07-2777 (RC) Title 24TITLE 24 REPORT Title 24 Report for: Calle Estado, LLC Desert Club Dr. & Calle Estado La Quinta, CA 92253 �8-n�i Ga��C �5��0 she.lo Ir��' 1' `i'i' SEP 2 0 no? I.� B; Project Designer: South West Concects p� . 78-120 Calle Estado, Suite La Quinta, CA 92253 (760) 564-4707 Report Prepared By: Tim Scott Scott Design & Title 24 77085 Michigan Dr. Palm Desert, CA 92211 (760) 200-4780 Job Number: Date: 6/13/2007 CITY OF LA QUIN' BUILDING & SAFM DE APPROVED FO CONSTRUCTION DATO LowE The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is .10horized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. 1a0 EnergyPro 4.3 by EnergySoft Job Number: _ User Number. 6712 I TABLE OF CONTENTS I J Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM Envelope Mandatory Measures Form LTG -7-C Room Cavity Ratio Worksheet Form OLTG-1-C Certificate of Compliance Form OLTG-2-C Lighting Compliance Summary Form OLTG-3-C Illuminated Area Calculation Worksheet Form LTG -MM Lighting Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary Room .Load Summary Room Heating Peak Loads Room Cooling Peak Loads Room Cooling Coil Loads 1 2 3 27 24 29 s1 32 33 34 36 49 62 75 89 I ;. EnergyPro 4.3 by EnergySoft Job Number: User Number. 6712 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHORSIGNATURE DATE OF PLANS DATE Tim Scott BUILDING CONDITIONED FLOOR AREA 9,048sy.Ft. 7 -CLIMATE ZONE 15 � BUILDING TYPE ® NONRESIDENTIAL [:] HIGH RISE RESIDENTIAL [:] HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION E] ADDITION E] EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHORSIGNATURE DATE Tim Scott The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. [—] ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to _p sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. F-1. ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ F1 ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE South West Concects LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures LTG -1, LTG -2, LTG -3 Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE Hewa Electrical Contractors MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 MECH-5 Required Forms PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE LIC. NO. DATE H & H Air Conditioning I . EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page:3 of 102 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-1� NAME Calle E DATE 6/13/2007 Building Orientation Number of Stories Number of Systems Number of Zones (N)Odeg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 9,048 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r 0 14 Standard Proposed Compliance sqft. ENERGY COMPONENT Design Design Margin 1,770 sqft. 233 sqft. Space Heating 1.46 Rear Elevation (S) 3,135 1.29 586 0.18 18.7% Space Cooling 204.60 sqft. 80 194.26 4.3% 10.34 I 9,840 Indoor Fans 53.98 sqft.21.9% 57.67 Roof -3.69 sq ft. L�sqft Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 0.00 Domestic Hot Water 16.17 16.31 -0.14 Lighting 72.981 75.14 -2.16 Receptacle 81.78 81.78 0.00 aksa�° Process 4.90 4.90 40 60 80 100 120 140 160 180 200 TOTALS: 435.87 431.34 4.53 ketu/sgft-yr' , Percent better than Standard: 1.0% ( 1.1% excluding process) Building Orientation Number of Stories Number of Systems Number of Zones (N)Odeg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 9,048 sqft. sqft. sqft. 2 0 14 5,402 131 Natural Gas sqft. Orientation Gross Area Glazing Area Glazing Ratio Front Elevation N 3,065 sqft. 1,260 sqft. 41.1% Left Elevation (E) 1,770 sqft. 233 sqft. 13.2% Rear Elevation (S) 3,135 sqft 586 sqft 18.7% Right Elevation (W) 1,870 sqft. 80 sqft . 4.3% Total 9,840 sift. 2,158 sqft.21.9% Roof 5,411 sq ft. L�sqft 0.0% Standard Proposed Lighting Power Density 1.100 W/sgft. 1.133 W/sgft. Prescriptive Env. Heat Loss 2,192 Btu/h 2,075 Btu/h Prescriptive Env. Heat Gain 226,727 Btu/h-F 217,905 Btu/h-F Remarks: - EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:4 of 102 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME DATE Calle Estado, LLC 6/13/2007 J :I TONE INFORMATION Floor Inst I ?A7lowedi.LP.tSa `'P�. j - Area LPD? C7edits:Ae Taito[e�d Fos System Name Zone Name Occupancy Type (sgtt. (Wisf) . W 1 J< 2== "' " 3 .7 1(W sfj:=`:::::...Is s N (W st] r HVAC -4 Suite 101 Comp Bldg Office 820 r r 0.794 HVAC Suite 102 Comp Bldg Office 433 .� j:�"4iii Li i,h: 1.28 �Fi i.,' $ -2 .�aL r..k s i,'r,.:'j3: Ip, 1;;., Suite 103 j 3 L ` HVAC -2.5 Bld Office Com g 484 1.28 W -:i.:: - i.. - .- ;"1a5A�0i �!i HVAC Suite 104 Comp Bldg Office 484 .. ,i,,.�,v i.j-'cv._ �--_u_:.i _�i� �•iLL—;.�i";i:4 :. F!lYJ4���': 1.28 -2 HVAC -2 Suite 105 Comp Bldg Office 433 1.2891am,L'4 HVAC 2.5 Suite 106 Com BldgOffice 578 1.28 F+'tr'_: 4: :_?!; _,r ;a',a- y� i^,•.. ' HVAC 2 Suite 107 Com BldgOffice 405 „q�,. K:u _�`�i J'�_: 1.37& rY �4:! - i!j _ HVAC -3 Suite 201 Com Bld Office 619 ii 1.05 ±;.r .',:.MIN. HVAC Suite 202 ;1=;: 'ti;i.y:;"a„-:F:•.nh:. xr-..l r;:_(;=: 1J;..F ..�.: 1 -3 Com BldgOffice 728 1.02 HVAC -3 Suite 203 Comp Bldg Office 781 :CI'''ii.{i:-y_fy'},.L'�;ri'�uki��k ��l.n .—'ry;i.�eu F•..�a. �,.. 1 4 1.271x` HVAC -4 Suite 204 Comp Bldg Office 860 j:n:�'-`'?� .i]'J..���.-il#'�� i1=I;�_ '::•ri:'r ".0 -ate. 1.264HVAC-4 Suite 205 Comp Bldg Office 1,733 0.93 :k° HVAC -3.5 Suite 206 Comp Bldg Office 690 1.07 .I :- ' i m UNION, ?a�:, ':::ya L*' 13?'i'a G�f}z •'a .. at.lk: rtti.j.!•�� i1r7� S r i! Ekj... ak�jj•Tl ,:[ .. I la'-4,I:i.} ' .A:"� Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C VIT-I6iEi::-cvs:r.•,-v F•::I: sN�!+' :5F.1rp;r "IF ;-? 4. See LTG -6-C ltemslabQverrgg bt plre pecrfalorc�umentaon•[ J (items marked with asterisk, see LTG -2 -C by others) (by others) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System "Carrier 38YRA02433" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 38YRA04833" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 38YRA03033" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 50JX0365" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 50JX0485" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 50JX0423" includes Demand Control Ventilation per Standards Section 121. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and -)cumentation for their use have been provided by the applicant. Signature or Stam .-In. - EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page:S of 102 CERTIFICATE OF COMPLIANCE ENVA -C ECT NAME Calle Estado, LLC DATE 6/13/2007 # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 1 Wall 17f 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 101 2 Wall 6 0.074 R-19 R-0.0 45 90 New 09-A5 Suite 101 3 Wall 16 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 101 4 Wall 34Q 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 101 5 Wall 1 0.074 R-19 R-0.0 270 90 New 09-A5 Suite 101 6 Wall 6 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 102 7 Wall 11 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 102 13 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 103 all 18 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 103 all 24 0.074 R-19 R-0.0 270 90 New 09-A5 Suite 103 48all oor 2 1.450 None R-0.0 270 90 New 28-A1 Suite 103 all ' 13 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 104 all 26 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 104 all 18 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 104 15 lWall J IBE 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 105 16 Wall / 11 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 105 17 Wall 114 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 106 18 Wall 3C 0.074 R-19 R-0.01 90 90 New 09-A5 Suite 106 19 Wall 1-29q 0.074 R -19I R-0.01 270 1 90 New 09-A5• Suite 106 20 Wall 9 0.074 R-19 R-0.01 90 1 90 New 09-A5 Suite 107 N, E, A, R (New, Existing, Altered, Removed) FENESTRATION SURFACES More than or equal to 10,000 sq.ft of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default LI -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors project once during construction and in the building manager's office after construction # Tvpe Area U -Fac' SHGC2 Act. Azm.. Cond. Stat. Glazing Type Location/ Comments Window Front N 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 101 Window Front N 48 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 101 3 Window Front (N) 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 101 4 Window Front N 36 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 101 5 Window Front(NE).36 2.0 0.580 116-A 0.53 116 -BI 45 New Double Non Metal Tinted Suite 101 6 Window Left E 36 0.580 116-A 0.53 116-B 90 New Double Non Metal Tinted Suite 101 7 Window Rear S 20 0.5801116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 101 8 Window Rear S 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 101 9 Window Front N 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 102 10 Window Front (N) 48 0.580 116-A 0.53 116-B - 0 New I Double Non Metal Tinted Suite 102 11 Window Front(N)/, 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 102 12 Window Rear S 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 102 13 Window Rear S 25 0.580 116-A 0.53 116-B 1 180 New I Double Non Metal Tinted ISuite 102 �1 LI -factor Type: 116-A Default Table from Standards, Table NIA Default Table from the ACM Manual Appendix, NFRC Labeled value. 2; SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 2 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 3 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 4 None 0.76 6.0 6.0 2.0 0.1 2.0 2.0 5 None / 0.76 6.0 6.0 2.0 0.1 2.0 2.0 6 None 0.76 6.0 6.0 2.0 0.1 2.0 2.0 7 None 0.76 5.0 4.0 10.0 0.1 10.0 10.0 8 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 9 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 10 None 0 0.76 8.0 6.0 2.0 0.1 2.0 2.0 11 None d 0.76 8.0 3.0 2.0 0.1 2.0 2.0 12 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 13 1 None 0.76 5.0 5.0 10.0 0.1 10.0 10.0 IINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building Is In climate zones 2 through 15 and contains an enclosed space with Floor area greater than 25,000 R2, a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 WIR2. See Section 143(c). If this box Is checked, ENV -4-C must be filled out when submitting under the Prescriptive Compliance Approach. - EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:6 of 102 1 CERTIFICATE OF COMPLIANCE ENVA -C' t ROJECT NAME DATE Calle Estado, LLC 6/13/2007 Surface # Type Area U -Fac- Insulation Cay. Cont. Act. Am. Tilt Cond. Status Joint Appendix IV Reference Location / Comments 21 Wall 4 Window 21C 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 107 22 Wall Window 19 0.074 R-19 R-0.0 270 90 New 09-A5 Suite 107 23 Roof 16 Window 61E 0.036 R-30 R-0.0 0 0 New 02-A9 Suite 201 24 Wall 17 Window 13c, 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 201 25 Wall 18 Window 6 0.074 R-19 R-0.0 45 90 New 09-A5 Suite 201 26 Wall 19 Window 124 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 201 27 Wall 20 iWindow 28 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 201 28 Roof 21 Window 72 0.036 R-30 R-0.0 0 0 New 02-A9 Suite 202 29 Wall 22 Window 6 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 202 30 Wall v 20 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 202 31 Wall .