Loading...
08-0192 (RC) Title 240 � MAY g 3 2008 TITLE 24 REPORT Title 24 Report for: J F K Hospital New Orthopedic Center 47-647 Caleo Bay Drive, La Quinta„ Ca 92253 Project Designer: Holt Architects 70-225 Highway 111, Studio D Rancho Mirage„ Ca 92270 (760) 328-5280 Report Prepared By: Ric Krown Desert Energy Services, LLC P.O. Box 6251 La Quinta, CA 92248 r (760) 20-0-2084 Job Number: 0781 Date: 5/3/2008 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DA 6 t'ABY - .0 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. Energypro 4.4 by Energysoft Job Number. 0781 User Number. 2366 TABLE OF CONTENTS LPD's Cover Page Table of Contents Nonresidential Performance .Title 24 Forms Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary I 1 2 3 4 13 15 EnergyPro 4.4 by EnergySoft Job Number. 0781 User Number. 2366 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 Of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE J F K Hospital New Orthopedic Center DOCUMENTATION AUTHOR 5/3/2008 PROJECT ADDRESS BUILDING CONDITIONED FLOOR AREA 5,771 sq.Ft 47-647 Caleo Bay Drive, La Quinta, CLIMATE ZONE 15 BUILDING TYPE PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit# Holt Architects (760) 328-5280 ADDITION DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Desert Energy Services, LLC (760) 250-2084 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate andfornpi9te. DOCUMENTATION AUTHOR DATE OF PLANS 12/5/07 BUILDING CONDITIONED FLOOR AREA 5,771 sq.Ft 1 CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ADDITION [::] EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate andfornpi9te. DOCUMENTATION AUTHOR SIGNATURE DAT Ric Krown s' 0 8 The Principal Designer hereby certifys that the proposed building design represented In this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. E 2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Envelope Compliance Not In The Scope Of IS U ml a Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The 'Scope Of Required Forms -SubmittalI his PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ECH-1, MECH-2 MECH-3 MECH-5 Requorms PRINCIPAL MECHANICAL DESIGNER - NAMET LIC. NO. DAT Polar Barr Air Conditioning ZZ2 A 1 -? /Tq� I EnemvPro 4.4 by EneravSoft User Number. 2366 Job Number. 0781 Page:4 of 20 1 ILPD's PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 When a performance run is done without compliance for lighting, the 'program uses the .default LPD's. EnergyPro By EnergySoft User Number. User Job Number. 0781 Page:1 of 20 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PE PROJECT NAME JFK DATE 5/3/2008 ANNUAL TDV ENERGY USE SUMMARY kBtuls ft- r Standard Proposed Compliance ENERGY COMPONENT Design Design Margin [j] Standard ® Pmposed Space Heating 1.17 0.96 0.21°" Space Cooling 217.44 207.50 9.93 Indoor Fans 59.43 61.70 -2.27 IEM�Nl Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 0.00 """'`"'° Domestic Hot Water 19.41 19.29. 0.12 Lighting 79.61 79.61 0.00 - - Receptacle 91.54 91.54 0.00 Process 0.00 0.00 0.00 0�2oaoso�eocoo�2oiaoieoieozoo TOTALS: 468.60 460.60 8.00 kBtulSQfl-r` Percent better than Standard: 1.7% ( 1.7% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (W)270deg Conditioned Floor Area 5,771 Syn 2 Number of Stories Unconditioned Floor Area o syft 7 Number of Systems Conditioned Footprint Area 0 syn• 7 Number of Zones Fuel Type Natural Gas Orientation Gross Area . Glazing Ratio 1,292 �Area jGlazing 319 24.7% Front Elevation I M I scrR. sce_ Left Elevation (N) 27 syn. 0 syfc 0.0% 1,324 290 21.9% Rear Elevation (E) syft soft 1,088 233 21.4% Right Elevation Total Roof (S) syn sc ft syn syn. syn. soft 3,731 1 842 5,781 0.0% Standard Proposed Lighting Power Density 1.200 wisyft 1.200 wisyft Prescriptive Env. Heat Loss 1,875 Btuth 1,693 Btu/h