PM102018-0004CITY OF LA QL*rrA PEFUT NO.
TRACT 37359
EAST PROPERTY LINE.
F YOU SEE DUST COMING FROM
5.
STAGING AREA SEE SHT. NO, 2
ALL•
THIS PROJECT PLEASE CALL-
6.
WHEEL WASHING PROVISIONS TRACK OUT-, SEE DETAIL NO. 3 SHT. NO 2
949- 306- 2289
949-306-2289
HERE IS THE SUMMARIZED MATRIX OF REWIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE
7
F YOU DOWT BET A R6FOME WRIN ONE HOUR REAS CALL
A B C 0
THE crrr OF LA QWA RELIC TeorKs DFARIIBIT
PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS.)
8.
700.418-6916
X X X X SIGNS POSTED ON SIFEWITH TH 24 NR. PHONE NUMBERS) FOR DUST CONTROLLER
IEFORT THE Pl31111iff CA FROJWT NMDA AND THE FIIOIE ABOVE.
X X X X SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING AASONRY WALLS
OR CALL AN Q AL7rY MANAGE ff MTMT AM 1 -800 -MO -MM
O17 WIND BLOCK.
SAIF WATERING DAYS A WEEK ISYSTEM, NTN. 4 TIMES PER 14 HRS,
10.
96"
8'
MIN.
GROUND
TERM STABIL047ON TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT
PERIMETER SPRINKLER SYSTEM (ALL SIDES CONTINUOUS NIGHTRAGE WATERING WHEN WINDY)
DUST CONTROL SIGN DETAIL
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
LEVEL
A REVEGE)ATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM
NOT TO SCALE
LS IN PUC£ AT ALL FAMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
PROJECT INFORMATION
PROJECT NAME THE CENTRE
STREET ADDRESS: EAST SIDE OF ADAMS STREET, SOUTH OF AUTO CENTRE DRIVE
TRACT/PARCEL NUMBER. J7J59
TOTAL PROJECT ACREAGE.' 19.2 (DISTURBED AREA)
LOCATION OF WATER SOURCE AND FLOW RATE EXISTING FH, CRYO WATER (1500 GPM, MIN.)
LOCATION OF BACKUP SOURCE AND FLOW CVWD WATER ALOIN (1500 GPM, MIN)
MAX CUBIC YARDS OF EARTH MOVEMENT' 46,776 CY. MASS EXCAVATON
AMOUNT OF EXPORT.. O CY
DISPOSAL SITES N/A
ON SITE STORAGE PILES.. TBD BY CITY/CONTRACTOR (NOTE..- NO STOCKPILING WITHOUT CITY ENGINEER APPROVAL)
PRIA94RY SOIL TYPE SILTY SANDS & SANDY SILTS
CONTROL BUDGET.$80,000
OWNER REPRESENTATIVE INFORMATION
OWNERS REPRESENTA77VE NOME.• TORRY LOZANO
OWNERS REPRESENTATIVE ADDRESS 2 PARK PLAZA, SUITE 700
IRVINE, CA 92614
CONTACT PHONE NUMBER (24 HOURS): 949-JO6-2289
OWNER'S REPRESENTATIVE'S AQMD CERTIFICATION NUMBER- CV2021-010231-10251 (JUSTIN WORE)
OWNERS REPRESENTATIVE SON47URE AND DATE:
PHASING OF GRADING ACTIVITIES
THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED 4 TIMES PER
DAY BY EITHER SPRINKLERS OR WATER TRUCKS TYPICAL 2000 GALLON WATER TRUCKS CAN EFFECTIVELY WATER
ABOUT B ACRES PER HOUR. THEREFORE AN 8 HR. WORKDAY DIVIDED BY 4 WATER/NGS PER DAY TIMES 4 AC./HR.
= 8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN
SOME LOCATIONS UP TO 24 AC. PER TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECAL PERMISSION LARGER
PROJECTS MUST HAVE MORE TRUCKS MORE HOURS MORE SPRINKLERS OR LESS DISTURBED AREA AT ANY ONE
TIME AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED WITH CHEMICALS HYDROMULCH, OR
VEGEFATKJN BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING THE PHASING PATTERN BELOW SHALL BE
SHOWN IN THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES THROUGH A PROJECT MUSF BE
COUNTED /N ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER. IT IS BETTER TO TREAT THEM WITH AN
APPROVED -OIL" (LIKE ENVIROKLEEN) OR SIMILAR NON -CRUSTING DUST PALLAFW, TO SAVE WATER.
ASSUME 1 2000 GALLON WATER TRUCK CAN EFFECTIVELY WATER B ACRES PER DAY ON NON HM,H WIND DAYS
DURING HIGH WIND DAYS THE NUMBER OF TRUCKS MAY INCREASE DEPENDING ON THE SM A7ON.
THE UTILITY TRENCHING PHASE AND STREET" IMPROVEMENT PHASE WILL OBTAIN ITS OWN WATER TRUCK.
PHASE A CLEW AND GRUB 2,000 GAL 4,000 GAL
START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS WATER TRUCKS
7/1/21 7/30/21 19.2 0.0 19.2 0 2
PHASE B ROUGH GRADING 2,000 GAL 4,000 GAL
START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS WATER TRUCKS
8/1/21 9/30/21 19.2 0.0 0 0 2
PHASE C UTILITY TRENCHING AND STREET IMPROVEMENTS 2 000 DAL 4,000 GAL
START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS WATER )RUCKS
10/1/21 11/30/21 BIT 10.6 0 2 0
PHASE D BUILDING AND LANDSCAPING 1,000 CAL 4,000 GAL
START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS WATER TRUCKS
12/1/21 UNKNOWN 5.0 14.2 0 1 0
PHASE "A": ROUGH GRADING (SITE PREP. & MOBILIZATION) CONTINUED
4. IN/TIAL STAGING AREA. AS SHOWN ON SHEET 2
EQUIPMENT STORAGE AS SHOWN ON NET 2
TEMPORARY OFFICE Ab bHUWN LIN �LHUI .1
EMPLOYEE PARKING AS SHOWN ON SHEET 2
5. WHEEL WASHING PROVISIONS
6. SPEED RESTRAC77ON SIGN LOCATION: -Egum AT
7 NUMBER OF POSTED "DUST CONTROL SIGNS' TWO (2) SIGNS INSTALLED
(TYP. AT CONSMUC7ON ENTRANCE OFF FRONTING ROAD)
B. 07HER PRELIMINARY WORK:
TO REDUCE JOB -SITE TRACK -OUT, INSTALL "TRACKCLEAM OR SIMILAR TYPE RUMBLE STRIPS
BEFORE INM477NO ANY ONSITE ACTIVITY RELATED TO GRADING., SEE SWPPP
PHASE "B": ROUGH GRADING (MASS GRADING, PERIMETER WALLS)
2. GRADING/EXCAVATING DUST CONTROL METHOD., WATER WITH 4,000 GAL WATER TRUCKS, 2800 CY PER TRUCK
(TOTAL = 2) (MINIMUM 4 TIMES PER 24 HRS.). APPLY CONTINOUSLY.
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD. WATER MINIMUM OF 2 TIMES DAILY OR AS
NEEDED. MAY USE AN APPROVED ADMIT SOIL STABILIZER AS NECESSARY.
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHAINLINK AND SAND FENCING
AT PROJECT BOUNDARY.
5. INITIAL STAGING AREA' SEE SHT." NO. 2
6. WHEEL WASHING PROVISIONS TRACK OUT', SEE DETAIL NO. J, SHT NO. 2
7. WEEKEND DUST CONTROL MITIGATION: WATER WITH 4,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY
OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD.- WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT
TRAVELING SPEEDS TO 15 MPH. STOP WORK AND INCREASE WATERING AS NEEDED IF MINIMUM DUST CONTROL
WATERING IS FOUND TO BE INADEQUATE
9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: NO STOCK PILES ON SITE
10. WITHIN 10 DAYS OF CEASING ACTIVITY. AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG-
TERM STA61LIZ477ON TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTMT7ES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
A REVEGETA77ON THAT RESUL73 IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM
IS IN PUCE AT ALL TIMES; OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA,• OR
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA (CHEMICAL STABILIZERS STALL BE PROVIDED WITH GREEN COLORANTS)
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. HAUL ROUTE.-
EXPORT- HAUL ROUTE TBD BY DEVERLOPER/CONTRACTOR, WITH APPROVAL FROM C/TY.
2. SOIL STABILIZ477ON METHODS:
ACTIVE AREA WATER SCHEDULE.. (MIN. 4 TIMES PER 24 HRS)
TWO (2) 4,000 GAL WATER TRUCK 4 TIMES/24 HRS.
WEEKEND WATERING SCHEDULE: (MIN 4 TIMES PER 24 HRS. )
TWO (2) 4,000 GAL WATER TRUCKS 4 TIMES/24 HRS.
INACTIVE AREA STABILIZATION METHOD(S):
(ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL OR AS DESCRIBED HERE)
J. PERIMETER BLOCK WALL SCHEDULE WEST, NORTH AMC EAST WALLS TO BE BUILT AS SOON AS
SUFFICIENT GRADING HAS BEEN COMPLETED. THERE /S AN EXSMNG WALL ALONG THE SOUTH BORY.
