Loading...
ENC2022-00014 Q"Kra C.FM of hr N'SF1ZV — ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION See below for Finance Revenue Codes For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. DATE: 1/10/2022 LOCATION OF CONSTRUCTION(Street address or Description): WASHINGTON S OF AVE 48; AVE 48 AT ENDLESS SKY; DUNE PALMS PURPOSE OF CONSTRUCTION: ACCESS 6 EX MANHOLES TO PLACE & SPLICE-503OLF OF NEW CABLE AND ACCESS 1 EX MANHOLE TO SPLICE EX CABLE FOR 79440 CORPORATE CENTER DR DESCRIPTION OF CONSTRUCTION: FRONTIER 70058-5290516; ACCESS 6 MANHOLES DIMENSION OF INSTALLATION OR REMOVAL:10 DAYS IMATE TIME WHEN WORK WILL BEGIN:1/6/2022 TIME OF COMPLETION: 3/7/2022 ESTIMATED CONSTRUCTION COST: (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS: In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four (24) hours prior to the anticipated inspection. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City ,o�f^Laa� / Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent FRONTIER CALIFORNIA - ROSIE SALINAS 1400 PHILLIPS BLVD POMONA, CA 91766 Name of Applicant (please print) Business Address FRONTIER CALIFORNIA 1400 PHILLIPS BLVD POMONA, CA 91766 Name of Contractor and Job Foreman Business Address 488385 NA Contractor's License No. STEADFAST INSURANCE COMPANY Applicant's Insurance Company Finance Revenue Code PERMIT INSPECTION TRAFFIC CONTROL $2,358.00 TRAFFIC CONTROL PLAN REVIEW $498.00 TECHNOLOGY ENHANCEMENT FEE $5.00 TOTAL; $0.00 City Business License No. GLO 0285992-04 Policy Number PERMIT NO: ENC2022-0001 DATE ISSUED: 1 -1 1 -2022 EXPIRATION DATE: 1-11-2023 BY: AL WORK INSPECTED BY*: PERMIT COMPLETION DATE*: (909)798-4400 Telephone No. (909)798-4400 Telephone No. *If the work is covered by a Subdivision Improvement Agreement, Subdivider shall request final acceptance of improvements from the City Council. PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT Date: 12/23/21 Tract No: Project Name: 70058-5290516 - Vicinity Purpose of Construction (i.e.: Rouah Gradinz, Offsite Street, etc.)- ACCESS 6 EX. MANHOLES TO PLACE & SPLICE +/-5030 LF OF NEW CABLE WITHIN EX. CONDUIT. ACCESS 1 EX. MANHOLE TO SPLICb EX. CABLE TO SERVICE A CUSTOMER LOCATED AT 79440 CORPORATE CENTER DR Description of Construction (i.e.: See Plan Set No. 01234, N/S/O AVE 48 E/O ENDLESS SKY; N/S/O AVE 48 W/O ENDLESS SKY, N/S/O AVE 48, E/O ADAMS; W/S/O DUNE PALMS RD, N/O VISTA CORALINA SIB TRAFFIC LN ON DUNE PALMS, N/O AVE 48; NB TRAFFIC LN ON WASHINGTON ST, S/O AVE 48 Dimension of Installation or Removal: Duration of work: 10 Days I Approximate Construction Start Date: 01 /06/22 ■ Approximate Construction Completion Date: 03/06/22 Estimated Construction Cost: $� Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling, compaction and placing permanent resurfacing and or replacing improvements Contact Name: Rosie Salinas Phone Number: (909)-798-4400 HIM Name of Applicant/Owner: Frontier California Inc Ftr. Engineer: Harmeet Kaur ' Applicant Address: 11400 Phillips Blvd, Pomona CA 91766 Applicant Telephone Number: (909)-798-4400 Applicant E-mail Address: permits@mountaintcs.com Name of Contractor: Contractor Address: Contractor Telephone Number: Contractor State License Number: Contractor City Business License Number: Contractor E-mail Address: ►A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED• ►plicant or Contractor General Liability Insurance Company: or Contractor General Office Use Only: Inspection Fee: Permit Fee: As -Built Deposit:_ Dust Control Deposit: Credit Amount: Insurance Policv Number: Office Use Only: Assigned Permit Number: Approval Date: Expiration Date: Issue Date: Administrative Authority plication for Permit pose - TOTAL FEE DUE: Koh's DIGALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UG SERVICE ALEM OF SOUrHEAH G W —. TRAFFIC CONTROL PLANS MISCELLANEOUS DEVICES m m m YP.) FLASHING ARROW SIGN TRAILER (TYP.) (FAS) WORK HOURS: 9AM - 2PM WORK DATES: XX/XX/XX - XX/XX/XX ACTUAL WORK DAYS: # ALL WORK ZONE TRAFFI CONTROL SIGNS AND MARKINGS ARE TO BE REMOVED AT THE END OF THE DAY TYPE 1 BARRICADE HIGH LEVEL WARNING DEVICE (HLWD) z c 9,-nI, TILE LA Q UINTA, CA WARNING SIGNS (24 In) _ RIGHT LANE �� ROAD END LANE RIGHT LANE WORK � ROAD WORK iW1 CLOSED M U S TAHEAD TURN RIGHT CLOSED G2o-2 AHEAD W20-1 C30(CA) R3-7R W20-5R (30 in) (30 in) (30 in) SIDEWALK CLOSED -- �c� ��s��"n6 SIDEWALK AHEAD SIDEWAY S BIKE `� RIGHT l �J� CLOSED CROSSCROSS HERE LAII N CLOSED SHOULDER W11- CLOSED R9-9 R9-11 (RT) R9-11A (LT) SC11 (MOD) W21-SAR (30 W16-1 SHARE in) TXE ROA W11-1 ASSEMBLY CA TYPE N-3 (24 in) Al TRAFFIC CONE OBJECT MARKER (OM1-3) ffl� R3-2 R3-4 (36 in) J NOTE: 1.ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA M.U.T.C.D) 2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. 3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH TRAFFIC CONTROL PLANS. 4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10' (12' TYP.) TRAFFIC LANE WIDTH AT ALL TIMES. THERE SHALL BE A MINIMUM 2' BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE. 5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT THE END OF WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL. 7. CLOSURE HOURS TO COINCIDE WITH WORK HOURS 9AM-2PM " NO NOTIFY TRAFFIC SIGNAL MAINTENANCE STAFF 48 HOURS BEFORE TRAFFIC SIGNALS OPERATIONS HAVE TO BE MODIFIED, TURNED OFF OR PUT INTO FLASHING OPERATION DETAIL SHEET LEGEND ---1 EXISTING TURN ONLY —40- EXISTING NO TURN LA OTraffic Cone Temporary Sign Direction of Travel •Z••••• Flashing Arrow Sign (FAS) 0 0 FAS Support or Trailer Portable Flashing Beacon l%r Flagger ($) TRAFFIC SIGNAL TRAFFIC FLOW DIRECTION Work Area ® Work Vehicle OSignalized Intersection I --I Type III Barricade with sign HLWD High Level Warning Device CONE SPACING TO BE 25' MAXIMUM Lowe's HomeQ ImDmvemen[\ Sprouts Farmers Market \\\\ ® v vBeat Buy TargetQ \ ©Loulaes Pantry a r - �R o s VVarrSrt Sup —enter You Grill Korean BBQ ® 9 COMO WhOlesaleQ Aventine 9 wolrf waters Place ,Pwashi48, L. Quirt S[ &Ave 48, La Qulnta, CA 9Y253 Aw AB 41 6 Rancho La Qulnta® 6 . Rancho La 9-1 QUInta Golf Club V LEGEND OTraffic Cone FTemporary Sign Direction of Travel {•••••• • Flashing Arrow Sign (FAS) 00 o FAS Support or Trailer Portable Flashing Beacon Flagger Work Area ® Work Vehicle OSignalized Intersection -- Type III Barricade with sign Ave 48 r' HLWD High Level Warning Device Frontier COMMUNICATIONS W.O.# 70058-5290516 DATE: 1/5/2022 TITLE: TRAFFIC CONTROL PLAN LOCATION: DUNES PALMS RD, AVE 48, WASHINGTON ST CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 MTCS T.G. PAGE: SHEET#: Mountain Top XXX-XX 1 OF 2 Communication Services LLC CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TAPER CURB • • • • 3 0 WORK AREA CONSTRUCTION NOTES 1. WORK CREW TO UTILIZE THIS CLOSURE TO ACCESS MH#41 ON E/S/O WASHINGTON ST, 195' S/O AVE 48 CENTERLINE. 2. WORK CREW TO MAINTAIN 4' MIN. WALKWAY OR ASSIST PEDESTRIANS AROUND WORK AREA WHEN NECESSARY. 3. WORK CREW TO COORDINATE WORK WITH PROPERTY OWNERS WHEN NECESSARY. 4. WORK HOURS ARE AS FOLLOWS 08:30 A.M. TO 3:30 P.M. 5. IF A SCHOOL IS IN PROXIMITY OF THE WORK AREA, WORK HOURS ARE AS FOLLOWS 09:00 A.M. TO 2:30 P.M. 6. WHEN PERFORMING WORK ON ROADWAYS DESIGNATED AS A BIKE ROUTE OR WHERE SEPARATE BIKE LANES ARE PRESENT, SPECIAL ATTENTION SHALL BE GIVEN TO BICYCLISTS. 7. WORK CREW TO ADJUST TRAFFIC CONTROL PER FIELD CONDITIONS. 8. REFERENCE CA MUTCD (DWG NO. 22) MODIFIED FOR THIS TCP. ADDRESS NEAREST TO WORK LOCATION: 47900 Washington St, La Quinta, CA 92253 WASHINGTON ST (50 MPH +o 0 Ro Cork & Fork Small Plates • SS Walgreens Drug store O Washington St & Ave 48, La Qulnta, CA 92253 Ave 48 -41¢g Cier,; PROJECT LOCATION \ 72 HOURS PRIOR TO COMMENCING WORK INSTALL TEMP. NO PARKING SIGNS 195' TO C/L LEGEND .o Co N O Traffic Cone U "IG w 3 j f Temporary Sign ZU)'DOWNSTREAMDirection of Travel TAPER WORK BUFFER SPACE 600' 500, 500'Flashing Arrow Sign (FAS) 50'MIN/ AREA 50'MIN MERGING TAPER SIGN SIGN 100'MAX SPACING SPACING SPACING 006 FAS Support or Trailer 50' MIN 50' Portable Flashing Beacon MH#41 MIN LOCATION CURB Flagger • • _ • • • Work Area --d4— 12' MIN. -I*— Work Vehicle IZT 44' TO C/L S Signalized Intersection w > LANDSCAPE MEDIAN —, Type III Barricade with sign HLWD High Level Warning Device o M CURB D • Zrwn " oz g00 N AO o U Fr'ont ier �oQ�OFESP, COMMUNICATIONS 2G) W.O.# 70058-5290516 DATE: 1/5/2022 co C 29570 Z TITLE: TRAFFIC CONTROL PLAN Exp. 3/31 /23 M LOCATION: WASHINGTON ST & AVE 48 - CITY/STATE: LA QUINTA, CA �t 1/6/2022 FTR ENGINEER: RAUL RIVAS (909) 406-3178 Clv It- �P FTR INSPECTOR: MIKE REDDING (760) 352-1240 TF OF CAL XF� NTS DRAWN BY: MTCS 40000*�I`A`l T.G. PAGE: SHEET#: Mountain Top XXX-XX 2 OF 2 Communication Services LLC DIGALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG W SERVICE ALERT oFSOUrHEAHGW—. TRAFFIC CONTROL PLANS MISCELLANEOUS DEVICES m m m YP.) FLASHING ARROW SIGN TRAILER (TYP.) (FAS) WORK HOURS: 9AM - 2PM WORK DATES: XX/XX/XX - XX/XX/XX ACTUAL WORK DAYS: # ALL WORK ZONE TRAFFI CONTROL SIGNS AND MARKINGS ARE TO BE REMOVED AT THE END OF THE DAY TYPE 1 BARRICADE HIGH LEVEL WARNING DEVICE (HLWD) z c 9,-nI, TILE LA Q UINTA, CA WARNING SIGNS (24 In) _ RIGHT LANE � ROAD END LANE R WORK ROAD WORK y CLOSED M U S T AHEAD IGHT LANE CLOSED TURN RIGHT G2o-2 W20-1 W12-1 C30(CA) R3-7R AHEAD W20-5R (30 in) (30 in) (30 in) SIDEWALK CLOSED -- �c� ��s� Ito �"n6 SIDEWALK AHEAD SIDEWAY S BIKE LANI `� RIGHT l �J� CLOSED CROSSCROSS HERE N CLOSED SHOULDER W11- CLOSED R9-9 R9-11 (RT) R9-11A (LT) SC11 (MOD) W21-SAR W16-1 SHARE (30 in) TXE ROA W11-1 ASSEMBLY CA TYPE N-3 (24 in) D TRAFFIC CONE OBJECT MARKER (OM1-3) R3-2 R3-4 (36 in) J NOTE: 1.ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA M.U.T.C.D) 2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. 3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH TRAFFIC CONTROL PLANS. 4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10' (12' TYP.) TRAFFIC LANE WIDTH AT ALL TIMES. THERE SHALL BE A MINIMUM 2' BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE. 5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT THE END OF WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL. 7. CLOSURE HOURS TO COINCIDE WITH WORK HOURS 9AM-2PM " NO NOTIFY TRAFFIC SIGNAL MAINTENANCE STAFF 48 HOURS BEFORE TRAFFIC SIGNALS OPERATIONS HAVE TO BE MODIFIED, TURNED OFF OR PUT INTO FLASHING OPERATION DETAIL SHEET LEGEND ---1 EXISTING TURN ONLY —40- EXISTING NO TURN LA OTraffic Cone Temporary Sign Direction of Travel •Z••••• Flashing Arrow Sign (FAS) 0 0 FAS Support or Trailer Portable Flashing Beacon il%r Flagger ($) TRAFFIC SIGNAL TRAFFIC FLOW DIRECTION Work Area ® Work Vehicle OSignalized Intersection I --I Type III Barricade with sign HLWD High Level Warning Device CONE SPACING TO BE 25' MAXIMUM +�+� QKohl Lowe'a Home ' Improvemmtl� Sprouts Farmers Market ® v vBest Buy You Grill Korean BB Q Target Q �L-0es Pe tr _�-'Residenaalnnb n y Marriott La QUIma r �R o - �.. 3 Warr art Sup —enter Q CoMoWholesalev Aventine 9 Desert sardS School Distrir Wolff Waters Place SC Ave •.,L. �^�^m•r®„ uirt 48, La Quinta, CA 9Y253 Aw a8 Ave 48 _ .-_Rancho Lo Crusts Q a n�avrerIX c..acA�un _ Rancho La - Qelola Qdf Club® LEGEND OTraffic Cone FTemporary Sign Direction of Travel {•••••• • Flashing Arrow Sign (FAS) 00 o FAS Support or Trailer Portable Flashing Beacon Flagger Work Area ® Work Vehicle OSignalized Intersection -- Type III Barricade with sign HLWD High Level Warning Device Frontier COMMUNICATIONS W.O.# 70058-5290516 I DATE: 1/6/2022 TITLE: TRAFFIC CONTROL PLAN LOCATION: DUNES PALMS RD, AVE 48, WASHINGTON ST CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 MTCS T.G. PAGE: SHEET#: Mountain Top XXX-XX 1 OF 4 Communication Services LLC CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TAPER 0 • • • • CURB a Y W J 0 Z W R9-11 (RT) j DOWNSTREAM TAPER SO' MIN /inn' MAX_ 1. WORK CREW TO UTILIZE THIS CLOSURE TO ACCESS MT#246 ON N/S/O AVE 48, 311' E/O ENDLESS SKY CENTERLINE. 2. WORK CREW TO MAINTAIN 4' MIN. WALKWAY OR ASSIST PEDESTRIANS AROUND WORK AREA WHEN NECESSARY. 3. WORK CREW TO COORDINATE WORK WITH PROPERTY OWNERS WHEN NECESSARY. 4. WORK HOURS ARE AS FOLLOWS 08:30 A.M. TO 3:30 P.M. 5. IF A SCHOOL IS IN PROXIMITY OF THE WORK AREA, WORK HOURS ARE AS FOLLOWS 09:00 A.M. TO 2:30 P.M. 6. WHEN PERFORMING WORK ON ROADWAYS DESIGNATED AS A BIKE ROUTE OR WHERE SEPARATE BIKE LANES ARE PRESENT, SPECIAL ATTENTION SHALL BE GIVEN TO BICYCLISTS. 7. WORK CREW TO ADJUST TRAFFIC CONTROL PER FIELD CONDITIONS. 8. REFERENCE CA MUTCD (DWG NO. 9) MODIFIED FOR THIS TCP. ADDRESS NEAREST TO WORK LOCATION: AVE 48 (50 MPH) 47795 DUNE PALMS RD, LA QUINTA, CA 92253 200' (50' MIN.) 600' BIKE LANE 500' 500' 500' WORK ARFA 42R RHFFFR MFRGING TAPFR TAPFR SIGN SPACING SIGN SPACING SIGN SPACING 1 (OPTIONAL) CURB OR EDP G20-2 500' SIGN SPACING SIDEWALK ROAD \ CLOSED WORK AHEAD R9-9 SIDEWALK CLOSED W20-1 AHEAD� CROSS HERE R9-11(RT) SIDEWALK CLOSED AHEAD� END ROAD WORK CROSS HERE R9-11(LT) G20-2 *CLOSED LANE W11-1 CLOSED C30(CA) W20-5 SHARE W16-1 INTERCHANGEABLE WITH THE ROAD C20A (CA) (USE IF APPLICABLE) BIKE LANE CLOSED AHEAD i W4-2R C20 (BIKE) OFESS/O P 9 .\ 9570 z U Exp. 3/31 /23 m * 1 /6/2022 STgT C I V 11- C�\P OF CA1-�F� Cod Refleeti°n - Ave 48 Are 48 Ave 48 Endless Sky 6 ve 48. La Qolnta, CA 9 253 PROJECT L CATION Ave a8 LEGEND R9-11 (LT) O Traffic Cone f Temporary Sign Direction of Travel ••••• Flashing Arrow Sign (FAS) 000 FAS Support or Trailer Portable Flashing Beacon Flagger Work Area Work Vehicle OSignalized Intersection =1 Type III Barricade with sign HLWD High Level Warning Device • • • Fr'ontoier COMMUNICATIONS W.O.