� 15 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 202 32 Floor / 28 0.037 R-19 R-0.0 0 180 New 20-A4 Suite 202 33 Roof 26 indow 78 0.036 R-30 R-0.0 0 0 New 02-A9 Suite 203 34 lWall 1 134 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 203 35 Wall 170 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 203 36 Wall 360 0.074 R-19 R-0.0 270 90 New 09-A5 Suite 203 37 Door 2 1.450 None R-0.0 270 90 New 28-A1 Suite 203 38 Floor i 26 0.037 R-19 R-0.01 0 1 180 New 20-A4 Suite 203 39 Roof 861 0.036 R-30 R-0.01 0 1 0 New 02-A9 Suite 204 40 Wall 13 0.074 R-19 R-0,01 0 1 90 New 09-A5 Suite 204 ' N, E. A, R (New, Existing, Altered, Removed) FENESTRATION SURFACES FMore than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either Issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors proiecl office during construction and in the building managers office after construction # TvDe Area U -Fac' SHGC2 Act.Cond. Am. Stat. Glazing Type Location/ Comments 4 Window Front N None 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 103 Window Front N / 48 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 103 16 Window Front N I 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 103 17 Window Rear S < 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 103 18 Window Rear S 0.1 25 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 103 19 Window Front N 21 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 104 20 iWindow Front N 5.0 5.0 481 0.5801116-A 0.53 116-B 01 New Double Non Metal Tinted Suite 104 21 Window Front N / 24 0.580 116-A 0.53 116-B 01 New Double Non Metal Tinted Suite 104 22 Window Rear S None 25 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 104 23 Window Rear S 2.0 24 0.580 116-A 0.53 116-B 180New Double Non Metal Tinted Suite 104 24 Window Front N 24 0.580 116-A 0.53 116-B ew Double Non Metal Tinted Suite 105 25 Window Front N 48 0.580 116-A 0.53 116-B Hew Double Non Metal Tinted Suite 105 26 indow Front N 240.580 116-A 0.53 116-B ew Double Non Metal Tinted ISuite 105 ((1) Ll -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. (2) SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 14 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 15 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 16 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 17 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 18 None 0.76 5.0 5.0 10.0 0.1 10.0 10.0 19 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 20 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 21 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 22 None 0.76 5.0 5.0 10.0 0.1 10.0 10.0 23 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 24 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 25 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 26 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 - 1INIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building Win climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 H2, a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 WIft2. See Section 143(c). If this box Is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach. - EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:7 of 102 1 CERTIFICATE OF COMPLIANCE ENV -1-C ROJECT NAME I Calle Estado, LLC DATE 6/13/2007 OPAQUE SURFACES Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments q,7 Window Rear S 24 0.580 116-A 0.531116-B 0.76 180 New Double Non Metal Tinted Suite 105 # Surface Tvpe Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond' Status Joint Appendix IV Reference Location / Comments 41 Wall 36 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 204 42 Door 2 1.450 None R-0.0 90 90 New 28-A1 Suite 204 43 Wall 24 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 204 44 Floor 26 0.037 R-19 R-0.0 0 180 New 20-A4 Suite 204 45 Roof 1 73 0.036 R-30 R-0.0 0 1 0 New 02-A9 Suite 205 46 Wall ! 18 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 205 47 Wall s 91 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 205 48 Wall 30 0.074 R-19 R-0.0 180 90 New 09-A5 Suite 205 49 Wall 51 0.074 R-19 R-0.0 270 90 New 09-A5 Suite 205 50 Floor 26 0.037 R-19 R-0.0 0 180 New 20-A4 Suite 205 51 Roof 69 0.036 R-30 R-0.0 0 0 New 02-A9 Suite 206 52 Wall 32 0.074 R-19 R-0.0 0 90 New 09-A5 Suite 206 53 Wall i 17 0.074 R-19 R-0.0 90 90 New 09-A5 Suite 206 54 Wall 23 0.074 R-19 R-0.01 180 90 1 New 09-A5 Suite 206 55 Wall 130 0.074 R-19 R-0.0 270 90 New 09-A5 Suite 206 56 Floor 690 0.037 R-19 R-0.0 0 180 New 20-A4 Suite 206 N. E. A. R (New, Existing, Altered, More than or equal to 10,000 sq.fl, of site -built fenestration area must include a label certificate either Issued by NFRC or provide a CEC Default Label Certificate using the default LI -factors from Standards Table 116-A and B. Certificate shall be filed in the contractor's 3roject office during construction and in the building manager's office after construction # Tvpe Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments q,7 Window Rear S 24 0.580 116-A 0.531116-B 0.76 180 New Double Non Metal Tinted Suite 105 Window Rear S) t 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 105 29 Window Front N 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 106 30 lWindow Front N 48 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 106 31 lWindow Front N 241 0.580 116-A 0.53 116-B 01 New Double Non Metal Tinted Suite 106 32 Window Left E 24 0.580 116-A 0.53 116-B 901 New Double Non Metal Tinted Suite 107 33 Window Left E) 48 0.5801116 -Al 0.53 116-B 90 New Double Non Metal Tinted Suite 107 34 Window Left E 24 0.580 116 -Al 0.53 116-B 90 New Double Non Metal Tinted Suite 107 35 Window Front N 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 201 36 Window Front N / 48 0.580 116-A 0.53 116-B 0 New I Double Non Metal Tinted Suite 201 37 Window Front N 24 0.580 116-A 0.53 116-B 0 New I Double Non Metal Tinted Suite 201 38 lWindow Front NE 36 0.580 116-A 0.53 116-B 45 New Double Non Metal Tinted Suite 201 39 lWindow Left (E) / 361 0.580 116-A 0.53 116 -BI 90 New I Double Non Metal Tinted I Suite 201 1 U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116.8 Default Table from Standards, COG Center of Glass. NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 27 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 28 None 0.76 5.0 5.0 10.0 0.1 10.0 10.0 29 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 30 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 31 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 32 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 33 None 0.76 8.0 6.0 10.0 0.1 10.0 10.0 34 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 35 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 36 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 37 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 38 None 0.76 6.0 6.0 2.0 0.1 2.0 2.0 39 None 0.76 6.0 6.0 2.0 0.1 2.0 2.0 IINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 fl2, a lighting of at least 0.5 WHIZ See Section 143(c). If this box Is checked, ENV -4-C must be filled out. when submitting under the Pin greater than 15 feet, and an LPD for general pllance Approach. - EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:8 of 102 1 CERTIFICATE OF COMPLIANCE ENV -1 - 'NAME Calle Estado, LLC E SURFACES DATE 6/13/2007 N, E. A. R (New, Existing, Altered, Removed) FENESTRATION SURFACES l�i More than or equal to 10,000 sq.R of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default 1.1 -factors from F -I I CMmn tenAec Tehlo 4-A - n f eAifin�le ehell he fileA in the trortne, nmlert Mr.- A. Ann -t in 1he N,llAinn -n-e, nffiw neer nnnet-n..n # TvPe Area U -Fac? SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments <. Window Rear S None 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 201 Window Front N , 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 202 42 Window Front N i 48 0.580 116-A 0.53 116-8 0 New Double Non Metal Tinted Suite 202 43 Window Front N 0.76 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 202 44 Window Rear S 0.1 30 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 202 45 Window Rear S 47 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 202 46 Window Front (N J 24 0.580 116-A 0.53 116-B 0 New In Suite 203 47 Window Front N 4.0 48 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 203 48 Window Front N None 24 0.580 116-A 0.53 116-B N, E. A. R (New, Existing, Altered, Removed) FENESTRATION SURFACES l�i More than or equal to 10,000 sq.R of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default 1.1 -factors from F -I I CMmn tenAec Tehlo 4-A - n f eAifin�le ehell he fileA in the trortne, nmlert Mr.- A. Ann -t in 1he N,llAinn -n-e, nffiw neer nnnet-n..n # TvPe Area U -Fac? SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments <. Window Rear S None 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 201 Window Front N , 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 202 42 Window Front N i 48 0.580 116-A 0.53 116-8 0 New Double Non Metal Tinted Suite 202 43 Window Front N 0.76 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 202 44 Window Rear S 0.1 30 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 202 45 Window Rear S 47 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 202 46 Window Front (N J 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 203 47 Window Front N 4.0 48 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 203 48 Window Front N None 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 203 49 Window Rear S 2.0 24 0.580 116 -Al 0.53 116-B 180 New Double Non Metal Tinted Suite 203 50 Window Rear S / 30 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 203 51 Window Front N 24 0.580 116 -Al 0.53 116-B 0 New Double Non Metal Tinted Suite 204 52 Window Front N 48 0.5801116 -Al 0.53 116-B 0 New Double Non Metal Tinted Suite 204 1 1.1 -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 40 None 0.76 8.0 3.0 10.0 0.1 10.0 10.0 41 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 42 None • 0.76 8.0 6.0 2.0 0.1 2.0 2.0 43 None 0.76 8.0 3.0 2.0 0.1 • 2.0 2.0 44 None 0.76 5.0 6.0 4.0 0.1 4.0 4.0 45 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 46 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 47 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 48 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 49 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 50 None 0.76 5.0 6.0 4.0 0.1 4.0 4.0 51 None 0.76 8.0 3.0 2.0 0.1 ' 2.0 2.0 52 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 IINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building is in climate zones 2 through 15 and contains an enclosed space with Floor area greater than 25,000 R2, a 1 lighting of at least 0.5 W/ft2. See Section 143(c). If this box Is checked, ENV4-C must be filled out. when submitting under the Pre: Run Initiation Time: 06/13/07 13:20:10 Run Code: EnergyPro 4.3 by EnergvSoft User Number. 