Loading...
07-0665 (RC) Analysis of ShelvingsSEIZMIC MATERIAL HANDLING ENGINEERING EST. 1985 STORAGE RACKS STEEL SHELVING SEISMIC ANALYSIS ALASKA KENTUCKY NORTH CAROLINA DRIVE-IN RACKS MOVABLE SHELVING STRUCTURAL DESIGN ARIZONA MARYLAND MASSACHUSETTS OHIO OKLAHOMA CANTILEVER RACKS STORAGE RACKS CITY APPROVALS CALIFORNIA COLORADO MICHIGAN OREGON MEZZANINES MODULAR OFFICES STATE APPROVALS PRODUCT TESTING CONNECTICUT MINNESOTA PENNSYLVANIA CONVEYORS CAROUSELS GONDOLAS BOOKSTACKS FIELD INSPECTION FLORIDA MISSOURI TENNESSEE PUSHBACK RACKS FLOW RACKS SPECIAL FABRICATION GEORGIA MONTANA TEXAS UTAH RACK BUILDINGS FOOTINGS PERMITTING SERVICES IDAHO NEBRASKA VIRGINIA ILLINOIS NEVADA INDIANA NEW JERSEY WASHINGTON KANSAS NEW MEXICO WISCONSIN CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE y SEISMIC ANALYSIS OF SHELVINGS FOR BARBECUES GALORE 78900 HIGHWAY 1 I I LA QUINTA, CA 92253 JOB # 07-0246A APPROVED BY SAL E. FATEEN, P.E. 2/22/2007 /�,�,O ES5[QN� c' a No. 35215 xp 9- -07 9:1 of CA��F° T MAR 0 12007 161 ATLANTIC STREET * POMONA * CA 91768 * TEL: (909) 869-0989 * FAX: (909) 869-0981 SEIZMIC _ INC. MATERIAL HANDLING ENGINEERING TEL: (909) 869-0989 • FAX: (909) 869-0981 1 Al AT] ANTIC; AVENUE • POMONA. CA 91768 TABLE OF CONTENTS PROJECT BARBECUES GALORE FOR NAUMANN HOBBS SHEET NO. 2 CALCULATED BY TC DATE 2/22/2007 DESCRIPTION PAGE# COVER PAGE 1 TABLE OF CONTENTS 2 PROJECT SCOPE & PARAMETERS 3 GENERAL CONFIGURATIONS 4 LOADS & DISTRIBUTION 5 LONGITUDINAL & TRANSVERSE ANALYSIS 6 COLUMN ANALYSIS 7 RIVET CONNECTION CHECK 8 SHELF ANALYSIS 9 OVERTURNING ANALYSIS 10 SLAB & SOIL CHECK 11 SEIZMIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 3 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) 869-0989 • FAX: (909) 869-0981 DATE 2/22/2007 161 ATLANTIC AVENUE • POMONA, CA 91768 LIGHT DUTY STORAGE RACKS PROJECT SCOPE THE PURPOSE OF THIS ANALYSIS IS TO SHOW THAT THE FOLLOWING LIGHT DUTY STORAGE RACK SYSTEM COMPLIES WITH CHAPTER 22, DIVISION X OF THE 1997 UBC/ 2001 CBC. PARAMETERS SHELVING UNITS WILL BE ANALYZED AS AN ELEMENT UTILIZING THE FOLLOWING FORMULA: SPECIFICATIONS V=2.5xCaxlxW/R <== SECTION 2228.5.2 &1630.2.1 WHERE: Ca = 0.44 <__= NOTE: Ca = 0.44 x Na, where Na = 1 1 = 1.0 R = 5.6 <_= FOR MOMENT FRAMES W= LL/n+DL n = 1 <=== SGL ROW 1.4 <=== WORKING STRESS REDUCTION STEEL - Fy = 36000 PSI ✓BOLTS - A307 UNLESS OTHERWISE NOTED JRIVETS - Fy = 50,000 PSI ANCHORS - (1) 1/4" 0 x 1-15/16" MIN. EMBD. RAMSET/ REDHEAD TRUBOLT [CC 1372 SHELVES - PARTICLE BOARD OR PLYWOOD SLAB - 5 IN x 3000 PSI SOIL- 1,000PSF SEIZMIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 