08-0192 (RC) Title 240
� MAY g 3 2008
TITLE 24 REPORT
Title 24 Report for:
J F K Hospital New Orthopedic Center
47-647 Caleo Bay Drive,
La Quinta„ Ca 92253
Project Designer:
Holt Architects
70-225 Highway 111, Studio D
Rancho Mirage„ Ca 92270
(760) 328-5280
Report Prepared By:
Ric Krown
Desert Energy Services, LLC
P.O. Box 6251
La Quinta, CA 92248
r (760) 20-0-2084
Job Number:
0781
Date:
5/3/2008
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
DA 6 t'ABY
- .0
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
Energypro 4.4 by Energysoft Job Number. 0781 User Number. 2366
TABLE OF CONTENTS
LPD's
Cover Page
Table of Contents
Nonresidential Performance .Title 24 Forms
Form MECH-MM Mechanical Mandatory Measures
HVAC System Heating and Cooling Loads Summary
I
1
2
3
4
13
15
EnergyPro 4.4 by EnergySoft Job Number. 0781 User Number. 2366
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 Of 3 PERF -1
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
J F K Hospital New Orthopedic Center
DOCUMENTATION AUTHOR
5/3/2008
PROJECT ADDRESS
BUILDING CONDITIONED FLOOR AREA
5,771 sq.Ft
47-647 Caleo Bay Drive, La Quinta,
CLIMATE ZONE
15
BUILDING TYPE
PRINCIPAL DESIGNER - ENVELOPE
TELEPHONE
Building Permit#
Holt Architects
(760) 328-5280
ADDITION
DOCUMENTATION AUTHOR
TELEPHONE
Checked by/Date
Desert Energy Services, LLC
(760) 250-2084
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate andfornpi9te.
DOCUMENTATION AUTHOR
DATE OF PLANS
12/5/07
BUILDING CONDITIONED FLOOR AREA
5,771 sq.Ft
1
CLIMATE ZONE
15
BUILDING TYPE
® NONRESIDENTIAL
HIGH RISE RESIDENTIAL ❑
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
NEW CONSTRUCTION
ADDITION
[::]
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate andfornpi9te.
DOCUMENTATION AUTHOR
SIGNATURE
DAT
Ric Krown
s' 0 8
The Principal Designer hereby certifys that the proposed building design represented In this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
E 2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Envelope Compliance Not In The Scope Of
IS U ml a
Required Forms
PRINCIPAL ENVELOPE DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Lighting Compliance Not In The 'Scope Of
Required Forms
-SubmittalI his
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ECH-1, MECH-2 MECH-3 MECH-5
Requorms
PRINCIPAL MECHANICAL DESIGNER - NAMET
LIC. NO.
DAT
Polar Barr Air Conditioning
ZZ2 A 1
-? /Tq�
I EnemvPro 4.4 by EneravSoft User Number. 2366 Job Number. 0781 Page:4 of 20 1
ILPD's
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
When a performance run is done without compliance for lighting, the 'program uses the .default
LPD's.
EnergyPro By EnergySoft User Number. User Job Number. 0781 Page:1 of 20
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PE
PROJECT NAME
JFK
DATE
5/3/2008
ANNUAL TDV ENERGY USE SUMMARY
kBtuls ft- r
Standard
Proposed Compliance
ENERGY COMPONENT Design
Design Margin [j] Standard ® Pmposed
Space Heating 1.17
0.96 0.21°"
Space Cooling 217.44
207.50 9.93
Indoor Fans 59.43
61.70 -2.27 IEM�Nl
Heat Rejection 0.00
0.00 0.00
Pumps & Misc. 0.00
0.00 0.00 """'`"'°
Domestic Hot Water 19.41
19.29. 0.12
Lighting 79.61
79.61 0.00 - -
Receptacle 91.54
91.54 0.00
Process 0.00
0.00 0.00
0�2oaoso�eocoo�2oiaoieoieozoo
TOTALS: 468.60
460.60 8.00 kBtulSQfl-r`
Percent better than Standard:
1.7% ( 1.7% excluding process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
(W)270deg
Conditioned Floor Area 5,771 Syn
2
Number of Stories
Unconditioned Floor Area o syft
7
Number of Systems
Conditioned Footprint Area 0 syn•
7
Number of Zones
Fuel Type Natural Gas
Orientation
Gross Area
. Glazing
Ratio
1,292
�Area
jGlazing
319
24.7%
Front Elevation I M I
scrR.
sce_
Left Elevation
(N)
27
syn.
