BCOM2014-1014 Revision 1 Title 24A
` BUILDING, ENERGY ANALYSIS REPORT
AUG 2 8 2014
Y OF LA QUINTA
INITY DEVELOPMENT
PROJECT:
YOGURTLAND
79174 Highway 111, Suite 103 } N, r
tLa Quinta,:CA 93010
Project Designer:,
JEFF S. COFFMAN - ARCHITECT'
2000 E Chapman Avenue, Suite 202
Fullerton, CA 92831
714.738.7045
Report Prepared by:
Z�* AD00CED TITLE 24
PROFESSIONAL- TITLE 24 CALCULATIONS
2000 E Chapman Avenue, Suite 202
'Fullerton, CA 92831
714.S2-S.9824Ph. ❖ 714.S2S.9811fax
www.advancedtit[e24.com
Sol
Job Number:
140812
Date:
8/15/2014
CITY OF LA QUINTA
BUILDING & SAFETY REPT.
APPROVED
FOR CONSTRuanoM
1��JV�2Dl� `IDlyC,
The Energ b �n ed to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the r di Sion for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC _ www.energysoft.com.
EnerovPro 6.2 by EneruvSoR User Number. • 2299 ID: 140812
$T
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Form MCH -01-E Mechanical Systems 3
Form MCH -02-E HVAC System Requirements 6
Form MCH -03-E Mechanical Ventilation and Reheat 8
Form MCH -05-E Requirements for Packaged Single Zone Units 10
Form PLB-01-E Water Heating System 12
HVAC System Heating and Cooling Loads Summary 15
j AT, ). 1
j !,
Y•r ��. '� �y � ��,�c . v c..� i .. �r}mss ��s'.�+� I
CJI f a.�citiJv
. b
EnergyPro 6.2 by EnergySoft Job Number ID: 140812 User Number. 2299
C
J
STATE OF CALIFORNIA
MECHANICAL SYSTEMS
CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
Mechanical Systems (Page 1 of 4)
Project Name: YOGURTLAND oaterrepared: 8/15/2014
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual
Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
YES NO Form/Worksheet #
Title ..
0 ❑ NRCC-MCH-01E (Part 1 of 3)
Certificate of Compliance, Declaration. Required on plans for all submittals.
® ❑ NRCC-MCH-01E (Part 2 of 3)
Certificate of Compliance,'Required Acceptance Tests (MCH -02A to 11A). Required on plans for all submittals.
0 ❑ NRCC-MCH-01E (Part 3 of 3)
Certificate of Compliance, Required Acceptance Tests (MCH -12A to 18A). Required on plans where applicable. '
0 ❑ NRCC-MCH-02E (Part 1 of 2)
Mechanical Dry Equipmenf Summary is required for all submittals with Central Air Systems. It is optional on plans.
10 ❑ NRCC-MCH-02E (Part 2 of 2)
Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water
systems. It is optional on plans.
0 ❑ NRCC-MCH-03E
Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is
optional on plans.
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all
acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the some type that requires a test list the equipment description and the number of systems.
Installing Contractor:
The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
Enforcement Agency:
Plancheck — The NRCC-MCH-01-E form is not considered a completed form and Is not to be accepted by the building department unless the correct boxes are checked.
Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
Test Description
MCH;02A
MCH -03A
MCH -04A
MCH -05A
MCH -06A
MCH -07A
MCH -08A
MCH -09A
MCH -10A
MCH -11A
Equipment # of
Outdoor
Single Zone
-Air
Economizer
Demand
Supply Fan
Valve Leakage
Supply Water
Hydronic
Automatic
Requiring Testing units
Ventilation
Unitary
Distribution
Controls
Control
VAV
Test
Temp. Reset
System
Demand Shed
or Verification
Ducts
Ventilation
Variable Flow
Control
(DCV)
Control
q
a
❑
❑
❑
❑
❑
❑
❑
❑
r
D
❑ -
❑
❑
❑
❑
- ❑
❑
❑
❑
❑
Cl
❑
❑
❑
❑
❑
13
❑
❑
❑
Cl
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
p
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance lune 2013
STATE OF CALIFORNIA
MECHANICAL SYSTEMS
[;EC-NRCC-MCH-01-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION ,�'
CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
Mechanical Systems (Page 2 of 4)
Project Name: YOGURTLAND Dateprepared: 8/15/2014
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all
acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.