Prescriptive Env. Heat Gain 145,622 Btum-F 163,417 Btum-F Remarks: Standard Building (Compliance) Run Initiation Time: 05/03/08 09:17:34 Run Code: 1209831454 EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:5 of 20 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 ®f 3 PERF®I PROJECT NAME J F K Hospital New Orthopedic Center DATE 5/3/2008 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sgft) Inst LPD (W/sf)t Ctrl. Allowed LPD Proc. Credits Area Tailored Loads (W/sf)2 /s 3 (W/S4 (w/sf) Exist HP -1 (6 Ton) OFFICES Office 970 •1.20 New HP -2 (5Ton) OFFICES Office 970 '1.20 Exist Hp -3 2 8 Tons OFFICES Office 1,020 '1.20 New HP -2 (5 Ton) OFFICES Office 750 `1.20 OFFICES Office 461 `1.20 Exist HP -2 5 Ton OFFICES Office 580 •1.20 New HP -2 (5Ton) OFFICES Office 1,020 `1.20 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C (items marked with asterisk see LTG -2 -C by others) (by others) 4. See LTG6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified In this checklist These items require special written )ustmcauon and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed In this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant I EnerovPro 4.4 by EnerovSoft User Number. 2366 Job Number. 0781 Page:6 of 20 1 ;CERTIFICATE OF COMPLIANCE MECH®1 -C PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, Installation certificates, and operatinq and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit ❑ MECH-3-A Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Consbucibn and Retrofit Units with economizers that are installed at the factory and certrBed with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 V of space or less and 25% or more of the duds are in noncendWoned or semtconditbned space like an attic. New systems that meet the above requirements. Rebofit systems that meet the above requirements and either extend duds, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chr7lers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant Row chilled and hot water systems Mat have a design capacity greater than or equal to 500,000 Bhuhr. -Water400p Heat Pump Controls Applies to all new waterfoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable Row chilled, hydfomc heat pump or condenser water systems where Me pumps motors are greater than 5 hp. Equipment re quiringacceptance testing EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:7 of 20 ��' �R ���EREQUIREMENTS Part 1®f 2 MECH®2®C I (PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 C-a!eWaated Sensible Cnnnnn Cep-aelh. X. 212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS, Central or Single Zone Exist HP -1 (6 Ton) New HP -2 (5Ton) Exist Hp -3 (2) (8 Tons) 1 1 2 Reference on Plans or Specification t 112(a) 8.00 HSPF 8.10 HSPF 8.00 HSPF 112(a) 12.0 SEER / 10.6 EER 13.0 SEER / 11.3 EER 12.0 SEER / 10.6 EER 112(b) Yes Yes Yes 112(c), 115(a),n/a 27,751 btuh n/a n/a 121(b) No No No 121 b 146 cfm 146 cfm 153 cfm 121 c No No No 121 c No No No 121(c), 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Gravity Gravity Gravity 122 n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 29,979 btuh 36,850 btuh 59,959 btuh .44'a & b` rua n/a 144 a & b 27,751 btuh 38,222 btuh 56,747 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c No No No 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features, are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes N System is: Constant Volume, Single Zone; Serves < 5,000 sqf ; Has > 25% duct in unconditioned space. Duct seating is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnemvPro 4.4 by EnerovSoft User Number. 2366 Job Number. 