Loading...
04-4202 (OFC) Title 24• .TITLE 24 -REPORT' Title .24 Report for: La Quinta Valley Plaza, Building 3 Highway 111 La Qu i nta, Ca 92253 Project Designer: Robert...Pitchford, Architect 74-835 Fox Hills Palm Desert, Ca 92260 -(760) 346-8775 'Repo'rt`P.repared By: Tim Scott H & H Air Conditioning Z4-991 Joni Drive #20 Palm Desert, CA 92260-2043 (760)340-3088 CI BUILDINGOF LA QUINTA & SAFETY DEPT. ;. APPROVED FOR CONSTRUCTION 2aDj �S ... , DAT !D BY�j'{� Job Number: -Date: 6/16/04 The'EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number:' User Number: 5533 TABLE OF CONTENTS -Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM. Envelope. Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and.- Cooling Loads Summary Room Load Summary Room Heating Peak Loads Room Cooling, Peak Loads Room Cooling Coil Loads 1 2 3 11 12 14 15 16 17 19 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and DATE La Quinta Valley Plaza, Building 3 The Principal Designers hereby certify that the. proposed, building design, represented in the construction documents and od led 6/16/04 PROJECT ADDRESS 8,231Sq.Ft. ENV. LTG. MECH. Highway 111 La Quinta BUILDING TYPE rf PRINCIPAL DESIGNER -ENVELOPE TELEPHONE Building Permit # Robert Pitchford, Architect (760) 346-8775 DOCUMENTATION AUTHOR TELEPHONE Checked by/Date H & H Air Conditioning (760) 340-3088 Enforcement Agency Use ISTATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6; of the State Building Code. This certificate applies.only to a Building using the performance compliance approach. DOCUMENTATION AUTROR 5TG DAT Tim Scott )bLo4- The Principal Designers hereby certify that the. proposed, building design, represented in the construction documents and od led for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed'meets the energy efficiency requirements of the State Building Code, Title 8,231Sq.Ft. ENV. LTG. MECH. 15 BUILDING TYPE NONRESIDENTIAL " '' '0`'� HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ED ADDITION ❑ ALTERATION EXISTING + ADDITION ISTATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6; of the State Building Code. This certificate applies.only to a Building using the performance compliance approach. DOCUMENTATION AUTROR 5TG DAT Tim Scott )bLo4- The Principal Designers hereby certify that the. proposed, building design, represented in the construction documents and od led for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed'meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ; ENV. LTG. MECH. F] R 0 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code -Section. 0 . 5537.2 or 6737.3 to sign this document asttie`person. responsible for its preparation; and that I am a licensed contractor preparing documents for work that l have contracted to perform. 0.: E • F] .3. 1 affirm that I am 'eligible'under Diyision-3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) Indicate location on plans of Note Block for.Mandatory Measures . :Re Ire or PRINCIPACENVELOPE-DESIGNER _1 .. • - NAM Robert Pitchford, Architect . �2'�l '"i ILIGHTING COMPLIANCE 'Indicate location on plans of Note Block for Mandatory. Measures Lighting Compliance Not In The Scope Of Required Forms IS46bmftta PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE Indicate location on plans of Note Block for Mandatory Measures ' ECH-1, MECH-2, MECH-3 Required. rms PRINCIPAL MECHANICAL DESIGNER - NAME H & H Air Conditioningb4- SIGN"E LIC. NO. DAT Run Initiation Time: 06/16/04 13-42:51 Run Code: 1087418571 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number. Page:3 of 20 rPERFORMA.NCE'CERTIFICATE,,'OF-.COMPLI.ANCE Part 2 of 3 PERF -1 DATE La Quinta Valley Plaza;Building 3 6/16/04 .ANNUAL SOURCE ENERQ u sq -yr . ENERGY COMPONENT : , Standard Design , Proposed, Design j Compliance Margin sta° ar propo__ 4009299W=fts Space Heating Space Cooling Indoor Fans _ . Heat Rejection . Pumps.