Loading...
13636 (CSCS) Title 24TITLE 24 REPORT FOR: LUB SHOP WASHINGTON AND 111 LA QUINTA, CALIFORNIA PROJECT DESIGNER: GARY KNUTSON (619) 328-4187. REPORT PREPARED BY: JOHN H HACKER JOHN H. HACKER & ASSOCIATES 4501 E. Sunny Dune Rd. Suite C PALM SPRINGS, CALIFORNIA 92264 (619) 327-4565 Job Number: Date: 5/2/1994 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential Building.Energy Efficiency Standards. . r'A' Table Of Contents for Title 24 Report ------------------------------------- CoverPage ........................................................... 1 Table of Contents .................... 2 Form tNV-1 Envelope Certificate of Compliance ....................... 3 Form ENV -2 Envelope Summary ......................................... 5 Form LTG -1 Lighting Certificate of Compliance ....................... 9 Form LTG -2 Lighting Compliance summary .............................. 11 Form LTG -3 Lighting Controls Credit Worksheet ........................ 12 Form MECH-1 Mechanical Certificate of Compliance ...................... 13 Form MECH-2 mechanical Summary ...................................... 16 Form MECH-3 Mechanical Equipment Summary ............................ 17 HVAC Zone & Space -Loads Summary ..................................... 18 Form PERF -1 Performance Compliance Summary .......................... 20 0 CERTIFICATE OF COMPLIANCE (part 1 of 2) ENV -1 page 3 of 20 ------------------------------------------------------- 7 ------------------- Project Name: LUB SHOP Date: 5/2/1994 Address: WASHINGTON AND 111. LA QUINTA, CALIFORNIA IBuilding Permit No Envelope Designer: GARY KNUTSON Checked by / Date Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655 --------------------------------------------------------------------------- GENERAL INFORMATION Date of Plans: Building Conditioned Floor Area: 755 sf Building Type: Nonresidential Climate Zone: 15 Phase of Construction: New Construction 0 Addition Alteration Method of Envelope Compliance: Prescriptive overall Envelope STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4,,Article 1 of the California Code of Regula- tions. This certificate applies only to building envelope requirements. The Principal Envelope Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the envelope requirements contained in sections 110, 116 through 118, and 143 or 149 of.Title 24, Part 6, Chapter 1. -Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer or architect. 0 1 affirm that I am eligible'under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I -am a licensed contractor preparing docu- ments for work that I have contracted to perform. .0 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section of the Code to sign this document as the person responsible for its preparation; and for the following reason: PRINCIPAL ENVELOPE DESIGNER GARY KNUTSON (619) 328-4187 (S�kjnidtiire) (Lic. (Date) ENVELOPE MANDATORY MEASURES .Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF --------------------------------------------------------------------------- COMPLIANCE (part 2 of 2) ENV -1 page 4 of 20 Project Name: LUB SHOP JDate: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES I ICOMPLY 24 User 2655 --------------------------------------------------------------------------- OPAQUE SURFACES Const Assembly Name Type ----------------------- ----- 811 Solid CMU R-3 Metal 811 Solid CMU Wall None R-30 Roof(R.30.2xl2.16) Wood FENESTRATION Frame Note to Location/Comments Field --------------------------------- ------- orient -------- Panes ----- Type ----- Exterior Shade -------------------------- OH Glazing ----------------------- Type Front (E) 2 Metal