6712 Job Number: greater than 15 feet, and an LPD for general of 102 ,CERTIFICATE OF COMPLIANCE ENV -1 -C ROJECT NAME DATE 1 Calle Estado, LLC 6/13/2007 Surface Insulation Act. Cond' Joint Appendix # - Type Area U -Fac. Cay. Cont. Am. Tilt Status IV Reference Location/ Comments N. E, A, R (New, Existing, Altered, Removed) FENESTRATION SURFACES 171 More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either Issued by NFRC or provide a CEC Default Label Certificate using the default 1.1 -factors from Standards Table 116-A and B. Certificate shall be filed In the contractors project office durinq construction and In the building manager's office after construction # T e Area U -Fac? SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments 53 Window Front N e 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 204 Window Rear S 4.0 30 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 204 -55 Window Rear S 4.0 24 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 204 56 Window Front N 0.76 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 205 57 Window Front N 0.1 481 0.580 116 -Al 0.53 116 -BI 0 New Double Non Metal Tinted Suite 205 58 Window Front N 60 241 0.580 116-A 0.53 116-B 0 New I Double Non Metal Tinted Suite 205 59 Window Front N 8.0 3.0 241 0.580 116-A 0.53 116-B 0 New I Double Non Metal Tinted Suite 205 60 Window Front N 4.0 48 0.580 116-A 0.53 116-B 0 New I Double Non Metal Tinted Suite 205 61 Window Front N None 24 0.580 116-A 0.53 116-B 0 New Double Non Metal Tinted Suite 205 62 Window Left E 30 0.580 116-A 0.53 116-B 90 New Double Non Metal Tinted Suite 205 63 Window Rear S 48 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 205 64 Window Rear S 25 0.580 116-A 0.53 116-B 1 180 New Double Non Metal Tinted ISuite 205 65 lWindow, Left E 18 0.5801116 -Al 0.53 116-B 1 90 New Double Non Metal Tinted I Suite 206 (1) U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 53 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 54 None 0.76 5.0 6.0 4.0 0.1 4.0 4.0 55 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 56 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 57 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 58 None 0.76 8.0 3.0 -2.0 0.1 2.0 2.0 59 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 60 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 61 None 0.76 8.0 3.0 2.0 0.1 2.0 2.0 62 None 0.76 1 5.0 6.0 4.0 0.1 4.0 4.0 63 None 0.76 8.0 6.0 4.0 0.1 4.0 4.0 64 None 0.76 5.0 5.0 4.0 0.1 4.0 4.0 65 None 0.76 11NIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1-1 The proposed building Is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2,.a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 WIft2. See Section 143(c). If this box Is checked, ENV -4-C must be filled out when submitting under the Prescriptive Compliance ADoroach. I- EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page: 10 of 102 1 CERTIFICATE OF COMPLIANCE ENV -1-C PROJECT NAME DATE Calle Estado, LLC 6/13/2007 160AQUE SURFACES # Surface Insulation Act. Con& Joint Appendix Type Area U -Fac. Cay. Cont. Am. Tilt Status IV Reference Location / Comments ' N. E, A. R (New, Existing, Altered, Removed) FENESTRATION SURFACES FIMore than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default 1.1 -factors from Standards Table 116-A and B. Certificate shall be filed in the contractor's Prolecl office durinq construction and in the buildinq managers office after construction # Type Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments L,;p Window Left E 18 0.580 116-A 0.53 116-B 90 New Double Non Metal Tinted Suite 206 Window Rear S 18 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 206 08 Window Rear S 18 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 206 69 Window Rear S 18 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 206 70 Window Rear S 181 0.580 116-A 0.53 116 -BI 180 New Double Non Metal Tinted Suite 206 71 Window Rear S 18 0.580 116-A 0.53 116-B 180 New Double Non Metal Tinted Suite 206 72 Window Right W 16 0.580 116-A 0.53 116-B 270 New Double Non Metal Tinted Suite 206 73 Window Right W 48 0.580 116-A 0.53 116-B 270 New Double Non Metal Tinted Suite 206 74 Window Right. W 16 0.580 116-A 0.53 116-B 270 New Double Non Metal Tinted Suite 206 1 LI -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 66 None 0.76 67 None 0.76 68 None 0.76 69 None 0.76 70 None 0.76 71 None 0.76 72 None 0.76 8.0 2.0 10.0 0.1 10.0 10.0 73 None 0.76 8.0 6.0 10.0 0.1 10.0 10.0 74 None 0.76 8.0 2.0 10.0 0.1 10.0 10.0 -IINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES - The proposed building is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 fit, a calling height greater than 15 feet, and an LPD for general lighting of at least 0.5 W/ft2. See Section 143(c). If this box is checked, ENV -4-C must be Filled out. when submifting under the Prescriptive Compliance Approach. - EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page: 11 of 102 1 ICERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C I PROJECT NAME DATE �.I Calle Estado, LLC 1 6/13/2007 11NSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) PORTABLE LIGHTING (From LTG -3-C) LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING.METHOD (From LTG -5-C) ❑ AREA CATEGORY METHOD (From LTG -5-C) ❑ TAILORED METHOD (From LTG -5-C) LI PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED LIGHTING POWER INSTALLED WATTS 10j61 87 0 10,248 0 0 0 ALLOWED WATTS 10,248 ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) o MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION CONTROL CONTROLTYPE IDENTIFICATION (Auto Time Switch, Dimming, etc.) Check if SPACE CONTROLLED Daylighting NOTES TO FIELD - For Building Department Use Only :...:. _ ��. .....u. .. :...�—:..::..._._.a- __...� - - - t' -'•: i .:+ -W iii': T_, _. _... ........m r _ _.u..__--'. .!,•n:::-.. ,.. i.x4r-�m:-:: ___.-..-.t..-e .. .�`.. .......: ..!:. ...:.... .. ....:..,_.::..�::-:.�... _- _ ___ _-_ _ _ _ .—.�=ii:-:-. �: - +. t. u: u '�i';: "'i!•, E -i<J"•� . _ _.....-- - .... +.. _1. - -- --.. .. _ _ .....-....,...:... �.._... ..._. _.. .... _.�.._+. _ � :Eau ::;'_:=�: �:i'i_ _- j Run Initiation Time: 06/13/07 13:20:10 Run Code: 1181766010 EnergyPro 4.3 by Energy5oft User Number: 6712 Job Number: Page:12 of 102 CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG -1-C PROJECT NAME Calle Estado, LLC DATE 6/13/2007 esigner: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the .building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department that: A. Certifies. plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Description Test Performed By: O .LTG -2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance I - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing O LTG -3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing I EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page: 13 of 102 1 CERTIFICATE OF COMPLIANCE MECH-1-C NAME Calle Estado, LLC DATE 6/13/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operatinq and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit'serves 5, 000 112 of space or less and 25% or more of the ducts are in nonconditioned or semicondifioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls Installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 BfWhr. -Water-loop Heat Pump Controls Applies to all new waterioop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. •E ui ment requiring acceptance testing EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page: 14 of 102 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C I.I_1i<il:4 Calle Estado. LLC INSTALLED LIGHTING POWER FOR CONDITIONED SPACES DATE 6/13/2007 Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Name Type Description �3 CD � cdc 333 m m o 3m 'O m cmc '3 3'y� m m o c �� N cu v cn •J Yeal No r Z �.°3Q <D c u, xwCD `� N d Metallux 2G-3-32ED F3 T8 3 32 1.5 93.0 X 105 9 765 Metallux 6313 1 30 1.0 29.0 X 4. 116 Portfolio C6032 FTR32WGX24 -3 1 32 1.0 35.0 X 8 280 PAGE TOTAL 10 161 BUILDING TOTAL (sum of all pages) 10,161 PORTABLE LIGHTING (From LTG -3-C) 87 CONTROL CREDIT (From LTG -4-C) Q ADJUSTED ACTUAL WATTS 10 248 I _ EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page: 15 of 102 1 PORTABLE LIGHTING WORKSHEET LTG -3-C ECT NAME Calle Estado, LLC DATE 6/13/2007 ITABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET I A B C D ROOM # DEFAULT OR ZONE ID Wls ft AREA TOTAL WATTS SF B X C Suite 102 0.2• 433 87 G ROOM # OR ZONE ID PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTSPER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) Suite 104 484 1 484 TOTALI 433 87 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B BUILDING TOTAL C D E F G ROOM # OR ZONE ID PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTSPER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) Suite 104 484 1 484 Suite 105 433 1 1 433 Suite 106 578 1 578 ite 107 405 1 405 •;iuite 201 619 1 619 Suite 202 728 1 728 Suite 203 1 1 781 1 1 781 Suite 204 860 1 860 TOTAL 4,888 0 TABLE 3 - PLANS SHOW PORTABLE LIGHTING IS NOT RE UIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # TOTAL AREA OR ZONE ID (SF) TOTALI 0 Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details include luminalre types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 7,744 87 L EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page: 16 of 102 1 PORTABLE LIGHTING WORKSHEET LTG -3-C NAME Calle Estado, LLC DATE 6/13/2007 (TABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B C D ROOM # OR ZONE ID DEFAULT /s ft AREA TOTAL WATTS SF B X C G ROOM # OR ZONE ID PORTABLE LIGHTING Descri tion # OF FIXT. LUMIN. WATTS PER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) Suite 205 1,733 1 1.733 Suite 206 690 1 1 690 TOTAL 0 1 0 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B 7,744 C D E F G ROOM # OR ZONE ID PORTABLE LIGHTING Descri tion # OF FIXT. LUMIN. WATTS PER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) Suite 205 1,733 1 1.733 Suite 206 690 1 1 690 TOTAL 2.423 0 ROOM # TOTAL AREA OR ZONE ID (SF) TOTALI 0 BUILDING SUMMARY - PORTABLE LIGHTING Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details include luminaire types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 7,744 87 l EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:17 of 102 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C NAME Calle Estado, LLC ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation juct Insulation PRESCRIPTIVE MEASURES DATE 6/13/2007 AIR SYSTEMS, Central or Single Zone HVAC -4 HVAC -2 HVAC -2.5 1 1 1 Reference on Plans or Specification 1 112(a) 8.60 HSPF 7.50 HSPF 7.70 HSPF 112(a) 12.5 SEER / 10.8 EER 12.5 SEER / 10.9 EER 12.3 SEER / 10.7 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121 b 123 cfm 108 cfm 121 cfm 121 c No No No 121(c) Yes Yes Yes 121(c), 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Require Heating & Cooling Required 122 Auto Auto Auto 122(g) n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. 144 a & b n/a n/a n/a 144 a & b 29,355 btuh 14,990 btuh 18,737 btuh 144 a & b n/a n/a n/a 144 a & b 29,312 btuh 17,616 btuh 21,538 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c) 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144(f) Constant Temp Constant Temp Constant Temp 144 k No No No -I.— 11c1nzm� n�.vn.nn W— r -...a... nnon�ccnnn I EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page: 18 of 102 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI PROJECT NAME DATE '1 Calle Estado, LLC 1 6/13/2007 ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation )uct Insulation PRESCRIPTIVE MEASURES AIR SYSTEMS, Central or Single Zone HVAC -2 HVAC -2 HVAC 2.5 1 1 1 Reference on Pians or Specification t 112(a) 7.50 HSPF 7.50 HSPF 7.70 HSPF 112(al 12.5 SEER / 10.9 EER 12.5 SEER / 10.9 EER 12.3 SEER / 10.7 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121 b 121 cfm 108 cfm 144 cfm 121 c No No No 121c Yes Yes Yes 121(c).122(e) . P roq ram mable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Auto Auto Auto 122(g) n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. 