Loading...
05-0410 (RC) Certificate of ComplianceMar. 1. 2005 6:16PM VENNERI LTD No,7456 P, 2/46 � S8� CERTIFICATE OF COMPLIANCE Part 1 of 2 ENV-1 PROJECT NAME - _ REMAX REAL STATE OFFICES PROJECT ADDRESS _ , 78-965 HWY 111 pad 2 LA Quinta PRINCIPAL DESIGNER - ENVELOPE WILLIAM AZZAL_IN_O_ ARCHITECT DOCUMENTATION AUTHOR -- _ Venneri LTD. carp �.,._ 317/2005 TELEPHONE - Building eermit # 949.903.4033 { TE LEPHONE Cheaked:6ylDate (4 W 635-7838 --..i;rrf�xoamer�t• a use GENeRAI_ INFORMATION J DATE OF PLANS !BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 4,794 sq.Ft. 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL U HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ICI NEW CONSTRUCTION ADDITION ALTERATION n EXISTING +ADDITION :Mt„THOO OF ENVELOPE ❑ COMPONENT OVERALL ENVEL )PE , Q F�TA NTCE COMPLIAN1 Lf1 I STATEMENT OF COMPLIANCE BillLDING & SAFErY DEP , ;This Certificate of Compliance lists the building features and performance; speci alions n � f[34, ,'Parts 1 and 6 of the California Code of Regulations This certificate applies only o twildi p The documentation preparer hereby certifies that the document is accurate and oEkNm - BY �DOCUMENTA-nON AUTHO SIGNATURE' [DPATEra The Principal Envelope Designer h by certifies that the proposed building design r p ented in this set of constru documents is consistent with the other compliance forms and worksheets, with the :;p ificadans, and with any other calculations submitted with this permit application_ The proposed building has been designed to meet the envelope requirements contained in Sections 110, 116 through 118. and 140, 142. 143 or 14P of Title 24. Part 6. Please check one: i ❑ 1 hereby affirm that I am eligible under the provisions of Division 3 of the Busin,:ss and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the state of California as a civil engineer or mechanical engineer, or I am a licensed architect. L I affirm that I am eligible under the exemption to Division 3 of the Business anc Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuanf to Business and 916feisions Code Sections 5537, 5538, and 6737.1. PRINCIPAL ENVELOPE DESIGNER - NAME $IC'i TURF- bATE UC.# WILLIAM_A ALI-NO ARCHITECT �j-js- ©S iC2Z-77 O Indicate location on plans of Note Blook for Mandatory Measures INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. ENV-1. Required on plans for all submittals. Part 2 may be incorporated in schec ules on plans. ENV-2: Used for all submittals; choose appropriate version depending on method of envelope compliance. ENV-3; Optional, Use if default U-values are not used. Choose appropriate version for assembly U-value to be calculated. �nsr,g rc 3.7 B�1=n I�Soh User Number: 5248 Job Number- 0506 _ Paya 1 of 31 0 Mar. 1. 2005 6:17PM VENNERI LTD No-7456 P, 3/46 ENVELOPE COMPLIANCE SUMMARY Part 2 of 2 ENV-1 PROJECT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 OPAQUE SURFACES I Solar Surface Framing Act. Gains # Type Type Area IU�-Fac. Azm, Tilt YIN Form 3 Reference Location / Comments 1 Wall 'Wo 175 0.065 180 90 X R•19 Wall W,19,2x ,16_ Offcgr South 2 :Door (None 25 0.387' 180 90 x Svlid Wond Door Offices South T ;Roof IiNood 101 0.035 270 1 0-]-x R-30 ROof(R-30.2x12.15] Ofiir.psSrnifh 4 fWall[Wood 138 1 0.065 180 1 90 x I I R-19 Wail W,19,2x6.f,§)_ 10ftims South 5 Irzoof Wood 1 150 0.035 270 0 x R-30 Roof(R-30.2XI2.'16 _ Offices South 6 Wall Wood 138 0.065 180 90 x R-19 Wa11 VMR.2x6-16 Offices South 7 Roof 'Wood 101 0.035 270 0 R-30 Rvaf R.30.;2x12.16 Offices South B +Wall Wood 154 0.065 180 90 R-19 Wall W.19-2x6.16 Offices South 9 Roof 'Wood 101 0.035 270 0 NO Roof R.30.2xi2.16 Offices South 10 'Wall 'Wood 1154 0.065 180 90 X11 I R-19 Wall W.19.2x6.16 Offices South 11 IRoof Wood 1101 0.035 1 270 0 R-30 RqoffB.30.2x12A6L Offices South 12 Wall Wood 147 0,065 180 90 x R-19 Wall W.19-2x6.18 Offices South 13 IRoof Wood 101 0.035 270 0 R 30 Roof R.30.2x12.16 Otfiices South 14 Wall 'Wood 1147 0.065 90 90 x l R-19 Wail W.19.26,16 Offices South Wall Wood 212 0,065 90 9q R-19Wall _19.2x6.16 Offices East 311,65 Roof Wood 101 0.035 270 0 X. R-30 Rao R,30.2x12.16 Offices East 'Wall 'Wood 110 0.065 1 90 90 x R-19 Wa€l W.19,2x5.16 Offices East 18 :Roof Wood 101 0.035 VO 0 x R-30 Root R.30.2A2.16 Offices East 19 Wall Wood 140 0.965 $0 90 I RAS Wall W.19.2x6.16Offices mast 20 Ill 1wood j 101 0.036 1 270 1 0 Rti30 RookR.30,2xI2.16' I Offices East, FENESTRATION SURFACES Site Assembled Glazing Check box if Building is > = 100,000 sqft of CFA and >= 10,000 sgft vertical Blazing then NFRC Cef ication is requirad Fallow NFRC 100-SB Procedures and submlt NFRC Label C:ertl wte Form. # Type Act_ Azm. SHGC Glazing Type Location / Comments 1 +Window .530 180 0.53 Ashrae Wndw Dlrl NonMf1 Tint Offices South 2 Window jAreaj11jU-.1Fac. ,530 180 t Jffices South 0.53 Ashrae Wndw D"Tint 3 Wlndow .530 180 0.53 Ashrae Wndw DIt 4 'Window 0530 . 180 0.53 Ashrae Wndw DI ?If6ces Sauth 5 'Window 23 0,530 180 0.53 Ashrae Wndw Dffices Routh 6 Window 23 0.534 90 0.53 Ashrae Wndw Dlt 7fficss South 7 'endow 60 0.534 90 0.53 Ashrae Wndw Dbl NonMtl Tint lffices East 8 Window 30 0.530 90 0.53 Ashrae Wndw DI+I NonMtl Tint Dffices East 9 oNindow 60 0.530 90 0.53 Ashrae Wndw Dbl NonMtl Tint fficas East 10 Window 1 102 0.530 270 0.55 Ashrae Wndw D1 NonMtl Tint EC. & OFFICES W 11 Window 24 0.530 270 0.53 1 Ashrae Wndw 01A NonMtl Tint REC. & OFFICES W 12 i'Window 60 0.530 270 0,53 Ashrae Wndw Dlil NonMtl Tint REC. & OFFICES W 13 'Window 1 48 1 0.530 1 0 0.53 Ashrae Wndw Dh€ NOnMtI Tint REC_ & OFFICES W 14 Window 36 1 0.530 0 0.53 A,%bma Wndw Ai)l NonMtl Tina Offices North _15 VViindow 32 1 0,530 1 0 n_5 aFnmA wnq.r n+ nrn..ne++ T+ + ffi.k EXTERIOR SHADING __ Window Overhang~-� Left Fin Right Fin Exterior Shade Type SHGC H t. Wd. _ H ' , ��R�t, Dist. Len. H t. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 7 None 0.76 1 10.0 10.0 f 10.0 0.1 10.0 10.0 Vone 0.76 I. Vone 0.76 " Mona 0.76 Jone 0 76 gone 0,76 EnergyPro 31 By EnergySo'ft __._ User Number: 5248 Job Number: 0506 Pane:2 of 31 Mar. 7, 2005 6:17PM VENNER[ LTD No,7456 P. 4/46 ENVELOPE COMPLIANCE SUMMARY Part 2of2 ENV-1 PROJECT NAME J DATE REMAX REAL STATE OFFICES 3/7/2005 OPAQUESURFACES Surface # Type Framing Type Area U-Fac. Act. Azm. Solar Gains Tilt y/N Form 3 Reference Location 1 Comments 21 Wall WUo 170 0.065 90 90 X R-18 Wall tW.19.2x-16j� Offices East 22 Roof Wood 101 0.035 270 0 X R-30 Roof R.30.2x12.16 Offices East 23 Wall Wood 11p OA65 90 90 X R-19 Wail W.19.2x616 Offices East 24 Roof Nood 101 0.035 270 0 X R-30 Roof R.30.2x12.1fi Offices East 25 IRoof Wood 388 0.035 0 0 X R-30 Roof IR.30.2x12.16 INTERIOR 26 Roof Npad 95 0.035 0 0 R-30 Rcpf.R.30.2x12.16 INTERIOR 27 Roof 'Wood 700 ; 0.035 0 0 R 30 Roof 12.30.2x12.16 INTERIOR 28 Roof 'Wood 181 1 0.035 0 0 X R-30 Roof R-30-2x12.16 INTERIOR 29 Roof Wood 181 1 0.035 0 D X R-30 Ruof R.30.2x12.16 INTERIOR 30 Hoof 'Wood 95 0,035 0 1 0 X1 I R-30 Roof R.30.2x12,16 INTERIOR 31 Roof lWood 142 0.035 0 0 x R-30 Roof R.30.2x12.16 INTERIOR 32 Roof Wood 280 0,035 0 0 - X I R-30 Roof R,30.2x12.16 INTERIOR 33 Roof Wood 101 01035 0 0 R-30 Roof R.30.2A2.16 INTERIOR 34 Roof 'Wood 1 77 0.035 0 0 X I JR-30Roof(R,30.2x12-16)t]INTERIOR 35 Roof 'Wood 1 169 0.035 0 0 R-30 Roof R.30.2x12.16{INTERIOR 36 Nall 'Wood 162 0.065 271a 90 X11 IR-19Wall W.19.24.16 REC- & OFFICES W 37 Door None 51 0.397 270 90 X _ Solid Wood doer REC. & OFFICES W 38 Roof 'Wood 169 0.036 0 0 X. R-30 Roof R.30,2x12.1B Ri=C: & OFFICES W 39 1JVali Wood 246 0.065 I 270 90 R-19 Wall W.19.24 18 REC. & OFFICES W 40 IRoof Wood 169 0.035 1 0 0 1 R-30 Roof[R.30.2x12.16] REC. & OFFICES W FENESTRATION SURFACES Site Assembled Glazing Check box if Buildfng is>= t(10,000 sgft of CFA and — 10,C00 sqff vertical glazing then NFRC Csrtification Is required. Follow NFRC 100-5B Procedures and submit NFRC Label Certificate Form. # Type Area iU-Fac. Act. Azm. SHGC Glazing Type Location / Comments 16 'fndow 32 0.530 0 0.53 Ashrae Wndw D )i NonMtl Tint Offices North 17 Window 54 0-530 90 0-53 Ashrae Wndw 0 )I NonMtl Tint Offices North I I EXTERIOR SHADING # Exterior Shade Type SHGC Window H . Wd. Overhang Left Fin Right Fin EDist. Len. H t. Len. Hi t. LExt.RExf. 16 None 0.76 17 None 0.76 I PnerpyPro 3.1 By Energy6oft USer Number: 5248 Job Number 0506 Page:3 of 31 Mar, 7, 2005 6:17PM VENNERI LTD No,7456 P- 5/46 ENVELOPE COMPLIANCE SUMMARY Part of 2 ENV-1 PROJECT NAME DATE REMAX REAL, STATE OFFICES 3/7/2005 ]OPAQUE SURFACES # Surface Type Framing Type Area IU-Fac, Act_ Azm_ Solar Gains Tilt Y/N Form 3 Referent: Location / Comments � 41 'W II 'Wood i 76 1 D.QO5 270 90 X R-19 Wail W.19.2x6.1E Rf=C. & OFFICES W 42 Roof Wood 169 I _ 0 p R-30 R FR.30.2x12.16 REC. & OFFICES W REC. & OFFICES W 43 'Wall Wood 186 0.065 270 90 IXT _ JR-19Wall [W-19-2x6.16 44 'Wall Wood 154 0.065 0 90 R-19 Wall W,192x6.1§L_ REC. & OFFICES W 45 IRoof Wood 169 0.035 0 1 0 JXJJ JR-30Roof(R-30,2x12.16)REC. & OFFICES W 46 'Wall 'Wood 125 0.065 0 90 Xj JR-19Wall W,1 .2%6.i6 Offices North 47 Roof Wood 114 0.035 0 0 1X 1 R-30 Roof R.30.2X12.16 Offices North 48 Wall 'Wood 129 0.065 0 90 X R-19 Wall {W.19.M.16] Offices North 49 Roof 'Wood 117 0.035 0 0 X R,30 Roof R.30.2x12.16 Offices North 50 Wall Wood 129 0.065 0 90 X F1-19 Wal[ W-19.2x6.16 Offices North 51 Wall Wood 165 0.065 90 90 X R-19 Watl W.19.2x6.16) Offices North 52 hoof Wood 125 0.035 270 0 R-30 Roof R-30 2x12.16 Offices North I � I FENESTRATION SURFACES n Check box If Building is �-= 100:000 still -of OFA and — 10,030 sgft vertical glazing then NFRC Certification is required Mar. 7, 2005 6:18PM VENNERI LTD No,1456 P. 6/46 JOVERALL ENVELOPE METHOD Part 1 of 6 ENV2 PROJECT NAME REMAX REAL STATE OFFICES UVIND0W AREA TEST A, DISPLAY PERIMETER B_ GROSS EXTERIOR WALL AREA C_ GROSS EXTERIOR WALL AREA D. ENTER LARGER OFA or B E. ENTER PROPOSED WINDOW AREA 3991 ftX6= 3,933. sf X 0.40 T 3.933, Sf X 0.10 = DATE 317/2005 2 39 ` sf DISPLAY AREA 57 sf 40%AREA 39 sf MINIMUM STND, AREA 2 3� sf MAXIMUM STND. AREA 691 sf PROPOSED AREA F. WINDOW WALL RATIO = Proposed Window Area Divided by Gross Exterior WaIIArFa = 17.56% IF E IS GREATER THAN D OR LESS THAN G. PROCEED TO THE NEXTCALCULATION FOR THE WINDOW AREA ADJUSTMENT. IF NOT, GO TO PART 2 OF 6, 1. IF E GREATER THAN D_ MAXIMUM PROPOSED WINDOW STANDARD AREA WINDOW AREA ADJUSTMENT FACTOR — - -_� 2. IF I -ES$ THAN C: MINIMUM STANDARD AREA SKYLI A TEST GO TO PART 6 TO CALCULATE ADJUSTED AREAS, PROPOSED AREA ATRIUM HEIGHT FT l IF— 55FT IF>55FT WINDOW ADJUSTMENT FACT OR GO TO PART 6 TO CALCULATE ADJUSTED AREAS. �—► 0.1 o X m 0.05 X 4 97 230 STANDARD % GROSS STANDARD ROOFAREA SKYLIGHTAREA PROPOSED SKYLIGHTAREA IF THE PROPOSED SKYLIGHTAREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIG-IT AREA ADJUSTMENT. F NOT, GO TO PART 2 OF 6, 1. IF PROPOSED SKYLIGHT AREA ># STANDARD SKYLIGHT AREA: SKYLIGHT STANDARD SKYLIGHT AREA PROPOSED SKYLIGHT AREA ADJUSTMENT FACTOR GO TO PART 6 TO CALCULATE ADJUSTED AREAS. I EriergyPrc 3.1 By EnergyS❑tt User Number: $248 Job Number: 0506 Aa4e:6 of 31 1 7. 2005 6:18PM VENNERI LTD No,7456 P. 7/46 OVERALL ENVELOPE METHOD Part 2 of 6 ENV-2 PROJECT NAME DATE REAL STATE OFFICES /20.05 [OVERALL HEAT LOSS FD I _ L U G❑ 0 PROPOSED STANDARD UA U-FACTOR (F X G) AREA ! HEAT CAPACITY U- FACTOR TAK VALUES E V ILIA (B X Q) AREA" (Adjusted) ASSEMBLY NAME (a.g_ Wall-1, Floer-1) Y South 175 3.23 0.065 11.5I 175 0.084 14.1 Roof 101 2.73 0.035 NJ C1 3.5 10 0,057 5.7 South 136 3.23 0.065 ❑ 9.D 138 0.094 11.6 Window 32 0.530 ❑ �J 17.0 32 0.49C 15.7 Roof 150 2.73 0.035 5.2 150 0.057 8.6 South 138 3.23 0.0 6 5i ❑7� 9.0 1381 0.084,, 11.6 Window 32 0.530 ❑ �J 17,0 32 0.490 15.71 Roof 1101 2.73 0,035 ®C] 3.5 10 0.051 5.7 South 3,23 0-055 ❑10.1 154 0.0 12.9 Window 110F 0.530 ❑ EJ 8.5 16 0.49 7.8 Roof 2.73 0.035 ❑ 3-5 101 0.05) 5.7 South 154 3.23 0,065 x❑ C7 40.1 154 0.084 12.9 Window 16 0.530 ❑ 8.5 16 0,490 7.8 Roof 101 147 2,73 0.03,5 x❑ C� 3.51 1011 0,05. 5.7 South 3.23 0.065 ®C� 9.13 147 0,084 12.3 Window 23 0.530 ❑ J 12.4 23 0.49 11.5 Roof 101 2.73 0.035 ❑ 3.5 101 0,057 5.7 EAST 147 3.23 0.065 ❑%� ❑ 9.61 147 0.084 12.3 Window 23 0.530 ❑ C� 12.4 23 0,490 11,5 EAST 212 3.23 0.066 0 ❑ 13.8 212 0.084 17.8 Roof 1151 2.73 0.035 ®❑ 3.5 101 0.057 5.7 EAST 110 3,231 0,065 7.2 110 0.084 9.2 1 Window 601 0,530 ❑ �� 31.8 60; 0.490 29.4 Roof 101 2.73 0.035 ®❑ 3.5. 101 0.057 5.7 EAST 1401 3.23 0.065 ®C� 9.2 140 0. 11.8 Window 30 0.530 ❑ 15.9 30 0.49C 14,7 Roof 101 2,73 0,035 ® � 3.5 101 0,057 5.7 3.23 0,065 ®� 11.1 170 0.084 14.3 2.73 0.035 ❑X C0,057 5.7 3.23 1 0,0651 ❑i 7.2 110 0,084 9.2 Column E shall be 277 This Page Total 325 no greater than Column H 733 Building Total 96E EAST 170 Roof 10.1 EAST 11 1101 If Window and/or Skylight Area Adjustment is R"ufra use Adjusted Areas from Part 6 of 6_ Energyft 3.1 0y Enor y ,oft User plumber: 5248 Job Number: ]506 Page=6 of 31 7 2005 6:18PM VENNERI LTD No,7456 P., 8/46 JOVERALL ENVELOPE METHOD Part 2 of 6 ENV.2 PROJECT NAME BATE REMAX REAL ST TE OFFICES 3/7/2005 VERALL HEAT LOSS [Al o ui o ASSEMBLY NAME (e.g. Wall-1, Floor-1) Window Roof Roof Roof Roof Roof Roof Roof Roof Roof Roof Roof Roof WEST Window Roof WEST Roof WEST Window Roof WEST Window NORTH Window Roof NORTH Window Roof NORTH PROPOSED HEAT AREA CAPACITY U- FACTOR TABLE VALU _S Y UA (B X D) 60 0.630 ❑ rV !%� 31.6 10 2.73 0.035 ❑ 3.5 388 2.73 0-035 ❑ 13.5 95 2.73 0-025 3.3 700 2.73 0.035 ©❑ 24.3 181 2.73 0.035 0 6.3 161 2.73 0.035 ©❑ 6.3 95 2.73 0.035 � 3.3 142 2.7'3 0.035 77 4.9 280 2.73 0.035 101 2.73 0.035 ❑ 3.5 77 2.73 0.035 X❑ 2.7 169 2.73 0.035 Q ❑ 5.9 152 3.23 0,065 x 10.6 102 0.530 El[K rr❑ 54.1 169 2.73 0.035 0 ❑ 5:9 246 3-23 0,065 2] 16.1 169 2.73 0.035 ®❑ 5.9 76 3.23 0.065 ❑ ❑ 5.0 24 0.530 ❑� 12.7 169 2.73 0.035 N - 1 5.9 1.851 323 0.065 X ❑ 12.2 60 0.530 ❑ 31.8 154 3.231 0.065 10.1 48 0.530 ❑ 25.4 169 2.73 0.035 [.� 5.01 125 3.23 0.065 X D 6.2 36 0.530 ❑ L 19.1 114 2.73 0.035❑ 129I 3,23 0.065 If Window and/or Skylight Area Adjustment is Require ,! Column E shall be use Adjusted Areas from Part 6 of 6. no greater than Column H STANDARD AREA" (Adjusted) U-FACTOR UA (F X G) 60 049C 29.4 101 0.057 5.7 289 0-057 22.1 95 0-057 6.4 7001 0.05 39-9 181 0.057 10.3 181 0.057 10.3 95 0,057 5.4 142 0,067 8.1 280 0,057 16.0 10.1 0.05 5-8 77 B-057 4.4 169 0,057 9.6 162 0-M 13.6 102 0.49C 50.0 1W 0:057 9.6 240 0,084 20.7 169 0.057 9.6 76 0.084 6.4 24 0.490 11.8 169 0.057 9.6 186 0.084 15.6 60 0.490 29.4 154 0.084 12.9 48 0.490 23.5 169 0.0571 9.6 125 0,084 10.5 36 0.490f 17.6 114 0.06-A 6.5 129 0.084I 10.8 360 This Page Total 440 733 Building Total 866 EnergyPro 3.1 By EnergySoft User Number: 5248 Job Number. 0$06 _ Page:7 of 31 I Mar- 7, 2005 6,,18PM VENNERI LTD IN P, 9/4, OVERALL ENVELOPE METHOD Part 2 of 6 ENV-2 PROJECT NAME VERALL HEAT LOSS A� ASSEMBLY NAME (e.g. Wall-1, Floor-1) Window Roof NORTH Window EAST Window Roof DATE 317120Q5 IEl FG I H PROPOSED STANDARD AREA HEAT CAPACITY U- FACTOR TABLE VALU �S UA (B X D) AREA'S (Adjusted) U-FACTOR UA (F X G) Y V 32 0.530 ❑ X 1710 32 0.49 15.7 117 2.73 0,035 IX 4.1 117 0.05 6.7 129 3.23 0,065. ® D 8.4 129 0.084 10.8 32 0.530 ❑ C� 17.0 32 0-490 15.7 165 3.23 0,065 ®❑ 10.8 165 0.084 13.9 64 0.530 ❑ GJ 33.9 644 0.49q 31.4 125 2.73 0.035 ®C� 4.3 125 0.057 7.1 ❑ C� ❑ C� ❑ C� ❑ C� ❑ C� L� C� ❑❑ C� C� ❑❑ Ell ❑ C� ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑ ❑j `If Windowandlar Skyfight Area Adjustment Is Require Column Eshall be 95 This Page Total 1b use Adjusted Areas from Part 6 of 6. no greater than Column H 733 Building Total 86fi Enei,pyPra 3.1 By Energysoft. User Number: 5248 Job Number: 0506 Psge:8 of 31 Mar. 1. 2005 6 19PM VENNERI LTD No,7456 P. 10/46 [OVERALL ENVELOPE METHOD Part 3 of 6 ENV-2 PROJECT NAME DATE RFMAY RFAI STATF OFFICES 3/7/2005 VERALL HEAT GAIN FROM CONDUCTION i_BJ C L IC 0 EHI PROPOSED STANDARD TABtE HEAT HEAT ASSEMBI,Y NAME HEAT U- VALU =S GQN AREA* U- GAQIN (e.g- Wall•1, Floor-1) AREA TF CAPACITY FACTOR y V (BxCxE i(Adjusted)FACTOR TF OYHXl) South 175 55 3.28 0,065 ❑ 63.0 175 0.084 55 808 Roof 101 55 2.73 0.035 192 101 0.057 55 315 South 138 55 3.23 0.065 ❑ 497 138 0.084 55 638 Window .321 55 0.530 9331 32 0.490 55 862 f 150 55 2.73 0.035 286 150 0,057 55 470 South 138 55 3.23 0.065 Q ❑ 497 138 0.084 55 638 Window 32 55 0.530 ❑ 933 32 0-490 55 862 Roof 101 55 2.73 0.035 ®❑ 192 101 0.057 55 315 South 154 55 3.23 0.065 ®❑ 554 154 0.084 55 711 Window 16 55 0,530 466 16 0.490 55 431 Roof 101 551 2.73. 0.035 X❑ �� 1921 101 0,057 55 315 South 154 55 3.23 0,065 554 154 0.084 55 711 Window 16 55 0.530 466 16 0.490 55 431 Roof 101 55 2.73 0.035 ❑i� 192 101 0.057 55 315 South 147 55 3.23 0.055 ®t,7�� rr❑ 528 147 0,084 55 677 Window 23; 155 0.530 ❑ [J 682 23 0.490 55 631 goof 101' 55 2,73 0.03.5 0 C 192 101 0.057 55 315 EAST 147 55 3.23 0.065 ❑X ❑ 528 147 0.084 55 677 Window 23 55 0.530 ❑ 682 23 0.490 55 631 AST 212 55 3.23 0.065; 763 212 0-084 55 979 Roof 101 55 2.73 0.035 192 101 0,057 55 315 �A57 110 55 3,23 0.065 ®1 396 110 0.084 55 508 Window 80 55 0.530 1,749 60 0.490 55 1,617 Roof 101 55 2.73 0.035 192 101 0.057 55 315 =AST 140 55 3.23 0.0651 504 140 0.084 55 641 Window 30 55 0.530 874 30 0.490 55 808 Roof 101 55 2.73 0,035 192 101 0-057 55 315 LAST _ 170 55 3,23 o.065 ®I r❑ 617 170 0.084 55, 786 Zoof _ 101 55 2.73 0.035 [XJJ 192 101f 0.057 55 315 OAST 110 55 3.23 0.065 ❑X ❑ 396 110 0-0 55 508 15,Z61 17,87 Subtotal Sub"I * If Window and/or Skylight Area Adjustment is Require use Adjusted Areas from Part 6 of 6- Fr. .0 .9 1 Rv FncrnvSnR I Isar Number 5248 Job Number 0506 Page:) of 31 aJ Mar. 7. 