Installing Contractor:
The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
The following tests require a
Enforcement Agency:
Plancheck — The NRCC-MCH-01-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked.
Inspector - Before occupancy permit is granted all newt Installed process systems must be tested to ensure proper operations.
Test Description
MCH -12A
MCH -13A
MCH -14A
MCH -15A
MCH -16A
MCH -17A
MCH -18A
Equipment
# of
Fault Detection &
Automatic Fault
Distributed Energy
Thermal Energy
Supply Air
Condenser Water
ECMS
Requiring Testing
units
Diagnostics for DX
Detection &
Storage DX AC
Storage (TES)
Temperature Reset
Reset Controls
or Verification
Units
Diagnostics for Air &
Systems
Systems
Controls
Zone
❑
❑
❑
❑
❑
❑
❑
❑ _
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
0
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
13
❑
❑
❑
❑
❑
❑
❑'
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑.
❑
❑
❑
❑
❑
❑
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
STATE OF CALIFORNIA
MECHANICAL SYSTEMS
CEC-NRCC-MCH-01-E Revised 06/13
CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE ; NRCC-MCH-01-E
Mechanical Systems - ( (Page 3 of 4)
Project Name: YOGURTLAND '• _ Date Prepared: 8/15/2014 ! '
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Efrain Olivas )
Documentation Author Signature:
Company: ADVANCED TITLE 24 _
signature Date: 8/15/2014
Address: 2000 E Chapman Avenue, Suite 202 -
CEA/HERS Certification ldentificati (if plicable):
City/State/Zip: i Fullerton, CA 92831
Phone: 7i 4.525.9824
RESPONSIBLE PERSON'S DECLARATION STATEMENT }
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. '
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) Issued for the building, and made available to the enforcement
agency for all applicable inspections. 1 understand that a completed signed copy of this Certificate of Compliance is required be Included wit the documentation the builder provides to the
building owner at occupancy.
Responsible Designer Name: Jeff S Coffman,
Responsible Designer Signature:
Company: JEFF S. COFFMAN -,ARCHITECT
Date signed: 8/15/ 014 t
Address` 2000 E Chapman Avenue, Suite 202 ..
License: C- 115
City/state/zip: Fullerton,'CA 92831
Phone: 714.738.7045
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
June 2013
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS
CEC-NRCC-MCH-02-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Dry System Requirements - (Page 1 of 3)
P10jWNa-: YOGURTLAND 8/15/2014
Equipment Tags and System Description
Zone RTU -1
MANDATORY MEASURES
T-24 Sections
Reference to the Requirements in the Contract DocumentS2
Heating Equipment Efficiency3
110.1 or 110.2(a)
M-1 & M-2
Cooling Equipment Efficiency3
110.1 or 110.2(a)
M-1 & M-2
HVAC or Heat Pump Thermostats
130.2(b), 110.2(c)
M-1 & M-2
Furnace Standby Loss Control
110.2(d)
M-1 & M-2
Low leakage AHUs
110.2(f)
M-1 & M-2
Ventilation
120.1(b)
M-1 & M-2
Demand Control Ventilations
120.1(c)4
M-1 & M-2
Occupant Sensor Ventilation Contro16
120.1(c)5, 120.2(e)3
M-1 & M-2
Shutoff and Reset Controls'
120.2(e)
M-1 & M-2
Outdoor Air and Exhaust Damper Control
120.2(f)
M-1 & M-2
Isolation Zones
120.2(8)
M-1 & M-2
Automatic Demand Shed Controls
120.2(h)
M-1 & M-2
Economizer FDD
120.2(i)
M-1 & M-2
Duct Insulation
120.4
M-1 & M-2
PRESCRIPTIVE MEASURES
Equipment is sized in conformance with 140.4(a & b) M-1 & M-2
140.4(a&b)
Supply Fan Pressure Control 140.4(c) M-1 & M-2
Simultaneous Heat/Cool8 140.4(d) M-1 & M-2
Economizer 140.4(e) M-1 & M-2
Heat and Cool Air Supply Reset 140.4(f) M-1 & M-2
Electric Resistance Heating9 140.4(8) M-1 & M-2
Duct Leakage Sealing and Testing.10 140.4(1) M-1 & M-2
Notes:
1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units
with common requirements can be grouped together.