None Y Double Clear Default(N) Left (S) 2 Metal None Y Double Clear Default(N), Left (S) 2 Metal None Y Double Clear Default(N) Back (W) 1 Metal None Y Single Clear Default(N) a OVERALL ENVELOPE METHOD Part 1 of 4 ENV -2 page 5 of 20 --------------------------------------------------------------------------- Project Name: LUB SHOP JDate: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655 --7 ------------------------------------------------------------------------ WINDOW AREA TEST 13 A. Display Perimeter 0.0 ft X 6 ft = 0.0 sf Display Area B. Gross Exterior Wall Area 1000.0 sf X 0.40 = 400.0 sf 40% Area C. Gross Exterior Wall Area 1000.0 sf X 0.10 100.0 sf Min Std Area D. Enter Larger of A or B 4 \ 00.0 sf Max Std Area E. Enter Proposed Windpw Area 238.0 sf Proposed Area If E is greater than D or less than C, proceed to the next calculation for window area adjustment. If not, go to part 2 of 4. 1. If E is greater than D: D. Maximum Standard Area ------------------------ N/A 2. If E is less than C: E. Proposed Area ---------------- N/A C. Minimum Standard Area E. Proposed Area ------------------------ ---- 7 ----------- . N/A N/A SKYLIGHT AREA TEST Window Adjustment Factor ----------------- N/A Window Adjustment Factor ----------------- N/A Atrium Height ------------- 0.0 ft If Height < 55 ft If Height >=-55 ft Standard = 5% --------------------- Standard = 10% V A. Gross Exterior Roof Area 755.0 sf X 0.05 37.8 sf Standard Area B. Enter Proposed Skylight Area 0.0 sf Proposed Area If the Proposed Skylight Area is greater than.the Standard Skylight Area, proceed to the next calculation for the skylight area adjustment. If not got,to part 2 of 4. 1. If Proposed Skylight Area > Standard Skylight Area: 1, - Skylight Standard Skylight Area Proposed Skylight Area Adjustment Factor - ---------------------- ---------------------- ----------------- N/A N/A N/A OVERALL ENVELOPE METHOD Part 2 of 4 ENV -2 page 6 of 20 ---------------------------------------------- ---------------------------- Project.Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655 --------------------------- 1� ------------------------------ --- ------------ OVERALL HEAT LOSS A . . . PROPOSED Adj. STANDARD Assembly Name ----------------------- Area HC U -Val UxA Area U--�Val UxA 811 Solid CMU R-3 ------ 200.0 ---- 17.2 ----- 0.199 ------ ------ 39.-8 200.0 ----- ------ 0.400 80.0 811 Solid CMU R-3 276.0 17.2 0.199 54.9 276.0 0.400 110.4 811 Solid CMU R-3 46.0 17.2 0.199 9.2 46.0 0.400 18.4 811 Solid CMU Wall 240.0 16.7 0.690 165.5 240.0 0.400 96.0 R-30 Roof(R.30.2xl2.16) 755.0 4.2 0.035 26.6 755.0 0.057 43.0 Double Clear Default(N) 24.0 N/A 17.3 24.0 0.720 17.3 Double Clear Default(N) 134.0 N/A 0.720 96.5. 134.0 0.720 96.5 Double Clear Default(N) 20.0 N/A 0.760 15.2 20.0 0.720 14.4 Single Clear Default(N) 60.0 N/A 1.190 71.4 ------ 60.0 0.720 43.2 Total 496.4 ------ Total 519.2 OVERALL HEAT LOSS COMPLIES PROPOSED UA <= STANDARD UA A . . . OVERALL ---------------------------------------------- ENVELOPE METHOD Part 3 of 4 ---------------------------- ENV -2 page 7 of 20 Project Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. -------------------- HACKER & ------------------------------ ASSOCIATES COMPLY ------- 24 User ------------- 2655 OVERALL HEAT GAIN PROPOSED STANDARD Glazing -------------- WF ---- ------ Area SC ---- H ---- V OHF Total Area RSHG Total East 1.08 24.0 0.88 2.0 ---- 2.1 ---- 0.44 ------ 10.1 ------ 24.0 ---- ------- 0.57 14.8 South 1.12 134.0 0.88 8.0 9.1 0.44 57.8 134.0 0.57 85.5 South 1.12 20.0 0.88 2.0 7.1 0.71 14.0 20.0'0.57 12.8 West 1.13 60.0 0.75 10.0 8.1 0.43 21.9 60.0 0.57 38.6 Total 103.7. Total 151.7 