13636 (CSCS) Title 24TITLE 24 REPORT FOR:
LUB SHOP
WASHINGTON AND 111
LA QUINTA, CALIFORNIA
PROJECT DESIGNER:
GARY KNUTSON
(619) 328-4187.
REPORT PREPARED BY:
JOHN H HACKER
JOHN H. HACKER & ASSOCIATES
4501 E. Sunny Dune Rd. Suite C
PALM SPRINGS, CALIFORNIA 92264
(619) 327-4565
Job Number:
Date: 5/2/1994
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building.Energy Efficiency Standards.
. r'A'
Table Of Contents for Title 24 Report
-------------------------------------
CoverPage ........................................................... 1
Table of Contents .................... 2
Form tNV-1 Envelope Certificate of Compliance ....................... 3
Form ENV -2 Envelope Summary ......................................... 5
Form LTG -1 Lighting Certificate of Compliance ....................... 9
Form LTG -2 Lighting Compliance summary .............................. 11
Form LTG -3 Lighting Controls Credit Worksheet ........................ 12
Form MECH-1 Mechanical Certificate of Compliance ...................... 13
Form MECH-2 mechanical Summary ...................................... 16
Form MECH-3 Mechanical Equipment Summary ............................ 17
HVAC Zone & Space -Loads Summary ..................................... 18
Form PERF -1 Performance Compliance Summary .......................... 20
0
CERTIFICATE OF COMPLIANCE (part 1 of 2) ENV -1 page 3 of 20
------------------------------------------------------- 7 -------------------
Project Name: LUB SHOP Date: 5/2/1994
Address: WASHINGTON AND 111.
LA QUINTA, CALIFORNIA IBuilding Permit No
Envelope
Designer: GARY KNUTSON
Checked by / Date
Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655
---------------------------------------------------------------------------
GENERAL INFORMATION
Date of Plans: Building Conditioned Floor Area: 755 sf
Building Type: Nonresidential Climate Zone: 15
Phase of Construction: New Construction 0 Addition Alteration
Method of Envelope Compliance: Prescriptive overall Envelope
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4,,Article 1 of the California Code of Regula-
tions. This certificate applies only to building envelope requirements.
The Principal Envelope Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the envelope requirements
contained in sections 110, 116 through 118, and 143 or 149 of.Title 24,
Part 6, Chapter 1.
-Please check one:
I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
or architect.
0 1 affirm that I am eligible'under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I -am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
.0 1 affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section of the
Code to sign this document as the person responsible for its
preparation; and for the following reason:
PRINCIPAL ENVELOPE DESIGNER
GARY KNUTSON
(619) 328-4187 (S�kjnidtiire)
(Lic. (Date)
ENVELOPE MANDATORY MEASURES
.Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF
---------------------------------------------------------------------------
COMPLIANCE (part 2 of 2)
ENV -1
page 4 of 20
Project Name:
LUB SHOP
JDate:
5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES I ICOMPLY 24 User 2655
---------------------------------------------------------------------------
OPAQUE SURFACES Const
Assembly Name Type
----------------------- -----
811 Solid CMU R-3 Metal
811 Solid CMU Wall None
R-30 Roof(R.30.2xl2.16) Wood
FENESTRATION Frame
Note to
Location/Comments Field
--------------------------------- -------
orient
--------
Panes
-----
Type
-----
Exterior Shade
--------------------------
OH
Glazing
-----------------------
Type
Front
(E)
2
Metal
None
Y
Double
Clear
Default(N)
Left
(S)
2
Metal
None
Y
Double
Clear
Default(N),
Left
(S)
2
Metal
None
Y
Double
Clear
Default(N)
Back
(W)
1
Metal
None
Y
Single
Clear
Default(N)
a
OVERALL ENVELOPE METHOD Part 1 of 4 ENV -2 page 5 of 20
---------------------------------------------------------------------------
Project Name: LUB SHOP JDate: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655
--7 ------------------------------------------------------------------------
WINDOW AREA TEST
13
A. Display Perimeter 0.0 ft X 6 ft = 0.0 sf Display Area
B. Gross Exterior Wall Area 1000.0 sf X 0.40 = 400.0 sf 40% Area
C. Gross Exterior Wall Area 1000.0 sf X 0.10 100.0 sf Min Std Area
D. Enter Larger of A or B 4 \ 00.0 sf Max Std Area
E. Enter Proposed Windpw Area 238.0 sf Proposed Area
If E is greater than D or less than C, proceed to the next calculation
for window area adjustment. If not, go to part 2 of 4.
