07-3034 (PAT) Title 241
' � Y
�Y
I - TITLE 24 REPORT
Title 24 Report for:
Report Prepared By:
JS
GLS Group
74-854 Velie Way, Suite 5
Palm Desert, CA 92260
(760) 340-3528
Job Number:
LQ03 - T24-1
Date:
9/12/03
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC (415) 883-5900.
EnergyPro 3.1 By EnergySoft Job Number: LQ03 - T24-1 User Number: 5553
C.CN (,5c --r
BOB RUNYAN
Q78-700
CABRILLO WA
La-QujntaCA-922-53
Z o U o
M� WE=
=
d Q �-
m
U-IL
08
o CL M
Project Designer:
-j 2
C0 �
GLS Group
o
74-854 Velie Way, Suite # 5
Palm Desert, CA 92260
760.340.3528
Report Prepared By:
JS
GLS Group
74-854 Velie Way, Suite 5
Palm Desert, CA 92260
(760) 340-3528
Job Number:
LQ03 - T24-1
Date:
9/12/03
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC (415) 883-5900.
EnergyPro 3.1 By EnergySoft Job Number: LQ03 - T24-1 User Number: 5553
C.CN (,5c --r
TABLE OF CONTENTS
Cover Page
Table of Contents
Form CF -1 R Certificate of Compliance
Form MF -1 R Mandatory Measures Checklist
Form C -2R Computer Method Summary
HVAC System Heating and Cooling Loads Summary
1
2
3
6
8
12
EnergyPro 3.1 By EnergySoft Job Number: L003 - T24-1 User Number: 5553
Certificate of Compliance: Residential (Part 1 of 2) CF -1 R
BOB RUNYAN
Frame
Type
9/12/03
Project Title
R-38 Roof (R.38.2x4.24)
Date
78-700 CABRILLO WAY La Quinta
Exterior Roof
Slab On Grade
n/a
Project Address
Covered Slab w/R-0.0 Perimeter Insulation
Slab On Grade
Building Permit #
GLS Group
(760) 340-3528
R-13 Wall w/1" EPS
Wood
0.059
Plan Check / Date
Documentation Author
Telephone
0.387
Exterior Door
Computer Performance
15
0.054
Field Check I Date
Compliance Method (Package or Computer)
Climate Zone
Enforcement Agency Use Only
GENERAL INFORMATION
Total Conditioned Floor Area: 558 ft2 Average Ceiling Height: 10.0 ft
Total Conditioned Slab Area: 558 ft2
Building Type:
(check one or more)
X❑ Single Family Detached ❑ Addition
❑ Single Family Attached ❑ Existing Building
❑ Multi -Family ❑ Existing Plus Addition
Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor
Number of Dwelling Units: 1.00
Number of Stories: 1 ❑ Raised Floor
Component
Type
Frame
Type
Const.
Assembly
U -Value
Location/Comments
(attic, garage, typical, etc.)
R-38 Roof (R.38.2x4.24)
Wood
0.024
Exterior Roof
Slab On Grade
n/a
0.756
Covered Slab w/R-0.0 Perimeter Insulation
Slab On Grade
n/a
0.756
Exposed Slab w/R-0.0 Perimeter Insulation
R-13 Wall w/1" EPS
Wood
0.059
Exterior Wall
Solid Wood Door
None
0.387
Exterior Door
R-15 Wall w/1" EPS
Wood
0.054
Exterior Wall
FENESTRATION
Shading Devices
Type Orientation
Area
Fenestration
Exterior
Overhang Side Fins
SF
U -Factor
SHGC
Shading
Yes / No
Yes / No
Front
8.0
0.43
0.41
Bug Screen
❑ X❑
❑ x❑
Left
44.0
0.59
0.66
Bug Screen
❑ x❑
❑X❑
Rear
25.0
0.43
0.41
Bug Screen
❑ x❑
❑ x❑
Rear
4.0
0.59
0.66
Bug Screen
❑ X❑
❑ 0
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑❑
❑❑
Run Initiation Time: 09110/03 21:14:59 Run Code: 1063253699
Ener Pro 3.1 By Ener Soft
User Number: 5553
Job Number: LQ03 - T24-1
Pa e:3 of 12
Certificate of Compliance: Residential (Part2 of 2) CF -1 R
BOB RUNYAN 9/12/03
Project Title Date
HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load.
