Loading...
05-0302 (CSCS) Field ReportCORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02111/2006 PROJECT NO. 31151703 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 " PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME` Pad 1 INSPECTION ADDRESS: 7"24 Highway 111 - La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NONCONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES CONTRACTORS. EQUIPMENT / MANPOWER USED: WELDING MACHINE: AREA, GRIDLINES, PIECES OBSERVED: Items Completed Torque tightening of the ASTM A325 High Strength Bolts on the beam to column moment connections on lines 4/A.1 & 4lA.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS; REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 84 Deg. F TESTS REQUIRED: n/a SITE TIME START: 8:00 AM SITE TIME FINISH: 9:00 AM LUNCH PERIOD: none TRAVEL TIME:VERIFIED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. L'U 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI ii QGcnQT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW 'ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02104/2006 PROJECT NO. 3115F03 12220 EI Camino Real Suite 200 San Diego, CA 92130 REPORT NO. 2 PG 1 OF 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-302 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 1 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-024 Highway 111 ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailbfazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Torque tightening of the ASTM A325 High Strength Bolts on all of the W8x10 beam to beam connections on the roof level from line 1 to 3 between line A & D. (2) Welding of the entire roof joist bridging angles from line 1 to.3 between line A & D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:30 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD:none TRAVEL TIME: VERIFIED BY I DO BY CFRTIFV TWAT i WAVC ocoenr. -- ---- -- •� ,.. Bio i �u r�owC Kivu I nNI I NI5 vVOHK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. t Z 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley,.CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 7ROJECTNO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. ' 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS- Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: AREA, GRIDLINES, PIECES OBSERVED: , Items Completed Torque tightening of the ASTM A325 High Strength Bolts on the beam to column moment connections on lines 4/A.1 & 4/A.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 84 Deg. F TESTS REQUIRED: n/a SITE TIME START: 8:00 AM SITE TIME FINISH: 9:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I Uv a T t,rK I it T i rw i i rwvt t'tKSUNALLY Ut$5hKVEU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE. 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino'Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01123/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 11,1 _ La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:00 AM SITE TIME FINISH: 1:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/23/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc'. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: (CBO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RF,S, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. .MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SAE -250 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the splice plates between the ends of the ledger angles. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a. TEMPERATURE: 68 Deg. F TESTS REQUIRED: Na SITE TIME START: 9:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/25/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200. San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 3115FO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING.ELECTRODEE SMAW E-7018 & FCAW NR 232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 402P, Lincoln Ranger 305G AREA, GRIDLINES, PIECES OBSERVED: Completed: (1) RFI No. 0102 (2) Welding of all the W8x10 beams at the roof level. (3) Welding of the splice plates at the ledger angle joints on line 1/Ato D, 3/A to D, A/1 to 3 & D/1 to 3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n1a TEMPERATURE: 70 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:00 AM SITE TIME FINISH: 1130 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOILINVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/26/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: . Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS: INCLUDING MEETIMGS: (PER APPROVED PLANS) REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm TEMPERATURE: 71 Deg. F SAMPLES TAKEN: n/a TESTS REQUIRED: n/a SITE TIME START: 9:30 AM SITE TIME FINISH: 11:30 AM j, I LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT.' -7% 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/27/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworlh Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01128/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES ' SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RAS USED: REMARKS: INCLUDING MEETINGS: (PER APPROVED PLANS) REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm TEMPERATURE: 71 Deg. F SAMPLES TAKEN: n/a TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 6:00 PM t LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: 6ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/28/2006 City Of La Quinta Print Name I Date Of Report City / County Certification Number ri CORPORATE San Diego I Imperial County 2992 E. La Palma Ave., Suite A 7313 Carroll Road, Suite G A0 Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 rim n RI=PnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ---[ ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO. 15F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301G & Miller Trailblazer 302 AREA, GRIDLINES, PIECES OBSERVED: Completed Welding of the splice plates on the top cord of the girder to girder Connections at lines 2/13 & 2/C. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 67 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 4:30 PM K=0 LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH r THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature j ICBG Certification Number Steve W. Bodnar 01/18/2006 City Of La Quinta Print Name I Date Of Report City / County Certification Number :1<`> CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 .Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO. F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, , Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Completed: 1) Welding of the top cords of the truss and joist end connections along wall lines 1 from A to D and 3 from A to D. (2) Welding of the splice plates on the top cords of the truss to truss and joist to joist connections on line 2 from A to D. (3) Welding of the tube steel to the top cords of the girders on line 2 from A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 67 deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 1 DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. yv� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/19/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01121/2006 PROJECT NO. 31 3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 . PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA 7La ADDRESS OF PROJECT:. 79-024 Highway 111 Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR 232 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D & Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging angles. Completed: Welding of the tube steel to the top cords of the girder joists on line 2 from A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm - SAMPLES TAKEN: n/a TEMPERATURE: 67 Deg. F TESTS REQUIRED: Na SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDIN'q CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/20/2006 City Of La Quintal Print Name Date Of Report City / County Certification Number 1 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/2812006 PROJECT NO. 3115 �w ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the 8x10 beams to the top cords of the trusses and joists. (2) Welding of the roof joist bridging. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. le Signature Steve W. Bodnar Print Name 0849264-85 ICBO Certification Number 01/23/2006 City Of La Quinta Date Of Report City / County Certification Number C%7:71e77_ti" 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01128/2006 PROJECT NO. 311 w ENGINEER: CSSI 2445 Fitch Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G, Miller Big Blue 400D, Miller Big Blue 401P AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the roof joist bridging. (2) Welding of the splice plates for the ledger angle joints. (3) Welding the 8x10 beams to the top cords of the roof girders, trusses and joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: ' WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 01/24/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number 6 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.39 90 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 31 ew ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 " PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta; CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging. Items Completed: (1) Welding of the splice plates between ends of the ledger angles on lines !