0781 Page:8 of 20 1 AIR SYSTEM REQUIREMENTS Pali 1 of 2 MECH-2-C (PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS, Central or Single Zone New HP -2 (5 Ton) Exist HP -2 (5 Ton) New HP -2 (5Ton) 1 1 1 T-24 MANDATORY MEASURES Section Reference on Plans or Specification ' Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum VentHation VAV Minimum Position Cmt d Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Contiml Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity z 1.43 2 Proposed Heating Capacity 2 r'clGLfa:�(t�niciMln Pnnliru� r`����ifi;. 1 X12 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 112(a) 8.10 HSPF 7.60 HSPF 8.10 HSPF 11 WWI 13.0 SEER / 11.3 EER 11.9 SEER / 10.3 EER 13.0 SEER / 11.3 EER 112 Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121 (b) No No No 121 b 182 cfm a"I CfM- 51 3 cfm 121(c) No No _ No'�`.r-fes' — 121 c No No No 121(c), 122(e) Proramr:able.gj1'++tch Pro rammable Switch Hsatinc`& Cooling Required Heating & Cooling Required Prorammable Switch 122(e) Heating & Cooling Required 122 0 Gravitv Gravity Gravity 122(g) n/a n/a n/a 123 144 Constant Temp 124 R-4.2 R-4.2 R-8.0 144 a & 4 n/a n/a n/a 144 a & b 36,850 btuh 37,474 btuh 36,850 btuh 1441 R h n/� nl� n/2 . 144 a & b 40,150 btuh 38,191 btuh 38,361 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c No No Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put'N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft~ Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2. MECH-2-C (PROJECT NAME _ - DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM FEATURES ITEM OR SYSTEM( TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specification Equipment Efficiency 11 12(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW Heater ilui-rob r Gi SjiSi2�iia I I _ MANDATORY MEASURES Reference on Plans or Specification' Water Heater Certification 113 (a) Water Heater Efficiency 113 b Service Water Heating Installation 113 (c) Pool and Spa Efficiency and Control 114 a Pool and Spa Installation 114 b Pool Heater - No Pilot Light 115 (c) Spa Heater - No Pilot Light 115 d Bradford -White M -III - 50 91. -17 n/a n/a n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "NW ins the column. Run Initiation Time: 05/03/08 09:17:34 Run Code: 1209831454 EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:10 of 20 IMECHANICAL VEPIi9LAT10PB DAECFI-3-C PROJECY NAME ®ATE 1 J F K Hospital New Orthopedic Center 5/3/2008 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121(b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N 20NE/SYSTEM n D� Tma v m 0 J3 oci�n 30-n 0 3 �'' x Dn n m E z m3 vCr m o .0 C) r5a-A ° m�� xr►n —z In m 3 _ G'D ox G Q °, � C) 41) Tr.m 3 D° to o� nmo �1f/�~ M9 � zco 0 30° ° x a A °o wad o x C' = S' 0 y m> 13 �? 0 D OFFICES 97C 0.15 1461 1 1461 146 Exist HP -1 (6 Ton). Total 146 146 OFFICES 97C 0.15 146 146 146 New HP -2 (5Ton) Total 146 146 OFFICES 1,02C 0.15 153 153 153 Exist Hp -3 (2) (8 Tons) Total 153 153 OFFICES 75C 0.15 113 113 113 OFFICES 461 0.15 69 69 69 New HP -2 (5 Ton) Total 182 182 OFFICES 58C 0.15 87 87 87 Exist HP -2 (5 Ton) Total 87 87 OFFICES 1,020 0.15 153 153 153 New HP -2 (5Ton) Total 153 153 C Minimum ventilation rate per Section 121 Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress Purposes fors aces without fixed seating. H Requivred Ventilation Air REM VA is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). I Must be -greater than or equal to H or use Transfer Air column N to make up the difference. J Design fan supply cfm Fan CFM) x 30%; or K Condition area ft sq.) x 04 dmfR sq.; or L Max mum of Columns H, J, K or 300 cfm M This must be less than or equal to Column L and greater that or equal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required VeWation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPm 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 11 of 20 MECHANICAL EQUIPMENT DETAILS Fart 