0
syfc
0.0%
1,324
290
21.9%
Rear Elevation
(E)
syft
soft
1,088
233
21.4%
Right Elevation
Total
Roof
(S)
syn
sc ft
syn
syn.
syn.
soft
3,731
1 842
5,781
0.0%
Standard Proposed
Lighting Power Density
1.200 wisyft 1.200 wisyft
Prescriptive Env. Heat Loss
1,875 Btuth 1,693 Btu/h
Prescriptive Env. Heat Gain
145,622 Btum-F 163,417 Btum-F
Remarks:
Standard Building (Compliance)
Run Initiation Time: 05/03/08 09:17:34 Run Code: 1209831454
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:5 of 20
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 ®f 3 PERF®I
PROJECT NAME
J F K Hospital
New Orthopedic
Center
DATE
5/3/2008
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
(sgft)
Inst
LPD
(W/sf)t
Ctrl. Allowed LPD Proc.
Credits Area Tailored Loads
(W/sf)2 /s 3 (W/S4 (w/sf)
Exist HP -1 (6 Ton)
OFFICES
Office
970
•1.20
New HP -2 (5Ton)
OFFICES
Office
970
'1.20
Exist Hp -3 2 8 Tons
OFFICES
Office
1,020
'1.20
New HP -2 (5 Ton)
OFFICES
Office
750
`1.20
OFFICES
Office
461
`1.20
Exist HP -2 5 Ton
OFFICES
Office
580
•1.20
New HP -2 (5Ton)
OFFICES
Office
1,020
`1.20
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk see LTG -2 -C by others) (by others)
4. See LTG6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified In this checklist These items require special written )ustmcauon
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The exceptional features listed In this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant
I EnerovPro 4.4 by EnerovSoft User Number. 2366 Job Number. 0781 Page:6 of 20 1
;CERTIFICATE OF COMPLIANCE MECH®1 -C
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, Installation
certificates, and operatinq and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit
❑ MECH-3-A Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Consbucibn and Retrofit Units with economizers that are installed at the factory and certrBed with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 V of space or less and 25% or more of the duds are in noncendWoned or semtconditbned space like an
attic. New systems that meet the above requirements. Rebofit systems that meet the above requirements and either extend duds, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chr7lers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant Row chilled and hot water systems Mat have a design capacity greater than or equal to 500,000 Bhuhr.
-Water400p Heat Pump Controls
Applies to all new waterfoop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable Row chilled, hydfomc heat pump
or condenser water systems where Me pumps motors are greater than 5 hp.