2005 6:19-PM VENNERI LTD No,7456 P. 11/46 (OVERALL ENVELOPE METHOD Part 3 of 6 ENV-2 1 PRQJECT NAME EMAX REAL STATE OFF DATE 31i1200 11ERALL HEAT GAIN FROM CONDUCTION LJ ❑B ❑! 1 1 E E H❑ I 2 PROPOSED STANDARD TAB( E HEAT HEAT GAMIN ASSEMBLY NAME HEAT U- I VALUES GAQIN AREA* U. (e.g_ Wall-1, Floor-1) AREA TF CAPACITYFACTORJ y N BxCxE) {Adjusted FACTOR TF GxHxl) Window 50 55 0.530 ❑ 1,749 60 0.490 55 1.617 Roof 10 55 2.73 0,035 C� 192 101 0.057 55 315 hoof 388 55 2.73 0.035 741 388 0.057 55 1,215 hoof 95 55 2.73 0.035 181 95 0.057 55 298 hoof 700 55 2,73 0.035 1,3371 700 0.067 55 2,194 Roof 181 55 2.73 0.035 r❑ 346 181 0.057 55 567 hoof 181 55 2.73 0.035 ❑ 346 181 0.057 55 567 Roof 95 55 2.73 0,o35 181 95 0.057 55 298 hoof 142 55 2.73 0.035 271 142 0.057 55 445 3oof 280 55 2.73 0.03-5 635 280 0.057 55 878 Roof 101 55 2,73 0.035 X❑ ❑ 193 101 0,057 55 317 hoof 77 55 2,73 0,035 L�J 147 77 0.057 55 241 Roof 169 55 273 0.035 C� 323 169 0,0571 555 530 NFST 162 55 3.23 0.065 .❑X ❑ 683 162 0.094 55 748 Window 102 55 1 0,530 • ❑ X 2,973 102 0.490 55 2,749, hoof 169 55 2.73 0.035 ©❑ 323 169 0.057 55 530 NEST 246 55 3.23 0.065 X❑ ❑ 886 .. 246 0.084 55 1,137 *00f 169 55 2.113 0,035 X❑ 3231 169 0.057 55 530 NEST 76 55 3.23 0,065 0 r�� L� 274 76 0.084 55 351 Window 24 55 � 0.530 E. [K 700 24 0.490 55 647 700F 169 55 2,73 0.035 ® 323 169 0.05-1 55 530 NEST 186 55 3.23 0.065 6701 186 0,084 55 859 Window 60 55 0.530 ❑. 1,749 60 0,490 55 1.617 NORTH 154 55 3.23 0.065, ®❑ 554 154 0.084 55 711 Window 48 55 0.53C ❑ �� 1,3991 48 0,490 55 1,29d Roof 169 55 2.73 0.035 323 10 0.0571 55 530 VORTH 125 55 323 0.065- ❑X f �} 450 125 0.084 55 [ 578 Window 36 55 0.5301 ❑ �J 1.049 36 0-490 55 970 hoof 114 55 2.73 0.0351 X❑ [� 218 114 0,057 55 357 QFZTH 129 55 3.23 0,065 X❑ 464 129 0.084 55 596 19.802 24,218 9utit�sel $uhtetal *if Window and/or Skylight Area Adjustment i5 Require use Adjusted Areas from Part 6 of 6. Enorgypm 3,1 E3y &nergysoit User Number: 5248 Job Number. 0506 Pagel of 31 Mar. 7, 2005 5,,19PM VENNERI LTD No.7456 P, 12/46 OVERALL ENVELOPE METHOD Part3 of ENV-2 (PROJECT NAME DATE REMAK REAL STAT 317 2005 V7;ZALL HEAT GAIN FROM CONDUCTION A J-[C] L��� K EF L1 H IT ❑ PROPOSED STANDARD { TABLE HEAT HEAT ASSEMBLY NAME HEAT 1-1- VALUES C'QN AREA' U. GAIN (e.9- Wall-1, Floor-1) AREA TF CAPACITY FACTOR y N BxCXE (Adjusted] FACTOR TF GXKXI Window 32 55 0.530 ❑ C� 933 32 0.490 55 862 koof 117 55 2.73 0.035 �{ 223 117 0,0571 55 367 VORTH 129 55 3.23 0,065 ❑x 4641 129 0.084 55 596 Window 32 55 0.530 ❑ 933 32 0,490 55 862 LAST 165 55 3.23 0.065 594 165 0.084 55 762 Window 641551 0,530 ❑ 1,866 64 0,490 551 1.725 Roof 125 55 2.73 0.035 ❑ 238 125 0.057 55 391 _ ❑ 1. ❑ ❑ ❑ El ❑ ❑ ❑ ❑ _❑ ❑ [1 LJ ❑ ❑. rr� L oil] _ I ❑ ❑ ❑ ❑ If Window and/or Skylight Area Adjustment is Require 5 251 5,565 use Adjusted Areas from Part 6 of 6. Subtotal Subtotal 6nergyPro 3.1 By Energ+Svft User Number: 5248 Job Number: 0S06 Page:f 1 of 31 Mar. 7. 2005 6:19PM VENNERI LTD No,1456 P. 13/46 (OVERALL ENVELOPE METHOD Part 4 of 6 ENV-21 PROJECT NAME REMAX REAL STATE OFFICES OVERALL HEAT GAIN FROM RADIATION OPAQUE SURFACES DATE 3/7/2005 Ir' ❑g © LI LII LGH� �j K PROPOSED STANDARD ASSEMBLY NAME a.g. Roof-1) AREA 5F WEIGHTiru FACTOR U. FACTOR Absorp HEAT CiAIN (BXCxD)ExF) AREA' (ADJUSTED) U-Factor Absorp _ HEAT GAIN (CxgxMxlx.f) Roof 1& 123 0.92 0.035 0.70 101 0.057 0.70 454 lRoof is 123 Q92 0.035 0.70 Ala 1501 0.057677 Roof 10 123 0.92 0,035 0.70 277 101 0.057 1 0.70 454 oof 10 123 0.92 0.035 0.70 277 10 0.057 0,70 454 Roof 10 123 0.92 O.D35 0.70 277 101; 0.057 0.70 454 f 10,1 2 0.035 0,70 7 454 Roof 10 123 0.92 O.D35 0.7 277 101[ 0.057 0.70 454 Roof 10 123 0.92 0.035 1 277 101 0,057 0.70 454 Roof 10 123 0.92 0.035 .7 277 10 0.057 0.70 a5a f 10, 1231 Q..q2 0.035 10 Q,07 0.70. Roof 10 123 _92 .03 .7 277 101 0.057 0.70 a Roof 388 123 0.92 0.035 0,70 I 1 667 388 0.057 0.70 17 Roof 95 123 0.92 0.70 261 95 0.057 0.70 42 Roof 700 123 0.92 0,70 1.926 700 0 057 0.70 3 1 1 Ro f 18 1231 0.92 0-70 498 181 0.057 0.70 17 Roof 18 123 0.92 0.035 0.70 498 181 0,057 0.70 817 Roof 9 123 0,92 0.035 0,70 261 95 0.057 1 0.70 42 R f 14 14 0.92 0.70 391 1421_7 i Roof 280 123 0.92 0.70 770 280 0.057 0.70 2264 _ f 1 123 0._92- 0.0-AS 070 27E 1 1! 7 _70 Roof 77 123 0.2_ 0.035 0.70 212 77 0.057 0.70 348 Roof 16 123 0,035 0.70465 169 0.057 0.70 7 Roof 16 123 0. D35 I 0-70 465 169 0.057 0.70 7 Roof 7 465 169 0.057 0.70 7 Roof 0.92 0,035 0-7 465 169 0-057 0.70 763 Roof q115 2 0.035 0 7 465 169 0.057 D.7D 763 Roof 0,035 0.70 314 114 0,057 D.70 515 Roof 11 123 0.92 0.035 0.70 322 117 0,057 0.70 528 ?,301 SUBTOTAL 20,191 SUBTOTAL EnergyPro 3.1 sy EnergyPro User Number: 5248 Job Number: 0506 �� Page 9 2 of 31 Mar. 7, 2005 6:20PM VENNERI LTD No,7456 P. 14/46 OVERALL ENVELOPE METHOD Part 4 of 6 ENV-2 PROJECT NAME iDAiE REMAX REAL STATE OFFICES 3/7/2005 QVERALL HEAT GAIN FROM RADIATION OPAQUE SURFACES AJ � E CD z"I _�_ �IK1 343 562 SUBTO"AL SUPTOTAL EnergyP.3.1 By EnsrgyPro _ User Number: 5248 µ� Jab Number: )506 Page;13 of 31 1 Mar, 1, 2005 6:20PM VENNERI LTD No,1456 P. 15/46 OVERALL ENVELOPE METHOD Part 5 of 6 ENV-2 PRpJEC7NAME DATE REMAX REAL STATE OFFICES 3/7/2005 JOVERALI._ HEAT GAIN FROM RADIATION FENESTi2ATION SURFACES n nn�nnn 71 o non PROPOSED STANDARD NINDOWISKYLIGHT NAME (e.g.Wind-1,Sky-1) ORIENT WoGHTINC FACTOR AREA $F �SHGqH OVERHANG HEii7GAIN AREA' (ADJUSTED) RSHG (orSHGC** $P HEAT OAIN (BxJxxKxL) V HN1OHF(BxCxDxExH) Window S 1.27 32 12-3 0.53 2 649 32 036 123 1,800 Window S 1.27 32 123 0.53 2 649 32 0.36 123 1 80p Window S 1.27 1 123 0.53 1,3251 16 123 900 _ . Window S 1.27 1 123 16 0.36 123 900 Window 1.27 22 123 0.5,1 1937 23 122 1316 oyy E vvii 1,07 2 123 0.53 23 0.36 123 1109 Window E 1,07 64 123 , 0.53 4,185 60 23 843 Window E 1.07 X 123' 0.53 2093 30 0.36 1221 1,421 Window E 1.07 5c 123 0.53 4,185 60 123 2,843 Window W 1.05 10 123 0.55,10. 10.1 3132 102 123 474 Windo W 1.05 24 123 0.53II 1,643 24 0.36 123 1.116 Window 1N 1.05 60 123 0.53j 4107 60 0.36 122 2790 VV;adLvj N 0.61 4 123 1.909 48 0.51123 183 Window N 0,61 31 123 0-53 1.432 36 0.51123 137 W;nN 0.61 32 123 1,278 0.51 1231.22 Window N 0.61 32 123 0.53 1,273 0-51 123 1 224 Window )= 1.07 64 123 052 4,464 64 0.36 123 3.0321 I i 1 *" Only SHGC is used for Skylights Part Subtotal F 40,314 Part3SubtDtalL 47,655j Part 4 Subtotal C 12,644 Part 4 Subtotal 20,754 'If Window and/or Skylight Area Colurrin I must be Adjustment is required, use iless than column M Part 5 Subtotal C 41,211 Part 5 Subtotal 32.2741 Adjusted Areas from Part 6 of 6 (� L� 94,169 Total Heat Gain 100.68 EnergyPro 3.1 By Energy5oh Ur;ar IJurnber 5248 Job Number, 0506 Page:14 at 31 I Mar. 7. 2005 6:20PM VENNERI LTD No,7456 P. 16/46 IOVERALL ENVELOPE METHOD Part 6 of 6 E ;PROJECT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 IWINDOW AREA ADJ USTIVIENT CALCULATIONS I 7-� CHECK -X ;:CK IF NOT APPLICABLE (See Part I of 6.) 7A I I WALL NAME ORI (e.g. Wall-1, Wall-2) N E S -W Ll El 7 7 —1 LJ [—.11 — ] Ld El El El E] El El E.0 ',..J El 71 F— ❑-1 7— El Ll 7.' El WINDOW I ADJUSTED ADJUSTED ADJUST. I WINDOW WALL GROSS DOOR WINDCW FACTOR AREA AREA AREA AREA AREA, (From Part 1) i (D X E) 11 - (F + C) :0 :TA:LS i j I N FRICHECK IF NOT APPLICABLE (See Part I of 5.) ROOF NAME (e.g. Roof-1, Roof-2) :0 :TA:LS i j I N FRICHECK IF NOT APPLICABLE (See Part I of 5.) ROOF NAME (e.g. Roof-1, Roof-2) LEI SKYLIGHT ADJUSTED ADJUSTED ADJUST- 'SKYLIGHT ROOF GROSS SKYLIGH'r FACTOR AREA AREA AREA AREA (From Part 1) (C X D) (B - E) TOTALS NW EnargyPra 3.1 By gnmysolt User Number 5248 Job Number: 0506 Pape: 15 of 31 ` Mar. 7. 2005 6:20PM VENNER[ LTD No,1456 P. 17/46 ENVELOPE MANDATORY MEASURES ENV-MM PROJECT NAMF REMAX REAL STATE OFFICES DESCRIPTION § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3_ All Insulating Materials shall be installed in compliance with the flames r.ad rating § 118{c) g p � P �' 9 and smoke density requirements of sections 2602 and 707 of Title 24, Pan 2_ All Exterior Joints and openings In the building that are observable sourcos of air leakage shall be caulked, gasketed, weathemtripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors)_ § 116(a)1 Manufactured Doors and windows Installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards- Manufactured fenestration products must be labeled for Uwalue according to NFRC proiAdures. § 118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-11 between framing members. I i i fEnergyPro 3.1 ^By EnergySoft - llSV Number: 5248 Job Number: 0606 ;DATE 3/7/2005 Designer , Enforcement W Page:16 of 31 Mar. 1. 