Loading...
BCOM2014-1014 Revision 1 Title 24A ` BUILDING, ENERGY ANALYSIS REPORT AUG 2 8 2014 Y OF LA QUINTA INITY DEVELOPMENT PROJECT: YOGURTLAND 79174 Highway 111, Suite 103 } N, r tLa Quinta,:CA 93010 Project Designer:, JEFF S. COFFMAN - ARCHITECT' 2000 E Chapman Avenue, Suite 202 Fullerton, CA 92831 714.738.7045 Report Prepared by: Z�* AD00CED TITLE 24 PROFESSIONAL- TITLE 24 CALCULATIONS 2000 E Chapman Avenue, Suite 202 'Fullerton, CA 92831 714.S2-S.9824Ph. ❖ 714.S2S.9811fax www.advancedtit[e24.com Sol Job Number: 140812 Date: 8/15/2014 CITY OF LA QUINTA BUILDING & SAFETY REPT. APPROVED FOR CONSTRuanoM 1��JV�2Dl� `IDlyC, The Energ b �n ed to perform the calculations summarized in this compliance report. This program has approval and is authorized by the r di Sion for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC _ www.energysoft.com. EnerovPro 6.2 by EneruvSoR User Number. • 2299 ID: 140812 $T TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MCH -01-E Mechanical Systems 3 Form MCH -02-E HVAC System Requirements 6 Form MCH -03-E Mechanical Ventilation and Reheat 8 Form MCH -05-E Requirements for Packaged Single Zone Units 10 Form PLB-01-E Water Heating System 12 HVAC System Heating and Cooling Loads Summary 15 j AT, ). 1 j !, Y•r ��. '� �y � ��,�c . v c..� i .. �r}mss ��s'.�+� I CJI f a.�citiJv . b EnergyPro 6.2 by EnergySoft Job Number ID: 140812 User Number. 2299 C J STATE OF CALIFORNIA MECHANICAL SYSTEMS CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 1 of 4) Project Name: YOGURTLAND oaterrepared: 8/15/2014 MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. YES NO Form/Worksheet # Title .. 0 ❑ NRCC-MCH-01E (Part 1 of 3) Certificate of Compliance, Declaration. Required on plans for all submittals. ® ❑ NRCC-MCH-01E (Part 2 of 3) Certificate of Compliance,'Required Acceptance Tests (MCH -02A to 11A). Required on plans for all submittals. 0 ❑ NRCC-MCH-01E (Part 3 of 3) Certificate of Compliance, Required Acceptance Tests (MCH -12A to 18A). Required on plans where applicable. ' 0 ❑ NRCC-MCH-02E (Part 1 of 2) Mechanical Dry Equipmenf Summary is required for all submittals with Central Air Systems. It is optional on plans. 10 ❑ NRCC-MCH-02E (Part 2 of 2) Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water systems. It is optional on plans. 0 ❑ NRCC-MCH-03E Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is optional on plans. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms) Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the some type that requires a test list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. Enforcement Agency: Plancheck — The NRCC-MCH-01-E form is not considered a completed form and Is not to be accepted by the building department unless the correct boxes are checked. Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. Test Description MCH;02A MCH -03A MCH -04A MCH -05A MCH -06A MCH -07A MCH -08A MCH -09A MCH -10A MCH -11A Equipment # of Outdoor Single Zone -Air Economizer Demand Supply Fan Valve Leakage Supply Water Hydronic Automatic Requiring Testing units Ventilation Unitary Distribution Controls Control VAV Test Temp. Reset System Demand Shed or Verification Ducts Ventilation Variable Flow Control (DCV) Control q a ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ r D ❑ - ❑ ❑ ❑ ❑ - ❑ ❑ ❑ ❑ ❑ Cl ❑ ❑ ❑ ❑ ❑ 13 ❑ ❑ ❑ Cl ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ p CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance lune 2013 STATE OF CALIFORNIA MECHANICAL SYSTEMS [;EC-NRCC-MCH-01-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION ,�' CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 2 of 4) Project Name: YOGURTLAND Dateprepared: 8/15/2014 MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms) Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. The following tests require a Enforcement Agency: Plancheck — The NRCC-MCH-01-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. Inspector - Before occupancy permit is granted all newt Installed process systems must be tested to ensure proper operations. Test Description MCH -12A MCH -13A MCH -14A MCH -15A MCH -16A MCH -17A MCH -18A Equipment # of Fault Detection & Automatic Fault Distributed Energy Thermal Energy Supply Air Condenser Water ECMS Requiring Testing units Diagnostics for DX Detection & Storage DX AC Storage (TES) Temperature Reset Reset Controls or Verification Units Diagnostics for Air & Systems Systems