Loading...
04-3831 (CONR) Geotechnical Investiagion ReportEarth Systems 0% le Southwest. GEOTECHNICAL ENGINEERING REPORT PROPOSED SIX ACRE MIXED USE COMMERCIAL DEVELOPMENT f HIGHWAY I11., WEST OF DUNE PALMS DRIVE I LA QUINTA, CALIFORNIA Active Fault Near -Source Zones This'map is intended to be used in conjunction with the 1997 Uniform Building Code, Tables 16-S and 16-T Q-34 California Department of Conservatioll Division of Mines and Geology LEGEND See expanded legend and Index map Shaded zones Are within 2 km of known seismic sources. A fault B fault Contours of closest horizontal distance to known seismic sources. ----------------• 5 km --------------------------- 10 km -------------- 15 km 0 5 E= 10 Kilometers 114" is approximately equal to 1 km August, 1997 Figure I Site Location Map West of Dune Palms Road Location Map p oc Figure igu Highway ill West of Dune Palms Road t California La Quinta, Cliforn,i File Number: 09254-01 Earth Systems Southwest August'] l; 2003 - 13 - File No.: 09254-01 03-07-831 bac.kfilled with native soils compacted to a minimum of 90% relative compaction. Backfill operations should be observed and tested to monitor compliance with these recommendations. 5.3 , Siope Stability of Graded Slopes Unprotected, permanent graded slopes (if any) should not be steeper than 3:1 (horizontal: vertical) to reduce wind and rain erosion. Protected slopes with ground cover may be as steep as 2:1. However, maintenance with motorized equipment may not be possible at this inclination. Fill slopes should be overfilled and trimmed back to competent material. STRUCTURES In our professional opinion, .stricture foundations can be supported on shallow foundations bearing on a zone of _properly 'prepared and compacted soils placed as recommended in Section 5.1. The recommendations that follow are based on very low expansion category soils: _5.4 Foundations Footing design of widths, depths, and reinforcing are the responsibility of the Structural Engineer, considering the structural loading and the geotechnical parameters given in this report. A minimum footing depth of 12 inches below lowest adjacent grade should be maintained. A representative of ESSW should observe foundation excavations before placement of reinforcing steel or concrete.' Loose soil or construction debris should be removed from footing excavations before placement of concrete. Conventional Spread Foundations: Allowable soil bearing pressures are given below for foundatib.ns bearing on recompacted soils as described in Section 5.1. .Allowable bearing pressures are net (weight of footing and soil surcharge may be neglected). ➢ 'Continuous wall foundations; 12-inch minimum width and 12 inches below grade: 1500 psf for dead plus design live loads Allowable increases of 300 psf per each foot of additional footing width and 300 psf for each additional 0.5 foot of footing depth may be used up to a maximum value of 3000 psf. ➢ Isolated pad foundations, 2 x 2 foot minimum in plan and 18 inches below grade: 2000 psf for dead plus design live .loads Allowable increases of 200 psf per each foot of additional footing width and 400 psf for each additional 0.5 foot of footing depth may be used up to a maximum value of 3000 psf. A one-third ('/3) increase in the bearing pressure may be used when calculating resistance to wind., or seismic loads. The allowable bearing values indicated are based on the anticipated maximum loads stated in Section 1.1 of this report. If the anticipated loads exceed these values, the geotechnical engineer must reevaluate the . allowable bearing values and the . grading requirements. M. EARTH SYSTEMS SOUT14WEST r SECTION 2 -- GRAVITY LOAD ANALYSIS. DEAD AND LIVE LOAD INFORMATION AT VARIOUS COLUMN.SUPPORTS ARE SHOWN IN THE SHEETS ATTACHED HEREIN SECTION 3 -- LATERAL LOAD ANALYSIS (SEISMIC/WIND) LATERAL LOADS AT COLUMN SUPPORT LOCATIONS ARE SHOWN IN THE SHEETS ATTACHED HEREIN SECTION 4 -- DESIGN CALCULATIONS FOR PURPOSES OF DESIGN CRITICAL COLUMNS OCCUR AT THE BUILDING CORNER SUPPORTS. ATTACHED TABULATIONS INDICATE WORST CASE LOADINGS AT THE CORNE COLUMNS FOR (A) MAXIMUM AXIAL LOAD CONDITIONS, (B) MAXIMUM LATERAL LOAD CONDITIONS DUE TO WIND AND (C) MAXIMUM LATERAL LOAD CONDITIONS FOR SEISM 1 t 1�I II .,�i r•'--_-.. ..._.._ ..._..._... _. '-_'_...._.. _......... .. ........... .... .._'_ ._._..._...