4. OTHER -
A) INSTALL SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS
IMMEDIATELY UPON /NITL47/ON OF THIS PHASE OF GRADING.
B) TTA REDUCE "-SITE 7RACK-OUT, INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS
BEFORE INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING.
PHASE "C": FINISH GRADING (UTILITY & STREET CONST,)
I. HAULING PROCEDURES: SEE NOTES ON SHEET 2
1. GRADING/EXCAVATING DUST CONTROL METHOD' WATER WITH 2,000 GAL WATER TRUCK (TOTAL - 2).
3. INACTIVE DISTURBED AREA DUST CONTROL MITM 77ON METHOD: WATER MINIMUM OF 2 TIMES DAILY OR AS
NEEDED. MAY USE AN APPROVED ADMIT SOIL STABILIZER AS NECESSARY
4 PERIMETER DUST M/RG477ON METHOD AND ACCESS CONTROL: CN41NLINK AND SAND FENCING ON NORTH AND
THE CITY OF U OUINTA PUBLIC WORKS DEPARTMENT FOR RENEW THIS FEEDlACK" WILL EVENTUALLY
HELP THE CRY TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN
IN BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE 774E REPORT FORM THATS AVAILABLE FROM
THE CITY OR /N THE AFORES41D DOCUMENT.
FUGITIVE PM To DUST CONTROL PROGRAM DETAILS
EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON
ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REWIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT
OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS TEMPORARY
IRRIGATION LINES 7RUCK/WHEEL WASHERS TEMPORARY SAND FENCING, CONSTRUCTION PHASING, WORKER'S
PARKING AREAS GRAVELED ENMANCE/EXIT, AND OTHER THINGS AS NEEDED.
PHASE "A": CLEARING AND GRUBBING (SITE PREP. & MOBILIZATION)
SPECFIC PROCEDURES
1. PREMIER/NG METHODS: SPRINKLER ENTIRE SITE TO AT LEAST 12X MINIMUM MOISTURE CONTENT OR WITHIN
707 OPTIMUM /F THE OPTIMUM MOISTURE CONTENT IS LESS THAN 12X, TO OVEREXCAVAT/ON DEPTH.
VALUES 64SED ON ASTM TEST METHODS D2216 AND D1557.
2. GRADING/EXCAVATING OUST CONTROL METHOD: WATER WITH 4,000 GAL WATER TRUCKS (TOTAL - J).
J. OFFSITE WORK PERMISSION NEEDED: NA
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NUNK AND SAND FENCING AROUND
PERIMETER OF PROJECT WITH ACCESS GATES LOCATED AT WEST AND SOUTH SIDES OF PROJECT.
5. INITIAL STAGING AREA: SEE PUN
6. WHEEL WASHING PROVISIONS SEE PUN
7. WEEKEND DUST CONTROL MITIGATION: WAFER WITH 4,000 G4L WATER TRUCK MINIMUM OF 4 PASSES
PER DAY OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD. WATER MINIMUM OF 4 PASSES OR AS NEEDED.
RESTRICT TRAVELING SPEEDS TO 15 MPH MAXIMUM. LOCATIONS OF SPEED LIMIT SONS PER SHT. 2.
9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD. WATER WITH ZOOO GAL WATER TRUCKS (TOTAL = 1).
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING LONG-
TERM STABILLATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE HOT
SCHEDULED TO OCCUR FOR AT LEAST JO DAYS:
A REVEGETA77ON THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED TAT AN ACTIVE WATERING SYSTEM
IS IN PUCE AT ALL TIMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSM4L ACCESS RESTRAC77ON
SURROUNDING THE AREA: OR
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA.
SITE SPEOW DETAIL&•
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE): SEPINKI FR
WATER AVAILABILITY, INITIAL STAGE
YYM�1.
2. OFF-SIFE WORK PERMISSION NEEDED: NONE
3. ACCESS WILL BE CONTROLLED BY.•���T CONSTRUC7CE
3. STREET PAVING SCHEDULE.•
4. STAGING AREA MOVEMENT SCHEDULE
TBD BY DEVELOPER/CONTRACTOR
5. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTUR84NCE OF NEWLY GRADED BUILDING PADS
B) 70 REDUCE JOB -SITE TRACK -OUT, MAINTAIN "TRACKCLEAN' OR SIM/UR TYPE RUMBLE STRIPS
C) MAINTAIN TWO (2) 2,000 GALLON WATER TRUCKS WATERING AS NEEDED
PHASE "D": FINISH GRADING (BLDG. UTIL.. BLDG. CONST., LANDSCAPING)
SINE SPECK D C`
1. HAULING PROCEDURES SEE NOTES ON SHEET 1
2. DISTURBED AREA DUST CONTROL METHOD. (TOTAL 1 TRUCK REWIRED)
WATER WITH 2,000 GAL WATER TRUCK MIN/MUM OF 2 PASSES OR AS NEEDED.
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD- PERMANENTLY STABILIZED.
4. PERIMETER DUST MITARATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED,
5. STAGING AREA SEE SHT NO, 2
6. WHEEL WASH/NG PROVISIONS: "TRACK OUT-, SEE DETAIL NO. J, SHT. NO. 2
7. WEEKEND DUST CONTROL MITIGATION
WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY OR AS NEEDED.
& UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED.
9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITICA77ON METHOD: COMPLETED
10, WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LFAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST JO DAYS -
A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SMFEM
IS IN PUCE AT ALL TIMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA; OR
C USE OF CHEMICAL STABILIZERS 70 ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING 774E AREA (CHEMICAL STABILIZERS SHUT BE PROVIDED WITH GREEN COLORANTS)
SDE Sf>E7:F27 D "_L
(PLEASE DESCRIBE ANY SPECIFIC OR ADDMON4L CONTROL MEASURE PROPOSED.)
1. BUILDING PAD WATERING
HAND WATERING
2. FORMWORK AND TRENCH WATERING
HAND WATERING
3. PERIMETER LANDSCAPE SCHEDULE • (AS SOON AS POSSIBLE)
4. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS
B) TO REDUCE JOB -SITE C) MAINTAIN ONE (1J 2,000
TRACK -OUT, MAINTAIN GALLON WATER CKS
TRACKCLEAN" OR SIM/LAR WATERING AS NEEDED
TYPE RUMBLE STRIPS
IN THE CITY OF LA ®UINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA
TRACT NO. 37359, THE CENTRE
PERMIT NO.
FUGITIVE DUST (PM -10) MITIGATION PLAN
PARCELS 1 THROUGH 3, AND PARCEL A, OF PARCEL MAP NO. 37193,
IN THE CITY OF LA AUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA,
AS PER MAP FILED IN BOOK 243, PAGES 38 AND 39 OF PARCEL MAPS,
IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY.
PHASE "E•• FINISH GRADING (DRAINAGE SWALES AND SITE LANDSCAPING)
SPECEIC PROCFD/IES
1. HAULING PROCEDURES: SEE NOTES SHL NO. 2
2. DISTURBED AREA DUST CONTROL METHOD: WATER W77H 2,000 GAL WATER TRUCK MINIMUM OF 4 PASSES
OR AS NEEDED. (TOTAL 2 TRUCK REQUIRED)
J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD; PERMANENTLY STABILIZED.
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED.
5. STAGING AREA: SEE SHL NO. 2
6. WHEEL WASHING PROVISIONS REMOVED
7 WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MIN/MUM OF 4 PASSES PER DAY
OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIG4TION METHOD: ALL ROADWAYS PAVED.
9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: COMPLETED
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTM77ES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST JO DAYS
A REVEGETATTON THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE W47EWNG SYSTEM
6 /N PLACE AT ALL TIMES: OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE ARFA- OR
C USE OF CHEMICAL STABILIZERS 70 ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA
AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO THE CITY OF U WINTA TO PERMIT
THE ENTRY UPON THE SITE AT ALL TIMES AND UNDER THE FOLLOWING CIRCUMSTANCES
A IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST AIR
QUALITY AMN4GEMENT DISTRICT (SCAOMD) FOR A PARTICULAR DAY,
B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL SCAOMD STANDARDS REGISTERING 2 WIND
GUSTS IN EXCESS OF 25 MPH WITHIN CONSECUTIVE 30 MINUTE PERIODS OR
C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FROM ANY BOUNDARY LINE AND
D. THE CITY /S UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE GENERAL CONTRACTOR, OR
THE RESPONSIBLE DUST CONTROL PERSON AFTER M 60 MINUTE CONSECUTIVE PERIOD WHICH SHUT COMMENCE WITH
THE FIRST TELEPHONE CALL WHETHER ANSWERED OR NOT. THE CITY MAY THEN, WITHOUT PREJUDICE, INM47F ONE OR
ALL OF THE BELOW LISTED ACTIONS:
1. THE CITY MAY CAUSE THE CESSATION OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING,
CONSTRUCTION, D£MOL/TION OR VEHICULAR MOVEMENT AND MANEUVERING EXISTING FUGITIVE DUST MITOATION
MEASURES SHALL CONTINUE.
