2022-23 GHD, Inc Amendment 3 - Hwy 111 Corridor Form-Based Code Project 2019-05MEMORANDUM
DATE:
TO:
FROM:
RE:
Please list the Contracting Party / Vendor Name, type of agreement to be executed, including any change orders or
amendments, and the type of services to be provided. Make sure to list any related Project No. and Project Name.
___
___
___
Authority to execute this agreement is based upon:
Approved by City Council on ___________________________________________
City Manager’s signing authority provided under the City’s Purchasing Polic\
[Resolution No. 2019-021] for budget expenditures of $50,000 or less.
Department Director’s or Manager’s signing authority provided under the City’s
Purchasing Policy [Resolution No. 2019-021] for budget expenditures of $15,000 and
$5,000, respectively, or less.
Procurement Method (one must apply):
___ Bid ___ RFP ___ RFQ ___ 3 written informal bids
___ Sole Source ___ Select Source ___ Cooperative Procurement
Requesting department shall check and attach the items below as appropriate:
___ Agreement payment will be charged to Account No.: _____________________
___ Agreement term: Start Date ________________ End Date ________________
___ Amount of Agreement, Amendment, Change Order, etc.: $____________________
REMINDER: Signing authorities listed above are applicable on the aggregate Agreement amount,
not individual Amendments or Change Orders!
___ Insurance certificates as required by the Agreement for Risk Manager approval
Approved by: ______________________________ Date: _______________
___ Bonds (originals)as required by the Agreement (Performance, Payment, etc.)
___ Conflict of Interest Form 700 Statement of Economic Interests from Consultant(s)
NOTE: Review the “Form 700 Disclosure for Consultants” guidance to determine if a Form 700 is
required pursuant FPPC regulation 18701(2)
___ Business License No. __________________; Expires: __________________
___ Requisition for a Purchase Order has been prepared (Agreements over $5,000)
1/18/21
Jon McMillen, City Manager
Julie Mignogna, Management Analyst
Amendment No. 3 with GHD Inc. for services related to the Highway 111 Corridor
Project (No. 2019-05).
✔12/21/21 Business Session 4
✔
✔401-0000-60188
✔9/16/2020 6/30/2023
✔545,523.00
✔
On File in LF - NR 1/19/2022
✔
✔LIC-767986 6/30/2022
AMENDMENT NO. 3
TO AGREEMENT FOR CONTRACT SERVICES WITH GHD, INC.
This Amendment No. 3 (“Amendment 3”) to Agreement for Contract
Services ("Agreement”) is made and entered into as of the 22nd day of
December 2021, ("Effective Date") by and between the CITY OF LA QUINTA
("City"), a California municipal corporation and GHD, INC., a corporation
(“Contracting Party”).
RECITALS
WHEREAS, on or about September 16, 2020, the City and Contracting
Party entered into an Agreement to provide those services related to Highway
111 Corridor Form Based Code Planning and Engineering Services, Project No.
2019-05, for a total not to exceed amount of $885,228. The term of the
Agreement will expire on June 30, 2023 (“Initial Term”); and
WHEREAS, on or about March 22, 2021, the City and Contracting Party
executed Amendment No. 1 and mutually agreed to amend the following
sections of the Agreement
x Section 1.1 Scope of Services – to obtain and analyze Street Light Data;
x Section 2.3 Compensation for Additional Services – to allow the Contract
Officer to approve Additional Services and related additional
compensation amounting to no more than five percent (5%) of the
Contract Sum; and
x Section 2.1 Contract Sum – increasing the contract amount by $11,760,
resulting in a new total not to exceed amount of $896,988; and
WHEREAS, on or about May 3, 2021, the City and Contracting Party
executed Amendment No. 2 and mutually agreed to amend the “Time and
Materials” cost allocation, by Task, of Compensation for Services; and
WHEREAS, on or about May 21, 2021, the City and Contracting Party
mutually agreed to amend the scope of services to include additional property
owners and developers meeting services and to increase fiscal year 2020/21
compensation by an additional $4,272, amounting for 5% or less of the annual
contract amount, in accordance with Section 2.3 – Compensation for
Additional Services of the Agreement, for a total not to exceed amount of
$901,260, which was memorialized via a Memorandum; and
WHEREAS the City and Contracting party mutually agree to amend
Section 1.1 – Scope of Services of the Agreement as outlined in detail in
enclosed Exhibit A, incorporated herewith by this reference; and
WHEREAS, Section 2.1 Contract Sum of the Agreement shall be
amended to remove Task 3.4, increase the hours in Task 0.4 and
include compensation for the additional scope of services in the amount of
$5,523, as detailed in Exhibit B attached and made part of hereto, for a
revised total not to exceed amount of $1,4,783; and
WHEREAS, the City and Contracting party mutually agree to amend
Section 3.2 Schedule of Performance to include the revised Exhibit C
attached and made part of hereto.
NOW THEREFORE, in consideration of the mutual covenant herein
contained, the parties agree as follows:
AMENDMENT
In consideration of the foregoing Recitals and the covenants and
promises hereinafter contained, and for good and valuable consideration, the
sufficiency and receipt of which are hereby acknowledged, the parties hereto
agree as follows:
1.Section 1.1 is amended to remove Task 3.4, adjust the number of hours