2005 6:21PM VENNERI LTD No,7456 P. 18/46 CERTIFICATE OF COMPLIANCE Dart 1 of 3 LTG-1 PROJECT N E DATE REMAX REAL STATE OFFICES 3/7/2005 PROJECT ADDREss 78-965 HWY 111 pad 2 LA Quinta _ PRINCIPAL DESIGNER - LIGHTING TELEPHONE VENNERI LTD. 416 635 7838 _� 1— Ghecked..iiyLl]at�.; DOCUMENTATION AUTHOR _ TELEPHONE Venneri LTD. 416 635-7838 i .: emBntA s u GENERAL INFORMATION i DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 4,794 sq.Ft. 15 113UILPING TYPE ® NONRE$IDI NTIAL HIGH RISE RESIDEM'IAL �j HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ADDITION ❑ ALTERATION EXI$TING *ADDITION METHOD OF LIGHTING COMPLETE BUILDING AREA CATEGORY ] TAILORED PERFOkMANCE COMPLIANCE STATEMENT OF COMPLIANCE _ This Certificate of Compliance fists the building features and performance specifications needod to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate z nd complete. C UOCUMENTATION AUTHOR 51GNT E , OATS Barbara Hamanrta 1 ' • lrc U The Principal Lighting Designer hereby certifies that the pro posedN ilding de i represented in this set of construction documents is consistent with the other compliance forms and worksheets, wlth i 3 specifications, and with any other calculations submitted with this permit application. The proposed building has bean designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146 or 149 o"Title 24, Part 6_ Please check one, h I hereby affirm that I am aligi ble under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am license d in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. 1 affirm that I am eligible u rider the provisions of Division 3 of the Business a id Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; aid that I am a licensed contractor performing this work. I affirm that I am eligible u rider the exemption to Division 3 of the Business and Professions Code to sign this document k H-. e.4 I Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING OF -SIGNER - NAME NA DATE LIC. # VENNERI LTD. 1 -- S c — 2 -77 i© LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Mea� WJ C INSTRUCTIONS TO APPLICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. L7G-1: Required on plans for all submittals. Part 2 and 3 may be incorporated in schedules on plans. LTG-2: Required on all submittals. LTG-3; Optional. Use anly if lighting control credits are taken_ LTG-4- Optional Use only if Tailored method is used. LTG-5., Optional. Use only if Tailored method is used. FnemvPra 3.1 By EnargySoh User Number 5248 Job Number' 05013 Page:1 of 14 Mar. 7. 2005 6:21PM VENNERI LTD No,7456 P. 19/46 LIGHTING COMPLIANCE SUMMARY Dart 2 of 3 LTG-1 PROJF-CT NAME DATE REMAX REAL STATE OFFICES r---�. _ 3/7/2005 INSTALLED I-IGHTING SCHEDULE LAMPS BALLASTS Luminalre _I Code LUMINAIRE DESCRIPTION TYPE DESCRIPTION # Wafts Lemp DESCRIPTION # Lam # + Ballast watts Total Watts 6) 4 ft Fluorescent T5 (Tandem) MaaHCFO 5 4T H 54, Maonetic heater Cutout FO 1_ 59 logo (5,372 35w Low Voltage Halogen iD3 MF21 12 M_gietic Enerciv Efficient 1_ 1,2481 FT I Lighting Schedule an Plans Shows Exterior Lighting Subtotal from this Page 7,620 Meets Total i,620 —i Portable Lighting (From LTG-1) L ens Control Credit Wafts (From LTG-3) 919 Control Requirements of9131(f) Adjusted Actual Watts 6,70 !]ATORY AUTOMATIC CONTROLS CONTROL. LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Exterior, etc,) SPACI= CONTROLLED N07FTO FIE.M. CONTROL LOCATIO (Room # or Dwg #) TF-LICOMPUTER119 _5ALES OFF-115 SALES 05r-116 SALES OFF-117 CONTROL IDENTIFICATION CONTROL TYPE Occ Sensor <= 250 sqH Occ Sensor <- 250 spit Occ Sensor — 250 sgft Occ Sensor — 250 sgft etc_) LUMINAIRES CONTROLLED TYPE # OF LUMINAIRES 2 2 2 2 Nt]TE9TO HELD -For Building Department Use Only EnerovPro 3.1 ev i=nerav50R User Number: 5248 Job Number: 3506 Paoe:2 of 14 Mar. 1. 2005 6:21PM VENNERI LTD No.1456 P, 20/46 LIGHTING COMPLIANCE SUMMARY Part 2 of 3 LTG-1 PROJECT NAME DATE ~ REMAX REAL STATE OFFICES 3/7/2005 INSTALLED LIGHTING SCHEDULE _ �� u wLUMINAIRE Code DESCRIPTION LAMPS 13ALLASTS Luminaire Lam * Ballast TYPE DESCRIPTION Waus # 'tam DESCRIPTION # Total Watts # Watts I Lighting Schedule on Plans Shows Exterior Lighting Subtotal from this Page �] Masts Total 7,620 -- i Portaiile Lighting (From LTG.1) 0 I t=mcacy and Controi kequiremant of 9i30(c) El Loss Control Cradit Mtts (From LTG-3) 919 Control Requirements of�131(f) Adjusted Actual Watts 6,701 IMANDATORY AUTOMATICCONTROLS CONTROL LOCATION CONTROL CONTROLTYPETE:rd (Room #) IDENTIFICATION (Auto Time Switch, Exterior, etc.) SPACI= CONTROLLED FfELD CONTROLS FOR CREDIT CONTROL LOCATION CONTROL (Room # or D% #) IDENTIFICATION OFF-118 SALES OFF-121 SALES OFF-127 SALES OFI;-126 L )TES TO FIELD - For CONTROL TYPE IOCcupant, Daylight, Dimming, etc) Occ Sensor — 250 s ft Oce Sensor — 250 sqff Occ Sensor — 250 sgft Occ Sensor — 250 s ft 3.1 By Enargy5oft User Number: 5248 Job Number: 0506 Psge:3 of 14 Mar. 7. 2005 6:22PM VENNER[ LTD No,7456 P. 21/46 JUGHTING COMPLIANCE SUMMARY Part 2of3 LTG-1 PROJECT NAME REMAX REAL STATE OFFICES INSTALLED LIGHTING SCHEDULE DATE 3/7/2005 LAMPS BALLASTS Luminaire Coda LUMINAIRE TYPE DESCRIPTION DESCRIPTION # VyFans LamrP DESCRIPTION Lam # + Ballast yy Total Watts i I Lighting Schedule an Plans Shows Exterior Lighting Subtotal from this Page Meats Total 7,620 r� ❑ Efficacy and Control Requirement of �130(c) Portable Lighting (From LTG-1) Control Requirements of9131(f) Less Control Credit blbtts (From LTC-3) 919 ❑ Adjusted Actual Watts 6,70 MAN DATOR-7-A-UTUNIATIC CONTOIS CONTROL LOCATION CONTROL CONTROL TYPE Nd E;T (Room 0) IDENTIFICATION (Auto Time Switch, Exterior, etc.) SPACE CONTROLLED : r. FUP.!! I rnRITW'U C CPYG Y'Drn1'i' CONTROL LOCATION (Room # or Qwg #) SALES OFF-125 SALES OFF123 CONTROL IDENTIFICATION CONTROL TYPE (Occupant, Dayilght, Dlmming, etc,) LUMINAIRES CONTROLLED NOTE:TO FI£Ld TYPE #! OF LUMINAIRES I Occ Sensor <= 250 sqft 2 Occ Sensor <= 250 s ft 2 SALES OFF 124 Occ Sensor <= 250 sgft 2 WASHR- Oce Sensor <= 250 s ft 7 NOT For Building Department Use Onl &ergyPro 3.1 By EnsrgySoft User Number: 524E Job Number: 0506 Poae:4 of 14 Mar, 1. 2005 6:22PM VENNER[ LTD No-1456 P. 22/46 LIGHTING COMPLIANCE SUMMARY Part 2 of 3 LTG-1 PROJECT NAME _ DATE REMAX REAL STATE OFFICES _ 3/7/2005 INSTALLED LIGHTING SCHEDULE LAMPS BALLASTS Luminaire Code LUMINAIRE DESCRIPTION TYPE DESCRIPTION waGs Lamp DESCRIPTION # Lamp + # Ballast Watts Total watts I Lighting Schedule on Plans Shows Exterior Lighting Subtotal from this Page Meats Total Portable Lighting (From LTG -I) Efficacy and Control Requirement of �130(c) Less Control Credit Watts (From LTG-3) 7,620 = 0 919 t;ontroi Kequirements oTsi.51trf Adjusted Actual Watts 6,701 M►4NDAT MATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Exterior, eta-) SPACE CONTROL -LED CONTROL LOCATIC (Room # or Dwg. # p_pR_RW&A�SLHHF.-� q 4 GENERAL OFFT133 SALES OFF-104 CONF RM132 CONTROL IDENTIFICATION CONTROL TYPE (Occupant, Daylight, Dimming; etc j Occ Sensor — 250 s R. Occ Sensor } 250 Kft Oce Sensor <= 250 stIR Occ Sensor <= 250 sqft NV I tti I V 1-ImLu - ror tsu nui Ing LjejRarTment Ls se vnl 6 2 `a 3.1 By Energv3of! User Number: 524E J00 Number: 0505 Page:5 of 14 Mar, 7, 2005 6:22PM VENNEU LTD No,7456 P. 23/46 LIGHTING COMPLIANCE SUMMARY Part 2 of 3 LTG-1 PROJECT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 JI INSTALLED LIGHTING SCHEDULE _ I AMPS I RAI I ❑STC i Luminaire Code LUMINAIRF DESCRIPTION TYPE pESCRIPTION Wpe�Cs Lam DESCRIPTIONI I Lam + Ballast Total Watts # Wads -- — I Lighting Schedule on Plans Shows Exterior Lighting Subtotal from this Page i 01 Meets Total 7,620 Portable Lighting (From LTG-1) ❑ Efficacy and Control Requirement ofiTr130(c) Less Control Credit fttts (From LTG-3) 919 Control Requirements of5131(f) Adjusted Actual Watts t3,y01 MANDATORY AUTOMATIC CONTRQLS CONTROL LOCATION CONTROL CONTROL TYPE NOTE Tail (Room #) IDENTIFICATION (Auto Time Switch, Exterior, etc.) SPACE CONTROLLED I• I"i3 El01 i CONTROL LOCATION CONTROL CONTROL TYPE t+IOTE" TO (Room # or Dwg #) IDENTIFICATION (occupant Raylight, Dimming, etc) TYPE I# OP LUMINAIRES FIELD., SALES OFF-105 ll Sensor 250 il 2 SALES OFF-130 _ Occ Sensor 250 sqft 3 SALES OFF-129 Occ Sensor <= 250 sgft 2 SALES OFt=t28 Occ Sensor —250 wft 2 NOTES TO FIELD - For buildhq Department Use Oniv Enil 31 Sy EnarcntSoft User Number: 5248 Job Number: 0506 PooIll of 14 Mar, 1. 