2. IN THE EVENT THAT AN ON-SITE IRRIG477ON SYSTEM /S NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL
CAUSE THE SITE TO BE WATERED. IN ANY CONTRACT BETWEEN THE GENERAL CONTRACTOR AND ANY
WATER -PROVIDING VENDOR, SUCH AS A WATERING TRUCK OPERATION OR IRRIGATION SYSTEM PROVIDER/OPERATOR,
THE CITY AND THE ENVIRONMENTAL OBSERVER SHALL BE NAMED AS AN AUTHORIZED AGENT FOR PERUPOSES OF
ORDERING OR GALLING -OUT WATER TRUCKS OR CAUSING AN IRRIGATION SYSTEM TO BE RADE OPERATION. SHOULD
THE GENERAL CONTRACTOR NOT HAVE SUCH A CONTRACT OR HAVE FAILED TO DESIGNATE THE CITY AND THE
RESPONSIBLE DUST CONTROL INDIVIDUAL AN AN AGENT OR NOT INFORMED THE CITY OF THE CONTRACTOR'S NAME
ADDRESS AND PHONE NUMBER, OR THE CITY 5 UNABLE TO CONTACT THE CONTRACTOR AFTER A REASONABLE EFFORT
ISMAADE TO DO SO, THE CITY SHALL AUTHORIZE ANY OTHER VENDOR AS IT'S AGENT FOR PURPOSED OF ENTRY UPON
THE SITE TO ATTEMPT 70 MITIGATE ANY P07ENTI4L DUST CONTROL PROBLEMS.
3. IN THE EVENT AN ON-SITE IRRIGATION SYSTEM IS INSTALLED, THE CITY WILL CAUSE THE IRRIG477ON SYSTEM TO
OPERATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY STEMS 70 ENSURE THE THE CITY HAS THE MEANS
TO ACCESSES THE SI7F AND THE VALVES OF THE IRRICA77ON SYSTEM, THAT lS THE KEYS TO ANY AND LLALOCKES
PROVIDED TO THE CITY ENGINEER BY THE END OF THE NET WORK DAY FOLLOWING THE INSTALLATION OF ANY SUCH
LOOK EACH KEY SHALL BE PLAINLY AND CLEARLY AARKED WITH THE PROTECT NAME AND CORRESPONDING LOCK
(MAIN CA7E. SO THE IRRIGATION SYSTEM, ETC.).
E. IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, THE INTENSITY, FREQUENCY OR DURATION OF FUG177VE
DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOND
THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR AGENT MAY IMMEDIATELY ENTER UPON THE SITE
OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT
LIMITED TO COMMENCING WATERING ON THE S17F OR ORDERING THE CESA77ON OF ANY EMISSION -GENERATING ACTIVITY
OCCURRING ON-SITE.
F. ANY OF THE ABOVE ACTIONS SHALL BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY WILL "BACK CHARGE
THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE CITY SHALL DEEM APPROPRATE
DESIGNED BY: BJB
i
"ITT 111
VICINITY MAP
NIS
DRAWN BY: BJB CHECKED BY: SCM
PREPARED UNDER THE DIRECTION OF:
/''/�[^ DATE: 7 21
E6TF J. N ^ P. DAT 12 1 2
AP ROVED BY:
�Aw1^,L� /FQ1I
KINNEY, P.E..E. DATEKINNEY, .E. DATE
PM -10 DUST
CONTROL SECURITY
PM -10 DUST CONTROL SECURITY IS $28,800
BOND WITH $9,600 GSH OR ALL CASH AT
$38,400.
(CLEARING AND GRUBING CONTRACTOR)
I HAVE READ THE COND/TIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF ALL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
MWE.
COMPANY NAME
TRADE.' CLEARING & GRUBBING
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
•_ r
Mmullm
(GRADING CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE HMPLEMENTA770N OF AL HTS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME.- NOT YET DETERMINED
COMPANY NAME.:
TRADE. GRADING
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
DATE. -
SIGNATURE.•
(WATER TRENCH CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PUN AND THE OWNER HIS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME.: NOT YET DETERMINED
COMPANY NAME
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER.•
IRD1910PROINDT SINAL£ AM
CALL TOLL
all
oDAYS
HAVE )
READ THE CONDITIONS
I OF THE FUGNA£
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMIN"ENTATON OF AL ITS
PROVISIONS 'THROUGHOUT PROJECT BUILDOUT.
NAME: NOT YET DETERMINED
COMPANY NAME.'
TRADE:
LICENSE CLASS
NO.:
CONTACT PHONE NUMBER -
DATE:
SIpAATURE:•
MAW.' NOT YET DETERMINED
COMPANY NAME.'
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER
DATE
SAGNATURE.•
(PAVING CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PRONSONS THROUGHOUT PROTECT BUILDOUT
NAME.• NOT YET DETERMINED
COMPANY NAME.•
LICENSE CLASS.
NO.:
CONTACT PHONE NUIBER'
DATE.- DATE..
SAGMTURE.• SIGNATURE
OWNERS CERTIFICATION �nrw�
TO INSURE IMPLEMENTATION OF THE DUST CONTROL U177CA7ON MEASURES A RMW14L SECURITY OF j2000/PRWECT
ACREAGE STALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERMIT ANY FINANCIAL SECUM77ES GOLLECFED UNDER THE
PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY OF U QUINTI FOR P07ENTAL USE IN MI71G11TNG SOURCES
OF FUGITIVE DUST NOT ADEQUATELY M/TNAFED BY THE PROPERTY OWNERS OR RESPONSIBLE DUST CONTROL PERSON. ALL
UNUSED SECURITY SHALL BE RETURNED 70 THE PROPERTY OWNER ONCE THE CITY HAS ACCEPTED THE FINAL IMPROVEMENT
AND ISSUED CERTIFICATES OF OCCUPANCY.
I CERTIFY 7H4T / HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND I Ar / AM RESPONSIBLE FOR THE
COMPIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN I UNDERSTAND THAT THE
DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY OF U AUINTA AAT' BE USED BY THE CITY, AND ADD/TONU
CHARGES, lF NEEDED, TO MITIGATE ANY VIS/BLE EM/SS/ONS OR FUG/THE DUST, lF / FAIL 70 KEEP THE DUST UNDER CONTROL.
I UNDERSTAND THAT DUST CONTRTOL /S REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS
SITE /S DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE
PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE' IS ACCEPTABLY RE -VEGETATED AND PAVED.
RESPONSIBILITY FRO THE DUST CONTROL ON THE SITE C4N NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A
PORTON OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, OR OWNERS. A REPLACEMENT PM -10 PUN AND OUST
CONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED POR77ON OF THE PROJECT.
I CERTIFY THAT / HAV£ READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN 5 TRUE AGO CORRECT. I
AGREE TO COMPLY WITH THE CITY FUGITIVE DUST ORDINANCE, AOMD RULE 40; 407.1 AND THE FAN4L COACHElU VALLEY SLP.
AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES LANDSCAPING, AND BUNDNG OPERATIONS. I AUTHORIZE
REPRESENTATIVES OF THE CITY OF U QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION AND/OR
A&47EMENr PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY OF U QUANTA AND ITS REPRESENTATIVES FROM LABILITY
FOR ANY ACTIONS RELATED TO THIS PERMIT
OWNER'S REPRESENTATIVE NAME.' TORRY LOZANO
OWNER'S ADDRESS 2 PARK PLACE SUITE 700
IRVINE G 92614
CONTACT NUMBER (24 HOURS): (949) 417-1396
DATE.? L�
RESPONSIBLE DUST CONTROL PERSON
I CERTIFY THAT / HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT / AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS N07ED OR REFERENCED HEREIN. AS THE AUTHORIZED
RESPONSIBLE PERSON FOR THIS PROJECT / WILL LIST MY PHONE NUMBER ON THE REWIRED SITE SONS, AND / WILL
N / THE 1 HOUR LIMIT. I UNDERSTAND THAT DUST CONTROL /S REQUIRED 24 HOURS PER
RESPOND TO DUST EK, FROM
TS HE DA M
DAY I DAYS PER WEEK, FROM THE DATE THAT THE PROJECT is FIRST DISTURBED IN ANY WAY FROM THE ED AND VEGETATED
CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE
PROTECT /S ACCEPTABLY RE -VEGETATED AND PAVED. l ALSO CERTIFY TEAT /HAVE ATTENDED AN AOMD SE7INNAR ON
FUGITIVE DUST CONTROL.
NAME.. JUSTIN MOORE
COMPANY NAME VERTICAL INTEGRITY
ADDRESS 1968 S. COAST HIGHWAY, SUITE 522
LAGUN4 BEACH, CA 92651
CONTACT PHONE NUMBER: 949-306-2289
AQMD H ON NUMBER. CV2101-010231-10251
DATE.'--i�
P ECT DATA (SEE ATTACHED PLAN ALSO)
1147E• Nov.. 2020 PROJECTNAME., THE CENTRE STREET ADDRESS / SITE LOC477ON: E457 SIDE OF ROWS -
SI OF
AUTO CENTRE DRIVE
ADJOINING PROPERTY INFO. (FOR SENSITIVITY TYP. WINDS BLOW N.If
SOUTHERLY RFSIn W AI
SOUTHWESTERLY
WESTERLY
NORTHWESTERLY RESIDENTIAL
NORTHERLY VACANT CDMMERCLIL AUTO DEAIERS'
NORTHEASTERLY COMMERCAL (WENDYS)
CURRENT LAND USAGE.' VACANT
PROPOSED LAND USAGE.- RESIDENTIAL
Lor I (ODI'lDO's) TRACT: 37359 PERMIT NO.:
A.P.N. 600-340-048 PARCEL SIZE.I9.L-ACRES(DISTURBED AREA)
WATER AVAILABILITY, INITIAL STAGE EXISTING CVWD FI
41865 Boardwalk
. MORSE Suits 218
Palm Desert, CA 92211
S C H U L T Z Voice: 760-674-5776
PLANNERS ENGINEERS SURVEYORS
SCALE: SEE ABOVE BENCH MARK: OIY OFO OUMTA N0. OBD BEV. 94.781 WAVOB7)
Jr NGS BASS DISK W LARGE ROCK, STARED "Y1467, DOWN 0.1', LOCATED
DATE: JUNE, 2021 ABOUT 22.5' SOUTHERLY OF THE SOUTH CURB FACE OF HIGHBOY 111, ACROSS
FROM THE DIFF HOUSE ENIRNICE.