144 a & b n/a n/a n/a 144 a & b 14,990 btuh 14,990 btuh 18,737 btuh 144 a & b n/a n/a n/a 144 a & b 18,790 btuh 18,760 btuh 22,916 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page: 19 of 102 1 AIR SYSTEM REQUIREMENTS . Part 1 of 2 MECH-2-C ROJECT NAME Calle Estado, LLC ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation )uct Insulation PRESCRIPTIVE MEASURES DATE 6/13/2007 AIR SYSTEMS, Central or Single Zone HVAC 2 HVAC -3 HVAC -3 1 1 1 Reference on Plans or Specification I 112(a) 7.50 HSPF 7.10 HSPF 7.10 HSPF 112 a 12.5 SEER / 10.9 EER 12.0 SEER / 10.5 EER 12.0 SEER / 10.5 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121 b 101 cfm 155 cfm 182 cfm 121 c No No No 121 c Yes Yes Yes 121(c), 122(e) Pro rammable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Require 122 Auto Auto Auto 122(g) n/a n/a n/a 123 124 1 R-4.2 I R-4.2 R4.2 Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydropic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is; Constant -Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. 144 a & b n/a n/a n/a 144 a & b 14,990 btuh 21,860 btuh 21,860 btuh 144 a & b n/a n/a n/a 144 a & b 18,765 btuh 26,872 btuh 26,916 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144(f) Constant Temp Constant Temp Constant Temp 144 k No No No AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C „I_PROJECT NAME ("ally Fctarin I I C ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation )uct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance DATE 6/13/2007 AIR SYSTEMS Central or Single Zone HVAC -3 HVAC -4 HVAC -4 1 1 2 Reference on Plans or Specification 1 112(a) 7.10 HSPF 7.20 HSPF 7.20 HSPF 112(a) 12.0 SEER / 10.5 EER 12.0 SEER / 10.5 EER 12.0 SEER / 10.5 EER 112(b) Yes Yes Yes 112(c), 115(a),n/a 27,047 btuh n/a n/a 121(b) Yes Yes Yes 121 b 195 cfm 215 cfm 433 cfm 121 c No No No 121 c Yes Yes Yes 121(c), 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Require 122 Auto Auto Auto 122(g) n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 21,860 btuh 29,355 btuh 58,710 btuh 144 a & b n/a n/a n/a 144 a & b 27,047 btuh 37,514 btuh 74,956 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/K in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. v I L;0 1 V FIGLU - Fur I UIIUI11u IJ CIJat UI1V11L UW! VIIIV i Run Initiation Time: 06/13/07 13:20:10 Run Code: 1181766010 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Paae:21 of 102 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C ECT NAME DATE Calle Estado, LLC I 6/13/2007 ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS Central or Single Zone HVAC -3.5 1 T-24 MANDATORY MEASURES Section Reference on Plans or Specification 1 Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation duct Insulation 112(a) 7.20 HSPF 112 a 12.0 SEER / 10.4 EER 1112(b) Yes 112(c), 115(a) n/a 121(b) Yes 121 b 172 cfm 121 c No 121 c Yes 121(c), 122(e) Programmable Switch 122(e) Heating & Cooling Required 122 Auto 122(g) n/a 123 124 R-4.2 PRESCRIPTIVE MEASURES ' Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 144 a & b n/a 144 a & b 25,607 btuh 144 a & b n/a 144 a & b 32,259 btuh 144 c Constant Volume 144 c 144 c Yes 144 d No 144 a No Economizer 144 Constant Tem 144(l) Constant Temp 144 k No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. I- EneravPro 4.3 by EneravSoft User Number: 6712 Job Number: Page: 22 of 102 1 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2. MECH-2-C PROJECT NAME DATE x Calle Estado, LLC 1 6/13/2007 2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops = ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specificationl Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 144 (a & b) 113 b 113 (c) 144 (a & b) 114 b 115 (c) 144 h 144 h 144 (1 144 ' 144 0) 144 ' 144 0) 144 ' 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph } number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW Heater Number of Systems 2 MANDATORY MEASURES Reference on Plans or Specification' Water Heater Certification Water Heater Efficiency Service Water Heating Installation Pool and Spa Efficiency and Control Pool and Spa Installation Pool Heater - No Pilot Light Spa Heater - No Pilot Light 113 (a) 113 b 113 (c) 114 a 114 b 115 (c) 115 d AO SMITH ELJF-10 99% n/a n/a n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page:23 of 102 MECHANICAL VENTILATION MECH-3-C NAME Calle Estado, LLC DATE 6/13/2007 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121 1b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I I J K L M N ZONEISYSTEM 1 TNa ... N w.00 f(DmT 10 0 W X Dn m3 OQ ID o r(D,0 r7i !D '� 7^9 M0 Xrt �yA OX G n� � T... rn nEC 0M TfA O MO �W NX w3m 07X O iw OX - -n- � � 7 N r D Suite 101 82 0.15 123 123 123 HVAC -4 Total 123 123 Suite 102 43 0.15 65 65 108 HVAC -2 Total 65 108 uite 103 1 481 0.15 73 73 121 HVAC -2.5 I Total 73 121 Suite 104 484 0.15 73 73 121 HVAC -2 Total 1 73 121 Suite 105 43 0.15 65 65 108 HVAC -2 Total 65 108 uite 106 57E 0.15 87 87 144 HVAC 2.5 Total 87 144 Suite 107 405 0.15 61 61 101 HVAC 2 Total 61 101 Suite 201 61S 0.151 93 93 155 HVAC -3 Total 93 155 Suite 202 72E 0.15 109 109 182 HVAC -3 Total 109 182 Suite 203 78 0.15 117 117 195 HVAC -3 Total 117 195 Suite 204 86q 0.15 129 129 215 HVAC -4 Total 129 215 Suite 205 1,733 0.15 260 260 433 HVAC -4 Total 260 433 Suite 206 69C 0.15 104 104 172 C Minimum ventilation rate perSection 121 Table 121-A E Based on toted seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D VA. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G)._ I Must be greater than orequal to H or use Transfer Air column N to make up the difference. J Design fan supply dm Fan CFM x 30%; or K Condition area (ft. sq.) x 04 cfm/fL sq.; or L Maximum of Columns H, J, K or 300 dm M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page: 24 of 102 MECHANICAL VENTILATION MECH-3-C ECT NAME Calle Estado. LLC DATE 6/13/2007 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) :Y BASIS VAV MINIMUM G H I J K L M N n 2-+ m� �Iy -n _No A � SO L C)m DIC O c�M o �� 0 'O 0 �� 3x -p O xA �O 4+3d '0 T=om m m> 09 -I > y Total 104 1721 1 cu ant load fore ress purposes fors aces without fixed seating. A or OCCUPANCY BASIS column D or G). N. -sign Minimum Air (column M). Where required, transfer air must be greater than or equal lumn M), column H - M. Job Number. Page: 25 of 102 ECHANICAL EQUIPMENT DETAILS )JECT NAME Calle Estado. LLC 1 I GR AMn Tr)WFR SUMMARY Part 1 of 2 MECH-5-C DATE 6/13/2007 MULTI -FAMILY CENTRAL WATER HEATING DETAILS Efficiency Tons PUMPS System Name System Type Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control 2 5,120 10 New 0.95 n/a n/a Carrier 38YRA02433 Packa ed DX rrier 50JX0485 800 0.25 64.0% 97.0% Packaged DX rrier 50JX0423 Carrier 38YRA03033 Constant Volume Packaged DX 1,000 0.33 64.0% 97.0% none Carrier 50JX0365 Constant Volume Blow -Through 1,200 0.33 64.0% 97.0% none DHW BOILER SUMMARY MULTI -FAMILY CENTRAL WATER HEATING DETAILS Energy Factor I or RE Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input Vol.Condition (Gals.) Status Ext. R -Val. O SMITH ELJF-10 Small Elec. All Pipes Ins 2 5,120 10 New 0.95 n/a n/a Carrier 38YRA02433 Packa ed DX rrier 50JX0485 800 0.25 64.0% 97.0% Packaged DX rrier 50JX0423 Carrier 38YRA03033 Constant Volume Packaged DX 1,000 0.33 64.0% 97.0% none MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Piping Len th ft Control # HP Type In Plenum Outside Buried 0.0 Split DX rrier 3BYRA03033 0.0 7.10 HS 3 47,000 0.0 Split DX rrier 50JX0365 0.0 7.20 HS Carrier 38YRA02433 Packa ed DX rrier 50JX0485 800 0.25 64.0% 97.0% Packaged DX rrier 50JX0423 rrier 38YRA04833 Aux. kW ' Eff. 1 47,000 0.0 Split DX rrier 38YRA02433 0.0 7.50 HS 2 30,000 0.0 Split DX rrier 3BYRA03033 0.0 7.10 HS 3 47,000 0.0 Split DX rrier 50JX0365 0.0 7.20 HS Carrier 38YRA02433 Packa ed DX rrier 50JX0485 800 0.25 64.0% 97.0% Packaged DX rrier 50JX0423 Carrier 38YRA03033 Constant Volume Packaged DX tv Out ut I Aux. kW ' Eff. 1 47,000 0.0 8.60 HS 4 24,000 0.0 7.50 HS 2 30,000 0.0 7.70 HS 3 35,000 0.0 7.10 HS 3 47,000 0.0 7.20 HS 1 41,000 0.0 7.20 HS 47,500112.5 SEER / 10.8 EE 24,000 12.5 SEER / 10.9 EE 28,600 12.3 SEER / 10.7 EE 35,00 12.0 SEER / 10.5 EE 48,000 12.0 SEER / 10.5 EE 41,500 12.0 SEER / 10.4 EE Add 1/2" Insulation Condition Status Economizer 1 New No Economizer New No Economizer New No Economizer New No Economizer New No Economizer New No Economizer CENTRAL SYSTEM FAN SUMMARY • QIIOOI V CAW OCTIIOKI CAW System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. Carrier 38YRA04833 Constant Volume Draw -Through 1,600 0.50 76.0% 97.0% none Carrier 38YRA02433 Constant Volume Draw -Through 800 0.25 64.0% 97.0% none Carrier 38YRA03033 Constant Volume Draw -Through 1,000 0.33 64.0% 97.0% none Carrier 50JX0365 Constant Volume Blow -Through 1,200 0.33 64.0% 97.0% none Carrier 50JX0485 Constant Volume Blow -Through 1,600 0.50 76.0% 97.0% none Carrier 50JX0423 Constant Volume Blow -Through 1,400 0.50 76.0% 97.00% none Run Initiation Time: 06/13/07 13:20:10 Run Code: 1181766010 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page:26 of 102 ENVELOPE MANDATORY MEASURES ENV - NAME Calle Estado, LLC DATE 6/13/2007 DESCRIPTION Designer Enforcement _ a§118(,) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. X❑ §117(,) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. R§ 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except.for unframed glass doors and fire doors). ® § 116(a)1 Manufactured Doors and Windows Installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. X❑ §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have Insulation with an installed R -value of no less than R-13 between framing members. EnergyPro By EnergySoft User Number: User Job Number: Page:27 of 102 BROOM CAVITY RATIO WORKSHEET (RCR>=3.5) LTG -7-C NAME Calle Estado, LLC ATION AUTHOR ANGULAR SPAC DATE A B C D E F Room Name Task/Activity Description Room Length (L) ft Room Width (W) ft Room Cavity Height (H) (ft) Room Cay. Ratio 5xHx(L+W) /(LxW) A B C D E F Room Name Task/Activity Description Room Area (A) (SD Room Perimeter (P) (ft) Room Cavity Height (H) (ft) Room Cay. Ratio 2.5 x H x P /A 4.3 by EnergySoft User Number: 6712 Job Number: Page:28 of 102 CERTIFICATE OF COMPLIANCE (Part 1 of 2) OLTG-1-C .PROJECT NAME DATE Calle Estado, LLC 6/13/2007 PROJECT ADDRESS a.r. . Desert Club Dr. &Calle Estado La Quinta u?i�° PRINCIPAL DESIGNER - LIGHTING TELEPHONE liid; "� - J " Hegge Electrical Contractors (760) 775-4855: u' DOCUMENTATION AUTHOR TELEPHONE •� Scott Design & Title 24 (760) 200-4780ato GENERAL INFORMATION DATE OF PLANS OUTDOOR LIGHTING ZONE LZ1 LZ2 [XI LZ3 EJ LZ4 FUNCTION TYPE © OUTDOOR LIGHTING OUTDOOR SIGNS INDOOR SIGNS PHASE OF CONSTRUCTION ® NEW CONSTRUCTION a ADDITION F-� ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE Tim Scott The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6. • )lease Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE DATE Hegge Electrical Contractors LIGHTING COMPLIANCE FORMS $ WORKSHEETS Check box if worksheet is included ®OLTG-1-C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 maybe incorporated in schedules on the p Either LTG -1-C or OLTG-1-C may be used for signs as follows: 1. Use LTG -1 -C if the project consists solely of indoor signs. 