2005 6:23PM VENNERI LTD o,1456 P. 24/46 LIGHTING COMPLIANCE SUMMARY Part 3 of 3 I.TG-1 PROJECT NAME BATE REMAX REAL STATE OFFICES 3/7/2005 TABLE 1A - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE. AREAS �250 SQUARE FEET 41 ROOM # OR ZONE ID DEFAULT W/s ft AREA :F TOTAL WATTS BXC I TOTAL 0 ITABLE 1 B - PORTABLE LIGHTING SHUVVN ON PLANS FOR OFFICE AREAS y250 SQUARE FEET A� B a o a o [GI LUMEN. TASK #OF TOTAL TOTAL ROOM # PORTABLE LIGHTING # OP WATTS PER AREA TASK AREA(SF) WATTS OR ZONE ID nre^rinrnn FIKT. FIXTURE tap] AREAS (1) x El IC x E1 TEL/COMPUTER119 78 1 78 SALES OFF-11.5 151 1 151 SALES OFF l 16 108 1 108 SALES OFF-117 108 1 108 SALES OFF-119 108 1 108 SALES OFF 121 101 1 101 SALES OFF-127 136 1 136 SALES OFF-126 _ 108 1 108 898 0 _ ._ TOTAL TABLE I - PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # OR ZONE ID TOTALAREA (SF) Designer needs to provicb detailed documentation that the lighting level prQvided by the overhead lighting meets the needs of the space. The dl:tails include luminaire types, CU, and moulting i locatior% rela-:ive to work areas. Li. TOTAL 0 BUILDING SUMMARY BUILDING TOTAL TOTAL AREA ($F (FROM TABLES 1A+1 +1C) 4.794 TOTAL WATTS (FROM TABLES 1A+iB) 0 Enemypro 3.1 By Energyscq We? Number: 6248 Job Number: 0506 Page.7 0114 0 Mar. 1. 2005 6:23PM VENNERI LTD No,7456 P, 25/46 _IGHTING COMPLIANCE SUMMARY Part 3 of 3 LTG-' P ROJ ECT NAME PATE REMAX REAL STATE OFFICES 3/7/2005 TABLE I - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICI- AREAS >250 SQUARE FEET A ROOM # OR ZONE ID � bEFAULT /s ft AF:EA ::F TOTAL WATTS B X C) 1 I TOTAL 0 TABLE 1 B -PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICI= ARi=AS a250 SQUARE FEET , ,K Al BI 0 0 1-UMIN. TASK #OF TOTAL TOTAL ROOM W PORTABLE LIGHTING # OF WATTS PER AREA TASK AREA (SF) WATTS MR 7nNF In n.c eie inn FIXT_ FIXTURE [SF1 AREAS (D x El [C x F1 SALES OFF125 108 1 108 SALES OFF123 108 1 108 SALES OFF124 106 1 108 WASHR-CO RR&CLOSET114 3 1 385 SALESAREA-107 386 1 386 GENERAL OFF-133 685 1 685 COFEEJLUNCH106 182 1 182 FILE STORAGE 181 1 t 181 TOTAL I 2.143 I 0 I TABLE 'IC -PLANS SHOW PORTABLE LICKING IS NOT REQUIRED FOR OFFICE AREAS a 250 SQUARE FEET 11V %IV11t1RIHR I - fVR 1 M1& BUILDING SUMMARY BUILDING Eoergyprn 3.1 By EnergySoft Designer needs to provide detailed documentation that the Ngl level providecl by the overhead lighting meats the needs of the space. The dltalls Include luminaire types, CU, and mounting locations relative to work areas. TOTALARE4 (SF (FROM TABLES 1A+1 *1G) 4.794 User Number; 5248 Job Number. 0506 TOTAL WATTS (FROM TABLES 1A+iB) Off 14 Mar, 7, 2005 6:23PM VENNERI LTD SLIGHTING COMPLIANCE SUMMARY Part3 of 3 LTG-11 PROJECT NAME — DATE REMAX REAL STATE pFFICES 3/7/2005 TABLE 1A - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250_SQUARE FEET ROOM # DEFAULT OR ZONE ID (Witoft) AF EA TOTAL WATTS (BXC I I -W i TOTAL 0 TABLE 16 - PORTABLE LIQHTING SHOWN ON PLAIDS FOR OFFICE AREAS >250 SQUARE FEET K E D G LUMIN. TASK #OF TOTAL. TOTAL ROOM # PORTABLE LIGHTING # 3F WATTS PER AREA TASK AREA(SF) WATTS np 7nuG in nnorrinssni. FIKT. FIXTURE ISFI AREAS (D x El X x ET 'SALES OFI~105 95 1 95 I SALES OFF-104 142 1 142 CORRIDOR 109 270 1 270 RECEPTION 111 100 1 100 CONF RM109 77 1 77 CONF RM110 123 1 I 123 RECEPTION LOBBY 235 1 235 CONE RM132 119 1 119 TOTAL! 1,161 0 TABLE 'IC - FLANS SHOW PORTABLE LIGHTING IS NOT REQUIRE L? F+OR OFFICE AREAS ? 250 SQUARE FEET Designer needs to provicb detailed documentation that the ligt level providec by the overhead lighting meets the needs of the space. The da!taiis include luminair0 types, CU, and moulting locations relai Ive to work areas. BUILDING SUMMARY - PORTABLE LIGHTING TOTAL AREA (SF) TOTAL WATTS BUILDING SUMMARY (FROM TABLES 1A+1B+10) (FROM TABLES 1A+1B) BUILDING TOTAL 4,794. 0 F-iergyPro 3.1 By ErtergySafi USer Number: $246 Job Number: D506 Pa9e:9 of 14 Mar. 7. 2005 6:23PM VENNERI LTD No,7456 P. 27/46 �LIGHTING ,COMPLIANCE SUMMARY Part 3 of 3 LTG-1 PROJECT NAME REMAX REAL STATE OFFICES (DATE 3l7/2005 TABLE I - PORTABLE LIGHTING NOT SHOWN ON PR_ LANs FQOFFICE- AREAS >250 SQUARE FEETID u Iw L- j ROOM # OR ZONE ID DEFAULT W/s ft AREA f F TOTAL WATTS B X C 1 TOTAL { 0 TA13LE 1 B - PORTABLE LIGHTING SHOWN ON PLANS Ft]R OFFICE AREAS >250 SQUARE FEET F` ROOM # PORTAOLE LIGHTING OR ZONE ID DescriDbun LUMIN_ TASK # X WATTS PER AREA Fl (T. FIXTLIRE ($F) # OF TASK AREAS � �j L'J I-J TOTAL TOTAL AREA (SF) WATTS (D x E) (C x E) PART CORRIDOR 69 1 69 SALES OFF-125 168 1 168 SALES OFK130 114 4 114 SALES OFF-129 117 1 117 SALES OFF-128 125 1 125 . ............ TOTALI 593 I 0 TALC - PLANS SHOW PORTABLE LIGHTINC :QUI RED FOR OFFICE AREAS > 250 SQUARE FEET Designer needs to provide detailed documentation that the ligf level provldec by the overhead lighting meets the needs of the space_ The details include luminaire types, CU, and mounting locations relative to work areas. BUILDING SUMMARY - PORTABLE LIGHTING 1 TOTAL AREA BUILDING SUMMARY (FROM TABLES IA+IB+IC) TOTAL WATTS (FROM TABLES 1A+1B) BUILDING TOTAL 4,794 3.1 By EnsrgySoft User Number: 5248 Job Number: )506 Page:10 of 14 Mar. 7, 2005 6:23PM VENNERI LTD No,7456 P. 28/46 LIGHTING COMPLIANCE SUMMARY LTG-2 PROJECT NAME REMAX REAL STATE OFFICES LIGHTING POWER LUMINAIRE NAME DESCRIPTION (3) 4 ft Fluorescent 75 (Tandem) MagHCFO 35w Low Voltage Halogen L---J L.--- L Office -Convention/Go nferenc e DATE 317/2005 NUMBEROF WATTS PER LUMINAIRE -CFC: 0EFAuL-r -Total Watts att11 LUMINAIRES- Y N.] 59 108-01 6,372 39.0 X Jh 1,248 CJ LIE] L Subtotal from this Page Building Total E �7 . E62 (d Portable Lighting (From LTG-1) Q Lass Control Credit watts (From LTG-3) Adjusted Actual Watts 6=7 0 1.30 2,168 2 819 1.50 97 PAGE TOTAL [�7 4, BUILDING TOTAL7 4,7941 F 7581 AREA WATTS TOTAL ALLOWED WATTS (From LTG-4 or from computer run.) tne ro 3.1 By Energy$?User Number 5249 Job Number 0506 paq_q_ I I of 14 Mar. 1. 2005 6:24PM VENNERI LTD No,7456 P. 30/46 �AILORED LPD SUMMARY and WORKSHEE'T Part 1 of 3 LYG-4 DATE REMAX REAL STATE OFFICES 3/7/2005 AILORED LPD SUMMARY 1. Watts for Illuminance Categories A-D (from column G) - I 20 watts 2. Watts for Illuminance Categories E-1 (from LTG-4 Part 2) 01 watts 3. Watts for Display Lighting (from LTG-4 Parts 2 & 3) Q t - 1 + E- - 0 watts Public Area Display Sales Feature Floor Disphy Sales Feature Wall Display 4. Total Allowed Watts (lines 1+2+3) -- 20 Watts 7 ROOM E 5� ILLUMINANC :ATEGORY A A A A A -A A A A A A A A A A A A A A y Sales ,area 1E FE ROOM CAVITY FLOOR RATIO AREA 2.29 0 2;37 1.27 1.27 1.27 2.73 1.24 1.27 1.27 1.27 1.27 3-03 3-1 4 4.37 5-53 4.43 4.43 5.99 1 nl Al ,GE TOTAL = 1 Q ING TOTAL 4,7941 SF Job Number: 0506 0 ALLOWED LPD ALLOWED WATTS (E x F) 0.20 0 0.201 0 0.20 0 0.20 0 0.20 0 0.20 20 0.20 0 0.20 0 0.20 0 0.20 0 0.20 0 0.20 0 020 0 020 0 0.30 0 0.30 0 0.30 0 0.30 0 0.30 0 20 20 WATTS Page:18 of 31 Mar, 7, 2005 6:24PM VENNERI LTD No,7456 P. 29/46 FLiGKkG CONTROL CREDIT WORKSHEET LTG-3 PROJECT NAME— - GATE ! REMAX REAL STATE OFFICES_ 3/7/2005 F�.QQ.A Ni DAYLtGI{TtNC� WATTS OF LIGHTING CdNTROL ROOM# LIGHTING CONTROL PLANS ROOM GLAZING CONTROL ADJUST- WAFTS ZONEIb j DESCRIPTION REF. 45F} RATIO"_ VLT LIGHTING FACTOR j�x� TELICOMI'l!T! R119 OCC Sensor <=250 7$ 216 0.20 43 $ALES OF�115 S Occ ersar <= 250 _ Spy - ! 1511—_...2� (}.2 43 . SALES OFF116 Occ Sensor <= 250 ~I 10& l 216 �0.20' 43 . �- Sgft —� - SALES OFF117 Occ Sensor <= 250 108 ; 216 0.20 43' saL=s o�� 11s" Occ Sens — 250so � 4 108 7 216 0.20 43 F SALES OAF 121 CC Sensor <= 250 1 a 1 ��16 D.2D 43 SALES OFF-127 �r Ooc Sensor <� 250 • _ 136 _ . �- 216 0.20 • 43 . _ SALES OFF 126 occ Sensor <_ 250 1-0 216 0.20I 43 SALES OFF-725 Occ Sensor <- 250 _ 10$ --•-- .... 218, 0.20� 43. SALES OFF123 Occ Sensor <= 250 soft 1 1 Q8! 216 Q.20 43 _.5ALE5 OFF 124 O nn or <= 250 — ~ L�. �: 108. _ .. 216 0.20 43 1NASt-IR- � Sensor <= 250 Co Rrz&CLOSEf114 q _ $5i L_ _ 273� -. .2 55 WASHR- Occ Sensor <^' 250 I GORR&CLOSET114 t 385 216 0.20 43 SALES OFF-1 04 UUNI- kM7 SZ I_ SA�STiFF`105 SALES OFF 130 SALIMS 0F12�1 I Oce Sensor 2.5 SA occ Sensor <= 250 —4fit 1 Occ Sensor <m 250_; Oex Sensor <= 250 _ sgft Occ Sensor <= 250 Snft Occ Sensor <= 250 Occ Sensor <= 250 -SQf 125 PAGE TOTAL �19 For windows, use the Window Wall Ratio fortho room. 70r SIVIights, use the Skylight -to -Roof ratio for the room. BUILDING TOTAL �91 Enter on LTG-1 and 2= Actual Lighting Power calculation. EnergyP:o 2.1 y Energy§2a. User Number 524E - Job Number. 