,
WDID / 7 33C392041 A
IN THE CRY OF LA QUINTI, STATE OF CALIFORNIA
THE CENTRE
y+TTR�/A�CT NO. 3773559���yyy'yy���' SHT. 1 v
rCONTROLL�A/p OF � SHTS
A PORTION OF THE SW 1/4THESSWW 1/4, OF SECTION 29VT.5S�,,R�7EE,,JS.B.M.
FOR: THE CENTRE ON ADAMS, N,2W.O. No: d
w
EAST PROPERTY LINE.
FUGITIVE PM10 DUST CONTROL MEASURES
5.
STAGING AREA SEE SHT. NO, 2
6.
WHEEL WASHING PROVISIONS TRACK OUT-, SEE DETAIL NO. 3 SHT. NO 2
HERE IS THE SUMMARIZED MATRIX OF REWIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE
7
WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MIN/MUM OF 2 PASSES PER
A B C 0
DAY OR AS NEEDED.
PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS.)
8.
UNPAVEDROAD� METHOD.- WATER MINIMUM OF 4 PASSES OR AS NEEDED.
OL MITIGIEEDS
DTRAVELDUING
X X X X SIGNS POSTED ON SIFEWITH TH 24 NR. PHONE NUMBERS) FOR DUST CONTROLLER
SPCONT
70 15
RESTRICT9. STORAGE STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: ONE 2,000 GAL WATER TRUCK
X X X X SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING AASONRY WALLS
MINIMUM 4 TIMES PER 24 NRS.
O17 WIND BLOCK.
SAIF WATERING DAYS A WEEK ISYSTEM, NTN. 4 TIMES PER 14 HRS,
10.
WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG -
X X X X
OR BY WATER TRUCKS MIN.. 4 DIESS PER 24 HRS, 1 TRUCK ER 8 ACRES)
4 77
TERM STABIL047ON TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT
PERIMETER SPRINKLER SYSTEM (ALL SIDES CONTINUOUS NIGHTRAGE WATERING WHEN WINDY)
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
GROVEL (AKN. 1.5" DAM. X DEEP AT OFF-STREET STORAGE AND PARIIPO AREAS)
A REVEGE)ATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM
EXITS.
X X X X WHEEL LEANINGS (RUCK TAI("RUMBLE STRIPS", DRIVE-THROUGH PONDS
GRAVEL AREAS EA DETAIL METHOD ON REFERENCE MAP AT AT
LS IN PUC£ AT ALL FAMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA; OR
IL. OR
INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROA/ULCH, APPROVED OIL. OR PLANTS)
ACTIVE AREA SOIL STABILIZERS (E "OILS 0R SIMILARWND WETTING AGENTS)
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
T WATERTROKLEEN
STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > ?5 MPH
SURROUNDING THE AREA. CHEMICAL STABILIZERS SHALL BE PROVIDED WITH GREEN COLORANTS
( )
STREET SWEEPING WHENEVER NEEDED
SITE
SPECIFIC
PERMANENT VEGETATION / LANDSCAPING
BLOCK WALLS
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.
ROAD PAVING
1.
TRENCH STOCKPILE TREATMENT:
NOTE: THESE CONTROL METHODS ARE DISCUSSED /N DETAIL IN THE "DUST CONTROL PLAN RENEW
WATER AS NECESSARY
GUIDANCE FOR LOCAL GOVERNMENT' FROM THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT,
(SCA.O.M.0). AND AVAILABLE FROM THE C17Y OF U QUANTA PUBLIC WORKS/ENGINEERING DEPARTMENT.
2.
INACTIVE AREA TREATMENT
PROJECT RECORDKEEPING/REPORT.' RECORD ALL ACTMTIES CONTRACTS AND MATERIALS PURCHASES
(ACRYLIC POLYMER HYGROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE)
ASSOCIATED WITH BLOWSAND/FUGITIVE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO
TBD BY DEVELOPER/CONTRACTOR
THE CITY OF U OUINTA PUBLIC WORKS DEPARTMENT FOR RENEW THIS FEEDlACK" WILL EVENTUALLY
HELP THE CRY TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN
IN BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE 774E REPORT FORM THATS AVAILABLE FROM
THE CITY OR /N THE AFORES41D DOCUMENT.
FUGITIVE PM To DUST CONTROL PROGRAM DETAILS
EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON
ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REWIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT
OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS TEMPORARY
IRRIGATION LINES 7RUCK/WHEEL WASHERS TEMPORARY SAND FENCING, CONSTRUCTION PHASING, WORKER'S
PARKING AREAS GRAVELED ENMANCE/EXIT, AND OTHER THINGS AS NEEDED.
PHASE "A": CLEARING AND GRUBBING (SITE PREP. & MOBILIZATION)
SPECFIC PROCEDURES
1. PREMIER/NG METHODS: SPRINKLER ENTIRE SITE TO AT LEAST 12X MINIMUM MOISTURE CONTENT OR WITHIN
707 OPTIMUM /F THE OPTIMUM MOISTURE CONTENT IS LESS THAN 12X, TO OVEREXCAVAT/ON DEPTH.
VALUES 64SED ON ASTM TEST METHODS D2216 AND D1557.
2. GRADING/EXCAVATING OUST CONTROL METHOD: WATER WITH 4,000 GAL WATER TRUCKS (TOTAL - J).
J. OFFSITE WORK PERMISSION NEEDED: NA
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NUNK AND SAND FENCING AROUND
PERIMETER OF PROJECT WITH ACCESS GATES LOCATED AT WEST AND SOUTH SIDES OF PROJECT.
5. INITIAL STAGING AREA: SEE PUN
6. WHEEL WASHING PROVISIONS SEE PUN
7. WEEKEND DUST CONTROL MITIGATION: WAFER WITH 4,000 G4L WATER TRUCK MINIMUM OF 4 PASSES
PER DAY OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD. WATER MINIMUM OF 4 PASSES OR AS NEEDED.
RESTRICT TRAVELING SPEEDS TO 15 MPH MAXIMUM. LOCATIONS OF SPEED LIMIT SONS PER SHT. 2.
9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD. WATER WITH ZOOO GAL WATER TRUCKS (TOTAL = 1).
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING LONG-
TERM STABILLATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE HOT
SCHEDULED TO OCCUR FOR AT LEAST JO DAYS:
A REVEGETA77ON THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED TAT AN ACTIVE WATERING SYSTEM
IS IN PUCE AT ALL TIMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSM4L ACCESS RESTRAC77ON
SURROUNDING THE AREA: OR
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA.
SITE SPEOW DETAIL&•
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE): SEPINKI FR
WATER AVAILABILITY, INITIAL STAGE
YYM�1.
2. OFF-SIFE WORK PERMISSION NEEDED: NONE
3. ACCESS WILL BE CONTROLLED BY.•���T CONSTRUC7CE
3. STREET PAVING SCHEDULE.•
4. STAGING AREA MOVEMENT SCHEDULE
TBD BY DEVELOPER/CONTRACTOR
5. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTUR84NCE OF NEWLY GRADED BUILDING PADS
B) 70 REDUCE JOB -SITE TRACK -OUT, MAINTAIN "TRACKCLEAN' OR SIM/UR TYPE RUMBLE STRIPS
C) MAINTAIN TWO (2) 2,000 GALLON WATER TRUCKS WATERING AS NEEDED
PHASE "D": FINISH GRADING (BLDG. UTIL.. BLDG. CONST., LANDSCAPING)
SINE SPECK D C`
1. HAULING PROCEDURES SEE NOTES ON SHEET 1
2. DISTURBED AREA DUST CONTROL METHOD. (TOTAL 1 TRUCK REWIRED)
WATER WITH 2,000 GAL WATER TRUCK MIN/MUM OF 2 PASSES OR AS NEEDED.
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD- PERMANENTLY STABILIZED.
4. PERIMETER DUST MITARATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED,
5. STAGING AREA SEE SHT NO, 2
6. WHEEL WASH/NG PROVISIONS: "TRACK OUT-, SEE DETAIL NO. J, SHT. NO. 2
7. WEEKEND DUST CONTROL MITIGATION
WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY OR AS NEEDED.
& UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED.