in Task 0.4 and update Task 4, including 4.0 through 4.8 in the attached
“Exhibit A”, incorporated herewith by this reference.
2.Section 2.1 Contract Sum is amended to:
2.1 Contract Sum. For the Services rendered pursuant to this
Agreement, Contracting Party shall be compensated in accordance with
“Exhibit B” (the “Schedule of Compensation”) in a total amount not to
exceed One Million Four Hundred )RUW\6L[ Thousand SevenHundred
Eighty-Three Dollars ($1,4,783.00) for the life of the
Agreement, encompassing the initial and any extended terms. (the
“Contract Sum”), except as provided in Section 1.7.
3.Section 3.2 Schedule of Performance is amended to revised
schedule in the attached “Exhibit C”, incorporated herewith
by this reference.
In all other respects, the original Agreement shall remain in effect.
Exhibit A
Scope of Services
Section 1.1 is amended to remove Task 3.4, adjust the number of hours in
Task 0.4 and update Task 4, including 4.0 through 4.8 in the attached
“Exhibit A”, incorporated herewith by this reference.
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
dĂƐŬϰ͘>ĂYƵŝŶƚĂ,ŝŐŚǁĂLJϭϭϭ^ƉĞĐŝĨŝĐWůĂŶ
dĂƐŬϰ͘ϭ͘ʹWŚĂƐĞϰ<ŝĐŬŽĨĨΘĂĐŬŐƌŽƵŶĚĂƚĂŽůůĞĐƚŝŽŶ
dĂƐŬϰ͘ϭ͘ϭʹ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ^ĐŽƉŝŶŐDĞĞƚŝŶŐΘ^ŝƚĞdŽƵƌ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',
^ƵƉƉŽƌƚ>t͕ŝƚLJ
',͕ƚŚĞůĞĂĚĐŽŶƐƵůƚĂŶƚ͕ĂŶĚ>t;ŽŶƐƵůƚĂŶƚdĞĂŵͿǁŝůůƉƌĞƉĂƌĞĨŽƌĂŶĚĂƚƚĞŶĚŽŶĞǀŝƌƚƵĂů^ĐŽƉŝŶŐ
DĞĞƚŝŶŐǁŝƚŚŝƚLJƐƚĂĨĨƚŽĚŝƐĐƵƐƐWŚĂƐĞϰƉƌŽũĞĐƚŽďũĞĐƚŝǀĞƐ͕ƐĐŽƉĞŽĨǁŽƌŬ͕ƐĐŚĞĚƵůĞ͕ďƵĚŐĞƚ͕ŐĞŶĞƌĂů
ƉƌŽũĞĐƚĐŽŽƌĚŝŶĂƚŝŽŶ͕ĂŶĚĂƌĞĂƐŽĨĐŽŶĐĞƌŶ͘dŚĞŽŶƐƵůƚĂŶƚdĞĂŵĐŽŶƐŝĚĞƌƐƚŚĞWŚĂƐĞϰ^ĐŽƉŝŶŐDĞĞƚŝŶŐ
ĂƐĂǀŝƚĂůƉĂƌƚŽĨƚŚĞƉƌŽũĞĐƚŝŶǁŚŝĐŚƚŚĞŝƚLJ͛ƐƉƌŝŽƌŝƚLJŐŽĂůƐĨŽƌWŚĂƐĞϰǁŝůůďĞĐŽŶĨŝƌŵĞĚ͘
ƐƉĂƌƚŽĨƚŚŝƐŵĞĞƚŝŶŐ͕',ǁŝůůĂůƐŽĐŽŶĚƵĐƚĂŶŝŶͲƉĞƌƐŽŶŽƌ͕ŝĨŶĞĐĞƐƐĂƌLJĚƵĞƚŽƚŚĞŽŶŐŽŝŶŐŐůŽďĂů
Ks/ͲϭϵƉĂŶĚĞŵŝĐ͕ĂǀŝƌƚƵĂůƚŽƵƌŽĨƚŚĞWůĂŶĂƌĞĂǁŝƚŚŝƚLJƐƚĂĨĨƚŽĐŽůůĞĐƚƉƌĞůŝŵŝŶĂƌLJĚĂƚĂĂŶĚ
ĚŽĐƵŵĞŶƚŝŵƉŽƌƚĂŶƚƉĂƌĐĞůƐ͕ďƵŝůĚŝŶŐƐ͕ĂŶĚŝŶĨƌĂƐƚƌƵĐƚƵƌĞƚŽďĞƚƚĞƌƵŶĚĞƌƐƚĂŶĚƚŚĞWůĂŶƌĞĂ͘>tŵĂLJ
ĂƚƚĞŶĚŝŶͲƉĞƌƐŽŶ͕ƐƵďũĞĐƚƚŽĂŶĂĚĚŝƚŝŽŶĂůĨĞĞŽŶĂƚŝŵĞĂŶĚŵĂƚĞƌŝĂůƐďĂƐŝƐ͘
dĂƐŬϰ͘ϭ͘Ϯʹ^ƉĞĐŝĨŝĐWůĂŶĂĐŬŐƌŽƵŶĚĂƚĂŽůůĞĐƚŝŽŶΘƐƐĞƐƐŵĞŶƚ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',
^ƵƉƉŽƌƚŝƚLJ
',ǁŝůůĐŽŵƉůĞƚĞĂĨŽĐƵƐĞĚĂƐƐĞƐƐŵĞŶƚŽĨĂĚĚŝƚŝŽŶĂůƌĞůĞǀĂŶƚĚŽĐƵŵĞŶƚƐ;ŶŽƚƐƚƵĚŝĞĚŝŶWŚĂƐĞ/ͿĂŶĚ
ďĂĐŬŐƌŽƵŶĚĚĂƚĂŝŶŽƌĚĞƌƚŽŐĂŝŶĂĐŽŵƉůĞƚĞƵŶĚĞƌƐƚĂŶĚŝŶŐŽĨĞdžŝƐƚŝŶŐůĂŶĚƵƐĞƉŽůŝĐLJĂŶĚĐŽŶĨŝŐƵƌĂƚŝŽŶ͕
ŝŶĨƌĂƐƚƌƵĐƚƵƌĞ͕ƚƌĂŶƐŝƚ͕ĐŝƌĐƵůĂƚŝŽŶĂŶĚƉĂƌŬŝŶŐ͕ĂŶĚĚĞŵŽŐƌĂƉŚŝĐĐŽŶĚŝƚŝŽŶƐƌĞůĞǀĂŶƚƚŽĐŽŵƉůĞƚŝŶŐƚŚĞ
^ƉĞĐŝĨŝĐWůĂŶ͘dŚĞĚŽĐƵŵĞŶƚƐƚŽďĞƌĞǀŝĞǁĞĚǁŝůůďĞƉƌŽǀŝĚĞĚďLJƚŚĞŝƚLJ͘ůŝƐƚŽĨĚĂƚĂŶĞĞĚƐǁŝůůďĞ
ƌĞĨŝŶĞĚŝŶƉƌĞƉĂƌĂƚŝŽŶĨŽƌƚŚŝƐƚĂƐŬ͖ƚŚĞĨŽůůŽǁŝŶŐŝƐĂďĂƐĞůŝŶĞůŝƐƚ͗
ŝŐŝƚĂůĚŽĐƵŵĞŶƚĂƚŝŽŶĨŽƌƚŚĞĞŶƚŝƌĞ^ƉĞĐŝĨŝĐWůĂŶƐƚƵĚLJĂƌĞĂƌĞƋƵŝƌĞĚďLJƚŚĞƉƌŽũĞĐƚƚĞĂŵƚŽƉƌŽĐĞĞĚ;ŝĨ
ŶŽƚĂůƌĞĂĚLJƉƌŽǀŝĚĞĚͿ͗
Ͳ ,ŝŐŚǁĂLJϭϭϭŽƌƌŝĚŽƌWůĂŶ;ϮϬϭϵͿ
Ͳ ,ŝŐŚǁĂLJϭϭϭĞƐŝŐŶ'ƵŝĚĞůŝŶĞƐ;ϮϬϭϭͿ
Ͳ ZĞĐĞŶƚĚĞǀĞůŽƉŵĞŶƚĂƉƉůŝĐĂƚŝŽŶƐ
Ͳ ĚŽƉƚĞĚ'ĞŶĞƌĂůWůĂŶĂŶĚnjŽŶŝŶŐŵĂƉƐĂŶĚŽƌĚŝŶĂŶĐĞƐ
Ͳ ŶLJŽƚŚĞƌƌĞůĞǀĂŶƚƉůĂŶŶŝŶŐŽƌƉŽůŝĐLJĚŽĐƵŵĞŶƚƐ
Ͳ ^ƚƌĞĞƚĐĞŶƚĞƌůŝŶĞƐ
Ͳ ^ƚƌĞĞƚƌŝŐŚƚŽĨǁĂLJ;ŵĂLJďĞƉƌŽǀŝĚĞĚďLJƉĂƌĐĞůŵĂƉͿ
Ͳ WĂƌĐĞůƐ;njŽŶŝŶŐƌĞƋƵŝƌĞĚ͖ŝŵƉƌŽǀĞŵĞŶƚƐƋƵĂƌĞĨŽŽƚĂŐĞ͕
Ͳ hƚŝůŝƚLJŵĂŝŶƐ;ƐƚŽƌŵǁĂƚĞƌ͕ƉŽƚĂďůĞǁĂƚĞƌ͕ƌĞĐůĂŝŵĞĚǁĂƚĞƌ͕ƐĞǁĞƌ͕ĞůĞĐƚƌŝĐĂů͕ďƌŽĂĚďĂŶĚ͕ŶĂƚƵƌĂů
ŐĂƐ;ŝĨƉƌĞƐĞŶƚͿ͕ƉĞƚƌŽůĞƵŵͬĨƵĞů;ŝĨƉƌĞƐĞŶƚͿ͘
Ͳ ,ĂnjĂƌĚďŽƵŶĚĂƌŝĞƐĂŶĚƉƌŽƚĞĐƚĞĚĂƌĞĂƐ;ĐŚĞŵŝĐĂůƉůƵŵĞƐ͕ǁĞůůƐŝƚĞƐ͕ĞĐŽůŽŐŝĐĂůŝŵƉĂĐƚĂƌĞĂƐ͕
&D͕ŬŶŽǁŶŚŝƐƚŽƌŝĐĂůĂƐƐĞƚƐͿ͘
Ͳ ĞƐŝŐŶĚƌĂǁŝŶŐƐ;W&Žƌ:W'ͿĨŽƌĨƵƚƵƌĞƉƵďůŝĐƌĞĂůŵŝŵƉƌŽǀĞŵĞŶƚƐ͕ŝŶĐůƵĚŝŶŐsůŝŶŬ͘
([KLELW$
6FRSHRI6HUYLFHV
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
dĂƐŬϰ͘ϭ͘ϯʹ^ƚĂŬĞŚŽůĚĞƌŶŐĂŐĞŵĞŶƚWůĂŶ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',
^ƵƉƉŽƌƚŝƚLJ
/ŶĂŶĞĨĨŽƌƚƚŽŵĂŝŶƚĂŝŶĐŽŶƐŝƐƚĞŶƚĂŶĚƐƵďƐƚĂŶƚŝǀĞĚŝĂůŽŐƵĞǁŝƚŚŝƚLJƐƚĂĨĨĂŶĚƚŚĞƐƚĂŬĞŚŽůĚĞƌ
ĐŽŵŵƵŶŝƚLJ͕',ǁŝůůƉƌĞƉĂƌĞĂ^ƚĂŬĞŚŽůĚĞƌŶŐĂŐĞŵĞŶƚWůĂŶ;^WͿǁŚŝĐŚǁŝůůŽƵƚůŝŶĞƚŚĞŽǀĞƌĂůů
ĂƉƉƌŽĂĐŚƚŽĞŶŐĂŐĞŵĞŶƚĂŶĚĞƐƚĂďůŝƐŚĂƉƌĞůŝŵŝŶĂƌLJƐĐŚĞĚƵůĞŽĨŵĞĞƚŝŶŐƐ͘ĞĐĂƵƐĞŽĨƚŚĞĞdžƚĞŶƐŝǀĞ
ŽƵƚƌĞĂĐŚƉĞƌĨŽƌŵĞĚĂƐƉĂƌƚŽĨƚŚĞĚĞǀĞůŽƉŵĞŶƚŽĨƚŚĞ,ŝŐŚǁĂLJϭϭϭŽƌƌŝĚŽƌsŝƐŝŽŶWůĂŶ͕ƚŚĞŽŶƐƵůƚĂŶƚ
dĞĂŵĞdžƉĞĐƚƐƚŚĞĨŽůůŽǁŝŶŐĞŶŐĂŐĞŵĞŶƚŽƉƉŽƌƚƵŶŝƚŝĞƐ͕ĂƐŽƵƚůŝŶĞĚŝŶƚŚĞdĂƐŬƐďĞůŽǁ͗
ͻ DĞĞƚŝŶŐƐǁŝƚŚWƌŽƉĞƌƚLJKǁŶĞƌƐĂŶĚĞǀĞůŽƉĞƌƐ;^ĞĞdĂƐŬϰ͘ϯ͘ϮͿ
ͻ WƵďůŝĐ^ƚƵĚLJ^ĞƐƐŝŽŶƐǁŝƚŚWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂŶĚŝƚLJŽƵŶĐŝů;^ĞĞdĂƐŬƐϰ͘ϯ͘ϰĂŶĚϰ͘ϲ͘ϮͿ
ͻ ,ĞĂƌŝŶŐƐǁŝƚŚWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂŶĚŝƚLJŽƵŶĐŝů;^ĞĞdĂƐŬϰ͘ϴͿ
',ŚĂƐŝŶĐůƵĚĞĚďƵĚŐĞƚƚŽĂƚƚĞŶĚŵĞĞƚŝŶŐƐŝŶƉĞƌƐŽŶ͘,ŽǁĞǀĞƌ͕ĚƵĞƚŽƚŚĞŽŶŐŽŝŶŐŐůŽďĂůKs/Ͳϭϵ
ƉĂŶĚĞŵŝĐ͕',ŝƐĂůƐŽĂǀĂŝůĂďůĞƚŽĂƚƚĞŶĚĂůůƐƚĂĨĨŵĞĞƚŝŶŐƐ͕ƉƵďůŝĐŵĞĞƚŝŶŐƐ͕ĂŶĚŚĞĂƌŝŶŐƐǀŝƌƚƵĂůůLJ͘>t
ŝƐƉƌŽƉŽƐĞĚƚŽĂƚƚĞŶĚĂůůŵĞĞƚŝŶŐƐǀŝƌƚƵĂůůLJ͕ďƵƚŵĂLJďĞĂǀĂŝůĂďůĞĨŽƌŝŶƉĞƌƐŽŶŵĞĞƚŝŶŐƐǁŝƚŚƐƵďũĞĐƚƚŽ
ŵƵƚƵĂůĂŐƌĞĞŵĞŶƚ͕ŽŶĂƚŝŵĞĂŶĚŵĂƚĞƌŝĂůƐďĂƐŝƐ͘
dĂƐŬϰ͘ϭWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x ^ƵŵŵĂƌLJŽĨDĞĞƚŝŶŐƐ
x ^ƚĂŬĞŚŽůĚĞƌŶŐĂŐĞŵĞŶƚWůĂŶ
dĂƐŬϰ͘Ϯ͘ʹ^ƉĞĐŝĨŝĐWůĂŶdžŝƐƚŝŶŐŽŶĚŝƚŝŽŶƐŶĂůLJƐĞƐ
dĂƐŬϰ͘Ϯ͘ϭʹ'ĞŶĞƌĂůWůĂŶ͕ŽƌƌŝĚŽƌWůĂŶ͕ĂŶĚ^ƉĞĐŝĨŝĐWůĂŶsŝƐŝŽŶĂŶĚWŽůŝĐLJ
ƐƐĞƐƐŵĞŶƚ;^ĞĞdĂƐŬϰ͘Ϯ͘ϮĨŽƌZĞŐƵůĂƚŽƌLJƐƐĞƐƐŵĞŶƚͿ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',
^ƵƉƉŽƌƚŝƚLJ
',ǁŝůůĂŶĂůLJnjĞĂŶĚĂƐƐĞƐƐƚŚĞ,ŝŐŚǁĂLJϭϭϭŽƌƌŝĚŽƌWůĂŶ͕^ƉĞĐŝĨŝĐWůĂŶƐ͕ĂŶĚ'ĞŶĞƌĂůWůĂŶƚŽĚĞůŝŶĞĂƚĞ
ĂĐŽŚĞƐŝǀĞǀŝƐŝŽŶĨŽƌƚŚĞŶĞǁ^ƉĞĐŝĨŝĐWůĂŶ͘',ǁŝůůƉĞƌĨŽƌŵĂĚĞƚĂŝůĞĚĂƐƐĞƐƐŵĞŶƚŽĨƚŚĞ'ĞŶĞƌĂůWůĂŶ͕
^ƉĞĐŝĨŝĐWůĂŶƐ͕ĂŶĚŽƌƌŝĚŽƌWůĂŶĨŽƌĚŝƌĞĐƚŝŽŶ͕ǀŝƐŝŽŶ͕ŐŽĂůƐ͕ƉŽůŝĐŝĞƐ͕ĂŶĚƉƌŽŐƌĂŵƐƌĞůĞǀĂŶƚƚŽƚŚĞ
^ƉĞĐŝĨŝĐWůĂŶƌĞĂĂŶĚƐƵŵŵĂƌŝnjĞƚŚĞƌĞƐƵůƚƐŽĨƚŚĞĂŶĂůLJƐŝƐŝŶĂWŽǁĞƌWŽŝŶƚƉƌĞƐĞŶƚĂƚŝŽŶ;ƐĞĞdĂƐŬ
ϰ͘Ϯ͘ϯͿ͘dŚĞŝŶƚĞŶƚŽĨƚŚŝƐƌĞǀŝĞǁŝƐƚŽŝĚĞŶƚŝĨLJƌĞůĞǀĂŶƚƉŽůŝĐŝĞƐĂŶĚŽďũĞĐƚŝǀĞƐĨŽƌƚŚĞ^ƉĞĐŝĨŝĐWůĂŶĂŶĚ
ŝĚĞŶƚŝĨLJĂƌĞĂƐǁŚĞƌĞĂĚĚŝƚŝŽŶĂůĚŝƌĞĐƚŝŽŶŽƌǀŝƐŝŽŶŝŶŐŝƐŶĞĞĚĞĚƚŽĐŽŵƉůĞƚĞƚŚĞ,ŝŐŚǁĂLJϭϭϭ^ƉĞĐŝĨŝĐ
WůĂŶ͘',ǁŝůůƌĞǀŝĞǁĂůůĂƉƉůŝĐĂďůĞĞdžŝƐƚŝŶŐ^ƉĞĐŝĨŝĐWůĂŶƐƚŽĚĞƚĞƌŵŝŶĞǁŚŝĐŚƉŽůŝĐŝĞƐĂƌĞƌĞůĞǀĂŶƚĂŶĚ
