07-2460 (MECH) Title 24TITLE 24 REPORT
Title 24 Report for:
RETAIL SHOP BUILDING - PARCEL 1
79485 HIGHWAY 111
LA QU I NTA, CA
Project Designer:
Misha Parks
4000 Valley Blvd.
Walnut, Ca 91789
909-860-1200
Report Prepared By:
Misha Parks
C+J Technical Solutions and Services, Inc.
1320 Valley Vista Dr. Suite 206
Diamond Bar, CA 91765
(909) 896-3631
CITY ®�� �ETUYIDE A.
BUILDING
APPROVED
Job Number: FOR CONSTRUC ION
��� C06105 DATE 1'L 0 BY
A��312 .
�r� -
� Date: 07- 2
8/30/2007
The EnergyPro computer program has been used to perform the'calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.2 by EnergySoft Job Number: C06105 User Number: 5950
TABLE OF CONTENTS '
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV-MM Envelope Mandatory Measures 16
Form MECH-MM Mechanical Mandatory Measures 17
HVAC System Heating and Cooling Loads Summary 19
EnergyPro 4.2 by EnergySoft Job Number: C06105 User Number: 5950
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
PROJECT NAME
RETAIL SHOP BUILDING - PARCEL 1
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
8/30/2007
PROJECT ADDRESS
79485 HIGHWAY 111 LA QUINTA
DATE OF PLANS
BUILDING CONDITIONED FLOOR AREA
22,646 Sq.Ft.
PRINCIPAL DESIGNER - ENVELOPE
Misha Parks
TELEPHONE
909-860-1200
Building Permit #
DOCUMENTATION AUTHOR
C+J Technical Solutions and Services, Inc.
TELEPHONE
(909) 896-3631
Checked by/Date
1 Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation Is acc rate and complete.
DATE OF PLANS
BUILDING CONDITIONED FLOOR AREA
22,646 Sq.Ft.
CLIMATE ZONE
15
BUILDING TYPE
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
NEW CONSTRUCTION ADDITION
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation Is acc rate and complete.
DOCUMENTATION AUTHOR
SIGNATUR
T
Misha Parks
The Principal Designer hereby certifys that the proposed building ign repre to ' his set of construction doc9mistoted
isconsistent
with the other compliance forms and worksheets, wit specific i ns, ith any other calculations ith this
permit application. The proposed building as designed meets t energy effi 'ency requirements contained in secti11, 16,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
❑ ❑ F] 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, or I am a licensed architect.
0 F-1 2.1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
❑ F-1 F] 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
A Forms
Require
PRINCIPAL ENVELOPE DESIGNER - NAME SIGN R LIC. NO.
Misha Parks
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Manda y Meas s
Li ing Compliance Not In The Cop Of
This-SGbmltta
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
CH -1 MECH-2, MECH-3, MEC -5
Require s
PRINCIPAL MECHANICAL DESIGN - NAME
P U ua'(z c- 04c'
JILIC. NO.
0-226 9
DAIV—
cS
EnergyPro 4.2 by EnergySofl User Number: 5950 Job Number: C06105 Paae:3 of 3b I
7
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-'
F'FiVJtGI NAMt DATE
RETAIL SHOP BUILDING - PARCEL 1 1
8/30/2007
ANNUAL TDV
ENERGY COMPONENT
Standard
Design
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
Proposed
Design
sqft.
sqft.
sqft.
Compliance
Margin
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
0.85
0.83
0.02
207.15
177.81
29.35
51.32
70.63
-19.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.61
79.61
0.00
91.54
91.54
0.00
0.00
0.00
0.00
TOTALS: 430.47
Percent better than Standard:
420.41 10.06
�SAmnHaEtkO. _
bld Farr;ponpa
u
8mlc
,I
r
�.
°.0 20 40 60 80 ,100 120 140 160 • 180. 200
kBtu/sgft•yr
2.39% ( 2.31% excluding process)
Building Orientation
Number of Stories
Number of Systems
Number of Zones
E 90 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
22,646
sqft.
sqft.
sqft.
1
o
15
22,646
121
Natural Gas
sqft.
52.0%
Orientation
Gross Area
Glazing Area
Glazing
Ratio
Front Elevation (E)
4,068
sqft.
2,115
sqft.
52.0%
Left Elevation (S)
1,500
sqft.
400
sqft.
26.7%
Rear Elevation w)
5,028
sqft.
0
sqft.
0.0%
Right Elevation (N)
Total
Roof
720
11,316
23,sos
sqft.
sqft.
sqft.
370
2,885
0
sqft.
sqft.
sqn.
51.4%
Standard Proposed
Lighting Power Density 1.200 W/sqft. 1.200 W/sqft.
Prescriptive Env. Heat Loss 4,389 Biu/h 7,874 Btu/h
Prescriptive Env. Heat Gain 438,471 Btum-F 728,478 Btu/h-F
Remarks:
Hun Initiation time: os/30/07 16:25:03 Run Code: 1188516303
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page:4 of 30
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1I
PROJECT NAME
RETAIL SHOP BUILDING - PARCEL 1
DATE
8/30/2007
ZONE INFORMATION
_
System Name Zone Name Occupancy Type
Floor
Area
(sgtt.)
Inst.
LPD
(W/sf)1
Ctrl.
Credits
(W/sf)2
Allowed LPD Proc.
Area Tailored Loads
W/s 3 (W/S4 (W/sf)
HP -1A HP -1A
Office
1,800
'1.20
HP -1A 01B
Office
1,200
-1.200
HP -2 02
Office
1,500
-1.200
HP -3 03
Office
1,800
-1.200
HP -4 04
Office
1,800
-1.200
HP -5 05
Office
1,440
'1.200
HP -6 06
Office
5,306
'1.20
HP -7 07
Office
1,300
'1.200
HP -8 08
Office
1,300
-1.200
HP -9 09
Office
1,300
'1.20
HP -10 10
Office
1,950
'1.200
HP -11 11
Office
1,950
'1.20
Notes: 1. See LTG -2-C 2. See LTG -4-C
(items marked with asterisk, see LTG -2 -C by others)
3. See LTG -5-C
(by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System "York DNP060" is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The HVAC System "York DH078: Premium Ell" 0.90 BHP Supply Fan Motor has been specified.