OVERALL HEAT,GAIN COMPLIES PROPOSED HG <= STANDARD HG OVERALL ENVELOPE METHOD --.i ------------------------------------------------------------------------- Part 4 of 4 Skylt ENV -2 page 8 of 20 Project Name: LUB SHOP Area 0.0 ------ ------ 0.0000 0.0 ------ ------ 755.0 Date: 5/2/1994 ------ 755.0 Documentation: JOHN H. ------------------------------------------------------ HACKER'& ASSOCIATES COMPLY 24 User ------ ------------- 2655 Window,Area Adjustment Calculations Adjusted Gross Door Window Adjust Window Wall Wall Name ----------------------- Dir --- Area Area ----- Area Factor Area Area ,Undefined North N ------ 200.0 ------ 0.0 ------ 1.0000 ------ ------ 0.0 200.0 Undefined.East E 300.0 24.0 1.0000 24.0 276.0 Undefined South S 200.0 154.0 1.0000 154.0 46.0 Undefined West W 300.0 ------ 60.0 ------ 1.0000 60.0 240.0 TOTALS 1000.0 0.0 238.0 ------ ------ 238.0 762.0 Skylight Area Adjustment Calculations Gross Roof Name Dir Area ----------------------- --- ----- Undefined R-30 Roof H 755.0 TOTALS 755.0 U Adjusted Skylt Adjust Skylt Roof Area ------ Factor Area ------ Area 0.0 ------ ------ 0.0000 0.0 ------ ------ 755.0 -0.0 0.0 ------ 755.0 U CERTIFICATE OF ------------------------------------------------------------------------ COMPLIANCE (part 1 of.2) LTG -1 page 9 of Project Name: LUB SHOP JDate: 5/2/1994 Address: WASHINGTON AND 111 LA QUINTA, CALIFORNIA Lighting Designer: 20 Building Permit No Checked by / Date Documentation: JOHN H. HACKER & ASSOCIATES 1COMPLY'24 User 2655 --------------------------------------------------- --------------- GENERAL INFORMATION Date of Plans: Building Conditioned Floor Area: 755 sf Building Type: Nonresidential Climate Zone: 15 Phase of Constructi ' on: XNew Construction 0 Addition h1teration Method ofLighting Compliance: Prescriptive STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building lighting requirements. I The Principal Lighting Designer ing design represented in this with the other compliance forms and with any other calculations The proposed building has been contained in sections 110, 119, Please check one: hereby certifies that the proposed build - set of construction documents is consistent and worksheets, with the specifications, submitted with this permit application. designed to meet the lighting requirements 130 through 132 and 146 or 149. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer electrical engineer or architect. 0 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. 0 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section of the Code to sign this document.as the person responsible its preparation; and for the following reason: PRINCIPAL LIGHTING DESIGNER 12o e N Signature) (Lic. (Date) LIGHTING MANDATORY MEASURES .Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 2) LTG -1 page 10 of 20 --------------------------------------------------------------------------- .Project Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655 -------------------------- 7 ---------------------------------- ------------ INSTALLED LIGHTING SCHEDULE CONTROLS FOR CREDIT � Control Note to Control Location ID Control Type Space Controlled Field ---------------- ------- --------------- ---------------------- ------- I No of Watts/ Ballast Ballasts/ No of Note to Name Lamp Type ----- ------------ Lamps ------ Lamp Type ------ Luminaire Fixt. Field Fluorescent 4 ---------- 34 Standard --------- ----- 2.0 8 ------- Incandescent 60 n/a n/a 4 MANDATORY AUTOMATIC CONTROLS Control Note to Control Location ---------------- ------- ID Control Type Space --------------- ---------------------- Controlled Field ------- CONTROLS FOR CREDIT � Control