Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
09-1142 (RC) Revision 1 Title 24
BUILDING ENERGY ANALYSIS REPORT PROJECT: DRMC Outpatient Imaging 47-647 Caleo Bay, Suite 100 La Quinta, Ca 92253 Project Designer: Report Prepared by: Bibi Moscovici MRC Engineering, Inc. 72-880 Fred Waring Drive, Suite C-11 Palm Desert, CA 92260 760-340-9005 R C C11 -Y OF LA QUIIVTA ENGiNEERiNG, INC,`' BUILDING & SAFETY DEPT.. Job Number: APPROVED FOR CONSTRUCTI N 9065.00 DArE.MID,Wr ' Date: la_4 5/26/2010 •' ®�1 �<< MM The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 20 HVAC System Heating and Cooling Loads Summary 21 EnergyPro 5.0 by EnergySoft Job Number. ID: 9065.00 User Number. 7746 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1 C Project Name Date DRMC Outpatient Imaging 1 5/26/2010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 47-647 Caleo Bay, Suite 100 La Quinta CA Climate Zone 15 192 192 GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition 0 Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Bibi Moscovici Signature Company MRC Engineering, Inc. Date 5/16/1010 Address 72-880 Fred Waring Drive, Suite C-11 Phone 760-340-9005 City/State/Zip palm Desert, CA 92260 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Company Date Address License # City/State/Zip Phone Principal Mechanical Designer Name MRC.ENG =Signature Company MRC.ENG A Date Address 72-880 Fred Waring Dr. License # City/State/Zip palm Desert, Ca 92260 Phone 760-340-9005 Principal Lighting Designer Name MRC. ENG. Signature Company MRC.ENG Date Address 72-880 Fred Waring Dr License # City/State/Zip palm Desert, Ca 92260 Phone 760-340-9005 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) © ENV-1C Certificate of Compliance. Required on plans. 0 MECH-1C Certificate of Compliance. Required on plans. 10 LTG-1 C Certificate of Compliance. Required on plans. 0 MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG-2C Lighting Controls Credit Worksheet. 0 MECH-3C Mechanical Ventilation and Reheat. ❑ LTG-3C Indoor Lighting Power Allowance. 10 MECH-5C Mechanical Equipment Details. LEnergyPro 5.0 by EnergySoft User Number: 7746 Run Code: 2010.05-26714:07:51 ID: 9065.00 Page 3 of 21 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1C Project Name Date DRMC Outpatient Imaging 1512612010 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sgft-yr) Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS Standard Proposed Complian Design Desian Margin 0.00 0.00 (N) 0.00 64,299.94 63,343.41 (S) 956.54 12, 265.20 10, 307.46 1,957.74 0.00 0.00 0.00 0.00 0.00 0.00 113.39 113.39 0.00 281.95 281.95 0.00 156.63 156.63 0.00 113, 719.54 113, 719.54 0.00 447.98 447.98 0.00 191, 284.64 188, 370.36 2,914.28 Percent better than Standard AL INFORMA 1.5%1 ( 3.8 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg BUILDING COMPLIES Building Orientation (IM 270 deg Conditioned Floor Area 192 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft- Number of Systems 1 Conditioned Footprint Area 192 sqft. Number of Zones 1 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Gross Area (►M 120 (N) 0 (E) 0 (S) 160 280 0 sqft. sqft. sqft. sqft. sqft. sqft. Standard Proposed Lighting Power Density 1.800 W/sgft. 1.800 W/sqft. Prescriptive Envelope TDV Energy 2365 3,88s Remarks: 0 0 0 0 001 sqft. sqft. sqft. sqft. sqft. sqft. G127ino Ratio 0.0% 0.0% 0.0% 0.0 0.0%1 0.0%1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1C Project Name DRMC Outpatient Imaging Date 5/26/2010 ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads System Name Zone Name Occupancy Type s ft. W/Sf' W/sf 2 W/Sf 3 W/sf ° W/Sf FC -7 CT SCAN "Mammography 192 '1.800 726.000 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C gems above require special documentation items marked with asterisk see LTG -1-C by others) (by others EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the Items specified In this checklist. These Items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System Carrier 38QRC060 A Premium Efficiency 0.75 BHP Supply Fan Motor has been specked. —Denotes an OSHPD Healthcare (I Occupancy) in the list of spaces above, which is NOT regulated by Title 24. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.0 by EnergySoft User Number: 7746 RunCode: 2010-05-26714:07:51 ID: 9065.00 Page 5 of 21 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name DRMC Outpatient Imaging Date 1 5/26/2010 Project Address 47-647 Caleo Bay, Suite 100 La Quinta Climate Zone 15 Total Cond. Floor Area 192 Addition Floor Area 192 GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 270 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type z d a ° 3oc N W O z r �L 0 W V OC O d 7 % io w> O CM d n W LL d �o > CD d c LL x 6 o a a c «� C o« v m y w a A a 1 Wall 160 (S) 0.069 R-211 4.3.1-A6 Altered ❑ ❑ 2 Wall 120 (W) 0.069 R-21 4.3.1-A6 Altered ❑ ❑ 3 Slab 192 (N) 0.730 None 4.4.7-A1 Altered ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 c yd d W O Z 0 K i Al 2> 0, li 2 o a >(n = ^� U Pi a = o y N -E d > O `vr C in N W a = w U. