09-1142 (RC) Title 24I TITLE 24 REPORT " - I
Title 24 Report for:
DRMC OUTPATIENT IMAGIN
47-CALEO BAY, SUITE 100
LA QUINTA, CA 92253
� r�c�r2ae� D
DEC -4 209
Project Designer:
CHRISTOPHER S. MILLS
490 SOUTH FARRELL DRIVE SUITE C-203
PALM SPRINGS, CA 92262
760-320-1790
Report Prepared By:
VICTOR LEON
MRC Engineering, Inc.
72-880 Fred Waring Drive Suite C-11
Palm Desert, CA 92260
(760) 340-9005
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTI®N,
DATE
4:46:7-
Job Number:
Date:
10/16/2009 '/� Ir
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.4 by EnergySoft Job Number: 09P004.00 User Number: 7746
74,47 tk /60 �� %
�TABLE OF CONTENTS
f
Cover Page
Table of Contents
Nonresidential Performance Title 24 Forms
Form ENV -MM Envelope Mandatory Measures
Form LTG -MM Lighting Mandatory Measures
Form MECH-MM Mechanical Mandatory Measures
1
2
3
18
19
20
EnergyPro 4.4 by EnergySoft Job Number: 09P004.00 User Number: 7746
PERFORMANCE CERTIFICATE OF COMPLIANCE Pala 1 of 3 PERF -1
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
DRMC OUTPATIENT IMAGING
DATE OF PLANS
4/20/2009
10/16/2009
PROJECT ADDRESS
VICTOR LEON
47-CALEO BAY, SUITE 100 LA QUINTA
Ej HIGH RISE RESIDENTIAL E]
HOTEL/MOTEL GUEST ROOM
PRINCIPAL DESIGNER - ENVELOPE
TELEPHONE
Building Permit #
CHRISTOPHER S. MILLS
760-320-1790
;
DOCUMENTATION AUTHOR
TELEPHONE
Ched by/Date
eck
MRC Engineering, Inc.
(760) 340-9005
Eniorcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and c9qnplete.
DATE OF PLANS
4/20/2009
BUILDING CONDITIONED FLOOR AREA
5,407 Sq.Ft.
VICTOR LEON
CLIMATE ZONE
15
BUILDING TYPE ® NONRESIDENTIAL
Ej HIGH RISE RESIDENTIAL E]
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION NEW CONSTRUCTION
❑ ADDITION
®
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and c9qnplete.
DOCUMENTATION AUTHOR
SIGNATURE
DATE
VICTOR LEON
of
11
The Principal Designer hereby certifys that the proposed building de ' n represented in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
NX
jeKk 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
F1 R F-1 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
R orms
PRINCIPAL ENVELOPE DESIGNER - NAME SIGN E LIC. NO. JDATE
CHRISTOPHER S. MILLS C, 0 - • OJ
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
LTG -1, LTG -2
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
RANDALL V. MOSS
SIGNATURELIC.
NO.
v_ io jA
DATE
12-
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ECH-1 MECH-2 MECH-3 MECH-5
Required Forms
PRINCIPAL MECHANICAL DESIGNER - NAMENATURE
LIC. NO. DATE
JIM O' CONNOR 11,z?m&a
�-
4555 11,2111,Oq
Run Initiation 11:51:06 Run Code: 1255719066
EnergyPro 4.4 by Energysoft User Number: 7746 Job Number: 09P004.00 Page:3 of 21
{
PERFORMANCE -CERTIFICATE OF COMPLIANCE Part2 of 3 PE
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 10/16/2009
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard Proposed
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
Compliance `
ENERGY COMPONENT Design Design
1
(® Standard �Pmpoaed"
MarginM.
Space Heating 4.64 0.16
.
5,407
4.48
Space Cooling 237.08 105.86
174
131.22
Indoor Fans, 58.87 71.21
116
-12.34 1n°""F
Heat Rejection 0.00 0.00
r k.
0.00
Pumps & Misc. 0.00 0.00
[::::::]4
0.00
Domestic Hot Water 4.72 4.72
> 0
0.00 9, °H
Lighting 72.02 77.43
g
-5.41sw
Receptacle 71.70 71.70
0.00owl
Process o.00 o.00
'
o.00 °°°°A
�
� 60.2
140 t80�`180 200 220
'8kew�r�yv
TOTALS: 449.02 331.08
117.95 0 20 40 0�e80� 100%120
`
Percent better than Standard: 26.3%
( 26.3% excluding process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
Number of Stories
Number of Systems
Number of Zones
w 270 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
5,407
sgft.
sgft.
sgft.