ƐŚŽƵůĚƌĞŵĂŝŶŽƌďĞƵƉĚĂƚĞĚŝŶƚŚĞŶĞǁ^ƉĞĐŝĨŝĐWůĂŶ͘',ǁŝůůƌĞǀŝĞǁǁŝƚŚŝƚLJƐƚĂĨĨĂŶĚƉƌŽǀŝĚĞŽŶĞ
ƌŽƵŶĚŽĨĞĚŝƚƐŝŶŽƌĚĞƌƚŽĨŝŶĂůŝnjĞ͘
>ĂŶĚhƐĞ
',ǁŝůůƌĞǀŝĞǁƚŚĞ'ĞŶĞƌĂůWůĂŶ͛Ɛ>ĂŶĚhƐĞĂŶĚĞǀĞůŽƉŵĞŶƚ^ƚƌĂƚĞŐLJƚŽĂƐƐĞƐƐƚŚĞĚĞŐƌĞĞƚŽ
ǁŚŝĐŚƚŚĞ^ƉĞĐŝĨŝĐWůĂŶƐŚŽƵůĚďƵŝůĚŽĨĨŽĨƚŚĞŐŽĂůƐ͕ůĂŶĚƵƐĞŝŶƚĞŶƐŝƚŝĞƐ͕ůĂŶĚƵƐĞƐ͕ĂŶĚƐƵďͲ
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
ĂƌĞĂƐŝĚĞŶƚŝĨŝĞĚŝŶƚŚĞ'ĞŶĞƌĂůWůĂŶĂŶĚƚŚĞ,ŝŐŚǁĂLJϭϭϭŽƌƌŝĚŽƌWůĂŶ͘
dƌĂŶƐƉŽƌƚĂƚŝŽŶ
',ǁŝůůƌĞǀŝĞǁƚŚĞŝƚLJ͛Ɛ'ĞŶĞƌĂůWůĂŶŝƌĐƵůĂƚŝŽŶůĞŵĞŶƚƚŽŝĚĞŶƚŝĨLJƉŽůŝĐŝĞƐ͕ŐŽĂůƐ͕Žƌ
ŽďũĞĐƚŝǀĞƐƚŚĂƚŵĂLJŐƵŝĚĞƚŚĞ^ƉĞĐŝĨŝĐWůĂŶƉƌŽĐĞƐƐŽƌƚŚĂƚĐŽƵůĚďĞŶĞĨŝƚĨƌŽŵŵŽĚŝĨŝĐĂƚŝŽŶŝŶ
ƚŚĞ^ƉĞĐŝĨŝĐWůĂŶĂƌĞĂ͘
hƌďĂŶĞƐŝŐŶ
',ǁŝůůƐƵŵŵĂƌŝnjĞŬĞLJŐŽĂůƐĂŶĚƉŽůŝĐŝĞƐŽĨƚŚĞ'ĞŶĞƌĂůWůĂŶƌĞůĂƚĞĚƚŽůĂŶĚƵƐĞ͕
ƚƌĂŶƐƉŽƌƚĂƚŝŽŶĂŶĚŵƵůƚŝͲŵŽĚĂůĂĐĐĞƐƐŝďŝůŝƚLJ͕ƐƚƌĞĞƚƐĐĂƉĞ͕ĂŶĚƵƌďĂŶĚĞƐŝŐŶƚŚĂƚƉƌŽǀŝĚĞ
ĚŝƌĞĐƚŝŽŶĨŽƌƚŚĞĚĞƐŝƌĞĚůĂŶĚƵƐĞƉĂƚƚĞƌŶƐ͕ŵŝdžŽĨƵƐĞƐ͕ĚĞǀĞůŽƉŵĞŶƚŝŶƚĞŶƐŝƚŝĞƐ͕ĐŽŶŶĞĐƚŝǀŝƚLJ͕
ĂŶĚƉŚLJƐŝĐĂůĂƉƉĞĂƌĂŶĐĞŽĨƚŚĞ^ƉĞĐŝĨŝĐWůĂŶƌĞĂ͘
dĂƐŬϰ͘Ϯ͘ϮʹŽŶŝŶŐĂŶĚ^ƉĞĐŝĨŝĐWůĂŶZĞŐƵůĂƚŽƌLJƐƐĞƐƐŵĞŶƚ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗>t
>tǁŝůůƌĞǀŝĞǁƚŚĞnjŽŶŝŶŐĂŶĚĚĞǀĞůŽƉŵĞŶƚƐƚĂŶĚĂƌĚƐĂƐŽƵƚůŝŶĞĚŝŶĞdžŝƚŝŶŐƐƉĞĐŝĨŝĐƉůĂŶƐƚŚĂƚĐŽǀĞƌ
ƚŚĞŶĞǁ^ƉĞĐŝĨŝĐWůĂŶďŽƵŶĚĂƌLJ;ĂŶĚǁĞƌĞŶŽƚĂůƌĞĂĚLJĂŶĂůLJnjĞĚŝŶWŚĂƐĞϭͿĂŶĚƐƵŵŵĂƌŝnjĞƚŚĞĨŝŶĚŝŶŐƐ
ĂŶĚƌĞƐƵůƚƐŽĨƚŚĞƌĞǀŝĞǁŝŶĂWŽǁĞƌWŽŝŶƚƉƌĞƐĞŶƚĂƚŝŽŶ;ƐĞĞdĂƐŬϮ͘ϯͿdŚĞŝŶƚĞŶƚŝƐƚŽƵŶĚĞƌƐƚĂŶĚƚŚĞ
ŵƵůƚŝƉůĞůĂLJĞƌƐŽĨĚĞǀĞůŽƉŵĞŶƚƐƚĂŶĚĂƌĚƐĂŶĚnjŽŶŝŶŐƌĞŐƵůĂƚŝŽŶƐŝŶĐůƵĚĞĚǁŝƚŚŝŶƚŚĞƐƉĞĐŝĨŝĐƉůĂŶƐĂŶĚ
njŽŶŝŶŐŽǀĞƌůĂLJƐŝŶŽƌĚĞƌƚŽĞůŝŵŝŶĂƚĞŝŶĐŽŶƐŝƐƚĞŶĐŝĞƐĂŶĚĚĞǀĞůŽƉĂƐƚƌĂƚĞŐLJƚŽƌĞƉůĂĐĞƚŚĞŵ;ŝĨƉŽƐƐŝďůĞͿ
ǁŝƚŚƵŶŝĨŽƌŵƐƚĂŶĚĂƌĚƐĐŽŶƐŝƐƚĞŶƚǁŝƚŚƚŚĞůĂŶĚƵƐĞǀŝƐŝŽŶŽĨƚŚĞ^ƉĞĐŝĨŝĐWůĂŶ͘ŶLJĞĨĨĞĐƚŝǀĞ͕ĂŶĚƐƚŝůů
ƌĞůĞǀĂŶƚ͕ƉƌŽǀŝƐŝŽŶƐĨƌŽŵƚŚĞĞdžŝƐƚŝŶŐƐƉĞĐŝĨŝĐƉůĂŶƐǁŝůůďĞŝŶĐŽƌƉŽƌĂƚĞĚŝŶƚŽŶĞǁnjŽŶŝŶŐƌĞŐƵůĂƚŝŽŶƐ͘͘
>tǁŝůůƌĞǀŝĞǁǁŝƚŚŝƚLJƐƚĂĨĨĂŶĚƉƌŽǀŝĚĞŽŶĞƌŽƵŶĚŽĨĞĚŝƚƐŝŶŽƌĚĞƌƚŽĨŝŶĂůŝnjĞ͘
dĂƐŬϰ͘Ϯ͘ϯʹdžŝƐƚŝŶŐŽƌƌŝĚŽƌŽŶĚŝƚŝŽŶƐ^LJŶƚŚĞƐŝƐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗',ĂŶĚ>t;ƐĞĞďĞůŽǁͿ
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉĞƌĨŽƌŵĂŶĞdžŝƐƚŝŶŐĐŽŶĚŝƚŝŽŶƐƐLJŶƚŚĞƐŝƐŽĨƚŚĞWůĂŶƌĞĂƚŽŝŶĨŽƌŵƚŚĞŝŶŝƚŝĂů
ƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐĨŽƌƚŚĞ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ͘dŚĞƌĞƐƵůƚƐŽĨƚŚĞĞdžŝƐƚŝŶŐĐŽŶĚŝƚŝŽŶƐĂƐƐĞƐƐŵĞŶƚǁŝůů
ďĞƐƵŵŵĂƌŝnjĞĚŝŶĂĚĞůŝǀĞƌĂďůĞĨŽƌŵĂƚŽĨƚŚĞŝƚLJ͛ƐĐŚŽŽƐŝŶŐ;W&ŽĨWŽǁĞƌWŽŝŶƚŽƌtŽƌĚŽĐƵŵĞŶƚͿ͘/Ŷ
ĂĚĚŝƚŝŽŶƚŽƚŚĞĨŝŶĚŝŶŐƐĨƌŽŵdĂƐŬϰ͘Ϯ͘ϭĂŶĚϰ͘Ϯ͘Ϯ͕ƚŚĞĂƐƐĞƐƐŵĞŶƚǁŝůůŝŶĐůƵĚĞƚŚĞĨŽůůŽǁŝŶŐ
ĐŽŵƉŽŶĞŶƚƐ͗
DĂƌŬĞƚĞŵĂŶĚ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗>t
ƵŝůĚŝŶŐŽĨĨƚŚĞ'ĞŶĞƌĂůWůĂŶ͕ĂŶLJĞdžŝƐƚŝŶŐĞĐŽŶŽŵŝĐƐƚƵĚŝĞƐĂŶĚƐƚƌĂƚĞŐŝĐƉůĂŶƐ͕ƐƵĐŚĂƐƚŚĞh>/
ƐƚƵĚLJ͕>tǁŝůůĐŽŶĚƵĐƚĂŵĂƌŬĞƚĂŶĂůLJƐŝƐŽĨĐƵƌƌĞŶƚĂŶĚĨƵƚƵƌĞĚĞŵĂŶĚĨŽƌƌĞƚĂŝů͕
ĞŶƚĞƌƚĂŝŶŵĞŶƚ͕ŽĨĨŝĐĞ͕ĂŶĚƌĞƐŝĚĞŶƚŝĂůƐƉĂĐĞ͘dŚĞĨŝŶĚŝŶŐƐĨƌŽŵƚŚŝƐĂŶĂůLJƐŝƐǁŝůůŝŶĨŽƌŵƚŚĞ
ŽƉƚŝŵĂůŵŝdžŽĨƵƐĞƐŝŶĐƌĞĂƚŝŶŐĂǀŝďƌĂŶƚĂŶĚƐƵƐƚĂŝŶĂďůĞƌĞƚĂŝůĂŶĚĞŶƚĞƌƚĂŝŶŵĞŶƚĐĞŶƚĞƌ͕ĂŶĚ
ƉƌŽǀŝĚĞƚŚĞďĂƐŝƐĨŽƌĂůůŽǁĞĚƵƐĞƐ͕ŶĞǁnjŽŶĞƐ͕ĂŶĚĚĞǀĞůŽƉŵĞŶƚƐƚĂŶĚĂƌĚƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐŝŶ
ƚŚĞ^ƉĞĐŝĨŝĐWůĂŶ͘dŚĞŵĂƌŬĞƚĂŶĂůLJƐŝƐǁŝůůĨŽĐƵƐŽŶŵĂƌŬĞƚŵĞƚƌŝĐƐ;ĚĞŵŽŐƌĂƉŚŝĐƐ͕ŝŶĐŽŵĞ
ůĞǀĞůƐ͕ĐŽŶĨŝŐƵƌĂƚŝŽŶĂŶĚƉůĂĐĞŵĞŶƚŽĨďƵƐŝŶĞƐƐĞƐ͕ƚLJƉĞƐĂŶĚŶƵŵďĞƌŽĨĞdžŝƐƚŝŶŐďƵƐŝŶĞƐƐĞƐ͕
ůĞĂŬĂŐĞƐ͕ƌĞŐŝŽŶĂůĐŽŵƉĞƚŝƚŝŽŶ͕ĞƚĐ͘ͿĂŶĚĞǀĂůƵĂƚĞĞdžŝƐƚŝŶŐŽƉƉŽƌƚƵŶŝƚŝĞƐĂŶĚĐŽŶƐƚƌĂŝŶƚƐƚŽ
ĨƵƚƵƌĞƌĞǀŝƚĂůŝnjĂƚŝŽŶĞĨĨŽƌƚƐ͘
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
ŝƌĐƵůĂƚŝŽŶEĞƚǁŽƌŬ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
',ǁŝůůƐƵŵŵĂƌŝnjĞƚŚĞĞdžŝƐƚŝŶŐĐŽŶĚŝƚŝŽŶƐĐŝƌĐƵůĂƚŝŽŶĂƐƐĞƐƐŵĞŶƚĨƌŽŵƚŚĞŽƌƌŝĚŽƌĞƐŝŐŶ
ŽŶĐĞƉƚ;WŚĂƐĞϮͿĨŽĐƵƐŝŶŐŽŶĐƵƌƌĞŶƚƐĂĨĞƚLJĂŶĚŵŽďŝůŝƚLJĐŽŶĚŝƚŝŽŶƐĂůŽŶŐƚŚĞ,ŝŐŚǁĂLJϭϭϭ
ŽƌƌŝĚŽƌ͘',ǁŝůůĞdžƉĂŶĚŽŶƚŚĞǁŽƌŬƉƌĞƉĂƌĞĚŝŶWŚĂƐĞϮƚŽŝŶĐůƵĚĞŽƌŝŐŝŶͲĚĞƐƚŝŶĂƚŝŽŶĂŶĂůLJƐŝƐ
ŽĨůŽĐĂůĂŶĚƌĞŐŝŽŶĂůƚƌĂĨĨŝĐĨůŽǁƐ͕ďLJŵŽĚĞ͕ŝŶĨŽƌŵŝŶŐŽƵƌƵŶĚĞƌƐƚĂŶĚŝŶŐŽĨĐŽƌƌŝĚŽƌǀŝƐŝƚŽƌƐŚŝƉ
ŝŶƚŚĞŵĂƌŬĞƚĚĞŵĂŶĚĂŶĂůLJƐŝƐ͘',ǁŝůůĂůƐŽŝŶĐůƵĚĞĂƐƐĞƐƐŵĞŶƚŽĨƚŚĞŝŶƚĞƌŶĂůĐŝƌĐƵůĂƚŝŽŶ
ǁŝƚŚŝŶƉƌŝǀĂƚĞĐŽŵŵĞƌĐŝĂůƉĂƌĐĞůƐ͘
ŽŵŵƵŶŝƚLJ&ŽƌŵĂŶĚŚĂƌĂĐƚĞƌŶĂůLJƐŝƐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
',ǁŝůůĐŽŶĚƵĐƚĂĐŽŵŵƵŶŝƚLJĨŽƌŵĂŶĚĐŚĂƌĂĐƚĞƌĂŶĂůLJƐŝƐŽĨƚŚĞWůĂŶƌĞĂ͛ƐďƵŝůƚĞŶǀŝƌŽŶŵĞŶƚ͘
dŚŝƐĂŶĂůLJƐŝƐǁŝůůŝŶĐůƵĚĞŵĂƉƉŝŶŐŽĨĞdžŝƐƚŝŶŐůĂŶĚƵƐĞƐĂŶĚĚŽĐƵŵĞŶƚĂƚŝŽŶŽĨ
ƐƚƌĞĞƚƐĐĂƉĞͬĨƌŽŶƚĂŐĞĐŽŶĚŝƚŝŽŶƐĂŶĚƉƵďůŝĐĂŵĞŶŝƚŝĞƐŝŶĂĨĞǁŬĞLJĂƌĞĂƐƚŽĨƌĂŵĞƚŚĞĞdžŝƐƚŝŶŐ
ƉŚLJƐŝĐĂůĨƌĂŵĞǁŽƌŬĂŶĚĚĞƐŝŐŶŽƉƉŽƌƚƵŶŝƚŝĞƐͬĐŽŶƐƚƌĂŝŶƚƐ͕ŝŶĐůƵĚŝŶŐŝĚĞŶƚŝĨŝĐĂƚŝŽŶŽĨŽƉƉŽƌƚƵŶŝƚLJ
ƐŝƚĞƐĨŽƌĨƵƌƚŚĞƌĂŶĂůLJƐŝƐ͘
ŶǀŝƌŽŶŵĞŶƚĂůŽŶĚŝƚŝŽŶƐĂŶĚŽŶƐƚƌĂŝŶƚƐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
',ǁŝůůĐŽŶĚƵĐƚĂƐĐƌĞĞŶŝŶŐͲůĞǀĞůƌĞǀŝĞǁŽĨĞdžŝƐƚŝŶŐĞŶǀŝƌŽŶŵĞŶƚĂůĐŽŶĚŝƚŝŽŶƐĂŶĚƉŽƚĞŶƚŝĂů
ĐŽŶƐƚƌĂŝŶƚƐĂƐƐŽĐŝĂƚĞĚǁŝƚŚŝŵƉůĞŵĞŶƚĂƚŝŽŶŽĨƚŚĞƉƌŽƉŽƐĞĚ^ƉĞĐŝĨŝĐWůĂŶ͘dŚĞƌĞǀŝĞǁǁŝůů
ĐŽŶƐŝĚĞƌĞŶǀŝƌŽŶŵĞŶƚĂůĚŝƐĐŝƉůŝŶĞƐƉƌĞƐĞŶƚĞĚŝŶƉƉĞŶĚŝdž'ŽĨƚŚĞY'ƵŝĚĞůŝŶĞƐ͕
ƌĞůĂƚŝŽŶƐŚŝƉƚŽƚŚĞĐƵƌƌĞŶƚ'ĞŶĞƌĂůWůĂŶĂŶĚŽƚŚĞƌƐƉĞĐŝĨŝĐƉůĂŶƐŝŶƚŚĞǀŝĐŝŶŝƚLJŽĨƚŚĞ,ŝŐŚǁĂLJ
ϭϭϭĐŽƌƌŝĚŽƌ͕ĂŶĚƵƐĞŽĨƚŚĞYĚŽĐƵŵĞŶƚ;ĂƐƉƌŽƉŽƐĞĚŝŶdĂƐŬϱ͕ďĞůŽǁͿŝŶŝŵƉůĞŵĞŶƚŝŶŐ
ĨƵƚƵƌĞĚĞǀĞůŽƉŵĞŶƚ͘
/ŶĨƌĂƐƚƌƵĐƚƵƌĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
',ǁŝůůƉƌŽǀŝĚĞĂŚŝŐŚͲůĞǀĞůƌĞǀŝĞǁŽĨĐƌŝƚŝĐĂůƵƚŝůŝƚŝĞƐĐƵƌƌĞŶƚůLJƐĞƌǀŝŶŐƚŚĞƉƌŽũĞĐƚĂƌĞĂƚŽ
ƐƵƉƉŽƌƚŝĚĞŶƚŝĨŝĐĂƚŝŽŶŽĨŝŶĨƌĂƐƚƌƵĐƚƵƌĞŝŵƉƌŽǀĞŵĞŶƚƐƌĞƋƵŝƌĞĚƚŽƐƵƉƉŽƌƚƚŚĞƉƌŽƉŽƐĞĚ
ĚĞǀĞůŽƉŵĞŶƚ͘dŚĞƌĞǀŝĞǁǁŝůůĂĚĚƌĞƐƐƉŽƚĂďůĞǁĂƚĞƌƐĞƌǀŝĐĞ͕ǁĂƐƚĞǁĂƚĞƌĐŽůůĞĐƚŝŽŶ͕
ƐƚŽƌŵǁĂƚĞƌͬĨůŽŽĚĐŽŶƚƌŽů͕ĂŶĚƌĞĐLJĐůĞĚǁĂƚĞƌƐĞƌǀŝĐĞĂǀĂŝůĂďŝůŝƚLJ͖ĞůĞĐƚƌŝĐŝƚLJĂŶĚŶĂƚƵƌĂůŐĂƐ͖
ĂŶĚĂǀĂŝůĂďůĞƚĞůĞĐŽŵŵƵŶŝĐĂƚŝŽŶƐƉƌŽǀŝĚĞƌƐ͘',ǁŝůůƵƚŝůŝnjĞĞdžŝƐƚŝŶŐŵĂƐƚĞƌƉůĂŶƐ͕ŝŶĐůƵĚŝŶŐƚŚĞ
ĐƵƌƌĞŶƚhƌďĂŶtĂƚĞƌDĂŶĂŐĞŵĞŶƚWůĂŶĨŽƌƚŚĞŽĂĐŚĞůůĂsĂůůĞLJ͕ƵƚŝůŝƚLJůĂLJŽƵƚƐĂǀĂŝůĂďůĞ
ƚŚƌŽƵŐŚŵĂƉƉŝŶŐƌĞƋƵĞƐƚƐĂŶĚŽƚŚĞƌǁŝƐĞƉƵďůŝĐůLJĂǀĂŝůĂďůĞ͕ĂŶĚƚĞůĞĐŽŵŵƵŶŝĐĂƚŝŽŶƐ
;ƚĞůĞƉŚŽŶĞ͕ŝŶƚĞƌŶĞƚͿƐĞƌǀŝĐĞƉƌŽǀŝĚĞƌŝŶĨŽƌŵĂƚŝŽŶ͘&ŽůůŽǁŝŶŐƚŚŝƐƌĞǀŝĞǁ͕',ǁŝůůƐƵŵŵĂƌŝnjĞ
ŝŶĨŽƌŵĂƚŝŽŶƉĞƌƚŝŶĞŶƚƚŽƚŚĞƉƌŽũĞĐƚĂƌĞĂĂŶĚŝĚĞŶƚŝĨLJƉŽƚĞŶƚŝĂůĐŽŶƐƚƌĂŝŶƚƐŽŶƚŚĞƉƌŽƉŽƐĞĚ
ĚĞǀĞůŽƉŵĞŶƚ͘dŚĞĂŶĂůLJƐŝƐǁŝůůŶŽƚŝŶĐůƵĚĞĂŶLJƐLJƐƚĞŵŽƌƵƚŝůŝƚLJŵŽĚĞůŝŶŐĨŽƌƚŚĞƉƌŽũĞĐƚĂƌĞĂ͕
ƚŚŽƵŐŚƐƵĐŚŵŽĚĞůŝŶŐŵĂLJďĞƌĞĐŽŵŵĞŶĚĞĚĂƐĂŶĞdžƚƐƚĞƉ͘