Equipment re quiringacceptance testing
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:7 of 20
��'
�R ���EREQUIREMENTS Part 1®f 2 MECH®2®C I
(PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
C-a!eWaated Sensible Cnnnnn Cep-aelh. X. 212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
Exist HP -1 (6 Ton)
New HP -2 (5Ton)
Exist Hp -3 (2) (8 Tons)
1
1
2
Reference on Plans or Specification t
112(a)
8.00 HSPF
8.10 HSPF
8.00 HSPF
112(a)
12.0 SEER / 10.6 EER
13.0 SEER / 11.3 EER
12.0 SEER / 10.6 EER
112(b)
Yes
Yes
Yes
112(c), 115(a),n/a
27,751 btuh
n/a
n/a
121(b)
No
No
No
121 b
146 cfm
146 cfm
153 cfm
121 c
No
No
No
121 c
No
No
No
121(c), 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Gravity
Gravity
Gravity
122
n/a
n/a
n/a
123
124
R-4.2
R-4.2
R-4.2
144 a & b
n/a
n/a
n/a
144 a & b
29,979 btuh
36,850 btuh
59,959 btuh
.44'a & b`
rua
n/a
144 a & b
27,751 btuh
38,222 btuh
56,747 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
No
No
No
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features, are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes N System is: Constant Volume, Single Zone; Serves < 5,000 sqf ; Has > 25% duct in unconditioned space. Duct seating is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnemvPro 4.4 by EnerovSoft User Number. 2366 Job Number. 0781 Page:8 of 20 1
AIR SYSTEM REQUIREMENTS Pali 1 of 2 MECH-2-C
(PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
AIR SYSTEMS, Central or Single Zone
New HP -2 (5 Ton)
Exist HP -2 (5 Ton)
New HP -2 (5Ton)
1
1
1
T-24
MANDATORY MEASURES Section Reference on Plans or Specification '
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum VentHation
VAV Minimum Position Cmt d
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Contiml
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity z 1.43 2
Proposed Heating Capacity 2
r'clGLfa:�(t�niciMln Pnnliru� r`����ifi;. 1 X12
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
112(a)
8.10 HSPF 7.60 HSPF
8.10 HSPF
11 WWI
13.0 SEER / 11.3 EER 11.9 SEER / 10.3 EER
13.0 SEER / 11.3 EER
112
Yes Yes
Yes
112(c), 115(a)
n/a n/a
n/a
121 (b)
No No
No
121 b
182 cfm a"I CfM-
51 3 cfm
121(c)
No No
_ No'�`.r-fes'
—
121 c
No No
No
121(c), 122(e)
Proramr:able.gj1'++tch Pro rammable Switch
Hsatinc`& Cooling Required Heating & Cooling Required
Prorammable Switch
122(e)
Heating & Cooling Required
122 0
Gravitv Gravity
Gravity
122(g)
n/a n/a
n/a
123
144
Constant Temp
124
R-4.2 R-4.2
R-8.0
144 a & 4
n/a
n/a
n/a
144 a & b
36,850 btuh
37,474 btuh
36,850 btuh
1441 R h
n/�
nl�
n/2 .
144 a & b
40,150 btuh
38,191 btuh
38,361 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
No
No
Yes
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put'N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft~ Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2. MECH-2-C
(PROJECT NAME _ - DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM FEATURES
ITEM OR SYSTEM( TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section Reference on Plans or Specification
Equipment Efficiency 11 12(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Calculated Capacity
Proposed Capacity
Tower Fan Controls
Tower Flow Controls
Variable Flow System Design
Chiller and Boiler Isolation
CHW and HHW Reset Controls
WLHP Isolation Valves
VSD on CHW, CW & WLHP Pumps > 5
HP
DP Sensor Location
1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph
number where the required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Water side systems include wet side system using other liquids such as glycol or brine.
Service Hot Water, Pool Heating
ITEM OR SYSTEM TAG(S) DHW Heater
ilui-rob r Gi SjiSi2�iia I I _
MANDATORY MEASURES Reference on Plans or Specification'
Water Heater Certification
113 (a)
Water Heater Efficiency
113 b
Service Water Heating Installation
113 (c)
Pool and Spa Efficiency and Control
114 a
Pool and Spa Installation
114 b
Pool Heater - No Pilot Light
115 (c)
Spa Heater - No Pilot Light
115 d
Bradford -White M -III -
50 91. -17
n/a
n/a
n/a
n/a
1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and
paragraph number where the required features are documented. If a requirement is not applicable, put "NW ins the column.