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.0 by EnergySoft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Page 6 of 21 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name DRMC Outpatient Imaging Date 5/26/2010 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or 13that have a LI -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. 13Wood 13 [3 El ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U -f actor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ ❑ ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, sees readsheet calculator at www.ener .ca. ov/title24/ Cl ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from Cool Roof criteria below. E3 13the ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped ro fing criteria. ❑ ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope Product Weight Product s 2:12 > 2:12 < 51b1ft2 a 51b/ft2 Type 2 Aged Solar Reflectance3 Thermal Emmitance SRI Pass Fails ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroots.ora/r)roducts/search.;)hi) 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p,Nuw — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at httgJ/www.energy,ca.gov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Forth and take appropriate action to correct. Verify building plans if necessarv. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnergyPro 5.0 by EnemySoft User Number: 7746 RunCode: 2010-05.26714:07:51 ID: 9065.00 Page 7 of 21 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name DRMC Outpatient Imaging Date 5/26/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 EnergyPm 5.0 by EnergySoft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Pe e 8 of 21 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name DRMC Outpatient Imaging Date 5/26/2010 Project Address 47-647 Caleo Bay, Suite 100 La Quinta Climate Zone 15 Total Cond. Floor Area 192 Addition Floor Area 192 GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition 0 Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 270 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC-1 RTU-1 HP-1 FC-7 [3 13i.e. Equipment T e3: Split DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 58,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 20.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 24,900 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 10.0 EER ❑ ❑ Duct Location/ R-Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1 HP-1 ❑ ❑ Equipment T e3: ❑ ❑ Number of Systems ❑ ❑ Max Allowed Heating Capacity' ❑ ❑ Minimum Heating Efficiency' ❑ ❑ Max Allowed Cooling Capacity' ❑ ❑ Cooling Efficiency' ❑ ❑ Duct Location/ R-Value ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS ❑ ❑ Economizer ❑ ❑ Thermostat ❑ ❑ Fan Control ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.0 by EneigySoft User Number: 7746 Run Code: 2010-05-26714:07:51 ID: 9065.00 Pae 12 of 21 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date DRMC Outpatient Imaqinq 1 5/26/2010 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Date DRMC Outpatient Imaging 5/26/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Qty. VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control Carrier 38QRC060 1 0 ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.0 by EneravSoft User Number: 7746 Run Code: 2010-05-26714:07:51 ID: 9065.00 Pae 14 of 21 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name DRMC Outpatient Imaging Date 5/26/2010 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Fault Detection & Diagnostics Qty. for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: Carrier 38QRC060 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.0 by EnergySoft User Number. 7746 Run Code: 2010-05-26714:07:51 ID: 9065.00 Pae 15 of 21 AIR SYSTEM REQUIREMENTS Part1 of 2 MECH-2C Project Name Date DRMC Outpatient Imaging 1 5/26/2010 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 FC -7 Number of Systems 1 Indicate Pa - e Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 20.00 HSPF Cooling Equipment Efficiency 112(a) 13.0 SEER/ 10.0 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Furnace Controls/Thermostat 112(c), 115(a) n/a Natural Ventilation 121 b No Mechanical Ventilation 121 b 17 cfm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c No Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 Na Pipe Insulation 123 Duct Insulation 124 R-8.