( x + X )X = ( x + X )X = ( x + x )X = ( X + X )X = Sched. Page Total 1 1,10 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 350 x 0.500 Watts/sgft x 3.413 Btuh/Watt — 597 Occupants 1.00 X 350 X 250 Btuh/occ. / 200 sgft/occ. = 438 Receptacle 1.00 x 350 X 1.500 Watts/sgft x 3.413 Btuh/Watt = 1,792 Process �i 1�..0,0,x,� 350 x 100..00000 Watts/sgft x 3.41 Btuh/Watt = 0 Infiltration: �c� x Air Sensible x Area x ceiling Height x ACH / 60] z-\ T _ Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7,5561 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occu ants1.00 x 350 x 200 Btuh/occ. / 200 sgft/occ. = 350 Receptacle 1.00 x 350 x 0.000 Watts/sgft x 3.41 Btuh/Watt = o Process I� 1.00 x 350 X 0.000 Watts/sgft X 3.41 Btuh/Watt = o Infiltration: I 1.00 x 4840 x 35 x 10.00 x 0.50 / 60] 0.00433 = 611 —Schedule Air Latent Area Ceiling Height ACH �yy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 961 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:50 of 51 1 1 RESIDENTIAL ROOM COOLING LOAD SUMMARY 1 - The Clarke Residence - Lot #25 Cgs The Quarry 6/11/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Wine/Theatre 780F 1,15°F 370F Conduction Area U -Value DETD 1 Btu/hr. Raised Conditioned Floor(Wood) -1 Wall .21.2x6.16 (Underground) Terra Pacific Clad Lo/E Terra Pacific Clad Lo/E -2 Wall .21.2x6.16 Solid Wood Door X X X X X X 0.0 = = = = = = 0 35.6 2,020 37.0 638 37.0 256 35.6 330 35.6 331 X X X 1. Design Equivalent Temperature Difference (DETD) Page Total 3 576 I Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr 1 1 1 1 1 1 1 1 1 1 CsmntWdw (LW4) (Southeast) Etd.G1sVVr1 Southeast CsmntWdw (LW4; (Southeast) CsmntWdw (LW1) (Southeast) CsmntWdw (LW2) (Southeast) FxdGlsWdw (LW3) (Southeast) CsmntWdw (LW2) (Southeast) 62) 0.423 244 ( 0.0 1 9.3 ( 0.0 X1 X x x X X x x x x + + + + + + + + + + 9.3 X X x X X X X x x x 62)X x x X )x )X )x 0.334 = = = = = = = = = = 193 ( 0.0 1 9.3 62) 0.423 244 ( 0.0 1 9.3 62)X 0.334 193 ( 0.0 1 5.8 62) 0.334 120 ( 0.0 1 10.5 62)x 0.334 217 ( 0.0 1 10.5 62) 0.423 275 ( 0.0 1 10.5 62)x 0.334 217 ( ( ( Sched. Page Total 1 ass Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 883 x 0.500 Watts/sgft x 3.41 Btuh/Waft - 1,507 Occupants 1.00 X 883 X 250 Btuh/OCc. / 200 sgft/occ. = 1,104 Receptacle 1.00 x 883 x 1.500 Watts/sgft x 3.413 Btuh/Watt = 4,521 Process 1.00 x 883 x 0.000 Watts/sgft x 3.413 Btuh/Watt = 0 Infiltration: �� x � x � x x � / 60] 0 = Schedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 15 546 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 883 X 200 Btuh/occ. / 200 sgft/occ. = 883 Receptacle 1.00 X 883 x 0.000 Watts/sgft x 3.41 BtuhlWaft = 0 Process 1.00 x e83 x 0.000 Wafts/sgft x 3.41 Btuh/Watt = o Infiltration: 1.00 x 4840 x 88 x 11.50 x 0.50 / 60] 0.00433 = 1 773 "`-- chedule Air Latent Area Ceiling Height ACH LWy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,656 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page: 51 of 51 t i i i i i i i i i i i i i i ■L' N CITY OF UINTA BUILDIN AFETY DEPT. PROVED FOR CONSTRUCTION C Project: Michael and Susan Clark The Quarry Lot #25 -Tract#27728 GORDON ROSS 58631 Banfield Drive 42-829 Cook SV.L Swrc 104 - Palm Desert. Cati(omia 92260 Phone. (760)5681712 Fax (760)341.7631 Emd 6ordomossre0rdomou.oa La Quinta, California THESE DRAWINGS ARE THE PROPERTY OF GORDONROSS / MAY NOT BE REPRODUCED. C HANGFD OR MPIM inl Wn4nt P nR M PART \v7rrcan3 M4 7ur rmRrccrn Wmrrrrnl rnwrc— nr Detail Name: T I Za Oct B Lower Level Floor Plan M Power Plan Scale: 1/4" = V-0" . Drawn By. Joel D. Beckham Date: - Sheet: ASI -5 2 of 5 ^SS. COPYRIGHT 2004 _•fin 1 Y 1 TO LIGHT ---------_------- --- ® TOP_,oF s ------ - ---- - --- -- - " - STAIR J6 --------- �.. C:) rn 1 1 � 111`, 1a k'e'-------- `� ------- ' ```� M�'�`tj �r''' Y ^ � ` .6.b�.»Hlr�-E(-� t�[d'S � I 11 1; 11 "." !