Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2021-22 RIVCO Bermudas ADA Ramps Project 2021-03 Bid Authorization Letter
January 4, 2022 Noe Arechiga CDBG Program Manager Riverside County EDA, Community Services Division 44-199 Monroe Street, Suite B Indio, CA 92201 Reference: CDBG Project Numbers 4.LQ.42-21 Subject: Citywide Miscellaneous ADA Improvements City Project Number 2021-03 Dear Mr. Arechiga: The purpose of this letter is to certify that the City of La Quinta City Council approved the specifications and engineer’s estimate, and authorized staff to advertise for bid the Citywide Miscellaneous Americans with Disabilities Act (ADA) Improvements, Project Number 2021-03 on December 21, 2021. The project specifications and engineer’s estimate were prepared and will be bid in accordance with the Community Development Block Grant guidelines and procedures. Please contact me if you have questions regarding this matter. Sincerely, William H. Ihrke City Attorney City of La Quinta CITY COUNCIL MEETING: December 21, 2021 STAFF REPORT AGENDA TITLE: APPROVE PLANS, SPECIFICATIONS, ENGINEER’S ESTIMATE, AND ADVERTISE FOR BID THE CITYWIDE MISCELLANEOUS AMERICANS WITH DISABILITIES ACT IMPROVEMENTS PROJECT NO. 2021-03 RECOMMENDATION Approve plans, specifications, engineer’s estimate, and authorize Staff to bid the Citywide Miscellaneous Americans with Disabilities Act Improvements Project No. 2021-03. EXECUTIVE SUMMARY •This project is a continuation of previous years of Americans with Disabilities Act (ADA) Ramp Improvement projects located on various intersections along Avenida Bermudas (Attachment 1). •The ADA miscellaneous improvements will include reconstructing curb ramps, sidewalks, and driveways to bring them to current code. Improvements also include an additive alternate to construct raised crosswalks across Avenida La Fonda and Calle Estado on the east side of Avenida Bermudas. Raised crosswalks are proposed due to the right of way constraints when placing curb ramps. •Construction is funded with Community Development Block Grant (CDBG) funds, which must be expended by the end of the 2021/22 Fiscal Year. The County has requested that the project be as complete as possible by the end of March 2022. FISCAL IMPACT The projected budget is $265,000, of which $77,623 will be allocated from the Citywide Sidewalk Improvements (Project No. 2122STI) and $187,377 from CDBG funds for construction costs as follows: CDBG Citywide Sidewalk Improvements Project Total Budget Professional/Design: $ 0 $ 25,000 $ 25,000 Inspection/Testing/Survey: $ 0 $ 15,000 $ 15,000 Construction: $ 187,377 $ 12,623 $ 200,000 Contingency: $ 0 $ 25,000 $ 25,000 Total Budget: $ 187,377 $ 77,623 $ 265,000 CONSENT CALENDAR ITEM NO. 8 55 BACKGROUND/ANALYSIS In 2011, the City conducted an ADA accessibility survey of all public facilities. To date, the City has addressed ADA deficiencies at the Exterior and Interior of City Hall, La Quinta Park, Civic Center Campus, La Quinta Library, SilverRock parking lot, La Quinta Museum, YMCA, Sports Complex, Velasco Park, Eisenhower Park, Adams Park, Desert Pride Park, Saguaro Park, Fritz Burns Park, Seasons Park, and a portion of Avenida Bermudas. This year’s Citywide Miscellaneous ADA Improvements will continue the work along Avenida Bermudas and focus the improvements at the following intersections: Calle Nogales Calle Colima Calle Madrid Eisenhower Drive Angel View Resale Store (Driveway and Sidewalk) Calle Estado (Raised Crosswalk) Avenida La Fonda (Raised Crosswalk) Work will not begin on Calle Estado or Avenida La Fonda until after the festivals if the additive alternates are awarded. Contingent upon approval to advertise the project for bid on December 21, 2021, the following is the project schedule: Council Bid Authorization December 21, 2021 Bid Period December 22, 2021 to January 17, 2022 Council Considers Project Award February 1, 2022 Execute Contract and Mobilize February 2 to February 28, 2022 Construction (30 Working Days) March 2022-May 2022 Accept Improvements June 2022 ALTERNATIVES Staff does not recommend an alternative due to the funding timing constraints. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer Attachment: 1. Vicinity Map 56 *IMPORTANT* Maps and data are to be used for reference purposes only. Map features are approximate, and are not necessarily accurate to surveying or engineering standards. The County of Riverside makes no warranty or guarantee as to the content (the source is often third party), accuracy, timeliness, or completeness of any of the data provided, and assumes no legal responsibility for the information contained on this map. Any use of this product with respect to accuracy and precision shall be the sole responsibility of the user. © Riverside County GIS Feet Legend Citywide Miscellaneous ADA Improvements Notes 0 REPORT PRINTED ON...12/1/2021 11:06:40 AM Project Vicinity Map 3,009 6,019 Blueline Streams City Areas World Street Map ATTACHMENT 1 57 58