9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITICA77ON METHOD: COMPLETED
10, WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LFAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST JO DAYS -
A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SMFEM
IS IN PUCE AT ALL TIMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA; OR
C USE OF CHEMICAL STABILIZERS 70 ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING 774E AREA (CHEMICAL STABILIZERS SHUT BE PROVIDED WITH GREEN COLORANTS)
SDE Sf>E7:F27 D "_L
(PLEASE DESCRIBE ANY SPECIFIC OR ADDMON4L CONTROL MEASURE PROPOSED.)
1. BUILDING PAD WATERING
HAND WATERING
2. FORMWORK AND TRENCH WATERING
HAND WATERING
3. PERIMETER LANDSCAPE SCHEDULE • (AS SOON AS POSSIBLE)
4. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS
B) TO REDUCE JOB -SITE C) MAINTAIN ONE (1J 2,000
TRACK -OUT, MAINTAIN GALLON WATER CKS
TRACKCLEAN" OR SIM/LAR WATERING AS NEEDED
TYPE RUMBLE STRIPS
IN THE CITY OF LA ®UINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA
TRACT NO. 37359, THE CENTRE
PERMIT NO.
FUGITIVE DUST (PM -10) MITIGATION PLAN
PARCELS 1 THROUGH 3, AND PARCEL A, OF PARCEL MAP NO. 37193,
IN THE CITY OF LA AUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA,
AS PER MAP FILED IN BOOK 243, PAGES 38 AND 39 OF PARCEL MAPS,
IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY.
PHASE "E•• FINISH GRADING (DRAINAGE SWALES AND SITE LANDSCAPING)
SPECEIC PROCFD/IES
1. HAULING PROCEDURES: SEE NOTES SHL NO. 2
2. DISTURBED AREA DUST CONTROL METHOD: WATER W77H 2,000 GAL WATER TRUCK MINIMUM OF 4 PASSES
OR AS NEEDED. (TOTAL 2 TRUCK REQUIRED)
J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD; PERMANENTLY STABILIZED.
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED.
5. STAGING AREA: SEE SHL NO. 2
6. WHEEL WASHING PROVISIONS REMOVED
7 WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MIN/MUM OF 4 PASSES PER DAY
OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIG4TION METHOD: ALL ROADWAYS PAVED.
9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: COMPLETED
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTM77ES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST JO DAYS
A REVEGETATTON THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE W47EWNG SYSTEM
6 /N PLACE AT ALL TIMES: OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE ARFA- OR
C USE OF CHEMICAL STABILIZERS 70 ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA
AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO THE CITY OF U WINTA TO PERMIT
THE ENTRY UPON THE SITE AT ALL TIMES AND UNDER THE FOLLOWING CIRCUMSTANCES
A IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST AIR
QUALITY AMN4GEMENT DISTRICT (SCAOMD) FOR A PARTICULAR DAY,
B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL SCAOMD STANDARDS REGISTERING 2 WIND
GUSTS IN EXCESS OF 25 MPH WITHIN CONSECUTIVE 30 MINUTE PERIODS OR
C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FROM ANY BOUNDARY LINE AND
D. THE CITY /S UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE GENERAL CONTRACTOR, OR
THE RESPONSIBLE DUST CONTROL PERSON AFTER M 60 MINUTE CONSECUTIVE PERIOD WHICH SHUT COMMENCE WITH
THE FIRST TELEPHONE CALL WHETHER ANSWERED OR NOT. THE CITY MAY THEN, WITHOUT PREJUDICE, INM47F ONE OR
ALL OF THE BELOW LISTED ACTIONS:
1. THE CITY MAY CAUSE THE CESSATION OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING,
CONSTRUCTION, D£MOL/TION OR VEHICULAR MOVEMENT AND MANEUVERING EXISTING FUGITIVE DUST MITOATION
MEASURES SHALL CONTINUE.
2. IN THE EVENT THAT AN ON-SITE IRRIG477ON SYSTEM /S NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL
CAUSE THE SITE TO BE WATERED. IN ANY CONTRACT BETWEEN THE GENERAL CONTRACTOR AND ANY
WATER -PROVIDING VENDOR, SUCH AS A WATERING TRUCK OPERATION OR IRRIGATION SYSTEM PROVIDER/OPERATOR,
THE CITY AND THE ENVIRONMENTAL OBSERVER SHALL BE NAMED AS AN AUTHORIZED AGENT FOR PERUPOSES OF
ORDERING OR GALLING -OUT WATER TRUCKS OR CAUSING AN IRRIGATION SYSTEM TO BE RADE OPERATION. SHOULD
THE GENERAL CONTRACTOR NOT HAVE SUCH A CONTRACT OR HAVE FAILED TO DESIGNATE THE CITY AND THE
RESPONSIBLE DUST CONTROL INDIVIDUAL AN AN AGENT OR NOT INFORMED THE CITY OF THE CONTRACTOR'S NAME
ADDRESS AND PHONE NUMBER, OR THE CITY 5 UNABLE TO CONTACT THE CONTRACTOR AFTER A REASONABLE EFFORT
ISMAADE TO DO SO, THE CITY SHALL AUTHORIZE ANY OTHER VENDOR AS IT'S AGENT FOR PURPOSED OF ENTRY UPON
THE SITE TO ATTEMPT 70 MITIGATE ANY P07ENTI4L DUST CONTROL PROBLEMS.
3. IN THE EVENT AN ON-SITE IRRIGATION SYSTEM IS INSTALLED, THE CITY WILL CAUSE THE IRRIG477ON SYSTEM TO
OPERATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY STEMS 70 ENSURE THE THE CITY HAS THE MEANS
TO ACCESSES THE SI7F AND THE VALVES OF THE IRRICA77ON SYSTEM, THAT lS THE KEYS TO ANY AND LLALOCKES
PROVIDED TO THE CITY ENGINEER BY THE END OF THE NET WORK DAY FOLLOWING THE INSTALLATION OF ANY SUCH
LOOK EACH KEY SHALL BE PLAINLY AND CLEARLY AARKED WITH THE PROTECT NAME AND CORRESPONDING LOCK
(MAIN CA7E. SO THE IRRIGATION SYSTEM, ETC.).
E. IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, THE INTENSITY, FREQUENCY OR DURATION OF FUG177VE
DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOND
THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR AGENT MAY IMMEDIATELY ENTER UPON THE SITE
OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT
LIMITED TO COMMENCING WATERING ON THE S17F OR ORDERING THE CESA77ON OF ANY EMISSION -GENERATING ACTIVITY
OCCURRING ON-SITE.
F. ANY OF THE ABOVE ACTIONS SHALL BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY WILL "BACK CHARGE
THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE CITY SHALL DEEM APPROPRATE
DESIGNED BY: BJB
i
"ITT 111
VICINITY MAP
NIS
DRAWN BY: BJB CHECKED BY: SCM
PREPARED UNDER THE DIRECTION OF:
/''/�[^ DATE: 7 21
E6TF J. N ^ P. DAT 12 1 2
AP ROVED BY:
�Aw1^,L� /FQ1I
KINNEY, P.E..E. DATEKINNEY, .E. DATE
PM -10 DUST
CONTROL SECURITY
PM -10 DUST CONTROL SECURITY IS $28,800
BOND WITH $9,600 GSH OR ALL CASH AT
$38,400.
(CLEARING AND GRUBING CONTRACTOR)
I HAVE READ THE COND/TIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF ALL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
MWE.
COMPANY NAME
TRADE.' CLEARING & GRUBBING
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
•_ r
Mmullm
(GRADING CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE HMPLEMENTA770N OF AL HTS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME.- NOT YET DETERMINED
COMPANY NAME.:
TRADE. GRADING
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
DATE. -
SIGNATURE.•
(WATER TRENCH CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PUN AND THE OWNER HIS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME.: NOT YET DETERMINED
COMPANY NAME
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER.•
IRD1910PROINDT SINAL£ AM
CALL TOLL
all
oDAYS
HAVE )
READ THE CONDITIONS
I OF THE FUGNA£
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMIN"ENTATON OF AL ITS
PROVISIONS 'THROUGHOUT PROJECT BUILDOUT.
NAME: NOT YET DETERMINED
COMPANY NAME.'
TRADE:
LICENSE CLASS
NO.:
CONTACT PHONE NUMBER -
DATE:
SIpAATURE:•
MAW.' NOT YET DETERMINED
COMPANY NAME.'
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER
DATE
SAGNATURE.•
(PAVING CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PRONSONS THROUGHOUT PROTECT BUILDOUT
NAME.• NOT YET DETERMINED
COMPANY NAME.•
LICENSE CLASS.
NO.:
CONTACT PHONE NUIBER'
DATE.- DATE..
SAGMTURE.• SIGNATURE
OWNERS CERTIFICATION �nrw�
TO INSURE IMPLEMENTATION OF THE DUST CONTROL U177CA7ON MEASURES A RMW14L SECURITY OF j2000/PRWECT
ACREAGE STALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERMIT ANY FINANCIAL SECUM77ES GOLLECFED UNDER THE
PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY OF U QUINTI FOR P07ENTAL USE IN MI71G11TNG SOURCES
OF FUGITIVE DUST NOT ADEQUATELY M/TNAFED BY THE PROPERTY OWNERS OR RESPONSIBLE DUST CONTROL PERSON. ALL
UNUSED SECURITY SHALL BE RETURNED 70 THE PROPERTY OWNER ONCE THE CITY HAS ACCEPTED THE FINAL IMPROVEMENT
AND ISSUED CERTIFICATES OF OCCUPANCY.