Run Initiation Time: 05/03/08 09:17:34 Run Code: 1209831454
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:10 of 20
IMECHANICAL VEPIi9LAT10PB DAECFI-3-C
PROJECY NAME ®ATE 1
J F K Hospital New Orthopedic Center 5/3/2008
PRESCRIPTIVE REHEAT
LIMITATION Section 144(d))
MECHANICAL VENTILATION Section
121(b)2)
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
20NE/SYSTEM
n
D�
Tma
v m 0
J3
oci�n
30-n
0 3
�''
x Dn
n m E
z
m3
vCr
m o
.0 C)
r5a-A
°
m��
xr►n
—z In m 3
_
G'D
ox G
Q °, �
C) 41)
Tr.m
3 D°
to
o�
nmo
�1f/�~
M9 �
zco
0
30°
° x
a A
°o
wad
o x
C' = S'
0
y
m>
13
�?
0
D
OFFICES
97C
0.15
1461
1
1461
146
Exist HP -1 (6 Ton).
Total
146
146
OFFICES
97C
0.15
146
146
146
New HP -2 (5Ton)
Total
146
146
OFFICES
1,02C
0.15
153
153
153
Exist Hp -3 (2) (8 Tons)
Total
153
153
OFFICES
75C
0.15
113
113
113
OFFICES
461
0.15
69
69
69
New HP -2 (5 Ton)
Total
182
182
OFFICES
58C
0.15
87
87
87
Exist HP -2 (5 Ton)
Total
87
87
OFFICES
1,020
0.15
153
153
153
New HP -2 (5Ton)
Total
153
153
C Minimum ventilation rate per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress Purposes fors aces without fixed seating.
H Requivred Ventilation Air REM VA is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be -greater than or equal to H or use Transfer Air column N to make up the difference.
J Design fan supply cfm Fan CFM) x 30%; or
K Condition area ft sq.) x 04 dmfR sq.; or
L Max mum of Columns H, J, K or 300 cfm
M This must be less than or equal to Column L and greater that or equal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required VeWation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPm 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 11 of 20
MECHANICAL EQUIPMENT DETAILS
Fart 1 of 2 MECH-5-C
PROJECT NAME
J F K Hospital New Orthopedic Center
COOLING
®ATE 5/3/2008
CHILLER AND TOWER SUMMARY
ON
Outout
Efficiency
Tons
PUMPS
Efficlengy
Condition
Status
Equipment Name
Equipment Type
Qty.
Tot.
Qty
GPM
BHP
Motor
Eff.
Driv
Effie
Co Pum
No Economizer
Carrier 50HJQ006 New Hp Packaged DX
2
3
59,000
0.0
8.10 HSPF
59,000
13.0 SEER / 11.3 EER
New
No Economizer
Carrier 50HJQ006 Exist
Hp -2 Packaged DX
1
60,000
0.0
7.60 HSPF
59,00011.9
SEER / 10.3 EER
Existing
No Economizer
D W / BOILER SUMMARY
Energy Standby ITANK INSUL.
Rated. Vol. Condition Factor Loss or Ext
System Name System Type Distribution Type Qty Input (Gals.) Status or RE I Pilot R -Val.
Bradford --White M -III- Small Elec. No Pipe Insulation 1 15,358 50 New 0.91 n/a n/a
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Systern Type
ON
Outout
Aux.
kW
Eff.
Outout
Efficlengy
Condition
Status
Economizer Type
HCarrier 50HJ0005 Exist Packaged DX
3
48,000
0.0
8.00 HSPF
45,00012.0
SEER/ 10.6 EER
Existing
No Economizer
Carrier 50HJQ006 New Hp Packaged DX
2
3
59,000
0.0
8.10 HSPF
59,000
13.0 SEER / 11.3 EER
New
No Economizer
Carrier 50HJQ006 Exist
Hp -2 Packaged DX
1
60,000
0.0
7.60 HSPF
59,00011.9
SEER / 10.3 EER
Existing
No Economizer
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH®MM
PRO JECY NAME DAVE
J F K Hospital New Orthopedic Center I
5/3/2008
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
FX §11 Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard.
91I $(a) Fan type central furnaces shall not have a pilot light.
n9423 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
9124 Air handling duct systems shall be Installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CIVIC Standards.
Controls
9122(e) Each space conditioning system shall be installed with one of the following:
RI §122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off-hours_for up to 4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted; or
❑ 9122(e)1 B An occupancy sensor to control the operating period of the system; or
F] §422(e)1 C A 4 -hour timer that can be manually operated to control the operating period of
the system.