The HVAC System "York DH090: Premium Eff" 1.25 BHP Supply Fan Motor has been specified.
The HVAC System "York DF072: Premium Eff' 0.90 BHP Supply Fan Motor has been specified.
The HVAC System "HP -1 A" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -1 A" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -1 A" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "HP -2" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -3" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -4" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -5' incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -6" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "HP -7" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page:5 of 30 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
RETAIL SHOP BUILDING - PARCEL 1
DATE
8/30/2007
ZONE INFORMATION
_ _
System Name Zone Name Occupancy Type
Floor Inst.
Area LPD
(sqft.) (W/sf)1
Ctrl. Allowed LPD Proc.
Credits Area Tailored Loads
(W/sf)2 /sf 3 /sf 4 M/sf)
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
i ne iocai enforcement agency snows pay speciai attention to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System "HP -7" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "HP -8" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "HP -8" incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve.
The HVAC System "HP -10" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
i ne excepuonai features iistea in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Sianature
I stun Initiation rime: os/30/07 16:25:03 Run Code: 1188516303 1
EnergyPro 4.2 by EnergySott User Number. 5950 Job Number: C06105 Page:6 of 30 1
ICERTIFICATE OF COMPLIANCE ENV -1 -Cl
(PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
OPAQUE SURFACES
# Surface
Type
Area
LI -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond.
Status
Joint Appendix
IV Reference
Location / Comments
1 Wall
440
0.183
R-19
R-0.0
90
90
New
11-A5
HP -1A
2 Wall
360
0.183
R-19
R-0.0
270
90
New
11-A5
HP -1A
3 Wall
350
0.183
R-19
R-0.0
0
90
New
11-A5
HP -1A
4 Roof
1,800
0.036
R-30
R-0.0
90
0
New
02-A9
HP -1A
5 Wall
225
0.183
R-19
R-0.01
90
90
New
11-A5
01B
6 lWall
1 720
0.183
R-19
R-0.0
180 1
90
New
11-A5
01B
7 Wall
240
0.183
R-19
R-0.0
270
90
New
11-A5
01B
8 Roof
1,800
0.036
R-30
R-0.0
90
0
New
02-A9
0113
9 Wall
150
0.183
R-19
R-0.0
90
90
New
11-A5
02
10 Wall
300
0.183
R-19
R-0.0
270
90
New
11-A5
02
11 Roof
1,500
0.036
R-30
R-0.0
90
0
New
02-A9
02
12 lWall
1 110
0.183
R-19
R-0.01
90
90
1 New
11-A5
03
13 Wall
360
0.183
R-19
R-0.01
270
90
New
11-A5
03
14 Roof
1,800
0.036
R-30
R-0.0
90
0
New
02-A9
03
15 Wall
160
0.183.
R-19
R-0.0
90
90
New
11-A5
04
16 Wall
360
0.183
R-19
R-0.0
270
90
New
11-A5
04
17 Roof
1,800
0.036
R-30
R-0.0
90
0
New
02-A9
04
18 Wall
98
0.183
R-19
R-0.0
90
90
New
11-A5
05
19 lWall
1 2881
0.183
R-19
R-0.0
270
90
New
11-A5
05
20 IRoof
1 1,8001
0.036
R-30
R-0.01
90
0
New
02-A9
105
Altered,
t l More than or equal to 10,000 sq.ft. of she -built fenestration area must Include a label certif.'cate either Issuad by NFRC or provide a CEC Default Label Certificate using the default 1.1 -factors from
Standards Table 116-A and B. Certificate shall be filed In the contractor's orelect office durino construction and in the huildino manan el Mira after rnnsmmtlnn
#
lTvDe
Area U -Fac'
SHGC2
Act.
Am.
Cond.
Stat.
Glazing Type
Location/
Comments
1
Window
Front
E
220 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear Default
HP -1A
2
Window
Right
(N)
370 1.900 NFRC
0.83 NFRC
0
New
Single Metal Clear Default
HP -1A
3
Window
Front
(E)
15 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear Default
01B
4
Window
Front
E
150 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear Default
02
5
Window
Front
E
250 1.900 NFRC
0.83 NFRCl
90
New
I Single Metal Clear Default
03
6
Window
Front
(E)
200 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear (Default
04
7
Window
Front
E)
190 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear Default
05
8
Window
Front
E
230 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear Default
06
9
Window
Front
E
150 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear Default
07
10 Window
Front
(E)
110 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear (Default
08
11 Window
Front
(E)
180 1.900 NFRC
0.83 NFRC
90
New
Single Metal Clear (Default
109
12 Window
Front
E
210 1.900 NFRC
0.83 NFRCI
90
New
I Single Metal Clear Default
110
13 Window
Front
E
210 1.900INFRCI
0.83 INFRCI
901
New
Single Metal Clear (Default
Ill
(1) Ll -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
##
Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhang Left Fin Right Fin
Len. Hgt. LExt.RExt. Dist. Len. Hgt. Dist. Len. Hat.
1
None
0.76
10.0 22.0
4.0
0.1
4.0
4.0
2
None
0.76
10.0 37.0
4.0
0.1
4.0
4.0
3
None
0.76
10.0 15.0
4.0
0.1
4.0
4.0
4
None
0.76
10.0 15.0
4.0
0.1
4.0
4.0
5
None
0.76
10.0 25.0
4.0
0.1
4.0
4.0
6
None
0.76
10.0 20.0
4.0
0.1
4.0
4.0
7
None
0.76
10.0 19.0
4.0
0.1
4.0
4.0
8
None
0.76
10.0 23.0
4.0
0.1
4.0
4.0
9
None
0.76
10.0 15.0
4.0
0.1
4.0
4.0
10
None
0.76
10.0 11.0
4.0
0.1
4.0
4.0
11
None
0.76
10.0 18.0
4.0
0.1
4.0
4.0
12
None
0.76
10.0 21.0
4.0
0.1
4.0
4.0
13
1 None
0.76
10.0 21.0
4.0
0.1
4.0
4.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a telling height greater then 15 feet and a LPD for general lighting of at least 0.5 W/sq.ft. If this
box Is checked, ENV -4-C must be filled out when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Pace:7 of 30 1
CERTIFICATE OF COMPLIANCE ENV -1-C
(PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
OPAQUE SURFACES
# Surface
Tye
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond.