I CERTIFY 7H4T / HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND I Ar / AM RESPONSIBLE FOR THE
COMPIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN I UNDERSTAND THAT THE
DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY OF U AUINTA AAT' BE USED BY THE CITY, AND ADD/TONU
CHARGES, lF NEEDED, TO MITIGATE ANY VIS/BLE EM/SS/ONS OR FUG/THE DUST, lF / FAIL 70 KEEP THE DUST UNDER CONTROL.
I UNDERSTAND THAT DUST CONTRTOL /S REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS
SITE /S DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE
PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE' IS ACCEPTABLY RE -VEGETATED AND PAVED.
RESPONSIBILITY FRO THE DUST CONTROL ON THE SITE C4N NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A
PORTON OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, OR OWNERS. A REPLACEMENT PM -10 PUN AND OUST
CONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED POR77ON OF THE PROJECT.
I CERTIFY THAT / HAV£ READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN 5 TRUE AGO CORRECT. I
AGREE TO COMPLY WITH THE CITY FUGITIVE DUST ORDINANCE, AOMD RULE 40; 407.1 AND THE FAN4L COACHElU VALLEY SLP.
AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES LANDSCAPING, AND BUNDNG OPERATIONS. I AUTHORIZE
REPRESENTATIVES OF THE CITY OF U QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION AND/OR
A&47EMENr PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY OF U QUANTA AND ITS REPRESENTATIVES FROM LABILITY
FOR ANY ACTIONS RELATED TO THIS PERMIT
OWNER'S REPRESENTATIVE NAME.' TORRY LOZANO
OWNER'S ADDRESS 2 PARK PLACE SUITE 700
IRVINE G 92614
CONTACT NUMBER (24 HOURS): (949) 417-1396
DATE.? L�
RESPONSIBLE DUST CONTROL PERSON
I CERTIFY THAT / HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT / AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS N07ED OR REFERENCED HEREIN. AS THE AUTHORIZED
RESPONSIBLE PERSON FOR THIS PROJECT / WILL LIST MY PHONE NUMBER ON THE REWIRED SITE SONS, AND / WILL
N / THE 1 HOUR LIMIT. I UNDERSTAND THAT DUST CONTROL /S REQUIRED 24 HOURS PER
RESPOND TO DUST EK, FROM
TS HE DA M
DAY I DAYS PER WEEK, FROM THE DATE THAT THE PROJECT is FIRST DISTURBED IN ANY WAY FROM THE ED AND VEGETATED
CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE
PROTECT /S ACCEPTABLY RE -VEGETATED AND PAVED. l ALSO CERTIFY TEAT /HAVE ATTENDED AN AOMD SE7INNAR ON
FUGITIVE DUST CONTROL.
NAME.. JUSTIN MOORE
COMPANY NAME VERTICAL INTEGRITY
ADDRESS 1968 S. COAST HIGHWAY, SUITE 522
LAGUN4 BEACH, CA 92651
CONTACT PHONE NUMBER: 949-306-2289
AQMD H ON NUMBER. CV2101-010231-10251
DATE.'--i�
P ECT DATA (SEE ATTACHED PLAN ALSO)
1147E• Nov.. 2020 PROJECTNAME., THE CENTRE STREET ADDRESS / SITE LOC477ON: E457 SIDE OF ROWS -
SI OF
AUTO CENTRE DRIVE
ADJOINING PROPERTY INFO. (FOR SENSITIVITY TYP. WINDS BLOW N.If
SOUTHERLY RFSIn W AI
SOUTHWESTERLY
WESTERLY
NORTHWESTERLY RESIDENTIAL
NORTHERLY VACANT CDMMERCLIL AUTO DEAIERS'
NORTHEASTERLY COMMERCAL (WENDYS)
CURRENT LAND USAGE.' VACANT
PROPOSED LAND USAGE.- RESIDENTIAL
Lor I (ODI'lDO's) TRACT: 37359 PERMIT NO.:
A.P.N. 600-340-048 PARCEL SIZE.I9.L-ACRES(DISTURBED AREA)
WATER AVAILABILITY, INITIAL STAGE EXISTING CVWD FI
41865 Boardwalk
. MORSE Suits 218
Palm Desert, CA 92211
S C H U L T Z Voice: 760-674-5776
PLANNERS ENGINEERS SURVEYORS
SCALE: SEE ABOVE BENCH MARK: OIY OFO OUMTA N0. OBD BEV. 94.781 WAVOB7)
Jr NGS BASS DISK W LARGE ROCK, STARED "Y1467, DOWN 0.1', LOCATED
DATE: JUNE, 2021 ABOUT 22.5' SOUTHERLY OF THE SOUTH CURB FACE OF HIGHBOY 111, ACROSS
FROM THE DIFF HOUSE ENIRNICE.
,
WDID / 7 33C392041 A
IN THE CRY OF LA QUINTI, STATE OF CALIFORNIA
THE CENTRE
y+TTR�/A�CT NO. 3773559���yyy'yy���' SHT. 1 v
rCONTROLL�A/p OF � SHTS
A PORTION OF THE SW 1/4THESSWW 1/4, OF SECTION 29VT.5S�,,R�7EE,,JS.B.M.
FOR: THE CENTRE ON ADAMS, N,2W.O. No: d
w
FUGITIVE DUST CONTROL NOTES
1. WHEN LOCAL WIND EXCEED 25 MPH, THE FOLLOWING (BUY NOT LIMITED TOO) SHALL BE DONE
A ALL GRADING ACIMIIES SHALL BE SIISPEINDED EXCEPT WATER TRW USED TO CONTROL FUGITIVE DUST.
2. THE RESPONSIBLE DUST CONTROL PERSON SHALL MAINTAIN A LIST OF CITY APPROVED RESPONSIBLE DUST CONTROL
PERSONS AUMORIZED M IM OMTELY CORRECT FUGITIVE DUST (RULE 403, 403.1, AND C.V. SIP) AND NUISANCE
(RULE02) VICIARLIL
ONS. THIS ST SHOAALSO CONTAIN ADDITIONAL MOMENT (WATER TRUCKS) OPERATORS
IB
3. PM -10 FENCING SHALL BE 6' CH INLNK FENCE WITH WMDSCREEN POSTS HALL BE 2-1/,f DA • 8' O.C. WITH
1-5/B' TOP RAIL POSTS SHOULD BE EMBEDDED 3' INTO NATIVE SOL. WHOSCREEN SHOULD BE PLACED ON WEST OR
NORTH SIDE OF FENCE. WINDSCREEN SHOULD BE ATTACHED TO FENCE WITH METAL GROMMETS • 2FT O.C. TOP AND
BT1M. PLACE GROMMETS • 2FT O.C. VERTICALLY AT EVERY POST.
4. DUST MIIIGATKN MEASURES (VEHICLES, TOWERS, LOADING MEA, FENCING, ... ETC) SHALL BE IN PLACE PRIOR TO
THE RECONSTRUCTION MEETING OR WILIENG OF GRADING PERMIT. (MEETING GOVERNS)
5. THE FOLLOWING SOL STARVATION PRODUCTS ARE POSSIBLE OPTIONS FOR SOIL STARVATION BUT MUST DE
APPLIED EVERT' 6 MONTHS AND NO FOOT OR VOW" TRAFFIC IS ALLOWED:
A SOL-SEMENT (ACTOUC POLYMER EMULSION) 180 GALLONS OF CONCENTRATE PER ACRE 9:1 (WATER CEMENT)
B. ENYIROTAC N 10:1 RATIO
C. FIBER-SORB1 1-1/7 LAYER (100 TONS PER ACRE) SOME VEHICULAR TRAFFIC ALLOWED
D. COMPOSITE 300 GAL OF ENVIKIIEC + 600 LBS PAPER FIBER MULCH + 8 PARTS WATER
MATERIAL CERAS REQUIRED.
6. DURING SOIL WOR1/E70'•ORT ACTIVITIES THE FOLLOWING SHALL BE ACCOMPLISHED
A A VALID GRADING PEWIT SHALL BE ACTIVE AT BOTH THE IMPORT AND EXPORT SITE
B. PREM015TFHED AT THE IMPORT AND EXPORT SITES PRIOR TO LOADING TRANSPORTS
C. PRDAOISTENED SOIL PRIOR TO COVER IN THE LOADING TRNNSPORIS TO NEM 70
CONTENT.
D. ALL TRUCKS SHALL BE COVERED AND HAVE A MINIMUM OF 6" OF FREEBOARD PRIOR TO HAULING,
E STREET CLEANING SHALL OCCUR, AS NECESSARY, AT IMPORT AND EXPORT LOCATION.