džŝƐƚŝŶŐŽŶĚŝƚŝŽŶƐĂƐĞŽĐƵŵĞŶƚƐĂŶĚzŝĞůĚdĂďůĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
',ǁŝůůĂƐƐĞŵďůĞĚŝŐŝƚĂůĚĂƚĂƉƌŽǀŝĚĞĚďLJƚŚĞŝƚLJƚŽĞƐƚĂďůŝƐŚĂŶĞdžŝƐƚŝŶŐĐŽŶĚŝƚŝŽŶƐĨŝůĞ͕
ŝŶĐůƵĚŝŶŐĨĂĐĞͲŽĨͲĐƵƌď͕ďĂĐŬŽĨĐƵƌď͕ďƵŝůĚŝŶŐĨŽŽƚƉƌŝŶƚƐ͕ĂŶĚƉĂƌĐĞůďŽƵŶĚĂƌŝĞƐ͘ďĂƐĞĨŝůĞ
ŝƐĨŽƌŝůůƵƐƚƌĂƚŝǀĞĂŶĚĐŽŶĐĞƉƚƵĂůĚĞƐŝŐŶƉƵƌƉŽƐĞƐŽŶůLJĂŶĚǁŝůůďĞĂĐĐƵƌĂƚĞĞŶŽƵŐŚŽŶůLJƚŽĚĞƉŝĐƚ
ƚŚĞůĂLJŽƵƚŽĨĐŽŶĐĞƉƚƐĨŽƌĨƵƚƵƌĞƉƌŝǀĂƚĞĚĞǀĞůŽƉŵĞŶƚĂŶĚƉƵďůŝĐǁŽƌŬƐ͘
',ǁŝůůƵƐĞƚŚŝƐƚĂƐŬƚŽƉƌĞƉĂƌĞĂ^ŬĞƚĐŚƵƉϯŵŽĚĞů;ďƵŝůĚŝŶŐƐĂŶĚƐŝƚĞƐͿĂŶĚZĞŵŝdžǁĞďƚŽŽů
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
;ƌŽĂĚƐͿĨŽƌƚŚĞƉƌŽũĞĐƚƐƚƵĚLJĂƌĞĂĨŽƌůĂƚĞƌƵƐĞŝŶϭͿ͘YƵĂŶƚŝĨLJŝŶŐƉƌŽƉŽƐĞĚŵƵůƚŝͲƐƚŽƌLJ
ĚĞǀĞůŽƉŵĞŶƚLJŝĞůĚƐ͕ĂŶĚϮͿ͘ŝůůƵƐƚƌĂƚŝǀĞǀŝƐƵĂůŝnjĂƚŝŽŶĂŶĚĂĞƌŝĂůĚŝĂŐƌĂŵƐ͘
',ǁŝůůƵƐĞƚŚŝƐƚĂƐŬƚŽƉƌĞƉĂƌĞĂĚŝĂŐƌĂŵŵĂƉďĂƐĞĨŽƌƉƵƌƉŽƐĞƐŽĨĚŝĂŐƌĂŵŵŝŶŐĂŶĚ
ŝůůƵƐƚƌĂƚŝǀĞƉůĂŶĚƌĂǁŝŶŐƐŝŶĚŽďĞƐŽĨƚǁĂƌĞ͘
',ǁŝůůĂůƐŽƵƐĞƚŚŝƐƚĂƐŬƚŽĨŽƌŵĂƚĂĚĞǀĞůŽƉŵĞŶƚƐƵŵŵĂƌLJƐƉƌĞĂĚƐŚĞĞƚͬƚĂďůĞƚŽďĞƵƐĞĚŝŶ
ƋƵĂŶƚŝĨLJŝŶŐĂŶƚŝĐŝƉĂƚĞĚĚĞǀĞůŽƉŵĞŶƚLJŝĞůĚ;'&ĂŶĚhͿ͘
dĂƐŬϰ͘ϮWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x ^ƉĞĐŝĨŝĐWůĂŶdžŝƐƚŝŶŐŽŶĚŝƚŝŽŶƐŶĂůLJƐŝƐWŽǁĞƌWŽŝŶƚ
x ĂƐĞDĂƉƉŝŶŐĂŶĚDŽĚĞů͕ĂƐĞ͕ĂŶĚĂƐĞĞǀĞůŽƉŵĞŶƚdĂďůĞ
dĂƐŬϰ͘ϯ͘ʹWƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬ
dĂƐŬϰ͘ϯ͘ϭʹWƌĞƉĂƌĞĨŽƌĂŶĚƚƚĞŶĚtŽƌŬŝŶŐ^ĞƐƐŝŽŶǁŝƚŚ^ƚĂĨĨ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',͕ŝƚLJ
^ƵƉƉŽƌƚ>t
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉĂƌƚŝĐŝƉĂƚĞŝŶĂǁŽƌŬŝŶŐƐĞƐƐŝŽŶǁŝƚŚŝƚLJƐƚĂĨĨƚŽƉƌĞƉĂƌĞĨŽƌŵĞĞƚŝŶŐƐǁŝƚŚ
ƉƌŽƉĞƌƚLJŽǁŶĞƌƐĂŶĚĚĞǀĞůŽƉĞƌƐ;dĂƐŬϰ͘ϯ͘ϮͿ͘
dĂƐŬϰ͘ϯ͘ϮʹDĞĞƚŝŶŐƐǁŝƚŚWƌŽƉĞƌƚLJKǁŶĞƌƐĂŶĚĞǀĞůŽƉĞƌƐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',͕ŝƚLJ
^ƵƉƉŽƌƚ>t
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůĐŽŶĚƵĐƚĂƐĞƌŝĞƐŽĨǀŝƌƚƵĂůŵĞĞƚŝŶŐƐ;ƵƉƚŽϭϬƐĞƐƐŝŽŶƐͿǁŝƚŚƉƌŽƉĞƌƚLJŽǁŶĞƌƐ
ĂŶĚĚĞǀĞůŽƉĞƌƐƚŽ͗ϭͿŝŶŝƚŝĂƚĞĂŶĚƐƚƌĞŶŐƚŚĞŶƚŚĞƌĞůĂƚŝŽŶƐŚŝƉǁŝƚŚƚŚĞŽǁŶĞƌƐ͕ϮͿƉƌŽǀŝĚĞĂŶŽǀĞƌǀŝĞǁŽĨ
ƚŚĞƉƌŽũĞĐƚ͕ϯͿƉƌĞƐĞŶƚƌĞůĞǀĂŶƚďĂĐŬŐƌŽƵŶĚĂŶĚŵĂƌŬĞƚĚĂƚĂ͕ϰͿƌĞǀŝƐŝƚĂŶĚĞdžƉůŽƌĞƚŚĞŽƌƌŝĚŽƌWůĂŶ
ǀŝƐŝŽŶ͕ĂŶĚϱͿĞŶŐĂŐĞŽǁŶĞƌƐĂŶĚĚĞǀĞůŽƉĞƌƐŝŶĂĚŝĂůŽŐƵĞĂďŽƵƚƚŚĞŝƌĐŽŶĐĞƌŶƐ͕ƉƌŝŽƌŝƚŝĞƐ͕
ŽƉƉŽƌƚƵŶŝƚŝĞƐ͕ĂŶĚǀŝƐŝŽŶĨŽƌƚŚĞƐƉĞĐŝĨŝĐĂƌĞĂĂŶĚƚŚĞŽƌƌŝĚŽƌĂƐĂǁŚŽůĞ͘dŚĞ',ǁŝůůƐƵŵŵĂƌŝnjĞƚŚĞ
ĨŝŶĚŝŶŐƐĨƌŽŵƚŚĞƐĞƐƐŝŽŶƐ͕ŝŶĐůƵĚŝŶŐŬĞLJŝƐƐƵĞƐ͕ĐŽŶĐĞƌŶƐ͕ŽƉƉŽƌƚƵŶŝƚŝĞƐ͕ĂŶĚƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐ͘
dĂƐŬϰ͘ϯ͘ϯʹWƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',
^ƵƉƉŽƌƚ>t
džƚĞŶƐŝǀĞǁŽƌŬŚĂƐďĞĞŶƉĞƌĨŽƌŵĞĚƚŽͲĚĂƚĞďLJƚŚĞŝƚLJƚŽǁĂƌĚƚŚĞĐŽƌĞĐŽŶƚĞŶƚŽĨĂĐŽŵƉƌĞŚĞŶƐŝǀĞ
ƐƉĞĐŝĨŝĐ͖ŵŽƌĞŽǀĞƌ͕ĐůĞĂƌƚŚŽƵŐŚƚŚĂƐďĞĞŶŐĞŶĞƌĂƚĞĚƚŚƌŽƵŐŚĂĐŽͲĐƌĞĂƚŝǀĞƉƌŽĐĞƐƐŝŶǀŽůǀŝŶŐ
ĐŽŵŵƵŶŝƚLJǁŽƌŬƐŚŽƉƐǁŝƚŚƐŝŐŶŝĨŝĐĂŶƚĂƚƚĞŶĚĂŶĐĞ͘dŚĞƉƌŽĚƵĐƚŽĨƚŚĂƚƉƌŽĐĞƐƐŝƐĂǀŝƐŝŽŶŝŶŐĚŽĐƵŵĞŶƚ
ƚŚĂƚŝŶĐůƵĚĞƐĂƐƉĞĐƚƐŽĨƚŚĞƉŚLJƐŝĐĂůƉůĂŶŶŝŶŐĨƌĂŵĞǁŽƌŬĨŽƌĂƐƉĞĐŝĨŝĐƉůĂŶ͘hŶĚĞƌƉŝŶŶŝŶŐƚŚĂƚǁŽƌŬŝƐ
ĂůƐŽĂĐŽŵƉůĞƚĞĂƌƌĂLJŽĨǀŝƐŝŽŶ͕ŐŽĂůƐ͕ƉŽůŝĐŝĞƐ͕ĂŶĚŝŶŝƚŝĂƚŝǀĞƐ͘
dŚŝƐĐŽŶƚĞŶƚǁŝůůďĞƚŚĞďĂƐŝƐŽĨĂ^ƉĞĐŝĨŝĐWůĂŶ',ŐĞŶĞƌĂƚĞƐĨŽƌƚŚĞƐƚƵĚLJĂƌĞĂ͘ůŵŽƐƚĞǀĞƌLJĂƐƉĞĐƚ
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
ŽĨĂƐƉĞĐŝĨŝĐƉůĂŶŚĂƐƐŽŵĞĐŽŶƚĞŶƚƉƌĞƉĂƌĞĚĨŽƌƌĞǀŝĞǁ͘dŚĞƉŽůŝĐŝĞƐĂƌĞŵŽƐƚĐŽŵƉůĞƚĞďƵƚŶĞĞĚĂŶ
ĞdžƚĞŶƐŝǀĞĐŚĞĐŬƚŽĞŶƐƵƌĞƚŚĞLJŵĞĞƚƚŚĞŶĞĞĚƐŽĨƐƉĞĐŝĨŝĐƉůĂŶƐďĞŝŶŐďƌŽƵŐŚƚƵŶĚĞƌƚŚŝƐŶĞǁ
ĞŶĐŽŵƉĂƐƐŝŶŐƉůĂŶ͘/ŶŽƌĚĞƌƚŽƉƌĞƉĂƌĞƚŚŝƐĐŽŶƚĞŶƚƚŽƐƚĂŶĚĂƐĂƐƉĞĐŝĨŝĐƉůĂŶƚŚĂƚŝŶĐŽƌƉŽƌĂƚĞƐĂŶĚ
ƐƵƉƉůĂŶƚƐŽƚŚĞƌƐƉĞĐŝĨŝĐƉůĂŶƐ͕ƚŽĚŝĨĨĞƌŝŶŐĚĞŐƌĞĞƐ͕ĂůůǁŽƌŬƚŽͲĚĂƚĞŶĞĞĚƐƚŽďĞ͗
ϭ͘ͿǀĂůƵĂƚĞĚƚŽĞŶƐƵƌĞŝƚĐŽŵƉŽƌƚƐǁŝƚŚĐƵƌƌĞŶƚŵĂƌŬĞƚĐŽŶĚŝƚŝŽŶƐĂŶĚƐƚĂŬĞŚŽůĚĞƌĞdžƉĞĐƚĂƚŝŽŶƐ
Ϯ͘ͿŽŵƉůĞƚĞĚƚŽĞŶƐƵƌĞƚŚĞƌĞĂƌĞŶŽŐĂƉƐŝŶƚŚĞǀŝƐƵĂůĐŽŵŵƵŶŝĐĂƚŝŽŶŽƌƉŽůŝĐLJŵĞĂƐƵƌĞƐ
ϯ͘ͿhƉŐƌĂĚĞĚƚŽĞŶƐƵƌĞĂĚĚŝƚŝŽŶĂůƐƚĂŶĚĂƌĚͲŽĨͲĐĂƌĞ͕ĂŶĚƐƚĂƚĞͲŽĨͲƚŚĞͲĂƌƚĞůĞŵĞŶƚƐĂƌĞŝŶĐůƵĚĞĚ
ϰ͘ͿŶƌŝĐŚĞĚĂƐĂŶŝŶƚĞŐƌĂƚĞĚŵŽĚĞůƚŽƐƵƉƉŽƌƚĚĞƚĂŝůĂďŽƵƚŚŽƵƐŝŶŐ͕ĚĞǀĞůŽƉŵĞŶƚƚLJƉĞ͕ĂŶĚLJŝĞůĚ
ϱ͘ͿWŽůŝƐŚĞĚƚŽĞŶƐƵƌĞƚŚĞǀŝƐƵĂůĐŽŵŵƵŶŝĐĂƚŝŽŶƋƵĂůŝƚLJƌĞĨůĞĐƚƐĂŶĞĐŽŶŽŵŝĐĂůůLJĐŽŵƉĞƚŝƚŝǀĞŝƚLJ
dŚĞĨŽůůŽǁŝŶŐĂƌĞĂƐƉĞĐƚƐŽĨƚŚĞƉůĂŶǁŚŝĐŚŶĞĞĚŽŶůLJŵŝŶŝŵĂůƌĞǀŝĞǁĨŽƌŝŶƚĞŐƌĂƚŝŽŶŝŶƚŚĞŶĞǁƉůĂŶ͗
Ͳ sŝƐŝŽŶŝŶŐŐŽĂůƐ͕ƉŽůŝĐŝĞƐ͕ĂŶĚƉƌŽŐƌĂŵƐ;',Ϳ
Ͳ KƵƚƌĞĂĐŚƐƵŵŵĂƌLJƚĞdžƚ͕ƉŚŽƚŽƐĂŶĚŐƌĂƉŚƐ;',Ϳ
Ͳ ^ƚƌĂƚĞŐŝĞƐĂŶĚƉƌŝŽƌŝƚŝĞƐƐƵƉƉŽƌƚŝŶŐƉŚLJƐŝĐĂůĨƌĂŵĞǁŽƌŬĚŝĂŐƌĂŵƐ;',Ϳ
Ͳ ĞǀĞůŽƉŵĞŶƚďůŽĐŬƉĂƚƚĞƌŶ;',͕ƚŽďĞƌĞǀŝƐĞĚƉĞƌƌĞĐĞŶƚ,ǁLJϭϭϭƚƌĂŶƐƉŽƌƚĂƚŝŽŶĐŽŶĐĞƉƚƐͿ
Ͳ ZŽĂĚǁĂLJŶĞƚǁŽƌŬ;',͕ƚŽďĞƌĞǀŝƐĞĚƉĞƌƌĞĐĞŶƚ,ǁLJϭϭϭƚƌĂŶƐƉŽƌƚĂƚŝŽŶĐŽŶĐĞƉƚƐͿ
dŚĞĨŽůůŽǁŝŶŐĂƌĞĂƐƉĞĐƚƐŽĨƚŚĞƉůĂŶǁŚŝĐŚŶĞĞĚƐŝŐŶŝĨŝĐĂŶƚƌĞǀŝĞǁĂŶĚĨƵƌƚŚĞƌǁŽƌŬƵƉŝŶƚŚĞŶĞǁƉůĂŶ͗
ĞǀĞůŽƉŵĞŶƚ&ƌĂŵĞǁŽƌŬ;WŚLJƐŝĐĂůͿ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
ŶŽǀĞƌĂůůƉŚLJƐŝĐĂůĚĞǀĞůŽƉŵĞŶƚůĂLJŽƵƚǁŝƚŚŝŶĨĞƌƌĞĚďƵŝůĚŝŶŐƚLJƉĞƐǁĂƐƉƌĞƉĂƌĞĚŝŶƚŚĞŽƌƌŝĚŽƌsŝƐŝŽŶ
ĚŽĐƵŵĞŶƚ͖ŚŽǁĞǀĞƌ͕ƚŚŽƐĞďƵŝůĚŝŶŐƐŶĞĞĚƚŽďĞƌĞĐŽŶƐŝĚĞƌĞĚĨŽƌĚǁĞůůŝŶŐƵŶŝƚƚLJƉĞͬƐŝnjĞ͕ŝŶƚĞŶƐŝƚLJ͕
ƚƌĂƵŶĐŚŝŶŐͬŐƌŽƵŶĚůĞĂƐĞƐŝnjĞ͕ĨŽŽƚƉƌŝŶƚƐŝnjĞ͕ĂŶĚŵĂƌŬĞƚƌĂŶŐĞ;ƚLJƉĞǀĂƌŝĞƚLJͿĂĐĐŽƌĚŝŶŐƚŽƚŚĞƌĞƐƵůƚƐŽĨ
ŶĞǁŵĂƌŬĞƚƌĞƐĞĂƌĐŚ;^ĞĞdĂƐŬϰ͘Ϯ͘ϯͿ͘
<ĞLJƚŽƚŚŝƐǁŽƌŬƵƉŽĨĞǀĞůŽƉŵĞŶƚ&ƌĂŵĞǁŽƌŬŝƐŐƌĞĂƚĞƌĚĞƚĂŝůĂŶĚƌĞƐŽůƵƚŝŽŶŝŶĂϯŵŽĚĞůƚŽ
ĂĐĐƵƌĂƚĞůLJŵĞĂƐƵƌĞĂŶĚĚĞƉŝĐƚĂĚĞǀĞůŽƉŵĞŶƚƐĐĞŶĂƌŝŽ͘dŚŝƐǁŝůůďĞƵƐĞĚƚŽĞdžƉƌĞƐƐƵŶŝƚƚLJƉĞǀĂƌŝĞƚLJ͕
ĂŶĚƐƵƉƉŽƌƚĚĞƚĂŝůĞĚ'&LJŝĞůĚƚĂďůĞƐ;ŐƌŽƐƐͲĨůŽŽƌͲĂƌĞĂĂŶĚͬhƐƉƌĞĂĚƐŚĞĞƚƐͿƚŚĂƚĂƌĞŵĞĂŶŝŶŐĨƵůƚŽ
YƌĞǀŝĞǁ͕ĞŶƚŝƚůĞŵĞŶƚƐ͕ƌĞͲƉĂƌĐĞůŝnjĂƚŝŽŶ͕ƉŽůŝĐLJŽǀĞƌůĂLJĂŶĚŚŽƵƐŝŶŐƌĞƋƵŝƌĞŵĞŶƚƐ͕ĂŶĚŵŽƌĞ
ĞŶŐĂŐŝŶŐĐŽŵŵƵŶŝƚLJŵĂƌŬĞƚŝŶŐǀŝƐƵĂůƐ;ƉĞƌƐƉĞĐƚŝǀĞǀŝĞǁƐͿ͘ĞǀĞůŽƉŵĞŶƚĂƉĂĐŝƚLJƚĂƌŐĞƚƐǁŝůůďĞ
ŵĞĂƐƵƌĞĚĨŽƌƐŝƚĞƐ͕ĂŶĚĐŽŵƉĂƌĞĚǁŝƚŚŵĂƌŬĞƚĂďƐŽƌƉƚŝŽŶŽĨĂƐƐĞƚĐůĂƐƐĞƐ;'&ŵĂƌŬĞƚĚĞŵĂŶĚďLJůĂŶĚ
ƵƐĞͿʹĂĐŽŵƉĂƌŝƐŽŶĐƌƵĐŝĂůƚŽƉƌŽƐƉĞĐƚŝǀĞĚĞǀĞůŽƉĞƌƐ͘
^ŽŵĞĂĚũƵƐƚŵĞŶƚƚŽďůŽĐŬĂŶĚďƵŝůĚŝŶŐƐŝnjĞŵĂLJďĞǁĂƌƌĂŶƚĞĚĂĨƚĞƌƚŚĞsŝƐŝŽŶĚĞǀĞůŽƉŵĞŶƚǁŽƌŬŝƐĨŝƌƐƚ
ƚƌĂĐĞĚ;ŽƌĚŽǁŶůŽĂĚĞĚͿĂŶĚƌĞǀŝĞǁĞĚ͘dŚĞ',ƉůĂŶŶŝŶŐƚĞĂŵďĞůŝĞǀĞƐƐŽŵĞŐƌĞĂƚĞƌŚŝĞƌĂƌĐŚLJĂŶĚ
ǀĂƌŝĞƚLJŝŶďůŽĐŬƐƚƌƵĐƚƵƌĞŵĂLJƐƵƉƉŽƌƚƚŚĞĞĐŽŶŽŵŝĐƚĞŶĚĞŶĐŝĞƐŽĨĚĞǀĞůŽƉŵĞŶƚƉŚĂƐŝŶŐ͘dŚŝƐĂůƐŽǁŝůů
ƐƵƉƉŽƌƚĂƐĞŶƐĞŽĨƉůĂĐĞƐŽĐƌƵĐŝĂůǁŚĞƌĞƐƵďƵƌďĂŶƌĞƚĂŝůƐŝƚĞƐƐĞĞŝŶĨŝůůŐƌŽǁƚŚ͘
WĂƌŬŝŶŐ^ƚƌĂƚĞŐLJ;WĂƌƚŽĨDŽďŝůŝƚLJ&ƌĂŵĞǁŽƌŬͿ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
dŚĞǀŝƐŝŽŶŝŶŐǁŽƌŬƉƌŝŽƌƚŽƚŚŝƐƉƌŽũĞĐƚƐĞƚƐĂĐůĞĂƌĚŝƌĞĐƚŝŽŶĨŽƌƉĂƌŬŝŶŐƐƚƌĂƚĞŐLJŝŶĂŵŽƌĞƐƵƐƚĂŝŶĂďůĞ