/A to D, 3/A to D, A/1 to 3 & D/1 to 3. (2) Welding of all of the 8x10 beams to the top cords of the girders, trusses and joists from line A to D between 1 and D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: - Warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM i" LUNCH PERIOD: - none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING DE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/25/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 1/28/2006 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 _ Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (`r) APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 311 W ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller D302K, Lincoln Ranger 305G AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: . WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 70 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM LUNCH PERIOD: none TRAVEL TIME: ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK L15 Eu At3UVE ANU I HA I I 1115 wUKF%T Umrurw VVI I n THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/26/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number s 7 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 el Type Of Work X INSPECTOR. TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 311 w ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS: INCLUDING MEETINGS: (PER APPROVED PLANS) REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm TEMPERATURE: 71 Deg. F SAMPLES TAKEN: n/a TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 6:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY U I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/27/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 NZ PROJECT NO. 311 (j ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 6 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 -SUB-CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street, La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT./ MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G, Lincoln SA -250, Lincoln SAE -350 AREA, GRIDLINES, PIECES OBSERVED: Completed (1) Puddle welding and seam punch locking of the entire metal roof decking from lines A to D between lines 1 &3. (2) Welding of the C6x10.5 channels on the top cord of the roof joists at lines 1.3/A.9, 1.3/13, 2.9/8.3, 2.9/B.5, 2.9/C & 2.9/C. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:00 AM SITE TIME FINISH: 11:30 AM s LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY -THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/28/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number 3No CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT. (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO.3115d ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction'Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE ENO OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the 8x10 beams to the top cords of the trusses and joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM G LUNCH PERIOD: none TRAVEL TIME: v ERIFIED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/21/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave. Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax. 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO -13446 -New ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. ' • P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS:, 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NONCONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Completed: (1) Welding of the splice plates at the top cord of the truss to truss and joist to joist connections on line 2 from A to D. (2) Welding of the tube steel to the top cords of the girder joists on line 2 from A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: "' PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 67 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. w� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/20/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number I F :ooh CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 n Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR.WEEK ENDING 01/19/2006 PROJECT NO. ew ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G AREA, GRIOLINES, PIECES OBSERVED: Completed: Welding of the splice plates on the top cords of the truss to truss and joist to joist connections on line 2 from A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 67 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE. TIME FINISH: 11:30 AM , LUNCH PERIOD: none TRAVEL TIME: ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDI CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �Z-��-✓ 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/19/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951653 4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO. ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL ! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G AREA, GRIDLINES, PIECES OBSERVED: Completed: Welding of the splice plates at the top cord of the girder to girder connections on lines 2/B & 2/C. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 70 Deg. F TESTS REQUIRED: Na SITE TIME START: 1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: ERIFIEC BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/17/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE San Diego / Imperial County Inland Empire ( &E�_M 2992 E. La Palma Ave., Suite A 7313 Carroll Road, Suite G 14320 Elsworth Street, Suite C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD DEPORT l` � Type Of Work X INSPECTOR TECHNICIAN ,SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO. w ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 ' Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-257 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Shop 1 INSPECTION ADDRESS: 46-650 Adams Street La Quinta, CA ADDRESS OF PROJECT: 46-650 Adams Street La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS ORA PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301 G & Miller trailblazer 302 AREA, GRIDLINES, PIECES OBSERVED: Completed: Welding of the top cord of the truss ends and joist ends on lines 1/A to D, 2/A to D & 3/A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 67 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: V RIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/18/2006 City Of La Quinta Print Name. Date Of Report City / County Certification Number i �y >;s„a r a CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPnRY Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/04/2006 PROJECT NO. 3 03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1' CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constfuctios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES • SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Torque tightening of the ASTM A325 High Strength Bolts on all of the W8x10 beam to beam connections on the roof level from line 1 to 3 between line A & D. (2) Welding of the entire roof joist bridging angles from line 1 to 3 between line A & D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:30 AM SITE TIME FINISH: 11:30 AM 4A�� - LUNCH PERIOD:none TRAVEL TIME: VERIFIED BY -- - • --• • • •• • • • � • - -'r . -o MV CU NLL VP i r- vvUKr u,) i tU At3vVt ANU THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 02/01/2006 _ City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFL® RFP()RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 '2,1 t pbo) Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (YI, ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/04/2006 PROJECT NO. llF 3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Completed Puddle welding and side seam punch locking of the entire metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY - --- ----- -----•----•---...• -1- II - vv 11 01 CUADUVtA1VU II'1A1 INISVVOHKCOMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. zol 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/29/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number r ' CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 , MELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW - ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 01/21/2006 PROJECT NO. 3115F03 12220 EI Camino Real Suite 200 San Diego, CA 92130 REPORT NO. 3 PG 1 OF 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-302 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. - PROJECT NAME: Pad 1 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-024 Highway 111 ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR 232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D & Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging angles. Completed: Welding of the tube steel to the top cords of the girder joists on line 2 from A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED:, (PER APPROVED PLANS) REMARKS: INCLUDING MEET/NGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 67 Deg. F TESTS REQUIRED: Na SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I r1l1 Rv �coriry r — -� • �.� ...�� VDJCR VCU ALL Vf I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDIN CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. i 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 01/20/2006 City Of La Quinta Print Name Date Of Report City / County Cerfification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951..653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/14/2006 PROJECT NO. 3115 New ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA' 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESSje9-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT.: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT ACOPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 302G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Complete joint penetration welding of the beam to column moment connections on lines 4/A.2 & 4/A.9. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a ! SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM 1• ,:. G` LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I Uv CT UtK I II Y I HAI I HAVt NtKSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 'g: 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/12/2006 City Of La Quintal Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.29 74 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/21/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, , Mifler trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Completed: 1) Welding of the top cords of the truss and joist end connections along wall lines 1 from A to D and 3 from A to D. (2) Welding of the splice plates on the top cords of the truss to truss and joist to joist connections on line 2 from A to D. (3) Welding of the tube steel to the top cords of the girders on line 2 from A to D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PIANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 67 deg. F TESTS REQUIRED: Na SITE TIME START: 11:00 AM SITE TIME FINISH: 4:30 PMS` LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT, Signature Steve W. Bodnar 01/19/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 pr1 ill Q=Dr1DT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting ArchitectsFOR 12220 EI Camino Real Suite 200 San Diego, CA 92130 WEEK ENDING 01/28/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 3G0 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR 232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 402P, Lincoln Ranger 305G AREA, GRIDLINES, PIECES OBSERVED: Completed: (1) RFI No. 0102 (2) Welding of all the W8x10 beams at the roof level. (3) Welding of the splice plates at the ledger angle joints on line 1/Ato D, 3/A to D, A/1 to 3 & D/1 to 3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS:, REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 70 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY inn cv r�oTiry r - - - - -- - - - - -- • • - • - - •^-�•-�� �w-.� �.+ �.�� yr me rvvrtn L10 1 CU ACUVt ANU 1 MA 1 1 HIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 7 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/26/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 01/28/2006 PROJECT NO. 3115F03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta. CA REPORTING REQUIREMENTS: K:BO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SAE -250 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the splice plates between the ends of the ledger angles. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: Na SITE TIME START: 9:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I LPU OT UtK i WT i nevi i MAVt rtKSUNALLY U135ERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 01/25/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/23/2006 PROJECT NO. 3115F03 REPORT NO. 1 PG 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 OF 1 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-302 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 1 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-024 Highway 111 ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORh1ING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:00 AM SITE TIME FINISH: 1:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I rin RV PCDTICV TUAT 1 u - - • - -� I V CU MLL yr int VVurcrt us I EU ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. f Signature Steve W. Bodnar Print Name 01/23/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 . San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 PIP r) oponoir Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 "I voacn VCU nLL Ur I tit WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. - 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/27/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01/28/2006 PROJECT NO. 3115F03 REPORT NO 4 PG 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 OF 1 PLAN FILE NO. PERMIT NO. 05-302 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: Pad 1 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-024 Highway 111 ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:30 AM SITE TIME FINISH: 11:30 AM v LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I nn RV rrccrncv r "I voacn VCU nLL Ur I tit WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. - 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/27/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.6322999 Fax. 714.6322974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax. 951.653.4666 Type OF Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulft Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 01282006 PROJECT NO. 31151703 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. JPERMIT NO. 05-302 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 1 INSPECTION ADDRESS: 79-024 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA REPORTING REau1REMENrS: ICBG FIELD INSPECTION MANUAL ! MTGL SOI. MANUAL4MvIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMNG WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGNAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: ONCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT I MANPOWER USED: WELDING MACHINE: Muer trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: Na SITE TIME START: 11:30 AM SITE TIME FINISH: 6:00 PM i LUNCH PERIOD: 12 Hr. TRAVEL TIME: 6ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WOKK UUMrutb VVI I H THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/28/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number In CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 0 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPCIPT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/0412006 PROJECT NO. 3115F03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO. 1 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-302 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 1 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-024 Highway 111 ADDRESS OF PROJECT: 79-024 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Completed Puddle welding and side seam punch locking of the entire metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM l LUNCH PERIOD: none TRAVEL TIME: / VERIFIED BY I ne) RV rcoriry r...... ------ -1—CU .. 1—CU MLL yr I rIt VVVHK LIS I ED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. - S - 0849264-85 Ignature ICBO Certification Number Steve W. Bodnar 01/29/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA; CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7651 I File No.: ^• OA q Permit No.: vl Project No.: 3115F03 Project Name: PAD 1 MARKET PLACE @ LA QUINTA HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 12/16/2005 6X 12 28.37 70,780 2,500 Cone -28 1/6/2006 6X 12 28.37 98,950 3,490 Cone 28 1/6/2006 6X 12 28.37 95,580 3,370 Cone Specified Strength: 3,000 PSI Sampled By GEORGE CHAVEZ Location: S.O.G. AT GRIDS 2 & C Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3597055 " Water added at Site: 0.00 gal. By Cement Type: II/V _ Mix Time: 45 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/9/2005 Date Received: 12/12/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 70 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 '1Z M.B. (Ben) Lo Chief Engineer 3430 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 31151703 LA QUINTA, CA 92253 Project Name: PAD 1 MARKET PLACE @ LA QUINTA HWY l 11 @ ADAMS n ' LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: 5-7650 Age Date (Days) Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 12/16/2005 6 X 12 28.37 87,560 3,090 Cone 28 1/6/2006 6X 12 28.37 111,730 3,940 Cone 28 1/6/2006 6X 12 28.37 113,390 4,000 Cone Specified Strength: 3,000 PSI Sampled By, GEORGE CHAVEZ Location: S.O.G. GRIDS A& 2 Concrete Supplier: ASSOCIATED READY MDC Mix No.: 25336 Ticket No.: 3596540 Water added at Site: 0.00 gal. By Cement Type: IIN Mix Time: 55 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ' ASTM C172 Date Sampled: 12/9/2005 Date Received: 12/12/2005 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 60 °F ASTM C1064 Slump: 4.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer 3970 PSI 28 -day compression test complies with the specified strength. City of Ga Quinta BUILDING & SAFETY DEPARTMENT SPECIAL INSPECTOR'S REPORT PROJECT INFORMATION CONTACT INFORMATION PROJECT NAME: INSPECTOR'S NAME: Steve W. Bodnar PAD 1 CERTIFIED BY (AGENCY): ICBO INSPECTION ADDRESS: CERTIFICATION NUMBER: 0849264-85 79-024 Highway 111 La Quinta, CA-- — - - SUPERINTENDENT: Richard W. Davis (761771-5333 WEEK OF: . 01/12/2006 TESTING -LABORATORY/COMPANY: MTGL 29992 East La Palma Avenue Suite A Anaheim. CA INSPECTION'S PERFORMED Items completed: Complete joint penetration welding of the beam to column moment connections on lines 4/A.2 & A.9. -Steve W. Bodnar 80-400 Camino Santa Elise Indio, CA 92203-7489' DATE: 01/12/2006 �zA �, s mop '0,/' Corporate: San Diego/Imperial County: Inland Empill - 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT C101 rDEC2 2005 TYPE OF WORK A INSPECTOR OTECHNICIAN S Q AVAILABLE: SOIL REPORT J% (N) S ECS �i)-(N) APPROVED PLANS) (N) A 8P tIRAWING (1y (N) r~ ARCHITECT C FOR WEEK ENDING PROJECT NO. /Y - ENGINEER REP T N0. PG OF CONT TOR PLAN FILE NO. PERMIT NO. SUB -CONT CTOR PROJECT NPME 1. INSPECTION ADDRESS C / _ � ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USEDBYY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EOUIPMENT / MANPOWER USED: oodAom P'M?-VZZRAr�4 - L, s .