1. If E is greater than D:
D. Maximum Standard Area
------------------------
N/A
2. If E is less than C:
E. Proposed Area
----------------
N/A
C. Minimum Standard Area E. Proposed Area
------------------------ ---- 7 -----------
. N/A N/A
SKYLIGHT AREA TEST
Window
Adjustment Factor
-----------------
N/A
Window
Adjustment Factor
-----------------
N/A
Atrium Height
-------------
0.0 ft
If Height < 55 ft If Height >=-55 ft
Standard = 5% --------------------- Standard = 10%
V
A. Gross Exterior Roof Area 755.0 sf X 0.05 37.8 sf Standard Area
B. Enter Proposed Skylight Area 0.0 sf Proposed Area
If the Proposed Skylight Area is greater than.the Standard Skylight Area,
proceed to the next calculation for the skylight area adjustment. If not
got,to part 2 of 4.
1. If Proposed Skylight Area > Standard Skylight Area:
1, - Skylight
Standard Skylight Area Proposed Skylight Area Adjustment Factor
- ---------------------- ---------------------- -----------------
N/A N/A N/A
OVERALL ENVELOPE METHOD Part 2 of 4 ENV -2 page 6 of 20
---------------------------------------------- ----------------------------
Project.Name: LUB SHOP Date: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655
--------------------------- 1� ------------------------------ --- ------------
OVERALL HEAT LOSS
A . . .
PROPOSED
Adj.
STANDARD
Assembly Name
-----------------------
Area
HC
U -Val
UxA
Area
U--�Val
UxA
811 Solid CMU
R-3
------
200.0
----
17.2
-----
0.199
------ ------
39.-8
200.0
----- ------
0.400
80.0
811 Solid CMU
R-3
276.0
17.2
0.199
54.9
276.0
0.400
110.4
811 Solid CMU
R-3
46.0
17.2
0.199
9.2
46.0
0.400
18.4
811 Solid CMU
Wall
240.0
16.7
0.690
165.5
240.0
0.400
96.0
R-30 Roof(R.30.2xl2.16)
755.0
4.2
0.035
26.6
755.0
0.057
43.0
Double Clear
Default(N)
24.0
N/A
17.3
24.0
0.720
17.3
Double Clear
Default(N)
134.0
N/A
0.720
96.5.
134.0
0.720
96.5
Double Clear
Default(N)
20.0
N/A
0.760
15.2
20.0
0.720
14.4
Single Clear
Default(N)
60.0
N/A
1.190
71.4
------
60.0
0.720
43.2
Total
496.4
------
Total
519.2
OVERALL
HEAT LOSS COMPLIES
PROPOSED
UA <=
STANDARD
UA
A . . .
OVERALL
----------------------------------------------
ENVELOPE METHOD Part 3
of 4
----------------------------
ENV -2
page 7
of 20
Project
Name: LUB SHOP
Date:
5/2/1994
Documentation: JOHN H.