1 of 2 MECH-5-C PROJECT NAME J F K Hospital New Orthopedic Center COOLING ®ATE 5/3/2008 CHILLER AND TOWER SUMMARY ON Outout Efficiency Tons PUMPS Efficlengy Condition Status Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Driv Effie Co Pum No Economizer Carrier 50HJQ006 New Hp Packaged DX 2 3 59,000 0.0 8.10 HSPF 59,000 13.0 SEER / 11.3 EER New No Economizer Carrier 50HJQ006 Exist Hp -2 Packaged DX 1 60,000 0.0 7.60 HSPF 59,00011.9 SEER / 10.3 EER Existing No Economizer D W / BOILER SUMMARY Energy Standby ITANK INSUL. Rated. Vol. Condition Factor Loss or Ext System Name System Type Distribution Type Qty Input (Gals.) Status or RE I Pilot R -Val. Bradford --White M -III- Small Elec. No Pipe Insulation 1 15,358 50 New 0.91 n/a n/a CENTRAL SYSTEM RATINGS HEATING COOLING System Name Systern Type ON Outout Aux. kW Eff. Outout Efficlengy Condition Status Economizer Type HCarrier 50HJ0005 Exist Packaged DX 3 48,000 0.0 8.00 HSPF 45,00012.0 SEER/ 10.6 EER Existing No Economizer Carrier 50HJQ006 New Hp Packaged DX 2 3 59,000 0.0 8.10 HSPF 59,000 13.0 SEER / 11.3 EER New No Economizer Carrier 50HJQ006 Exist Hp -2 Packaged DX 1 60,000 0.0 7.60 HSPF 59,00011.9 SEER / 10.3 EER Existing No Economizer MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH®MM PRO JECY NAME DAVE J F K Hospital New Orthopedic Center I 5/3/2008 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies FX §11 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. 91I $(a) Fan type central furnaces shall not have a pilot light. n9423 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. 9124 Air handling duct systems shall be Installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CIVIC Standards. Controls 9122(e) Each space conditioning system shall be installed with one of the following: RI §122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours_for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ 9122(e)1 B An occupancy sensor to control the operating period of the system; or F] §422(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the system. FXJ 9122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint 922(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with Isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® 9122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower.. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. FV I §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. 0 9112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 13 of 20 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-M PROJECT NAME IDATE J F K Hospital New OrthODedic Center 1 5/3/2008 Description Designer Enforcement Ventilation R§121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. FX §122(f) §12Y(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. F] §I21(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or §121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or X] §121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or §121(f)4 Another method approved by the Commission. Service Water Heating Systems X❑ §413(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. §113(c) lavatories in restrooms of public facilities shall be equipped with controls to limit L`a o:tfet tape a c:r .0110 r+egrecs F. EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 14 of 20 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM NAME FLOOR AREA Exist HP -1 6 Ton 970 Number of Systems 1 Heating System Output per System 48,000 Total Output (Btuh) 48,000 Output (Btuh/sgft) 49.5 Cooling System Output per System 45,000 Total Output (Btuh) 45,000 Total Output (Tons) 3.8 Total Output (Btutdsgfl) 46.4 Total Output (sgR/ron) 258.7 Air System CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cf Wsgft) 1.65 Airflow (cfmrron) 426.7 Outside Air (%) 9.1 Outside Air (cfm/sgtt) 0.15 Note: values above given at ARI conditions 26.0 OF 65.8 OF Outside Air O 146 cfm Supply Fan 1600 cfm 69.8 of 111.0 / 77.4 of Outside —�—� 146 dim 74.5/65.3 of 65.