� crz��-22rn�i►� AREA, GRID LINES, PIECES OBSERVED: e 9'1;011 T T R STRUCTURAL NOTES, DETAIL.OR RFIS USED: REMARKS. INC wmaMEET7Nr�: -/ /9Nrl PLAT�i/V D0 46 on PSS �a a v REWORK AS PERCENT OF ALL WORK TODAYO PERQENT PROJE=COMPLETIOM WEATHER: TEMPERATURE: O r e SAMPLESTAKEN: `�-C,6A[C. SP6Ci'i"EJVJ �� S /Q✓ TESTS REQUIRED: SITE TIME START:�LfD O SITE TIME FINISH: ` OD ll�iQS LUNCH PERIOD: TRAVEL TIME: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPk'15'SWITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND/OZTOVED PLANS, SPECIF S AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT `2 / D !? l90Q6S /v ignature Date of Report ICBG Certification Number ,1 Print Name City / County Certification Number Rev: 7/97 z Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ** VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES Set No.: 5-7650 File No.: Nominal Size Permit No.: Load (lbs.) Project No.: 31151`03 Project Name: PAD I MARKET PLACE @ LA QUINTA 28.37 HWY 111 @ ADAMS 3,090 LA QUINTA, CA Age Date (Days) Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 12/16/2005 6X 12 28.37 87,560 3,090 Cone 28 1/6/2006 6X 12 28.27 28 1/6/2006 6X 12 1 28.27 Specified Strength: 3,000 PSI Sampled By GEORGE CHAVEZ Location: S.O.G. GRIDS A& 2 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3596540 Water added at Site: 0.00 gal. By Cement Type: II/V Mix Time: 55 _ _ min. . Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY '**LAB COPY** -' A Y ASTM C172 Date Sampled: 12/9/2005 Date Received: 12/12/2005 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 60 °F ASTM C1064 Slump: 4.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: Branch: Branch: Branch: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7651 —~ I DEC 2 0 005 j File No.: — -------- Permit --.Permit No.: Project No.: 3115F03 Project Name: PAD 1 MARKET PLACE @ LA QUINTA HWY I I I @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 12/16/2005 6X 12 28.37 70,780 2,500 - Cone 28 1/6/2006 6X 12 28.27 28 1 /6/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By GEORGE CHAVEZ Location: S.O.G. AT GRIDS 2 & C Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3597055 ` Water added at Site: 0.00 gal. By Cement Type: II/V Mix Time: 45 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** i ASTM C172 Date Sampled: 12/9/2005 ' Date Received: 12/12/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 70 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim _ Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Y X MTG L Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fait: 714.632.2974 ,4'/7 Cy" iH / rr San Diego/Imperia County: Inland Empi,_. 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR OTECHNICIAN AVAILABLE: SOIL REPORTPO (N) SPECS QV) (N) Nc S APPROVED PLANS (N) APPROVED SHOP DRAWING ^N) ARCHITECT` FOR WEEK ENDING PROJECT N0. C OD,s .. - 63 ENGINEER REP RT NO. PG ,/ OF CONTRA C PLAN FILE NO. PERMIT NO. N . SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT r REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE 1S NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISS!PG MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED,OTJ�ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. !/ MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): ifdNc / JV/X 2 5'-3 3 CONTRACTORS EQUIPMENT/ MANPOWER USEq: iA,t�.rz Vl A,9 rQ !2 - 2-,0we4/ AREA, GRID LINES, PIECES OBSERVED: - '0001mcAd s-�6 ow ale) -i dAE 02,6A D_1,•'A#jr_ .1 4 �8', �i� Yds P�,Qc�r►! 5�6' 6291NJs did- &&Q-1 TOS+ � �, 10 STRUCTURAL NOTES, DETAIL, OR FIRS USED: SLfa . Z[/_ R,+L" rZES ' S PAC' S "AQ1N B r;11 A/ &,VAI - t'sl ��514 i✓ REMARKS, INCLUDING MEETINGS: aZ yerW P Ae?Fr»x yT "n/ 6,�g g 1610 , - A1nl PLAN D'e zwe P'5i, a�yc, oVl _5� AAQ oREWORK AS PERCENT OF ALL WORK TODAY4 k9AGENT-PROJECr-COMPLETION- WEATHER: -C.ONC, OF 5, SAMPLES TAKEIT" a CR g C TEMPERATURE: TESTS REQUIRED: '—Vamb 7, es- SITE TIME START: ­: _ Olp SITE TIME FINISH: X"00 Z'W LUNCH PERIOD: —49p-- TRAVEL TIME: _4Q� VERIFIEDB . I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMP ITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR ROVED PLANS, SPE IFIC IONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLES RWISE NOTED IN THE DEFICIENCY REPORT ignature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES Set No.: 5-7528 File No.: Permit No.: 05-2121 By Project No.: 3115D03 Project Name: BEST BUY MARKET PLACE @ LA QUINTA 79220 HWY 11 l @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 12/8/2005 6X 12 28.37 71,240 2,510 Cone 28 12/29/2005 6X 12 28.27 28 12/29/2005 6X 12 28.27 28H 12/29/2005 6X 12 1 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: CONT. FOOTING @ (STORE FRONT) Concrete Supplier: ASSOCIATED READY MDC Mix No.: 25336 Ticket No.: 3589964 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/1/2005 Date Received: 12/5/2005 Concrete Temp: 'F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B.(Ben) Lo Chief Engineer. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC . 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 . Client: THOMAS ENTERPRISES' A Set No.: 5-7527 File No.: Permit No.: 05-2121 Project No.: 3115D03 Project Name: BEST BUY MARKET PLACE @ LA QUINTA 79220 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested i. Load Strength (lbs.) (psi) Type of Fracture 7 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC . 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 . Client: THOMAS ENTERPRISES' A Set No.: 5-7527 File No.: Permit No.: 05-2121 Project No.: 3115D03 Project Name: BEST BUY MARKET PLACE @ LA QUINTA 79220 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Actual Area Size (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 7 12/9/2005 6X 12 28.37 75,610 2,670 Cone 28 12/30/2005 6X 12 28.27 28 12/30/2005 6X 12 28.27 28 H 12/30/2005 6X 12 28.27 28 H 12/30/2005 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By JEREMY JOHNSON Location: PERIMETER FOOTING LINE G & 3.3 MIDDLE SECTION Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3590307 Water added at Site: 5.00 gal. By Cement Type: Mix Time: 66 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/2/2005 Date Received: 12/5/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 66 °F ASTM C1064 Slump: 4.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer A Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7543— File No.: Permit No.: 05-2121 Project No.: 3115D03 Project Name: BEST BUY MARKET PLACE @ LA QUINTA 79220 HWY 111 @ ADAMS LA QUINTA, CA Age Date (Days) Tested Nominal Actual Area Load • Size (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 12/12/2005 6X 12 28.37 68,900 2,430 Cone 28 1/2/2006 6X 12 28.27 28 1/2/2006 6X 12 1 28.27 28 H 1/2/2006 6X 12 1 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G Location: INT. SPREAD FOOTINGS Concrete Supplier: ASSOCIATED READY MLX Mix No.: 15336 Ticket No.: 3592509 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 . Date Sampled: 12/5/2005 Date Received: 12/7/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 79 °F ASTM C1064 Slump: 5.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. ` M.B. (Ben) Lo Chief Engineer Ufa I'MTO L Corporate: � \1 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empll.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYLE&WORN &INSPECTOR �B O TECHNICIAN AVAILABLE: SOIL REPORT(Y)IN) SPECS (Y)(N) APPROVED PLANS (N) APPROVED SHOP DRAWING (Y) (N) ARC TECT FOR WEEK ENDING PROJECT. N0. a ENC)EE� REPORT N0. PG OF CON or PLAN FILE NO. PERMIT /iJ0 �� Q%L 1109 SUB. (> I �LCI�- r ° PRMSE'ZA� INSPECTION ADDRESS Tri - ��D a2— dot I// Oaji%- ADDRESS OF PROJECT � SAH E REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS US#D BY CONTRACTOR ((IINCLj RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CON CTORSEQUIPMENT/ MANPO R USED: tj 51s,®7 rx-rs Li HWS+ Com- Ic�r=��cY�S AREA, GRID LINES, PJEgES�OBSE VE STRUCTURAL3�,,�ETmL�RFISUSEG- Ps Bil _ 's ' i REMARKS. !M� NG Mf adE-6 _ / �� I daU) / �11 ( �. I a -&0&'t �UNZ4 HJ JL d b� s.I-9l•.19,4d �,,�/i.IC(A�S J, int '("1T'g4 � 7oip �eG�c- e! ���c REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: �(J�dJ®-L� 9; TEMPERATURE: - SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: 1` SITE TIME FINISH: LUNCH PERIOD: Zi /L 3A TRAVEL TIME: VERIFIED BY: B JI4HC0� I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, ANTHE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Z.R l'L IDI / D S_ D90240 - SS Signature Date of Report ICBO Certification Number �6� �Q �llL/ZSi(�f (J&91—ct' fJ5 Print Name City / r�Certification Number Rev: 7/97 MTG Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 I Inland Empha.` 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE 9F WORK �/j�( INSPECTOR O TECHNICIAN ELIC-L-bild& AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANSQ*(N) APPROVED SHOP DRAWING (Y) (N) ARC TECT FOR WEEK ENDING s _ T. NO PRQIEC EN NEER lCw- REPORT NO. PG OF COH,TR t e PLAN FILE N0. PE�IIT 05 zu SUB" tOLIW L. OLD a P ECT NAME 9>Rt aoe C �G 7UA 1 Q I INS�TIO1) dG � 81 L A Amdr ""1lpp iJ.•dd ADDRESS O PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGJ: SOIL MANUAL – REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. ' MATERIALS USED /BVONTRACTOpR (INCLUDE R f fH REPORT NO. OR MATERIAL TEST REPORTS): 1T'IL.. – / Si CONTRA TORS EQUIPMENT/ MANPO R U�IEll:: ` / / 9 Ice �j ] ,�/► �Z) �dSSOL YeLY'!7 � � J ��`B4 (7 �ZJIL'�d.BA.�J IrN:�6i8�E/ //� /� y ep' pr I. flwi 0, YL9od-5. . AREA, GRID LIN PnLO��BINIL' STRUCTISBANOTES, DLAIIR URFIS SE®���� REMARKS,INCIUO,!,k�EETINGS: „ �SW6 °�1op I L 1 k� cis .5ft'o' ieb E Wig REWORK AS PERCENT OF ALL WORK TODAY* PERCENT PROJECT COMPLETION4 WEATHER. ` SAMPLES TAKEN: TEMPERATURE,215 TESTS REQUIRED: SITE TIME START.