0506�Page: i7 of 31of 31 Mar. 7. 2005 6:24PN1 VENNERI LTD No,7456 P. 21/46 �AILORED LPD SUMMARY and WORKSHEET Part 1 of 3 LTG-4 PROJECT NAME DATE I REMAX REAL STATE OFFICES 1 3/7/2005 LPL) SU 1. Watts for Illuminance Categories A-D (from column G) 20 watts 2. Watts for Illuminance Categories E-1 (from LTG-4 Part 2) Q; watts 3. Watts for Display Lighting (from LTG-4 Parts 2 & 3) + Q ♦ Q watts Public Area Display Sales Feature Floor Dispby Sales Feature VVall Display 4. Total Allowed Watts (lines 1+2+3) 20 Watts TAILGREo L - Illuminance Categories A,B,C, and D and Gross Sales Wea I o ® S1 161 El FF1 Fa Mai, 7. 2005 G 25PM VENNER.1 LTD No,7456 P. 32/46 ROOM CAVITY RATIO WORKSHEET (RCR>=:3.5) LTG-5 DATE P1zOJECT NAME REMAX REAL STATE OFFICES 3/7/2005 Room Task/Activity i R� Room Room Room Cav, Ratio Name Description Area (A) Perimeter (P) Cavity 2.5 x H x P Height (H) /A 1 11 a� rm rmAnfi User Number, 5248 Jab Number M06 Papm:20 of 31 Mar, 7, 2005 6:25PM VENNEU LTD No,7456 P. 33/46 LIGHTING MANDATORY MEASURES LTG-MM PROJECT NAMi= REMAX REAL STATE OFFICES ON 4 DESCRIPTI-- _ IAJ § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 118 and may be an occupancy sensor, automatic time switch, or other device I capable of automatically shutting off the lighting. § 131(d)20verdde for Building Lighting Shut-off: The automatic building shut-off s!fytem is provided with a manual, accessible override switch in sight of the lights. "-he area of override Is not to exceed 5,000 square feet- § 119(h) Automatic Control Devices Certifier!: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. 111 Fluorescent Ballast and Luminaires Certified. All fluorescent fixtures spa -ified for the project are certified and listed In the Directory_ All installed fixtures shall he certified. DATE f�13l712005 'Designer ,Enforcement I i § 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132, or all one and three lamp fluorescent fixtures are t:peclfled with electronic high -frequency ballasts and are exempt from tandem wiring V`I requirements. I - § 131(a) Individual Roorn/Area Controls: Each room and area in this building Is eq Gipped with a separate switch or occupancy sensor device for each area with floor -to eiling walls. § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall he controlled with bi-level switching for uniform reduction of lighting within the room. § 131(e) Daylight urea Control: All rooms with windows and skylights that are gre lter than 250 square fleet and that allow for the effective uto of daylight in the area shall have 50% of the lamps In each daylit area controlled by a separate switch; or tte effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during diffe•ent times of the year is Included on plans. § 131(f) Control of Exterior Lights: Exterior mounted fixtures served from the electrical panel Inside the building are controlled with a directional photo cell control on t 1e roof and a corresponding relay in the electrical panel, or uses an astronomical timo clock. § 131(e) Display Lighting- Display lighting shall be separately switched on circuit: that are 20 amps or less. ek § 130(c) Efficacy of Exterior Lights: Exterior mounted fixtures with lamps over 100 Watts LIA served from the electrical panel inside the building have a source efficacy of at least 60 lumens per Watt, or are controlled by a motion sensor. Erteraffo User Number: 524 _ Job Number: 0506 . Paga:2i otSt Mar, 7, 2005 6:25PM VENNERI LTD No,1456 P. 34/46 CERTIFICATE qF COMPLIANCE Part 1 of MECH-1 PROJECT NAME DATE L -REMAX REAL STATE OFF ,ECES - __-- ___--3/712005 I PROJECT AIr1DRE3s . 78-965 HWY 111 pad 2 LA Quints PRINCIPAL_ DESIGNER - MECHANICAL _ .. _.. _ 'TELEPHONE Buifalrig P9rrYfit #.;' . VENNERI LTD. 416 635 7838 DOCUMENTATION AUTHOR TELEPHONE Checl:ed by!Date Venneri LTD. (416) 635-7838 �EnTarcementHgel+�y[�se; J GENERAL INFORMATION _ BATE OF PLANS I BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE i BUILDING TYPE NONRESIDENTIAL PHASE OF CONSTRUCTION -X NEW CONSTRUCTION METHOD OF MECHANICAL PRESCRIPTIVE 4,794sq.Ft_ j 15 _ HIGH RISE RESIDENT AL LJ HOTEUMOTEL GUEST ROOM ADDITION 1',' ALrE:?ATION (� EXISTING+ADDITION PERFORMANCE PROOF OF ENVELOPE COMPLIANCE PREVIOUS ENVELOPE PERMIT _ ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to Luilding mechanical requirements. The documentation preparer hereby certifies that the documentati n ' ac rate anc complete DOCUMENTATION AUTHOR '310NATURE D r The Principal Mechanical Designer hereby certifies that the proposed building design represe t in this set of construction documents is consistent with the other compliance forms and worksheets, with the c•peciflcaiio ,and with any ether calculations submitted with this permit application_ The proposed building has been designed to meet the mechanical requirements contained in Sections 110 through115, 120 through 124, 140 through 142, 144 and 145, a� Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, or mechanical engineer or I am a licensed architect. 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a j licensed contractor performing this work. .JJ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Cade to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1, f [PRINCIPAL MECHANICAL DESIGNER - NAME SIG ATUR DATE LIC- VENNE J o - 5 'Ll Z27710 flii'll~CHANICAL MANDATORY MEASURES 1[ 7_0 1 Indicate location on plans of Note Block for Mandatory Measur I INSTRUCTIONS TO APP LICANT For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. MECH-1: Required on plans for all submittals. Parts 2 may be incorporated in schedules on plans, MECH-2- Required for all submittals, but maybe incorporated in schedules on plars. MECH-3: Required for all submittals unless required outdoor ventilation rates and airflows are shown on plans per Section 4.3.4. MECH-4: Required for Prescriptive submittals. M1=CH-5: Qptionat-Performance use on�for Iechanical distribution summary. EnLJZA 3.1 13y Ena oi[ -- UstrNumber: Ud8 Job Number: 0506 _ Paga:12 of 14 !j Isar. 1, 2005 6:25PM VENNERI LTD No.7456 P. 35/46 CERTIFICATE OF COMPLIANCE Part 2 of 2 MECH-1 PROJECT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 SYSTEM FEATURES MECHANICAL SYSTEMS !SYSTEM NAME DHW Heater HAGt; HACK NQT1= TD ._ _.,.... � FIELD:: TIME CONTROL SET CK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? PAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM MECH-3, COLUMN I HEATING EQUIPMENTTYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCTINSULATICN PROTECTED? HEATING DUCT LOCATION. R-VALUE COOLING DUCT LOCATION R-VALUE VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE n/a Pro rammabie Switch Programmable Switch n/a Heatina & Cooliliq ReQUire Heating $ Cooling Require n/a n/a n/a n/a Yes 10.0 kW n/a n/a n/a n/a Constant Volume Constant Volume n/a No No n/a No No +1/a Constant -'emp Constant Temp n/a Constant -'emp Constant Temp n/a n/a n/a n/a Air Balance Air Balance n/a Auto Auto n/a No Economizer No Economizer 227 cfm n/a Electric Res 253 ofrL Heat Pulnp Gas Furnace 100% 7.00 HSPF 81%AFUE AO SMTFH PEC-030 Package DX Packaged bX n/a 10.0 SEER 13.6 EER 10.0 SEER / 8.7 EER n/a CARRIER 50HS •060--- 301-i Yes CARRIER 48S50 8080511 Yes Yes Yes Yes Yes n/a n/a Ducts in Conditioned n!a Ducts in Conditioned n/a n/a n/a Ducts In Conditlo red n/ Ducts in Conditioned n/a n/a No No CODE TABLES: Enter code from tabb below into columns above - HEAT PUMP THERMOSTAT? TIME CONTROL SETBACK GTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch H: Heating Enter Number of 1: Inlet Vanes 0: Occupancy C: Cvvling Isolation zones_ P: Variable Pitch VAV MINIMUM POSITION CONTROL? Sensor B: Both V: VFD SIMULTANEOUS HEAT /COOL? Y: Yes M: Manual Timer 0: Other C: Curve N: No HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR p,;MPER ECONOMIZER O.A_ CFM HIGH EFFICIENCY? B: Alr Balance C: OufsideAir Cert. A: Auto A: Air G: Gravity W: Water Enter Outdoor Alr CFW PIPE INSULATION REQUIRED? M: Out. Air Measure D: Demand Control IN: Natural N: Not Required EC: Economizer ;'Control $ee Section Note; This shall be no less than Col. H on MECH-3, PIPE/DUCY INSULATION PROTECTED? SEALED DUCTS IN CEILINGROOF SPACE — _ 4 44(e)3 11V,.tt1•CQ 14J rIF-LW -FUI laWIL11111A i.rCl.lal LF 11=1 I L %JaG'+utr _ EnergyPro 3.1 �By EnergySoft User Number: 5248 Job Number: 3506 Page:13 of 14 0 Mar. 7. 