# 70058-5290516 DATE: 1/6/2022 TITLE: TRAFFIC CONTROL PLAN LOCATION: ENDLESS SKY & AVE 48 CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 DRAWN BY: MTCS SCALE 000�T.G. PAGE: SHEET#: Mountain Top XXX-XX 2 OF 4 Communication Services LLC CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TAPER CURB • • • • r YYVRR NRCN I�VRJ 1 RVIi I IVR RV 1 CJ 1. WORK CREW TO UTILIZE THIS CLOSURE TO ACCESS MH#244 ON N/S/O AVE 48, 603' W/O ENDLESS SKY CENTERLINE. 2. WORK CREW TO MAINTAIN 4' MIN. WALKWAY OR ASSIST PEDESTRIANS AROUND WORK AREA WHEN NECESSARY. 3. WORK CREW TO COORDINATE WORK WITH PROPERTY OWNERS WHEN NECESSARY. 4. WORK HOURS ARE AS FOLLOWS 08:30 A.M. TO 3:30 P.M. 5. IF A SCHOOL IS IN PROXIMITY OF THE WORK AREA, WORK HOURS ARE AS FOLLOWS 09:00 A.M. TO 2:30 P.M. 6. WHEN PERFORMING WORK ON ROADWAYS DESIGNATED AS A BIKE ROUTE OR WHERE SEPARATE BIKE LANES ARE PRESENT, SPECIAL ATTENTION SHALL BE GIVEN TO BICYCLISTS. 7. WORK CREW TO ADJUST TRAFFIC CONTROL PER FIELD CONDITIONS. 8. REFERENCE CA MUTCD (DWG NO. 22) MODIFIED FOR THIS TCP. ADDRESS NEAREST TO WORK LOCATION: 79175 SHADOW TRAIL, LA QUINTA, CA 92253 If PAW-T..11 Cool Reflection Ave 48 CT LOCATION Ave 4R L-OZM 0V3HV ROAEND DWORK L E G E N D NaOM avow G20-2 } 48 AVE (50 MPH) <_ w O Traffic Cone Y g�a �m g_�= &�� F g _ i,� Temporary Sign 603' TO C/L 50' MIN. GAP 350' 100, 200' 500' Y 500' 500' Direction of Travel WORK (n BETWEEN MERGING TAPER TANGENT BIKE LANE SIGN SIGN SIGN ••••• Flashing Arrow Sin FAS AREA � W CHANNELIZERS TAPER J SPACING SPACING SPACING g g ( ) zN o 0 006 FAS Support or Trailer M H 244 ° w _ Y g Z z� o o LOCATION o ~" 3 ww O AW $ Portable Flashing Beacon CURB �O O t y CURB mso 3 SIDEWALK SIDEWALK BIKE LANE • • • BIKE LANE Flagger • • •� •—:-� • • • • Work Area 50' TO C/L Work Vehicle CONCRETE MEDIAN Jr"•S LANDSCAPE MEDIAN OSignalized Intersection —I Type III Barricade with sign CURB CURB A � n HLWD High Level Warning Device �00 N O vFo O � Z N O� �o Q�NF Ess /oN - G 29570 z 0 Exp. 3/31 /23 M * 1 /6/2022 top C)vl� qTF OF CAQ- w`x Fr'ont*ier COMMUNICATIONS W.O.# 70058-5290516 DATE: 1/6/2022 TITLE: TRAFFIC CONTROL PLAN LOCATION: 48 AVE & ENDLESS WAY CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 DRAWN BY: MTCS T.G. PAGE: SHEET#: Mountain Top xxx-xx 3 OF 4 Communication Services LLC CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TAPER — — — • • • CURB • • • • Q Of 0 536' TO C/L AVENUE 48 (50 MPH) 72 HOURS PRIOR TO COMMENCING WORK INSTALL TEMP. NO PARKING www 0 WORK 50' U N 100, AREA BUFFER BIKE TA 1. WORK CREW TO UTILIZE THIS CLOSURE TO ACCESS MH#244 ON N/S/O AVE 48, 536' E/O ADAMS ST CENTERLINE. 2. WORK CREW TO MAINTAIN 4' MIN. WALKWAY OR ASSIST PEDESTRIANS AROUND WORK AREA WHEN NECESSARY. 3. WORK CREW TO COORDINATE WORK WITH PROPERTY OWNERS WHEN NECESSARY. 4. WORK HOURS ARE AS FOLLOWS 08:30 A.M. TO 3:30 P.M. 5. IF A SCHOOL IS IN PROXIMITY OF THE WORK AREA, WORK HOURS ARE AS FOLLOWS 09:00 A.M. TO 2:30 P.M. 6. WHEN PERFORMING WORK ON ROADWAYS DESIGNATED AS A BIKE ROUTE OR WHERE SEPARATE BIKE LANES ARE PRESENT, SPECIAL ATTENTION SHALL BE GIVEN TO BICYCLISTS. 7. WORK CREW TO ADJUST TRAFFIC CONTROL PER FIELD CONDITIONS. 8. REFERENCE CA MUTCD (DWG NO. 22) MODIFIED FOR THIS TCP. wQ • N N o MH#243 LOCATION 0 �N O moo 3 $ U N O PARKWAY ADDRESS NEAREST TO WORK LOCATION: 79115 Shadow Trail, La Quinta, CA 92253 U W O Z w L] U w O= N 00. 350' 350' SIGN SPACING SIGN SPACING J r11 LU <& U) wz a c O 3 � � • • I • • • • BIKE LANE 49' TO C/L 12' MIN. LANDSCAPE MEDIAN BIKE LANE CURB E0 xoo0 o z C wa N 00 N N O � FESS/O� P 9 9570 z L Exp. 3/31 /23 \* 1 /6/2022 qTF C I V IOF CAL \F SCALE Shadow Trall Sn,'I., i,., Ave 48 & Adams St, Ave 48 La Quinta, CA 92253 Ave 48 Ave 48 PROJECT LOZ,I,Q,N so 9QJ�W P LEGEND OTraffic Cone f Temporary Sign 4 Direction of Travel k•••• Flashing Arrow Sign (FAS) 006 FAS Support or Trailer Portable Flashing Beacon Flagger Work Area Work Vehicle OSignalized Intersection —I Type III Barricade with sign HLWD High Level Warning Device Fr'ont*ier COMMUNICATIONS W.O.