-.7b)SITE TIME FINISH: LUNCH PERIOD: ID TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND THE LAPPVEID PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT 01 Signature Date of Report ICBO Certification Number &&-L— zyk'L� Print Name �� ��5f?i 'TSS City /,GDunby Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empilr. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYWL F WORK NSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS/A(N) APPROVED SHOP DRAWING (Y) (N) 494, ITECT favi FOR WEEK ENDING PR CT N0. ENEER REPORT N0. PG OF CIM 0 PLAN FILE NO. PERMIT 0. S ONTRACT R P JECT NAME G ✓v" C� 14VKTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CO CTR (IN LUDE RESPFH REPORT NOR RIALTORTS): C0 T0r8`[:OU__IPf�IE� /MrLQTR AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL, OR RAS USED: REMARKS, INCLUDING MEETINGS: AA-r/-tt- a % f 1 iC[1 e alb0 REWORK AS PERCENT OF ALL WORK TODAY: PERCENT I IFrT rnnn I ETIO I HER: ILSAMPLES TAKEN: TEMPERATURE: `�tJ —� TESTS REQUIRED: SITE TIME START: _�"� 00- SITE TIME FINISH: 3� �j t2 2 d LUNCH PERIOD: 9��a0` �TRAVEL TIME: VERIFIED BY: I DO CERTIFY II -Y I HAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / THE APPRO ED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT � Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: San DiegoAmperial County. 2992 E. La Palma Ave., Suite A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 FIELD REPORT Inland Empire: 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 . Tel: 909.653.4999 Fax: 909.653.4666 TYPE OF WORK XINSPECTOR OTECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECSO(N) APPROVED PLANS40(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER REPORT NO. PG \ OF CONTRACTOR PLAN FILE NO. PERMIT N0. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR(INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONITIACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED. STRUCTURAL NOTES, DETAIL, OR RFIS USED: C%- REMARKS, INCLUDING MEETINGS: iZ�_A �.c^.tet Stc� � 1_'! \ \ `�aiZ.�"�jZ. ��L �F aiY.�t� V �.�- Zc� '-�3�•, h\(�1 -�.� � REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIOM WEATHER: C��t�S� SAMPLES TAKEN: _49-_ TEMPERATURE: C� �� cry c�� s� TESTS REQUIRED: �- - SITE TIME START: "'to V lz,." LUNCH PERIOD: SITE TIME FINISH: 3G= TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WA THE SOIL VESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS. AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN HE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 ..", A - San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire: 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 909.653.4999 Fax: 909.653.4666 TYPE OF WORK XINSPECTOR ❑ TECHNICIAN t ► �—G AVAILABLE: SOIL REPORT (Y) (N) SPECS 4j I) APPROVED PLANSI9(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT y.y .vim :aCt axct FOR WEEK ENDING l 1-\\,-oIs PROJECT. NO. 3\ ENGINEER REPORT NO. PG \ OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. © - Z SUB -CONTRACTOR �! PROJECT NAME INSPECTION ADDRESS //l��� ,tom \ `7 \!``1' \ `••• ^ Qi:�i �a�liSac ADDRESS •OOFF`PROJECT 4 0 \� `\ O `IiAL,-% 1 k REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): C CONTRACTORS EQUIPMENT/MANPOWER USED: ��IUC•^��.'�,�'` �`\•tLe-�Z, a it Ci'•+sZ�L��"C VJ ��lra�.V.+�DIA�� AREA, GRID LINES, PIECES OBSERVED: \�'Vt'e_ STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS: / /S REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: SAMPLES TAKEN: TEMPERATURE: Sin _ TESTS REQUIRED: _fir SITE TIME START: N QC1 N- " — LUNCH PERIOD: SITE TIME FINISH: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL'INVESTIGATION RECOMMEABAUM, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /� �✓� /' ��— - / l l C) S ®fig SY Signature Date of Report ICBG Certification Number �l `/�O�L / �G�/��C✓LLQ!!' . Print Name City / County Certification Number Rev: 7/97 4 rr, MTG � Corporate: n 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp,._.• 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK INSPECTOR ❑ TECHNICIAN C.'\' AVAILABLE: SOIL REPORT SPEC N) APPROVED PLANZ N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT NO. ENGINEER REPORT NO. PG OF CONTRACTOR SUB -CONTRACTOR PLAN FILE NO. PERMIT NO. PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: Tc AREA, GRID LINES, PIECES OBSERVED. lip e �R C OC \� ti �� enSc C=�'�ay.� yy.�:4k L-kCu S�\ STRUCTURAL NOTES, DETAIL, OR FINS USED: \ REMARKS, INCLUDING MEE7/NGS. v.."--�� I �� v--�_P� �•«�;y�\�h `��Sz�` 2w�'p-_~��''-� � �_^>'�,,�j'�C���� 3' /S\ a'Le l CC�<�r� ' 0 REWORK AS PERCENT OF ALL WORK TODAY' PERCENT PROJECT COMPLETION* ETION• WEATHER: QAeA\4�1_ SAMPLES TAKEN: © TEMPERATURE: TESTS _ �S TESTS REQUIRED: SITE TIME START: �Q �'r �-- SITE TIME FINISH:- : ��n — LUNCH PERIOD• TRAVEL TIME VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL I STIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN E DEFICIENCY REPORT Signature Print Name Date of Report ICBO Certification Number City / County Certification Number Rev: 7/97 FRI Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 r-1. Inland Emp.. _. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORTdt (N) SPECS (N) APPROVED PLANSdb(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDINGOJECT. Z z- S73\\ NO. ENGINEER � � �z REPORT N0. PG � OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACT R PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): /� r fj CON CTORS EQUIPMENT/ MANPOWER USED: r�������,��s� �o��a•, L1�� AREA, GRID LIMPIECES OBSERVED: STRUCTURAL NOTES, DETAIL. OR RAS USED: REMARKS. INCLUDING MEETINGS: V C. S t� s= �'C� ��. L}� \lam •� �� `��J �N Z��! Q= % REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIONe WEATHER: SAMPLES TAKEN: �- TEMPERATURE: c`qr7 `a o TESTS REQUIRED: SITE TIME START: �'l Cc�' !zt:. -- SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH IKE SOIL INVES TION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DE IENCY REPORT // / / ®/ O S snao C 'R— R �4 . Y9 Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 ` MTG L n Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Ern .__: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT#�(N) SPECS4Y4 (N) APPROVED PLANS rMN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING —off PROJECT. NO. ENGINEER REPORT NO. PG ` OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAM INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 1a •�.�.�as o� ����.�-� .,..���- ��•z.3�, ��� psi CONTRACTORS EQUIPMENT/ MANPOWER USED: c'S�.a11� . �Y�.Y�a�i� p_C S�v •(� I �G. i\S�*a' S �� T AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES, DETAIL, OR RAS USED: REMARKS, IMCMUDING MEETINGS: `wcZ\.•zx cA,l� C�S� �y�l. �SCs_� e' S � \ �� 1�.s O_1�i 2R.`� �\�\ v REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION* WEATHER: TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: SITE TIME START: -Cxn SITE TIME FINISH: �E LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S01ESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED HE DEFICIENCY REPORT Signature Date of Report ICBO Cert'Ification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Ern . 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK ,Pj' INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORTIMN) SPECSIM(N) APPROVED PLAN811j (N) APPROVED SHOP DRAWING (Y) IN) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER S REPORT NO. PG t OF \ CONTRACTOR CC. PLAN FILE NO. PERMIT N0. Q SUB -CONTRACTOR \ �� �'h Zd �t PROJECT NAME � � QA do INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUALJMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): L � A.s—^c N♦ �'`.-4 C� N `vim\ ��k_+c To � `j -he -`a.�� •Z �C�C_. o �� . -t.c 1..�^C CONTRACTORS �EQUIPMENT/ MANPOWER USED: \Nt\ �V'� t V \� C1��1� �C� ��,L�\�'! �J �S •�_.n�. •S`�SJ \ l� � 1 �\) AREA, GRID LINES. OBSERVED: STRUCTURAL NOTES, DETAIL. OR FIRS USED: REMARKS, INCLUDING MEETINGS: 2 72-T'p-\�:�C1F'�atw-2�+��C G" 2� REWORK AS PERCENT OF ALL WORK T DAY• PERCENT PROJECT COMP) FTIOM WEATHER:\ -Q �Z_ TEMPERATURE: �,f'{� SAMPLES TAKEN: TESTS REQUIRED: 1 w iso•,."^� �I� SITE TIME START: S� �y "�`—�— SITE TIME FINISH: 'S LUNCH PERIOD: TRAVEL TIME: --- VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DE ICIENCY REPORT r \\ / k S/ o s Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 i� \i Inland Emph- 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK OINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPEC N) APPROVED PLANSaN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT r- FOR WEEK ENDINGPROJECT NO. ENGINEER a SZ REPORT NO. PG \ OF ` CONTRACTOR t PLAN FILE NO. PERMIT N0. SUB -CONTRACTOR PROJECT NAM INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: 6C .� � • est FSC � �- � �cC�C�e'1vsl� t� AREA, GRID LINES, PIECES OBSERVED: �\ .r` ,t� ii� `r ICT � � •.ems. `� � �- `mac � �iy�n-'mac' STRUCTURAL NOTES, DETAIL, OR FIRS USED: REMARKS, INCLUDING NEEIINGS. REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION' WEATHER: SAMPLES TAKEN: 9T TEMPERATURE: 'S• �S`1` ^_ TESTS REQUIRED: SITE TIME START: !o (!) r'. -- LUNCH PERIOD: SITE TIME FINISH: `O�i o TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL ITIGATION RECOMMENDATIOIGSI AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED INT E DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Z�e/ 'P' Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp,.. . 