-'---... ... _.. _.._._...._....... ... .__. _.._........ __...__'......-__........_....._.._..___._.._..._._.__.._.__.__.......-._...... ..._..._...-._.__..._._..-_� _...._...._.__.. _....._. _.__._... _... ...._.......... .. ,.... ............__........_.. .. _. .. ..._ .. _. .,.,I.. .. n_... .._ r.l a.l A_. ._ I I,. I.II. :.. .. I.I. .., ,.. ,11.1 F Wall Sst.Seel line iIl' 1 n n n LYgJ `IYj) ([YjJ /Y7) Q 1 Y Q (By Others) ✓ it 3/0 iI 170'a 11 � i tli'I fi I • . I . i • i tD I JI I i• � + ;. it : l•� I 1 I : � FIT, � • W ' ' p N 'n n I' II1 I, I Ij �i l I iI i AO-- I �I 'T •4 - 20'-9i 22'-2 „A" 22'-2 22'-2 22:-2 20'-91l 4 n -�1�----- ---- ! +[+ N - — - -----1'�-----------� ---- n oO �I m=ill o �'I �I n o w_�I v 1 ... v I ---t---------- -------- (PORTAL FRAME) -----------------}-------- ---------'------------------}----- 1 I (PORTAL FRAME) 1 ----------- --�-------- --------�---- ` '------`-------��� +I+ ------��-�'`�----- +I++'+ +I+ -----'��'-----------+4-- +I+ +I+ ++ --------®-+`11------------ ++ �+ +I+ 2� If 212 1' I �I•, rj In r DO C, Z t I r i r•I C I r ------------+' -------�-+ ---�� ---- ---------- '-------�-� I --------- (PORTAL FRAME) I I I (PORTAL FRAME) i A.. i i 4 --- 20'-94 j 22'-2 j. 22'-2 1 22'-2 i 22'-2 _ 20'-91, ' 4 I 1 s ii I ALL BASE PLAIES��T'EEVATION 0'-0• r �' j i UNLESS. TED.. I II A T ! I I ( d ' • I' ' I ' ' I{ ' I , I, {! ! 1 ! ! 1 i'i I I I' I a NCHOR OOL DIAMETERS HAVE BEEN DESIGNED BY THE METAL BUILDING MANUFACTURER BASED ON AISC METHOD IHTH COMBINED SHEAR AND TCNSION. DEVELOPMENT, EMBEDMENT AND HOOK LENGTH OF ANCHOR BOLTS IN THE CONCRETE ARE DESIGN RESPONSIBILITY OF OTHERS, ALSO DESIGN OF SHEAR ANGLES, TENSION PLATES, HAIRPINS, AND ANY OTHER EMBEDDED MATERIAL IN THE CONCRETE SHALL BE DESIGNED AND'PROwDED BY OTHERS. I ' , BDIE ANCHOR BOLT PROJECDON IS FROM BOTTOM OF BASE PLATE. T i l ANCHOR BOLT PROJECTION D1q' 1/2• PROJ - i , /2 L)riAWINU 01AIU.`3 F(Y! APPRfIVAI. O T/ESE ORANINI:S, 9EING FOR APPROVAL. ARE BY DEFINITION NOT FINAL AND AR_ FOR CONCEPTUAL REPRESENWON ONLY. THEIR PURPOSE IS TO CONFIRM PROPER INTERPRETARON OF THE PROJECT DOCUMENTS. dR��TEGS ISSUED "FOR CONSTRUCHON" CAN 8E FTIR iYiulr• O U.- ORANINOS. BEING FOR PERMIT, ARE BY DEFINITION NOT FINAL IN THAT, AS A MINIMUM, PIECE MARIUNCS ARE NOT IDENTIFIED. ONLY DRAWINGS ISSUED " FOR CONSTRUCTION . CAN BE CONSIDERED AS Co PLETE MM TRU"M FORM ❑ FINAL DRAWINGS. ANCHOR BOLT •)(- BOTTOM O" " BASE PLATE/B. . ' 5/8" 2- 3/A• 2 1/2- '• 3 1/2• 1 I/8' J 1/2' 1 r/t' 3 12' ANCHOR BOLTS 8Y OTHERS + 6 s Finished Floor --. Recess If re 'd is D delerm-*n by others) ' Base Slab Section SEC. A b1f1� rr A v; 'i i 1` NOT FUR pE;,jjV1,1T �j Approved as submitted 0 Approved as noted i ❑ Disapproved ! Resubmit I A Date:...____._. Signature: ..._. -4 I metallic building company 7301 FARMEW • HOUSTON. TEkAS • P.O. BOY 1O33B ZIP 77041 (713) t88-778e ZIP 77240 I LOCATION LA 9UWA. CA ]— P' IN I 0305-209800 F I i 1 is f I � I I I. I 1 � II, II r'� 11,�'•{1���f .tl:' i ,.- r - 11} i' 71 l fl, +i��'9 ��Ir.I. j.f,.';{''�� '..,..... _._ .....__..._ ...._....._ _._.. ..........._ ........- - - ............_....._.... ............... } � i,' r i PI !