Note to Control Location ID Control Type Space Controlled Field ---------------- ------- --------------- ---------------------- ------- I LIGHTING COMPLIANCE SUMMARY LTG -2 page 11 of 20 --------------------------------------------------------------------------- Project Name: LUB SHOP JDate: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655 ----------------------------------------------------- --------------- ACTUAL LIGHTING POWER No of Watts Total Name Description ----- ----------------------------------------- Lumin ----- per Default Watts 4811 T-12 Low Watt /4 Lamp 8 --- ------- 144.0� ----- 1152.0 60 w Surface Mount Incandescent 4 60.0 240.0 SubTotal 1392 Less Control Credits (LTG -3) 0 Total Proposed Watts 1392 If not CEC-Default value, please provide supporting documentation. ALLOWED LIGHTING POWER BY SPACE Allowed Floor LPD Total Tailored Space Name ----------------------- Occupancy ---------------------- Area ----- (w/sf) (watts) (watts) ------ Undefined Retail Retail/Wholesale Sales 155 ----- ------- ------- 2.'200 1661 ------ 0 TOTALS 755 ------- ------- 2.200 1661 0 Note: Tailored Allotment requires supporting documentation on f6rm. LTG -4. 4 LIGHTING CONTROLS CREDIT WORKSHEET LTG -3 page 12 of 20 --------------------------------------------------------------------------- Project Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655 ------------------------------------------------------------------- LIGHTING CONTROLS BY SPACE Floor Watts Adj.. Control Spade Name Control Description Area Ctrld Fctr Credit TOTAL 0 CERTIFICATE OF COMPLIANCE (part 1 of 3) MECH-1 page 13 of 20 --------------------------------------------------------------------------- Project Name: LUB SHOP Date: 5/2/1994 Address: WASHINGTON AND 111 LA QUINTA, CALIFORNIA Building Permit No Mechanical Designer: Checked by / Date Documentation: JOHN H. HACKER & ASSOCIATES . ICOMPLY 24 User 2655 ----------------------------------------------------- ---------------- GENERAL INFORMATION Date of Plans: Building Conditioned Floor Area: 755 sf Building Type: Nonresidential Climate Zone: 15 Phase.of Construction: New Construction 0 Addition Alteration Method of Mechanical Compliance: Prescriptive Proof of Envelope Compliance: 0 Previous Permit 0 Compliance Attached STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building mechanical requirements. Th� Principal Mechanical Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in sections 110 through 115, 120 through 124, 140 through 142,144 and 145. Please check one: I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer mechanical engineer or architect. 0 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its prepara ' tion; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. 0 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section of the Code to sign this document as the person responsible for its preparation; -and for the following reason: PRINCIPAL MECHANICAL DESIGNER ignature) (Lic. #) (Date) MECHANICAL MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF --------------------------------------------------------------------------- COMPLIANCE (part 2 of 3) MECH-1 page 14 of 20 Project Name: LU B SHOP # of Isolation Zonesn/a JDate: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 26.55 ----------------------------------------------------- -------------- SYSTEM FEATURES Note to Field Zone Name Undefined Nonres Zone Time Control S:Prog Switch Setback Control Both. # of Isolation Zonesn/a HP Thermostat Yes Electric Heat 10.0 KW Fan Control Constant Volume VAV Min Position n/a Simul. Heat/Cool n/a �Heat Supply.Reset Constant Temp Cool Supply Reset Constant