Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
05-3263 (CSCS) Title 24
TITLE 24 REPORT Title 24 Report for: tThe:--Dunes_Retail-Center (Building—EB- - Parcel 4 (Highway 111) La Quinta, CA Project Designer: KKE Architects, Inc 525 East Colorado Boulevard Pasadena, CA 91101 626-796-8230 Report Prepared By: SIA GARESTANI, P.E. SPEC Engineering 6800 Owensmouth Ave. #140 Woodland Hills, CA 91303 (818) 59)-6643 Job Number: 05-250 Date: 10/3/2005 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FORCONS TR ON DA fiD —1*(C BY L The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number: 05-250 User Number: 3358 TABLE OF CONTENTS Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV-MM Envelope Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary 1 2 3 12 13 15 EnergyPro 3.1 By EnergySoft Job Number: 05-250 User Number: 3358 I PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1 )JECT NAME The Dunes Retail Center (Building "B EJECT ADDRESS Parcel 4 (Highway 111) La Quinta NCIPAL DESIGNER - ENVELOPE KKE Architects, Inc 'UMENTATION AUTHOR SPEC Engineering TELEPHONE 626-796-8230 TELEPHONE (818) 592-6643 DATE 10/3/2005 Building Permit#. Checked by/Date. Enforcement Agency Use GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 07-14-05I 8,762 Sq.Ft. 15 BUILDING TYPE [& NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION u NEW CONSTRUCTION ADDITION ALTERATION EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Building using pert ance compliance approach. DOCUMENTATION AUTHOR SIGNATURE DATE SIA GARESTANI, P.E. _ IQ-d3- The Principal Designers hereby certify that the proposed buildin sign represented in the construction documents and modelled for this permit application are consistent with all other forms a eworksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed me s the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. ❑ ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) , ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Fo s V-1 _ PRINCIPAL ENVELOPE DESIGNER - NAME SIGNAT LIC. NO. DATE KKE Architects Inc i.•"ii'i�� 1 ,O;.Qg' LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms Th1S Sabmittal PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required For s H-1 MECH-2, MECH-3 PRINCIPAL MECHANICAL DESIGNER - NAME SIGNAT LIC. NO. DATE SIA GARESTANI P.E. _ �t4-Z&42-[O 10-03- IEnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Pane:3 of 18 PERFORMANCE CERTIFICATE. OF COMPLIANCE Part 2 of 3 1 PERF .. The Dunes Retail Center Buildin "B" - DATE" 10/3/2005... ANNUAL SOURCE -ENERGY. USE SUMMARY kBtu/s ft- r . . - Standard ENERGY COMPONENT Design Space Heating 1.68' Space Cooling 63.41 Indoor Fans 18.22 Heat Rejection 0.00 •Pumps & misc. 0.010 Domestic Hot Water" 6.00 Lk hting 50.66 • Receptacle 15.02 Process33.90'_33:90.0.00�' , TOTALS: 183.18 ° Percent better than Standard: Proposed Design 1.54 61.67 18.42 0.00 0.00 0.00 50.06 - 15.92 181.50. 0.9% - Compliance Margin � ,.. 9-t i 3—n c i i KRA MEB P.[oposea -.; 0.14 u raw M y zF�:l':.i�.t,.Y3EXr. •R ",�' 'per" tF�`Rii 3 �''YA43"'}¢.pti.�i . T DH�YJiP� z L•�i tt�- v S��fi%FE&9EhtE2 9ESyt h P. •� 0 10 kelwsgn `� Y Rao �i process) 1.75 -0.21% 0.00 6.00 0.00 0.00 1.68 ( 1.1 % excluding BUILDING COMPLIES-1 GENERAL INFORMATION Building Orientation Number of Stories' Numberof:: Systems Number of Zones South 180 deg = Conditioned Floor Area 8,762 sgft. 7, 1 Unconditioned Floor Area ., o Sqn. 4 Conditioned Footprint Area.;'. .o sgft_ 4 t Orientation Gross Area, Glazing Area -Glazing Ratio • Front Elevation (South) 2,244sgft. 712 sgft. 31.7% Left Elevation (west) 0 5gft.. 0 sgn. ' o.o°io Rear.Elevatlon ` (North) 1,986 sgft. 0 Right Elevation -rot al - (East) 0 4,230 5 qft. sgft. 0 " : 712 sgft. _ sgft. oj 0.oo ROOF 8,762 `sgft.sgft. Standard Proposed. LEtIP Energy_& AtrntLsRhere CrQdit: Lighting Power Density t1:700 wisgft., f 1:700 wisgft., ' : Savings vs. Title 241 Prescriptive Env. Heat Loss 1,144 Btum: 1;412 arum Energy Performance CreditZ o Points'. Prescriptive Env. Heat Gain 142;509 Btu/h-F 153,041 scum-F 1: excludes process and receptacle2. see LEE& table 8-c or 84 Remarks: ,. Run Initiation Time: 10/03/05 10.58.10 Run Code! ' 112a362290 EneegyPro 3.1 by EnergySoft User Number.