# 70058-5290516 DATE: 1/6/2022 TITLE: TRAFFIC CONTROL PLAN LOCATION: AVE 48 & ADAMS ST CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 DRAWN BY: MTCS T.G. PAGE: SHEET#: Mountain Top XXX_XX 4 OF 4 Communication Services LLC Koh's DIGALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UG SERVICE ALEM OF SOUrREAH GW—. TRAFFIC CONTROL PLANS MISCELLANEOUS DEVICES m m m YP.) FLASHING ARROW SIGN TRAILER (TYP.) (FAS) WORK HOURS: 9AM - 2PM WORK DATES: XX/XX/XX - XX/XX/XX ACTUAL WORK DAYS: # ALL WORK ZONE TRAFFI CONTROL SIGNS AND MARKINGS ARE TO BE REMOVED AT THE END OF THE DAY TYPE 1 BARRICADE HIGH LEVEL WARNING DEVICE (HLWD) z c 9,-nI, TILE LA Q UINTA, CA WARNING SIGNS (24 In) _ RIGHT LANE �� ROAD END LANE RIGHT LANE WORK � ROAD WORK iW1 CLOSED M U S TAHEAD TURN RIGHT CLOSED G2o-2 AHEAD W20-1 C30(CA) R3-7R W20-5R (30 in) (30 in) (30 in) SIDEWALK CLOSED -- �c� ��s� ���� gas SIDEWALK AHEAD SIDEWAY S BIKE `� RIGHT J >Jc CLOSED CROSSCROSS HERE LANN CLOSED SHOULDER W11- CLOSED R9-9 R9-11 (RT) R9-11A (LT) SC11 (MOD) W21-SAR W16-1 SHARE (30 in) TXE ROA W11-1 ASSEMBLY CA TYPE N-3 Al TRAFFIC CONE OBJECT MARKER (OM1-3) ffl� R3-2 R3-4 (36 in) J NOTE: 1.ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA M.U.T.C.D) 2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. 3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH TRAFFIC CONTROL PLANS. 4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10' (12' TYP.) TRAFFIC LANE WIDTH AT ALL TIMES. THERE SHALL BE A MINIMUM 2' BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE. 5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT THE END OF WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND TRAFFIC RETURNED TO NORMAL. 7. CLOSURE HOURS TO COINCIDE WITH WORK HOURS 9AM-2PM " NO NOTIFY TRAFFIC SIGNAL MAINTENANCE STAFF 48 HOURS BEFORE TRAFFIC SIGNALS OPERATIONS HAVE TO BE MODIFIED, TURNED OFF OR PUT INTO FLASHING OPERATION DETAIL SHEET LEGEND ---1 EXISTING TURN ONLY —40- EXISTING NO TURN LA OTraffic Cone Temporary Sign Direction of Travel •Z••••• Flashing Arrow Sign (FAS) o o o FAS Support or Trailer Portable Flashing Beacon l%r Flagger ($) TRAFFIC SIGNAL TRAFFIC FLOW DIRECTION Work Area ® Work Vehicle OSignalized Intersection I --I Type III Barricade with sign HLWD High Level Warning Device CONE SPACING TO BE 25' MAXIMUM Lowe's HomeQ ImDmvemen[\ Sprouts Farmers Market \\\\ ® v vBeat Buy TargetQ \ ©Loulaes Pantry a r - �R o s VVarrSrt Sup —enter You Grill Korean BBQ ® 9 COMO WhOlesaleQ Aventine 9 wolrf waters Place Ilfwashi48, L. Quirt S[ &Ave 48, La Qulnta, CA 9Y253 Aw AB 41 6 Rancho La Qulnta® 6 . °i Rancho La 9-1 r"n1 QUInta Golf Club V LEGEND OTraffic Cone FTemporary Sign Direction of Travel {•••••• • Flashing Arrow Sign (FAS) 00 o FAS Support or Trailer Portable Flashing Beacon Flagger Work Area ® Work Vehicle OSignalized Intersection -- Type III Barricade with sign Ave 48 r' HLWD High Level Warning Device Frontier COMMUNICATIONS W.O.# 70058-5290516 DATE: 12/17/2021 TITLE: TRAFFIC CONTROL PLAN LOCATION: DUNE PALMS RD, AVE 48, WASHINGTON ST CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 MTCS T.G. PAGE: SHEET#: Mountain Top XXX-XX 1 OF 3 Communication Services LLC CA MUTCD (California Manual on Uniform Traffic Control Devices) Approved by the Federal Highway Administrator as the National Standard in accordance with Title 23 U.S. Code, Sections 109(d),114(a), 217,315, and 402(a), 23 CFR 655, and 49 CFR 1.48(b)(8), 1.48(b)(33), and 1.48(c)(2). CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TAPER • • • 1 0-0 CURB • • • • } Q W 0 (OPTIONAL) CURB OR EOP G20-2 DUNE PALMS RD (45 MPH) 1. WORK CREW TO UTILIZE THIS CLOSURE TO ACCESS MH#369 ON W/S/O DUNE PALMS RD, 222' N/O AVE 48 CENTERLINE. 2. WORK CREW TO MAINTAIN 4' MIN. WALKWAY OR ASSIST PEDESTRIANS AROUND WORK AREA WHEN NECESSARY. 3. WORK CREW TO COORDINATE WORK WITH PROPERTY OWNERS WHEN NECESSARY. 4. WORK HOURS ARE AS FOLLOWS 08:30 A.M. TO 3:30 P.M. 5. IF A SCHOOL IS IN PROXIMITY OF THE WORK AREA, WORK HOURS ARE AS FOLLOWS 09:00 A.M. TO 2:30 P.M. 6. WHEN PERFORMING WORK ON ROADWAYS DESIGNATED AS A BIKE ROUTE OR WHERE SEPARATE BIKE LANES ARE PRESENT, SPECIAL ATTENTION SHALL BE GIVEN TO BICYCLISTS. 7. WORK CREW TO ADJUST TRAFFIC CONTROL PER FIELD CONDITIONS. 8. REFERENCE CA MUTCD (DWG NO. 9) MODIFIED FOR THIS TCP. ADDRESS NEAREST TO WORK LOCATION: 79315 CA-111. LA QUINTA. CA 92253 Z J Q Z_ 350' J SIGN SPACING 0 0 Q W20-1 CURB OR EOP > 0 C30 (CA) C30 (CA)I BIKE LANE SC11 BIKE LANE MH#369 W20-1 C20 C20 (CA) W4 2R W11-1 I (MOD) LOCATION G20-2 (BIKE) W16-1 180, DOWNSTREAM 350' 350' 350' BIKE LANE 540' (50' MIN.) TAPER SIGN SPACING SIGN SPACING SIGN SPACING TAPER MERGING TAPER 360' BUFFER WORK AREA 50' MIN./100' MAX. ROAD LANE WORK CLOSED AHEAD W20-1 C30(CA) 0 RIGHT LAN<tvv W11-1 CLOSED AHEAD W20-5 16-1 INTERCHANGEABLE WITH C20A (CA) (USE IF APPLICABLE) QROFESS/0 ��O y N 9` F END<(1%> BIKE LANE ROAD WORK CLOSED AHEAD 29570 z G20-2 I Exp.3/31/23 M W4-2R C20 (BIKE) * 12/21/2021 ��qTF OF 1 CAL \F��\P 222' TO C/L The UPSSIoreV Marriott La QUrIId� , QBevMo! Coctco Gas St Lion a vCoral Mourrtain apartments u o Coctco who!esaleQ supercenterQ Q a Rosc D.. Wolff Waters Place " o� _ a — QQ Watercobrs At La Quinta a aca� s PROJECT LOCATION m�e� Ave 49 Are 48 Ave 48 Ranch La Ouinla or > B elg design LEGEND OTraffic Cone f Temporary Sign Direction of Travel ••••• Flashing Arrow Sign (FAS) 0 0 o FAS Support or Trailer Portable Flashing Beacon Flagger Work Area Work Vehicle OSignalized Intersection Type III Barricade with sign HLWD High Level Warning Device Frontier COMMUNICATIONS W.O.