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Los AngelesNentura County: 13010 San Fernando Rd., Unit 1 Sylmar, CA 91342 Tel: 818.833.8100 Fax: 818.833.0085 TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPEC ( (N) APPROVED PLANB(n) N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT pe FOR WEEK ENDING PROJECT. NO. {� `-sc -IL. ENGINEER � � � REPORT N0. PG ` OF \ CONTRACTOR PLAN FILE NO. PERMIT NO. o�-Co3Z- SUB-CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALIMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS . IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIA`SEDBYC�ST\(INCLUDE RESEARCH REPORT NO. OR�MATERIAL TEST �R`PO�S): CONTRACTORS EQUIPMENT/ MANPOWER USED: �yJ Li��os•QsS, �C�l �\s�St�s�S AREA, GRID LINES,I FECES OBSERVED: ` C. STRUCTURAL NOTES. DETAIL. OR FIRS USED: REMARKS. IMCIUD/MOMEEIIMGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMP1 ETION• WEATHER: Q�,\ TEMPERATURE: SAMPLES TAKE `\. S +�--� �� LA �� o /• TESTS REQUIRED J SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: l VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S 0 VESTIGATION RECOMMEN AN10 D / OR THE APPROVED PLANS, AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED THE DEFICIENCY REPORT s y Signature Date of Report ICBO CertHication Number Print Name City / County Certification Number Rev: 7/97 :TG . Corporate: 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire: 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 909.653.4999 Fax: 909.653.4666 TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPEC ) V APPROVED PLAN.-L-jF4151) APPROVED SHOP DRAWING (Y) (N) ARCHITECT � FOR WEEK ENDING \ \ _ \66 r PROJECT. N0. —a—,`\. �z t, (1-1� ENGINEER REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT N0. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT ca REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): S`� �s�-q�\acl� �`•t� S c ��•�� CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVE . STRUCTURAL NOTES, DETAIL. OR RAS USED: REMARKS, INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY p R('FNT PROJECT CO P ETION1 WEATHER: L SAMPLES TAKEN: ��— TEMPERATURE- TESTS REQUIRED: '�` SITE TIME FINISH:=VERIFIED =PERIOD: TRAVEL TIME: I uu utH I iFf THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report Print Name ICBO Certification Number City / County Certification Number Rev: 7/97 ap�.t Y- MTG-� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empiic. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS N) APPROVED PLANSQ4 (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT a 4� �` FOR WEEK ENDING � k ` _'L S- PROJECT. NO. `\ J - ENGINEER REPORT NO. PG ` of \ CONTRACTOR PLAN FILE NO. PERMIT NO. - SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ` ♦ ADDRESS OF PROJECT i� rev REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): —� '� ice\ �... W\ -vim.. •t•�. 5.,..c �'� - — �Cg �" `-`r^ s G? -� S ���z \�a.� CONTRACTORS EQUIPMENT / MANPOWER USED: \ `) AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES, DETAIL, OR FIRS USED: REMARKS, INCLUD/Na MEETINGS. Ck,�c�e REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIM WEATHER:\-xS� / L\o: ��\j SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: _ oy S- — LUNCH PERIOD: SITE TIME FINISH:�^— TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NIN TH�(/( OTED DEFICIENCY REPORT Signature Date of Report ICBO Certification Number %2-616 e Print Name City / County CerMication Number Rev: 7/97 w MTG�� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Irnperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 I Inland Empf,..' 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK./1"'IINSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANSCMN) SPECS 0 (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEKENDING V PROJECT. NO. ENGINEER REPORT NO. PG ` OF CONTRACTOR PLAN FILE NO. PERMIT N0. C SUB -CONTRACTOR PROJECT NAME INSPECTION �\\G ADDRESS \ OF PROJECT \s`) REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAIJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: 7 — — E 1..5 �\\ � cam.," � 3`= �•�-�- \� e°��-�� STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETINGS: r `►�.t ��j ©� ��1`i�C�S 3 �1�� \' �Q S Cn�kIt Ln �� L� ���Q \ Yom. �. � �� � \\� � ��►��i �'�-�.. ��1�\�, C9� �'� ��' X41 \1�-% Irl "\ :v Q� 2�•.r k•.(q REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETION' WEATHER: C�•�a SAMPLESTAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: ")CC'�' .'_ LUNCH PERIOD: SITE TIME FINISH: �E�? TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOILVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN IE DEFICIENCY REPORT Signature Print Name // / Zz/ c) 's S € -y Date of Report ICBO Certification Number City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emp11.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS(%X�(N) uC-_ r SLIA �A ARCHITECT APPROVED PLAN84=N) APPROVED SHOP DRAWING (Y) (N) FOR WEEK ENDING PROJECT N0. ENGINEER ` ` Vs czzz J `�O REPORT N0. PG ! OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR �� Z PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT `l ci \ \ O REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL– REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: l�\Qs �-+�• !�.*„c �SZ , �C� c'�\ ��� 1 0 was ��,t�►.�i AREA GRID LINES PIECES OBSERVED f STRUCTURAL NOTES DETAIL OR RFIS USED REMARKS, INCLUDING MEETINGS: r s ���-mac► 6 REWORK AS PERCENT OF ALL WORK TODAY PER FNT PROJECT CO P GTI WEATHER: v � SAMPLES TAKEN: - r- TEMPERATURE., TESTS REQUIRED: SITE TIME START:Q A"` SITE TIME FINISH:=— LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: i nn rcnnry T ---- .„ HAI ; Hhvc FERSUNALLY 06SERVtU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL VESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT n r, Signature Print Name / Z / / o S S��ogk - B!V Date of Report ICBO Certification Number City / County Certification Number Rev: 7/97 i MTG L 1 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 I San Diego/Imperial County: Inland EmpL,,. 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT a, I os&�) TYPE 0 W AK �l� _Lj,J P 'INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS' (Y) (N) APPROVED PLANS (N(N) APPROVED SHOP DRAWING (Y) (N) ARCH T� P .4Wt, FOR WEEKEND G a Z ®• ®� PROJECT. NO. E EER t ¢� S REPORT NO. PG OF coT OFj� u�� PLAN FILE NO. PERMI N0. 0 ® LCJ S CTOR _ ® o Sa .�� PRO�TI�AME" />� I FCTIONA®ES�Sy® J` ADDRESS OFIPROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE SEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: Ll AREA, GRID LINES, P EC rOCBSERVED: ;y A /� STRUCTWkAL NOTES, DETAI OR RFISMED: i REMARKS, WaUp�"fETINGS: Cd3-sa9d � Y C= Y2— 04, Al- !r"/4 9- 1427_ QL 'f" IS 9d�APIS fl S L3 �4 1119- V0� 6 1D �' S REWORK AS PERCENT OF ALL WORK TODAye PERCENT PROJECT COMPLETIOW WEATHER: L.14*W F41J_ ?H C SAMPLES TAKEN: AL TEMPERATURE: ,D4.� _ L® To )b TESTS REQUIRED: Ak SITE TIME START: -1 "CD SITE TIME FINISH: �• LUNCH PERIOD: _ It 2-1,3D TRAVEL TIME: VERIFIED BY: 1/ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND THE APPRovfb PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Z 4� 1 .4 Signature Date of Report ICBO Certification Number � Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empli.. 14320 Elsworth Street, Ste Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT C101 TYP 0 WORK INSPECTOR O TECHNICIAN �ELbILp � AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) APPROVED PLANS #) (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT �1 / FOR WEEK ENDING PROJECT. NO. ENOEER scQ2 G�����s REPORT NO. PG OF COra SUB�®kr�IOR PLAN FILE NO. PERgM�T N0. Q PROJ NAME INSPECTION ADDRESS. i4- ®s-ok fite III vaAkl* ADDRESS OF PR JECT MA —Sa�� REPORTING REQUIREMENTS: 1CBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USE BY CONTRACTOR (INCLUDE ES�ARCH REPORT NO. OR MATERIAL TEST REPORTS): L 3.,. .a CONTRACTORS EQUIPMENT/ MANPOWER USED: ,S 13 '�t. 5 -� t� 0) Y Li S QC AREA, GRID LINES, PIE�CE$10 SERVED: -3-oke zw 4�- 12,&,c- STRUCTURAL NQT\ES, DETAIL. OR RFISEEG: -/ _ REMARKS, I IJD/NG MEETINGS. , 66ktla !l%E �cd P�QiO L(Icil d11Lf(� 6`✓ Z� 1 0,6 d �L�Li9dC� d aa`' W of e'j< 'cz 02 �L /,vz� _,cjy ,tet 2 -- d—REWORK REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPI ETIO I• WEATHER: Ak. C d a ChF4L- yt(( Ai& SAMPLES TAKEN: TEMPERATURE: 44 405-- Pit tb TESTS REQUIRED: SITE TIME START: TED Akf SITE TIME FINISH: LUNCH PERIOD: 17-'00! 17- 5o TRAVEL TIME:(/ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, ANDE APPROV PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT dl I L Signature Date of Report P ICBO Certification Number 3&71; '*ZuMh6 D2 -0 -BS-_ Print Name City / CC°u.�"�— ification Number Rev: 7/97 . ACorporate: San Diego/Imperial County: Inland Empn6. 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT ISI I� �JORK 42INSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y)(N) ILL 61 APPROVED PLANS () (N) APPROVED SHOP DRAWING (Y) (N) ARCH CT ® p / FOR WEEK EN ING _ pgOJ �6'&tit$ ��CSr11 FlAL� �/LCOJ. d�' ®�'Oa ENGINEER REPORT N0. PG OF ®5 C�40Z o �,� S CONTijA DR� PLAN FILE NO. PERMI 0. slfi;?rnNrannrna P ECT NAME , o� 8b .1a.,u E��ACS IN-SyPE ION ADDRESSa// a ADDRESS 0 PROJECT C AT THIS WORK COMPLIES WITH THE AND / THE APPROVED PLANS,' SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING O NG CODE, UNLESS OTH RWISE NOTED THE D GATION FI CIIENCY REPORRECOMMENDATIONS, .&A 115 /01$® n � �l Signature &X,1c Date ofReport ICBG Certifiction Number ('01'a :i' 5'Ze&ts/t£ D€W di SPrint Nam City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C 1019 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7661 2 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q) HWY 1 i l @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 12/15/2005 3 X 3 X 6 9.86 9,800 990 N/A 28 1/5/2006 3 X 3 X 6 9.00 28 1/5/2006 3 X 3 X 6 9.00 A Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LIFT LINE A Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 1327061 Water added at Site: 0.00 gal. By Cement Type: Mix Time: 35 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 12/8/2005 Date Received: 12/12/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 76 °F ASTM C1.064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 - Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7583 File No.: Date Tested Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 3 X 3 X 6 HWY 111 @ ADAMS 1,440 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. inch) (lbs.) Strength (psi) Type of Fracture 7 12/7/2005 3 X 3 X 6 9.46 13,630 1,440 N/A 28 12/28/2005 3 X 3 X 6 9.00 28 12/28/2005 3 X 3 X 6 9.00 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: 5TH LIFT LINE I Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3592382 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 11/30/2005 Date Received: 12/7/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 80 °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma.Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 ` Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 *s VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7459 File No.: Permit No.: 046-326 Project No.: 31151103 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Actual Area Size (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 7 12/5/2005 3 X 3 X 6 10.52 29,470 2,800 N/A 28 12/26/2005 3 X 3 X 6 9.00 28 12/26/2005 3 X 3 X 6 9.00 28 H 12/26/2005 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By Location: 4TH LIFT LINE I Concrete Supplier: •ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 117201 Water added at Site: 0.00 gal. By Cement Type: Mix Time: 30 min. r Remarks: TRUCK # 265 Distribution: THOMAS ENTERPRISES " VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** J A ASTM C172 Date Sampled: 11/28/2005 Date Received: 11/30/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 81 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate:. 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 'Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 - Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -MASONRY PRISM ASTM C1314 * * File No.: VCC - Permit No.: 046-326 4425 JAMBOREE ROAD, SUITE 180 Project No.: 31151303 NEWPORT BEACH, CA 92660 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS'ENTERPRISES " Set No." 5-7316 -- . - - -- - . • Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/24/2005 8 X 8 X 16 58.60 229,990 3,920 N/A 28 12/15/2005 8X 8X 16 58.75 272,640 4,640 N/A 28 12/15/2005 8 X 8 X 16 58.83 278,160 4,730 N/A Specified Strength: 2,500 PSI Sampled By. MICHAEL G. Location: 2ND LIFT LINE 6 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3579503 Water added at Site: 0.00 . gal. By Cement Type: Mix Time: Remarks: ASTM C172 Date Sampled: 11/17/2005 Date Received: 11/21/2005 Concrete Temp: 72 'F ASTM C1064 Ambient Temp: 82 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Distribution: Respectfully Submitted, THOMAS ENTERPRISES VCC MTGL, Inc. 1 CITY OF LA QUINTA-BLDG & SAFETY , **LAB COPY** 1Z M.B. (Ben) Lo Chief Engineer 4680 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 • Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 * * File No.: VCC Permit No.: 046-326 4425 JAMBOREE ROAD, SUITE 180 Project No.: 31151303 NEWPORT BEACH, CA 92660 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: 5-7315 - Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/24/2005 3 X 3 X 6 10.43 21,930 2,100 N/A 28 12/15/2005 3 X 3 X 6 10.53 36,070 3,430 N/A 28 12/15/2005 3 X 3 X 6 10.56 37,030 3,510 N/A 28H 12/15/2005 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. ASTM C172 Date Sampled: 11/17/2005 Date Received: 11/21/2005 Location: 2ND LIFT LINE I Concrete Supplier: ASSOCIATED READY MIX Concrete Temp: 72 °F ASTM C1064 Mix No.: 46511 Ambient Temp: 82 °F ASTM C1064 Ticket No.: 359503 Water added at Site: 0.00 gal. By Slump: 9.00 in. ASTM C143 Cement Type: Mix Time: 50 min. Tested at: Anaheim Remarks: Distribution: THOMAS ENTERPRISES Respectfully Submitted,MTGL, Inc. VCC j CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** M.B. (Ben) Lo Chief Engineer 3470 PSI 28 -day compression test complies with the specified strength. y� Date Tested Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Load (lbs.) Tel: (714) 632-2999 Fax: (714) 632-2974 ' Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 11/22/2005 Tel: (858) 537-3999 Fax: (858) 537-3990 10.63 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 N/A 28 Tel: (909) 653-4999 Fax: (909) 6534666 3 X 3 X 6 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 . Tel: (818) 833-8100 Fax: (818) 833 IIv^ Q 12/13/2005 3 X 3 X 6 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 2,670 DEC 2 ®ZQQS 2814 12/13/2005 * * File No.: JBY _..... ,.. — VCC Permit No.: 046-326 4425 JAMBOREE ROAD, SUITE 180 Project No.: 31151303 NEWPORT BEACH, CA 92660 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES ^ Set No.: 5-7250 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/22/2005 3 X 3 X 6 10.63 13,500 1,270 N/A 28 12/13/2005 3 X 3 X 6 10.59 28,690 2,710 N/A 28 12/13/2005 3 X 3 X 6 10.73 28,610 2,670 N/A 2814 12/13/2005 3 X 3 X 6 9.00 'r Specified Strength: 2,500 PSI Sampled By MICHAEL G. ASTM C172 Date Sampled: 11/15/2005 Date Received: 11/17/2005 Location: 1 ST LIFT LOADING DOCK Concrete Supplier: ASSOCIATED READY MIX Concrete Temp: 70 °F ASTM C1064 Mix No.: 46511 Ambient Temp: 86 °F ASTM C1064 Ticket No.: 3576873 Water added at Site: 0.00 gal. By Slump: 9.00 in. ASTM C143 Cement Type: Mix Time: 36 min. Tested at: Anaheim Remarks: Respectfully Submitted, Distribution: THOMAS ENTERPRISES MTGL, Inc. VCC j CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** . IA6s M.B. (Ben) Lo Chief Engineer • r ' 2690 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653.4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 s* VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7584 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area (Sq. Inch) Load Strength Type of (lbs.) (psi) Fracture 7 12/12/2005 3 X 3 X 6 9.63 16,890 1,750 N/A 28 1/2/2006 3 X 3 X 6 9.00 28 1/2/2006 3 X 3 X 6 9.00 Specified Strength: 3,000 . PSI Sampled By MICHAEL G. Location: 5TH LIFT LINE 2 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3592362 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/5/2005 Date Received: 12/7/2005 Concrete Temp: 72 °F ASTM C1064 Ambient Temp: 81 °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B. (Ben) Lo Chief Engineer n Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 65314999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7179 File No.: Date Tested Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 92,410 3,260 HWY 111 @ ADAMS 7 LA QUINTA, CA A Age (Days) Date Tested Nominal, Actual Area Size (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 92,410 3,260 Cone 7 11/21/2005 6X 12 28.37 92,410 3,260 Cone 28 12/12/2005 6X 12 28.37 155,170 5,470 Shear 28 12/12/2005 6X 12 28.37 160,260 5,650 Shear Specified Strength: 4,500. PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231' Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 5560 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 ` NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A_ Set No.: 5-7178 File No.: Permit No.: 046-326 Project No.: 3115B03 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA r _ _, - - - - - • - A Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 100,340 3,540 Cone 7 11/21/2005 6X 12 28.37 100,340 3,540 Cone 28 12/12/2005 6X 12 28.37 160,860 5,670 Cone & Split��l 28 J 12/12/2005 6X 12 28.37 157,590 5,560 Cone & Split Specified Strength: 4,500 PSI Sampled By Location: SLAB ON GRADE Concrete Supplier: Mix No.: 17231 Ticket No.: , Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 OF ASTM C1064 Ambient Temp: OF ASTM C1064 Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 5620 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 . . Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909)'6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 * * File No.: VCC Permit No.: 046-326 4425 JAMBOREE ROAD, SUITE 180. Project No.: 3115B03 NEWPORT BEACH, CA 92660 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: 5-7177 ^ Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 4 11/18/2005 6X 12 28.37 100,420 3,540 Cone 7 11/21/2005 6X 12 28.37 100,420 3,540 Cone 28 12/12/2005 6X 12 1 28.37 1 169,960 1 5,990 1 Cone & Split 28 12/12/2005 6X 12 1 28.37 1 168,640 1 5,940 1 Cone & Split Specified Strength: 4,500 PSI Sampled By ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Location: SLAB ON GRADE Concrete Supplier: Concrete Temp: °F ASTM C1064 Mix No.: 17231 Ambient Temp: °F ASTM C1064 Ticket No.: Water added at Site: 0.00 gal. By Slump: in. ASTM C143 Cement Type: Mix Time: min. Tested at: Anaheim Remarks: Respectfully Submitted, Distribution: THOMAS ENTERPRISES MTGL, Inc. VCC 1 CITY OF LA QUINTA-BLDG & SAFETY + **LAB COPY** M.B. (Ben) Lo Chief Engineer 5960 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 - Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 File No.: VCC Permit No.: 046-326 4425 JAMBOREE ROAD, SUITE 180 Project No.: 31151303 NEWPORT BEACH, CA 92660, Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES' s Set No.: 517176 Age • (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 4 11/18/2005 6X 12 28.37 105;380 3,710 Cone 7 11/21/2005 6X 12 28.37 105,380 3,710 Cone 28 12/12/2005 6X 12 28.37 157,360 5,550 Cone & Split 28 -12/12/2005 6X 12 28.37 160,680 5,660 Cone & Split _ r - Specified Strength: 4,500 PSI . Sampled By Location: SLAB ON GRADE Concrete Supplier: F Mix No.: 17231 Ticket No. - Water added at Site: 0.00 gal. By Cement Type: Mix Time: - Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** - ASTM C172 Date Sampled: 11/14/2005 Date Received: 11/15/2005 Concrete Temp: 79 °F ASTM C1064 Ambient Temp: °F ASTM C1064 r Slump: 4.50 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 5600 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7190 File No.: Date Tested Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q 11/16/2005 HWY 111 @ ADAMS 10.27 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 11/16/2005 3 X 3 X 6 10.27 26,000 2,530 N/A 28 12/7/2005 3 X 3 X 6 10.66 40,460 3,800 N/A 28 1 12/7/2005 1 3 X 3 X 6 1 10.69 1 39,620 1 3,710 1 N/A 28 H 1 12/7/2005 1 3 X 3 X 6 1 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G Location: 1 ST LIFT LINE 6 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: 50 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 11/9/2005 Date Received: 11/15/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 81 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 3760 PSI 28 -day compression test complies with the specified strength. 