& Misr... Domestic . Lighting Receptacle TOTALS. 1.75 2.55 -0.80^ ' s7 �• k r� �xx y _ 55.84 50.12 5.72 . 18.52 21.76 -3.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 :.. o,00 35.35 35.35,,.:. .0.00 [E202..0701 22.71 0.00Process. o.q0 0.00'' 134.16 132:49 1.68 Building Orientation Number of Stories. Number,of Systems ` Number of Zones (Northwest) 315 deg Conditioned Floor Area 8,23 sgft. 1 'Unconditioned Floor Area o sqn. 6 Conditioned Footprint Area 8,231 sgft. 1 Orientation Front Elevation :(Northviiest) Left Elevation '(Northeast)'. Rear Elevation; ($outheast) Right Elevation (Sauomest) Total Roof „ ' Gross AreaGlazing sgtt,'ji sqn. sgft. sqn. sgft. sgft. Area Glazing sgft: sgft. sgft. sqn. sgft. Ratio ' ` 1,206 556 46.3% 690 60 8.7% 1,200 0 0.0% 690 319sgft. 46.2% 3,780 935 8,231 0.0% _-..StandardProposed • ...... .' Lighting power Density `.1.200 W/sgft. ' 0.000 W/sgft. Prescriptive Env. Heat Loss' 1;419 2,031 Prescriptive Env. Heat Gain 161,129 229,855 emar s: Run InitiatiqnTime: un Code: 1087418571 EnergyPro 3.1' ByEnergySoft User Number: 5533 .. Job Number., PageA of 20 PERFORMANCE 'CERTIFICATE�:OF`:COMPLIANCE Part'3 of 3 PERF -1 PROJECT NAME La Quinta Valley Plaza, Building 3 DATE 6/16/04 System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)1 Port. LPD (W/sf)1 Ctrl. Credits (W/S02 lailorea Proc. Loads (W/sf) (W/sf)3 HVAC -1 thru 6 Building 3 Comp. Bldg Office 8,231 0.000 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTGA Items above require special documentation I ne weal enrorcemem ayency snowu pay special auenuon io use nems specmeu m ims cnecRnsi. I nese nems requuv speciai wnaen justification and documentation, and special verification to.be used. with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building 'or design that otherwise complies based on the adequacy of the special justification and:documentation submitted. Plan Field I I I The exceptional features listed in this performance approach' application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run InitiationTime: un Code: 1087418571 jEnergyPro 3.1 By EnergySoft User Number:,5533 ,..w', Job Number. Page:5 of 20 ENVELOPE COMPLIANCE SUMMARY.'Performance ENV -1 PROJECT NAME La Quinta Valley Plaza, Building'3 DATE 6/16/04 Glazing Type . Location / Comments 1 Window 60 0.720 45 0.56 Double Metal Tinted Default # Surface Framing Type Type Act. Area U -Fac. Azm. Solar Gains Tilt y/N . . Form 3 Reference Location / Comments 1 Roof Metal 8,231 0.107 0 0 X I I R-30 Roof(R.30) Building 3 2 Wall Metal 488 0.172 45 90 'X R-19 Wall Building 3 3 Door None 21 0.146 45 90 Insulated Metal Door Building 3 4 Door one 21 0.146 45 vu Insulated MetalDoor Building 0.56, oor one 8 Window X Insulated Metaloor Building Double Metal Tinted Default a e aR-19WaII 99 0.720 315 0.56 Building 7. a eta 315 X R-19 Wall. Building 11 endow Wall e a 0.56 -D-o-uBTe-Ve-tal TintedDe au tBui a building 18 0.720 315 0.56 Double Metal Tinted Default uilding 3 13 Window 50. 0.720 315: 0.5.6 Double Metal Tinted Default Building 3 14 in ow 99 0.720 -73M 0.56 Double Metal Tinteda au t ul ing 3 15 Window 99 0.720. ,3 „ 0, 6 , Double Metal Tinteda au t uilding 3 # Exterior Shade Type SHGC Window. Hgt. Wd. Len. Hgt. ver ang. Left Fin Right Fin xt. x .i6's.Len-.-igf Dist. en. g . 1 • None 0.76 6.0 10.0 0.0 0.0 0.0 0.0 2 None 0.76 3 None 0.76 4. None . 