# 70058-5290516 DATE: 12/17/2021 TITLE: TRAFFIC CONTROL PLAN LOCATION: VISTA CORALINA LN & DUNE PALMS RD CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 DRAWN BY: MTCS SCALE T.G. PAGE: SHEET#: Mountain Top xxx-xx 2 OF 3 Communication Services LLC CA MUTCD (California Manual on Uniform Traffic Control Devices) Approved by the Federal Highway Administrator as the National Standard in accordance with Title 23 U.S. Code, Sections 109(d),114(a), 217,315, and 402(a), 23 CFR 655, and 49 CFR 1.48(b)(8), 1.48(b)(33), and 1.48(c)(2). CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TAPER CURB • • • • w of 0 1. WORK CREW TO UTILIZE THIS CLOSURE TO ACCESS MH#367 ON W/S/O DUNE PALMS RD, 158' N/O AVE 48 CENTERLINE. 2. WORK CREW TO MAINTAIN 4' MIN. WALKWAY OR ASSIST PEDESTRIANS AROUND WORK AREA WHEN NECESSARY. 3. WORK CREW TO COORDINATE WORK WITH PROPERTY OWNERS WHEN NECESSARY. 4. WORK HOURS ARE AS FOLLOWS 08:30 A.M. TO 3:30 P.M. 5. IF A SCHOOL IS IN PROXIMITY OF THE WORK AREA, WORK HOURS ARE AS FOLLOWS 09:00 A.M. TO 2:30 P.M. 6. WHEN PERFORMING WORK ON ROADWAYS DESIGNATED AS A BIKE ROUTE OR WHERE SEPARATE BIKE LANES ARE PRESENT, SPECIAL ATTENTION SHALL BE GIVEN TO BICYCLISTS. 7. WORK CREW TO ADJUST TRAFFIC CONTROL PER FIELD CONDITIONS. 8. REFERENCE CA MUTCD (DWG NO. 9) MODIFIED FOR THIS TCP. ADDRESS NEAREST TO WORK LOCATION: 79315 CA-111, LA QUINTA, CA 92253 rQ P Sign Of Spring Rose Dawn Costco wholesale a 9Wolff Waters Place Watercolors At La Quinta 4.1 •e ��JJ{\ g Ave 46 Ave 4 aa'un„ PROJECT LOCATION \'' J. PALMS RD (45 MPH) LEGEND O o� o _DUNE oYo Traffic Cone CURB f Temporary Sign 27 ' TO C/L 4ME Direction of Travel 00••••• Flashing Arrow Sign (FAS) w o 0 o FAS Support or Trailer CONCRETE MEDIAN ar T T Q Portable Flashing Beacon • ' 0 ® • • 12' MIN. Flagger • • • • • • • • • • • • • • • • • • • • • Work Area CURB Work Vehicle 0 MH 367 N om w om LOCATION N Ao O Signalized Intersection 350' n WORK Type III Barricade with sign SIGN SPACING �Ag AREA R 158' TO C/L HLWD High Level Warning Device 9 v� v NN O �pNESS 29570 z d Exp. 3/31 /23 M 12/21 /2021 STET C i v I t- OF CAL \F I COMMUNICATIONS W.O.# 70058-5290516 DATE: 12/17/2021 TITLE: TRAFFIC CONTROL PLAN _ LOCATION: DUNE PALMS RD & AVE 48 CITY/STATE: LA QUINTA, CA FTR ENGINEER: RAUL RIVAS (909) 406-3178 FTR INSPECTOR: MIKE REDDING (760) 352-1240 DRAWN BY: MTCS SCALE T.G. PAGE: SHEET#: Mountain Top xxx-xx 3 OF 3 Communication Services LLC City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number ENC2022-0001 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall notify the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course having an "R" value of not less than ( ** N/A **) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ❑ R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch ('/d') to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (** N/A **) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 ''/2") of A.C. paving on (** N/A **) of class (** N/A ** ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of Backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub -grade. The SC-800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of three inches (Y) of SC-800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La Quinta Standard 600 shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO. ENC2022-0001 Frontier 70058-5290416/ Access (7) Existing Manholes to Place and Splice Cable to Service 79440 Corporate Centre Dr / Washington St, Ave 48, and Dune Palms Rd In addition to the standard permit conditions, the following shall apply: 1. Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. The permittee may only work at night if approved by the City Manager. If approved by the city manager, night work may be halted if the city receives complaints about the night work. 3. Prior to commencing the excavation of a trench 5 feet in depth or greater and into which a person will be required to descend, the Contractor shall first obtain a permit to do so from the Division of Industrial Safety pursuant to 7-10.4.1. 