ĨƵƚƵƌĞĨŽƌ>ĂYƵŝŶƚĂ͘ĚĂƚĂƌŝĐŚƉĂƌŬŝŶŐƐƚƌĂƚĞŐLJ͕ĂŶĚĞƐƉĞĐŝĂůůLJĨŽƌƐŚĂƌĞĚƉĂƌŬŝŶŐ͕ĂŶĚƉƵďůŝĐǀƐ͘
ƉƌŝǀĂƚĞŽƉĞƌĂƚŝŽŶ͕ŶĞĞĚƐƚŽďĞŐĞŶĞƌĂƚĞĚĂŶĚƚĂďůĞĚǁŝƚŚŐƌĞĂƚĞƌĚĞƚĂŝůŝŶƐƵƉƉŽƌƚŽĨĂĨŝŶĂůŝnjĞĚŚŽƵƐŝŶŐ
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
ĂŶĚhŽƵƚůĂLJ͘dŚĞƵƐĞŽĨƐŚĂƌĞĚƉĂƌŬŝŶŐh>/ŶŽŶͲĐĂƉƚƵƌĞƌĂƚŝŽƐǁŝůůŚĞůƉŬĞLJƐƚĂŬĞŚŽůĚĞƌƐƵŶĚĞƌƐƚĂŶĚ
ƚŚĞŵƵƚƵĂůďĞŶĞĨŝƚŽĨŵŝdžĞĚͲƵƐĞƵƐĞƐŝƚĞƐ͘ƐŵĂƌƚ͕ǁĂůŬĂďůĞ͕ƉĂƌŬŝŶŐƐƚƌĂƚĞŐLJŝƐŝŵƉŽƌƚĂŶƚƚŽƐƵĐĐĞƐƐŝŶ
ůŽĐŬŝŶŐŝŶĂŶ/^ͬDEĚĞƚĞƌŵŝŶĂƚŝŽŶ͘
>ĂŶĚhƐĞDĂƉ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
dŚĞĚĞƐŝŐŶĂƚĞĚůĂŶĚƵƐĞŵĂƉŶĞĞĚƐƚŽďĞĚƌĂǁŶĂĐĐŽƌĚŝŶŐƚŽƚŚĞŝŶĨůƵĞŶĐĞŽĨƐƵƌƌŽƵŶĚŝŶŐƐƉĞĐŝĨŝĐƉůĂŶƐ
ĂŶĚƚŚĞĐŽŶĨŝƌŵĞĚǀŝƐŝŽŶĂŶĚĚĞǀĞůŽƉŵĞŶƚƐĐĞŶĂƌŝŽĂƐĚĞǀĞůŽƉĞĚĨŽƌƚŚŝƐ^ƉĞĐŝĨŝĐWůĂŶ͘dŚĞƌĞŵĂLJďĞ
ŚŽƵƐŝŶŐŽǀĞƌůĂLJƐ͕ĚĞŶƐŝƚLJŽǀĞƌůĂLJƐ͕ŽƉĞŶƐƉĂĐĞƉƌĞƐĞƌǀĞƐ͕ĂŶĚĨŝŶĞƌĚĞĐŝƐŝŽŶƐĨƌŽŵƚŚŽƐĞƉůĂŶƐƚŚĂƚĨĂůů
ŝŶƚŽƚŚĞŽǀĞƌĂƌĐŚŝŶŐƉŝĐƚƵƌĞƉĂŝŶƚĞĚďLJƚŚĞsŝƐŝŽŶŝŶŐƉƌŽĐĞƐƐĨŽƵƌLJĞĂƌƐĂŐŽ͘
KƉĞŶ^ƉĂĐĞ&ƌĂŵĞǁŽƌŬ;WŚLJƐŝĐĂůĂŶĚ^ŽŵĞWŽůŝĐLJͿ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
dŚĞsŝƐŝŽŶŝŶŐǁŽƌŬƉƌĞƉĂƌĞĚŚĂŶĚͲŝŶͲŚĂŶĚǁŝƚŚƚŚĞĐŽŵŵƵŶŝƚLJĚŽĞƐĂŐŽŽĚũŽďŽĨĚĞƐĐƌŝďŝŶŐĂƐŽůŝĚͲ
ǀŽŝĚĐŽŶĨŝŐƵƌĂƚŝŽŶƚŚĂƚŐĞŶƵĨůĞĐƚƐďŽƚŚƚŽŶĞǁƚŚŽƌŽƵŐŚĨĂƌĞƐĂŶĚƚŽƚŚĞsůŝŶŬĐŽƌƌŝĚŽƌ͘ŶƐƵƌŝŶŐƚŚĂƚ
ŵĂƌŬĞƚĚƌŝǀĞŶƉĂƌŬŝŶŐŝŵƉĂĐƚ͕ďƵŝůĚŝŶŐƚLJƉĞ͕ůĞǀĞůŽĨŝŶǀĞƐƚŵĞŶƚ͕ĂŶĚĚĞŶƐŝƚLJďĞŚĂǀŝŽƌĨƌŽŵĚĞǀĞůŽƉĞƌƐ
ŵĂŝŶƚĂŝŶƐĂƋƵĂůŝƚLJƉƵďůŝĐƌĞĂůŵŵĞĂŶƐŵŽƌĞĐůĞĂƌůLJĚĞĨŝŶŝŶŐƚŚŽƐĞƐƉĂĐĞƐ͕ƉƌĞƐĞƌǀŝŶŐŝŶƚĞƌŶĂůďůŽĐŬ
ĐŽƵƌƚLJĂƌĚƐĂŶĚĐŽŵŵŽŶƐ͕ŵŽƌĞŽƉĞŶƐƉĂĐĞŚŝĞƌĂƌĐŚLJ;ŬĞLJƐƉĂĐĞƐŚŽƐƚŝŶŐĞǀĞŶƚƐ͕ǀĞƌƐƵƐƐŵĂůůĞƌ
ĚŝƐƚƌŝďƵƚĞĚĂƌĞĂƐͿ͕ĂŶĚĞŶƐƵƌŝŶŐƚŚĞƌĞŝƐĂůĂŶĚƐĐĂƉĞĂƌĐŚŝƚĞĐƚƵƌĞůĂLJĞƌƚŽƚŚĂƚĨƌĂŵĞǁŽƌŬʹŝŶĐůƵĚŝŶŐ
ƐƚƌĞĞƚƚƌĞĞůŽĐĂƚŝŽŶƐ͕ƐƵƌĨĂĐĞƚƵƌĨͬŚĂƌĚƐĐĂƉĞƉƌŽƉŽƐĂůƐ͕ĂŶĚůĂŶĚƐĐĂƉĞƐƚŚĂƚĚŽǁŽƌŬŝŶƚĞƌŵƐŽĨƵƌďĂŶ
ĐŽŽůŝŶŐͬƐŚĂĚŝŶŐ͕ŵŽŶƐŽŽŶĂůƌƵŶŽĨĨĐĂƉƚƵƌĞ͕ĨůĞdžŝďůĞƵƐĞ͕ĂŶĚĐŽŵŵƵŶŝƚLJĂŶĚĐƵůƚƵƌĂůůĞŐŝďŝůŝƚLJ͘
DŽďŝůŝƚLJ&ƌĂŵĞǁŽƌŬ;WŚLJƐŝĐĂůĂŶĚ^ŽŵĞWŽůŝĐLJͿ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
dŚĞŵŽďŝůŝƚLJĨƌĂŵĞǁŽƌŬŝƐŶĞĂƌůLJĐŽŵƉůĞƚĞŝŶƚĞƌŵƐŽĨƌŽĂĚǁĂLJƐ͕ƌŝŐŚƚͲŽĨͲǁĂLJƉƌŽƉŽƐĂů͕ĂŶĚŽĨĐŽƵƌƐĞ
ƚŚĞ,ǁLJϭϭϭƌŽĂĚǁĂLJĐŽƌƌŝĚŽƌŝƚƐĞůĨ͘KŶĞƚŽƚŚƌĞĞĚŝĂŐƌĂŵƐĞdžƉĂŶĚŝŶŐŽŶůŽĐĂƚŝŽŶƐĨŽƌĂĐƚŝǀĞͲŵŽďŝůŝƚLJ
ƌĞƐŽƵƌĐĞƐ͕ƉĞĚĞƐƚƌŝĂŶĂĐĐĞƐƐĂŶĚƐĞƌǀŝĐĞƉŽŝŶƚƐ͕ĞǀĞŶƚŝŵƉĂĐƚƐ͕ĂŶĚŬĞLJǁĂLJĨŝŶĚŝŶŐĚĞĐŝƐŝŽŶŶŽĚĞƐ
ƐŚŽƵůĚďĞƉƌĞƉĂƌĞĚ͘
hƚŝůŝƚLJ&ƌĂŵĞǁŽƌŬ;WŚLJƐŝĐĂůͿ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗',
dŚĞƵƚŝůŝƚLJŶĞĞĚƐŽĨƉƌŽƉŽƐĞĚďƵŝůĚŝŶŐƐŶĞĞĚƐƚŽďĞĞǀĂůƵĂƚĞĚĨŽƌŝŵƉĂĐƚƚŽĞdžŝƐƚŝŶŐŵĂŝŶƐĂŶĚŝƐ
ŶĞĐĞƐƐĂƌLJĨŽƌĂƐƵĐĐĞƐƐĨƵů/^ͬDEŽƵƚĐŽŵĞ͘dŚĞƵƚŝůŝƚLJĨƌĂŵĞǁŽƌŬǁŝůůĨƵƌƚŚĞƌĚĞƚĂŝůƐŝnjŝŶŐĂŶĚ
ĐĂƉĂĐŝƚŝĞƐĚĂƚĂƚŚĂƚŵĂLJďĞĞƐƐĞŶƚŝĂůŝŶŐƌĂŶƚĂƉƉůŝĐĂƚŝŽŶƐ͘dŚŝƐŝƐĂůƐŽĂŶŽƉƉŽƌƚƵŶŝƚLJƚŽƌĂŝƐĞƚŚĞƉƌŽĨŝůĞ
ŽĨƚŚĞƐƉĞĐŝĨŝĐƉůĂŶĂƐƌĞƐŝůŝĞŶĐLJƉƌĞƉĂƌĂƚŝŽŶʹĂƉůĂŶƋƵĂůŝƚLJƚŚĂƚƚĞŶĚƐƚŽŐĂƌŶĞƌWĂǁĂƌĚƌĞĐŽŐŶŝƚŝŽŶ
ƚŚĂƚďĞŶĞĨŝƚƐŝŵƉůĞŵĞŶƚĂƚŝŽŶĞĨĨŽƌƚƐ͘
ĚĚŝƚŝŽŶĂůůLJ͕ƚŚĞWƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬĚĞůŝǀĞƌĂďůĞƐǁŝůůĂĐĐŽŵƉĂŶLJĂĚƌĂĨƚƚĂďůĞŽĨ
ĐŽŶƚĞŶƚƐĨŽƌƚŚĞ^ƉĞĐŝĨŝĐWůĂŶ͕ĂŶĚĂnjŽŶŝŶŐƚĂďůĞǁŚŝĐŚŝŶĐůƵĚĞƐƉƌĞůŝŵŝŶĂƌLJďŽƵŶĚĂƌŝĞƐ͕ƐƚĂŶĚĂƌĚƐ͕ĂŶĚ
ĂůůŽǁĞĚƵƐĞƐ͘
&ŽƌŵͲĂƐĞĚŽĚĞƉƉƌŽĂĐŚĂŶĚ&ƌĂŵĞǁŽƌŬ
ZĞƐƉŽŶƐŝďůĞWĂƌƚLJ͗>t
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
ĂƐĞĚŽŶƚŚĞǁŽƌŬĐŽŵƉůĞƚĞĚĂďŽǀĞ͕>tǁŝůůƉƌĞƉĂƌĞĂŶĂƉƉƌŽĂĐŚƚŽŝŶĐŽƌƉŽƌĂƚŝŶŐĞdžŝƐƚŝŶŐƐƉĞĐŝĨŝĐ
ƉůĂŶƌĞŐƵůĂƚŝŽŶƐŝŶƚŽƚŚĞŽĚĞĨŽƌƚŚĞ^ƉĞĐŝĨŝĐWůĂŶ;ĂƐĂƉƉƌŽƉƌŝĂƚĞͿĂŶĚĂŽĚĞĨƌĂŵĞǁŽƌŬƚĂďůĞ͕
ŽƵƚůŝŶŝŶŐƚŚĞƌĞĐŽŵŵĞŶĚĞĚŝŶƚĞŶƚŽĨŶĞǁnjŽŶĞƐ͕ĂŶĚĂŐĞŶĞƌĂůŽǀĞƌǀŝĞǁŽĨĂůůŽǁĞĚďƵŝůĚŝŶŐ͕ĨƌŽŶƚĂŐĞ͕
ĂŶĚĐŝǀŝĐƐƉĂĐĞƚLJƉĞƐĨŽƌĞĂĐŚnjŽŶĞ͘dŚŝƐǁŽƌŬǁŝůůĚŽĐƵŵĞŶƚǁŚĞƌĞĞdžŝƐƚŝŶŐƌĞŐƵůĂƚŝŽŶƐǁŝůůďĞ
ƐƵƉĞƌƐĞĚĞĚďLJƚŚĞŶĞǁŽĚĞŝŶŽƌĚĞƌƚŽŝŵƉůĞŵĞŶƚƚŚĞůĂŶĚƵƐĞǀŝƐŝŽŶĨŽƌůĂŶĚƵƐĞ͕ĚĞŶƐŝƚLJ͕ŝŶƚĞŶƐŝƚLJ͕
ĂŶĚďƵŝůĚŝŶŐĨŽƌŵ͘dŚĞĨƌĂŵĞǁŽƌŬǁŝůůĂůƐŽŝŶĐůƵĚĞĂĚƌĂĨƚƌĞŐƵůĂƚŝŶŐƉůĂŶ͕ƚŽŝŵƉůĞŵĞŶƚƚŚĞůĂŶĚƵƐĞ
ŵĂƉ;ƐĞĞƚĂƐŬĂďŽǀĞͿ͘dŚĞĨƌĂŵĞǁŽƌŬǁŝůůďĞƚŚĞŐƵŝĚŝŶŐĚŽĐƵŵĞŶƚŝŶƉƌĞƉĂƌĂƚŝŽŶŽĨƚŚĞĚƌĂĨƚŽĚĞ
;dĂƐŬϰ͘ϰͿ
dĂƐŬϰ͘ϯ͘ϰʹ^ƚƵĚLJ^ĞƐƐŝŽŶ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',͕ŝƚLJ
^ƵƉƉŽƌƚ>t͕
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉĂƌƚŝĐŝƉĂƚĞŝŶŽŶĞǀŝƌƚƵĂůƐƚƵĚLJƐĞƐƐŝŽŶǁŝƚŚƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂŶĚŝƚLJ
ŽƵŶĐŝůƚŽƉƌŽǀŝĚĞĂŶƵƉĚĂƚĞŽŶƚŚĞƉƌŽũĞĐƚ͕ƐƵŵŵĂƌŝnjĞďĂĐŬŐƌŽƵŶĚŝŶĨŽƌŵĂƚŝŽŶ͕ĂŶĚƉƌĞƐĞŶƚƚŚĞ
WƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬ͘dŚĞŽďũĞĐƚŝǀĞŽĨƚŚĞŵĞĞƚŝŶŐŝƐƚŽŐĂƚŚĞƌĂŶLJĂĚĚŝƚŝŽŶĂůŝŶƉƵƚƚŽ
ŝŶĐůƵĚĞŝŶƚŚĞĚƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ͘
dĂƐŬϰ͘ϯWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x ĞǀĞůŽƉĞƌDĞĞƚŝŶŐWƌĞƉĂƌĂƚŝŽŶĂŶĚƚƚĞŶĚĂŶĐĞ
x WƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬ
x WƌĞƉĂƌĞĨŽƌĂŶĚĂƚƚĞŶĚŽŶĞ^ƚƵĚLJ^ĞƐƐŝŽŶ
dĂƐŬϰ͘ϰʹĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
dĂƐŬϰ͘ϰ͘ϭʹWƌĞƉĂƌĞĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗',
',dĞĂŵǁŝůůƉƌĞƉĂƌĞĂŶĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĨŽƌŝƚLJƐƚĂĨĨƌĞǀŝĞǁĂŶĚĐŽŵŵĞŶƚ͘
dŚĞĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶǁŝůůĐŽǀĞƌƚŚĞĨŽůůŽǁŝŶŐĐŽŵƉŽŶĞŶƚƐ͗
ͻ/ŶƚƌŽĚƵĐƚŝŽŶ
ͻ >ĂŶĚhƐĞ
ͻ ŽŵŵƵŶŝƚLJ&ŽƌŵĂŶĚŚĂƌĂĐƚĞƌ
ͻ DŽďŝůŝƚLJĂŶĚdD
ͻ /ŶĨƌĂƐƚƌƵĐƚƵƌĞ
ͻ /ŵƉůĞŵĞŶƚĂƚŝŽŶ'ŽĂůƐ͕WŽůŝĐŝĞƐ͕ĂŶĚWƌŽŐƌĂŵƐ;tĂLJĨŝŶĚŝŶŐ͕ďƌĂŶĚŝŶŐ͕ĂŶĚŽƚŚĞƌƐŝŵŝůĂƌŝŶŝƚŝĂƚŝǀĞƐ
ǁŝůůďĞŝŶĐůƵĚĞĚĂƐƉƌŽŐƌĂŵƐŝŶƚŚĞ^ƉĞĐŝĨŝĐWůĂŶͿ
',ǁŝůůĚĞǀĞůŽƉƚŚĞ^ƉĞĐŝĨŝĐWůĂŶŝŶĂĨŽƌŵĂƚĂƐĂŐƌĞĞĚƵƉŽŶǁŝƚŚƚŚĞŝƚLJ͘
dĂƐŬϰ͘ϰ͘ϮʹWƌĞƉĂƌĞĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚŽĚĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗>t
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
dŚĞĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚŽĚĞǁŝůůŝŶĐůƵĚĞƚŚĞĨŽůůŽǁŝŶŐ͗
ŽŶĞƐ
ĞǀĞůŽƉŵĞŶƚ^ƚĂŶĚĂƌĚƐ
>ĂŶĚhƐĞƐ
ƵŝůĚŝŶŐĂŶĚ&ƌŽŶƚĂŐĞĂŶĚŝǀŝĐ^ƉĂĐĞdLJƉĞƐ
^ƚĂŶĚĂƌĚƐĨŽƌ>ĂƌŐĞ^ŝƚĞƐ
^ŝŐŶƐ;ƐƐƵŵĞƐĞdžŝƐƚŝŶŐŝƚLJƐƚĂŶĚĂƌĚƐĐŽŶĨŽƌŵƚŽĂƉƉůŝĐĂďůĞůĞŐĂůƐƚĂŶĚĂƌĚƐͿ
ĚŵŝŶŝƐƚƌĂƚŝŽŶĂŶĚWƌŽĐĞĚƵƌĞƐ;ĂĚĚŝƚŝŽŶĂůƚŽŝƚLJǁŝĚĞƐƚĂŶĚĂƌĚƐ͕ŝĨŶĞĞĚĞĚ͕ĨŽƌƚŚĞ^ƉĞĐŝĨŝĐWůĂŶ
ƌĞĂͿ
>tǁŝůůƵƚŝůŝnjĞƚŚĞƚĞŵƉůĂƚĞ͕ůĂLJŽƵƚ͕ĂŶĚĨŽƌŵĂƚĚĞǀĞůŽƉĞĚĨŽƌƚŚĞƐĂŵƉůĞ&;dĂƐŬϭͿĨŽƌƚŚĞŽĚĞ͘
dĂƐŬϰ͘ϰ͘ϯʹ^ƚĂĨĨZĞǀŝĞǁŽĨĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',>t͕͕