• _ 1 1 rz7 1 s ; 1 i 1 1 , 1 1 , 1 A NOTE: COORDINATE LIGHT SWITCH LOCATIONS CIN QF WITH LOW VOLTAGE CONTROL CONTRACTOR BUILDING gFE�TUYINTA FOR CONSOVED DEPT. CTION DA ZDo C Project: Michael and Susan Clark Detail Name: Lower Level Floor Plan Modifications Date: 12-1-04 Sheet: GORDON R O S S The Quarry Lot #25 - Tract #27728 Lighting Plan ASI -5 47.829 Cook$trsxt Suim lOa•Palm De�CaETomia 92260 Phone: (760)568-1712 Fax: (760)341-7671 Email: gordonross@gord—s.ne 58631 Banfield Drive La Quinta, California `1 ,1 Scale: 1/411 = 1'-011 Drawn By: Joel D. Beckham 3 of 5 THFSF FRAVANCS ARF THF PROFF RTV C)F (-.C)RT)r)NRnCS / MAV NC)T RF RFPRC)T)1 TUFT) r74ANr_Fn nR r r)DTFn MT XYrt nT r nn MT nn a7. 41cav5l ........ .. ...... ...... ....... . .. .... .. . ........... ... ....... ... ...... ....... . ... .. .. ............ . . ....... : . ... ........... ................... .... . ..... . ......... . ...... . .. v;� .............. . ... . Project:. Michael and Susan Clark Detail Name: Date: Sheet: Lower Level Flo Plan'Modifications 12-1-04 CGORDON ROSS The Quarry Lot #25 -Tract #277Floor 58631 Plumbing Plan ASI -5 42,829 Cook SUML Sulu 10< -Palm D� California 92260 Pb ... :(760) 569-1712 F—(760)341-7631 Email: Banfield Drive La Quinta, California Scale: 1/4" = V-0" Drawn By. Joel D. Beckham 4 of 15 .THESE DRAWINGS ARE THE PROPERTY OF GORDONROSS /MAY NOT BE REPRODUCED, CHANGED OR COPIED IN WHOLE OR IN PART WITHOUTHTI-M EXPRESSED WRITTEN' CONSENT OF GORDONROSS. COPYRIGHT 2004 V a_ 1 CITY OF LA QUINTA ` BUILDING & SAFETY DEPT APPR®��® FOR CON R CTION _7�T= , 2D BY . N F- Project: Michael and Susan Clark Detail Name: - Date: Sheet: O O'R D O'.�`v� R O S S The Quarry Lot #25 - Tract #27728 Upper Level Floor Plan Modifications 12-1-04 58631 Banfield Drive Plumbing Plan ASI -5 42.829 Cool Sam Suite 104 •Palm Desen. California 92260 PLone:(760) 568.1712 Fu: (360) 341-7631 E—U: gordoomssCgordonross.oe _ La QUlnta, Califomia Scale: 1/4'..= V-0" Drawn By. Joel D. Beckham THESE DRAWINGS ARE THE PROPERTY OF GORDONROSS / MAY NOT BE REPRODUCED, CHANGED OR COPIED IN WHOLE OR IN PART WITHOUTH THE EXPRESSED WRITTEN MNiFNT OF MRTXlNMC)cS mnvu7r_ur 1— 5 of CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 1 of 5) CF -1R Protect Title -Da-tee/ / :13uildinw Permit'# >1 Do a tion Au or Compliance Method (Prescriptive) a-7 'a4) Srq S - Climate Zone Check / Date: 1 Cheek /Date Alternative Component Package Method: (check one) C D D (Alternative) Package C and Package D choices require HERS rater field verification and/or diagnostic testing (see CF -1R page 3) For Package D Alternative see Appendix B Table 151-C Footnotes 8-14 in the Residential Compliance Manual (RCM) I GENERAL INFORMATION CITY OF LA QUI NTA Total Conditioned Floor Area (CFA)if BUILDING &SAFETY DEPT. AP PR VED Average Ceiling Height: _ ft FOR CONST UCTION Check Applicable Boxes Q r -'711167R Building Type: (check one or more) Single F u t1 I tIo Alteration (If adding fenestration fill -out WS -4R, Fenestration Maximum Allowed Ar Worksheet and see Section 8.3.2 for Additions and 8.3.3 for Alterations in the RCM.) • Maximum Allowed Total Fenestration Area f? (from WS -4R) • Maximum Allowed West Facing Fenestration Area W (from WS -411) • Number of Stories: --Number of Dwelling Units: • Floor Construction Type: rA(R Slab/Raised Floor circle one or both) • Front Orientation: W North / South / Easest :,All Orientations (input front orientation in degrees from True North and circle one). OPAQUE SURFACES INCLUDING OPAQUE DOORS Component Type (Wall, Roof, Floor, Slab Edge, Doors) Frame Type Cavity (.Wood or Insulation Metal) R -Value Assembly U - factor (for wood, Continuous metal frame and Insulation mass R -Value assemblies)' Joint Appendix IV Reference - Roof Radiant*.- , ": Barrier ' Insta1led2 .,.Yes ofNo.., ; Location Comments (attic, garage, ical etc. 2xb ao0 - I) See Joint Appendix IV in Section 1V.2, 1V.3, and I V A, whlcn Is the basis for the U -tactor criterion. U -tactors can not exceed prescriptive value to show equivalence to R -values. 2) This column is for the Inspector to verify installation of roof radiant barrier. Residential Compliance Forms December 2005 . 