2. Use LTG -1-C if the project consists of indoor lighting, outdoor or indoor signs, but no other outdoor lighting. 3. Use OLTG-I-C if the project consists solely of outdoor signs. 4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indoor lighting. ❑x OLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances (Except Signs). OLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations. L]OLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and externally illuminated signs, for both indoor and outdoor signs. EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:29 of 102 ans. CERTIFICATE OF COMPLIANCE (Part 2 of 2) OLTG-1-C NAME Calle Estado, LLC d 1 Plans Sh w that Outdoo L' ht' Meets Allowed Li htin P DATE 6/13/2007 LIq tin C e U eS On O r IksInM ❑ Lighting power allowance for general site Illumination on OLTG-2-C Part 1 of 4 ❑X Not Applicable ❑ ❑X Lighting power allowance for local ordinances or for security multipliers on OLTG-2-C Part 2 of 4 Not Applicable ❑X ❑ Lighting power allowances for specific applications, other than vehicle service stations with canopies on OLTG-2-C Part 3 of 4 Not Applicable ❑ X❑ Lighting power allowances for vehicle service station canopies on OLTG-2-C part 4 of 4 Not Applicable ❑ a Sign lighting compliance on OLTG-4-C Not Applicable Mandatory Measures on Plans Show that Outdoor Lighting Meets Outdoor Lighting Controls And Fguji3Mej3t OInstalled ❑ lighting power has been determined in accordance with Section 130(c)1 Not Applicable EX -1 ❑ All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumins per Watt or are controlled by a motion sensor per Section 132(a) Not Applicable aAll Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements of Section 132(b) Not Applicable aAll ❑ permanently Installed outdoor lighting meets the control requirements of Section 132(c)1 Not Applicable QBuilding ❑ facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements of Section 132(c) Not Applicable MANDATORY AUTOMATIC CONTROLS 'EST OT jN(,a,ysglr( �.FIEtD]..,; CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) AREA CONTROLLED EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page: 30 of 102 SLIGHTING COMPLIANCE SUMMARY (Part 3 of 4) OLTG-2-C' I.Prolect Name Calle Estado, LLC Date 6/13/2007 LIGHTING POWER ALLOWANCE FOR SPECIFIC APPLICATIONS able 147-B - Other than Vehicle Station without Canopies Allotted Watts Luminaire Lam s/Ballasts I Desi n Watts A B C I D E F G H I J K I L IM N 0 P Lighting Application Category (Table 147-13) r D 'Oa�?'xM >�N a T D rma ma r �'a D xM a n m i o A Description vrr �C �o °; X01 va ®'o 3.-a 5 d. o m m n a v v `; r- 03 3y 3� d, o m m r 3 3 ' d M i'o � n n v X rz �a� mm y° XMEr z m n 3n o,0 va ° m it Ext Task 1,87 0.35 655 50w Low Voltage Halogen 50 Watt 1 50 1.0 54.0 X 8 43 43 Ext Task 27 38.50 10,626 50w Low Voltage Halogen L 5BrWatt 1 50 1.0 54.0 X 18 97 97 Lamp EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page: 31 of 102 1 ILLUMINATED AREA CALCULATION WORKSHEET (Part 3 of 5) OLTG-3-C PROJECT NAME Calle Estado, LLC �. Outdoor Sales Lot Frontage and Sales Lot Area DATE 6/13/2007 A B C D E F G H = Gross Illuminated Area (sq. ft.) If an Outdoor Sales Frontage Allotment was used, subtract that area from the Gross Illuminated Area Overlapping Areas of Another Application Sales Lot Area (A - F - G) Mounting height of Sales Frontage Luminaires (feet) 3 x B Distance (Inpia view) from the frontagge luminaire to fron edge of Sales Lot Sales Lot Frontage Length (feet) Sales Frontage Area (C - D) x E (sq. ft.) Area for which Illumination is Net Area Obstructed by Available for Other Objects Facade Designated Name Gross Area Areas covered and Area Not Sub total Ligghtin } and Orientation Length Height (B x C) by signs Illuminated (E + F) (D -G Ext Task 1 156 1 12 1 1.872 0 0 1.872 ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. U Section 147 (c)2 B - Measured in plan view, only Illuminated sections of outdoor sales frontage areas tnat are Immediately adjacent to the principle viewing location and unobstructed viewing length, and are within 3 mounting heights of the frontage have been used. Luminaires qualifying for this allowance are located in plan view between the 3 principle viewing location and the frontage sales. gilding Facade Area A B C D E F G H Areas (SF) to Subtract from within the Illuminated Area Area for which Illumination is Net Area Obstructed by Available for Other Objects Facade Designated Name Gross Area Areas covered and Area Not Sub total Ligghtin } and Orientation Length Height (B x C) by signs Illuminated (E + F) (D -G Ext Task 1 156 1 12 1 1.872 0 0 1.872 Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ] Section 147 (c)2 A - Only facades areas that are illuminated without obstruction or interference, by one or more luminaires, have been used. EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number. Page:32 of 102 1 LIGHTING MANDATORY MEASURES LTG -MM -1PROJECT NAME Calle Estado, LLC DATE 6/13/2007 DESCRIPTION Designer Enforcement F§131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X❑ §131(d)2Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. F§111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. F§132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. 0 §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - j ceiling walls. F§131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. a §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. i EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page:33 of 102 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM ECT NAME Calle Estado, LLC DATE 6/13/2007 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies § 111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. R§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. RX § 124 Air handling duct systems shall be Installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls § 122(e) Each space conditioning system shall be installed with one of the following: a§ 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and vyeekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 122 e 1 B An occupancy sensor to control the operating g period of the system; or F§ 122(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the system. X § 122(e)2 Each space conditioning system shall be Installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. F§ 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with Isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other Isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling Is shut off or reduced to a minimum. 0 § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be Installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: Page: 34 of 102 MECHANICAL MANDATORY MEASURES Part'2 of 2 MECH-MM NAME Calle Estado, LLC DATE 6/13/2007 Description Designer Enforcement Ventilation a§ 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers Interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. 0 § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air openings. R§ 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or § 121(f)4 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is Installed, It shall have a control capable of automatically turning off the circulating pump(s) when hot water Is not required. 0 § 113(c) Lavatories In restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro By EnergySoft User Number: User Job Number: Page:35 of 102 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Calle Estado, LLC 6/13/2007 kSTEM NAME FLOOR AREA HVAC -2.5 484 ENGINEERING CHECKS ISYSTEM LOAD Number of Systems 1 Heating System Output per System 30,000 Total,Output (Btuh) 30,000 Output (Btuh/sgft) 62.0 Cooling System Output per System 28,600 Total Output (Btuh) 28,600 Total Output (Tons) 2.4 Total Output (Btuh/sqft) 59.1 Total Output (sgft/Ton) 203.1 Air System CFM per System 1,000 Airflow (cfm) 1,000 Airflow (cfm/sgft) 2.07fml Airflow (cTon) 419.6 Outside Air (%) 12.1 Outside Air (cfm/sgft) 0.25 I Note: values above aiven at ARI conditions 26.0 OF Outside �� 121 cfm 69.5 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent CFM I Sensible 1,196 17,886 2,209 924 11,115 0 894 556 0 0 12 4,785 1,382 121 5,599 0 0 894 556 24,4651 3,592 17 825 Carrier 38YRA03033 21,538 4,356 18,737 Total Adjusted System Output 21,538 4,356 18,737 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am earn Temperatures at Time of Heatina Peakl 64.2 OF 81.8 OF Heating Coil Supply Fan 1000 cfm 81.8 of Supply Air Ducts 81.3 of ROOMS 70.0 of h Return Air Ducts 4 DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0/77.90F 79.3 / 66.2 of 59.1158. 0 of 59.1 / 58.0 of s Supply Air Ducts Outside Air 121 cfm Cooling Coil Supply Fan 59.9 / 58.4 F 1000 cfm 58.4% R.H. ROOMS 74.8/64.2 of 74.0 64.0 OF Return Air Ducts I EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:38 of 102 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY (PROJECT NAME Calle Estado, LLC ,STEM NAME I HVAC -2 Total Output (sgft/Ton) I 242.0( Air System CFM per System 800 Airflow (cfm) 800 Airflow (cfm/sgft) 1.65 Airflow (cfm/Ton) 400.0 Outside Air (%) 15.1 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS 26.0 of 62.9 of Outside Air 121 cfm 69.4 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 6/13/2007 FLOOR AREA COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 759 12,567 1,957 917 9,662 0 628 483 0 0 12 4,283 833 121 5,593 0 0 628 1 483 18 107 2 79 16 22 r 38YRA02433 18,790 3,870 14,990 Total Adjusted System Output 18,790 3,870 14,990 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am Heating Coil DOLING SYSTEM PSYCHROMETRICS 12.0 / 77.9 of Outside Air 121 cfm 78.7/66.8 of 4.3 Supply Fan 800 cfm 80.5 of =-3► Supply Air Ducts 79.9 of ROOMS 70.0 of f% Return Air Ducts 83.8/68.7OF 61.7/60.5OF 2 Cooling Coil Supply Fa 800 cfm User Number: 6712 61.7 / 60.5 of Supply Air Ducts Fan 62.4 / 60.7 of 55.6% R.H. ROOMS 78.0 / 66.6 of Return Air Ducts Job Number: of 102 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY rNAME Calle Estado, LLC NAME HVAC -2 NGINEERII Number of Heating Sv r Total O Output Coolina Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfmlTon) Outside Air (%) Outside Air (cfm/sgft) C Note: values above given at ARI conditions 26.0 OF Outs" _� e Air 108 cfm 69.6 OF 01 COOLING SYSTEM P 112.0 / 77.9 OF Outside Air 108 cfm 78.6 / 66.4 OF EnergyPro 4.3 by Ener! 24,000 Total Room Loads 24,000 DATE 6/13/2007 FLOOR AREA 433 COIL COOLING PEAKA Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD CFM 55.4 I I CFM 24,000 24,000 2.o 55.4 216.5 DATE 6/13/2007 FLOOR AREA 433 COIL COOLING PEAKA I COIL HTG. PEAK CFM I Sensible Latent I I CFM I Sensible 628 10,857 1,75 607 7,030 0 543 352 0 0 108 3,843 895 108 5,02 0 0 543 352 15,7861 2,6461 1 12,7541 ouv 800 Carrier 38YRA02433 18,760 3,696 14,990 1.85 00.0 13.5 Total Adjusted System Output 18,760 3,696 14,990 (Adjusted for Peak Design Conditions) 0.25111 TIME OF SYSTEM PEAK I Jul 3 pml I Jan 12 am 63.7°F 81.3°F Heating Coil res at Time of Supply Fan 800 cfm 81.3 OF -� Supply Ai Ducts 80.9 OF ROOMS 70.0 OF �% Return Air Ducts 4 in 83.2/68.10F IM 61.1/59.90F 61.1 / 59.9 OF User Number. 