1
0
7
5,407
71
Natural Gas
174
16.9%
Orientation
Front Elevation w
Left Elevation (N
Rear Elevation E
Right Elevation . (S
Total
Roofsgft.
Gross Area
sgft.
sgft.
sgft.
sgft.
sqn.
Glazing Area
Glazing
sgft.
sqn.
sgft.
sgft.
sgft.
sgft.
Ratio
460
174
37.8%
920
174
16.9%
886
116
13.1%
1 70
0.0%
2,336
[::::::]4
> 0
O.o%
1 Standard Proposed
Lighting Power Density 1.086 w/sgft. 1.167 w/sgft.'
Prescriptive Env. Heat Loss 407 Btu/h 351 Btu/h
Prescriptive Env. Heat Gain 42,623 Btu/h-F 39,522 Btu/h-F
Remarks:
Run Initiation Time: 10/1610911:51:06 Run Code: 1255719066
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:4 of 21
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
DRMC OUTPATIENT IMAGING
DATE
10/16/2009
ZONE INFORMATION
System Name Zone Name
Occupancy Type
Floor
Area
(sgft.)
Inst.
LPD
(Wlsf)1
Ctrl.
Credits
(W/sf)2
Allowed LPD
Area Tailored
Wls 3 Is 4
Proc.
Loads
(Wlsf)
DSI IT ROOM
All Others
156
0.59
FC -6 FC -6
Comp Bldg Medical and Clinic
400
0.00
FC -5 FC -5
Comp Bldg Medical and Clinic
180
1.55
FC -4 FC -4
Comp Bldg Medical and Clinic
629
1.79
FC -3 FC -3
Comp Bldg Medical and Clinic
2,362
1.09
FC -2 FC -2
Comp Bldg Medical and Clinic
9541
0.90
FC -1 FC -1
Comp Bldg Medical and Clinic
726
1.86
Notes: 1. See LTG -2-C
(items marked with asterisk, see LTG -2 -C by others)
2. See LTG -4-C 3. See LTG -5-C
(by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System "Carrier 38AUZ07: Premium Eff' 1.50 BHP Supply Fan Motor has been specified.
The HVAC System "Sanyo 12 XS71: Premium Eff' 0.25 BHP Supply Fan Motor has been specified.
The HVAC System "DSI" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "DSI" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "FC -6" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "FC -6" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "FC -6" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "FC -5" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "FC -5" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "FC -4" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "FC -4" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "FC -4" incorporates a HERS verified Refrigerant Char - e test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "FC -3" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:5 of 21 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
DRMC OUTPATIENT IMAGING
DATE
10/16/2009
ZONE INFORMATION
System Name Zone Name Occupancy Type
Floor Inst.
Area LPD
(sgft.) (Wisf)1
Ctrl. Allowed LPD
Credits Area Tailored
(Wlsf� Wl 3 Wls 4
Proc.
Loads
(Wlsf)
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System "FC -3" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "FC -3" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "FC -2" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "FC -2" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "FC -2" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "FC -1" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "FC -1" includes credit for verified adequate airflow. A certified HERS rater must diagnostically measure the airflow.
The HVAC System "FC -1" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 0913004.00 Page:6 of 21 1
CERTIFICATE OF COMPLIANCE ENV -1-C
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 10/16/2009
OPAQUE SURFACES
#
Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments
1
Wall
33C
0.074
R-13
R-4.5
0
90
Altered
09-A3 E=13 -D5
FC -6
2
Wall
11
0.074
R-13
R-4.5
0
90
Altered
09-A3 E=13 -D5
FC -5
3
Door
2
0.500
Insul
R-0.0
0
90
Existing
28-A3
FC -5
4
Wall
7Q
0.074 1
R-13
R-4.5
180
90
Altered
09-A3 E=13 -D5
FC -4
5
lWall
1 284
0.074
R-13
R-4.5
90
90
Altered
09-A3 E=13 -D5
FC -4
6
Wall
50
0.074
R-13
R-4.5
90
90
Altered
09-A3 E=13 -D5
FC -3
7
Wall
43
0.074
R-13
R-4.5
90
90
Altered
09-A3 E=13 -D5
FC -3
8
Wall
12
0.074
R-13
R-4.5
270
90
Altered
09-A3 E=13 -D5
FC -2
9
Wall
27
0.074
R-13
R-4.5
0
90
Altered
09-A3 E=13 -D5
FC -1
10 Wall
16
0.074
R-13
R-4.51
270
90
Altered
09-A3 E=13 -D5
FC -1
A. R (New, Existing, Altered,
More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default Ll -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's project office during construction and in the building manager's office after construction
#
T e
## Exterior Shade Type
Window Overhang Left Fin Right Fin
SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
Area U -Fac'
SHGC2
Act.