Status
Joint Appendix
IV Reference
Location / Comments
21 Wall
190
0.183
R-19
R-0.0
90
90
New
11-A5
06
22 Wall
1,680
0.183
R-19
R-0.0
270
90
New
11-A5
06
23 Roof
5,306
0.036
R-30
R-0.0
90
0
New
02-A9
06
24 Wall
90
0.183
R-19
R-0.0
90
90
New
11-A5
07
25 lWall 1
240
0.183
R-19
R-0.0
270
90
1 New
11-A5
07
26 Roof
1,300
0.036
R-30
R-0.0
90
0
New
02-A9
07
27 Wall
130
0.183
R-19
R-0.0
90
90
New
11-A5
08
28 Wall
240
0.183
R-19
R-0.0
270
90
New
11-A5
08
29 Roof
1,300
0.036
R-30
R-0.0
90
0
New
02-A9
08
30 Wall
60
0.183
R-19
R-0.01
90
90
New
11-A5
09
31 Wall
240
0.183
R-19
R-0.01
270 1
90
New
11-A5
09
32 lRoof 1
1,300
0.036 1
R-30
R-0.01
90
0
New
02-A9
09
33 Wall
150
0.183
R-19
R-0.01
90
90
New
11-A5
10
34 Wall
360
0.183
R-19
R-0.0
270
90
New
11-A5
10
35 Roof
1,950
0.036
R-30
R-0.0
90
0
New
02-A9
10
36 Wall
150
0.183
R-19
R-0.0
90
90
New
11-A5 Ill
37 Wall
380
0.183
R-19
R-0.0
180
90
New
11-A5
11
38 Wall
360
0.183
R-19
R-0.0
270
90
New
11-A5
11
39 Raaf
1,950
0.036
R-30
R-0.0
90
0
New
02-A9
11
N. E. A, R
I FENESTRATION SURFACES
More than or equal to 10,000 sq.k. of site -bulk fenestration area must include a label I=ssued Issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's oroleet okiee during construction and In the building managers oHiee akar construction
(1) 1.1 -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-e Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
Window Overhang Left Fin Right Fin
## Exterior Shade Type SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hot. Dist. Len. H t.
14 None 0.76 10.0 40.0 4.0 0.1 4.0 4.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
1:1The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least 0.5 W/sq.ft. If this
box Is checked, ENV4 1-C must be filled out when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paae:8 of 30 1
IM71IIIIIIIIII lift-
I Location/
Comments
N., 110MISMI
(1) 1.1 -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-e Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
Window Overhang Left Fin Right Fin
## Exterior Shade Type SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hot. Dist. Len. H t.
14 None 0.76 10.0 40.0 4.0 0.1 4.0 4.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
1:1The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least 0.5 W/sq.ft. If this
box Is checked, ENV4 1-C must be filled out when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paae:8 of 30 1
CERTIFICATE OF COMPLIANCE MECH-I-C
PROJECT NAME
RETAIL SHOP BUILDING - PARCEL
LL•Yi4
8/30/2007
ueslgner:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates, and ooeratino and maintenance information meet the reauirements of Section 10-103fb1 and Title 24 Part S.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems bath New Constructian and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both Now Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are Installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required It the unit serves 5,000 t12 of space or less and 25% or more of the ducts are In nonconditioned or semiconditioned space 10ce an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btulhr.
-Water-loop Heat Pump Controls
Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump
• or condenser water systems where the pumps motors are greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page:9 of 30
JAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-Cl
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
AIR SYSTEMS, Central or Single Zone
HP -1 A
HP -1 A
HP -2
1
1
1
Reference on Plans or Specification t
112(a)
3.20 COP 7.70 HSPF
3.20 COP
112(a)
11.5 EER 13.0 SEER/ 11.5 EER
10.4 EER
112(b)
Yes Yes
Yes
112(c), 115(a)
n/a n/a
n/a
121(b)
No No
No
121(b)
270 cfm 180 cfm
225 cfm
121 c
No No
No
121(c)
No No
No
121 (c), 122(e)
Programmable Switch Programmable Switch
Pro rammable Switch
122(e)
Heating & Cooling Required Heating & Cooling Required
Heating & Cooling Required
122
Gravity Gravity
Gravity
122(g)
n/a n/a
n/a
123
Constant Temp
Constant Temp
124
R-4.2 R-4.2
R-4.2
144 a & b
n/a
n/a
n/a
144 a & b
54,338 btuh
35,288 btuh
43,720 btuh
144 a & b
n/a
n/a
n/a
144 a & b
67,708 btuh
42,817 btuh
50,408 btuh
144 (c)
Constant Volume
Constant Volume
Constant Volume
144 (c)
144 U
No
No
No
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144 U
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 (k)
No
No
No
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
1 Hun Initiation Ilme: UB/30/07 16:25:03 Run Code: 1188516303 I
EnergyPro 4.2 by EnergySolt User Number: 5950 Job Number: C06105 Page:10 of 30 1
IAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control'
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control '
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
HP -3
HP -4
HP -5
1
1
1
Reference on Plans or Specification 1
112(a)
3.20 COP 3.20 COP
3.20 COP
112 a
11.5 EER 11.5 EER
10.4 EER
112(b)
Yes Yes
Yes
112(c), 115(a)
n/a n/a
n/a
121(b)
No No
No
121(b)
270 cfm 270 cfm
216 cfm
121 c
No No
No
121(c)
No No
No
121 c 122(e)
Programmable Switch Programmable Switch
Programmable Switch
122(e)
Healing & Cooling Required Heating & Cooling Required
Heating & Cooling Required
122
Gravity Gravi
Gravity
122(g)
n/a n/a
n/a
123
Constant Temp
Constant Temp
124
R-4.2 L R-4.2
R-4.2
144 a & b
n/a
n/a
n/a I
144 a & b
54,338 btuh
54,338 btuh
43,720 btuh
144 a & b
n/a
n/a
n/a
144 a & b
66,973 btuh
66,860 btuh
50,385 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 (c)
144 c
No
No
No
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144
Constant Temp
Constant Temp
onstant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 (k)
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paoe:11 of 30 1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
AIR SYSTEMS, Central or Single Zone
HP -6
HP -7
HP -8
4
1
1
T-24
MANDATORY MEASURES Section Reference on Plans or Specification 1
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
112(a)
7.70 HSPF
7.70 HSPF
7.70 HSPF
112(a)
13.0 SEER / 11.5 EER
13.0 SEER / 11.5 EER
13.0 SEER / 11.5 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
No
No
No
121(b)
796 cfm
195 cfm
195 cfm
121 c
No
No
No
121(c)
No
No
No
121(c), 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
1220
Gravity
Gravity
Gravity
122(g)
n/a
n/a
n/a
123
124
R-4.2
R-4.2
R-4.2
144 a & b
n/a
n/a
n/a
144 a & b
141,153 btuh
35,288 btuh
35,288 btuh
144 a & b
n/a
n/a
n/a
144 a & b
171,547 btuh
43,040 btuh
45,171 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 (c)
144 c
No
No
No
144 d
No
No
No
144 a
No.Economizer
No Economizer
No Economizer
144 U
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144( k)
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
I Faun Initiation Time: 08/30/07 16:25:03 Run Code: 1188516303 1
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paae:12 of 30 1
JAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-Cl
(PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control.