{T 1 1 I�� I ,rA ( ;� ' {• 1 , , r • � � onlsl nu. FT Of 2 A i 1 I i+' 1 J t � ill j B SIDEWALL STEEL LINE SIDEWALL STEEL 4DEWALL STEEL LIwE _ I 2 2 2 2 1 1 2 _ANCNQR DOLT PLAN ` SEE ANCHOR BOLT P9L17AN - SEE ANQ10R BOLT PLAN BABE PLATE _DETAIL BASE PLATE DETAIL BABE PLATE DETAIL A. BOLTS �'o BASE a THK. v BP-01 A. BOLTS Vo I BASE a THIN. {' BP-02 A. BOLTS V# I BASE E THK. BP-03 SEE ANCHOR BOLT PLAN SEE ANCHOR BOLT PLAN �-2s 3 - 91, -1 2 2 1 2 1 I STDEWALL STEEL LINESlOEWALL STEEL UNE - < - - - - _a S � . } e I,_I,*' BASE a ' easE e 43 +� 4 4 1•-4 _ 1•-4 1 4-�Ip--4-jj ,y BABE PLATE DETAIL BABE PLATE DETAIL BABE PLATE DETAIL A. BOLTS i'A BASE a THK. BP OQ A. BOLTS i'A BASE C TNK. V BP-•05 A. BOLTS j'6 BASE 1! TNK. j' BP-06 SEE ANCHOR BOLT PLAN SEE ANCHOR BOLT PLAN s---� f- 2 2 1} I} SiDEWALL STEEL LINE -- n 14j41 3B1 BP-08 I , . I '1 J 1�R.1:l'i0"11!14",tl�i��liJ .t Mato frame R4at9an IN Lk- 1-7 Mde frwrl. R4adhN IN LAW.9L06 A IIIGHSIDE PORTAL Md. frmm RaeDem d lbw: 6LDG A LOW -SIDE PORTAL Mde from. RNi.r_ d lion; fL. 1 Main from. Rwdi- d Llrw. f.L 2 A NOTE. 0 Al raacOarl. o. AmIsVs- Q tas 365 1,Kt. AD reodbn art MlKpe 21 N=:- IR reoolidn me Atu.n n Ky. NOTE E NI rwdicne ea gun n KIDS NOTE: p r 0*,'I. me ?om n Kos E A eqP01. IekA ".1, 4 A neyolAe due. b8caln A negalhe dun WNW. i negaNn .2ue, indw. A r due, e6.141 appogla oftil irml SIT n aoA S�' I wooeile &alhn I Fran. 51' Back 11-� I ¢pm0e aieclal I iron. SW Bad. SM -� I appmA_t e d-tim 9aci wP&.Iw N=4 Y A1_ . Xa fY Yaa . N=1 Y Yon . Na'Vl Ibm . xa ♦ Y Y/a/n 4 �r .Y xa .Vl Na ♦Y (\-'b-� Condaln GM V. Fiar kw O.Wo.. GM Yv R. Mom CanmOm cm Vu N. Yam Canadian GAO V. Nor Yam Coal" GXa Va IW Yam OL A 1.9 0.6 0.0 DEAD 4 UVE LOAD 20 0.5900 0.0250 ODD00 DEAD . 171E LOAD 2a5 G4510 O.R130 0GOOD ----- OL 0 4.0 _0 QO DEAD . LIVE LOAD 3" 0.55W _OD250 0.0000 DEAD . 171E LOAD 3a6 0.4310-0.0230 00000 DL C 1179 0,000 "00 a E 3662, GOOD 0.000 OL 4 LL 4 a A 10.7 4.3 OLD a 4 ILL 7as-3.9010-7.5090 0. DOW a •Ill. 2A5 -I.0430-1.0990 0.ODW . OL . Ll ♦ a D 4.3 -4.J 0, a 4 ILL 3A6 4.1400 -15510 &GOOD OL . ILL 3a6 1.9240-1.1310 ODGOG a 4 L 4 a' E 4.319 0.000 GCOG OL 4 V. ♦ a E 5.756 DOW Qom �r OL / Mu A -7.7 -69 0.0 a 4 MIA 2a5 4.7400 2.5510 MOODO a 4 MLR 2a5 1.924D 1.1310 &DOW OL 4 Ml. 0 a/ -44 0.0 0. . NR SA6 -3a0 0 25090 0.0000 a +MLR 3A8-1.0130 1.0890 0.0700 a . ILL �! E 1215 -Dow 0.000 DI 4 VU 1.861 -a6S3 0000 OL 4 MR A -0.6 4.9 0.0 OL . a/1.4 2a5 -&4420-4.2340 MODDO OL 4 EL/1.1 2A5 -2.7%0-2.4030 000001 9 ' 0. 4 O R 0 -9.4 17 GO OL 4 EL/L4 .7a6 7.5=-4.2730 OD000 a 4 a/IA 3" 3,6770 _14410 O.000OIa 4 TAR E 7.119 1.425 &000 a I MLR E 1,507 1.423 GOOD OL 4 EL/1.4 . a A LO -0..0 GO a 4 ER/IA 2A5 7.5620 4.7730 ODOD0 a 4 ER/1.4 2&S 16770 2,4410 0.0000 ' OL 4 EL/I.4 4 Q 0 &9 -4.5. 0.0 a f ER/,/ ]a8 -64420 1.2340 GOOD0 a 4 ER/1.4 30-2.7960 2.4030 00000 O 4 EL/1.4 4 a E 1443 •OOOC DOW a 4 EL/1.4 4 a E 4.126 GOOD E000 a4ER/LAra A 9.7 4.5 0.0 ' OL 4 ER/I./ ♦ a 0 3.2 0.6 00 OL 4 ER/1.4 I CL E 3.371 GOOD 0.000 a 4 ER/1.4 4 C. E 4.054 GC00 DODO x FM ARRRIVAI• THESE DRAWNCS, ` BEING FOR APPROVAL, ARE BY DEFINITION NOT FINAL, AND RE ARE FOR CONCEPTUAL PRESENTATION ONLY. THEIR PURPOSE IS TO CONFIRM PROPER INTERPRETATION OF THE PROJECT DOCUMENTS. ONLY DRAWINGS ISSUED "FOR CONSTRUCTION" CAN BE CONSIDERED AS COMPLETE. X FDR PFRMIT- THESE+ORAWINIM BEING FOR PERMIT. ARE BY DEFINITION NOT FINAL IN THAT, AS A MINIMUM, PIECE MARKINGS ARE NOT IDENTIFIED. ONLY ORAWINGS ISSUED - FOR CONSTRUCTION •' CAN BE CONSIDERED AS COMPLETE. FYIR rtwelmlrnOt FINAL ORAM/NGS. Mde 1- Rwdiw IN 11w.: 3,40 MAX. WIND CoL REACTIONS NOTE: (-LI WR3, I I 1 -' Ae -1.1 a ar. Am Is Kips E A negplile due, mdcalrA Mu) LCa4b 0,2K appasie Wat an eoa sM Hoala WIND c 2.o5k 1--+ - ly. - F 1 CenpIIMI ONO Vlr Net MIMom 4 It a 1e 0.0 ao i a4U. 4 a E 58 GO 0.0 OL 4 W. E 2.1 -2.2 0.0 ,R a 4 11.7 E SA -2.2 GO 0. . MA E a7 1.4 GO a 4 IR2 E 0.7 1.4 0.0 OL 4 EL E 42 0.0 0.0 OL 4 111 E 13 010 DO V. kc) •CAS: CCU;::= �,Itii7 (VOY F=Vl1 pGE+T i C3 Approved as submitted I Approved as noted Disapproved ! Resubmit Signature' --- - DESCRIPTION I BY Ian metallic building company FOR PERMT AND APPROVAL ' 7301KtnE FAEM . HOUSTOI, rAS • P.O. BOX 40336 ZIP 1104: (713) 466-77aB ZIP 77240 7 6' DATE SCALL .V79. K0. i NONE 010S-2D980C ' E 4 I I I I I I 1 i;I Concorde Consulting Group, INC. 3505 Camino Del Rio South #350 San Diego California 92108 Title : Kleine Buildings Job # 03-216 Dsgnr: KMK Date: 8:50AM, 1 DEC 03 Description : Foundation Designs for Buildings Scope: User:KW.0605524.Ver5.6.1,25-Oct-2002 General FootingAnalysis & Design Page 1 11 I (O1983-2002 ENERCALC Engineering Software 7 c:\ec55Udeine building foundalions.mwCalcu Description Building # 4 Grid�1`A andt7 A� CASE 1 General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements Allowable Soil Bearing Short Term Increase Seismic Zone Biaxial Applied Loads Live & Short Term Combined fc Fy 2,600.0 psf Dimensions... 