Distribution
Heating Equipment Minimum Type and Duct or
Type (furnace, heat Efficiency Location Piping Thermostat Location /
pump, etc.) (AFU E/HSPF) (ducts, attic, etc.) R -Value Type Comments
(`Pntral Furnaces
80% AFUE
Ducts in Attic
42
Setback
HVAC lit System Gas Elec
Cooling Equipment
Minimum
Duct
Type (air conditioner,
Efficiency
Location
Duct
Thermostat Location /
heat pump, evap. cooling)
(SEER)
(attic, etc.)
R -Value
Type
Comments
Split Air Conditioner
12.1 SEER
Ducts in Attic
42
Setback
HVAC S Ip it Systesm rac/FIPr.
WATER HEATING SYSTEMS
Rated 1
Tank
Energy Fact! 1 External
Water Heater
Water Heater
Distribution
# in Input
Cap.
or Recovery Standby Tank Insul.
System Name
Type
Type
Syst. Btu/hr
(gal)
Efficiency Loss (%) R -Value
1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input and Recovery Efficiency.
REMARKS
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with
over responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification
a ield veri tion by an approved HERS rater.
esigner r wrier (per Bus'ness & Professio s Code) Documentation Author
Name: is
Title/Firm: GLS Group Title/Firm: GLS Group
Address: 74-854 Velie Way, Suite # 5 Address: 74-854 Velie Way, Suite 5
Palm Desert, CA 92260 Palm Desert, CA 92260
Te I e p h o n e: 760.340.3528
Lic.
kz—. 9 - v -2 V— :>
(S!
u ) (date)
Enforce nt Agency
Name:
Title/Firm: _
Address:
Telephone:
Telep ne: (760) 340-3528
6T•l2.2
(sign (date)
(signature/stamp) (date)
Run Initiation Ti I n Code:
EnergyPro 3.1 By EnergySoft User Number: 5553 Job Number: LQ03 - T24-1 PageA of 12
Certificate of Compliance: Residential (Addendum) CF -1 R
BOB RUNYAN 9/12/03
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
3ased on the adequacy of the special Justification ano aocumentation suomiaea. Plan Field
TheHVAC System "HVAC Split System Gas/Elec" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 338 sgft Covered Slab Floor, 3.50" thick at WHOLE HOUSE
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 220 sqft Exposed Slab Floor, 3.50" thick at WHOLE HOUSE
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form cF-61R.
Plan
Field
The HVAC System "HVAC Split System Gas/Elec" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater
must provide verifification of the TXV, or measure the Refrigerant Charge and Airflow.
The HVAC System "HVAC Split System Gas/Elec" is using reduced duct leakage to comply and must have diagnostic site testing of
duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form.
Run Initiation Time: 09/10/03 21:14:59 Run Code: 1063253699
EnergyPro 3.1 By EnergySoft User Number: 5553 Job Number: LQ03 - T24-1 Page:5 of 12
Mandatory Measures Checklist: Residential (Page 1 of 2) MF -1 R
NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable.
DESIGNER
ENFORCEMENT
Building Envelope Measures
'§150(a): Minimum R-19 ceiling insulation.
§150(b): Loose fill insulation manufacturer's labeled R -Value.
*§150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does
not apply to exterior mass walls).
*§150(d): Minimum R-13 raised floor insulation in framed floors or equivalent.
[]*§150(d):
§150(1): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no
❑
greater than 2.0 perm/inch.
❑X §118: Insulation specified or installed meets insulation quality standards. Indicate type and form.
® §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
❑ §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
§ 150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards.
❑ Gas Appliances Gas Logs.
§150(e): Installation of Fireplaces, Decorative and
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning gas pilots allowed.