Outdoor
ontrol-
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
HP -9
HP -10
HP -11
1
1
1
Reference on Plans or Specification t
112(a)
3.20 COP
3.20 COP
3.20 COP
11 2(a)
11.5 EER
11.5 EER
11.5 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
No
No
No
121(b)
195 cfm
293 cfm
293 cfm
121 c
No
No
No
121(c)
No
No
No
121 c 122(e)
Programmable Switch
Pro rammable Switch
Programmable Switch
122(e)
Heating & Cooling,Required
Heating & Cooling Required
Heating & Cooling Required
122 f
Gravitv
Auto
Gravity
122(g)
n/a
n/a
n/a
123
124
R-8.0
R-4.2
R-4.2
144 a & b
n/a
n/a
n/a
144 a & b
46,843 btuh
54,338 btuh
54,338 btuh
144 a & b
n/a
n/a
n/a
144 a & b
58,094 btuh
67,097 btuh
71,128 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 (c)
144 c
No
No
No
144 d
No
No
No
144 U
No Economizer
No Economizer
No Economizer
144 U
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 (k)
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
I Hun Initiation t Ime: US/3U/U7 16:25:03 Run Code: 1188516303 1
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page: 13 of 30 1
MECHANICAL VENTILATION MECH-3-C
PROJECT
IL SHOP BUILDING - PARCEL 1
DATE
8/30/2007
PRESCRIPTIVE REHEAT
LIMITATION (Section 144(d))
MECHANICAL VENTILATION Section 121(b)2)
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
B
C
D
E
I F
G
H
I
J
K
L
M
N
ZONE/SYSTEM
0
ND3
v fD d
3-
.0
Q)..n
fD �1
1
o
Q3
��
x D A
n d E
c
M3
O Q
coo
M•a0
dl fD T
�3
m05
x n A
T m
m
°dp
x
<
D
<
0= CD
m .r N
_D 3
°�
nM0
�1 N ••"
E�
ro
�e °
n
3x°
fA
a
°S
m3m
O 3 x
n=
-n-
C-
=°3
'p
D
N
D
-
HP -1A
1,800
0.15
270
270
270
HP -1 A
Total
270
270
01B
1,200
0.15
180
180
180
HP -1A
Total
180
1801
1
02
1,500
0.15
225
225
225
HP -2
Total
225
225
03
1,800
0.15
270
270
270
HP -3
Total
270
270
04
1,800
0.15
270
270
270
HP -4
Total
1 270
270
05
1,440
0.15
216
216
216
HP -5
Total
216
216
06
5,306
0.15
796
796
796
HP -6
I
Total
1 796
796
07
1,300
0.15
195
195
195
HP -7
Total
195
195
08
1,300
0.15
195
195
195
HP -8
Total
195
195
09
1,300
0.15
195
195
195
HP -9
Total
1 195
195
10
1,950
0.15
292
292
293
HP -10
Total
292
293
11
1,950
0.15
292
292
293
HP -11
Total
292
293
Minimum ventilation rate perSeclion 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seatin .
H Required Ventilation Air (REO'D V.A.) is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be greater than orequal to H or use Transfer Air column N to make up the difference.
J Design tan supply cfm (Fan CFM) x 30%; or
K Condition area ft. s x 04 cfmttt. s .* or
L Maximum of Columns H, J, K, or 300 cfm
M IThis must be less than or equal to Column L and greater that or equal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page: 14 of 30
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
RETAIL SHOP BUILDING - PARCEL 1
TANK INSUL.
DATE 8/30/200
CHILLER AND TOWER SUMMARY
Oty
Rated
Input
Efficiency
Tons
PUMPS
Equipment Name
Equipment Type
Oty.
Tot.
Qty
GPM
BHP
Motor
I Eff.
Drive
Eff.
Pump
Control
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp Hot Water Pipin Length ft
Control
#
HP
T pe
In Plenum
Outside
Buried
Add 1/2"
Insulation
DHW / BOILER SUMMARY
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name System Type
Distribution Type
Oty
Rated
Input
Vol.
(Gals.)
Condition
Status
Ext.
R -Val.
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp Hot Water Pipin Length ft
Control
#
HP
T pe
In Plenum
Outside
Buried
Add 1/2"
Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Type
Qtv
Outout
Aux.
kW
Eff.