1.330 Width along X-X Axis 5.000 ft 4 Length along Y-Y Axis 5.000 ft Footing Thickness 18.00 in Col Dim. Along X-X Axis 8.00 in 2,500.0 psi Col Dim. Along Y-Y Axis 12.00 in 60,000.0 psi Base Pedestal Height 1.000 in Concrete Weight 145.00 pcf Overburden Weight Min Steel % 0.0014 0.00 psf Rebar Center To Edge Distance 3.50 in Loads Applied Vertical Load... Dead Load 4.000 k ...ecc along X-X Axis 0.000 in Live Load 6.700 k ...ecc along Y-Y Axis 0.000 in Short Term Load. k Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Moments... (pressures @ left & right) (pressures @ top & bot) Dead Load k-ft k-ft Live Load k-ft k-ft Short Term k-ft k-ft Creates Rotation about Y-Y-Axis Creates Rotation about X-X Axis Applied Shears... (pressures @ left & right) (pressures @ top & bot) Dead Load 1.600 k k Live Load 2.700 k k Short Term k k Footing Design Shear Forces ACI 9-1 ACI 9-2 ACI 9-3 Vn * Phi Two -Way Shear 6.46 psi 8.69 psi 2.08 psi 170.00 psi One -Way Shears... Vu @ Left 5.97 psi 5.34 psi 1.56 psi 85.00 psi Vu @ Right 1.45 psi ' 1.19 psi 0.00 psi 85.00 psi ' Vu @ Top 3.33 psi 2.94 psi 0.74 psi 85.00 psi Vu @ Bottom 3.33 psi 2.94 psi 0.74 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As Rea'd Mu @ Left 0.74 k-ft 0.62 k-ft 0.04 k-ft 3.9 psi 0.24 in2 per ft Mu @ Right 2.45 k-ft 2.19 k-ft 0.63 k-ft 12.9 psi 0.24 in2 per ft Mu @ Top 1.36 k-ft 1.20 k-ft 0.29 k-ft 7.2 psi 0.24 in2 per ft Mu @ Bottom 1.36 k-ft 1.20 k-ft 0.29 k-ft 7.2 psi 0.24 in2 per ft Soil Pressure Summary Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL + LL 972.62 972.62 319.02 319.02 psf DL + LL + ST 972.62 972.62 319.02 319.02 psf Factored Load Soil Pressures ACI Eq. 9-1. 1,482.76 1,482.76 486.35 486.35 psf ACI Eq. 9-2 1,360.99 1,360.99 446.41 446.41 psf ACI Eq. 9-3 511.67 511.67 167.83 167.83 psf ACI Factors (per ACI, applied internally to entered loads) ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400 ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 ....seismic = ST * : 1.100 J � � � ', .. 4 Concorde Consulting Group, INC. Title : Kleine Buildings Job # 03-216 3505 Camino Del Rio South Dsgnr: KMK Date: 8:50AM, 1 DEC 03 #350 Description : Foundation Designs for Buildings San Diego California 92108 Scope Rev: 560100 User: 3-202ENE,Ver5.6.1.2eeringSo2 ENERCALC General Footing Analysis & Design Page 1 Yc:1ec55Udeine (c)1983-2002 Engineering Software building foundations.ecw:Calcu Description Building Grids 1-A and 'A CA�2 General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements Allowable Soil Bearing 2,600.0 psf Dimensions... Short Term Increase 1 *330 Width along X-X Axis 5.000 ft Seismic Zone 4 Length along Y-Y Axis 5.000 ft Biaxial Applied Loads Footing Thickness 18.00 in Live & Short Term Combined Col Dim. Along X-X Axis 8.00 in f c 2,500.0 psi Col Dim. Along Y-Y Axis 12.00 in Fy 60,000.0 psi Base Pedestal Height 1.000 in Concrete Weight 145.00 pcf Overburden Weight 0.00 psf Min Steel % 0.0014 Rebar Center To Edge Distance 3.50 in Applied Vertical Load... Dead Load Live Load Short Term Load Applied Moments... Dead Load Live Load Short Term Applied Shears.. Dead Load Live Load Short Term 7.700 k k k Creates Rotation about Y-Y Axis (pressures @ left & right) k-ft k-ft k-ft Creates Rotation about Y-Y Axis (pressures @ left & right) k k 8.900 k .ecc along X-X Axis 0.000 in .ecc along Y-Y Axis 0.000 in Creates Rotation about X-X Axis (pressures @ top & bot) k-ft k-ft k-ft