2000 6:26PM VENNERI LTD No,7456 P. 36/46 CERTIFICATE OF COMPLIANCE Part 2 of 2 MECH-1 'PROJECT NAME REMAX REAL STATE OFFICES DATE3/7/2005� SYSTEM FEATURES _ MECHANICAL SYSTEMS SYSTEM NAME HAC 3 HAC-2� HAC-1 NOTE TO FIELD.. TIME CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANI=OUS HEAT/COOL? G SUPPLY HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL DESIGN OA. CFM MECH-3, COLUMN I HEATING EQUIPMENTTYPE HEATING EQUIPMENTEFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPEIDUCT INSULATION PROTECTED? _HEATING DUCT LOCATION RVALUE COOLING DUCT LOCATIO RALUE VFRIFIFD SEALED ❑U TS Programmable Switch Heating & Cooling Re uire n/a n/a n/a Constant Volume No No Constant To Constant Temp n/a Air Balance Auto No Economizer 682 cfm Gas Furnace 82°/p AFUE Packa ed DX 10.5 EER CARRIER 48HJ 012501 Yes Yes Ducts in Conditioned rJa Ducts in Con i i n d , n/a No Pro rammabl3 Switch Programmable Switch Heatino & Cooliri Re wired n/a Yes 10.0 kW Constant V plume No No Constant --em Constant" em n/a Air Balance Auto No Economizer 196 ch n Heat Pu n 7.00 HSI'F Pack a ed DX 10.0 SEER / 3.6 EER CARRIER 501`!S-060--301" Yes Yes Dvoka In Conditioned n/a Ducts In Conditioned n/a No 1 Heating & Cooling Required .. n/a n/a Constant Volume No No Constant Temp Constant Temp . Air Balance Auto No Economizer 142 cfm Gas Furnace 81% AFUE Packaged PX 10.0 SEER 18.9 EER Yes Yes Ducts in Conditioned n/a Ducts in Conditioned n/a No CODE TABLES: Enter code from tabb below Into columns above - HEAT PUMP THERMOSTAT? Y: Yes N: No TIME CONTROL SETBACK I,TRL. S: Prog, Switch H: Heating O: Occupancy C- Cooling Sensor B: Both JM: Manual Timor ISOLATION ZONES ! FAN CONTROL Enter Number of 1 I: Inlet Vanes Isolation Zones- P: Variable Pitch V: VFO O: Other C: Curve ELECTRIC HEAT? VAV MINIMUM POSTION CONTROL? SIMULTANEOUS HEAT )COOL? HEAT AND COOT. SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER ; O.A. CFM HIGH EFFICIENCY'S S: Air Ba ante C: Outside Air Cert. M, Out. Air Measure D: Demand Control N: Natural A. Auto G: Gravity - Air -, Water N: Not Required EC: Economizer Control See Section 144 e 3 Enter Outdoor :r CFM- Note: Thisshall be no lesr, than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPEIDUCT INSULATION PROTECTED? SEALED DUCTS IN CEILINGROOF SPACE? NOTEt TO FIELD -tor Building Department t ie Onix EnergyPm 3-1 By ErergySoft — User Number: 5245 Job Number. 0506 Pape:14 of 14 Mar. 7, 2005 6:26PM VENNERI LTD No,7456 P. 37/46 (~(MECHANICAL EQUIPMENT SUMMARY Part 1 &2 MECH-2 pRf7.lEGT NAME DATE �.REMA?C REA TATE OFFICES _. _ 317J2005 Gill LLER AND TOWER SUMMARY_, _ - - --- -- - Equipment Name Equipment Type Qty. Eflicienc I .. ... I Tot, Motor Drive I Pump Tqns Rty I3PM BHP eff, Eft. Control ------------ I_ I - Enargy Factor Standby TANK INSIiL. Rated Vol. or Rocovery Loss or Ext. System Name I_ System Type Distribution Type 4hr. Input j_Gels.] Efficiency Pilot R Val. AO SMITH PEC-030 �Storage,Elec. Standard 91 15.359 28. 0.ij1 n!a nfa F— r CENTRAL SYSTEM RATfNGS H1J177NG - MOILING • � stem Name- - S stem Ty e �GARRIER 50H5-060-- Packaged pX 301- _ CARRIER 48SS04808051{Papkaged DX CARRIER 48HJE012501 (Packaged ❑k CARR1I=R 48SSO42060521PackagEd DX Aux. 914 ut ! kW Eff_ Out 2 57.000 10.017.00 HSP'F 57 64,800 0-0j' 81 % AF 184.500 0.0' 82% AF 46,9301 _ 0.081%AF I 47 ell Efficiency EyonomizerType 010.0 SEER / 8.6 EER ;No Eoonomizer 10.0 SEER / 8.7 EER iNo Economizer . 10.5 EER No Economizer iik10.0 SEER / 8.9 EER Nv Eran_u�izar ! I WPRL..� RETU.. Motor Drive Motor Drive —_. 5y_stem Name Fan' fjlpe Motor Location CFM E1HP Et#. Eff,_ CFM BHP_ !. Eff_ Eff. CARRIER 50HS-060--- 1 .Constant Volume s' :Blow -Through 2,000 _ 1.40 82.5% 100.0% none CARRIER 48SS048080511 Constant Volume Ellow-Through 11600 0.50 77.0°k 100.0 none CARRIER 48H 3E012501 ,Constant Volume (Blow•Through 4,000 4.20 86.5% 97.0% none CARRIER 48SSD42060521 _ ._._... _.. ` ;Constant V_ olume BlovrThrough 1,400 0.50 77.0°/ 100.0% none ! ------------ i-nefgyWo 3.1 By Ener Soft User Number. 6248 Job Number. 0606 Page:22 of 31 Mar. 7. 2005 6±27PM VENNERI LTD No,7456 P. 38/46 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 Mar. 1, 2005 6:27PM VENNERI LTD No,7456 P. 39/46 MECHANICAL VENTILATION MECH-3 PROJECT NAME DATE REMAX REAL STATE OFFICES _ w 3/7/2005 Al1EcHANICAL VENTILATION --- a [E © o 2 a 56E 0.1q 85 626 0.50 1.313 591 0.1 89 356 0.15 53 OCCUPANCY BASIS REQ'D DESIGN NO. CFM MIN. O.A. OUTDOD VAV RAt4S OF PER CFM (MAX OF AIR MIN. FER PEOPLE PERSON (ExF) D OR G) CFM RATIO AIR 12A 20.0 253; 253 253 Total T T 25 227 227 682 682 196 196 142 142 631 C Minimum Ventilation Rate per Section 121, Table 1•F, Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Oc-upant Density. �1 Must be greater than or equal to H, or use Transfer Air Design Outdoor Air includes vE ntilation from Supply Air System & Room Exhaust Fans LK Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H-J), I Eneroypro 3.1 By EnerpySoft User Number: 6248 Job Number: 0506 Flag e:24 of 31 1 Mar, 1. 2005 6:27PM VENNERI LTD No,7456 P. 40/46 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME REMAX REAL STATE OFFICES DATE 3/7/2005 SYSTEM NAME 'FLOOR AREA IHAC-5 NOTE: Provide one copy of this form for each mechanical system when usingthe Prescriptive Approach, w SIZING AND EQUIPMENT SELECTION ^1. COOLING HEATING DESIGN CONDITIONS: OUTDOOR DRY BULB TEMPERATURE (APPENDIX C) 108 OF 6 °F a OUTDOOR WET BULB TEMPERATURE (APPENDIX C) 7 of INDOOR, DRY BULB TEMPERATURE SEE ASHRAE CHAPTER 8, 1993 75 OF 7O OF OR APPENDIX B 2_ SIZING: DESIGN OUTDOOR AIR _253. CFM (MECH 3; COLUMN 1) - ROOM LOADS RETURN VENTED LIGHTING - RETURN AIR DUCTS - RETURN FAN SUPPLYFAN - SUPPLYDUCTS TOTALS SAFETY/WARM-UP FACTOR MAXIMUM ADJUSTED LOAD (TOTALS FROMABOVE x SAFETY/WARM-UP FACTOR) 7 316 40,533 11,863 7183 nI , 39 0, 0 39 20,480 1.43 29 286 0 2,027 0 0 2,02 5194$ 1.21 62 $56 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) to I Hr to I Hr Btu I Hr Btu 1 Hr IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN POWER A FAN DESCRIPTION [s' DESIGN BRAKE HP 1-000 © _61 EJ LF I-E EFFICIENCY NUMBER OF FAN$ MOTOR DRIVE 82.5°/ 100. % 1 NOTE: Include only fan systems exceeding 25 HP (see Section 144). Total Fan Sy5tam Power Demand may not exceed 0.8 Wattslcfm for constant volume systems or 1.25 Wattslcfrn for VAV sysfems- PEAK WATTS CFM B X E X 746 / (C X D (Supply Fans) 904 2,000 TOTALS 904 2 000 TOTAL FAN SYSTEM POWER DEMAND 0.452 WATTS / CFM COI. F / COL G I~nergyPro 3.1 By FneigySnfk User Number Job Number- 0506 _ Page15 Of 31 Mar. 7. 2005 6:27PM VENNERI LTD N o . 7 4 5 6 P. 41/46 [MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 SYSTEM NAME FLOOR AREA HAC-4 568 NOTE: Provide one copy of this form for each mechanical system when usingthe Prescriptive Approach. SIZING ARID EQUIPMENT SELECTION 1. DESIGN CONDITIONS: DRY SULS TEMPERATURE (APPENDIX C) COOLING OF HEATING OF OUTDOOR 108 26 - OUTDOOR WET BULB TEMPERATURE (APPENDIX C) 76 OF - INDOOR, DRY BULB TEMPERATURE SEE ASHRAE CHAPTER 8, '1993 75 OF 70 OF OR APPENDIX B 2. SIZING: I i DESIGN OUTDOOR AIR �` 2271 CFM (MECH 3; COL JMN 1) - ROOM LOADS RETURN VENTED LICHTING RETURN AIR DUCTS - RETURN FAN SUPPLYFAN - SUPPLY DUCTS TOTALS SAFETY I WARM-UP FACTOR MAXIMUM ADJUSTED LOAD (TOTALS FROMABOVE x SAFETY /WARM-UP FACTOR) 7 573 10,674 6,053 n/ 30 0 30 17,333 1.43 24,786 29,712 0 1,486 0 1,48 40,335 1.21 48,805 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) 32 413 64 $p0 Btu / He Btu / He IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN PTION A © �21 DI 0 :G:] DESIGN EFFICIENCY NUMBER PEAK WATTS CFM FAN DESCRIPTION BRAKE HP MOTOR DRIVE OFFANS B X E X 746 / (C X D (Supply Fans) Supply Fan 0.500 77.00/a 100.00/o 1 484 1,600 —` — TOTALS 484 1 600 NOTE: Include only fan systems exceedlnq 25 HP (see Section 144). L Total Fan System Power Demand may not exceed 0.8 Watts/cfm for TOTAL FAN SYSTEM constant volume systems yr 1.25 Wattslcfm for VAV systems- POWER DEMAND 0.303 WATTS / CFM Col. F / Col. G L EneroPru 3.1 By Energysoft User Number 5248 Job Number: )506 Pags26 of 31 Mar. 7. 