Outout
Eff icienc
Condition
Status
Economizer T e
York DH090
Packaged DX
5
87,000
0.0
3.20 COP
87,00011.5
EER
New
No Economizer
York DNP060
Packaged DX
7
56,500
0.0
7.70 HSPF
56,500
13.0 SEER / 11.5 EER
New
No Economizer
York DF072
Packaged DX
2
70,000
0.01
3.20 COP
70,000
10.4 EER
New
No Economizer
York OH078
Packaged DX
11
75,000
0.0
3.20 COP
75,000
11.5 EER
New
No Economizer
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN
FAN
System Name
Fan Type
Motor Location
CFM
BHP
Motor
Eff.
Drive
Eff.
CFM
BHP
Motor
Eff.
Drive
Eff.
York DH090
Constant Volume
Draw -Through
2,516
1.25
85.5%
97.0%
none
York DNP060
Constant Volume
Draw -Through
1,525
0.75
77.0%
97.0%
none
York DF072
Constant Volume
Draw -Through
2,624
0.90
84.0%
97.0%
none
York DH078
Constant Volume
Draw -Through
2,600
0.90
84.0%
97.0%
none
Run Initiation Time: 08/30/07 16:25:03 Run Code: 1188516303
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page:15 of 30
ENVELOPE MANDATORY MEASURES ENV -MM
NAME
RETAIL SHOP BUILDING - PARCEL
DATE
8/30/2007
DESCRIPTION
Designer
Enforcement
0 §.118(,) Installed Insulating Material shall have been certified by the manufacturer to comply
with the California Quality Standards for insulating material, Title 20, Chapter 4, Article
3.
0 § 118(c) *All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
§ 117(a) . All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
§ 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors and
fire doors).
❑ § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
X❑ §118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls In nonresidential buildings shall have
Insulation with an Installed R -value of no less than R-13 between framing members.
b
EnergyPro By EnergySoft User Number: User Job Number: C06105 Page: 16 of 30
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME . DATE
RETAIL SHOP BUILDING - PARCEL 1 1 8/30/2007
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
❑X §111 Any appliance for which there is a California standard established In the Appliance
Efficiency Regulations will comply with the applicable standard.
❑ § 115(a) Fan type central furnaces shall not have a pilot light.
E§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated In accordance with
Standards Section 123.
0 § 124 Air handling duct systems shall be Installed and Insulated In compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§ 122(e) Each space conditioning system shall be installed with one of the following:
X § 122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the requirements
of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for
up to 4 hours. The time switch shall be capable of programming different
schedules for weekdays and weekends and have program backup capabilities that
prevent the loss of the device's program and time setting for at least 10 hours if
power is Interrupted; or
§ 122(e)1 B An occupancy sensor to control the operating period of the system; or
F-] § 122(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the
system.
X] § 122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
§ 122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with Isolation
zones. Each zone: shall not exceed 25,000 square feet; shall be provided with
Isolation devices, such as valves or dampers, that allow the supply of heating or
cooling to be setback or shut off independently of other Isolation areas; and shall
be controlled by a time control device as described above. ,
X❑ § 122(a&b) Each space conditioning system shall be controlled by an Individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the control
shall be adjustable up to 85 degrees F or higher. Where used for both heating and
cooling, the control shall be capable of providing a deadband of at least 5 degrees
F within which the supply of heating and cooling is shut off or reduced to a
minimum.
n§ 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable
setpoint stops accessible only to authorized personnel.
❑ § 112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro By Energysoft . User Number: User Job Number: C06105 Page: 17 of 30
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM I
t
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
Description
Designer
Enforcement
Ventilation
FX§
121(e)
Controls shall be provided to allow outside air dampers or devices to be operated at
the ventilation rates as specified on these plans.
❑ § 122(f)
Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and .
exhaust systems.
§ 122(f)
All gravity ventilating systems shall be provided with automatic or readily accessible
manually operated dampers in all openings to the outside, except for combustion air
openings.
§ 121(01
Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§ 121(f)2
Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
Installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the
person with overall responsibility for the design of the ventilation system; or
§ 121(03
Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§ 121(04
Another method approved by the Commission.
Service
Water Heating Systems
.§ 113(b)2
If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
§ 113(c)
Lavatories in restrooms of public facilities shall be equipped with controls to limit the
outlet temperature to 110 degrees F.
•
EnergyPro
By EnergySoft User Number: User Job Number: C06105 Page:18 of W
WAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -1A 1,800
:ATING SYSTEM PSYCHROMETRICS
26.0 of 63.9 OF
Outside Air
270 cfm
68.4 of
:DOLING SYS
12.0 / 77.9 of
-o
Outside Air
270 cfm
75.8/65.1 OF
EnergyPro 4.2
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAKCOIL
HTG. PEAK
CFM
I Sensiblel
Latent
I CFM I
Sensible
115,3661:1=2 104,673
York DH090 67,708 11,750 54,338
Total Adjusted System Output67,708 11,750 54,338
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
140.0 of
Heating Coil
140.0 of
(O�
Supply Air Ducts
Supply Fan 138.4 of
2516 cfm ROOMS
70.0 of
Return Air Ducts I
Temperatures at Time of Coo
79.7 / 66.7 of 59.0 / 58.0 of
Cooling Coil Supply Fa
2516 cfm
User Number: 5950
59.0/58.00
Supply Air Ducts
Fan 60.8/58.6OF
60.4% R.H. ROOMS
74.0/64.5OF
h Return Air Ducts 11
Job Number: C06105
19 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -1 A 1,200
PSYCH
26.0 OF
Outside Air
180 cfm
69.1 OF
64.0 OF
Total Room Loads
3eturn Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
CFM
Sensible
1,963
39,684
6,915
823
30,667
0
1,984
1,533
0
0
180
6,850
2,929
180
8,248
0
0