FXJ 9122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint
922(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
Isolation zones. Each zone: shall not exceed 25,000 square feet; shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
® 9122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower.. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
FV I §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
0 9112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 13 of 20
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-M
PROJECT NAME IDATE
J F K Hospital New OrthODedic Center 1 5/3/2008
Description
Designer
Enforcement
Ventilation
R§121(e) Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans.
§122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
FX §122(f) §12Y(f) All gravity ventilating systems shall be provided with automatic or readily
accessible manually operated dampers in all openings to the outside, except for
combustion air openings.
F] §I21(f)1 Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§121(f)2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system; or
X] §121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§121(f)4 Another method approved by the Commission.
Service Water Heating Systems
X❑ §413(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
§113(c) lavatories in restrooms of public facilities shall be equipped with controls to limit
L`a o:tfet tape a c:r .0110 r+egrecs F.
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 14 of 20
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM NAME FLOOR AREA
Exist HP -1 6 Ton 970
Number of Systems
1
Heating System
Output per System
48,000
Total Output (Btuh)
48,000
Output (Btuh/sgft)
49.5
Cooling System
Output per System
45,000
Total Output (Btuh)
45,000
Total Output (Tons)
3.8
Total Output (Btutdsgfl)
46.4
Total Output (sgR/ron)
258.7
Air System
CFM per System
1,600
Airflow (cfm)
1,600
Airflow (cf Wsgft)
1.65
Airflow (cfmrron)
426.7
Outside Air (%)
9.1
Outside Air (cfm/sgtt)
0.15
Note: values above given at ARI conditions
26.0 OF 65.8 OF
Outside Air O
146 cfm
Supply Fan
1600 cfm
69.8 of
111.0 / 77.4 of
Outside —�—�
146 dim
74.5/65.3 of
65.8 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
I COIL HTG. PEAK
CFM
I Sensible Latent
I I CFM
I Sensible
36,7471 2,8931
Carrier 50HJQ005 Exist HP -3 27,751 13,398 29,979
Total Adjusted System Output 27 751 13,398 29,979
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 5 pm Jan 12 am
Heating Coil
83.3 of
K Return Air Ducts 4
77.8/66.5OF 77.8/66.4OF 0 61.6/60.6OF
-(P
Supply Fan
1600 cfm
Cooling Coil
h Return Air Ducts 'I
Supply nir Ducts
83.1 of
ROOMS
70.0 of
Supply Air Ducts
62.1 / 60.8 of
62.7% R.H. ROOMS
74.0/65.1OF
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 15 of 20 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM NAME FLOOR AREA
New HP -2 (5Ton) 970
Number of Systems
1
Heating System
Output per System
59,000
Total Output (Stuh)
59,000
Output (Btuh/sq t)
60.8
Cooling System
Output per System
59,000
Total Output (Btuh)
59,000
Total Output (Tons)
4.9
Total Output (Btuh/sgft)
60.8
Total Output (sgft/Ton)
197.3
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sgft)
2.06
Airflow (cfm/Ton)
406.8
Outside Air (%)
7.3
Outside Air (cf n1sgft)
0.15
Note: values above alven at ARI conditions
26.0 of 66.7 of
Outside Air
146 cfm
Supply Fan
2000 cfm
69.9 of
11.0 / 77.4 of
)b I
Outside
---
146 cfm
74.4/63.7 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK I COIL HTG. PEAK
CFM I Sensiblel Latent CFM I Sensible
1,734
26,798
1,940
618
9,097
0
804
273
0
0
146
5,710
1,695
146
6,844
0
0
804.