1 CERTIFICATE OF COMPLIANCE: RESIDENTIAL . (Page 2 of 5) CF -1R Project Title Date FENESTRATION PRODUCTS — U -FACTOR AND SHGC ✓ ®FENESTRATION MAXIMUM ALLOWED AREA.WORKSHEET WS -411 — must be included for New Construction, Additions, and Alterations. Fenestration #/Type/Pos. (Front, Orien- Left, Rear, Right, tation, Area Skylight) N, S, E, W' (W) Exterior Shading/Overhangs6.1. U -factor SHGC ✓ box if WS -311 is Source' SHGC4 Sources included Duct or Piping R -Value 13 - ❑ 13 13 13 1) Skylights are now included in West -facing fenestration area if the skylights are tilted to the west or tilted in any'direction when the pitch is less than 1:12. See § 151(f)3C and in Section 3.2.3 of the Residential Manual. 2) Enter values in this column from either NFRC Certified Label or from Standards Default Table 116-A. 3) Indicate source either from NFRC or Table 116-A, 4) Enter values in this column from NFRC or from Standards Default Table 116B or adjusted SHGC from WS -3R. 5) Indicate source either from NFRC, Table 116B or WS -3R 6). Shading Devices are defined in Table 3-3 in the Residential Manual and see WS -3R to calculate Exterior Shading devices.. 7) See Section 3.2.4 in the Residential Manual. HVAC SYSTEMS Heating Equipment Minimum Distribution Type and Capacity Efficiency Type and Location Duct or Piping Thermostat Configuration fumace, heat pump, boiler, etc. AFUE or HSPF ducts attic etc. R -Value Type (split or package) EXIST Cooling Equipment Type and Capacity (A/C, heat pump, evap. cooling) Minimum Efficiency Distribution' (SEER or Type and Location EER) (duces attic etc. Duct or Piping R -Value Thermostat Type Configuration (split or package) 1� Residential Compliance Forms December 2005 f CERTIFICATE OF COMPLIANCE: RESIDENTIAL (P Project Title ;e 3 of 5) CF -1R Date SEALED DUCTS and TXVs (or Alternative Measures) A si ned CF -4R Form must be provided to the building department for each home for,which the following are required. ❑ Sealed Ducts all climate zones Installer testing and certification and HERS rater field verification required.) ❑ TXVs, readily accessible (climate zones 2 and 8-15 only) Tank Capacity (Rallons Installer testing and certification and HERS Rater field verification required.) ❑ Refrigerant Charge (climate zones 2 and 8-15 only) (Installer testing and certification and HERS Rater field verification required.) V l\ ❑ Alternative to Sealed Ducts and Refrigerant Charge /TXVs (See Package D Alternative Package Features for . Project Climate Zone in the RM Appendix B Table 151-C, Footnotes 7-14. OR ❑ . No ducts installed. Number in System New ducts from existing space conditioning equipment, not exceeding 40ft. in len Tank Capacity (Rallons For additions and alterations, duct systems thatare not documented to have been previously sealed as confirmed ❑ through field verification and diagnostic testing in accordance with procedures in the Residential ACM Manual. Duct systems with more than 40 linear feet in unconditioned spaces shall meet the requirements of Section 150(m) ❑ and duct insulation requirements of Package D. WATER HEATING SYSTEMS aystc ns servitiv slnvie Ilweiiinv unit% (lee. NMI-ahle 5-4 Alternative e .e...... c _..e..:_..,,L..:,.., r,....:�. ._. Water Heater Type/Fuel Type Check box if system meets criteria of a "Standard" system. Standard system is one gas-fired water heater per dwelling ' Number in System unit. If the water heater is a storage type, 50 gallons is the maximum capacity and recirculation s stem is not allowed. Tank Capacity (Rallons Check box when using Preapproved Alternative Water Heating table, Table 5-4 in Chapter 5 in the Residential Standby Loss % Manual. No water heating calculations are required, and the system complies automatically. Check box if system does not meet criteria of "Standard" system, and does not comply with the Preapproved ❑ Alternative Water Heating table. In this case, the Performance Method must be used and must be included in the submittal. ❑ Check box to verify