1,984
1,533
50,502 9,844 41,981
York DNP060 42,817 7,571 35,288
Total Adjusted System Output 42,817 7,571 35,288
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Aug 2 pm Jan 12 ann
'earn Temperatures at Time of Heating Peak)
105.0 OF 105.0 OF
O Supply Air Ducts
Heating Coil Supply Fan 104.1 °F
1525 cfm ROOMS
70.0 OF
k Return Air Ducts 4
DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
111.0 / 77.6 OF 79.4 / 64.9 OF 55.0 / 53.9 OF 55.0 / 53.9 OF
OSupply Air Ducts
Outside Air
180 cfmF
Cooling Coil Supply Fan 56.2 / 54.4 °
1525 cfm 52.9% R.H. ROOMS
75.2/62.9 °F 74.0 / 62.5 OF
h Return Air Ducts 4
I EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page:20 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
. RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -2 1.500
ENGINEERING CHECKS IISYSTEM LOAD
11
Number of Systems
1
Heating System
Output per System
70,000
Total Output (Btuh)
70,000
Output (Btuh/sqft)
46.7
Cooling System
Output per System
70,000
Total Output (Btuh)
70,000
Total Output (Tons)
5.8
Total Output (Btuh/sqft)
46.7
Total Output (sgft/Ton)
257.1
Air System
CFM per System
2,624
Airflow (cfm)
2,624
Airflow (cfm/sqft)
1.75
Airflow (cfm/ron)
449.8
Outside Air (%)
8.6
Outside Air (cfm/sqft)
0.15
Note: values above given at ARI conditions
26.0 OF
Outside Air
l
225 cfm
69.3 of
PSYCHROM
12.0 / 77.9 of
�7
Outside Air
225 cfm
74.9/64.6 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
L CFM I
Sensible
3,234
51,629
8,633
515
38,369
0
2,581
1,918
0
0
225
8,878
2,300
225
10,371
0
0
2,581
1,918
65,6691 10,9341 52,577
HVAC EQUIPMENT SELECTION
York DF072 50,408 12,782 43,720
Total Adjusted System Output0,408 12,782 43,720
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
,earn Temoeratures at Time of Heatina Peak)
65.6 OF gI 140.OoF
lel
Heating Coil
(TT
Supply Fan
2624 cfm
140.0 of
Supply Air Ducts
139.3 of
ROOMS
70.0 of
I
k Return Air Ducts
78.1 / 66.0 of 59.0 / 58.0 of
Cooling Coil Supply Fan
2624 cfm
59.0 / 58.0 of
Supply Air Ducts
59.9 / 58.4 of
59.7% R.H. ROOMS
74.0/64.3OF
0M.— A:.
I EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paae:21 of 30 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -3 1,800
26.0 of
Outside
��
270 cfm
69.1 of
112.0 / 77.9 of
Outside Air
270 cfm
75.3/65.0 of
LOAD
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
I CFM
I Sensible
4,255
67,917
10,360
674
50,174
0
3,396
2,509
0
0
270
10,554
2,564
270
12,374
0
0
3,396
2,509
85,2631 12,924 67,566
HVAC EQUIPMENT SELECTION
York DHO90 66,973 12,333 54,338
Total Adjusted System Output 66,973 12,333 54,338
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm 1 Jan 12 am
'earn Temperatures at Time of Heatina Peak)
64.4 of ri 140.0 of
Heating Coil
ROMETRICS
Supply Fan
2516 cfm
140.0 of
-� Supply Air Ducts
139.1 of
ROOMS
70.0 of
k Return Air Ducts
79.2 / 66.6 of 59.0 / 58.0 of
Cooling Coil Supply Fa
2516 Orn
59.0 / 58.0 of
Supply Air Ducts
Fan
60.3/58.5OF
60.5% R.H. ROOMS
74.0 / 64.5 of
h Return Air Ducts i
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paae:22 of 30 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -4 1,800
ENGINEERING CHECKS SYSTEM LOAD
Number of Systems
1
Heating System
Output per System
87,000
Total Output (Btuh)
87,000
Output (Btuh/sqft)
48.3
Cooling System
Output per System
87,000
Total Output (Btuh)
87,000
Total Output (Tons) .
7.2
Total Output (Btuh/sqft)
48.3
Total Output (sgft/Ton)
248.3
Air System
CFM per System
2,516
Airflow (cfm)
2,516
Airflow (cfm/sqft)
1.40
Airflow (cfmlTon)
347.0
Outside Air (%)
10.7
Outside Air (cfm/sqft)
0.15
Note: values above given at ARI conditions
!ATING SYSTEM
26.0 OF
Outside Air
270 cfm
69.1 OF
64.5 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
I CFM
I Sensible
80,601 12,920
623 46,397
2,320
0
270 12,394
0
2,320
63,431
1HVAC EQUIPMENT SELECTION
York DH090 66,860 12,424 54,338
Total Adjusted System Output 66,860 12,424 54,338
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
Cream Temperatures at Time of Heating Peak)
140.0 OF 140.0 OF
O Supply Air Ducts
Heating Coil Supply Fan 139.1 °F
2516 cfm ROOMS
70.0 OF
Return Air Ducts < I
ROMETRICS
12.0 / 77.9 OF 79.1 / 66.5 OF 59.0 / 58.0 OF
Outside Air
270 cfm
Cooling Coil Supply Fan
2516 cfm
75.2/64.9 °F
59.0 / 58.0 OF
Supply Air Ducts
60.2 / 58.5 OF
60.6% R.H. ROOMS
74.0 64.5 OF
�% Return Air Ducts
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paoe:23 of 30 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -5 _1,440
ENGINEERING CHECKS SYSTEM LOAD
Number of Systems
II
Note: values above given at ARI conditions
• EATING S
26.0 of
Outside
��
216 cfm
1 69.3 of
i'
112.0 / 77.9 of
` -
Outside
��
216 cfm
75.0/64.6 of
tnerg
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
COIL COOLING PEAK
1
Heating System
Output per System
70,000
Total Output (Btuh)
70,000
Output (Btuh/sgft)
48.6
Cooling System
Output per System
70,000
Total Output (Btuh)
70,000
Total Output (Tons)
5.8
Total Output (Btuh/sgft)
48.6
Total Output (sgft/Ton)
246.9
Air System,
CFM per System
2,624
Airflow (cfm)
2,624
Airflow (cfm/sgft)
1.82
Airflow (cfm/Ton),
449.8
Outside Air (%)
8.2
Outside Air (cfm/sqft)
0.15
Note: values above given at ARI conditions
• EATING S
26.0 of
Outside
��
216 cfm
1 69.3 of
i'
112.0 / 77.9 of
` -
Outside
��
216 cfm
75.0/64.6 of
tnerg
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
L CFM
I Sensible
3,409
54,412
8,288
552
41,111
0
2,721
2,056
0
0
216
8,511
2,237
216
9,945
0
0
2,721
2,056
TOTAL SYSTEM LOAD 1 68,3681 10,526 5s,1s7
HVAC EQUIPMENT SELECTION
York DF072 50,385 12,731 43,720
Total Adjusted System Output 50,385] 12,731 43,720
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
ROMETRICS (Airstream Temperatures at Time of Heating Peak)
65.7 of 140.0 of 140.0 of
0 Supply Air Ducts
Heating Coil Supply Fan 139.3 of
2624 cfm ROOMS
70.0 of
Return Air Ducts I
lirstream Temperatures at Time of Cooling Peak)
78.0 / 65.9 of 59.0 / 58.0 of 59.0 / 58.0 OF
Supply Air Ducts
Cooling Coil Supply Fan 60.0 / 58.4 of
2624 cfm 59.6% R.H. ROOMS
74.0 / 64.3 of
Return Air Ducts - I
4.2 by EnergySoft User Number: 5950 Job Number: C06105 Paoe:24 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -6 5,306
Number of Systems
a
Heating System
Output per System
56,500
Total Output (Btuh)
226,000
Output (Btuh/sgft)
42.6
Cooling System
Output per System
56,500
Total Output (Btuh)
226,000
Total Output (Tons)
-18.8
Total Output (Btuh/sgft)
42.6
Total Output (sqf /Ton)
281.7
Air System
CFM per System
1,525
Airflow (cfm)
6,100
Airflow (cfm/sgft) "
1.15
Airflow (cfm/Ton).