--------------------
HACKER &
------------------------------
ASSOCIATES
COMPLY
-------
24 User
-------------
2655
OVERALL
HEAT GAIN
PROPOSED
STANDARD
Glazing
--------------
WF
---- ------
Area SC
----
H
----
V
OHF
Total
Area
RSHG Total
East
1.08
24.0 0.88
2.0
----
2.1
----
0.44
------
10.1
------
24.0
---- -------
0.57
14.8
South
1.12
134.0 0.88
8.0
9.1
0.44
57.8
134.0
0.57
85.5
South
1.12
20.0 0.88
2.0
7.1
0.71
14.0
20.0'0.57
12.8
West
1.13
60.0 0.75
10.0
8.1
0.43
21.9
60.0
0.57
38.6
Total 103.7. Total 151.7
OVERALL HEAT,GAIN COMPLIES PROPOSED HG <= STANDARD HG
OVERALL ENVELOPE METHOD
--.i -------------------------------------------------------------------------
Part 4 of 4
Skylt
ENV -2
page 8
of 20
Project Name: LUB SHOP
Area
0.0
------
------
0.0000 0.0
------
------
755.0
Date:
5/2/1994
------
755.0
Documentation: JOHN H.
------------------------------------------------------
HACKER'&
ASSOCIATES
COMPLY 24 User
------ -------------
2655
Window,Area Adjustment
Calculations
Adjusted
Gross Door
Window
Adjust
Window
Wall
Wall Name
-----------------------
Dir
---
Area Area
-----
Area
Factor
Area
Area
,Undefined North
N
------
200.0
------
0.0
------
1.0000
------ ------
0.0
200.0
Undefined.East
E
300.0
24.0
1.0000
24.0
276.0
Undefined South
S
200.0
154.0
1.0000
154.0
46.0
Undefined West
W
300.0
------
60.0
------
1.0000
60.0
240.0
TOTALS
1000.0 0.0
238.0
------ ------
238.0
762.0
Skylight Area Adjustment Calculations
Gross
Roof Name Dir Area
----------------------- --- -----
Undefined R-30 Roof H 755.0
TOTALS 755.0
U
Adjusted
Skylt
Adjust Skylt
Roof
Area
------
Factor Area
------
Area
0.0
------
------
0.0000 0.0
------
------
755.0
-0.0
0.0
------
755.0
U
CERTIFICATE OF
------------------------------------------------------------------------
COMPLIANCE (part 1 of.2)
LTG -1
page 9 of
Project Name:
LUB SHOP
JDate:
5/2/1994
Address: WASHINGTON AND 111
LA QUINTA, CALIFORNIA
Lighting
Designer:
20
Building Permit No
Checked by / Date
Documentation: JOHN H. HACKER & ASSOCIATES 1COMPLY'24 User 2655
--------------------------------------------------- ---------------
GENERAL INFORMATION
Date of Plans: Building Conditioned Floor Area: 755 sf
Building Type: Nonresidential Climate Zone: 15
Phase of Constructi ' on: XNew Construction 0 Addition h1teration
Method ofLighting Compliance: Prescriptive
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building lighting requirements.
I
The Principal Lighting Designer
ing design represented in this
with the other compliance forms
and with any other calculations
The proposed building has been
contained in sections 110, 119,
Please check one:
hereby certifies that the proposed build -
set of construction documents is consistent
and worksheets, with the specifications,
submitted with this permit application.
designed to meet the lighting requirements
130 through 132 and 146 or 149.
I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
electrical engineer or architect.
0 1 affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
0 1 affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section of the
Code to sign this document.as the person responsible its
preparation; and for the following reason:
PRINCIPAL LIGHTING DESIGNER
12o e
N Signature) (Lic. (Date)
LIGHTING MANDATORY MEASURES
.Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF COMPLIANCE (part 2 of 2) LTG -1 page 10 of 20
---------------------------------------------------------------------------
.Project Name: LUB SHOP Date: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655
-------------------------- 7 ---------------------------------- ------------
INSTALLED LIGHTING SCHEDULE
CONTROLS FOR CREDIT
� Control Note to
Control Location ID Control Type Space Controlled Field
---------------- ------- --------------- ---------------------- -------
I
No of
Watts/ Ballast
Ballasts/ No of
Note to
Name Lamp Type
----- ------------
Lamps
------
Lamp Type
------
Luminaire Fixt.