-3358 Job'Number 05-250 P lae•4 of 18 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1 PROJECT NAME DATE The Dunes Retail Center(Building "B" 10/3/2005 ZONE INFORMATION Floor Inst. Port. C4rl :Tailored P, Area LPD LPD Credits s LPQ Loads System Name Zone Name Occupancy Type (sqft.) (Wlsf)1 (W/sf)1 „ W/s 2 , .,(W/sf):3 (W%sf) �! RTU-4 Building "B" Comp Bldg RetailMholesale 2,651 -1.700 2:000, RTU-5 Building "B" Comp Bldg RetalUWholesale 1,848 -1.700 ¢2:000 RTU-6 Building "B" Comp BIdq Retail/Wholesale 2,451 "1.700 z, 2;000 RTU-7 Building "B" Comp Bldg RetaiUWholesale 1,812 '1.700 F 2:000. t � `M1 yy A Notes: 1. See LTG-1 (items marked with asterisk, see LTG-2 by others) 2. See LTG-3 3. See LTG-4 Items above require special docurrientation <<..,, ., ..:::w EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST . at ctuvtt cntcm ayctwy mwuiu pay bpeciai attention to the Items SpecITiea In this cneCKIISt. f nese Items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentatinn cuhmittari The Zone "Building "B"" has a Display Perimeter Credit of 24 ft. I -loll I r, IeIU The Zone "Building "B"" has a Display Perimeter Credit of 17 ft. The Zone "Building "B"" has a Display Perimeter Credit of 24 ft. The Zone "Building "B"" has a Display Perimeter Credit of 17 ft. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run Initiation Time: 10/03/05 10:58:10 Run Code: 1128362290 EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 - Page:5 of 18 ENVELOPE COMPLIANCE SUMMARY Performance ENV-1 PROJECT NAME DATE The Dunes Retail Center(Building "B" 10/3/2005 OPAQUE SURFACES # Surface Type Framing Type Area U-Fac. Act. Azm. Solar Gains Tilt y/N Form 3 Reference Location / Comments 1 Roof Wood 2.651 0.035 0 0 X R-30 Roof R.30.2x12.16 Building "B" 2 Wall Wood 608 0.065 180 90 R-19 Wall .19.2x6.16 Building "B" 3 lWall lWood 450 0.065 0 90 X R-19 Wall W.19.2x6.16 Building "B" 4 Roof Wood 1,848 0.051 0 0 R-19 Roof R.19.2x8.16 Building "B" 5 Wall Wood 272 0.065 180 90 x R-19 Wall W.19.2x6.16 Building "B" 6 Wall Wood 450 0.065 0 90 X R-19 Wall W.19.2x6.16 Building "B" 7 Wall Wood 630 1 0.065 0 1 90 X11 JR-19Wall W.19.2x6.16 Building "B" 8 Wall Wood 375 0.065 180 90 X1 R-19 Wall (W.19.2x6.16) Building "B" 9 Roof Wood 2,451 0.035 0 0 X R-30 Roof R.30.2x12.16 Building "B" 10 Wall Wood 456 0.065 0 9F X R-19 Wall W.19.2x6.16 Building "B" 11 lWall lWood 277 0.065 180 90 R-19 Wall W.19.2x6.16 Building "B" 12 Roof Wood 1,812 0.035 0 0 X R-30 Roof (R.30.2x12.16) Building "B" FENESTRATION SURFACES Site Assembled Glazing 1-1c;necK box It building is - 100,000 sgft of CFA and - 10,000 sgft vertical glazing then NFRC Certification is required. Follow NFRC inn -SR Prnr2ri11rP4 and cnhmif NFRrt I nhcl Ccrfifi-fa Fnrm # I Type Area U-Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 100 1.190 180 0.82 Single Clear Default NM Buildin "B" 2 Window 178 1.190 180 0.82 Single Clear Default NM Buildin "B" 3 Window 255 1.190 180 0.82 Sin le Clear Default NM Buildin "B" 4 Window 179 1.190 180 0.82 Single Clear Default NM Buildin "B" EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. Hat. LExt.RExt. Dist. Len. H t. Dist. Len. Hat. 1 None 0.76 10.5 9.5 11.0 0.1 11.0 11.0 2 None 0.76 10.5 17.0 4.0 0.1 4.0 4.0 3 None 0.76 10.5 24.2 11.0 0.1 11.0 11.0 4 None 0.76 10.5 17.0 4.0 0.1 4.0 4.0 Run Initiation Time: 10 03/0 0:58:10 Run Code: 1128362290 EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:6 of 18 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE The Dunes Retail Center (Building "B") 10/3/2005 SYSTEM FEATURES MECHANICAL SYSTEMS SYSTEM NAME :N1'E OTE;TO RTU-4 RTU-5 RTU-6 TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION I R-VALUE COOLING DUCT LOCATION R-VALUE VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto Fixed Temp Non-Inte 904 cfm Heat Pump 3.30 COP Packaged DX 10.3 EER CARRIER 50HJQ009 Yes No Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Temp. Constant Temp n/a Air Balance Auto No Economizer 630 cfm Heat Pump 3.40 COP Packaged DX 10.5 EER CARRIER 50HJQ007 Yes No Ducts in Attic 4.2 Ducts in Attic 4.2 7 No Programmable