Space Conditioning, Water Heating and Plumbing System Measures
§110-13: HVAC equipment; water heaters, showerheads and faucets certified by the Commission.
❑ §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA.
§150(i): Setback thermostat on all applicable heating and/or cooling systems.
❑ §1500): Pipe and Tank Insulation
1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater)
3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external
insulation or R-16 combined internal/external insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55 degrees F. insulated.
6. Piping insulating between heating source and indirect hot water tank.
EnergyPro 3.1 By EnergySoft User Number: 5553 Job Number: LQ03 - T24-1 Page:6 of 12
Mandatory Measures Checklist: Residential (Page 2 of 2) MF -1 R
NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable.
DESIGNER
ENFORCEMENT
Space Conditioning, Water Heating and Plumbing System Measures: (continued)
X❑ '§ 150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601,
603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R4.2 or enclosed entirely in
conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system
that meets the applicable requirements of UL181, UL181A, or UL181B. If mastic or tape is used to seal openings
greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not
be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be
sealed with Goth back rubber adhesive duct tapes unless such tape is used in combination with mastic and
drawbands.
2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other
than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building
cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be
compressed to cause reductions in the cross-sectional area of the ducts.
3. Joints and seams of duct systems and their components shall not be sealed with Goth back rubber adhesive
duct tapes unless such a tape is used in combination with mastic and drawbands.
4. Exhaust fan systems have back draft or automatic dampers.
5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually
operated dampers.
6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture,
equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable
for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam
insulation shall be protected as above or painted with a coating that is water retardant and provides shielding
from solar radiation that can cause degradation of the material.
❑ § 114: Pool and Spa Heating Systems and Equipment
1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance
heating, and no pilot.
2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or
spas.
a. At least 36" of pipe between filter and heater for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation pump time switch.
X❑ §115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no
continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr)
❑ §118 (f): Cool Roof material meet specified criteria
Lighting Measures
❑ §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for
general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting
control panel at an entrance to the kitchen.
§150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of
40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement
allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved.
3.1 By EnergySoft User Number: 5553 Job Number: LQ03 - T24-1 Page:? of 12
Comouter Method Summary (Part 1 of 3) C -2R
BOB RUNYAN 9/12/03
Project Title Date
78-700 CABRILLO WAY La Quinta
Project Address Building Permit #
GLS Group (760) 340-3528 Plan Check/Date
Documentation Author Telephone
Computer Performance 15 Field Check/Date
Compliance Method (Package or Computer) Cimate Zone
Source Energy Standard
Use (kBtu/sf-yr) Design
Space Heating 4.01
Facing
North Margin
45
Facing
East Margin
Facing
South Margin
R=38RooQR-38.2x4-24.)
Facing
West Margin
1.80 2.21
3.05 0.96
3.94 0.07
3.14 0.87
Space Cooling 55.75
56.76 -1.00
.R--13_WalLw/J.LE2S
53.41 2.34
Wall- x.6.3
45.26 10.49
1.35-
51.60 4.15
Domestic Hot Water 0.00
0.00 0.00
.RR13_Wall_w/a-EeS
0.00 0.00
W l� M
0.00 0.00
t80
0.00 0.00
58.56 1.20
56.46 3.30
49.20 10.56
54.74 5.02
Totals 59.76
-0-05-9-
_2.7_0.
90
This C -2R describes the front facing North occurrence of a four cardinal orientation analysis. Features are identical in all orientations.
Total Conditioned Floor Area: 558 ft
Building Type: Single Fam Detached Floor Construction Type: ❑ Raised Floor ❑X Slab Floor
Building Front Orientation: All Four Orientations Total Fenestration Area: 14.5%
Number of Dwelling Units: 1.00 Total Conditioned Volume: 5,580 ft 3
Number of Stories: 1 Total Conditioned Slab Area: 558 ft2
BUILDING ZONE INFORMATION # of Thermostat Vent
Zone Name Floor Area Volume Units Zone Type Type Hgt. Area
±wAC-Split-System_Gas/Eler 558 -5,580 -1_0.0_ Conditioned- -Setback- -2 -nla
OPAQUE SURFACES Solar
Act. Gains
Tvoe Area U -Val. Azm. Tilt Y / N Form 3 Reference
Location / Comments
Raof 52].