7. TRAINING FOR AQMD CERTIFICATION CM BE ACCOMPLISHED BY CALLING SHARON ZAMORA • 909-31NI-2183
8. REMOVAL OF SK;►N/S ARE GROUNDS FOR TEMPORARY OR PERMANENT CANCELLATION OF THE PERMIT.
9. PAVED ACCESS TO THE RAW STIES SHALL BE REQUIRED PRIOR TO MAW OF THE BUILDINGS. THE
CONSTRUCTION STAGE USUALLY NDK',ATES M INCREASE IN THE NUMBER OF WORKERS AND THEIR VEHICLES. ALSO,
THE PAVED ACCESS IS REQUIRED FOR FIRE FIGHTING PURPOSES. IF PAYING IS DESIRED BEFORE ALL UTILITIES AND/OR
LATERALS ARE INSTALLED, THE BASE UFT OF ASPHALT IS SUFFICIENT FOR ACCESS. THE A.C. CAN BE -CAPPW LATER,
LEAVING A FINAL SURFACE THAT IS FREE OF UTILITY CUTS AD PATCHES.
10. WITHIN 10 DAYS OF CEASING ACTIN, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING
LONG -TETRA STARVATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE COHSTRUC110N ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
A REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT M ACTIVE WATERING SYSTEM IS
IN PLACE AT ALL III OR
8 ESTABLISHMENT OF A STABAJZED SURFACE THROUGH WATERING WITH PHYSICAL. ACCESS RESTRICTION SURROUNDING
THE AREA; OR
C. USE OF CHEMICAL STABILVERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA
11. STAFF TRAINING
A PROVIDE TRA1i FOR STAFF AND MANAGEMENT AT A REGULARLY SCHEDULED AOMD WORIOW (GALL SHARON
AT (909)-396-2183
B. REWIRE ALL SIBODNIRACIORS AND BUILDERS TO ATTEND A REGULARLY SCHEDULED AOMD WORKSHOP.
12. PROJECT SIGNAGE
A 1 SG! LOOM AND PER 600' OF FRONTAGE STREET
B. SION/S MUST BE PRESENT AT PRECCN MEETING
13. HAWING PROCEDURES
A. TRUCKS HAVLINNG DIRT ON PAVED ROADS MUST MINTAN 6' OF FREEBOARD AND BE TARPED.
B. THE HAUL ROUTE SMALL BE PLACED ON THIS PLM OR APPROVED BY THE CITY ENGINEER.
C. THE IMPORT AND EXPORT SITE MUST HAVE A VALID GRADING PERMIT AND FUGITIVE DUST CONTROL PLAN PRIOR TO
DISTURBING SITES.
D. THE SOIL IN HAUL TRUCKS SHOULD BE AT A MINIMUM OF 70% OF OPTIMUM MOISTURE CONTENT.
E ALL VEHICLES GOING FROM DIRT MEAS ONTO PAVED STREETS SHILL HAVE TIES AND WHEELS INSPECTED AD
WASHED IF NECESSARY TO AVOID 'TRACKING OUP DIRT.
F. IF PERIMETER WAIS ARE TO BE BUILT, THEY SHOULD BE GIVEN HIGH PRIORITY SINCE THEY WILL HELP TO CATCH
91MAND AND COULD THOM REDUCE THE AMOUNT OF STREET SWEEPING REQUIRED.
G. DTC CONCENTRATE MAY ALSO BE USED AS A SPRAY ON TARP (SEE WWW.SSPCO.ORG)
14. STORAGE AND STOCKPILE HANDLING WIND SHELTERING
A INSTAL PM10 FENCING ON 3 SIDES OF PILE EQUAL TO HEIGHT OF PIE
B. COVERINGS CAN BE USED ON SMALL PIES AND SECURE THEM.
STOCKPILE OR TRENCH PIE STARVATION MEIHIODS
A CONRNDUS WATERING BY TRUCK OR SPRINKLERs
B. CHEMICAL STABILIZATION WHEN CONTIDUS MONITORING
MATERIAL HANDLING
A CONFINE LOAD IN/OUT TO WWNWIND SIDE OF PILE
B. PIES GREATER THAN BFT IN HEIGHT MUST BE A M16MUM OF 10OFT AWAY FROM OCCUPIED BUILDINGS,
15. MEAS SUBJECT TO FREQUENT DISTURBANCES
A EQUIPMENT STAGING AREAS ARE TO BE TREATED WITH AT LEAST ONE INCH WASHED GRAVEL MANTAIED TO A DEPTH
OF FOUR INCHES OR TREATED WITH CHEMICAL DUST SUPPRI SSMTS DESIGNED BY THE MANUFACTURER FOR TRAFFIC
MEAS, AND APPLIED IN A;CORDAIICE WITH THE MANUFACTURER'S SPECIFICATIONS AND IN SUFFICIENT CONCENTRATIONS
AND FREQUENCY TO ENSURE COMPLIANCE WITH THE APPLICABLE TEST METHODS.
B. EMPLOYEE PARKING MEAS ME TO BE COVERED WITH AT LEAST ONE INCH WASHED GRAVEL MAINTAINED TO A DEPTH
OF FOUR INCHES OR TREATED WITH CHEMICAL DUST SUPPRESSANTS DESIGNED BY THE MANUFACTURER FOR TRAFFIC
MEAS, AND APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND IN SUFFICIENT CONCENTRATIONS
AND FREQUENCY TO ENSURE COMPLIANCE WITH THE APPLICABLE TEST METHODS. IF M INTERNAL ROADWAY NETWORK
IS PAVED, EMPLOYEES ARE TO BE INSTRUCTED TO PARK ONLY ON PAVED MEAS.
16. RECORD KEEPING FORMS
A PER FORMAT IN SECTION 6-2 COICHEIU VALLEY FUGITIVE DUST CONTROL HANDBOOK.
SOURCES OF FIKYWE DUST
1. BALL EARTHMONNG ACTIVITIES WILL BE LIMITED TO THE ONSITE AREA,
IMPORT OF MATERIAL FROM OFFSITE SOURCES
WILL BE PERFORMED IN ORDER TO PREPARE THE SITE FOR THE RESIDENTIAL LOTS.
2. UIPAIED ROAD ORIEL• THE SITE WILL HAVE UNPAVED ROADS TO THE VARIOUS CONSTRUCTION
STIES. AVERAGE DAILY TRAFFIC LEVELS WILL BE 10 TRIPS PER DAY.
3. VEICUAR 1RAN7L-OUT, VEHICLES MACH EXIT THE SITE HAVE POTENTIAL TO TRACK MATERIAL ONTO
LA WINTA DRIVE AND/OR AUTO CENTRE DRIVE. WO ars VEHICLES, DELIVERY TRUCKS AND
MAINTENANCE TRUCK FOR EARTHMOVING EQUIPMENT WILL ENTER AND EXIT THE SITE ON
AVERAGE, 10 VEHICLES WILL EXIT THE SITE DAILY.
4. DEREM SU11i.ABTA THE ENTIRE SITE WILL BE DISTURBED FROM ITS NATURAL CONDITION
DURING THE GRADING OPERATION.
I
GRAVEL ENTRANCE NOTES
F-WF:77,] .1 1.. .;. ,. .,,..: - •4 : :Iw`•'71 -: •r S]i 1-: ]. '7•:.L.. : •ll 1' 1 •]1
1 ] 1 1 «} ! 11 1511 O UIL ollZl']'ill I
"1']' FUNCIIIONING OF THE PAD.
♦' ` it 1 11 }
��•�il .T•�l il�•�1i•�. ► t►.•� 1 �T
0 INSTALL PM -10 DUST CONTROL FENCING (6' HIGH) 5,230 LF.
02 INSTALL PM -10 DUST CONTROL SIGN PER DET. 3 EA.
SNT. NO. 1
03 TTwALL CONSTRUCTION ENTRANCE PER DET. THIS SM. 1 EA
04 INSTALL SPEED LIMIT SIGN (15 MPH) 1 EA.
NOTES
❑1 FULLING. MANTENAICE, CONCRETE WASHOUT AND MATERIAL STORAGE
AREA SURFACE MATERAL. 1' MN. WASHED GRAVEL, If THICK.
(6 FOOT FENCE AND GATE W/ LACK)
❑2 INITIAL. STAGING AREA, EQUIPMENT STORAGE AND EMPLOYEE PARKING.
SURFACE MATERIAL 1' MN. WASHED GRAVEL, S THICK,
�3 CONSTRUCTION OFFICE WITH WIND MONTORING EQUIPMENT PER AtTMD
SPECIFICATIONS. PRIOR TO INSTALLATION OF OFFICE, INTERN
MONITORING TO BEGIN UPON COMMENCEMENT OF GRADING ACTIVITIES
PER AOMO SPECIFICATIONS. CONTRACTOR/DEVELOPER TO FOLLOW
MONITORING TEMPLATE AS PER AQMD.
❑4 WATER TOWER, EXACT LOCATION TBD BY DEVELOPER/OONTRACTOR IN
FIELD. PROPOSED MAXIMUM AREA DISNRED AT A TIME, 10 ACRES.
1. A WIND FENCE SHALL BE ERECTED AS SHOWN ON THE PUMA PRIOR TO START OF GRADING AND
SHALL RI]MIN IN PLACE UNTIL SUM TIME AS NON -ERODIBLE CONDITIONS PREVAL
2. ALL GRADING ACTIVITIES STALL CEASE WHEN WIND SPEED REALES 25 MPH. SITE STALL BE KEPT
CONTINUOUSLY WATERED TO PREVENT BLOWING DUST WHILE WINDS EXCEED 25 MPH.