Controls Zone ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 13 ❑ ❑ ❑ ❑ ❑ ❑ ❑' 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑ ❑ CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E Revised 06/13 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE ; NRCC-MCH-01-E Mechanical Systems - ( (Page 3 of 4) Project Name: YOGURTLAND '• _ Date Prepared: 8/15/2014 ! ' DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Efrain Olivas ) Documentation Author Signature: Company: ADVANCED TITLE 24 _ signature Date: 8/15/2014 Address: 2000 E Chapman Avenue, Suite 202 - CEA/HERS Certification ldentificati (if plicable): City/State/Zip: i Fullerton, CA 92831 Phone: 7i 4.525.9824 RESPONSIBLE PERSON'S DECLARATION STATEMENT } I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. ' 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) Issued for the building, and made available to the enforcement agency for all applicable inspections. 1 understand that a completed signed copy of this Certificate of Compliance is required be Included wit the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Jeff S Coffman, Responsible Designer Signature: Company: JEFF S. COFFMAN -,ARCHITECT Date signed: 8/15/ 014 t Address` 2000 E Chapman Avenue, Suite 202 .. License: C- 115 City/state/zip: Fullerton,'CA 92831 Phone: 714.738.7045 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Dry System Requirements - (Page 1 of 3) P10jWNa-: YOGURTLAND 8/15/2014 Equipment Tags and System Description Zone RTU -1 MANDATORY MEASURES T-24 Sections Reference to the Requirements in the Contract DocumentS2 Heating Equipment Efficiency3 110.1 or 110.2(a) M-1 & M-2 Cooling Equipment Efficiency3 110.1 or 110.2(a) M-1 & M-2 HVAC or Heat Pump Thermostats 130.2(b), 110.2(c) M-1 & M-2 Furnace Standby Loss Control 110.2(d) M-1 & M-2 Low leakage AHUs 110.2(f) M-1 & M-2 Ventilation 120.1(b) M-1 & M-2 Demand Control Ventilations 120.1(c)4 M-1 & M-2 Occupant Sensor Ventilation Contro16 120.1(c)5, 120.2(e)3 M-1 & M-2 Shutoff and Reset Controls' 120.2(e) M-1 & M-2 Outdoor Air and Exhaust Damper Control 120.2(f) M-1 & M-2 Isolation Zones 120.2(8) M-1 & M-2 Automatic Demand Shed Controls 120.2(h) M-1 & M-2 Economizer FDD 120.2(i) M-1 & M-2 Duct Insulation 120.4 M-1 & M-2 PRESCRIPTIVE MEASURES Equipment is sized in conformance with 140.4(a & b) M-1 & M-2 140.4(a&b) Supply Fan Pressure Control 140.4(c) M-1 & M-2 Simultaneous Heat/Cool8 140.4(d) M-1 & M-2 Economizer 140.4(e) M-1 & M-2 Heat and Cool Air Supply Reset 140.4(f) M-1 & M-2 Electric Resistance Heating9 140.4(8) M-1 & M-2 Duct Leakage Sealing and Testing.10 140.4(1) M-1 & M-2 Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units with common requirements can be grouped together. 2. Provide references to plans (i. e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full- and part -load) include all. Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 201601 et seq. 4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH -03-E form. S. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation. 6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation 7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required). For all systems identify the specification for the thermostats and time clocks (if applicable). S. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the specification of the zone controls. Provide a MCH -03-E form. - 9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH -04-A form must be submitted. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA HVAC SYSTEM REQUIREMENTS mm CEC-NRCC-MCH-02-E Revised 06/13 CALIFORNIA ENERGY COMMISSION -'=' CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Wet System Requirements (Page 3 of 3) Project Name: YOGURTLAND Date Prepared: 8/15/2014 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Efrain 011vas Documentation Author ' natur . Company: ADVANCED TITLE 24 signature Date: 8/15/ 14 Address: 2000 E Chapman Avenue, Suite 202 CEA/ HERS Certificati Vification (if applicable): City/State/Zip: Fullerton, CA 92831 phone 714.525.9824 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand ^t a completed si ed copy of this Certificate of Compliance is required to be included with the documentation the builder provides t4theVWkg ow rat occupancy. Responsible Designer Name: Jeff S Coffman Responsible Designer Signature: Company: JEFF S. COFFMAN - ARCHITECT Date Signed: 8/15/ 014 Address: 2000 E Chapman