2. Provide references to plans (i. e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system.
3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency
requirements are applicable (e.g. full- and part -load) include all. Where appliance standards apply (110.1), identify where
equipment is required to be listed per Title 201601 et seq.
4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central
unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the
plans and specifications. Multiple zone central air systems must also provide a MCH -03-E form.
S. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the
sequence of operation.
6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and
the sequence of operation
7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).
For all systems identify the specification for the thermostats and time clocks (if applicable).
S. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the
specification of the zone controls. Provide a MCH -03-E form. -
9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies.
10. If duct leakage sealing and testing is required, a MCH -04-A form must be submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS
mm
CEC-NRCC-MCH-02-E Revised 06/13 CALIFORNIA ENERGY COMMISSION -'='
CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Wet System Requirements (Page 3 of 3)
Project Name: YOGURTLAND Date Prepared: 8/15/2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Efrain 011vas
Documentation Author ' natur .
Company: ADVANCED TITLE 24
signature Date: 8/15/ 14
Address: 2000 E Chapman Avenue, Suite 202
CEA/ HERS Certificati Vification (if applicable):
City/State/Zip: Fullerton, CA 92831
phone 714.525.9824
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand ^t a completed si ed copy of this
Certificate of Compliance is required to be included with the documentation the builder provides t4theVWkg ow rat occupancy.
Responsible Designer Name: Jeff S Coffman
Responsible Designer Signature:
Company: JEFF S. COFFMAN - ARCHITECT
Date Signed: 8/15/ 014
Address: 2000 E Chapman Avenue, Suite 202
License: c'-28115
City/State/Zip: Fullerton, CA 92831
phone: 714.738.7045
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
STATE OF CALIFORNIA
MECHANICAL VENTILATION AND REHEAT
CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E
Mechanical Ventilation & Reheat (Page 1 of 2)
Project Name: YOGURTLAND Date Prepared:
8/15/2014
ACTUAL DESIGN INFO (FROM EQUIPMENT
SCHEDULES, ETC)
AREA BASIS
OCCUPANCY BASIS
MINIMUM
VAV Reheated Primary Air
CFM
VAV Deadband
Primary Air CFM
A
B
C
D
E
F
G
H
I
1
K
L
M
N
0
P
Q
R
S
T
< o
D Z
<�*
w
x
D mmi
c�3
o um_
ZM
ii�z
3 n 9
T
oz
n
7o O
�rr��
cO>Qz
C D A
T Z
�Oz
S c
Ci
Z�
R�z
3 'OL
` T
oz
n
Z
RI
c
�-i
�z
" C p
G
p
Z
[ano
y
Z
o
3
Z
T
T
A
3
Z
n
t
W
t
a
z
C
3
y
m
o
y
m
m
o
z
2
r
r?i
C
D�+z+
�p
0,0
�'
3
.... O Q
aF�
...
p
m
`"
Z D
O
9TP1�
V O .r� O
=b 0
Nt Gzi
n 3
T
3
3
3
O .�
�_
0
O
C
N
2 C
O
zT ?
+ O Ci
n Z
`� D
2 d
�Oa
DA
T O� O•
Z
V Oo
'Z 70
fl
O
C
vm
custol
454
0.50
227
30.3
7.5
227
227
Y
Servic
102
0.15
15
0.5
30.0
15
15
Y
Back F
492
0.15
74
2.5
30.0
74
74
Y
Hallwe
31
0.15
5
0.3
15.0
5
5
Y
Restr
64
0.15
10
0.6
15.0
10
10
Y
Total
330
Yellow shaded cells require user input. Remaining cells are protected and automatic
B. The largest amount of primary air supplied by the terminal unit when it's operating in the cooling mode. t
C. The smallest amount of primary air supplied by the terminal unit in the deadband mode.
D. The largest amount of primary air supplied by the terminal unit when it's operating in the heating mode.
E. A terminal unit can be controlled with DDC controls, or non -DDC controls. Each control category has different reheat limitations in code.