0.76 PI 5 None 0.76 --9-.None 0.76 T ---None 0.76 8 None 0.76 6.0 19.6 ^' '• ' 8.0' '0.1 8.0" 8.0 9 None 0.76 6.0.16.5 Site Assembled Glazing vuc n wn n uwiu..V'0-7 ivu,vuu ayiuvrn anu iu,uw ayn vci ut ai yiauny uwn ivrn�. �.cnniVaiwii W IGl�U11CU. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm: SHGC•. Glazing Type . Location / Comments 1 Window 60 0.720 45 0.56 Double Metal Tinted Default Building 3 .2 Window 99 0.720 225 0.56 ou a eta rote Default -Bu lding 3 .3. Window 50 : 0.720 225 .:..., .. ,0.56 D-ou-65-191-efiaTTintecl Default Bw ing 3 . .4 Window 42 0.850 225". .° '' V 0:56 ` Double Metal.Tinted Default Building 3 5 Window 18 0.720 225 0:56 Double Metal Tinted Default Building 3 ..6 Window 66-70-2o 225 0.56 7 Double Metal TintedDefault Building 3 7 Window 60 0.720 225 0.56, Double Metal Tinted De ault Building 3 8 Window 99 0.720 315.. 0.56 Double Metal Tinted Default Building 3 9 Window 99 0.720 315 0.56 Double Metal Tinted Default Building 3 10 Window 50 0.720 315 0.56 Double Metal.Tinted Default -Building 3 11 endow 42 0.850 315 0.56 -D-o-uBTe-Ve-tal TintedDe au tBui ing 3 12 Window 18 0.720 315 0.56 Double Metal Tinted Default uilding 3 13 Window 50. 0.720 315: 0.5.6 Double Metal Tinted Default Building 3 14 in ow 99 0.720 -73M 0.56 Double Metal Tinteda au t ul ing 3 15 Window 99 0.720. ,3 „ 0, 6 , Double Metal Tinteda au t uilding 3 # Exterior Shade Type SHGC Window. Hgt. Wd. Len. Hgt. ver ang. Left Fin Right Fin xt. x .i6's.Len-.-igf Dist. en. g . 1 • None 0.76 6.0 10.0 0.0 0.0 0.0 0.0 2 None 0.76 3 None 0.76 4. None . 0.76 5 None 0.76 --9-.None 0.76 T ---None 0.76 8 None 0.76 6.0 19.6 ^' '• ' 8.0' '0.1 8.0" 8.0 9 None 0.76 6.0.16.5 8.0 0.1 8.0 B.T. 10 None 0.76 10.0 , 5.0 8.0 0.1 8.0 , 8:0 1:1 None 0.76 7.0 6.0:. 18.0 0.1 8.0 8.0 12 None 0.76 3.0 6.0 8.0 0.1 ' 8.0 8.0 13 None 0.76 10.0 5.0 8.0 0.1 8.0 8.0•• . 14 one 0.76 6.0 16.5 8.0 0.1 8.0 8.0 15 None 0.76 6.0 16.5 8.0 0.1 8.0 8.0 Run Initlation.Time:, 06/16164 13: 2:5 un Code: 70-87418571 EnergyPro 3.1 By EnergySoft User Number: 5.533... ,..s .... .:•--.;Job Number. Page:6 of 20 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE La Quinta Valley Plaza, Building 3 6/16/04 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET " HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY - MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE HVAC -1 thru 8 Programmable Switch Heating & Cooling Requirec n/a Yes Constant Volume No No Constant Temp Constant Temp n/a Auto No Economizer 823 cfm Heat Pump - 7.20 HSPF Packaged DX 12.0 SEER /10.2 EER- Yes Yes Ducts in Attic .4.2 Ducts in Attic 4.2 No Run Initiation Time: un Code: 1087418571 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number. Pagel of 20 CODE TABLES: Enter co e: rom table below into co umns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B:.Air Balance C: Outside Air;Cert. M: Out: Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water , N: Not Required . EC: Economizer Control See Section 144(e)3 Enter Outdoor it CFM. Note: This shall be n less than Col. H on MECH-3. PIKE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC NUIh5 IU F It --LU - or tsuilding Uepartment Use Unly 1 Run Initiation Time: un Code: 1087418571 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number. Pagel of 20 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 --2.11 PROJECT NAME La Quinta Valley PlazaBuilding 3 DATE', 6/16/04 SUPPLY FAN RETURN FAN Efficiency Tons PUMPS CFM BHP ,Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive' Eff. 'Pump Control ' "none ' ' Energy Factor or Recovery Efficiency Standby Loss or Pilot TANK INSO U. System Name System Type Distributlon'Type, Qty Rated Input (Gals.) Vol. Ext. R -Val. • ,M C6OLING System Name System Type Qty.. Output • Aux.. 