4 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) 869-0989 • FAX: (909) 869-0981 DATE 2/22/2007 161 ATLANTIC AVENUE • POMONA, CA 91768 GENERAL CONFIGURATIONS: 1) POST 2) FOOT PLATE 3) ANCHOR 146, 5) SHELF SU^^^^T ----- - - - - -- i i NOTE: THIS IS THE TRIBUTARY SYSTEM BEING ANALYZED. r00 SEIZAIIIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 5 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) 869-0989 - FAX: (909) 869-0981 DATE 2/22/2007 161 ATLANTIC AVENUE - POMONA, CA 91768 LOADS & DISTRIBUTION -TYPE 72" x 36" ANALYSIS WILL BE BASED ON CHAPTER 22, DIVISION X OF THE 1997 UBC, WHERE SEISMIC SHEAR IS DERIVED AS: vv=2.5xCaxIxW/R 1.4 == WORKING STRESS REDUCTION Ca = 0.44 I=1 R = 6.6 <== MOMENT FRAMES n= 1 #of SHELF LVLS = 3 <== ACTUAL SHELF LEVELS SHELF LL = 550 LB/LVL <== ACTUAL SHELF LIVE LOAD .� DL/LEVEL = 10 LB/LVL <== ACTUAL SHELF DEAD LOAD '-/TOTAL LL = 1,650 LB TOTAL DL = 30 LB SEISMIC SHEAR V= 2.5x0.44x1 x(1650LB/1+0LB/4+30LB) /(5.6x1.4) = 236 LB LEVEL wx DL + LL hx wx hx Fi Movt 1 560 LBV .0 IN 1,680 ✓4.7 LB 14 IN -LB 4087 2 560 LB �1.0 IN 8,560 t40A LB IN -LB 3 560 LB %,p6.0 IN '13,760 A50.9 LB 14,482 IN -LB 4 0 LB 0.0 IN 0 0.0 LB 0 IN -LB 5 0 LB 0.0 IN 0 0.0 LB 0 IN -LB 6 0 LB 0.0 IN 0 0.0 LB 0 IN -LB 7 0 LB 0.0 IN 0 0.0 LB 0 IN -LB 8 0 LB 0.0 IN 0 0.0 LB 0 IN -LB 9 0 LB 0.0 IN 0 0.0 LB 0 IN -LB 1,680 LB TOTAL = 4,000 236 LB 18,584 IN -LB #OF LVLS x 1.0 x 1.0 x 1.0 x 0.0 x 0.0 x 0.0 x 0.0 x 0.0 x 0.0 x 3.0 NOTE: THERE ARE ONLY 3 MOMENT RESISTING BEAMS, THE LOADS OF THE 3 SHELVES ARE DISTRIBUTED ACCORDINGL` SEIZMIC INC. MATERIAL HANDLING ENGINEERING TEL: (909) 869-0989 • FAX: (909) 869-0981 161 ATLANTIC AVENUE • POMONA, CA 91768 LONGITUDINAL ANALYSIS COLUMN FORCES PROJECT FOR SHEET NO. CALCULATED BY DATE Mbase = 0 IN -LB <==BASE ASSUMED TO BE PINNED Pcol(seismic) = Movt/d = 516 LB Vcol = V/2 = 118 LB <==PLEASE SEE LOADS & DISTRIBUTION PAGE Mcol(1-1) = Vcol x hi - Mbase Pcol(1-1) = 840 LB = 118 LB x 3 IN - 0 IN -LB = 354 IN-L3 Mcol(2-2) = [Vcol - EFi/21 x hi/2 = [118 - 2.4] LB x 48 IN / 2 = 2,772IN-LB Mcol(3-3) = 1,697 IN -LB BEAM TO COLUMN MOMENTS Mconn(1-1) = [Mcol(1-1) + Mcol(2-2)] / 2 = 1,5631N-LB Mconn(2-2) = 2,235 IN -LB Mconn(3-3) = 849 IN -LB Pcol(2-2) = 560 LB Pcol(3-3) = 280 LB BARBECUES GALORE NAUMANN HOBBS 6 TC 2/22/2007 — COLUMN CHECK — CONNECTION CHECK SEIZMIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 7 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) B69-0989 • FAX: (909) 869-0981 DATE 2/22/2007 161 ATLANTIC AVENUE • POMONA, CA 91768 COLUMN ANALYSIS-DBL ANGLE ANALYZED