Switch Heating & Cooling Require n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto Fixed Temp Non-Inte 836 cfm Heat Pump 3.30 COP Packaged DX 10.3 EER CARRIER 50HJQ009 Yes No Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above HEAT PUMP THERMOSTAT? Y: Yes N: NO TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch 0: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD 0: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATIONOUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B: Air Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural A: Auto G: Gravity A: Air W: Water N: Not Required EC: Economizer Control See Section 1AA1.11 Enter Outdoor Air CFM. Note: This shall be no less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE & \3 r.K� � ^� ^^t Y '��'i�' 'F �y'�L S � 4 .5 ,��'• v � '4-r !*� �'� �.i'Twt4Q.iq ?S-_� /� � 'fit Run Initiation Time: 10/03/05 10:58:10 Run Code: 1128362290 EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:7 of 18 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE The Dunes Retail Center(Building "B" 10/3/2005 SYSTEM FEATURES MECHANICAL SYSTEMS SYSTEM NAME RTU-7 ^NO7 E TO Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 618 cfm Heat Pump 3.40 COP Packa ed DX 10.5 EER CARRIER 50HJQ007 Yes No Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: NO TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch 0: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD 0: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATIONOUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B: Air Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural A: Auto G: Gravity A: Air W: Water N: Not Required EC: Economizer Control See Section 144e3 Enter Outdoor Air CFM. Note: This shall be no less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE NOTES TO FIELD - For Building Use Only l .v t •. Run Initiation Time: 10/03/05 10:58:10 Run Code: 1128362290. EnergyPro 3.1 By Energysoft User Number: 3358 Job Number: 05-250' Page:8 of 18 y r MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME The Dunes Retail Center (Building "B") ]DATE 10/3/2005 CHILLER AND TOWER SUMMARY Efficiency Tons PUMPS Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control /BOILER SUMMARY TANK INSUL. Energy Factor or Recovery I Efficiency Standby Loss or Pilot System Name System Type Distribution Type Qty Rated Input (Gals.) Vol. Ext. R-Val. FT CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type CARRIER 50HJQ009 Packaged DX 2 96,000 0.0 3.30 COPI 102,300 77,20010.3 EER Fixed Temp (Non-Inte ' CARRIER 50HJ0007 Packaged DX 2 69,000 0.0 3.40 COP 76,000 56,40010.5 EER No Economizer EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:9 of 18 IMECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-21 (PROJECT NAME The Dunes Retail Center (Building "B") I DATE10/3/2005 MMARY VAV TERMINAL BOX TERMINAL FAN Min. CFM Reheat Coil Motor Drive System Type Qtv. Ratio Type DeltaT CFM BHP Eff. Eff. MMARY Room Name q , CFM BHP Motor Eff. Drive Eff. Type EXHAUSTFAN Room Name Q CFM BHP Motor Eff. Drive Eff. EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:10 of 1 MECHANICAL VENTILATION MECH-3 PROJECT NAME The Dunes Retail Center (Building "B") DATE 10/3/2005 MECHANICAL VENTILATION o ©© o 0 0© o o a a AREA BASIS OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOOF AIR CFM VAV MIN. RATIO TRANS. FER AIR ZONE/SYSTEM COND. AREA (SF) CFM PER SF MIN. CFM (B x C) NO. OF PEOPLE CFM PER PERSON MIN. CFM (EXF) Building "B" 2,651 0.23 610 60.2 15.0 904 904 904 RTU4 Total 904 904 Building "B" 1,848 0.23 425 42.0 15.0 630 630 630 RTU-5 Total 630 630 Building "B" 2,451 0.23 564 55.7 15.0 836 836 836 RTU-6 Total 836 836 Building "B" 1,812 0.23 4171 41. 