6712 Cooling Coil ` Supply Air Ducts Supply Fan 61.8 / 60.1 of 800 cfm 54.2% R.H. ROOMS 78.0 / 66.2 OF Return Air Ducts I Job Number: of 102 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ECT NAME Calle Estado, LLC EM NAME HVAC 2.5 VGINEERING CHECKS Dumber of Systems seating System Output per System Total Output (Btuh) Output (Btuhlsgft) : ooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfmisqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions (EATING SYSTEM PSYCHROMETRI 1 30,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 30,000 51.9 Latent 28,600 28,600 2.4 49.5 242.5 26.0 of 63.3 of 4 gig Outside Air 144 cfm 69.6 of .. DATE 6/13/2007 FLOOR AREA 578 COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 72 11,955 2,337 695 7,82 0 598 39 0 0 144 5,142 953 144 6,710 0 0 598 391 18.299T —32901 F77175:3131 1,000 1,000 Carrier 38YRA03033 22,916 4,064 18,737 1.73 419.6 14.4111 Total Adjusted System Output 22,9161 4,064 F 18,737 Heating Coil (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am Im Temperatures at Time of Heating Peak) 80.90F 80.9 of Supply Air Ducts :r Supply Fan 80.6 of 1000 cfm ROOMS 70.0 OF Return Air Ducts'R< I DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0/77.9OF 83.4/68.6OF RM 61.9/60.6OF 61.9/60.6OF , x Supply Air Ducts Outside Air F -; pp y 144 cfm Cooling Coil Supply Fan 62.4 / 60.8 OF 1000 cfm 55.9% R.H. ROOMS 78.6/66.9 of 78.0/66.7 OF Return Air Ducts I I EnergyPro 4.3 by EnergySoft User Number. 6712 ' ' Job Number: Page:41 of 102 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Calle Estado, LLC -(STEM NAME d HVAC 2 Number of Heating SV Total Output (Btuh) Output (Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sgft) Note: values above aiven at ARI conditions 26.0 of Outside �,,..� 101 cfm 69.6 of DATE 6/13/2007 FLOOR AREA 405 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 24,000 Total Room Loads 60 10,595 1,638 632 7,534 24,000 Return Vented Lighting 0 59.3 Return Air Ducts 530 377 Return Fan 0 0 24,000 Ventilation 10 3,597 91 101 4,693 24,000 Supply Fan 0 0 2.0]Supply Air Ducts 530 377 5�I I TOTAL SYSTEM LOAD 15,727517772 549 12 98 800 Carrier 38YRA02433 18,765 3,583 14,990 1.98 00.0 12 7 Total Adjusted System Output18,765 3,583 14,990 (Adjusted for Peak Design Conditions) 0.25 TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am RICS (Airstream Tei 64.0 OF 81.7 OF �OOLING SYSTEM PSYCHROMETRIC 12.0 / 77.9 of Outside Air 101 cfm 78.6/66.2 of Heating Coil em 81.7 of Supply Air Ducts Supply Fan 81'2 of 800 cfm ROOMS 70.0 OF Return Air Ducts I 82.8 / 67.9 of ® 60.8 / 59.6 of Time of Cooling Peak) 60.8 / 59.6 of Supply Air Ducts Cooling Coil Supply Fan 61.4/59.8 °F 800 cfm 53.5% R.H. ROOMS 78.0 / 66.0 of h Return Air Ducts 4 EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: Page:42 of 102 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY - PROJECT NAME DATE Calle Estado, LLC 6/13/2007 ;�fSTEM NAME FLOOR AREA HVAC -3 619 ENGINEERING CHECKS---ISYSTEM LOAD Number of Systems 1 Heating System Output per System 35,000 Total Output (Btuh) 35,000 Output (Btuh/sgft) 56.5 Cooling System Output per System 35,000 Total Output (Btuh) 35,000 Total Output (Tons) 2.9 Total Output (Btuh/sqft) 56.5 Total Output (sgft/Ton) L 212.2 Air System ' CFM per System 1,200 Airflow (cfm) 1,200 Airflow (cfm/sgft) 1.94 Airflow (cfm/Ton) 411.4 Outside Air 12.9 Outside Air (cfmisgft) 0.25 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS 26.0 OF 64.0°F 64.0 OF Outside Air PNE 155 cfm 69.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD Supply Fan Heating Coil 1200 cfm COOLING SYSTEM PSYC 112.0 177.9 of Outside Air 155 cfm 178.7 / 66.9 of 4.3 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,102 17,990 2,503 905 10,292 0 899 515 0 0 155 5,483 1,02 155 7,180 0 0 8991 515 25 277 3 524 E771j;] r 50JX0365 26,872 6,066 21,860 Total Adjusted System Output 26,872 6,066 21,860 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm I Jan 12 am Temperatures at Time of Heatina Peakl 81.1oF h Return Air Ducts 11 ROMETRICS (Airstream Temperatures at Time 83.0 / 68.5 of 83.0/68.50F IM 62.0/60.80F Supply Fan Cooling Coil 1200 cfm User Number: 6712 Return Air Ducts Job Number: Supply Air Ducts 80.7 of ROOMS 70.0 OF I Supply Air Ducts 62.7/61 . 0 of 55.9% R.H. ROOMS 78.0 / 66.7 of I of 102 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Calle Estado LLC 6/13/2007 STEM NAME FLOOR AREA HVAC -3 728 Number of Systems 1 Heating System Output per System 35,000 Total Output (Btuh) 35,000 Output (Btuh/sgft) 48.1 Cooling System Output per System 35,000 Total Output (Btuh) 35,000 Total Output (Tons) 2.9 Total Output (Btuh/sgft) 48.1 Total Output (sgft/Ton) 249.6 Air System CFM per System 1,200 Airflow (cfm) 1,200 Airflow (cfm/sgft) 1.65 Airflow (cfm/Ton) 411.4 Outside Air (%) 15.2 Outside Air (cfm/sgft) 0.25 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,070 16,748 2,944 928 9,629 0 837 48 0 0 182 6,458 888 182 8,449 0 0 8371 481 TOTAL SYSTEM LOAD 1 24,88 3,83 19 oa HVAC EQUIPMENT SELECTION Carrier 50JX0365 26,916 6,382 21,860 Total Adjusted System Output 26,916 6,382 .21,860 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12am Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 of 63.0 of 63.0 of 80.10F Q� Supply Air Ducts Outside Air 182 cfm 79.7 of Supply Fan Heating Coil 1200 cfm ROOMS 70.0 OF 69.6 of I 112.0 / 77.9 of Outside Air 182 cfm 78.7/67.4 of 4.3 h Return Air Ducts PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak 83.7 / 69.1 of 83.7/69.10F 62.6/61.40F ..,i.Y.Supply Air Ducts Supply Fan Cooling Coil 63.3 / 61.7 of 1200 cfm 57.6% R.H. ROOMS 78.0 / 67.2 OF User Number: 6712 Job Number. of 102 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY • PROJECT NAME DATE Calle Estado LLC 6/13/2007 STEM NAME FLOOR AREA HVAC -3 781 Number of Systems 1 Heating System Output per System 35,000 Total Output (Btuh) 35,000 Output (Btuh/sgft) 44.8 Cooling System Output per System 35,000 Total Output (Btuh) 35,000 Total Output (Tons) 2.9 Total Output (Btuh/sgft) X44.8 Total Output (sgft/Ton) 267.8 Air System CFM per System 1,200 Airflow (cfm) 1,200 Airflow (cfm/sgft) 1.54 Airflow (cfm/Ton) 411.4 Outside Air (%) 16.3 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS 26.0 of 62.4 of 62.4 of Outside Air^w; 195 cfm 69.5 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,408 21,167 3,158 1,27 12,278 0 1,058 614 0 0 195 6,893 760 195 9,043 0 0 1,058 614 30.176 3,918 22 549 r 50JX0365 27,047 6,468 21,860 Total Adjusted System Output 27,047 6,468 21,860 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am Temperatures at Time of Heatina Peakl 79.6 of Supply Fan Heating Coil 1200 cfm Supply Air Ducts 79.1 of ROOMS 70.0 of Return Air Ducts I ICCOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) I 12.0 / 77.9 of Outside Air 195 cfm 1 78.8/67.7OF 84.2/69.5 OF 84.2/69.5 OF FM 63.0/61.8 OF Supply Fan Cooling Coil 1200 cfm 4.3 by EnergySoft User Number: 6712 Return Air Ducts Job Number. Supply Air Ducts 63.9/62.1OF 58.6% R.H. ROOMS 78.0 / 67.5 of of 102 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Calle Estado, LLC ,/STEM NAME HVAC -4 ENGINEERING CHECKS NumhPr of Svstems Heating System Output per System 47,000 Total Output (Btuh) 47,000 Output (Btuh/sgft) 54.7 Cooling System Output per System 48,000 Total Output (Btuh) 48,000 Total Output (Tons) 4.0 Total Output (Btuh/sgft) 55.8 Total Output (sgft/Ton) 215.0 Air System CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cfm/sgft) 1.86 Airflow (cfm/Ton) 400.0 Outside Air (%) 13.4 Outside Air (cfm/sgft) 0.25 fl Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS 26.0 of 63.8 of 63.8 of 0 Outside Air 215 cfm` 69.6 of 112.0 / 77.9 of Outside —�-'� 215 cfm 78.6 / 66.4 of 4.3 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 6/13/2007 FLOOR AREA COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,223 21,219 3,477 LLIL 12,939 0 1,061 647 0 0 215 7,637 1,796 215 9,98 0 .0 1,0611 1 647 30,978T 574 2 24 214 JVAC EQUIPMENT SELECTION Carrier 50JX0485 37,514 7,370 29,355 Total Adjusted System Output 37,514 7,370 29,355 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am rstream Temperatures at Time of Heatina Peak) in 81.0 OF Supply Fan Heating Coil 1600 cfm h Return Air Ducts 4 20METRICS (Airstream Temperatures at Time of Coo 83.1 / 68.1 of 83.1 / m 1 °F = 61.1 / 59 8 of Supply Fan Cooling Coil 1600 cfm User Number: 6712 Supply Air Ducts 80.6 of ROOMS 70.0 of I Supply Air Ducts' 61.7 / 60.1 of 54.1% R.H. ROOMS 78.0 ! 66.2 of Return Air Ducts < I Job Number: Page:46 of 102 [HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Calle Estado, LLC FSTEM NAME HVAC -4 INnmhor of Rvctpms 1 21 Heating System Output per System 47,000 Total Output (Btuh) 94,000 Output (Btuh/sgft) 54.2 Cooling System Output per System 48,000 Total Output (Btuh) 96,000 Total Output (Tons) 8.0' Total Output (Btuh/sgft) . 55.4 Total Output (sgft/Ton) 216.6 Air System CFM per System 1,600 Airflow (cfm) 3,200 (cfm/sgft) 1.85 rOAirflow Airflow (cfm/Ton) 400.0 utside Air (%) 13.5 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS 26.0 OF 63.8 OF 63.8 OF Outside Air 433 cfm 69.7 of 12.0 / 77.9 of Outside Air 433 cfm 1 178.6 / 66.4 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 6/13/2007 FLOOR AREA 1,733 COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent I I CFM I Sensible 2,182 38,013 7,008 1,847 21,046 0 1,901 1,052 0 0 433 15,419 3,61 433 20,145 0 0 1,901 1,052 57 233 10 618 43 295 Carrier 50JX0485 74,956 14,815 58,710 Total Adjusted System Output 74,956 14,815 58,710 (Adjusted for Peak Design Conditions) Supply Fan Heating Coil 3200 cfm TIME OF SYSTEM PEAK I Jul 3 pml I Jan 12 am km Tei 81.0 of h Return Air Ducts `S ROMETRICS (Airstream Temperatures at 83.1 / 68.1 OF 83.1/68.10F Ell 61.1/59.80F Supply Fan 3200 cfm 4.3 by EnergySoft User Number. 6712 Cooling Coil Return Air Ducts Job Number: Supply Air Ducts 80.7 of ROOMS 70.0 of Supply Air Ducts 61.6 / 60.0 of 54.2% R.H. ROOMS 78.0 / 66.2 of of 102 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Calle Estado LLC STEM NAME HVAC -3.5 Air System CFM per System 1,400 Airflow (cfm) 1,400 Airflow (cfm/sqft) 2.03 Airflow (cfm/Ton) 404.8 Outside Air (%) 12.3 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions 26.0 of Outside .�� 172 cfm 69.