F. Transfer Air must be provided where Required Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C).
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
STATE OF CALIFORNIA
MECHANICAL VENTILATION AND REHEAT
DO
CEC-NRCC-MCH-03-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E
Mechanical Ventilation & Reheat (Page 2 of 2)
Project Name: YOGURTLAND Date Prepared: 8/15/2014
H. Minimum ventilation rate per Section §120.1. Table 120.1-A.
J. Based on number of fixed seats where applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating.
M. Required Ventilation Airflow (Req'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L)
N. This column Identifies whether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F.
0. Design Primary Cooling Airflow • 0.50 for DDC, Design Primary Cooling Airflow " 0.30 for Non -DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable.
P. Maximum of Column M and Column 0. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable.
Q. This column identifies whether or not the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D.
R. Design Primary Cooling Airflow . 0.20 for DDC. Not applicable for Non -DDC zones or zones where Design Primary Cooling Airflow is is 300 cfm or less.
S. Maximum of Column M and Column R. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less.
T. This column identifies whether or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C.
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Efrain OlivaS
Documentation Author Signature:
Company: ADVANCED TITLE 24
signature Date: 8/15/2014
Address: 2000 E Chapman Avenue, Suite 202
CEA/ HERS Certlfication Identification (if ppl le):
city/state/zip: Fullerton, CA 92831
Phone: 714.525.9824
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: _ e.
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required tocluded with th documentation the builder provides to the
building owner at occupancy.
Responsible Designer Name: Jeff S Coffman
Responsible Designer Signature:
Company: JEFF S. COFFMAN - ARCHITECT
Date Signed: 8/15/ 014
Address: 2000 E Chapman Avenue, Suite 202 -
License: C- 115
City/State/Zip: Fullerton, CA 92831
Phone` 714.738.7045
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
STATE OF CALIFORNIA
REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS
- - (Revised 06/13) CALIFORNIA ENERGY COMMISSION .,
CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E
Requirements for Packaged Single -Zone Units (Page 1 of 2)
Project Name: YOGURTLAND Date Prepared: 8/15/2014
Equipment Tags) Zone RTU -1
MANDATORY MEASURES T-24 Sections Requirement As Schedulete Requiremen As Scheduled3 Requirement As Schedulece
Heating Equipment Efficiency° 110.1 or 110.2(a) 3.30 COP 3.50 COP
Cooling Equipment Efficiency° 110.1 or 110.2(a) 11.0 EER 12.1 EER
Thermostatss ' 110.2(b), 110.2(c) Setback Setback
Furnace Standby Loss Control6 110.2(d) n/a
Ventilation? 120.1(b) 330 431
Demand Control VentilationB 120.1(c)4 Reg Yes
Occupant Sensor Ventilation Control8 120.1(c)5, 120.2(e)3
Shutoff and Reset Control? 120.2(e) Reg Pro rammable
Outdoor Air and Exhaust Damper Control 120.2(f) Reg Auto
Automatic Demand Shed Controls 120.2(h) NR none
Economizer FDD 120.2(i) Reg Yes
Duct Insulation 120.4 R-8 R-4.2
PRESCRIPTIVE MEASURES
Equipment is sized In conformance with 140.4(a & b) 46,045 Btu/hr 52,464 Btu/hr
140.4 (a & b) 69,496 Btu/hr 59,267 Btu/hr
Economizer 140.4(e) Reg Fixed Enth Int
Electric Resistance Heating10 140.4(8) No No
Duct Leakage Sealing and Testing.11 140.4(1) NR No -
Notes:
1. Provide equipment tags (e.g. ACI or ACI to 10). Multiple units of the same make -and model with the some application and accessories can be grouped together.
2. Enter the following information as appropriate: Unit Manufacturer- Unit Model Number (including all accessories); Description of the unit (e.g. gas -pack or heat pump; rated heating capacity
- (enter "N/A" if no heating), and, rated cooling capacity (enter "N/A"if no cooling). For unit capacities include the units (e.g. kBtuh or tons).
3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement'). In the right column (under "As Scheduled") enter the value for
the units as specified.
4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER).
S. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), : In the right column indicate the
capabilities of the thermostat as scheduled.
6. If the unit has a furnace which is rated at >=225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID). If there is no furnace or the unit is rated for <225,000 Btuh
indicate "N/A".
Z In the left column, enter both the required ventilation value from Table 120. 1A and for the number of occupants times 15 cfm/person. In the right column enter the actual minimum
ventilation as scheduled. If the space is naturally ventilated enter "N/A"in the left column and "the space is naturally ventilated" in the right column.
B. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). If either DCV or Occupant
Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "NIA "in the right column)
9. In the left column indicate the required time controls from the standard. In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock).
10. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies.
11. If duct leakage sealing and testing is required, a MCH -04-A form must be submitted.
Uh tauuautg r_neagY rtnciencY xdnaaros - zui.s tvonresioennai t-ompuance June 2013
STATE OF CALIFORNIA
REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS
CEC-NRCC-MCH-05-E Revised 06113 CALIFORNIA ENERGY COMMISSION'
CERTIFICATE OF COMPLIANCE I NRCC-MCH-05-E
Requirements for Packaged Single -Zone Units (Page 2 of 2)
Protect Name: YOGURTLAND Date Prepared: 8/15/2014
i
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete. lel_Zz 1-1
Documentation Author Name: Efrain OIIvaS
Documentation Author Signature:
Company: ADVANCED TITLE 24
signature Date: 8/15/2014
Address: 2000 E Chapman Avenue, Suite 202
CEA/ HERS Certification Identification (If plic le):
City/state/Zip: Fullerton, CA 92831
phone: 714.525.9824
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. ^
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer). , '-
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. ;
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is quired to be incl ed with the documentation the builder provides to the
building owner at occupancy.
Responsible Designer Name: Jeff S Coffman
Responsible Designer Signature: VVV
Company: JEFF S. COFFMAN - ARCHITECT _
Date Signed: 8/15/ 014
Address: 2000 E Chapman Avenue, Suite 202
ucense: C- 115
City/State/Zip: Fullerton, CA 92831
phone` 714.738.7045
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
STATE OF CALIFORNIA
WATER HEATING SYSTEM GENERAL INFORMATION
CEC-NRCC-PLB-01-E (Revised 06/131
CERTIFICATE OF COMPLIANCE
Water Heating System
� General Information
Project Name: YOGUR I TL AND
Date Prepared: 811512014
NRCC-PLB-01-E
(Pagel of 3)
A. GENERAL INFORMATION/SYSTEM INFORMATION
1. Water Heater System Name:
Navien NPE-240A
2. Water Heater System Configuration:
Non -Central
3. Water Heater System Type:
Gas Fired
4. Building Type:
:
5. Total Number of Water Heaters in Systems:
1
6. Central DHW Distribution Type:
n/a
7. Dwelling Unit DHW Distribution Type:
All Pipes Ins
The responsible person's signature on this Certificate of Installation indicates the system identified on this Certificate has
complied with all applicable requirements specified in this Table.
B. WATER HEATER INFORMATION
Each water heater type requires a separate form.
1.
Water Heater Type:
Small Instantaneous Gas
2.
Fuel Type
Gas Fired
3.
Number of Identical Water Heaters:
1
4.
Efficiency:
0.95
S.
I Required Minimum Efficiency:
0.95
6.
Standby Total or Standby:
0.000
7.
Rated Input
199,000
8.
Pilot Energy:
9.
Water Heater Tank Storage Volume:
1
10.
Exterior Insulation On Water Heater:
0
11.
Volume of Supplemental Storage:
12.
Internal Insulation on Supplemental Storage:
13.
Exterior Insulation on Supplemental Storage:
The responsible person's signature on this Certificate of Installation indicates the system identified on this Certificate has
complied with all applicable requirements specified in this Table.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
June 2013
r
L.
I
STATE OF CALIFORNIA
WATER HEATING SYSTEM GENERAL INFORMATION
=�
'CERTIFICATE OF COMPLIANCE
Water Heating System General Information
Project Name: VOGURT1 AND
CALIFORNIA ENERGY COMMISSIOI`
Date Prepared: 8/15/2014
N RCC-PLB-01-E
(Page 2 of 3)
PLUMBING COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer, to the 2013 Nonresidential Manual
Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
YES
NO
Form/Worksheet #
I , Title
" [2
❑
NRCC-PLB-01-E
Certificate of Compliance, Declaration. Required on plans for all submittals.