15.0 618 618 618 RTU-7 Total 618 618 C E I K Minimum Ventilation Rate per Section 121, Table 1-F, Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H-J). EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:11 of 18 ENVELOPE MANDATORY MEASURES ENV-MM PROJECT NAME DATE The Dunes Retail Center (Buildinq "B") 10/3/2005 DESCRIPTION Designer Enforcement § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. F§ 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). FXJ § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U-value according to NFRC procedures. X❑ § 118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls In nonresidential buildings shall have Insulation with an installed R-value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:12 of 18 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM NAME The Dunes Retail Center (Buildina "B DATE 10/3/2005 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies X § 111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. , X] § 115(a) Fan type central furnaces shall not have a pilot light. / X] § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. X❑ § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: X❑ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the / requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during \// off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ § 122(e)1 B An occupancy sensor to control the operating period of the system; or ❑X § 122(e)1C A 4-hour timer that can be manually operated to control the operating period of I� the system. X § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. ❑ § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with ^ isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ❑ § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. 1 § 112(b) Heat pumps shall be installed with controls to prevent electric resistance N /� supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:13 of 18 (MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE The Dunes Retail Center (Building "B") 10/3/2005 Description Designer Enforcement Ventilation - 0 § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. FXJ § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air Intakes and discharges of all space conditioning and exhaust systems. a§ 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. IN § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or / Associated Air Balance Council (AABC) National Standards (1989); or X❑ § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous 1 %� basis and displaying that quantity on a readily accessible display divice; or § 121(04 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. 0 § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the / outlet temperature to 110 degrees F. ✓/ X] § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per V minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self -closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self -closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self -closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:14 of 18 iVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center Building"B") 10/3/2005 SYSTEM NAME FLOOR AREA RTU-4 2,651 Number of Systems 1 Heating System Output per System 96,000 Total Output (Btuh) 96,000 Output (Btuh/sgft) 36.2 Cooling System Output per System 102,300 Total Output (Btuh) 102,300 Total Output (Tons) 8.5 Total Output (Btuh/sgft) 38.6 Total Output (sgft/Ton) 310.9 Air System CFM per System 3,400 Airflow (cfm) 3,400 Airflow (cfm/sgft) 1.28 Airflow (cfm/Ton) 398.8 Outside Air (%) 26.6 Outside Air (cfm/sgft) 0.34 Note: values above given at ARI conditions JEATING SYSTEM PSYCHROMETRICS 24.0 OF 57.6 OF Outside Air 904 cfm 69.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 104,71 30,736 CARRIER 50HJ0009 91,247 2,005 60,512 Total Adjusted System Output g1 247 2,005� 60,512 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am 105.0 of Heating Coil _; Supply Fan 3400 cfm of Heating Peak) 105.0 OF � Supply Air Ducts 104.8 OF ROOMS 70.0 of K Return Air Ducts 4 PUULINU 5Y5 FEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 1 12.0 / 78.5 of Outside Air 904 cfm 74.9 / 62.0 °F 84.7 / 66.6 of . 