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts DATE 6/13/2007 FLOOR AREA 690 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,34 22,915 2,790 1104 12,869 at Time of Cooling 0 12.0177.9 of 82.9 / 68.0 of 82.9 / 68.1 of 1,146 643 0 0 172 6,097 1,415 172 7,998 0 0 1,1461 1 643 TOTAL SYSTEM LOAD 1 311,367 4,205 22 154 HVAC EQUIPMENT SELECTION Carrier 50JX0423 32,259 6,511 25,607 Total Adjusted System Output 32,259 6,51 25,607 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm an 12 am ,earn Temperatures at Time of Heatina Peak) 64.2 of 64.2 of 81.4 of Supply Fan 1400 cfm Heating Coil Supply Air Ducts 81.0 of ROOMS 70.0 of I I EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: PageA8 of 102 1 h Return Air Ducts It TOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 12.0177.9 of 82.9 / 68.0 of 82.9 / 68.1 of 61.2 / 60.0 of Outside Air n; s Supply Air Ducts 172 cfm Supply Fan Cooling Coil 62.0 60.3 of 1400 cfm ROOMS 54.3% R.H. 78.8/66.5 OF 78.0 / 66.2 of Return Air Ducts I EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number: PageA8 of 102 1 IROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC -4 FLOOR AREA 820 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Suite 101 Suite 101 1 1,613 22,363 3,743 1,613 22,363 •3 743 1,097 15,174 .J PAGE TOTAL 1 1,613 22,363 31743 1,097 15,174 TOTAL L 1,613 22,363 3,743]F-1,097 15,174 EnergyPro By EnergySoft User Number. User Job Number: Page:49 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC -2 FLOOR AREA 433 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM ISENSIBLE LATENT CFM SENSIBLE Suite 102 Suite 102 1 836 12,608 1,977 836 12,608 1,977 609 7,052 EnergyPro By EnergySoft User Number: User Job Number. Page:50 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 ,fSTEM NAME HVAC -2 FLOOR AREA 484 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Suite 104 Suite 104 1 759 12,567 1,957 759 12,567 1,957 917 9,662 J PAGE TOTAL 756 12,567 1,657 917 9,662 TOTAL 759 12,567 1,957 917 9,662 EnergyPro By EnergySoft User Number: User Job Number. Page:52 of 102 ROOM LOA® SUMMARY PROJECT NAME ., Calle Estado, LLC DATE 6/13/2007 (STEM NAME HVAC -2 FLOOR AREA 433 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM I SENSIBLE Suite 105 Suite 105 1 628 10,857 1,751 628 10,857 1,751 607 7,030 hl PAGE TOTAL 6281 10,857 1,751 607 7,030 TOTAL 1 628 10,857 11751 607 7,030 EnergyPro By EnergySoff User Number. User Job Number. Page:53 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC 2.5 FLOOR AREA 578 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Suite 106 Suite 106 1 725 12,022 1,943 721 11,955 2,337 695 7,821 PAGE TOTAL 1 721 11,955 2,337 695 7,821 TOTAL 1 721 11,955 2,3371[---67975 7,821 EnergyPro By EnergySoft User Number: User Job Number. Page:54 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC 2 FLOOR AREA 405 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Suite 107 Suite 107 1 601 10,595 1,638 601 10,595 1,638 632 7,534 PAGE TOTAL 1 601 10,595 1,638 632 7,534 TOTAL 1 601 10,595 1,638 632 7,534 EnergyPro By EnergySoft User Number. User Job Number: Page:55 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 ,., STEM NAME HVAC -3 FLOOR AREA 619 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLESuite LATENT CFM SENSIBLE LATENT CFM SENSIBLE Suite 201 201 1 1,106 18,046 2 505 1,102 17,990 2,503 905 10,292 EnergyPro By EnergySoft User Number: User Job Number: Page:56 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC -3 FLOOR AREA 728 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEA ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIB Suite 202 Suite 202 1 1,070 16,748 2,944 1,070 16,748 2,944 928 9,6219 EnergyPro By EnergySoft User Number: User Job Number: Page: 57 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC -3 FLOOR AREA 781 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Suite 203 Suite 203 1 1,408 21,167 3,158 1,408 21,167 3,158 1,271 12,278 EnergyPro By EnergySoft User Number. User Job Number. Page:58 of 102 ROOM LOAD SUMMARY PROJECT NAME Calle Estado, LLC DATE 6/13/2007 STEM NAME HVAC -4 FLOOR AREA 860 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENTSuite CFM SENSIBLE LATENT CFM SENSIBLE Suite 204 204 1 1,223 21,219 3,477 1,223 21,219 3,477 1,145 12,939 EnergyPro By EnergySoft User Number: User Job Number. Page:59 of 102 ROOM HEATING PEAK LOADS _I roject Title )aIle Estado, LLC Room Information Room Name Floor Area Indoor Dry Bulb Temperature Conduction Desion Conditions Suite 101 Time of Peak 820 Outdoor Dry Bulb Temperature 70 OF AT of Jan 12 am 26 6r - 178.0 F Items shown with an asterisk (') denote conduction through an interior surface to another room, Page Total: 11 974 Infiltration: 1.001 x 1.064 x ago x 10.0o x o.50o 16 0] x as = 3 200 ,had, 'a Air Sensible Area Ceiling Height ACH p7 Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 15,174 EnergyPro 4.3 by Energysoft User Number: 6712 Job Number. Page: 62 of 102 178.0 X X X X X X X X X X X X X X x X X x X x x X x x x X x X X x x X X x X x X x X 0.0740 X X X X X X X X X x X X x X X X X X X X X X X X X X X X X X X X x X X X X X 44 = = = = = = = = = = = = = = 580 24.0 0.5800 44 612 48.0 0.5800 44 1,225 24.0 0.5800 44 612 36.0 0.5800 44 919 64.0 0.0740 44 208 36.0 0.5800 44 919 164.0 0.0740 44 534 0 0,580 0. 44 99 346.0 0.0740 44 1,127 20.0 0.5800 44csin 24.0 0.5800 44 612 15.0 0.0740 44 49 perimeter = 98.0 0.7300 44= 3.148 i Items shown with an asterisk (') denote conduction through an interior surface to another room, Page Total: 11 974 Infiltration: 1.001 x 1.064 x ago x 10.0o x o.50o 16 0] x as = 3 200 ,had, 'a Air Sensible Area Ceiling Height ACH p7 Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 15,174 EnergyPro 4.3 by Energysoft User Number: 6712 Job Number. Page: 62 of 102 ROOM HEATING PEAK LOADS Project Title Date 1ralle Estado, LLC 16/13/2007 Room Information Desian Conditions Room Name Suite 102 Time of Peak Jan 12 am Floor Area 433 Outdoor Dry Bulb Temperature 26Oi Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value AT of 69.0 X X X X X X X X X. X X x X X X x X X x X X X x X x X x x X X X X x X x X X X X 0.0740 X X x X X X X X X x x x X x x X X x X x x X X x x X X X X x x X x x x x X x X 24.0 0.5800 48.0 0.5800 24.0 0.5800 116.0 0.0740 24.0 0.5800 25.0 0.5800 perimeter = 33.0 0.7300 Items shown with an asterisk (•) denote conduction through an interior surface to another room. Infiltration: 1.00 x 1.064 x 433 x 10.00 x 0.500 / 60] x "Schedule Air Sensible Area Ceiling Height ACH Fraction Btu/hr Page Total LT 5 363 = 1690 TOTAL HOURLY HEAT LOSS FOR ROOM 7,052 EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number. Page: 63 of 102 ROOM HEATING PEAK LOADS Project Title Date iallim Fctarin I I t^ s/l w9n 17 Room Information Desi n Conditions Room Name Suite 103 Time of Peak Jan 12 am Floor Area 484 Outdoor Dry Bulb Temperature 26 IF Indoor Dry Bulb Temperature 70 OF Double Non Metal Tinted Conduction Area U -Value AT of R-19 Wall .19.2x6.16 134.0 X X X x X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X x x X X X x 0.0740 X X X x X X X X X X x X X x x X X x X x x X X x x X x X X x x X X x X x X x X x Double Non Metal Tinted 24.0 0.5800 Double Non Metal Tented 48.0 0.5800 Double Non Metal Tinted 24.0 0.5800 - 181.0 0.0740 Double Non Metal Tinted 24.0 0.5800 Double Non Metal Tinted 25.0 0.5800 R-19 Wall .19.2x6.16 241.0 0.0740 1-4500 Slab -On -Grade perimeter = 68.0 0.7300 Items shown with an asterisk (') denote conduction through an interior Infiltration: r 1.001 x 1.o6a x schedule Air Sensible Fraction surface to another room. asa x 10.00 Area Ceiling Height 0.500 / 60] ACH Page Total 0 &T Btu/hr 436 612 1,225 612 589 612 638 785 1.531 2,184 9 226 1889 TOTAL HOURLY HEAT LOSS FOR ROOM 11,115 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page: 64 of 102 ROOM HEATING PEAK LOADS Title Room Name Floor Area Indoor Dry Bulb Temperature Conduction Desi n Conditions Suite 105 Time of Peak Jan 12 am 433 Outdoor Dry Bulb Temperature 266 70 OF Area U -Value Z�T of Btu/hr Items shown with an asterisk ('rr) denote conduction through an interior surface to another room. Page Total: 5340 Infiltration: I1.00 x 1.064 x 433 x 10.00 x 0.500 / 60] x U = 1 690 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 7,030 EnergyPro 4.3 by EnergySoit User Number. 6712 Job Number. Page: 66 of 102 69.0 X X X x X X X X X x x x x x x X x x X x x X x x x X x x x x x x X x x x x x x 0.0740 X X X X X X X X X x x X x X X X x X X X x X x X X X x x X X x x X X X X x x x 44 = = = = = — = — — = — — = = = — — — — o = — — — = = = = — — - = — - = = — = = 24.0 0.5800 44 48.0 0.5800 44 24.0 0.5800 44 117.0 0.0740 44 24.0 0.5800 44 24.0 0.5800 44 perimeter = 33.0 0.7300 44 Btu/hr Items shown with an asterisk ('rr) denote conduction through an interior surface to another room. Page Total: 5340 Infiltration: I1.00 x 1.064 x 433 x 10.00 x 0.500 / 60] x U = 1 690 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 7,030 EnergyPro 4.3 by EnergySoit User Number. 6712 Job Number. Page: 66 of 102 ROOM HEATING PEAK LOADS ;.JProect Title %ally Fctarin_ LLC Date s onu Room Information Desi n Conditions Room Name Suite 106 Time of Peak Jan 12 am Floor Area 578 Outdoor Dry Bulb Temperature 26o -F Indoor Dry Bulb Temperature 70 OF R-19 Wall .19.2x6.16 Conduction Area x x X x X X X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x U -Value x X X x x x X x x x x X x x x x x x x x x x x x x x x x x x x x x x x x x x x R-19 Wall .19.2x6.16 114.0 0.0740 Double Non Metal Tinted 24.0 0.5800 nnuble Non Metal Tinted 48.0 0.5800 Double Non Metal Tinted 24.0 0.5800 _ 30.0 0.0740 -19 Wal .19 2 6. 6 290.0 0.0740 laD-On-Grade perimeter = 53.0 0.7300 OT of Btu/hr 371 612 1,225 612 98 944 1,702 Items shown with an asterisk (f') denote conduction through an interior surface to another room. Page Total: 5 565 Infiltration: 1 1.001 x 1.064 x 578 x 10.00 x 0.500 / 6] x 44 = 2 255 chedule Air Sensible Area Ceiling Height ACH p7 Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 7,821 EnergyPro 4.3 by Energysoft User Number: 6712 Job Number: Page: 67 of 102 ROOM IDEATING PEAK LOADS Project Title Date vnIla Fctnrin .1 1 ( t1/13/7nn17 Room Information Desi n Conditions Room Name Suite 107 Time of Peak Jan 12 am Floor Area 405 Outdoor Dry Bulb Temperature 2jF Indoor Dry Bulb Temperature 70 OF 48.0 Conduction Non Area U -Value 94.0 X X X X X X X x X X X X X x x X X X X X X X X X X X X X X X X X X X X x X X X 0.0740 X X X X X X X x X x x X X X x X X x X x x X X x x X x X X x x X X x X X X x X 24.0 0.5800 48.0 0.5800 24.0 0.5800 210.0 0.0740 190.0 0.0740 perimeter = 59.0 0.7300 AT of Btu/hr Items shown with an asterisk (•r) denote conduction through an interior surface to another room. Page Total: 5 953 Infiltration: 1.001 x 1.064 x 405 x 10.00 x 0.500 / 6] x ® = 1 580 chedule Air Sensible Area Ceiling Height ACH p7 Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 7,534 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page: 68 of 102 ROOM HEATING PEAK LOADS _Project Title Date ialle Estado, LLC 16/13/2007 Room Information Desi n Conditions Room Name Suite 2o1 Time of Peak Jan 12 am Floor Area 619 Outdoor Dry Bulb Temperature 260r Indoor Dry Bulb Temperature 70°F Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X U -Value. X X X X X X X X X X x X X x x X X x X x x X X x x X x X X x x X X x X x X x X R-30 Roof R.30.2x12.16 619.0 0.0360 R-19 Wall .19.2x6.16 139.0 0.0740 notible Non Metal Tinted 24.0 0.5800 Double Non Metal Tinted 48.0 0.5800 24.0 0.5800 -1 Wall .19.2x6.16 64.0 0.0740 Double Non Metal Tinted 36.0 0.5600 R-19 Wall .19.2x6.16 124.0 0.0740 360 0,5800 -1 Wall 19.2x6.16 286.0 0.0740 24.0 0.5800 - OT of Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 7 876 Infiltration: `S 1.00 x 1.064 x 619 X 10.00 X 0.500 /60] x 44 = 2 415 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,292 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page: 69 of 102 ROOM HEATING PEAK LOADS Project Title Date Ale Estado. LLC 16/13/2007 Room Information Desi n Conditions Room Name Suite 202 Time of Peak Jan 12 am Floor Area 728 Outdoor Dry Bulb Temperature 26°F Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of R-30 Roof R.30.2x12.16 728.0 x X X x X X X X X X x X x x x x x x x x x x x x x X x X x x x x x x x x x Xx X x 0.0360 x X X X X X X X X x X x X X x X X X x x X X x x X X X x X X X X X x x X x X x 44 = = = = = = = = = = = = = = = = = = 1,153 R-19 Wall .19.2x6.16 64.0 0.0740 44 208 Double Non Metal Tinted 24.0 0.5800 44 612 Double Non Metal Tinted 48.0 0.5800 44 1,225 Douhfp Nnn Metal Tinted 24.0 0.5800 44 612 - 9 Wa 9.2x6.6 200.0 0.0740 44 651 6 151.0 0.0740 44 492 Double Non Metal Tinted 30.0 0.5800 44 766 0,5800 44 612 9 Floor Assembly 280.0 0.0370 44 456 F Items shown with an asterisk (•r) denote conduction through an interior Infiltration:1.00 x 1.064 x chedule Air Sensible Fraction surface to another room. 728 x 10.00 Area Ceiling Height 0.500 / 60] ACH Page Total: 44 pT 6 788 2 841 TOTAL HOURLY HEAT LOSS FOR ROOM 9,629 EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number. Page: 70 of 102 ROOM HEATING PEAK LOADS Project Title Date ialIP Fctnrin I I C; R/i ionm Room Information Desi n Conditions Room Name Suite 203 Time of Peak Jan 12 am Floor Area 781 Outdoor Dry Bulb Temperature 266F Indoor Dry Bulb Temperature 70.