4 CORPORATE 2992 E. La Palma Ave., Suite Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 ' San Diego / Imperial County A 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work ' X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 12/31/2005 PROJECT NO. 311 B303 12220 EI Camino Real Suite 200 San Diego, CA 92130 REPORT NO. 3 pr, 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 OF 1 PLAN FILE NO. PERMIT NO. 04-6326 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Bed bath ✓?< Beyond 10722 Edison Court Rancho Cucamonga, CA 91730 ADDRESS OF PROJECT: 79-110 Highway 111 INSPECTION ADDRESS:. 79-110 Highway 111 La Quints, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the canopy framing along line 6. (2) Puddle welding of the metal roof decking. Items Completed: Welding of the rano y joists and joist tie plates from line B.2 to C.9 between lines 6 & 7. STRUCTURAL NOTES, DETAIL, OR RFIS USED: .(PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM — LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: / V RIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number ' Steve W. Bodnar 12/29/2005 City Of La Quinta Print Name Date Of Report City/ County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN - - - --• - vuu�nvw AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW, " APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 12/31/205' PROJECT NO. 31113303 12220 EI Camino Real Suite 200 San Diego, CA 92130 -- ENGINEER: CSSI REPORT NO. 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 04-6326 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Bed bath & Beyond 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: , 79-110 Highway 111 ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 302P, Red Arc D302K AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) ,Puddle welding of the metal roof decking. (2) Erecting the canopy framing along line 6. Items Completed: Welding of the bridging angles for the roof joists from fine 2 to 6 between lines A and I. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS. REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 72 beg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY � nn ov nceTiry r -LL Ur 1 nr- VVUMI% ua i tU AbUvt AN 1 HAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. z 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/28/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 12!31/2005 PROJECT N 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court ' Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA O. 3110303 REPORT NO. 1 PG 1 OF 1 PLAN FILE NO. !PERMIT NO. 04-6326 PROJECT NAME: Bed bath & Beyond ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta• CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / M rGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Bigt Blue 302P, Red Arc D302K AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the metal roof decking. (2) Welding of the roof joists bridging angles to connections at the block wall on lines A & I. (3) Erection of the canopy framing along line 6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Hot TEMPERATURE: 81 deg. F SITE TIME START: 7:00 AM LUNCH PERIOD: 1/2 Hr. (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 4:30 PM TRAVEL TIME: PERCENT PROJECT COMPLETION: n/a Na /1 VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/27/2005 City Of La Quintal Print Name Date Of Report City / County Certification Number t San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW CORPORATE ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 12124!2005PROJECT �..f . .............. 2992 E. La Palma Ave., Suite A REPORT NO. 4 PG 1 OF 1 Anaheim, CA 92806 PLAN FILE NO. Tel: 714.632.2999 ,, Fax: 714.632. 2974 t San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 12124!2005PROJECT NO. 3118303 ENGINEER: . CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: . 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO: OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G, Miller D302K. AREA, GRIDLINES, PIECES OBSERVED: In Progress Placement and welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: WARM SAMPLES TAKEN: n/a TEMPERATURE: 75 deg. F TESTS REQUIRED: n1a SITE TIME START: 7:00 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 112 Hr. TRAVEL TIME: VERIFIED BY I nn OV !`COTIN Tunr i _.._,..,, , --1 I nC YYVR1l. LIQ I CU A6UVt ANU- INA I I HIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/23/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 12/24/2005 PROJECT NO. 3118303 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 11 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath 8 Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICAO FIELD INSPECTION MANUAL ! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301 G Miller 0302K AREA, GRIDLINES, PIECES OBSERVED: In Progress: 1 Welding of the support framing for the HVAC units along lines 3 & 5. (2) Placement and wind tacking of the meta( roof decking. Completed: Welding of the W8x10 beams and beam ties on line 5.9 from line C.9 to F.5 at roof leve(. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS:; REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 84 deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH .THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/22/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number 41Y Cycr is TrT Corporate: San Diego/Imper a County: Inland Emph- 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C10 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK �i INSPECTOR OTECHNICIAN AVAILABLE: SOIL REPORTPO (N) SPECS QV) (N) APPROVED PLANS 00 (N) APPROVED SHOP DRAWING (MIN) ARCHITECT FOR WEEK ENDING PROJECT N0. C DDS ENGINEER -�- REP RT NO. PG OFM CONTRA 0r C PLAN FILE N0. PERMIT N0. N , SUB -CONTRACTOR PROJECT NAME A*IJIr. / INSPECTION ADDRESS ADDRESS OF PROJECT I REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW. PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, do01 N THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. // MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATE AL TEST REPORTS): r 6 RLr-13R1P' OD?� P,S'/ ,0 AIC /r%X CONTRACTORS EQUIPMENT / MANPOWER USES: Boom �UkYIp — V�A A To a — 1.2z"Lrra . •+, sw, AREA, GRID LINES. PIECES OBSERVED: y Amee �8', �i� Yds P Acer►/ 516" urrld , STRUCTURAL NOTES, DETAIL. OR FIRS USED: sr,�� .T�rn�- A/or�� - � -�s -�� .,� •4��a/v .P �N-m�-� a/�����/ REMARKS.INCLUO/NG MEETINGS. -,.1 "n/ Zl�qw 610 gs 404, /0LACiN O/= �DO� P�5' l ,e.0A1Q o L% REWORK AS PERCENT OF ALL WORK TODAYe WEATHER: 'ION: `'"C 6 Ica 2O� `r� •��VI;4s SAMPLES TAKEIT a �^ •f `+ TEMPERATURE: TESTS REQUIRED: C '- r- SITE TIME START: 7,DP SITE TIME FINISH: Woo 0�—iE'S' LUNCH PERIOD: TRAVEL TIME: VERIFIED (ioeL I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMP ITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR ROVED PLANS, SPE IFIC IONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLES RWISE NOTED IN THE DEFICIENCY REPORT ignature Date of Report P ICBO Certification Number b / Print Name City/ County Certification Number Rev: 7/97 11 Corporate: San Dle o/Im erial Count : Inland Em 2992 E. La Palma Ave:, Ste. A 7313 Carroll Road, Suite G 14320 Elswortli Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: .714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK .0 INSPECTOR 0 TECHNICIAN 4 NC , - -3, 4, r , AVAILABLE: SOIL REPORT IY) (N) SPECS 4,Y) (N) APPROVED PLANS I) (N) APPROVED SHOP DRAWING (7b) (N) ARCHITECT ' FOR WEEKENDING PROJECT. NO. ENGINEER -- I REPORT NO. PG 9 OF CONTRACITOFJ, PLAN FILE NO.PER MIT NO. SUB -CONTRACTOR 61y< _ PROJECT NAME , X U/ in NA T' /i 131/ �v INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS ORA PREVIOUS INSPECTOR'S, IS CORRECTED (SQAOT - ON THE ORIGINAL DEFICIENCY REPORT AND, SUBMIT COPY WITH YOUR WEEK'S REPORTS.' MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): R -8Al2 - noa'Si r"an/c , 4Y1/X 2 S 3 6 CONTRACTORS EQUIPMENT/ MANPOWER USED: r"I" kA '*'rl— G'enh7 /°L///l7V),AAa ro12 _ z", Ac 1/ AREA, GRID LINES, PIECES OBSERVED: aN 49 onl� /. T�//� �/ y B!�llfJ/='E N �Rl)s AE01 4R/d+ 1 To 3 STRUCTURAL NOTES, DETAIL. OR RAS USED: 1i�iin/W4 7_1A A/ A-1,19/11 oWl dLc S/Q Al REMARKS, IMCLUD/NG MEEWNGS. ANcJ /�/A�'//VCS D•� 3�0� PS/. �NC !9/V� SA���LL�� S'f�i?�� /UD REWORK AS PERCENT OF ALL WORK TOPAY4 ___-P_ERGENT PROJE .T C�MPI FTI�N WEATHER:i'CDNC. TEMPERATURE: d C / S/ �C//FYI !V S a��% Sr�% ra•, SAMPLES TAKEN: TESTS REQUIRED: Vamb - - — SITE TIME START:��i �D SITE TIME FINISH: 4,40 0 9- __'Ielloe3 LUNCH PERIOD: -� ^ TRAVEL TIME: —�-- VERIFIED BY ► - �^ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES, AND / OR TH&APPROVED PLANS; SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OcMER� �V • y l Signatuurre Date of Report 4 I Print Name THE SOIL INVESTIGATION RECOMMENDATIONS, NOTED IN THE DEFICIENCY REPORT ICBO Certification Number ;-7-S891 —941 City / County Certification Number Rev: 7/97