'W! -Ti- Eff.; � -•• Output - Sensible Efficiency Economizer Type CARRIER 50JX0605 Packaged DX 6 57,000 0.0 7.20 HSPF 60,000 42,00012.0 SEER 110.2 EEF No Economizer CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN .System Name • Fan Type .Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. G7�ltR1ER3�00X0603. . Constant Volume , �'; " • •Draw ' "none ' ' EnergyPro 3.1 By EnergySoft User Number. 5533.:: Job Number: Page:6 of 20 Through"" 2,000 •0.70 77.0% 100.0% ' "none ' ' EnergyPro 3.1 By EnergySoft User Number. 5533.:: Job Number: Page:6 of 20 . ' MECHANICAL EQUIPMENT --S.UMMARY,- Part 2 of 2 MECH-2 PROJECT NAME DATE La Quinta Valley Plaza, Building 3 6/16/04 ZONE TERMINAL SUMM= TERMINAL F Motor Drive CFM BHP Eff. Eff. Type Output UNAL OUR in. CFM Reheat Coil Ratio I ype DeltaT tTAQS Room Name Qty. CFM BHP Motor Eff.. Drive Eff!, Room Name Qty, CFM BHP Motor Eff. Drive Eff. • is i., Run Initiation Time: un Code: 1087418571 EnergyPro 11 By EnergySoft User Number::5533 ­ • Job Number: Page:9 of 20 MECHANICAL VENTILATION MECH-3 La Quinta Valley Plaza, Building 3 6/16/04 FA © a o AREA BASIS AREA CFM CFM PER SF B x C a o a OCCUPANCY BASIS IN FIVI OF PER CFM PEOPL PERSON IExFI a REQ'D O.A. (MAX OF DORG► o DESIGN OUTDOO AIR CFMRAT a o [VA] N]ZONE/SYSTEM MIFERSF AIR C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10.1997 UBC Occupant Density. 1 Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or.equal to (H -J). EnergyPro 3.1 By EnergySofC User Number: 5533 ; Job Number. Page:10 of 20 ENVELOPE MANDATORY MEASURES ENV - PROJECT NAME DATE La Quiinta Valley Plaza, Building 3.. 6/16/04 DESCRIPTION Designer Enforcement �( § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. �( • § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirerrients of Sections and 707 of Title 24, Part 2. • ... •i. 12602 . -.. i Ali i'l r.11 �I,.�4r•;='� •!�'. ., ... § 117(a) All Exterior Joints and openings in the building that'are observable sources of air leakage shall be caulked, gas keted; weatherstripped or otherwise sealed. F-]. §.116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and.shall be weatherstripped (except for unframed glass doors and fire doors). ' § 116(a)1 Manufactured Doors and Windows installed shall have.air Infiltration rates not exceeding those shown in Table Number 1-E-of.the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. :o 118(e) Demising Walls in Nonresidential Buildings:,, The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number. Page: 11 of 20 MECHANICAL MANDATORY, MEASURES Part 1 of 2 MECH-MM La Quinta Valley Plaza, Building 3 6/16/04 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies §111 Any appliance for which there Is a California standard established In the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment; shall be insulated In accordance with Standards Section 123. �( .6124 Air handling duct systems shall die installed and Insulated In compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be Installed with one of the following: �( § 122(e)1A Each space conditioning system serving building types such.as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable'of programming different schedules for weekdays and. weekends; Incorporate an automatic holiday "shut- off' feature that turns off all loads for'at least,24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 1,O hours If power Is interrupted; or a§ 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. ' § 122(e)2 Each space conditioning system shall, be.lnstalled