Field
Fluorescent
4
----------
34 Standard
--------- -----
2.0 8
-------
Incandescent
60 n/a
n/a 4
MANDATORY AUTOMATIC
CONTROLS
Control
Note to
Control Location
---------------- -------
ID
Control Type Space
--------------- ----------------------
Controlled
Field
-------
CONTROLS FOR CREDIT
� Control Note to
Control Location ID Control Type Space Controlled Field
---------------- ------- --------------- ---------------------- -------
I
LIGHTING COMPLIANCE SUMMARY LTG -2 page 11 of 20
---------------------------------------------------------------------------
Project Name: LUB SHOP JDate: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655
----------------------------------------------------- ---------------
ACTUAL LIGHTING POWER
No of Watts Total
Name Description
----- -----------------------------------------
Lumin
-----
per Default
Watts
4811 T-12 Low
Watt /4 Lamp
8
--- -------
144.0�
-----
1152.0
60 w Surface
Mount Incandescent
4
60.0
240.0
SubTotal
1392
Less Control
Credits (LTG -3)
0
Total Proposed Watts
1392
If not CEC-Default value, please provide supporting
documentation.
ALLOWED LIGHTING POWER BY SPACE
Allowed
Floor
LPD Total Tailored
Space Name
-----------------------
Occupancy
----------------------
Area
-----
(w/sf) (watts) (watts)
------
Undefined Retail
Retail/Wholesale
Sales 155
-----
------- -------
2.'200 1661
------
0
TOTALS
755
------- -------
2.200 1661
0
Note: Tailored Allotment requires supporting documentation on f6rm. LTG -4.
4
LIGHTING CONTROLS CREDIT WORKSHEET LTG -3 page 12 of 20
---------------------------------------------------------------------------
Project Name: LUB SHOP Date: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655
-------------------------------------------------------------------
LIGHTING CONTROLS BY SPACE
Floor Watts Adj.. Control
Spade Name Control Description Area Ctrld Fctr Credit
TOTAL 0
CERTIFICATE OF COMPLIANCE (part 1 of 3) MECH-1 page 13 of 20
---------------------------------------------------------------------------
Project Name: LUB SHOP Date: 5/2/1994
Address: WASHINGTON AND 111
LA QUINTA, CALIFORNIA Building Permit No
Mechanical
Designer:
Checked by / Date
Documentation: JOHN H. HACKER & ASSOCIATES . ICOMPLY 24 User 2655
----------------------------------------------------- ----------------
GENERAL INFORMATION
Date of Plans: Building Conditioned Floor Area: 755 sf
Building Type: Nonresidential Climate Zone: 15
Phase.of Construction: New Construction 0 Addition Alteration
Method of Mechanical Compliance: Prescriptive
Proof of Envelope Compliance: 0 Previous Permit 0 Compliance Attached
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building mechanical requirements.
Th� Principal Mechanical Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the mechanical requirements
contained in sections 110 through 115, 120 through 124, 140 through 142,144
and 145.
Please check one:
I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
mechanical engineer or architect.
0 1 affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its prepara ' tion; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
0 1 affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section of the
Code to sign this document as the person responsible for its
preparation; -and for the following reason:
PRINCIPAL MECHANICAL DESIGNER
ignature) (Lic. #) (Date)
MECHANICAL MANDATORY MEASURES
Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF
---------------------------------------------------------------------------
COMPLIANCE (part 2 of 3)
MECH-1
page 14 of 20
Project Name:
LU B SHOP
# of Isolation Zonesn/a
JDate:
5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 26.55
----------------------------------------------------- --------------
SYSTEM FEATURES Note to
Field
Zone Name
Undefined Nonres Zone
Time Control
S:Prog Switch
Setback Control
Both.
# of Isolation Zonesn/a
HP Thermostat
Yes
Electric Heat
10.0 KW
Fan Control
Constant Volume
VAV Min Position
n/a
Simul. Heat/Cool
n/a
�Heat Supply.Reset
Constant Temp
Cool Supply Reset
Constant Temp,
Ventilation
OA Damper Control
Economizer Type No Economizer
Outdoor Air CFM 151
Heat Equip Type Heat Pump
Make & Model No. Day&Night 542GN060-C
Cool Equip Type DX
Make and Model
Code Tables
Time Control
Ventilation
'OA Damper
S:Prog Switch
B:Air Balance
A:Auto
O:Occ Sensor
C:OA Cert.