PER AISI & THE 1997 UBC/2001 CBC. SECTION PROPERTIES BASED ON THE EFFECTIVE SECTION. AX IAL Ptotal= 560 LB Mmax= 2,772 IN -LB KxLx/rx = 1.2*45 IN/0.473 IN = 114.2 <___ (KI/r)mak KyLy/ry = 1.2*45 IN/0.623 IN = 86.7 Fe= rrA2E/(KL/r)max^2 = 22.3 KSI Fy/2= 18.0 KSI SINCE, Fe > Fy/2 THEN, Fn= Fy(1-Fy/4Fe) = 36 KSI*[1-36 KSI/(4*22.3 KSI)] 21.5 KSI Pn= Aeff"Fn = 7,234 LB Qc= 1.92 Pa= Pn/nc = 7234 LB/1.92 3,768 LB P/Pa= 0.15 < 0.15 FLE}CUREV/ CHECK: P/Pa + Mx/Max <_ 1.33 Pno= Ae*Fy 0.337 INA2 *36000 PSI 12,116 LB ✓Pao= Pno/f)c = 12116 LB/1.92 . 6,310 LB Myield=My= Sx*Fy = 0.113 INA3 * 36000 PSI = 4,068 IN -LB Max= My/0f = 4068 IN-LB/1.67 •� 2,436 IN -LB Pcr= rrA2E1/(KL)max^2 = rrA2*29500000 PSI/(1.2*45 IN)^2 = 9,185 LB :. SECTION PROPERTIES t = 0.075 1N Aeff = 0.337 INA2 Ix = 0.098 INA4 Sx = 0.089 INA3 rx = 0.473 IN ly = 0.169 INA4 Sy = 0.113 INA3 ry = 0.623 IN Kx = 1.20 Lx = 45.0 IN Ky = 1.20 (y = 45.0 IN ,EF = 36 KSI = 29,500 KSI Of= 1.67 Cmx= 1.00 Cb= 1.0 px= {1/[1-(QeP/Pcr)]}^-1 = {1/[1-(1.92*560 LB/9785 LB)]}^-1 = 0.89 THUS, (560 LB/3768 LB) + (2772 IN-LB/2436 IN -LB) = 1.23 < 1.33, OK SEIZMIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 8 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) 869-0989 - FAX: (909) 869-0981 DATE 2/22/2007 1 R1 ATI ANTIC; AVENUE - POMONA. CA 91768 CHECK CAPACITY OF DOUBLE RIVET BEAM CONNECTION SINCE THE FRAME IS ASSUMED TO RESIST THE SEISMIC LOADS AS A MOMENT RESISTING FRAME, THE CAPACITY OF THE RIVET BEAM CONNECTION SHALL BE DETERMINED. Mconn= Mseismic + Mstatic = 2,235 IN -LB CAPACITY OF STUD IN SHEAR Vallow= 0.4 * Fy * AREA * 1.33 = 2,944 LB Vallow= 0.22* Fu * AREA * 1.33 = 2,914 LB BEARING CAPACITY OF STUDS �brg.allow= stud O x tmin x Fu x 1.33 = 2,438 LB Mallo = Vallow * d = 3,656 IN -LB > Mconn OK 1 1/2" 0= 0.375 IN tmin= 0.075 IN AREA= 0.11 IN^2 Fy= 50,000 PSI Fu-METAL= 65,000 PSI Fu-RIVET= 90,000 PSI SEIZMIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 9 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) 869-0989 • FAX: (909) 869-0981 DATE 2/22/2007 1 R,1 ATI ANTIC AVENUE • POMONA, CA 91768 MOMENT RESISTING SHELF ANALYSIS THE SHELF SHALL BE ANALYZED TO DETERMINE THE ADEQUACY OF THE COMPONENTS TO CARRY THE c,IVFN STATIC LOADS. ASSUME SIMPLY SUPPORTED END CONDITIONS. SHELF LOAD(DL+LL)= 560 LB/LVL- TOTAL SHELF AREA= 2,592 IN12 TRIB AREA A= 972 IN12 TRIB AREA B= 324 INA2 BEAM TYPE 1(A) LOAD= SHELF LOAD * (AREA A/TOTAL AREA) = 2.92 LB/IN BEAM TYPE 2(B) LOAD= SHELF LOAD - (AREA B/TOTAL AREA) v` 1.94 LB/IN BEAM TYPE 1 ANALYSIS BEAM TYPE 2 KI F&I - ]EI BEAM SHELF TOP TYPE 1 Mmax = wL112/8 