Avenue, Suite 202 License: c'-28115 City/State/Zip: Fullerton, CA 92831 phone: 714.738.7045 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA MECHANICAL VENTILATION AND REHEAT CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E Mechanical Ventilation & Reheat (Page 1 of 2) Project Name: YOGURTLAND Date Prepared: 8/15/2014 ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC) AREA BASIS OCCUPANCY BASIS MINIMUM VAV Reheated Primary Air CFM VAV Deadband Primary Air CFM A B C D E F G H I 1 K L M N 0 P Q R S T < o D Z <�* w x D mmi c�3 o um_ ZM ii�z 3 n 9 T oz n 7o O �rr�� cO>Qz C D A T Z �Oz S c Ci Z� R�z 3 'OL ` T oz n Z RI c �-i �z " C p G p Z [ano y Z o 3 Z T T A 3 Z n t W t a z C 3 y m o y m m o z 2 r r?i C D�+z+ �p 0,0 �' 3 .... O Q aF� ... p m `" Z D O 9TP1� V O .r� O =b 0 Nt Gzi n 3 T 3 3 3 O .� �_ 0 O C N 2 C O zT ? + O Ci n Z `� D 2 d �Oa DA T O� O• Z V Oo 'Z 70 fl O C vm custol 454 0.50 227 30.3 7.5 227 227 Y Servic 102 0.15 15 0.5 30.0 15 15 Y Back F 492 0.15 74 2.5 30.0 74 74 Y Hallwe 31 0.15 5 0.3 15.0 5 5 Y Restr 64 0.15 10 0.6 15.0 10 10 Y Total 330 Yellow shaded cells require user input. Remaining cells are protected and automatic B. The largest amount of primary air supplied by the terminal unit when it's operating in the cooling mode. t C. The smallest amount of primary air supplied by the terminal unit in the deadband mode. D. The largest amount of primary air supplied by the terminal unit when it's operating in the heating mode. E. A terminal unit can be controlled with DDC controls, or non -DDC controls. Each control category has different reheat limitations in code. F. Transfer Air must be provided where Required Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C). CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA MECHANICAL VENTILATION AND REHEAT DO CEC-NRCC-MCH-03-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E Mechanical Ventilation & Reheat (Page 2 of 2) Project Name: YOGURTLAND Date Prepared: 8/15/2014 H. Minimum ventilation rate per Section §120.1. Table 120.1-A. J. Based on number of fixed seats where applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. M. Required Ventilation Airflow (Req'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L) N. This column Identifies whether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. 0. Design Primary Cooling Airflow • 0.50 for DDC, Design Primary Cooling Airflow " 0.30 for Non -DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. P. Maximum of Column M and Column 0. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable. Q. This column identifies whether or not the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D. R. Design Primary Cooling Airflow . 0.20 for DDC. Not applicable for Non -DDC zones or zones where Design Primary Cooling Airflow is is 300 cfm or less. S. Maximum of Column M and Column R. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less. T. This column identifies whether or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C. DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Efrain OlivaS Documentation Author Signature: Company: ADVANCED TITLE 24 signature Date: 8/15/2014 Address: 2000 E Chapman Avenue, Suite 202 CEA/ HERS Certlfication Identification (if ppl le): city/state/zip: Fullerton, CA 92831 Phone: 714.525.9824 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: _ e. 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required tocluded with th documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Jeff S Coffman Responsible Designer Signature: Company: JEFF S. COFFMAN - ARCHITECT Date Signed: 8/15/ 014 Address: 2000 E Chapman Avenue, Suite 202 - License: C- 115 City/State/Zip: Fullerton, CA 92831 Phone` 714.738.7045 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS - - (Revised 06/13) CALIFORNIA ENERGY COMMISSION ., CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E Requirements for Packaged Single -Zone Units (Page 1 of 2) Project Name: YOGURTLAND Date Prepared: 8/15/2014 Equipment Tags) Zone RTU -1 MANDATORY MEASURES T-24 Sections Requirement As Schedulete Requiremen As Scheduled3 Requirement As Schedulece Heating Equipment Efficiency° 110.1 or 110.2(a) 3.30 COP 3.50 COP Cooling Equipment Efficiency° 110.1 or 110.2(a) 11.0 EER 12.1 EER Thermostatss ' 110.2(b), 110.2(c) Setback Setback Furnace Standby Loss Control6 110.2(d) n/a Ventilation? 