G:Gravity
M:Man Timer
M:OA Measure
D:Demand Cont
.N:Natural
CERTIFICATE OF COMPLIANCE (part 3 of 3)
- ---------------------------------------------------------------------------
MECH-1
page 15 of 20
Project Name: LUB.SHOP
Date:
5/2/1994
Documentation: JOHN H.
------------------------------------------------------
HACKER & ASSOCIATES
COMPLY 24 User 2655
------- -------------
DUCT INSULATION
Duct Tape
Insul Note to
System Name
-------------- ---------
-Type- Duct Location
-------
Allowed
R -Val Field
7
Day&Night 542GN060-C
-------------------
Heating Ducts in Attic
-------
Y N
----- -------
4.2
Cooling Ducts in Attic
Y N
4.2
PIPE'INSULATION
Insul
Note to
System Name
-----------------------
Pipe Type Required
----------- --------
Field
Domestic Hot,Water
Y / N
-------
NOTES TO FIELD - For Building Department Use Only
------------------------------------------------------------------------
MECHANICAL SIZING AND FAN POWER
------------------------------------------------
Project Name: LUB SHOP
Documentation: JOHN H. HACKER & ASSOCIATES
------- ; ------------------------------------------
SIZING AND EQUIPMENT SELECTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Peak Load Method:'
Relative Humidity:
1. DESIGN CONDITIONS FOR Palm Springs
2. SIZING
MECH-2 page.16 of 20
---------------------------
Date: 5/2/1994
COMPLY 24 User 2655
Undefined Nonres Zone
Day&Night 542GN060-C
8
,COINCIDENT
50
.COOLING
HEATING SENSIBLE LATENT
------- -------- ------
31 F 113 F 73 F
SPACES SERVED BY SYSTEM PEAK
----------------------- ----
Btu/hr
-------
PEAK Btu/hr
---- --------
Btu/hr
Undefined Retail (Jan 12am)
24070
-------
(Aug 4pm) 25273
------
1510
TOTAL SPACE LOAD
24070
--------
25273
------
1510
Duct Gains & Losses:
2407
2527
Ventilation: ( 151 CFM)
6265
5140
-1349
Return Air Lighting Gain
-------
0
TOTAL SYSTEM LOAD
32742
--------
32940
------
161
3. SELECTION
A. Safety/Warmup Factor .1.43 1.21
B. Maximum Adjusted Load 46821 39857
C. -Installed Equipment Capacity 609724 313308 117022
If Line 3-C > Line 3-B, Explain:
FAN POWER CONSUMPTION
No. Efficiency Peak Conv Peak Supply
Fan Description Sys BHP Motor Drive HP Fact Watts CFM
--------------------- --- ----- ----- ----- ----- ---- ----- ------
Supply Fan 8 x 1.00 [0.79 x 1.00] =10.13 x 746 7554 200'0
----- ----- ------
Totals 10.13 7554 16000
FAN POWER DEMAND 7554 watts 16000 cfm 0.472 watts/cfm
MECHANICAL EQUIPMENT SUMMARY MECH-3 page 17 of 20
-------------------------------------- -------------------------------------
Project Name: LUB SHOP Date: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES ICOMPLY 24 User 2655
------------------------------------------------------- --------------------
PLANT EQUIPMENT SUMMARY Fuel Elec Total
No. Input Input Output
Equipment Name Equipment Type Sys (KBtu) (KW) (KBtu)
----------------------- ------------------- --- ------ ------ ------
Std Gas 50 gal or Less Gas'Fired 1 40.0 0.0 30.4
CENTRAL SYSTEM SUMMARY
Sys No
No System Name System Type Sys Economizer Type
-- -------------------- 7 -- --------------- --- ---------------------------
1, Day&Night 542GN060-C Packaged Heat Pu 8 No Economizer
CENTRAL SYSTEM RATINGS
Sys ------- Heating ------------------ ---------------- Cooling ----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