°F 24.0 Conduction R-30 Roof R.30.2x12.16 . R-19 Wall .19.2x6.16 Qnuble Nnn Metal Tinted Double Non Metal Tinted R- 9 Wall W 19.2x6 16 Double Non Metal T*nted Double Non Metal Tinted Solid Wood Doo Area U -Value 781.0 X X X X X X X X X X X X X X X X X x X X X X X x X X X X X X X X X X X X X X X 0.0360 X X X X X X X X X X X X X x x X X x X x x X X X x X x X X x x X X x X x X x X 134.0 0.0740 24.0 0.5800 48.0 0.5800 24.0 0.5800 176.0 0.0740 24.0 0.5800 30.0 0.5800 366.0 00740 24.0 1.4500 266.0 0.0370 Z�T of Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 9 230 Infiltration: `1 1.001 x 1.064 x 781 x 10.00 x 0.500 / 60] X 0 = 3 048 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 12,278 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number: Page: 71 of 102 ROOM HEATING PEAK LOADS Project Title Dat® 'Ialla Fctarin I I C Fi/1.,vgn 17 Room Information Desi - n Conditions Room Name Suite 204 Time of Peak Jan 12 am Floor Area 860 Outdoor Dry Bulb Temperature 26 67r- FIndoor IndoorDry Bulb Temperature 70 OF X X X X X X X X X X x X X x x X X x X x x X X x x x x X X x x X X x X x X x X AT of Btu/hr Items shown with an asterisk ('rr) denote conduction through an interior surface to another room. Page Total: 9 583 Infiltration: �- 1.00 x 1.064 x 860 x 10.00 x 0.500 / 6] x 44 = 3 356 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 12,939 EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number. Page:, of 102 Conduction Area X x X X X X X X X X X X X X X x X x X x X X x X X X X X X X x X X X X X X X X U -Value X X X X X X X X X X x X X x x X X x X x x X X x x x x X X x x X X x X x X x X R-30 Roof R.30.2x12.16 860.0 0.0360 R-19 Wall W.19.2x6.16 134.0 0.0740 nnuble Non Metal Tinted 24.0 0.5800 Double Non Metal Tinted 48.0 0.5800 24.0 0.5800 R- 9 Wall .19.2x6.16 366.0 0.0740 Solid Wood Door 24.0 1.4500 R-19 Wall .19.2x6.16 246.0 0.0740 0-5800 Double Non Metal Tinted 24.0 0.5800 266.0 0.0370 AT of Btu/hr Items shown with an asterisk ('rr) denote conduction through an interior surface to another room. Page Total: 9 583 Infiltration: �- 1.00 x 1.064 x 860 x 10.00 x 0.500 / 6] x 44 = 3 356 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 12,939 EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number. Page:, of 102 ROOM HEATING PEAK LOADS Proiect Title C Room Name Suite 205 Time of Peak Jan 12 am Floor Area 1,733 Outdoor Dry Bulb Temperature 26°-F Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value AT of Btu/hr R-30 Roof R.30.2x12.16 1,733.0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Height 0.0360 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 44 = 2,745 = 612 = 612 = 1 225 = 612 = 612 = 1,225 = 612 309 766 = 1,225 = 638 1,661 = = 14 283 = 6 762 R-19 Wall .19.24.16 188.0 0.0740 44 Dnuble Non Metal Tinted 24.0 0.5800 44 Double Non Metal Tinted 48.0 0.5800 44 24.0 0.5800 44 Dou le Non Metal Tinted 24.0 0.5800 44 Double Non Metal Tinted 48.0 0.5800 44 Double Non Metal Tinted 24.0 0.5800 44 - 44 Dou le Non Metal in ed 30.0 0.5800 44 R-19 Wall ON 19 W 16) 307.0 0.0740 Double Non Metal Tinted 48.0 0.5800 44 Doulple Non Metal Tinted 25.0 0.5800 44 R-1 alI (W.19,24,16) 510.0 0,0740 44= - 63 0.0370 44= Items shown with an asterisk (') denote conduction through an interior Infiltration: r 1.001X 1.064 X `Schedule Air Sensible Fraction surface to another room. 1 733 X 10.00 Area Ceiling 0.500 / 6 ] ACH Page Total: 44 pT TOTAL HOURLY HEAT LOSS FOR ROOM 21,046 EnergyPro 4.3 by EnergySoft User Number: 6712 Job Number. Page:73 of 102 DOOM HEATING PEAK LOADS i Project Title Date �,alle Estado, LLC 6/13/2007 Room Information Desi - n Conditions Room Name suite 206 Time of Peak Jan 12 am Floor Area 690 Outdoor Dry Bulb Temperature 266E Indoor Dry Bulb Temperature 70 OF Conduction Area 690.0 320.0 175.0 17.5 17.5 232.5 17.5 17.5 17.5 17.5 17.5 130.0 6.0 8.0 690.0 U -Value AT of Btu/hr 1,093 1,042 570 447 447 757 447 447 447 447 423 408 1.225 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 10 176 Infiltration: L 1.0o x Lisa x s90 x 10.0o x o.500 / 6� x 0 = 2s92 ehedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 12,869 EnergyPro 4.3 by EnergySoft User Number. 6712 Job Number. Page: 74 of 102 r ROOM COOLING COIL LOADS . (Project Title I Date Calle Estado, LLC 6/13/2007 ROOM INFORMATION DESIGN CONDITIONS Room Name Suite 205 Time of Peak Jul 3 pm Floor Area 1,733 Outdoor Dry Bulb Temperature 112 `k` Indoor Dry Bulb Temperature 78* Outdoor Wet Bulb Temperature 7s `k Conduction -30 Roof R.30.2x12.16 -19 Wall .19.2x6.16 Double Non Metal Tinted -19 Wall W.19.2x6.16 ouble Non Metal Tinted 19 Wall .19.2x6.16 ouble Non Metal Tinted -19 Wall .19.2x6.16 -19 Floor Assembly Area 1,733.0 188.0 240.0 95.0 30.0 307.0 25.0 510.0 263.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0360 0.0740 0.5800 0.0740 0.5800 0.0740 0.5800 0.0740 0.0370 DETD 1 X X X X X X X X X 70.3 = = = = = = = 34.4 24.5 36.8 24.5 37.1 24.5 55.1 28.6 Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X x X X X X Factor = = = = = = = = = (N) 24.0 4 0.590 0.876 (N) 48.0 4 0.590 0.876 (N) 24.0 4 0.590 0.876 (N) 24:0 4 0.590 0.876 (N) 48.0 41 0.590 0.876 (N) 24.0 4 0.590 0.876 (E) 30.0 4 0.590 1.270 (S) 48.0 42 0.590 0.868 (S) 25.0 42 0.590 0.868 Page Total Btu/hr 4,385 479 3,408 259 426 843 355 2,080 279 12 513 Btulhr 509 1,018 509 509 1.01 509 922 1,032 538 6 562 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0 X 1,733 X 0.939 Watts/sgft X 3.41 Btuh/Watt X 1.000 = 5,556 ccu ants 1.0c X 1,733 X 300 Btuh/occ. / 10 sqft/occ. X 1.00 = 5,199 Receptacle 1.0 X 1,733 X 0.500 Watts/sgft x 3.41 BtuhfWatt X 1.00 = 2,957 Process 1.0 xi 1,733 x 0.000 Watts/sgft x ' 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 X 1A64 X 1733 X 10.00 X 0.50 /6] X 34 = 5225 chedule Air Sensible Area Ceiling Height ACH T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 38,013 Sched. Btulhr Latent Gain Frac. Area Heat Gain ccu ants 1.00 X 1 733 X 300 Btuh/OCC. / 100 sqft/occ. = 5199 Receptacle 1.on x x 0000 Watts/sgft x BtuhlWatt = rocess 1.00 X 1,733 X 0.000 Wafts/sqft x 3.413 Btuh/Watt = 0 Infiltration: x x F 1733 /6 x x � ] x _ chedule Air Latent Area Ceiling Height ACH pyy I F] ROOM COOLING COIL LOADS 1Project Title 1 Calle Estado, LLC ROOM INFORMATION Room Name Floor Area Indoor Dry Bulb Temperature Conduction -30 Roof(R.30.2x12.16) -19 Wall .19.2x6.16 -19 Wall .19.2x6.16 Double Non Metal Tinted Double Non Metal Tinted -19 Wall .19.2x6.16 Double Non Metal Tinted Double Non Metal Tinted Double Non Metal Tinted Suite 206 1 Time of Peak 690 I Outdoor Dry Bulb Temperature 78`F Outdoor Wet Bulb Temperature Area 690.0 320.0 175.0 17.5 17.5 232.5 17.5 17.5 17.5 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain , U -Value 0. Date 6/13/2007 DETD 1 X X X X X X X X X 65.2 = = = = = = = = = 33.5 35.9 24.5 24.5 41.7 24.5 24.5 24.5 Page Total Orientation Area X X X X X x X X X x SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = = = = = = = = = (E) 17.5 36 0.590 2.078 (E) 17.5 36 0.590 2.078 (S) 17.5 70 0.590 1.112 (S) 17.5 70 0.590 1.112 (S) 17.5 70 0.590 1.112 (S) 17.5 70 0.590 1.112 (S) 17.5 70 0.590 1.112 (1M 16.0 5 0.590 0.730 (W) 48.0 5 0.590 0.730 16.0 5 0.590 0.730 Page Total Aug 3 pm 112 78 9F Btu/hr 1,619 792 465 248 248 717 248 248 248 4 835 Btu/h r 772 772 804 804 804 804 804 351 1,054 351 7 319 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights 1.0 x 690 x 1.078 Watts/sgft x 3.41 Btuh/Watt x 1.000 = 2,539 ccu ants 1.0c x 690 X 300 Btuh/OCc. / 10 sgft/occ. X 1.00 = 2.07 0 Receptacle 1.0 x 690 X 0.500 Watts/sgft x 3.41 Btuh/Watt x 1.00 = 1,177 rocess 1.0 x 690 x 0.000 Watts/sqft X 3.41 Btuh/Watt x 1.00 = 0 Infiltration:1.00 X 1.064 X 690 X 10.00 X 0.50 / 60] x 34 = 2.08 1 Ledule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 22,915 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 690 x 3001 Btuh/OCC. / L 100 Sgftlocc. = 2 070 Receptacle 1.no x x o.000 Watts/sgft x L 3.4131 Btuh/Watt = Process 1.00 X 690 X 0.000 Watts/sgft x 3.413 Btuh/Watt = 0 Infiltration: ��� xx x E:1� x16] x � = chedule Air Latent Area Ceiling Height ACH pW ROOM COOLING COIL LOADS Project Title Date 'y Calle Estado, LLC 6/13/2007 ROOM INFORMATION DESIGN CONDITIONS Room Name Suite 206 Time of Peak Aug 3 pm Floor Area 690 Outdoor Dry Bulb Temperature 112 tk Indoor Dry Bulb Temperature 78`F Outdoor Wet Bulb Temperature 78 OF Conduction Area 17 17 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. U -Value 0.5800 0.5800 Solar Gain Orientation Area SGF SC DETD t 24.5 = 24.5 = 55.0 = 24.5 = 24.5 = 24.5 = 28.6 = Page Total Btu/hr 248 248 529 227 682 227 731 2 893 Weighting Factor Btu/hr x = x = x = x = x = x = x = x = X x = Page Total I o Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0 x 690 x 1.078 Watts/sqft X 3.41 Btuh/Watt x 1.000 = 2,539 ccu ants 1.0c x 690 x 300 Btuhlocc. / 10 sgft/occ. x 1.00 = 2,070 Receptacle 1.0 x 690 X 0.500 Watts/sgft x 3.41 Btuh/Watt x 1.00 = 1,177 rocess FE x 690 x o.000 Watts/sgft X 3.41 Btuh/Watt x 1.00 = 0 Infiltration:) 1.00 x 1.064 x 690 x 10.00 x 0.50 160] x 34 = 2081 '-Schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 22,915 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccu ants 1.00 x 690x 3001 Btuh/occ. / 100 sgft/occ. = 2 070 Receptacle 1-00 x x nonni Watts/sgft xL 3 m Btuh/Watt = rocess 1.00 X 690 I X� 0.000 Watts/sgft x 3.413 Btuh/Watt Infiltration: xx I 69n x x / 60] x p�262 = �_z2QJ chedule Air latent Area Ceiling Height ACH DW x x x x x x x x x x .� x x x x x x X x x x DETD t 24.5 = 24.5 = 55.0 = 24.5 = 24.5 = 24.5 = 28.6 = Page Total Btu/hr 248 248 529 227 682 227 731 2 893 Weighting Factor Btu/hr x = x = x = x = x = x = x = x = X x = Page Total I o Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0 x 690 x 1.078 Watts/sqft X 3.41 Btuh/Watt x 1.000 = 2,539 ccu ants 1.0c x 690 x 300 Btuhlocc. / 10 sgft/occ. x 1.00 = 2,070 Receptacle 1.0 x 690 X 0.500 Watts/sgft x 3.41 Btuh/Watt x 1.00 = 1,177 rocess FE x 690 x o.000 Watts/sgft X 3.41 Btuh/Watt x 1.00 = 0 Infiltration:) 1.00 x 1.064 x 690 x 10.00 x 0.50 160] x 34 = 2081 '-Schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 22,915 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccu ants 1.00 x 690x 3001 Btuh/occ. / 100 sgft/occ. = 2 070 Receptacle 1-00 x x nonni Watts/sgft xL 3 m Btuh/Watt = rocess 1.00 X 690 I X� 0.000 Watts/sgft x 3.413 Btuh/Watt Infiltration: xx I 69n x x / 60] x p�262 = �_z2QJ chedule Air latent Area Ceiling Height ACH DW