Am.
Cond.
Stat.
Glazinq Type
Location/
Comments
1
Window
Rear
E
116 0.460 NFRC
0.40 INFRIC
90
Existing
Interpane INE -177
FC -4
2
Window
Front
W
58 0.460 NFRC
0.40 NFRC
270
New
Interpane INE -177
FC -2
3
Window
Left
N
174 0.460 NFRC
0.40 NFRC
0
New
Interpane INE -177
FC -1
4
Window
Front
W
116 0.460 NFRC
0.40 NFRC
270
New
Interpane INE -177
FC -1
(1) LI -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
## Exterior Shade Type
Window Overhang Left Fin Right Fin
SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
1 Roll -down Blind or Slats
0.13
2 Roll -down Blind or Slats
0.13
3 Roll -down Blind or Slats
0.13
4 Roll -down Blind or Slats
0.13
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
❑The proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a calling height greater than 15 feet, and an LPD for general
lighting of at least 0.5 Wtft2. See Section 143(c). If this box is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:7 of 21 1
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1-C
(PROJECT NAME DATE
f DRMC OUTPATIENT IMAGING 10/16/2009
INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES
INSTALLED
WATTS
INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 6,309
PORTABLE LIGHTING (From LTG -3-C) 0
LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0
CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 6,309
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 6,309
IIALTERNATE COMPLIANCE
❑X PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) o
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATI
(Room #)
CONTROL
IDENTIFICATION
CONTROL TYPE
(Auto Time Switch, Dimming, etc.)
Check if
SPACE CONTROLLED Daylighting
Run Initiation Time: 10/16/09 11:51:06 Run Code: 1255719066
EnergyPro 4.4 by Energysoft User Number: 7746 Job Number: 09P004.00 Page:8 of 21
CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG -
PROJECT NAME
DRMC OUTPATIENT IMAGING
DATE
10/16/2009
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance
tests for lighting systems. The designer is required to check the boxes by all acceptance tests that
apply and list all equipment that require an acceptance test. If all equipment of a certain type requires
a test, list the equipment description and the number of systems to be tested in parentheses. The NJ
number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the
test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design
professional or an agent selected by the owner). Since this form will be part of the plans, completion
of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Before an occupancy permit is granted for a newly constructed building or space, or a new lighting
system system serving a building or space is operated for normal use, all control devices serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department
that:
A. Certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of§10-103(b) and Title 24 Part 6.
Test Description
Test Performed BY:
❑ LTG -2-A: Lighting Control Acceptance Document
- Occupancy Sensor Acceptance
- Manual Daylight Controls Acceptance
- Automatic Time Switch Control Acceptance
Equipment requiring acceptance testing
❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:9 of 21 1
CERTIFICATE OF COMPLIANCE MECH-1-C
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 1 10/16/2009
ueslgner:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-1-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates, and operatinq and maintenance information meet the reauirements of Section 10-103(b) and Title 24 Part 6.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 V of space or less and 25% or more of the ducts are in noncondilioned or semiconditioned space like an
attic New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VAV fan volume controls installed on new or existirg systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primarypumps are connected to a common header.
-Supply Water Temperature Reset Controls.
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500, 000 atu/hr.