Temp, Ventilation OA Damper Control Economizer Type No Economizer Outdoor Air CFM 151 Heat Equip Type Heat Pump Make & Model No. Day&Night 542GN060-C Cool Equip Type DX Make and Model Code Tables Time Control Ventilation 'OA Damper S:Prog Switch B:Air Balance A:Auto O:Occ Sensor C:OA Cert. G:Gravity M:Man Timer M:OA Measure D:Demand Cont .N:Natural CERTIFICATE OF COMPLIANCE (part 3 of 3) - --------------------------------------------------------------------------- MECH-1 page 15 of 20 Project Name: LUB.SHOP Date: 5/2/1994 Documentation: JOHN H. ------------------------------------------------------ HACKER & ASSOCIATES COMPLY 24 User 2655 ------- ------------- DUCT INSULATION Duct Tape Insul Note to System Name -------------- --------- -Type- Duct Location ------- Allowed R -Val Field 7 Day&Night 542GN060-C ------------------- Heating Ducts in Attic ------- Y N ----- ------- 4.2 Cooling Ducts in Attic Y N 4.2 PIPE'INSULATION Insul Note to System Name ----------------------- Pipe Type Required ----------- -------- Field Domestic Hot,Water Y / N ------- NOTES TO FIELD - For Building Department Use Only ------------------------------------------------------------------------ MECHANICAL SIZING AND FAN POWER ------------------------------------------------ Project Name: LUB SHOP Documentation: JOHN H. HACKER & ASSOCIATES ------- ; ------------------------------------------ SIZING AND EQUIPMENT SELECTION HVAC Zone Name: Heating System Name: Cooling System Name: System Multiplier: Peak Load Method:' Relative Humidity: 1. DESIGN CONDITIONS FOR Palm Springs 2. SIZING MECH-2 page.16 of 20 --------------------------- Date: 5/2/1994 COMPLY 24 User 2655 Undefined Nonres Zone Day&Night 542GN060-C 8 ,COINCIDENT 50 .COOLING HEATING SENSIBLE LATENT ------- -------- ------ 31 F 113 F 73 F SPACES SERVED BY SYSTEM PEAK ----------------------- ---- Btu/hr ------- PEAK Btu/hr ---- -------- Btu/hr Undefined Retail (Jan 12am) 24070 ------- (Aug 4pm) 25273 ------ 1510 TOTAL SPACE LOAD 24070 -------- 25273 ------ 1510 Duct Gains & Losses: 2407 2527 Ventilation: ( 151 CFM) 6265 5140 -1349 Return Air Lighting Gain ------- 0 TOTAL SYSTEM LOAD 32742 -------- 32940 ------ 161 3. SELECTION A. Safety/Warmup Factor .1.43 1.21 B. Maximum Adjusted Load 46821 39857 C. -Installed Equipment Capacity 609724 313308 117022 If Line 3-C > Line 3-B, Explain: FAN POWER CONSUMPTION No. Efficiency Peak Conv Peak Supply Fan Description Sys BHP Motor Drive HP Fact Watts CFM --------------------- --- ----- ----- ----- ----- ---- ----- ------ Supply Fan 8 x 1.00 [0.79 x 1.00] =10.13 x 746 7554 200'0 ----- ----- ------ Totals 10.13 7554 16000 FAN POWER DEMAND 7554 watts 16000 cfm 0.472 watts/cfm MECHANICAL EQUIPMENT SUMMARY MECH-3 page 17 of 20 -------------------------------------- ------------------------------------- Project Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655 ------------------------------------------------------- -------------------- PLANT EQUIPMENT SUMMARY Fuel Elec Total No. Input Input Output Equipment Name Equipment Type Sys (KBtu) (KW) (KBtu) ----------------------- ------------------- --- ------ ------ ------ Std Gas 50 gal or Less Gas'Fired 1 40.0 0.0 30.4 CENTRAL SYSTEM SUMMARY Sys No No System Name System Type Sys Economizer Type -- -------------------- 7 -- --------------- --- --------------------------- 1, Day&Night 542GN060-C Packaged Heat Pu 8 No Economizer CENTRAL SYSTEM RATINGS Sys ------- Heating ------------------ ---------------- Cooling ---------- No Type Output Aux KW EFF Type Output Sensible EER SEER ----------- ------- ------ ---- ------- ------- -------- ----- ----- 1 Heat Pump 58000 10.0 6.60 DX 58000 40600 