323.9
Outside Air (%)
13.0
Outside Air (cfm/sgft) -
0.15
Note: values above given at ARI conditions
EATING SYSTEM PSYCHROMETRICS
26.0 OF 63.A OF
Outside Air
796 cfm
69.2 OF
, Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
COIL COOLING PEAK
ICOILHTG.PEAK
CFM
Sensible
Latent
I CFM
I Sensible
7,855
158,824
30,539
1 2,635
98,163
0
7,941
4,908
0
0
796
31,150
12,569
796
36,628
0
0
7,941
4,908
TOTAL SYSTEM LOAD 1 205,857 43,108 144 607
HVAC EQUIPMENT SELECTION
York DNP060 171,547 30,136 141,153
Total Adjusted System Output 171,547 30,136 141,153
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
tream Temperatures at Time of Heating Peak)
105.0 °F 105.0 of
0 Supply Air Ducts
Heating Coil Supply Fan 104.2 °F
6100 cfm ROOMS
70.0 OF
Return Air Ducts < I
[COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak)
112.0/77.9°F r80.0/65.3°F 55.0/53.9°F 55.0/53.9°F
;10O B10 Supply Air Ducts
Outside Air
796 cfm Cooling Coil Supply Fan 56.2 / 54.4 OF
6100 cfm 53.4%. R.H. ROOMS
75.2/63.0 °F 74.0 / 62.6 OF
Return Air Ducts I
I
EnergyPro 4.2
EnergySoft User Number: 5950
D
Job Number: C06105
25 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -7 1,300
26.0 of 63.4 of
Outside Air
195 cfm
68.9 of
OOLING SYSTEM PSYCHROMETRICS
112.0 / 77.9 of
Outside Air
.195 cfm
75.4/63.0 0F,-
EneravPro 4.2 by E
I
STEM LOAD
Total Room Loads
:turn Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
DTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
CFM
I Sensible
2,280
46,097
7,482
945
35,213
0
2,305
1,761
0
0
195
7,591
3,104
195
8,906
0
0
2,305
1,761
58,2971=1 7 47,640
HVAC EQUIPMENT SELECTION
York DNP060 43,040 7,363 35,288
Total Adjusted System Output 43,040 7,363 35,288
(Adjusted for Peak Design Conditions)
.TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
'earn Temperatures at Time of Heating Peak)
105.0 of 105.0 of
Supply Air Ducts
:oil Supply Fan 103.9 of
1525 cfm ROOMS
70.0 of
Return Air Ducts I
80.1 / 65.2 of 55.0 / 53.9 of 55.0/53.90
0 . Supply Air Ducts
Cooling Coil Supply Fan 56.4 / 54.4 of
1525 cfm 53.3% R.H. ROOMS
74.0162.6 OF
Return Air Ducts I
User Number: 5950
Job Number: C06105
of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -8 1,300
Number of Systems'
i
Heating System
Output per System
56,500
Total Output (Btuh)
56,500
Output (Btuh/sgft)
43.5
Cooling System
Output per System
56,500
Total Output (Stuh)
56,500
.Total Output (Tons)
4.7
Total Output (Btuh/sqtt)
43.5
Total Output (sgtt/Ton)
276.1
Air System
CFM per System
1,525
Airflow (cfm)
1,525
Airflow (cfm/sgft)
1.17
Airflow (cfm/Ton)
323.9
Outside Air (%)
12.8
Outside Air (cfm/sgft)
0.15
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
CFM
I Sensible
1,956
42,690
7,482
2,121
32,191
Supply Fan
0
1525 cfm
2,134
1,610
0
0
195
7,613
3,968
1 195
8,925
0
drstream Temperatures
0
2,134
1,610
TOTAL SYSTEM LOAD 54,5711 11,450 44,335
HVAC EQUIPMENT SELECTION
York DNP060 45,171 4,259 35,288
Total Adjusted System Output 45,171 4,259 35,288
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm F Jan 12;n
Note: values above given at ARI conditions
EATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak)
26.0 OF 63.5 OF 711 85.3 OF 85.3 OF
Outside Air
195 cfm
69.0 of
112.0/77.9OF-
dir
Outside Air
195 cfm
75.3 / 61.6 of
EnergyPro 4.2 by Energysoft User Number: 5950 _ Job Number: C06105 Page:27 of 30
O
Supply Air Ducts
ting Coil
Supply Fan
84.3 of
1525 cfm
ROOMS
70.0 of
Return Air Ducts
I
drstream Temperatures
at Time of Cooling
Peak)
80.0 / 64.0 of
52.2 / 51.0 of 52.2 / 51.0 of
Supply Air Ducts
O
Cooling Coil Supply Fan
53.5! 51.5 of
1525 cfm
ROOMS
48.2% R.H.