-Water-loop Heat Pump Controls
Applies to all new waledoop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable /low chilled, hydronic heat pump
or condenser water systems where the pumps motors are greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:10 of 21
INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 1 10/16/2009
INSTALLED LIGHTING POWER FOR CONDITIONED SPACES
Luminaire
Lamps/Ballasts
Installed Watts
C
D
E
F
G
H
I
J
Name
Type Description
r
vM
CD -0
33c
�vQ
ANN
a
m `� °
r�
°'gid
N
cdc
�•»v
N��N
.�
m `� °
c
�•m°'
fD
Cn
dm
J
r
3 c
503
N
��0
wd
vNfD
d
A
(1) 42w Compact Fluorescent Trip/Quad
4 in Elec
CFTR42WGX24 -4
11
42
1.0
46.0
X
1
46
B
(1) 42w Compact Fluorescent Trip/Quad
a in Elec
1
42
1.0
46.0
X
17
782
C
50w Low Voltage Halogen Mag
0 Waft Lamp
1
50
1.0
55.0
X
2
110
1
�1lec Compact Fluorescent Triple 4 Pin
FTR32WGX24 -3
1
32
1.0
35.0
X
9
315
FD2
(2) 26w Compact Fluorescent Triple 4 Pin
Elec
2
26
1.0
55.0
X
4
220
(3) 2 ft Fluorescent T8 Elec
3
36
1,908
F
(3) 2 ft Fluorescent T8 Elec
7T8
3
17
1.0
53.0
X
15
795
G
(3) 4 ft Fluorescent T8 Rapid Start Elec
3
19
1 767
K
((
P ) 40w Lng Cmpt T5 Fluorescent Twin
T40W/2G11
1
40
1.0
41.0
X
3
123
L
(1) 21w Linear Fluorescent T5 Elec
1
21
1:0
27.0
X
9
243
PAGE TOTAL 6,309
BUILDING TOTAL (sum of all pages) 6,309
PORTABLE LIGHTING (From LTG -3-C)
CONTROL CREDIT (From LTG -4-C) O .
ADJUSTED ACTUAL WATTS 6 309
Run Initiation Time: 10/16/0911:51:06 Run Code: 1255719066
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 0913004.00 Page: 11 of 21
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 10/16/2009
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
DSI
FC -6
FC -5
1
1
1
Reference on Plans or Specification t
112(a)
n/a
7.70 HSPF
7.80 HSPF
112(a)
16.0 SEER / 11.8 EER
13.0 SEER / 11.0 EER
10.0 EER
112 b
n/a
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121 b
13 cfm
33 cfm
15 cfm
121(c)
No
No
No
121 c
No
No
No
121(c), 122(e)
Pro rammable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
n/a
R-8.0
R-8.0
144 (a& b
n/a
n/a
n/a
144 a & b
0 btuh
15,427 btuh
0 btuh
144 a & b
n/a
n/a
n/a
144 a & b
9,621 btuh
18,537 btuh
57,860 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144
Constant TernD
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
Run Initiation Time: 10/16/09 11:51:06 Run Code: 1255719066
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:12 of 21
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
(PROJECT NAME DATE DRMC OUTPATIENT IMAGING 10/16/2009
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
FC -4
FC -3
FC -2
1
1
1
Reference on Plans or Specification 1
112(a)
7.70 HSPF
7.70 HSPF
7.70 HSPF
112(a)
13.0 SEER / 11.0 EER
13.0 SEER / 11.0 EER
13.0 SEER / 11.0 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121 b
52 cfm
200 cfm
100 cfm
121(c)
No
No
No
121 c
No
No
No
121(c), 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
Auto
122
n/a
n/a
n/a
123
124
R-8.0
R-8.0
R-8.0
144 a & b
n/a
n/a
n/a
144 a & b
19,986 btuh
34,352 btuh
17,988 btuh
144 a & b
n/a
n/a
n/a
144 a & b
23,597 btuh
40,065 btuh
20,359 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page: 13 of 21 1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 710/16/2009
71
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous HeatlCool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
FC -1
1
Reference on Plans or Specification t
112(a)
7.70 HSPF
112(a)
13.0 SEER / 11.0 EER
112 b
Yes
112 c,115a
n/a
121(b)
Yes
121(b)
60 cfm
121 c
No
121 c
No
121(c). 122(e).