0-024-
45
18-
R=38RooQR-38.2x4-24.)
WHOLF HO.U.SF
Wall -22.0
0 059
-0--9-0-
❑
.R--13_WalLw/J.LE2S
WHOLE_H.O' ISE
Wall- x.6.3
0_059
1.35-
9.0-
❑
.RR13_Wall_w/a-EeS
WHOLEt10.U.SF
W l� M
0..059
t80
90
❑
R13_WalLw/1LEeS
WHOLE_t1QUSE
Wall- 2t9
-0-05-9-
_2.7_0.
90
❑
1-1.3 Wall _wL1_EES
WHOLE_HQU.SE
21
0._3.87_
-2.7.0_
90_
�
❑
_Solid_Wood-D.00r
WH..01 F: Hn.USF
-Doo-L--
Wall 21
-0,05A-
t35
90
❑
R=15_Wallyv/-ILEP_S
WHOLE -H SE
IlooL-- 24-
0 387_
-D5
90
-Solid -Wood -Doo,
WHO.LE_IiQU.SE
❑
❑
❑
❑
❑
❑
-
❑
❑
❑
❑
❑
❑
❑❑
❑❑
❑❑
F-1
F-1
Run Initiation Time: 0913 21:14:$9
Run Code: 10632 369
3.1
By EnergySoft
User Number:
5553 .
LQ03 - T24-1 Page:8 of 12
Computer Method Summary (Part 2 of 3) C -2R
BOB RUNYAN 9/12/03
Project Title Date
FENESTRATION SURFACES
U- Act. Glazing Type Location/
# Type Area Factor SHGC Azm. Tilt Comments
4
Window Front (North)
—4.-0_
—0._4.3.0_
0._41.
0_ —90.
Milgard_W_—AL.U.MIN.UM_Low E_
WHOLE HOUSE
2
Window Front
North.
4.0
0.430
0.41
0
90 Milgard W. ALUMINUM Low E
WHOLE HOUSE
3
Window Left
Southeast)
24.0
0.590
0.66
135
90 Milgard W. ALUMINUM Low E
WHOLE HOUSE
4
Window Left
Southeast)
20.0
0.590
0.66
135
90 Milgard W. ALUMINUM Low E
WHOLE HOUSE
5
Window Rear
(South)
25.0
0.430
0.41
180
90 Milgard W. ALUMINUM Low E
WHOLE HOUSE
6
Window Rear
(South)
4.0
0.590
0.66
180
90 Milgard W. ALUMINUM Low E
WHOLE HOUSE
INTERIOR AND EXTERIOR SHADING
Right Fin
Window
Overhang Left Fin
#
Exterior Shade Type SHGC
Hgt. Wd.
Len. Hg_t.
LExt. RExt. Dist Len
Hgt Dist Len Hgt.
1
Bug Screen
0.76
2
Bug Screen
0.76
3
Bug Screen
0.76
4
Bug Screen
0.76
5
Bug Screen
0.76
6
Bug Screen
0.76
Run Initiation Time_09I141Q3 21:14:59
Run Code: 1063253699
EnergyPro 3.1
-y�neMySoft
User Number: 5553
Job Number: LQ03 - T24-1
Page:9 of 12
Computer Method Summary (Part 3 of 3)' C -2R
BOB RUNYAN 9/12/03
Project Title Date
THERMAL MASS FOR HIGH MASS DESIGN
Area Thick. Heat Inside Location
Type (sf) (in.) Cap. Cond. Form 3 Reference R -Val. Comments
Corn er to eavyweight— —3.38. _3..5.0 _28. 0-98. n1a _2. y1fLiQLE_Ii01lSE_/_Slab_o�Grade
Concrete. Heavyweight 220 3.50 28 0.98 n/a 0 WHOLE HOUSE /Slab on Grade
PERIMETER LOSSES
Type
F2
Length Factor
Insulation
R -Val. Depth Location / Comments
5i a Perimeter
510 7f
_00 0 WHOLE HOUSE
Slab— edmeter
48 016.