55.0 / 53.4 of Supply Fan 3400 cfm Cooling Coil 55.0 / 53.4 of Supply Air Ducts 55.9 / 53.8 of 49.9% R.H. ROOMS 74.0 / 61.7 of EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number 05-250 Page: 15 of 18 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center Buildings 10/3/2005 SYSTEM NAME FLOOR AREA RTU-5 1.848 I.Number of Systems 1 Heating System Output per System 69,000 Total Output (Btuh) 69,000 Output (Btuh/sgft) 37.3 Cooling System Output per System 76,000 Total Output (Btuh) 76,000 Total Output (Tons) 6.3 Total Output (Btuh/sgft) 41.1 Total Output (sgft/Ton) 291.8 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.30 Airflow (cfm/Ton) 378.9 Outside Air (%) --]26.2 Outside Air (cfm/sgft) 0.34 Note: values above given at ARI conditions JEATING SYSTEM PSYCHROMETRICS 24.0 of 57.7 OF Outside Air 630 cfm 69.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM ISensiblel Latent I CFM Sensible 2,530 51,904 7,980 431 16,271 0 2,595 814 0 0 630 25,098 13,487 630 31,072 0 0 2,5951 814 82,6881 21,467 48 971 CARRIER 50HJQ007 66,455 2,807 43,493 Total Adjusted System Output 66,455 2,807 43,493 (Adjusted for Peak Design Conditions) 105.0 OF Heating Coil TIME OF SYSTEM PEAK I Jul 3 pm I I Jan 12 am Tern res at Supply Fan 2400 cfm 105.0 OF —� Supply Air Ducts 104.7 OF ROOMS 70.0 OF >% Return Air Ducts `i 12.0 / 78.5 OF 84.8 / 66.6 OF . 55.0 / 53.4 OF 55.0 / 53.4 OF Outside Air 630 cfm Cooling Coil 75.1 / 62.10F Opa n Supply Air Ducts Supply Fan 56.1 / 53.9 of 2400 cfm 49.8% R.H. ROOMS 74.0 / 61.7 OF h Return Air Ducts "I EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Pane:16 of 18 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center Building "B" 10/3/2005 SYSTEM NAME FLOOR AREA RTU-6 2,451 ENGINEERING CHECKS ISYSTEM LOAD 1 =4 Number of Systems 1 Heating System Output per System 96,000 Total Output (Btuh) 96,000 Output (Btuh/sgft) 39.2 Cooling System Output per System 102,300 Total Output (Btuh) 102,300 Total Output (Tons) 8.5 Total Output (Btuh/sgft) 41.7 Total Output (sgft/Ton) 287.5 Air System CFM per System 3,400 Airflow (cfm) 3,400 Airflow (cfm/sgft) 1.39 Airflow (cfm/Ton) 398.8 Outside Air (%) 24.6 Outside Air (cfm/sgft) 0.34 ote: values above given at ARI conditions :ATING SYSTEM PSYCHROMETRICS 24.0 OF 58.5 OF Outside Air 836 cfm 69.7 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK 11COILHTG.PEAK CFM I Sensiblel Latent I I CFM I Sensible 3,286 67,406 10,584 553 20,900 0 3,370 1,045 0 0 836 33,450 18,010 F 836 41,237 0 0 3,3701 1,045 107,596 28,594 64 227 CARRIER 50HJ0009 90,267 2,416 60,512 Total Adjusted System Output go,267 2,a16 60,512 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am eam Temperatures at Time of Heatina Peak1 105.0 OF -)b Supply Air Ducts 104.7 of ROOMS 70.0 OF Return Air Ducts It I TOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 12.0 / 78.5 OF 84.0 / 66.2 OF 55.0 153.5 OF 55.0 / 53.5 OF 0 Outside Air ° Supply Air Ducts 836 cfm Cooling Coil Supply Fan 55.9 / 53.8 OF 3400 cfm 49.7% R.H. ROOMS 74.9/62.00F 74.0/61.6OF Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Page:17 of 18 105.0 OF Heating Coil �Q Supply Fan 3400 cfm IHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center Building"B") 10/3/2005 SYSTEM NAME FLOOR AREA RTU-7 1,812 Number of Systems 1 Heating System Output per System 69,000 Total Output (Btuh) 69,000 Output (Btuh/sgft) 38.1 Cooling System Output per System 76,000 Total Output (Btuh) 76,000 Total Output (Tons) 6.3 Total Output (Btuh/sqft) 41.9 Total Output (sgft/Ton) 286.1 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.32 Airflow (cfm/Ton) 378.9 Outside Air (%) 25.7 Outside Air (cfm/sgft) 0.34 Vote: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS 24.0 of 57.9 of Outside Air 618 cfm 69.7 of 12.0 / 78.5 of 310� Outside Air 618 cfm 75.1 / 62.0 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK 11COILHTG.PEAK CFM I Sensiblel Latent I I CFM I Sensible 79,407 21078 CARRIER 50HJQ007 66,233 2,911 43,493 Total Adjusted System Output 66,233 2,911 43,493 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am yam Tern 105.0 of Heating Coil itures at Time of Heating Peak) 105.0 of -7F 4_� Supply Air Ducts Supply Fan 104.7 of 2400 cfm ROOMS 70.0 of Return Air Ducts CS (Airstream Temperatures at Time 84.6 / 66.4 of M 55.0 / 53.4 of Cooling Coil Supply Fan 2400 cfm 55.0 / 53.4 of -> Supply Air Ducts 56.1 / 53.9 of 49.8% R.H. ROOMS 74.0 / 611 of h Return Air Ducts 4 EnergyPro 3.1 By EnergySoft User Number: 3358 Job Number: 05-250 Paae:18 of 18 1