^ƵƉƉŽƌƚŝƚLJ
dŚĞŝƚLJŝƐĞdžƉĞĐƚĞĚƚŽƌĞǀŝĞǁƚŚĞĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞĂŶĚƉƌĞƉĂƌĞŽŶĞƐĞƚŽĨ
ĐŽŶƐŽůŝĚĂƚĞĚ͕ŶŽŶͲĐŽŶĨůŝĐƚŝŶŐĐŽŵŵĞŶƚƐƚŽƚŚĞŽŶƐƵůƚĂŶƚdĞĂŵŽŶĞǁĞĞŬƉƌŝŽƌƚŽĂƌĞǀŝĞǁĐŽŶĨĞƌĞŶĐĞ
ĐĂůů͘dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉĂƌƚŝĐŝƉĂƚĞŝŶϮĐŽŶĨĞƌĞŶĐĞĐĂůůƐǁŝƚŚƐƚĂĨĨƚŽĚŝƐĐƵƐƐƚŚĞĚŵŝŶŝƐƚƌĂƚŝǀĞ
ƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ͘
dĂƐŬϰ͘ϰWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x ĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
dĂƐŬϰ͘ϱʹŶǀŝƌŽŶŵĞŶƚĂůZĞǀŝĞǁͬY
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗',
YŽŵƉůŝĂŶĐĞ
YĞŶǀŝƌŽŶŵĞŶƚĂůĚŽĐƵŵĞŶƚƐǁŝůůďĞƉƌĞƉĂƌĞĚƚŚĂƚĂĚĚƌĞƐƐƚŚĞĞŶƚŝƌĞƚLJŽĨƚŚĞ,ŝŐŚǁĂLJϭϭϭ^ƉĞĐŝĨŝĐ
WůĂŶ͘'ŝǀĞŶƚŚĞůĞŶŐƚŚŽĨƚŚĞŽƌƌŝĚŽƌ͕ƚŚĞĞdžƚĞŶƚŽĨƐƚƌĞĞƚŝŵƉƌŽǀĞŵĞŶƚƐ͕ďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶ
ĨĂĐŝůŝƚŝĞƐ͕ŽƚŚĞƌĂĐƚŝǀĞƌĞĐƌĞĂƚŝŽŶ͕ĂŶĚǀŝƐƵĂůƌĞƐŽƵƌĐĞƐƚŽŝŶĐůƵĚĞůĂŶĚƐĐĂƉŝŶŐĂŶĚƉƵďůŝĐĂƌƚ͕ǁĞĂƐƐƵŵĞ
ƚŚĂƚĂŶ/ŶŝƚŝĂů^ƚƵĚLJͬDŝƚŝŐĂƚĞĚEĞŐĂƚŝǀĞĞĐůĂƌĂƚŝŽŶ;/^ͬDEͿǁŝůůďĞƚŚĞĂƉƉƌŽƉƌŝĂƚĞĨŽƌŵŽĨ
ĚŽĐƵŵĞŶƚĂƚŝŽŶĨŽƌƚŚŝƐĞĨĨŽƌƚ͘dŚĞ/^ͬDEƉƌŽĐĞƐƐǁŝůůĐŽŶƐŝƐƚŽĨƚŚĞĨŽůůŽǁŝŶŐƚĂƐŬƐ͗
ͻ WƌŽũĞĐƚ/ŶŝƚŝĂƚŝŽŶ;<ŝĐŬͲKĨĨDĞĞƚŝŶŐ͕ŝŶĨŽƌŵĂƚŝŽŶŶĞĞĚƐƌĞƋƵĞƐƚͿ
ͻ WƌŽũĞĐƚĞƐĐƌŝƉƚŝŽŶ;ŝŶĐůƵĚŝŶŐĂƐƵŵŵĂƌLJŽĨƚŚĞƉƌŽũĞĐƚůŽĐĂƚŝŽŶ͕ƉƌŽũĞĐƚĐŚĂƌĂĐƚĞƌŝƐƚŝĐƐ͕
ĐŽŶƐƚƌƵĐƚŝŽŶŵĞƚŚŽĚƐ͕ŽƉĞƌĂƚŝŽŶĂůĐŚĂƌĂĐƚĞƌŝƐƚŝĐƐ͕ŵŝŶŝŵŝnjĂƚŝŽŶŵĞĂƐƵƌĞƐ͕ĂŶĚŐƌĂƉŚŝĐƐͿ
ͻ ĚŵŝŶƌĂĨƚ/^ͬDE;ĂĚĚƌĞƐƐŝŶŐĂƉƉůŝĐĂďůĞƚŽƉŝĐƐĨƌŽŵYƉƉĞŶĚŝdž'͕ŶǀŝƌŽŶŵĞŶƚĂůŚĞĐŬůŝƐƚ
&ŽƌŵͿ͗
ͻ ĞƐƚŚĞƚŝĐƐ
ͻ ŝƌYƵĂůŝƚLJ
ͻ ŝŽůŽŐŝĐĂůZĞƐŽƵƌĐĞƐ
ͻ ƵůƚƵƌĂůZĞƐŽƵƌĐĞƐ
ͻŶĞƌŐLJ
ͻ 'ĞŽůŽŐLJͬ^ŽŝůƐ
ͻ 'ƌĞĞŶŚŽƵƐĞ'ĂƐŵŝƐƐŝŽŶƐ
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx Page 10
ͻ ,ĂnjĂƌĚƐĂŶĚ,ĂnjĂƌĚŽƵƐDĂƚĞƌŝĂůƐ
ͻ ,LJĚƌŽůŽŐLJͬtĂƚĞƌYƵĂůŝƚLJ
ͻ >ĂŶĚhƐĞͬWůĂŶŶŝŶŐ
ͻEŽŝƐĞ
ͻ WŽƉƵůĂƚŝŽŶͬ,ŽƵƐŝŶŐ
ͻ WƵďůŝĐ^ĞƌǀŝĐĞƐ
ͻZĞĐƌĞĂƚŝŽŶ
ͻ dƌĂŶƐƉŽƌƚĂƚŝŽŶ
ͻ dƌŝďĂůƵůƚƵƌĂůZĞƐŽƵƌĐĞƐ
ͻ hƚŝůŝƚŝĞƐͬ^ĞƌǀŝĐĞ^LJƐƚĞŵƐ
ͻ tŝůĚĨŝƌĞ
ͻ DĂŶĚĂƚŽƌLJ&ŝŶĚŝŶŐƐŽĨ^ŝŐŶŝĨŝĐĂŶĐĞ
ͻ ƌĂĨƚ/^ͬDE;ĨŽƌƉƵďůŝĐƌĞǀŝĞǁͿ
ͻ WƵďůŝĐZĞǀŝĞǁĂŶĚEŽƚŝĐĞŽĨ/ŶƚĞŶƚ
ͻ &ŝŶĂů/^ͬDE;ŝŶĐůƵĚŝŶŐƌĞƐƉŽŶƐĞƐƚŽĐŽŵŵĞŶƚƐ͕ĂŶĚDŝƚŝŐĂƚŝŽŶĂŶĚDŽŶŝƚŽƌŝŶŐWůĂŶͿ
ͻ WƵďůŝĐ,ĞĂƌŝŶŐĂŶĚEŽƚŝĐĞŽĨĞƚĞƌŵŝŶĂƚŝŽŶ
tŝƚŚƚŚŝƐĂƉƉƌŽĂĐŚ͕ĂƐĚĞǀĞůŽƉŵĞŶƚŽĐĐƵƌƐĂůŽŶŐƚŚĞŽƌƌŝĚŽƌ͕ĞŶǀŝƌŽŶŵĞŶƚĂůƌĞǀŝĞǁĐĂŶƚŝĞƌĨƌŽŵƚŚĞ
/^ͬDE;ĨŽƌĞdžĂŵƉůĞ͕ĂƐĂĂƚĞŐŽƌŝĐĂůdžĞŵƉƚŝŽŶͿŽƌďĞĂĚĚƌĞƐƐĞĚƚŚƌŽƵŐŚĂ^ƵďƐĞƋƵĞŶƚ/^ͬDEĂƐ
ĚŝƐĐƵƐƐĞĚŝŶ^ĞĐƚŝŽŶϭϱϭϲϮŽĨƚŚĞY'ƵŝĚĞůŝŶĞƐ͘dŚŝƐǁŝůůĞŶĂďůĞĨƵƚƵƌĞƉƌŽũĞĐƚƐƌĞƋƵŝƌŝŶŐY
ƌĞǀŝĞǁƚŽŵĂŬĞŵĂdžŝŵƵŵƵƐĞŽĨƚŚĞĞŶǀŝƌŽŶŵĞŶƚĂůĂŶĂůLJƐĞƐĐŽŶĚƵĐƚĞĚƵŶĚĞƌƚŚĞƉƌĞƐĞŶƚƐĐŽƉĞŽĨ
ǁŽƌŬ͕ƚŚĞƌĞďLJƌĞĚƵĐŝŶŐƚŚĞĞdžƚĞŶƚĂŶĚĐŽƐƚŽĨĨƵƚƵƌĞĂŶĂůLJƐĞƐ͘
/ŶƚŚĞĞǀĞŶƚƚŚĂƚĂŶŽƚŚĞƌĨŽƌŵŽĨYĚŽĐƵŵĞŶƚ;ƐƵĐŚĂƐĂŶ/ZͿŝƐĚĞƚĞƌŵŝŶĞĚŶĞĐĞƐƐĂƌLJĨŽƌƚŚĞ
ĐƵƌƌĞŶƚƉƌŽũĞĐƚďĂƐĞĚƵƉŽŶƚŚĞƉŽƚĞŶƚŝĂůƐŝŐŶŝĨŝĐĂŶĐĞŽĨĞŶǀŝƌŽŶŵĞŶƚĂůŝŵƉĂĐƚƐ͕ǁĞǁŝůůƐƵďŵŝƚĂƌĞǀŝƐĞĚ
ƐĐŽƉĞŽĨǁŽƌŬĂŶĚĐŽƐƚĞƐƚŝŵĂƚĞƚŽƚŚĞŝƚLJĨŽƌƚŚĂƚĂĚĚŝƚŝŽŶĂůĞĨĨŽƌƚ͘tĞĂƐƐƵŵĞƚŚĂƚŶŽƌĞƐŽƵƌĐĞ
ĂŐĞŶĐLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐǁŝůůďĞŶĞĞĚĞĚĨŽƌƚŚŝƐƉƌŽũĞĐƚ͘
ƌŝĞĨƚĞĐŚŶŝĐĂůŵĞŵŽƐǁŝůůďĞƉƌĞƉĂƌĞĚĨŽƌƚŚĞĨŽůůŽǁŝŶŐĞŶǀŝƌŽŶŵĞŶƚĂůĚŝƐĐŝƉůŝŶĞƐ͕ďĂƐĞĚƵƉŽŶ
ĚĂƚĂďĂƐĞƌĞǀŝĞǁƐƵƐĞĚƚŽĐŽŶĨŝƌŵƚŚĂƚŶŽƐŝŐŶŝĨŝĐĂŶƚĞŶǀŝƌŽŶŵĞŶƚĂůĐŽŶĐĞƌŶƐĂƌĞƉƌĞƐĞŶƚĞĚďLJƚŚĞ
ƉƌŽũĞĐƚ͗
ͻ ŝŽůŽŐŝĐĂůĚĂƚĂďĂƐĞƌĞǀŝĞǁ;ŚŝƐƚŽƌŝĐĂĞƌŝĂůƉŚŽƚŽƐĂŶĚŚĂďŝƚĂƚ͖ƐƉĞĐŝĂůͲƐƚĂƚƵƐƐƉĞĐŝĞƐƌĞĐŽƌĚƐ͖
ǁĞƚůĂŶĚĚĂƚĂďĂƐĞƐ;ďŽƚŚĨĞĚĞƌĂůĂŶĚƐƚĂƚĞͿ͖ƐŽŝůƐƵƌǀĞLJĚĂƚĂ͖&tĂůŝĨŽƌŶŝĂEĂƚƵƌĂůŝǀĞƌƐŝƚLJ
ĂƚĂďĂƐĞ;EͬŝŽƐͿ͖h^&t^/ŶĨŽƌŵĂƚŝŽŶĨŽƌWůĂŶŶŝŶŐĂŶĚŽŶƐƵůƚĂƚŝŽŶ;/WĂͿ͖h^&t^KŶůŝŶĞ
ƌŝƚŝĐĂů,ĂďŝƚĂƚDĂƉƉĞƌͿ͘
ͻ ƵůƚƵƌĂůƌĞƐŽƵƌĐĞƐƌĞĐŽƌĚƐĞĂƌĐŚ͕ďĂĐŬŐƌŽƵŶĚŝŶĨŽƌŵĂƚŝŽŶƌĞǀŝĞǁ͘
ͻ ,ĂnjĂƌĚŽƵƐŵĂƚĞƌŝĂůƐĚĂƚĂďĂƐĞƌĞƉŽƌƚ;Ğ͘Ő͕͘ZͿƚŽŝĚĞŶƚŝĨLJĂŶLJĂƌĞĂƐŽĨŬŶŽǁŶĐŽŶƚĂŵŝŶĂƚŝŽŶŶĞĂƌ
ƚŚĞĞŵŽŶƐƚƌĂƚŝŽŶWƌŽũĞĐƚ͘
dŚĞƚƌĂĨĨŝĐĚŝƐĐƵƐƐŝŽŶŝŶƚŚĞ/^ͬDEǁŝůůďĞƉĂƌƚŝĂůůLJďĂƐĞĚƵƉŽŶĚĂƚĂĂŶĚĐŽŶĐůƵƐŝŽŶƐƌĞĂĐŚĞĚĂƐƉĂƌƚŽĨ
dĂƐŬϮ͘Ϯ͕ŶĂŵĞůLJƚŚĞƉƌĞͲĂŶĚƉŽƐƚͲƉƌŽũĞĐƚsDdĞƐƚŝŵĂƚĞ͕ƉĞƌƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨ^ϳϰϯ͘,ŽǁĞǀĞƌ͕ƚŚĞ
sDdĞƐƚŝŵĂƚĞǁŝůůƌĞƋƵŝƌĞŵŽĚĞůŝŶŐŽĨƚŚĞƉƌŽƉŽƐĞĚ^ƉĞĐŝĨŝĐWůĂŶůĂŶĚƵƐĞƐƚŽĞŶƐƵƌĞƚŚĂƚĨƵůůďƵŝůĚŽƵƚ
ŽĨƚŚĞĐŽƌƌŝĚŽƌ͕ǁŝƚŚƚŚĞƉƌŽƉŽƐĞĚĐŚĂŶŐĞƐ͕ŝƐĐŽŶƐŝĚĞƌĞĚĨƌŽŵďŽƚŚĂůĂŶĚƵƐĞĞĨĨŝĐŝĞŶĐLJďĂƐŝƐĂŶĚ
ƚƌĂĨĨŝĐǀŽůƵŵĞĨŽƌĞĐĂƐƚŝŶŐďĂƐŝƐ͘',ǁŝůůĞƐƚĂďůŝƐŚĂďĂƐĞůŝŶĞsDdǀĂůƵĞĂŶĚĂƐƐƵŵĞƌĞĐŽŵŵĞŶĚĞĚ
ƚŚƌĞƐŚŽůĚƐƉĞƌƚŚĞ'ŽǀĞƌŶŽƌ͛ƐKĨĨŝĐĞŽĨWůĂŶŶŝŶŐĂŶĚZĞƐĞĂƌĐŚ;KWZͿdĞĐŚŶŝĐĂůĚǀŝƐŽƌLJŽŶǀĂůƵĂƚŝŶŐ
dƌĂŶƐƉŽƌƚĂƚŝŽŶ/ŵƉĂĐƚƐŝŶY;ĞĐĞŵďĞƌϮϬϭϴͿĂŶĚƚŚĞŝƚLJ͛ƐĂĚŽƉƚĞĚsDdƉŽůŝĐLJ;ϮϬϮϭͿ͘
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx Page 11
EWŽŵƉůŝĂŶĐĞ
',ƵŶĚĞƌƐƚĂŶĚƐƚŚĂƚŶŽĨĞĚĞƌĂůĨƵŶĚŝŶŐŝƐĂŶƚŝĐŝƉĂƚĞĚĨŽƌƚŚĞƉƌŽƉŽƐĞĚ^ƉĞĐŝĨŝĐWůĂŶĚŽĐƵŵĞŶƚ͕ĂŶĚ
ƚŚĂƚŶŽĞŶǀŝƌŽŶŵĞŶƚĂůĚŽĐƵŵĞŶƚĂƚŝŽŶǁŝůůďĞƌĞƋƵŝƌĞĚƵŶĚĞƌƚŚĞEĂƚŝŽŶĂůŶǀŝƌŽŶŵĞŶƚĂůWŽůŝĐLJĐƚ
;EWͿ͘/ŶƚŚĞĞǀĞŶƚƚŚĂƚƐƵĐŚĐŽŶĚŝƚŝŽŶƐĐŚĂŶŐĞ͕ǁĞǁŝůůƉƌĞƉĂƌĞĂƐĐŽƉĞĂŶĚĐŽƐƚĞƐƚŝŵĂƚĞƉƌŽƉŽƐĂůƚŽ
ƚŚĞŝƚLJŝĚĞŶƚŝĨLJŝŶŐƚŚĞŶĞĐĞƐƐĂƌLJĐŽŵƉůŝĂŶĐĞĂĐƚŝǀŝƚŝĞƐĂŶƚŝĐŝƉĂƚĞĚƵŶĚĞƌEW͘dŚĞƐĞǁŽƵůĚůŝŬĞůLJ
ŝŶĐůƵĚĞĂůƚƌĂŶƐŝŶǀŽůǀĞŵĞŶƚĂƐEWůĞĂĚĂŐĞŶĐLJ͕ǁŝƚŚƚŚĞĞŶǀŝƌŽŶŵĞŶƚĂůƌĞǀŝĞǁƉƌŽĐĞƐƐĨŽůůŽǁŝŶŐƚŚĞ
ĂůƚƌĂŶƐ>ŽĐĂůƐƐŝƐƚĂŶĐĞWƌŽĐĞĚƵƌĞƐĂŶĚƚŚĞ^ƚĂŶĚĂƌĚŶǀŝƌŽŶŵĞŶƚĂůZĞĨĞƌĞŶĐĞ;^ZͿ͘
dĂƐŬϰ͘ϱƐƐƵŵƉƚŝŽŶƐ
x YĞůŝǀĞƌĂďůĞƐ;Ğ͘Ő͕͘ĚŵŝŶƌĂĨƚ͕ƌĂĨƚ͕ĂŶĚ&ŝŶĂů/^ͬDEͿǁŝůůďĞƌĞǀŝƐĞĚŝŶƌĞƐƉŽŶƐĞƚŽŽŶĞ
ƌŽƵŶĚŽĨŝƚLJƌĞǀŝĞǁ͘ZĞǀŝƐŝŽŶƐĂƌĞĂƐƐƵŵĞĚƚŽďĞƉƌŝŶĐŝƉĂůůLJƋƵĂůŝƚĂƚŝǀĞŝŶŶĂƚƵƌĞ͕ĂŶĚǁŝůůŶŽƚ
ƌĞƋƵŝƌĞĂĚĚŝƚŝŽŶĂůƋƵĂŶƚŝƚĂƚŝǀĞĂŶĂůLJƐŝƐŽƌŵŽĚĞůŝŶŐ͘
x ůůĚĞůŝǀĞƌĂďůĞƐǁŝůůďĞƉƌŽǀŝĚĞĚĞůĞĐƚƌŽŶŝĐĂůůLJƚŽƚŚĞŝƚLJ͘dŚĞŝƚLJǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌĐŽƐƚƐ
ĂƐƐŽĐŝĂƚĞĚǁŝƚŚƌĞƉƌŽĚƵĐƚŝŽŶĂŶĚĚŝƐƚƌŝďƵƚŝŽŶͬŵĂŝůŝŶŐŽĨĚĞůŝǀĞƌĂďůĞƐ͘
x WƵďůŝĐEŽƚŝĐĞƐŝĚĞŶƚŝĨŝĞĚĂďŽǀĞ;Ğ͘Ő͕͘EŽƚŝĐĞŽĨ/ŶƚĞŶƚ͕EŽƚŝĐĞŽĨŽŵƉůĞƚŝŽŶĂŶĚEŽƚŝĐĞŽĨ
ĞƚĞƌŵŝŶĂƚŝŽŶͿǁŝůůďĞƉƌĞƉĂƌĞĚďLJ',͘
x WƵďůŝĐŶŽƚŝĐŝŶŐŽĨƚŚĞƌĂĨƚ/^ͬDEǁŝůůŝŶĐůƵĚĞƉƵďůŝƐŚŝŶŐŝŶŽŶĞŶĞǁƐƉĂƉĞƌŽĨŐĞŶĞƌĂůĐŝƌĐƵůĂƚŝŽŶŝŶ
ƚŚĞƉƌŽũĞĐƚǀŝĐŝŶŝƚLJ͕ĨŝůŝŶŐŽŶƚŚĞEŽƚŝĐĞŽĨ/ŶƚĞŶƚǁŝƚŚƚŚĞŽƵŶƚLJůĞƌŬ͕ĂŶĚĨŝůŝŶŐŽĨĂEŽƚŝĐĞŽĨ
ŽŵƉůĞƚŝŽŶǁŝƚŚƚŚĞ^ƚĂƚĞůĞĂƌŝŶŐŚŽƵƐĞƚŽƐŽůŝĐŝƚǁƌŝƚƚĞŶĐŽŵŵĞŶƚƐ͘YĚŽĞƐŶŽƚƌĞƋƵŝƌĞĂ
ƉƵďůŝĐŵĞĞƚŝŶŐƚŽĂĐĐĞƉƚĐŽŵŵĞŶƚƐĨŽƌ/^ͬDEͲůĞǀĞůĚŽĐƵŵĞŶƚƐ͖ŚŽǁĞǀĞƌ͕ǁĞƵŶĚĞƌƐƚĂŶĚƚŚĂƚƚŚĞ