Creates Rotation about X-X Axis (pressures @ top & bot) k k k Shear Forces ACI 9-1 ACI 9-2 ACI 9-3 Vn * Phi Two -Way Shear 4.16 psi 6.32 psi 4.06 psi 170.00 psi One -Way Shears... Vu @ Left 2.35 psi 6.79 psi 4.36 psi 85.00 psi Vu @ Right 2.35 psi -1.63 psi -1.05 psi 85.00 psi Vu @ Top 2.14 psi 2.15 psi 1.38 psi 85.00 psi Vu @ Bottom 2.14 psi 2.15 psi 1.38 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As s Reo'd Mu @ Left 1.01 k-ft -0.52 k-ft -0.34 k-ft 5.4 psi 0.24 in2 per ft Mu @ Right 1.01 k-ft 2.68 k-ft 1.72 k-ft 14.1 psi 0.24 in2 per ft Mu @ Top 0.86 k-ft 0.87 k-ft 0.56 k-ft 4.6 psi 0.24 in2 per ft - Mu @ Bottom 0.86 k-ft. 0.87 k-ft 0.56 k-ft 4.6 psi 0.24 in2 per ft Soil Pressure Su Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL + LL 525.82 525.82 525.82 525.82 psf DL + LL + ST 1,227.39 1,227.39 0.00 0.00 psf Factored Load Soil Pressures ACI Eq. 9-1 736.15 736.15 736.15 736.15 psf ACI Eq. 9-2 1,717.29 1,717.29 0.00 0.00 psf ACI Eq. 9-3 1,103.97 1,103.97 0.00 0.00 psf ACI Factors (per ACI, applied internally to entered loads) ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400 ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 ....seismic = ST * : 1.100 Ss • _ L 1 ' � ' � T'� ,' . � , . ," � � ' S f r Concorde Consulting Group, INC. Title : Kleine Buildings Job # 03-2.16 3505 Camino Del Rio South Dsgnr: KMK Date: 8:49AM, 1 DEC 03 #350 Description : Foundation Designs for Buildings San Diego Scope California 92108 Rev: 560100 User: KW-0605524.Ver5.6.1,25-Oct-2002 General Footing Analysis & Design Page 1 (c)1983-2002 ENERCALC Engineering Software ,,, A - c:\ec55\kleine building foundations.ecw:Calcu Description Building # 4 Grids14-Aand 7-A CASV3 General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements Allowable Soil Bearing 2,600.0 psf Dimensions... Short Term Increase 1.330 Width along X-X Axis 5.000 ft Seismic Zone 4 Length along Y-Y Axis 5.000 ft Biaxial Applied Loads Footing Thickness 18.00 in Live & Short Term Combined Col Dim. Along X-X Axis 8.00 in fc 2,500.0 psi Col Dim. Along Y-Y Axis 12.00 in Fy 60,000.0 psi Base Pedestal Height 1.000 in Concrete Weight 145.00 pcf Min Steel % 0.0014 Overburden Weight 0.00 psf Rebar Center To Edge Distance 3.50 in Loads Applied Vertical Load... Dead Load 6.700 k ...ecc along X-X Axis 0.000 in Live Load k ...ecc along Y-Y Axis 0.000 in Short Term Load k Applied Moments... Dead Load Live Load Short Term Applied Shears... Dead Load Live Load Short Term Footing Design Creates Rotation about Y-Y Axis (pressures @ left & right) k-ft k-ft k-ft Creates Rotation about Y-Y Axis (pressures @ left & right) k k 4.500 k Creates Rotation about X-X Axis (pressures @ top & bot) k-ft k-ft k-ft Creates Rotation about X-X Axis (pressures @ top & bot) k k k Shear Forces ACI 9-1 ACI 9-2 AUI 9-3 Vn' Phi - Two -Way Shear 3.62 psi 5.43 psi 3.49 psi 170.00 psi One -Way Shears... . Vu @ Left 2.05 psi 4.22 psi 2.71 psi 85.00 psi Vu @ Right 2.05 psi -0.13 psi -0.08 psi 85.00 psi Vu @ Top 1.87 psi 1.87 psi 1.20 psi 85.00 psi Vu @ Bottom 1.87 psi 1.87 psi 1.20 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As Req'd Mu @ Left 0.88 k-ft 0.06 k-ft 0.04 k-ft 4.7 psi 0.24 in2 per ft Mu @ Right 0.88 k-ft 1.70 k-ft 1.09 k-ft 9.0 psi 0.24 in2 per ft Mu @ Top 0.75 k-ft 0.75 k-ft 0.48 k-ft 4.0 psi 0.24 in2 per ft Mu @ Bottom 0.75 k-ft 0.75 k-ft 0.48 k-ft 4.0 psi 0.24 in2 per ft Soil Pressure Summary Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL +'LL 485.82 485.82 485.82 485.82 psf' DL + LL + ST' 827.82 827.82 143.82 143.82 psf Factored Load Soil Pressures ACI Eq. 9-1 680.15 680.15 680.15 680.15 psf ACI Eq. 9-2 1,158.18 1,158.18 201.22 201.22 psf ACI Eq. 9-3 744.55 744.55 129.35 129.35 psf ACI Factors (per ACI, applied internally to entered loads) Cl 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400 ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 ....seismic = ST " : 1.100 iiS­ Concorde Consulting Group, INC. 3505 Camino Del Rio South #350 San Diego California 92108 Title : Kleine Buildings Job # 03-216 Dsgnr: KMK Date: 8:51AM, 1 DEC 03 Description : Foundation Designs for Buildings Scope : �De 0605524, Ver5.6.1, 25-0a-2oo2 General Footing Analysis &Design Page 1 2002 ENERCALC Engineering Software c \ec55Ucleine building foundations.eCalcuscription Building # 4 Grids 4'D and'Q CASE 1 u L General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements Allowable Soil Bearing 2,600.0 psf Dimensions... Short Term Increase 1.330 Width along X-X Axis 5.000 ft Seismic Zone 4 Length along Y-Y Axis 5.000 ft Biaxial Applied Loads Live & Short Term Combined Footing Thickness 18.00 in Col Dim. Along X-X Axis 8.00 in fc 2,500.0 psi Col Dim. Along Y-Y Axis 12.00 in FY 60,000.0 psi Base Pedestal Height 1.000 in Concrete Weight 145.00 pcf Overburden Weight 0.00 psf Min Steel % 0.0014 . Rebar Center To Edge Distance 3.50 in Applied Vertical Load... Dead Load 5.600 k ...ecc along X-X Axis 0.000 in Live Load 8.700 k ...ecc along Y-Y Axis 0.000 in Short Term Load k Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Moments... (pressures @ left & right) (pressures @ top & bot) Dead Load k-ft k-ft Live Load k-ft k-ft Short Term k-ft k-ft Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Shears... (pressures @ left & right) (pressures @ top & bot) Dead Load 1.600 k k Live Load 2.700 k k Short Term k k Footing Design. Shear Forces ACI 9-1 ACI 9-2 ACI 9-3 Vn ' Phi Two -Way Shear 8.64 psi 11.63 psi 2.92 psi 170.00 psi One -Way Shears... Vu @ Left 7.22 psi 6.45 psi 1.84 psi 85.00 psi Vu @ Right 2.67 psi 2.30 psi 0.35 psi 85.00 psi Vu @ Top 4.41 psi 3.91 psi 1.01 psi 85.00 psi Vu @ Bottom 4.41 psi 3.91 psi 1.01 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As Req'd Mu @ Left 1.27 k-ft 1.10 k-ft 0.19 k-ft 6.7 psi 0.24 in2 per ft Mu @ Right 2.98 k-ft 2.66 k-ft 6.75 k-ft 15.8 psi 0.24 in2 per ft Mu @ Top 1.81 k-ft 1.60 k-ft 0.40 k-ft 9.6 psi 0.24 in2 per ft Mu @ Bottom 1.81 k-ft 1.60 k-ft 0.40 k-ft 9.6 psi 0.24 in2 per ft Soil Pressure Summary Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL + LL 1,116.62 1,116.62 463.02 463.02 psf DL + LL + ST 1,116.62 1,116.62 463.02 463.02 psf Factored Load Soil Pressures ACI Eq. 9-1 1,710.87 1,710.87 709.43 709.43 psf ACI Eq. 9-2 1,562.63 1,562.63 647.97 647.97 psf ACI Eq. 9-3 561.76 561.76 232.94 232.94 psf ACI Factors (per ACI, applied internally to entered loads) ACI 9-1 & 9-2 DL 1.400 gym-. ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400 ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 ....seismic = ST ' : 1.100 .. - +. • .'.. �.. �"R, _ • � � N f Concorde Consulting Group, INC. Title : Kleine Buildings Job # 03-216 3505 Camino Del Rio South Dsgnr: KMK Date: 8:50AM, 1 DEC 03 #350 Description: Foundation Designs for Buildings San Diego Scope: California 92108 Rev: 560100 User:KW-0605524.Ver5.6.1,25-Oct-2002 General Footing Analysis & Design Page 1 (c)1983-2002 ENERCALC Engineering Software 7 g c:\ec55\kleine building foundalions.ecw:Calcu Description Building # 4 Grids 1*--D and L!QiCASE 2 [General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements Allowable Soil Bearing Short Term Increase Seismic Zone Biaxial Applied Loads Live & Short Term Combined fc Fy 2,600.0 psf Dimensions... 1.330 Width along X-X Axis 5.000 ft 4 Length along Y-Y Axis 5.000 ft Footing Thickness 18.00 in Col Dim. Along X-X Axis 8.00 in 2,500.0 psi Col Dim. Along Y-Y Axis 12.00 in 60,000.0 psi Base Pedestal Height 1.000 in Concrete Weight 145.00 pcf Min Steel % 0.0014 Overburden Weight 0.00 psf Rebar Center To Edge Distance 3.50 in Loads ' Applied Vertical Load... Dead Load 9.400 k ...ecc along X-X Axis 0.000 in Live Load k ...ecc along Y-Y Axis 0.000 in Short Term Load k Applied Moments.. Dead Load Live Load Short Term Applied Shears... Dead Load Live Load Short Term Footing Design Shear Forces Two -Way Shear One -Way Shears... Vu @ Left Vu @ Right Vu @ Top Vu @ Bottom Creates Rotation about Y-Y Axis (pressures @ left & right) k-ft k-ft k-ft Creates Rotation about Y-Y Axis (pressures @ left & right) k k 9.700 k Creates Rotation about X-X Axis (pressures @ top & bot) k-ft k-ft k-ft Creates Rotation about X-X Axis (pressures @ top & bot) k k k ACI 9-1 ACI 9-2 ACI 9-3 Vn * Phi 5.08 psi 7.68 psi 4.94 psi 170.00 psi 2.87 psi 7.66 psi 4.93 psi 85.00 psi 2.87 psi -1.56 psi -1.01 psi 85.00 psi 2.60 psi 2.61 psi 1.68 psi 85.00 psi 2.60 psi 2.61 psi 1.68 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As Redd Mu @ Left 1.24 k-ft -0.46 k-ft -0.29 k-ft 6.5 psi 0.24 in2 per ft Mu @ Right 1.24 k-ft 3.04 k-ft 1.95 k-ft 16.0 psi 0.24 in2 per ft Mu @ Top 1.05 k-ft 1.06 k-ft 0.68 k-ft 5.6 psi 0.24 in2 per ft Mu @ Bottom 1.05 k-ft 1.06 k-ft 0.68 k-ft 5.6 psi 0.24 in2 per ft Soil Pressure Summary Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL + LL 593.82 593.82 593.82 593.82 psf DL + LL + ST 1,350.71 1,350.71 0.00 0.00 psf Factored Load Soil Pressures ACI Eq. 9-1 831.35 831.35 831.35 831.35 psf ACI Eq. 9-2 1,889.97 1,889.97 0.00 0.00 psf ACI Eq. 9-3 1,214.98 1,214.98 0.00 0.00 psf ACI FeCtors (per ACI, applied internally to entered loads) ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400 ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor 1.300 ....seismic = ST * : 1.100 Concorde Consulting Group, INC. Title : Kleine Buildings Job # 03-216 3505 Camino Del Rio South Dsgnr: KMK Date: 8:49AM, 1 DEC 03 #350 Description : Foundation Designs for Buildings San Diego Scope: California 92108 Rev: 560100 General 1 User: KW-0605524, Ver 5.6.1. 25-Oct-2002 Footing Analysis & Design (01983-2002 ENERCALC Engineering Software c:\ec55Udeine building foundations.ecw:Catcu Description Building # 4 Grids f1'D'and General Information Allowable Soil Bearing 2,600.0 psf Short Term Increase 1.330 Seismic Zone 4 Biaxial Applied Loads Live & Short Term Combined fc 2,500.0 psi Fy 60,000.0 psi CASE 3 Calculations are designed to ACI 318-95 and 1997 UBC Requirements Dimensions... Width along X-X Axis, 5.000 ft Length along Y-Y Axis 5.000 ft Footing Thickness 18.00 in Col Dim. Along X-X Axis 8.00 in Col Dim. Along Y-Y Axis 12.00 in Base Pedestal Height 1.000 in Concrete Weight 145.00 , pcf Min Steel % 0.0014 Overburden Weight 0.00 psf Rebar Center To Edge Distance 3.50 in Loads Applied Vertical Load... Dead Load 8.900 k ...ecc along X-X Axis 0.000 in Live Load k ...ecc along Y-Y Axis 0.000 in Short Term Load k Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Moments... (pressures @ left & right) (pressures @ top & bot) Dead Load k-ft k-ft Live Load k-ft k-ft Short Term k-ft k-ft Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Shears... (pressures @ left & right) (pressures @ top & bot) Dead Load k k Live Load k k Short Term 4.500 k k Footincl Desi Shear Forces ACI 9-1 ACI 9-2 AGi 9-3 Vn ` Phi Two -Way Shear 4.81 psi 7.22 psi 4.64 psi 170.00 psi One -Way Shears... Vu @ Left 2.72 psi 4.89 psi 3.14 psi 85.00 psi Vu @ Right 2.72 psi 0.55 psi 0.35 psi 85.00 psi Vu @ Top 2.46 psi 2.46 psi 1.58 psi 85.00 psi Vu @ Bottom 2.46 psi 2.46 psi 1.58 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As Req'd Mu @ Left 1.17 k-ft 0.35 k-ft 0.23 k-ft 6.2 psi 0.24 in2 per ft Mu @ Right 1.17 k-ft 1.99 k-ft 1.28 k-ft 10.5 psi 0.24 in2 per ft Mu @ Top 1.00 k-ft 1.00 k-ft 0.64 k-ft 5.3 psi 0.24 in2 per ft Mu @ Bottom 1.00 k-ft 1.00 k-ft 0.64 k-ft 5.3 psi 0.24 in2 per ft Soil Pressure Summary Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL + LL 573.82 573.82 573.82 573.82 psf DL + LL + ST .915.82 915.82 231.82 231.82 psf Factored .Load Soil Pressures ACI Eq. 9-1 803.35 803.35 803.35 803.35 psf ACI Eq. 9-2 1,281.43 1,281.43 324.37 324.37 psf ACI Eq. 9-3 823.78 823.78 208.52 208.52 psf ACI Factors (per ACI, applied internally to entered loads) ACI 9-1 & 9-2 DL 1.400 ACI 9-2 Group Factor 0.750 UBC 1921.2.7 "1.4" Factor 1.400 ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor 0.900 UBC 1921.2.7 "0.9" Factor 0.900 ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short -Term Factor 1.300 ....seismic = ST' : 1.100 Z.