273
34 581 3 635 16 486
Carrier 50HJ0006 New Hp -2 38,222 14,281 36,850
Total Adjusted System Output 38,222 14,281 36,850
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 5 pm Jan 12 am
66.7 OF 83.9 OF
Heating Coil
77.0 / 64.9 of 77.0 / 64.8 of
O
—h Return Air Ducts
iratures at Time of Cc
59.2 / 58.1 of
Supply Fan Cooling Coil
2000 cfm
in Return Air Ducts "i
Supply nir Duc J
83.7 of
ROOMS
70.0 of
I
Supply Air Ducts
59.6 / 58.3 of
57.0% R.H. ROOMS
74.0/63.6OF
I
I EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 16 of 20 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM NAME FLOOR AREA
Exist HP -3 2 8 Tons 1,020
Number of Systems
2
Heating System
Output per System
48,000
Total Output (Btuh)
96,000
Output (Btuh/sgft)
94.1
Cooling System
Output per System
45,000
Total Output (Btuh)
90,000
Total Output (Tons)
7.5
Total Output (Btuh/sgft)
88.2
Total Output (sgftrron)
136.0
Air System
CFM per System
1,600
Airflow (cfm)
3,200
Airflow (cfm/sgft)
3.14
Airflow (cf n ron)
426.7
Outside Air (%)
4.8
Outside Air (cfm/sgft)
0.15
Note: values above given at ARI conditions
26.0 of 67.7 of
Outside Air
0
153 cfm
Supply Fan
3200 cfm
69.8 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
I I COIL HTG. PEAK
CFM
I Sensible
Latent
I I CFM
I Sensible
2,723
41,610
2,040
11261
20,309
0
1,248
609
0
0
153
5,353
-121
153
7,188
0
0
1,248
609
49,8851 19191
28 716
Carrier 50HJQ005 Exist HP -3 56,747 24,205 59,959
Total Adjusted System Output 56,747 24,205 59,959
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am
67.7 of 85.2 of
� ISI
Heating Coil
h Return Air Ducts 4
107.0 / 73.5 of 75.9 / 64.3 of 75.9 / 64.2 of 59.4 / 58.3 of
Outside Air O `
153 cfm Supply Fan
3200 cfm
74.4/63.80F
Cooling Coil
h Return Air Ducts '*I
Supply Air Ducts
85.0 of
ROOMS
70.0 of
Supply Air Ducts
59.7 / 58.5 of
57.1% R.H. ROOMS
74.0 / 63.6 of
I EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 17 of 20 1
I /
!HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY �
PROJECT NAME DATE
11 J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM NAME FLOOR AREA
New HP -2 5 Ton 1,211
c
Number of Systems
1
Heating System
Output per System
59,000
Total Output (Btuh)
59,000
Output (Stuh/sgft)
48.7
Cooling System
Output per System
59,000
Total Output (Btuh)
59,000
Total Output (Tons)
4.9
Total Output (Btuh/sgft)
48.7
Total Output (sgft/Ton)
246.3
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sgft)
1.65
Airflow (cfm/Ton)
406.8
Outside Air (%)
9.1
Outside Air (cfm/sgft)
0.15
Note: values above given. at ARI conditions
26.0 of 65.9 of
Outside Air
182 cfm
Supply Fan
2000 cfm
69.9 of
06.0 / 73.2 of
Outside
'_'—�
182 cfm
74.4/63.4 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
I COIL HTG. PEAK
CFM
I Sensiblel Latent
I I CFM
I Sensible
1,755
28,343
2,422
680
9,428
0
850
283
0
0
182
6,151
106
1 182
8,543
0
0
850
283
36,6751 2,5281
18 537
Carrier 50HJQ006 New Hp -2 40,150 13,252 36,850
Total Adjusted System Output40,150 13,252 36,850
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Sep 2 pm Jan 12 am
-eam Temneratures at Time of Heatina Peak)
65.9 of r 883.1 of