—0-0 0 W_--110lEdQlZSE
HVAC SYSTEMS
Heating Equipment Minimum Distribution Type
Type (furnace, heat Efficiency and Location
Duct Thermostat Location /
pump, etc.) (AFUE/HSPF)(ducts/attic, etc.)
R -Value Type Comments
Antral Furnace 80° AF1�E Dols in Attic
4.2 Setback HVAC S Iit�System Ga�/EJec
Hydronic Piping Pipe Pipe Insul.
System Name Length Diameter Thick.
Cooling Equipment Minimum Duct
Type (air conditioner, Efficiency Location
Duct Thermostat Location /
heat pump, evap. cooling) (SEER) (attic, etc)
R -Value Type Comments
SplitAir ConditiQner 12.1 $EER Ducts in Attic
4.2 Setback HVAC Split System—G-as/Elec
WATER HEATING SYSTEMS
Ratedl Tank Energy Factl 1 Tank Insul.
Water Heater Water Heater Distribution
# in Input Cap. or Recovery Standby R -Value
System Name Type Type
S sy t. Btu/hr (gam Efficiency Loss (%) Ext.
1 For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated
Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency.
Run Initiation Time: 09/10/03 21:14:59 Run Code: 1063253699
EnergyPro 3.1 By EnergySoft User Number: 5553 Job Number: LQ03 - T24-1 Page: 10 of 12
Computer Method Summary (Addendum) C -2R
BOB RUNYAN 9/12/03
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
)ased on the adequacy of the special lustmcation ana aocumentation suamittea. Plan Field
The HVAC System "HVAC Split System Gas/Elec" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 338 sgft Covered Slab Floor, 3.50" thick at WHOLE HOUSE
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 220 sgft Exposed Slab Floor, 3.50" thick at WHOLE HOUSE
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the tiew vermcation ana aiagnostic testing of these measures on a torm (A --15K.
Plan
Field
The HVAC System "HVAC Split System Gas/Elec" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater
must provide verifification of the TXV, or measure the Refrigerant Charge and Airflow.
The HVAC System "HVAC Split System Gas/Elec" is using reduced duct leakage to comply and must have diagnostic site testing of
duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form.
Run Initiation Time: 09/10/03 21:14:59 Run Code: 1063253699
EnergyPro 3.1 By EnergySoft User Number: 5553 Job Number: LQ03 - T24-1 Page: 11 of 12
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
BOB RUNYAN 9/12/03
SYSTEM NAME FLOOR AREA
HVAC Split System Gas/Elec 558
26.0 of 69.5 of
Outside Air
0 cfm
Supply Fan
1000 cfm
69.5 of
TEM
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK I
COIL HTG. PEAK
CFM
Sensible
Latent
I CFM
Sensible
307
6,555
0
311
9,646
0
328
482
0
0
0
0
011
0
0
0
0
328
482
7,210 0 10 610
HVAC EQUIPMENT SELECTION
York H4DH030/P4HUB12LO32 U8H 21,994 4,624 32,000
Total Adjusted System Output 21,994 4,624 32,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Aug 2 pm Jan 12am
69.5 of ® 99.6 of
Heating Coil
�% Return Air Ducts 4
11.0 177.6 of 78.3 / 63.8 of 78.3 / 63.8 of 57.6 / 56.4 of
Outside Air O
0 cfm
Supply Fan
1000 cfm
78.3/63.8 of
Cooling Coil
�% Return Air Ducts `i
n
Supply Air Ducts
99.2 of
ROOMS
70.0 of
Supply Air Ducts
57.9 / 56.6 of
45.8% R.H. ROOMS
78.0 / 63.7 of