2005 6:28PM VENNERI LTD No,7456 P. 42/46 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 SYSTEM NAME FLOOR AREA HAC-3 2,626 NOTE: Provide one copy of this form for each mechanical system when usingthe Prescriptive Approach. SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: COOLING HEATING - OUTDOOR DRY BULB TEMPERATURE (APPENDIX C) 108 OF J 26 OF - OUTDOOR WET BULB TEMPERATURE (APPENDIX C) % OF - INDOOR, DRY BULB TEMPERATURE SEE ASHRAE CHAPTER 8, 1993 75 °F 70 °F OR APPENDIX B 2. SIZING: - DESIGN OUTDOOR AIR 682 CFM (MECH 3; COLUMN 1) 23 716 32,138 - ROOM LOADS 49,606 6,10 - RETURN VENTED LIGHTING 0 n/a - RETURN AIR DUCTS 2,480 30 RETURN FAN 0 SUPPLYFAN SUPPLYDUCTS TOTALS 78,319 38,850 SAFETY /WARM-UP FACTOR 1 ,2 II MAXIMUM ADJUSTED LOAD (TOTALS FROMABOVE x SAFETY /WARM-UP FAC"OR)9C)7665 E55 3. SELECTION: INSTALLED EGIUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) 86.551 184 5001 Btu / Hr Btu / Hr IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN FAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan DESIGN BRAKE HP 4.200 I EI FI L�J EFFICIENCY NUMBER OF FANS MOTOR j DRIVE 86.5%, 97.0°' 1 NOTE: Include only fan systems exceeding 25 HP (see Section'144)_ Total Fan System Power Demand may not exceed 0.8 Watts/cfm for constant volume systems or 1.25 Watts/cfm for VAV systems. PEAK ATTS f CFM B x E x 7461(C X D (Supply Fans) 3,734 4,000 TOTALS 3,734 4,OQ0 TOTAL FAN SYSTEM POWER DEMAND 0.934� WATTS I CFM Cal. F / Col. G EnergyPro 3A By EnergySofj User 5248 Job Number: )506 27 of 31 Mar. 1. 2005 6:28PM VENNERI LTD No,7456 P. 43/46 MECHANICAL SIZING AND FAN POWER _ MECH-4 CT NAME DATE REMAX REAL STATE OFFICES 3/7/2005 t NAME (iAC-2 FLOOR ARE91 Provide one copy of this form for each mechanical system when usingthe Prescriptive Approach. 81ZING AND EQUIPMENT SELECTION 1_ DESIGN CONDITIONS: COOLING HEATING - OUTDOOR DRY BULB TEMPERATURE (APPENDIX C) 108 OF 26 OF - OUTDOOR WET BULB TEMPERATURE (APPENDIX C) 7 of - INDOOR, DRY BUL13 TEMPERATURE SEE ASHRAE CHAPTER 8, 1993 75 °F 70 °F OR APPENDIX B 2. SIZING_ DESIGN OUTDOOR AIR : 196 CFM (MECH 3; COLJMN I) 6.061 9,177 ROOM LOADS 30,752 11,52 RETURN VENTED LIGHTING 0 n/ RETURN AIR DUCTS 1,538 576 - RETURN FAN 0 5UPPLYFAN 0 Q - SUPPLYDUCTS 1,538 576 TOTALS 3� 8$8 21,850 SAFETY /WARM-UP FACTOR 1.43 MAXIMUM ADJUSTED LOAD (TOTALS FROMABOVE x SAFETY /WARM-UP FAC--OR) 48 265 31.240 3. SELECTION: INSTALLED EQUIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) 3S,14O 37.4$H Stu I Hr Stu I Hr IF W$TALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN FAN POWER CONSUMPTION Ia C! FAN DESCRIPTION DESIGN BRAKE HP Supply Fan 1.000 E EFFICIENCY NUMBER OF FANS MOTOR DRIVE 82.5% 100.00da I PEAK WATTS BxEx746/(CX LG! CFM (SUPpIj Fans) 2,000 �90412 000 NOTE: Includa only fan systems exceeding 25 HP (see Section 144). TOTALS Total Fan System Power Demand may not exceed 0.8 Watts/cfm for TOTAL FAN SYSTEM constant volume systems or 1.25 Watts/cfm for VAV systems. POWER DEMAND 0,452 WATTS I CFM Col. F / Col. G EnergyPro 3 1 By EnergySoft User Number 5248 Job Number: 0506 _ Page:28 of 31 Mar, 1. 2005 6:28PM VENNERI LTD No,7456 P. 44/46 MECHANICAL SIZING AND FAN POWER MECH-4 PROJECT NAME REMAX REAL STATE OFFICES SYSTEM NAME HAC-1 NOTE: Provide one copy of this form for each mechanical system when usingthe Prescr ptive Approach. DATE 3/7/2005 FLUOR AREA 356 SIZING AND EQUIPMENT SELECTION 1. DESIGN CONDITIONS: COOLING HEATING • OUTDOOR DRY BULB TEMPERATURE (APPENDIX C) 108 OF 2 OF - OUTDOOR WET BULB TEMPERATURE (APPENDIX C) F 6 of - INDOOR, DRY BULB TEMPERATURE SOR PPSH is gHAPTER 8, 1993 75of 70 OF 2. SIZING: - DESIGN OUTDOOR AIR 142 CFM (MECH 3; COLUMN 1) - ROOM LOADS - RETURN VENTED LIGHTING - RETURN AIR DUCTS • RETURN FAN - SUPPLYFAN - SUPPLYDUCTS TOTALS SAFETY / WARM-UP FACTOR MAXIMUM ADJUSTED LOAD (TOTALS FROMABOVE x SAFETY /WARM-UP FAC'..-OR) 4,935 E 680 5,800 n/ 290 d 290 13,060 1.43 18 676 19,119 0 956 0 95 25,971 1.2 31.425 3. SELECTION: INSTALLED EWIPMENT CAPACITY (ADJUSTED FOR DESIGN CONDITIONS) IF INSTALLED CAPACITY EXCEEDS MAXIMUM ADJUSTED LOAD, EXPLAIN FAN POWER CQNSUMP7 A FAN DESCRIPTION Supply Fan IC DESIGN BRAKE HP 0.500 29,673 46,930 Btu / Hr Btu / Hr F 1E EFFICIENCY NUMBER OF FANS MOTOR DRIVE 77.0% 100.010 1 NOTE: Include only fan systems exceeding 25 HP (see Section 1"). Total Fan System Power Demand may not exceed 0.6 Watts/cfm for constant volume systems or 1.25 Wattslcfm for VAV systems. 13 Number 5248 Job Number! 0506 PEAK WATTS CFM B x E x 7461 (C X D (Supply Fans) 484 1,400 TOTALS1 484 1 400 TOTAL FAN SYSTEM POWER DEMAND D.346 WATTS / CFM COL F / Col. G Page,29 of 31 . • Mar. 7. 2005 6,28PM VENNERI LTD No,1456 P. 45/46 MFCHANICAL MANDATORY MEASURES ;PROJECT NAME REMAX REAL STATE OFFICES DESCRIPTION _ Equipment and Systems Efficiencies Part 1 0 2 MECH-MM _.. .. DATE �� 31712❑05_ Qesi per Enforcement I I Any appliance for which there Is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. 115(a) Fan type central furnaces shall not have a pilot light- § 123 piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be Insulated in accordance with Standards Section 123, X I § 124 Air handling duct systems shall be Installed and Insulated in compliancy with Sections 601, 603 and aU of the uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: ` § 122(e)1A Each space conditioning system serving bullding types such as offices and manufacturing facilities (and all others not explicitly oxampt From the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during tiff -hours for up too hours. The time switch shall be capable of programming differe-it schedules for weekdays and weekends; incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes & a normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours it power is interrupted; or X, § 122(e)1t3 An occupancy sensor to control the operating period of the system; or �! § 122(e)1c A 4-hour timer that can be manually operated to control the operating pi:riod of the system. Ll 5 122(e)2 Each space conditioning system shall be installed with controls that terporarily restart and temporarily operate the system as required to maintain a Setback heating and/or a setup cooling thermostat setpoint. IX § 922(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square fact; shall be provided with isolation devices, such as valves or dampers, that allow the supply of h-:ating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above- X1 § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher_ where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. 'X; § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) anc' adjustable setpoint stops accessible only to authorized personnel. X § 112(b) Meat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be mat by the heat pump alone_ EsergyPro 3.1 By EnergySaf`- User Number: 5248 Job Number: 0506 Pa e:30 of 3� ' Mar - 7, 2005 6:29PM VENNEU LTD No,7456 P. 46/46 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME 'DATE REMAX REAL STATE. OFFICES 1 317/2045 Description Designer (Enforcement Ventilation !�( § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. X§ 122(o Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditicning and ; 3 exhaust systems- �)( § 122(9 All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air i openings. I ,X, § 121(gg Air Balancing; The system shall be balanced in accordance with the NEtlonal Environmental Balancing Bureau (NE1313) Procedural Standards (1993). or Associated Air Balance Couricil (AABC) National Standards (1939); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as - shown on the mechanical drawings, and shall be measured and certifieI by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licanced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divicu; or �.._ § 121(t)4 Another method approved by the Commission- Service Water Heating Systems — ] § 1 f3(b)2 if a circulating hot water system is installed, It shall have a control capable of automatically turning off the circulating pump(s) when hot water Is not required. )( § 113(b)M Lavatories in restrooms of public facilities shall be equipped with contr5is to limit the outlet temperature to 110 degrees F. X ! § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet• devices that limit the flow of hot water to a maximum of 0.5 gallo is per minute. Foot actuated control valves, and outlet devices that limit the flow of hct water to a maximum of 0-75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self -closing valves, and outlet devices that limit the flow of hot water to a maximum of 2-5 gallons per minute, and 0,25 gallonslcycle (circulating system). Self -closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallonslcycle (non -circulating systen)- Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2-5 gallons per minute, and 0.75 gallonslcycle (foot switches and proAmity sensor controls). I EnergyPro 31 By EnernySoff _ User Number: 524$ Job Number: 0506 — Page:31 of 31„