that a time control is required for a recirculating system pump for a system serving multiple units aystc ns servitiv slnvie Ilweiiinv unit% (lee. NMI-ahle 5-4 Alternative e .e...... c _..e..:_..,,L..:,.., r,....:�. ._. Water Heater Type/Fuel Type Distribution Type Number in System Rated Input' (kW or Btu/hr) Tank Capacity (Rallons Energy Factor' or Thermal Efficiency Standby Loss % w Tank External Insulation R -Value Jvsrern servrn9 muitlnle aweltrntz nnitS tSee Re6tlential Manual SPrtinn S 1 Zl Water He Type Distribution Type Number in System Rated Input' (kW Btu/hr(gallons) Tank Capacity Energy Factor' oror Thermal Efficiency Standby I Loss % Tank External Insulation R -Value I) For small gas storage water heaters (rated inputs of less than or equal to •75,000 Btu/hr), electric resistance, and heat pump water heaters, list Energy Factor. For large gas storage water heaters (rated input of greater than 75,000 Bw/hr), list Rated Input, Recovery Efficiency, Thermal Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Thermal Efficiencies. Pipe Insulation (kitchen lines >_ 3/4 inches) All hot water pipes from the heating source to the kitchen fixtures that are '/4 inches or greater in diameter shall be thermally insulated as specified by Section 150 0) 2 A or 150 0) 2'B.. Residential Compliance Forms December 2005 CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 4 of 5) CF -1R Project Title Date SPECIAL FEATURES REQUIRING BUILDING OFFICAL or HERS RATER VERIFICATION Indicate which special features are parts of this project. The list below only represents special features relevant to the nrPw roti— mattind LnecK APP11C3Die Doxes Building Official HERS Rater Verification of HERS Rater Diagnostic C ategory Special Features Verification Testing Measure Ducts ❑ ❑ Y' .; Air retarding wrap 100% of ducts in crawlspace/basement ❑ Y Buried ducts ❑ Y Diagnostic supply duct location, surface area, and R -value ❑ "Y _ `. High thermal mass Duct increased R -value ❑ Inter -zone ventilation Y Duct leakage. ❑ Y Metal framed walls Duds in attic with radiant barriers ❑ Y Less than 12 ft. of dud outside conditioned space ❑ Y Y Non-standard duct location ❑ Y Radiant barrier Supply registers within two ft of floor Residential Compliance Forms December 2005 Envelope ❑ Y :.:-. Air retarding wrap ❑ Y Cool roof ❑ ;. Y> Exterior shades ❑ Y;;^;;-:::: High thermal mass ❑ Y ° Inter -zone ventilation ❑ = . =1': Metal framed walls ❑ Y Nonilefault vent heights ❑ Y Quality insulation installation ❑ Y " Radiant barrier ❑ Y Reduced infiltration (blower door). May also require mechanical ventilation. ❑ Y Solar gain targeting (for sunspaces) ❑ Y Sunspace with interzone surfaces ❑ Y' Vent area greater than 10% HVAC Equipment ❑ '::x Y Adequate air flow ❑ Y Air conditioner size ❑ _ Y Air handler fan.power ❑ " Y High EER ❑ Y :; Hydronic heating systems ❑ Y Mechanical ventilation ❑ Y Refrigerant charge ❑ Y Thermostatic expansion valve (TXV) Y:;......;; Zonal control Water Heater C1 Y; : Combined hydronic ❑ 1' ° High EF for existing water heaters ❑ Y': .' Non-NAECA water heater ❑ Y Non-standard water heaters (wh/unit) ❑ Y ` Water heater distribution credits Residential Compliance Forms December 2005 C CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 5 of Project Title Date n � Special Remarks- f -1'R COMPLIANCE STATEMENT This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognizes that compliance using' duct design, duct sealing, verification of refrigerant charge and TXVs, insulation installation quality, and building envelope sealing. require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business and Professions Code) Documentation Author Na ,/ me: // /y� 4OJ5 49C 1:4 Name: Title/Firm:. TitleFirm: . Address: p ?O Address: /Pl i As V Tele hon . .. �� Telephone: ` License #: License #:.