----------- ------- ------ ---- ------- ------- -------- ----- -----
1 Heat Pump 58000 10.0 6.60 DX 58000 40600 7.80 8.90
CENTRAL FAN SUMMARY ------------ Supply Fan ----------- ---- Return Fan ---
SYS , Mtr Dry Mtr Dry
No Fan Type Motor Location CFM BHP Eff Eff CFM BHP Eff Eff
- -- --------------- --------------- ----- ------ --- --- ----- ----- --- ---
1,Constant Volume Draw -Through 2000 1.00 79 100 None
ZONAL FAN SUMMARY --------- Zonal Fan ----- ------- Exhaust Fan -----
Mtr Dry Mtr Dry
Space Name No CFM BHP Eff Eff No CFM BHP Eff Eff
------------------- -- ----- ------ ---- ---- -- ----- ------ ---- ----
None
HVAC ZONE HEATING
---------------------------------------------------------------------------
& COOLING LOAD SUMMARY
page 18 of 20
.Project Name: LUB
SHOP
jDate:
5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES . ICOMPLY 24 User 2655
---------------------------------------------------- ---------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK HEATING
----------------------- ---- -------
Undefined Retail (Jan 12am), 24070
TOTAL SPACE LOAD 24070
Duct Gaint & Losses: 2407
.Ventilation: ( 151 CFM) 6265
Return Air Lighting Gain
TOTAL SYSTEM LOAD 32742
SYSTEM OUTPUT AT DESIGN CONDITIONS 609724
Undefined Nonres Zone
Day&Night 542GN060-C
8
Day Fans STD
COINCIDENT
50
COOLING
PEAK SENSIBLE LATENT
---- -------- ------
(Aug 4pM) 25273 1510
-------- ------
25273 1510
2527
5140 -1349
0
-------- ------
32940 161
313308 117022
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a rea'sonable,margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection -should note that S&nsible and Latent Cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
SPACE HEATING & COOLING LOAD SUMMARY page 19 of 20
---------------------------------------------- ----------------------------
Project Name: LUB SHOP Date: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655
1
------------------------------------------------------ -------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
Undefined Retail
COOLING
DESIGN CONDITIONS
--------------------
HEATING
*SENSIBLE
LATENT
Peak Hour:
-------
Jan
12am,
--------
Aug 7pm
------
Indoor Conditions:
70
F DB
78 F DB
50 % RH
Outdoor Conditions:
31
F DB
97 F DB
57 F WB,
LOAD COMPONENT
---------------------
Quantity
------------
Btu/hr
-------
Btu/hr
-------
Btu/hr
Wall Conduction
762.0
sqft
10507
8413
-------
.Window Conduction
238.0
sqft
7814
2614
Door Conduction
0.0
sqft
0
- 0
Roof Conduction
755.0
sqft
1039
519
Skylight Conduction
0.0
sqft
0
0
Floor Conduction
0.0
sqft
0
0
Slab Conduction
755.0
sqft
2100
0
Interior Conduction
0.0
sqft
0
0
Infiltration
0.5
AC/hr
2610
1272
-2817
'Solar Gain
238.0
sqft
0
3906
Lighting'
1510.0
watts
0
4130
Receptacle
755.0
watts
0
2577
Process
0.0
watts
0
0
Occupants
7.5
occs
0
1887
1510
SPACE
-------
LOADS
24070
-------
25318
-------
-1307
Heating,AirFlow:
24070 Btu/hr
/ [1.06
x 35
F DeltaT)]
= 646 cfm
Cooling AirFlow:
.25318 Btu/hr
/ [1.06
x 23
F DeltaT)]
= 1035 cfm
PERFORMANCE COMPLIANCE SUMMARY PERF -1 page 20 of 20.
---------------------------------------------------------------------------
.Project Name: LUB SHOP Date: 5/2/1994
Documentation: JOHN H. HACKER & ASSOCIATES COMPLY 24 User 2655
------------------------------------------------------- -------------
DOE-24 (COMPLIANCE) RESULTS NOT CALCULATED