120.1(b) 330 431 Demand Control VentilationB 120.1(c)4 Reg Yes Occupant Sensor Ventilation Control8 120.1(c)5, 120.2(e)3 Shutoff and Reset Control? 120.2(e) Reg Pro rammable Outdoor Air and Exhaust Damper Control 120.2(f) Reg Auto Automatic Demand Shed Controls 120.2(h) NR none Economizer FDD 120.2(i) Reg Yes Duct Insulation 120.4 R-8 R-4.2 PRESCRIPTIVE MEASURES Equipment is sized In conformance with 140.4(a & b) 46,045 Btu/hr 52,464 Btu/hr 140.4 (a & b) 69,496 Btu/hr 59,267 Btu/hr Economizer 140.4(e) Reg Fixed Enth Int Electric Resistance Heating10 140.4(8) No No Duct Leakage Sealing and Testing.11 140.4(1) NR No - Notes: 1. Provide equipment tags (e.g. ACI or ACI to 10). Multiple units of the same make -and model with the some application and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer- Unit Model Number (including all accessories); Description of the unit (e.g. gas -pack or heat pump; rated heating capacity - (enter "N/A" if no heating), and, rated cooling capacity (enter "N/A"if no cooling). For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement'). In the right column (under "As Scheduled") enter the value for the units as specified. 4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). S. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), : In the right column indicate the capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at >=225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID). If there is no furnace or the unit is rated for <225,000 Btuh indicate "N/A". Z In the left column, enter both the required ventilation value from Table 120. 1A and for the number of occupants times 15 cfm/person. In the right column enter the actual minimum ventilation as scheduled. If the space is naturally ventilated enter "N/A"in the left column and "the space is naturally ventilated" in the right column. B. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). If either DCV or Occupant Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "NIA "in the right column) 9. In the left column indicate the required time controls from the standard. In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 11. If duct leakage sealing and testing is required, a MCH -04-A form must be submitted. Uh tauuautg r_neagY rtnciencY xdnaaros - zui.s tvonresioennai t-ompuance June 2013 STATE OF CALIFORNIA REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E Revised 06113 CALIFORNIA ENERGY COMMISSION' CERTIFICATE OF COMPLIANCE I NRCC-MCH-05-E Requirements for Packaged Single -Zone Units (Page 2 of 2) Protect Name: YOGURTLAND Date Prepared: 8/15/2014 i DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. lel_Zz 1-1 Documentation Author Name: Efrain OIIvaS Documentation Author Signature: Company: ADVANCED TITLE 24 signature Date: 8/15/2014 Address: 2000 E Chapman Avenue, Suite 202 CEA/ HERS Certification Identification (If plic le): City/state/Zip: Fullerton, CA 92831 phone: 714.525.9824 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. ^ 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). , '- 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. ; 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is quired to be incl ed with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Jeff S Coffman Responsible Designer Signature: VVV Company: JEFF S. COFFMAN - ARCHITECT _ Date Signed: 8/15/ 014 Address: 2000 E Chapman Avenue, Suite 202 ucense: C- 115 City/State/Zip: Fullerton, CA 92831 phone` 714.738.7045 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 STATE OF CALIFORNIA WATER HEATING SYSTEM GENERAL INFORMATION CEC-NRCC-PLB-01-E (Revised 06/131 CERTIFICATE OF COMPLIANCE Water Heating System � General Information Project Name: YOGUR I TL AND Date Prepared: 811512014 NRCC-PLB-01-E (Pagel of 3) A. GENERAL INFORMATION/SYSTEM INFORMATION 1. Water Heater System Name: Navien NPE-240A 2. Water Heater System Configuration: Non -Central 3. Water Heater System Type: Gas Fired 4. Building Type: : 5. Total Number of Water Heaters in Systems: 1 6. Central DHW Distribution Type: n/a 7. Dwelling Unit DHW Distribution Type: All Pipes Ins The responsible person's signature on this Certificate of Installation indicates the system identified on this Certificate has complied with all applicable requirements specified in this Table. B. WATER HEATER INFORMATION Each water heater type requires a separate form. 1. Water Heater Type: Small Instantaneous Gas 2. Fuel Type Gas Fired 3. Number of Identical Water Heaters: 1 4. Efficiency: 0.95 S. I Required Minimum Efficiency: 0.95 6. Standby Total or Standby: 0.000 7. Rated Input 199,000 8. Pilot Energy: 9. Water Heater Tank Storage Volume: 1 10. Exterior Insulation On Water Heater: 0 11. Volume of Supplemental Storage: 12. Internal Insulation on Supplemental Storage: 13. Exterior Insulation on Supplemental Storage: The responsible person's signature on this Certificate of Installation indicates the system identified on this Certificate has complied with all applicable requirements specified in this Table. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 r L. I STATE OF CALIFORNIA WATER HEATING SYSTEM GENERAL INFORMATION =� 'CERTIFICATE OF COMPLIANCE Water Heating System General Information Project Name: VOGURT1 AND CALIFORNIA ENERGY COMMISSIOI` Date Prepared: 8/15/2014 N RCC-PLB-01-E (Page 2 of 3) PLUMBING COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer, to the 2013 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. YES NO Form/Worksheet # I , Title " [2 ❑ NRCC-PLB-01-E Certificate of Compliance, Declaration. Required on plans for all submittals. ❑ ❑ NRCI-PLB-01-E Certificate of Installation. Required on plans for all submittals. - t Certificate of Compliance, required on single dwelling unit systems in high-rise ❑ ❑ NRCI-PLB,-02A-E residential, hotel/motel application. Certificate of Compliance, required on single dwelling unit systems in nonresidential ❑ ❑ NRCI-PLB-02B-E application. P ' Certificate of Compliance, required on central systems in high-rise residential, ❑ ❑ NRCI-PLB-03A-E t hotel/motel application. ❑ _0, NRCI-PLB-03B-E Certificate of Compliance, required on central systems in nonresidential application. t Certificate of Compliance, required on HERS verified central systems in high-rise 0 ❑ NRCI-PLB-21-H residential, hotel/motel application. , ❑ ❑ NRCI-STH-01-E Certificate of Compliance, required on any solar water heating CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance `June 2013 STATE OF CALIFORNIA WATER HEATING SYSTEM GENERAL INFORMATION. CERTIFICATE OF COMPLIANCE NRCC-PLB-01-E ` Water Heating System General Information (Page 3 of 3) Project Name: YOGURTLAND [late Prepared: 8/15/2014 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and comp) Documentation Author Name: Efrain Olivas r 5 nDocumentation oature: Company: ADVANCED TITLE 24 Signature Date: 8 /2014 y Address: 2000 E Chapman Avenue, Suite 20 CEA/HERS " cat nldentiflcation('rfapplicable): City/State/Zip:Fullerton, CA 92831 Ph°"eC 714.525.9824 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). ` 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,'calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.'l understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentati the builder prov' es to the building owner at occupancy. Responsible Designer Name: Jeff S Coffman Responsible Designer Signature: ,. Company: JEFF S. COFFMAN - ARCHITECT Date signed: 8/15/ 014 Address: 2000 E Chapman Avenue, Suite 20 `1enw , C -2f115 City/State/Zip: Fullerton, CA 92831 phone` 714.738.7045 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name YOGURTLAND Date 8/15/2014 System Name Zone RTU-1 Floor Area 1,143 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 2,857 Return Vented Lighting Return Air Ducts Return Fan Ventilation 431 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 84,000 36,616 9,9721 260 11,007 Total Output Btuh 84,000 0 Output Stuh/s ft 73.5 1,831 550 Cooling System 0 0 Output per System 90,000 17,157 2,452 431 20,091 Total Output Btuh 90,000 0 1,831 1 57,434 12,423 0 Total Output ons 7.5 550 Total Output Btuh/s ) 78.7 Total Output s on 152.4 32,199 Air System CFM per System 3,000 HVAC EQUIPMENT SELECTION Airflow(cfm) 3,000 (E) Carrier 50HCQD08 59,267 24,495 52,464 Airflow (cfm/s 2.62 Airflow cfm/Ton 400.0 Outside Air % 14.4% Total Adjusted System Output (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK 59,267 r 24,495 Jul 3 PM 52,464 F Jan 1 AM Outside Air (cfm/ft) 0,38 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 64 OF Outside Air 431 cfm Supply Fan 3,000 cfm 70 OF 64 OF 110 OF Heating Coil p� 110 OF ROOM IN 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 112/78°F 80/68°F 80/68°F 61/60°F 10 0'' 11-01 — r= Outside Air 431 cfm AL Supply Fan Cooling Coil 3,000 cfm 75 / 66 OF 62 / 61 OF 64.9% � ROOM 74 / 66 OF EnergyPro 6.2 by Energ Soft User Number. 2299 RunCode: 2014-08-15713:49:10 ID: 140812 Pae 15 of 15