RIOS - Cost ProposalSubmitted December 1, 2021 to CIty of La Quinta Cost Proposal for La Quinta Cultural Campus La Quinta Cultural Campus RIOSLa Quinta Cultural Campus RIOS Hourly Rates RIOS Additional services when requested by Owner are typically invoiced monthly at our current hourly rates, unless otherwise negotiated. Professional fees for hourly services will be billed at current hourly rates. Hourly rates are subject to change and client will be notified 30 days in advance of any change. Staff Role Hourly Rate Creative Director $ 325 Studio Director $ 250 Senior Staff $ 250 Senior Project Director / Senior Project Designer $ 200 Project Director / Project Designer $ 180 Designer II $ 140 Designer I $ 125 Draftsperson / Intern $ 125 The Altum Group Staff Role Hourly Rate Principal $ 184 Director of Urban Design $ 163 Senior Planner $ 158 Assistant Planner $ 90 GIS Tech $ 90 Project Management / Admin $ 163 P2S Staff Role Hourly Rate Engineer Grade 03 $ 229 Engineer Grade 02 $ 211 Design Engineer Grade 05 $ 229 Design Engineer Grade 04 $ 211 Design Engineer Grade 02 $ 166 La Quinta Cultural Campus RIOS jLa Quinta Cultural Campus RIOS Holmes The table below reflects the hourly rates for structural engineering services. Hourly rates are subject to revision on the First Day of February and the First Day of August each year. The unearned portion of fixed fees is also subject to revision based upon revised salary scales every six months from the date of Contract Execution. Staff Role Hourly Rate Principal $ 260 - $ 300 Associate Principal $ 210 - $ 250 Senior Engineer $ 175 - $ 195 Project Engineer $ 145 - $ 165 Structural Designer $ 135 Senior Revit Specialist $ 155 Revit Specialist $ 135 - $ 145 Administration $ 85 AEA Consulting Travel time is charged at 50% of the above fees; for consulting work undertaken onsite that spans a weekend or public holiday, each weekend / holiday day is charged as 8 hours of travel time in addition to work hours incurred. Additional services when requested by Owner are typically invoiced monthly at our current hourly rates, unless otherwise negotiated. Professional fees for hourly services will be billed at current hourly rates. Hourly rates are subject to change and client will be notified 30 days in advance of any change. Staff Role Hourly Rate Director $ 400 Managing Principal $ 300 Principal $ 275 Senior Consultant $ 225 Consultant $ 180 Research Analyst $ 145 Administration $ 105Assumptions & Exclusions Please note that the following items are not included in our base scope of services: • Seismic evaluation and analysis of the existing structures, including quantitative analysis of existing buildings (Tier 1,2, or 3) • Structural design of new structures, detailed design or evaluation of seismic retrofit, additions, or alterations • Structural input during Phase 1 and Phase 3 • Special studies including wind tunnel testing, Geotechnical investigation and report and Material testing and destructive investigation • Preparation of demolition documentation (for existing buildings) • As-built structural documentation • Services necessary due to significant scope changes or design revisions • Services necessary due to significant schedule extensions The ONDA Group Staff Role Hourly Rate Archival Consultant Team $ 300 La Quinta Cultural Campus RIOSLa Quinta Cultural Campus RIOS Earth Systems Staff Role Hourly Rate Principal Professional $ 220 Associate Professional $ 195 Senior Professional $ 175 Project Professional $ 160 Staff Professional $ 130 Special Inspector, Prevailing Wage $ 120 Technician, Prevailing Wage $ 115 Special Services / Caltrans Technician, Prevailing Wage $ 118 Special Services Technician $ 112 Special Inspector $ 102 Technical Assistant and Drafter $ 96 