( 7'� `' � � � � ,. � � � .. Y, d 8 _' � 1 - y ' A`� ` ... . ` ... e *'. r . _ +, � ` r ,� . ,. t � Concorde Consulting Group, INC. Title : Job # 3505 Camino Del Rio South Dsgnr: Date: 8:40AM, 1 DEC 03 #350 Description San Diego ' California 92108 Scope: User: KW0601N Ver 5.6.1, 26-Oct (c)1983-2002 ENERCALC Engineering Software General Footin Analysis & Design Page 1 7 c1ec5Skleine building foundalions.ecw:Calcu Description BUllding # 4 Typical Interior Column General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements Allowable Soil Bearing 2,200.0 psf Dimensions... Short Term Increase 1.330 Width along X-X Axis 3.500 ft Seismic Zone 4 Length along Y-Y.Axis 3.000 ft Biaxial Applied Loads Footing Thickness 18.00 in Live & Short Term Combined Col Dim. Along X-X Axis 8.00 in Fc 2,500.0 psi Col Dim. Along Y-Y Axis 12.00 in FY 60,000.0 psi Base Pedestal Height 1.000 in Concrete Weight 145.00 pcf Overburden Weight 0.00 psf Min Steel % 0.0014 Rebar Center To Edge Distance 3.50 in Loads Applied Vertical Load... Dead Load 7.580 k ...ecc along X-X Axis 0.000 in Live Load k ...ecc along Y-Y Axis 0.000 in Short Term Load k Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Moments... (pressures @ left & right) (pressures @ top & bot) Dead Load k-ft k-ft Live Load k-ft k-ft Short Term k-ft k-ft Creates Rotation about Y-Y Axis Creates Rotation about X-X Axis Applied Shears... (pressures @ left & right) (pressures @ top & bot) Dead Load k k Live Load k k Short Term 5.000 k k Footing Design Shear Forces ACI 9-1 ACI 9-2 ACI 9-3 Vn * Phi Two -Way Shear 1.96 psi 4.68 psi 3.01 psi 170.00 psi One -Way Shears... . Vu @ Left 1.53 psi 4.15 psi 2.67 psi 85.00 psi Vu @ Right 1.53 psi -0.36 psi -0.23 psi 85.00 psi Vu @ Top 0.00 psi 0.00 psi 0.00 psi 85.00 psi Vu @ Bottom 0.00 psi 0.00 psi 0.00 psi 85.00 psi Moments ACI 9-1 ACI 9-2 ACI 9-3 Ru / Phi As Read Mu @ Left 1.02 k-ft -0.23 k-ft -0.15 k-ft 5.4 psi 0.24 in2 per ft Mu @ Right 1.02 k-ft 2.44 k-ft 1.57 k-ft 12.9 psi 0.24 in2 per ft Mu @ Top 0.51 k-ft 0.51 k-ft 0.33 k-ft 2.7 psi 0.24 in2 per ft Mu @ Bottom 0.51 k-ft 0.51 k-ft 0.33 k-ft 2.7 psi 0.24 in2 per ft Soil Pressure Summary Service Load Soil Pressures Bottom- Top -Rig Bottom- Top-Lef DL + LL . 940.17 940.17 940.17 940.17 psf DL + LL + ST 2,313.94 2,313.94 0.00 0.00 psf Factored Load Soil Pressures . ACI Eq. 9-1 1,316.24 1,316.24 1,316.24 1,316.24 psf ACI Eq. 9-2 3,236.87 3,236.87 0.00 0.00 psf ACI Eq. 9-3 2,080.84 2,080.84 0.00 0.00 psf ACI Factors (per ACI, applied internally to entered loads) a ACI 9-1 & 9-2 DL . ACI 9-1 & 9-2 LL ACI 9-1 & 9-2 ST ....seismic = ST 1.400 ACI 9-2 Group Factor 1.700 ACI 9-3 Dead Load Factor 1.700 ACI 9-3 Short Term Factor 1.100 0.750 UBC 1921.2.7 "1.4" Factor 1.400 0.900 UBC 1921.2.7 "0.9" Factor 0.900 1.300 _.3 Ocit 01 04 08:51a Kleine Development 760 776 4842 p.l FLEWE BUILDING &DEVELOPMENT, INC. TO: GREG BUTLER - CITY OF LA QUINTA 2 PAGES fax - 777-1233 FROM: NANCY C-C Tel: 776-4840 Fax - 776-4842 RE: LA QUINTA VALLEY PLAZA DATE: OCTOBER 1, 2004 The page following is Welder Operations information and certification. If you have any questions do not hesitate to contact our office or Bob Finch, 578-3244, in the field. Thank you. .-10,!c�l 01 04 08:51a Kleine Development 760 776 4842 p.2 Record of Welding Operator's Qualification Test Process: SMAW Position: All t.and 1 Filter Base. Metal: AlI F-2. F-3 & F=4` Metal: Coated Steel Joints) All aooroved D1.3 joints Thickness: 3/16 & i !ab Number. 24379 So. California Carpentry Joint -Apprenticeship & Training Committee • r WELDING CERTIFICATION This is to Certify that Welders Signatu(O Has satisfactorily completed and passed the Welding requn�nts o AWS: 01.3 98 SecSon 4 Dart B JOHN U. NQtZQ The undersigned testifies that he wftnmed and four candidetee to competent as detai on the reverse side of this card. CW1 1 inspector. Date of Test