7.80 8.90 CENTRAL FAN SUMMARY ------------ Supply Fan ----------- ---- Return Fan --- SYS , Mtr Dry Mtr Dry No Fan Type Motor Location CFM BHP Eff Eff CFM BHP Eff Eff - -- --------------- --------------- ----- ------ --- --- ----- ----- --- --- 1,Constant Volume Draw -Through 2000 1.00 79 100 None ZONAL FAN SUMMARY --------- Zonal Fan ----- ------- Exhaust Fan ----- Mtr Dry Mtr Dry Space Name No CFM BHP Eff Eff No CFM BHP Eff Eff ------------------- -- ----- ------ ---- ---- -- ----- ------ ---- ---- None HVAC ZONE HEATING --------------------------------------------------------------------------- & COOLING LOAD SUMMARY page 18 of 20 .Project Name: LUB SHOP jDate: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES . ICOMPLY 24 User 2655 ---------------------------------------------------- --------------- HVAC ZONE DESCRIPTION HVAC Zone Name: Heating System Name: Cooling System Name: System Multiplier: Fan Schedule: Peak Load Method: Relative Humidity: SPACES IN THIS ZONE PEAK HEATING ----------------------- ---- ------- Undefined Retail (Jan 12am), 24070 TOTAL SPACE LOAD 24070 Duct Gaint & Losses: 2407 .Ventilation: ( 151 CFM) 6265 Return Air Lighting Gain TOTAL SYSTEM LOAD 32742 SYSTEM OUTPUT AT DESIGN CONDITIONS 609724 Undefined Nonres Zone Day&Night 542GN060-C 8 Day Fans STD COINCIDENT 50 COOLING PEAK SENSIBLE LATENT ---- -------- ------ (Aug 4pM) 25273 1510 -------- ------ 25273 1510 2527 5140 -1349 0 -------- ------ 32940 161 313308 117022 NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment which will heat or cool this zone during the design conditions indicated. These numbers include no safety factor, and the HVAC contractor should oversize by a rea'sonable,margin to account for variations in weather conditions and the pick-up capacity required to bring the zone to temper- ature as a result of a setback thermostat. Those responsible for final equipment selection -should note that S&nsible and Latent Cooling Loads are indicated to allow for accurate comparison with manufacturer's output data. SPACE HEATING & COOLING LOAD SUMMARY page 19 of 20 ---------------------------------------------- ---------------------------- Project Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655 1 ------------------------------------------------------ ------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: Undefined Retail COOLING DESIGN CONDITIONS -------------------- HEATING *SENSIBLE LATENT Peak Hour: ------- Jan 12am, -------- Aug 7pm ------ Indoor Conditions: 70 F DB 78 F DB 50 % RH Outdoor Conditions: 31 F DB 97 F DB 57 F WB, LOAD COMPONENT --------------------- Quantity ------------ Btu/hr ------- Btu/hr ------- Btu/hr Wall Conduction 762.0 sqft 10507 8413 ------- .Window Conduction 238.0 sqft 7814 2614 Door Conduction 0.0 sqft 0 - 0 Roof Conduction 755.0 sqft 1039 519 Skylight Conduction 0.0 sqft 0 0 Floor Conduction 0.0 sqft 0 0 Slab Conduction 755.0 sqft 2100 0 Interior Conduction 0.0 sqft 0 0 Infiltration 0.5 AC/hr 2610 1272 -2817 'Solar Gain 238.0 sqft 0 3906 Lighting' 1510.0 watts 0 4130 Receptacle 755.0 watts 0 2577 Process 0.0 watts 0 0 Occupants 7.5 occs 0 1887 1510 SPACE ------- LOADS 24070 ------- 25318 ------- -1307 Heating,AirFlow: 24070 Btu/hr / [1.06 x 35 F DeltaT)] = 646 cfm Cooling AirFlow: .25318 Btu/hr / [1.06 x 23 F DeltaT)] = 1035 cfm PERFORMANCE COMPLIANCE SUMMARY PERF -1 page 20 of 20. --------------------------------------------------------------------------- .Project Name: LUB SHOP Date: 5/2/1994 Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655 ------------------------------------------------------- ------------- DOE-24 (COMPLIANCE) RESULTS NOT CALCULATED