with controls that temporarily restart and temporarily operate the system as required to'niaintain a setback heating and/or a setup cooling thermostat setpoint. . F§ 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than'25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed -25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independehtly'of.other Isolation areas; and shall be controlled by a time control device.as described above.... �( § 122(a&b) Each space conditioning system shall,be controlled by an Individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F. or lower. For cooling, the control shall'be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable.of providing a'deadband of at least 5 degrees F within which the supply of heating and cooling Is shut off or reduced to a minimum. 122(c) Thermostats shall have numeric setpoints In degrees Fahrenheit,(F) and adjustable setpoint stops accessible only to authorized personnel. ❑ § 112(b) Heat pumps shall be installed with controls to prev ent.electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number.. Page:12 of 20 MECHANICAL MANDATORY MEASURES- Part 2 of 2 MECH-MM La Quinta Valley Plaza, Building 3 6/16/04 Description Designer Enforcement Ventilation § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 1��(q All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the.outside, except for combustion air openings. i § 121(f)1 Air Balancing: The system shall.be balanced In accordance'with!the National Environmental Balancing Bureau (NEBB) Procedural Standards'(1983), or Associated Air Balance Council (AABC) National Standards (1989); or ' &.121 (f)2 Outside Air Certification: The system shall,provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or ' §121(f)3 Outside Air Measurement: The system shall.be equipped with a calibrated local or ' remote device capable of measuring -the quantity, of outside air on a continuous basis and displaying that quantity.on dreadily,accessible display divice; or § 121(f)4 Another method approved by the Commission. Service Water Heating Systems 0 : § 113(b)2 If a circulating hot water system is installed; it shall have a control capable of automatically turning off the circulating pump(s) when hot water Is not required. §1 13(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. [X]' § 1.13(b)3C Lavatories in restrooms of.public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. . Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. i Proximity sensor actuated control valves,'and outlet, devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing -valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallonslcycle,(circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallonslcycle;(foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number :5533 Job Number. Page: 13 of 20 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE La Quinta Valley Plaza, Building 3 6/16/04 SYSTEM NAME FLOOR AREA HVACA thru 6 8,231 CFM per System 2,000 -Airflow (cfm) 12,000 Airflow (cfm/sqft) 1.46 Airflow (cfmrTon) 400.0 :Outside Air (%) .6.9 Outside Air (cfm/sqft) 0.10 Note: Values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan. Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 11,659 170,482 29,342 9,661 139,236 0 8,524 6,962 0 0 823 32,702 8,102 823 38,065 0 0 8,524 6,962 220,232 37,444 191,224 CARRIER 50JX0605 225,221 98,207 224,925 Total Adjusted System Output 225,22 98,207 224,925 . (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am ream I empera ures at Time of Heating ea 26.0 of 66.5 OF 84.1 OF 84.1 OF Supply Air Ducts Outside Air • 823 cfm' o Heating Coil Supply Fan 83.5 F 12000 cfm ROOMS 70.0 of 69.5 OF Return Air Ducts 11.2:0 / 77.9 of .77.2/65' 7 OF. 59.6 / 58.7�OF ; . 