4. This permit is for work within the R/W. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Associate Engineer) of the private land owner whom is being encroached upon. 5. The City of La Quinta reserves the right to require modifications of the work be made at permittee's sole cost for further modifications as it relates to any sight distance concerns and/or improvement plan requirements as required by the City Engineer. 6. "The permittee shall not construct an improvement that reduces vehicular sight distances. If such improvement is found to reduce the vehicular sight distance, then the permittee shall relocate the improvement prior to sign off of their encroachment permit." 7. The permittee shall not install improvements with the intention of providing video transmission services unless the permittee obtains a valid Franchise Agreement. The permittee shall remove any underground utility markings that are no longer being used for this project. The permittee shall remove markings on paved areas using high pressure wash or a method equivalent and at the discretion of the City Engineer. 9. Any asphaltic or concrete repairs shall closely match the existing paved areas in color at the discretion of the City Engineer. A finish product with a checkerboard appearance will not be accepted. 10. The permittee shall maintain the existing pedestrian path of travel and must maintain accessible compliant pathways leading to areas for use of public transportation systems. 11. No stockpiling of any materials will be allowed within the City R/W without an approved permit explicitly stating the use for stockpiling and/or storage. 12. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. Special Conditions Page 1 of 6 PERMIT NO. ENC2022-0001 Frontier 70058-5290416/ Access (7) Existing Manholes to Place and Splice Cable to Service 79440 Corporate Centre Dr / Washington St, Ave 48, and Dune Palms Rd 13. Frontier California Inc. (Harmeet Kaur), hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 14. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. 15. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097 before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection. 16. The permittee is required to provide a changeable message board informing the commuters using the affected Major and Primary Arterial roads of major construction and possible traffic delays, time of construction, and if possible alternate routes. The message board shall be provided for the commuters 48 hours prior to the start of traffic delays. 17. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. 18. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the City Traffic Signal Maintenance Division at (760) 777-7070 if signal operation at the intersection is to be altered in any way. 19. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 20. The permittee shall place temporary no parking signs along the parking area affected by the construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and removed immediately after the construction completion date. Special Conditions Page 2 of 6 PERMIT NO. ENC2022-0001 Frontier 70058-5290416/ Access (7) Existing Manholes to Place and Splice Cable to Service 79440 Corporate Centre Dr / Washington St, Ave 48, and Dune Palms Rd 21. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 811. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the following: A. Approval of the construction B. Plan identification C. Time Frame of Closure D. Alternative Routes 22. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), at residential streets, advance warning signs and traffic control shall be installed and maintained in accordance the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). On Collectors to Arterial Streets, the permittee must submit a traffic control plan which shall be from or prepared under the guidance of the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). Traffic Control plans not from the CA MUTCD or the WATCH shall be signed and stamped by a civil or traffic engineer registered in the State of California. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 23. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 24. The City of La Quinta reserves the right to require modifications of the work be made at permittee's sole cost for proper sight distance requirements per guidelines in the AASHTO "A Policy on Geometric Design of Highways and Streets, 5th Edition" or latest, in the installation of all appurtenances abutting and within the public street right-of-way. Special Conditions Page 3 of 6 PERMIT NO. ENC2022-0001 Frontier 70058-5290416/ Access (7) Existing Manholes to Place and Splice Cable to Service 79440 Corporate Centre Dr / Washington St, Ave 48, and Dune Palms Rd 25. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe random trench compaction testing performed by a city approved material testing firm. If the inspector's phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or the Associate Engineer at 777-7047 to determine the city inspector's phone number. The inspector shall determine the number and location of the test location/s. The above testing does not relieve the permittee's responsibility for future repairs due to settlement at and near the locations of the work area. Materials testing must be performed under direct supervision of a California Registered Civil Engineer. 26. The issuance of this permit and the City approval of the related construction improvement plans do not provide a vested entitlement for all design parameters that may have been utilized for the plans. As such, plans approved for this permit may be "at risk" for further modifications as it relates to any follow up improvement plan requirements as required by the city or existing errors & omissions by the architect or engineer of record. 27. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 28. The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts provided in the Engineering Bulletin for Indemnification & Insurance Requirements. This insurance shall be kept in full force and effect at all times by Applicant or Contractor during the prosecution of the permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each policy shall name the City as an additional insured. 29. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Associate Engineer) of the private land owner whom is being encroached upon. 30. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the permittee shall inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site. 31. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, a traffic control plan for review and approval prior to start of construction or parking on the paved R/W. 32. The permittee is required to provide an informative message board (approved by the City Engineer) informing the commuters using the affected Primary Arterial roads or heavier traffic of possible traffic delays, time of construction, and if possible alternate routes. The message board shall be provided for the commuters 48 hours prior to the start of traffic delays. Special Conditions Page 4 of 6 PERMIT NO. ENC2022-0001 Frontier 70058-5290416/ Access (7) Existing Manholes to Place and Splice Cable to Service 79440 Corporate Centre Dr / Washington St, Ave 48, and Dune Palms Rd 33. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 34. Access and egress to all local properties shall be maintained at all times. 35. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved 1/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000 asphalt concrete mix. The width of the cold milling area shall be as follows: • For longitudinal trenches located in a parking lane: three (3) feet outside the sawcut removal lines. • For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. • For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. Special Conditions Page 5 of 6 PERMIT NO. ENC2022-0001 Frontier 70058-5290416/ Access (7) Existing Manholes to Place and Splice Cable to Service 79440 Corporate Centre Dr / Washington St, Ave 48, and Dune Palms Rd E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 3/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 36. All landscaping, irrigation, decorative rock, decorative concrete, lighting, sidewalk, etc., shall be replaced to its original condition. 37. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 38. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 39. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 40. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 41. If it is the intent of the permittee to cut the pavement and have it restored by a third parry, the permittee shall postpone cutting the pavement until the intended third parry has acquired a permit from the City to perform the required restoration work. Special Conditions Page 6 of 6