(if applicable) (si'gnature) , (date) (signature) (date) Enforcement Agency Residential Compliance Forms December 2005 MANDATORY MEASURES SUMMARY: RESIDENTIAL (Page Lof 2) MF -1R Project Title Date Note: Low-rise residential buildings subject to the Standards must contain these measures regardless of the compliance.approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (') below. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes or check NA if not applicable and included with the permit application documentation. DESCRIPTION NA Designer .Entorce 'ri:= men tis Building Envelope Measures: ✓ ✓,% • §150(a)-- Minimum RA 9 in wood frame ceiling insulation or equivalent U -factor in metal frame ceiling. ❑ ❑ I ❑ " is §150(b): Loose fill insulation manufacturer's labeled R -Value: ❑ ❑ t .,. , ❑ ^ ti • §150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls). ❑ ❑ ❑ »" , �h §150(d): Minimum R-13 raised -floor insulation in framed floors or equivalent U -factor. ❑ ❑ y: `5 p z + §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. closeable metal or glass door covering the entire opening of the firebox ❑ ❑ r: "t • ❑{ b. outside air intake with damper and control, flue damper and control Ar `� 2. No continuous burning gas pilot lights allowed. _ ❑ ❑ �O §150(0: Air retarding wrap installed to comply with §151 meets requirements specified in the ACM Residential Manual. ❑ ❑ §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. ❑ ❑ E § 150(1): Slab edge insulation - water. absorption rate for the insulation material alone without facings no greater than 0.3%, water vapor ermeance rate no reater than 2.0 rm/inch. ❑ ❑# IS. t §118: Insulation specified or installed meets insulation installation quality standards. Indicate type and include CF -6R Form: § 116-§ 117: Fenestration Products, Exterior Doors, and Infiltration/Exfiltration Controls. 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. ❑x❑ 2. Fenestration products (except field -fabricated) have label with certified U -factor, certified Solar Heat Gain Coefficient SHGC ,and infiltration certification. ❑ ❑❑ Ux 3. Exterior doors and windows weather-stripped; all joints and penetrations caulked and sealed. ❑❑ i Space Conditioning, Water Heating and Plumbing System Measures: §110-§113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission. ❑ ❑ §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. ❑ ;;;0 § 150(i): Setback thermostat on all applicable heating and/or cooling systems, ❑ ❑'❑ §1506): Water system pipe and tank insulation and cooling systems line insulation. 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. ❑ ❑ r ❑ x+ 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal insulation and indicated on the exterior of the tank showin the R -value. ❑ ❑` ❑ S,T. 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B. ❑ OrElC'r 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. ❑ ❑ N4 4. Steam hydro nic heating systems or hot water systems >15 psi, meet requirements of Table 123-A. ❑ ❑ Q rt 4 Residential Compliance Forms December 2005 MANDATORY MEASURES SUMMARY: RESIDENTIAL .(Page 24.2) MF -1R DESCRIPTION° rEnforee-� NA Designer S ace Conditioning; Water Heating and Plumbing S stem Measures: continued ✓ ✓ng 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. ❑ � ❑ 11 6: Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in' ❑ J, conditioned space. ❑`�❑ ' 7. Solar water -heating systems/collectors are certified by the Solar. Rating and Certification Corporation: ❑ x.. ❑ 3�s ®� • §150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirement of the CMC Sections 601, 602, 603, 604, 605 and Standard 6=5; supply -air and retum-air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed n1111 - -applicable entirely' in conditioned space. Openings shall be sealed with mastic, tape or other ductclosure system that meetsthe ❑ ❑RA requirements of UL 181, UL 181A, or UL 181B'or aerosol sealant that meets the requirements of UL 723. If. mastic or tape is used to seal openings eater than 1/4 inch the combination of mastic and either mesh or tape shall be used., r ' 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than K sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and ,support platforms may contain ducts. Ducts installed in cavities and supportplatforms shall not be compressed,to cause � 0 reductions in the cross-sectional area of the ducts. ' 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes ❑ ❑ unless such tape is used in combination with mastic and draw bands. ' 4. Exhaust fan systems have back draft of automatic dampers. ❑ ❑ �® 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated' dampers. ❑ ❑ ' Mel 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight;"moisture, equipment IN maintenance, and wind. Cellular foam insulation shall be protected as above or. painted with a coating that is water ❑ . - ❑ . ® 1 retardant and.provides shielding from solar radiation that can cause degradation of the material.; 7. Flexible ducts cannot have porous inner cores. _ ❑ ❑ N��. §114: Pool and Spa Heating Systems and Equipment. L A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, ❑ ❑ • ' �,! weathe roof operating instructions, no electric resistance heatingand no pilot li t.� 2. System is installed with: a. at least 36" of pipe. between .filter and heater for future solar heating W. — .,. ❑ ❑ �C b. cover for outdoor pools or outdoor spas Fed" 3. Pool system has directional inlets and a circulation pump time switch. ❑ ❑*c® §115: Gas fired'fan-type central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously g ❑ burning pilot light. Exce tion: Non -electrical cooking appliances with pilot < 150 Btu/hr . 0 ' § 118(i): Cool Roof material meets specified criteria ❑ ❑ N :-... Residential Lighting Measures: ` §150(k)I:•HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps asr outlined in Table 150-C, and do not contain a medium screw base'socket (EWE26). Ballast for lamps 13 watts or greater are elecVonic and have an output fr uen no less than 20 kHz .. El [I.'- El � §I50(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C luminaire has factory installed HID ballast ❑ ❑❑°� §150(k)2: Permanently installed luminaires in kitchens shall be high efticacy'luminaires. Up to 50'percent ofthe wattage, as " determined in § 130 (c), of permanently installed luminaires in kitchens may, be,in luminaires.that are not high efficacy ❑ luminaires, provided that these luminaires are controlled by switches separate from,those controlling the high efficacy luminaires.? 0 §150(k)3: Permanently installed luminaires in bathrooms, garages,, laundry rooms and utility rooms shall be high efficacy IRMO luminaires: OR are controlled by amoccupant sensors) certified to comply with Section 119(d) that does not tum on automatically or have an always ono tion. IN pu s §150(k)4: Permanently installed luminaires located other than,in kitchens; bathrooms, garages, laundry rooms, and utility ; +❑ rooms shall be high efficacy luminaires (except closets less than 706): OR are controlled by a dimmer switch OR are 0 c ®� controlled by an occupant sensor that complies with Section 119(d) that,does not tum onautomatically or have an always .. onoption. .. kr §150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are ❑ ❑ .❑ >� certified airtight to ASTM E283 and labeled as air tight' AT to less than 2.0 CFM at 75 Pascals. §150(k)6: Luminairesproviding outdoor lighting and permanently mounted to a residential building or to otherbuildings on �< the same lot shall be high efficacy luminaires (not including lighting around swimming pools/water features or other ❑. , x�T Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section � 119(d)..P°`r�i?r.:m? R� §150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 930, 132, and 147. ❑ ❑ Lighting for parking jamges for 8 or more vehicles shall have lighting that corn lies with Sec. 130 131 and 146. X1.0„ § I50(k)8: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or 01 more dwelling units shall be high efficacy luminaires OR are controlled by occupant sensor(s) certified to comply,with ❑ ❑�❑ yr ' Section 119(d): Residential Compliance Forms December 2005