59.6 158.7 of Supply Air Ducts Outside Air 823 cfm • _ .. Cooling Coil ,Supply Fan 60.3158.9 OF 12000 cfm 60.20/6' R.H. ROOMS 74.7 / 64.7 of 74.0 / 64.4 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page 14 of 20 ROOM LOAD SUMMARY PROJECT NAME . La Quinta Valley Plaza, Building 3 DATE 6116104 SYSTEM NAME HVAC -1 thru 6 FLOOR AREA 8,231 IROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM . SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Building 3 uiing 1 11,659 17.0,482 29,342 11,659 170,482 29,342 9,661 139,236 jJ PAGE TOTAL 11,659 170,482 29,342 9,661 139,236 TOTAL 11,659 170,482 29,342 9,661 139,236 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 15 of 20 -ROOM HEATING PEAK LOADS Project Title Date La Quinta Valley Plaza, Building 3 16/16/04 Room Information Design Conditions Room Name Building 3 Time of Peak Jan 12 am Floor Area 8,231 Outdoor Dry Bulb Temperature 26°F Indoor Dry Bulb Temperature 70°F. Conduction Area U -Value AT of Btu/hr Items shown with an asterisk (f') denote conduction through an interior surface to another room. Page Total: 107,117 Infiltration: I 1.00 x 1.064 x 8,231 x 10.00 x 0.50 / 501 x Sc e u e it sense a rea a ng e g .t ., —I pT Fraction i TOTAL -HOURLY HEAT LOSS FOR ROOM 139,236 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number:Page: 16 of 20 8,231.0 X x X x X x X x x x x x x x x x x x x x x x X x x x X X X x X x x X X x x 0.1073 x x X x X x x x x x x x x x x x x x x x x x x x x X X x x x X x x x x x X x 44.0 = = = = = = = = = = = = = = = = = = = = = = = = = = = 38,864 2,703.0 0.1717 44.0 20,419 142.0 0.1460 44.0 912 851.0 0.7200 44.0 26,960 84.0 0.8500 44.0 31142 perimeter= 378.0 44.5 16,821 M'✓ ' " Items shown with an asterisk (f') denote conduction through an interior surface to another room. Page Total: 107,117 Infiltration: I 1.00 x 1.064 x 8,231 x 10.00 x 0.50 / 501 x Sc e u e it sense a rea a ng e g .t ., —I pT Fraction i TOTAL -HOURLY HEAT LOSS FOR ROOM 139,236 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number:Page: 16 of 20 ROOM COOLING PEAK'LOADS' Project Title . La Quinta Valley Plaza, Building I Date --] 6/16/04 ROON DESIGN CONDITIONS Room Name Building 3 Time of Peak Jul 3 pm Floor Area 8,231 Outdoor Dry Bulb Temperature 112 1: Indoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 7E Conduction 11-30 Roof(R.30) R-19 Wall nsulated Metal Door nsulated Metal Door ouble Metal Tinted Default =19 Wall -19 Wall., ouble.Metal Tinted.Default ouble Metal Tinted Default Area 8,231.0 488.0 42.0 100.0 120.0 1,200.0 _ 495.0 200.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. U -Value 0.1073 0.1717 0.1460 0.1460 0.7200 0.1717 -- 0.1717 0.7200 0.7200 X X X X X x X. X X DETD 1 = = = = = = = = = Btu/hr 64.3 56,827 38.2 3,201 42.0 257 42.0 613 27.0 2,334 38.7 7,982 51.6 3,288 27.0 9,630 27.0 3,891 Page Total SS,o23 Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr (Northeast) ..'.60.0 x x 'x x x x x X X X 42 x x x x x x x x X X 0.623 x x x x x x x x X X 1.400 = = = = = = = = = = 2,200 (Southwest) _ 99.0 189 0.623 , 0.428 4,995 (Southwest)„ ;; '; ; ':'' • ' 50.0 189 0.623 0.428 2,523 (Southwest) 42.0 189 0.623 0.428 2,119 (Southwest) 18.0 189 0.623 0.428 908 (Southwest) 50.0 189 0.623 0.428 2,523 (Southwest) 60.0 189 0.623 0.428 3,027 (Northwest) 99.0 50 0.623 0.698 2,155 (Northwest) . 