Technician $ 98 Clerical / Administrative $ 80 eSquared Additional services when requested by Owner are typically invoiced monthly at our current hourly rates, unless otherwise negotiated. Professional fees for hourly services will be billed at current hourly rates. Hourly rates are subject to change and client will be notified 30 days in advance of any change. Staff Role Hourly Rate Principal $ 300 Senior Lighting Designer $ 150 Lighting Designer $ 90 - $ 140 Intern $ 50 Torres Martinez Desert Cahuilla Indians Cultural Committee Staff Role Fee Two (2) Tribal Consultants + One (1) Archaeologist $ 200 ARUP Our proposal assumes that all services herein will be selected. We reserve the right to revise our fees if we are retained to provide fewer than all services herein. Staff Role Hourly Rate Principal $ 395 Associate $ 240 Sr. Consultant $ 200 Consultant $ 140 Administrator $ 115 *Rates are reviewed April 1st of each year La Quinta Cultural Campus RIOS La Quinta Cultural Campus RIOS MGAC The fee assumes that drawings, specifications, and reports required for the performance of our work will be provided in hard-copy form and electronically, at no cost to MGAC. Should you require printed copies of probably construction cost, this fee assumes that we will provide a maximum of six copies of each report. Reimbursable expenses, including reprographics charges, travel beyond a 100-mile radius of our LA office and interstate-shipping charges will be charged at cost plus 10.00%. All other services, including additional cost reports, design stage cost reports, bid negotiation and construction phase services will be considered additional services. Unless otherwise agreed prior to the work being carried out, our fees for any additional services will be based on time expended at our normal billing rates prevailing at the time the work is carried out. Staff Role Hourly Rate Directors $ 350 Senior / Regional Vice Presidents $ 325 Vice Presidents $ 265 Senior Cost Managers $ 200 Cost Managers $ 125 Compensation The RIOS team is pleased to provide you with this fee proposal to provide Urban Design, Architecture, + Landscape Architecture design services for the La Quinta Cultural Campus project. Basic Services – Hourly Breakdown for Tasks RIOS - Urban Design, Architecture, + Landscape Architecture Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Creative Director $325.00 2 20 22 $7,150.00 Studio Director $250.00 20 100 120 $30,000.00 Senior Project Director / Senior Project Designer $200.00 60 200 260 $52,000.00 Project Director / Project Designer $180.00 80 300 380 $68,400.00 Designer II $140.00 160 500 660 $92,400.00 Subtotals 322 1120 1442 $249,950.00 The Altum Group - Planning & Urban Design Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $184.00 8 -8 $1,472.00 Director or Urban Design $163.00 15 8 23 $3,749.00 Senior Planner $158.00 25 -25 $3,950.00 Assistant Planner $90.00 80 8 88 $7,920.00 Project Manage- ment / Admin $163.00 12 20 32 $5,216.00 Project Manage- ment / Admin $163.00 12 20 32 $5,216.00 Subtotals 140 36 176 $22,307.00 La Quinta Cultural Campus RIOSLa Quinta Cultural Campus RIOS The Altum Group - Surveying Exhibit & Utility Research Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Chief Engineer $163.00 -18 18 $2,934.00 2 Man Field Survey Crew $225.00 -16 16 $3,600.00 Assistant Survey Manager $155.00 -17 17 $2,635.00 Aerial Topo Consultant $2,472.00 -1 1 $2,472.00 Director Surveying (R Bndy, Topo & Exhibit $163.00 -12 12 $1,956.00 Subtotals -64 64 $13,597.00 The Altum Group - Civil Engineering Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Chief Engineer $163.00 -76 76 $12,388.00 Assistant Designer $90.00 -205 205 $18,450.00 Subtotals -281 281 $30,838.00 The Altum Group - Public