❑
❑
NRCI-PLB-01-E
Certificate of Installation. Required on plans for all submittals. - t
Certificate of Compliance, required on single dwelling unit systems in high-rise
❑
❑
NRCI-PLB,-02A-E
residential, hotel/motel application.
Certificate of Compliance, required on single dwelling unit systems in nonresidential
❑
❑
NRCI-PLB-02B-E
application.
P
'
Certificate of Compliance, required on central systems in high-rise residential,
❑
❑
NRCI-PLB-03A-E
t
hotel/motel application.
❑
_0,
NRCI-PLB-03B-E
Certificate of Compliance, required on central systems in nonresidential application.
t
Certificate of Compliance, required on HERS verified central systems in high-rise
0
❑
NRCI-PLB-21-H
residential, hotel/motel application. ,
❑
❑
NRCI-STH-01-E
Certificate of Compliance, required on any solar water heating
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance `June 2013
STATE OF CALIFORNIA
WATER HEATING SYSTEM GENERAL INFORMATION.
CERTIFICATE OF COMPLIANCE NRCC-PLB-01-E `
Water Heating System General Information (Page 3 of 3)
Project Name: YOGURTLAND [late Prepared: 8/15/2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and comp)
Documentation Author Name: Efrain Olivas
r 5 nDocumentation oature:
Company: ADVANCED TITLE 24
Signature Date: 8 /2014
y
Address: 2000 E Chapman Avenue, Suite 20
CEA/HERS " cat nldentiflcation('rfapplicable):
City/State/Zip:Fullerton, CA 92831
Ph°"eC 714.525.9824
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer). `
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the
California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the
information provided on other applicable compliance documents, worksheets,'calculations, plans and specifications submitted to
the enforcement agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections.'l understand that a completed
signed copy of this Certificate of Compliance is required to be included with the documentati the builder prov' es to the building
owner at occupancy.
Responsible Designer Name: Jeff S Coffman
Responsible Designer Signature:
,.
Company: JEFF S. COFFMAN - ARCHITECT
Date signed: 8/15/ 014
Address: 2000 E Chapman Avenue, Suite 20
`1enw , C -2f115
City/State/Zip: Fullerton, CA 92831
phone` 714.738.7045
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
YOGURTLAND
Date
8/15/2014
System Name
Zone RTU-1
Floor Area
1,143
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 2,857
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 431
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 84,000
36,616
9,9721 260
11,007
Total Output Btuh 84,000
0
Output Stuh/s ft 73.5
1,831
550
Cooling System
0
0
Output per System 90,000
17,157
2,452 431
20,091
Total Output Btuh 90,000
0
1,831
1 57,434
12,423
0
Total Output ons 7.5
550
Total Output Btuh/s ) 78.7
Total Output s on 152.4
32,199
Air System
CFM per System
3,000
HVAC EQUIPMENT SELECTION
Airflow(cfm)
3,000
(E) Carrier 50HCQD08
59,267
24,495
52,464
Airflow (cfm/s
2.62
Airflow cfm/Ton
400.0
Outside Air %
14.4%
Total Adjusted System Output
(Adjusted for Peak Design conditions)
I TIME OF SYSTEM PEAK
59,267
r
24,495
Jul 3 PM
52,464
F Jan 1 AM
Outside Air (cfm/ft) 0,38
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
26 OF 64 OF
Outside Air
431 cfm Supply Fan
3,000 cfm
70 OF
64 OF 110 OF
Heating Coil
p� 110 OF
ROOM IN
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
112/78°F 80/68°F 80/68°F 61/60°F
10 0''
11-01 — r=
Outside Air
431 cfm AL Supply Fan Cooling Coil
3,000 cfm
75 / 66 OF
62 / 61 OF
64.9% � ROOM
74 / 66 OF
EnergyPro 6.2 by Energ Soft User Number. 2299 RunCode: 2014-08-15713:49:10
ID: 140812
Pae 15 of 15