ŝƚLJŵĂLJƉƌĞĨĞƌƚŽŚŽůĚƐƵĐŚĂŵĞĞƚŝŶŐĂŶĚƐŽĂƚƚĞŶĚĂŶĐĞĂƚŽŶĞŵĞĞƚŝŶŐŝƐŝŶĐůƵĚĞĚŝŶŽƵƌƐĐŽƉĞŽĨ
ǁŽƌŬ͘
x ŽƐƚƐĂƐƐŽĐŝĂƚĞĚǁŝƚŚƚŚĞŶĞǁƐƉĂƉĞƌĂĚ͕ĂŶĚĂŶLJĂŐĞŶĐLJĨŝůŝŶŐĨĞĞƐ͕ǁŝůůďĞƉĂŝĚďLJƚŚĞŝƚLJ͘
dĂƐŬϰ͘ϱWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x ĚŵŝŶƌĂĨƚ͕ƌĂĨƚ͕ĂŶĚ&ŝŶĂů/^ͬDE
x WƵďůŝĐEŽƚŝĐĞƐ
dĂƐŬϰ͘ϲʹWƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
dĂƐŬϰ͘ϲ͘ϭʹWƌĞƉĂƌĞWƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗',ĂŶĚ>t
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉƌĞƉĂƌĞĂWƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞďĂƐĞĚŽŶŝŶƉƵƚĨƌŽŵ
ƐƚĂĨĨ͘dŚĞWƵďůŝĐZĞǀŝĞǁƌĂĨƚǁŝůůďĞŝŶĨŽƌŵĂƚƐ;W&ͿƚŚĂƚĐĂŶďĞƉŽƐƚĞĚďLJƚŚĞŝƚLJƚŽƚŚĞŝƚLJ͛Ɛ
ǁĞďƐŝƚĞ͘
dĂƐŬϰ͘ϲ͘Ϯʹ^ƚƵĚLJ^ĞƐƐŝŽŶŽŶWƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',
^ƵƉƉŽƌƚŝƚLJ
',ǁŝůůĐŽŶĚƵĐƚϰŝŶͲƉĞƌƐŽŶŽƌǀŝƌƚƵĂůƐƚƵĚLJƐĞƐƐŝŽŶƐǁŝƚŚƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂŶĚŝƚLJŽƵŶĐŝůƚŽ
ƉƌĞƐĞŶƚƚŚĞWƵďůŝĐZĞǀŝĞǁƌĂĨƚ͕ĐůĂƌŝĨLJƋƵĞƐƚŝŽŶƐ͕ĂŶĚĂĚĚƌĞƐƐĐŽŵŵĞŶƚƐƌĞŐĂƌĚŝŶŐŝƚƐĐŽŶƚĞŶƚ͘dŚĞ
ŵĞĞƚŝŶŐƐǁŝůůĐŽǀĞƌĂǀĂƌŝĞƚLJŽĨƚŽƉŝĐƐŝŶĐůƵĚŝŶŐ͗
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
ͻ >ĂŶĚhƐĞĂŶĚhƌďĂŶĞƐŝŐŶ
ͻ dƌĂŶƐƉŽƌƚĂƚŝŽŶĂŶĚ/ŶĨƌĂƐƚƌƵĐƚƵƌĞ
ͻ /ŵƉůĞŵĞŶƚĂƚŝŽŶWůĂŶ
',ǁŝůůƐƵŵŵĂƌŝnjĞĐŽŵŵĞŶƚƐŐĂƚŚĞƌĞĚŝŶƚŚĞƐĞƐƚƵĚLJƐĞƐƐŝŽŶƐ͕ǁŝƚŚƌĞĐŽŵŵĞŶĚĞĚĞĚŝƚƐƚŽďĞƚƌĂĐŬĞĚ
ŝŶĂƚĂďůĞĨŽƌŵĂƚ͘ĨƚĞƌƚŚĞƐƚƵĚLJƐĞƐƐŝŽŶƐ͕ƚŚĞƚĂďůĞǁŝůůďĞƐŚĂƌĞĚǁŝƚŚƚŚĞŝƚLJƚŽĞŶƐƵƌĞ
ĐŽŵƉƌĞŚĞŶƐŝŽŶŽĨĂŶĚĂŐƌĞĞŵĞŶƚŽŶŝƚLJĐŽŵŵĞŶƚƐ͘
dĂƐŬϰ͘ϲWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x WƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
x DĞĞƚŝŶŐŵĂƚĞƌŝĂůƐĂŶĚƐƵŵŵĂƌLJ
dĂƐŬϰ͘ϳʹWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
dĂƐŬϰ͘ϳ͘ϭʹ^ƚĂĨĨDĞĞƚŝŶŐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',ĂŶĚ>t͕
^ƵƉƉŽƌƚŝƚLJ
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůŵĞĞƚǁŝƚŚƚŚĞŝƚLJƐƚĂĨĨĚŝƐĐƵƐƐĐŽŵŵĞŶƚƐƌĞĐĞŝǀĞĚĚƵƌŝŶŐƉƵďůŝĐƌĞǀŝĞǁĂŶĚ
ĐŽŶĨŝƌŵĚŝƌĞĐƚŝŽŶĨŽƌƉƌĞƉĂƌĂƚŝŽŶŽĨƚŚĞWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ͘
dĂƐŬϰ͘ϳ͘ϮʹWƌĞƉĂƌĞWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗',ĂŶĚ>t͕
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůŵŽĚŝĨLJƚŚĞWƵďůŝĐZĞǀŝĞǁƌĂĨƚĂĐĐŽƌĚŝŶŐƚŽƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐƌĞĐĞŝǀĞĚĨƌŽŵ
ŝƚLJƐƚĂĨĨĂŶĚƚŚĞĐŽŵŵƵŶŝƚLJ;dĂƐŬϰ͘ϲ͘ϮͿĂŶĚƉƌĞƉĂƌĞƚŚĞWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶ;',ͿĂŶĚ
ŽĚĞ;>tͿ͘',ĂŶĚ>tǁŝůůŵĂŬĞĚŽĐƵŵĞŶƚĐŚĂŶŐĞƐĂŶĚƚƌĂĐŬƌĞƐŽůƵƚŝŽŶƚŽĞĂĐŚĐŽŵŵĞŶƚŝŶƚŚĞ
ƚƌĂĐŬŝŶŐƐŚĞĞƚ;ŶŽƚŝŶƚŚĞĚŽĐƵŵĞŶƚͿ͘KŶĐĞĂůůĐŽŵŵĞŶƚƐĂƌĞĂĚĚƌĞƐƐĞĚ͕ŶŽĨƵƌƚŚĞƌĐŚĂŶŐĞƐǁŝůůďĞ
ŵĂĚĞƵŶƚŝůĂĨƚĞƌƉƵďůŝĐŝŶƉƵƚƚŚƌŽƵŐŚƚŚĞĚŽƉƚŝŽŶ,ĞĂƌŝŶŐƐŝƐŐĂƚŚĞƌĞĚ͘dŚĞWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚǁŝůůďĞ
ƉŽƐƚĞĚďLJƚŚĞŝƚLJƚŽƚŚĞŝƚLJ͛ƐǁĞďƐŝƚĞ͘
dĂƐŬϰ͘ϳWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x WƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
dĂƐŬϰ͘ϴʹĚŽƉƚŝŽŶ,ĞĂƌŝŶŐƐ
^ĞǀĞƌĂůƐŝŐŶŝĨŝĐĂŶƚƌĞŐƵůĂƚŽƌLJĂĐƚŝŽŶƐŵĂLJďĞŶĞĞĚĞĚƚŽĨĂĐŝůŝƚĂƚĞĂĚŽƉƚŝŽŶŽĨƚŚĞ^ƉĞĐŝĨŝĐWůĂŶ͘dŚĞƐĞ
ŵĂLJŝŶĐůƵĚĞ͗
x ŽŶŝŶŐKƌĚŝŶĂŶĐĞŵĞŶĚŵĞŶƚ;ƌĞƉůĂĐĞǁŝƚŚ,ǁLJϭϭϭ^WŽĚĞͿ
x 'ĞŶĞƌĂůWůĂŶŵĞŶĚŵĞŶƚ;ƉŽƐƐŝďůLJĐŚĂŶŐĞ'ĞŶĞƌĂůWůĂŶĚĞƐŝŐŶĂƚŝŽŶƐͿ
Highway 111 Specific Plan Scope of Work 10-10-21_LWC markup 2.docx
x ^ƉĞĐŝĨŝĐWůĂŶŵĞŶĚŵĞŶƚ;ZĞƉĞĂůĞdžŝƐƚŝŶŐ^ƉĞĐŝĨŝĐWůĂŶƐͿ
x EĞǁ^ƉĞĐŝĨŝĐWůĂŶĚŽƉƚŝŽŶ
dĂƐŬϰ͘ϴ͘ϭʹWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶ,ĞĂƌŝŶŐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',ĂŶĚŝƚLJ
^ƵƉƉŽƌƚ>t͕
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉƌĞƉĂƌĞĨŽƌĂŶĚƉĂƌƚŝĐŝƉĂƚĞŝŶŽŶĞǀŝƌƚƵĂůWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŚĞĂƌŝŶŐ͘dŚĞ
ŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉƌĞƉĂƌĞĂWŽǁĞƌWŽŝŶƚƉƌĞƐĞŶƚĂƚŝŽŶ͘dŚĞdĞĂŵĂƐƐƵŵĞƐƚŚĞŝƚLJǁŝůůďĞƌĞƐƉŽŶƐŝďůĞ
ĨŽƌƐƚĂĨĨƌĞƉŽƌƚĂŶĚĂŶLJŶŽƚŝĐŝŶŐ͘
dĂƐŬϰ͘ϴ͘ϮʹŝƚLJŽƵŶĐŝů,ĞĂƌŝŶŐ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ͗
>ĞĂĚ',ĂŶĚŝƚLJ
^ƵƉƉŽƌƚ>t͕
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůƉƌĞƉĂƌĞĨŽƌĂŶĚƉĂƌƚŝĐŝƉĂƚĞŝŶŽŶĞǀŝƌƚƵĂůŝƚLJŽƵŶĐŝůŚĞĂƌŝŶŐ͘',ǁŝůů
ƉƌĞƉĂƌĞĂWŽǁĞƌWŽŝŶƚƉƌĞƐĞŶƚĂƚŝŽŶ͘dŚĞdĞĂŵĂƐƐƵŵĞƐƚŚĞŝƚLJǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌƐƚĂĨĨƌĞƉŽƌƚĂŶĚ
ĂŶLJŶŽƚŝĐŝŶŐ͘
dĂƐŬϰ͘ϴ͘ϯʹWƌĞƉĂƌĞ&ŝŶĂů^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
ZĞƐƉŽŶƐŝďůĞWĂƌƚŝĞƐ
>ĞĂĚ',ĂŶĚŝƚLJ
^ƵƉƉŽƌƚ>t
dŚĞŽŶƐƵůƚĂŶƚdĞĂŵǁŝůůŵĂŬĞĂŶLJĨŝŶĂůƌĞǀŝƐŝŽŶƐďĂƐĞĚŽŶƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐĨƌŽŵƚŚĞWůĂŶŶŝŶŐ
ŽŵŵŝƐƐŝŽŶĂŶĚŝƚLJŽƵŶĐŝůĂŶĚƉƌĞƉĂƌĞƚŚĞ&ŝŶĂůĚŽƉƚĞĚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞďĂƐĞĚŽŶƚŚĞŝƌŝŶƉƵƚ͘
',ǁŝůůĂŐĂŝŶƐƵŵŵĂƌŝnjĞĐŽŵŵĞŶƚƐŐĂƚŚĞƌĞĚŝŶĨƌŽŵƚŚĞŝƚLJƉƌŽũĞĐƚůĞĂĚĞƌƐŚŝƉ͕WůĂŶŶŝŶŐ
ŽŵŵŝƐƐŝŽŶ͕ĂŶĚŝƚLJŽƵŶĐŝůǁŝƚŚƌĞĐŽŵŵĞŶĚĞĚĞĚŝƚƐƚŽďĞƚƌĂĐŬĞĚŝŶĂƚĂďůĞĨŽƌŵĂƚ͘',ĂŶĚ>t
ǁŝůůĐŽŵŵŝƚĚŽĐƵŵĞŶƚĐŚĂŶŐĞƐĂŶĚƚƌĂĐŬƌĞƐŽůƵƚŝŽŶƚŽĞĂĐŚĐŽŵŵĞŶƚ͘KŶĐĞĂůůĐŽŵŵĞŶƚƐĂƌĞ
ĂĚĚƌĞƐƐĞĚ͕ĂŶĚƚŚĞ&ŝŶĂů^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞĚŽĐƵŵĞŶƚŝƐƉƌŽǀŝĚĞĚŝŶW&ĨŽƌŵ͕ƐƵďƐƚĂŶƚŝǀĞĐŚĂŶŐĞƐ
;ŵŽƌĞƐŝŐŶŝĨŝĐĂŶƚƚŚĂŶŐƌĂŵŵĂƌĂŶĚŝŵĂŐĞĞƌƌŽƌƐͿŵĂLJƌĞƋƵŝƌĞĂŶĂĚĚŝƚŝŽŶĂůƐĞƌǀŝĐĞĂŶĚĨĞĞ͘
dĂƐŬϰ͘ϴWƌŽĚƵĐƚƐͬĞůŝǀĞƌĂďůĞƐ;ĞůĞĐƚƌŽŶŝĐƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶŽƚĞĚͿ
x WƌĞƉĂƌĞĨŽƌĂŶĚĂƚƚĞŶĚϭWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŚĞĂƌŝŶŐĂŶĚϭŝƚLJŽƵŶĐŝůŚĞĂƌŝŶŐ
x &ŝŶĂů^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞ
Exhibit B
Schedule of Compensation
Pursuant to Section 2.3 of the Agreement the Contracting Party shall
receive additional compensation in the amount of Five Hundred )RUW\)LYH
Thousand, Five Hundred and Twenty-Three ($5,523.00) dollars for
the Additional Services provided herein. With the exception of
compensation, Additional Services provided for in Section 2.3 of this
Agreement, the maximum total compensation to be paid to Consultant
under this Agreement is One Million Four Hundred )RUW\6L[ Thousand
Seven Hundred Eighty-Three Dollars ($1,4,783.00) (“Contract Sum”).