99.0 50 0.623 0.698 2,155 (Northwest) 50.0 50 0.623 0.716 1,117 Page Total 23;722 Sched. ,. Weighting .Internal Gain Frac. Area Heat Gain ` Factor Btu/hr ights.' ' 1.0 x 8,231 X o.000 Watts/sqft x 3.41 Btuh[Watt x 0.000 = 0 Occupants _ x 8,231 x 300 Btuh/occ. / 15 sqft/occ. x 1.00 = 16,462 eceptacle 1.00 x 8,231 x 6.666 Watts/sgft x 3.41 Btuh[Watt x 1.00 = 0 rocess _ 01 x 8,231 x o.00o Watts/sqft x 3.41 Btuh/Waft x 1.00 = 0 Infiltration: 1[7-Q0x _ 1.064 x +' 8,231 x 10.00 x 0.50 / 60 x 38 = 27,739 Schedu a :FSnsei . e Area Cening ReIgntp Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM. i 170,482 Sched. Latent Gain Frac. Area Heat Gain Btu/hr ccup� ants 1.00 x 8,231 x 300 Btuhloco. / 150 sqft/occ. = 16,462 Receptacle 1.00 x 8 231 x 0.000 Watts/sqft x 3.413 Btuh/Watt = 0 Process L.I'ddioo.] 1.00 x 8,231 x 0.000 Watts/sqft x 3.413 Btuh/WattInfiltration: x 4 771 x' ; . 1231x 050 /6] x +� en rea ,dening meignt AUH QW Fraction . TOTAL'HOURLY LATENT HEAT GAIN FOR ROOM 29,342 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 17 of 20 ROOM COOLING PEAK LOADS Project Title Date La Quinta Valley Plaza, Building 3.' 6/16/04 ROOM INFORMATION DESIGN CONDITIONS Room Name Building 3 Time of Peak Jul 3 pm Floor Area 8,231 Outdoor Dry Bulb Temperature 112 Indoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 78 Conduction ouble Metal Tinted Default ouble.Metal.Tinted Default R-19 Wall Area 84.0 36.0 644.0 U -Value 0.8500 0.7200 0.1717 X X X X X X X X X DETD 1 = = = = = = = = = Btu/hr 26.1 1,867 27.0 700 47.4 5,238 (Northwest) . 18.0 50 0.623 0.681 382 '(Northwest) 50.0 50 0.623 0.716 1,117 1. Design Equivalent Temperature Difference (DETD) Page Total 7,806 'Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area. SGF SC Factor Btu/hr (Northwest). 42.0 x X X x x x' x X X x 50 x x X x x x x X X x 0.623 X X x x x x X X X x 0.703 = = =. = = = - 921 (Northwest) . 18.0 50 0.623 0.681 382 '(Northwest) 50.0 50 0.623 0.716 1,117 99.0 50 0.623 . 0.698 2,155 -(Northwest)',. (Northwest) ...:• 99.0 50 0.623 0.698 2,155 Page Total s,73o Sched. Weighting Btu/tir Internal Gain Frac... Area Heat'Galn.: ,..:._.: ,:. Factor .fights, 1.00 x 8,231 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 0.000 = 0 Occupants 1 00 x 8,231 X 300 Btuh/occ. / 15 sgft/occ. X 1.00 = 16,462 eceptacle 1 00 x 8,231 X' 0:000 Watts/sqft x 3.4v Btuh/Watt X 1.00 = 0 rocess1 00 x 8,231 x 0:000 'Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 x _ 1.064 x' 8,231 x 10.00 x 0.50 / 60] x 38 = 27,739 [F,hed-uie Air Sensible Area CeilingHeightC p Fraction TOTAL -HOURLY SENSIBLE HEAT GAIN FOR ROOM 170,482 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 x 1 8,231 x , 300 Btuh/occ. / 150 sgft/occ. = 16,462 Receptacle _ 1.00 X 8 231 x . 0.000 Watts/sgft x 3.413 BtuhfWatt = 0 Process 1.00 x• 8,231 X 0.000 Watts/sgft x 3.413 Btuh/Watt = 0 Infiltration: 1.00 x 4t,771 x 8231 X 10.00 x 0.50 /6G1 x 0.00394 = 12880 chlaule Ai► en rea • o f ng e g C J Qyy Fraction ' TOTAL HOURLY LATENT HEAT GAIN FOR.ROOM- -.,-i.-.-'.'--.-,---,,, "" - 29,342 EnergyPro 3.1 By EnergySoft User Number:.5533 ' Page: 18 of 20 ROOM COOLING COIL LOADS Project Title Date La Quinta Valley Plaza, Building.3. 6/16/04 IROOM- INFORMATION 60.0 DESIGN CONDITIONS I Room Name Floor Area Indoor Dry Bulb Temperature Building 3: 8,231 74'� Time of Peak Outdoor Dry Bulb Temperature Outdoor Wet Bulb Temperature Jul 3 pm 112 1: 78 Conduction Roof(R.30) =19 Wall. nsulated. Metal Door nsulated Metal Door ouble Metal Tinted Default -19 Wall ouble Metal -Tinted Default ouble Metal Tinted Default Area 8,231.0 488.0 42.0 100.0 120.0 1,200.0 371.0 495.0 200.0 1, Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Orientation Area (Northeast) 60.0 (Southwest) 99.0 (Southwest) 50.0 (Southwest) 42.0 (Southwest) 18.0 (Southwest) 50.0 (Southwest). . _ 60.0. (Northwest) 99.0 (Northwest) 99.0 (Northwest) 50.0 U -Value SGF X. 42 x 189 X 189 X 189 x . 