Programmable Switch
122(e)
Heating & Cooling Required
122
Auto
122
n/a
123
124
R-8.0
144 a & b
n/a
144 a & b
28,481 btuh
144 a & b
n/a
144 a & b
38,719 btuh
144 c
Constant Volume
144 c
144 c
Yes
144 d
No
144 a
No Economizer
144
Constant Tem
144 (f)
Constant Temp
144 k
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:14 of 21
MECHANICAL VENTILATION MECH-3-C
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING I
10/16/2009
PRESCRIPTIVE REHEAT
LIMITATION Section 144(d))
MECHANICAL VENTILATION Section 121 b 2
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
ZONE/SYSTEM
o
D°
a
— m=
o
c
dvn
m°m
. 3
c
c3
ao�e�
x Dn
3
-0
®�
cQ
v W
0
v
°ten
u�m'+
0. 3
�`3
m0�
xe,
c n
lu 3—
m
p3D
0�' C
D
�p
T..y
3•
3�
n®o
mN
3 C p
v y.
Top
3 x
a s
x
°c3
w3m
o°x
0 N o
T?
m0=2
$
0 3
d
a,
V
D
IT ROOM
156
0.15
23
23
13
10
DSI
I
I Total
1 23
131
1
FC -6
40C
0.15
60
60
33
1
1
27
FC -6
Total
60
33
FC -5
18C
0.15
27
27
15
12
FC -5
Total
27
15
FC -4
629
0.15
94
94
52
42
FC -4
Total
94
52
FC -3
2,362
0.15
354
354
200
154
FC -3
Total
354
200
FC -2
954
0.15
143
143
100
43
FC -2
Total
143
100
FC -1
726
0.15
109
109
60
48
FC -1
Total
109
60
C Minimum ventilation rate per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load fore Tess purposes fors aces without fixed seating.
H Required Ventilation Air REQ'D V.A, is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be greater than orequal to H or use Transfer Air column N to make up the difference.
J Design fan supply cfrn (Fan CFM) x 30%; or
K Condition area (ft. sq.) x 04 cfm/R. sq.; or
L Maximum of Columns H, J, K, or 300 cfm
M IThis must be less than or equal to Column L and greater that orequal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page: 15 of 21
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
DRMC OUTPATIENT IMAGING
DATE
10/16/2009
C ILL R AND TOWER SUMMARY
System Type
Distribution Type
Efficiency
[Tons
PUMPS
Condition
Status
Ext.
R -Val.
Equipment Name
Equipment Type
Qty.
Tot.
Qty
GPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp
Hot Water Piping Len th ft
Control
#
HP
Type
In Plenum
Outside
Buried
Add 1/2"
Insulation
1DHW/ BOILER SUMMARY
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name
System Type
Distribution Type
Qty
Rated
Input
Vol.
(Gals.)
Condition
Status
Ext.
R -Val.
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp
Hot Water Piping Len th ft
Control
#
HP
Type
In Plenum
Outside
Buried
Add 1/2"
Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Tvve
Qtv1
Output
Aux.
kW
Eff.
Out ut
Efficiency
Condition
Status
Economizer Type
Sanyo 12 XS71
Split DX
1
0 0.0
n/a
12,00016.0
SEER / 11.8 EER
New
No Economizer
Carrier 38QRRRO24 --- 3 w/
FX4CO24
Split DX
1
24,700
0.0
7.70 HSPF
24,000
13.0 SEER / 11.0 EER
New
No Economizer
Carrier 38AUZ07
Packaged DX
1
0 0.0
7.80 HSPF
71,000
10.0 EER
New
No Economizer
Carrier 38QRR036-3/5/6
40QAE036
Split DX
1
1 32,000
0.0
7.70 HSPF
33,000
13.0 SEER / 11.0 EER
New
No Economizer
Carrier 38QRR060-3/5/6
40QAE060
Split DX
1
55,000
0.0
7.70 HSPF
56,000
13.0 SEER / 11.0 EER
New
No Economizer
Carrier 38QRRO30 --- 3 w/
40QAE036
Split DX
1
28,800
0.0
7.70 HSPF
28,00013.0
SEER / 11.0 EER
New
No Economizer
Carrier 38QRRR048 --- 3 w/
FX4C048
S lit DX
p
1
45,6001
0.0
7.70 HSPF
49,000
13.0 SEER / 11.0 EER
New
No Economizer
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name
Fan Type
Motor Location
CFM
BHP
Motor
Eff.
Drive
Eff.