Outreach Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $163.00 4 4 8 $1,304.00 Chief Engineer $163.00 -8 8 $1,304.00 Director of Urban Design $163.00 8 8 16 $2,608.00 Senior Planner $158.00 4 4 8 $1,264.00 Assistant Planner $90.00 4 10 14 $1,260.00 Subtotals 20 34 54 $7,740.00 P2S - MEP Engineering & Security Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $329.00 4 12 16 $5,264.00 Project Manager $229.00 8 80 88 $20,152.00 Project Engineer $229.00 8 212 220 $50,380.00 CADD/Draftsman $130.00 -8 8 $1,040.00 Jr. CADD/ Draftsman $105.00 -24 24 $2,520.00 Administration $96.00 4 9 13 $1,248.00 Design Engineer $166.00 132 132 $21,912.00 Subtotals 24 477 501 $102,516.00 Holmes - Structural Engineering Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $260.00 -10 10 $2,600.00 Project Manager $175.00 -50 50 $8,750.00 Project Engineer $145.00 -80 80 $11,600.00 Subtotals -140 140 $22,950.00 AEA Consulting - Cultural Strategy Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $300.00 12 12 24 $7,200.00 Project Manager / Senior Consultant $225.00 12 12 24 $5,400.00 Consultant $180.00 12 12 24 $4,320.00 Research Analyst $145.00 25 25 50 $7,250.00 Administration $105.00 4 4 8 $840.00 Subtotals 65 65 130 $25,010.00 La Quinta Cultural Campus RIOSLa Quinta Cultural Campus RIOS The ONDA Group - Museum Consulting Waverly Lowell + Robin Chandler $300.00 25 40 65 $19,500.00 Subtotals 25 40 65 $19,500.00 Earth Systems - Geotechnical Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $220.00 -6 6 $1,320.00 Project Manager / Engineer $160.00 ---- Senior Engineer $175.00 -24 24 $4,200.00 Staff Engineer $130.00 ---- Jr. CADD Draftsman $96.00 -4 4 $384.00 Administration $80.00 -8 8 $640.00 Lab Technician $98.00 --19 $1,862.00 Subtotals -42 61 $8,406.00 MGAC - Cost Estimating Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Regional VP $325.00 -60 60 $19,500.00 Assistant Cost Manager $125.00 -40 40 $5,000.00 Subtotals -100 100 $24,500.00 ARUP - Digital Master Planning Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $395.00 ---- Associate $240.00 4 8 12 $2,880.00 Sr. Consultant $200.00 2 8 10 $2,000.00 Consultant $140.00 4 20 24 $3,360.00 Administration $115.00 2 8 10 $1,150.00 Subtotals 12 44 56 $9,390.00 ARUP - Sustainability Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $395.00 ---- Associate $240.00 4 12 16 $3,840.00 Sr. Consultant $200.00 2 8 10 $2,000.00 Consultant $140.00 4 26 30 $4,200.00 Administration $115.00 2 8 10 $1,150.00 Subtotals 12 54 66 $11,190.00 ARUP - Audiovisual Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $395.00 ---- Associate $240.00 -18 18 $4,320.00 Sr. Consultant $200.00 -24 24 $4,800.00 Consultant $140.00 -12 12 $1,680.00 Administration $115.00 -6 6 $690.00 Subtotals -60 60 $11,490.00 eSquared - Lighting Design Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Principal $300.00 8 18 26 $7,800.00 Project Manager / Designer $150.00 5 18 23 $3,450.00 Theatrical Designer $130.00 -4 4 $520.00 Designer $90.00 16 60 76 $6,840.00 Subtotals 29 100 129 $18,610.00 Torres Martinez Desert Cahuilla Indians Cultural Committee - Tribal Consultant Staff Hourly Rate Phase 1 – Planning Phase 2 – Preliminary Design Total Hours Total Tribal Consultant $200.00 8 20 28 $5,600.00 Archaeologist $200.00 2 20 22 $4,400.00 Subtotals 10 40 50 $10,000.00 Total Base Fee $587,994.00 La Quinta Cultural Campus RIOS tLa Quinta Cultural Campus RIOS Reimbursables Altum - Inhouse Prints $2,500.00 ONDA - Transportation, Lodging $2,775.00 Earth Systems - Drill Rig Subcontract $1,969.00 TOTAL $595,238.00 Left Palm Springs Downtown Park, Palm Springs, CA Right Grand Park, Los Angeles, CA RIOS.com 323. 785. 1800 3101 W. Exposition Place Los Angeles, CA 90018 2505 SE 11th Avenue, Suite 310 Portland, OR 97202 1980 8th Street Boulder, CO 80302