189 X 189 X 189 x 50 x 50 X. 50 0.1073 0.1717 0.1460 0.1460 0.7200 0.1717 0.1717 0.7200 0.7200 X X X X X x x X X DETD 1 = = = = = = = = 64.3 38.2 42.0 42.0 27.0 38.7 51.6 27.0 27.0 SC x 0.623 X 0.623 x 0.623 x 0.623 x 0.623 X 0.623 x 0.623 X 0.623 x 0.623 x 0.623 Page Total Weighting Factor x 1.400 = X 0.428 = x 0.428 = x 0.428 = x 0.428 = x 0.428 = X 0.428 = x 0.698 = x 0.698 = x 0.7161 = Page Total Btu/hr 56,827 3,201 257 613 2,334 7,982 3,288 9,630 3,891 88,023 Btu/hr 2,200 4,995 2,523 2,119 908 2,523 3;027 2,155 2,155 1,117 23,722 Sched. Weighting Internal Gain Frac. Area Heat Gain .. Factor Btu/hr ights 1.00 X 8,231 X 0.000 Watts/sqft X 3.41 Btuh/Watt x 0.000 = 0 Ccupants 1.0 x 8,231 X• • •300 Btuh/OCC. / 15 sgft/OCc. X 1.00 = 16,462 eceptacle 1.0 x 8,231 x 0.000 .Watts/sqft 'x 3.41 Btuh/Wattx 1.00 = 0 rocess ' .' f1.0 x 8,231 X 0.000 Watts/sqft x 3.41 Btuh/Watt �1 x 1.00 = 0 Infiltration: L 1.00 x�S-Jnio= x ' 8,231 X. 10.00 x 0.50 / 6G x 38 = 27,739 Schedule AArea,a ng e g J p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 170,482 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccupants 1.00 X 8,231' ' •X` 300 BtUh/OCC. / 150 Sgft/oCC. = 16,462 Receptacle 1.00 X 8 231 x 0.000 Watts/sqft X 3.413 Btuh/Watt = 0 Process 1.00 x 81231 x 0.000 Watts/sqft x 3.413 Btuh/Watt = 0 Infiltration: 1.00 x _ 4,771 X 8 231 X ' , 10.00 x 0.50 / 60� x 0.00394 = 12 880 Schedule AHLaten rea killing eig C pW Fraction TOTAL HOURLY LATENT HEAT GAIN' FOR ROOM 29,342 EngigyPro 3.1 By EnergySoff User Number: 5533 Page: 19 of 20 ROOM COOLING COIL LOADS"' Project Title Date La Quinta Valley Plaza, Building 3 6/16/04 ROOKIN FORMATION X DESIGN CONDITIONS X Room Name Floor Area Indoor. Dry Bulb Temperature Building 3 8,231 74c� Time of Peak Outdoor Dry Bulb Temperature Outdoor Wet Bulb Temperature Jul 3 pm 112 78 c� Conduction bouble Metal Tinted Default Double Metal'Tinted Default -19 Wall Area 84.0 36.0 644.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. U -Value X 0.8500 X X 0.7200 X X 0.1717 X X 0.623 X X 18.0 X X indow X X 50 X X (Northwest) X X. 0.623 X Solar Gain Orientation Area , X X x X x X X X X X SGF 'x x x x X X X X x X SC Window _ (Northwest) 42.0 50 0.623 Window (Northwest) 18.0 .50 0.623 indow (Northwest) , . 50.0 50 0.623 indow (Northwest) 99.0 50 0.623 Window (Northwest) 99.0 50 0.623 DETD 1 Btu/hr 26.1 = 1,867 27.0 = 700 47.4 = 5,238 Page Total 7,8os Weighting x x X x x X X X X X Factor = = = = = = Btu/hr 0.703 921 0.681 382 0.716 1,117 0.698 2,155 0.698 2,155 P-- F - Page Total 1 6,730 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain . Factor fights 1.0( x 8,231 X o.000 Watts/sqft x 3.41 Btuh/Watt x 0.000 = 0 ccupants _1.0( x 8,231 X. 7 300 Btuh/occ. / 15 sgft/occ. X 1.00 = 16,462 Receptacle 1.00 x 8,231 x . 0.000 •Watts/sgft x 3.41 Btuh/Watt x 1.00 = 0 rocess , 01 X 8,231 X 0.000 Watts/s.gft x 3.41 Btuh/Watt�l X 1.00 = 0 Infiltration: i 1_00 x _. 1.064 .x' ';' 8,231 ,x 10.00 x 0.50 / 6] x 38 = 27,739 Schedule A-ir Sensi a rea Ceiling e g c p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 170,482 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccupants 1.00 x 8,231 X .' 300 Btuh/occ. / 150 sgft/occ. = 16,462 eceptacle . 1.00 X 8,231 'X 0.000 Watts/sqft X 3.413 Btuh/Watt = o Process . 1.00. x 8,231 ' ` x;_ ; . ;A ";'' 0.000 Wafts/sgft X 3.413 Btuh/Watt = 0 Infiltration: 1.00 X� 4 771 X 8 231 .x 10.00. X 0.50 / 60 x 0.00394 12 880 �ch� Airtent Area Ceiling Height Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 29,342 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 20 of 20