CFM I
BHP
Motor
Eff.
Drive
Eff.
Sanyo 12 XS71
Constant Volume
Blow -Through
235
0.25
64.0%
97.0%
none
Carrier 38QRRRO24 --- 3 w/
FX4CO24
Constant Volume
Blow -Through
792
0.33
64.0%
97.0%
none
Carrier 38AUZ07
Constant Volume
Draw -Through
2,400
1.50
86.5%
97.0%
none
Carrier 38QRR036-3/5/6
40QAE036
Constant Volume
Draw -Through
1,200
0.16
55.0%
97.0%
none
Carrier 38QRR060-3/5/6
40QAE060
Constant Volume
Draw -Through
2,000
0.33
66.0%
97.0%
none
Carrier 38QRRO30 --- 3 w/
40QAE036
Constant Volume
Draw -Through
1,000
0.161
55.0%1
97.0%1
none
Carrier 38QRRRO48 --- 3 w/
FX4C048
Constant Volume
Blow -Through
1,669
0.75
77.0%
97.0%
none
Run Initiation Time, 10116109 11,51:06 Run Code; 1255719066
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page: 16 of 21
MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-CI
ENVELOPE MANDATORY MEASURES ENV -MM
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 1 10/16/2009
DESCRIPTION
Desi ner
Enforcement
NXI §i18(a) Installed Insulating Material shall have been certified by the manufacturer to
comply with the California Quality Standards for insulating material, Title 20,
Chapter 4, Article 3.
§118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
X] § 117(a) All Exterior Joints and openings in the building that are observable sources of. air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
X] § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors
and fire doors).
§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
X❑ § 118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall
have insulation with an installed R -value of no less than R-13 between framing
members.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page: 18 of 21
[LIGHTING MANDATORY MEASURES LTG -MM
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 10/16/2009
DESCRIPTION
Designer
Enforcement
❑X § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic
control to shut off the lighting. This automatic control shall meet the requirements of
Section 119 and may be an occupancy sensor, automatic time switch, or other device
capable of automatically shutting off the lighting.
R § 131(d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is
provided with a manual, accessible override switch in sight of the lights. The area of
override is not to exceed 5,000 square feet.
X❑ § 119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed by the
manufacturer.
§ 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the
project are certified and listed in the Directory. All installed fixtures shall be certified.
RI § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with
a separate switch or occupancy sensor device for each area with floor -to -ceiling
walls.
§ 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100
square feet and more than 0.8 wafts per square foot of lighting load shall be
controlled with bi-level switching for uniform reduction of lighting within the room.
❑ § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall have
50% of the lamps in each daylit area controlled by a separate switch; or the effective
use of daylight cannot be accomplished because the windows are continuously
shaded by a building on the adjacent lot. Diagram of shading during different times
of the year is included on plans.
§ 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are
20 amps or less.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page: 19 of 21
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
(PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 1 10/16/2009
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
X❑ §11 Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard.
§115(a) Fan type central furnaces shall not have a pilot light.
0 §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
§124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§g22(e) Each space conditioning system shall be installed with one of the following:
n§122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off -hours for up to 4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted; or
rXJ §122(e)1g An occupancy sensor to control the operating period of the system; or
F] §122(e)1C A 4 -hour timer that can be manually operated to control the operating period of
the system.
X❑ §122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
§122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
isolation zones. Each zone: shall not exceed 25,000 square feet; shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
® §122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
X] §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
Fiv §112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:20 of 21
IMEi,'HANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
PROJECT NAME DATE
DRMC OUTPATIENT IMAGING 1 10/16/2009
Description
Designer
Enforcement
Ventilation
§121(e)
Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans.
§122(f)
Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
§4 22(f)
All gravity ventilating systems shall be provided with automatic or readily
accessible manually operated dampers in all openings to the outside, except for
combustion air openings.
0
§121(f)1
Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
a9121
(f)2
Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system; or
F]
§121(f)3
Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§121(04
Another method approved by the Commission.
Service
Water Heating Systems
§113(b)2
If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
§113(c)
Lavatories in restrooms of public facilities shall be equipped with controls to limit
the outlet temperature to 110 degrees F.
EnergyPro 4.4 by EnergySoft User Number: 7746 Job Number: 09P004.00 Page:21 of 21