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensible Latent I I CFM I Sensible 36,7471 2,8931 Carrier 50HJQ005 Exist HP -3 27,751 13,398 29,979 Total Adjusted System Output 27 751 13,398 29,979 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 5 pm Jan 12 am Heating Coil 83.3 of K Return Air Ducts 4 77.8/66.5OF 77.8/66.4OF 0 61.6/60.6OF -(P Supply Fan 1600 cfm Cooling Coil h Return Air Ducts 'I Supply nir Ducts 83.1 of ROOMS 70.0 of Supply Air Ducts 62.1 / 60.8 of 62.7% R.H. ROOMS 74.0/65.1OF EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 15 of 20 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM NAME FLOOR AREA New HP -2 (5Ton) 970 Number of Systems 1 Heating System Output per System 59,000 Total Output (Stuh) 59,000 Output (Btuh/sq t) 60.8 Cooling System Output per System 59,000 Total Output (Btuh) 59,000 Total Output (Tons) 4.9 Total Output (Btuh/sgft) 60.8 Total Output (sgft/Ton) 197.3 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 2.06 Airflow (cfm/Ton) 406.8 Outside Air (%) 7.3 Outside Air (cf n1sgft) 0.15 Note: values above alven at ARI conditions 26.0 of 66.7 of Outside Air 146 cfm Supply Fan 2000 cfm 69.9 of 11.0 / 77.4 of )b I Outside --- 146 cfm 74.4/63.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,734 26,798 1,940 618 9,097 0 804 273 0 0 146 5,710 1,695 146 6,844 0 0 804. 273 34 581 3 635 16 486 Carrier 50HJ0006 New Hp -2 38,222 14,281 36,850 Total Adjusted System Output 38,222 14,281 36,850 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 5 pm Jan 12 am 66.7 OF 83.9 OF Heating Coil 77.0 / 64.9 of 77.0 / 64.8 of O —h Return Air Ducts iratures at Time of Cc 59.2 / 58.1 of Supply Fan Cooling Coil 2000 cfm in Return Air Ducts "i Supply nir Duc J 83.7 of ROOMS 70.0 of I Supply Air Ducts 59.6 / 58.3 of 57.0% R.H. ROOMS 74.0/63.6OF I I EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 16 of 20 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM NAME FLOOR AREA Exist HP -3 2 8 Tons 1,020 Number of Systems 2 Heating System Output per System 48,000 Total Output (Btuh) 96,000 Output (Btuh/sgft) 94.1 Cooling System Output per System 45,000 Total Output (Btuh) 90,000 Total Output (Tons) 7.5 Total Output (Btuh/sgft) 88.2 Total Output (sgftrron) 136.0 Air System CFM per System 1,600 Airflow (cfm) 3,200 Airflow (cfm/sgft) 3.14 Airflow (cf n ron) 426.7 Outside Air (%) 4.8 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 26.0 of 67.7 of Outside Air 0 153 cfm Supply Fan 3200 cfm 69.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I I COIL HTG. PEAK CFM I Sensible Latent I I CFM I Sensible 2,723 41,610 2,040 11261 20,309 0 1,248 609 0 0 153 5,353 -121 153 7,188 0 0 1,248 609 49,8851 19191 28 716 Carrier 50HJQ005 Exist HP -3 56,747 24,205 59,959 Total Adjusted System Output 56,747 24,205 59,959 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am 67.7 of 85.2 of � ISI Heating Coil h Return Air Ducts 4 107.0 / 73.5 of 75.9 / 64.3 of 75.9 / 64.2 of 59.4 / 58.3 of Outside Air O ` 153 cfm Supply Fan 3200 cfm 74.4/63.80F Cooling Coil h Return Air Ducts '*I Supply Air Ducts 85.0 of ROOMS 70.0 of Supply Air Ducts 59.7 / 58.5 of 57.1% R.H. ROOMS 74.0 / 63.6 of I EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 17 of 20 1 I / !HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY � PROJECT NAME DATE 11 J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM NAME FLOOR AREA New HP -2 5 Ton 1,211 c Number of Systems 1 Heating System Output per System 59,000 Total Output (Btuh) 59,000 Output (Stuh/sgft) 48.7 Cooling System Output per System 59,000 Total Output (Btuh) 59,000 