Loading...
HGA - Cost ProposalPROPOSAL PREPARED FOR CITY OF LA QUINTA | CULTURAL CAMPUS PROJECT NO. 2019-01 | PLANNING AND DESIGN SERVICES 2 | HGA 9 COST PROPOSAL Hammel, Green and Abrahamson Inc. (HGA) is pleased to submit this fee proposal for master planning and preliminary design services for the La Quinta Cultural Campus project, as described in RFP No. 2019-01. HGA’s understanding of the project scope and scope of services is described below, and in our response to the subject RFP. SCOPE OF SERVICES AND DESIGN DISCIPLINES The scope of services will be as described in the RFP response. The design disciplines include architectural/planning; civil engineer; landscape architect; arts specialist; museum exhibit specialist; tribal consultant; sustainability specialist; structural engineer; mechanical, plumbing and electrical engineer, AV/IT, lighting, and cost estimating. Additional specialty consultants can be provided upon request, but are not reflected in the fees listed herein. ASSUMPTIONS 1. All services shall be performed in accordance with the professional standard of care applicable to those who provide services of the type called for in the Agreement for projects of a scope and complexity comparable to the Project. Whenever a covenant or statement is made by Design Consultant in the Agreement or elsewhere concerning the services or deliverables to be provided by Design Consultant, such covenant or statement is made or agreed subject to the standard of care set forth in this paragraph. No express warranties concerning any matter or thing have been made by Design Consultant, and any implied warranties relating to services or work product of Architect are expressly disclaimed. 2. The owner shall provide the design team with all existing documentation including site surveys, site utility information, as-built site drawings, topographic maps, design standards, geotechnical evaluation reports, and all proposed or adopted development plans in the areas that will be addressed by this project. Survey work is excluded. 3. Geotechnical surveys are excluded. 4. Changes to the project scope requested by the owner that are contrary to previous steering committee/user group direction can be provided as an Additional Service to this scope. 5. Any consulting services other than the disciplines outlined above will be considered as additional services. 6. Presentation renderings, animations and presentation models in addition to those listed in this proposal will be considered additional. 7. CEQA-related services are not included. 8. Sustainable design measures will be explored; however, LEED services are excluded. | 3 PROPOSED SCHEDULE AND WORK PLAN The proposed duration for the Phase 1 and 2 efforts is as indicated in the RFP response, and will follow the scope of services and deliverables as described. HGA welcomes further conversations with the city of La Quinta to align our scope of services assumptions with your expectations to make sure we are meeting the project needs and priorities. FEE Compensation for the basic services fee is stipulated sum and will be invoiced monthly. Reimbursable Expenses are included in the fees listed herein. The total stipulated sum fee for the Phase 1 and 2 portions of the project is as follows: PHASE 1 – MASTER PLANNING $172,300 PHASE 2 – PRELIMINARY DESIGN $275,000 TOTAL $447,300 (Four Hundred Forty-Seven Thousand, Three Hundred Dollars) Should more detailed information be needed regarding the calculation of the design fees presented herein, that can be provided upon request. Hammel, Green and Abrahamson, Inc. is enthusiastic to start working with you on the project. If you have any questions about our proposal please feel free to give me a call. Sincerely, Kevin Donaghey AIA | DBIA | LEED BD+C Principal 4 | HGA MASTER PLANNING, PROGRAMMING, ARCHITECTURE & ENGINEERING Principal $185 - $460 Senior Project Manager $170 - $385 Project Manager $140 - $230 Senior Project Designer $165 - $230 Project Designer $105 - $175 Senior Project Architect $115 - $330 Project Architect $105 - $220 Architect $80 - $165 Intern $70 - $110 Senior Interior Designer $140 - $240 Interior Designer $90 - $185 Junior Interior Designer $ 75 - $120 Senior Project Engineer $145 - $310 Project Engineer $130 - $250 Engineer $110 - $205 Engineering Staff $75 - $125 Senior Lighting Designer $145 - $180 Lighting Designer $115 - $155 Senior Technology Systems Designer $145 - $225 Technology Systems Designer $120 - $165 Project Specifier $150 - $280 Specifications Technician $135 - $185 Cost Estimator $210 - $240 Design Insight Specialist $105 - $285 Sustainability Specialist $110 - $195 Visualization Specialist $120 - $190 Research Librarian $120 - $165 Administrative Assistant $70 - $165 HGA HOURLY RATES | 5 PAGE INTENTIONALLY LEFT BLANK 310.557.7600 HGA.COM 1301 Colorado Avenue Santa Monica, CA 90404