Heating Coil
77.3 / 64.3 of 77.3 / 64.3 of
i% Retum Air Ducts 4
watures at Time of
58.5/57.4OF
Supply Fan Cooling Coil
2000 cfm
K Return Air Ducts i
S---pp!y Air r% ---Cts -y
82.99 OF
ROOMS
70.0 of
Supply Air Ducts
58.9/57.5OF
55.6% R.H. ROOMS
74.0 163.2 of
I EnemvPro 4.4 by EnerovSoft User Number. 2366 Job Number. 0781 Page: 18 of 20 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM NAME FLOOR AREA
Exist HP -2 5 Ton 580
Number of Systems
1
Heating System
Output per System
60,000
Total Output (Stuh)
60,000
Output (Btuh/sgft)
103.4
Cooling System
Output per'System
59,000
Total Output (Btuh)
59,000
Total Output (Tons)
4.9
Total Output (Btuh/sgft)
101.7
Total Output (sgft/Ton)
118.0
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sgft)
3.45
Airflow (cfmITon)
406.8
Outside Air (0AJ
4.4
Outside Air (cfmisgft)
0.15
Note: values above given at ARI conditions
26.0 of 68.0 of
Outside Air Q
87 cfm
Supply Fan
2000 cfm
69.9 of
11.0 / 77.4 of
oatside -
-A
87 cfm
74.2/62.9 of
68.0 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
CFM
I Sensible
798
13,538
1,160
303
5,015
0
406
150
0
0
87
3,431
1,240
87
4,097
0
0
406
\- 150
18 048 2 400 F7779 413
Carrier 50HJ0006 Exist Hp -2 38,191 13,257 37,474
Total Adjusted System Output 38 191 13,257 37,474
(Adjusted for Peak Design Conditions)
Heating Coil
TIME OF SYSTEM PEAK I Jul 1 pm l I Jan 12 am
85.5 of
k Return Air Ducts `{
75.8 / 63.6 of 75.8 / 63.5 of 121 58.0 / 56.9 of
--(P
Supply Fan
2000 cfm
Cooling Coil
k Return Air Ducts `S
Supply Air Ducts
85.4 of
ROOMS
70.0 of
Supply Air Ducts
58.2 / 57.0 of
54.0'/ R.H. ROOMS
74.0/62 . 8 of
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 19 of 20 1
♦. SYSTEM
i l l T` f AND ',. • OS 1 1 LOADS
i•' 1 ,: i tR
PROJECT NAME DATE
J F K Hospital New Orthopedic Center 5/3/2008
SYSTEM NAME FLOOR AREA
New HP -2 (5Ton) 1,020
Number of Systems
1
Heating System
Output per System
59,000
Total Output (Btuh)
59,000
Output (Btuh/sgft)
57.8
Cooling System
Output per System
59,000
Total Output (Btuh)
59,000
Total Output (Tons)
4.9
Total Output (Btuh/sgft)
57.8
Total Output (sgftrron)
207.5
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sgft)
1.96
Airflow (cftn/Ton)
406.8
Outside Air (%)
7.7
Outside Air (cfm/sgft)
0.15
Note: values above given at ARI conditions
26.0 OF 66.4 OF
Outside Air 0
153 cfm
Supply Fan
2000 cfm
69.7 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel
Latent
I I CFM
Sensible
2,601
39,059
2,040
Ljj427
20,309
0
1,172
609
0
0
153
5,976
1,711
153
7,171
0
0
1,172
1 609
47,832F 3 751 28 698
Carrier 50HJQ006 New Hp -2 38,351 14,352 36,850
Total Adjusted System Output 38,351 14,352 36,850
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 10 am Jan 12 am
66.40F 83.6 OF
Heating Coil
11.0 177.4 OF 77.3 / 65.1 of
Outside Ad ir O
153 cfm Supply Fat
2000 cfm
74-5/63.9 of
k Return Air Ducts 4
77.3 / 65.0 of ® 59.4/58.40F
Cooling Coil
h Return Air Ducts `j
Supply Air Du. s —if .
83.3 of
R0QM7S71
70.0 of
Supply Air Ducts
60.0/58.6OF
57.5% R.H. ROOMS
74.0 / 63.8 L of
EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:20 of 20