3. WATERING SHALL BE DONE PRIOR TO HOUGH GRADING USING AN ONSITE IRRIGATION SYSTEM PRIOR
TO BEGIN!" OF GRADING ACTIVES. PRE -WATERING SHALL ALSO BE COMPLETED ALONG EQUIPMENT
ROUTES FROM MAJOR CUT / FRI ACTIVITIES AS WELL AS ACCESS AND PARKING MEAS. WATERING
SHALL CONTINUE WRING ROUGH GRADING OPERATIONS TO PRECLUDE DUST GENERATION.
4. ALL AREA STREETS SHALL BE INSPECTED DAILY AND SWEEPING ORDERED WHEN SLT AND SAND
ACCUMULATE.
5. DEVELOPED BUILDING PADS SHALL BE HYDROMULCHED.
6. WATERING SHALL CONTINUE FOR THE DURATION OF FINAL GRADING ACTIVITIES UTILIZING THE ONSITE
IRRIGATION SYSTEM.
7. ESTIMATED PM -10 COST: SM.000
B STOCKER OM -SITE: TBD BY COY/CONTRACTOR
9. ANY UNPAVED ROADWAYS TO BE WATERED AS NECESSARY
10. WHEEL WAS" MEAL IF NEEDED, TO BE LOCATED AT CONSTRUCTION ENTRANCE.
'i . - • 7 • •
1. EARTHMOVING
WATERING
WILL BE APPLIED PRIOR TO INTIARNG ANY EARTH MOVEMENT.
WATER WILL BE APPLIED TO ALL DISTURBED MFRS MINIMUM ONCE DIMLY.
CONTINGENCY MEASURE:
STOP ALL WOW(
2. UNPAVED ROAD TRAVEL
WATERING
WATER WILL BE APPLIED TO ALL UNPAVED ROWS MINIMUM TWICE DALY.
REDUCE SPEED LIMIT:
ALL UNPAVED ROADWAYS ON THE SITE HAVE A MAXIMUM SPEED LLAT OF 10 MPH.
CONTINGENCY
PLACE GRAVEL. OR USE PAVED ROADWAY
MEASURE
3. VEHICULAR! TRACK -OUT
CLEANING
AVENUE 60 WILL BE SWEPT AT THE END OF EACH WORK DAY AND ANY
MATERIAL THAT HAS BEEN TRACKED OUT WILL BE REMOVED AND RETURNED
TO THE SITE
GRAVEL
TWO GRAVEL CONSTRUCTION ENTIANCES OF CRUSHED STONE WILL PREPARED AT THE
CONSTRUCTION
AVENUE 60 AND MONROE STREET CONSTRUCTION ENTRANCES IT IS A GRAVEL PAD
ENTRANCE
CONSISTING OF A MINIMUM THEE INCH OR LARGER WASHED GRAVEL MAINTAINED TO A
DEPTH OF SIX INCHES AT LEAST 50 FEET LONG AND 30 FEET WEE ADDITIONAL
STONE MAY HAVE TO BE ADDED PERIODICALLY TO MWNTAN THE PROPER FUNCTIONNG
OF THE PAD.
CONTINGENCY MEASURE:
ADDIION& INSPECTION AND STREET SWEEPING WILL BE MADE IF TRACK -OUT
MATERIAL IS OBSERVED ON LA OUNTA DRIVE AD/OR AUTO CENTRE DRIVE,
NEAR THE CONSTRUCTION ENTRY ROAD.
4. DISTURBED SURFACE AREAS
WIND FENCE:
A WIND FENCE SHALL BE INSTALLED AS SHOWN TO REDUCE WIND SPEEDS
AND TO PREVENT WINDBLOWN MATERIAL FROM LEAVING THE SIZE
CONHIGENCY MEASURE:
WATER WILL BE APPLIED TO ALL DISTURBED SURFACE AREAS FROM WHICH VISIBLE
DUST EMISSIONS ARE OBSERVED.
PRIVATE ENGINEERING NOTE
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY
ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE
REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OR CONSTRUCTION OF THE PROJECT.
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT
SHALL BE AIDE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO
DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM
ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING
FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.
DESIGNED BY: BJB DRAWN BY: BJB
TRACT
a�a�w
a�a+var e.A�aa
a� �a aaa a
r�a�� �a�r
Y
al.
i
L'1'1.:1^I
RUMBLE STRIPS 'TRACK CLEAN'
DR --1
0.0 - FLIER FAB
PM -10 FENCING
SIGHT DISTANCE LINE (TYP.)
EX EDGE OF PAVEMENT
ADE
SECTION A -A w
_ ___I- _ --•.._.. -_I --_r.
T -O
PLAN v" 11
3 GRAVEL CONSTRUCTION ENTRANCE
NTS
s -
11x1 I.
I � ILIBOUNDARY
CANT
� I
1---L-
z
IMA
,1 s
LIM
--
w�l
z
Nu
I
HUNK FENCE-�
I FABRIC
2 _
N.A.P.
WELLWD
SITE
I'
AP,P)ROVED BY:
lFil01 4�/-! �/' 1
M KINNEY, P.E.P.. DATE
6' C94AM FENCE
W/PM10 FABRIC
I
GRAPHIC SCALE
120 0 60 120 240 480
(IN FEET)
1 Inch - 120 R
I I _ II
1 r r
L_ J 71
I I I
�-- - 1 Ir
L---- ---_--- L--L--� �---�--J
I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I 1
I I I I I I I I I I
-I EF 11
-
IL
I I I I I
I I I I I I I
-_-1.- -L--J L--L--L--1---1--�
EXISTING CONCRETE
BLOC( WALL
PLANNERS
SCALE: SEE ABOVE
DATE: JUNE, 2021
EXISTING RESIDENTIAL
M 0 R S E
S CH UL TZ
ENGINEERS
N CH M ARK: CIIYOFU
Jr NGS BUSS DSK W LWOE KOC
ABMT 22.5' SOUTHERLY OF THE S
FROM THE CUFF HOUSE D R Qa.
1
/ SECONDARY WA
EX CCVVWWD
FIRE HYDRAR
- -I 4 / 1 6' CH AOLINK FENCE
t,904);,1
"' W/P1I10 FABRIC
U( -T --h- .... /3
I
I
I I I I
I I I TRACT
-JI--1r-� BWNDARY
I I I
1 PRIMIN WATER SOURCE
EXIST cm FIRE HYDRANT
EXISTING
r r L r III COMMERCIAL
I I I 1
M MI I
I
_ _I
T � )
1
t
IEi/AION I
DAMN N
-----------
-�
41865 Boardwalk
Suite 218
Palm Desert, CA 92211
Voice: 760-674-5776
SURVEYORS
DBD RFV. 94.301 (NVo63)
Y140f. DOWN 0.1', LOCATED
FACE OF HD TRAY 111, ACROSS
FXIJITITTIZI
B' CHAT CIH( FENCE
W/PM10 FABRIC
WDID * 7 33C392041
IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA
THE CENTRE ^/
TRACT NO. 37359 SHT.FL1133MVE DUST `
MISSION
COLANE ( 2
OF_SHTS.
A PORTION OF THE SW 1/4, OF SECTION 29, T.5S, R.7E, S.B.M.
FOR: THE CENTRE ON ADAMS, LLC W.O. NO:
I: RGYPMIO-02 6/22/21
j
-----r----- I
I I
I I II
I
I I _ II
1 r r
L_ J 71
I I I
�-- - 1 Ir
L---- ---_--- L--L--� �---�--J
I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I 1
I I I I I I I I I I
-I EF 11
-
IL
I I I I I
I I I I I I I
-_-1.- -L--J L--L--L--1---1--�
EXISTING CONCRETE
BLOC( WALL
PLANNERS
SCALE: SEE ABOVE
DATE: JUNE, 2021
EXISTING RESIDENTIAL
M 0 R S E
S CH UL TZ
ENGINEERS
N CH M ARK: CIIYOFU
Jr NGS BUSS DSK W LWOE KOC
ABMT 22.5' SOUTHERLY OF THE S
FROM THE CUFF HOUSE D R Qa.
1
/ SECONDARY WA
EX CCVVWWD
FIRE HYDRAR
- -I 4 / 1 6' CH AOLINK FENCE
t,904);,1
"' W/P1I10 FABRIC
U( -T --h- .... /3
I
I
I I I I
I I I TRACT
-JI--1r-� BWNDARY
I I I
1 PRIMIN WATER SOURCE
EXIST cm FIRE HYDRANT
EXISTING
r r L r III COMMERCIAL
I I I 1
M MI I
I
_ _I
T � )
1
t
IEi/AION I
DAMN N
-----------
-�
41865 Boardwalk
Suite 218
Palm Desert, CA 92211
Voice: 760-674-5776
SURVEYORS
DBD RFV. 94.301 (NVo63)
Y140f. DOWN 0.1', LOCATED
FACE OF HD TRAY 111, ACROSS
FXIJITITTIZI
B' CHAT CIH( FENCE
W/PM10 FABRIC
WDID * 7 33C392041
IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA
THE CENTRE ^/
TRACT NO. 37359 SHT.FL1133MVE DUST `
MISSION
COLANE ( 2
OF_SHTS.
A PORTION OF THE SW 1/4, OF SECTION 29, T.5S, R.7E, S.B.M.
FOR: THE CENTRE ON ADAMS, LLC W.O. NO:
I: RGYPMIO-02 6/22/21