The Contract Sum shall be paid to Consultant in conformance with Section
2.4 of the Agreement.
AMENDMENT :
Task 4 and 0.4 $ 64,393
Task 0.4 ($ 15,940)
Task 3.4 ($ 85,930)
AMENDMENT TOTAL: $5,523
CONTRACT SUM
Agreement $ 885,228
Amendment 1 $ 11,760
Amendment 2 0
0HPRUDQGXP $ 4,272
Amendment $ 5,523
TOTAL $1,4,783
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xhibit B Fee for Services
>ĂYƵŝŶƚĂ,ŝŐŚǁĂLJϭϭϭŽƌƌŝĚŽƌ^ƉĞĐŝĨŝĐWůĂŶͮWƌŽũĞĐƚWƌŽƉŽƐĞĚ^ĐŚĞĚƵůĞͮZĞǀŝƐĞĚϭϬĞĐĞŵďĞƌϮϬϮϭ^ĐŚĞĚƵůĞ&ĞďϮϬϮϮ DĂƌ Ɖƌ DĂLJ :ƵŶ :Ƶů ƵŐ ^ĞƉ KĐƚ EŽǀ ĞĐ :ĂŶϮϬϮϯ &Ğď DĂƌ Ɖƌ DĂLJ :ƵŶ :Ƶůǁϭ ǁϮ ǁϯ ǁϰ ǁϭ ǁϮ ǁϯ ǁϰ tϭ ǁϮ ǁϯ ǁϰ ǁϭ ǁϮ ǁϯ ǁϰ tϭ ǁϮ ǁϯ ǁϰ ǁϭ ǁϮ ǁϯ ǁϰ ǁϭ ǁϮ ǁϯ ǁϰ ǁϭ ǁϮ ǁϯ ǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰǁϭǁϮǁϯǁϰ ǁϭ ǁϮ ǁϯ ǁϰ ǁϭ ǁϮ ǁϯ ǁϰ/ŶĨŽƌŵĂƚŝŽŶ'ĂƚŚĞƌŝŶŐĂŶĚŶĂůLJƐŝƐ &ƵƚƵƌĞWůĂŶŶŝŶŐĂŶĚZĞƉŽƌƚŽŶƚĞŶƚWƌŽĚƵĐƚŝŽŶ WůĂŶZĞĨŝŶĞŵĞŶƚĂŶĚĚŽƉƚŝŽŶLJĐůĞWŚĂƐĞϰ<ŝĐŬŽĨĨΘĂĐŬŐƌŽƵŶĚĂƚĂŽůůĞĐƚŝŽŶϰ͘ϭ͘ϭ WŚĂƐĞϰ^ĐŽƉŝŶŐDĞĞƚŝŶŐΘ^ŝƚĞdŽƵƌϰ͘ϭ͘Ϯ ĂĐŬŐƌŽƵŶĚĂƚĂŽůůĞĐƚŝŽŶΘŶĂůLJƐŝƐϰ͘ϭ͘ϯ ^ƚĂŬĞŚŽůĚĞƌŶŐĂŐĞŵĞŶƚWůĂŶdžŝƐƚŝŶŐŽŶĚŝƚŝŽŶƐŶĂůLJƐĞƐϰ͘Ϯ͘ϭ 'ĞŶĞƌĂůWůĂŶŶĂůLJƐŝƐϰ͘Ϯ͘Ϯ ŽƌƌŝĚŽƌWůĂŶĂŶĚ^ƉĞĐŝĨŝĐWůĂŶŶĂůLJƐŝƐϰ͘Ϯ͘ϯ džŝƐƚŝŶŐŽƌƌŝĚŽƌŽŶĚŝƚŝŽŶƐ^LJŶƚŚĞƐŝƐWƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬϰ͘ϯ͘ϭ WƌĞƉĂƌĞĨŽƌĂŶĚƚƚĞŶĚDĞĞƚŝŶŐǁŝƚŚ^ƚĂĨĨϰ͘ϯ͘Ϯ DĞĞƚŝŶŐƐǁŝƚŚWƌŽƉĞƌƚLJKǁŶĞƌƐĂŶĚĞǀĞůŽƉĞƌƐϰ͘ϯ͘ϯ WƌĞƉĂƌĞWƌĞĨĞƌƌĞĚWůĂŶĂŶĚWŽůŝĐLJ&ƌĂŵĞǁŽƌŬϰ͘ϯ͘ϰ ^ƚƵĚLJ^ĞƐƐŝŽŶĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞϰ͘ϰ͘ϭ WƌĞƉĂƌĞĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶ;WůĂŶŽĐƵŵĞŶƚͿϰ͘ϰ͘Ϯ WƌĞƉĂƌĞĚŵŝŶŝƐƚƌĂƚŝǀĞ&ŽƌŵͲĂƐĞĚŽĚĞϰ͘ϰ͘ϯ ^ƚĂĨĨZĞǀŝĞǁŽĨĚŵŝŶŝƐƚƌĂƚŝǀĞƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞŶǀŝƌŽŶŵĞŶƚĂůZĞǀŝĞǁͬYϰ͘ϱ͘ϭ WƌŽũĞĐƚ/ŶŝƚŝĂƚŝŽŶϰ͘ϱ͘Ϯ WƌŽũĞĐƚĞƐĐƌŝƉƚŝŽŶϰ͘ϱ͘ϯ ĚŵŝŶƌĂĨƚ/^ͬDEϰ͘ϱ͘ϰ ƌĂĨƚ/^ͬDEϰ͘ϱ͘ϱ WƵďůŝĐZĞǀŝĞǁΘEŽƚŝĐĞŽĨ/ŶƚĞŶƚϰ͘ϱ͘ϲ &ŝŶĂů/^ͬDEϰ͘ϱ͘ϳ WƵďůŝĐ,ĞĂƌŝŶŐΘEŽƚŝĐĞŽĨĞƚĞƌŵŝŶĂƚŝŽŶWƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞϰ͘ϲ͘ϭ WƌĞƉĂƌĞWƵďůŝĐZĞǀŝĞǁƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞϰ͘ϲ͘Ϯ ^ƚƵĚLJ^ĞƐƐŝŽŶƐŽŶWƵďůŝĐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞϰ͘ϳ͘ϭ ^ƚĂĨĨDĞĞƚŝŶŐ;ĐŽŶĨĞƌĞŶĐĞĐĂůůͿϰ͘ϳ͘Ϯ WƌĞƉĂƌĞWƵďůŝĐ,ĞĂƌŝŶŐƌĂĨƚ^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞĚŽƉƚŝŽŶ,ĞĂƌŝŶŐƐϰ͘ϴ͘ϭ WůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶ,ĞĂƌŝŶŐϰ͘ϴ͘Ϯ ŝƚLJŽƵŶĐŝů,ĞĂƌŝŶŐϰ͘ϴ͘ϯ WƌĞƉĂƌĞ&ŝŶĂů^ƉĞĐŝĨŝĐWůĂŶĂŶĚŽĚĞŝͲDŽŶƚŚůLJdĞĂŵŽŽƌĚŝŶĂƚŝŽŶDĞĞƚŝŶŐƐ([KLELW&6FKHGXOH
City of La Quinta
CITY COUNCIL MEETING: December 21, 2021
STAFF REPORT
AGENDA TITLE: APPROVE AMENDMENT NO. 3 TO AGREEMENT FOR
CONTRACT SERVICES WITH GHD, INC. TO REVISE THE SCOPE OF SERVICES
FOR PHASE 4 TO PREPARE A SPECIFIC PLAN FOR THE HIGHWAY 111
CORRIDOR, PROJECT NO. 2019-05
RECOMMENDATION
Approve Amendment No. 3 to the Agreement for Contract Services with GHD,
Inc. to revise the scope of services for Phase 4 to prepare a specific plan for
the Highway 111 Corridor, Project No. 2019-05, in the amount of $647,393,
and authorize the City Manager to execute the agreement.
EXECUTIVE SUMMARY
•The Highway 111 Corridor Project seeks to address connectivity,
pedestrian- and bicycle-friendliness, transit, green infrastructure,
economic development, and the retrofitting of the existing suburban
fabric.
•In September 2020, the City entered into an Agreement for Contract
Services (Agreement) with GHD, Inc. for planning and engineering
services to continue efforts to implement the Highway 111 Corridor Plan
(Corridor Plan) including exploring form-based code zoning and roadway
design
•In March 2021, the City and GHD executed Amendment No. 1 to obtain
and analyze Street Light Data to assist with roadway design services.
•In May 2021, the City and GHD executed Amendment No. 2 to amend the
“Time and Materials” cost allocation, by Task, of Compensation for
Services. Additionally, the scope of services was amended via a
memorandum to include additional property owners and developers
meeting services.
BUSINESS SESSION ITEM NO. 4
279
•The current contract for planning and engineering services consists of four
phases. The revised scope for optional Phase 4 was presented to City
Council and Planning Commission (PC) at a joint study session held on
December 7, 2021.
•The proposed Amendment No. 3 (Attachment 1) would initiate Phase 4
with the revised scope which consists of preparation of a Specific Plan for
the entire Corridor per Council’s direction.
FISCAL IMPACT
The Capital Improvement Projects (CIP) program allocated $1,000,000 in
fiscal year (FY) 2019/20, $250,000 in FY 2020/21, and $1,000,000 in FY
2021/22 for a total current budget of $2,250,000 for projects to be
implemented along Highway 111. There is sufficient funding in the project
budget (401-0000-60185 1920-05) for this Amendment.
Financial Accounting for Project 2019-05:
Amendment 3:
Task 4 and 0.4 $ 647,393
Task 0.4 ($ 15,940)
Task 3.4 ($ 85,930)
AMENDMENT 3 TOTAL: $ 545,523
Contract Sum:
Agreement $ 885,228
Amendment 1 $ 11,760
Amendment 2* 0
Memorandum $ 4,272
Amendment 3 $ 545,523
TOTAL $1,446,783
*Costs were shifted between tasks; none were added.
As of December 15, 2021, $331,204.09 has been expended.
BACKGROUND/ANALYSIS
The Corridor Plan was developed in 2019 to address connectivity, pedestrian-
and bicycle-friendliness, transit, green infrastructure, economic development,
and the retrofitting of the existing suburban fabric. Recommendations for
implementation of the Corridor Plan detail a strategy for improvements,
recognizing the dual functions of moving vehicles and creating a safe, walkable
280
environment and opportunities for future development that will lead to
increases in economic competitiveness, neighborhood livability, and
sustainability in La Quinta.
Since the Corridor Plan was developed, further planning and implementation
efforts have been in progress under the current contract with GHD and LWC.
Several study sessions have been held with the Council and PC discussing
zoning for the Corridor. At the latest study session, a revised scope was
presented for the optional Phase 4 task to prepare an overall Specific Plan
(SP) for the entire Corridor. This approach affords a wholistic plan to create a
more cohesive Corridor as is advised in the Corridor Plan.
The revised Phase 4 scope would consist of reviewing the eleven (11)
individual specific plans along the Corridor, repealing them, and maintaining
applicable existing standards and removing standards that are no longer
effective or are not in line with the Highway 111 Vision. An overall SP would
be drafted that incorporates these standards and creates a zoning code for
the area that includes form based code concepts. The SP code would also
incorporate the existing Mixed Use and Affordable Housing Overlays to reduce
layers of legislation and incorporate housing in the Corridor area to help meet
the City’s housing goals. The SP would provide flexibility, adapt to the
changing commercial environment, and help streamline development along
the Corridor.
The project scope includes a build-out plan, similar to the Village Build-Out
Plan. This would include an environmental analysis consistent with the
California Environmental Quality Act (CEQA) of the build-out of the area, thus
accounting for environmental review for future developments.
This entire SP effort would entail outreach with the shopping center and
property owners along the Corridor to carefully consider any potential zoning
conflicts and identify opportunities for development that is consistent with the
Corridor Vision. Study sessions are included to inform the Council, PC and
public on the status of the SP. The SP preparation effort is anticipated to take
approximately 24 months.
Optional Enhancements
Based on comments from the December 7 study session, GHD has proposed
an Enhanced Engagement Package consisting of three additional items that
can be included to the SP scope:
1.Augmented Reality (AR) display of Corridor improvements at two or
more key locations which would include project renderings
281
2.Highway 111 Corridor Plan website to host documents and resources for
the SP for the duration of the planning process
3.Special exhibit/presentation at the January 2023 Community Workshop
or separate workshop to showcase the SP
A rough estimation of the cost for these items would be approximately
$150,000-200,000, added to the SP cost. If Council would like to add these
items to the contract, staff will bring a scope and cost back to the Council for
review and approval.
ALTERNATIVES
•Council may decide to not approve the contract amendment and the
Corridor would continue to be governed by the existing Specific Plans.
•Council may decide to revise the scope of work and advise staff to
come back with the revisions for approval.
Prepared by: Cheri Flores, Planning Manager
Approved by: Danny Castro, Design and Development Director
Attachment: 1. Draft Contract Amendment No. 3
282