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 36,225 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 17,061 Btu/hr Fan Control Constant Volume DP Sensor Location Supply Pressure Reset (DDC only) 1144d Yes Simultaneous Heat/Cool No Economizer 144(e) No Economizer Heat Air Supply Reset 144 Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. Energ Pro 5.0 by Energ Soft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Page 16 of 21 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name DRMC Outpatient Imaging Date 5/26/2010 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft) CFM per ft2 Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air CT SCAN 0.30 58 58 17 40 FC -7 Total 58 17 r Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnergyPro 5.0 by EnergySoft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Pae 17 of 21 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name DRMC Outpatient Imaging Date 512612010 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type City, Efficiency Tons Oty. GPM Premium BHP Eff. Motor Pump Control DHW / BOILER SUMMARY System Name Type Vol. Energy Factor Distribution Oty. Rated Input (Gals). or RE Standby Loss Tank Ext. or Pilot R -Value Status MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length ft Control HP Type In Plenum Outside Buried I Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Ot . Output Aux. kW Efficiency Output Efficiency Status Carrier 38QRC060 Split DX 1 58,000 0.0 20.00 HSPF 24,900 13.0 SEER/ 10.0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Premium Economizer Type BHP Eff. Motor CFM BHP Premium Eff. Motor Carrier38QRC060 Constant Volume No Economizer 1,600 0.75 © none ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.0 by EnergySoft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Pae 18 of 21 MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5C Project Name DRMC Outpatient Imaging Date 5/26/2010 ZONE SYSTEM SUMMARY SYSTEM VAV Fan E$ o m mi a w a ►L V v o w 2 Min CFM Zone Name System Name Type Oty. Heating Cooling Ratio Reheat Coil CFM BHP Outside Air CT SCAN CAV Box/No Reheat VA Box 1 0 100% None ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 10 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EXHAUST FAN SUMMARY EXHAUST FAN EE o E� �mi o. w EXHAUST FAN 0 o E� o_ w EXHAUST FAN E G o E� m a w Room Name oty. CFM BHP Room Name Oty. CFM BHP Room Name Ot . CFM BHP ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ of EnergyPro 5.0 by EnemySoft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Pae 19 of 21 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date DRMC Outpatient Imaging 512612010 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(x): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinning and sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). EnergyPro 5.0 by Enert7ySoft User Number. 7746 Run Code: 2010-05-26714:07:51 ID: 9065.00 Pa a 20 of 21 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name DRMC Outpatient Imaging Date 5/26/2010 System Name FC -7 Floor Area 192 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK CFM Sensible Total Room Loads 27,199 481,190 Return Vented Lighting 0 Return Air Ducts 24,059 Return Fan 0 Ventilation 17 644 Supply Fan 2,344 Supply Air Ducts 1 24,059 TOTAL SYSTEM LOAD 1 532,2961 COIL HTG. Latent I CFM 298 23 362 17 660 PEAK Heating System Sensible Output perSystem 58,000 1,749 Total Output Btuh 58,000 Output Btuh/s ft 302.1 87 Cooling System 0 Output perSystem 24,900 808 Total Output Btuh 24,900 -2,344 Total Output ons 2.1 87 Total Output Btuh/s ft 129.7 Total Output s ft/Ton 92.5 389 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow cfm 1,600 Carrier 38QRC060 17,061 4,103 36,225 Airflow cfm/s ft 8.33 Airflow cfmlTon 771.1 Outside Air % 1.1 % Total Adjusted System Output 17,061 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 4,103 Aug 3 PM 36,225 I Jan 1 AM Outside Air cfm/s ft 0.09 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF Outside Air 4r' 17 cfm 70 OF 69 OF 140 OF /-� 141 OF l7 ,� I& rd Heating Coil Supply Fan 141 OF 1,600 cfm ROOM in 70 OF I COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 112/78°F Outside Air Ar 17 cfm 77 / 62 OF 77/62°F 55/54°F 56!54°F Cooling Coil Supply Fan 1,600 cfm 45.9% 58 / 55 OF _...._....... ROOM 75 ! 61 OF EnergyPro5.0 by EnergySoft User Number: 7746 RunCode: 2010-05-26T14:07:51 ID: 9065.00 Page 21 of 21