Total Output (Tons) 4.9 Total Output (Btuh/sgft) 48.7 Total Output (sgft/Ton) 246.3 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.65 Airflow (cfm/Ton) 406.8 Outside Air (%) 9.1 Outside Air (cfm/sgft) 0.15 Note: values above given. at ARI conditions 26.0 of 65.9 of Outside Air 182 cfm Supply Fan 2000 cfm 69.9 of 06.0 / 73.2 of Outside '_'—� 182 cfm 74.4/63.4 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 1,755 28,343 2,422 680 9,428 0 850 283 0 0 182 6,151 106 1 182 8,543 0 0 850 283 36,6751 2,5281 18 537 Carrier 50HJQ006 New Hp -2 40,150 13,252 36,850 Total Adjusted System Output40,150 13,252 36,850 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 2 pm Jan 12 am -eam Temneratures at Time of Heatina Peak) 65.9 of r 883.1 of Heating Coil 77.3 / 64.3 of 77.3 / 64.3 of i% Retum Air Ducts 4 watures at Time of 58.5/57.4OF Supply Fan Cooling Coil 2000 cfm K Return Air Ducts i S---pp!y Air r% ---Cts -y 82.99 OF ROOMS 70.0 of Supply Air Ducts 58.9/57.5OF 55.6% R.H. ROOMS 74.0 163.2 of I EnemvPro 4.4 by EnerovSoft User Number. 2366 Job Number. 0781 Page: 18 of 20 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM NAME FLOOR AREA Exist HP -2 5 Ton 580 Number of Systems 1 Heating System Output per System 60,000 Total Output (Stuh) 60,000 Output (Btuh/sgft) 103.4 Cooling System Output per'System 59,000 Total Output (Btuh) 59,000 Total Output (Tons) 4.9 Total Output (Btuh/sgft) 101.7 Total Output (sgft/Ton) 118.0 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 3.45 Airflow (cfmITon) 406.8 Outside Air (0AJ 4.4 Outside Air (cfmisgft) 0.15 Note: values above given at ARI conditions 26.0 of 68.0 of Outside Air Q 87 cfm Supply Fan 2000 cfm 69.9 of 11.0 / 77.4 of oatside - -A 87 cfm 74.2/62.9 of 68.0 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 798 13,538 1,160 303 5,015 0 406 150 0 0 87 3,431 1,240 87 4,097 0 0 406 \- 150 18 048 2 400 F7779 413 Carrier 50HJ0006 Exist Hp -2 38,191 13,257 37,474 Total Adjusted System Output 38 191 13,257 37,474 (Adjusted for Peak Design Conditions) Heating Coil TIME OF SYSTEM PEAK I Jul 1 pm l I Jan 12 am 85.5 of k Return Air Ducts `{ 75.8 / 63.6 of 75.8 / 63.5 of 121 58.0 / 56.9 of --(P Supply Fan 2000 cfm Cooling Coil k Return Air Ducts `S Supply Air Ducts 85.4 of ROOMS 70.0 of Supply Air Ducts 58.2 / 57.0 of 54.0'/ R.H. ROOMS 74.0/62 . 8 of EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page: 19 of 20 1 ♦. SYSTEM i l l T` f AND ',. • OS 1 1 LOADS i•' 1 ,: i tR PROJECT NAME DATE J F K Hospital New Orthopedic Center 5/3/2008 SYSTEM NAME FLOOR AREA New HP -2 (5Ton) 1,020 Number of Systems 1 Heating System Output per System 59,000 Total Output (Btuh) 59,000 Output (Btuh/sgft) 57.8 Cooling System Output per System 59,000 Total Output (Btuh) 59,000 Total Output (Tons) 4.9 Total Output (Btuh/sgft) 57.8 Total Output (sgftrron) 207.5 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.96 Airflow (cftn/Ton) 406.8 Outside Air (%) 7.7 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 26.0 OF 66.4 OF Outside Air 0 153 cfm Supply Fan 2000 cfm 69.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I I CFM Sensible 2,601 39,059 2,040 Ljj427 20,309 0 1,172 609 0 0 153 5,976 1,711 153 7,171 0 0 1,172 1 609 47,832F 3 751 28 698 Carrier 50HJQ006 New Hp -2 38,351 14,352 36,850 Total Adjusted System Output 38,351 14,352 36,850 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 10 am Jan 12 am 66.40F 83.6 OF Heating Coil 11.0 177.4 OF 77.3 / 65.1 of Outside Ad ir O 153 cfm Supply Fat 2000 cfm 74-5/63.9 of k Return Air Ducts 4 77.3 / 65.0 of ® 59.4/58.40F Cooling Coil h Return Air Ducts `j Supply Air Du. s —if . 83.3 of R0QM7S71 70.0 of Supply Air Ducts 60.0/58.6OF 57.5% R.H. ROOMS 74.0 / 63.8 L of EnergyPro 4.4 by EnergySoft User Number. 2366 Job Number. 0781 Page:20 of 20