W (2.92 LB/IN)*(72)^2/8 1,8901N-LB fb= M/S 1890 1 N-LB/0.28 I N"3 6,750 PSI Fb= 0.6*Fy 0.6 * 36000 PSI - 21,600 . Si fb/Fb= N31 < 1.0 BEAM TYPE 1 OK A= 5WLA4/(384E1) = 5*2.917 LB/IN*(72 IN)^4/(384*29X10^6 PSI* INA4) 0.080IN Dallow=U240 = 0.300 IN OK BEAM TYPE 2 ANALYSES VMmax = wLA2/8 J = 3151N-LB fb= M/S ,,/= 2,250 PSI Fb= 21,600 PSI fb/Fb= 0.10 < 1.0 BEAM TYPE 2 OK BEAM TYPE 1: SSC Ix= 0.440 INA4 Sx= 0.280 INA3 L= 72.0 IN BEAM TYPE 2: SS Sx= 0.140 IN A 3 L= 36.0 IN SEIZMIC PROJECT INC. FOR SHEET NO. MATERIAL HANDLING ENGINEERING CALCULATED BY TEL: (909) 869-0989 • FAX: (909) 869-0981 DATE 161 ATLANTIC AVENUE • POMONA, CA 91768 OVERTURNING ANALYSIS/STATIC UNITS FULLY LOADED: Movt = 18,584 IN -LB Mst = 3 LVLS x (550 LB + 10 LB) x 36 IN / 2 = 30,240 IN -LB Puplift = (Movt x 1.15 - Mst) / d = [21371 - 30240] IN -LB / 36 IN = -246 LB, <=== NO UPLIFT BARBECUES GALORE NAUMANN HOBBS 10 TC 2/22/2007 rm INTERACTION EQN. [0 LB/ 265 LB] -(I) + [118 LB/ 420 LB]^(1) = 0.28 < 1.0 THEREFORE OK d = 36.0 IN ALLOWABLE TENSION = 265 LB ALLOWABLE SHEAR = 420 LB # OF ANCHORS/ B.P. = 1 SEIZMIC PROJECT BARBECUES GALORE INC. FOR NAUMANN HOBBS SHEET NO. 11 MATERIAL HANDLING ENGINEERING CALCULATED BY TC TEL: (909) 869-0989 • FAX: (909) 869-0981 DATE 2/22/2007 161 ATLANTIC AVENUE • POMONA, CA 91768 SLAB AND SOIL THE SLAB IS CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS THE SLAB IS ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL HENCE, ACTING AS A FOOTING. CONCRETE IS REINFORCED. (A) PUNCTURE i P= 1.4 x P o+ 1.7 x Movt/depth = 1.4 x 60 LB + 1.7 x 18584 IN -LB / 36 IN = 1,662 LB' Fpunct = 2.66 x (F ck.5) <==(SECTION 1922.5.4) = 2.66 x (3Y( 0 PSI)^0.5 = 146 PS17 Apunct = [(Weff.+t/2)+(Deff.+t/2)] x 2 x t = [(31N+51N/2)+(51N+51N/2)]x2x5IN = 130 I N"2 •. i/Fv = PUIE(Apunct)(Fpunct)] = T662 LB/[130 INA2 x 146 PSI x 0.651 (B) SLAB TENSION Ascil 1[l.33 x fs] J 1662 LB/[1.33 x 1000 PSF/M441N"2/FT"2)] = 179.9 INA2 L = Asoil^0.5 = (179.9 INA2)^0.5 = 13.4 IN B = [(Weff.)(Deff.)]^0.5 + t = [3 IN x 5 IN]^0.5 + 5 = 8.9 IN b = (L-B)/2 <==(SECTION 1922.7.5 (3)) = (13.41 IN - 8.87 IN)/2 = 2.3 IN 0.13 < 1.33 OK /Aconc = (w)(bA2)/2 = [(1.33)(fs)(bA2)]/[144 (IN A2/FTA2) x 21 = [1.33 x 1000 PSI x (2.27 IN)^2]/[144 (IN A2/FTA2) x 2] = 24 IN -LB 5conc = 1 IN x (t^2)/6 = 1 IN x (5 IN)^2/6 = 4.17 INA3 Fconc = 5 x 0 x fc^0.5 = 5 x 0.65 x (3000 PSI)^0.5 = 178.0 PSI fb/Fb = Mconc/[(Sconc)(Fconc)] = 23.79 IN-LB44.17 INA3)(178.01 PSI)] BASE PLATE Weff. = 3.00 IN Deff. = 5.00 IN CONCRETE t = 5.0 IN fc = 3,000 PSI SOIL fs = 1,000 PSF DEPTH= 36.0 IN Mot= 18,5841N-LB Pcol= 560 LB