74.0 61.2 of
Return Air DU._C_t_S__QEI
EnergyPro 4.2 by Energysoft User Number: 5950 _ Job Number: C06105 Page:27 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -9 1,300
ENGINEERING CHECKS IFSYSTEM LOAD
Number of Systems
1
Heating System'.
Output per System
75,000
Total Output (Btuh)
75,000
Output (Btuh/sqft)
57.7
Cooling System
Output per System
75,000
Total Output (Btuh)
75,000
Total Output (Tons)
6.2
Total Output (Btuh/sgft)
57.7
Total Output (sgft/Ton)
208.0
Air System
CFM per System
2,600
Airflow (cfm)
2,600
Airflow (cfm/sgft)
2.00
Airflow (cfm/Ton)
416.0
Outside Air (%)
7.5
Outside Air (cfm/sgft)
0.15
Note: values above given at ARI conditions
EATING SYSTEM PSYCHROMETRICS
26.0 OF 66.1 OF
Outside Air
195 cfm
69.3 OF
112.0 / 77.9 OF
Outside Air
195 cfm
74.9 / 64.5 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
CFM
Sensible
3,048
48,652
7,482
503
37,479
0
2,433
1,874
0
0
195
7,703
2,069
195
8,990
0
0
2,433
1,874
TOTAL SYSTEM LOAD 1 61,2211 9,551 1 50,217
HVAC EQUIPMENT SELECTION
York DH078 58,094 9,306 46,843
Total Adjusted System Output58,094 9,306 46,843
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
tream Temperatures at Time of Heating Peak)
140.0 or 140.0 OF
O Supply Air Ducts
Heating Coil Supply Fan 139.3 °F
2600 cfm ROOMS
70.0 OF
Return Air Ducts I
ROMETRICS
77.7 / 65.7 OF 59.0 / 58.1 OF 59.0 / 58.1 OF
0Supply Air Ducts
Cooling Coil Supply Fan 59.9 / 58.4 OF
2600 cfm 59.3% R.H. ROOMS
74.0/64.2°F
Return Air Ducts ` I
EnergyPro 4.2 by EnergySoft - User Number: 5950 Job Number: C06105 Page:28 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
RETAIL SHOP BUILDING - PARCEL 1 8/30/2007
SYSTEM NAME FLOOR AREA
HP -10 1,950
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
CFM
I Sensible
4,251
67,867
11,224
655
48,795
ROOMS
0
60.9% R.H.
3,393
2,440
0
0
293
11,434
2,682
293
13,413
0
0
3,393
2,440
86,088 13,9051 67,087
York OH090 67,097 12,482 54,338
Total Adjusted System Output s7,os7 12,482 54,338
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
26.0 OF 64.1 OF140.00F
Outside Air
293.cfm
Heating Coil
69.1 of
0
Supply Fan
2516 cfm
140.0 of
Supply Air Ducts
139.1 of
ROOMS
70.0 of
k Return Air Ducts %4
(COOLING SYSTEM PSYCHROMETRICS (Airstream Temoeratures at Time of Coolino Peak) I
112.0 / 77.9 of 79.5 / 66.8 of 59.0 / 58.0 of 59.0 / 58.0 of
S I A' D
Outside Air
293 cfm
75.3/65.0 of
Cooling Coil
O
upp y Ir ucts
Supply Fan
60.3 / 58.5 of
2516 cfm
ROOMS
60.9% R.H.
74.0 / 64.6 of
Return Air Ducts
I
I EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Pape:29 of 30 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME
RETAIL SHOP BUILDING - PARCEL 1
i
DATE
8/30/2007
SYSTEM NAME
HP -11
87,000
FLOOR AREA
1,950
ENGINEERING CHECKS
SYSTEM -LOAD
44.6
Cooling System
Output per System
87,000
Total Output (Btuh)
87,000
Total Output (Tons)
7.2
Total Output (Btuh/sqft)
44.6
Total Output (sgft/Ton)
269.0
Number of Systems COIL COOLING PEAK COIL HTG. PEAK
CFM Sensible Latent CFM Sensible
i
Heating System
Output per System
87,000
Total Output (Stuh)
87,000
Output (Btuh/sgft)
44.6
Cooling System
Output per System
87,000
Total Output (Btuh)
87,000
Total Output (Tons)
7.2
Total Output (Btuh/sqft)
44.6
Total Output (sgft/Ton)
269.0
Air System ,
CFM per System
2,516
Airflow (cfm)
2,516
Airflow (cfm/sqft)
1.29
Airflow (cfm/Ton)
347.0
Outside Air (%)
11.6
Outside Air (cfm/sqft)
0.15
Note: values above given at ARI conditions
PSYCHROMETRICS
26.0 ° F
Outside Air
293 cfm
68.4 OF
DOLING SYSTEM
107.0 / 73.6 OF
Outside Air
293 cfm
75.9 64.6 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
6,331
101,069
6,398
1,145
85,295
0
5,053
4,265
0
0
293
9,683
-271
293
13,201
0
0
5,053
4,265
TOTAL SYSTEM LOAD 1 120,884 6,1261 107,025
HVAC EQUIPMENT SELECTION
York DHO90 71,128 9,135 54,338
Total Adjusted System Output 71 128 9,135 54,338
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am
tream Temperatures at Time of Heating Peak)
140.0 OF 140.0 OF
CC --h. A:. n,, a
Heating Coil Supply Fan 138.4 OF
2516 cfm ROOMS
70.0 OF
Return Air Ducts I
i (Airstream Temperatures at Time of Coolinq Peak)
79.5 / 65.8 OF 59.0 / 57.9 OF 59.0 / 57.9 OF
0 Supply Air Ducts
Cooling Coil Supply Fan 60.9 / 58.6 OF
2516 cfm 58.3% R.H. ROOMS
74.0 / 64.0 OF
Return Air Ducts
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C06105 Page:30 of 30
A